Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
07/03/2019 6C
AGENDA BILL CITY OF BREMERTON 6C CITY COUNCIL SUBJECT: Professional Services Study Session Date: June 26, 2019 Agreement with Transportation Solutions COUNCIL MEETING Date: July 3, 2019 Inc. (TSI) for City Traffic Operations Model Department: Engineering and Signal Study Presenter: Shane Weber Phone: (360) 473-2354 SUMMARY: The Professional Services Agreement provides for creation of city-wide travel demand and signalized intersection operations models, two 6th Street and 11th Street Corridor Studies and draft code language to implement a concurrency management system. The first corridor study will to v - e evaluate a 6 Street Road Diet configuration consistingof a three-lane roadway (two-way plus center ( Y turn lane) and bike lanes. The second corridor study will evaluate a one-way couplet conversion for 6th Street and 11th Street with three lane roadways on both streets. The concurrency management scope will allow the compound effects to traffic from multiple development projects to be evaluated in a streamlined manner. ATTACHMENTS: 1) Professional Services Agreement FISCAL IMPACTS (Include Budgeted Amount): The study is budgeted in the Transportation Capital Fund and funded by the stormwater utility tax at $100,000. STUDY SESSION AGENDA: ❑x Limited Presentation ❑ Full Presentation STUDY SESSION ACTION: ❑x Consent Agenda ©General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the Professional Services Agreement with Transportation Solutions Inc. (TSI) for City Traffic Operations Model and Signal Study; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/02/2018 TT