Loading...
HomeMy WebLinkAbout07/10/2019 SPECIAL MEETING & STUDY SESSION______________________________________________________________ CITY COUNCIL 345 6th Street, Suite 100, Bremerton, WA 98337 Phone (360) 473-5280 JULY 10, 2019 CITY COUNCIL STUDY SESSION COUNCIL CONFERENCE ROOM 603 The Study Session is open to the public, but there will be no opportunities for input or participation; no action is anticipated; and the content of these items is subject to change. If approved by Council, the items will be placed on the July 17, 2019 Council Meeting Agenda: A.SPECIAL MEETING - 4:30 PM Presentation on AWC "Legislative Priorities & Process" with Peter B. King, Chief Executive Officer; and Candice Bock, Director of Government Relation with the Association of Washington Cities (AWC) B.BRIEFINGS ON AGENDA ITEMS - 5:15 PM 1.Confirm Appointment of Beverly Kincaid to the Civil Service Commission 2.Purchase Agreement with Trebron Company, Inc. to Upgrade the SOPHOS Firewall and Renew the License 3.Interlocal Agreement with Mason County and the Port of Bremerton for Design Oversight of the Puget Sound Industrial Center - Bremerton to Belfair Sewer Connection Project 4.Local Agency Professional Services Cost Plus Fixed Fee Consultant Agreement with SCJ Alliance, Inc. for Design of Kitsap Way (SR310) & Warren Avenue (SR303) Traffic Signal and Multimodal Safety Project 5.Proposed Public Hearing and Resolution adopting the 2020 – 2025 Six-Year Transportation Improvement Plan 6.Resolution placing the Continuation of the Emergency Medical Care & Service Tax Levy for a Six (6) year period on the November 5, 2019 General Election Ballot C.GENERAL COUNCIL BUSINESS o Other General Council Business D.ADJOURNMENT OF STUDY SESSION Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations should contact the City Clerk’s Office at (360) 473-5323 at least 24 hours prior to the meeting. Form Created 5/4/15 INFORMATION ONLY ITEM CITY OF BREMERTON CITY COUNCIL SUBJECT: Presentation on the Association of Washington Cities (AWC) “Legislative Priorities & Process” Special Meeting Date: July 10, 2019 Presenter: Peter B. King, CEO Candice Bock, Govt. Relations Director Phone: (800) 562-8981 SUMMARY: A presentation will be provided on the various outcomes of the 2019 Legislative Session; and the process for establishing the 2020 Legislative Priorities will also be discussed. HANDOUTS: 1) 2019 AWC Legislative Session City Priorities & Outcomes 2) 2020 AWC Legislative Priorities Committee Process Overview 3) AWC Legislative Priorities Committee Roster STUDY SESSION AGENDA: ☐ No Presentation ☒ Full Presentation A1 Invest in affordable housing PRO – Invested $175 million in the Housing Trust Fund, a significant increase from the previous biennium for this critical housing program. PRO – Created a $26 million annual local government revenue sharing tool (HB 1406). PRO – Passed HB 1923, a voluntary and incentive-based proposal to promote urban density and infill. PRO – Extended local authority to use REET for affordable housing (HB 1219). PRO – Passed SB 5334, condominium liability reform to remove barriers to this housing option. PRO – Funded a study of shared housing opportunities. CON – Failed to pass a $1.5 million annual sales tax reinvestment program for multifamily housing (HB 1938). CON – Failed to authorize smaller cities to use the multifamily tax exemption program (SB 5366). Fund a systems approach to correct fish- blocking culverts PRO – Funded the Fish Barrier Removal Board (FBRB) at $26.5 million. While significantly less than the $50 million requested, this funding exceeds that of the last biennium and will allow the FBRB to continue to make progress on a coordinated, watershed approach for local and state-owned culvert corrections. Support economic development tools to encourage job creation and economic growth PRO – Passed SB 5511, creating new tools and resources for expanding broadband access in unserved areas of the state. CON – Failed to pass SB 5564 for a new infrastructure financing tool to support economic development. Keep the Public Works Trust Fund in working order PRO – Passed a capital budget that funds $95 million in project loans for the Public Works Trust Fund. CON – Continued diversions from the PWTF, including a $160 million transfer to the Education Legacy Account and $21.5 million for a new statewide broadband program. CON – Revised statutory allocation amounts from graduated state REET in SB 5998, effectively capping the distribution amounts instead of allowing them to grow as a proportional share of the increase in REET to rebuild the PWTF. CON – Failed to pass proposals to end revenue diversions and restore funding to the PWTF: • HB 1680 / SB 5952 to restore funding for housing infrastructure • HB 1691 to restore funding for culverts • SB 5788 to restore funding for both housing infrastructure and culverts Candice Bock Director of Government Relations candiceb@awcnet.org • 360.753.4137 01/15/19 Contact: Association of Washington Cities • 1076 Franklin St SE, Olympia, WA 98501 • 1.800.562.8981 • wacities.org Legislative Session2019City Priorities - Outcomes more outcomes on back The 2019 Legislature took action on AWC’s priorities this session, with pros and cons for cities. Candice Bock Director of Government Relations candiceb@awcnet.org • 360.753.4137 01/15/19 Contact: Association of Washington Cities • 1076 Franklin St SE, Olympia, WA 98501 • 1.800.562.8981 • wacities.org PRO – Directed the Washington State Department of Transportation, in complying with a federal court-ordered injunction, to coordinate with the FBRB to maximize habitat improvements by replacing both state and local culverts based on a watershed approach. CON – Did not establish a permanent framework to address all fish-blocking culverts. Although proviso language to ensure a robust plan to address local culverts was proposed, it was not adopted. Provide responsive funding for the Criminal Justice Training Commission (CJTC) PRO – Funded 19 Basic Law Enforcement Academy (BLEA) classes per year, as requested. In addition, funded seven Corrections Officer Academy classes in the first year of the biennium and six in the second year. CON – Failed to pass a proposal to reduce the maximum BLEA wait time from six months to two months (HB 1253/SB 5944). Address a failing behavioral health system PRO – Passed SB 5444, the Trueblood bill that establishes forensic navigators to assist individuals referred for a competency evaluation and help coordinate community services for individuals ordered to receive outpatient competency restoration. PRO – Funded the co-response program to provide a mental health professional to assist law enforcement; $3 million to implement the program in underserved areas and $1 million to support existing programs. PRO – Passed HB 1767, creating a grant program administered through the Washington Association of Sheriffs and Police Chiefs to help identify individuals with substance use disorders and other behavioral health needs at the time of arrest or incarceration, and engage those persons with therapeutic interventions and other services. Provided $2.2 million dollars in funding. PRO – Passed SB 5380 to provide a statewide approach to the Opioid Use Disorder (OUD). CON – Failed to provide funding for jails to provide Medically Assisted Treatment (MAT) services for persons suffering from OUD. Other outcomes: State shared revenues and city finances PRO – Fully funded state shared revenues for Liquor Profits, Liquor Taxes, Municipal Criminal Justice Assistance, Fire Insurance Premium Taxes, City-County (6050) Assistance, and Streamlined Sales Tax (SST) Mitigation. PRO – Funded continued SST mitigation for jurisdictions most negatively impacted after October 2019. PRO – Passed SB 5581 aligning the Department of Revenue’s regulatory changes with the United States Supreme Court’s decision in South Dakota v. Wayfair, increasing sales tax revenues for the state and cities. PRO – Passed a Model Toxics Control Act reform bill (SB 5993), creating a $63 million per biennium in dedicated funding for local stormwater assistance; the bill also stabilizes the funding source and provides more resources for toxic cleanup sites. PRO – Passed HB 1667, making public record grant and technical assistance programs permanent. PRO – Created greater public works contracting flexibility by raising bid limits for cities (SB 5418). CON – Funded Marijuana Excise Tax distributions at last biennium’s level of $30 million, instead of planned increase to $40 million when distribution allocations were established in 2015. CON – Transferred $300 million from the LEOFF 2 pension account to the Benefits Improvement Account to fund new, increased pension benefits at the expense of funding current benefits (HB 2144). 2020 Legislative Priorities Committee Process Overview The major focus for the Legislative Priorities Committee is to identify AWC’s legislative priorities for 2020. The Committee will vet an array of issues and provide guidance that will help direct AWC’s approach and position on a larger list of issues beyond just those selected as priorities. AWC’s Legislative Priorities Committee met on June 27, 2019 to kick off the process of identifying issues to consider for inclusion in AWC’s 2020 legislative agenda. The Committee will break into subcommittees that will meet during July and August to further identify and vet issues. The subcommittees will make recommendations to the full Committee for consideration. The full Committee will consider those recommendations at a meeting on September 5, 2019 where the Committee will vote on recommendations to forward to the AWC Board of Directors for consideration at their September 27 meeting. Committee members are encouraged to solicit and collect potential legislative agenda items from their cities and fellow city colleagues. AWC staff will also solicit ideas for consideration from the Large City Advisory Committee, Small City Advisory Committee, affiliate organizations, and AWC members via requests in the Legislative Bulletin. The 2020 session will be a short, 60-day session in an election year when the Legislature will only consider supplemental budgets. That means that AWC will want to keep our agenda realistic and consider this an opportunity to make some headway while laying the foundation for the 2021 session. As we begin this year’s process, it may be helpful to review the following categories that AWC has historically used when developing our legislative agenda. Priority Issues These are the issues the committee believes should be major priorities for AWC during the session. Staff would be expected to draft legislation, find sponsors, coordinate lobbying efforts, testify at hearings, and work very hard to secure passage. These issues might be distinguished from the “Other Significant Issues” category because they would affect a significant number of cities, would have a major impact on cities, or would require substantial effort to secure passage. Other Significant Issues These are important issues for cities that the committee recommends be part of the active legislative program for AWC. However, they are issues that do not rise to the level of importance of the “Major Priority Issues.” This could be because the issues may not affect as many cities or the impacts would not be as significant. Staff would potentially draft legislation, secure sponsors, and coordinate lobbying efforts. Endorse/Support These issues would be good for cities, but would not be the focus of staff time and resources. AWC staff would not take the lead in advocating for endorsed issues, nor would they draft legislation or devote significant time to lobbying legislators. However, they would support the issues to the extent possible, such as signing in at hearings and testifying if time allowed. Monitor These are issues AWC has identified will likely be introduced this session by other parties. They can either be proactive or defensive in nature. AWC staff neither support nor defend against these issues, but rather keep a close watch over them as they move along in the legislative process. It is possible that staff would recommend taking a specific position if the issues develops in a manner that is either positive or negative for cities. Strongly Defend Against AWC spends a significant amount of time defending against measures that would be harmful to city interests. These issues would affect a significant number of cities, have a major negative impact on cities, and require substantial effort to defeat. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Confirm Appointment of Beverly Kincaid to the Civil Service Commission Study Session Date: July 10, 2019 COUNCIL MEETING Date: July 17, 2019 Department: Executive Presenter: Mayor Wheeler Phone: (360) 473-5266 SUMMARY: The Mayor is seeking confirmation for the appointment of Beverly Kincaid to the Civil Service Commission. The term expires July 16, 2022. ATTACHMENTS: Application to the committee is available in the Mayor’s Office. FISCAL IMPACTS (Include Budgeted Amount): None. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Briefing/Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to confirm the appointment of Beverly Kincaid to the Civil Service Commission for the term expiring July 16, 2022. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 B1 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: July 10, 2019 Purchase Agreement with Trebron Company, Inc. to Upgrade the SOPHOS Firewall and Renew the License COUNCIL MEETING Date: July 17, 2019 Department: Finance/IT Presenter: Dave Sorensen Phone: (360) 473-5472 SUMMARY: The City’s current SOPHOS Firewall Appliance contract is expiring in August 2019. This renewal will replace the current software appliance and license for 3 years. Trebron is the 3rd Party reseller and came in with the lowest cost of the 3 quotes received. The contract also allows for the ability to upgrade to the newer SOPHOS firewall technology at no extra cost, if the engineers are able to adapt it to the City’s configuration. ATTACHMENTS: 1) Trebron 3 Year Purchase Agreement 2) Quote from Presidio Networked Solutions Group, LLC 3) Quote from CDW-G FISCAL IMPACTS (Include Budgeted Amount): The Trebron 3 year purchase agreement amortizes the cost of the license and appliance over 3 years. These annual payments of $8225.00 will be invoiced on July 31, 2019, July 31, 2020 and the final payment on July 31, 2021. The Firewall upgrade and costs were anticipated and added to the budget for 2019 and the following years. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve a three year purchase agreement with Trebron Company, Inc. to renew the SOPHOS firewall license and replace the firewall appliance for a total amount of $24,675.00; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 B2 Seattle, WA (Corporate) 5506 35th Ave NE, Seattle, WA 98105 Office (206) 527-3477 | Fax (206) 527-4288 Springfield, MO Office (417) 473-9199 | Fax (206) 527-4288 Page 1 of 2 Date: May 28, 2019 Buyer: City of Bremerton Trebron Account Executive: Scott Griffin Trebron Company, Inc. 5506 35th Ave. N.E. Seattle, WA 98105 Mailing 345 6th Street, Suite 100 206-527-3477 Corporate Address: Bremerton, WA 98337-1873 360-275-9100 Mobile sgriffin@trebron.com Purchase Agreement 3 Years The Parties hereto, “Buyer,” City of Bremerton and “Seller,” Trebron Company, Inc. hereby agree as follows: 1. Description: Buyer agrees to purchase from Seller, “Product” as listed in the table below for $24,675.00 (Twenty Four Thousand Six Hundred Seventy Five United States Dollars and 00/100), plus applicable shipping costs and sales tax, unless Buyer is exempt from the payment of such tax and provides Seller with evidence of such exemption. Qty (Users) Included Components Term (Months) Total Price ($USD) 1 Sophos SG 450 FullGuard 24x7 – Renewal 36 $24,675.00 1 Sophos XG 450 Rev. 2 Security Appliance - Included 2. Payment: To be made to Seller in three annual installments of $8,225.00 each. The first payment is due on or before July 31, 2019. The second payment is due on or before July 31, 2020. The third and final payment is due on or before July 31, 2021. Payment Terms are net thirty (30) days from date of invoice. All payments shall be by check made payable to Trebron Company, Inc. at the address listed above. 3. Term: Buyer’s license for the product expires approximately 7/8/2022 (3 years). 4. Representations: Buyer understands that Seller is a reseller of hardware and software products. Buyer acknowledges that it has not relied on any representations by Seller and has independently investigated the products and determined the suitability of the products for Buyer’s intended purposes. 5. Warranty: Seller shall pass through to Buyer any original manufacturers’ warranties for Product acquired by Seller for Buyer, including Licensor’s warranties for Product. Except for the foregoing, Seller shall deliver the Product “as is” and Seller makes no other warranty, express or implied, including any warranty of merchantability or fitness for a particular purpose. 6. Limitation of Liability: Under no circumstances will Seller be liable for any incidental, indirect, special or consequential damages from Buyer or any third party, including damages for lost revenue, profits, data or use, even if Seller has been advised of the possibility of such damages. In no event shall Seller’s entire liability under this agreement exceed the price of the products under this Agreement. 7. Indemnification: Buyer shall defend, indemnify and hold harmless Seller, its employees and its agents from and against all damages, claims and liabilities of every nature whatsoever, including but not limited to reasonable legal expenses, arising in connection with or out of the improper or unauthorized operation use or repair of the products furnished to Buyer. 8. Late Fees: Late payments shall accrue interest beginning from the payment due date at a rate of eigh teen percent (18%) per annum or the maximum allowable legal rate whichever is lower. In the event that any payment or amount owed is more than ninety (90) days past due, Seller may declare the entire amount due and owing in addition to accrued fees and costs. Buyer’s failure to pay under this agreement may result in termination of Buyer’s software license. 9. Cancellation: Once Seller has accepted Buyer’s order, Buyer cannot cancel the agreement, in whole or in part, without Seller’s express written consent. Such cancellation is conditioned upon Buyer’s reimbursement to Seller for all costs incurred by Seller in connection with the order up to the time of cancellation —including, but not limited to Seller’s cost for cancellation. 10. Attorney’s Fees: In the event any cost or expense, including reasonable attorney’s fees (“Costs”) are incurred in the enforcement of this Agreement, the prevailing party shall be entitled to reimbursement for all such Costs in addition to damages. Page 2 of 2 11. Governing Law: This Agreement shall be construed and interpreted in accordance with the laws of the State of Washington. Venue for any and all actions shall be in the state or federal courts of King County, Washington. 12. Software: Buyer will negotiate all software license provisions of Product directly with the Licensor. 13. Miscellaneous: This Agreement must be executed on or before 7/28/2019 or it becomes void. 14. Waiver: The waiver of any breach of any provision of this Agreement shall not operate or be construed as a waiver of any subsequent breach and shall be effective only if presented in writing. 15. Severability: If any provision of this Agreement is deemed invalid or u nenforceable, all other provisions of this Agreement shall remain in full force and effect. 16. Entire Agreement: This Agreement constitutes the entire Agreement of the parties and may not be amended or superseded except in writing with execution by both parties. City of Bremerton IT Director Signature Business Office Signature - Required Printed Name Printed Name Title Title Date Date Must be signed by an authorized representative of Buyer Trebron Company, Inc. Billing Information Do you accept invoices via Email? Y  N  Signature Accounts Payable Contact Norbert van Dam Printed Name Email Address President Title Phone Date 2003219905524-01QUOTE: 06/11/2019DATE: PAGE:1 of 2 FROM:Presidio Networked Solutions Group, LLC Dave Anderson 10655 NE 4th Street Suite 212 Bellevue, WA 98004 daanderson@presidio.com TO:City of Bremerton Dave Sorensen 345 6th St. Bremerton, WA 88337 Dave.Sorensen@ci.bremerton.wa.us (p) . Dave Anderson Matt Davis Title: Inside Sales Rep: Account Manager: Sophos SG-450 Customer#:CITYO978 #Part #Description QtyUnit Price Ext PriceList Price Discount Ext List Price 1 SB4532SUSK SG 450 TOTALPROTECT 24X7 3 US 1$28,931.26 $28,931.2614.00 %$33,641.00 $33,641.00 Total List Price: Sub Total:$28,931.26 $33,641.00 Grand Total:$28,931.26 2003219905524-01QUOTE: 06/11/2019DATE: PAGE:2 of 2 Quote valid for 30 days unless otherwise noted. Additional Terms The following terms and conditions shall govern this agreement unless a valid Master Services & Product Agreement or other similar agreement (“Master Agreement”) between the parties has been executed and is in force, in which case the terms of the Master Agreement shall prevail to the extent that they are inconsistent with the following terms and conditions. 1. Purchase Orders, Invoicing, Payment and Acceptance. Any purchase order submitted by CLIENT in connection with this agreement shall be deemed subject to these Additional Terms and this agreement. Unsigned, electronically submitted purchase orders shall be deemed to include CLIENT’s electronic signature and shall be binding to the extent accepted by Presidio. Presidio’s performance of such purchase order shall not constitute Presidio’s acceptance of new or different terms, including pre-printed terms on such order. In absence of a purchase order, CLIENT agrees that its signature below grants Presidio the right to invoice CLIENT and authorizes payment to Presidio for the amounts owed. Further, CLIENT represents that Presidio can rely on such CLIENT signature for payment. Presidio shall invoice CLIENT for the Products and/or Services in accordance with the terms stated in the agreement. The price included herein reflects a 3% discount for payment by cash, check or wire transfer. This discount will not apply in the event that CLIENT pays using a credit card or debit card. CLIENT shall make payment to Presidio within thirty (30) days from the date of invoice. Except for taxes due on Presidio’s net income, CLIENT shall pay all taxes. Presidio reserves the right to bill CLIENT for additional work requested by CLIENT and performed by Presidio, and for applicable expenses incurred by Presidio pursuant to providing such additional services, which are not described in this agreement. Client understands and agrees to its obligation, that applicable sales tax will apply to the quoted services on a by site location basis. Unless otherwise indicated in this agreement, CLIENT agrees that staff augmentation services and services performed on a time and materials basis shall be deemed accepted as performed. Unless otherwise indicated in this agreement, Projects shall be deemed accepted upon the earlier of Presidio’s receipt a signed Project Completion and Acceptance document which has been signed and dated by an authorized representative of CLIENT, or thirty (30) calendar days from the date of the delivery of the final Project deliverable. If acceptance is refused, the Client shall provide, in writing to Presidio, its reasonable basis for refusal, prior to the expiration of the thirty (30) calendars day period. Presidio shall address the issue before subsequent work is undertaken. 2. Shipment of Product. All Products delivered to CLIENT hereunder shall be shipped FOB origin, freight collect. Title and risk of loss shall pass to CLIENT at point of origin. Products shall be deemed accepted upon delivery. 3. Limitations of Warranties. Presidio warrants that Services shall be provided by competent personnel in accordance with applicable professional standards. ALL PRODUCTS PROVIDED BY PRESIDIO ARE PROVIDED “AS IS”, WITH ALL FAULTS. PRESIDIO MAKES NO OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. ANY AND ALL ORIGINAL EQUIPMENT MANUFACTURER (OEM) WARRANTIES, CERTIFICATIONS AND GUARANTEES, IF ANY, ARE PASSED THROUGH TO CLIENT. 4. Intellectual Property. CLIENT acknowledges that Presidio, its vendors, and/or its licensors retain all patents and/or copyrights in and to all proprietary data, processes and programs, if any, provided in connection with Services performed hereunder; any Presidio software provided to CLIENT as part of the Services provided shall be subject to the vendor's, licensor’s or OEM’s copyright and licensing policy. To the extent such software is prepared by Presidio, it is provided by nontransferable, nonexclusive license for CLIENT'S internal use only, subject strictly to the terms and conditions of this Agreement, and shall terminate upon termination or expiration of this Agreement. CLIENT shall not duplicate, use or disclose for the benefit of third parties, reverse engineer or decompile any such software. 5. Confidential Information. The parties agree that Confidential Information means any information disclosed by the disclosing party to the receiving party, either directly or indirectly, in writing, orally or by inspection of tangible objects (including without limitation documents, prototypes, samples, plant and equipment, “CLIENT” lists or other “CLIENT” information not known to the public), which is designated as "Confidential," "Proprietary" or some similar designation, or is the type of information which should reasonably be recognized as Confidential or Proprietary. The receiving party shall not use any Confidential Information of the disclosing party for any purpose except to evaluate and engage in discussions concerning this Proposal. Each party agrees to protect the other party’s Proprietary and Confidential Information to the same extent that it protects its own Proprietary and Confidential Information but with no less than a reasonable degree of care. 6. Limitation of Liability. IN NO EVENT SHALL PRESIDIO BE LIABLE TO CLIENT FOR ANY INDIRECT, INCIDENTAL, SPECIAL, CONSEQUENTIAL, EXEMPLARY, OR PUNITIVE DAMAGES OF ANY KIND WHATSOEVER, ARISING IN CONTRACT, TORT OR OTHERWISE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. PRESIDIO’S ENTIRE LIABILITY AND CLIENT’S EXCLUSIVE REMEDY FOR DAMAGES FROM ANY CAUSE WHATSOEVER, INCLUDING, BUT NOT LIMITED TO, NONPERFORMANCE OR MISREPRESENTATION, AND REGARDLESS OF THE FORM OF ACTIONS, SHALL BE LIMITED TO THE AMOUNT WHICH HAS BEEN ACTUALLY PAID TO PRESIDIO BY CLIENT FOR SERVICES AND/OR PERFORMANCE HEREUNDER. Without limiting the foregoing, Presidio will have no responsibility for the adequacy or performance of (in) any third party software provided to Presidio under this agreement; (ii) any hardware, and (iii) any services provided by any third party. 7. Non-Solicitation Provision. During the term of this agreement and for twelve (12) months thereafter, CLIENT will not solicit for a permanent or other position any employee or subcontractor of the other party to whom that party was introduced as a result of this agreement. Should CLIENT solicit and/or hire an employee or contractor from PRESIDIO, CLIENT shall pay to PRESIDIO an administrative fee equal to 1 year’s salary of the employee’s new salary at CLIENT. 8. Export Law Compliance. CLIENT has been advised that all Products purchased hereunder and Presidio Confidential Information is subject to the U.S. Export Administration Regulations. CLIENT agrees to comply with all applicable United States export control laws, and regulations, as from time to time amended, including without limitation, the laws and regulations administered by the United States Department of Commerce and the United States Department of State. 9. Force Majeure. Neither party shall be liable for any failure or delay in performance of its obligations hereunder where such performance is prevented or delayed by causes beyond its reasonable control, including without limitation, flood, war, embargo, strike or other labor dispute, riot, acts of God or the intervention of any government authority. 10. Choice of Law and Venue. The parties will attempt to settle any claim or controversy arising under this agreement through consultation and negotiation in good faith and a spirit of mutual cooperation. This agreement and all matters relating thereto shall be governed exclusively by the substantive law of the State of Texas. Any dispute relating directly or indirectly to this agreement or any other contract or agreement between the parties which cannot be resolved through the process of consultation and negotiation shall be brought in a court of competent jurisdiction in Dallas County, Texas, that being the exclusive venue for any dispute between or any claims held by any of the parties to this agreement. 11. Miscellaneous. This agreement constitutes the entire agreement of the parties and supersedes all prior written or oral agreements, representations and understandings relating to the subject matter hereof, with the exception of a valid Master Services and Product Agreement between the parties under the terms of which this agreement shall be incorporated. This agreement shall not be amended or modified except by written instrument signed by the parties. Should additional work beyond the scope of the Services detailed herein by Presidio be requested by CLIENT, fees for such additional Services will be negotiated with CLIENT prior to performing such work and will be memorialized in writing between the Parties by utilizing a Project Change Request form (“PCR”) or an additional agreement as appropriate. Presidio will invoice CLIENT for any additional work performed and expenses incurred which are not described in this agreement. The Parties agree that neither may assign its rights or duties under this contract without the prior written consent of the other Party, which consent shall not be unreasonably withheld. 12. Severability. The provisions of this Agreement are severable. If any provision of this Agreement or its application to any person or circumstance is ever held by any court of competent jurisdiction to be invalid for any reason, the remainder of this Agreement and the application of such provision or part of this Agreement to other persons or circumstances shall not be affected. Customer hereby authorizes and agrees to make timely payment for products delivered and services rendered, including payments for partial shipments Customer Signature Date Page 1 of 1 QUOTE CONFIRMATION DEAR DAVE SORENSEN, Thank you for considering CDWG for your computing needs. The details of your quote are below. Click here to convert your quote to an order. QUOTE #QUOTE DATE QUOTE REFERENCE CUSTOMER #GRAND TOTAL KRGR226 6/10/2019 KRGR226 169321 $33,779.10 QUOTE DETAILS ITEM QTY CDW#UNIT PRICE EXT.PRICE Sophos SG 450 FullGuard 24x7 - subscription license ( 3 years ) 1 3343387 $23,290.00 $23,290.00 Mfg. Part#: FG453CSPA UNSPSC: 43233205 Sophos SG 450 FullGuard 24x7 - 36 Months Electronic distribution - NO MEDIA Contract: MARKET Sophos XG 450 - Rev 2 - security appliance 1 4758026 $7,700.00 $7,700.00 Mfg. Part#: XG45T2HUS UNSPSC: 43222501 Sophos XG 450 Rev. 2 Security Appliance - US Power Cord Contract: KCDA Catalog Agreement- Contract# 018-A (018-A) PURCHASER BILLING INFO SUBTOTAL $30,990.00 Billing Address: CITY OF BREMERTON ACCT PAYABLE 345 6TH ST STE 100 BREMERTON, WA 98337-1891 Phone: (360) 478-5293 Payment Terms: Request Terms SHIPPING $0.00 SALES TAX $2,789.10 GRAND TOTAL $33,779.10 DELIVER TO Please remit payments to: Shipping Address: CITY OF BREMERTON DAVE SORENSEN 345 6TH ST STE 100 BREMERTON, WA 98337-1891 Phone: (360) 478-5293 Shipping Method: DROP SHIP-GROUND CDW Government 75 Remittance Drive Suite 1515 Chicago, IL 60675-1515 Need Assistance? CDWG SALES CONTACT INFORMATION Danny Moore |(866) 339-7080 |dannmoo@cdwg.com This quote is subject to CDW’s Terms and Conditions of Sales and Service Projects at http://www.cdwg.com/content/terms-conditions/product-sales.aspx For more information, contact a CDW account manager ' 2019 CDWG LLC, 200 N. Milwaukee Avenue, Vernon Hills, IL 60061 | 800.808.4239 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Interlocal Agreement with Mason County and the Port of Bremerton for Design Oversight of the Puget Sound Industrial Center – Bremerton to Belfair Sewer Connection Project Study Session Date: July 10, 2019 COUNCIL MEETING Date: July 17, 2019 Department: Public Works Presenter: Ned Lever Phone: (360) 473-2398 SUMMARY: This interlocal agreement provides for Port of Bremerton, Mason County, and City of Bremerton coordination in feasibility analysis, design oversight, and construction of the proposed sewer extension into PSIC-Bremerton from the Belfair wastewater treatment plant. ATTACHMENTS: Proposed interlocal agreement. FISCAL IMPACTS (Include Budgeted Amount): The financial commitments associated with this agreement are included in the CIP and current approved budget. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve an interlocal agreement with Mason County and the Port of Bremerton for design oversight, and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 B3 Page 1 Interlocal Agreement Between Port of Bremerton, City of Bremerton, and Mason County for PSIC Sewer Design Oversight INTERLOCAL AGREEMENT BETWEEN MASON COUNTY, THE PORT OF BREMERTON, AND THE CITY OF BREMERTON RELATED TO PARTICIPATION IN EXECUTIVE AND TECHNICAL COMMITTEES PROVIDING PROJECT DESIGN OVERSIGHT TO THE PUGET SOUND INDUSTRIAL CENTER – BREMERTON TO BELFAIR SEWER CONNECTION PROJECT ____________________ THIS INTERLOCAL AGREEMENT is made and entered into pursuant to the Interlocal Cooperation Act, Chapter 39.34 of the Revised Code of Washington, on the ________ day of ________________________, 2019, by and between the Port of Bremerton (the “Port”), Mason County (the “County”), and the City of Bremerton (the “City”) (collectively the “Parties”). WHEREAS, Revised Code of Washington Section 39.34.030 authorizes cooperative efforts between public agencies; and WHEREAS, Mason County owns and operates a water reclamation facility near Belfair, Washington, with available capacity to treat sanitary sewage that may be generated from the currently unserviced area between Belfair and Bremerton, which includes the Puget Sound Industrial Center – Bremerton (PSIC-Bremerton); and WHEREAS, the City of Bremerton is interested in improving the availability of sanitary sewer service within PSIC-Bremerton; and WHERAS, Mason County is interested in providing sanitary sewer service within PSIC- Bremerton and the Belfair UGA; and WHERAS, the Port owns and operates a wastewater collection and treatment system located within PSIC-Bremerton; and WHEREAS, the Parties are interested in improving the availability of sanitary sewer service within the larger PSIC-Bremerton geographic area; and WHEREAS, available capacity at the Belfair Water Reclamation Facility, and the upcoming Belfair Bypass project appear to provide an opportunity to extend sanitary sewer service to PSIC-Bremerton; and WHEREAS, the State of Washington, through its Department of Commerce, has appropriated $515,000 for the purpose of designing new sanitary sewer transmission facilities to serve PSIC-Bremerton and the Belfair UGA; and WHEREAS, the City, through its Sewer Capital Budget, has committed an additional Page 2 Interlocal Agreement Between Port of Bremerton, City of Bremerton, and Mason County for PSIC Sewer Design Oversight $1,000,000 to be invested into this design and planning effort focused toward the goal of providing improved sewer service to PSIC-Bremerton; and WHEREAS, the City and County have requested the Port participate on the project’s Executive Committee and the Technical Committee to ensure robust communication among and between all involved stakeholders; and WHEREAS, the Parties wish to work cooperatively to investigate the feasibility of improved sanitary sewer service to PSIC-Bremerton; and WHEREAS, the City and County executed an interlocal agreement to pursue design of a system extension to serve PSIC-Bremerton on January 29, 2018, and the City and County wish to rescind that agreement and replace it with the present Interlocal Agreement. NOW, THEREFORE, in consideration of their mutual covenants, conditions and promises, THE PARTIES AGREE as follows: 1. PURPOSE OF AGREEMENT: The purpose of this Agreement is for the Parties to work cooperatively to oversee the initial analysis and feasibility of potential designs for a sewer system extension from the Belfair Water Reclamation Facility, through participation on the Executive Committee and the Technical Committee. 2. RESCISSION OF PRIOR AGREEMENT: The County and the City hereby rescind and replace with this Agreement the “Interlocal Agreement Between Mason County and the City of Bremerton Related to Engineering Design of Sanitary Sewer Facilities Extension from the Belfair Water Reclamation Facility, Future Sanitary Sewer System Development and Sanitary Sewer Service Provisions Within the Belfair UGA and Puget Sound Industrial Center – Bremerton,” which was executed on January 29, 2018. 3. ADMINISTRATION OF AGREEMENT: The CEO of the Port will administer this Agreement for the Port, The Mason County Public Works Director will administer this agreement for Mason County, and the Bremerton Public Works and Utilities Director will administer this Agreement for the City. 4. FUTURE AGREEMENTS: This Interlocal Agreement envisions the possibility of amendments to this Interlocal Agreement which may address future cooperative efforts, should subsequent phases develop; however, nothing in this Agreement shall be construed to bind either party to any future course of action, including but not limited to agreement to utilize the Belfair Water Reclamation Facility, contract with Mason County for such use, or commit any capital investments toward such effort. 5. DURATION OF AGREEMENT: This Agreement shall take effect upon execution of this Agreement by the Port, the City and the County, and shall remain in effect until December Page 3 Interlocal Agreement Between Port of Bremerton, City of Bremerton, and Mason County for PSIC Sewer Design Oversight 31, 2022. This Agreement may be extended one or more times by mutual agreement of the Parties, in writing, for a duration no longer than one (1) year. 6. TERMINATION OF AGREEMENT: Any party may withdraw from this Agreement by giving the other parties ten (10) days written notice. The Agreement shall remain in place unless and until two parties withdraw. 7. PORT EMPLOYEES: Port employees pursuant to this Agreement remain employees of the Port at all times and shall perform the work envisioned under sole supervision of the Port. 8. COUNTY EMPLOYEES: County employees pursuant to this agreement remain employees of the County at all times and shall perform the work envisioned under sole supervision of the County. 9. CITY EMPLOYEES: City employees pursuant to this Agreement remain employees of the City at all times and shall perform the work requested under sole supervision of the City. 10. REIMBURSEMENT: At the mutual agreement of the Parties, any of the parties may reimburse the other for specifically defined services which constitute a work program or project. 11. LEGAL/ADMINISTRATIVE ENTITY: No separate legal or administrative entity is created by or pursuant to this Agreement. 12. INDEMNIFICATION A. The Port shall defend, indemnify and hold harmless the County and the City, its officials, officers, employees and agents, for all claims, liabilities, damages, expenses, reasonable attorney’s fees and suits arising from negligence of the Port and its agents. B. The County shall defend, indemnify and hold harmless the Port and the City, its officials, officers, employees and agents, for all claims, liabilities, damages, expenses, reasonable attorney’s fees and suits arising from negligence of the County and its agents. C. The City shall defend, indemnify and hold harmless the Port and the County, its officials, officers, employees and agents, for all claims, liabilities, damages, expenses, reasonable attorney’s fees and suits arising from negligence of the City and its agents. D. In cases of concurrent fault of the Parties, the above provisions requiring each party to defend, indemnify and hold harmless the other party (“indemnification provisions”) are valid and enforceable only to the extent of the fault of the respective parties. Page 4 Interlocal Agreement Between Port of Bremerton, City of Bremerton, and Mason County for PSIC Sewer Design Oversight E. Solely for purposes of the indemnification provisions, each party waives its immunity under Title 51 (Industrial Insurance) of the Revised Code of Washington and acknowledges that this waiver was mutually negotiated by the Parties. F. The indemnification provisions shall survive the expiration or termination of this agreement. 13. COMPLIANCE WITH REGULATIONS AND LAWS: The Parties shall comply with all applicable rules and regulations pertaining to them in connection with the matters covered herein. 14. ASSIGNMENT: The Parties shall not assign this Agreement or any interest, obligation or duty herein without the express written consent of the other party. 15. ATTORNEYS' FEES: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney’s fees. 16. NOTICES: All notices hereunder may be delivered or mailed. If mailed, they shall be sent to the following respective addresses: To the Port of Bremerton: To Bremerton: Port of Bremerton City of Bremerton Chief Executive Officer Public Works & Utilities Director 8859 S.W. State Hwy 3 345 6th Street, Suite 100 Bremerton, WA 98312 Bremerton, WA 98337 To Mason County: Public Works Department 100 W Public Works Drive Shelton, WA 98584 Attn: Public Works Director Phone (360) 427-9670 or to such other respective addresses as either party may hereafter designate in writing. All notices and payments mailed by regular post (including first class) shall be deemed to have been given on the second business day following the date of mailing, if properly mailed and addressed. Notices and payments sent by certified or registered mail shall be deemed to have been given on the day next following the date of mailing, if properly mailed and addressed. For all types of mail, the postmark affixed by the United States Postal Service shall be conclusive Page 5 Interlocal Agreement Between Port of Bremerton, City of Bremerton, and Mason County for PSIC Sewer Design Oversight evidence of the date of mailing. 17. NON-DISCRIMINATION POLICY: The Parties agree not to discriminate in the performance of this Agreement because of race, color, national origin, sex, sexual orientat ion, age, religion, creed, marital status, disabled or Vietnam era veteran status, or the presence of any physical, mental sensory handicap, or other status protected by law. 18. FILING: This document shall be filed with both the Kitsap County Auditor and the Mason County Auditor pursuant to RCW 39.34 or, alternatively, listed by subject on each public agency’s website. 19. ENTIRE AGREEMENT: This Agreement constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. 20. CHOICE OF LAW AND VENUE: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Pierce County Superior Court. IN WITNESS WHEREOF the Parties hereto have executed this Agreement as of the day and year first above written. DATED this , day of , 2019 CITY OF BREMERTON PORT OF BREMERTON BOARD OF COMMISSIONERS _________________________________ Greg Wheeler, Mayor Axel Strakeljahn, President _________________________ _________________________________ Date Larry Stokes, Vice President _________________________________ Cary Bozeman, Secretary Page 6 Interlocal Agreement Between Port of Bremerton, City of Bremerton, and Mason County for PSIC Sewer Design Oversight ATTEST: ATTEST: _________________________ _________________________________ Angela Woods, City Clerk Ginger Waye, Clerk of the Board Approved as to form: Approved as to form: _________________________________ _____________________________ Casey Pence, Assistant City Attorney Anne Montgomery, Port Attorney BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON _________________________________ Kevin Shutty, Chair _________________________________ Sharon Trask, Vice Chair _________________________________ Randy Neatherlin, Commissioner ATTEST: ________________________________ Melissa Drewry, Clerk of the Board Approved as to form: _________________________________ Page 7 Interlocal Agreement Between Port of Bremerton, City of Bremerton, and Mason County for PSIC Sewer Design Oversight Tim Whitehead, CH. Deputy Prosecuting Attorney AGENDA BILL CITY OF BREMERTON CITY COUNCIL Study Session Date: July 10, 2019 SUBJECT: Local Agency Professional Services Cost Plus Fixed Fee Consultant Agreement with SCJ Alliance, Inc. for Design of Kitsap Way (SR310) & Warren Avenue (SR303) Traffic Signal and Multimodal Safety Project COUNCIL MEETING Date: July 17, 2019 Department: Engineering Presenter: Andrea Archer-Parsons Phone: (360) 473-2317 SUMMARY: In February 2019, the City accepted a Highway Safety Improvement Program (HSIP) grant to improve bike lanes and traffic signals on Kitsap Way and improve traffic signals on State Route 303. The City advertised a Request for Qualifications and received proposals from three firms to perform the design. Three firms were interviewed and SCJ Alliance was selected to perform the design. ATTACHMENTS: 1) Local Agency Professional Services Cost Plus Fixed Fee Consultant Agreement with SCJ Alliance, Inc. FISCAL IMPACTS (Include Budgeted Amount): The consultant fee for design is estimated at $373,469 and is eligible for 90% grant funding. The 10% City match is funded from REET. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the Consultant Agreement with SCJ Alliance, Inc. for the design of the Kitsap Way (SR310) and Warren Avenue (SR303) Traffic Signal and Multimodal Safety Project; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 B4 Page 1 of 14 Local Agency Professional Services Cost Plus Fixed Fee Consultant Agreement Revised  Local Agency Professional Services Cost Plus Fixed Fee Consultant Agreement Agreement Number: 'RHVWKLV5HTXLUH'(6¿OLQJ" Yes No Firm/Organization Legal Name (do not use dba’s): Address Federal Aid Number UBI Number Federal TIN or SSN Number Execution Date Completion Date 1099 Form Required Yes No Federal Participation Yes No Project Title Description of Work Yes % No DBE Participation Yes % No MBE Participation Yes % No WBE Participation Yes % No SBE Participation Total Amount Authorized: Management Reserve Fund: Maximum Amount Payable: Index of Exhibits Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Exhibit G Exhibit H ([KLELW, Exhibit J Scope of Work DBE Participation6%(3ODQ 3UHSDUDWLRQDQG'HOLYHU\RI(OHFWURQLF(QJLQHHULQJDQG2WKHU'DWD 3ULPH&RQVXOWDQW&RVW&RPSXWDWLRQV 6XEFRQVXOWDQW&RVW&RPSXWDWLRQV 7LWOH9,$VVXUDQFHV &HUWL¿FDWLRQ'RFXPHQWV /LDELOLW\,QVXUDQFH,QFUHDVH $OOHJHG&RQVXOWDQW'HVLJQ(UURU3URFHGXUHV &RQVXOWDQW&ODLP3URFHGXUHV Agreement Number: SCJ Alliance, Inc. 8730 Tallon Lane NE, Suite 200, Lacey, WA 98516 602-612-261 July 17, 2019 June 30, 2021 Kitsap Way (SR 310) and Warren Avenue (SR 303) Traffic Signal and Multimodal Safety Retime signals, increase the visibility of traffic signal heads, and improve conditions for pedestrians at traffic signals. Upgrade signing and pavement markings and control access at driveways. On Kitsap Way (SR 310), improve lighting and rechannelize the roadway including with bike lanes and green bike lane facilities. 9 HISP Phase III July 1, 2019 City of Bremerton Page 1 EXHIBIT A SCOPE OF WORK HIGHWAY IMPROVEMENT SAFTEY PROJECT PHASE III BREMERTON, WASHINGTON Prepared for: Andrea Archer-Parsons, PE, Project Manager City of Bremerton Prepared by: Josh Brannin, PE, Project Manager Date prepared: July 1, 2019 Overview This Scope of Work is for the HSIP Phase III Improvements (Project). This scope includes data collection, site reconnaissance, preliminary engineering, final design (including plans, specifications, and estimates), traffic policy development, and traffic signal timing/coordination development and implementation support. The following Design Standards and References (as of execution of the agreement) are to be followed during the development of the project: • City of Bremerton Engineering Design & Construction Standards (latest editions) • 2020 Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction. • WSDOT Local Agency Guidelines (LAG). • Manual on Uniform Traffic Control Devices for Streets and Highways (latest edition). • A Policy on Geometric Design of Highways and Streets (i.e. AASHTO ‘Green Book’) (latest edition). • WSDOT Standard Plans as required (latest edition). • PROWAG, 2005 • Current edition of ITE Standards • Federal ITS Architecture, latest edition • NEC 2015 The work will consist of the following phases: 1. Project Management 2. Survey and Right of Way Delineation (MTN2COAST) 3. Preliminary Design 4. Retaining Wall Design (Sargent) SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 2 5. Traffic Engineering (PH Consulting) 6. Geotechnical Design (GeoEngineers) 7. Environmental Documentation Support 8. Public Involvement 9. Final Design 10. Bidding Services The following phases may be added by amendment: 1. Potholing 2. NEPA Discipline Reports 3. Right-of-Way Services 4. Construction Engineering Services 5. Timing and Coordination Plan Implementation Assumptions 1. The project may require right of way or temporary construction easements. 2. The improvements will generally conform to the concepts provided in the grant applications. 3. Added impervious surfaces will not trigger thresholds requiring flow control and stormwater treatment. 4. Stormwater improvements are limited to connections to existing stormwater facilities. 5. The project falls under NEPA Categorical Exemption (23)(i). 6. The project meets exemptions for Section 106, hazardous materials, noise, air, and environmental justice discipline reports. Information Provided by the City 1. All available as-built drawings for roadway, water, sewer, and stormwater. Project Management This phase includes tasks to plan, manage, and administer the work; attend project meetings; and provide quality assurance/quality control. Management 1) Management: Manage the project by directing and supervising staff and reviewing work for the duration of the project. This management is for the overall work rather than specific tasks. 2) Schedule and Budget: Develop a critical path project schedule to match the scope of work. Identify task durations, predecessors, City reviews, deliverables, and milestones. Review and update the schedule on a monthly basis. Monitor project budget on a biweekly basis. Provide monthly billing statements to the City including overall budget and schedule confirmation and review for each progress billing period. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 3 Administration 1) Progress Reports: Prepare and submit a bi-weekly progress report. Progress reports will show: (1) prior work performed, (2) current work planned, (3) schedule and budget status, (4) a summary of scope changes/added value, and (5) items needed from the City and/or others. 2) Progress Billings: Prepare a monthly progress bill with weekly progress reports attached. Bills will show staff hours for each phase (i.e., Phase 1: Project Management). Include a Budget Remaining Report with each invoice. 3) Filing: Develop a project filing system and maintain project files in one centralized location. Periodically purge draft and redundant documents. 4) Subconsultant Administration: Execute and administer sub agreements. Review and approve monthly invoices. Quality Assurance/Quality Control 1) Quality Control: Provide senior level review of task deliverables before submittal to the City. 2) Quality Assurance: Audit quality check activities and documentation on a periodic basis. Understanding • Project management will be provided over a 15-month timeframe. • Progress billings will be submitted monthly to the City. • Budget for peer checks for quality control is included within budget for design tasks. Deliverables • Bi-weekly Progress Report submitted via email in PDF format. • Progress billings submitted monthly submitted via email in PDF format. • MS Project schedule updates submitted via email in PDF format. Survey and Right of Way Delineation (by MTN2COAST) Survey and Right of Way Delineation 1) Topographic Survey: Perform topographic survey for Kitsap Way / 11th Avenue extending 350 feet northwest on Kistap Way, 150 feet southwest on 11th Street, 100 feet northeast on 11th Avenue, and 350 feet southeast on Kitsap Way of the intersection including top and toe of slopes and structures within 50 feet of the back of sidewalk on the south side of the corridor. Perform topographic survey at Kitsap Way / National Avenue extending 50 feet in each direction. Perform topographic survey below the SR 3 overpass. Provide aerial survey for the remaining corridor extending 150 feet west of the southbound SR 3 offramp to 150 east of Callow Drive. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 4 2) Right of Way Mapping: Locate monuments and use record right of way maps to establish existing rights of way at the intersections of Kitsap Way / 11th Avenue and Kitsap Way / National Avenue to the limits described in Task 1.1. Mapping shall include parcel lot lines. 3) Base Map: Prepare a topographic base map in AutoCAD, including existing rights of way. The base map shall include channelization, signal poles, pedestrian push butto n poles, signal cabinets, signs, face of curb, and splitter islands along the whole corridor and underground utilities including inverts, overhead utilities including height, back of sidewalk, ADA facilities, and structures within the limits described in Task 1.1. Provide a surface model for the existing ground surface in Civil 3D at the intersections of Kitsap Way / 11th Avenue and Kitsap Way / National Avenue to the limits described in Task 1.1. 4) Legal Description and Exhibit: Prepare up to four legal descriptions and exhibit for right- of-way or easement acquisition. Understanding • Field data will be collected on NAD83/91 Washington State Plane Coordinates, North Zone, Geoid 12A, and NAVD88 Elevation datum. • Base mapping will conform to City Bremerton and APWA standards. Deliverables • Topographic base map in AutoCAD format and existing surface in Civil 3D format. Preliminary Design Data Collection 1) Data Collection: Gather and review available background data and as-builts from the City. Gather and review system maps from dry utility providers (power and communication). 2) Photographs: Walk the site and provide photo documentation. Roadway 1) Horizontal Layout • Refine concept widening plans for Kitsap Way / 11th Avenue. • Develop construction centerline alignments for Kitsap Way and connecting streets. • Develop preliminary engineering level detail for the roadway layout. Show travel lanes, turn lanes, bike lanes, curb/gutter, sidewalks, and driveways. Curb returns at side streets will match existing street width for side streets. • Define alignment data (bearing and curve data) for the centerline and define alignment data (station/offset and curve data) for curbs, and edges of pavement. 2) Vertical Layout • Develop flowline profile for roadway widening at Kitsap Way / 11th Avenue. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 5 • Prepare up to four driveway profiles for parcels impacted by the widening at Kitsap Way / 11th Avenue. • Prepare centerline profile for 11th Street. • Design ADA curb ramps at Kitsap Way /11th Avenue and Kitsap Way / National Avenue. 3) Technical Memorandum: Prepare a draft technical memorandum for inclusion in the Basis for Design Report. The memorandum will describe roadway design including standards used to layout the roadway. Stormwater 1) Draft Stormwater Site Plan: Prepare a draft Stormwater Site Plan (drainage report) for inclusion in the Basis for Design Report described under Phase 4. Utility Mapping 1) Utility Mapping: • Obtain system maps and as-built drawings from utility providers. Compare to survey mapping to verify mapping completeness. • Field-verify the utility mapping against visible appurtenances and available system maps. • Reconcile mapping discrepancies with the City and utility providers. 2) Utility Conflict Technical Memorandum: Prepare a utility conflict technical memorandum and submit for City review. Evaluate available data to identify utility conflicts and make recommendations for final resolution. Coordinate with utility providers to determine cost responsibility for relocations. Identify special construction- related requirements for each utility. Revise the memorandum once per City comments. Include the final memorandum in the Basis for Design Report. 3) Utility Coordination: Coordinate with utility purveyors and City of Bremerton Public Works for utility relocations. WSDOT Plan for Approval 1) PFA 1: Prepare an Intersection Plan for Approval (PFA) package for the Kitsap Way corridor. Base the PFA package on the 12-page Olympic Region checklist for PFA submittals. 2) PFA 2: Revise the first PFA based on WSDOT review comments and submit the second PFA package. 3) PFA Pre-Mylar: Revise the second PFA package based on WSDOT review comments and prepare the pre-Mylar package. 4) Final PFA: Revise the pre-Mylar package based on WSDOT review comments and print the PFA drawings on Mylar for WSDOT approval. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 6 5) Coordination: Attend up to one meeting with WSDOT to review the PFA to approval. Preliminary Plans 1) Preliminary Plans: Prepare the following plan types at 1”=20’ scale (unless noted otherwise). The number of plan sheets per plan type is shown in parentheses. • Cover (1 sheet) • Typical Sections (2 sheets) • Plan and Profile (4 sheets) • Channelization (12 sheets) • ADA Details (2 sheets) • Traffic Signals (Prepared by PH Consulting under Phase 5) • Illumination (Prepared by PH Consulting under Phase 5) • Retaining Wall Plan and Profile (Prepared by Sargent Engineers under Phase 4) Preliminary Cost Estimate 1) Preliminary Cost Estimate • Develop quantities based on the preliminary plans. • Assign unit costs for quantified items and assign lump sum costs to other items based on professional judgment. • Develop a planning level construction estimate that includes a 30% contingency. Basis for Design Report 1) Draft Basis for Design Report: Prepare an executive summary to describe work completed and decisions made in Phase 4. Include technical memorandums prepared separately for roadway design, stormwater design, traffic design, traffic control strategy, and utility conflict. Include preliminary plans and cost estimates. Submit to the City for review in MS Word format. 2) Final Basis for Design Report: Revise the report once per City comments. Understanding • 11th street only profile change resulting from widening. • Roadway design is based on City of Bremerton Engineering and Construction Standards. • Drainage design is based on Department of Ecology, Stormwater Management Manual for Western Washington, 2014. Deliverables • Meeting summaries submitted in PDF via email. • Utility Conflict technical memorandum submitted in PDF via email. • Preliminary Plans (11”x17”) submitted in PDF via email. • Basis for Design Report submitted in PDF via email. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 7 Retaining Walls (Sargent Engineers) Preliminary Retaining Wall Design 1) Layout: Prepare horizontal and vertical layout of approximately 350 linear feet of engineered retaining wall for cut slopes and approximately 100 linear feet of structural earth wall for cut slopes. 2) Type Selection: Evaluate fill wall type considering cost and constructability. Discuss findings/recommendations with the City and select final wall types. 3) Preliminary Plans: Prepare the following plan types at 1”=20’ scale (unless noted otherwise). The number of plan sheets per plan type is shown in parentheses. • Wall 1 (2 sheets) • Wall 2 (4 sheets) • Wall Details (2 sheets) 4) Preliminary Cost Estimate: • Develop quantities based on the preliminary plans. • Assign unit costs for quantified items and assign lump sum costs to other items based on professional judgment. 5) Technical Memorandum: Prepare a draft technical memorandum for inclusion in the Basis for Design Report. The technical memorandum will summarize cost, constructability and aesthetic considerations for identifying preferred wall types. 90% Retaining Wall Design 1) Layout: Refine wall layout based on 30% design review comments. 2) Design Walls: Provide design parameters for the structural earth retaining wall, Wall 1. Provide engineering design calculations for a soldier pile wall or similar , Wall 2. Provide technical memorandum with design calculations and considerations for inclusion in the Basis for Design Report. 3) 90% Plans: Prepare the following plan types at 1”=20’ scale (unless noted otherwise). The number of plan sheets per plan type is shown in parentheses. • Wall 1 (2 sheets) • Wall 2 (4 sheets) • Wall Details (2 sheets) 4) Cost Estimate: Develop quantities based on the 90% plans. Assign unit costs for quantified item and assign lump sum costs to other items based on professional judgement. 5) Special Provisions: Write specifications for all non-standard items. 6) Response to Comments: Provide response to 90% design review comments. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 8 7) Final PS&E: Update the plans, cost estimate, and special provisions based on the 90% design review comments. Understanding • Coordination with utility providers will require up to 40 hours of effort. • Plans, cost estimate, and special provisions will be provided to SCJ for each submittal. • SCJ will provide the sheet border template in ACAD 2018 format. • Wall 1 is located west of 11th Avenue between 13th Street and 11th Avenue on the south side of Kitsap Way. The wall is estimated to be approximately 50 feet in length and is assumed to be a structural earth retaining wall. • Wall 2 is located at the intersection of Kitsap Way/11th Avenue on the south side of Kitsap Way. The wall is estimated to be approximately 350 feet in length and is assumed to be a cantilever solider pile wall or similar. • SCJ will provide geotechnical studies for each wall. • SCJ will provide the roadway design drawings and topographic surfaces in Civil3D 2018 format. Deliverables • Preliminary, 90%, and Final PS&E documents submitted in PDF via email. • Technical memorandum submitted in PDF via email. Traffic and Lighting (PH Consulting) The project intersections are on the Kitsap Way (SR 310) Corridor and Warren Ave/Wheaton Way (SR 303) Corridor. The traffic and lighting scope consists of preparing the contract documents (PS&E), technical reports, traffic signal timing/coordinati on plans, and policy statements to implement the following: Improvement/Countermeasure: Add/Upgrade LED Street Lighting at the following location: 1) Kitsap Way Corridor between Wilbert and 11th Ave Improvement/Countermeasure: Signal Head Back Plates with Retroreflective Tape Borders at the following intersections: 1) Kitsap Way & SR3 Off-Ramp (EB, WB, SB) 2) Kitsap Way & SR3 On-Ramp (EB, WB) 3) Kitsap Way & Shorewood Drive (EB, WB) 4) Kitsap Way & Oyster Bay Ave (EB, WB, NB) 5) Kitsap Way & Pedestrian Signal (EB, WB) 6) Kitsap Way & National Ave (WB) 7) Kitsap Way & Adele Ave (WB) 8) Kitsap Way & 11th Ave (NB) 9) Kitsap Way & Wycoff (EB, WB, SB) SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 9 10) Kitsap Way/6th St & N Callow Ave (NB) 11) Burwell (SR 304) & Warren (SR-303) (EB, WB, SB) 12) Warren (SR-303) & 6th St (EB, WB, SB, NB) 13) Warren (SR-303) & 11th St (EB, WB, SB, NB) 14) Warren (SR-303) & 16th St (EB, WB, SB, NB) 15) Wheaton Way (SR-303) & Sheridan (EB, WB, SB, NB) 16) Wheaton Way (SR-303) & Sylvan (EB, WB, SB, NB) 17) Wheaton Way (SR-303) & Hollis (EB, WB, SB, NB) 18) Wheaton Way (SR-303) & Riddell (EB, WB, SB, NB) 19) SR-303 & Furneys (EB, WB, SB, NB) Improvement/Countermeasure: Update Signal Timing/Coordination Programming at the following intersections: 1) Kitsap Way & SR3 SB Off-Ramp 2) Kitsap Way & SR-3 NB On/Off-Ramp 3) Kitsap Way & Shorewood Drive 4) Kitsap Way & Ostrich Bay Ave 5) Kitsap Way & Oyster Bay Ave 6) Kitsap Way & Pedestrian Signal 7) Kitsap Way & National Ave 8) Kitsap Way & Adele Ave 9) Kitsap Way & 11th Ave 10) Kitsap Way & Wycoff 11) Kitsap Way/6th St & N Callow Ave 12) 6th St & N Montgomery Ave 13) Burwell (SR 304) & Warren (SR-303) 14) Warren (SR-303) & 6th St 15) Warren (SR-303) & 11th St 16) Warren (SR-303) & 13th St 17) Warren (SR-303) & 16th St 18) Wheaton Way (SR-303) & Sheridan 19) Wheaton Way (SR-303) & Sylvan 20) Wheaton Way (SR-303) & Broad 21) Wheaton Way (SR-303) & Hollis 22) Wheaton Way (SR-303) & Riddell 23) SR-303 & Furneys Improvement/Countermeasure: Provide Pedestrian Clearance Upgrades to meet ITE/MUTCD and Lead Pedestrian Intervals at the following intersections: 1) Kitsap Way & Shorewood Drive 2) Kitsap Way & Ostrich Bay Ave 3) Kitsap Way & Oyster Bay Ave 4) Kitsap Way & Pedestrian Signal SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 10 5) Kitsap Way & National Ave 6) Kitsap Way & Adele Ave 7) Kitsap Way & 11th Ave 8) Kitsap Way & Wycoff 9) Kitsap Way/6th St & N Callow Ave 10) 6th St & N Montgomery 11) Burwell (SR 304) & Warren (SR-303) 12) Warren (SR-303) & 6th St 13) Warren (SR-303) & 11th St 14) Warren (SR-303) & 13th St 15) Warren (SR-303) & 16th St 16) Wheaton Way (SR-303) & Sheridan 17) Wheaton Way (SR-303) & Sylvan 18) Wheaton Way (SR-303) & Broad 19) Wheaton Way (SR-303) & Hollis 20) Wheaton Way (SR-303) & Riddell 21) SR-303 & Furneys Improvement/Countermeasure: Install Auxiliary Signal Heads at the following intersections: 1) Kitsap Way & Shorewood Drive (EB, WB) 2) Kitsap Way & Ostrich Bay Ave (EB, WB, NB) 3) Kitsap Way & Oyster Bay Ave (EB, WB) 4) Kitsap Way & National Ave (EB, WB) 5) Kitsap Way & 11th Ave (SB, NB) 6) Kitsap Way & Wycoff (SB) 7) Burwell (SR 304) & Warren (SR-303) (EB, WB) 8) Warren (SR-303) & 6th St (EB, WB) 9) Warren (SR-303) & 11th St (EB - replace with protected, WB) 10) Warren (SR-303) & 13th St (EB, WB) 11) Warren (SR-303) & 16th St (EB, WB) 12) Wheaton Way (SR-303) & Sheridan (EB, WB, NB) 13) Wheaton Way (SR-303) & Sylvan (EB, WB, NB) 14) Wheaton Way (SR-303) & Hollis (WB) 15) Wheaton Way (SR-303) & Riddell (EB, WB, SB) 16) SR-303 & Furneys (SB, NB) Improvement/Countermeasure: Provide Vehicle & Bicycle Detection System at the following intersections: 1) Kitsap Way & Shorewood Drive 2) Kitsap Way & Ostrich Bay Ave 3) Kitsap Way & Oyster Bay Ave 4) Kitsap Way & National Ave 5) Kitsap Way & Adele Ave SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 11 6) Kitsap Way & 11th Ave Improvement/Countermeasure: Provide ADA Accessible Pedestrian Pushbuttons at the following intersections: 1) Kitsap Way & Shorewood Drive 2) Kitsap Way & National Ave 3) Kitsap Way & 11th Ave 4) Warren (SR-303) & 6th St Improvement/Countermeasure: Kitsap Way & Shorewood Drive Intersection Improvements 1) Add Protected vehicle/pedestrian phase for eastbound right turn lane with ADA signal. Improvement/Countermeasure: Kitsap Way & Ostrich Bay Intersection Improvements 1) Eastbound: Add left turn signal head/phasing. 2) Northbound: Modify signal heads markings to be consistent with lane use restrictions. Improvement/Countermeasure: Kitsap Way & Pedestrian Signal Crossing 1) Remove extra signal heads and adjust existing signal heads. Improvement/Countermeasure: Kitsap Way & National Ave Improvements 1) Add Protected vehicle/pedestrian phase for eastbound right turn lane with ADA signal improvements. Improvement/Countermeasure: Kitsap Way & 11th Ave Intersection Improvements 1) Traffic signal modifications to include new cabinet/controller and foundation, new dual mast signal pole & foundations, and ADA signals. Project Monitoring and Coordination 1) Project Coordination: Provide coordinate with SCJ on a weekly basis. Provide support for the City in coordination with WSDOT requirements. 2) Project Monitoring, Progress Reporting, and Invoicing: Coordinate with design team members, project scheduling, and prepare of a monthly progress report and a monthly billing statement. The monthly progress report shall summarize work completed during the reporting period; issues addressed, and anticipated issues during the next reporting period. 3) Project Team Meetings: Conduct internal project coordination meetings and biweekly meetings with SCJ throughout the duration of the Project. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 12 Preliminary Design 1) Data Collection and Review: Review the as-builts, CAD files, GIS Data, and incorporate relevant information. 2) Site Reconnaissance: Visit the project sites and familiarize with the site conditions and data collected for the project. Obtain photographs for design reference. Check the preliminary base maps to confirm complete and accurate representation of existing conditions. Field check the design to assure the design fits the conditions in the field. Notify SCJ of any additional information or clarification required. 3) Preliminary Traffic Signal & Street Light Improvements: Prepare preliminary traffic signal and lighting improvement plans with construction notes and standard details at 1”=20’ scale (unless noted otherwise). The number of plan sheets per plan type is shown in parentheses. • Index/Key Map (1 sheet) • Traffic Signal Modification Plan Sheets (7 sheets) • Kitsap & Shorewood (1 sheet) • Kitsap & Ostrich (1 sheet) • Kitsap & National (1 sheet) • 11th St Signal Plan Sheet (1 sheet) • Street Light Plan (1 sheet) 4) 30% Design Package: Provide technical memorandum including design documentation, calculations, and considerations. Provide technical memorandum to SCJ for inclusion in the Basis for Design Report. Provide preliminary cost estimate prepared under a separate task. Agency and Stakeholder Coordination 1) City Coordination: Support SCJ in coordinating the preparation and review of the project design work with CITY staff and applicable review agencies and stakeholders at the OTS, 90%, and 100% levels of design completion. Provide copies of technical documentation to facilitate agency and stakeholder review and approval of the proposed project solutions. This task provides for coordination of technical issues with CITY staff and the coordination and resolution of review comments. Up to four meetings at the City of Bremerton are assumed as follows: • Project Kickoff Meeting • OTS, 90%, 100% Comment Review Meetings Final Design 1) Over the Shoulder Review Set: Provide one over-the-shoulder (OTS) review set for the 60% design meetings based on comments received during the 30% design review meeting. The OTS review plan set will include the following plans prepared at 1”=20’ scale (unless noted otherwise) in addition to the plans prepared during the preliminary design. The number of plan sheets per plan type is shown in parentheses. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 13 • Traffic Signal Pole Schedule (1 sheet) • Traffic Signal Wire Diagram (1 sheet) • Traffic Signal Detail Sheets (2 sheets) 2) 90% Traffic Signal & Street Lighting Improvement Design: Revise the design drawings in accordance with comments received in the OTS review meeting. Prepare traffic signal and street lighting improvement plans and details in accordance with CITY standards, CITY guidelines, and MUTCD. Plans will show proposed locations for the new streetlights, signal poles, traffic signal heads, pedestrian push buttons, wiring diagrams, electrical hardware, conduit, and pedestrian poles. 3) Comment Response: Coordinate with SCJ to receive comments on each plan submittal and respond to each set of comments resulting from the 30%, OTS, 90%, and 100% design review meetings. 4) Final Plans: Revise plans based on the 90% design review comments and submit to SCJ in PDF format via email. 5) Bid Set: Revise plans based on the 100% design submittal and submit to SCJ in PDF format via email. Special Provisions 1) Special Provisions: Provide the contract provisions, special provisions and appendices for the project to SCJ for incorporation into the project package. A contract specifications outline will be prepared for the 30% design submittal. Special provisions will be included with the 90% design submittal. Quantities and Opinion of Probable Costs 1) Quantities: Compile quantities for the project into a single summary of quantities sheet. provide SCJ with calculation and measurement notes for estimated quantities at each design level. 2) Opinion of Cost: Prepare an engineer’s opinion of cost for the project at the 30%, 90%, 100%, and bid-ready levels of completion. The opinions of cost will be prepared using bid items with documented unit costs, lump-sum prices, and back up. The opinions of cost will be submitted in Excel format meeting the CITY’s standard format. Traffic Analysis, Timing, and Coordination Plans 1) Traffic Operations Policy Recommendations: Develop proposed operations policy for implementation of Lead Pedestrian Interval and pedestrian crossing time calculation methodology meeting MUTCD requirements. Prepare preliminary memorandum to CITY for review and incorporate comments into final technical memorandum. 2) Signal Timing Plan Development – Warren Avenue / Wheaton Way Corridor: Prepare recommended basic signal timing parameters and up to two new time of day coordination plans for up to 11 intersections on the Warren Avenue / Wheaton Way SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 14 Corridor. Intersections are anticipated to operate in free mode during off peak periods. Proposed timing parameters will include Lead Pedestrian Intervals and calculated pedestrian clearance phase timings per MUTCD and approved City Policy. Attend one preliminary meeting with CITY traffic operations staff to document required timing parameters and understand needs as they relate to signal timing. One meeting is assumed between CITY traffic operations staff and PHC staff to review proposed timings prior to implementation as described in Task 7. Timing, Coordination Plan Implementation – Warren Avenue / Wheaton Way Corridor 1) Timing, Coordination Plan Implementation – Warren Avenue / Wheaton Way Corridor: Provide traffic signal timing implementation support services for the Warren Ave Wheaton Way Corridor intersections. After traffic signal timings have been reviewed, approved, and bench tested by the CITY PHC will spend up to three days in the fi eld with CITY traffic operations staff observing, testing, and adjusting timings to optimize coordination plans. Bidding Services 1) Bidding Services: Support SCJ and City staff during the bidding period as directed. For budget purposes, 8 hours of support are assumed. Understanding • CITY will review and approve PHCs proposed traffic signal improvement sheet layouts. • SCJ will provide electronic base mapping in Civil3D 2018 format. • CITY will provide existing as-builts along the corridor and at intersections. • SCJ will provide utility and Right of Way coordination. • CITY will provide available historical traffic collision data and traffic count data information for all applicable intersections. • CITY will provide all existing traffic signal timing sheets and elect ronic controller database/configuration files for the intersections being analyzed. • City will provide latest relevant synchro model network segments. • City will test all controller programming files supplied by PHC prior to implementing in field. • SCJ will perform all WSDOT/FHWA, property owner, and private utility coordination necessary for the project. • SCJ will be responsible for preparing meeting agendas, documentation, and confirming action items. • Applicable CITY and/or WSDOT Standard Plans will be included in the Contract Provisions. • Traffic Control plans will be provided by SCJ. • PIF Documentation will be provided by SCJ. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 15 • Wiring diagrams and custom details will be provided during the 60% design review meetings and 90% PS&E package. • SCJ will provide the sheet border template in ACAD 2018 format. • SCJ will compile the project plans, estimate, and special provisions into a single submittal and submit to the City. • New signal timing and coordination development for the Warren Ave Corridor will be completed and implemented prior to beginning work for the Kitsap Way Corridor. • Contract special provisions will be prepared using the current WSDOT Standard Specifications, WSDOT/APWA general special provisions, and the CITY’s standard special provisions as applicable to the project design. Deliverables • Preliminary Traffic Signal & Street Lighting Improvement Sheets submitted to SCJ in PDF via email. • Cost estimates for the 30%, 90%, 100%, and bid plan sets submitted to SCJ in Excel via email. • Special provisions for the 90%, 100%, and bid packages submitted to SCJ in Word via email. • Technical Memorandum submitted to SCJ in PDF via email. • Draft and Final Traffic Operations Recommendations Memorandum submitted to SCJ in PDF via email. • Weekday AM, and PM Synchro models with proposed signal timing plans for all intersections. (Synchro). • Controller Database/Configuration files with new timings programmed. • Traffic Analysis Memorandum documenting approach, proposed timings, coordination periods and segments, and Existing and Proposed LOS Results submitted to SCJ in PDF via email. • Final AutoCAD drawings in AutoCAD 2018 format with x-ref files bound to each drawing file. Geotechnical Design (by GeoEngineers) Project Planning, Coordination, and Field Explorations 1) Project Planning and Coordination: Apply for Washington State Department of Transportation (WSDOT) General Permit. Provide traffic control plans and traffic control for geotechnical field explorations. Coordinate planning and scheduling for subcontracted drilling and traffic control services. 2) Utility Locates: Visit the project site to coordinate boring locations and mark out preliminary boring locations. Contacting the “One-Call” Utility Notification Center to locate utilities. Follow-up site visit to check status of underground utility locates. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 16 3) Field Explorations: Advance three to four hollow-stem auger borings near proposed wall structures and site improvements to nominal depths ranging between 20 and 40 feet below ground surface (bgs). Coordinate with vacuum truck services to clear boring location of soil to check for presence of utilities. Obtain soil samples and perform standard penetration tests (SPT) at 2.5- to 5-foot intervals to sample soils and measure in-place density. 4) Slope Reconnaissance: Conduct a limited slope reconnaissance for the length of slope where the proposed engineered wall will be located. The slope reconnaissance will be limited to observations made from the public ROW. These observations will be completed during the time of subsurface explorations. Geotechnical Design and Reporting 1) Data Collection: Review existing readily available subsurface information and published geologic maps. 2) Laboratory Testing: Laboratory testing on selected soil samples. Laboratory testing will comprise moisture content determinations and particle-size analyses. 3) Geotechnical Report: Prepare a written geotechnical design report summarizing our findings, conclusions and recommendations. Our report will include a site map of the project with boring locations, appropriate engineering figures and supporting information. Provide a draft report for comment and review followed by a final report incorporating mutually agreed upon changes. The report will include the following: • General discussion of site soil and groundwater conditions encountered based on our review, explorations, and testing. • Discussion on existing slope observations made during our limited slope reconnaissance. • Design recommendations for a contractor-designed structural earth wall (SEW), for up to about 12 feet exposed height, based on guidance from applicable sections of the American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design Specifications, Eighth Edition, 2017 (AASHTO LRFD), WSDOT Geotechnical Design Manual, 2015 (WSDOT GDM) and WSDOT Standard Specifications, 2020. Recommendations will include SEW design parameters, bearing surface preparation recommendations and allowable bearing pressures. Provide a discussion on drainage criteria. • Recommendations for permanent cantilever soldier pile or similar wall design within existing slope adjacent State Route 310 southbound. Provide presumed lateral earth pressure diagram(s) based on guidance from applicable sections of the AASHTO LRFD and WSDOT GDM and include a discussion on installation and construction considerations. • Provide global slope stability analysis of the slope with proposed permanent cantilever soldier pile wall or similar wall in-place using commercially available slope stability analysis software (SLOPE/W) and based on guidance from applicable sections of the WSDOT GDM. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 17 • Provide geotechnical seismic design information in accordance with the AASHTO LRFD guidelines and discussing our opinion on the potential for surface rupture, liquefaction and lateral spreading at the site. • Provide recommendations for lateral bearing pressures for signal pole foundation design based on guidance in the WSDOT GDM. Discuss construction considerations regarding installation of the signal pole foundations. • Provide recommendations for small ancillary foundations within the project site based on guidance from applicable sections of the AASHTO LRFD. • Provide recommendations for site preparation and earthwork including temporary erosion and sedimentation controls, temporary and permanent cut slopes, fill placement and compaction requirements, wet weather considerations, groundwater handling and site drainage. Post Geotechnical Design Consultation 1) Geotechnical Consultation: Provide geotechnical consultation during planning and design. Understanding • SCJ will provide the proposed topographic data that includes the proposed soldier pile wall. • Soldier piles will not require axial loading considerations. • Work time restrictions limit work between 9 am and 3 pm within the traveled way. • The budget includes up to 100 lineal feet of drilling and two full days for field explorations. • One travel lane will be closed to access boring locations and obtain samples. • The planned explorations do not include an environmental site assessment and the site is assumed to be “clean” regarding hazardous or contaminated materials. • The liquefaction potential at the site is anticipated to be low; therefore, a full liquefaction and lateral spreading analysis for this study is not included. • Post geotechnical design consultation is budgeted at 20 hours. Deliverables • Traffic Control Plan submitted in PDF via email. • Geotechnical Design Report in PDF via email. Environmental Documentation Support Environmental Documentation Support 1) Area of Potential Effects: Prepare Area of Potential Effects document for the project limits. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 18 2) WSDOT Meeting: Attend NEPA DCE meeting with LPE and LEE at the City or WSDOT Olympic Region. Prepare draft NEPA DCE and distribute to meeting attendees one week prior to the meeting. Understanding • There are no wetland impacts. • The City will prepare the SEPA and NEPA DCE applications. • There are no discipline reports required for the NEPA. • The SEPA determination will be Determination of Non-Significance. Deliverables • APE Public Involvement Public Involvement 1) Focus Meetings: Support the City in meeting with individual property owners and/or business owners to discuss the project and gather input. 2) Public Meetings: Hold up to two public information meetings to report on project progress and gather public feedback. Prepare graphic materials for discussion purposes. Prepare notes from the meetings to document key decisions and/or action items. Understanding • Support for Focus Meetings is budgeted at 8 hours. Deliverables • Meetings summaries for focus meetings, public information meetings, submitted in PDF via email. Final Design Utility Coordination 1) Identify Potholing Locations: Based on potential utility conflicts identified under the preliminary design phase, identify recommended potholing locations and submit to the City. Roadway 1) Horizontal Layout: Finalize the horizontal layout. 2) Vertical Layout: Determine final flowline grade at Kitsap Way/11th Avenue; develop final curb return profiles and intersection grading (1 intersection); develop final driveway profiles for up to 4 driveways; and detail ADA ramps, roadway intersections, and driveways. Develop final back of sidewalk grades and design conformance to existing yards. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 19 Drainage 1) Stormwater Site Plan: Prepare a Stormwater Site Plan (drainage report) per the Ecology Stormwater Management Manual for Western Washington (2014). Channelization and Signing 1) Striping: Revise pavement marking plans to incorporate any horizontal design changes. 2) Signing: Develop a signing plan to meet the requirements of the MUTCD. Identify sign type, size and location. Identify existing signs to be relocated or removed. Design Documentation 1) Final Design Report: Prepare a memorandum in addendum to the Basis of Design Report. Explain changes to the design and attach supporting documentation and/or calculations. 60% Progress Meetings: 1) 60% Progress Meetings: Attend up to one two-hour meeting in Bremerton and up to two one-hour conference calls to review design and plan progress with the City between Preliminary Design and 90% PS&E. 2) Utility and Electrical Review: Provide 60% utility and electrical design drawings for review. 90% Plan Sheets 1) The following 90% plans will be updated according the 30% review and comments from Task 6: • Cover Sheet (1 sheet) • Summary of Quantities (1 sheet) • Horizontal Alignment Plan (12 sheets @ 20 scale double stacked full size) • Roadway Sections (3 sheets) • Temporary Erosion and Sediment Control Plans (12 sheets @ 20 scale double stacked full size) • TESC Details and Notes (1 sheet) • Removal and Excavation Plans (12 sheets @ 20 scale double stacked full size) • Roadway/Stormwater Plan and Profiles (4 sheets @ 20 scale full size) • Roadway/Stormwater Details (1 sheets) • ADA Grading Details (4 sheets) • Paving Plans (4 sheets @ 20 scale double stacked full size) • Pavement Marking and Signing Plan (12 sheets @ 20 scale double stacked full size) • Sign Specification Sheet (1 sheet) • Traffic Signals (Prepared by PH Consulting under Phase 5) • Illumination (Prepared by PH Consulting under Phase 5) SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 20 • Retaining Wall Plan and Profile (Prepared by Sargent Engineers under Phase 4) • Traffic Control Plans (6 sheets @ 20 scale full size) 90% Engineer’s Estimate 1) 90% Engineer’s Estimate: Develop quantities based on the 90% plans. Assign unit costs for quantified item and assign lump sum costs to other items based on professional judgment. Develop a 90% construction cost estimate that includes a 10% contingency. 90% Contract Documents 1) 90% Contract Documents: Write specifications for all non-standard items. Compile the special provisions into one Project Manual document. Final Comment Resolution 1) Final Comment Resolution: Respond to 90% review comments in a matrix format. Attend one meeting with the City to resolve comments from the 90% review. Final PS&E Package 1) Final Plans: Update the plans per the 90% review comments. 2) Final Engineer’s Estimate: Update the quantities to reflect the plan updates. Prepare Unit Price Worksheet including item descriptions, unit, quantity and cost. Update the engineer’s estimate with revised quantities. 3) Final Contract Documents: Assemble the General Provisions, Special Provisions, and Unit Price Worksheet into one Project Manual document. Understanding • The City will provide SCJ with approved contract documents and boilerplate Division 1 special provisions. • The 90% and Final reviews will not result in material changes to the design of improvements. Deliverables • Final Basis of Design Report submitted in PDF via email. • Stormwater Site Plan submitted in PDF via email. • PS&E Package (90%) including half-size plans, special provisions, and engineer’s estimate. • PS&E Approval Package (Final) including half-size plans, special provisions, and engineer’s estimate. Bidding Services Bidding Services 1) Bid Documents: Prepare bidding documents for advertisement. SCJ Alliance Exhibit A – Scope of Work HISP Phase III July 1, 2019 City of Bremerton Page 21 2) Bidding Services: Support City staff during the bidding period as directed. For budget purposes, 8 hours of support preparing addendums and responding to request for information are assumed. 3) Conformance Documents: Prepare conformance documents to include bid addendums. Potholing (Optional Future Phase) NEPA Discipline Reports (Optional Future Phase) Right-of-Way Services (Optional Future Phase) Construction Engineering Services (Optional Future Phase) Timing and Coordination Plan Implementation (Optional Future Phase) END OF SCOPE OF SERVICE G:\Team Drives\Marketing\Proposal Numbers\P3200.01 to P3600.01\P3421.01 Bremerton Kitsap Way Design\Scope and Fee\2019-0524_Bremerton HISP Ph 3_Scope_DRAFT.docx 212 N Tower Ave  Centralia , WA 98 531  Office 360.669.0700  Fax 360.352.1509  scjalliance.com Exhibit B UDBE Participation Plan To Brian Moorhead, PE From: Josh Brannin, PE Date: July 1, 2019 Project: P3241.01 – HISP Phase III: Kitsap Way (SR 310) and Warren Avenue (SR 303) Traffic Signal and Multimodal Safety Subject Proposed UDBE Participation Plan SCJ Alliance proposes to use the following Underutilized Disadvantaged Business Enterprises (UDBEs) for the Taylor Way Rehabilitation Project. The proposed use of UDBE firms is based on an assumed total Consultant Team contract of $386,000 with a minimum participation of level of 9%. Please contact Josh Brannin at 360-352-1465, josh.brannin@scjalliance.com, if you have any questions. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Public Hearing and Resolution No.____ Adopting the 2020 – 2025 Six Year Transportation Improvement Plan Study Session Date: July 10, 2018 COUNCIL MEETING Date: July 17, 2018 Department: PW&U Presenter: Tom Knuckey Phone: (360) 473-2376 SUMMARY: The Six-Year Transportation Improvement Program (TIP) is prepared pursuant to RCW 35.77.010. The TIP is updated annually and filed with the Secretary of Transportation, Local Programs Office. It is intended as a planning tool for the local, State and Federal transportation funding entities. The TIP has been prepared for City Council approval by Resolution prior to submittal to the Washington State Department of Transportation. This TIP is consistent with Bremerton’s Comprehensive and Non-Motorized Transportation Plans, and Street CIP. ATTACHMENTS: 1) Resolution No. _____; 2) 2020 – 2025 Six Year City TIP Projects List Updated; and 3) TIP Program Overview Added FISCAL IMPACTS (Include Budgeted Amount): Annual adoption of a six-year TIP is required by State law, and is necessary to receive certain State and Federal Transportation funds. The TIP includes $127,826,106 in projects over the 6-year planning period. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve Resolution No. _____, which approves the City’s 2020 – 2025 Six-Year Transportation Improvement Plan, and allow the Mayor to forward the Resolution and Plan to the Department of Transportation, Local Programs Office. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 B5 Updated 1 Six Year Transportation Plan RESOLUTION NO. ________ A RESOLUTION of the City Council of the City of Bremerton, Washington, adopting the 2020 – 2025 Six Year Transportation Improvement Plan. WHEREAS, after proper notice, the City Council of the City of Bremerton held a public hearing at the regular meeting of the City Council at 5:30 p.m. on July 3, 2019 to consider public testimony on the City’s proposed 2020 - 2025 Six Year Transportation Improvement Plan and, having considered public testimony to the Plan and in accordance with the provisions of RCW 47.80; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The 2020 through 2025 Six Year Transportation Improvement Plan, set forth in Exhibit “A” attached hereto and herewith filed with the City Clerk, is hereby adopted. SECTION 2. Severability. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 3. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this _____ day of __________________, 2019. _________________________________ Eric Younger, Council President APPROVED AS TO FORM: ATTEST: __________________________________ ________________________________ ROGER A. LUBOVICH, City Attorney ANGELA WOODS, City Clerk R:\Legal\Legal\Resolutions\Public Works\2008 Resolution for TIP.doc PW Project # Project Title2020  2021  2022 2023 2024 2025 Grand Total TR00007 11th Street Reconstruction, Warren to Pacific500,000          500,000            TR00035 15th and Corbett Intersection Improvements ‐                         TR00102 4th Street Landscaping Replacement/Sidewalk Repair‐                         TR00003 6th Street Phase I (Callow to Naval)631,000         631,000            TR00004 6th Street Phase II (Warren to Pacific)1,440,440      1,440,440        TR00005 6th Street Phase III (Naval to Warren)300,000          2,100,000       ‐                       2,400,000        TR00050 ADA Sidewalk Improvements260,000          320,000          380,000          440,000          500,000          400,000          2,300,000        TR00128 Analysis Area C and SR 3 ‐ New intersection southwest of existing Lake Flora Road / SR 3 intersection‐                       ‐                         TR00129 Analysis Area C/D and Lake Flora Road ‐ New intersection southeast of existing Lake Flora Road / SR 3 intersection‐                       ‐                         TR00055 Anderson Cove Sidewalks (19th & Naval to 15th)40,000            400,000          440,000            TR00138 Annual General Maintenance and Operations Costs‐                       ‐                         TR00139 Annual Maintenance Program: Arterial and Local Streets Major Maintenance and Reconstruction  3,300,000       5,800,000       5,800,000       5,800,000       5,800,000       5,800,000       32,300,000      TR00117 Area B Collector Road ‐ new roadway west of SR 3 at Cross PSIC‐intersections‐                       ‐                         TR00118 Area C Collector Road ‐ new roadway south of Lake Flora Road to the Belfair Bypass‐                       ‐                         TR00119 Area D Collector Road ‐ portion of new roadway south of Lake Flora Road‐                       ‐                         TR00120 Area F Collector Road ‐ new roadway north from Lake Flora Road‐                       ‐                         TR00121 Area G Collector Road ‐new roadway east from Cross PSIC Roads‐                       ‐                         TR00041 Armin Jahr Elementary (SRTS)‐                         TR00034 Arsenal Way/Patton Ave Safety Improvements100,000          100,000            TR00083 Austin Drive Bike/Ped Street Markings30,000           30,000              TR00031 Auto Center Way Multimodal Conversion (Loxie Eagans N to SB Freeway)‐                         TR00134 Belfair Bypass ‐ 2‐lane divided highway with capability for 4 lanes‐                         TR00095 Belfair Valley Road Shoulder Widening for Multimodal‐                       ‐                         TR00076 Big Belly Trash Cans and Refurbish Benches15,000            15,000            15,000            15,000            15,000            75,000              TR00062 Bremerton School Zone Safety Improvements (SRTS)244,000         244,000            TR00085 Bridge to Bridge Trail Wayfinding75,000            75,000              TR00066 City Safety Improvement100,000          100,000          100,000          100,000          100,000          100,000          600,000            TR00105 City Street Lighting ‐ evaluation and upgrade for compliance with standards‐                         TR00130 Cross‐SKIA Connector and Lake Flora Road ‐ New intersection of southern terminus of extension of Cross‐PSIC Connector‐                       ‐                         TR00131 Cross‐SKIA Connector/ Analysis Area B/ SR 3 ‐ New intersection of northern terminus of Cross‐PSIC Connector‐                       ‐                         TR00039 Crownhill Elementary (SRTS) Phase II‐                       350,000          350,000            TR00048 Dockside Access Way (Planning)‐                         TR00049 Downtown Bike Facilities150,000         150,000            TR00088 Downtown Street Circulation Study‐                       ‐                       50,000            ‐                       ‐                       50,000              TR00028 E. Bremerton Shared Use Path80,000            600,000          680,000            TR00024 East/West Corridor Diet (6th or 11th or Couplet)‐                       800,000          8,000,000       8,800,000        TR00072 Gateway Landscaping Materials75,000           75,000              TR00047 Gorst Sinclair Trail (Planning)‐                         TR00114 Green Standard Bicycle Improvements20,000            20,000            20,000            20,000            20,000            20,000            120,000            TR00113 Green Standard Pedestrian Improvements20,000            20,000            20,000            20,000            20,000            20,000            120,000            TR00106 Hospital District Street Improvements; Callahan, Cherry, Wheaton‐                         TR00011 HSIP III‐Kitsap Way Bike Lane/Warren Signal363,000          2,154,800       2,517,800        TR00022 Improve Shorewood Drive through the NAD Park to Jackson Park‐                         TR00071 ITS Adaptive Signals on SR‐304 (Charleston to Washington)125,000          125,000          1,450,000       1,700,000        CITY OF BREMERTON PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM 2020‐2025 PW Project # Project Title2020  2021  2022 2023 2024 2025 Grand Total CITY OF BREMERTON PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM 2020‐2025TR00033 ITS City‐Wide500,000          500,000            TR00012 Kitsap Lake Elementary (SRST)500,000         500,000            TR00110 Kitsap Lake Vicinity Ped/Bike Improvements‐                         TR00133 Lake Flora Widening ‐ Widening to southern end of potential southern end of Cross‐PSIC Bremerton roads‐                       ‐                         TR00122 Local Access Projects ‐ 5.64 miles of local access road‐                       ‐                         TR00136 Lower Wheaton Way Reconstruction (Lebo to Sheridan)‐                         TR00089 Manette Traffic Circulation Study‐                       ‐                       ‐                       25,000            ‐                       25,000              TR00111 Marine Drive LOS Improvements at Kitsap Way‐                       ‐                         TR00030 Marine Drive NMT Improvements‐                       400,000          5,000,000       5,400,000        TR00056 Matan & Lillian & James Sidewalk Connector (Bloomington to Olympic)‐                       40,000            40,000              TR00040 Mountain View Middle School (SRTS)‐                         TR00026 National Avenue Reconstruction (Kitsap Way to City Limits)‐                       300,000          300,000            TR00044 Naval Avenue Elementary (SRTS)‐                         TR00010 Naval Avenue Road Diet (1st to 15th)600,000          400,000          3,000,000       4,000,000        TR00037 Navy Commuter Master Plan250,000          250,000          500,000            TR00092 Non‐Motorized Transportation Plan Update‐                       80,000            80,000              TR00027 North/South Corridor Bike/Ped Backbone Improvements‐                         TR00126 Old Clifton Road / SR 16 Eastbound Ramps ‐ Signalize intersection add dedicated right turn EB and dedicated left turn WB‐                         TR00127 Old Clifton Road / SR 16 Westbound Ramps ‐ Signalize intersection ‐                         TR00020 Oyster Bay Avenue Improvements (Kitsap Way to Arsenal)‐                       250,000          2,500,000       2,750,000        TR00058 Paint & Refurbish 30 Street Lights25,000            25,000            25,000            25,000            25,000            25,000            150,000            TR00137 Pavement Preservation including Transportation Benefit District‐                       ‐                         TR00001 Perry Avenue ReconstrucƟon (11th to 17th)4,989,881       4,989,881        TR00061 Pine Road ‐ Street Light Construction‐                         TR00017 Pine Road Construction (Sheridan to Pinewood)‐                       250,000          2,250,000       2,500,000        TR00075 PSE Power Pole Relocation5,000              5,000              5,000              5,000              5,000              25,000              TR00074 PSNS Main Entrance ‐                         TR00002 Quincy Square on 4th Street (Washington to Pacific)5,917,500       5,917,500        TR00109 Repair Downtown Street Standard Banner Supports‐                         TR00060 Ricky Road ‐ Street Light Construction‐                         TR00053 Riddell Road Sidewalk Improvement (City limits to Wheaton Way)‐                       ‐                         TR00015 Sheridan Reconstruction (Wheaton Way to Lebo)‐                       ‐                       250,000          250,000            TR00023 Shore Drive Shared Use Path (Planning)‐                         TR00051 Sidewalk Abatement (BMC 11.08.090)85,000            90,000            95,000            100,000          105,000          50,000            525,000            TR00108 Sidewalk Improvement (Wheaton Way at Callahan)‐                         TR00052 Sidewalk In‐fill Program750,000          750,000          750,000          750,000          750,000          3,750,000        TR00068 Signal System Upgrades100,000          100,000          100,000          100,000          100,000          100,000          600,000            TR00132 SR 3 Widening ‐ Widening from Imperial Way to Gorst‐                         TR00123 SR 3/Imperial Way ‐ signalize intersection, modify approaches‐                         TR00125 SR 3/SR 16/ Sam Christopherson Ave ‐ grade separation‐                         TR00124 SR 3/Sunnyslope Road ‐ signalize intersection, modify approaches‐                         TR00029 SR 303 Warren Ave Bridge Pedestrian Improvements750,000          750,000          7,500,000       9,000,000        TR00036 SR‐3/16 Study Implementation10,000,000    10,000,000      TR00008 SR‐303 Corridor Study (Burwell to McWilliams)194,485         194,485             PW Project # Project Title2020  2021  2022 2023 2024 2025 Grand Total CITY OF BREMERTON PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM 2020‐2025TR00013 SR‐303 Olympic College Frontage50,000           50,000              TR00046 State Street Pedestrian Corridor Improvement75,000            75,000              TR00100 STEM Academy (National/Arsenal) SRTS‐                         TR00059 Street Light Illumination over/on Signal Stantions30,000           30,000              TR00067 Streets Electrical Cabinet Replacement Program35,000            35,000            35,000            35,000            35,000            35,000            210,000            TR00016 Sylvan Reconstruction (Wheaton Way to Pine Road)250,000          4,750,000       5,000,000        TR00032 Tracyton Beach Drive Improvements‐                         TR00082 Traffic Calming30,000            30,000            30,000            30,000            30,000            30,000            180,000            TR00038 Traffic Model Development/Corridor Capacity and Signal OpƟmizaƟon Study 25,000            ‐                       25,000              TR00093 Traffic Sign Replacement ‐ Retroreflective Requirements20,000            20,000            20,000            20,000            20,000            20,000            120,000            TR00098 Traffic Signal Retiming Annual Plan15,000            15,000            15,000            15,000            15,000            15,000            90,000              TR00135 Trails‐12 miles of trails‐                       ‐                         TR00043 View Ridge Elementary (SRTS)‐                         TR00112 Warren Avenue Intersection LOS Improvements (Burwell to Bridge)‐                       ‐                         TR00014 Warren Avenue Pedestrian Overpass/Underpass‐                       250,000          1,271,000       1,521,000        TR00063 Washington Avenue Lower Sidewalks75,000            500,000          575,000            TR00057 Washington Avenue Sidewalk Construction ‐ Towers Dev Agmt10,000            145,000          155,000            TR00006 Washington Avenue, Pacific to Manette Bridge337,500          337,500          4,225,000       4,900,000        TR00064 Wayfinding Signage‐                       80,000            80,000              TR00065 Werner Road ‐ Signal Improvements and Widening‐                       300,000          3,000,000       ‐                       3,300,000        TR00097 West Belfair Valley Road Reconstruction‐                       ‐                         TR00096 West Kitsap Way Reconstruction/Rechannelization (Chico to SR‐3)‐                       1,500,000       1,500,000        TR00103 Wheaton Way ‐ extended left turn pocket from 16th south to 13th for College Main Entrance‐                       200,000          2,100,000       2,300,000        TR00116 Yellow Standard Bicycle Improvements‐                       ‐                         TR00115 Yellow Standard Pedestrian Improvements‐                       ‐                         TR00069 Yellow‐Flashing Lights (City‐Wide)10,000            10,000            20,000              Grand Total10,545,425    23,084,681    23,585,000    22,671,000    21,360,000    26,580,000    127,826,106     City of Bremerton 2020-2025 Transportation Improvement Program Overview This section provides an overview of the changes from the previous 6 year project list (2019-2024) to this year’s 6 year project list (2020-2025). The changes are segmented by: projects removed; projects added; and other changes. Projects were generally not removed, however, the total TIP cost was reduced significantly due to consolidation listed below and projects being implemented in future years (i.e. 2026+) which reduced the total amount of cost reported. The major revisions to the project list are as follows: 1. Removed and consolidated projects with redundant scopes; 2. Removed all SR303 projects pending recommendations from Corridor Study 3. Removed completed projects; 4. Added or adjusted projects to be consistent with the Comprehensive Plan; 5. Added newly funded projects; 6. Added unique ID to each project; Projects Removed: TIP ID Comments Non Motorized Circulation Plan, Define Major Corridors N/A Duplicate with Navy Commuter Master Plan (ID# TR00037) 2007 Non Motorized Transportation Plan Implementation N/A Duplicate with Green Standard Bicycle and Pedestrian Improvements (ID#’s TR00114 & TR00113) Warren Avenue Improvements for Bus Rapid Transit (Study) N/A Duplicate with SR303 Corridor Study (ID# TR00008) Warren Avenue: SR303 Corridor Improvements – Burwell to Riddell N/A Pending recommendations from SR303 Corridor Study Warren Avenue – Reconstruct inter at 16th, and extend left turn pocket to 13th N/A Pending recommendations from SR303 Corridor Study Warren Avenue – Pedestrian/Bike Improvements 11th to Bridge South Approach N/A Pending recommendations from SR303 Corridor Study Kitsap Way: Chico Way / Northlake Blvd Roundabout N/A Duplicate with West Kitsap Way Reconstruction/Rechannelization (Chico to SR-3) project (ID# TR00096) Kitsap Way Bike Lane Improvements (See WSCC Proposal) N/A Duplicate with West Kitsap Way Reconstruction/Rechannelization (Chico to SR-3) project (ID#TR00096) Kitsap Way Multimodal Conversion Phase I: Northlake to Lakehurst N/A Duplicate with West Kitsap Way Reconstruction/Rechannelization (Chico to SR-3) project (ID#TR00096) Kitsap Way Multimodal Conversion Phase II: Lakehurst to SR-3 N/A Duplicate with West Kitsap Way Reconstruction/Rechannelization (Chico to SR-3) project (ID#TR00096) Arterial and Collector Streets - Maintenance N/A Duplicate with Project ID# TR00139 Arterial and Collector Streets - Preservation N/A Duplicate with Project ID# TR00139 Arterial and Collector Streets - Reconstruction N/A Duplicate with Project ID# TR00139 Sidewalk Reconstruction with PSE Power Pole Relocation N/A Duplicate with Green Standard Pedestrian Improvements (ID# TR00113) Austin Drive Bike/Ped Street Markings N/A Duplicate with Green Standard Bicycle and Pedestrian Improvements (ID #TR00113 & TR00114) Manette E. 11th Sidewalk/Storm Low Impact Development Retrofit (joint w/ Storm) N/A Project funded and included in scope of work for Perry Avenue Reconstruction Project (ID#TR00001) Warren Avenue Improvements North of Bridge to Sheridan, Reconstruction N/A Pending recommendations from SR303 Corridor Study Sylvan Way Sidewalk Improvements N/A Duplicate with Sylvan Reconstruction Project (TR00016) SR304 (Montgomery to Warren Ave) LAPA with WSDOT Preservation Project N/A Project Completed 2019 SR-303 Mid-Block Crossings (HAWK Signals) N/A Pending recommendations from SR303 Corridor Study City Safety Plan Implementation N/A Duplicate with City Safety Improvement (ID# TR00066 Residential Streets – All projects N/A Duplicate with other transportation projects on the list (i.e. traffic calming, sidewalk, major maintenance) or projects were not eligible for capital (i.e. labor, office supplies) Projects Added: TIP ID Comments Navy Commuter Master Plan TR00037 Quantifies parking deficit and a series of implementable projects to address lack of NBK parking. Potential funding by Department of Defense (DOD) Office of Economic Adjustment (OEA) 6th Street Phase III (Naval to Warren) TR00005 Grind and overlay of 6th street including curb ramps. Annual General Maintenance and Operations Costs TR00138 Project identified in Comprehensive Plan Annual Maintenance Program: Arterial and Local Streets Major Maintenance and Reconstruction TR00139 Project identified in Comprehensive Plan Pavement Preservation including Transportation Benefit District TR00137 Project identified in Comprehensive Plan Bridge to Bridge Trail Wayfinding TR00085 Project identified in the Comprehensive Plan Downtown Street Circulation Study TR00088 Project identified in the Comprehensive Plan HSIP III – Kitsap Way Bike Lane/Warren Avenue Signal TR00011 2019 Federal HSIP Grant – Project will add bike lanes to Kitsap Way and upgrade signals and signal timings along Kitsap Way and SR303 Manette Traffic Circulation Study TR00089 Project identified in Comprehensive Plan Non Motorized Transportation Plan Update TR00092 Project identified in Comprehensive Plan Traffic Calming TR00082 Project identified in Comprehensive Plan Traffic Sign Replacement – Retroreflective Requirements TR00093 Project identified in Comprehensive Plan Traffic Signal Retiming Annual Plan TR00098 Updates the signal timing for multiple intersections per year. Washington Avenue Lower Sidewalks TR00063 Reconstructs lower sidewalks along Washington and 11th north of the Manette Bridge. Washington Avenue Sidewalk Construction – Towers Dev Agmt TR00057 Replaces asphalt sidewalk on Washington between 6th and Manette Bridge. Developer funded. Sheridan Reconstruction (Wheaton Way to Lebo) TR00015 Project provides major rehabilitation of Sheridan Road. 4th Street Landscaping Replacement/Sidewalk Repair TR00102 Project identified in Comprehensive Plan Belfair Bypass – 2-lane divided highway with capability for 4 lanes TR00134 Project identified in Comprehensive Plan City Street Lighting – evaluation and upgrade for compliance with standard TR00105 Project identified in Comprehensive Plan Hospital District Street Improvements; Callahan, Cherry, Wheaton TR00106 Project identified in Comprehensive Plan Kitsap Lake Vicinity Ped/Bike Improvements TR00110 Project identified in Comprehensive Plan Lower Wheaton Way Reconstruction (Lebo to Sheridan) TR00136 Project identified in Comprehensive Plan Repair Downtown Street Standard Banner Supports TR00109 Project identified in Comprehensive Plan Sidewalk Improvement (Wheaton Way at Callahan) TR00108 Project identified in Comprehensive Plan West Kitsap Way Reconstruction/Rechannelization (Chico to SR-3) TR00096 Project identified in Comprehensive Plan SR 303 Warren Ave Bridge Pedestrian Improvements TR00029 2019-21 Transportation Budget appropriation. Project improves pedestrian access on Warren Avenue Bridge and includes improvements to north and south bridge approaches. Preliminary Engineering funding only. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: July 10, 2019 Resolution placing the Continuation of the Emergency Medical Care & Service Tax Levy for a Six (6) year period on the November 5, 2019 General Election Ballot COUNCIL MEETING Date: July 17, 2019 Department: Fire Presenter: Pat McGanney Phone: (360) 473-5382 SUMMARY: The Bremerton Fire Department provides Emergency Medical Care to the citizens of Bremerton. The “Rescue One” program is funded through a property tax of $.50 or less per thousand of assessed valuation. This property tax has to be renewed every 6 years. This is not a new tax, but a continuation otherwise the funding stops. ATTACHMENTS: Resolution No. FISCAL IMPACTS (Include Budgeted Amount): This property tax generates approximately 1.3 million dollars. Failure to pass the levy would jeopardize the paramedic program. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve Resolution No. ________ . COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 B6 1 EMS Levy 2019 RESOLUTION NO. ____ A RESOLUTION of the City Council of the City of Bremerton, Washington setting forth a property tax levy to fund emergency medical services for submission to the voters of the City for approval and ratification or rejection at the election to be held on November 5, 2019. WHEREAS, it is deemed necessary to the public health, safety and welfare that the City of Bremerton (the “City”) provide emergency medical care and emergency medical treatment to its citizen; and WHEREAS, the Fire Department of the City of Bremerton is in need of monetary funds for present and future funding to continue its emergency medical service; and WHEREAS, the City currently has a six year emergency medical services levy, but the levy rate has fallen from $0.50 per $1,000 of assessed value to $0.36 per $1,000 of assessed value; and WHEREAS, a property tax levy would perpetuate and enhance the Bremerton emergency medical services program by funding personnel costs, training and related equipment, supplies, vehicle and structures needed for the provision of such care or services not including the costs of transportation to and from medical treatment facilities; and WHEREAS, RCW 84.52.069 provides for the levy of regular property taxes in an amount not to exceed $0.50 per $1,000 of assessed valuation if such increased levy is for six years or less, replaces a levy and is authorized by a ballot proposition approved by a majority of the voters at an election held within the taxing district; and WHEREAS, in order to replace the current levy that expires in 2019, the City Council has determined that it is in the best interest of the City and its residents to submit a proposition under RCW 84.52.069(2) to the voters for their approval or rejection; NOW THEREFORE THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. Purpose and Description of Ballot Proposition. For the purposes identified below, the Council seeks voter approval under RCW 84.52.069(2) for a regular property tax levy, as follows: (a) Purpose. The amounts collected in 2020 through 2025 pursuant to the increase authorized shall be used solely to provide medical care and emergency services in the City. 2 EMS Levy 2019 (b) Maximum Levy Rate Authorized in 2020-26. The proposition would authorize a regular property tax levy of $0.50 or less per $1,000 of assessed value for levy beginning in 2019 through 2024 and to be collected in 2020 through 2025. SECTION 2. Calling of Election and Ballot Proposition. The Auditor of Kitsap County, Washington (the “Auditor”), as ex officio supervisor of elections, is hereby requested to call and conduct an election in the City, to be held in conjunction with the general election on November 5, 2019, and to submit to the voters of the City a proposition in substantially the following form. THE CITY OF BREMERTON PROPOSITION NO. 1 EMERGENCY MEDICAL CARE AND SERVICES TAX LEVY The City Council of the City of Bremerton adopted Resolution No. ___ concerning a regular property tax levy under chapter 84.52 RCW. Will the City be authorized to impose regular property tax levies of $0.50 or less per $1,000 of assessed valuation for each of six consecutive years (2020-2025) to continue financing emergency medical care and services? Yes______ No ______ SECTION 3. Notices Relating to Ballot Proposition. For purposes of receiving notice of the exact language of the ballot proposition required by RCW 29A.36.080, the Council designates the City Clerk (or his/her designee) as the individual to whom such notice should be provided. SECTION 4 Authorization to Deliver Resolution and Perform Other Necessary Duties. The City Clerk is authorized and directed, no later than August 6, 2019, to certify a copy of this Resolution to the Auditor and to perform such other duties as are necessary or required by law to the end that the proposition described herein should appear on the ballot at the general election identified in Section 2 of this resolution. SECTION 5. Local Voters’ Pamphlet Authorized. The preparation and distribution of a local voters’ pamphlet providing information on this ballot proposition is hereby authorized. The pamphlet shall include arguments advocating approval and disapproval of the ballot proposition. In accordance with RCW 29A.32.280 or with rules of the County Auditor, committees to prepare arguments advocating approval and disapproval of the measure shall be appointed by Fire Chief. Each committee shall be composed of not more than three persons, and the committee advocating approval shall be composed of persons known to favor the ballot proposition and the committee advocating disapproval shall be composed of persons known to oppose the ballot proposition. The City Clerk is authorized to post publicly and accept nominations for the pro and con committees, and if more than three individuals are nominated for either side, to select the committees by randomly drawing three names from each pool of nominations. Names of committee members so selected shall be forwarded to the appropriate County officials. 3 EMS Levy 2019 SECTION 6. Severability. If any or one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 7. Changes. The City Attorney is authorized to make such minor adjustments to the wording of such proposition as deemed appropriate or as may be recommended by the Kitsap County Auditor and its Supervisor of Elections, as long as the intent of the proposition remains clear and as approved by the City Council. SECTION 8. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this ____ day of ______________, 2019. __________________________ ERIC YOUNGER, Council President APPROVED AS TO FORM: ATTEST: ______________________________ __________________________ ROGER A. LUBOVICH, City Attorney ANGELA WOODS, City Clerk July 10, 2019 Study Session Item C. Other General Council Business