HomeMy WebLinkAboutWHEATON WAY, 2025General Testing Laboratories, Inc.
18970 3rd Avenue NE, P.O. Box 1586, Poulsbo, Washington 98370, (206) 779-9196
2601 70th Avenue W., Suite L, Tacoma, Washington 98466, (206) 272-6 • (206) 565-8110
October 22, 1984
Project B-6828
Gary Lindsey
P.O. Box 56
Silverdale, WA 98383
Re: Soils and Foundation Investigation
Port Washington Narrows
Bremerton, Washington
Gentlemen:
This report presents the results of our soils and foundation investiga-
tion at the referenced site. The site is located on Wheaton Way and overlooks
the east side of the Port Washington Narrows in Bremerton, Washington. Our
work was verbally authorized by Mr. Gary Lindsey on October 11, 1984.
General
The planned structure will be two stories in height and roughly square
in shape with foundation plan dimensions on the order of 46 feet by 40 feet.
The main west foundation line will be ten feet east of the steep downward
slope to Port Washington Narrows, An exterior line of piers is planned
west of the main west foundation line, and retaining walls of varying heights
will be constructed along the north and east foundation lines. The planned
construction will incorporate both concrete and wood materials.
The foundation design plans have been completed and are based on an
assumed allowable soil bearing of 2000 psf.
The lower level of the structure will have a slab -on -grade floor at
elevation 59.0.
Extensive filling and regrading of the parking area will be required
to bring that portion of the site up to the desired grades.
Site Conditions
The proposed building area is nearly level, sloping slightly towards
the west while the parking area slopes fairly steeply downward, towards
the west, from Wheaton Way. The total topographic relief across the proposed
development area is on the order of 16 feet. That portion of the property
not designated for development slopes steeply downward to Port Washington
Narrows with slope angles ranging from 40 degrees to near vertical with a
vertical height of about 50 feet.
Gary Lindsey
October 22, 1984
Project B-6828
Page Two
At the time of our fieldwork, the building area had been cleared and
grubbed and all of the large trees on the slope to Port Washington Narrows
felled. The limbs and other debris from the felled trees had been left on
the slope.
No groundwater or seepage vas observed in the area of proposed
development or in the upper portion of the slope to Port Washington Narrows.
Subsurface Exploration Program
The subsurface exploration program consisted of logging a series of
four test pits across the site and making a reconnaissance of the site and
adjacent areas.
The test pit locations were selected and the excavations logged by an
engineering geologist from our office who examined the soils exposed, and
evaluated the difficulty of excavating the soil as an indication of its
relative density.
The soil strata shown on the test pit logs were observed at spot
locations across the site. Actual subsoil conditions between test pit
locations and exposed in excavations may vary from those shown on the test
it logs. The test pit logs are presented at the end of this report and
the test pit locations are shown on Figure 1.
Subsurface Soil Conditions
Based upon the results of our subsurface exploration program, it appears
that the upper 1.0 to 1.5 foot of soil consists of silty sand with some
gravel in a very loose condition. Based upon the appearance of the material
and presence of roots, sticks and limbs (test pits 2 and 3), we believe that
this unit was disturbed and mixed during the previous stripping and grubbing
of the site. In test pit 3 this unit extends to a depth of 3.0 feet with
only the upper 1.5 feet disturbed and mixed with debris.
.Underlying the uppermost soils is a layer of loose sand which ranges
in thickness from about 1.0 to 1.5 feet. In test pit 3 gravels are mixed
with the sand.
The lowermost unit encountered in test pits 1 and 2 consists of a
medium dense sand and gravel, while in test pits 3 and 4 the lowermost
material consists of a medium dense sand with a trace of silt and gravel.
Gary Lindsey
October 22, 1984
Project B-6828
Page Three
Moisture contents of the soils encountered ranged from very moist to
moist at the surface, caused by recent heavy rainfall, to damp or dry at
depth.
RECOMMENDATIONS
Site Preparation
All building, pavement and fill areas should be stripped of any remaining
vegetation, existing fill or other deleterious materials. Over most of the
site this will be a matter of inches, locally extending to a foot or so.
Test pit excavations should be dug out sufficiently to permit refilling using
heavy equipment. A clean excavation with no lenses of loose backfill is
important.
Stripped soil should be wasted, or the portion relatively free of organic
material and debris could be used in landscape areas.
Areas which will require filling to bring site grades up to the desired
underslab/pavement grades should be filled using granular material free from
roots, trash, wood waste, organics or other deleterious material. The
granular on -site soils will be suitable for use as fill,
Imported materials should conform to the following gradation' limits:
U.S. Standard Percent Passing
Sieve Size By Weight
22" 100
#4 25-100
#10 10-80
#40 0-35
#200 0-5
Following the stripping and grubbing of
in the construction area or where fill is to
the
Gary Lindsey
October 22, 1984
Project B-6828
Page Four
All fill materials
in loose thickness and
to at least 95% of its
Foundation Support
should be placed in lifts not exceeding eight inches
thoroughly compacted by suitable vibratory equipment
maximum dry density as determined by ASTM D-1557.
We recommend that individual columns and load -bearing walls be supported
on spread and continuous footings respectively. Foundations east of building
Line 2 should bear on the medium dense sand and sand and gravel at depths of
two to three feet below the existing site grades. Foundations west of and
including building line 2 should be embedded into the medium dense soils
at least 18 inches.
An allowable soil bearing capacity of 2000 psf is recommended for the
design of footings. However, continuous footings should not be less than
16 inches wide and isloated footings should measure at least 18 inches in
their smallest dimension, regardless of the resulting bearing pressure.
All footings should bottom a minimum of 18 inches below the lowest
adjacent exterior finish grade and be at least 12 inches below the lowest
adjacent interior slab grade. It is recommended that all footing excavations
be inspected prior to placing concrete and any disturbed soil removed.
Settlements, for foundations designed and constructed as recommended,
are estimated to be less than one inch.
Slab -On -Grade Floors
Due to the very loose to loose nature of the near surface soils, we
recommend that slab subgrade areas be over -excavated a minimum of one foot
and the subgrade rolled and the area refilled as described in the Site
Preparation section of this report. Following refilling and compaction of
the slab area, a capillary break consisting of four inches of clean, coarse
sand and gravel or crushed rock should be placed below the floor slab. The
capillary break material should contain less than 3% fines (material passing
a U.S. standard #200 sieve). A vapor barrier should be placed between the
capillary break and the floor slab.
Outlets should be provided so that any water which accumulates in the
capillary break may escape.
Gary Lindsey
October 22, 1984
Project B-6828
Page Five
Site Drainage and Moisture Protection
Generally, groundwater is not expected to create any problems during
or after construction. However, to preclude the possible build-up of
groundwater or storm runoff in the soils adjacent to the building, it is
recommended that a four inch diameter perforated pipe be placed, perforations
down, around the outside of the building foundation at the footing subgrade
elevation. All of the drainage system should be bedded in pea gravel and
designed to carry any accumulated water away to the storm drainage system
or offsite. Offsite discharge should not be allowed where the waters
will hazard soils, slopes, retaining structures or property.
All storm water runoff from roofs, patios, decks and parking areas should
also be collected and discharged into the storm drain system or offsite.
If offsite discharge is employed for disposal of storm and/or ground -
waters, we recommend that such a system tight -line all of the collected
water to the beach. No surface water should be channeled or allowed to
drain into the perforated subdrains. The two water collection systems
should remain separate unless an offsite discharge system is used in which
case the two drainage systems may be connected into a common tight -line
15 feet downslope of the structure.
In addition, all foundation backfill and soils used in landscaping
should slope away from the building for a distance of at least five feet.
Slope Protection and Maintenance
Slopes similar to those on the western end of the site have remained
stable for varying periods of time. Similar slopes have remained relatively
unchanged for periods of 15 to 20 years or more. The length of time a slope
area is stable is highly dependent upon the intensity of winter storms,
modifications to the slope (undercutting of the slope, removal of vegetation,
loading, etc.), and on the efficiency of measures taken to protect the
slope toe and to divert surface water runoff from flowing toward and over
the top or across the slope. The past history of slope recession in similar
areas indicates these longevity estimates are reasonable; however, no guarantee
can be, or is made in this regard.
Gary Lindsey
October 22, 1984
Project B-6828
Page Six
As a general rule, we strongly recommend that efforts be made to protect
all slope areas by planting deep-rooted, fast-growing trees, shrubs and other
types of vegetation, and controlling water runoff. However, some erosion of
the protected slope may still be anticipated due to natural runoff and
weathering of the slope. In addition, there is substantial evidence to
indicate that certain actions will accelerate the deterioration of the slope.
Any cutting of the existing deep-rooted vegetation, trees or brush which
tend to anchor the soil, or any action which tends to retain or accumulate
moisture or loading at the top of the slope would adversely affect the slope.
Finally, although the Puget Sound region is not noted as being overly active
seismicly, some quaking does occur and could cause a large soils movement if
other conditions are favorable.
Based upon our observations, it does not appear that the existing slopes
require the addition of structural support at this time. However, we do make
the following recommendations. First, all of the logs and limbs from the
felled trees should be removed along with any other debris and no additional
dumping of debris over the slope should be allowed. Second, no storage of
construction materials should be allowed west of the building. Third, the
re-establishment of deep-rooted, fast-growing trees and shrubs is strongly
recommended. Fourth, periodic inspections of the slope area should be made
to check for increased erosion rates or other signs of slope distress which
could indicate the need of additional protective measures.
Please call our office if you have any questions regarding this report
or if we may be of additional service.
Respectful f su mitted,
GENER �' T LABORATORIES, INC.
A en Ly`�- a r t
Engineering Geologist
PORT WASHINGTON NARROWS
Bremerton, tJashin�ton Project 8-6828
Wheaton Way
Property Line
®3 4 •
� �-
.' �.
J � �-
Foundation
Line
---, 2------------1®-
Port Washington
Narrows
FIGURE 1
1 ® Test Pit Number and
Location
Scale 1" = 20'
Top of Bank
North
General Testing Laboratories, Inc.
SITE PLAN
_��
TEST PIT 1
Depth - Feet Soil
0.0 - 1.2 Dark brown, silty SAND with some gravel (Very loose,
very moist becoming moist)(Disturbed soil zone)
1.2 - 2.3 Light brown to tan SAND (Loose, damp becoming
dry)
2.3 - 6.0 Tan to gray SAND and GRAVEL, trace silt with
lenses of clean sand (Medium dense becoming dense,
dry)
No groundwater observed
TEST PIT 2
Depth - Feet Soil
0.0 - 1.0 Dark brown silty SAND with some gravel mixed with roots,
limbs and sticks (Very loose, very moist becoming moist)
(Disturbed soil zone)
1.0 - 2.8 Light brown to tan SAND (Loose, damp)
2.8 - 6.0 Tan to gray SAND and GRAVEL occasional cobbles
and boulders (Medium dense becoming dense, dry)
Root zone extends to 2.2 feet
No groundwater observed
FIGURE 2
Depth - Feet
TEST PIT 3
Soil
0.0 - 3.0 Dark brown silty SAND with some gravel mixed with
roots, limbs and sticks in upper 1.5 feet (Very
loose becoming loose, very moist becoming moist)
(Disturbed soil zone)
3.0 - 4.7 Brown to tan gravelly SAND grading to SAND and
GRAVEL (Medium dense, moist becoming dry)
4.7 - 7.5 Gray to tan SAND with .trace silt and gravel
(Medium dense, dry)
Root zone extends to 2.5 feet
No groundwater observed
TEST PIT 4
Depth - Feet Soil
0.0 - 1.0 Dark brown silty SAND with some gravel,mixed with
limbs and roots (Very loose, very moist becoming
moist)(Disturbed soil zone)
Light brown SAND with trace silt (Loose, moist)
2.1 - 7.8 Gray SAND with some gravel, trace silt (Medium
dense, dry)
Root zone extends to 2.0 feet
No groundwater observed
FIGURE 3
•
�a •�• i
Sjj•-�•• •
GAp,Y LINDSEY• iN & CAJ�DLE LOIDHAMER
BUILDING AREA: LOWER 1933 SQUARE FEET
aU
TOTAL 3799 SQUARE FEET
I �
a•�pp
a C f I
z f
1" : 10'-0
V/1
;7
I
� i I
i
G�
I
I.
0000
l l
eL '
PLAN / LANDSC A
zf �83
Gu1T=R
!o' ��-R
g C a
r i 16
r J�
ax
i 'A; _✓
i
=Xwoo
1r
era"+
�"• bJ.N1 Ez�FY ��TI�
i
N>rw cc�-iG 5�.
G
rCig: o6
A I