Loading...
HomeMy WebLinkAboutWHEATON WAY, 1943City of Bremerton Department of Comr( ,-unity Development PERMIT NUMBER DATE ISSUED: BB16 00353 OS/31/2016 345 - 6th Street, Ste. 600, Bremerton WA 98337 SITE ADDRESS: 1943 WHEATON WAY (360)473-5275 Fax: (360)473-5278 ASSESSOR NUMBER: 3976-030-012-0007 Name APPLICANT: HESS JUDY L OWNER: HESS JUDY L CONTRACTOR: GB UNDERGROUND LENDER: SUBMITTED: VALUATION: State Surcharge Demolition Fee TOTAL FEES Inspection Requests: OS/23/2016 $4.50 $100.00 $104.50 ZONING: EC Phone Address (360)509-2665 5464 CHICO WAY NW BREMERTON, WA 983124246 (360)509-2665 5464 CHICO WAY NW BREMERTON, WA 983124246 360431-3164 1131 MORGAN RD BREMERTON, WA 98312 APPROVED: OS/31/2016 Demolition Permit EXPIRATION: 11/27/2016 Access Code 80T2W-Z2RZG 80T2W-Z2RZG XZSH9-KXRFV STATUS: ISSUED COMMERCIAL -DEMO 3 ATTACHED BUILDINGS ON SHORELINE COMMERCIAL -DEMO 3 ATTACHED BUILDINGS ON SHORELINE Building Code Edition: Occupancy Group; Type of Construction: Flood Zone: Setbacks: Sanitation Method: Number of Bedrooms: DCD: Bung Inspections: (360) 473-5870 L&I: Department of Labar and Industries (360) 415-4000 FIRE: Fire Inspections (360) 473-5386 HEALTH: Kitsap County Health District (360) 337-5285 PW&U: Public Works - Engineering (360) 473=5270 This permit shall become null and void if the described work authorized by this permit has not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned at any time after the work is commenced for a period of 180 days. It is the responsibility of the permit holder to see that tFie required inspections are made. Failure to obtain required inspections may result in stoppage of the work until such time that the permit holder can susbstantiate to the City of Bremerton that the concealed work meets or exceeds code requirements. Any demolition, testing, or financial burden shall be borne directly by the permit holder. Failure to substantiate code requirements will indemnify the City against any and all responsibility or liability connected with the construction. I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel provisions of any State or local law regulating construction or the performance of the construction. If listing the owner as general contractor, I certify that I am exempt from the requirements of the State Contractor's Registration Law under Section 3, Chapter 126, Laws of 1967, All revisions to an approved plan require DCD review and approval prior to performing work. All building and tenant occupancy permits are required to pass final inspection prior to permit expiration and obtain a certificate of occupancy prior to use or occupancy. I have read, and agree to abide by the conditions/of this permit including all conditions of zoning, building codes, and State and Federal laws. SIGNATURE OF OWNER OR AGENT: r✓ � \% i CONDITI City of Bremerton's approval of this application pertains only to the City's regulatory jurisdiction, and thus compliance with City regulations does not necessarily ensure compliance with federal or state laws. Printed by :Wood, Tracey on: OS/31/2016 11:45 AM Page I of 3 City of Bremerton Department of Community Development 345 - 6th Street, Ste. 600, Bremerton WA 98337 (360) 473=5275 Fax: (360) 473-5278 ASSESSOR NUMBER: 3976-030-012-0007 ZONING: Name APPLICANT: OWNER: HESS JUDY L HESS JUDY L CONTRACTOR: GB UNDERGROUND LENDER: SUBMITTED: 05/23/2016 EC Phone (360)509-2665 (360)509-2665 360-731-3164 APPROVED: OS/31/2016 PERMIT NUMBER: BB16 00353 DATE ISSUED: 05/31/2016 SITE ADDRESS: 1943 WHEATON WAY 5464 CHICO WAY NW BREMERTON, WA 983124246 5464 CHICO WAY NW BREMERTON, WA 983124246 1131 MORGAN RD BREMERTON, WA 98312 EXPIRATION: 11 /27/2016 Access Code 80T2W-Z2RZG XZSH9-KXRFV STATUS: ISSUED 1. (DCD-1 l) DCD: Once demolition work has begun, it must be completed and ready for inspection within 60 days. All demolition debris shall be properly transported to, and disposed of within an approved solid waste facility. The property shall be left in a clean, safe condition, protected from erosion. Demolition approval does not constitute approval for any other work, including site development work. 2. (DCD-02) DCD: Validity of permit. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Washington State Building code or of any other ordinance of the City of Bremerton. Permits presuming to give authority to violate or cancel the provisions of the Washington State Building code or other ordinances of the City of Bremerton shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of the Washington State Building code or of any other ordinances of the City of Bremerton. Cko (DCD-50) Final Inspection Required: All building permits shall have a final inspection performed and approved by the City o f Bremerton Department of Community Developtuent prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration may require a reactivation fee, or a new permit application if more than a year has passed with no activity. The permit expires 180 days past the date of inactivity. Required inspections: Any work required to be inspected and that is covered before such inspection may be required to be uncovered so that the inspection may be performed. Examples of inspections to be performed before covering are mechanical rough -in, plumbing rough -in, gas piping, framing, and sheetrock nailing. 4. (DCD-01) ASBESTOS AND LEAD -BASED PAINT: ASBESTOS: Prior to performing any renovation or demolition work, Puget Sound Clean Air Agency and Washington Department of Labor and Industries (L&I) regulations require an asbestos survey be performed to determine whether there are asbestos -containing materials in the work area or structure. The asbestos survey must be conducted by and EPA -certified (AHERA) building inspector (except renovation or owner -occupied single family residences).For more information, please contact Clean Air Agency through their web site at www.pseleanair.org or by phone at 800-552-3565 or 206-3434800. The L&I web site can be found at www.ini.wa.gov/TradesLicensing/LicensingReq/Asbestos/default.asp. LEAD -BASED PAINT: A contractor or person receiving compensation who is performing renovation, repairs or painting on a residential building or a child -occupied facility built before 1978, must be trained and certified by an accredited training provider, and registered as a Renovator by the Washington State Department of Commerce- Lead -Based Paint Program. For further information please contact: The Department of Commerce website at: www.commerce.wa.gov/lead, or call: (360) 58&LEAD (5323). CONTRACTOR: A contractor's registration issued by Washington State Dept. of Labor & Industries is required for anyone who contracts or submits bids for construction work, including new construction, alterations, repairs, or anyone who consults or superintends, improves, demolishes, develops residential property for sale, or "flips" houses. Contact L & I at (360)415- 4000 for information. (DCD-DEMOI) IBC SECTION 3308 TEMPORARY USE OF STREETS, ALLEYS AND PUBLIC PROPERTY 3308.1 Storage and handling of materials. The temporary use of streets or public property for the storage or handling of materials or of equiptent required for construction or demolition, and the protection provided to the public shall comply with the provisions of the authority having jurisdiction and this chapter. 3308.1.1 Obstructions. Construction materials and equipment shall not be placed or stored so as to obstruct access to fire hydrants, standpipes, fire or police alarm boxes, catch basins or manholes, nor shall such material or equipment be located within 20 feet (6096 mm) of a street intersection, or placed so as to obstruct normal observations of traffic signals or to hinder the use of public transit loading platforms. 3308.2 Utility fixtures. Building materials, fences, sheds or any obstruction of any kind shall not be placed so as to obstruct free approach to any fire hydrant, fire department connection, utility pole, manhole, fire alarm box or catch basin, or so as to interfere with the passage of water in the gutter. Protection against damage shall be provided to such utility fixtures during the progress of the work, but sight of them shall not be obstructed. A Right -of --Way permit is required if any work is to be conducted in the right -of --way, including the placement of any dumpsters in the right -of --way. R , Printed by :Wood, Tracey on: OS/31/2016 11:45 AM Page 2 of 3 6 City of Bremerton Department of Community Development 345 - 6th Street, Ste. 6o0, Bremerton WA 98337 (360) 473-5275 Fax: (360) 473-5278 ASSESSOR NUMBER: 3976-030-012-0007 Name APPLICANT: OWNER: HESS JUDY L HESS JUDY L CONTRACTOR: GB UNDERGROUND LENDER: SUBMITTED: OS/23/2016 ZONING: EC Phone Address PERMIT NUMBER: DATE ISSUED BB16 00353 OS/31/2016 SITE ADDRESS: 1943 WHEATON WAY (360)509-2665 5464 CHICO WAY NW BREMERTON, WA 983124246 (360)509-2665 5464 CHICO WAY NW BREMERTON, WA 983124246 360-731-3164 1131 MORGAN RD BREMERTON, WA 98312 APPROVED: OS/31/2016 EXPIRATION: 11/27/2016 Access Code 80T2W-Z2RZG 80T2W-Z2RZG XZSH9-I{XRFV STATUS: ISSUED 6. (DCD-DEM02) IBC 3301.2 Storage and placement. Construction equipment and materials shall be stored and placed so as not to endanger the public, the workers or adjoining property for the duration of the construction project. IBC 3302.2 Manner of removal, Waste taterials shall be removed in a manner which prevents injury or damage to persons, adjoining properties and public rights -of -way. IBC SECTION 3307 PROTECTION OF ADJOINING PROPERTY 3307.1 Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work. Protection must be provided for footings, foundations, party walls, chimneys, skylights and roofs. Provisions shall be made to controhvater runoff and erosion during construction or demolition activities. The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining buildings should be protected. Said notification shall be delivered not less than 10 days prior to the scheduled starting date of the excavation. f 7. (DCD-91) Call before you dig: Calling 811, two business days before you begin digging, will alert utilities to come out and mark THEIR buried lines from the street to your house For FREE! 8. (Custom) Geotech Requirements: 1) Maintain a 10 foot buffer from top of slope to any motorized demolition equipment. 2) Mowing of invasive plants on the upper level portion of the site is authorized, provided materials are mulched and broadcast over the ground to create erosion protection over an area that is at least a 10 foot strip above the crest of the slope. 3) If the demolition occurs in the dry season which is typically defined until October 1, no other erosion control is required other than what is described in the email provided by the geotechnical engineer. The owner is responsible for protecting the slope from erosion and protecting the shoreline from developmental impact. 9. (Custom) PW&U-ENGR: i No Equipment or Materials will be allowed to be placed within the Public Right -of -Way without a right-of-way permit. Any damage to the existing sidewalk will be the responsibility of the contractor. MINIMUM INSPECTIONS REQUIRED To request an inspection, please call (360) 473-5870 and be sure to provide your permit number, name on permit, site address, contact phone number, and inspection type. To register for on-line inspection access, visit the City's website at www.ci.bremerton.wa.us. Inspection PW&U -EROSION CNTRL FINAL -BUILDING Description PW -Erosion Control (continuous) Final Inspection -Building Printed by :Wood, Tracey on: OS/3I/2016 11:45 AM Page 3 of 3 B UILDING PERMIT INSPECTION CARD PROTECT THIS CARD FROM THE WEATHER 1943 WHEATON WAY COMMERCIAL - DEMO 3 ATTACHED BUILDINGS ON SHORELINE i Building Lj Plumbing Lj Mechanical Lj Alarm/Sprinkler This Placard must be posted on or near building and the Permit &"Approved" plans must be at the site. Permit # BB16 00353 Call the following Agencv Telephone Numbers for inspections: Building Department Inspections: (360) 473=5870 Water - Public Works: (360) 473-5927 PW - Public Works - Engineering_ (360) 473-5270 Kitsap Public Health: (360) 337-5235 Fire -Fire Department: (360) 473=5385 L&I - Dept. of Labor and Industry (360) 4154000 - Property lines shall be properly identified and marked before foundation footing inspection. Setbacks are measured to the finished wall structure. - Reinspection fee may be assessed if inspection has been requested when not ready or corrections are not completed. - Permit, approved plans, engineering, and inspection card shall be on site during construction or Reinspection Fee may be assessed. Inspection APP DATE Notes PW - Erosion Control (continuous) Final Inspection -Building FINAL BUILDING (360) 473-5870 All of the above must be approved. Approved Final Inspection grants occupancy for single family residence only. Commercial structures require separate Certificate of Occupancy. DO NOT OCCUPY BUILDING WITHOUT BUILDING DEPARTMENT APPROVAL Page 1 of 1 Ir�' MIT ' C' jCOMMERCIAL Building Permit Application City of Bremerton, Department of Community Development * 345 - 6th Street Suite 600 ' Bremerton WA 983374873 (360) 473 :527 ; * Fax- t:gi;fn A7.�-�mR * : , _ __.___ _ Applicant^ ❑ Owner Contractor ❑Authorized Agent Business Name: Site Address: CONTRACTOR: Address: 1 1� City, State, Zip: j License # & Exp. Contact Name: Contact Phone #: Email address: wD Tax ID/Parcel #: ® Sewer What is the a ` �� To apply for a property address, contact Public Works at (360) 473-5270 Date: �th�il�U-� `il�i=L ❑ Septic lease ❑ NEW COMMERCIAL ❑ COMMERCIAL REMODEL ❑ COMMERCIAL ADDITION ❑ COMMERCIAL REPAIR ❑ NEW MULTI -FAMILY DEMOLITION. Interior_ Exterior** OWNER: �t Address: City, State, Zil Phone #: (� Authorized A Address,�;r� Name: ,r,n Cit ,State, Zi : t3�, Phone Email address: ❑ New Constructic � to ❑ TENANT IMPROVEMENT WITH WORK ❑ TENANT IMPROVEMENT WITHOUT WORK ❑ NEW SIGN ❑ GRADING (Cubic Yards: ) ❑ REROOF Foundation Wall** _ Roof / Section" `" Separate demolition permit and fees required. Contact Public Works for sewer cap permit (473 5270). Sewer must be capped prior to demolition permit issuance. ❑ OTHER: IS THIS PROPERTY WITHIN 200 FEET OF A SHORELINE? YES ❑ NO ❑ Square Footage: Building: i :=�-�b � * 1 � Construction Type: �i,EiA L �- �,� Valuation Plan Review Fee Permit Fee Surcharge Total Fees Application for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the building official. The building official may extend the time Tohaption by the_�pplicant for a period not exceeding 180 days on request by the applicant, showing the circumstances beyond the control of the applican a e prevented actionefrom being taken. N/oo.applicant shall be extended more than once. In order to renew action on an application after expirat p, th/applican� shall`rVub3hit plans �fl�pay a new plan review fee. Date DC Rev. July 2008 Questions on this sheet, please contact Wke Six, Fire Marshal. (360) 473-5386, or email: chael.Six@ci.bremerton.wa.us ,3remerton Fire Department Ff�re ,Marshal's Office Construction Assistance Bulletin Operations checklist Project Address: Primary Contact. Below is a checklist of activities which this occupancy will be performing during day to day operations, not during construction. Please check all that apply. Also, please provide a copy (in both PDF and DWF/DWG format) of ALL Plea use check all that a Aviation L : . Battery Back Card swipe system Compressed Gases u Cooking CoRosives Cryogenics Emergency Generator Fireworks Gates Lumber/wood products Refrigeration System Flammable Material Hot-work Motor vehicle momre air Storage >6' hi h FlammablelCombustible Liquids LaOven s r a Painting/powder coating Tire Storage Forklifts LPG Racks (12' or more in het ct Dust products vrill'be roduced Place a check next to any item that will be added/removed or otherwise modified DURING CONSTRUCTION ONLY99P Electrical Hood S stem Items not mentioned: 1�Jalls Doors Fire .. NEW City of Bremerton 345 6th St„ Suite 600 Bremerton, WA 98337 (360) 473-5212, desk (360) 473-5278, fax Jeannie .vauahn@ci.bremerton wa us Froms Luark, Richard D[mailto:Richard.LuarkCterracon,comj Sent; Friday, May 13, 2016 4:14 PM To: Kristin Moerler <Kristin.Moe rler@ci,bremerton.wa.us> Cc, Jeannie Vaughn <Jeannie.Vaughn@ci.bremerton.wa.us>s mark@mbeco,biz Subject; RE: Demo at 1934 Wheaton Way _ Geotechnical Input Kristin, R COE��ED City of Bremerton, DCD On behalf of Mark Goldberg, I am providing geotechnical recommendations in regards to the proposed clearing of vegetation and demolition of the structures located at 1934 Wheaton Way, Bremerton Washington. I am both a licensed professional engineer and licensed engineering geologist in the State of Washington, The area which contains the vegetation to be cleared and buildings to be demolished is not defined a geologically hazardous area; however, it fails within the 50 foot default buffer defined by the City of Bremerton Critical Areas Ordinance. The buildings are located with a nearly level area between the steep slope crest and Wheaton Way. The steep slope is defined as a Critical Area due to the slope inclination being greater than 40%. The entire site, including the steep slope, is mapped as continental glacial till, which consists of very dense silty sand with gravel that was deposited beneath the continental glaciers during the last Ice age. Glacial till has a high shear strength and therefore forms steep stable slopes provided it is protected from erosion. The steep slope at the referenced site is well vegetated and is therefore protected from erosion, The site is not within a mapped landslide area and the trees on the slope do not show signs of past slope movement or soil creep. Therefore, it is our opinion that the proposed demolition can occur within the 50 foot default setback area without impacting the steep slope critical area, We recommend at least a 10 foot buffer be maintained between motorized demolition equipment and the crest of the steep slope. It is also our understanding that clearing of vegetation on the level portion of the site is desired. It is our opinion that clearing of vegetation with the 50 foot buffer will not impact the steep slope area provided vegetation is mulched and broadcast over the ground to provide erosion protection within at least a 10 foot strip above the crest of the steep slope, Per the City of Bremerton Critical Areas Ordinance, an erosion control plan is not required for clearing and grading within 200 feet of a high geologic hazard area provided the clearing occurs between May 1 to October 1. Therefore, it is our opinion that an erosion control plan Is not required for demolition of the buildings or clearing of vegetation, provided it occurs during the dry season, defined as May 1 to October 1. If you require additional information or have any questions, please contact me. Cheers, Richard D. Luark, PE, LEG Senior Project Engineer 1 Geotechnical Terracon 21905 64th Ave W, Suite 100 1 Mountlake Terrace, WA 98043 D (425) 409 26641 F (425) 7713549 1 M (425) 3018782 rdluark@terracon.com I terracon,com 2 From: Sent. To: Cc: Subject. Kristin, Luark, Richard D <Richard.Luark@terracon.com> Friday, May 13, 2016 4:14 PM Kristin Moerler Jeannie Vaughn; mark@mbeco.biz RE: Demo at 1934 Wheaton Way - Geotechnical Input On behalf of Marl< Goldberg, I am providing geotechnical recommendations in regards to the proposed clearing of vegetation and demolition of the structures located at 1934 Wheaton Way, Bremerton Washington. I am both a licensed professional engineer and licensed engineering geologist in the State of Washington. The area which contains the vegetation to be cleared and buildings to be demolished is not defined a geologically hazardous area; however, it falls within the 50 foot default buffer defined by the City of Bremerton Critical Areas Ordinance. The buildings are located with a nearly level area between the steep slope crest and Wheaton Way. The steep slope is defined as a Critical Area due to the slope inclination being greater than 40%. The entire site, including the steep slope, is mapped as continental glacial till, which consists of very dense silty sand with gravel that was deposited beneath the continental glaciers during the last ice age. Glacial till has a high shear strength and therefore forms steep stable slopes provided it is protected from erosion. The steep slope at the referenced site is well vegetated and is therefore protected from erosion. The site is not within a mapped landslide area and the trees on the slope do not show signs of past slope movement or soil creep. Therefore, it is our opinion that the proposed demolition can occur within the 50 foot default setback area without impacting the steep slope critical area. We recommend at least a 10 foot buffer be maintained between motorized demolition equipment and the crest of the steep slope. It is also our understanding that clearing of vegetation on the level portion of the site is desired. It is our opinion that clearing of vegetation with the 50 foot buffer will not impact the steep slope area provided vegetation is mulched and broadcast over the ground to provide erosion protection within at least a 10 foot strip above the crest of the steep slope. Per fihe City of Bremerton Critical Areas Ordinance, an erasion control plan is not required for clearing and grading within 200 feet of a high geologic hazard area provided the clearing occurs between May 1 to October 1. Therefore, it is our opinion that an erosion control plan is not required for demolition of the buildings or clearing of vegetation, provided it occurs during the dry season, defined as May 1 to October 1. If you require additional information or have any questions, please contact me. Cheers, Richard D. Luark, PE, LEG Senior Project Engineer I Geotechnical Terracon 21905 6401 Ave W, Suite 100 1 Mountlake Terrace, WA 98043 D (425) 409 26641 F (425) 7713549 1 M (425) 3018782 rdluark(o)terracon.com I terracon.com E i � � � w ��� ���'`� �� E�G�,c�,�teirlG - City of Bremerton, DCD Validity of permit, The issuance or granting of a pe Koval ' shall not be construed to be a permit tor, or an app of, any violation of the provisions of the International Codes or any o?her ordinance of the City of Bremerton Permits presuming to give authority to utolate or cancel the provisions of the International Codes and — - ordinances of the City of Bremerton shall not be valid. (IBC 105 & IRC 105.4) CHANGES MUST BE APPROVED PRIOR TO PERFORMING WORK MUST COMPLY WITH ALL WASHINGTON STATE CODES erLQ i �-�e,r �v �r�erte.,�-�, � �r-�e� N�✓c�la�-I ova Q-�, ��, , /-�tldlD DAMAGE. 76 �,lE,,,� SrOcw�u� � A ,21(N7 In/AY ��eM17 is eEQule �a D�tv� Ac�¢os . �� I -� �� S /OE lcVgtl� I�SDDp �E�FQ �,JLi£, haw! v ,�t � PF `DLS?�2 � �1 .1 A FE7Y PG�a kll �L E IZEQu 1►eEp I.gFFoe� A tz� v PeeMIT l IsS� a � I._: � � �. � Reviewed for ode mpliance �:.. By' 4 Jeannie Vaughn From: Sent: To. cc: Subject. Kristin, Luark, Richard D <Richard.Luark@terracon.com> Friday, May 13, 2016 4:14 PM Kristin Moerler Jeannie Vaughn; mark@mbeco.biz RE: Demo at 1934 Wheaton Way - Geotechnical Input On behalf of Marl< Goldberg, I am providing geotechnical recommendations in regards to the proposed clearing of vegetation and demolition of the structures located at 1934 Wheaton Way, Bremerton Washington. I am both a licensed professional engineer and licensed engineering geologist in the State of Washington. The area which contains the vegetation to be cleared and buildings to be demolished is not defined a geologically hazardous area; however, it falls within the 50 foot default buffer defined by the City of Bremerton Critical Areas Ordinance. The buildings are located with a nearly level area between the steep slope crest and Wheaton Way. The steep slope is defined as a Critical Area due to the slope inclination being greater than 40%. The entire site, including the steep slope, is mapped as continental glacial till, which consists of very dense silty sand with gravel that was deposited beneath the continental glaciers during the last ice age. Glacial till has a high shear strength and therefore forms steep stable slopes provided it is protected from erosion. The steep slope at the referenced site is well vegetated and is therefore protected from erosion. The site is not within a mapped landslide area and the trees on the slope do not show signs of past slope movement or soil creep. Therefore, it is our opinion that the proposed demolition can occur within the 50 foot default setback area without impacting the steep slope critical area. We recommend at least a 10 foot buffer be maintained between motorized demolition equipment and the crest of the steep slope. It is also our understanding that clearing of vegetation on the level portion of the site is desired. It is our opinion that clearing of vegetation with the 50 foot buffer will not impact the steep slope area provided vegetation is mulched and broadcast over the ground to provide erosion protection within at least a 10 foot strip above the crest of the steep slope. Per the City of Bremerton Critical Areas Ordinance, an erasion control plan is not required for clearing and grading within 200 feet of a high geologic hazard area provided the clearing occurs between May 1 to October 1. Therefore, it is our opinion that an erosion control plan is not required for demolition of the buildings or clearing of vegetation, provided it occurs during the dry season, defined as May 1 to October 1. If you require additional information or have any questions, please contact me. Cheers, Richard D. Luark, PE, LEG Senior Project Engineer I Geotechnica) Terracon 21905 6401 Ave W, Suite 100 1 Mountlake Terrace, WA 98043 D (425) 409 26641 F (425) 7713549 1 M (425) 3018782 rdluarka()terracon.com I terracon.com 1 City of Bremerton 345 6th St., Suite 600 Bremerton, WA 98337 (360) 473-5212, desk (360) 473-5278, fax Jeannie.vaughn@ci.bremerton.wa.us i!y of Bremerton, DCaD From; LUCH Richard D [mall to:Rlchard.Luark@terracon.com] Sent; Friday, May 13, 2016 4:14 PM To: Kristin Moerler <Kristin.Moerler@ci.bremerton.wa.us> Cc: Jeannie Vaughn <Jeannie.Vaughn@ci.bremerton.wa.us>; mark@mbeco.biz Subject: RE: Demo at 1934 Wheaton Way _ Geotechnical Input Kristin, On behalf of Mark Goldberg, I am providing geotechnical recommendations in regards to the proposed clearing of vegetation and demolition of the structures located at 1934 Wheaton Way, Bremerton Washington. I am both a licensed professional engineer and licensed engineering geologist in the State of Washington. ri4 The area which contains the vegetation to be cleared and buildings to be demolished is not defined a geologically hazardous area, however, it falls within the 50 foot default buffer defined by the City of Bremerton Critical Areas Ordinance. The buildings are located with a nearly level area between the steep slope crest and Wheaton Way. The steep slope is defined as a Critical Area due to the slope inclination being greater than 40%. The entire site, including the steep slope, is mapped as continental glacial till, which consists of very dense silty sand with gravel that was deposited beneath the continental glaciers during the last ice age. Glacial till has a high shear strength and therefore forms steep stable slopes provided it is protected from erosion. The steep slope at the referenced site is well vegetated and is therefore protected from erosion. The site is not within a mapped landslide area and the trees on the slope do not show signs of past slope movement or soil creep. Therefore, it is our opinion that the proposed demolition can occur within the 50 foot default setback area without impacting the steep slope critical area. We recommend at least a 10 foot buffer be maintained between motorized demolition equipment and the crest of the steep slope. It is also our understanding that clearing of vegetation on the level portion of the site is desired. It is our opinion that clearing of vegetation with the 50 foot buffer will not impact the steep slope area provided vegetation is mulched and broadcast over the ground to provide erosion protection within at least a 10 foot strip above the crest of the steep slope. Per the City fa + n Critical Areas Ordinance, an erosion control plan is not required for clearing and grading within 200 feet of a high geologic hazard area provided the clearing occurs between May 1 to October 1. Therefore, it is our opinion that an erosion control plan is not required for demolition of the buildings or clearing of vegetation, provided it occurs during the dry season, defined as May 1 to October 1, if you require additional information or have any questions, please contact me. Cheers, Richard D. Luark, PE, LEG Senior Project Engineer I Geotechnical Terracon 21905 64th Ave W, Suite 100 1 Mountlake Terrace, WA 98043 D (425) 409 26641 F (425) 7713549 1 M (425) 3018782 rdluark&terracon.com I terracon,com 2 e City of Bremerton 345 - 6th Street, Ste. 600, Bremerton WA 98337 (360) 473-5275 PERMIT ESTIMATE: E0T16 00068 ESTIMATE TYPE: Demolition Permit PROJECT NAME: COMMERCIAL -DEMO SITE ADDRESS: 1943 WHEATON WAY BREMERTON PARCEL: 3976-030-012-0007 ESTIMATE DATE: 05/20/2016 PLANNED SUBMITTAL DATE: 05/03/2016 APPLICANT HESS JUDY L OWNER: HESS JUDY L 5464 CHICO WAY NW 5464 CHICO WAY NW BREMERTON, WA 98312-1246 BREMERTON, WA 98312-1246 (360)509-2665 (360)509-2665 VALUATION DETAILS ESTIMATED FEES SUMMARY State Surcharge $4.50 Demolition Fee $100900 Total Estimated Valuation. Total Estimated Fees: $104050 FIXTURE DETAILS (3ty Mechanical Fixtures (sty Plumbing Fixtures (sty Electrical Fixtures SUBMITTAL DOCUMENT CHECKLIST Required Submittals The following documents are required for a complete application submittal. Additional Submittals The following documents maybe required for a complete application depending on the specifics of your project. OTHER PERMITS REQUIRED The following additional permits will be required if you move forward with fhis permit. REQUIRED INSPECTIONS The following inspections will be required to be completed and approved if you move forward with this permit. Additional Inspections may be required. Final Inspection -Building PERMIT CONDITIONS The following conditions, in addition to others, may be required if you move forward with your permit. Printed: 05/20/2016 10:20 AM Page 1 of 3 City of Bremerton 345 - 6th Street, Ste. 600, Bremerton WA 98337 (360) 473-5275 PERMIT ESTIMATE: E0T16 00068 ESTIMATE TYPE: Demolition Permit PROJECT NAME: COMMERCIAL -DEMO SITE ADDRESS: 1943 WHEATON WAY BREMERTON ESTIMATE DATE: 05/20/2016 PLANNED SUBMITTAL DATE: 05/03/2016 * DCD: Once demolition work has begun, it must be completed and ready for inspection within 60 days. All demolition debris shall be properly transported to, and disposed of within an approved solid waste facility. The property shall be left in a clean, safe condition, protected from erosion. Demolition approval does not constitute approval for any other work, including site development work. * ASBESTOS AND LEAD -BASED PAINT: ASBESTOS: Prior to performing any renovation or demolition work, Puget Sound Clean Air Agency and Washington Department of Labor and Industries (L&I) regulations require an asbestos survey be performed to determine whether there are asbestos -containing materials in the work area or structure. The asbestos survey must be conducted by and EPA - certified (AHERA) building inspector (except renovation or owner -occupied single family residences).For more information, please contact Clean Air Agency through their web site at www,pscleanair.org or by phone at 800-552-3565 or 206-343- 8800. The L&I web site can be found at www.lni.wa.gov/TradesLicensing/LicensingReq/Asbestos/defaultmasps LEAD -BASED PAINT: A contractor or person receiving compensation who is performing renovation, repairs or painting on a residential building or a child -occupied facility built before 1978, must be trained and certified by an accredited training provider, and registered as a Renovator by the Washington State Department of Commerce- Lead -Based Paint Program. For further information please contact: The Department of Commerce website at: www,commerce.wa.gov/lead, or call: (360) 586-LEAD (5323). CONTRACTOR: A contractor's registration issued by Washington State Dept. of Labor & Industries is required for anyone who contracts or submits bids for construction work, including new construction, alterations, repairs, or anyone who consults or superintends, improves, demolishes, develops residential property for sale, or "flips" houses. Contact L & I at (360)415- 4000 for information. * Final Inspection Required: All building permits shall have a final inspection performed and approved by the City of Bremerton Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration may require a reactivation fee, or a new permit application if more than a year has passed with no activity. The permit expires 180 days past the date of inactivity. Required inspections: Any work required to be inspected and that is covered before such inspection may be required to be uncovered so that the inspection may be performed. Examples of inspections to be performed before covering are mechanical rough -in, plumbing rough -in, gas piping, framing, and sheetrock nailing. * IBC SECTION 3308 TEMPORARY USE OF STREETS, ALLEYS AND PUBLIC PROPERTY 3308.1 Storage and handling of materials. The temporary use of streets or public property for the storage or handling of materials or of equipment required for construction or demolition, and the protection provided to the public shall comply with the provisions of the authority having jurisdiction and this chapter. 330841.1 Obstructions. Construction materials and equipment shall not be placed or stored so as to obstruct access to fire hydrants, standpipes, fire or police alarm boxes, catch basins or manholes, nor shall such material or equipment be located within 20 feet (6096 mm) of a street intersection, or placed so as to obstruct normal observations of traffic signals or to hinder the use of public transit loading platforms. 3308.2 Utility fixtures. Building materials, fences, sheds or any obstruction of any kind shall not be placed so as to obstruct free approach to any fire hydrant, fire department connection, utility pole, manhole, fire alarm box or catch basin, or so as to interfere with the passage of water in the gutter. Protection against damage shall be provided to such utility fixtures during the progress of the work, but sight of them shall not be obstructed. A Right -of -Way permit is required if any work is to be conducted in the right-of-way, including the placement of any dumpsters in the right-of-way. Printed: 05/20/201610:20 AM Page 2 of 3 City of Bremerton 345 - 6th Street, Ste. 600, Bremerton WA 98337 (360) 473-5275 PERMIT ESTIMATE: EST16 00068 ESTIMATE TYPE: Demolition Permit PROJECT NAME: COMMERCIAL - DEMO ESTIMATE DATE: 05/20/2016 SITE ADDRESS: 1943 WHEATON WAY BREMERTON PLANNED SUBMITTAL DATE: 05/03/2016 * IBC 3301.2 Storage and placement. Construction equipment and materials shall be stored and placed so as not to endanger the public, the workers or adjoining property for the duration of the construction project. IBC 3302.2 Manner of removal. Waste materials shall be removed in a manner which prevents injury or damage to persons, adjoining properties and public rights -of -way. IBC SECTION 3307 PROTECTION OF ADJOINING PROPERTY 3307.1 Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work. Protection must be provided for footings, foundations, party walls, chimneys, skylights and roofs. Provisions shall be made to controlwater runoff and erosion during construction or demolition activities. The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining buildings should be protected. Said notification shall be delivered not less than 10 days prior to the scheduled starting date of the excavation. * Call before you dig: Calling 811, two business days before you begin digging, will alert utilities to come out and mark THEIR buried lines from the street to your house For FREEI * DCD: Validity of permit. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Washington State Building code or of any other ordinance of the City of Bremerton. Permits presuming to give authority to violate or cancel the provisions of the Washington State Building code or other ordinances of the City of Bremerton shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of the Washington State Building code or of any other ordinances of the City of Bremerton. Printed: 05/20/201610:20 AM Page 3 of 3 K G B ENVIRONMENTAL SERVICES PHONE # (360)830-5022 FAX # (360)830.5020 P.O. BOX 220 SEABECK, WA, 98380 CERTIFIED AHERA ASBESTOS INSPECTION 1943 Wheaton Way Bremerton, WA 98312 KITSAP COUNTY April Z'1, 2016 Prepared for: Estate of Judy L. Hess C/O Byron Harris 2497 Bethel Road/ P.O. Box 1014 Port Orchard, WA 98366 1 City of Bremerton, DCD TABLE Or CONTENTS 001. Regulatory Compliance ..... . . . ...... a , , ........... , . , .... . 002. Asbestos Definition ......................... . . . . . ........... 003. Sampling Protocol ......... . .... . ............... . . . .......... 005, Site Specifications ............... . . .................... . .. . . . 006, Summary ................... . ...... . ........................ . . . Attachments which may be included: * Site location maps * Photos * Notification forms * Lab analysis ' Field reports * Chain of Custody forms * Certifications Print outs * Miscellaneous information 7 001, Re&ulatary Compliance This inspection satisfies the current regulation WAC 29&- 62-07707 that requires building owners to conduct an inspection before any repair, remodel, or demolition can be performed where asbestos may be disturbed (Chapter 49-17 RCW) and... Pu�e� Sound Clean Air A eney_�PSCAA Regulations, _Article 4 of the Asbestos Control Standards Section 4.02 fa) Asbestos Survey Requirements; "It shall be unlawful for any person to cause or allow a renovation unless the property owner or the owner's agent determines whether there are suspect asbestos containing materials in the work area and obtains an asbestos survey of any suspect asbestos containing materials by an AHERA Building Inspector, An AHERA Building Inspector is not required for asbestos surveys associated with the renovation of an owner -occupied, single family residence. (1) If there are no suspect materials in the work area, this determination shall either be posted at the work site or communicated in writing to all contractors involved in the renovation, (2) It is not required that an AHERA Building Inspector evaluate any material presumed to be asbestos containing. (3) Except for renovations of an owner -occupied, single family residence, only an AHERA Building Inspector may determine that a suspect material does not contain asbestos. (4) A summary of the results of the asbestos survey shall either be posted by the property owner or the owner's agent at the work site or communicated in writing to all persons who may come into contact with the material. (b) Requirements for Demolition It shall be unlawful for any person to cause or allow any demolition unless the property owner or the owner's agent obtains an asbestos survey by an AHERA Building Inspector of the structure to be demolished, (1) It is not required that an AHERA Building Inspector evaluate any material presumed to be asbestos containing material... 3 (2) Only an AHERA Building Inspector may determine #hat a suspect material does not contain asbestos. (3) A summary of the results of the asbestos survey shall either be posted by the property owner or the owner's agent at the work site or communicated in writing to all persons who may come into contact with the material, Section 4.04 (a) Removal of Friable Asbestos Prior to Renovation or Demolition. Except as provided in Section 4.O6c of this Regulation, it shall be unlawful for any person to cause or allow any demolition or renovation that may disturb friable asbestos -containing -material or damage a structure so as to preclude access to friable asbestos containing material for future removal, without first removing all friable asbestos -containing material in accordance with the requirements in this regulation, Notification is required for demolition's involving structures with a projected roof area greater than 120 square feet, even if no ACM is present. Friable, asbestos -containing material need not be removed from a component if the component can be removed, stored, or transported for reuse without disturbing or damaging the asbestos. It shall be unlawful for any person to cause or allow the burning of any facility for fire training without removing all asbestos -containing materials prior to burning. This includes both friable and nonfriable ACM. Sectian 4.05 Procedures for Asbestos Projects. Training Requirements It shall be unlawful for any person to cause or allow any work on an asbestos project unless it is performed by persons trained and certified in accordance with the standards established by the Washington State Department of Labor and Industries, the federal Occupational Safety & Health Administration (OSHA), or the United States Environmental Protection Agency (whichever agency has jurisdiction) and whose certification is current. " This certification requirement does not apply to asbestos projec#s conducted in an owner -occupied, single family residence performed by the resident owner of the dwelling, AHERA (Asbestos Hazard Emergency Response Act) regulation requires this inspection to include the identification of Friable and Non -Friable ACM in (1) Surfacing Materials, (2) Thermal System Insulation, and (3) Miscellaneous Materials; to delineate homogeneous areas and to sample or "Presume" all materials located. Friable ACM is thought to release fibers into the all. more readily, however, many types of Nan -Friable ACM can become airborne if disturbed. Additionally, the condition of the material will be graded and the potential for future damage assessed. The number of samples required is specified in the AHERA Rule (40 CFR 763.86) as follows; Surfacing Materials;. {SM} 3 samples par homo- geneous area of less than 1000 square feet, 5' samples for greater than 1000 but less than 5000 square feet, 7 samples for greater than 5000 square feet. Thermal System Insulation: (TSI) 3 samples from each homogeneous area that is not "Assumed" to be asbestos,1 sample per each patched area, and as determined by the inspector for tees, elbows or valves. Miscellaneous Materials; {MM) Sample in amounts determined sufficient by the inspector, Friable asbestos is material that can be crumbled, pulverized or reduced to powder by hand pressure. Non -Friable asbestos can became Friable by sanding, grinding, sawing, or other mechanically in duced means. EPA (Environmental Protection Agency) regulates asbestos above 1%, as determined using the method specified in Appendix A, Subpart F, 40 CFR (Code of Federal Regulations) Part 763, Section 1, by Polarized Light Microscopy (PLM). These agencies regulate asbestos in these counties; (Washington State) • Puget Sound Clean Air Agency (PSCAA) King, Kitsap, Pierce, Snohomish • Olympic Regional Clean Air Agency (ORCAA) Jefferson, Clallant, Mason jhurston, Pacific, Grays Harbor • Southwest Clean Air Agency (SWCAA) Lewis, Clark, Waid:iaktir% Cowlitz, Skamania • Yakima County Clean Air Authority (YCCAA)Yakima • Northwest Air Pollution Authority (NAPA)%atcom, Skagit, island + Douglas County Clean Air Commission,Dmiglas + Grant County Clean Air Authority, Grant • Tri Counties Air Pollution Control Authority, Benton, Walla Walla, Franklin • Spokane County Air Pollution Control Authority (SCAPCA) Spokane 5 e • Washington Department of Ecology, (DOE) Stevens, Ferry, Okanogan, san Juan, Cheian, Kittitas, Klickitat, Columbia, Garfield, Asotin, Adams, Lincoln, Pend Oreille There is a required waiting period after filing a notification before work can begin. (Mandatory 10 days for all demolition's) Calendar or working day wait is stipulated by each regulatory agency's policy. Further information regarding compliance may be obtained it our office. It is unlawful for the owner ar the owner's agent to remove asbestos in excess of 10 linear feet or 48 square feet per year, per structure, unless the building is an owner_occupied, single family private residence. Washington State Iaw requires asbestos that is left in place, be in good repair and maintained at regular intervals. Maintenance should be documented. References; WAC 296-62-077Asbestos, Tr•en:olite, Anthophlylite & Actinolite VA C 296-65-001 Asbestos Removal & Encapsulation NESHAP Asbestos Regulations 40 CFR 61 Sub Part M PSCAA Regulation IIIArticle 4 AHERA Model Accreditation Plan /AHERA Final Rule 40CFR 763 OSHA 29 CFR Parts 1910 US EPA Guidance far Controlling Friable ACM in Buildings US EPA ACM in School Buildings, A Guidance Document Part 1 &2 US EPA Asbestos Waste Management Guidance (Office of Solid Waste) US EPA Reporting & Recordkeeping Requirements for Waste Disposal 11 w90 US EPA Asbestos in the Home, A Homeowners Guide 6.88 United States Environmental Protection Agency; The Asbestos Informer All federally recognized Tribal Lands have the option of filing for permits with the local air pollution control agency or through the US EPA when undertaking asbestos abatement. 0 002. Asbestos Definition "Asbestos" includes Chrysoule, Amosite, Crocldolite, Tremolite asbestos, Anthtophylite asbestos, Actinolite asbestos, and any of these minerals that have been chemically treated and/or altered. Cluysotile is the mast commonly used type of asbestos in North America, known as "white asbestos", the only mineral in the serpentine group of asbestos minerals. The ward "asbestos" (Greek -not extinguishable} was first recorded in the first century AD, although the substance was known as early as the second century BC. 75% of the world's asbestos is mined in Quebec. Exposure to asbestos fibers can cause asbestosis, various cancers and the deadly mesothelioma which is an inoperable cancer of the chest and abdominal linings. Because there is no known safe Ievet of exposure to asbestos, all exposure should be avoided. Asbestos was used in the United S#ates in over 3dQ0 different building materials, and while it is possible to suspect that a material contains asbestos, actual determination can only be made by instrumental analysis. Sample List of Suspect Asbestos Containing Materials • Cement Siding/ wallboard/Cement asbestos pipes • Window putty • Vinyl Floor Tile/V nyl Wall Coverings • Vinyl Sheet Flooringfbacking and adhesives • Vermiculite attic insulation • Construction Mastics/Joint Compounds/Spackling/Caulking/Putty • Acoustical and Decorative Plaster • Textured Paints and Coatings • Ceiling Tiles and Lay -in PanelsP'popcorn" ceiling texture + Spray -on Insulation/Duct & Boiler Insulation • Blown -in Insulation/Wiring Insulation • Fireproofing Materials/Cooling Towers/Base Flashing • Taping Compounds/Chalkboards/Roofing Shingles • Packing Materials (Walls/Floors) • Gaskets/Drywall/Roofing Felt • Laboratory Hoods/Gloves/Table Tops • Fire Blankets/Fire Curtains /Fire Doors • Heating & Electrical Ducts/ Pipe Insulation • Elevator Brakes and Equipment Panels Note: This list does not include every product that may contain asbestos 7 003. Sampling Protocol This survey addresses Friable and Non_friable suspect asbestos containing materials to meet NESHAP 40 CFR 61 (National Emissions Standards for Hazardous Air Pollutants) requirements for renovation and/or demolition activities. When suspect ACM is observed our technicians are trained and proficient in gathering samples by approved industry standards. All samples are then analyzed by an independent EPA -approved NVLAP/ 41ST/A1HA accredited lab that participates in the PAT program according to 29 CFR 1910.1001, 0)(8)(ii)(A&B). The samples are analyzed using PLM with dispersion staining to estimate the percentage of asbestos composition by volume. Samples in which less than 1 % of asbestos mineral is detected is designated as "None Detected" (ND) or "No Asbestos Detected" (NAD). Random samples are gathered of each homogeneous suspect ACM identified during a visual search. A series of samples are gathered (according to the 3-5-7 AHERA Rule) and are read at the lab for a positive result. If positive, no other samples are read of that material, if the sample is negative of asbestos content, the other samples are studied. All samples gathered must be reported negative for the material to be considered "None Detected". The laboratory analysis of all bulk sampling is included in this report and intended to be an integral part of the inspection data. Guidelines require laboratories reading asbestos samples to read all materials which are included in the submitted sample (tile, mastics, vinyls, adhesives, leveling compounds, etc). Because we frequently submit a "layered" sample, we may not sample mastics/adhesives separately as we feel this would be redundant and cause confusion in the interpretation for our clients and also result in costlier lab fees. Therefore, the number of samples gathered will not always result in the same number of sample results received from the lab, Not all laboratories are qualified to analyze asbestos. The lab must be NVLAP certified, participating in the PAT Program of the Federal government, 004. Surve Methodolo 1 Limitations Site reconnaissance was conducted by a Certified AHERA Budding inspector, in accordance with 40 CFR Part 763 Appendix C, who is familiar with the probable uses and locations of suspected Asbestos Containing Building Materials (ACBM). In addition to a visual walk through, effort is expended to disclose prior uses of the facility, age, and characteristics of construction, and other information which helps determine the potential presence of suspected ACBM. This inspection report is the written opinion of a qualified Certified AHERA Building Inspector and is based on conditions visible at the time of the site visit. This report does not constitute a warranty of any kind. Although extensive searches are conducted, there remains a remote possibility that asbestos in some form may lie undetected within the structure; under a floor, inside a duct, behind a wall, or buried in the ground. No degree of demolition was authorized or performed. Some printed materials may be included in #his report strictly for educational purpose. Estimated dimensions quoted in #his report are approximate estimates for location awareness of the materials and are not intended to be accurate for bidding. The Abatement Contractor should check all measurements by site visit. No portion of this report should be removed from its entirety; copies can be made by folding back the pages, This report should remain on file for future reference regarding this structure. In alder structures, it should be noted for personal safety, #hat most window putty did contain asbestos, and that in the process of removing the putty to repair a pane, some individual contamination would most likely occur. Such windows should be removed with the glass intact, and disposed of as a unit. When floating is considered suspect of asbestos content, the mastic should always be treated as suspect as well, and should never be chipped, sanded or scraped until tested to determine if asbestos is present. All questions pertaining to this report should be directed to our office for immediate response. Field notes are included in this report for their interpretive value. Photo's if taken are included for identification. 9 Sample readings resulting in less than one percent (<I %) will not be recorded as asbestos because this amount in unregulated, therefore not considered asbestos (ACM). Our services have been executed in accordance with generally accepted practices within the limitations of scope, schedule, and budget; no other conditions are expressed or implied. This report does not expire as long as all repairs and remodeling activities after the inspection has been performed are conducted using new materials (not inventoried or used) certified asbestos flee; and this action is carefully documented. Because materials are being imported into the United States from China, which can contain asbestos, all suspect materials must be tested to ascertain whether or not asbestos fibers are present. There no longer is a "cut off' date from the year that the U.S. stopped the manufacturing of ACM for residential use that we can rely on. This document is protected by the Copyright Act of l 979 under Title 17 of the United States Code. Under no circumstances can this report be used unless it has been financially compensated for, nor can it be re -printed without express authorization from this firm. aVal site Speculeaiion: This EPA Certified AHERA Building Inspection has been authorized by Mark Goldberg, Principal of MBG Co. representing the owner of this commercial property located at 1943 Wheaton Way, Bremerton, WA 98312. There are 3 storage buildings on this site, all in a dilapidate state and planned for demolition. Characteristics of these buildings include: woad framing and construction; all overgrown with blackberry bushes, The building most Westerly on the site is about 40XI04, sided with T111 plywood; some sheetrock inside; some steel framing; cement floors; painted white; 1'XI00' facia has coating. About 10' tall. The building in the center of the three has: strand board siding in front; steel construction and roofing; concrete poured floors; 12' height and 24' deep. The building on the East of the property is wood framed; with a single membrane roofing; concrete floor; and measures 8' tall; 20X21. These 6 suspect building materials were collected: • Fiberboard • Drywall { 3 samples) • Roofing • Brown coating The suspect materials were collected wet, and sealed into 2mi1 poly lab pouches and were shipped by Priority Mail to our preferred asbestos -specific NVLAP laboratory for analysis using Polarized Light Microscopy. "Suspect Material" is defined as any building material that has ever been documented as containing asbestos fibers or materials that closely resemble those that have. The base amount of asbestos that is regulated is more than one percent. �- ii' • i'OLIFAMI higns i i i 11 You may call our office for additional information at your convenience. This report was prepared for the request of Mark Goldberg and his agents or representatives for specific application to this site. If new information is developed through excavations, borings or other studies, this inspector should be retained to re-evaluate the conclusions of this report and provide amendments as needed, 12 OQ6. Summaa: The local Clean Air Agencies require a 10 day wait prior to asbestos abatement of a commercial or other than owner -occupied structures; and requires the 10 day wait for all demolitions, We suggest you retain #his document for as long as you own this property (ar hold contract to work on it) to verify your compliance to the asbestos standards in place at this time. If there are any questions, please feel free to contact this inspector: Jeanie Taylor, EPA Certified AHERA. Building Inspector astx-r��s-oz-oaa6-os Contracting in Washington State continuously since 1967 t3 KCB ENVIRONMENTAL SERVICES P.O. Box 220 — Seabeck, WA 98380 360.830,5022 COMPENDIUM OF LOCATED ASBESTOS�CONTAINING MATERIALS 1943 Wheaton Way Bremerton, WA 98312 After due diligence was exercised in the investigation of these structures, it was found that no regulated asbestos containing materials were attached to them. Jeanie Taylor, US EPA Certified AHERA Building Inspector May 11, 201b #B/IR-NES-01�08-16 PORTS - K C 13 Environmental Services is a a ono a � ,v v 0) MISS md N x� U0m w tattoo CQo am a 0 w a 7 LU a 0 3 s b A U •_..S z O O O obompopmomoommomm V) o� U � CQ rl 0 g - w �t ` Li ' s �j • U 'FvM r� on ,tom , � � U � � � Cilew JEANIE TAYLOP, Report #: 0516036 KCB ENVIRONMENTAL S !RVICES Date of Recelpt: 05/09/201.6 PO Sox 220 Report Date: 05/10J2016 5eabeck Wa 98380 Date of Analysl$; 05/10/2016 Project: JEISDY HESS ESTATE Sample Material.. Client # Lecatinn Description Detection Composition 14943 W Drywall, White, Non- None Detected Cellulose Fiber 100/0 homogeneous, Chalky- Nolt•ribrous Material 90% Fibrous, Non -Friable 2*1943 W Drywall, White, Non- None Detected Cellulose Fiber 10% homogeneous, Chalky- Non -Fibrous Material 90% Fibrous, Non+riable 3-1943 W Drywall, White, Nan- None Detected Cellulose Fiber 100/0 homogeneous, Chalky Nan -Fibrous Materiel 90% Fibrous, Non+riable 44943 W Fiberboard, Tan, Non- Nono Detected Cellulose Alper 99% 1)011109eneous, Fibrous, Non% Non-Mbrous Material 1% Friable 54943 W Raafing Membrane, Black, Non- None Detected Non -Fibrous Material 100% homogeneous, Rubbery, Non - Friable ... ,. 6-1943 W Coating, Brown, Non- None Detected Non&Flbrous Material l00¢!0 homogeneous, Rubbery, Non• Friable ANALYMAL SERVI S Rem LNumber 256,717rANEAVO, PALMSAY, FLORIDA 32909 0516036 Phone; (321)E37 9837 Fax: (321)728-0728 Page 1 of 2 NVLAP CODE 200670-40 Client: JEANIE TAYLOR Report #: 0516036 KCB ENVIRONMENTAL S RVICES Date of Receipt; 05/09/2016 PO Box 220 Report Date, 05/10/2016 Seabeck Wa 90300 Date of Analysis: 05/10/2016 Project: JUSDY HEW ESTATE Sample Material Client # Location Description Detection Composition so art at a t ASBESTOS TYPES, Chrysatlle, Crocidolite, Anthophyillt4 Trentolite, Amoolte, Actinolite T}ta samples fisted ahova were Suspect of cgnta(nirig asbestos. A result ot'Nan Detect" means a thgrougfi search Uging 2y5proptiate techniques was cq>7ducied end no type of asbestos m as dfucoverad. a^ampfes submitted to this facility wit he disposed of unless the client reouests the samples be returned. Reports will be Archived for a poriod of no more than 3 years, Tho analysis perlotmad lain accordance with EPA 600/Mq.82v02G and ePA 6001F vW1116. Test to tts apply only to the samples submitted. It is not our policy to distribute the custoniels Information vrithout he written aonseAl of the oostomer. The test report shall not be reproduoed except In full, without the wriltan approval or lho labor itory. This report may not be used by the abovo client to claim product oertlOcation, approval or endoromont by NIST, Natio ial Voluntary Leboratory Accredltatton Program or the F6deral Govemmont. row v _art to to 9 r/& Uor� 0 a (orro Shalom Kearney Angela Kearney 1<.abnratory Director j Analyst president ANALYWAL SERVICES ReportNumber 256 7 DIANFAV� PALMBAK FLORIDA 32909 0516036 Phut e; (32I j 837=9 37 Few (3.21) 7284738 Page 2 of 2 NVLAP CODE'., 60670-R CER1 IF1CAT14N0 Un(f ied 8�.esine� Identt�eru 6ms8ysog t Conbuding in Washhrgimt Stets mnl'autacsfy since r96q 't� :, - �� 7 �_..!l.1. .... ;- -- '��°�� s; - = � iti /,;" : ', .. . . �. ....__ t ` { j j � t � ,. + .,� `%� DIY,, d 1 lU. ` ♦ �� �4�\ l� l L�r i �c �� � 4�� �,. J�. � � i S}..� �;iS.��.., ; -i �\i � ti 'fitt Ir.s t t � J;� � . /� li -t�\� jj t ram ? t w jtF '/� �t ai+;�� �:' y .c �/ t �. +( J T `� i �t� 1t(�.r � 1� �� ��i �a.Cd !=.S�Jr�11 t,, _1 'i tt, �;�sa. ��� i �•�; ;,;,. ;i :;. �;�: ;� 0 - � -� � '- �v a _ _. _ S��t./1- � O� 1'�Li.��.V.E 11�. 1C 3,�1� �� �S.�O/l.�lr 1�1��2�i6yVVJ Anaty�ieal �erviees 2563 Diane A��e. Palm Bay; FL 32909 Mr. Sha��m Kearney ..... Phone:321-385-7749 Fax:321-728-0728 Ftivfail: fl.analyticalservices@gznail.com • � �. �'Yl~.�' L�.B CODE 20Ub70-0 ,t�1I�LAP Code Des�gtttrtion/�esc�ipfaon I$/AOl EPA b001M4-82-020: interim �Ietl��od for the Determination of Asb.�stos in Bulk Insulation Samples 18/A03 EPA 6001R-9311 I b: Method for the Determination of Asbestos in Bulk Building Materials 2015•04-01 through 2016-03-31 Effec#Ne dates e For fhe Nat�onat Institute of Standards end Technology Page i of I MILAP-01S (RkV.2oo�05.19) CITY OF BREtittERTON TAX &LICENSE Dti/tStON , 345 6ti1 Street, Suite 600 • Bremerton WA 98337-1873 •PHONE (360) 473-5311 FAX (360) 473-5200 .B USINES�S LI �CENS� KCB ENVIRONMENTAI. SERVICES License Number: Po Box 220 SEA$ECK, WA 98384-0220 EX131TeS: Location: License Type: Business License as49s 12/31 /2a 16 PO Box 220 SEABECK, WA 98380 This License must be posted in a conspicuous place at the business location. This business license is trot transferable or assignable Jeannie Vaughn From: Jeannie Vaughn Sent: Friday, May 20, 2016 12:55 PM To: Joe Keller; 'Lee Golden'; Byron Harris Cc: Derek Skanes; Mark Goldberg; Kristin Moerler; Margret Mountjoy (Margret.Mountjoy@ci.bremerton.wa.us); Tracey Wood; 'ccknight81 @gmail.com' Subject: RE: Demo at 1934 Wheaton Way - Geotechnical Input Attachments: Wheaton Way.docx Apparently, there is some confusion as to what is needed for the demolition permit. We have already done a lot of the work for you. • A contour map from Kitsap Parcel Search has been pasted into the attached Word document. It has the building footprint. This is your site plan. You can use it to show the limits of work and where erosion control measures will be placed. • Tell us what you will be doing to the building and what will be left, i.e., "demolish the building above ground, leave slab".Show us that you will adhere to the conditions laid out in the geotechnical engineer's email of 5/17/16 and the heavy equipment will not encroach into a 10-foot buffer to the crest of the steep slope. • Tell us how the slope will be protected with erosion control. The geotech suggested mulching the vegetation and broadcasting it over the ground within a minimum 10' strip above the crest of the steep slope. This will be sufficient until October 1. If the soils are not stabilized by October 1, other measures may be needed to prevent erosion. • Submit a completed application with the demo permit fee total of $104.50. The owner, the contractor working on behalf of the owner, or the authorized representative of the owner designated with a notarized document may submit the application. • We have the geotechnical engineer email printed and ready for the permit application. You do not have to bring it with you. • The sewer cap has to be in place or have planned coordination with Public Worl<s. The process has started for the sewer cap as the permit has been created and fees paid, and I believe some coordination has occurred with Derek Skanes. Once we have the permit application, it will be expedited but is not a counter review. This site has special conditions to address. Hope this helps to clarify. If you have any other questions or comments, please feel free to contact us. Jeannie Vaughn Building Official Department of Community Development City of Bremerton 345 bth St., Suite 600 Bremerton, WA 98337 (360) 473-5212, desk (360) 473-5278, fax Jeannie.vauahn@ci.bremerton.wa.us 1 Kristin Moerler From: Jeannie Vaughn Sent. Wednesday, May 18, 2016 11:39 AM To: Kristin Moerler Subject: FW: Demo at 1934 Wheaton Way - Geotechnical Input Jeannie Vaughn Building Official Department of Community Development City of Bremerton 345 6th St., Suite 600 Bremerton, WA 98337 (360) 473-5212, desk (360) 473-5278, fax Jeannie.vaughn@ci.bremerton.wa.us From: Jeannie Vaughn Sent: Tuesday, May 17, 2016 12:35 PM Too 'Byron Harris' <byrondharris@gmail.com> Subject: RE: Demo at 1934 Wheaton Way - Geotechnical Input I've answered each concern below. Let me know if you have any other questions. Without a permit application, there's not much we can do right now. Jeannie Vaughn Building Official Department of Community Development City of Bremerton 345 6th St., Suite 600 Bremerton, WA 98337 (360) 473-5212, desk (360) 473-5278, fax Jean nie.vaughn@ci.bremerton.waa us From: Byron Harris [mailto:byrondharris(cDgmail.comj Sent: Tuesday, May 17, 2016 11:53 AM To: Jeannie Vaughn <Jeannie.Vaughn@ci.bremerton.wa.us> Cc: Luark, Richard D <Richard.Luark@terracon.com>; Mark Goldberg <mark@mbeco.biz>; Kristin Moerler <Kristin.Moerler@ci.bremerton.wa.us>; Crystal Knight <ccknight81@gmail.com> Subject: RE: Demo at 1934 Wheaton Way - Geotechnical Input Hi Jeannie, so lets number these items to eliminate confusion and or execution: 1. I believe Mark has the application filled out complete with the exception of the contractor information which the contractor will complete at the counter (contractor ubi, registration number, address, contact information) 1 We do not have a permit application. We created an estimate showing the parcel owner for Mark based on the building area. We have no information regarding the contractor. We cannot accept an application from Mark as he is not an authorized agent. In order to accept an application, we need a completed permit application, the associated documents, and the permit fees. We also need the sewer cap letter from Public Works to show the sanitation system has been capped. Public Works has not received an application or the appropriate fees. 2. Geotech letter has been circulated via email to the City and applicant will make a copy and attach it to the application. Thank you. 3. There is no grading taking place. The 8 hours of work is taking place on existing hard surface (Asphalt & Concrete). Since no dirt is being disturbed and no vegetation is being removed (simply mowed and left on site), I request that the erosion plan be waived since no work being performed would cause any erosion. Removal of the building will create an exposed dirt area that will be subject to erosion. The City's storm water permit requires us to be diligent in water quality on all sites. The geotechnical engineer's email has suggested erosion control measures to protect the slope and a condition will be placed on the permit that all recommendations of the geotechnical engineer be completed. 4. Not sure what a sewer cap letter is? The bldg slab will remain and once the fixtures are removed, any applicable sewer line will be plugged. This can be done as the applicable plumbing is revealed during demolition "after the permit is issued to do such" See answer to #1. The contractor or owner buys a cap and caps the sewer line, then Public Works inspects it. 5. Applicable fees can be paid at the counter Yes, with the permit application. 6. Given the above, I don't see where review in addition to counter review would be necessary. My thought is that the reviewable information has already been reviewed unless I am missing something. The sewer cap is typically placed and inspected before the issuance of the demo permit to protect the sewer. Sometimes, the sewer cap can't be placed until the sewer line is located or exposed during demolition and Public Works will add an inspection on to the demo permit. I don't have all parties at the counter ready to approve a permit and some reviewers are located in another building. While true that a lot of review has already taken place during our discussions and correspondence, the reviewers will approve their step in the database and place appropriate conditions on the permit. Please allow us enough time to make copies and get the permit to everyone for review. If the applicant could bring in four copies of the documents, it would make it faster for the Front Counter to disseminate the permit. Thanks Jeannie, please advise.....Byron I hope I've explained sufficiently. Please let me know if you need any clarification on anything. Jeannie On May 17, 2016 11:05 AM, "Jeannie Vaughn" <Jeannie.Vaughn(a,ci.bremerton.wa.us> wrote: When we receive a complete permit application from the owner, contractor or authorized representative (stipulated with a notarized letter) with all of the pertaining documents such as the geotechnical information relayed in the email, the erosion control plan, sewer cap letter from Public Works, the associated fees, etc., we will disseminate the permit to the appropriate parties. The review of a demolition permit typically takes a couple of days depending on the complexity and the availability of the reviewers. The only thing that can be eliminated from the previous list of items for the permit would be the shoreline checklist. If the demo is planned for next week, I would suggest submitting the permit application today or tomorrow. This one is more complex than normal because of the concerns to protect the slope and the shoreline, and the email from the geotechnical engineer appears to address those concerns which will make the review more efficient. If you have any other questions or comments, feel free to contact either one of us. Jeannie Vaughn Building Official Department of Community Development City of Bremerton 345 bth St., Suite 600 Bremerton, WA 98337 (360) 473-5212, desk (360) 473-5278, fax Jeannievauahn@ci.bremerton.wa.us From: Byron Harris [mailto:byrondharris@�mail.com] Sent: Tuesday, May 17, 201610:47 AM To: Kristin Moerler <Kristin.Moerler@ci.bremerton.wa.us> Cc: Luark, Richard D <Richard.Luark@terracon.com>; Mark Goldberg <mark@mbeco.biz>, Jeannie Vaughn <Jeannie.Vaughn@ci.bremerton.wa.us>; Crystal Knight Subject: RE: Demo at 1934 Wheaton Way - Geotechnical Input Good morning Kristin, Thank you for your research on this matter. You are correct in that the foundation/slab will not be removed and no grading of the site is proposed. We plan on cutting down invasive vegetation (le scotchbroom & blackberry) with a mower. 3 Golden excavation is prepared tc commence work next week. Would he be able to complete his contractor information and pay the fees and pick up the permit at the counter all at the same time or is there anything further lacking that needs to be addressed or required review period? Thanks so much for your help Kristin....Enjoy the sunsmne!........Byron On May 17, 2016 10:09 AM, "Kristin Moerler" <KrisLine Moerler a,ci.bremerLon.wa.us> wrote: Mark, I was out yesterday, but did hear back from the shoreline plamler I had reached out to late last week as I wanted to vet the guidance I had located on Ecology's website about demolition and how it relates to the shoreline definition of development. The critical piece of the puzzle that is not referenced on the Ecology website is the Cowiche Canyon Conservancy v. Bosley court case from 1992. This count case established that the demolition of a structure, does not become development merely because the exterior of a structure is affected, as alteration is not functionally removal. This case supports that as long as the demolition does not otherwise meet the definition of development it will not trigger a shoreline permit (substantial or an exemptions). It is clear that a demolition proposal that includes grading of the site as a part of removing the foundation or other work that meet the definition of development would require a shoreline permit. I am not aware that the proposal for this site will include any grading, or other development features. Please let me know if there was other work planned, based on our conversations I believe the only other work was removal of the invasive scotch broom. Assuming the work is limited as discussed above, it appears that you will not need to submit the shoreline checklist or related shoreline permit fee for the demolition. I look forward to seeing the demolition permit. Senior Planner -City of Bremerton (360Z473-5279 From: Jeannie Vaughn Sent: Friday, May 13, 2016 4:38 PM 0 To: Luark, Richard D <I idhard.Luark@terracon.com>; Kristin Moerler <Kristin. Mo erlerg ci.bremerton. wa. us> Cc: mark ,mb cg_o.biz Subject: no Demo at 1934 Wheaton Way - Geotechnical Input Thank you, Richard. The contents of the email are detailed sufficiently to address the slope for the demolition activities and the mitigation to protect the slope. We appreciate the diligence put forth. Mark, would you please be sure a copy of the email is with the permit application when it is submitted? The permit will be processed more efficiently if all the documentation is submitted as a package. Jeannie Vaughn Building Official Department of Community Development City of Bremerton 345 bth St., Suite 600 Bremerton, WA 98337 1360� 473-5212, desk j360) 473-5278, fax Jeannie.vaughn@ci.bremerton.wa.us From: Luark, Richard D[mailto:Richard.Luark(a,terracon.com] Sent: Friday, May 13, 2016 4:14 PM To: Kristin Moerler <Kristin.Moerlergci.bremerton.wa.us> Cc: Jeannie Vaughn <Jeannie.Vaughn@ci.bremerton.wa.us>; mark l-nbcg o biz Subject: RE: Demo at 1934 Wheaton Way - Geotechnical Input Kristin, 5 On behalf of Mark Goldber& I am providing geotechnical recommendations in regards to the proposed clearing of vegetation and demolition of the structures located at 1934 Wheaton Way, Bremerton Washington. I am both a licensed professional engineer and licensed engineering geologist in the State of Washington. The area which contains the vegetation to be cleared and buildings to be demolished is not defined a geologically hazardous area; however, it falls within the 50 foot default buffer defined by the City of Bremerton Critical Areas Ordinance. The buildings are located with a nearly level area between the steep slope crest and Wheaton Way. The steep slope is defined as a Critical Area due to the slope inclination being greater than 40%. The entire site, including the steep slope, is mapped as continental glacial till, which consists of very dense silty sand with gravel that was deposited beneath the continental glaciers during the last ice age. Glacial till has a high shear strength and therefore forms steep stable slopes provided it is protected from erosion. The steep slope at the referenced site is well vegetated and is therefore protected from erosion. The site is not within a mapped landslide area and the trees on the slope do not show signs of past slope movement or soil creep. Therefore, it is our opinion that the proposed demolition can occur within the 50 foot default setback area without impacting the steep slope critical area. We recommend at least a 10 foot buffer be maintained between motorized demolition equipment and the crest of the steep slope. It is also our understanding that clearing of vegetation on the level portion of the site is desired. It is our opinion that clearing of vegetation with the 50 foot buffer will not impact the steep slope area provided vegetation is mulched and broadcast over the ground to provide erosion protection within at least a 10 foot strip above the crest of the steep slope. Per the City of Bremerton Critical Areas Ordinance, an erosion control plan is not required for clearing and grading within 200 feet of a high geologic hazard area provided the clearing occurs between May 1 to October 1. Therefore, it is our opinion that an erosion control plan is not required for demolition of the buildings or clearing of vegetation, provided it occurs during the dry season, defined as May 1 to October 1. If you require additional information or have any questions, please contact me. Cheers, genior Project Engineer I Geotechnical Terracon 21905 64th Ave W, Suite 100 I Mountlake Terrace, WA 98043 D (425) 409 2664 I F 42j 5) 771 �549 �I M4425) 3018782 rdluark(a.terracon.com I terracon.com From: Mark Goldberg [mailto:mark@mbeco.biz] Sent: Friday, May 13, 2016 2:47 PM To: Luark, Richard D Subject: FW: Demo at 1934 Wheaton Way Richard, Here's the email. Please cc Jeannie Vaught who's the head Building Official at the City. She says she wants an erosion control plan also in your email. We are going to chop down and mulch all the scotchbroom which covers at least 20 feet from the bluff back toward the road and leave it all in place. From where the demo will take place the site slopes back toward the road. The email for Jeannie is: Jeannie.vaugJ�ci.bremerton.wa.us Thanks, Mark From: Kristin Moerler [mailto:Kristin.Moerler@ci.bremerton.wa.us] Sent: Wednesday, May il, 2016 8:54 AM To: Mark Goldberg Cc: Kelli Lambert; Garrett Jackson; Jeannie Vaughn; Tracey Wood; Margret Mountjoy; Janet Lunceford Subject: Demo at 1934 Wheaton Way Mark, I understand you were ip. yesterday to obtain a demolition permit for 1934 Wheaton. That site is in the shoreline environment and located in an area of high geologic hazards. This means that we cannot issue an over the counter demolition permit for this structure. I'm sorry I did not realize that was what you were in to pursue when we spoke. To demo the structure will require a geotechnical analysis of the demolition work and potential impact to the slope, it also requires a shoreline permit as demolition would affect the exterior of a structure and does not appear to be exempt from a substantial development permit. I would expect that it would be simpler to pursue one shoreline permit for the re -development of the property and the demolition, however separate permitting could also be done. See this guidance from Ecology on what is development in the shoreline, it addresses demolition near the end of the text: http://www.cey.wa.goy/programs/sea/sma/st guide/administration/development.html In addition I was asked to assure you are aware that the property owner or the licensed contractor working for the owner needs to apply for the permits. The tax records do not reflect you as an owner of the site, you'll need to document ownership for you to apply for the demolition permit and related shoreline permit. Senior Planner City of Bremerton �360) 473-5279 345 6th Street Suite 600 Bremerton WA 98337-1873 Total Cont►•ol Fanel To: ilia rk(W�mb cg obiz From: kristi n.moerlerci.bremerton.wa.us Message Score: 1 My Spam Blocking Level: High Block this sender High (60): i'as Medium (75): P<�:,s Low (90): l'ass Login ' , Block ci.bremerton.wa.us This message was delivered because the content,juter score did not exceed your filter level. Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability. Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access hyperlink, please a -mail sender. 0 Kristin Moerler From: Kristin Moerler Sent: Tuesday, May 17, 2016 10:09 AM To: mark@mbeco.biz; 'Crystal Knight '; 'Byron Harris' Cc: Jeannie Vaughn; Luark, Richard D Subject: RE: Demo at 1934 Wheaton Way - Geotechnical Input Mark, I was out yesterday, but did hear back from the shoreline planner 1 had reached out to late last week as I wanted to vet the guidance I had located on Ecology's website about demolition and how it relates to the shoreline definition of development. The critical piece of the puzzle that is not referenced on the Ecology website is the Cowiche Canyon Conservancy v. Bosley court case from 1992. This court case established that the demolition of a structure, does not become development merely because the exterior of a structure is affected, as alteration is not functionally removal. This case supports that as long as the demolition does not otherwise meet the definition of development it will not trigger a shoreline permit (substantial or an exemptions). It is clear that a demolition proposal that includes grading of the site as a part of removing the foundation or other work that meet the definition of development would require a shoreline permit. I am not aware that the proposal for this site will include any grading, or other development features. Please let me know if there was other work planned, based on our conversations I believe the only other work was removal of the invasive scotch broom. Assuming the work is limited as discussed above, it appears that you will not need to submit the shoreline checklist or related shoreline permit fee for the demolition. I look forward to seeing the demolition permit. Senior Planner - City of Bremerton (360) 473-5279 From:leannie Vaughn Sent: Friday, May 13, 2016 4:38 PM To: Luark, Richard D <Richard.Luark@terracon.com>; Kristin Moerler <Kristin.Moerler@ci.bremerton.wa.us> Cc: mark@mbeco.biz Subject: RE: Demo at 1934 Wheaton Way - Geotechnical Input Thank you, Richard. The contents of the email are detailed sufficiently to address the slope for the demolition activities and the mitigation to protect the slope. We appreciate the diligence put forth. Mark, would you please be sure a copy of the email is with the permit application when it is submitted? The permit will be processed more efficiently if all the documentation is submitted as a package. Jeannie Vaughn Building Official Department of Community Development City of Bremerton 345 6th St., Suite 600 Bremerton, WA 98337 (360) 473-5212, desk (360) 473-5278, fax Jeannie.vauahn@ci.bremerton.wa.us From: Luark, Richard D[mailto:Richard.Luark@terracon.com] Sent: Friday, May 13, 2016 4:14 PM To: Kristin Moerler <Kristin. Moerler@ci.bremerton.wa.us> Cc: Jeannie Vaughn <Jeannie.Vaughn@ci.bremerton.wa.us>; mark@mbeco.biz Subject: RE: Demo at 1934 Wheaton Way - Geotechnical Input Kristin, On behalf of Mark Goldberg, I am providing geotechnical recommendations in regards to the proposed clearing of vegetation and demolition of the structures located at 1934 Wheaton Way, Bremerton Washington. I am both a licensed professional engineer and licensed engineering geologist in the State of Washington. The area which contains the vegetation to be cleared and buildings to be demolished is not defined a geologically hazardous area; however, it falls within the 50 foot default buffer defined by the City of Bremerton Critical Areas Ordinance. The buildings are located with a nearly level area between the steep slope crest and Wheaton Way. The steep slope is defined as a Critical Area due to the slope inclination being greater than 40%. The entire site, including the steep slope, is mapped as continental glacial till, which consists of very dense silty sand with gravel that was deposited beneath the continental glaciers during the last ice age. Glacial till has a high shear strength and therefore forms steep stable slopes provided it is protected from erosion. The steep slope at the referenced site is well vegetated and is therefore protected from erosion. The site is not within a mapped landslide area and the trees on the slope do not show signs of past slope movement or soil creep. Therefore, it is our opinion that the proposed demolition can occur within the 50 foot default setback area without impacting the steep slope critical area. We recommend at least a 10 foot buffer be maintained between motorized demolition equipment and the crest of the steep slope. It is also our understanding that clearing of vegetation on the level portion of the site is desired. It is our opinion that clearing of vegetation with the 50 foot buffer will not impact the steep slope area provided vegetation is mulched and broadcast over the ground to provide erosion protection within at least a 10 foot strip above the crest of the steep slope. Per the City of Bremerton Critical Areas Ordinance, an erosion control plan is not required for clearing and grading within 200 feet of a high geologic hazard area provided the clearing occurs between May 1 to October 1. Therefore, it is our opinion that an erosion control plan is not required for demolition of the buildings or clearing of vegetation, provided it occurs during the dry season, defined as May 1 to October 1. If you require additional information or have any questions, please contact me. Cheers, i'erracon 21905 64th Ave W, Suite 100 I Mountlake Terrace, WA 98043 D (425) 409 26641 F (425) 7713549 1 M (425) 3018782 rdluark(o)terracon.com I terracon.com From: Mark Goldberg [mailto:marl<@mbaco.biz] Sent: Friday, May 13, 2016 2:47 PM To: Luark, Richard D Subject: FW: Demo at 1934 Wheaton Way Richard, Here's the email. Please cc Jeannie Vaught who's the head Building Official at the City. She says she wants an erosion control plan also in your email. We are going to chop down and mulch all the scotchbroom which covers at least 20 feet from the bluff back toward the road and leave it all in place. From where the demo will take place the site slopes back toward the road. The email for Jeannie is: Jeannie.vau�hn(a@ci.bremerton.wa.us Thanks, Mark From: Kristin Moerler [mailto:Kristin.MoerlerCa�ci.bremerton.wa.us] Sent: Wednesday, May 11, 2016 8:54 AM To: Mark Goldberg Cc: Kelli Lambert; Garrett Jackson; Jeannie Vaughn; Tracey Wood; Margret Mountjoy; Janet Lunceford Subject: Demo at 1934 Wheaton Way Mark, I understand you were in yesterday to obtain a demolition permit for 1934 Wheaton. That site is in the shoreline environment and located in an area of high geologic hazards. This means that we cannot issue an over the counter demolition permit for this structure. I'm sorry I did not realize that was what you were in to pursue when we spoke. To demo the structure will require a geotechnical analysis of the demolition work and potential impact to the slope, it also requires a shoreline permit as demolition would affect the exterior of a structure and does not appear to be exempt from a substantial development permit. I would expect that it would be simpler to pursue one shoreline permit for the re -development of the property and the demolition, however separate permitting could also be done. See this guidance from Ecology on what is development in the shoreline, it addresses demolition near the end of the text: http:www.ecy.wa.�ov/programs/sea/sma/st guide/administration/development.html In addition I was asked to assure you are aware that the property owner or the licensed contractor working for the owner needs to apply for the permits. The tax records do not reflect you as an owner of the site, you'll need to document ownership for you to apply for the demolition permit and related shoreline permit. Senior Planner City of Bremerton (360) 473-5279 345 61h Street Suite 600 Bremerton WA 983374873 Total Control Panel Logan 3 To: markgmb cg obiz Message Score: 1 From: My Spam Blocking Level: High kri stir. moerlerLcki. bremerton. wa. us Block this sender Block ci.bremerton.wa.us Tl:is message tivas delivered because the content filter score did not exceed your filter level. High (60): Medium (75): 11ass Low (90): Pass Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability. Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access hyperlink, please a -mail sender. 0 Department of Community Development Building InspectorlPlans Examiner, Larry Craze La rry.Craze@cLbremerton.wa.us May 19, 2006 Judy L Hess Curtis Knight 5464 Chico Way NW Bremerton, WA 98312 Dear Ms. Hess and Mr. Knight: cc: Chris Hugo Paul Wandling File Te1360473-5212 Fax 36047M278 345 6th Street, Suite 600 _Bremerton,WA98337 It is our understanding that you are proposing to construct eight townhouse style condominiums at 1943 Wheaton Way. Based on your proposal, the following is a summary of the major points discussed at the pre -application meeting held Wednesday, May 10, 2006. Land Use: 1. This property is zoned Employment Center with a Commercial Shoreline Designation. Compliance to BMC 20.92 and the Shoreline Master Program is required. Residential uses, including townhomes are a permitted use. 2. Shoreline Substantial Development Permit, Environmental Review and Site Plan Review are required. a. Type II decision by Director b. 30-day comment period c. 14-day local appeal period d. 21-day DOE appeal period 3. Shoreline requirements include setbacks, view corridor, and height/view corridor. We discussed the Code requirement for one continuous corridor. The Code is specific to "one" continuous corridor. However, as we are currently reviewing our Shoreline Program for proposed amendments, we will include this area for discussion. We anticipate amendments being reviewed by planning commission and City Council June/July. In the meantime, "one" corridor is required. 4. Landscaping is required per BMC 20.50 a. Front yard setback area b. 1 tree per 25 feet lineal frontage 5. Off-street parking is required per BMC 20.48 6. The property does not include parcels 3796-030-014-00 and 3796-030-011-00. Those properties shall be outlined on the site plan as separate, adjoining properties. You may contact the County Assessor's office to obtain further information on these properties. 7. Demolition permits are required for each building being demolished. 8. Any critical areas must be identified pursuant to Bremerton Municipal Code 20.14, Critical Areas Ordinance. A Geotechnical Report is required to comply with the City Code. Note: Pre -Submittal Report 4BP06-00082 Page 2 The Critical Areas Ordinance was revised on March 28, 2006 and the geotechnical report must reference current codes. Building Division: 1. Building Plan Review: Code Compliance -All work in the City of Bremerton shall adhere to the following 2003 International Codes: International Building Code International Residential Code International Existing Building Code International Fire Code International Mechanical Code Uniform Plumbing Code International Fuel Gas Code 1998 WA State Barrier Free Code 2001 WA State Energy Code 2000 WA State Ventilation Code Check For All Washington State Amendments. En ing Bering Department: Frontage Improvements are required per BMC 11.12.110. Specifically this means that you will be required to install curb, gutter, sidewalk, streetlighting and storm drainage conveyance along your property frontage. The road classification of Wheaton Way is a Collector Arterial. Engineering Road Standards for a Collector Arterial will be required. 2. Engineered Storm Drainage Report and Plan will be required. 3. Utility Plan is required. 4. Existing Static water pressure is around 50psi. Your designer will be required to coordinate with the Utility to schedule a flow test to verify fireflow. 5. Engineered Temporary Erosion and Sedimentation Control Plan are required. 6. Engineered Street Lighting Plan is required. Cross Connection Control: 1. No comments. Fire Department: 1. FIRE: Fire Protection systems shall comply with: International Fire Code-IFC International Building Code -IBC National Fire Protection Assoc.-NFPA Bremerton Municipal Code-BMC 2. No Double Keyed Deadbolts. Required exit doors are not allowed to be secured with locks requiring a key from the inside to open the lock. IFC 1008010803 (2.3) 3. Copies of fire ordinances and Bremerton Municipal Codes are available at the City's website, www.ci.bremerton.wa.us. To reach Scott Rappleye, call 360473-5384 or e-mail Pre -Submittal Report #BP06-00082 Page 3 at Scott.Kappleye@ci,bremerton.wa.us. To reach Mike Six, ca11473-5284 or Michael. Six@ci.bremerton.wa.us 4. Address numbers shall be sized depending on the distance of the building, from the street: 0-50' from the street :Number size shall be 642" minimum height; 50' to 100' from street: Number size shall be 12-18" minimum height; Greater than 100' from street: Number size shall be 18-24" minimum height; IFC/BMC 505.1.1 5. Provide Fire Extinguishers per IFC Section 906. 6. The following minimum dimensions shall apply for fire apparatus access roads: 1. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet, except for approved security gates in accordance with section 503.6 (min. 14' width) and IFC/BMC Appendix D 103.5, and an unobstructed vertical clearance of not less than 13 feet 6 inches. 2. In the immediate vicinity of any building or portion thereof in excess of 28 feet in height, the fire apparatus access road shall have an unobstructed width of not less than 26 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. 3. At least one of the required fire apparatus access roads shall be located a minimum of 15 feet and a maximum of 25 feet from each building on the premises and shall be positioned parallel to one entire side of each building. The measurement for this requirement shall be taken from the exterior wall of the building to the nearest edge of the fire apparatus access road. IFC/BMC503.2.1 7. Street or road signs shall be provided for all private and public roads. All private street and road signs shall be designed and installed to meet public road sign standards as set by the City of Bremerton Street Department, any expense shall be the responsibility of the property owner. New street and road signs shall be posted within 30 days after receiving approval from the City of Bremerton Engineering Department. IFC/BMC 503.3.4 8. Fire Alarm Systems must be addressable unless <10 devices All components must be listed for intended use Pull stations must be located at each exit and within 5' of that exit A Horn Strobe is required outside the entrance closest to the panel. Strobes must be synchronized A Knox Box is required with a Fire Alarm System 9. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. IFC 503,263 10. Elevator to accommodate ambulance stretcher In buildings four stories in height or more, at least one elevator shall be provided for fire department emergency access to all floors. Such elevator car shall be of such a size and arrangement to accommodate a 36" x 80" ambulance stretcher in the horizontal, open position and shall be identified by the international symbol for EMS services (star of life) at least 3" in size 11. A Knox Box is required to provide Fire Department Access: Commercial: 3200 series Knox Box Commercial: (>10 keys/elevator) 4400 Knox Vault Pre -Submittal Report #BP06-00082 Page 4 Commercial: kill" lti-story/MSDS sheets, Pre -fire plans, Haz-Mat data, Key Storage) requirel300 series Knox Cabinet Gates:w/ occupants behind gate. Opticom/Knox key switch 3500 series. Gates:w/out occupants behind Knox Padlock 3750 series. Residential: 1650 series Knox Box (<5 units) IFC 506.1 12. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. IFC 508.1 13. Provide fire hydrants and fire flow per International Fire Code Appendix B and C. Hydrants shall be color -coded and provide with 5" storz adapter and BLUE road reflectors to Bremerton standard. Contact Bremerton Municipal Utilities at 360473-5249 for more information. 14. Exits shall meet all requirements of 2003 International Building Code Chapter 10. 15. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. IFC 510.1 16. Buildings or Structures shall not be occupied prior to testing of all fire protection systems and Fire Marshal approval. IFC 1054393 17. ALARM SYSTEM REQUIREMENTS FOR CONTRACTORS: • Alarm systems shall be on a dedicated circuit. • That circuit shall be controlled by a securable breaker or panel as approved by the AHJ. • That breaker shall be readily identifiable, preferably a commercially produced "RED" breaker of the appropriate amperage. • A 100% documented system test shall be accomplished prior to scheduling an inspection with the AHJ48 hours prior to desired test. • AHJ signed and approved design plans shall be on -site during the installation and during the final inspection. • A minimum 7Ah battery minimum shall be used. • A smoke or heat detector, as determined by the AHJ, shall be provided above the alarm panel. • A current City of Bremerton business license is required by the installing company. • An experienced Journeyman level Electrician, shall be present during all phases of the alarm installation process. • The Alarm panel shall have all instructions, the system account number, and maintenance phone number shall be provided. • All alarm systems shall be addressable other than Level II retro-fits, and expansion of an existing system. • All new alarm systems in Level III structures shall be addressable. • A horn/strobe shall be installed on the structure outside the closest entrance to the Pre -Submittal Report #BP06-00082 Page 5 alarm panel. Contact the AHJ for more information. • A Statement of Compliance letter is required stating that installation, compatibility and testing have been accomplished per applicable standards. See International Fire Code 901.2.1 for exact language. AN L&I ELECTRICAL PERMIT MUST BE ON SITE AND APPROVED BY L&I PRIOR TO CALLING FOR FINAL INSPECTION. 18. Hydrants where required. All buildings or structures shall be located so that there is at least 1 hydrant within 150 feet, and no portion of the building or structure is more than 300 feet from a hydrant, as measured by an approved route. Exceptions: 1. For Group R-3 and Group U occupancies the distance required shall be 600 feet (183m). 2. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m) IFC 5086501 19. Required Automatic Sprinkler System shall be designed, installed, maintained, tested in accordance NFPA 13R. IFC 903.2 20. All Fire Alarm systems shall be pretested prior to scheduling an inspection with the Fire Marshals office. All pretest record shall be made available to Fire Marshal at the time of inspection. 21. Acceptance tests required for sprinkler systems, underground flush/hydro and sprinkler system hydro/head placement approval shall be completed before sheetrock installation and prior to final inspection and sprinkler testing 22. Fire alarm audibility of 75 db at each pillow is required in all sleeping areas. 23. Dumper Capacity exceeding 1.5 cubic yards. Dumpsters and containers with an individual capacity of 1.5 cubic yards or more shall not be stored in buildings or placed within 5 feet of combustible walls, openings or combustible roof eave lines. IFC 3040343 24. Fire Alarm System shall be addressable & designed, installed, tested and maintained in accordance to NFPA 72. IFC Section 907 25. L&I electrical certification -Shall be provided for both electric and fire alarm panels prior to final occupancy. 26. Provide building plans on CD to be used as needed for pre -fire planning. 27. Groups R-2, R-3, R4 and I-1. Single or multiple -station smoke alarms shall be installed and maintained in Groups R-2, R-3, R4 and 1-1 regardless of occupant load at all of the following locations: 1. On the ceiling or wall outside of each separate sleeping area in the immediate vicinity of bedrooms. 2. In each room used for sleeping purposes. 3. In each story within a dwelling unit, including basements but not including crawl spaces and uninhabitable attics. In dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level. Pre -Submittal Report 4BP06-00082 Page 6 SMOKE DETECTORS SHALL ALSO MEET THE REQUIREMENT OF 907.2.10.2 AND 907.2.10.3 THESE ADDRESS POWER SUPPLY AND 1NCONNECTION. 28. All Group R occupancies of five (3) or more units shall be equipped with an automatic sprinkler system installed in accordance with 903.3. Sprinkler heads in kitchens shall be installed (on the ceiling) no more than 2 feet out from the front of the stove top. (BMC 184035120) TrafEc (Police) 1. No comments. These comments are based on information that you had provided prior to and at the pre -submittal meeting. If you have; any further questions, please call me at (360) 473-5212. �l Sincerely, Y n 1 fto Larry Craze Building Inspector/Plaris. xam. Department of Community Development Land Use: (360) 473-5875 Building: (360) 473-5875 Engineering: (360) 473-5270 Cross Connection Control: (360) 473-5920 Fire: (360) 473-5380 Traffic: (360) 473-5220 s han 1 f� f'Dno 1943 Wheaton Way Townhomes, Enclosed: Vicinity Map Site Plan Floor Plans Current Use of Site: Shed and garages, vacant. Proposed Use: 8 Townhouse Condominiums Proposed or actual parcel and structure sizes: 1.2 acres or 52,272 square feet parcel size, building size 8 units of approximately a footprint of 26'x 40' with a maximum height of 3 5' . Adjacent Land Uses: Residential to the west, commercial to the east, vacant across the street to the north and Washington Narrows to the south. Kitsap Transit serves Wheaton Way in both directions. Scope of Work: Demolish existing structures and remove existing asphalt, construct eight townhouse condominiums (see floor plans) in two groups of four, add utilities as required to code, add storm water as required, pave new asphalt driveway, add sidewalk and planting strip, complete with landscaping signage and lighting. / Specific Questions. DO N�� , air v,ta 1. Maximum allowable height? yr. �D` reyib on � GC 2. View corridor verification of require ents. + r 5�b g'dr,r,3. Storm water, can't go into the bay? Will on site detention y�Q kG %KI � be required? 3 z 3 {.e r dl t,- 3ti � 4. Will sprinkler system be required and any additional fire 2ti"`kip IS ` bA114 (b(9 `4i`- )Hydrant(s)? t 5. Public access footpath required? 6. Width of entrance and exit? APR 2 0 2OO6 13REMER T ON-�)+uP i. Of= �®MMUN�1Y ptVELOPMENT VI. )l UO ; �- i ; _..__ __I I t N ___ .. I......._` -�--- - =--� _J I____--1-- 1 I_�....._._I_ � .J { — -- =— _ y . J t�`"� � i .. --f—•--�- �—=�---i I---^ iJ-.... "_J —=mil-"i ,a --� � �. N I 1 j "`'i !_ .� �r._:`_I t__o,L_.__.._I L__� cTl. _; ► EY �� \\ 1..__ 1 � � r — — o _ '"h*'y o, _.. ,, - _ - - - Q � �: ., -� �� P o _�_ _ „ \ . �, ..- , o � a o\ ,. \�, \ � %�o� o� o �'� � � Y\� \ \ „� \ � \ ,� °o�� �:> .�. � ,� \ o � �. � , __ sQa a.. � � � �, -� _. _. __; . o � _ .QQ� �o O _Q � y � i �`"z� ����� �\ �e j � 0 4i o �\ �p\ \\ \ � � U Q � O �' ry ( b _ �_ h /5 V !I+ ll . Kitsap County Assessor's Related Accounts Page 1 of 1 I ( I Elected I County I I I I Parks & Home Departments Officials Services Resources Environmental Elections%Licenses Recreation Related Accounts Print this,page Tax Account No. Process No. Situs Address 976-030-014-0005 1496835 —� close this window http://kcwppub2. co.kitsap.wa.us/pls/ilisw/online_lis_info�kg.related_acct?p_in_rp_acct_i... 5/10/2006 CITY OF BREMERTON FIB PERMIT NUMBER BP06 00082 ASSESSOR NUMBER: APPLICANT NAME: OWNER NAME: CONTRACTOR: LENDER NAME: DEPARTMENT OF COMMUNITY DEVELOPMENT DATE ISSUED: 345 - 6th Street, Bremerton, WA 98337 (360) 473-5275 Fax: (360) 473-5278 3976-030-012-0007 HESS JUDY L HESS JUDY L ZONING: EC SITE ADDRESS: 1943 WHEATON WAY PHONE: (360) 990-1476 ADDRESS: 5464 CHICO WAY NW, BREMERTON, WA 98312 PHONE: (360) 990-1476 ADDRESS: 5464 CHICO WAY NW, BREMERTON, WA 98312 PHONE: ADDRESS: PHONE: ADDRESS: SUBMITTED: OS/01/2006 APPROVED: EXPIRATION: 10/28/2006 STATUS: SCHEDULED VALUATION: TOTAL FEES: Department Phone Numbers DCD: Building and Land Use Fire Marshal Pre•Application Conference PRESUB FOR NEW 8 TOWNHOUSE CONDOMINIUMS Meeting Date 5/10/06 Meeting Time 9:30 Building Code Edition: Occupancy Group: Type of Construction: Flood Zone: Setbacks: Sanitation Method: (360) 473.5275 Public Works/Engineering (360) 473-5384 Public Works/Cross Connection Control I have read, and agree to abide by the conditions of this permit including all conditions of zoning, building codes, and State and Federal laws. SIGNATURE OF OWNER OR AGENT: k (360) 473.5270 (360) 473.5920 PRINTED NAME: DATE: CONDITIONS The City of Bremerton's comments below are based on information provided by the applicant for the presubmittal conference; other conditions may apply for permit issuance. Page 1 of 1 B R E M E R T O N Application Date Issue Date Assessor Acct # Site Location Owner - Last Name Street City Phone B U I L D I N G 03J03J1992 03/03/1992 D E P AA T Pi N T Appl.ic.ation Number 92AP04769 Permit Number 12962 Project Group 1943 WHEATON WAY WALLACE First ROBERT 5635 FERN AVENUE NE BREMERTON ._ ate WA Zip 98310 (2.06)-377-5321. MI 'ensnt's Name Fone(206} - Agent's Name - �� A. Ph*De(206) - Architect's Name [X] Building �� ;`:grading [ MetSick E. ] Paving [X] Mechanical T' Ive &wilding } _Burnie<a] Underground [X] Ylumbang `[ `, Mob11e Home [ ] Land Cle►az [ JDemolition Building . ontra'Aor4 AA 4' f _ Work wit pYeted by owns C - Nature A. Shent c echanical permit fo7.4fas furnace, piping Plumb:Clig peftitfor water heate �. tAt .t A - - N. _ - �4L Building ValvatioNwe. .1 $500400 ,st,ti, ,,en emw,, tomo �fpeep, imomw samiii mome tut an,,, op,mg, y,,,, Item t,dw ta,,, qpwAd Apm,, titter "110b UE", AMIF 106,, AMEMP IPI,M fto,,, 1,141 PeNdp 9001 IIIN '111M, 6,6110 ,,y, Iptat Council DY_t ri ct 3 Census Tract , ., ': AA A It,, Al IA INCA ConstructionA. y F'460 AAI Inspections Type Required Residence [ ] Business [X] other [ ] New [ Repair [ ] Remodel [XJ --_-Addition �[t] Received By: ,Zoning - �TYPe ,end Glee, Meet, Gets � It"I, � W"Od Status Code Foundation Framing [ [ ] ] Insulation [ ] Plumbing [X] Mechanical [X] Wallboard [X] 12 Final [X] TApproved By: —__=' �—___'=-=r tL� B R E �! E R T O N B U I L D I N G D E P A R T M F DI T M E G H A N I C A� L P E R .M I T A P P L I C. A T I O N+ '; - _-____�-�-_---___�����__-====T��_______________________________�_____- �. . Application Nuriak�.er �2AP047b$ Work will be completed by owner. Staves Fire Place Inaert�:�_ 1 �urna��a BurneYs Heaters Borer 2 Gas flirt l et s _ �,!�a�l ors '. A1�;� Oonditi.oning Llnits �,;' �Te�t Pumgs Re-I��eat :Boxes = - �� Aid Handling iJlgts�,�` FsnS Range Hoods. Dryers - - Incinerators Alterations Tanks _; ��,Refrigeration Ur���s __ '`.tether I terns -- � �.� �4. �. � <.,2 . '�+1r -4'''-r - .- ,': =, . B R E M E E T O IQ P I, U M. B I Pi G B U I L D I N G P E R M I T D F. P A R T M E ITT T A P P L I C A T I () N Application Number 9AP04769 Work will be completed by owner. Toi. I ets Bathtubs Basin.,%.: ` Sh.c rs xftcbAn S i� Di herd 4,0 Luc` y Trays wool Washers 1 11. Waw 6. r Ti4 aters tIt na�I's Dri,ri'king Fount. Drains If 0 Shop Sinks IF Cater Piping Interceptors — Vacuum Breaker Lawn Sprinkler Fire Sprinkler low Private pools IF Semi -Private Pa Public P001s Oroundwor :;_ Samps Alterations Kidney Machines 1. . o IF wool For ,111 Flow IN :4 low = Private Hot Tubs $emi-Private Hat TIF ubs Publ-5:•c Hot Tubs otti r aptions m W 0 cc f� V 2 m W ry Z W %ZZ l.. UCc02 a Z >.jPw C�Qx2 G z � z =u= U = f.,} r N m } L11 L' Z ivy d U ui W z Q �0J-W ~ a a W W ZZ > > W DD LC CIl ti L LL, r N Ca d" LO CA I- Z w wa: c�c��� a t - (n CL i] zi�C_�11—AZ) J z LL (n fn LL �- ���ZWiWi ZmNUI a.CL >2Ui...tiU7(ncn mo»ate fJGaC7 ~ 0:) C� OT T T W Z J Cd w W J 0 > LL aWWCl. �uOCa: W 0 o co LLJ wUy wIr w M 'CL CL 2 w (`C66 z w u 0 Lli (DCL CjW(51D wLLZcn — F- LL i- -m_p:rnW - �wZa cc: Ci �r G CL r N M d' Le) m GfI J J Q � U cc tag �r r_ Z LL (� J Z � aFoca c�i7,zzz Qa�W w u7 tC U W IOL Cc� u.QC]CL� W W 2 to CO u) cr.0 L`CC<C meZ LLI C) W {� � 0 JaDZ an Q!P cr z ? ,S r N ca 4 ui75 LL m LU CL �" cc w 0 m J IU 0D LOU J a }Zr~y�a >(} w W En W � O � Lr) 0occ Wa<CL0 z �Z=ate _ �v w r� 1- W W �C C.,5 > 0ww�0:20 Hu� �ODU��LOL1— �, C�0�00 wD' LLJUJ0 F' !cnz0i Z0 cnu��iulz�z< � rNm d'LS7 toi` T T rT T T" T r 0 VJ LU J 0 LLI CO CL 0 JW Z CC z Z w Z LL a: Lij L0MMCCZWC� du~jCL o:zQ Da: 00 Lu '<a: W-SW JLL LLJ W= Q (n CC Co J W Z "'z A iz WC=w __ ^�cnu.� i/ W -O 0 m Q Z: c Ti O W r 0 lu am m mm 13 mmy Dm I mma z MC Z m �1 CI7 !UM41 b W r�jj� p!�Q]�l��L'1 P W1+]-L mzrr�r�:E Dm�y 7D wz�,m--�aocn-�rr��' m77m mm='K5 mzmQ°=!o�l::S _-��rD�i 7]�omr�MmzK z fir=: 0o0Mm+000zm m co m-j�OM � 0 Z m r p C [n z r z ry = 0 m -� to Ln :o D -j�m� Z moo Di�N D Zp in co? zrn yzj mmlpmmo,5n m : EF �° u' Q) m z M�4ol01 .pWfV -1 O _ C D�0D033:EM-rlmZ—rmMi�,,MC,D:o z m{7m�mm-<Z0C-�w ztmn[��m�omo Z�D77m3)Lr). , :Emw<mo< DoR:'o J r rQrm C)z �mOMJ,jCFI 0 Inc mMCo z m��rM wm>�F=z L ��mD �,2mmZ:: r��m � z -� m D --�—mom pmm m� Zm Q F �_� �' 0ZDZ33 Lnn �7 z Q Ito m �o GD Umn _ a m m 0 _ � A 0 Z K m==m r mm mon o K mZmA"� Mm� z b LD >u S()-jm m LO Cn "V m m AC{��MCI m zr,C?C: DD�?1m�n 0 M Lj M m z -q [n < [n ; m r m 0�r mZ 0� zm G) Z m m m / ✓ / / `7 ol 00000 C�) ve " e PFF Ij LV :ti �? I / do City of Bremerton, Washington 98310 Phone: (206) 478=5281 Assessor's Tax Account No.: 3g71p -030 "CAQ "0007 Site Address: N13 (QYyA'lov Wq&,I �Y� I �� G � � f Phone No.: Owner's Name: Address: P.c • p�x a49 3 i 5b�7i fir' �I81 a Applicant: l,dl Owner ❑ Architect ❑ Contractor ❑ Tenant Architect Firm: Representative: Address: Phone: Contractor: fXw1rn tiWOor Gad\,kr 41 ai Representative: i m 65feL-u L� IN Address: P O Eft c l4 3 S;Ez eta c1 � l � Phone: laU�-9 Contractor's License No.: tMPIRocli )QjaAJA Exp. Date: ❑ Residence ❑ Business ❑ Other: New ❑ Repair ❑ Remodel/Addn ❑Demolish ❑ Duplex ❑ Multi -Family (No. units ) Sign ❑ Parking Lot C I ❑ Grading (cu. yds ) ❑ Bldg. Move Nature of Work Proposed: EXPt+ OfY12 hwL^^rb iXJtCY oAyer+1s*uI 2Q6D. oy) sj2j il. ,m or"t., . 5:, ' a t I S I la, imotkKknj 0'n JJiyarlh QU _1`1 12 otA hfl t f 'tn AQjJ'nln_QI I be I (A . Sq. Ft.: Utilities: ❑ Water ❑ Waste ❑ Sewer ❑ Septic ❑ New ❑ Existing ❑ Storm Valuation of Materials/Labor: Plan Review Fee: Permit Fee: Surcharges: [UBC Sec. 304(b)] �(�- $ ZS;oo . � State $3.50 �" Db .Receipt No.: 710367 Receipt No.? g3� 7 Energy $10/$15 ❑ Date: 11-3-9V Date: 6/4? i Zone Designation: Occupancy Classification (UBC): No. Stories: cc.I Setbacks: Front: [ S ` Sider_ Rear: Height: i 3, Heat Source: nc*,.e . Comments/Conditions of Approval: I �L,/A N tN ► N D N I & I understand that applications for which no permit is issued within 180 days following date of application shall expire by limitation, plans and/or other data submitted may be returnez to applicant or destroyed by the Building Official. (Sec. 304(d)UBC). I certify that the information on this application furnished by me is true and correct and that the applicable requirements f the Ci y of-nrPmAr}on will be met. $1 Signature ( _ Date ov Copies to: White -owner; Yellow -file; Pink -Assessor: Goldenrod -Building Stat. Code CITY OF BREMERTON POSTING MEMO FOR REFUNDS The amount of $S0.00 received as Building Permit Fee is to be refunded to: Empire Outdoor Advertising .0. Box 24431 le, �n1A 98124 as a result of ayplication for building permits denied. 500 National Avenue and 1943 Wheaton Way Date and number of original Treasurer's Receipt (if applicable) GR 79307 11/3/88 Fund/Revenue Account to be debited 001-62-322.1001 Paid by Treasurer's Check # CITY TREASURER 5UPERVISOR DIRECTOR OF ADMINISTRATIVE SERVICES Dated FORM M73o � COMPRINT, wc. (206) 373.9940 City of Bremerton, Washington 98310 Phone: (206) 478-5281 Assessor's Tax Account No.: 397o-03D'OQ "t--CC)�I — Site Address: �IVY�PA't�ytL>Ja� } �rC�SYYIe> Phone No.: (ncQ -�Caqq Owner's Name: Lmve.Address: P a�i93 I 66ATi -� 98)a`f' nt: I,�SI Owner ❑ Architect ❑ Contractor ❑ Tenant ct Firm: Representative: s: Phone. tor: ire �ii 3aof)r' ai+x'-� 1�-1LgA� Representative: isS nnt ogLu LoF�� rAddress: P C) ol I S�r'NT- LLo L �� c I Phone: (>z� Contractor's License No.: MOIR C)cj IjaAJAExp. Date: ence Business Other. New Repair Remodel/Addn FODemolish ❑ Duplex Multi -Family (No. units )Sign ❑ Parking Lot Grading (cu. yds ) ❑ Bldg. Move Nature of Work Proposed: Ey?f a- O1 l2 bw tc) ICY 2Qn, an cz,,uU d :Lozi t � aLa 'g C ,C,�vgirft:5II�VAQ T,pLno Sq. Fts:'"la oarr` s: ❑ Water ❑ Waste ❑ Sewer ❑ Septic ❑ New ❑ Existing ❑ Storm F[USC on of MateriaWLabor. Plan Review Fee: Permit Fee: Surcharges: Sec. 304(b)] S Z S, o State $3 . SO Receipt No.: 7 Receipt No..77 9307 Energy S10/$15 ❑ Date: Date: Zone Designation: OccLopancy Classification (UBC): No. Stories: ct.l Setbacks: Front: S Side: �C�O Rear:C::2Height. Heat Source:. Comm ents/Conditions of Approval:- r Q Ila a C I- cL I o I understand that applications for which no permit is issued within 180 days following date of application shall expire by limitation, plans and/or other data submitted may be returne to applicant or destroyed by the Building Official. (Sec. 304(d)UBC). I certify that the information on this application furnished by me is true and correct and that the applicable requiremen�tsIf the Ci y of -Aroma,-}on will be met. Signature Date Copies to: White -owner: Yellow -tile; Pink•Assessor: Goldenrod -Budding Stat. Code i Cissesa:..-s Awt rr� . � 317t� r w,a. 4�r3� � r�.ca,5 u:est nhd.• ��cu-�+-��.st. Qdsir�SS o� t�,! cn �r�,c�Y �s:i'Y` �cr,(Jti01'1CS �,c�t2 )Cft\'1L7Ylr li✓Yl�Lk�%t li.iJ`� Jrr (VX!;+ /YY\Gur112Ci J7li B t CJY1 cJ FJ tiv:tticc�- Ct r}i � �m � I�ICm ; �,,r•2i� O'Y�'�.. I�c��.•`tc, n.(:�:. [ v4. Asti 5�-tC.�l an �z CAL_CULAT I ON S IV WIO; R Co' HIGH SIGN ON Ip' (MAN) COt- H o.. t Imo. DESIGN G{Z1T EtZ-I A WA (90HPH EXP(S)J <21a0.7.1.4 = Z0.56 SAY 'LOPSF L4fS((5cHPH MXP(c))=17PI.2rl.4=ZB.<v SAY SO FPS wd= (qO MPH Z"Xr(G)) =ZI x,,2f1.4 = 95.Lb 5 A?J 3S P5I`• Fcc) TItVGSvest FOfL GLASS y,� �� III WR=oc CI STEt=I-ASTM A-36vt OrL ElOUIV. COOL- UNIFOmImo`I 15UILOING Come (Ug 19aSr=f� FrLAMING OEzS1GN ' HAtN-GOI. PA= 72¢ X 0002 KSFr I.44"' Fos :2,1(o PC = 2•SZ� Mod 1.44�x 13'= 18,7ZIk MB i6Zg.l'1L Mc 632,$'Kw SA ('a.iZ r1Z/24 t.S3= i•04a; is 10.5(e"3 Sc 'L.Z S USE" (SCNED 40) Ce' 4 S : 6.5 8" 'S= I(o o s 8 5 =1lO.b upf=erL GOL (USE WC opotti"Y) M1 2.52'� xS'=7.54o'K 53Z;SG.rI2=2.04 USE 3%Z,4, sic HEP40 CROSS ArZH MX^(DL) = 5000 As, =A'ti< MYY(64IINO)mss2%2 x3'=3.76'1e- EM =3,$6'IL USE. 340 SCHED 40 U FfLIGIiT S (4' E 2' SPAN " = 20" K USC 4 " C cj. 4'* PC`OTING COSIGN S,=cSoit-x�/3 d 2E©o = ADZ. I t I+4'AS GLASS � SOIL_ � 501E= O.I KSF/FTXl,33n Z = C.2(o7 A) TfLY Z' � v 7,5' 6) T IZY Z.10 x q' C) Tmie I gX9•S' Si = 0, G(csl S = C' S S -0.64 4 A= 2.5 A/2=1.2S A-3.IG A/2°LSO07 A- 3,49 A/'L=1.dl5 D 7. 3 G IL D 3 S.5' O tL D a q, 0 O K CLASS .LY SOIL a-'SOIL_=O•ISIGSF/FTxl.33x2=0.4 A) TRY 2'c� x CO•S' 5) TZY *2 q; 7.51 C)T2Y 2' p X8' S,=O.a(o7 $=1.0 S,=Igo 7 A= 1,94 A/2= 0.9 7 A= 2.52 A/2= 1,2(o A=Z.m7G A/2=1.'Sb 0g� loos' O 14coo, 7 O d . 3 IL Co OO 144to SOIL SOIL = 0.2 I�SF/FTx1.53rZ=C.533 A) T2Y 2'C� x �.7g...g 6)TRY 2'O * G.G71 G� T2Y 2'c�x7.25 S, = 1,02 5, = 1.V1 5, = 1.29 Z.?Z A/2 = I,O<O A C°. (mss 3' OIL D ? (o.q 2 N C. FO 2 V MOU 1VT ((OC° MAx) D5L- PACs FLAC, ^JI C.IJ k•COPY WT = Z95" SAY 300� M DUF TO D_ = 300* x (Z)k ZI"/IZYrr = 1. 095 1< (ON HAIt.I PJLF Iiij (C.I AM") L 3COax 3.5' + ZIGO'9` c 3' = 7530'9'1 - 9C•'1° W- (ES VALUE) d"(t, Scl-lE0 40 OKft iI(OL) PULL FLAG • 0•4o"•x6d = 3.(a' 4. SI•••IA C6ASE c 16•TZ + LOS = 1q.77' k !E: M5 a bASE =2 6.1 + I.OS = 19.15'1<.. L H c = 32. 8 t I. OS = 3 3, 65, iL " o GOES ArL O k (E)<C FULL FLAG) s/ FOOTINC51S - - GLASS a Ox = 7*G' )7.5' Bls = 6 ("5 <q•O' Dc = 9,Ib i q•o' GLAs5 = DA = (0,5'= COOS' Da=7,5 =7.5' Dc=7,94<8.0 GLASS ICT , � DA = 5.9' > Simms (n Da=,79' > (A (.7 {�c='7.OSG%250 FOOTINGS NEE.r� TO Ma t]EEPEN�O SLIGHTLY so HAKIE AI_t... V MOUNTS 3" OEcPER-. (FLAG HOUWTS SAME.) USG 814cpI o"AtN) <2gi FULr" FLAG I SCH='O 40 V+ STAND Rfl GIJFr \ (MAY B DOUOt_P_ rt SINCoL FAGD .o ) SCt.4e 40 Sol m BTUra g�J �I! 'pT(O SLIP .101t�1T W/ � , PL_uG L�I�•Los - i 1 SGI-lE0 4.O F*I P= C OL- (SC= GcwEO FO(L SIZE '�,' � COtJG FOOTING Y•1� = 2C00 PSI - (POUZ AGAINST FILM NATURAL 00015TUG300 SOiL (T VPIGAL) CENTEfZ- HCUt.JT e 21Grrr Fort I/ArL[AT OWS (Gltt= PACE TO UP - (LIGHTS (2.7OP L'= � WOOX BOLT (3IV(� ) (Z BOTTOM (STO Tift'IN < �• 11V HOUNT (��' FACs) E FLA4 VIJITS TO HAVE FOQ'rING DE�i 3" (HIr.II 6R>=ATE(L THAN SHOI�.IN IN GHA2T. "FLA4 MT.�GOL.TO 8E 8° (5ckooksp 40j MIN Ot A F02 ALL L oAD'G g PIPE GOL U f�ER SGHEMUL'c✓ d"6 SGHED, �\ 4p (V Mau ° \ (00 fMAX --� PL AN @ 0 s puTLINE I o AC, MGUNTj i Q N OUTLIN�.Ic_ �/ MOvr.�T _ 3�z4scImolEo APO p STD SLIP .!T I O W/ RUG WLICS I (°Ult_ S�CTiOhI C- V 11 )Ut'IT UGM 4"6SGF�D U QPLAG. FiOUtJT US'= IY N HAG' FLA UNT .E„ x Q Pt PE" COL PEfL xHPD - loggiiij =1Pt= GGL P52 SGi-{6� �G"� SCHI=a 40 ----- FACESINGLE OfL DBL1 - ----�J -G'-o" MAY - - PLAN FLAG MOUti1T1�4" = I'-O'` CP TION/�L MOUNTS !.�1 •u? Itsl 1 06 ® ALBERT R. KENNEY, JR. PE CONSIATING ENCER/FLAMER' 236-1551 ORe OU7DOO(zS 682-0491 ST,nNpAtzC "6 s1-+Er T " DISPLAY oAT I- EO PROFF e °0°+ l SEATTL_C� WASHINGTOtJ JOB NO. 6 (a 00 Z 0Inc0Y a SHEET NO, Br R KEN�`� T. City/ of BremertorL 239 FOURTH STREET BREMERTON, WASHINGTON 98310 (206) 478 - 5252 MAYOR GENE LOBE PURPOSE OF CHECKLIST: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requies all. governmental agencies to consider the r environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. INSTRUCTIONS FOR APPLICANTS: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. if you really do not know the answer or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some zoning, question agencies questions shorel, ine ask anA s it you can . can assist you. about governmental regulations, such as landmark designations. Answer these If you have problems, the governmental -1- Gateway to the Olympics and Home of the Puget Sound Naval Shipyard The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. USE OF CHECKLIST FOR NONPROJECT PROPOSAL: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." In addition, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (Part D). For nonproject actions, the references in the checklist to the words "project", "applicant" and "property or site" should be read as "proposal", "proposer," and "affected geographic area," respectively. A. BACKGROUND 1. Name of proposed project, if applicable 2. Name of applicant: 3. Address and phone number of applicant and contact person: >Eo tnw.. wwyi t 1)01�L9 4. Date checklist prepared: 1'1ovumbe, a, tQ�,� 5. Agency requesting checklist: GI-T�i � �3�2.�'�-b�� 6. Proposed timing or schedule (including phasing, if applicable) : ec-T 70 $� r�3 -2- 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. 8. List any environmental inf ormation you has been prepared, or will be prepared, to this proposal. 1�0v � 1 9. Do you know governmental affecting the explain* know about that directly related whether applications are pending for approvals of other proposals directly property covered by your proposal? If yes, N� 10. List any government approvals or permits that will be needed for your proposal, if known. 4 32.erne'c��rJ 11. Give brief, complete description, of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) bsc. oru2, Co�ct- 10 r-''`c��t 45(cr) Fr. L. u L.�U hr'�Ec2 z .Lvr( 1v ` ?C i 3 a YvA uLA.:U bka �• (fix, CF 4 tyu'h w-ZU �d' CO'DC;V`R' C I cuay)CA usz.s. ibt Cy uwvi 0 ncri► eat &Y^d. tr�Lxth4XV41"A dAvecib v., 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 4tgc n in, i�� F�Q� I cc' c .sect a ► q�► 3 1 �;�vz t acci- r-03C1�ib -03o b► a -j Lots oc��� li ►a ►3 F31K- 3o is sa u.5to5 gt°U4b3°o 59 - Ina f31k 3p �°-ts � � -m�-i a. ► gt►i. 3 �S no vt U`Wcl c0drt � ✓ v 1r�-� TO BE COMPLETED BY APPLICANT ae nFla! l description of the rolling, hilly, ainous,other site (circle one) steep slopes, D What is the steepest slope on the site (approximate percent slope)? vp L1yP nc� ,I1 -i- c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any _ _-1 �_ ' . d. Are there surf ace indications or history of unstable soils in the immediate vicinity? If so, describe. `v o e. Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source of f ill . y t r��� no �r�oc_ ..Ire-iiiiii WIN NEW f. Could erosion occur as a result of clearing, construction, or use If so, generally describe. I NINE -4- EVALUATION FOR AGENCY USE ONLY C2.SSQ r� g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: No�� 2. AIR a. What types of .emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and ,.;.,o nr,r�rntirimaf'P quantities if known. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. �o c. Proposed measures to reduce or control emissions or other impacts to air, if any: N�� 3. WATER a. Surface: 1) Is there any surf ace water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. N� -5- ,: 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described water? If yes, please describe and attach available plans. �o 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. OEM N Ov- OEM 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. liiiiiiiiiiiii I liiiiiiiiii Miami Will III III 11 NINE III MINNIE 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. III= MINNOW 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. ^^ ^ b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. NZD MINE I III 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of�houses to be served (if applicable) , or the number of animals or humans the system(s) are expected to serve. I NO III Oil I c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. ^ _ ,�" lr�% n V�\AIn10r4) AngC nT 2) Could waste materials enter ground or surface waters? If so, generally describe. NO d. proposed measures to reduce or control surface, ground, and runoff water impacts, if any : iJor�� -7- 4. PLANTS a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other (� shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoi11 other other types of vegetation b. What kind and amount of vegetation will be removed or altered? c. List threatened or. endangered species known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: WIN liiiiii MINE III I WIN WINNOW I III IIIII Wool 11 1111111 Pill MORRIE ,g a. Circle any birds V been observed on known to be on or birds: and animals which have or near the site or are near the site: hawk, heron, eagle, s: deer, bear, elk, other• 8- - songbirds, beaver, fish bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. NONt� c. Is the site part of a migration route? If so, explain. NO d. Proposed measures to preserve or enhance wildlife, if any: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed projects energy needs? Describe whether it will be used for heating,,manufacturing, etc. 1 2�L Off. 1J, , ( •' b. Would your project affect the potential use of solar energy by adjacent properties? If so,,generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to IN reduce or control energy impacts► if any: a. Are there any environmental health hazards, including exposure to toxic -9- chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? if so, describe. �11 III NO III 1) Describe special emergency services 4=,.,�4- mIl Rr+- ha rpauired. 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment operation, other)? 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come 3) Proposed measures to reduce or control no impacts, if any: NOISE -10- g, LAND AND SHORELINE USE a. What is the current use of the site adjacent properties? -n_ _ _• _ _._ _.,n--Y\n�, Ct'�.� 1, t.l� �! yam- �_rl�'(%/�� 1� DO Has the site been used for agriculture? so, describe. �. , ^� ME MEMO= c. Describe any structures on the site. i—=f' � � �^ 1 �c v- —V�1 �0 1 •. ,�1 ��^r� '1 � R �� �C' d. Will any structures be demolished? what? If e. What is the current zoning classification of the site? ( _ f. What is the current comprehensive plan designation of the site? '. g. If applicable, what is the current shoreline master program designation of the site? h. Has any part of the site been classif led as an "environmentally sensitive" area. If so, specify. n,, liiiiiiii WOMEN i. Approximately how many people would reside or work in the completed project? rJ I �1 liiiiiiiii Isom -11- IofSS evt y � co ►n+�.e.rr� j. Approximately how many people would the completed project displace? V�D1 k. Proposed measures to avoid or reduce displacement impacts, if any: 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: �ti. , ,-, r-l� ► _ C f=ivvl G` �"i I�n� , �JY'uo 0' 1 9. HODSING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. b. Approximately how many units, if any, would be eliminated. Indicate whether high, middle, or low-income housing. c. Proposed measures to reduce or control housing impacts, if any: IIIIIIIIIIIIIIN 10. AESTHETICS a. What is the tallest height of any proposed structures(s), not including antennas; what is the principal exterior building material(s) -12- rSe� NbJ. 3 l`t8`� �✓�© . -�oM �M 3 - tip"+- LJ t- %Awcv I lJa�i 66AArmin G.04 640e k Ess4t p 1 b. �l c. 11. What views altered or Proposed aesthetic in the obstruc C rn rn o immediate :ed? measures impactsir LIGHT AND GLARE a. What type produce? occur? vicinity would be to reduce �UtA.0 �- Aja cz ctJ, Sam a 0 e4 o r control 4z"k2�r�I t-o ,Oar Prrk4l Gc�rre�-T rc�0\ rcS of light or glare will the proposal What time of day would it mainly b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off -site sources of light or glare may affect your proposal? 0 Cie Nr� o d. Proposed measures to reduce or control light and glare impacts, if any: 12. RECREATION a. What designated and informal recreational opportunities are in" the immediate vicinity? - b. Would the proposed project displace any existing recreational uses? If so, describe. rJ 17) -13- c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any. 13. HISTORIC AND CIILTIIRAI. PRESERVATION a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. c. Proposed measures to reduce or control impacts, if any: NO�e 11 1 1 MINE MINE liiiii MEMO Oil 111111 MEN 11 MINIM MINE I 14. a. ify public Identstreets and highways serving the site, and describe proposed access to the existinq street system: Show on site plans, b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? C. How many parking spaces would the completed project have? How many would the project eliminate? N�N� I NoN� -14- F d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally. describe (indicate whether public or private). � O e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur.^ ^^ g. Proposed measures to reduce or control transportation impacts, if any: •N� r�� 15. PQBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. b. Proposed measures to reduce or control direct impacts on public services, if any* 16. UTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other* •�� V ���. -15- 17• The above answers are true best of my knowledge. I lead agency is relying decision. Signature: Date Subrni and complete to L. understand that on them to make -16- he th e its CIBI?EMD, n s B 1 g M o lkl o± r% P 1% a■■ 4 A 1% 9% ■■ iv AL 1W■ A sk s- = �vl 61011M%7 rr.Kff 11 JAr rLI%w#k i I%JIM City of Bremerton, Washington 98310 Phone: (206�' 261LITI.- Assessor's Tax Account No.: 3g710 -030 �C)G . -CC�7 Site Address: 19,1 (k)YV&t" Wgtt 1^ �ferry'�1'� I GupP q a3i I Phone No.: (pcZ�41 -c Cal Owner's Name: tmolre, R, X dccr QCAVe ddress: _�=; IJ� `-:� � � , Applicant: Owner rchitect ❑ Contractor ❑Tenant I f..� ' Architect Firm: Representative: Address: F,121 114C(t Phone: ILUMU W w1r' aiikitr F1 4opf Representative: Contractor: ?tm( Ire . PI& d� -,7 S Address: P.0• C o�` 2� i �L.L LJt ,s� c Shi Phone: (0,I Contractor's License No.: PI Exp. Date: ❑ Residence ❑ Business ❑ Other: New El Repair ❑ Remodel/Addn C11 ❑ Demolish ❑ Duplex ❑ Multi -Family (No. units ) Sign ElParkingLot ❑ Grading (cu. yds ) ❑ Bldg. Move Nature of Work Proposed: !-qca" )%Ip . bort � i�'1C�'_ CSC V�C tY %l ✓0_ 24iY�, o c (ru G� ,111� 10(�QL14 (Dr x f ` fm a yvtf J Q� n JJ i in n e fJ a Q '(fig_ aQ h o I Yi � 'i n c pjt Pn1x - S�cP,_ �� )tee I �► 1 Sq. Ft.. t Utilities: ❑ Water ❑ Waste ❑ Sewer ❑ Septic ❑ New ❑ Existing ❑ Storm rValuaticin of Materials/Labor: Plan Review Fee: Permit Fee: Surcharges: UBC Sec. 304(b)] S Z S o 0 40 State $ 3. 5 0 �/�DD " .Receipt No.: 72307 Receipt No,*? 7 Energy $101$15 ❑ Date: Date: �.a Occupancy Classification (UBC): No. Stories: TZoneesignation: , Setbacks: Front: 1 Side: 9DIC) Rear. Q_ Height: I Heat Source: '2 _ Comments/Conditions of Approval:T �Z - I understand that applications for which no permit is issued within 180 days following date of application shall expire by limitation, plans and/or other data submitted may be returnee to applicant or destroyed by the Building Official. (Sec. 304(d)UBC). I certify that the information on this application furnished by me is true and correct and that the applicable requirements f the Ci y of-RTatn=r+on will be met. Signature `- Date 4, Copies to: White -owner: Yellow -file; Pink•Assessor: Goldenrod -Building Stat. Code `err,tt�t���, Lug. 9�3i �c.G16 U:�St a `�wH�i aSt. Qcisi rem S o ,?� t ci 9 3 U,;nea tc� I !� �< :� , (?� cn t t . c psi Y' [ r,phcr) cf �,c�rZ )cc« Cori r u,n�cxta� LOCI-- Ck 1 Zorn i3 b�J: a,,�cicc.- c�dv`ar{i 5t Si r� cni Sinn ; -ej c,-l� t��u �c ru ar, ct -(� c�� `� t�i �,aci�lt��.4 aF�':>01A �n t j" 16, Gs . N� c i �crt +r�� l;�Lo arr,a w Suxh � u^�5 c--Lv u City of Bremerton, Washington 983'i0 Phone: (206) 478-5281 Assessor's Tax Account No.: _3Q70 - 03Q -C)Q JCC 7 Site Address: q �?1'�LA lUct - Yet y' (,VA �{�3I I Phone No.: �0�-� -ate--� Owner's Name: ( ry� 0.1. dccr QdV ddress: _Q �'C a49 3 ► 56ATi[r 981 a Tenant nt: l�.I Owner Architect Contractor ct Firm: L Representative: s: Phone: Contractor: mot raga-wr ckayxt�l�nay Representative: k i rn &9'6 t-u LoFs� Address: P D• en c>2 `f 3I < L-oT I�.SXl rlg10'?`� Phone: (0�ZDc;�9 License No.: p Exp. Date: rEIResidenceBusiness ❑ Other: New ❑ Repair ❑ Remodel/Addn ish Duplex Multi -Family (No. units ) Sign Parking Lot Grading (cu. yds ) ❑ Bldg. Move Nature of Work Proposed: ErnO'Y12 �?CV `lam(i' 0.0 �CNFiSt✓� OYl c111C �1C��Q.I�i t �CQ� S -Fa Q ilz) (Drx (r3�` Nfmai.wl erl Qqr7) jz ilonh f�Q�Q Ii7lp aQ hot ¢ tnc�a Na--I�yrCPO Sq. Ft.: t Utilities: ❑ Water ❑ Waste ❑ Sewer ❑ Septic ❑ New- ❑ Existing ❑ Storm Valuation of Materials/Labor: Plan Review Fee: Permit Fee: Surcharges. [UBC Sec. 304(b)] S 16, Z S S z S o V State $ 3 . S 0 � " DD Receipt No.: 7�3` Z Receipt No.7 Q 07 Energy $101V5 ❑ Date: Date: Zone Designation: _a Occupancy Classification (UBC): No. Stories: Setbacks: Front: � S Side: aL70 Rear. ce.l Heigh: Heat Source: inprae . �` Comments/Conditions of Approval: (_ /� ^ I ?> - , derstand that applications for which no permit is issued within 180 days following date pplication shall expire by limitation, plans and/or r2in other data submitted may be returnei pplicant or destroyed by the Building Official. (Sec. 304(d)UBC). I certify that the r•.nation onthis application furnished oy me is true and correct and that the applicable requirements /T('') the �Ci y of rr„nd r on will be met. 0*5 Date tq Copies to: White -owner: Yellow -file; Pink•Pssessor: Goldenrod -Building Stat. Code CITY OF BREMERTON BUILDING DEPARTMENT PERMIT APPLICATION DATE : 11-4- , 1988 TO BE COMPLETED BY 11-9- , 198 8 Empire Outdoor Advertising OWNER 1943 Wheaton Way LOCATION OF JOB For back to back sign ENGINEERING COMMENTS/REVIEWED BY ��. Empire Outdoor Advertising CONTRACTOR 4vO % 0 r) r eg 88 of�ob ro/v oro BUILDING 1 City of Bremerton, Washington 98310 Phone: (206) 478-5281 Assessor's Tax Account No.: 3971y -030 --OIL �C-GY?7 Site Address: 19423Il) lOyt l,l�cu 1" r�Y�tmeV�O'V� u3p' 9a3i 1 Phone No.: (DaA1 sOs,; Owner's Name: `r ddress0 P.0 �493 t S6ATtr Q8)a Applicant: I,dJ Owner ❑ Architect ❑ Contractor ❑ Tena Architect Firm. Representative: Address: Phone. Contractor. Lo �t� rr - rmfa cnr cauey+' ;, pA4 __ _ ___ _ __ Representative: k 1 m 8okl � � Lor Address: 9.0 Erx or-f 4 :� 1 5a477=&L, c 81 c Phone: r Contractor's License No.: P Exp. Date: I ❑ Residence ❑ Business ❑ Other. New ❑ Repair ❑ Remodel/Ac ❑ Demolish ❑ Duplex Q Multi -Family (No. units ,__ 1 Sign ❑ Parking _ C I ❑ Grading (cu. yds 1 El Bldg. Move Nature of Work Proposed: E mr: O+YW more "f D ts�( C�' OL VQdj!F i A 2.t4n, Ori cM d �1 Ol��i't�t' . 5 t-am -PA .t IS (D X (a.' rma*YAj,Cni O^n ,IJi�C1,Qp fJt2QQ �1L aQ hnt f �ncDa �i�n�►-.�covv, Sq. F t.O��� Utilities ❑ Waterer - Waste ❑ Sewer ❑ Septic ❑ New ❑ Existing Sic ,- .❑ Valuation of MaterialslLabor:. >- _-_._.. _.-_ Plan Review Fee: Permit Fee: Surcharges: JUBC Sec. 304(b)j• . z s Z sdo 6tt State $3.50 D - - - :Receipt No.: 7 3 a? Receipt No.:7 Q3�7 Energy $10M5 _. ... _. - Date:. //-3-rg� Date: /&� L 8�e� Zone Designation:- Occupancy Classification (UBC): No. Stories: Setbacks: Front:__ cr.f Side: 00 Rear.�t'�'_ Height• 1(2)1 Heat Sources n�f CommentslConditions of Approval: ( (( Sy I understand that applications for which no permit is issued within 180 days following d: of application shall expire by limitation, plans and/or other data submitted may be retu to applicant or destroyed by the Building Official. (Sec. 304(d)UBC). I certify that the. - information on this application furnished by me is true and correct and that the applicac requirements the Ci y of -ATo.ne,-+-.on will be met. Signature Date -- Copes to: White -owner, Yellow -file; Pink assessor. Goldenrod -Budding Slat. Code T' i•"'1tE� l i, , Lii1"i ! �; I:i; 1. 1 ;i11� 1 ,�<S`' ,. r)t'i:9'r::1 C'l'r't 1''<I;::3i•�:'i lli'll. i" i 'i I,.i, i Nr_3mi 1 :1�{1.`.f .l' t::'t:)(`11`?I rase 'r;94.`3,'�•�� WHE,1..1.1�r? i >1?1-:01M1EdoRT ON rlisrt'r; Nam(: ,�11�{:.>J..i c:r:31; .i ��rt Ni.3ml..te•:i �� ;'r�li==�::+ , .. F>cr'm a r: Nt3m[)c::: r I � I I: l rI ...... . Pee .........._ .............1....... _ae ,jj::)(:?.i.:i.c:i'i+ i i)Ale 1 i"l(.1ifIlow) (_'.Y 81 A1'i.)17; (Y :)r)k:rroc;l:c:rr I:::mPa:Ri� r:)f.i1f:)C.:)C:)R ADVI=T"O.1.S:I:t�l(:i y :3 r . r1.�...1.11.. red e,,I:Ifirrl:;.��.t 1,vr: `.::A., ;e:: l .J.(:(:TI i(_ !1 r*:4MPTr?t::)(l1 A e Cl +y L_. i. c:: e T ,..., al: x ... __ _.............._ — __.. _ _ . __. .__. .. ....... _...._ _....... _........ ...... we- . City'of Bremerton, 40 =39 FOURTH STREET BREMERTON, NotASHINGTON 98310 (_06)4iaM- ~5_ DETERMINATION OF NONSIGNIFICANCE Description of proposal Construct a 72 square foot off -premise advertising sign. Proponent Empire Outdoor Communications Location of proposal, including street address, if any: 1943 Wheaton Way Lead agency City of Bremerton Department of Community Development The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. n There is no comment period for this DNS. [� This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date below. Comments must beasubmitted by • Responsible official DONALD L. PRATT Position/title Director of Community Development phone (206) 478-5275 Address 817 Pacific Avenue, Bremerton, WA 98310 Date �141�70�' Signature You may appeal this determination to (name): RrPmarron Planning Commission/City Council _ You should be prepared to make specific factual objections. Contact Jack Allingham to read or ask about the procedures for SEPA appeals. There is no agency appeal. Gate�ra►• to the O1�•�npres an4 Home of tJre Puget Sound .`'ai•al Ship�•ard ACKERLEY COMMUNICATIONS OF THE NORTHWEST, INC. November 29, 1989 Mr. Dick Mumma Building Official 239 Fourth Street Bremerton, WA 98310 RE: PROPOSED SIGN AT 1943-45 WHEATON WAY Dear Mr . Mumma D� 1VOV 30 6g "11VG�pFRT0N �P9�TM£NT Enclosed herewith is our reapplication for the sign proposed for 1943-45 Wheaton Way. This application includes the following: 1. Application forms with filing fee 2. Construction plans 3. Sign site plan 4. Environmental checklist 5. Topographic map and cross-section profile 6. Photographs GENERAL INFORMATION REGARDING APPLICATION SITE PLAN: a. the nearest travel lane along Wheaton Way is 22 feet from the existing fence located along the front property line. The northern most edge of the proposed sign will be located 8 feet south of the fence. The total distance between the sign and nearest travel lane is thus 30 feet. b. The location of the sign as shown does not obstruct any view of the water as can be seen from northbound traffic on Wheaton Way. 3601 6th Ave. S., Seattle, WA 98134 / Phone: (206) 682-3833 / FAX (206) 447-0377 Mr. Mumma Page Two November 29, 1989 c. The sign contains two faces @ 72 square feet per face equaling a total sign area of 144 square feet. Therefore, there will be a total of 144 square feet of landscaping beneath the sign. This landscaping will be low growing vegetation. TOPOGRAPHIC MAP AND CROSS-SECTION PROFILE TOPOGRAPHIC MAP: a. The map shows the subject property and the profile line A to A' on which the profile cross-section is based. b. The map indicates that there is vegetation between the sign and the top of the bank. Thus, the view of the sign from the water would be obstructed. c. The map also indicates extensive vegetation along the north side of Wheaton Way. This vegetation would obstruct the view of the sign from this side of the street. Moreover, the rise of the terrain on the north side of the street would indicate that the sight -line from future development would be above the top of the proposed sign. TOPOGRAPHIC CROSS-SECTION: The cross-section is drawn SW to NE and designated on the topographic map as line A to A'. The following is concluded with respect to the visibility of the sign and its relationship of the water/shoreline. a. There is an approximate height of 75 feet from the water level to the first significant slope break; a 100 foot rise from the water to the second slope break; and a vertical rise in height of 112 feet from water level to the grade level at the sign post. DO The post of the proposed sign is located approximately 190 feet landward from the water/shoreline. c. The sign is oriented perpendicular to the shoreline, and if visible from the water, which is 112 feet below and Mr . Mumma Page Three November 29, 1989 200 feet distant, only the edge of the observable. This edge of the sign is 185 of the water/shoreline. Sincerely, Terr Sandblast, Director Pla ng/Code Liai ison enclosures sign would be feet landward Cltyof Bremerton, << 239 FOURTH STREET BREMERTON, WASHINGTON 98310 (206) 478 - 5252 MAYOR GENE LOBE PURPOSE OF CHECKLIST: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all. governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental. impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on _the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. INSTRUCTIONS FOR APPLICANTS: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. -1- Gateway to the Olympics and Home of the Puget Sound ;Naval Shipyard The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. USE OF CHECRLIST FOR NONPROJECT PROPOSAL: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." In addition, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (Part D). For nonproject actions, the references in the checklist to the words "project", "applicant" and "property or site" should be read as "proposal", "proposer," and "affected geographic area," respectively. A. BACRGROUND 1. Name of proposed project, if applicable: Z . Name of applicant : . -tP��2 oataw, Qc) 3. Address and phone number of applicant and contact person: LOY4 9'EIal 4. Date checklist prepared: nc,v&m,ural, 5 . Agency requesting checklist : C,I-�� � i3t2.t�'Lb i�-� 6. Proposed timing applicable) or schedule (including E3CM:�F 70 $e for q O �\�A -2- phasing, if 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. 8. List any environmental inf ormation you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. �.:) 10. List any government approvals or permits that will be needed for your proposal, if known. ll. Give brief, complete description of .your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) biaoy)z, WCY, b ►�'` Cace.. Orn +UVOv PIIDPZV. Sc , ce �, P m�a s YC In ` x a! airu�l w iQ P si Lp1� ►- to S posh. & iiaa cp - u, �a Q a' OJDO\rP, c,VvA amd u tz.lr.-P b ouzyd-cri ,}o �crw es� a^^d. c r:c � � dive �, , i of l qv s ►S'. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal_ would occur over a range of area, provide the range or boundaries of the site (s) . Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 1�Oy� CLCQO W tk-'3Ci91O-030.Ol a lz� 1;. C � 3 Bw► 3o y l.cAs i 5 l tp l o5los e C�t 3 o ' �a j � S q - Lo g1 � 30 ��•fs » -mru a. � f3t1c: 3L . �s S a.-1►-w-u. US na\IL� �cv,'cl �d►� �� '���v,�v�-� 1. TO BE COMPLETED BY APPLICANT ral description of the site (circle one Flat, rolling, hilly, steep slopes, ntainous, other • EVALUATION FOR AGENCY USE ONLY b. What is the steepest slope on the site See Nej, e,4 I�gq (approximate percent slope)? A'Sa,�c(��aS� Al ale *-r/ J)� Ala VC. J S,4v , s `E�s r/�,aN s "lo SF� ro Dc chi �. cXc s S c. What general types of soils are f ound on the site (for example, clay, sand, gravely peat, muck) ? If you know the classification of agricultural soils, specify them and note any d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. N O e. Describe the purpose, type quantities of any filling or Indicate source of fill. �r�) k:E� nc� f. Could erosion construction, describe. occur as or use? tJ 0 and approximate grading proposed. a result of If so, -4- i�nQC2-sSar�. clearing, generally g. About what percent with impervious construction (fo buildings)? h. Proposed measures erosion, or other of the site will be covered surfaces after project r example, asphalt or any: N �N� to reduce impacts to or control the earth, if 2. AIR 14 What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and n;�P annroximate auantities if known. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. C. Proposed measures to reduce or control emissions or other impacts to air, if any: N� c a. Surface: 1) Is there any surface water body the immediate vicinity of (including year-round and streams, saltwater, lakes, wetlands)? If yes, describe provide names. If appropriate, stream or river it flows into 2 .FT c..4rioN -5- on or in the site seasonal ponds, type and state what S. 2) Will the ct require any work err in, or djacent to (wit in feet) the descri d wa er. yes, p ease describe and tach available plans* c a 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill --�--- 1 - 4) Wily the proposal require surface water withdrawals tI diversions? Give general description, purpose, and approximate 5) quantities if known. _ � _ — _ n /, � ^ , , „C� , Does the proposal floodplain? If so, &) Does the .proposal of waste materials so, describe the anticipated volume lie within a 100—year note location on the involve any discharges to surface waters? If type of waste and of discharge. , -s- b. Ground. c. 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities know N� s 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable)op or the number of animals or humans the system(s) are expected to Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and O disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, 2) Could waste materials enter ground or surface waters? If so, generally d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any* -7- a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs grass pasture crop or grain wet soil plants: cattail, bullrush, skunk cabbage, other water plants: water lily, milfoil, other other types of vegetation ft buttercup eelgrass, b. What kind and amount of vegetation will be removed or altered? c. List threatened or endangered species known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: 5. ANIIKALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: ,-,_ hawk, heron, eagle, songbirds, s: deer, bear, elk, beaver, other* -8- fi bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. c. Is the site part of a migration route? If so, explain. �O d. Proposed measures to preserve or enhance wildlife, if any: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. 0 LQRrk! b. Would your project affect the potential use of solar energy by adjacent properties? If so,,generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to. reduce or control energy impacts, if any: N a. Are there any environmental health hazards, including exposure to toxic -9- chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. tJo 1) Describe special emergency services 4min=4- mi nhi- ha rPQti red. 2) reduce or control Proposed measures to environmental health b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment operation, other)? 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come 3) Proposed measures to reduce or control noise impacts, if any: *:)C) V'i -10- a. What is the current use of the site adjacent properties? Q 0" CJ t1_ I�J[`QrOd Ic b. Has the site so, describe. been used for agriculture0 and If c. Describe any structures on the site. I ^a J d. Will any structures be demolished? If so, what? e. What is the current zoning classification of the site? (� OI t P'ik/rra," F� %AYh f. What is the current comprehensive plan designation of the site? ,_��� OP g. If applicable, what is the current shoreline I master program designation of the site? h. Has any part �r one site been classified as an "environmentally sensitive" area? If so, specify. nn i. Approximately how many people would reside or work in the completed project? -11- icy 3I �eCrtJ Sanca.b��ta� j. Approximately how many people would the completed project displace? �4 k. Proposed measures to avoid or reduce displacement impacts, if any: ti 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: _ , 9. HOIISING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. Nl� b. Approximately how many units, if any, would be eliminated. Indicate whether high, middle, or low-income housing. c. Proposed measures to reduce or control housing impacts, if any: 10. FE AESTHETICS What is the tallest height of any proposed structures(s), not including antennas; what is the principal exterior building material(s) -12- o�yle�rA /NONE 1613 6Rdr0✓O440'e �dscn-pc d` b. What views in the immediate vicinity would be al eer�ed or obstructed? Aofyvnc , .a Fmk o l�s r (3c vi{ t�C3sTRu�-TAD. c. Proposed measures to reduce or control aesthetic impacts�, any : , a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety zard or interfere with views? c. What existing off -site sources of light or glare may affect your proposal? d. Proposed measures to reduce or control light and glare impacts, if any^ a. What designated and inf ormal recreational opportunities are in the immediate vicinity? b. Would the proposed project displace any existing recreational uses? If so, describe. III IN MEN -13- �. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: INEIIIIIIINME Idd a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. No D. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. - c. Proposed measures to reduce or control impacts, if any: N 0 14. TRANSPORTATION tifblic Ideny pustreets and highways serving the site, and describe proposed access to the existing street system: Show on site plans, b. is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? r�lflMINE Idiom NEW IIIII OEM I WIN iiiiiii WIN completed c. How many parking spaces would the project have? How many would the project eliminate? i -14- d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways?. If so, generally.describe (indicate whether public or private). t� O e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would 9 ccu�r.^w^ ^^ g. Propose d measures to reduce or control transportation impacts, if any: 15. PQBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If sor generally describe. N� b. Proposed measures to reduce or control direct impacts on public services, if any. 16. DTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, ref use service, telephone, sanitary sewer, septic system, other. VaL� -15- SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Submitted: _ I..�---- -16- iJ 4 r / IV ;. PIN IN';' N W PA KING `h IN Nk O AREAINN IN PARKING "IN �: 7 NI I -,; - J 2t3 ,i It € ) x _IV tt IN I IN I \ ^ tIt I 332 xFIL It 66 41 INIV vol IN IN I IN It IN IN, `\ _ PARKING ARKING AREA AREA IV Vu IN IV r NON IN - "t LIN g No �=�INN �. 1 0 ON\ PARKING v IN\ AREA . t mot/ MIF t IN\'�IN € �` +.' I _ A. 'KI \ 1��. RE, A ARKING .��,. r IN N ;r PARKING ... AREA - W J, \� \ AREA -� `L a L-- 1!' if NO '+ C' � 1 PARKING \\` • �� \ AREA _ ..: NI IN IN I IN IV It IFNI\ IN I PARKING IN t / \` + ^'a \e < \j IN PARKING REA ' a�� ,% tINN %ter —� r It I Ow It NO I a INN It cS thw. n - . is I IV r IN iwV Q r^ _ / �. IV +��tIN IN. T�IN fI �JI ;I NIL. _ +NO qIw V. ILIN L I WIN to E 1558IN .t I IN INVI -I >. :rk 1 __�: _ — Isse - - �t01NS .SHE 1000 feet grid bused on _. -- -_---. Washington State Plane. Coordinates North Zone - The lost three digits hove been dropped . I I, Datum is City of Bremef ton Datum PROFILE LINE A A' + IN` r {,A. I AN I I VON II III W y NpfSCALE I< 2400 y - -IFNI Thru Proposed Sign 200 0 20o 400 soo soo; located on property j - -- at 1943 Wheaton Way It SCALE 1N„ FEETIN a, NJ wVN WNTOUR INTERVAL S FEET • ,� (�; �• ' �i I ` � ' _ °,_---=-- ' i i { I ; �._ 1 I i ; ! : I _ 1 1'!L" �- ea �(,'�a i 1 ' I i I I 1 ; 1 i i ' I I i i � i I ' ! ` f � , I � a i Ir + '. F4' ��'* e i l ! I I i I , I I ' , ' � I I I ► i 1 i I I ; I • � � I � '! i ' I ! ' ; e I ! ! j 1 i i ; I ! ! I I i I ; I ' i , ! i }' -� i i If j i �► ; I � 1 1 ! , ' i • ! • , • • • l i I ' I .I 1 I I I I l I I I '� : I ' • � • - i I i 1 I I i ( i { I({! I I I I i I; I;' � I! I i I I I I� 6';hiigh cXclpne �en�cei ' �'' I I i i 11 I I i I I I I I I l l l i ,� i l l i l i-; ' I. ;�'' ► 1 1 i 2 j I ;i i!i ill' � lili I� I � ; ' i i I ' I � i ( I l I .( ; i ; ( ; I i 1 1 I I I i i i ! .1 t 1 'I I I 1 • i i I� I ! ' � i I j j{,� I �i• I i I i!;!' 1 I 1 j 1; I I •- : I l; l l i l l; i l( l l i i l l I'� i _, � I I I l i l l l l l i l l l� l i l : I I l l l i l I i I l i l i l l l� 1 1 1 l i f l� l i l� l i i i l i( l( l i l I i i( i i l l l l l� i i i 1 I 1 I .�., i! I i l i 'I I I I i l i i l �( I i i i 1 j i• I I'''� � �� � j � j i j! i l i 'l I i I l I l i i i '; { .I `i I l l l i j !�� i i i l j j I I I I ; I I I I j i i! I �; i i I• I I I I I I I .i I I l i l I I I!� i T! i l i ! i I i i I I �I• I I I ' i l I l i i;' !! � 1 I I I I I( I! I t( I I ' '�I � 1 I � I l i i i i i I I I( i � I I! 1( 1 I l l i .: ,. i I l l l i l�( i I i 1 I I I I � I I ( ' � I 1 I 'SW' - NE I PRIOF�L� � ; 'I I' I ; l I I 1 I I I i ' ( I I 1 i I I i 'I I I ( i l I ( I I ( , '_ A ITo A, 't't►ru silgr� -- I i l; l I( ;; I ; I i � � 1- i ! I I , ; ;location proposed) fdr prdpertyl '� i I ( i ; I i I I I I I i I• I ( i i I I , i t i l l I� j l i hocz.�ed!at 194� WHEATON 4XAY1 i l l i I i I I I I I I I I � I' l i l l i l; i� l k i i j l i i i i i 'l i l l i i i I I , l i i i j l���!� i _ i i f• I 1 i I I I I I I I � ' , � i , I 1 ' I ` I I °' ( I !� i (PROFILE' based on''�opoganHic i n,a'p I I_ I ( ! l I ! I I ' i 'III �Illiiill it I II I i l i l l i :, i l l l � i ; � ; 1 I .i I I I ' I c�3 'k�ased Ion; I I I { I I I I ( I ( I i i ( i I I I I ( ( (base:c� on T 0 0 D� fi e e ri I i ( I i I I I I I I I i I (• i I I'----r---= E III i i l ; I 1 ; I I I 1 + I i l i l l l I ' t Planer Coordinates I i I I� I I I I I I 1 I .' I. I I I I I IWasYt1^�ngton SL�.a e I . I `� I INo,:,.H Zbne Da�uml is Cit' of I i I I I I I i I I I i � ! I j ! I I i ! j I I I I I l I ( I { 1 ! I I I I I I I � .' ,1 i, I I I I ! i I I I( I I I I l i i { I _ ' i � � j I( � i� i i I ( l i i IBremerton�•!Datum. I I I I I I i _' ( I I I I ( I i i - i ! _ I i _ili li + IIIIIIilllilll I I, ilillii I I I• i t l l l l I I i i l� l I' I I i I I•i ! i I I I I I I► i t i, I I I I I i i i► 1 i{ � I{ I I I I I I ! I 1 1i ; Ilill� �I � ;iii; 'I I.; !�'! I I! I I I I I I � � ! I I I I I i l i l i l 11 I I I � '� I i I; i I� i; I! I( I I( i! I I I I l i l l l l i l I i�� l � i l i i l i l i I I � �( I � i I i i I I� I I i I I( i I I i!! I � itl I. I! .1 !;� i; I i i ii • i ( j I 1 I I i I � � I � � ( I I ( i 'i ' 2DD I �� j ;' . •2•�0- i ( I 1 I i ( I I I '' I I I �H©Rr:i I ! I 13'S' '_ 50' I 65' I i tl i1,0 � i i � I I I I ! i i ( I I i I i I i ! ! I I ' I 1 ' i i I i i i i zNE i� � �.; � � ! i i i l l l l i i i l i! I I �� 1 1 i! j � I I� i i w `' i i I i � -f I ` ' i ' j '"I cl — F' i ; � i ; I ' i i 1 I� I ! � I i I ± /�"' 22 $� I I I I I i ! i ! ( I , , � � ! I ' � � I , I i 3 i ` ; 1 ; i i i i i I i' ;__!_.'......l. ' ' '....�._.. �------_'_-•—�_-_�_.--� i1 ; ; I i I 1 i � ' __, _- ,•. i ! .--. �,�� i-------'.'-- ' .-- •,-may+= ,_�-- ' IMP I y 7 t � Mn op It ,j f Af Y November 3, 1989 T0: File: 19X� Wheaton Way FROM: Jim Susse RE: Proposed Empire Sign Consistency with B.S.M.P 1) The Building Permit Application on file for 1943 Wheaton Way is dated November 3, 1988. 2) Shoreline Master Program (p.89) states: 7. In Commercial designations that are isolated from the shoreline by a high bluff, the above sign restrictions and sign prohibitions may be waived by the Director of Community Development if it can be demonstrated that the views will not be blocked and that the signs will not be visible from the water. 3) Subject sign location is zoned Professional Office (PO), which is a Commercial designation. 4) The proposed site is isolated from the shoreline by a high bluff, which the applicant supports with a topo map and cross-section drawing. 5) The applicant also demonstrates by description and site photographs that the proposed sign will not be visible from the shoreline. 6) Based on the evidence presented by the applicant, the proposed sign installation appears to meet the requirements set forth in the Bremerton Shoreline Master Program for waiver from general sign restrictions by the Director of Community Development. . Q„ 4flAjIAA f I) �� i CALCULA i IONS 1 Z' WICC , !o' HtG:-+ SiGtJ Ce.� Ip' !,!-1.GX� GOB- C: Fi e� � IG'� � . - DES+Gr"t GZtT_2tA o B � Z t � 0.7 • 1.4 �s Za.58 5.1Y 'LOe�''F (dr, ( O HPH ExP� )� WO(dpHPH EX�►(Ci% =17= {.Z=t.G: ZC.�i <9.Y 3G7 r'Si"" • (.,(c (q0 Mt�F1 Cxr(C)) = 21 r 1.2s1..4 = 35.2b SATr '�S PSI" tsOOTiNGS� FOR- GLASS Y� �� � W� GH Z'i� grc-=t_-ASTt-� A-3� c2 E o�,v. coca - UNtFOczH BUIt_otNG GCG= (U9G� { �a5 �n I...rZp,t-LING OGSG�% �41N'GLL PAn %Z� tr ,OC2 KSF= 1. L4� P b s 2.I�e ,". Pc z 2.5 Z � • (`•tQ � I.4 4 a' � 13' ,. t a. ? Z' Ic M B � 2 b.1 ' ><- K c � 3 2. b' IL SAL 1'Fj.72 •1'�2�.t.�ge 7.Oss• � S a � IOSG"J 5 c � 12.2 � s c� 5 6•" '' �..d 5 - 10 �a s 8 m $ c(te.b U C� P = 2 G 0:.. C u S c 4,! C o,.t t_Y � L.t r 2 . S Z'�- . 3' : 7.5 C, ' fc 5 �i:5C�y12./(Z4,t.31)=2.04 V58 3%Zc'�, SCt-tHP-'t•0 - 3c0'j t3' =P'tc M�-(Y+wo�.ZSZ%Z Y3'=3.7b'IG CROSS A2H N==(�-) - E M n a, bb'K- VSc 3"� GGf-7E0 dC tJ PtZ;Gt-ITS (�'.' E Z' S?aN� `-; = 2Q" K C.IS� '� • �- 5•'' F�.'C-1NG C=SiGN S.=CSo,�,o/4 . / e•i` J e RcGC � A/Zl,l t IT ,,, G(-,ASS � SCtL Q-' SCtt_= G! KSF/r-. zi.33f 2 = ^•2G7 G "' Z'Q=` t � S - C. 0 5 �o.ed a A n Z. = A /2 = 1.25 A 3.l 6 A/2. 65%� C � b•s' oK p�Q.0 OK C � i.'b' CtiL GLASS .%s SOt�- C'SQIL +Gi5tG5"/FTf1,33f2-=C.0 TRY 2'b : Ce.S' t3} TZ.Y 'L'�St 7.5t C) T'Z`•' 2'_ � 8' G.) 5, - C.$:e, 1.0 :1.2Co A=2.�L A/Z.=t.Sb p, _ +,o a A/z = a.Q � A = Z.s� A/z c � -r.7 8 o K GLASS L.' SC1L. er5CI1_ C.2 IGSF/FT=L�3x2.�C.5�$ A) TRY ^..'� x o. is' �1TSZY Z O = G.6it G�S.t�`1.2!c�t7.2'S� 5� a I.CZ S, : 1.1 n A = 2.12 A/2 = LC<o A c 2.L° df2=11� A= LleS A/'Ls -'•82 C a C.. i.g' Glc. C ? [e.93 Orc.. o � -.� o ►� �.J P. ; _ CZ V 1'y^,� tV� CoC• �-1G).% D3t_ l�aC=. � FLAG A L_- 2 - F C $IC.1J 4GCP" y1T = 2�5'" SAY 30CS ot_ = SOC'"':(2)y zip/i2%rr.=I.CS'>< (CN NAtt.1 P'CL�� M CUF C a 3 ' + ZI60"`� 3' c 7530'�' '+ 40.'1• tiG (8 vat-UL� �,{ (G�3 AtZti-' � L 3 C C X . 5 � 't, L a 3. G' tL 5 � 2.E3 � � Sc�eo 40' C� {%( (Ot.) rvt_ FUG • O.G 7 +Los=1q.'7i'� = 1"'t� a O'SL _2 b.l � I.OS n Z'.IS'te .s ri, ecsAsa c 1 b• 2 � ,�, PUt.A_ Ft-A6� tZl..(=,s 02:.$ tl.o5' = 33.b5't�- . GOLS AtZ._ C fG (6 C• a 7. Cam' � ZS' S o = 8 • G'3 �,�I.O cLA35 � � Ca = 7.5' - 7.5' ac � i.94 <a.o D♦ G.5 = Co.S�. GLASS as-'T.. p.�:G.i9' % GG�' �c=�.O:SG%25a� C.+5.9'> 5.75' . N �c � TO 6i= of==.P cNG'O SLtG`,-1 � L-`� 1 PCOTINGS „ C��ecz (T=L,ACa 5-tCL)!3TS SAHG/ - •, M.�,<` AFL► .V (...IOvt.,tTS S USc�'�'•� (,HIN'� �.F"Vt-t.... t=LAG �- It•. �'�2� � I�.G� SG�e i ,.. .,•• 4 0 S� � � T V� I ��_ J �_ � ! -- _ ; �� gT0 SL.,r .to,�..tT W! P:..uG W=V=s I (S�c SC'J �,7 FC2 StZ= j I ,� 'Z' c;, G^�.� PC. :;mac NtiU2:.L V�CtS':.JZ-c== GSNT2 }iCXJtJ . Si-sC„IN Sc= �Of T� -ti�C cctrrrr t=crz VAr�IA�G�-S . (CLtt� r^G= T C U p- (5-0 TirrtN :T� � �• ' .0 _: ..� .� I �a" .1' -C ------- 501t_ TYPti-c G w J g J> Q Q V `' � J�u � � � (J iC � N ' yoO � ��� � c� n7 .J � <>--. o _J L ,J r �Y JJ� � HQD '' dZ 7� .;I � uNV VVa C i� z 0 0 � O Q4{ V If'� Q S2ootVt-- � Q1Jo � 00� I�VJtti - U :-� 1 uud Q vvJ 20 Psr I Co '^ � 7t-�r I Co -!o" , 5i-9, zSPsrt I �'' I�,-�' I a-o I ,''3., �- "V HCU`�T i:�- raG.) E PLa4 Ut..IITS.'�O HAVE-` � J,=:ar.-� 3" Ct,t^,1 GzS.�T_z T�+;aN U� 1N,., _ter,- `_ ...-uT .__--�. TJ BE. W [L �� �Ac� �'\� \`` \\` ,2�0. ►vtt_ sarnor+ \ ' _ �\ PIP = GO t_ ✓ b�O �1-{EO� F'aG= Lh�K .� M {- lam. , �- `'_ � s CUTUNC a irLAG HOJN' j i (] Gu"Ltrt�i °�.-- V I.�Cv�..tT i 1 I � 'o 50 SAP .IT � = I u� r � �t�� � 4 - I rUlt.. S=c"t0v I t;,- V ICJ nJT V Sa .d'b SGtt�.J "\Z �� ._ '-� rt ax e V Ha.t � . OI ' c _ Co'-C'HAY C t=_,td/ft�u�+T -E. - � • o�� - p'tr=" GCt_ Pat �.µro�,,, - '� f �2 i (At.._ L......_..._ 7'!SJ R ^... :4�ra. 99 S*R or ��' _ _ _� ..__ - -- � G-�- P�/=N C- � FLAG 1yCUNT i�„ o�� �oN��- Mo�N i s <<s%on,t E^�� . fa`Q _��'t�f `tom\ Ct. 7t15 � .. .. �- .-..� ^ ALBF�T R KFNNE`I,�JQR��F�E �o,� �s-;��, c� sa.�- ��..�� r� .,at-z0 •6 6}+c=T " Otst'"t.�.Y � t :LS . 5 T Lr.�O 10.�,os�Fy MPl2f� OU i DOOCZS a-1->; �� ` .,w t r S�?. T TL� + W S A� b. eQwt MEET I+O. � r n.` ��8._ ' � . ACKERLEY COMMUNICATIONS OF THE NORTHWEST, INC. October 2, 1989 Mr. Don Pratt Director of Planning Bremerton Planning Department 817 Pacific Avenue Bremerton, WA 98310 E3RCPr�r;"; U,r�J CUILDING U��'�RTMI:N7 RE: PROPOSED EMPIRE SIGN AT 1943-45 WHEATON WAY Dear Don: Earlier this year we submitted a building permit application to erect a 6 foot by 12 foot Empire sign that is to be placed on property located at 1943-45 Wheaton Way. This application has been held in abeyance because of a lack of information regarding the relationship of the sign to the shoreline. The topographic map that you recently sent to me has been helpful in developing the cross-section profile that is attached. Also included is a copy of the topographic map reflecting the location of the said property. The cross-section is drawn SW to NE and is designated on the map as line A to A. The following is concluded with respect to the visibility of the sign and its relationship to the water/shore. 1. There is an approximate height of 75 feet from the water level to the first significant slope break; a 100 foot rise from the water to the second slope break; and approximately 112 feet vertical height from the water to the grade level at the sign post. 2. The post of the proposed sign will be located approxi- mately 200 feet landward to the shoreline. 3. The sign is oriented perpendicular to the shoreline, and if visible from the water which is 112 feet below and 200 feet distant, only the edge of the sign would be visible, which would be located 194 feet from the shoreline. 3601 bth Ave. S., Seattle, WA 98134 / Phone: (206) 682-3833 / FAX (206) 447-0377 Mr. Don Page Two October Pratt 4. The topographic map indicates that there is vegetation between the sign and the top of the bank. Thus, the view of the sign from the water would be obstructed. Please see attached photograph. The topographic map also indicates extensive vegetation long the north side of Wheaton Way. This vegetation would obstruct the view of the sign from this side of the street. Moreover, the rise of the terrain on the north side of the street would indicate that the sought line from future development would be above the top of the proposed sign. Please see attached photograph. Lastly, the location of the sign in close proximity to Wheaton Way does not obstruct any view of the water as can presently been seen from northbound traffic. Please see attached photograph. I appreciate the time that you spend with men on September 19, 1989, and if I can answer any questions that you may have regarding the attached drawings, please call me at 682-3833. Si�}cerely, Terry S�a'ndblast Director, Planning/Code Liaison cc: Cathy Wingren is/slw I low ARr r.s -''-I 6Q oob ' ` '49 .� -� ^� .' — �� N W PARKING O AREA `"� oq OF 04 IV 4 VI to Of \0 PARKING ` * It I a.�' EA R" do I Fiat at* IS I :' y. } ,:1 at 332 c to X t• i ad a OF PARKING \ PARKING ` ' AREA ` _ �-^ l AREA : \ : t",. ,r,PC '� ..Far I • \ \ PARKINGIF—,3 at I AREA \Nos. ; \ \FIJI I I PARKI all (AREA \� �. �•..:: a OF Fa q� � all 1- 6 IMF at �' ARKING ., • f i'\ `OF �� \ \, P AREAL t EA Q PARKING 0 AR EA OF a I IF IF 1 Io ` �` PARKING ` IV at all Z A�KLA i� No. < PARKING s OF too, FIF IF I to Lwl I or 4! . at at It IF 0 t ; .t t , af._ .•:s.,. -tv"� !I IN .a.:r,`.�-.... ! :1i•,.,i.. ,Ja as ; ♦ ro'i ' N'+,.t In. .. .,�l �kw It .,r tom. , . '•���� No,r, "t, '�s'• "r ,'.� T.. ,".' 1Y'i :,H . -.•:....ale •'•na.s!w•c+.r,'^t�1r•.w�yryi' E 1558 �I r Val 0.0a0R: E 1559alOI Via ='_ - IN 0.I JOINS .SHEE --- - - - _ 1000 feet grad bose'd on.' Washington State Plane, Coordinates North Zone >; , - The•last three -digits hove been dropped , 1 - OaF Datum is City of Bremerton Datum It PROFILE LINE A A' It .1 IF" :a �t$at Sal CA! � .10 I Is 2400 � �L 11 0 � Thru Proposed Sign 200 'X a fir., Zoos .14v.yx �o� 60o T soo' IF IV 1located on property VIVO �,� at 1943 Wheaton Way i ° „ 't'Y , .SCAT E.. IN FEET i 1 IF > Vt-• ` ' , ` IF a 5 t f _.,, CONTOUR lt�TERVAL b FEET 6 . y,' . ._ B R E M E R T O N B U I L... D I N G D E P A R T M E N T P E R M I T A P P I_ I C A T I O N Application Date 11/30/1989 Application Number- 89AP01303 Issue Date Permit Number Assessor Acct # Project. Group Site.Location 1943/45 WNEATON WAY Owner -�- Last i�lame ACI<ERLEY COMMUNICATI First ONS i'1T -..Street 1943/45 WI-IEATON WAY -- City BREMERTON - :.State. WA Z i �-� 98310 -� Phone (�U6 ) Tenant 's -Name Phone( 206) - Agent 's Name -_ = - Phone( 20f�) - Architect's Name - .. .. C 7 Bui.ldi.ng C ]; Grading [X] Sign C 1 Paving [ ) Mechanical � ] Move Buil.dir�ig [ ] Burning . � ] Underground [ ] Plumbing [ ] Mobile Home [ ] Land Clear: [ 7 Demolition Building Gantractarc Contractor EMPIRE OUTDOOR ADVERTISING Street = _ . P .0 . BOX 4431 City SEATTLE Phone (�O6) - - State WA Zip 98124 Representative Stag: L.i.Uerese � EMPIROAI�-�N� _-Expiratic7n Date: OF>/30/1990 City License �# .Expiration Date Nature of Work: Sign permit for b,allboard. Sign Va ]. ua1; i on ��00 .DO Gour�c i 1 District 3 .Census Traci; 50 Carest ruct i arc Sg Fec��l: I aspect i or��� Type Required Res i denr_e [ ] Zan a. ng Four��dat i an C :] Busir��css [X] Type Frr�ming [ other C ] I. r��:�u 1. at i ��n [ 1 New.. f_ :1 Pl�.imbing �: :1 RE:E�r:� i. r [ } St at u:7 M�:.chan i. ca 1 [ 1 Rc�:mr..�ciF�.,1 (i C:r_7c:ic= W�:r 1 l boar d [ .� lacirl i t i. ran [ 1 � F, F= i. nr:� ]. [X] CITY OF BREMERTON BUILDING DEPARTMENT PERMIT APPLICATION 1989 DATE: Ackerley Communications OWNER 1943-45 Wheaton Way LOCATION OF JOB For billboard sign TO BE COMPLETED BY 12-�- ,198° ENGINEERING COMMENTS/REVIEWED G Empire Outdoor Advertising CONTRACTOR �Llll n��, FMERTON B R E .M E R T 0 N B U I L..., D I N G .;:: ,__-D E P A R T M E N T P ;E R_M I. T. A P P L i C A T I O N .,,.ry -. .;r._ ...•._ rrw. rrrrw.w•..—..........._............._.«�. ..r..•_+�_... w.rr-ate. ...r.^ .w «....w .r w.rrta.__.w...r....wwE Application Date .11l30/1989 Application Number 89AP01303 .Issue Date Permit- Number. ,,Assessor Acct, ProJect, Group Site. Locataan �1943/45 WHEATON WAY Owner � Last .game �ACKERLEY, ZOMMUN I CAT I FA rat • idNs. Street. ,:... :1943/45 WHEATt3Ny.WAY , r { City 13REMERTt3N „ r p.St ate .tA. + Zip 9831Q. Y Phone 206 � . Tenant 's Name . _ r _+to,e 206_ *r Agen is Name M Phone( 206 ) Architect's dame+_;-_, . :Build nc 1,;;Drad1ri-°_` �.� ,:,�.1X] �si�n � [:� Paving.. C Mechanical. -;;dove %Building [ Burning >> Undergrounr! t,:... C a Plumbing 9 �. ( .Mob 11 e _Home ..+,t, .� , C " 'Land Clear �;- C Dem4l it i or�r Bug, lding Contractor t Contractor zEMPIRE' OUTDOOR, Ap+,JERTISINC =BOX 24431 City a SEATTLE Ph cm) 1`1e , ( Ob ).., .,— �w State WA ZIP ;981214 RePresent at1w. Y State Ltcenoe- #t EMPIROM 4 ExPirat o on Dat�:� 06/30/1990+ City License r _.. xp ration Date .� Nature of Work Sign permit for ,: bi=l lboard-. • q i `J : - Coo,:i gn Va l.t.lat ion � $ 50�i-,i�Qa COLITIC: i l -D i €st r. i ct 3 Census Tract 5t13. construction 4 Sn feet L Inspectkons Tyne Required Res i Bence C a Zon i nc� __ Four•idat i can C Bus,ines8 CXI Type Framing [ Other { J Insul,at ion -C 1 New Plumbing Rcip a i, r+ C 1 Status Mechanical C 1 Rc-�mc: de I C .1 - Code Wa 1 :L k7oar•d [ ] Add It i, on C 1 26 Final 1X7 B R E M E R T O N , B lJ I I...- D I N G D E P A R `f M E N T P E R M I T A P P !_ I C A T I O N Application Date li/3q/1989 Issue Da�t e Assessor Acct # - Site Location. 1943/45 WHEATON WAY Uwner -- Last TJame AClCERLEY L'OMMUN I CAT I .- --Street 1943/4S WI-IEATON WAY -- City BREMERTON - � Phone (2U6) - Tenant 's -Name . - , Agent.'-s Name _ - _- _ �, Applicatior�i Number- 89AP01303 Permit Number Protect Group . first ONS - _.. _ ..-: rgi . ,.. .:State 1JA Zip 9£3310 - ,,:._ Phone( 206) - Phone(: Ob) - Architect s Name :, ..� , _ [ ] Building - : f_ ] Grading ' [X:J Sign [ 1 Paving [ ] Mechanical � ] Move Buil.d�.ng [ 7 Burning . [ ] Underground [ ] Plumbing [ ] Mobile Home . _ [ ] Lar�id Clear . [ ] Demolition Building Gontractorc Contractor EMPIRE OUTDOOR ADVERTISING Street = __ - -P.O. -BOX �4431 City SEA'iTLE .- r Phone '� t�-- ' _ (�Ob } - _ - State WA Zip 9�ii24 _ Representa�.ive _- State !_..i.�;eri:��: # EMPIROAI�-�N� Expiration Date: OE>/30/199U. City License # •Expirati.on Date Nature of .Work: Sign permit. for.,=bailbaard. 'Z�l��.� � P Sign Valuation ��OO �L10 -Gour�ic i 1 D i st r i rt 3 .Census Tract 50 Canstructior7 Sg fer.�t Insp�:ctions Type Re�au i r ed Residence [ ] Zon i rig foundat i an [ ] Busir��ess f_X] Type Framir��g [ 7 other [ ] I r�asu 1. at i on [ ] New [ ] Plumbing (_ .) RE�p�:x9.r C ] Status Mechanical [ Rc:.mc:�ciF�: ]. [ ] �:c�clF_a Wallboard [ ] Add i t i. an C 1 � b F= i. na ]. C%� CITY OF BREMERTON DEC .1 198q MU""'PAL LiTiuTiF, Permit Numl:ii: r i't 11Cww r:IT"i",II ; i. t; r'W1r)Y :)N COMMUN i:( r: 1 I. I:. ;. ' I'. ('.Ji 1`.:> 1,��':'3,'=7'::; "I t:`)N l.:l;^Y k,RF:4(11 F(1..faP•1 ,i.iil;(' I�li1 71:; F':;:39i.) FIFO r'141eri'I: 's N arylC. F tti iris nT i:;ft:i. I I i:i I: Nr3.mi_�' f I F3r_J:i a ci:irtc:{ . C :1 Gartti_i:i r'tc:) 1! �: ( � :i t.rr+ � i r`ii.. i rliI L I M(`i:f')i.'i IF (? 131). I F'a.urni:; f .] Muf:ii l r.: I li_tmE L I I .rjrtci t".':I :r"jT I i t 1:i. 7 i::i. T t S;a (. c.i nt Y a c; t: ii lve I::: I`11=' I. I?G�: +: i1.1 l I:)tai:ih �`�Dl�l � [-? I I: :; ;.1•d� s L A +F I l tnfA._ No pR BU/( p/ RtpN �<4. i EpARTM fNT rib/,elK� a ewes 00 e '51 e 11 / cet..Fi 5 je i,cin 1.)a.l (.,(isk::i isL(.i ;!`:.t:a:) ...F4..-._....... _.w..._.__ ... _ ............... t:.i.11:driC;a.1 1):i ;i_T 1r;! +.i';ri Js 1Ti�C;I:. 1=�c:itJr�rar:� k: is iirt {- ..I 7: rt I'l I. l y. t: i. c) r; ). J k�:LtImk;:i.nta B R E M E R T O N B U T i.._ D I N G D E P A R 'T M E N T P E R M I T A P P I_ I C A T I O N Application Date 11/30/1989 Issue Da't e Assessor Acct # Site Location 1943/45 WHEATON WAY Owner -- Last iJame ACI<ERLCY COMMON I CAT I - -Street 1943/45 W1-1F_ATON WAY -� City BREMERTON - Phor7e (i06) - Tenant 's Name - Agent 's Name -- . Architect's Name [ ] B�ai.lding [ ] Grading ' f_X] [ ] Mechanical [ ] Move Buil.dir'ig [ ] [ ] plumbing [ ] Mobile Home . [ ] Builrling Contractor= Application Number. 89APg1303 Permit Number Project Group First ONS 1'7I State :WA Zip 98510 Phone( O6) - Phone(OF,) - Sign C ] Paving Burning �� ] Underground' 1_and Clear. [ ] Demolition Contractor EMPIRE OUTDDOR:ADVER7ISING St re:e1: ;�== �_ P . o . BOX `4431 City _ 'SEATTLE Phane - (�O6) - _ _,State WA Zip 981 �4 Rep7�esent at ive Stag: L.i�,er�se � EMPIROA14�N2 Expira't iori Date: OF>/30/1990 City License # ,Expirati.on Date Nature of Work: Sign 1-permit for bi i iboard . Sign Vaa.uat ion Cour�►c i 1 District toast rust . or'� TYpe �9'� ��' �Z-�-B� ���a„moo, 3 Census Sh Fec:.'L' Tract 50 Inspections Regui.red R�:s i dense [ ] Zon i rig Four',dat i on [ ] Bus i r'it:s�� [X] Type Fr �:�m i ncJ [ ] other C 7 I risu 1. ai: i urn [ ] Nr.w [ ] Plumbing [ 1 Rc::p4�9.r [ ] Sta1:u; Mechanical [ Rr�mc�dF'� 1. [ ] Cor.:i�� W�:� 1 l boar d C ] A i:j ri :i t i, o rn [ ] � f_7 F a. r:�:j, ]. [X ] d e NOS Yes U 91/j,OZIV , fPrpN Dtpq�rMfNT �.--�i�iL�1NG PERMIT AP PL�C,�.T1®� - •� Cit of Bremerton, Washington 98310 Phone: (206) 478-5281 Assessor's Tax Account No.: Phone No.: ���� —�0 �-� Site Address: Owner's Name: applicant: Architect Firm: Owner ress: �-� ' ❑ Architect ❑Contractor Representative: Phone: ❑ Tenant Address: 1�r,1err _ � vp(,�j Representative: � kt-� Laf�z Contractor. � � �.� l � - Phone: �� -�0�.9 Address: .C' x `� � Exp. Date: Contractor's License No.: ' . �/� New / ❑Repair - -- �❑ Remodel/Addn ❑ Residence ❑Business ❑Other. � ,� ❑ Demolish ❑Duplex ❑ Multi -Family (No. units ) Sign ❑Parking Lot � ❑Bldg. Move ❑ Grading (cu. yds ,- _ �' _ _ _ �;,-,,,,., ,,,,, c ., � rt ..t�1r,(`,�t�`i'Li, ._ ? tC1-'}'� � Nature of Work Proposed: Utilities: ❑Water _ �Valuation of MaterialsJLabor: (UBC Sec. 304{b)j Zone Designation: Setbacks: Fro ❑ Waste ❑Sewer Comments/Conditions of Approval: ❑ Septic ❑ New ❑ Existing ❑ Storm Plan Review Fee: Permit Fee: Surcharges: S S State $ 3 . � 0 ❑ Receipt No.: Energy S101S15 ❑ .Receipt No.: . Date: Date: Oc�courpa�n�cy�C��fcation (UBC): t a-� o. Stories: �" .__���-��-- Height:_.-s-- Heat Source: n�'���' -- :1 3� �t�P� cZl2Q_ Rear- I understand that applications for which no permit is issued within 180 days following day; olicat_on shall expire by limitation, plans and/or other data subm.tted may be retur^ of ap_ to applicant or destroyed. by the Build�ea bf f melis. truecand correct) andI �attthe applicabl plication furnis Y infor•.nation on this P_ /- nT .�Y mor n W3. ' . requirements o= Signature � - - �r_.-..- .-..._• Stat. Code Copies ro: `Nhrte-owner; Yellow -file; P �k•Assessor Goldenrod -Budding ►. �. • � � � � � , � Site Address: I '• � -� M Owner's Name: ���. Applicant: Architect Firm: Address: Contractor: � /�Y',,��—�� Address:5-�--� Contractor's License No.: Owner p C P.,� a99.3 t SbA--� � r� RS► a 4� ❑ Architect ❑Contractor .� Representative: Phone: Representative: kS , m tic ❑ Tenant Phone•. (� —��� ��1��142_f�_1"q��� � Exp. Date: �I / ❑ Business ❑Other. � New ❑ Repatr - - ❑ Residence , r ❑ Multi-Famil (No. units ) � Sign ❑ Demolish ❑Duplex Y ❑ Grading (cu. yds 1 ❑Bldg. Move Nature of Work Proposed: Utilities: ❑Water _ �Valuation of Materials/Labor: (U8C Sec. 304{b)j ❑ Waste ❑Sewer ❑Septic Zone Designation: � �'� Setbacks: Front:8 Comments/Conditions of Approval: Plan Review Fee: Receipt No.: Date: Permit Fee: 3 Receipt No.: Date: ❑ New .❑ Remodel/Addn ❑ Parking Lot ��� .�.r .tni inn _ Sq. Ft.: �� Surc-- k � t a-n � � _ I �. ❑ Storm State $3.50 ❑ Energy S10IS1� ❑ Occupancy Classification (U8C): �No. Stories: ,�m,� � � � o Sider Rear. ���� � _ Height:__.__s'-- Neat Source: l�C�'1-E' . I understand that applications for which no permit is issued within 180 days following da" of application shall expire by limitation, plans and/or other data submitted may be retur^ to applicant or destroyed. by the Building Official. (Sec. 304(d)UBC). I certify that t'rte ins"ornation on this polication furnished by me is true and correct and that the applicant requirements of o*= -Rr moY n wi .-- /� Date. Signature � - - .f,_=._... .�_�. - Stat. Code Copes to: 'Nhrte-owner; Yellow -file: P' k-Assessor- Goldenrod-Bwlding _ B REMERTON B U T LA L I N G P E R M I T Application Uate 03/20/?49?. Issue Date 04/01/1.992 1Assessor Acct # SI to I:ocation 1943 WHEATON WAY Owner - Last Name WALLACE - Street 1.943 WHFA.!i'Ozq WAY - City BREMERTON Phone (206) 7'?04' 0838 Tenant's Name Agent's Name Architect's Name [ ] Building [ ] Mechanical [ 1 'Movf. quilding [ ] Plumbing [ 1 Mobile Home Building wilxcto: Contractor Stree. �. City Phone W , Represitat.iV'e State cYense # City Li*erase # AiAN50N SIGN CO. r P . O , ROX BREMERTON (206) 373-6015 RANDY IANSOI* k mm D E P A R T M E N 'P Application Number 9?.AP04825 Permit Number. 13046 Project Group First BCC$ State WP, Zip 98310 Phazie { 2 0 6 ) M7. rho... {206) - k ; i t2i Paving [ ] ?�uAidn Underground [ ] Land CI ] emolition L IM F STATION tate WA Zip 98 1 ,xp� ion ion LDat4 2;X9 Nature of rk: Remove e sting ole`:sign and i 11 one do e face ligh d s' nd 'one single face non umi m al sign on bui i pertk ached. Sign Valuation q.00 new a6& tee voi Council District Census Tract, Construction Sq Feet Inspections Tyue Required Residence [ ] Zoning Foundation [X] Business [X] Type Framing [ ] other [ ] Insu)ation [ ] New [ Plumbing [ ] Repair [ ] Status Mechanical [ ] Remodel [ Code Wallboard [ ] Addition ] �- final [X] Received By: pproved By: - - - -- -- -- --- ---- -- - =--�L __ hi �_�� B R E M E R T 0 N B U I L D I N G L1 E P A R T M E N T .S I G N P E R M I T A P P L I C A T I O N Contractor Street City Phone Representative State License # City License # Application Number 92AP04825 HANSON SIGN CO. P.O. BOX C, WYCOFF STATION BREMERTON (206) 373-6 a WA Zip 98312. RANDY is to 12 17/1992 • 11111111111111111111111111 OOOOO000!H pplication Number 92AP04825 Pe.rmi t Nt;mher 13046 Water --contractor to verify location and depth of existing utilities. Contact Underground %ocates (1-$00-424-5555) forty-eight hours prior to start of construction. Development is s Specification .�' - .. -t _ �s._ .; �; FILE COMMENTS SITE ADDRESS: { ? �,___.._ APP. NO. _!9j�� OWN El to l.( Ip �i ,Q _, NO. VLANU — TYPE OF CONSTRUCT SQa FfG. OCC0 LUAU VALUATION PLAN CK. l3LDG1. FEES PAID: PLBQo J MEcli. ` DATE DATE APP. W/ ROUTING: SET # SENT RETURNED APP. COMMENTS �.wM.r.r..•wrrwti.a•wl:NvY.MW.>itw.1,vwf•�dhva;wNM+...•Mni•�irit•NnrrNim+.AMn•w:,�r'H •, .�..•�..•m1ui.MlMli.M.»IM.{MrS.IN1:.MiMWa'3NN�w��d'wY•V/,�,N.NMVM.%i%rr �M.w BUILDING PLANNING DNTN PLANNING ENGINEERING WATER TRAFFIC HEALTH DEPT. SRCHG4 OT'tlEli APP. NOT REVIEWER DATE COMMENTS City of.?Breme.rton, Washington 98310 Phone: (206) 478-5281 Assessor's: dx--,A(c6oiunf No.: 1 C, Oh Phone No.: Site Address: 1-1'T \V� %_ Owner's Name: � All uAddress Owner ❑ Architect Applicant :-. . [10. 0 Contractor El Tenant --- Representative: j Archit44 ect Firm:: Address;' Phone: fiaii8on* Sign. Co.. , Inc. Representative: Randy Contractor: . 15.33. Shorewood Dr. Bremerton, Wa 98312 Phone: 373-6015 Address:.: Contra04 ctor's License No:: • . HANSOI*221J1 Exp. Date: 12-17-92 --� ❑ Residence • ❑Business ❑ Other: ❑ New ❑ Repair ❑ Remodel/Addn ❑ m Detilish •• ❑ Duplex ❑ Multi -Family (No. units ) © Sign ❑ Parking Lot j ..6 0 Grading-(cu: yds ) • ❑ Bldg. Move Nature mof Work Proposed:. ` 1 1 Ili kTD 1 I Sq. Ft.: Utilities:.: ' : ❑. Water. ❑Waste ❑Sewer ❑ Septic El Now ❑ Existing El Storm Surcharges: f 4. �4aterlalsYLabor. Valuation Plan Review Fee: Permit Fee: . (UBC Sec, 304(b)j _• •.:: •' � El f State 51.50 Receipt No.: Receipt No.: Energy S10/a15 ❑ Date: Date: ` Zone Designatlon; '. ' Occupancy Classification (UBC): No. Stories: Setbacks:.; Front: Side: Rear: Height: Heat Source: Comments/Condilions of Approval: - I understand that applications for which no permit is issued within 130 days follot:ring c}at^ .of application shall expire by limitation, plans and/or other data submitted may be retur:;cc to'• applicant or destroyed by the bui.]di.ng Offickal, (Sec, 304 (d)UBC) , I COY''�l. ; �.'[Irt, t4 n 'informwktiokoon it.h•as 6pplication furnished by is true and correct and L'ttat the applicable reouireinents of, the:City of Bremerton will be met. _4. Signature '•�_ Copies to. Whip©=owner; Yellow -fit©; Pink:Assessor: Goldenrod•Eivilding March 24, 1992 rtA TO: Janet Lunceford1 Building FROM: Derek Skanes SUBJ: All Sound Automotive Detail Building Application Number: 92AP04825 Site Location: 1943 Wheaton Way Tax Lot Number: Owner: Bob Wallace ��tL; MAN 2 6 199', E BUILD/NDN DEPARTMENT Contractor to verify location and depth of existing utilities. Contact Underground Utility Locates (1-800-424-5555) forty- eight hours prior to start of construction. Development is subject to AWWA Regulations, APWA Specifications, DOE Regulations, DOH Regulations, Bremerton Municipal Code and Construction Standards and Washington State Cross Connection Control Standards. Logged CITY OF BREMERTON MAR 2 31992 MUNICiPAL UTILITIES i I`30" t k. I; y I�ftCirlE: k u:atar'( 1::(F"11 ii 1; al. v(a (:: I t:e:rt,Nc: }f c a WYUUVo too S r("I I ()N I3�tr-:MFaZ rC:rN IzAN10)Y t IA- NSO T x <'Aol 1 J 1 <> k rt k: (-:: vv" k :1 r Pik: I Off 1 T'r-A1: i, cart y i ) 701,111 4? k7t�k:c:: IVI ? l (°1 E I, I. ` t: i i' ! i ? l.1 :�: i.. I:') ;I 11 t;a L) ,.I. IT 'Fill, 'I: (:i I�! AfIIF:) :c..;�l, I.'s:,rr i:)r�l;cs: i.) f,fF t:)�1{�`�,' Fs);>ts{.,i�:x�I. �.i;'ti i1t��171se::'r' `} :I,.>TV %..�»; I)�,t;c; 1%4 ta��:'r ...a�:>rr'r' (1�...s..'1; lip IDYIN ia'r'cs�� ? t.. T. t:, 1 t; ��.; L, �r�,� C :1 (4)ri 1 l4 Fils (AS1 II1AVJ�t")N WAY C1UJr1t `F%po 1,I EF If ,I is .... . ............ .... t.; ' l•J�11.,L�r^�t.,l',. IF IV. t I i; y 131;111.4IOI li TINT 1�it:rt'it •'il��,,...IT N m cat: IV z (t i'i t�� iVic- t�ci a �c..r�rrsIm IT IV I rr,YIN I Fs t9r,l,io- � )` is .... . ............ .... t.; ' l•J�11.,L�r^�t.,l',. IF IV. t I i; y 131;111.4IOI li TINT 1�it:rt'it •'il��,,...IT N m cat: IV z (t i'i t�� iVic- t�ci a �c..r�rrsIm IT IV I rr,YIN I Fs t9r,l,io- � )` ' l•J�11.,L�r^�t.,l',. IF IV. t I i; y 131;111.4IOI li TINT 1�it:rt'it •'il��,,...IT N m cat: IV z (t i'i t�� iVic- t�ci a �c..r�rrsIm IT IV I rr,YIN I Fs t9r,l,io- � )` e l i L : ' r'', i h,! i::; i r', r: t ! ! _ ,. ,. ,. ;... ... .... � � � ... r'•.., '.. ,.. t�.'•. f., i7CJ;.' jr1 7 :!�i. a. C:: i�9. �i:: t:i.r.i h�lam(�;i f'.::'(' �'':'�1-�l l.!Oti.}�{ .?;'�7 p-1�.!i.! i. !. t:i. �{, ;. i.irl �!r'z !: c O.:;/ .�)i +. _ E. E.. _ ..... . [,....i.!.t i)t'>.:�'': �='t.:rrn:i i:: E�:amf:tt:`r I`;:. ,... ... ?'i cil.11 ri l.:(;I; :;;� .J..�.....i ...i f'.'L; is i7Ar i:.ai.!.i.'' .. :i E:,., i i:ai::at7.i:; :i C.7T..t i ij.::; IA.!i It(1�t�L'7P''; I'.iil`, ' I h.} r i rn i:., �.�{ r``! i . I . t^t t :a::: 1 � i. 'r' :'�: �; I> � a r i'� t_1i�.)TlesY. _.. .j.:':> is ! ... : I. l) (i(li1.r..li., � -. , ., `. r!, � �i:i t : P!, ,,,�: :; ; , .; -:.... � i P'li: t. ri..'ii'(.t::F"' t '�� 1 � T't;;t � ,r!.rT'ia. ;�� t_1r1r'ic-:ri�:;r't��i.!rii-f i , : ,., � � �. i.. ! �. �: .i i=':I [;.mE';:i. _ rit-lf- :..�.t:: I-It:1mF: -! ' t::77 �� t... . is _I !._r:�� C: (. C)r:m �t: � _,r} t.l :I � i::i:I T't`::i i:?T1';: `r i�.(::; !. isi'i C:i:;Tli'r�f:�.t::'r: r !�-EnN`:,r:;h�J ::1:iaP ..... _:i:'rc:t::'i::; _ - ;_- :.�i . E:)t_l:; i�; , i.,l`(i:; 1=" ..L.t—, ! .: i7h1 !�., .. . .... � E r' i !+ i�+ 11::1 ,, <' Oir:; � ... t .. _..tf;�) I ..� :::, �.. c:9. i.: (: ['�,ii� t'.: ::i `fit 1 �:' ... ,.., ..., I .:3 1—.;ij:; i'=; 'fit: i�a�lE�l..)`i !. c'>. L. (:' I !. � It E_I(-ii`1`'ill.1:'r'' ,' . �:::(:;:I ,r , a. CaT; C)i:3. 1: E:; I ::, ._ , ..:. ... .... 1 i= ' :,.. � :. r'i-:m, ��, + Tlc7Ca i i. L 4-1T1 i9Tlii t. i:aT';%'. iUt1 i��c:t i i...J�, �; >i raru-� ,i.Tr~;Ic t:,t�: rac:lTi i, _ � �n - ;l.C7Tl iii:A.LU.i:3.I: Lt:aT'i <:;�' � J Ir'r ri:li.�rai_:a. a.. i:);.t:��t;' i.r.�: ., �>i�. l:i�lTiz";'i Ut;i:;:1i1T"t �F 3� ,9z. _. ; i�(i��?::I. i.ir::Tli:(:�: �.. _� .<`:.i:.�ii �. i I'; i�-�i:7(.1.T�;i_jr3.'t:i. i1'(i ...t E:i;.l.-..:i.r�ti_.,_. . I:a•_j 1 �:ii_'• � r�ir!;:i.r1.. �:i'I: �ii:�'� �.. ..� is r��>t!..i. r:�'E; a. clri j� i-�,E:j::;{j.l i �. .1 .,(.i3 ,U.i> i�t.::i: i1f:3.'ri:L ..,u �. Rt:mC:ai:ii�: �. �. .� C:i-:ai.,t:� i:l�. !. i. i..,i_1tx, �.., ,. _, -.: ", is i t:1:i. � :i t::1 r't i . .1 ' t r_j. a E i... CITY OF BREMERTON BUILDING DEPARTMENT PERMIT APPLICATION DATE: 199 2 TO BE COMPLETED BY 3-27- Bob Wallace OWNER 1943 Wheaton Way LOCATION OF JOB FOR ENGINEERING COMMENTS/REVIEWED BY N'o c�tit•KL��� Hanson Signs CONTRACTOR 4# r1 r= r: cl N E3 t..J r F) r N t. I) IT, or ;: { : .!. I. C. rtJ':)c:r; !. �:rt ,� : i�i'. t)3f i.t.% ].. ;':.� or ore, or or sme., 1...t:ir::: C.:i r)T1 i'r1Jmore 3 l�lldF A l C.lN LJt"IY r i;!1.Jfool (. r 4:i'J �::ir 'f�mE;. W(.)i..I ,...v. c:F,rt: 7 �lopc�; t WI IF �iT [:)IN WAY or i. t; y C:3FXF :Mlt:;lf �!r�moor t'tF.ra 1. i..r:.a9. l; i. i:in NsAmt7j::T ` <'.(lhC)i t3"; or 0 J' or t::1..mi ii C:: 7; l .a Y' t::i l J. t:"i J 3t.113 r 1 I; :%; , / [ ..t:rrJ:I:. } l y-c.;I1-i E::C:eto' : NamE' or X.I I F3U '. t t.� S:7 cat i:i rt!;) I'av I Trig t f Ji.'i..i tc31"t i1ToTel 'I L. t..lritir,T ?.7T't"tlArlcal .. , t•1ai : r f It:irTTt::) Ior I 4:� C.:: i C.:Jr::rrtt.:;.i 1 J:.I cirt nct I T'IIm T aic: , isiT mt: i-It`1N =alN `.; I: (; .LLL ;or. Iri:r::.'f: C'..t:i,. F3ClX.. C:, WYC. I:: ::ir"t; 1f.N 13FZ1:-m11r JZ T ON c. Trait (206 ;3i .5...�:;(.)l .a ra o11 r me ir1, t i Inc %tr ; Tel a RANDY JcAI:E. :It t tV-)`d: C F.x' ''1:ai I_ r4'iT' 1 I C)tiI is ? , `,'c d over 1-CE':;rrtC7VE:: ci:' 14 i':i l I. set or t;n Ctrt Tk: ri Tool I rirot c t> Tt() 1 c.", t �=;...Firs? L l.:i�iTli t: T tlC:: J. 7 C?r1 Od N mi7 T + I:. xi i-: �ttCiTt I I. •. _111i i..{... ,ta spy .. r t:i�.trti faa.I. a 0Tol ;� .J •r: J. ril.I"1mt:ii.Tot :;a I. ..� F1 r-'. ait. r I: i : -or; t...i at..) I X . J II � u rxz�a �b � � 9 N N � �r ���r� � I �O �- ✓ �� �� . �' ��� a 1 �. �' �� `{ ..,-� b �_�- rL __ �t �`� �-- f �� '� , ��• � t��� y,. `,� t� _� `�� -- .' ,�, � � `'� �i 6 � � t aw t t � '+ � J .-:. � �- � �' 6 '.1 � ' :�k, r � �)[[a) 1 t . J-..�w..� .gym--�r-_..�..� �-.•�. i � � \. 1 � Y ! 0 ml z w o. 0 W W U N u7 w CL a W z O Q W }z } 0 W z O Q O Q w� �~ �a0 m Jw U w� uJ—..Hg�zw tf1 --� U Oo�mQ J w�wOz� V�C�.}QOV tiCDOyOrN T T T w Z � a N �_ � Y W � Y W�-'VQ20 C cn ¢ F-- F- I— cn m cn o z Q z�w>-err p� o��Qc�w u �-`SYWzm z �W WQQ-J � w22�po a.V Vawcn f , r N C�7 � lfl t0 L.L.. Y I Wcy L U !rJ z � �_ o Z � _ o n a m w �„ as V z c=i�� L �d w � wrnz0 p cnF-- �t� wJwwO � x(='3cn � �w N= z �oC7� w �ww=C� H Vcnc~n� Z4�� �rz—,,��C7Z N ��ag � Z=��Q?u7 wQriJ=Q Z m V�"- V=�cnVow--�ocnZCJ�am �m��JU`�� m�VpaSGwgmaO�}o��z�Nwaw.wUw�� w�mcn`�rra-wzo~w�p�Q�m��—�az �QpmOmwJ—zwwazw�[taQa�¢Oa ��-cr G�mOa�wQw—VcnH--[tF-rtQc[[=cn O r N lTl d' IS? m t` CD N N N N N N N N N v ii 1 Wec si i � 0 � � cn � () w �¢ V � Q�Ocn� No4 CO � ���jQ tS tt Carl �w V=ruiz� zN�OJc�� O �z�wV pZcn�J O�mQVOV 0 �W¢Z��HaCC(J7� Qa wVm w G'WZaoxz���s g����'���¢ �Zooa�.woo- ►� �F�w�Qwc�-,� °:��v��zN��z � cnOw�Vw�oo�Q QQo�o�����_� ��ao>Zg>o����nu Q�JH~ Q= LiC.?�=o2SW Z� V tZ�W {1J� W zzWcnJ��N�Q�"41— ���—�Wz�Ow W> ��=OC�w�Qw�azc~r�a��Z�¢U�u�.�c�r�c=t�Zm cnmcnm�—gym } }�} rN C'�7 d' lS? � ti CD Qti O r N } y C}] � LS') � � � O � Q r r r r r r r r r r V LL m �m 11 Q Y f W5 i� O V z Q z ii; C!S W z Q� � rc � � m [�LI CC W ¢O� cv cri O z a7 Ti =N�?+p::Em mr12 mm-nrfm�Di= G)Dz z --1p�mp mD 0 mp �Dmp0>mOL�m�p> r -)MOU'O=OTD Dumi Omom�,mmzm N >Ztn Z N C M O � ri o � Ln DQ O m LO DZzzcnT+cncng2 z0mo0C�moOC� —i 00��0 r�r ��-iLn� OO�� ���MOOD 0MrwNK m0ocM W>�0 962 0q q ODmg°� zD.,00z O��qm OSOom7 m = Z] M -U tn0p5� tn> m �? < C m Gl Dmn—� C p � z z T-- to cn Ti �0 m p ' m O �� �� �D o r_ D r z < C� D G) m m m C � m co cn 13 r A � m OHO m m m o.amvrn �0D= :�:0 OO>nm m m n LOn � Om� ZZ—Ln> �uwzN— ��D Oz z m Zm z E > D m r W z Op Q � mcra�ti�� 77 Z O a mpK m2m:3=i �TT Q tnz m W D CO m C -mo N m z -o O H p � G) O m Q a � o�acn�ati Z Ln D 000 m�rn c�m]°m� [n�nOp� 51:13 m Drpmz Q -°�+m> OG T' cn D O < un m z m �4aNun4�1wNO) D C C O m m m 2 C m QnK< <zz� ��cncn03 CZZmz>> — CNCn—mm -I-1—!— mmz-o—icon LO � C r N o r- to Cn,_{OO �om—r0C -v—mom z�agzm!-gym gYO�DODM�p Q' z D O m nz im Q D U7 D �wrQ� -D =mi0 coo m=mp y � Cn Q m�m0 7J �Z Dm a m n > Q mm CO z 0 m or AR >; rI AM to .f �41W" a lb _ �_<`iLF,',a,,, - • 5 - _ _ :..- �r - '�.,- r U- s or .r ; or A is 4 r IRA Room? ow AIR Y' 1'x 'd '!x _ - /: ..L - a � OR_. ' y .x 1 may. r . s -. - - 3 - t A4n V J j 4�. T aj - r T.L - - J n , w ,.�., - .. _. F dAAl _ - - - look t ggo YF f x _ _ _ - =-^off 'i y-, s"I''``- 'tea.. -;F�'RIF PL _ t , '4 - - - ,-It AL AIR I go All 11 Igo VV .�► - IL >„ r:III It _ Al v t t or T /_ :q ' Arvo A. - ;. _ ' A* §, P IRA? t 5 AIVP !a om,- ° - - " - I I IRA vV It . - ' g _ t , Ric f A. _ . ce+� At A I A. ' ?: - I - _ OR logo A Is or I Roo,. y_ .. - .. - - w... •Ago g- IF VAR 11 - _RAV, .. .. _ - _ IRA . , `Y'u l.. :., , :R .� ., 1 ;, ,. -°r r, ,r. r IV `e+ i r. x� ,. = - , _ - :. a r �' yJ ... ' Al Ago AV A - 7-���yt:� go }9n 7�.t { 'c _y..: ae A C Q m OHO 'aa�" mca03 cDn = < mm> Z MC z m It 10 00 v Cis M .A W Pi 0") co „-?it�Am� � DZ�2A_ z cn o DZ m m Mm��mm7 VK mQ02 D W-4000'zo-<Mom�c D � mi 0 --j M En � z m (na) moQbD a 25Zr0CU'Z Z G) m���� cn a z z m Zm m m aj o Q° � m ED v m Vi Cnz�'m>�moo -�a13>to Akan cn Z �o � :u AA 0 �I:) zm V� o�4zxooz cnmD�� z Dcn0O Ho z Z� Q D� En ri �7 m33Z Dz z Co 0 m Cn r► C CO V f3s iSl � W ITV � 14.1 Q�D®z0�m2mm4ama�ma1DCQbzm 0 D�o 2m Q�3mom tzQ<En z�oOQ� ��0 mr��mwm:mmZ:Eouo MI a �� 0�m TCMC13 LmF=x2 Fn(� )�m(nA zmzmo:,,Gn �-I D�--i m G) m m m=m m mrAz�z2� a cn�,, r. o a z cn z o �� m 0 m 2 Q7 En Q _ a) :1 z a K m Z •• j M" m CO V �Tn 0330 rn DZ �� AA°°=o0 M)Q()mcnm m z -A _ c0<u'm� [n m C? � mz cn Q� Q z m G) Z m 0 Cc a. Q W Q z Q W Q < z z u�U= <z Lij >.1FW- -w O x = J:)zFF-Z o:2cc: :2 O=W= 3oft0 VJ _Z 0 7 1 F- U)ZCL CCwZtJL zr O � ''� D a.(!)ww OL �OZ�� (n Ul F CL CL VVU1aQ 0o Ch ,= cq T T T w z 05 w S J cn z w LLJ o�Q C-' � w� w�w� w�wcl: OL En �LU� w cc: CL Er) apf,�COO C3 C; �, ry 0 wCL IOL cCnMW(n:D ED W2= z f) CL tV Q tz W Q ai W w zB � OL::) ?�C)CL cn J J Q c� Lu Z Q w H �oj z QFq06 Z Cf3 Q) Q�0 0w w�LO(r0 w�QO0 a:�ao�0 w w 0 Z) EDCccn O En 0E---0 cn mCcw Er: w ZQ z Z aQrr.Q°: JZ�tt7� rC9Mc!-Lo 0 Q w o m J w 9t� 0 Z) Y Z {�ZFF- Oc o¢,En �_� to 0ir(� wQQ�Q w L�w���0WO� pWU�FZwaj rw Q �CL � 0 0�c Cnz0Q0z =�7cn(nu-(n?9� � C3� O r N cr) Ido S) m ti T T T V� T T T T (n 0CL E 0 2 W Z (D � F- CL C'J cc En Z Z �ma cn CO Q4<0LLLiEnccza: J Jq OF-�((no<o !C- J � Cc ui U) , 0 J < aC Q 0 w E w 4� W 0 W z z<Q) = U) m�wz QD— xQ�a� _ =kD=-Womgwmw r CV C+7 Kr LO SO t` OD W m Z mac.. './�'ca .r��. 'vim ,�. .rr�"�s..✓%�i..sr�a..tric' 'raG_ii,.i�JG� Y RFICI TOF OCCUPANG CE I. CITY OF BREMERTON BUILDING DEPARTMENT r PERFECTIONIST AUTO DETAILING Li cnclvt� al 1943 Wheaton Way eel CfiaCie dGuccvice mtL �e occ+�hieduGlc tle�v�ar�iaum� a�Che �uu fBade r TYPE oTYPE OCCUPANCY CONSTRUCTION OCCUPANCY LOAD COMMON USE VN B1 4 Auto Detailing February 22, 1991 David A. Nelson This certificate must be posted and permanently maintained in a conspicuous place. Permit No. Bus. Lic . r tv ► r ►. rtt \t �J'S g ► 3 ,Tay , R. to Ctssessor-s Rc.�} r}c. # 397(c-c3o-a�a --0007 . QcrtSS OF 3 Wm-tcllpl 11�101 , rrlrer�a rkr, ► 983) fwc� s ti;es� and Scuff +Psis. tva..� wes}tine, qs�v' ►�/c mRg��'" Gt�a,L.�. �i^^ � . jc�ription of s�n )ccatr� 11 �0 cm aGt, i 5 tD X f �,✓maun3ec • e'to-}a Tian oudcx cdvwEi sisgmbC ux4��on s�-a '50' scx,l tw sd14> - 9Sto' scu�hwt<.. -tie Q-�Q,�►�e. �.�u'�' .�-e-� " . .. boQ. 5/0 CRUZ AUTOMOTIVE . . .. OCCUPANCY00 TYPE TYPE 3ONSTRUCTION OCCUPANCY LOAD COMMON . • .air August 9, 1989 Richard R: Mumma This certificate must be posted and permanently maintained in a conspicuous place. Permit No. Bus. Lic . C1 3/'of BremertorL 239 FOURTH STREET BREMERTON, WASHINGTON 98310 (206) 478 - 5252 December 28, Ms. Kathy Wingren Ackerly Communications 3601 - 6th Avenue South Seattle, WA 98134 MAYOR GENE LOBE Re: Building Permit Application for Signs at 1128 Pearl Street, 1943 Wheaton Way and 500 National Avenue. Dear Ms. Wingren: By way of follow-up to our previous conversation, the sign proposed at 1128 Pearl Street has been approved as it complies with land use regulations in effect at the date of application. However, the two other proposed sign locations at 500 National Avenue and 1943 Wheaton Way cannot be approved at this time. In as much, I offer the following explanation. 500 National Avenue This site was zoned B-2 by Ordinance No. 3161 in 1974 and later amended by Ordinance No. 3286 in 1976. Ordinance No. 3286 restricts development to that "essentially as shown on the site plan" (exhibit "A" attached to the ordinance). This site plan does not show the proposed signs and therefore cannot be administratively approved. Copies of these ordinances are attached. L9 43 Wheaton Way The sign proposed at 1943 Wheaton Way is within 200 feet of the ordinary high water mark and therefore is within the jurisdiction of the Bremerton Shoreline Management Master Program (BSMMP). The BSMMP does not allow outdoor advertising signs within this 200-foot zone. However, it does state that in High Bluff situations some "...restrictions and prohibitions may be waived by the Director of Community Development if it can be demonstrated that views will not be blocked and the sign will not be visible from the water." Page 1 of 2 Gateway to the Olympics and Home of the Puget Sound Naval Shipyard To demonstrate this, please state now this proposal is consistent with the BSMMP's goals, policies and regulations and submit a visual impact analysis for our review. Such analysis will become part of the SEPA documentation for the Environmental Checklist, Section B.(10) Aesthetics. Such an analysis is not a common environmental documentation but in this situation is required by the BSMMP. If you need assistance request, please feel free Sincerely, 7"' JACK ALLINGHAM Planner JA:dw Enclosures in developing a methodology for this to contact our department at 478-5275. Page 2 of 2 CERT IFATEOF OCCUPAN'Tt., CITY OF BREMERTON BUILDING DEPARTMENT MIRACLES AUTO RECONDITIONING ,ruled act 1943 Wheaton Way Gi'ad��2ais cep die afiticch"e "tay %6e tw"e iiedsvdA 16e fmarv+asonb �m��,►Z act �e TYPE TYPE OCCUPANCY CONSTRUCTION OCCUPANCY LOAD COMMON USE y VN B1 16 Auto R conditio n g. gate: October 19, 1988All Rich710cc R. Mumma This certificate must be posted and permanently maintained innspicuous place. r - Ir r Permit No. us : hic :' V�Cs � CERTIFICATE OF �OCCUPANCY:� ,_- _.. � CITY OF BREMERTON `' _ BUILDING DEPARTMENT �� �,�h,����� ��/ � MARLIN AND WALT' S AUTO REPAIR ,� 5�� �' .lacaleal a-C 1943 Wheaton -Way �2�in�itCan; �a6��s :, ... �liai�ie 4�ic�iclsvice mav� 6e occc jaiedsoci�,h �te�iiauiaiums �, �sulalNi� - �� TYPE � TYPE OCCUPANCY - �� - _. d. CONSTRUCTION OCCUPANCY LOAD � COMMON USE , v . , °,a - VN g1 -: - 5 - - -Auto Repair �, ..: - � � mate:.w � � . �. - _ October 19, �1988 = '�� - � � �- � �` _ .� _ � _ - _. _ � - -Richard R. `Mumma��,� -, This certificate must be posted and permanently maintained in a � conspicuous place` . ,. ... w �.,, .:. � ,,� .. .' .- Permit No. � B o" Miracles Auto Detail 1943 Wheaton �. OCCUPANCYTYPE TYPE �ONSTRUCTION OCCUPANCY LOAD COMMON VN Bl S/7/87 -- Auto Detail 0 This certificate must be posted and permanently maintained in a conspicuous place. Permit No. na CERTIFICATE OF OCCUPANCY, CITY OF BREMERTON BUILDING DEPARTMENT 8" ice ��� ida mw & KEY MOTORS healed at 1943 Wheaton Way &WAel ja/ 444,0 &jy �V/ jgJZ4 Ae A4" TYPE TYPE OCCUPANCY rt, CONSMUCTION OCCUPANCY LOAD COMMON USE `1N B-1 Auto Sales Gale: � November 24 1986 Thisvvertificate must be posted and permanently maintained in a conspicuous place. Permit No. n N r n D'U 0D Z a �C �' t? m W um @3 W v W Z m ?�= IL W CD 0 Lie � v tM Rw`r r City of Bremerton, Washington Phone: (206) 478=5281 OWNER'S VALUE BLDG. DEPT, VALUE PLAN CHECK FEE QQ RECEIPT N0, PERMIT FEE QQ RECEIPT NO. RL /j DATE SITE ADDRESS /LOCATION OWNER'S NAME LC'..,@.,� C��� ADDRESSy J/''1��JO"'- PHONE CONTRACTOR STATE CONTRACTOR'S LIC. ►f ADDRESS PH RESIDENCE BUSINESS ❑ NEW � REPAIR ❑ REMODEL ❑ ADDITION PLANNING I ZONING FIRE ZONE STORIES OCCUPANCY THIS PERMIT ISSUED FOR: All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. r� INSPECTIONS REQUIRED: Foundation ❑ Framing ❑ Plumbing ❑ Electrical ❑ Wallboard FINAL INSPECTION: FOR INSPECTORS USE ONLY: REINSPECTION: NOT TYPE OF INSPECTION DATE TIME APPROVED APPROVED COMMENT DATE TIME APPROVED FINAL INSPECTION APPROVED BY Building Inspector ISSUANCE OF OCCUPANCY CERTIFICATE REQUIRED BEFORE OCCUPYING BUILDI C�-y OWNER'S SIGNATURE � BY Authorized Agent BUILDING DEPT. i 4 i M h i} P t E 5 4071 A City of Bremerton, Washington Phone: (206) 478=5281 OWNER'S VALUE $ �I G BLDG. DEPT. VALUE =� PLAN CHECK FEE $ �— RECEIPT N0. PERMIT FEE $ RECEIPT NO. DATE SITE ADDRESS / LOCATION OWNER'S NAME ADDRESS CONTRACTOR ��/%.LC� C��y i STATE CONTRACTOR'S LIC.# ZF-11 A�L� �2�( ADDRESS ❑ RESIDENCE PHONE lJ REMODEL lJ ADDITION LJ DEMOLISH PLANNING/ZONING FIRE ZONE STORIES OCCUPANCY T LIIC 1'1C 1']\AIT IC[�I ICr1 L'/1 �. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. INSPECTIONS REQUIRED: Foundation ❑ Framing K Plumbing ❑ Electrical ❑ Wallboard ❑ FINAL SEPARATE PERMITS ARE REQUIRED (WHERE APPLICABLE) FOR PLUMBING, MECHANICAL AND ELECTRICAL, FOR INSPECTORS USE ONLY: REINSPECTION: NOT TYPE OF INSPECTION DATE TIME APPROVEry APPROVED COMMENT DATE TIME APPROVED FINAL INSPECTION APPROVED BY Bullding Inspector ISSUANCE OF OCCUPANCY CERTIFICATE REQUIRED BEFORE OCCUPYING BUILD, N Loom /I CIA A A )WNER'S SIGNATURE BY AuthorizedAgent BUILDING DEPT, u 1 74C 0 PIE It a 1 (�✓ i6.�.� 4�.9 / G oas _ _ kr I _�_. ! �.."�a 1.._� 7 C� FLJ C_;,.✓ f"`t ,�/ OL, -" t 1 t t, IF^ _ C > fd . C r r, k r Ail CL _ V44 _� .. i r t � �, t�'r'i`i I ,�+' t,� i`l 7 +� � ,� `3' / tag! �.� &�� !�`t' � t�, 5 C� t�1 �_ �'� --�IJiL�i�G 1PER1�' APP�.1C�►.T1�-�--- City of Bremerton, Washington 98310 Phone: (206) 478-5281 Assessor's Tax Account No.' �q?�D _pip —�1� �C;C'��l Site Address: J - ' •� — �. Owner's Name: �"n � " Applicant: Architect Firm: Address: Contractor: o-rY� �,; c' Address: _ Q.C—� Contractor's License No.: Owner ❑ Residence ❑Business ❑ Demolish ❑Duplex ❑ Grading (cu. yds � Nature of Work Proposed: Utilities: ❑Water Valuation of Materialstlabor: (UBC Sec. 304{b)] ❑ Waste Zone Designation: � �� Setbacks: Front: 8 ' Comments/Conditions of Approval: ❑ Architect ! Phone No.: ��'y -�0�-� PC Px�r a493 i St�A; �t r• �-r81a� ❑ Other. � NE ❑ Multi -Family (No. units/) ❑ Bldg. Move ❑ Sewer Plan Review Fee: Receipt No.: Date: ❑ Contractor Representative: Phone: r. ierr _ Representative: ❑ Tenant Phone:_ �� —�i�� Exp. Date: ❑ Repair - - Sign ❑ Septic ❑New Permit Fee: S Receipt No.: Date: Sq. .❑ Remodel/Addn ❑ Parking Lot ❑ Existing Surcharges: ❑ Storm State $ 3 . � 0 ❑ Energy 510/S15 ❑ No. Stories: Occupancy�Cl�a�s�s'tf'cation (UBC): ' u.i O��om� �_ Rear:�.� Height:_.'-- Heat Source: nr'�'i-t' _ Side: I understand that applications for which no permit is issued witnin 180 days following day_ of application shall expire by limitation, plans and/or other data submitted may be retur^�_ to applicant or destroyed. by the Building Official. (Sec. 304(d)UBC). I certify that the information on this pplication furnished by me is true and correct and that the aoolicabl. r�QlllremeP.tS OL ,. nr' .Rr mor n Wl .— /� Date Signature _...- „_,__,,_,,, .___..-. Stet. Code Copes to: '/Yhite-owner; Yellow -file; P' k•Assessor Goldenrod -Budding 13/23/2004 12:54 03/23/04 CUSTOMER 63.1220-2 SERVIC A172-STORM A199-ADMI SERVICE 3604782330 r R; BREMERTON UTILITIES PAGE 01/01 � �. CITY OF BREMERTON PAGE 1 CUSTOMER CONTACT FORM CYCLE TAX/PEN EXEMPT CREDIT •- SERVICE ADDRESS••••••---- --••••--..BILLING ADDRESS•--•------ WHEATON WATERFRONT VILLAS LLC 3 N N .00 PROPERTY ID 3976-030-D12.0007 1 D1943 WHEATON WAY 11100 NE 8TH STREET # 707 WARNINGS 61 ATTN SCOTT CAMPBELL TELEPHONE # 4256889881-SCOTT BREMERTON WA BELLEVUE WA UNITS 001 98310-4343 98004 METER ID: COMMENTS OLD ACCOUNT NO, R 2/1/95 E READING USAGE CURRENT TAX PENALTY ADJUSTMENT DELINQUENT PAID DA BALANCE M 0 0 9.18 .00 .53 .00 43,89 .00 53,60_ N p 0 .00 .00 75 2.55 I5.41 .00 18� 1`� 1 DATE READING EST USAGE SERVICE DATE READING EST USAGE SERVICE DATE READING EST USAGE SERVICE DATE BATCH DEP05IT BILLING PAYMENT -----• DESCRZPTTON --••• OPERATOR 172-STORM 02/09/04 .00 9.18 .00 BILLED fleming 172-STORM 03/15/04 PEN9629 .00 .53 .00 PENALTY/INTEREST CHARGED fleming 199-ADMIN 03/15/04 PEN9629 .00 2.55 .00. SERVICE CHARGE ON DELINQ fleming' 199-ADMIN 03/15/04 PEN9629 .00 .15 .00 PENALTY/INTEREST CHARGED fleming PERIOD PEN9629 400 12.41 .OQ PERIOD TOTAL fleming 172-STORM 12/08/03 .00 9.00 .00 BILLED fleming 172.5TORM 01/12/04 PEN9462 ,00 .43 .00 PENALTY/INTEREST CHARGED fleming 199-ADMIN 01/12/04 PEN9462 .00 .13 .00 PENALTY/INTEREST CHARGED fleming 199-ADMIN 01/12/04 PEN9462 .00 2.55 .00 SERVICC CHARGE ON DELINQ fleming PERIOD PEN9462 .00 12.11 ,00 PERIOD TOTAL fleming *******�*•���*��x*�**�****** Dai:e: 03/23/2004 Time: 11:50:55 Person: Finnegan*******"*�'"*�`*�`*�***�`�"*�'"�* SCOTT - I SPOKE TO VAL IN THE BUILDING DEFT AND TRIED TO - EXPLAIN YOUR SITUATION RE THE DEMO PERMIT. TOLb HER THE METER HAD BEEN REMOVED 2/1195 AND THERE WAS NO SERVICE AT THIS TIME TO THE LOCATION. SHE WILL CONTACT YOU BY PHONE AND GET YOU GOING TOWARDS OBTAINING THE PERMIT. AS A REMINDER, THE STORMWATER $TILL CONTINUES TO BE BILLED ON THIS ACCOUNT REGARDLESS OF A METER IN THE GROUND, THX, ANN RUN OA E 03/23/04 TIME 11:55:20 S ©� 360 c0 5 s Vv� a, j n c_Q Yk aj c A.s�-e �.� 3 v� COUNT SYSTEMS/ROYCE ARBOUR. INC. - UTILITY BILLING �ha oe2�e�°uale �� ,� CONNIE MAY' S AUTO REPAIR TYPE CONSTRUCTION VN TYPE OCCUPANCY Bl August 8, 1994 OCCUPANCY LOAD 7 COMMON USE Auto Repair �� ���°usurl David A. Nelson. This certificate must be posted and permanently maintained in a conspicuous place. Permit No. Business License