HomeMy WebLinkAbout07/08/2020 STUDY SESSION PACKET______________________________________________________________
CITY COUNCIL 345 6th Street, Suite 100, Bremerton, WA 98337 Phone (360) 473-5280
WEDNESDAY, JULY 8, 2020
CITY COUNCIL STUDY SESSION AGENDA
5:00 PM – Via Zoom Webinar
To help reduce the spread of COVID-19, the City Council is conducting a Study Session via Zoom Webinar. The
Council Conference Room 603 will be closed, and all Council Members and staff will be participating remotely.
The Study Session is open to the public to listen in, but there will be no opportunities for input; no action is
anticipated; and the content of these items is subject to change. If approved by the Council, items will be placed
on the July 15, 2020 City Council Virtual Meeting Agenda…
Members of the public are invited to join the Zoom webinar by clicking on the following link:
https://us02web.zoom.us/j/84313065811?pwd=ZGk1b1Z2dmwxdzlJQzhzYUZxbEFYQT09
Password: 209823
Or iPhone one-tap: US: +12532158782,,84313065811#,,,,0#,,209823# or
+16699006833,,84313065811#,,,,0#,,209823#
Or Telephone: Dial (for higher quality, dial a number based on your current location):
+1 360 415 1029
+1 253 215 8782 US
+1 301 715 8592 US
Webinar ID: 843 1306 5811
Password: 209823
Citizens are always encouraged to send questions and comments to: City.Council@ci.bremerton.wa.us
A. BRIEFINGS ON AGENDA ITEMS
1. Proposed Public Hearing on 2021 Edward Byrne Memorial Justice Assistance Grant
2. Resolution authorizing two Applications to the WA State Recreation & Conservation Office
for 1) Washington Wildlife Recreation Program Local Park Grant; and 2) Youth Athletic
Facilities Grant to Renovate Haddon Park
3. Briefing on the Washington Resource Inventory Area Kitsap Watershed Plan Update
(Information only...)
4. Proposed Public Hearing on Resolution adopting the 2021 – 2026 Six Year Transportation
Improvement Program
B. GENERAL COUNCIL BUSINESS
o Other General Council Business
C. ADJOURNMENT OF STUDY SESSION
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: July 8, 2020
Proposed Public Hearing on 2021 Edward
Byrne Memorial Justice Assistance Grant
COUNCIL MEETING Date: July 15, 2020
Department: Police
Presenter: Tom Wolfe
Phone: (360) 473-5224
SUMMARY: The Bremerton Police Department is applying for the local solicitation of the Edward
Byrne Memorial Justice Assistance Grant (JAG). Since 2010, funding has been used to help fund
the salary for the position of the Community Resource Specialist. The grant will allow the City to
continue the Community Resource Unit and its crime prevention function and programs. The grant is
from the Department of Justice. No matching funds are required of the City. The total grant amount
is $65,084.00.
ATTACHMENTS: 2021 Edward Byrne Memorial Justice Assistance Grant Application
FISCAL IMPACTS (Include Budgeted Amount): None
STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☒ Public Hearing
RECOMMENDED MOTION:
Move to approve the Edward Byrne Memorial Justice Grant; and to authorize the Mayor to finalize
and execute the agreement with substantially the same terms and conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 01/02/2018
A1
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: July 8, 2020
Resolution No. authorizing two
Applications to the WA State Recreation &
Conservation Office for 1) Washington
Wildlife & Recreation Program Local Park
Grant; and 2) Youth Athletic Facilities Grant
to Renovate Haddon Park
COUNCIL MEETING Date: July 15, 2020
Department: Parks & Recreation
Presenter: Jeff Elevado
Phone: (360) 473-5428
SUMMARY: Haddon Park is an aging neighborhood park located on a 4-acre parcel in West
Bremerton. The park contains a parking area, sports court, playground, restroom and walking paths.
Currently no part of the park is ADA accessible. The park’s renovation is identified as a high priority
in the Parks, Recreation & Open Space Plan adopted in 2020. This project will develop accessible
pathways throughout the site to access new park amenities including: children’s playground,
restroom, shelter, and enhanced multi-use sports court. This project has been directly shaped by
community involvement which has included an in-depth park needs questionnaire mailed out to 980
residents living within a 10-minute walk of the park and public meetings conducted by the Parks &
Recreation Commission. Haddon Park is located in an underserved area which qualifies for a match
reduction of 10%.
ATTACHMENTS: 1) Resolution No.______ authorizing grant application
2) RCO Local Parks Project 20-1289 Factsheet Report
3) RCO Youth Athletic Facilities Project 20-1323 Factsheet Report
4) Haddon Park Site Development Plan
FISCAL IMPACTS (Include Budgeted Amount):
Project Cost Estimate: $949,625
Project Funding: RCO/LP Grant - $500k; RCO/YAF Grant - $350k;
City Cash Match - $59,625; Force Account Labor - $34k, Donations - $6k)
STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve Resolution No.__________authorizing staff to make two applications to the
Washington State Recreation and Conservation Office for 1) WWRP Local Park Grant and 2) Youth
Athletic Facilities Grant to renovate Haddon Park.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 01/02/2018
A2
1
Park Renovations
RESOLUTION NO. ________
A RESOLUTION of the City Council of the City of Bremerton,
Washington, to fulfill a Recreation and Conservation Office
Applicant Resolution/Authorization and obtain grants to benefit
local parks.
Organization Name (sponsor) City of Bremerton
Resolution No. (if applicable) ___________
Project(s) Number(s), and Name(s):
Project #20-1289 Haddon Park Renovation Project
Project #20-1323 Haddon Park Renovation Project
This resolution/authorization authorizes the person identified below (in section 2) to act as the
authorized representative/agent on behalf of our organization and to legally bind our organization
with respect to the above Project(s) for which we seek grant funding assistance managed through
the Recreation and Conservation Office (Office).
WHEREAS, state grant assistance is requested by our organization to aid in
financing the cost of the Project(s) referenced above;
NOW, THEREFORE, BE IT RESOLVED that:
1. Our organization has applied for or intends to apply for funding assistance
managed by the Office for the above “Project(s)”.
2. Mayor Greg Wheeler is authorized to act as a representative/agent for our
organization with full authority to bind the organization regarding all matters related to the
Project(s), including but not limited to, full authority to: (1) approve submittal of a grant
application to the Office, (2) enter into a project agreement(s) on behalf of our organization, (3)
sign any amendments thereto on behalf of our organization, (4) make any decisions and
submissions required with respect to the Project(s), and (5) designate a project contact(s) to
implement the day-to-day management of the grant(s).
3. Our organization has reviewed the sample project agreement on the
Recreation and Conservation Office’s website at https://rco.wa.gov/documents/manuals&forms/
SampleProjAgreement.pdf. We understand and acknowledge that if offered a project agreement to
sign in the future, it will contain an indemnification and legal venue stipulation (applicable to any
sponsor) and a waiver of sovereign immunity (applicable to Tribes) and other terms and conditions
substantially in the form contained in the sample project agreement and that such terms and
conditions of any signed project agreement shall be legally binding on the sponsor if our
representative/agent enters into a project agreement on our behalf. The Office reserves the right
to revise the project agreement prior to execution and shall communicate any such revisions with
the above authorized representative/agent before execution.
2
Park Renovations
4. Our organization acknowledges and warrants, after conferring with its legal
counsel, that its authorized representative/agent has full legal authority to enter into a project
agreement(s) on its behalf, that includes indemnification, waiver of sovereign immunity (as may
apply to Tribes), and stipulated legal venue for lawsuits and other terms substantially in the form
contained in the sample project agreement or as may be revised prior to execution.
5. Grant assistance is contingent on a signed project agreement. Entering into
any project agreement with the Office is purely voluntary on our part.
6. Our organization understands that grant policies and requirements vary
depending on the grant program applied to, the grant program and source of funding in the project
agreement, the characteristics of the project, and the characteristics of our organization.
7. Our organization further understands that prior to our authorized
representative/agent executing the project agreement(s), the RCO may make revisions to its sample
project agreement and that such revisions could include the indemnification, the waiver of
sovereign immunity, and the legal venue stipulation. Our organization accepts the legal obligation
that we shall, prior to execution of the project agreement(s), confer with our authorized
representative/agent as to any revisions to the project agreement from that of the sample project
agreement. We also acknowledge and accept that if our authorized representative/agent executes
the project agreement(s) with any such revisions, all terms and conditions of the executed project
agreement (including but not limited to the indemnification, the waiver of sovereign immunity,
and the legal venue stipulation) shall be conclusively deemed to be executed with our
authorization.
8. Any grant assistant received will be used for only direct eligible and
allowable costs that are reasonable and necessary to implement the project(s) referenced above.
9. Our organization acknowledges and warrants, after conferring with its legal
counsel, that no additional legal authorization beyond this authorization is required to make the
indemnification, the waiver of sovereign immunity (as may apply to Tribes), and the legal venue
stipulation substantially in form shown on the sample project agreement or as may be revised prior
to execution legally binding on our organization upon execution by our representative/agent.
10. [Recreation and Conservation Funding Board Grant Programs Only] If
match is required for the grant, we understand our organization must certify the availability of
match at least one month before funding approval. In addition, our organization understands it is
responsible for supporting all non-cash matching share commitments to this project should they
not materialize.
11. Our organization acknowledges that if it receives grant funds managed by
the Office, the Office will pay us on only a reimbursement basis. We understand reimbursement
basis means that we will only request payment from the Office after we incur grant eligible and
allowable costs and pay them. The Office may also determine an amount of retaining and hold
that amount until the Project is complete.
12. [Acquisition Projects Only] Our organization acknowledges that any
property acquired with grant assistance must be dedicated for the purposes of the grant in
perpetuity unless otherwise agreed to in writing by our organization and the Office. We agree to
dedicate the property in a signed “Deed of Right” for fee acquisitions, or an “Assignment of
Rights” for other than fee acquisitions (which documents will be based upon the Office’s standard
versions of those documents), to be recorded on the title of the property with the county auditor.
3
Park Renovations
13. [Acquisition Projects Only] Our organization acknowledges that any
property acquired in fee title must be immediately made available to the public unless otherwise
provided for in policy, the project agreement, or authorized in writing by the Office Director.
14. [Development, Renovation, Enhancement, and Restoration Projects Only –
If your organization owns the property] Our organization acknowledges that any property owned
by our organization that is developed, renovated, enhanced, or restored with grant assistance must
be dedicated for the purpose of the grant in perpetuity unless otherwise allowed by grant program
policy, or Office in writing and per the project agreement or an amendment thereto.
15. [Development, renovation, Enhancement, and Restoration Projects Only –
If your organization DOES NOT own the property] Our organization acknowledges that any
property not owned by our organization that is developed, renovated, enhanced, or restored with
grant assistance must be dedicated for the purpose of the grant as required by grant program
policies unless otherwise provided for per the project agreement or an amendment thereto.
16. [Only for Projects located in Water Resources Inventory Areas 1 – 19 that
are applying for funds from the Critical Habitat, Natural Areas, State Lands Restoration and
Enhancement, Riparian Protection, or Urban Wildlife Habitat grant categories; or the Puget
Sound Acquisition and Restoration program, or a Salmon Recovery Funding Board approved
grant] Our organization certifies the following: the Project does not conflict with the Puget Sound
Action Agenda developed by the Puget Sound Partnership under RCW 90.71.310.
17. This resolution/authorization is deemed to be part of the formal grant
application to the Office.
18. Our organization warrants and certifies, after conferring with its legal
counsel, that this resolution/authorization was properly and lawfully adopted following the
requirements of our organization and applicable laws and policies and that our organization has
full legal authority to commit our organization to the warranties, certifications, promises and
obligations set forth herein.
19. Severability. If any one or more sections, subsections, or sentences of this
Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of
the remaining portion of this Resolution and the same shall remain in full force and effect.
20. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
[Native American Tribes, Local Governments, and Nonprofit Organizations Only] This
application authorization was adopted by our organization during the meeting held:
Location_____________________________
Date________________________________
PASSED by the City Council the___________ day of ____________________, 2020.
[All Applicants] Signed and approved on behalf of the resolving body of the organization by the
following authorized member(s):
4
Park Renovations
_________________________________
ERIC YOUNGER, Council President
ATTEST: APPROVED AS TO FORM:
__________________________________ ________________________________
City Clerk ROGER A. LUBOVICH, City Attorney
Washington State Attorney General’s Office
Approved as to form_____________________________________________________________
Assistant Attorney General Date
R:\Legal\Legal\Resolutions\Legal\Park Improvements 2020.docx
20-1289, Dev, Bremerton City of
Haddon Neighborhood Park Renovation Project, RCO Grant Request: $500,000
BASICS
FUNDING
Costs
RCO $500,000 53%
Sponsor
Match $449,625 47%
Total $949,625 100%
Sponsor Match Breakdown
Appropriation -
Local $59,625
Force Acct - Labor $34,000
Grant - Local $6,000
Grant - RCO YAF $350,000
Total $449,625
Minimum match required
10.00%
DESCRIPTION
Haddon Park is an aging neighborhood park located on a 4-acre parcel which provides active and passive recreation
opportunities for neighborhood residents. The site contains a parking area, aging play equipment, non-accessible restroom,
non-accessible pathways and sports court and no picnic shelter. Currently no part of the park is ADA accessible. The park's
renovation is identified as a high priority in the 2020 adopted Parks, Recreation & Open Space Plan with the goal to provide the
neighborhood a safe, accessible and close-to-home place to recreate and play. This project will develop accessible pathways
throughout the site to access new park amenities including: children's playground, restroom, shelter, and enhanced multi-use
sports court. This project has been directly shaped by community involvement which has included an in-depth park needs
questionnaire mailed out to 980 residents living within a 10-minute walk of the park and public meetings conducted by the
Parks & Recreation Commission. The park is located in an underserved area which qualifies for a match reduction of 10%.
LOCATION
County, City, Water bodies
City Areas:Bremerton
County:Kitsap
METRICS/COSTS
DEVELOPMENT METRICS
Worksite: Haddon Park (#1)
COSTS
Project Factsheet Report
Page 1 of 8 05/27/2020
Category Work Type Estimated Cost Note
Buildings and Structures Construct / install restroom $196,800 Double occupancy
with
maintenance/storage
room
Cultural Resources Cultural resources $3,500
General Site
Improvements
Construct picnic shelter $54,500
Develop circulation paths or access
routes
$28,275
Install fencing/barriers $12,000
Install general site structures $25,000
Install signs/kiosk $3,200
Install site furnishings $25,500
Landscaping improvements $75,000
Parking and Roads Parking development $9,200
Permits Obtain permits $6,300
Play Areas Playground development $177,700
Site Preparation General site preparation $132,070 Includes safety
fencing, signs,
contractor surveying,
mobilization,
demolition, dumping
fees, clearing and
grubbing, temporary
erosion and
sedimentation
control, and fill
required to grade
accessible pathways.
Sport Courts Multi-purpose court development $37,500
Utilities Install power utilities $14,800
Install sewage system $5,000
Install stormwater system $7,500
Install water system $15,000
Subtotal:$828,845
Admin, Architecture, and
Engineering
$120,780
Total Estimate For Worksite:$949,625
METRICS
BUILDINGS AND STRUCTURES
Construct / install restroom
Total cost for Construct / install restroom
Number of restrooms
Select the restroom type
Provide the square feet of each restroom
GENERAL SITE IMPROVEMENTS
Construct picnic shelter
Total cost for Construct picnic shelter
$196,800
Note: Double occupancy with
maintenance/storage room
New: 0, Renov: 1
Restroom
216
$54,500
Project Factsheet
Page 2 of 8 05/27/2020
Number of group picnic shelters
Provide the square feet of each group picnic shelter
Select the picnic shelter amenities
Develop circulation paths or access routes
Total cost for development of circulation paths or access routes
Enter length of circulation paths and routes by surface type
Minimum width of the circulation paths or access routes
Lighting provided (yes/no)
Install fencing/barriers
Total cost for Install fencing/barriers
Select the fencing types
Linear feet of fencing/barriers installed
Number in feet of fence height
Select the barrier types
Install general site structures
Total cost for Install general site structures
Select one or more of the sheltered structures included in the project
Select one or more of the surface structures included in the project
Square feet of sheltered/surface structures
Length of retaining wall/seating wall (feet)
Install signs/kiosk
Total cost for Install signs/kiosk
Number of kiosks
Number of interpretive signs/displays
Number of permanent entrance signs
Number of electronic signs
Project involves installation of informational signs (yes/no)
Install site furnishings
Total cost for Install site furnishings
New: 1, Renov: 0
432
None
$28,275
Feet
Asphalt 350
Boardwalk 0
Concrete 0
Crushed rock 0
Recycled materials 0
Total 350
6
No
$12,000
Chain link fencing
Note: Vinyl-coated, color green
400
4
Bollards
$25,000
None
Retaining wall
0
60
$3,200
New: 0, Renov: 0
New: 1, Renov: 0
New: 0, Renov: 1
New: 0, Renov: 0
Yes
$25,500
Project Factsheet
Page 3 of 8 05/27/2020
Select the site furniture / amenities
Landscaping improvements
Total cost for Landscaping improvements
Acres of landscaped area
Select the landscape features
PARKING AND ROADS
Parking development
Total cost for Parking development
Number of vehicle parking stalls
Number of vehicle with trailer parking stalls
Number of accessible parking stalls
Select the parking surfaces
Select the parking enhancements
PLAY AREAS
Playground development
Total cost for Playground development
Number of play areas
Number of play structures/major components (slide set, swing set, etc.)
Number of climbing walls/rocks
Select the play area surface material type
Square feet of playgrounds
Benches
Bike racks
Drinking fountains
Pet waste bag
dispensers
Picnic tables
Recycling/Trash
receptacles
$75,000
3.00
Drainage
Grass/turf
Groundcover
Irrigation
Native vegetation
Trees/shrubs
$9,200
New: 0, Renov: 1
New: 0, Renov: 0
Number
Vehicle 1
Vehicle with trailers 0
Total 1
Asphalt
Catch basins
Curbs
Striping
Wheel stops
$177,700
New: 1, Renov: 0
New: 14, Renov: 0
New: 0, Renov: 0
Engineered wood
fiber
4,400
Project Factsheet
Page 4 of 8 05/27/2020
SITE PREPARATION
General site preparation
Total cost for General site preparation
Acres of site preparation
Number of trail miles for site preparation
Buildings / structures to be demolished
Select the site preparation activities
SPORT COURTS
Multi-purpose court development
Total cost for Multi-purpose court development
Select the surface types for multi-purpose courts
Select the multi-purpose court renovation elements
Select the recreational uses of multi-purpose courts
UTILITIES
Install power utilities
Total cost for Install power utilities
Select the power utilities
Install sewage system
Total cost for Install sewage system
Number of dump stations
$132,070
Note: Includes safety fencing,
signs, contractor surveying,
mobilization, demolition,
dumping fees, clearing and
grubbing, temporary erosion
and sedimentation control,
and fill required to grade
accessible pathways.
3.00
0.30
Restroom (1998), Playground
equipment (donated by Naval
Base Kitsap MWR in mid 1980's
prior to park development in
1998)
Demolition
General site prep
activities
Mobilization
Surveying
$37,500
Impervious
Add/upgrade court
amenities
Replace surface
Basketball
Note: Includes pickleball
$14,800
General service
connection
Power line
Relocate/bury power
utility
Transformers/panels
$5,000
New: 0, Renov: 0
Project Factsheet
Page 5 of 8 05/27/2020
Select the sewer utilities
Install stormwater system
Total cost for Install stormwater system
Select the stormwater utilities
Install water system
Total cost for Install water system
Select the water utilities
CULTURAL RESOURCES
Cultural resources
Total cost for Cultural resources
Acres surveyed for cultural resources
Number of trail miles surveyed for cultural resources
PERMITS
Obtain permits
Total cost to Obtain permits
Number of permits required for implementation of project
ARCHITECTURAL & ENGINEERING
Architectural & Engineering (A&E)
Total cost for Architectural & Engineering (A&E)
Total Development Cost $949,625
PERMITS
Permit Name Received Comment
Clear & Grade Permit No
Building Permit No
Archeological & Cultural Resoures (EO 05-05)No
Sewer connection
Sewer line
$7,500
Catch basins
Stormwater line
$15,000
Water line
Water meter
Water service
connection
Well
$3,500
3.10
0.30
$6,300
Optional
5
$120,780
Note: Includes construction
management support and
engineering support needed
during construction.
Project Factsheet
Page 6 of 8 05/27/2020
PROJECT PROPOSAL
PROPOSAL QUESTIONS
#1:Does this application contain state, federal or other grants as part of the "sponsor match"? If "yes," name the
grant(s) and date grant will be available.
Yes
A RCO Youth Athletic Facilities grant and a Bremerton Parks Foundation grant will be used
as sponsor match and will be available June 2021.
Project Factsheet
Page 7 of 8 05/27/2020
ATTACHMENTS
RELEVANT DOCUMENTS
File
Type Attachment Type Title
Site Plan: Development site
plan
Haddon Park Site Development Plan.pdf
Project Factsheet
Page 8 of 8 05/27/2020
20-1323, Dev, Bremerton City of
Haddon Park Sport Court & Restroom Improvements, RCO Grant Request: $350,000
BASICS
FUNDING
Costs
RCO $350,000 85%
Sponsor
Match $64,195 15%
Total $414,195 100%
Sponsor Match Breakdown
Appropriation -
Local $12,500
Force Acct - Labor $7,600
Grant - Private $6,000
Grant - RCO WWRP $38,095
Total $64,195
Minimum match required
10.00%
DESCRIPTION
Haddon Park is an aging neighborhood park located on a 4-acre parcel which provides active and passive recreation
opportunities for youth sports and neighborhood residents. The site contains a parking area, small non-accessible restroom,
and non-accessible pathways and sports court. Currently no part of the park is ADA accessible. The park's renovation is
identified as a high priority in the 2020 adopted Parks, Recreation & Open Space Plan with the goal to provide the
neighborhood a safe, accessible and close-to-home place to recreate and play. This project will develop accessible pathways
throughout the site to access new park amenities including a restroom and enhanced multi-use sports court. This project has
been directly shaped by community involvement which has included a park needs questionnaire mailed out to residents living
within a 10-minute walk of the park and public meetings conducted by the Parks & Recreation Commission. The park is located
in an underserved area which qualifies for a match reduction of 10%.
LOCATION
County, City, Water bodies
City Areas:Bremerton
County:Kitsap
METRICS/COSTS
DEVELOPMENT METRICS
Worksite: Haddon Park (#1)
COSTS
Project Factsheet Report
Page 1 of 11 05/27/2020
Category Work Type Estimated Cost Note
Buildings and Structures Construct / install restroom $196,800
Cultural Resources Cultural resources $3,300
General Site Improvements Develop circulation paths or access routes $14,750
Install signs/kiosk $3,200
Install site furnishings $14,800
Landscaping improvements $18,500
Parking and Roads Parking development $9,200
Permits Obtain permits $2,970
Site Preparation General site preparation $34,945 Estimate
includes
construction
safety fencing,
signage,
removal of
structures and
obstructions,
dumping
costs,
contractor
mobilization,
contractor
surveying,
clearing and
grubbing,
temporary
erosion and
sedimentation
control, and
fill needed for
grading
accessible
pathways.
Sport Courts Basketball court development $37,500
Utilities Install power utilities $14,500
Install sewage system $5,000
Install stormwater system $7,500
Install water system $15,000
Subtotal:$377,965
Admin, Architecture, and
Engineering
$36,230
Total Estimate For Worksite:$414,195
METRICS
BUILDINGS AND STRUCTURES
Construct / install restroom
Total cost for Construct / install restroom
Number of restrooms
Select the restroom type
Provide the square feet of each restroom
GENERAL SITE IMPROVEMENTS
Develop circulation paths or access routes
$196,800
New: 1, Renov: 0
Restroom
325 sf. with
maintenance/storage room
Project Factsheet
Page 2 of 11 05/27/2020
Total cost for development of circulation paths or access routes
Enter length of circulation paths and routes by surface type
Minimum width of the circulation paths or access routes
Lighting provided (yes/no)
Install signs/kiosk
Total cost for Install signs/kiosk
Number of kiosks
Number of interpretive signs/displays
Number of permanent entrance signs
Number of electronic signs
Project involves installation of informational signs (yes/no)
Install site furnishings
Total cost for Install site furnishings
Select the site furniture / amenities
Landscaping improvements
Total cost for Landscaping improvements
Acres of landscaped area
Select the landscape features
PARKING AND ROADS
Parking development
Total cost for Parking development
Number of vehicle parking stalls
Number of vehicle with trailer parking stalls
$14,750
Feet
Asphalt 175
Boardwalk 0
Concrete 0
Crushed rock 0
Recycled materials 0
Total 175
8
No
$3,200
New: 0, Renov: 0
New: 1, Renov: 0
New: 0, Renov: 1
New: 0, Renov: 0
Yes
$14,800
Benches
Bike racks
Drinking fountains
Pet waste bag
dispensers
Recycling/Trash
receptacles
$18,500
0.75
Drainage
Grass/turf
Groundcover
Irrigation
Native vegetation
Trees/shrubs
$9,200
New: 0, Renov: 1
New: 0, Renov: 0
Project Factsheet
Page 3 of 11 05/27/2020
Number of accessible parking stalls
Select the parking surfaces
Select the parking enhancements
SITE PREPARATION
General site preparation
Total cost for General site preparation
Acres of site preparation
Buildings / structures to be demolished
Select the site preparation activities
SPORT COURTS
Basketball court development
Total cost for Basketball court development
Number of basketball courts
Number of basketball courts with lighting
Surface types for basketball courts
Number
Vehicle 1
Total 1
Asphalt
Catch basins
Curbs
Striping
Wheel stops
$34,945
Note: Estimate includes
construction safety fencing,
signage, removal of structures
and obstructions, dumping
costs, contractor mobilization,
contractor surveying, clearing
and grubbing, temporary
erosion and sedimentation
control, and fill needed for
grading accessible pathways.
0.75
Restroom
Demolition
General site prep
activities
Mobilization
Surveying
Other
Note: Estimate includes
Temporary, Erosion and
Sedimentation Control
$37,500
New: 0, Renov: 1
New: 0, Renov: 0
Number
Impervious 1
Pervious 0
Total 1
Project Factsheet
Page 4 of 11 05/27/2020
Select the basketball court renovation elements
UTILITIES
Install power utilities
Total cost for Install power utilities
Select the power utilities
Install sewage system
Total cost for Install sewage system
Select the sewer utilities
Install stormwater system
Total cost for Install stormwater system
Select the stormwater utilities
Install water system
Total cost for Install water system
Select the water utilities
CULTURAL RESOURCES
Cultural resources
Total cost for Cultural resources
Acres surveyed for cultural resources
PERMITS
Obtain permits
Total cost to Obtain permits
ARCHITECTURAL & ENGINEERING
Architectural & Engineering (A&E)
Total cost for Architectural & Engineering (A&E)
Add/upgrade court
amenities
Replace surface
Note: Estimate includes
asphalt overlay, acrylic
coating and striping, and new
basketball standards.
$14,500
General service
connection
Relocate/bury power
utility
$5,000
Sewer connection
Sewer line
$7,500
Catch basins
Stormwater line
$15,000
Water line
Water meter
$3,300
1.00
$2,970
$36,230
Note: Estimate includes
construction management
support and engineering
support needed during
construction.
Project Factsheet
Page 5 of 11 05/27/2020
Total Development Cost $414,195
PERMITS
Permit Name Received Comment
Building Permit No
Archeological & Cultural Resoures (EO 05-05)No
PROJECT PROPOSAL
PROPOSAL QUESTIONS
#1:Does this application contain state, federal or other grants as part of the "sponsor match"? If "yes," name the
grant(s) and date grant will be available.
Yes
A RCO WWRP Local Parks grant; anticipated funding available Summer 2021.
EVALUATION CRITERIA QUESTIONS
#1:NEED AND NEED SATISFACTION What is the community’s need for the proposed youth athletic facility? To what
extent will the project satisfy the needs in the service area?
The Haddon Park renovation project is the result of an extensive community-based
planning effort led by City Staff with the help of the Bremerton Parks and Recreation
Commission. Beginning in 2018, the Parks & Recreation Department began updating the
Parks, Recreation & Open Space (PROS) Plan (adopted in February 2020) wherein Haddon
Parks' renovation was identified and recommended as a high priority. The PROS Plan was
developed over a 16-month period relying on public input from a variety of outreach
methods including a city-wide survey (soliciting responses on Bremerton's municipal
website, various social media outlets, flyers placed at strategic park locations along
popular walking paths and paper copies at various municipal locations) and 13 open
public meetings hosted by the Bremerton Parks & Recreation Commission. Based on this
extensive planning effort and priorities identified, the Haddon Park renovation project
(which has not seen a capital investment for over 22 years) was identified as being long
overdue and essential to serve the youth athletic needs of the community.
This renovation will improve the City's only outdoor full-court basketball facility in central
West Bremerton, a service area of approximately 31,000 residents. The current condition of
the park and court deters play due a cracked court, lack of striping, aged basketball
hoops, insufficient drinking fountain, substandard single-occupancy restroom, which is
rusted, non-accessible and hard to maintain due to its age and overall lack of
accessibility. (The restroom was re-sided in wood last year to cover the rusted metal frame
and improve the exterior appearance.) A new restroom, accessible upgrades and
renovated multi-sport court will provide the opportunity to develop new and expand
existing basketball and pickleball programs and will transform this outdated
neighborhood park into a vibrant welcoming place.
Project Factsheet
Page 6 of 11 05/27/2020
Bremerton's inventory of quality, accessible youth athletic facilities has limited the ability
of youth athletics programs to grow to meet the demands of its changing demographic.
Improvements to Bremerton's athletic facilities are needed to satisfy the community's
ever increasing demand to practice and play both traditional sports (e.g. basketball) as
well as others (e.g. pickleball) growing in popularity. The Parks and Recreation
Department has had difficulty expanding these uses due to lack of available quality
courts that also feature required amenities like adequate accessible restroom facilities,
accessible parking and pathways and appropriate court conditions.
The project addresses SCORP's priority towards helping low-income disadvantaged
communities. Haddon Park is located in a neighborhood which is generally characterized
by older housing stock and lower income residents, and the park is located four blocks
away from an officially designated Blighted Area, authorized by the Bremerton City
Council in 2003. By renovating this derelict park to provide close-to-home recreation
opportunities to youth without personal transportation it's estimated (based on other
park sites that have been renovated) that the recreational improvements to Haddon Park
will allow a 40-60% increase in participation. Haddon Park is located in the heart of
culturally diverse neighborhood where the majority of residents have no, or a very small,
yard and rely on Haddon Park for open space, recreating and social gathering. This
particular parcel of land with its central location, potential multitude of recreational
offerings and unparalleled potential for scenic beauty could be the crown jewel of the
neighborhood. These needed accessibility, restroom and multi-sport court improvements
will provide a place for pick-up and competitive practice for all ages, skills, incomes and
cultural groups withing a convenient walking distance of this under-served
neighborhood.
Lastly, this project also addresses SCORP priorities by removing the park's physical
barriers. Currently no part of Haddon Park is ADA accessible and while some of the current
site deficiencies may go unnoticed to a casual park user, to someone in a wheelchair they
are profoundly evident and significantly hinder one's enjoyment of the park. First off, the
slope of the accessible parking stall exceeds the maximum slope allowable, the pathway
from the parking lot to the park also exceeds the maximum cross slope allowable for an
accessible path, and the aging, rusted single-occupancy restroom is also not accessible;
all inequities that will be rectified by this project. Correcting these site deficiencies is
especially urgent in the community of Bremerton wherein the Bremerton School District
and local non-profit Holly Ridge Center serve more than 1,700 children ages 1-21 with
special needs due to the fact that Bremerton is one of five communities the Navy has
classified as an Exceptional Family Member (EFM) Program. This program allows military
families with children with special needs the ability to stay located in one place
throughout the duration of their child's education. The much-needed improvements
identified in the project will improve accessibility and recreational opportunities at
Haddon Park to promote health and wellness for all Bremerton residents, regardless of
ability.
Project Factsheet
Page 7 of 11 05/27/2020
#2:DESIGN AND COST ESTIMATE How well is the project designed? How reasonable are the cost estimates, do they
accurately reflect the scope of work, and are there enough funds to implement the proposed projects?
Based on public feedback and maintenance considerations the design organizes the site
features to achieve the following: make best use of available space; relocate new restroom
closer to activity areas; landscape slopes that are too steep to mow with drought-tolerant
vegetation; update automatic irrigation system to improve coverage and maintainability;
and resolve accessibility issues by removing all physical barriers from entering and using
park amenities to create a user-friendly, accessible park experience. In addition, the
project will resurface the basketball court and also stripe it for pickeball, a sport that has
been growing in popularity in our community for residents both young and old. The
design also includes installing an accessible path to the court, repaving the accessible
parking stall and pathways to meet current ADA standards and installing a new restroom
to serve the sport court patrons as well as those visiting the playground and proposed
shelter. The Haddon Park design was developed collaboratively with city staff throughout
multiple departments, taking into account environmental considerations, ADA standards,
and long-term maintenance.
The proposed project scope is financially feasible with the grant amount requested. Cost
estimates are realistic and are based on recent 2020 bids for similar types of work and
adjusted for 2023 costs. The Bremerton Parks & Recreation Department has successfully
completed several park renovation projects in the last decade ranging in scope from 200k
to 1.9M, and is well-versed in managing all the purchasing, permitting, regulatory, and
budgetary requirements for these types of capital projects. Current staff includes
experienced construction managers, cost estimators, a registered landscape architect and
a skilled maintenance-construction crew.
Project Factsheet
Page 8 of 11 05/27/2020
#3:SUSTAINABILITY Will the project result in a quality, sustainable, recreational opportunity while protecting the
integrity of the environment?
The Haddon Park renovation project will result in a quality, sustainable, recreation
opportunity while protecting the integrity of the environment in the following ways:
Install new restroom with water-efficient, low-flow toilets and sinks
Install new automatic irrigation system with controller & water-conserving spray
heads
Amend 0.25 acres with compost amended soils to: increase plant growth; reduce
erosion; increase infiltration; reduce pesticide and fertilizer inputs for plant
maintenance; and reduce peak summer irrigation needs.
Plant approximately 20 new trees providing shade, biodiversity and improved air
quality. Trees also play an important role in managing stormwater by capturing
and storing rainfall in the canopy and releasing water into the atmosphere through
evapotranspiration. Reducing runoff at this site is critical as stormwater is
discharged untreated into Phinney Bay just three blocks away.
Install dog bag dispensers to encourage dog owners to clean up pet waste, a health
hazard and water pollutant.
Renovating a neighborhood park within close proximity to residents comprised of
young families with children will provide recreational opportunities within walking
distance, thus decreasing greenhouse gas emissions from reduced vehicle usage.
Upon completion of the project, the Bremerton Parks & Recreation Department will
continue to protect the integrity of the environment of Haddon Park by following
sustainable maintenance practices.
#4:FACILITY MANAGEMENT Does the applicant have the ability to operate and maintain the facility?
Bremerton Parks & Recreation is a general fund department of the City of Bremerton and
is responsible for the long-term maintenance and operation of all city-owned athletic
facilities, parks and open space including Haddon Park. Parks Maintenance staff are
highly-qualified and experienced in maintaining park amenities and systems including
sports courts, restrooms, irrigation systems, turf management, trail and pathway
maintenance and janitorial duties. Recreation program staff manage athletic leagues for
youth and adults in softball, basketball and volleyball and program and administrative
staff schedule usage of city athletic facilities.
The current state of Haddon Park's aging infrastructure reflects a need for a larger capital
investment beyond on-going maintenance expenses. Past experience demonstrates that
upon renovation some maintenance needs (e.g. litter pick-up, restroom cleaning,
weeding, etc.) grow due to increased park use, however the overall cleaning, maintaning
and opeartion of the newly-modernized park becomes easier and more efficient. For
example, the new automatic-irrigation system will improve coverage eliminating over and
under-watered areas.
Project Factsheet
Page 9 of 11 05/27/2020
#5:AVAILABILITY When the project is complete, how often will it be available for competitive youth sports in a calendar
year?
Once renovated, access will not be restricted and the multi-use sports court at Haddon
Park will be available to the public seven days per week, 12 months per year from dawn to
dusk. Due to the increase in function (basketball and pickleball) we anticipate an increase
in use. Additionally, the parks’ ability to serve large youth athletic groups will be
significantly enhanced by replacing a substandard single-occupancy restroom with an
accessible double-occupancy facility and removing all physical barriers from accessing
the site.
Groups interested in scheduling use of the sport court for specific days/times will fill-out
an Athletic Facility Reservation form, available on-line and in person at the Sheridan Park
Community Center. Reservations from community youth groups will have the highest
priority. When not scheduled for use the multi-use sport court will be available on a first-
come, first-served basis.
#6:READINESS TO PROCEED What is the timeline for completing the project? Will the sponsor be able to complete the
project within 3 years?
Yes, the Haddon Park renovation project will be completed within 2-3 years of grant
award. The Bremerton Parks & Recreation Department has completed similar projects
recently and have the experience of a Registered Landscape Architect on staff to expedite
the design to 30% Construction Drawings in-house prior to the grant award. Upon grant
execution an A/E firm will be procured to take the 30% Construction Drawings through to
100% Bid Documents which are scheduled to be completed, along with securing permits,
by the end of 2021.
The construction contract will be awarded to the lowest, responsive, responsible bidder
and notice to proceed will be issued in Spring 2022 to take advantage of the start of the
dry construction season. Construction is expected to take 5-6 months with additional time
allowed for lawn establishment and landscaping installed by parks crew and volunteers.
The park's public dedication ceremony is expected to occur in Spring 2023.
#7:PROJECT SUPPORT AND PARTNERSHIPS To what extent do users and the public support the project?
The Haddon Park planning effort has actively engaged citizens by mailing out a survey to
over 980 residents living within a 10-minute walk of the park. Nearly 130 households filled
out the in-depth 2-page survey and answers to the 40 multiple choice questions were
supplemented by 945 written comments. The Haddon Park survey typically took 12-15
minutes to complete, totally over 26-32 hours of public feedback. The vast majority of
survey respondents stated that the park was substandard, needed improvements, and
that upgrading/improving Haddon Park was important to their family. The project also
has the support of the Bremerton Parks and Recreation Commission, Bremerton Beyond
Accessible Play Group and the Bremerton Parks Foundation who has pledged between
$6,000-$8,000 towards the project.
Project Factsheet
Page 10 of 11 05/27/2020
ATTACHMENTS
RELEVANT DOCUMENTS
File
Type Attachment Type Title
Site Plan: Development site
plan
Haddon Park Site Development Plan.pdf
Map: Athletic Facility Haddon Athletic Facility Map.pdf
Visuals Haddon Visuals.pdf
Project Factsheet
Page 11 of 11 05/27/2020
Haddon Park Site Development PlanSee Plan EnlargementFutureCommunityGardenLafayette Ave.Open LawnArea w/ NewShade TreesExisting PathNew Pathways Regraded for AccessibilityNew Tree Plantings under UtilitiesExisting Trees
Haddon Park Site Plan Enlargement (Rotated for legibility, with inspirational images)AccessibleRenovatedSports CourtChildren;s Playground w/ Retaining WallAccessible Pathway Connecting FeaturesPaved Accessible ParkingNew FencingPicnic Shelter & New Accessible PathwaysAccessible Parking & Entry PathwayExample of New Restroom & Drinking FountainExample of ShelterInterpretive SignageFuture Proposed Stairway Connection from Future SidewalkLandscaping to Stabilize SlopeExample of New Children’s Play AreaPicnicTablesBenchesBenchesNew RestroomShade TreesEntrySignageRenovated Multi-Sport Court
Haddon Neighborhood Park
Renovation Project
Proposed Improvements
Existing Conditions
Public Need: Service Area for Neighborhood Parks
Haddon Park
(10 min. walking
distance)
Matan Park
(0.3 acres)
Forest Ridge
Park (primarily
forested area)
Kiwanis Park
1.4 miles away
High Volume
Roadways
Public Need: Adopted Comprehensive Plan
Haddon Park
identified as a High Priority in
6-yr. Capital Facilities Plan
Plan Goals
•Continue updating/renovating older parks through
community engagement, grant opportunities and
partnerships.
•Continue to upgrade accessibility and play value of all city
parks and playgrounds.
•Continue to develop park perimeter trails, where feasible,
to encourage safe exercise walking opportunities within city
parks.
•Prepare Master Plan to guide site renovation including
parking, ADA pathways, new restroom, picnic shelter,
playground, basketball court and site furniture
•Plant trees to provide shade for park and playground areas
Public Need: Accessibility/Circulation Deficiencies
Parking
Restroo
m
Play
Area
Sports
Court
Lafayette Ave.Substandard, Non-accessible
Restroom
Non-accessible path from HC
parking stalls to park
Non-accessible Perimeter Path
Currently no part of the park is ADA accessible.
Public Need: Accessibility/Circulation Deficiencies
BB
Court
Substandard, Non-accessible
Site Furniture
Substandard, Non-accessible
Sports Court
Parking
Restroo
m
Play
Area
Sports
Court
Substandard Drinking FountainLafayette Ave.
Public Need: Accessibility/Circulation Deficiencies
BB
Court
Parking
Restroo
m
Play
Area
Sports
Court
Substandard, Non-accessible
Playground
Lack of Curbing & Ramp
Lack of ShelterLafayette Ave.
Project Scope
See Plan EnlargementFuture
Community
Garden
Lafayette Ave.Open Lawn
Area w/ New
Shade Trees
Existing
Path
New Pathways Regraded for
Accessibility
New Tree
Plantings under
Utilities
Existing Trees
Project Scope: Plan Enlargement
Accessible
Renovated
Sports Court Children;s Playground
w/ Retaining Wall
Accessible Pathway Connecting
Features
Paved Accessible Parking
New Fencing
Picnic Shelter &
New Accessible
Pathways
Accessible Parking &
Entry Pathway
Example of New Restroom &
Drinking Fountain Example of Shelter
Interpretive Signage
Future Proposed Stairway Connection
from Future Sidewalk
Landscaping to
Stabilize Slope
Example of New Children’s Play Area
Picnic
Tables
Benches
Benches
New Restroom
Shade
Trees
Entry
Signage
Renovated Multi-
Sport Court
Project Outreach & Support
Public Involvement/Outreach:
•Park Survey sent to 980 Households (13% Returned)
•Discussions with Individual Stakeholders
•Concept Plan Sign at park requesting feedback
•Interactive Website
•P&R Commission Approved Master Plan
Stakeholders/Potential Partners:
•Anderson Cove Neighborhood
•Parks and Recreation Commission
•Bremerton Beyond Accessible Group
•Charleston Baptist Church
•Bremerton Parks Foundation
•Kitsap Historical Society
•Service Clubs: Rotary, Kiwanis, Lions
17
Form Created 5/4/15
INFORMATION ONLY ITEM
CITY OF BREMERTON
CITY COUNCIL
SUBJECT:
Briefing on the Washington Resource
Inventory Area Kitsap Watershed Plan
Update
Study Session Date: July 8, 2020
Presenter: Teresa Smith
Phone: (360) 473-2347
SUMMARY:
The Streamflow Restoration Act (RCW 90.94) is a law passed in 2018 to help protect water
resources while providing water for families in rural Washington. The law directs local planning
groups in 15 watersheds to develop or update plans that offset potential impacts to instream flows
associated with new permit-exempt domestic water use. By legislative directive, the City of
Bremerton is a member of the WRIA 15 Kitsap Watershed Restoration and Enhancement
Committee. The Committee has been developing the watershed plan since October 2018, and aims
to finalize the plan for local review and approval by all participating members’ legislative bodies in
late 2020. All members must approve the plan prior to submitting the plan to Ecology for review and
adoption. The plan includes growth projections for new permit-exempt domestic wells, consumptive
water use estimates, and projects and actions that will offset impacts associated with new
consumptive water use.
HANDOUTS:
WRIA 15 Kitsap Watershed Restoration and Enhancement Committee Overview Brochure
STUDY SESSION AGENDA: ☐ No Presentation ☒ Full Presentation
A3
Water Resources Program
Publication 20-11-075 February 2020 Page 1
WRIA 15 Kitsap Watershed Restoration and
Enhancement Committee Overview
More information Visit the Streamflow Restoration webpage 1.
Contact information Stacy Vynne McKinstry Committee Chair Svyn461@ecy.wa.gov 425-649-7114
ADA accommodations To request ADA accommodation including materials in a format for the visually impaired, call Ecology at 360-407-6872 or visit ecology.wa.gov/accessibility. For TTY or Relay Service call 711 or 877-833-6341.
Background In January 2018, the Legislature passed the Streamflow Restoration law to help restore streamflow levels. Its purpose is to support robust, healthy, and sustainable salmon populations while providing water for homes in rural Washington. The law calls for local watershed planning and project implementation that improve streamflows. The Department of Ecology funds implementation through its competitive grant program2. Specifically, the law directs Ecology to convene Watershed Restoration and Enhancement Committees in eight watersheds surrounding Puget Sound. Each of these committees will develop a watershed restoration and enhancement plan (watershed plan). The plan must identify projects that: offset the potential impacts future permit-exempt domestic groundwater withdrawals will have on streamflows; and, provide a net ecological benefit 3 (NEB) to the Water Resource Inventory Area (WRIA). All members of the WRIA 15 Watershed Restoration and Enhancement Committee must approve the watershed plan prior to submitting its plan to Ecology for review. Ecology must complete its review by June 30, 2021. If it meets the requirements of the law and guidance, Ecology will adopt the plan.
1 https://ecology.wa.gov/StreamflowRestoration
2 https://ecology.wa.gov/StreamflowGrants
3 Final Guidance for Determining Net Ecological Benefit
https://fortress.wa.gov/ecy/publications/summarypages/1911079.html
Water Resources Program
Publication 20-11-075 February 2020 Page 2
Committee Membership The Streamflow Restoration law instructed Ecology to chair the WRIA 15 Watershed Restoration and Enhancement Committee 4 and invite entities in the watershed to participate, including tribal governments, county governments, city governments, Department of Fish and Wildlife, the largest non-municipal water purveyor, and interest groups. Local governments on the Committee selected organizations to represent agricultural interests, the residential construction industry, and environmental interests through a nomination process. The WRIA 15 Committee also added "ex officio" members, who were not listed in the law but provide valuable information and perspective. Members include: Skokomish Tribe Squaxin Island Tribe Suquamish Tribe Port Gamble S'Klallam Tribe Puyallup Tribe King County Kitsap County Mason County Pierce County City of Port Orchard City of Bremerton City of Gig Harbor City of Bainbridge
City of Poulsbo Washington Department of Ecology Washington Department of Fish and Wildlife Kitsap Public Utility District Kitsap Building Association, representing the residential construction industry Kitsap Conservation District, representing agricultural interests Great Peninsula Conservancy, representing environmental interests Mason-Kitsap Farm Bureau - ex officio member Washington Water Service - ex officio member
Approval Overview Ecology, the WRIA 15 Committee, and technical consultants have been developing the plan since October 2018. The Committee aims to finalize the plan for local review and Committee approval in late 2020 or early 2021. The law states that all members of the Committee must approve the plan prior to adoption. The law also requires that Ecology adopt the watershed plan by June 30, 2021, so Ecology must begin review of approved plans in early 2021. Committee members are expected to communicate frequently on Committee decisions and progress to their decision making bodies throughout the planning process. This includes thorough review and feedback of materials developed for the plan, such as technical memos and optional sections not required to be part of the plan. Ecology staff are available to support Committee members in preparing briefings, presentations, or other materials to ensure that decision making bodies are informed throughout the process and prepared to make a decision on the final plan. Reaching consensus on all plan components will be critical for final plan approval. Only plans approved by all members of the Committee will move forward for Ecology review.
4 https://www.ezview.wa.gov/site/alias__1962/37327/watershed_restoration_and_enhancement_-_wria_15.aspx
Water Resources Program
Publication 20-11-075 February 2020 Page 3
Steps to Completing the Plan
Step 1. Delineate Subbasins - Mid 2019 Divide the watershed into suitably sized areas that allow for meaningful analysis of the relationship between new consumptive water use and water offset projects.
Step 2. Project Growth of New Permit-Exempt Domestic Wells – Mid 2019 Estimate the number of new homes built between 2018 and 2038 that will rely on wells as their water source.
Step 3. Estimate New Consumptive Water Use – Late 2019 Estimate the consumptive water use associated with new permit-exempt domestic wells for each subbasin. The consumptive water use estimate includes the indoor household use and outdoor use to maintain a noncommercial lawn or garden.
Step 4. Identify Projects and Actions – Early 2020 Identify projects and actions that offset impacts associated with new consumptive water use. The Committee may, at their discretion, decide to include projects and actions that go above and beyond the minimum requirements as time and resources allow.
Step 5. Additional Plan Components (Not Required) – Mid 2020 The statute and the NEB guidance suggest other plan components for the Committee to consider. For example, adaptive management and a NEB evaluation of the plan.
Step 6. Plan Finalization and Committee Review – Mid 2020 Compile technical memos summarizing methods, data and results, and additional plan components previously reviewed by the Committee.
Step 7. Approve Plan and Submit to Ecology – Early 2021 The Committee must submit the locally approved watershed plan within a reasonable time (early first quarter 2021) for Ecology review prior to the adoption deadline of June 30, 2021.
Step 8. Ecology Review – Early 2021 Ecology will begin its review after the plan is formally approved by the Committee. If Ecology
adopts the plan by the statutory deadline of June 30, 2021, the planning process is
completed.
Step 9. If Needed: Plan Finalization and Rulemaking – After June 30, 2021 If the Committee does not approve the plan or if Ecology determines that a locally approved plan does not meet the law’s requirements prior to June 30, 2021, then Ecology is required to finalize the plan and begin a rulemaking process. Per the statute, Ecology will prepare a draft plan to submit to the Salmon Recovery Funding Board (SRFB) and request that the SRFB provide a technical review and recommendations to amend the final draft plan, if necessary, to result in a net ecological benefit to instream resources within the WRIA. Ecology will then consider the recommendations and finalize the plan. After adoption of the final plan, Ecology must initiate rule making within six months to incorporate recommendations into rules adopted under 90.94, 90.22 or 90.54 RCW. Ecology then has two years to adopt amended rules.
Water Resources Program
Publication 20-11-075 February 2020 Page 4
Timeline for Watershed Planning Process
2018 / Early 2019 Mid 2019 Late 2019 Early 2020 Mid 2020
The beginning Steps 1 & 2 Step 3 Step 4 Step 5
· Law is passed
· Committees are formed
· Agreement on
operating principles
· Delineate subbasins
· Project growth of new
permit-exempt
domestic wells
· Estimate new
consumptive water use
· Identify projects and
actions
· Consider Additional Plan
Components
(Not Required)
Late 2020 Early 2021 Early 2021 After June 30, 2021
Step 6 Step 7 Step 8 Step 9
· Plan Finalization and
Committee Review
· Local and Commitee
Plan Approval
· Submit approved plan to
Ecology in early
Quarter 1 of 2021
If approved, Ecology:
· Reviews and makes NEB
determination
· Adopts plan, if meets
requirements of law
and guidance, by June
30, 2021
If plan is not adopted, Ecology:
· Prepares plan
· Submits plan to SRFB for technical review and
recommendations
· Finalizes and adopts plan
· Initiates rulemaking
Water Resource Inventory Area 15 (WRIA 15)
Watershed Plan
Teresa Smith, Environmental Technician, PW&U-Water Resources
Allison Satter, Senior Planner (Long-range), DCD
•RCW 90.94 –Streamflow Restoration Act
•Creates Watershed Restoration and Enhancement Committees to develop watershed plans to offset potential impacts of future permit-exempt domestic water use on instream resources.
•Mandates that watershed plans must be adopted by June 30, 2021.
Plan Goal
Identify projects and actions that will measure, protect, and
enhance instream resources.
•Projects and actions must offset potential impacts to instream flows
from permit-exempt domestic water use
•Examples:
•Develop natural & constructed infrastructure
•Floodplain restoration
•Off-channel storage
•Aquifer recharge
•Acquire senior water rights
•Water conservation
•Water reuse
•Stream gauging
•Groundwater monitoring
Timeline for Watershed Planning Process
2018 –Agreement on operating principles
2019 –Subbasin delineation, growth projections, & water use estimates for new permit-exempt wells
2020 –Identify projects and actions to offset water use & draft plan
Late 2020 –Plan finalization, committee review, and local plan approval
Early 2021 –Submit approved plan to Ecology for Net Ecological Benefit determination
Subbasins
and
Potential Growth
of Permit -Exempt
Wells
Growth Scenario
(2020-2040)
Consumptive Use Range
(gallons per minute)
Low Growth 217-415
Medium Growth 248-475
High Growth 275-525
Consumptive Use Estimates
(Projects & actions in the watershed plan
need to offset this amount of water.)
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Proposed Public Hearing and
Resolution No.____ Adopting the 2021 –
2026 Six Year Transportation Improvement
Program
Study Session Date: July 8, 2020
COUNCIL MEETING Date: July 15, 2020
Department: PW&U
Presenter: Shane Weber
Phone: (360) 473-2354
SUMMARY: The Six-Year Transportation Improvement Program (TIP) is prepared pursuant to RCW
35.77.010. The TIP is updated annually and filed with the Puget Sound Regional Council (PSRC)
and Washington State Department of Transportation (WSDOT). It is intended as a planning tool for
the local, State and Federal transportation funding entities. The TIP has been prepared for City
Council approval by Resolution prior to submittal to PSRC and WSDOT. This TIP is consistent with
Bremerton’s Comprehensive and Non-Motorized Transportation Plans.
ATTACHMENTS: 1) 2021 – 2026 Six Year City TIP Projects Summary Updated;
2) Resolution No. _____
3) List of Project Changes From Previous Year’s TIP Added
FISCAL IMPACTS (Include Budgeted Amount): Annual adoption of a six-year TIP is required by
State law, and is necessary to receive certain State and Federal Transportation funds.
STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation
STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☒ Public Hearing
RECOMMENDED MOTION:
Move to approve Resolution No. _____, which approves the City’s 2021 – 2026 Six-Year
Transportation Improvement Program; and allow the Mayor to forward the Resolution and Plan to the
Puget Sound Regional Council and Washington Department of Transportation.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 01/02/2018
A4
2021 2022 2023 2024 2025 2026Six-Year Period TotalPROPOSED TRANSPORTATION IMPROVEMENT PROGRAM2021-2026Tier 1City Safety Improvement160,000 160,000 160,000 160,000160,000 160,000TR00066960,000Signal System Upgrades100,000 100,000 100,000 100,000100,000 100,000TR00068600,000PSE Power Pole Relocation5,000 5,000 5,000 5,0005,000 5,000TR0007530,000Trash Cans and Benches15,000 15,000 15,000 15,00015,000 15,000TR0007690,000Traffic Signal Retiming Annual Plan20,000 20,000 20,000 20,00020,000 20,000TR00098120,000City Street Lighting35,000 35,000 35,000 35,00035,000 35,000TR00105210,000Streets Preservation and Maintenance Program900,000 750,000 750,000 750,000750,000 750,000TR001394,650,000Signage and Pavement Marking Maintenance170,000 170,000 170,000 170,000170,000 170,000TR001421,020,000Sidewalk Program570,000 600,000 600,000 600,000600,000 600,000TR001433,570,000Bridge Inspection and Repair Program10,000 - 10,000 10,000- -TR0014430,000Transportation Comprehensive Plan Development500,000 100,000 100,000 -- -TR00146700,000E11th Street and Perry Avenue Reconstruction4,957,813 - - -- -TR000014,957,8136th Street Phase I- - - -- -TR00003-6th Street Phase II1,440,440 - - -- -TR000041,440,4406th Street Phase III- - 325,000 -1,885,000 -TR000052,210,000Washington Avenue Roundabout337,500 4,225,000 - -- -TR000064,562,500HSIP III-Kitsap Way Bike Lane/Warren Signal2,240,000 - - -- -TR000112,240,000Kitsap Lake Elementary (SRST)100,000 - - -- -TR00012100,000 Traffic Model Development/Corridor Capacity and Signal Op;miza;on Study20,000 - - -- -TR0003820,000Downtown Bike Improvements- - - -- -TR00049-Washington Avenue Sidewalk Construction - Towers Dev Agmt 145,000 - - -- -TR00057145,000Bremerton School Zone Safety Improvements (SRTS) 200,000 - - -- -TR00062200,000Wayfinding Signage80,000 - - -- -TR0006480,000Austin Drive Bike/Ped Street Markings150,000 - - -- -TR00083150,000Non-Motorized Transportation Plan Update- 80,000 - -- -TR0009280,000Belfair Valley Road Subgrade Repair & Overlay150,000 150,000 200,000 -- -TR00151500,000$12,305,753 $6,410,000 $2,490,000 $1,865,000$3,740,000 $1,855,000 $28,665,753Tier 1Subtotal Tier 2Systemic Pedestrian Treatments Bundle - Rectangular Rapid Flashing Beacons 72,000 72,000 705,000 -- -TR00149849,000Quincy Square on 4th Street100,000 3,930,000 - -- -TR000024,030,000Naval Avenue Road Diet400,000 6,000,000 - -- -TR000106,400,000Oyster Bay Avenue Improvements- - - 600,000- 4,000,000TR000204,600,000SR 303 Warren Ave Bridge Pedestrian Improvements 750,000 600,000 14,200,000 -- -TR0002915,550,000View Ridge Elementary (SRTS)- 250,000 250,000 -2,500,000 -TR000433,000,000Ricky Road - Street Light Construction- - - -200,000 -TR00060200,000Werner Road - Signal Improvements and Widening- - - 350,000- 350,000TR00065700,0006/29/2020Page 1 of 4
2021 2022 2023 2024 2025 2026Six-Year Period TotalPROPOSED TRANSPORTATION IMPROVEMENT PROGRAM2021-2026Burwell Street Adaptive Signals- 168,250 168,250 -1,910,100 -TR000712,246,600West Kitsap Way Reconstruction/Rechannelization- - 303,000 -303,000 700,000TR000961,306,000Cross-SKIA Connector and Lake Flora Road - New intersection - 185,000 - -- -TR00130185,000Sinclair / Union Intersection Improvements- - - -- 250,000TR00148250,00011th Street / Callow Avenue Intersection Improvements 60,000 100,000 600,000 -- -TR00150760,000$1,382,000 $11,305,250 $16,226,250 $950,000$4,913,100 $5,300,000 $40,076,600Tier 2Subtotal Tier 3Green Standard Pedestrian Improvements- - - -- -TR00113-Green Standard Bicycle Improvements- - - -- -TR00114-Yellow Standard Pedestrian Improvements- - - -- -TR00115-Yellow Standard Bicycle Improvements- - - -- -TR00116-Area B Collector Road- - - -- -TR00117-Area C Collector Road- - - -- -TR00118-Area D Collector Road- - - -- -TR00119-Area F Collector Road- - - -- -TR00120-Area G Collector Road- - - -- -TR00121-Local Access Projects - 5.64 miles of local access road- - - -- -TR00122-11th Street Reconstruction- - - -- -TR00007-SR-303 Olympic College Frontage- - - -- -TR00013-Warren Avenue Pedestrian Overpass/Underpass- - - -- -TR00014-Sheridan Reconstruction- - - -- -TR00015-Sylvan Reconstruction- - - -- -TR00016-Pine Road Construction- - - -- -TR00017-Improve Shorewood Drive through the NAD Park to Jackson Park - - - -- -TR00022-Shore Drive Shared Use Path (Planning)- - - -- -TR00023-East/West Corridor Diet (6th or 11th or Couplet)- - - -- -TR00024-National Avenue Reconstruction- - - -- -TR00026-North/South Corridor Bike/Ped Backbone Improvements- - - -- -TR00027-E. Bremerton Shared Use Path- - - -- -TR00028-Marine Drive NMT Improvements- - - -- -TR00030-Auto Center Way Multimodal Conversion- - - -- -TR00031-Tracyton Beach Drive Improvements- - - -- -TR00032-Intelligent Transportation Systems (ITS) Program- - - -- -TR00033-Arsenal Way/Patton Ave Safety Improvements- - - -- -TR00034-15th and Corbett Intersection Improvements- - - -- -TR00035-SR 303 Corridor Improvements- - - -- -TR00036-Crownhill Elementary (SRTS) Phase II- - - -- -TR00039-6/29/2020Page 2 of 4
2021 2022 2023 2024 2025 2026Six-Year Period TotalPROPOSED TRANSPORTATION IMPROVEMENT PROGRAM2021-2026Mountain View Middle School (SRTS)- - - -- -TR00040-Armin Jahr Elementary (SRTS)- - - -- -TR00041-Naval Avenue Elementary (SRTS)- - - -- -TR00044-State Street Pedestrian Corridor Improvement- - - -- -TR00046-Gorst Sinclair Trail (Planning)- - - -- -TR00047-Dockside Access Way (Planning)- - - -- -TR00048-Riddell Road Sidewalk Improvement- - - -- -TR00053-Anderson Cove Sidewalks- - - -- -TR00055-Matan & Lillian & James Sidewalk Connector- - - -- -TR00056-Pine Road - Street Light Construction- - - -- -TR00061-Washington Avenue Lower Sidewalks- - - -- -TR00063-PSNS Main Entrance - - - -- -TR00074-Bridge to Bridge Trail Wayfinding- - - -- -TR00085-Downtown Circulation Study- - - -- -TR00088-Manette Traffic Circulation Study- - - -- -TR00089-Belfair Valley Road Shoulder Widening for Multimodal- - - -- -TR00095-West Belfair Valley Road Reconstruction- - - -- -TR00097-STEM Academy (National/Arsenal) SRTS- - - -- -TR00100-4th Street Landscaping Replacement/Sidewalk Repair- - - -- -TR00102-Warren Avenue - extended left turn pocket- - - -- -TR00103-Hospital District Street Improvements; Callahan, Cherry, Wheaton - - - -- -TR00106-Sidewalk Improvement (Wheaton Way at Callahan)- - - -- -TR00108-Repair Downtown Street Standard Banner Supports- - - -- -TR00109-Kitsap Lake Vicinity Ped/Bike Improvements- - - -- -TR00110-Marine Drive LOS Improvements at Kitsap Way- - - -- -TR00111-Warren Avenue Intersection LOS Improvements- - - -- -TR00112-SR 3/Imperial Way - signalize intersection, modify approaches - - - -- -TR00123-SR 3/Sunnyslope Road - signalize intersection, modify approaches - - - -- -TR00124-SR 3/SR 16/Sam Christopherson Ave - grade separation- - - -- -TR00125-Old Clifton Road/SR 16 Eastbound Ramps - Signalize intersection - - - -- -TR00126-Old Clifton Road/SR 16 Westbound Ramps - Signalize intersection - - - -- -TR00127-Analysis Area C and SR 3 - New intersection- - - -- -TR00128-Analysis Area C/D and Lake Flora Road - New intersection- - - -- -TR00129-Cross-SKIA Connector/ Analysis Area B/ SR 3 - New intersection - - - -- -TR00131-SR 3 Widening - Widening from Imperial Way to Gorst- - - -- -TR00132-Lake Flora Widening- - - -- -TR00133-Belfair Bypass - 2-lane divided highway- - - -- -TR00134-6/29/2020Page 3 of 4
2021 2022 2023 2024 2025 2026Six-Year Period TotalPROPOSED TRANSPORTATION IMPROVEMENT PROGRAM2021-2026Trails-12 miles of trails- - - -- -TR00135-Lower Wheaton Way Reconstruction (Lebo to Sheridan)- - - -- -TR00136-- - - -- - -Tier 3Subtotal Grand Total13,687,753 $17,715,250 $18,716,250 $2,815,000$8,653,100 $7,155,000 $68,742,3536/29/2020Page 4 of 4
Page 1 of 1
Resolution Six Year Transportation Improvement Program
Rev. 10/2019
RESOLUTION NO. ________
A RESOLUTION of the City Council of the City of
Bremerton, Washington, adopting the 2021 – 2026 Six Year
Transportation Improvement Program.
WHEREAS, after proper notice, the City Council of the City of Bremerton held a
public hearing at the regular meeting of the City Council at 5:30 p.m. on July 15, 2020 to
consider public testimony on the City’s proposed 2021 - 2026 Six Year Transportation
Improvement Program and, having considered public testimony to the Program and in
accordance with the provisions of RCW 35.77.010; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The 2021 through 2026 Six Year Transportation Improvement
Program, set forth in Exhibit “A” attached hereto and herewith filed with the City Clerk, is
hereby adopted.
SECTION 2. Severability. If any one or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect.
SECTION 3. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
PASSED by the City Council of the City of Bremerton, Washington this _____
day of __________________, 20____.
ERIC YOUNGER, Council President
APPROVED AS TO FORM: ATTEST:
ROGER A. LUBOVICH, City Attorney ANGELA HOOVER, City Clerk
R:\Legal\Legal\Forms\FORMS ON COBWEB\Resolution Rev. 10 2019.doc
City of Bremerton
2021-2026 Transportation Improvement Program Overview
This section provides an overview of the changes from the previous 6-year project list (2020-2025) to this
year’s 6-year project list (2021-2026). Projects were generally not removed; however, the list was reduced
significantly due to consolidation listed below. Other major changes include adding project tiers to support
transportation planning and facilitate program funding communication. These changes are described below:
Project Tiers
Each project or program was assigned one of three tiers. The tiers are defined as follows:
· Tier 1 – Fully funded projects
· Tier 2 – Partially funded projects AND prospective grant funded projects (i.e. projects submitted for
grant funding that are reasonably expected)
· Tier 3 – unfunded projects
Removed/Added/Other Changes
1. Removed and consolidated projects with redundant scopes or program;
2. Removed completed projects;
3. Added or adjusted projects to be consistent with the Comprehensive Plan;
4. Added newly funded projects;
5. Added projects with prospective grant funding;
Projects Removed: TIP ID Comments
Gateway Landscaping Materials TR00072 Project Complete in 2020
Street Light Illumination over/on Signal
Stantions
TR00059 Combined with TR00105 City
Street Lighting
ADA Sidewalk Improvements TR00050 Combined with Project
#TR00143 Sidewalk Program
Annual General Maintenance and
Operations Costs
TR00138 Combined with #TR00139
Streets Preservation and
Maintenance Program
Downtown Bike Facilities TR00049 Project Complete in 2020
Navy Commuter Master Plan TR00037 Combined with TR00146
Transportation Comprehensive
Plan Development
Paint & Refurbish 30 Street Lights TR00058 Combined with Maintenance
items.
Sidewalk Abatement (BMC 11.08.090) TR00051 Combined with TR00143
Sidewalk Program
Sidewalk In-fill Program TR00052 Combined with TR00143
Sidewalk Program
Streets Electrical Cabinet Replacement
Program
TR00067 Combined with TR00105 City
Street Lighting
Traffic Calming TR00082 Combined with TR00066 City
Safety Improvement
Traffic Sign Replacement –
Retroreflective Requirements
TR00093 Combined with TR00142 Signage
and Pavement Marking
Maintenance
Projects Added: TIP ID Comments
Streets Preservation and Maintenance
Program
TR00139 Combines multiple projects for
roadway maintenance and
preservation into one program
item.
Signage and Pavement Marking
Maintenance
TR00142 Combines all traffic control
device maintenance into one
program.
Sidewalk Program TR00143 Combines multiple projects into
one sidewalk program
Bridge Inspection and Repair Program TR00144 Adds the City’s bridge into the
TIP.
Transportation Comprehensive Plan
Development
TR00146 Project to update the
Transportation Element of the
Comprehensive Plan and other
transportation planning studies.
Belfair Valley Road Subgrade Repair and
Overlay
TR00151 New safety project to address
settlement areas on Belfair
Valley Road.
Systemic Pedestrian Treatments Bundle
– Rectangular Rapid Flashing Beacon
TR00149 Potential 2020 HSIP Grant
project. Project addresses
pedestrian safety issues on
Sylvan, 13th and other locations
in the City to be determined.
Sinclair / Union Intersection
Improvements
TR00148 Provides intersection capacity
improvements at Sinclair / Union
due to new Wright Creek
Development. Developer
provided mitigation.
11th Street / Callow Avenue Intersection
Improvements
TR00150 Potential 2020 HSIP Grant
project. Addresses safety issues
at 11th Street and Callow.
RCW 35.77.010 requires municipalities to adopt a 6-
year Transportation Improvement Plan:
•Needs to be consistent with Comprehensive Plan
•Needs to be filed with WSDOT/PSRC by August 1st
Annually,
•Must include all Capital projects
•Inclusion on the TIP allows for pursuit of grant
funding
•Format revised, added “tiers” for clarity
•Tier 1 –Fully funded project
•Tier 2 –Partially funded or prospective grant project
•Tier 3 –Unfunded project
•Removed projects that are complete or expect
to be complete this year
•Projects added to better align with the
Comprehensive Plan
•Consolidated projects with like scope and
overlapping limits