HomeMy WebLinkAbout01/27/1998 MEETING MINUTES • •
City of Bremerton
Parks & Recreation Department
Parks & Recreation Commission Meeting
UNAPPROVED MINUTES
January 27, 1998
6:30 p.m.
Sheridan Park Community Center
680 Lebo Blvd., Bremerton, WA 98310
ATTENDANCE: Wanda Butler, Barry Cook, Terry Dodge, Carol Johnson, Nick
Garguile Sr., and Charles McWhorter.
ABSENT/EXCUSED: Lionel Collins, Russ Johnson.
AUDIENCE: Hilary Eichler, Doug Groneman, Wayne Olsen (Councilman District#1).
GUEST: Mayor Lynn Horton
STAFF: Jim Spencer, Interim Director, Jodi Wroblewski, Asst. Director,
Lena D'Agostino, Office Assistant II.
I. CALL TO ORDER: Chairman Barry Cook called the meeting to order at
6:35 PM.
II. ITEMS FROM THE AUDIENCE: Hillary Eichler commented that she had noticed
that they're (maintenance crew) cleaning up Haddon. Jim Spencer said Hillary will hear
more about Haddon during this meeting.
III. AGENDA: No change.
VI. OLD BUSINESS
1. Park Bond - Survey Committee
Surveys relative to the bond issue were sent out through the Utilities
Department with the utility bills, which will go out in 8 cycles over a two-month period.
An additional five hundred surveys were also sent out with the Parks & Recreation
Department's brochure mailing. Some of the survey results that came back contained
interesting inputs and comments.
Page 1
•
2. Renaming Field at Lions
At a Council Meeting in December, Councilman Al Colvin was presented
with the honor of naming Lions Park Field #1 to "Al Colvin Field" in tribute to his
retirement from City Council and his service to the community. Mr. Colvin was totally
overwhelmed and very pleased about it. A ceremony to install the sign will be held in
the spring.
3. Haddon Site Development
Jim Spencer reported that we've completed the Master plan for Haddon
with the assistance of the neighbors and Parametrix, Inc. The next step will be to go to
City Council to authorize a professional agreement with Parametrix to do a hazardous
site evaluation, prepare contract plans, specifications and construction cost estimate
for bidding purposes, and assist the City with bidding and construction services. Cost
is approximately $24,452. We hope to have the bid specifications out soon so we can
start Phase I development of Haddon (i.e. irrigated grassy play area and perimeter
walking path, as well as a small parking lot and sidewalk). The restroom and other
amenities will be bid as alternates with the hope that they can be built as well with the
current level of funding
Commissioner Wanda Butler inquired about the number of parking
spaces and if there would be some sidewalk improvement. Jim said the parking lot
space was reduced from 8 to 4 spaces. The reasoning behind that is this is a
neighborhood park where the majority of the users will either walk or ride their bikes to
the park as opposed to a regional/destination park. We do not anticipate putting
sidewalk around the whole piece of property at this point. Sidewalk improvements on
the southeast corner (tie into Lafayette and the parking lot) will probably required. Our
goal is to convert the property into a useable playground for children as soon as
possible and add requirements, such as sidewalks, and amenities to it at a later date.
Commissioner Nick Garguile asked how Parametrix came up with that
amount (do they charge per hour or based on the design?). According to Jim,
Parametrix submitted a proposal that was broken down by hour per task, which was
then followed by a negotiation process between Parametrix and Department staff and
the City Project Manager. Once the bid specification is completed, it will be advertised
and bids will be accepted. Unfortunately, the park will probably not be finished in time
for our summer Playground Express program. Estimated completion would be by the
end of summer.
Chairman Barry Cook added that he wanted to commend the staff and
everyone for doing a fine job with the public process and the entire project in general.
4. Budget 1998
Jim provided copies of the 1998 budget to all the Commissioners. He
gave general information on the basic funding categories, discussed budget
adjustments, summary expenditure, staffing profile, etc. He also enumerated specific
items of concerns: (a) Identifying permanent funding source for our Summer
Playground Program. He indicated that the we need to get on-going funding locked-in
for our playground program. Our ultimate goal is to expand the program to more than
Page 2
•
the current 4 sites. (b) Level of participation in Athletics — which has been pretty static
for the past three years. We need to get the young people involved in our athletic
programs (especially soccer and softball). (c) Delivering the forecasted revenue
amounts at the Golf Course. Concerns over the impact on fee increases and weather.
(d) Progress on the new Golf Clubhouse. (e) Capital projects in general (particularly
Evergreen Park Phase I and Haddon site development).
Another concern is to figure out a way to beef up resources to provide our
maintenance crew with more resources so that they can maintain their level of
competency and be more efficient.
V. NEW BUSINESS - Smith Cove Development
Mayor Lynn Horton reported that we were approached by the Bremerton
Rotary Club regarding the possibility of a partnership between the City and the
Bremerton Rotary Club in respect to the expansion of the Evergreen Park area. They
discussed donating a sizeable contribution of between $100,000 to $150,000 in
exchange for name recognition in a form of naming the expanded portion of Evergreen
Park to "Evergreen Rotary Park" or some facsimile. There will be two adjoining parks
rather than one park. Mayor Horton thinks that's fair if they wanted to make that kind of
commitment. With that contribution, we might want to look at applying for an
Interagency Committee (IAC) grant.
Jim stated he wanted to present all sides of the issue and reminded the
Commissioners of the policy in naming parks for an existing facility.
He added, with the Rotary's significant contribution, we will have a better
chance for an IAC Grant because of this show of community commitment.
Mayor Horton asked for the Commissioners' recommendations and
suggested that the Commissioners table their actions regarding the Rotary Club's
solicitation. The Mayor indicated that we still need to talk to the neighbors to hear their
suggestions - we do not want to leave the neighbors out of the loop. Jim suggested
that the Commissioners can leave this as an open item and report to the Mayor on the
progress in that regard.
At this point, the Commissioners advised they are in consensus of
supporting this issue.
Sinclair Landing Parking Lot Project Update: According to Mayor Horton, a tentative
agreement was made, depending on City Council approval, for the developers to
finance the 2,400 car parking garage structure worth approximately $60 million
structure. Payment to the commercial group would be 60% of the new taxes that would
come in to the City for the first 25 years as a result of Sinclair Landing Project. Real
Estate Excise, B&O, and Sales taxes will go towards the 60%. Estimated revenues
after 5 years would be approximately $2 million in new taxation to the City (60% of
which would be $1.2 million a year for 25 years) plus the net parking revenues from the
garage itself. If there is a shortfall, the developers would be responsible. The
requirement for the City was that the City takes on either no risk or as small a risk as
possible. This scenario accomplishes this objective. We will own the parking structure
from the day of construction and half of the dirt. The Mayor said that clearly there is a
Page 3
i •
piece of this that belongs to the Parks & Recreation Department. She would like to
recommend to the City Council to split the future revenues (after 25 years) between the
parks system and the Street Department so that there will be an endowment into
perpetuity for parks and for street renovations and repairs. We currently have about
120 parking spaces, which generate $150,000, net revenue for the City.
Commissioner Nick Garguile asked if the developers are willing to accept
these conditions with a major risk and no guarantee from the City. The Mayor replied
yes. She will present a copy of the Master Development Agreement to the City Council
tomorrow night (Wednesday, January 28th) and is hoping to have the document signed
and adopted. From that document the City will work on the level of detail and then
meet with the bond council to make sure the City can legally use this kind of
mechanism.
VI. STAFF REPORT:
Evergreen Park: Per Jim, we had an opportunity to review the 50% design review of
Phase I. There are some challenges in the area of drainage associated with that
asphalt triangular area. We're working through those and trying to move that project
along.
Kitsap Lake: Jim attended a neighborhood held meeting on the 19th of this month
relative to the screens (and removal) issue, and salmon habitat. The Department of
Fish & Wildlife put in a screen in the 1950's to keep the fish in the lake. Fish &
Wildlife stated that they don't think the screens are necessary any longer, and it's not a
matter of "if' they will remove them but "when". They did, however, agree to do a two-
year study to verify their hypothesis (that they're not losing trout) prior to screen
removal. Fisheries would like the salmon to come up Chico Creek into Kitsap Lake.
The interesting consequence is there is a dam associated with the screens and the
water level is controlled through boards that can be taken in and out of this dam. If the
whole dam and the screens are removed, there is the possibility of lowering of the lake
between 3 to 4 feet, which would impact property owners. Jim agreed to look at what it
would take to maintain the dam, however, there is easement involved with the adjoining
property owners. This is a very complex problem, but we'll look into it and see if we
could figure out a way to control the water level and deal with the screen issue
separately.
Relative to another Kitsap Lake issue owners and in conjunction to the
$10,000 CDBG grant, the staff met with Scott Sanden for recommendations. He was
the gentleman who gave a presentation relative to the Kitsap County lake weed issue
not too long ago. Scott suggested polling the property owners to make sure that they
agree there is a problem. The Department developed a simple weed survey (i.e. if they
believe there is a weed problem that needs to be addressed, and its location, etc.). and
sent to all the lakefront property. We're hoping for some good feedback and if a
majority agrees that there is a problem, then we'll take the next step and figure out what
we need to do relative to developing a plan.
Page 4
• •
Jim provided the Commissioners with copies of a document that
Commissioner Russ Johnson put together on the salmon aspect of Kitsap Lake.
The group then entered into a discussion relative to this issue.
Swimming pool at end of Pinewood: The staff was approached on the possibility of
operating this facility. Jim will present this issue to the City Council and get their
reaction regarding this request. Jim said he is personally not too anxious about taking
this facility on. He thinks this is a costly venture, there are liability concerns associated
with it and the facility is located in the County.
Annual Report for 1997: Jim is in the process of developing the report and will have
copies ready by next meeting. Jim added how proud he was of the people he worked
with and he's proud of this organization.
VII. APPROVAL OF MINUTES:
M/S/C/U ( C.Johnson/W.Butler) to approve the minutes from November 25,
1997 meeting.
VIII. COMMISSIONERS' COMMENTS & QUESTIONS
Commissioner Terry Dodge: When do we paint the house and outbuilding at Ivy Green
Cemetery? They looked pretty dumpy. Jim said he doesn't see the house staying
there, but will look into having the house and outbuilding painted in the near future.
Commissioner Nick Garguile mentioned that someone asked him why aren't our
facilities open on Martin Luther King Day? Jim said we do close on those holidays - it's
a cost issue and staffing is very difficult.
Commissioner Carol Johnson suggested moving our meeting time back to 6 p.m. and
maybe we ought to ask Commissioner Collins' opinion on this since he had requested
that the meeting time be moved to 6:30 p.m. in the first place. She also asked 1) where
is the site for the Clubhouse, and 2) how soon can we finish Haddon? Jim said there's
no site identified for the Clubhouse right now. Per Jodi, it takes about 2 months or so
to finish and bid the designs, another month or so to mobilize the construction. Jim
added that we also have to take into consideration the contamination problem we have
out at Haddon. The construction will probably be completed by this fall.
Commissioner/Chairman Barry Cook stated he is planning to write a letter to remind all
the Commissioners of their commitment to the Parks & Recreation Commission. In the
letter he will express his feelings on being on the Parks & Recreation Commission as
well as remind everyone concerned that they should be able to commit 2 hours of their
time once a month and attend these meetings. We can discuss moving the meeting
start time back to 6 p.m. and speak with Commissioner Collins next time he attends.
Chairman Cook added he would like to give the opportunity to give back not just act as
Page 5
• •
a sounding board. He indicated that there are areas in which the Commissioners can
participate in more such as helping to raise funds for our summer program.
Commissioner Wanda Butler said she would like to see a RV Park located somewhere
in the City (even dry hook-up). Jim said that there is no doubt we need a RV location,
and there have been some discussions on this matter. The Mayor has talked about
using the Square Dance Hall (located in Gorst), or Lower NAD Park. Commissioner
Butler also suggested to Chairman Cook that he should include the level of
participation in his letter. As far as she is concerned, we (the Commissioners) could do
a lot more. She reported she went to her neighborhood meeting, and she was very
proud of the exemplary job the staff did for that meeting.
Commissioner Charlie McWhorter. How much did we spend on Playground program?
Jim replied that we spent approximately $20,000 for the four sites in 1997. Of that sum
$14,500 came from CDBG. This year, 1998, we will receive no funding from CDBG.
There is some funding in the Parks & Recreation General Fund for this program and
we're still lobbying with the County to help provide funding for our Sparky Program (for
disabled children). A significant number of our Sparky participants live outside the City
limits. Commissioner McWhorter added that he is concerned about the Playground
program, and suggested that we should do something to help to support this. He also
asked about placing some temporary hoops at Haddon between now and when the
park is completed? Jim replied that a basketball court is part of the master plan and
will be installed as soon as feasible.
The Commissioners thanked the staff for the water bottles.
ix. ADJOURNMENT: The meeting was adjourned at 8:32 p.m.
Respectfully submitted:
Lena D'Agosti , Office Asst. 11 +inl Spence interim Director
Page 6