Loading...
HomeMy WebLinkAbout06/19/2019 5E AGENDA BILL CITY OF BREMERTON 5E CITY COUNCIL SUBJECT: Study Session Date: June 12, 2019 Contract with Pape & Sons Construction, COUNCIL MEETING Date: June 19, 2019 Inc. for the Marine Drive Stormwater LID Department: PW& U Retrofit Presenter: Katie Ketterer Phone: (360) 473-5334 SUMMARY: Stormwater runoff entering Oyster Bay is often contaminated with oils and other materials that contribute to poor water quality in Oyster Bay; that in turn contributes to poor habitat for wildlife, including salmon and shellfish. The City was awarded a grant from the Department of Ecology to treat a portion of the stormwater entering Oyster Bay by installing 4 water quality vaults in 3 locations in West Bremerton. Four bids were submitted and Pape & Sons was the lowest responsible and responsive bidder with a bid in the amount of$888,888.00. ATTACHMENTS: 1) Contract; 2) Bid Tabulation; 3) Vicinity Map; 4) Summary FISCAL IMPACTS (Include Budgeted Amount): The project was in the 2019 CIP and budgeted for $664,747; the Ecology grant amount is $498,560. The construction bid received was approximately $300,000 higher than the engineer's estimate. Additional funds for the project exists in the current stormwater capital fund and a budget adjustment is not required. STUDY SESSION AGENDA: 0 Limited Presentation ❑ Full Presentation STUDY SESSION ACTION: 0 Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to award the contract for the Marine Drive Stormwater LID Retrofit to Pape & Sons, Construction Inc. in the amount of$888,888.00; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: „ Approve ❑ Deny ❑ Table [' Continue ❑ No Action Form Updated 01/02/2018