Loading...
HomeMy WebLinkAbout1 - Original Submission_ 210211_Change Order # 01CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO:#001 PROJECT NAME: 2020 Pavement Markings (City Contract # 6164) PROJECT NO: 315040-42223 CONTRACTOR: ORIGINAL CONTRACT AMOUNT: 113,700.00 DAYS: 28 PREVIOUSLY APPROVED CHANGES: 0.00 DAYS: 0 THIS CHANGE: 29,737.50 DAYS: 0 REVISED CONTRACT AMOUNT: 143,437.50 DAYS: 28 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. Rule 170 Rule 171 DESCRIPTION OF CHANGES INCREASE IN CONTRACT AMOUNT ($) (DECREASE) IN CONTRACT AMOUNT ($) CONTRACT TIME EXTENSION (DAYS:) X X X X X X X X X X X X Corbet Drive- Kitsap Way to E Phinney Bay Drive E Phinney Bay Dr- Corbet Drive to 26th Street Wycoff Avenue- 6th Street to 25th Street Lafayette Avenue- 15th Street to 19th Street Lafayette Avenue- 24th Street to 26th Street 15th Street- Corbet Drive to High Avenue 13th Street- Callow Avenue to Kitsap Way Callow Avenue- 6th Street to 15th Street High Avenue- 11th Street to 15th Street High Avenue- 6th Street to 11th Street Veneta Avenue- 6th Street to 11th Street; 5thStreet to 6th Street Almira Drive- Sheridan Road to Riddell Road See Attachment #1 for additional scope detail 1,837.50 2,775.00 3,010.00 1,182.50 1,182.50 3,240.00 1,435.00 4,925.00 1,725.00 1,725.00 1,725.00 4,975.00 NET CHANGE IN CONTRACT AMOUNT INCREASE OR (DECREASE) 29,737.50 ESTIMATED SALES TAX AT 9.0% 0 TOTAL INCLUDING SALES TAX $ 143,437.50 Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City’s right to bring a claim for past performance. 113A6165 DocuSign Envelope ID: 96B8DEDA-054E-438E-979B-08428698DDFB Ned Lever Digitally signed by Ned Lever DN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned Lever Date: 2021.02.03 16:00:01-08'00' Thomas Knuckey Digitally signed by Thomas Knuckey Date: 2021.02.11 10:56:40 -08'00' DocuSign Envelope ID: 96B8DEDA-054E-438E-979B-08428698DDFB 3/1/2021 DocuSign Envelope ID: 96B8DEDA-054E-438E-979B-08428698DDFB Change Order No. 1 – Bid Item Descriptions 2020 Pavement Marking Project Bid Item Road Limits Description of Work 13 Corbet Drive Kitsap Way to E Phinney Bay Drive From Kitsap Way to 15th: Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. Does NOT Include intersection island at 15th. From 15th to E Phinney Bay Drive: Centerline DY line. Convert existing paint double yellow centerline to RPM’s by installing new RPM’s. 14 E. Phinney Bay Drive Corbett to 26th Street/E Phinney Bay Drive Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 15 N Wycoff Ave 6th Street to 25th Street Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 16 N Lafayette Ave 15th Street to 19th Street Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 17 N Lafayette Ave 24th Street to 26th Street Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 18 15th Street Corbett Drive to High Ave Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 19 13th Street Kitsap Way to Callow Ave DY Centerline and centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. There is a segment of paint DY centerline around horizontal curve just north of Kitsap Way; convert this paint segment to new RPM’s. 20 Callow Avenue 6th Street to 15th Street All longitudinal lines. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 21 High Avenue 11th Street to 15th Street Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 22 High Avenue 6th Street to 11th Street Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 23 Veneta Avenue 6th Street to 11th Street & 5th Street to 6th Street Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. 24 Almira Drive Sheridan Road to Riddell Road Centerline skip stripe. This segment has existing RPM’s. Replace missing Type 1 RPM’s and replace all Type 2 RPM’s with new. DocuSign Envelope ID: 96B8DEDA-054E-438E-979B-08428698DDFB