HomeMy WebLinkAbout6155AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Public Works Agreement with Industrial Coatings Unlimited, LLC for Steel Reservoir Exterior Coating Maintenance (2020) Study Session Date: August 12, 2020 COUNCIL MEETING Date: August 19, 2020 Department: Engineering Presenter: Bill Davis Phone: - (360) 473-2312 SUMMARY: In early 2019, Northwest Corrosion Engineering, LLC prepared an exterior Coating assessment report evaluating the general condition of the exterior coating of nine (9) City steel potable water reservoirs. The assessment included recommendations for pressure washing and spot coating repair of six (6) of these reservoirs to increase the longevity of the exterior coating. Requests for bids were sent to five (5) contractors selected off the Municipal Research and Services Center (MRSC) Small Works Roster to perform the reservoir cleaning and coating repair. Bids were opened on July 13, 2020. Four (4) bids were received. Industrial Coatings Unlimited, LLC was the lowest responsible, responsive bidder in the amount of $99,762.25 (which includes sales tax). ATTACHMENTS: 1. Location Map; 2. Agreement; 3. Bid Tabulation FISCAL IMPACTS (include Budgeted Amount): This project is included in the 2020 Water Capital Budget. STUDY SESSION AGENDA: M Limited Presentation L1 Full Presentation STUDY SESSION ACTION: NConsent Agenda L1 General Business El Public Hearing RECOMMENDED MOTION: Move to award the construction contract for Steel Reservoir Exterior Coating Maintenance (2020) to Industrial Coatings Unlimited, LLC in the amount of $99,762.25; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: 4Approve Form Updated 01/02/2018 El Deny [I Table E] Continue 0 No Action Public Works Agreement Page 1 of 9 City of Bremerton Steel Reservoir Exterior Coating Maintenance (2020) July 2020 PUBLIC WORKS AGREEMENT THIS AGREEMENT is entered into between the City of Bremerton, a Washington Municipal Corporation (“City”), and Industrial Coatings Unlimited, LLC (“Contractor”), whose mailing address is 18420 68th Ave S., Suite 110, Kent, WA 98032. The parties agree as follows: 1.CONTRACTOR SERVICES. The Contractor shall perform the following services for the City described in the Bid Documents titled: STEEL RESERVOIR EXTERIOR COATING MAINTENANCE (2020) 2.TIME OF COMPLETION. Contractor shall complete the work within 60 calendar days from the date of issuance of the City’s Notice to Proceed. Contract extensions will be considered due to adverse weather. 3. COMPENSATION. The City shall pay the Contractor an amount not-to-exceed $99,762.25, inclusive of any applicable Washington State Sales Tax, for the work and services contemplated in this agreement. The City shall pay the Contractor ninety percent (90%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this agreement. A.No Performance Bond. Because this contract including applicable sales tax is $150,000 or less, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a performance bond, has elected to have the City retain the final ten percent (10%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B.Retainage. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. C.Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this agreement; and extra work and materials furnished without the City’s written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. “Additional costs” shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D.Final Payment: Waiver of Claims. THE MAKING OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL PRECLUDE ALL CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. 4.INDEPENDENT CONTRACTOR. Contractor is and shall be at all times acting as an independent contractor and not as an employee of the City. The Contractor shall secure at its expense, and shall be responsible for all payments of income tax, social security, state disability insurance compensation, unemployment compensation, and all other payroll deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor shall also secure all applicable business licenses, if required, in connection with the contract services, including all required licenses for Contractor's officers, agents, employees and sub-contractors. 5.TERMINATION. The City may terminate this agreement for good cause. “Good cause” shall include, without limitation, any one or more of the following events: A.The Contractor’s refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B.The Contractor’s failure to complete the work within the time specified in this agreement. C.The Contractor’s failure to make full and prompt payment to sub-contractors or for material or labor. D.The Contractor’s persistent disregard of federal, state or local laws, rules or regulations. E.The Contractor’s filing for bankruptcy or becoming adjudged bankrupt. If the City terminates this agreement for good cause, the Contractor shall not receive any further monies due under this agreement until the Contract work is completed. 6. PREVAILING WAGES. Contractor shall file a “Statement of Intent to Pay Prevailing Wages” with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages rates for public works contracts in Kitsap County in effect at the time of the bid submittal deadline and comply with Chapter 39.12 of the Revised Code of City of Bremerton Public Works Agreement Steel Reservoir Exterior Coating Maintenance (2020) Page 2 of 9 July 2020 DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B Public Works Agreement Page 3 of 9 City of Bremerton Steel Reservoir Exterior Coating Maintenance (2020) July 2020 Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. 7.CHANGES. The City may issue a written work change directive for any change in the Contract work during the performance of this agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the City’s project manager within two (2) business days of the date the Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor’s costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving a written work change directive or change order from the City. If the Contractor fails to require a change order within the time allowed, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided below: A.Procedure and Protest by the Contractor. If the Contractor disagrees with anything required by a work change directive or change order, including any direction, instruction, interpretation, or determination by the City, the Contractor shall: 1.Immediately give a signed written notice of protest to the City; 2.Supplement the written protest within fourteen (14) calendar days with a written statement that provides the following information: a.The date of the Contract’s protest. b.The nature and circumstances that caused the protest. c.The provisions in this agreement that support the protest. d.The estimated dollar cost, if any, of the protested work and how that estimate was determined. e.An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. The Contractor shall keep complete records of extra costs and time incurred as a result of the protested work. The City shall have access to any of the Contractor’s records needed for evaluating the protest. 3.The City will evaluate all protests, provided the procedures in this section are followed. If the City determines that a protest is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B B.Contractor’s Duty to Complete Protested Work. In spite of any protest, the Contractor shall proceed promptly with the work as the City has ordered. C.Contractor’s Acceptance of Changes. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. D.Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written order (including directions, instructions, interpretations, and determination). E.Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts form the City any written order (including directions, instructions, interpretations, and determination). 8. CLAIMS. The Contractor shall give written notice to the City of all claims other than change orders within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim is set forth in detail in writing and received by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum, a Contractor’s written claim must include the information set forth regarding protests in Section 7.A.2.a.-e. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. Contractor must, in any event, file any claim or bring any suit arising from or connected with this agreement within 120 calendar days from the date the contract work is complete. 9. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the City’s acceptance of the Contract work. When defects are corrected, the warranty for that portion of the work shall extend for one year form the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does City of Bremerton Public Works Agreement Steel Reservoir Exterior Coating Maintenance (2020) Page 4 of 9 July 2020 DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B Public Works Agreement Page 5 of 9 City of Bremerton Steel Reservoir Exterior Coating Maintenance (2020) July 2020 not accomplish the corrections within a reasonable time, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 10.INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officer, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including all legal costs and attorney fees, arising out of or in connection with the performance of this agreement, except for injuries and damages caused by the City’s sole negligence. The City’s inspection or acceptance of any of Contractor’s work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Co ntractor and the City, its officials, employees, agents and volunteers, the Contractor’s liability hereunder shall be only to the extent of the Contractor’s negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS INDEMNIFICATION CONSTITUTES THE CONTRACTOR’S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this agreement. 11.INSURANCE. The Contractor shall procure and maintain for the duration of this agreement insurance of the types and in the amounts described below against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work by the Contractor, its agents, representative, employees, sub-consultants or sub-contractors. Before beginning work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: 1.Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2.Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; 3.Excess Liability insurance with limits not less than $1,000,000 per occurrence and aggregate. DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B 4.Worker’s Compensation insurance as statutorily required by the Industrial Insurance Act of the State of Washington, Title 51, Revised Code of Washington, and employer's liability with limits not less than $1,000,000. Any payment of deductible or self insured retention shall be the sole responsibility of the Contractor. The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor’s insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. The Consultant's insurance shall be primary and non-contributory insurance as respects the City and shall contain a waiver of subrogation against the City for claims arising out of any operations, liabilities and obligations to which coverage applies. It shall be an affirmative obligation upon Consultant to advise the City’s Risk Manager by fax at (360) 473-5161, or by certified mail, return receipt requested to City of Bremerton, attn: Risk Management, 345 6th Street, Suite 100, Bremerton, WA 98337 within two days of the cancellatio n, suspension or substantive change of any insurance policy set out herein, and failure to do so shall be construed to be a breach of this Agreement. The City reserves the right to receive a certified copy of all the required insurance policies. 12.MISCELLANEOUS. A.Nondiscrimination. In the hiring of employees for the performance of work under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or any person acting on behalf of such Contractor or sub-contractor shall not, by reason of race, religion, color, sex, national origin, or the presence of any sensory, mental, physical disability, or sexual orientation discriminate against any person who is qualified and available to perform the work to which the employment relates. B. Equal Employment Opportunity Statement. It is the policy of the City of Bremerton to offer equal employment opportunity to all individuals. The City of Bremerton will administer all actions with respect to employment practices in compliance with federal, state and local laws, and will not discriminate in any employment practice on the basis of age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the presence of any physical, mental or sensory disability. C. ADA Statement. The City of Bremerton does not discriminate on the basis of disability in programs and activities, which it operates pursuant to the requirements of the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment City of Bremerton Public Works Agreement Steel Reservoir Exterior Coating Maintenance (2020) Page 6 of 9 July 2020 DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B Public Works Agreement Page 7 of 9 City of Bremerton Steel Reservoir Exterior Coating Maintenance (2020) July 2020 and admission to participation in the programs, services and activities of the City of Bremerton. Reasonable accommodation for employees or applicants for employment will be provided. D.Compliance with Laws. Contractor shall comply with all federal, state and local laws, rules and regulations throughout every aspect in the performance of this agreement. E.Work Performed at Contractor’s Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor’s own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. F.Nonwaiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of those terms and rights and they shall remain in full force and effect G.Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be available only through the jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap County, Washington. H.Attorney’s Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties’ performance of this agreement, each party shall be responsible for payment of its own legal costs and attorney’s fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City’s right to indemnification under Section 10 of this agreement. I.Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated on this agreement. J.Assignment. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. K.Modification. No waiver, alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. L.Severability. If any one or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B Public Works Agreement Page 8 of 9 City of Bremerton Steel Reservoir Exterior Coating Maintenance (2020) July 2020 M.Entire Agreement. The written provisions and terms of this agreement, together with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement, the terms of this agreement shall prevail. N.Liquated Damages. Liquated Damages will be enforced in the amount of $200 per day that the work is not complete after the contractual substantial completion date. DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B Public Works Agreement Page 9 of 9 City of Bremerton Steel Reservoir Exterior Coating Maintenance (2020) July 2020 IN WITNESS WHEREOF, the parties below have executed this agreement. CONTRACTOR THE CITY OF BREMERTON (Signature) (Signature) Print Name: Print Name: Greg Wheeler Title: Title: Mayor DATE: DATE: Notices to be sent to: Notices to be sent to: CONTRACTOR: CITY OF BREMERTON: Attn: Aaron Couch 345 6th Street, Suite 100 Bremerton, WA 98337 (360)376-2350 (360)473-5200 (facsimile) APPROVED AS TO FORM: Roger A. Lubovich Bremerton City Attorney ATTEST: Angela Hoover, City Clerk T:\PROJECT FILES\PROJECT - Utility Files\45126 - Reservoir Cleaning and Maintenance\4 BID PHASE\Bid Docs\Exterior\A - Public Works Agreement_Exterior 45126.doc DocuSign Envelope ID: 55CF0F47-B25E-4046-831A-672744480E5B 9/4/2020 IN13UCOA-05 SPOPE ACORL7; �� CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDDIYYYY) 8/31/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Sharon Pope NAME - HONNo, Ext : (907) 348-1105 FAX, , No :(907) 782-4429 Hub International Northwest LLC 480 W. Tudor Road Suite 100 E-MAIL ADDRESS: sharon.pope@hubinternational.com Anchorage, AK 99503 INSURERS AFFORDING COVERAGE NAIC # INSURER A: Everest Indemnity Insurance Company 10851 INSURED INSURER B : Alaska National Insurance Company 38733 INSURER C : Industrial Coatings Unlimited, LLC INSURER D : PO Box 112629 Anchorage, AK 99511-2629 INSURER E INSURER F : COVERAGES CERTIFICATE NUMBFR- REVISION NUMBER - THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXPLTR LIMITS A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE X OCCUR X X EF4ML06460-201 911/2020 911/2021 EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED PREMISES (Ea oommu e) 100,000 $ X MED EXP (Anv one erson $ 10,000 Contractors Pollutio PERSONAL S ADV INJURY $ 1,000,000 AGGREGATE LIMIT APPLIES PER: POLICY �X JECT LOC GENERAL AGGREGATE $ 2,000,000 GENT X PRODUCTS - COMPIOP AGG $ 2,000,000 Pollution $ 1,000,000 OTHER: B AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident)X $ 1,000,000 BODILY INJURY Perperson) $ ANY AUTO 201AS11251 91112020 9/1 /2021 OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY Per accident BODILY $ PROPERTY DAMAGE Per accident $ E X AUTOS ONLY X AUUTNOS ONLY A UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 4,000,000 X AGGREGATE $ 4,000,000 EXCESS LIAB CLAIMS -MADE EF4CU01499-201 9/1/2020 9/1/2021 DEO I X I RETENTION $ 0 $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY PROPRIETORIPARTNERIEXECUTIVE j—� PM ridatoMEn N EXCLUDED? I _J NIA EF4ML06460-201 9/1/2020 9/1/2021 ER X1 ER OTH- STATUTE E.L. EACH ACCIDENT 1,000,000 $ E.L. DISEASE - EA EMPLOYE 1,000,000 $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT 1,000,000 $ DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Re: Job #20092, Project #MRSC PUBLIC WORKS AGREEMENT, Steel Reservoir Exterior Coating Maintenance (2020) "This is evidence of insurance procured and developed under the Alaska Surplus Lines Law AS21.34 It Is not covered by the Alaska Insurance Guaranty Association Act, AS21.80." Worldwide Facilities, LLC - License #9718 Carrier A City of Bremerton, its officials, employees, agents and volunteers are as Additional Insureds on the General Liability policy, where required by written contract or written agreement, subject to the policies' terms, conditions and exclusions. City of Bremerton 345 6th St., Ste. 100 Bremerton, WA 98337 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE a xt.L ACORD 25 (2016/03) @ 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD ACORO" ka� AGENCY CUSTOMER ID: INDUCOA-05 LOC #: 1 ADDITIONAL REMARKS SCHEDULE SPOPE Page 1 of 1 AGENCY NAMED INSURED Industrial Coatings Unlimited, LLC Hub International Northwest LLC PO Box 112629 Anchorage, AK 99511-2629 POLICY NUMBER EE PAGE 1 CARRIER NAIC CODE SEE PAGE 1 SEE P 1 EFFECTIVE DATE: SEE PAGE 1 ADDITIONAL THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: ACORD 25 FORM TITLE: Certificate of Liability Insurance Description of Operations/Locations/Vehicles: The General Liability policy shall be primary and non-contributory with any other insurance in force for or which may be purchased by the Certificate Holder, where required by written contract or written agreement. The Certificate Holder is granted a Waiver of Subrogation on the General Liability policy, where required by written contract or written agreement, subject to the policies' terms, conditions and exclusions. ACORD 101 (2008/01 ) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD