Loading...
HomeMy WebLinkAbout04/07/2021 5BAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: Local Agency Preliminary Engineering COUNCIL MEETING Date: Participating Agreement with Washington Department: State Department of Transportation Presenter: (WSDOT) for Warren Avenue Pedestrian Phone: Improvements Project March 24, 2021 April 7, 2021 PW&U- Engineering Shane Weber (360) 473-2354 SUMMARY: On September 18, 2020 the City accepted State grant funding in the amount of $1,500,000 for the design of the SR 303 Warren Avenue Bridge Pedestrian Improvements Project. Staff have coordinated with WSDOT to complete the structural design of the bridge which will be incorporated into the full design package which is being completed under a separate consultant civil design contract. The WSDOT design work includes preliminary engineering and permitting for pedestrian and bike improvements on the bridge and multimodal improvements to the north and south of the bridge. The contract is with WSDOT HQ Bridge Design Office and is for the structural design of the bridge modifications. The City entered into direct negotiations with WSDOT for this work because they have a working knowledge of the bridge and are the best qualified to perform the work. There are also efficiencies and cost savings if the State to performs the work. The estimated design fee is $252,000. The contract allows for a 25% increase for extra work, increasing the contract amount by $63,000 for a total amount of $315,000. ATTACHMENTS: 1) Local Agency Preliminary Engineering Participating Agreement with WSDOT, including Exhibits A, B and C FISCAL IMPACTS (Include Budgeted Amount): The budget is included in the Transportation Capital Fund and is 100%grant funded with no city match. STUDY SESSION AGENDA: � Limited Presentation ❑Full Presentation STUDY SESSION ACTION: ❑ Consent Agenda R General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the Professional Services Agreement with WSDOT for design of the Warren Avenue Bridge Pedestrian Improvements Project; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: �%JjApprove ❑Deny ❑Table ❑Continue ❑ No Action Form Updated 01/02/2018