HomeMy WebLinkAbout03/03/2021 2IAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Contract Modification Agreement No. 2 with Parametrix, Inc., for Design of the Ostrich Creek Culvert Replacement Project SUMMARY: Study Session Date COUNCIL MEETING Date Department: Presenter: Phone: February 24, 2021 March 3, 2021 PW&U- Engineering Gunnar Fridriksson (360) 473-5758 In November 2018, the City executed a contract with Parametrix for the design of the Ostrich Creek Culvert Replacement Project in the amount of $421,400.00, Contract Modification No. 01 was executed which extended the contract time, added scope to provide construction engineering support, and addressed items identified in design in the amount of $ 68,588,00. This proposed Contract Modification No. 02 increases the contract value by $ 95,660.00 to a new total of $585,648.00, to include design costs for the concrete girder bridge options for both Brentwood Drive and Price Road. ATTACHMENTS: 1) Contract Modification No. 02 with Parametrix, Inc.; 2) Site Plan FISCAL IMPACTS (Include Budgeted Amount): The Ostrich Bay Culvert Replacement Project # 869 is funded by a Public Works Trust Fund Loan ($4,687,968) to the Stormwater Fund. This additional cost will be covered by the loan as the increased cost for design will be offset by lower construction costs for a concrete versus steel bridge. STUDY SESSION AGENDA: � Limited Presentation ❑Full Presentation STUDY SESSION ACTION: n Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve Contract Modification Agreement No. 2 with Parametrix, Inc., for design of Ostrich Bay Culvert Replacement Project, and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve ❑Deny ❑Table ❑Continue ❑ No Action Form Updated 01/02/2018