HomeMy WebLinkAbout5402ORDINANCE NO.5402
AN ORDINANCE of the City Council of the City of
Bremerton, Washington, establishing a planned action for the
Eastside Village pursuant to the State Environmental Policy Act
WHEREAS, the State Environmental Policy Act (SEPA) and implementing rules
provide for the integration of environmental review with land use planning and project review
through designation of "Planned Actions" by jurisdictions planning under the Growth
Management Act (GMA); and
WHEREAS, the City has adopted a Comprehensive Plan complying with the
GMA; and
WHEREAS, the City has received a legislative appropriation to conduct a market
study, subarea plan, and planned action environmental impact statement for the Eastside
Employment Center, retitled Eastside Village through this planning process; and
WHEREAS, to guide Eastside Village's growth and redevelopment, the City has
engaged in extensive subarea planning and has adopted amendments to the Bremerton
Comprehensive Plan including the Eastside Village Subarea Plan; and
WHEREAS, the City desires to designate a Planned Action for the Eastside
Village; and
WHEREAS, designation of a Planned Action expedites the permitting process for
subsequent, implementing projects whose impacts have been previously addressed in a Planned
Action environmental impact statement (EIS), and thereby encourages desired growth and
economic development; and
WHEREAS, the Eastside Employment Center Planned Action EIS (now known
as the Eastside Village Planned Action EIS) identifies impacts and mitigation measures
associated with planned development in the Eastside Village. The Draft EIS refers to the
Eastside Employment Center Planned Action EIS. For the Final EIS the document was titled the
Eastside Village (with the document publishing under the Sheridan/Harrison Center name as the
name was revised); and
WHEREAS, the City has adopted development regulations and ordinances which
will help protect the environment, and is adopting regulations specific to the Eastside Village
which will guide the allocation, form, and quality of desired development; and
WHEREAS, the City's SEPA Rules, set forth in BMC 20.04.205 provide for
Planned Actions within the City; and
WHEREAS, the City as lead agency provided public comment opportunities
through an EIS scoping period from September 26 to November 15, 2019, and a public comment
period for the Eastside Village Draft Subarea Plan and Draft Planned Action EIS from March 6,
2020 to April 7, 2020, and held public meetings and hearings as part of a coordinated Eastside
Village public participation program throughout 2019 and 2020; and
1
WHEREAS, the City provided notice of a community meeting on March 18, 2020
advertising the community meeting held on April 6, 2020 by emailing to all affected federally
recognized tribal governments and agencies with jurisdiction over the future development
anticipated for the planned action, in compliance with RCW 43.21C.440; and
WHEREAS, the City held a community meeting on April 6, 2020 in compliance
with RCW 43.21C.440; and
WHEREAS, on June 15, 2020 and July 20, 2020 the Planning Commission held
public hearings after due notice on June 5, 2020 and July 10, 2020 to all parties of record and all
affected federally recognized tribal governments and agencies with jurisdiction over the future
development for the Eastside Village Subarea Plan; and
WHEREAS, on September 25, 2020 the City Council provided notification of a
public hearing to be held on October 7, 2020 to all parties of record and all affected federally
recognized tribal governments and agencies with jurisdiction over the future development for the
Eastside Village Subarea Plans and
WHEREAS, the City Council held a public hearing on October 7, 2020, the
Eastside Village Subarea Plans and
WHEREAS, on September 25, 2020 the City provided notification of a public
hearing to be held on October 7, 2020 to all parties of record and all affected federally
recognized tribal governments and agencies with jurisdiction over the future development
anticipated for the planned action; and
WHEREAS, the City Council held a public hearing on October 7, 2020 and
considered public comment; NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Recitals. The recitals set forth in this ordinance are hereby
incorporated as if fully set forth herein.
SECTION
2. Purpose. The City Council declares that the purpose of this
ordinance is to:
A. Combine environmental analysis, land use plans, development regulations, City
coAes and ordinances together with the mitigation measures in the Eastside Village Planned
Action EIS to mitigate environmental impacts and process planned action development
applications in the Planned Action Area;
B. Designate the Eastside Village as a Planned Action Area for purposes of
environmental review and permitting of subsequent, implementing projects pursuant to SEPA,
RCW 43.21 C.440;
C. Determine that the EIS prepared for the Eastside Village Subarea Plan meets the
requirements of a Planned Action EIS pursuant to SEPA;
D. Establish criteria and procedures, consistent with state law, that will determine
whether subsequent projects within the Planned Action Area qualify as Planned Actions;
E. Provide the public with information about Planned Actions and how the City will
process implementing projects within the Planned Action Area;
F. Streamline and expedite the land use permit review process by relying on the EIS
completed for the Planned Action; and
G. Apply the City's development regulations together with the mitigation measures
described in the EIS and this Ordinance to address the impacts of future development
contemplated by this Ordinance.
SECTION3a Findings. The City Council finds as follows:
A. The City is subject to the requirements of the GMA (RCW 36.70A), and is
applying the Planned Action to a UGA [Urban Growth Area]; and
B. The City has adopted a Comprehensive Plan complying with the GMA, and is
amending the Comprehensive Plan to incorporate a subarea element specific to the Eastside
Village; and
C. The City is adopting development regulations concurrent with the Eastside
Village Subarea Plan to implement said Plan, including this ordinance; and
D. An EIS has been prepared for the Planned Action Area, and the City Council
Finds that the EIS adequately identifies and addresses the probable significant environmental
impacts associated with the type and amount of development planned to occur in the designated
Planned Action Area; and
E. The mitigation measures identified in the Eastside Village Planned Action EIS
and attached to this ordinance as Exhibit B, incorporated herein by reference, together with
adopted City development regulations, will adequately mitigate significant impacts from
development within the Planned Action Area; and
F. The Eastside Village Subarea Plan and Eastside Village Planned Action EIS
identify the location, type and amount of development that is contemplated by the Planned
Action; and
G. Future projects that are implemented consistent with the Planned Action will
protect the environment, benefit the public and enhance economic development; and
H. The City provided several opportunities for meaningful public involvement in the
Eastside Village Subarea Plan and Planned Action EIS, including a community meeting prior to
the publication of notice for the planned action ordinance; have considered all comments
received; and, as appropriate, have modified the proposal or mitigation measures in response to
comments;
I. Essential public facilities defined in RCW 47.06.140 are excluded from the
Planned Action and not eligible for review or permitting as Planned Actions unless they are
accessory to or part of a project that otherwise qualifies as a planned action; and
J. The Planned Action applies to a defined area that is smaller than the overall City
boundaries and smaller than overall County designated UGAs; and
K. Public services and facilities are adequate to serve the proposed Planned Action,
with implementation of Subarea Plan and mitigation measures identified in the EIS.
SECTION 4. Procedures and Criteria for Evaluating and Determining Planned
Action Projects within Planned Action Area.
A. Planned Action Area. This Planned Action designation shall apply to the area
shown in Exhibit A, incorporated herein by reference.
B. Environmental Document. A Planned Action determination for a site -specific
project application within the Planned Action Area shall be based on the environmental analysis
contained in the Draft EIS issued by the City on March 6, 2020 and the Final EIS published on
3
September 14, 2020. The Draft and Final EIS documents shall comprise the Eastside Village
Planned Action EIS for the Planned Action Area. The mitigation measures contained in Exhibit
B, attached to this Ordinance and incorporated herein by reference, are based upon the findings
of the Planned Action EIS and shall, along with adopted City regulations, provide the framework
that the City will use to apply appropriate conditions on qualifying Planned Action projects
within the Planned Action Area.
C. Planned Action Designated. Land uses and activities described in the Planned
Action EIS, subject to the thresholds described in Subsection 4(D) and the mitigation measures
contained in Exhibit B, are designated Planned Actions or Planned Action Projects pursuant to
RCW 43.21 C.440. A development application for a site -specific Planned Action project located
within Planned Action Area shall be designated a Planned Action if it completes the modified
SEPA Checklist in Exhibit B and meets the criteria set forth in Subsection 4(D) of this
Ordinance and all other applicable laws, codes, development regulations and standards of the
City are met.
D. Planned Action Qualifications. The following thresholds shall be used to
determine if a site -specific development proposed within the Planned Action Area was
contemplated as a Planned Action and has had its environmental impacts evaluated in the
Planned Action EIS:
(1) Qualifying Land Uses.
(a) Planned Action Categories: The following general categories/types of
land uses are defined the Eastside Village Subarea Plan and are considered Planned Actions:
i. Mixed Use and Multi Use Development: Mixed Use and Multi Use
zoned uses including but not limited to retail, hotel, office, services, townhomes, and apartments
in horizontal or vertical patterns consistent with zone requirements.
ii. Residential: Center Residential -High, Center Residential -Medium,
and Center Residential -Low uses including but not limited to attached single family, cottages,
townhomes, apartments, and accessory dwelling units consistent with zone requirements.
ilia Commercial: Center Employment Corporate Campus or Retail
commercial uses including retail, hotel, office, and services consistent with zone requirements.
iv. Open Space, Recreation: Active and passive parks, recreation, and
open space facilities consistent with zone requirements.
(b) Planned Action Uses: A land use shall be considered a Planned Action
.and Use when:
i9 it is within the Planned Action Area as shown in Exhibit A;
ii. it is within the one or more of the land use categories described in
subsection 1(a) above; and
iii. it is listed in development regulations applicable to the zoning
classifications applied to properties within the Planned Action Area.
A Planned Action may be a single Planned Action use or a combination of
Planned Action uses together in a mixed use development. Planned Action uses include
accessory uses.
(c) Public Services: The following public services, infrastructure and utilities
are also Planned Actions: Multi -modal transportation improvements, water and sewer
improvements, and stormwater improvements, considered in capital plans associated with the
Eastside Village Subarea Plan.
i. Applicants for public services, infrastructure and utilities projects
shall demonstrate consistency with the Eastside Village Subarea Plan, Bremerton Shoreline
Master Program, and Bremerton Critical Areas Ordinance.
0
lie Essential public facilities defined in RCW 47.06.140 are excluded
from the Planned Action and not eligible for review or permitting as Planned Actions unless they
are accessory to or part of a project that otherwise qualifies as a planned action.
(2) Development Thresholds:
(a) Land Use: The following amounts of various new land uses are
contemplated by the Planned Action.
Table D2a-1. Alternative Comparison of Total and Net Growth
Population 451 1,240 789 3,740 3,289 2,030 1,579 3,610 3,159
Dwellings 332 787 455 2,155 1,823 1,170 838 2,080 1,748
(including Conv Care)
Jobs 21851 31740 889 11457 (11394) 41171 11320 21770 (81)
*Net change compared fo existing.
Source; PSRC 2017; Fehr & Peers 2019: BERK, 2020.
(b) Shifting development amounts between land uses in Subsection 4(D)(2)(a)
may be permitted when the total build -out is less than the aggregate amount of development
reviewed in the EIS; the traffic trips for the preferred alternative are not exceeded; and, the
development impacts identified in the Planned Action EIS and are mitigated consistent with
Exhibit B.
(c) Further environmental review may be required pursuant to WAC 197-11-
172, if any individual Planned Action or combination of Planned Actions exceed the
development thresholds specified in this Ordinance and/or alter the assumptions and analysis in
the Planned Action EIS.
(3) Transportation Thresholds:
(a) Trip Ranges & Thresholds. The maximum number of PM peak hour trips
anticipated in the Planned Action Area and reviewed in the EIS is as follows:
Table D3a-1. PM Peak Hour Vehicle Trips Generated, All Alternatives
No Action Alternative 1,656 —
Residential Focus Alternative 1,568 -88
Employment Focus Alternative 1,972 316
Preferred Alternative 1,972 316
Source: Fehr &Peers, 2020.
5
(b) Concurrency. All Planned Actions shall meet the transportation
concurrency requirements and the level of service (LOS) thresholds established in the Bremerton
Comprehensive Plan and Chapter 11.12 BMC Transportation Development Code.
(c) Traffic Impact and Mitigation. The responsible City official shall require
documentation by Planned Action Project applicants demonstrating that the total trips identified
in Subsection 4.1)(3)(a) are not exceeded, that the project meets the concurrency standards of
Subsection 3.1)(3)(b), and that the project has mitigated impacts consistent with Exhibit B. In
lieu of the requirements of BMC 11.12.060, planned action applicants shall provide the
following documentation:
(i) Trip generation and total trips in relation to the trip bank in Subsection 3.D(3)(a)
and (d).
(ii) Site -specific access design and consistency with City standards.
(iii) Implementation of required frontage improvements per Exhibit 13-3.
(iv) Share of cost on areawide mitigation per Exhibit 13-3.
(d) Discretion. The City Engineer or his/her designee or his/her designee
shall have discretion to determine incremental and total trip generation, consistent with the
Institute of Traffic Engineers (ITE) Trip Generation Manual (latest edition) or an alternative
manual accepted by the City Engineer at his or her sole discretion, for each project permit
application proposed under this Planned Action.
(4) Elements of the Environment and Degree of Impacts. A proposed project that
would result in a significant change in the type or degree of adverse impacts to any element(s) of
the environment analyzed in the Planned Action EIS, would not qualify as a Planned Action.
(5) Changed Conditions. Should environmental conditions change significantly from
those analyzed in the Planned Action EIS, the City's SEPA Responsible Official may determine
that the Planned Action designation is no longer applicable until supplemental environmental
review is conducted.
(6) Substantive Authority. Pursuant to SEPA Substantive Authority at BMC
20.04.010 and Comprehensive Plan Policies, impacts shall be mitigated through the measures
included in Exhibit B.
E. Planned Action Review Criteria.
(1) The City's SEPA Responsible Official may designate as "planned actions",
pursuant to RCW 43.21C.030, applications that meet all of the following conditions:
(a) The proposal is located within the Planned Action area identified in
Exhibit A of this ordinance;
(b) The proposed uses and activities are consistent with those described in the
Planned Action EIS and Subsection 4(D) of this ordinance;
(c) The proposal is within the Planned Action thresholds and other criteria of
Subsection 4(D) of this ordinance;
(d) The proposal is consistent with the City of Bremerton Comprehensive
Plan and the Eastside Village Subarea Plan;
(e) The proposal's significant adverse environmental impacts have been
identified in the Planned Action EIS;
(f) The proposal's significant impacts have been mitigated by application of
the measures identified in Exhibit B, and other applicable City regulations, together with any
modifications or variances or special permits that may be required;
(g) The proposal complies with all applicable local, state and/or federal laws
and regulations, and the SEPA Responsible Official determines that these constitute adequate
mitigation; and
(h) The proposal is not an essential public facility as defined by RCW
36.70A.200(1), unless the essential public facility is accessory to or part of a development that is
designated as a planned action under this ordinance.
(2) The City shall base its decision on review of a Planned Action SEPA checklist
(Exhibit B), or an alternative form approved by state law, and review of the application and
supporting documentation.
(3) A proposal that meets the criteria of this section shall be considered to qualify and
be designated as a planned action, consistent with the requirements of RCW 43.21 C.030, WAC
197-11-164 et seq., and this ordinance.
F. Effect of Planned Action.
(1) Designation as a Planned Action Project by the SEPA Responsible Official means
that a qualifying proposal has been reviewed in accordance with this Ordinance and found to be
consistent with the development parameters and thresholds established herein, and with the
environmental analysis contained in the Planned Action EIS.
(2) Upon determination by the City's SEPA Responsible Official that the proposal
meets the criteria of Subsection 4(D) and qualifies as a planned action, the proposal shall not
require a SEPA threshold determination, preparation of an EIS, or be subject to further review
pursuant to SEPA.
G. Planned Action Permit Process. Applications for planned actions shall be
reviewed pursuant to the following process:
(1) Development applications shall meet all applicable requirements of the Bremerton
Municipal Code (BMC). Applications for planned actions shall be made on forms provided by
the City and shall include the Planned Action SEPA checklist (Exhibit B).
(2) The City's SEPA Responsible Official shall determine whether the application is
complete as provided in BMC Chapter 20.02.
(3) If the application is for a project within the Planned Action Area defined in
Exhibit A, the application will be reviewed to determine if it is consistent with the criteria of this
ordinance and thereby qualifies as a Planned Action project.
(a) The decision of the City's SEPA Responsible Official regarding
qualification of a project as a Planned Action is a Type 1 decision. The SEPA Responsible
Official shall notify the applicant of his/her decision. Notice of the determination on Type 1
decisions involving a planned action shall also be mailed or otherwise verifiably delivered to
federally recognized tribal governments and to agencies with jurisdiction over the planned action
project, pursuant to RCW 43.21C.440.
(b) If the project is determined to qualify as a Planned Action, it shall proceed
in accordance with the applicable permit review procedures specified in BMC Chapter 20.02,
except that no SEPA threshold determination, EIS or additional SEPA review shall be required.
(c) Notice of the application for a planned action project shall be consistent
with Chapter 20.02 BMC.
(4) If notice is otherwise required for the underlying permit, the notice shall state that
the project has qualified as a Planned Action. If notice is not otherwise required for the
underlying permit, no special notice is required by this ordinance. See Subsection 4(G)(3)(a)
regarding notice of the Type 1 decision.
(5) To provide additional certainty about applicable requirements, the City or
applicant may request consideration and execution of a development agreement for a Planned
Action project, consistent with RCW 36.70B.170 et seq.
(6) If a project is determined to not qualify as a Planned Action, the SEPA
Responsible Official shall so notify the applicant and prescribe a SEPA review procedure
consistent with the City's SEPA regulations and the requirements of state law. The notice shall
describe the elements of the application that result in failure to qualify as a Planned Action.
(7) Projects that fail to qualify as Planned Actions may incorporate or otherwise use
relevant elements of the Planned Action EIS, as well as other relevant SEPA documents, to meet
their SEPA requirements. The SEPA Responsible Official may limit the scope of SEPA review
for the non -qualifying project to those issues and environmental impacts not previously
addressed in the Planned Action EIS.
SECTION S. Monitoring and Review.
A. The City should monitor the progress of development in the designated Planned
Action area as deemed appropriate to ensure that it is consistent with the assumptions of this
ordinance and the Planned Action EIS regarding the type and amount of development and
associated impacts, and with the mitigation measures and improvements planned for the Planned
Action Area.
Be This Planned Action Ordinance shall be reviewed by the SEPA Responsible
Official no later than eight years from its effective date. The review shall determine the
continuing relevance of the Planned Action assumptions and findings with respect to
environmental conditions in the Planned Action area, the impacts of development, and required
mitigation measures. The SEPA Responsible Official shall also consider the implementation of
Public Agency Actions and Commitments in Exhibit C. Based upon this review, the City may
Of
propose amendments to this ordinance and/or may supplement or revise the Planned Action EIS.
SECTION 6. Section 20.04.100 of the BMC entitle "Use of Categorical
Exemptions" for the State Environmental Policy Act (SEPA) is hereby amended as follows:
(a) Whenever a department within the City receives an application for a license or, in
the case of governmental proposals, the department within the City initiates the proposal,
the Planning Department shall determine whether the license and/or the proposal is
exempt. The Planning Department's determination that a proposal is exempt shall be final
and not subject to administrative review. If a proposal is exempt, none of the procedural
requirements of this chapter apply to the proposal. The City shall not require completion
of an environmental checklist for an exempt proposal.
(b) In determining whether or not a proposal is exempt, the Planning Department shall
make certain that the proposal is properly defined, and shall identify the governmental
licenses required (WAC Mee 11-060). If a proposal includes exempt and nonexempt
actions, the Planning Department shall determine the lead agency even if the license
application that triggers the Department's consideration is exempt.
(c) If a proposal includes both exempt and nonexempt actions, the City may authorize
exempt actions prior to compliance with the procedural requirements of this chapter,
except that:
(1) The City shall not give authorization for:
(i) Any nonexempt action;
(ii) Any action that would have an adverse environmental impact; or
(iii) Any action that would limit the choice of alternatives;
(2) The responsible official may withhold approval of an exempt action that
would lead to modification of the physical environment, when such modification
would serve no purpose if nonexempt action(s) were not approved; and
(3) The responsible official may withhold approval of exempt actions that would
lead to substantial financial expenditures by a private applicant when the
expenditures would serve no purpose if nonexempt action(s) were not approved.
(d) Threshold Levels for Categorical Exemptions in Bremerton, excluding the Eastside
Village. Pursuant to WAC 197-11400(1)(c) and (1)(d), cities may adopt raised levels of
threshold exemptions for certain types of actions, except as provided in WAC 197-11-
305 and 197-11400(1)(a). As authorized pursuant to WAC 197.11-800(1)(c) and (1)(d),
the following threshold exemptions are adopted:
(1) The construction or location of thirty (30) or fewer single-family residential
units.
(2) The construction or location of sixty (60) or fewer multifamily residential
units.
(3) The construction of an office, school, commercial, recreational, service or
storage building with thirty thousand (30,000) square feet of gross floor area, and
with associated parking facilities designed for ninety (90) parking spaces.
(4) The construction of a parking facility designed for ninety (90) parking spaces.
(5) Any landfill or excavation of one thousand (1,000) cubic yards throughout the
lifetime of the fill or excavation, and any fill or excavation classified as Class I, II,
or III forest practice under RCW 76.09.050 or regulations thereunder.
(e) Threshold Levels for Categorical Exemptions in Eastside Village. As authorized
pursuant to WAC 19741-800(1)(b), except as provided in WAC 19741-305 and 19741-
800(1)(a), the following threshold exemptions are adopted. Developments greater than
this scale are subject to the Eastside Village Planned Action Ordinance No. 5401.
(1) The construction or location of four (4) or fewer single-family residential
units.
(2) The construction or location of four (4) or fewer multifamily residential units.
(3) The construction of an office, school, commercial, recreational, service or
storage building with four thousand (4,000) square feet of gross floor area, and with
associated parking facilities designed for twenty (20) parking spaces.
(4) The construction of a parking facility designed for twenty (20) parking spaces.
(5) Any landfill or excavation of one hundred (100) cubic yards throughout the
lifetime of the fill or excavation, and any fill or excavation classified as Class I, II,
or III forest practice under RCW 76.09.050 or regulations thereunder.
SECTION 7. Con ict. In the event of a conflict between this Ordinance or any
gation measures imposed thereto, and any Ordinance or regulation of the City, the provisions
of this Ordinance shall control, except that the provision of any International Building Code shall
supersede.
SECTION 8. Corrections. The City Clerk and codifiers of this ordinance are
authorized to make necessary corrections to this ordinance, including but not limited to, the
correction of scrivener, clerical, typographical, and spelling errors, references, ordinance
numbering, section/subsection numbers and any references thereto_
SECTION 9. Severability. If any one or more sections, subsections, or sentences
of this Ordinance are held to be unconstitutional or invalid such decision shall not affect the
validity of the remaining portions of this Ordinance and the same shall remain in full force and
effect.
0
SECTION 10. Effective Date. This ordinance shall take effect and be in force ten
(10) days from and after its passage, approval and publication as provided by law.
PASSED by the City Council the day of (Oh IOC , 2020
Approved this
ATTEST:
$T11
Eric Y
day of % . w W� I , 2020
Mayor
APPROVED AS TO FORM:
Koger A. Lubovicri, City Attorney
PUBLISHED the � day of � � , 2020
EFFECTIVE the day of 92020
RDINANCE NO. � U O
10
Exhibit A: Eastside Village Subarea Planned Action
Area
s
Stephenson
Canyon 0\0-p\1\0 oR
yh
} yr
L'remer,ton. ry ; :� Q P
Health &Rehab m oz z
Center C d
m w
w =
2
JUNIPER ST V Harrison
Sheridan Medical
Community Center
Center
HICKORY S
ti
C,yMPeF`C IV
qY
A
303
QSubarea
Parcels
Parks and Open Space
%— Highways
Streets
Waterbody
:�11 BERK
Map Date: August 2020
Source: City of Bremerton, Kitsap County Assessor; BERK, 2020.
0 250 500 O
Feet
Exhibit B. SEPA Checklist and Mitigation Measures
Exhibit B: Example Environmental Checklist and Required Mitigation Document
INTRODUCTION
The State Environmental Policy Act (SEPA) requires environmental review for project and non -project proposals that are
likely to have adverse impacts upon the environment. In order to meet SEPA requirements, the City of Bremerton issued
the Eastside Village Planned Action Draft Environmental Impact Statement (EIS) on March 6, 2020, and the Final EIS
was issued on September 14, 2020. The Draft and the Final EIS together are referenced herein as the "EIS". The EIS
has identified significant beneficial and adverse impacts that are anticipated to occur with the future development of
the Planned Action Area, together with a number of possible measures to mitigate those significant adverse impacts.
On October 7, 2020, the City of Bremerton adopted Ordinance No. 5401 establishing a planned action designation
for the Eastside Village studied as Planned Action in the EIS (see Exhibit A). SEPA Rules indicates review of a project
proposed as a planned action is intended to be simpler and more focused than for other projects (WAC 197-1 1-172).
In addition, SEPA allows an agency to utilize a modified checklist form that is designated within the planned action
ordinance (see RCW 43.21 c.440). This Exhibit BA provides a modified checklist form adopted in the Eastside Village
Planned Action Ordinance.
MITIGATION DOCUMENT
A Mitigation Document is provided in Exhibit B-2, and also summarized in the environmental checklist. Exhibit B-2
establishes specific mitigation measures, based upon significant adverse impacts identified in the EIS. The mitigation
measures shall apply to future development proposals which are consistent with the Planned Action scenarios reviewed
in the EIS, and which are located within the Eastside Village Planned Action Area (see Exhibit A). In addition Exhibit
3
-3 provides details of transportation and parks mitigation requirements.
APPLICABLE PLANS AND REGULATIONS
The EIS identifies specific regulations that act as mitigation measures. These are summarized in Exhibit B-4 by EIS topic,
and are advisory to applicants. All applicable federal, state, and local regulations shall apply to Planned Actions,
including the regulations that are adopted with the Preferred Alternative. Planned Action applicants shall comply with
all adopted regulations where applicable including those listed in the EIS and those not included in the EIS.
INSTRUCTIONS TO APPLICANTS
This environmental checklist asks you to describe some basic information about your proposal. The City of Bremerton
will use this checklist to determine whether the project is consistent with the analysis in the Eastside Village Planned
Action EIS and qualifies as a planned action, or would otherwise require additional environmental review under SEPA.
Answer the questions briefly, with the most precise information known, or give the best description you can. You must
answer each question accurately and carefully, to the best of your knowledge. The checklist questions apply to all parts
of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any
additional information that will help describe your proposal or its environmental effects. The City may ask you to
explain your answers or provide additional information. In most cases, you should be able to answer the questions from
your own project plans and the Planned Action EIS without the need to hire experts.
EXHIBIT B-1 MODIFIED sEPA CHECKLIST
A. Proposal Description
Date:
Applicant:
Property Owner:
Property
Street:
City, State, Zip Code:
Address
Parcel
Assessor Parcel Number:
Property Size in Acres:
Information
Give a brief,
complete
description of
your proposal.
District Name:
Building Type:
Property Zoning
Land Use:
Engineering:
Building:
Other:
Permits
All Applications Deemed Complete? Yes _ No
Requested (list
Explain:
all that apply)
Are there pending governmental
approvals of other proposals directly affecting the property
covered by your proposal? Yes
_ No
Explain:
Describe Existing Uses on the Site:
Existing Land Use
Proposed Land
Mixed Use
Commercial
Use — Check and
Residential
Open Space, Recreation
Circle All That
Apply
# Existing Dwellings:
# Proposed
Proposed Density (du/ac):
Dwellings Units:
# Dwelling Type
# Type
# Dwelling Type
Dwellings
# Type
Dwelling Threshold Total in
Dwelling Bank Remainder as of 20_
Ordinance: 5401
dwellings
Existing:
Proposed:
Non-residential
Uses: Building
Employment in Ordinance: 5401
Job Remainder as of 20_
Square Feet
square feet
Existing
Stories:
Proposed Stories:
Building Height
Existing
Height in feet
Proposed Height in feet:
Parking Spaces
Existing:
Proposed:
Impervious
Existing
Square Feet:
Proposed Square Feet:
Surfaces
Existing
Estimated Trips
Future
Estimated Trips
Net New Trips:
Total:
Total:
PM Peak Hour
Weekday
Vehicle Trips
Source of Trip Rate: ITE Manual
Transportation Impacts Determined Consistent with
Other
BMC Chapter 1 1.12 Transportation Development
Code:
Yes No
Proposed timing
or schedule
(including
phasing).
Describe plans
for future
additions,
expansion, or
further activity
related to this
proposal.
List any
available or
pending
environmental
information
directly related
to this proposal.
B. Environmental Checklist and Mitigation Measures
NATURAL ENVIRONMENT CHECKLIST AND MITIGATION MEASURES
Geology/Soils Checklist and Mitigation Measures
1. Description of Conditions
Staff Comments:
A. General description of the site (circle one): Flat, rolling, hilly, steep slopes,
mountainous, other
B. What is the steepest slope on the site (approximate percent slope)?
C. What general types of soils are found on the site (for example, clay, sand, gravel,
peat, muck)?
2. Describe the purpose, type, and approximate quantities of any filling or grading
proposed. Indicate source of fill.
3. Has any part of the site been classified as a "geologically hazardous" area? (Check all
that apply)
❑ Landslide Hazards
❑ Erosion Hazards
❑ Seismic Hazards
❑ Liquefaction Hazards
❑ Other:
Describe:
4. Proposed Measures to control impacts including Exhibit 134 and 134 regarding
Mitigation Required for Development Applications and Exhibit 13-3 Applicable
Regulations:
❑ Temporary erosion and sediment controls
❑ Compliance with grading and fill standards
❑ Compliance with Critical Area Regulations
Explain:
Water Resources/Stormwater Checklist and Mitigation Measures
5. Will the proposal require or result in (check all that apply and describe below):
StafF Comments:
❑ any work over, in, or adjacent to (within 200 feet) Port Washington Narrows?
❑ fill and dredge material that would be placed in or removed from surface water
or wetlands?
❑ surface water withdrawals or diversions?
❑ discharges of waste materials to surface waters?
❑ groundwater withdrawal or discharge?
❑ waste materials entering ground or surface waters?
6. Describe the source of runoff (including stormwater) and method of collection,
treatment, and disposal, if any (include quantities, if known). Where will this water
flow? Will this water flow into other waters? If so, describe.
7. Is the area designated a critical aquifer recharge area? If so, please describe:
Water Resources/Stormwater Checklist and Mitigation Measures
8. About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buildings)?
9. What measures are proposed to reduce or control water
resources/stormwater impacts?
Proposed Measures to control impacts including Exhibit 134 and 134 regarding
Mitigation Required for Development Applications and Exhibit B-3 Applicable
Regulations (check all that apply):
❑ Compliance with construction -related stormwater requirements, including
temporary erosion and sediment control, and development and implementation
of a stormwater pollution and spill prevention plan.
❑ Determination of necessary permanent, long-term water quality treatment
requirements.
❑ Low Impact Development (LID) techniques employed, consistent with BMC
15.04.020 and the Eastside Village Subarea Plan?
❑ Adequate erosion protection at outfalls.
❑ Other:
Explain:
Plants and Animals Checklist and Mitigation Measures
10. Check or circle types of vegetation found on the site:
❑ Deciduous tree: Alder, maple, aspen, other
❑ Evergreen tree: Fir, cedar, pine, other
❑ Shrubs
❑ Grass
❑ Pasture
❑ Crop or grain
❑ Wet soil plants: Cattail, buttercup, bullrush, skunk cabbage, other
❑ Water plants: Water lily, eelgrass, milfoil, other
Other types of vegetation:
11. Are there wetlands on the property? Please describe their acreage and classification.
12. Is there riparian habitat on the property?
13. What kind and amount of vegetation will be removed or altered?
14. List threatened or endangered species known to be on or near the site
15. Are there plants or habitats subject to Critical Areas and/or Shoreline Master
Program?
16. Is the proposal consistent with critical area regulations, shoreline regulations, and
requirements of the Eastside Village Subarea Plan? Please describe.
17. Proposed landscaping, use of native plants, buffers, or other measures to preserve
or enhance vegetation on the site, if any:
Staff Comments:
Plants and Animals Checklist and Mitigation Measures
18. Proposed Measures to control impacts including Exhibit 134 and 134 regarding
Mitigation Required for Development Applications and Exhibit 13-3 Applicable
Regulations (check all that apply):
❑ Compliance with Critical Areas Ordinance
❑ Compliance with Shoreline Master Program
❑ Implementation of on -site or street frontage green infrastructure
❑ Other:
Explain:
LAND USE/POPULATION, EMPLOYMENT, AND HOUSING/HISTORIC RESOURCES
CHECKLIST AND MITIGATION MEASURES
Population/Employment/Housing Land Use Checklist and Mitigation Measures
19. What is the current use of the site and adjacent properties?
20. Describe any structures on the site. Will any structures be demolished? If so, what
21. The current Comprehensive Plan designation is "Subarea Plan". What is the
current zoning classification of the site?
22. What is the current Comprehensive Plan designation and zoning classification of
adjacent sites?
23. If applicable, what is the current shoreline master program designation of the
site?
24. What is the planned use of the site? List type of use, number of dwelling units and
building square feet.
25. Approximately how many people would reside or work in the completed project?
26. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
27. Approximately how many units, if any, would be eliminated? Indicate whether
high, middle, or low-income housing.
28. Approximately how many people would the completed project displace?
29. Are there any buildings, structures, or sites, located on or near the site that are
over 45 years old listed in or eligible for listing in national or state preservation
registers? If so, specifically describe.
30. Are there any landmarks, features, or other evidence of Indian or historic use or
occupation. This may include human burials or old cemeteries. Are there any
material evidence, artifacts, or areas of cultural importance on or near the site?
Please list any professional studies conducted at the site to identify such
resources.
Staff Comments
Population/Employment/Housing Land Use Checklist and Mitigation Measures
Proposed Measures to control impacts including Exhibit 134 and 134 regarding
Mitigation Required for Development Applications and Exhibit B-3 Applicable
Regulations (check all that apply):
❑ Compliance with Eastside Village Subarea Plan.
❑ Compliance with other applicable land use and shoreline policies and
development regulations.
❑ Compliance with tribal, federal, or state consultations or permits for cultural
or eligible historic resources.
❑ Other
Explain:
TRANSPORTATION CHECKLIST AND GREENHOUSE GAS MITIGATION MEASURES
Transportation Checklist and Mitigation Measures
31. Identify public streets and highways serving the site, and describe proposed
Staff Comments:
access to the existing street system. Show on site plans, if any.
32. Is site currently served by public transit? If not, what is the approximate distance
to the nearest transit stop?
33. How many parking spaces would the completed project have? How many would
the project eliminate?
34. Will the proposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe (indicate
whether public or private).
35. How many PM peak hour vehicular trips per day would be generated by the
completed project?
36. Is the land use addressed by the EIS Greenhouse Gas Analysis?
37. Proposed Measures to control impacts including Exhibit B-1 and 134 regarding
Mitigation Required for Development Applications and Exhibit 13-3 Applicable
Regulations (check all that apply):
❑ Evaluate and mitigate roadways consistent with Planned Action Ordinance
Section 4.D(3).
❑ Transportation Management Programs (TMPs)
❑ Parking Reduction Incentive
❑ Other:
Explain:
AESTHETICS CHECKLIST AND MITIGATION MEASURES
Aesthetics Checklist and Mitigation Measures
38. What is the tallest height of any proposed structure(s)?
39. Would any views in the immediate vicinity be altered or obstructed?
40. Would the proposal produce light or glare? What time of day would it mainly
occur?
41. Could light or glare from the finished project be a safety hazard or interfere with
views?
42. What existing offsite sources of light or glare may affect your proposal?
43. Would shade or shadow affect public parks, recreation, open space, or gathering
spaces?
44. Proposed Measures to control impacts including Exhibit B-1 and B-4 regarding
Mitigation Required for Development Applications and Exhibit B-3 Applicable
Regulations (check all that apply):
❑ Compliance with Eastside Village Subarea Plan.
❑ Use of Incentives for Height including public benefits in exchange for
increased height?
❑ Compliance with other applicable land use and shoreline policies and
development regulations.
❑ Other:
Explain:
Sfaff Comments:
PUBLIC SERVICES AND UTILITIES CHECKLIST AND MITIGATION MEASURES
Public Services and Utilities Checklist
45. Water Supply: Would the project result in an increased need for water supply or
fire flow pressure? Can City levels of service be met?
46. Wastewater: Would the project result in an increased need for wastewater
services? Can City levels of service be met?
47. Police Protection: Would the project increase demand for police services? Can City
levels of service be met?
48. Fire and Emergency Services: Would the project increase demand for fire and/or
emergency services? Can levels of services be met?
49. Schools: Would the project result in an increase in demand for school services?
Can levels of services be met? Is an impact fee required?
Staff Comments:
Public Services and Utilities Checklist
50. Parks and Recreation: Would the project require an increase in demand for parks
and recreation? Can levels of services be met?
51. Other Public Services and Utties: Would the project require an increase in
demand for other services and utilities? Can levels of services be met?
52. Proposed Measures to control impacts including Exhibit B-1 and B-4 regarding
Mitigation Required for Development Applications and Exhibit 13-3 Applicable
Regulations (check all that apply):
❑ Capital Facility Plan has been considered, and development provides its fair
share of the cost of improvements consistent with applicable local
government plans and codes.
❑ Law enforcement agency has been consulted, and development reflects
applicable code requirements.
❑ Fire protection agency has been consulted, and development complies with
Uniform Fire Code.
❑ School district has been consulted, and appropriate mitigation has been
provided, if applicable.
❑ Onsite park/recreation is required, or fee -in- lieu.
❑ Developer has coordinated with City to ensure that sewer lines, water lines,
or stormwater facilities will be extended to provide service to proposed
development site where required.
❑ General facility charges have been determined to ensure cumulative impacts
to utilities are addressed.
❑ Other Measures to reduce or control public services and utilities impacts:
Explain:
C. Applicant Signature
The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them
to make its decision.
Signature:
Date:
D. Review Criteria
REVIEW CRITERIA
The City's SEPA Responsible Official may designate "planned actions" consistent with criteria in Ordinance No. 5402
Subsection A.E.
Criteria
Discussion
(a) the proposal is located within the
Planned Action area identified in
Exhibit A of this Ordinance;
(b) the proposed uses and densities
are consistent with those described
in the Planned Action EIS and Section
4.D of this Ordinance;
(c) the proposal is within the Planned
Action thresholds and other criteria
of Section 4.D of this Ordinance;
(d) the proposal is consistent with
the City of Bremerton
Comprehensive Plan and the Eastside
Village Subarea Plan;
(e) the proposal's significant adverse
environmental impacts have been
identified in the Planned Action EIS;
(f) the proposal's significant impacts
have been mitigated by application
of the measures identified in Exhibit
B, and other applicable City
regulations, together with any
modifications or variances or special
permits that may be required;
(g) the proposal complies with all
applicable local, state and/or federal
laws and regulations, and the SEPA
Responsible Official determines that
these constitute adequate
mitigation;
(h) the proposal is not an essential
public facility as defined by RCW
36.70A.200(1), unless the essential
public facility is accessory to or part
of a development that is designated
as a planned action under this
ordinance.
DETERMINATION CRITERIA
Applications for planned actions shall be reviewed pursuant to the process in Ordinance No. 5402 Section 4.G.
Requirement
Applications for planned actions were
made on forms provided by the City
including this Eastside Village
Environmental Checklist and
Mitigation Document.
Discussion
Requirement
The application has been deemed
complete in accordance with BMC
Chapter 20.02.
The proposal is located within
Planned Action Area pursuant to
Exhibit A of this Ordinance
The proposed uses) are listed in
Section 4D of the Ordinance and
aualifv as a Planned Action.
Discussion
E. SEPA Responsible Official Determination
A. Qualifies as a Planned Action: The application is consistent with the criteria of Ordinance 5402 and thereby qualifies as
a Planned Action project.
It shall proceed in accordance with the applicable permit review procedures specified in Ord 5402, except that no SEPA
threshold determination, EIS or additional SEPA review shall be required.
Notice shall be made pursuant to BMC Chapter 20.02. as part of notice of the underlying permits and shall include the
results of the Planned Action determination. If notice is not otherwise required for the underlying permit, no special
notice is required. See Section 4.G(3)(a) regarding notice of the Type 1 decision.
The review process for the underlying permit shall be as provided in BMC Chapter 20.02.
NOTE: If it is determined during subsequent detailed permit review that a project does not qualify as a planned action,
this determination shall be amended.
Si
Date:
B. Does not Qualify as Planned Action: The application is not consistent with the criteria of Ordinance 5402, and does not
qualify as a Planned Action project for the following reasons:
Projects that fail to qualify as Planned Actions may incorporate or otherwise use relevant elements of the Planned Action
EIS, as well as other relevant SEPA documents, to meet their SEPA requirements. The SEPA Responsible Official may limit
the scope of SEPA review for the non -qualifying project to those issues and environmental impacts not previously
addressed in the Planned Action EIS.
SEPA Process Prescribed:
C.
nsible Official Si
Signature:
Date:
EXHIBIT B-2 MITIGATION DOCUMENT
A Mitigation Document is provided in this Exhibit B-1 to establish specific mitigation measures based upon significant adverse
impacts identified in the Planned Action EIS. The mitigation measures in this Exhibit 13-1 shall apply to Planned Action Project
applications that are consistent with the Preferred Alternative range reviewed in the Planned Action EIS and which are located
within the Planned Action Area (see Exhibit A).
Where a gation measure includes the words "shall" or "will," inclusion of that measure in Planned Action Project application
plans is mandatory in order to qualify as a Planned Action Project. Where "should" or "would" appear, the mitigation measure
may be considered by the project applicant as a source of additional mitigation, as feasible or necessary, to ensure that a
project qualifies as a Planned Action Project. Unless stated specifically otherwise, the mitigation measures that require
preparation of plans, conduct of studies, construction of improvements, conduct of maintenance activities, etc., are the
responsibility of the applicant or designee to fund and/or perform.
The City's SEPA Responsible Official's authorized designee shall determine consistency with this mitigation document.
Natural Environment
l . Planned Actions shall be consistent with subarea plan dimensional and development standards including maximum impervious
coverages.
2. Planned Actions shall implement required street frontages in the subarea plan, including landscaping and green
infrastructure.
3. Planned Actions may incorporate development incentives for green stormwater retrofits that provide water quality benefits
beyond standard requirements by code.
4. Planned Actions must provide onsite open space per dwelling unit. Per Exhibit B-3 development may achieve a portion of
the open space standard via in -lieu fees applied to common park space including green infrastructure.
Population, Employment, and Housing
5. Planned Actions are subject to regulations applied to existing development and uses in the subarea plan including but not
limited to proportional compliance intended to allow existing development and progress towards the subarea plan vision
and zoning intent.
Land Use and Aesthetics
6. Planned Actions shall be consistent with subarea plan development standards and guidelines.
7. Planned Actions shall provide site and building design features to protect public views of the Downtown and Port Washington
Narrows from public properties or public streets near Lower Wheaton Way and Callahan Drive consistent with the subarea
plan.
8. Within shoreline jurisdiction, Planned Actions must be consistent with cultural resources policies and regulations. Outside of
shoreline jurisdiction, Planned Actions shall be conditioned to be consistent with Inadvertent Human Remains Discovery
Language recommended by the State of Washington Department of Archaeology and Historic Preservation as a condition
of project approval consistent with RCWs 68.50.645, 27.44.055, and 68.60.055.
Transportation
9. Planned Actions shall implement parking standards consistent with the subarea plan.
1 0. Planned Actions shall implement required street frontage improvements consistent with the subarea plan and Exhibit B-3.
11. Planned Actions shall contribute mitigation fees for areawide multimodal transportation improvements based on each
development's demand consistent with Exhibit B-3.
Public Services
Z. Planned Actions shall demonstrate consistency with crime prevention through environmental design principles through
compliance with subarea plan development standards and guidelines.
Utilities
1 3. Planned Actions shall meet City standards for adequate water and sewer service, pay applicable general facility charges,
and incorporate water and sewer infrastructure improvements in street frontage improvements as appropriate.
14. Planned Actions shall implement required street frontages, including stormwater improvements, consistent with the subarea
plan and Exhibit B-3.
1 S. Planned Action shall implement the required stormwater manual and implement necessary stormwater improvements. If a
regional stormwater facility is approved by the City, an applicant may request or the City may condition development to
pay a fee based on the area of new and replaced impervious surface subject to the applicable stormwater management
manual in place at the time of application.
EXHIBIT 13-3 ADDITIONAL MITIGATION REQUIREMENTS & PROCEDURES
Transportation
Frontage Improvements
A. When a property redevelops and applies for permits, frontage improvements (or in -lieu contributions) and right-of-way
dedications if needed are required by the Bremerton Municipal Code (BMC 1 1.12.1 10).
B. If right-of-way (or an easement) is needed, it also must be dedicated to the City by the Planned Action Application property
owner. The City has developed specific cross sections in the Eastside Village Subarea Plan, which must be implemented as
part of required street frontage improvements.
C. Planned Action applicants may request and the City may consider afee-in-lieu for some or all of the frontage improvements
that are the responsibility of the property owner consistent with criteria in BMC 1 1.12.1 10 and agreements pursuant to
RCW 82.02.020 or other instrument deemed acceptable to the City and applicant.
Mitigation Fees
D. Areawide Improvements: Implementation of improvements identified in Table 13.3-1 and Table 13.3-2 shall occur through a
SEPA fair share fee program such that new development contributes its share of the cost for these projects.
E. Cost Basis: Unless amended, or replaced with a transportation impact fee, mitigation fees consistent with the proportionate
share of costs shall be applied to planned action applications.
F. A Planned Action's trips calculated per Section 4.D(3)(d) will be used to determine a development's demand and mitigation
payment.
G. Mitigation Fee Payable at Permit Issuance: The mitigation fee shall be payable at the time of building permit issuance.
H. Credit: The City shall provide a credit for the value of dedication or improvement to or new construction of any system
improvements provided by the developer in Table B.3-1 and Table B.3-2. The applicant shall be entitled to a credit for
the value of the land or actual costs of capital facility construction against the fee that would be chargeable under the
formula in subsection D above.
a. The dedication, improvement, or construction shall be conducted at suitable sites and constructed at acceptable quality
as determined by the City. Such improvement or construction shall be completed, dedicated, or otherwise transferred
to the City prior to the determination and award of a credit.
b. The value of a credit for right of way and easements shall be established based on an average deviation of sales
value compared to assessed value using Kitsap County Assessor information. If there is a disagreement on value, the
appraisal and review shall be prepared by a licensed appraiser in good standing with the State of Washington and
at the expense of the applicant.
c. The reduction in fees for implementing frontage improvements that are considered a system improvement that meets
areawide demand is addressed in Table B.3-3.
The Planned Action Share Transportation Fees will be incorporated into the City master fee schedule. Fees shall be subject
to biennial review to affirm the cost basis including a construction cost index or an equivalent as determined by the City.
Figure B.3=1. Multimodal Transportation improvements
Crosswalk to balifields
Consider intersection options
Stephenson -
Canyon
A variety of configurations
are being considered
New multi -use path
to connect bridge to
bridge -to -bridge trail
Pedestrian priority
ramp east from SR 303
to Lebo Blvd.
Signature corners
with highly visible
pedestrian traffic
a
•
•
•
•
I�
f .
•r
{ f
f #
#5
Bremerton
Health & Rehab
Center 1
Sheridan
Community
Center
Improve commercial
frontage, public works
access, and allow for
shoreline viewing
where feasible from
ROW or park
STREET TYPOLOGY
� Pedestrian Oriented Street
to Signature Road
Neighborhood Streets
.. • Bicycle Routes
Shared Use Street
New Street
_ Park
:ill BERK
#2
#4 Construct Rectangular
ft Rapid Flashing Beacon (RRFB)
to connect with sidewalk
on north side of Sheridan
Recommendations for all
# Neighborhood Streets
Short term: Stripe climbing lane
Long term: Construct protected
shared use path
s Other street sections may also
be considered
z
J
C
Pedestrian oriented street
#7� Harrison designated 100'northof
Lebo Blvd
Medical
Center
New park with ped/bike
commercial amenities and
watertreatment
Campbell is to be a multi -modal
- right of way allowing only low
speed vehicle access with
additional green infrastucture
a
�d
9�
o>
2d^
0
S
East
Park
A
Table B.3=1. Multimodal Transportation Improvements
Improvements to Priority Routes and Pedestrians, Bicycle, Transit, and Intersection Levels of Service
Segments
1 SR 303: Ped/Bike X X $2.6
2 Sheridan Road X X X $1.7 X
3 Wheaton Way X X* X Signature $6.3 X
4 Wheaton Way X X* X Signature $1.5 X
5 Clare Avenue X* Bicycle Route $3.3 X
Subtotal $15A
Signals
A Clare/Lebo $0.8 X
Subtotal $0•8
Other Frontage Improvements to Meet Cross Section
6 Juniper Street New Street** $0.9 X
7 Callahan Drive X Signature $1.7 X
8 Campbell Way Shared Use $0.6 X
9 Cherry Avenue * X Neighborhood $3.2
10 Hemlock Street Neighborhood $1.9
11 Hickory Street Neighborhood $0.5
Subtotal $8.8
Total $25.0
Notes: *Proposed Priority Bike Route to be shifted from Cherry Avenue to Lower Wheaton Way. Also, addition of Clare Avenue
to Priority Bike Routes.
** Provides a more direct connection from SR 303 and Clare Avenue to Wheaton Way.
Table B.M. Cost Basis and Per Trip Fee: Preferred Alternative Planned Action Share
PM Peak Hour Trips*
Multi -modal LOS Improvements
Transportation Intersection LOS
Mitigation
Areawide Contribution to
Frontage Improvements
Total
243
$12,819,700 $1I715 $6,501
$750,000 $92,400 $380
$3,195,900 $393,800 $1,621
$16,765,600 $2,065,915 $8,502
'` Net trips above existing vehicle trips as calculated in the Planned Action EIS.
"The share of cost is based on the new demand for improvements to meet City standards and fair share; approximately 7 2.32%
of total trips are due to new growth.
Table B.3-3. Per Trip Fee accounting for Implementation of Site Frontage Improvements ($2020)
Wheaton Way
Juniper Street
Callahan Drive
Campbell Way
$5,308
$6,881
$7,628
$8,218
Parks and Open Space
A. A Planned Action shall provide the common and private open space required per dwelling in the Eastside Village Subarea
Plan.
B. A development may pay a fee in lieu of providing up to 50% common open space or up to 50% of the private open
space onsite. The in -lieu fee shall be equal to the average fair market value of the land otherwise required to be provided
in on -site common or private open space. The in -lieu fees shall support park land purchase and improvements or shoreline
access and improvements within the 10-minute walk service area in Figure B.3-2 for any park, trail, stormwater park, or
shoreline access identified in the Eastside Village Subarea Plan, Parks, Recreation, and Open Space Plan, and Capital
Facility Plan.
C. The payment shall be held in a reserve account by the City and may only be expended to fund a capital improvement for
parks and recreation facility identified in the Eastside Village Subarea Plan. The payment shall be expended in all cases
within five years of collection. Any payment not so expended shall be refunded with interest to be calculated from the
original date the deposit was received by the City and at the same rate applied to tax refunds pursuant to RCW
84.69.100; however, if the payment is not expended within five years due to delay attributable to the developer, the
payment shall be refunded without interest.
Figure B.M. 10-Minute Walk Area
Bremerton Eastside Subarea
Parcels
Parcels in 5-min walkshed
Parcels in 10-min walkshed
Parks and Open Space
O0 $00 1,000
0 Feet
J NE SYLVAN WAY
L'. 0__
n�_El IN
I ll li�l
303
u:Tl I sr
.'� Highwpys
Streets
Waterbody
:III BERK
Map Date: May 2020
c\ v y I � 11 H�
NOTE: Walksheds are shown here as parcels within 5-minute (l/4 mile)
and 10-minute )1/2 mile) walking times along sheet centerlines.
Walking time/distnn<e is calculated from the Sheridan Contrranity
Center, Madrana Trails, vacant lot on north end of EEC, and the bridge
to bridge trail along Lebo Blvd and Campbell Way.
This analysis is based on the presence of a sheet and not necessarily a
sidewalk, and it assumes sheet connections envisioned in the subarea
plan. Factors like topography, activity along street, etc, can affect how
far people choose to walk - this is rat factored in the analysis here.
EXHIBIT B-4 APPLICABLE REGULATIONS AND ADVISORY NOTES
The Eastside Village Subarea Plan includes goals, policies, and development regulations as well as capital investments. In
addition, the following regulations may apply.
Natural Environment
Development and redevelopment projects within the study area that have the potential to impact environmentally sensitive
natural resources will require compliance with federal, state, and local regulations. Mitigation sequencing to avoid, minimize,
and mitigate environmental impacts is typically required for all applicable permitting reviews and authorizations. The table
below provides a regulatory permit matrix for actions requiring local, state, and federal authorizations. Appropriate mitigation
measures specific to project alternatives will need to be proposed when alternatives are farther along in the planning process.
This may include preservation, enhancement, and restoration of wetland and marine shoreline buffer.
Environmental Regulations
City of Bremerton Pre -Application submittal Conference
SEPA Determination (No Action Alternative) Planned Action Consistency
Determination (Action Alternatives)
Shoreline Exemption or Substantial Development Permit
Critical Areas Review
Washington State Department of Section 401 Water Quality Certification Construction Stormwater General
Ecology (Ecology) Permit
Coastal Zone Management Act Consistency Certification
Washington Department of Fish Hydraulic Project Approval (HPA)
and Wildlife (WDFW)
Department of Archaeology and Cultural Resources Review
Historic Preservation (DAHP) Form EZ1
U.S. Army Corps of Engineers Section 404 Clean Water Act
Section 10 Rivers and Harbor act
Requires Compliance with:
Section 7 of Endangered Species Act
Section 106 Historic Preservation Act
Magnuson -Stevens Act
Sources: Cify of Bremerton Municipal Code; Herrera 2020,
Population, Employment, and Housing
None.
Land Use and Aesthetics
Bremerton's Municipal Code contains regulations that help to ensure land use compatibility.
• Title 20 Land Use Code, except where regulated by the Subarea Plan and associated development regulations.
■ Bremerton Shoreline Master Program (SMP).
In terms of historic and cultural resources the following local, state, and federal laws or rules apply:
■ Bremerton's SMP includes policies and regulations that would require appropriate cultural review by tribal and other
agencies.
■ State funded capital projects require Governor's Executive Order 0505 review. Implementation of the Executive Order
requires all state agencies implementing or assisting capital projects using funds appropriated in the State's biennial
Capital Budget to consider how future proposed projects may impact significant cultural and historic places.
■ Section 106 of the National Historic Preservation Act requires that each federal agency identify and assess the effects its
actions may have on historic buildings.
Transportation
The following regulations address transportation:
■ Travel Demand Management (TDM): Washington State Commute Trip Reduction (CTR) law requires employers with 100 or
more employees and located in high -population counties to implement TDM programs.
■ Bremerton 2016 ADA Transition Plan
• Bremerton Complete Streets Ordinance
• Bremerton Capital Improvement Program
The following sections of the BMC:
1 1.12.090 Dedication of Right -Of -Way.
1 1.12.1 10 Street Frontage Improvements.
Public Services
The following regulations address public services:
■ Title 18 Fire —Includes requirements for fire suppression.
■ City Services Element and Appendix —Addresses levels of service and capital improvements for fire, police, and parks.
This is updated every eight years with the Comprehensive Plan.
■ Parks, Recreation, and Open Space (PROS) Plan 2020 — Establishes a plan for 2020-2025 and a 20-year plan including
capital projects.
■ Bremerton School District Levy 2020 —Addresses Capital Replacement projects to ensure proper function of current
schools.
Utilities
Water
When evaluating new construction, Bremerton Public Works and Utilities Department personnel determine the ability of the water
system to meet fire flow requirements at that location with a minimum of 20 psi residual pressure throughout the distribution
system. If the water system cannot provide the required fire flow for the specific project, the developer is required to revise
building construction and/or make the necessary improvements to the distribution system to meet the prolect's fire flow
requirements as established by the Fire Marshal.
BMC Chapter 15.02 includes provisions for service connections and mains to be upgraded by developers during redevelopment
if required to meet engineering design and construction standards. Chapter 15.02 also includes provisions for installation of
pumps if required to achieve adequate pressure during peak demands.
Wastewater
BMC Chapter 15.03 includes provisions for wastewater service connections and extensions when existing connections are
inadequate or sewer mains are not present along the frontage of a property.
Stormwater
BMC Chapter 15.04 includes provisions that require redevelopment to meet stormwater management requirements of the
Stormwater Management Manual for Western Washington related to stormwater treatment. Under all the alternatives these
requirements are expected to result in a net improvement in the quality of stormwater that is discharged to the Port Washington
Narrows. Because the entire EC drains directly to marine waters, and not to streams, redevelopment in the EC is exempt from
flow control, however, stormwater detention may be required by the City on a case by case basis to address capacity concerns
in the stormwater system and beach erosion at the outfall.