HomeMy WebLinkAbout10/28/1997 MEETING MINUTES • • 1
City of Bremerton
Parks & Recreation Department
Parks & Recreation Commission Meeting
UNAPPROVED MINUTES
October 28, 1997
6:30 p.m.
Sheridan Park Community Center
680 Lebo Blvd. , Bremerton, WA 98310
ATTENDANCE: Wanda Butler, Lionel Collins, Barry Cook, Terry
Dodge, Carol Johnson, Russ Johnson, and Charlie McWhorter.
ABSENT: Nick Garguile
AUDIENCE: Douglas Groneman
STAFF: Jim Spencer, Interim Director, Jodi Wroblewski ,
Asst. Director, Becky Lorber, Rec. Programmer II .
I. CALL TO ORDER: Chairman Barry Cook called the meeting
to order at 6: 40 p.m.
II. ITEMS FROM THE AUDIENCE: None
III. AGENDA: No change.
IV. OLD BUSINESS
1. PARK BOND SURVEY COMMITTEE: The Committee has met once,
which has resulted in a rough draft that is not ready for
review by the entire Park Commission. The Committee meets
again on Monday, November 10th at 4 : 00 p.m. They plan to
have a draft for review at the next Park Commission meeting
in November.
2. RENAMING FIELD AT LIONS: Field 1 is to be renamed for
Al Colvin. The new sign commemorating this event will be
presented in December prior to the end of his Council term.
Jim shared the schematic of the formal sign and a plaque
with a poem of appreciation for his many years of service to
the City of Bremerton.
3. HADDON: Jodi provided handouts on the prioritized,
required elements that resulted from the public input
meeting September 23 , and the memo that went to Randy Witt,
City Engineer, requesting clarification on City associated
requirements, specifically sidewalks. In addition, Jodi
brought an enlarged poster of Haddon Property with
topography lines and park elements to scale. Commissioners
spent some time placing fixtures within the park and making
suggestions for a possible layout of the future park.
411 S 2
Final suggestions included getting final determination on
sidewalk requirements and related costs. The Commission
would like to explore funding for sidewalks from alternative
sources, so that available park development dollars can be
used for park construction, fixtures, and equipment.
Somehow, it is hoped that the sidewalk could be linked into
an interior trail system, one to avoid duplicate expenses,
and to maximize trail length.
The next public meeting on Haddon development will be on
Thursday, November 20, at 6 : 30 p.m. Site to be determined,
but will be located on the Westside.
3. CDBG RESULTS: Jim reported on the recent results
on the five grants submitted. The Playground Express
Program requested $25,000 and received $0.00. This program
is a critical "must" and the department intends to have some
type of program, however the extent will be dependent of
available dollars in the 1998 budget.
ADA improvements requests were for $11, 350 and received
same. This will allow us to bring closure on the final ADA
recommendations for compliance and accessibility to Sheridan
Park, Jarstad Aquatic Center and the Senior Center ADA
parking.
Lower Sheridan Park upgrades for $8 , 000, received $6,000.
This will allow us to open up the park with tree trimming,
ADA approved fall zone material and a few additional park
furnishings.
The final city CDBG request was for $10, 000 for a water
aquatic management plan. The department intends to hire an
expert to determine specific action required to mitigate
weed growth and maintain quality water standards at Kitsap
Lake.
The final grant request was through the County for the
Sparky summer program for developmentally disabled youths.
Over 85% of the registrants live in the county. The request
was for $15,000 and we received $0 . 00. The mayor has sent a
letter to the County encouraging them to relook at this
need. The program will be offered at a reduced level in
1998 . This past year 65 children participated in an eight
week program.
V. NEW BUSINESS
1. Kitsap Transit and the Bremerton Boardwalk/Parking
lot: Jim distributed a letter generated by Paula Johnson to
Kitsap Transit, and the associated new Transit Center that
will be part of the SLA project. Transit wants to use the
parking areas that are part of the Roosevelt Field exchange,
for a lay-down area to support construction of this new
project, and will pay our department the amount associated
II/ . 3
with "lost revenue" . The problem arose when they wanted to
use the grassy knoll . This was considered an encroachment
into the Boardwalk, and therefore became a Parks Protection
issue. They backed away and found a way to do their project
without the use of the knoll .
The second component is putting in a second gang-plank for
ferry travelers. Jim does not see this as an issue since
the boardwalk was built to enhance use of the waterfront and
associated activities, including boat access.
2. Kitsap Lake Water Level Concern: Barry reported
that he attended a meeting related to water level concerns
and algae on Kitsap Lake. There is talk about having a
summer and winter level , which is regulated by boards
controlling water height. It is a delicate issue to ensure
that residents aren't flooded out at one end while others
don't receive any water. Many issues were discussed
including salmon run needs, etc. Basically, they want the
Parks and Recreation Department to regulate the water
levels, with the cooperation of the Department of Fisheries.
No final conclusions from this meeting. Barry will keep the
Commission updated.
VI. STAFF REPORT
1. Compost Grant: In 1996 , Jim went to Council about
implementing a grant from the County for a composting
program at Stepheson Canyon. In trying to implement the
program, the health department deluged us with paperwork
requirements and restrictions, which made the intent of the
grant financially impossible, as well as extremely labor
intensive. The mayor wrote a letter to the Health
Department about the beauracracy blocks preventing our
involvement. Suddenly the restrictions have been lifted,
and we hope to have an active composting program by the end
of the year.
2. 1998 Budget: On Monday, November 17, Jim will
present our balanced 1998 budget to Council . Numbers are
not a lot different, however we were able to maintain
existing full-time staff, and most of the part-time labor
dollars. Commission is welcome to attend.
3. Misleading Political Propaganda: Jim reported that
Rodney Johnson, a candidate running for mayor has published
a document stating that he could trim $190,000 from the
current operations of the Jarstad Aquatic Center. This is
false information. Jim is happy to explain the specific
pool budget to anyone that would like the real facts.
4. Architect Selection for the Golf Course Clubhouse:
An RFQ was sent out and 23 different firms responded. This
list was short-listed to 5. On Thursday, October 30, there
411
4
will be hourly interviews with these five firms, and
hopefully at the end of the day a selection will be made.
Secondly, on September 26th, The Sun printed an article, in
which the story was correct, but the headlines spoke about
cost over-runs, which was misleading. The complex is doing
well , costs were over-run, but revenue was also exceeded.
This was a learning year, since this is the first year of
operating two courses.
5. Break-in at Sheridan Park: Jim reported that the
building had been broken in on either Friday night or early
Saturday morning, October 24 or 25. Little damage and
minimal theft occurred, but what is most significant was
that three portable radios were taken. They were later used
by to erroneously report false incidents and for making
derogatory comments about police officers. The news media
has been reporting this incident.
6. Third Quarterly Report: Jim distributed this
report for Commissions' information.
7. Annual Halloween Party: Jim announced this annual
event, the Channel 12 coverage, and encouraged the
commission to come down and observe and participate.
8. Evergreen Park Seawall: The contract for the
seawall and planting strip is nearing completion. Jim
encouraged Commission to stop by and observe this
improvement. The Phase I design contact has been signed,
and now we are trying to develop a timeline that we all can
live with.
VII. APPROVAL OF MINUTES--SEPTEMBER 23, 1997
M/S/P to accept the minutes as presented. Updates to
the Commissioners' phone lists were made.
VIII.COMMISSIONER'S COMMENTS & QUESTIONS
Commissioner Dodge: No report
Commissioner C. Johnson: Asked when the clubhouse at
the golf course was to be built. Jim answered that he hoped
in 1998 . Design money is in the 1998 budget, but there has
been no work begun on the necessary bonds required for
construction. She has seen the seawall--it looks great!
Commissioner R. Johnson: Complimented the Parks staff
on the utility mailing of programs and offerings.
Commissioner McWhorter: Compliments to Tom Cressman
for the composting program.
Commissioner Collins: He met with the owner of the
batting cage who is interested in working with the Bremerton
Youth Council on providing some play opportunities.
Reference was made to involving Cyn Englegau's help in
pursuing this possible program. He did reference the weed
i • 5
document prepared by FishPro and agreed that there were no
conclusions for direction.
Commissioner Butler: No report.
IX. Adjournament: The meeting was adjourned at 8 :15 p.m.
Respectfully submitted:
Al AA. /.1.r4
Becky } orber, Rec. Prog. II im Spenc: ' , Interim Dir.