Loading...
HomeMy WebLinkAboutABALONE ST, 4526I'll, 2""' "al KIM "I M ... .... ... Building Department Inspections Call: (360) 473-5870 WATER - Public Works - Water: (360) 473-5927 PW - Public Works - Engineering: (360) 473-5270 HEALTH - Kltsap Co. Health District: (360) 337-5285 Fire - Fire Department, (360) 473-5386 L&I - Dept. of Labor and Industry: (360) 4154000 I'Vy v'� 51111'ral, - Property lines shall be properly identified and marked before foundation footing inspection. Setbacks are measured to the finished wall structure. - Reinspection fee may be assessed if inspection has been requested when not ready or corrections are not completed. - Permit, approved plans, engineering, and inspection card shall be on site during construction or Reinspection Fee may be assessed. Inspection . . . . . ................. .. .. .............. .. Approved .... ................ Date Notes --- ------- - ..... Cie® Report for Structural Fill and Compaction, Soil ..... . .............Lw. 11,10 . . ........... ... ........... . . . ..... . ...... ..... .B.Paring . ... . ................... ...... . . . . . . Foundation Footings, Property lines shall be properly identified . . . . ...... ...... — — ---- --- ----------- ------ Foundation Walls Hold downs . . . ...... j&- . . ... ...... . L&I - Electrical Cover Inspection Before Framing (State of — - — ------------------ Was"ton) S h a ar Wall Panels/Braced Wall Panels . . ... ..... ..... ........ ........ 11111116 .. .. .......... . ......... . ................. � . . ..... . .. ....... . . ................ ............ ........ - --- - --- . ......... ..... Framing Inspection (Mechanical & Plumb Rough -in, Elect Cover _1__"�j';;, . . . . . . ............. . 2j.t Completed) - - ----- ........... .... Paved Driveway & parking aress . . ...... .... . . . .................. . ... .. L - Electrical Final Inspection 7,`2% �i "'Z- ------------- Final Inspection - Building ............... ..... ..... . . . — 11 ­­ "I . . . ...... . ... . . . .......... . --- . . . ..... ... ... FINAL B UIL IN (360) 473-5870 All oj'the above must be approved Occup ands y approval fir SFR ori�y - Commercial structures require as separate Certifcate of Occupancy. DO NOT OCCUPY BUILDING WITHOUT BUILDING DEPARTMENTAPPROVAL PROTECT THIS CARD FROM THE WEATHER DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION 345 — 6th Street, Suite 600 Bremerton, Washington (360) 473-5275 INSPECTION REPORT PERMIT #: �.. ..`' �.....a_ leo r ADDRESS: Date: Phone: .,� .._..�...............I�SPECTO. R RECEIVE]h City of RremertkERMIT CENTER . .. . ....... . . NUG 2 3 201Z RESIDENTIAL (") (A ill g pp BuildinPermit pp lication DeparD�niern�915- ent I �� Do, artment of nimgit„Tcmcylb Street. 600 - Bremerton - WA - 98iii7,187� (360) 473-5275 * Fax (360) 473-5278 * www.d.bremertonma.us Site Address: To apply for a property address, contact Public Works at (360) 473-5270 CONTRACTOR: Zi Cid ,State, Z ........... .......... 7,s,/ License # & Ex . Date: Contact Name: Contact Phone #: 3$'!-v?i, Email address: ",Aw,(`L eawsr5b'�A Tax ID/Parcel 24ewer septic 4V OWNER: JV-AvGdS� Authorized Agent Name: Address: CitV, State, Zip., Phone #: ( Email address: )E91LEW SINGLE-FAMILY RESIDENCE 0 RESIDENTIAL REBUILD tj NEW DUPLEX Fj RESIDENTIAL ADDITION NEW MANUFACTURED HOME F-1 RESIDENTIAL REPAIR NEW GARAGE/CARPORT F-1 NEW ACCESSORY BUILDING DEMOLITION sf Interior sf Exterior” sf Foundation Wall" sf Roof I Section" ** Separate demolition permit and fees required. Contact Public Works for sewer cap permit (473-5270). Sewer must be capped prior to demolition permit issuance. = OTHER: IS THIS PROPERTY WITHIN 200 FEET OF A SHORELINE? YES NO 5�L Scope of work proposed: Square Footage: Building: 1st Floor Basement Garage: 1st Floor ;410 2nd Floor Other 2nd Floor-. Deck(s): Valuation Plan!ReviewFee Permit Fee Surcharge Total Fees a following the date of application shall expire by limitation, and plans and other d A plicafortin which no permli", t4 'hi 180dop/1", ri within to o a data submitted for review may the F efj,t(5, ihe applicant or destroyed by the building official. The building official may extend the time for action by the licen 0 -a per! rri rOxceeding 180 days on request by the applicant, showing that circumstances beyond the control of the applicant I v re d actio fro being taken. No applicant shall be extended more than once. In order to renew action on an H, applicationxpli he , a lipdnt shall resubmit plans and pay anew plan review fee. I Ap 1cant' ature Date Rev. Oct, 2008 (Continued on back) 1. Site Address: RESIDENTIAL SITE PLAN QUESTIONNAIREW IZI-7a' i -A, --0 2. Are any areas being developed on the site within 200 feet of the shoreline? Ye NOTE: If yes, please fill out a Shoreline Permit Submittal Checklist (WAC 173 -27 - CRITICAL AREA CHECKLIST: - 3. Slope is calculated by dividing the vertical Check all that apply ' to the site and areas within 200 feet of the distance by the horizontal distance and then site. multiplying the result by 100, Example: Flat: less than 5 -feet elevation change over entire site. Rolling: slopes on site generally less than 15%. Vertical� Distance = 20' Hilly: slopes present on site of more -than 15% and .less than 30%. Horizon - tal Steep: grades of'greater than 3Q% present onsite. Distance =100'Other (P , . describe): F Vertical 20 feet lease Horizo0ta1100 feet= .2 X 100 = 20% slope 4. Does the site or properties within 200 feet of the site contain areas of standing water, creek or an area where water flows across the ground surface? Yes 5. Is there an apparent wetland present on the site or on properties within 200 feet of the site? Yes bo RESIDENTIAL DEVELOPMENT WORKSHEET: 6. What is the amount of grading proposed (in cubic yards), not including foundation area? Fill amount Cut amount Total grading. NOTE: Grading over 50 cubic yards requires a separate permit. Will the grading material be imported or exported? Yee 7. Please provide the following information. The setbacks are measured from the finished. exterior wall of a structure to the lot line, not from the foundation. Accurately represent your setbacks on site plan. *Use this as the second fronts yard setback for corner lots and through lots. **Development Coverage is defined as that portion of a lot covered by impervious surface areas of all structures, and impervious paved areas; such as driveways and walkways. Residential Questionnaire Revision: October 2008 CITY OF BREMERTON DEPARTMENT OF COMMUNITY DEVELOPMENT 345 - 6th Street, Bremerton, WA 98337 (360) 473.5275 Fax: (360) 4735278 PERMIT NUMBER: BB12 00440 DATE ISSUED: 10/01/2012 ASSESSOR NUMBER: 5570-000-033-0000 ZONING: WPSAP SITE ADDRESS: 4526 ABALONE ST APPLICANT NAME: L.A. WILLIAMS CONST LTD PHONE: (253) 381-0292 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 OWNER NAME: L.A. WILLIAMS CONST LTD PHONE: (253) 381-0292 ADdRESS:. PO BOX 111, FOX ISLAND, WA 98333 CONTRACTOR: L A WILLIAMS CONSTRUCTION LTC PHONE. (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 LENDER NAME: Setbacks: PHONE: 0- ADDRESS: Sanitation Method: SUBMITTED: 08/2312012 APPROVED: 09/40; \ EXPIRATION: I.. 03/30/2013 STATUS: ISSUED .....__ �. VALUATION: $16,486.80 Building Permit • Nbg171echAKfal/Plumbing Building Permit $234.00 2211 NEW DETACHED GRAVE 50°% Plan Review Fee $76.05 16-4580 Building Code Editidh IRC 2009 State Surcharge $4.50 0236 Occupancy Group: U TOTAL FEES: $314.55 Type of Construction: Type V, Unprotected Flood Zone: Setbacks: (Front) (Side) (Rear) (Other) Sanitation Method: Number of Bedrooms: Square Footage: U Utility/Private Garage, Type VB 440 Inspection Requests FIRE: Fire Inspections (360) 473.5386 DCD: Building Inspections (360) 473-5870 HEALTH: Kitsap County Health District (360) 337.5285 L&I: Department of Labor and industries (360) 415-4000 PW&U: Public Works - Engineering (360) 473-5270 This permit shall become null and void if the described work authorized by this permit has not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned at any time after the work is commenced for a period of 180 days. It is the responsibility of the permit holder to see that the required inspections are made. Failure to obtain required inspections may result in stoppage of the work until such tin) -that,, The permit holder can susbstantiate to the City of Bremerton that the concealed work meets or exceeds code requirements. Any demolition, testing, or financial burden shall be erne sjt rw,�Jy by the permit holder. Failure to substantiate code requirements will indemnify the City against any and all responsibility or liability connected with the construction I hereby r �srthly tht II'h�ave read and examined this permit and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complifpJ wito ref er spQeifiet9 herein or not. The granting of permit does not presume to give authority to violate or cancel provisions of any Slate or local law regulating construction or th +(yc: 1cr enc f thrp i ongruction. If listing the owner as general contractor, I certify that I am exempt from the requirements of the State Contractor's Registration Law under Section 3 : hmp)� ei -t awi�gf"1967,: All revisions to an approved plan require DCD review and approval prior to performing work. All building and tenant occupancy permits are required to pad n ple s f w4 7rw priq t2 hermit expiration and obtain a certificate of occupancy prior to use or occupancy. I have read, and agree to abi SIGNATURE OF OWNER OR AGENT: PRINTED NAME: all conditions of zoning, DATE: codes, and State and Federal laws. CONDITIONS City of Bremerton's approval of this application pertains only to the City's regulatory jurisdiction, and thus compliance with regulations does not necessarily ensure compliance with federal or state laws. 10. (DCD-50) Final Inspection Required: All building permits shall have a final inspection performed and approved by the City of Bremerton Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration may require a reactivation fee, or a new permit application if more than a year has passed with no activity. 10. (DCD-14) DCD: Approved Plans, Engineering, Site Plan, Permit, and Conditions shall remain on site and be available for inspection. Any changes to plans shall be approved before construction is performed. Architect or engineer of record shall approve the change before submitting a revision. A revision is subject to a revision fee and additional fees for plan review and inspections. 10. (DCD-47) DCD: Reinspection Fee: All approved plans, the printed building permit, and the permit inspection placard, are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, approval will not be granted. In addition, a re -inspection fee will be charged and must be collected by the Department of Page 1 of 3 CITY OF BREMERTON DEPARTMENT OF COMMUNITY DEVELOPMENT 345 - 6th Street, Bremerton, WA 98337 (360)473-5275 Fax: (360) 473-5278 PERMIT NUMBER: BB12 00440 DATE ISSUED: 10/01/2012 ASSESSOR NUMBER: 5570-000-033-0000 ZONING: WPSAP SITE ADDRESS: 4526 ABALONE ST APPLICANT NAME: L.A. WILLIAMS CONST LTD PHONE: (253) 381-0292 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 OWNER NAME: L.A. WILLIAMS CONST LTD PHONE: (253) 381-0292 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 CONTRACTOR: L A WILLIAMS CONSTRUCTION LTC PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 LENDER NAME: PHONE. 0- ADDRESS: SUBMITTED: 08/23/2012 APPROVED: 09/27/2012 EXPIRATION: 03130/2013 STATUS: ISSUED Community Development prior to any further inspections being performed or approvals granted.. 10. (DCD-02) DCD: Validity of permit. The issuance or granting of a permit shall not be construed to be a..,. permit for, or an approval of, any violation of any of the provisions of the Washington State Building code or of any other ordinance of the City of Bremerton. Permits presuming to give authority to violate or cancel the provisions of the Washington State Building code or other ordinances of the City of Bremerton shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of the 4� Washington State Building code or of any other ordinances of the City of Bremerton. ... 10. (OTHER) Fire separation distance of less than 5 feet from the property line to an exterior wall requires �,F6(l fire -rated construction of at least 1 hour with exposure from both sides with a design tested in accordance with ASTM E 119 or UL 263 (IRC Table R302.1). Fire separation distance is measured from the face of the stud to the property line at a right angle from the wall (See IRC R202, amended, for definition). Projections may be 1 -hour rated on the underside when fire separation distance is between 2 and 5 feet. Openings in walls are not allowed when fire separation distance is less than 3 feet, and up to 25% is allowed when the fire separation distance is 3 to 5 feet. Penetrations of the fire -rated wall shall comply with R317.3 when fire separation distance is less than 5 feet. n I 11. (DCD-42) Geotechnical inspections and tests shall be performed in accordance with the geo-technical engineer's requirement and recommendations. All inspection results or density tests shall be provided to the Department of Community Development prior to requesting any soils related inspections (such as footing or foundation inspections). Y Required geotechnical inspections: 1. Soil bearing 12. (DCD-060) Property lines shall be properly marked. Setbacks are measured to the fnished wall of the t structure. 13. (DCD-38) Shear Wali Inspection: Due to the complexity of the shear wall nailing patterns and hold- " down requirements contained within the engineered lateral design, a separate shear wall inspection is required for this project. This inspection should be requested and performed prior to the installation of exterior wall coverings, prior to the framing inspection, such that all shear -wall nailing patterns may be observed, and the installation of all required hold-down devices and required straps, etc. are in place in accordance with the engineer's lateral design. 14. (DCD-19) Engineered Woad Floor Trusses & Truss Roof Systems shall have a site specific engineered design (Framing Pian) available at time of Under Floor and/or Framing Inspection. 15. (OTHER) Basic BS 11 00002 may be used during the current code cycle of the 2009 International Residential Code. The current code cycle is expected to end on June 30, 2013. J 16. (LU9) All driveways and areas used for loading, parking, and maneuvering motorized vehicles shall, have a paved surface. 17. (OTHER) Development must comply with BMC and the Bay Vista Sub -Area Plan. E, " Page 2 of 3 CITY OF BREMERTON DEPARTMENT OF COMMUNITY DEVELOPMENT 345.6th Street, Bremerton, WA 98337 (360) 473-5275 Fax: (360) 473-5278 PERMIT NUMBER: BB12 00440 DATE ISSUED: 10/0112012 ASSESSOR NUMBER: 5570-000-033-0000 ZONING: WPSAP SITE ADDRESS: 4526 ABALONE ST APPLICANT NAME: L.A. WILLIAMS CONST LTD PHONE: (253) 381-0292 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 OWNER NAME: L.A. WILLIAMS CONST LTD PHONE: (253) 381-0292 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 CONTRACTOR: L A WILLIAMS CONSTRUCTION LTC PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 LENDER NAME: PHONE: 0- ADDRESS: SUBMITTED: 08/23/2012 APPROVED: 09/27/2012 EXPIRATION: 03/30/2013 STATUS: ISSUED MINIMUM INSPECTIONS REQUIRED To request an inspection, please call (360) 473-5870 and be sure to provide your permit number, name on permit, site address, contact phone number, and inspection type. To register for on-line inspection access, visit the City's website at www.ci.bremerton.wa.us. Geotechnical Report for Structural Fill and Compaction, Soil Bearing Foundation Footings, Property lines shall be properly identified Foundation Walls / Hold downs L&I - Electrical Cover Inspection Before Framing (State of Washington) Shear Wall Panels/Braced Wall Panels Framing Inspection (Mechanical & Plumb Rough -In, Elect Cover Completed) Paved Driveway & parking areas L&I - Electrical Final Inspection Final Inspection - Building Page 3 of 3 AT THE TIME OF OUR SITE VISIT, THE BUILDING SUBGRADE WAS EXCAVATED AND CONCRETE FORM WORK WAS IN-PLACE FOR 4525 ABALONE ST. NLO'S. REPRESENTATIVE EVALUATED THE BUILDING'S FOUNDATION SUBGRADE WITH A 0.5 INCH DIAMETER STEEL T -PROBE WITH SOIL PENETRATIONS OF ROUGHLY 1 TO 2 INCHES WAS GENERALLY OBSERVED. NLO HAS DETAILED THE FOUNDATION SUBGRADE AREA THAT WAS EVALUATED TODAY, WHICH. AMOUNTS TO THE BUILDING SUBGRADE AREA FOR THE GARAGE AND MAIN RESIDENCE. NLO HAS ALSO RE -OBSERVED SOME ADDITIONAL OVEREXCAVATION, PER THE.RECOMMENDATIONS IN OUR EARLIER DAILY FIELD REPORT DFR 2. IN OUR OPINION, THE PROBED BUILDING FOUNDATION SUBGRADE AREAS SHOULD PROVIDE ADEQUATE SUPPORT FOR THE NEW SINGLE FAMILY RESIDENCE. NLO HAS OBSERVED ADDITIONAL OVEREXCAVATION, PER THE RECOMMENDATIONS IN OUR EARLIER DAILY FIELD REPORT DFR 2. IN OUR OPINION OVEREXCAVATED AREA IS SUITABLE AND SHOULD PROVIDE ADDUEQUATE FOUNDATION SUPPORT FOR THE PROPOSED STRUCTURE. APPROXIMATE BUILDING LAYOUT GARAGE MAIN RESIDENCE SCALE 1" =12' NLO WILL RETURN TO THE SITE AT THE CONTRACTOR'S REQUEST. F�r'S f � C A,. ptanarpermits on-sito YES Q NO Project tb. Permit No NLO's 2. if N0, contact the bulicing aeWmentor a*ain: Contractor Lo99ed BY ..._,.�... b NameA .Job Na'nber WRJ jAbalone 7888 3 4! ` N.L.Olson&Associates,Inc. a " Engineering. Planning and Surveying Time 1330 t d P r of "W 1345 10110/2012 Wed 2453 BETHEL AVENUE � P.O. BOX 637. Atte time mn iv " ......_..� 4t�ata7'tar ORT ORCHARD, WASHINGTON 98366-0637 CIOUdy 50's (Daily Field Report) TOtei lioixs �w. . - 1 hr ....� . Job Location aty CGentlOvmer 4525 Abalone ST Bremerton Toni lr\frllrams Pile Contractor Gerterel GorWect er SupeAntendent crackedsy D Williams Const. Tony Wrflrams ,...... ._ .....,., IT.. _. ... NLO WAS ON -.SITE AT THE REQUEST OF THE GENERAL CONTRACTOR TO VERIFY THE PROPOSED BUILDING'S SUBGRADE AREA. AT THE TIME OF OUR SITE VISIT, THE BUILDING SUBGRADE WAS EXCAVATED AND CONCRETE FORM WORK WAS IN-PLACE FOR 4525 ABALONE ST. NLO'S. REPRESENTATIVE EVALUATED THE BUILDING'S FOUNDATION SUBGRADE WITH A 0.5 INCH DIAMETER STEEL T -PROBE WITH SOIL PENETRATIONS OF ROUGHLY 1 TO 2 INCHES WAS GENERALLY OBSERVED. NLO HAS DETAILED THE FOUNDATION SUBGRADE AREA THAT WAS EVALUATED TODAY, WHICH. AMOUNTS TO THE BUILDING SUBGRADE AREA FOR THE GARAGE AND MAIN RESIDENCE. NLO HAS ALSO RE -OBSERVED SOME ADDITIONAL OVEREXCAVATION, PER THE.RECOMMENDATIONS IN OUR EARLIER DAILY FIELD REPORT DFR 2. IN OUR OPINION, THE PROBED BUILDING FOUNDATION SUBGRADE AREAS SHOULD PROVIDE ADEQUATE SUPPORT FOR THE NEW SINGLE FAMILY RESIDENCE. NLO HAS OBSERVED ADDITIONAL OVEREXCAVATION, PER THE RECOMMENDATIONS IN OUR EARLIER DAILY FIELD REPORT DFR 2. IN OUR OPINION OVEREXCAVATED AREA IS SUITABLE AND SHOULD PROVIDE ADDUEQUATE FOUNDATION SUPPORT FOR THE PROPOSED STRUCTURE. APPROXIMATE BUILDING LAYOUT GARAGE MAIN RESIDENCE SCALE 1" =12' NLO WILL RETURN TO THE SITE AT THE CONTRACTOR'S REQUEST. F�r'S f � C A,. ptanarpermits on-sito YES Q NO Project tb. Permit No NLO's 2. if N0, contact the bulicing aeWmentor a*ain: Contractor Logged By:---.�_ ......� Job Number J W m ob Name .__ Report # SD 7888 Williams -.'AN.L.Olson&Associates,Inc. Engineering, Planning and Surveying Start Time End Time - gate _. _-... bay of Weik 2453 BETHEL AVENUE 0800 0815 10/5/12 Friday P.O. BOX -637 -mw _._ .. ,...,, , :�HEte Time Miles Weafher PORT ORCHARD, WASHINGTON 98366-0637 0.25 hrs 18 miles Sunny, 60s Drive Time DFR Total Hours Daily Field Report 0.5 hr 0.25 hr 1 hr Job Location 4526Abalone ..�.���_. ���_.�..���� _.......,� ��....�,�� �� ....�.�._.��......_._. _......_�.�.._.........�m_____� Street, Bremerton (Lot 33) County Kitsap Client/Owner Tony Willams cin orllams Const. Tony Contractor ams Superintendent ITITmm _._...... WRJ�.__,. .....��. to Y ......_ .... ............... � �--....._ _---_----..... Checked B a. .. .. .._. NLO was onsite today to verify the foundation subgrade on lot 33 on Abalone Street. At the time of our site visit, the building's subgrade area was excavated in the area of Lot 33. NLO's representative evaluated the exposed portion of the building's foundation subgrade area with a half inch diameter steel T -Probe. NLO observed soil penetrations of about 1 to 2 inches with the steel T -probe.. The soil that was verified was fill comprised of silty sand that was previously in place density tested by others. However, deeper penetrations of about 3 to 4 inches were observed in the building's subgrade northwest comer. NLO has illustrated the encountered loose soil condition in Figure 1 below. NLO recommends the loose soil should be removed from below the foundation subgrade area down to the dense underlying soil condition. In our opinion and after our recommendation is implemented, the probed building foundation subgrade area should provide adequate support for the new single family residences. NLO's representative will return at the client's request. Figure 1 North Are approved plans/permits on-site ® YES ® NO if NO, contact the building department or explain: EQUIPMENT Project No. Permit No. NLO's Representative A� � Contractor Cassandra DijstelbergewI /" DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION 345 — 6th Street, Suite 600 Bremerton, Washington (360) 473-5275 INSPECTION REPORT I -R ft cl - PERMIT #: ADDRESS: Z��'A.W lvi-t S 'S tep Sol q73 -97g6 d,.g Date: Phone: INSPECTOR 91 4W L 4ln�.g " v+b A: —:A NMI L. Olson& Assoco" Engineering, Planning and Land Surveying. iatesAnc.1 January 11, 2012 LA Williams Construction PO Box 111 Fox Island, WA 98333 RE: Site Specific Re -Use for Bay Vista Subdivision Base Plan 20x22 garage NL Olson and Associates prepared engineering for a 20x22 Garage Plan by MD Designers. This base plan was set up for use in the Bay Vista Subdivision in Bremerton. The engineering for this residential house plan was completed in December 2011 under the 2009 International Building Code. The design parameters used in my analysis of the base plan are as follows: The lots within Bay Vista generally comply with the above design parameters. But due to mass grading that has taken place on the site, I recommend that a special inspection to verify soil bearing capacity be completed prior to placing the concrete for the footing (as noted in the geotechnical report for the subdivision completed by AESI). Please feel free to contact me with any questions. Sincerely, Matthew Zawlocki, PE, SE 2453 BETHEL AVENUE, P.O. BOX 637, PORT ORCHARD, WASHINGTON 98366 (360) 876-2284 FAX (360) 876-1487 0 Structural Calculations & Analysis for 20x22 Garage Base Plan Bay Vista Bremerton, WA for LA Williams Construction PO Box 111 Fox Island, WA 98333 by N.L. Olson & Associates, Inc. 2453 Bethel Avenue Port Orchard, WA 98366 360-876-2284 NLO Project #7852-11 SIpNAL December -11 Sco a of Work: Partial Lateral engineering for new 20x22 garage base plan in Bay Vista subdivision. The garage meets requirements for conventional construction per IBC, except for the front wall at the garage door. This engineering is for the 24" wide portal frame at the garage door Materials: Framing: HF #2 or better Beams: DF #2 or better Glulam: Douglas Fir 24F -V4 for simple supported and 24F -V8 for continuous or cantilevered beams Reinforcing Steel: Grade 60 for #5 Concrete: fc = 2500 psi r%g,"71''.IR aF4wTM.� Soil Properties: 1500 psf Bearing Capacity, 150 psf/ft lateral capacity (assumed) Design Wind: 85 MPH 3 sec gust Seismic Zone D2 Ss = 150% S, = 54.0% Snow Load: 30 psf Ground CONTENTS: Page 1-2 Basic Design Criteria/Dimensions Page 3-4 Lateral Loads Page 5 Frame Analysis 11 Basic Desi rl Criteria Basic Wind Speed = 85 mph Seismic design category = D Site Class = D Ss = 150% Sf = 54.0% Ground Snow Load = 30 psf Importance Factor, Seismic IE = 1.0 Importance Factor, Snow Is = 1.0 Importance Factor, Wind IW = 1.0 Dead Loads Floor = 12 psf (2 psf joist, 2.5 psf sheathing, 0.5 psf insulation, 4.0 psf covering) Wall = 10 psf (1.5 psf studs, 2.5 sheathing, 0.5 insulation, 3 paneling) Roof = 15 psf (2 psf truss, 1 insulation, 3 ceiling, 5, roofing) Live Loads Floor Live Load, Lf = 40 psf Roof Live Load, Lr = 25 psf Snow Loads Ce = 1.0 for Partially exposed roof in exposure B Ct = 1.1 (ASCE 7-05 Table 7-3) Pf = 0•7CeCtlsP9 = 23.1 psf (ASCE 7-05 Eq 7-1) Cs = 1.0 (ASCE 7-05 Figure 7-2) Ps = Cspf = 23.1 psf Use 25 psf Deflection Limits (ASCE 7-05 Table 7-2) Floor = L/ 240 Dead + Live and L / 360 dead Roof = L / 240 Dead + Live and L / 360 dead Check Footing Footing Width = Tributary roof = Bearing Pressure = 12 in Footing Width = 12 in 16 ft Tributary Floor= 7 ft 720 psf Bearing Pressure = 444 psf Both are < 1500 psf, therefore OK Page 1 Basic Dimensions 5.333 ft 8 f 22 ft - 4 20 ft _.._ ..._ 20 ft front Page 2 Roof Slope is 6:12 or 26.6 degrees Side View Front View Plan View 22 ft Assumed N Wind Loads Main Force resisting System - Simplified approach Basic Wind Speed, V = 85 mph Importance Factor, 1, = 1.0 Exposure Category = B Height Exposure Coefficient, X = 1.00 IBC Table 1609.6.2.1(4) End Zone distance, 2a = 6 ft ps values shown below are based 6:12 Roof from ASCE 7-05 Figure 6-2 4.3 psf 1 2.81psf 6.7 psf 5.0 psf i 3.9 psf 7.8 psf 7.0 psf ,. 8.8 ps 10 12 E -W Diaphra ri Design Forces Roof Shear = 1841 Ibs Base Shear = 962 lbs Shearwall Desin Forces Second Floor Shear = 1841 lbs Base Shear = 2804 lbs 10.2 psf 12.9 psf N -S Diapt_ra_qm_ Design Forces Roof Shear= 1135 lbs Base Shear = 881 lbs Shearwall Desion Forces Second Floor Shear = 1135 lbs Base Shear = 2015 lbs Resisting Moment, Mr = 119.9 k -ft Overturning Moment, Mo = 32.25 k -ft Safety Factor, Fo = 0.6D/W = 2.2 Page 3 Eguivalent lateral force method er ASCE 7-05 Base shear, V =CSW (ASCE 7-05 Eqn 12.8-1) Ss = 150% Ct = 0.02 Fa = 1.000 (ASCE 7-05 Table 11.4-1) X = 0.75 SDs = 2/3Sms = 2/3FaSs = 1.000 Ta =Ct hnx = 0.095 sec S, = 54.0% Fv = 1.500 (ASCE 7-05 Table 11.4-2) SD, = 2/3SM, = 2/3F„ S, = 0.540 Seismic Design Category = D R = 6.5 (ASCE 7-05 Table 12.2-1) CS = SDs / (RI) = 0.154 Max CS = SD, /(T R/1) = 0.873 Min CS = 0.044SDs I = 0.044 W2 = 11991 lbs (dead load of roof + 1/2 walls) W, = o lbs Wtotai = 11.991 kips Lateral Forces F. = C. V F2 = 1845 lbs F, = 0 lbs Base Shear, V = 1.84 kips Stability coefficient, 0 = PXA/Vxh.-Cd = 0.033 <0.1 threrefore no Pdelta calculated Resisting Moment, Mr = 119.9 k -ft Overturning Moment, Mo = 24.61 k -ft Safety Factor, Fo = 0.6D/0.7E = 4.2 DI_ ?jhr_ar m Desi n Forces for ASD E = 0.71=2 = 1291 lbs E = 0.71=2 = 0 lbs Shearwall Design Forces for ASD E = 0.71=2 = 1291 lbs E = 0.7F2 = 1291 lbs ........................ Base shear due to Seismic governs main lateral force resisting system in N -S Base shear due to Wind governs main lateral force resisting system in E -W Redundant - 1st Floor Shear walls USE p = 1.3 Page 4 Protalw Frame analysis at Front of Garace Full length = 3 ft Wall Height = 8 ft Length of Full height wall = 3 ft Max Height of opening = 0 % of full height walls = 100% Shear Resistance Adjustment Factor, Co = 1 (2008 NDS SDPWS Table 4.3.3.5) V = 921 lbs (from Wind load) Uplift Anchorage, T = Vh / C,EL; = 2148 lbs (2008 NDS SDPWS Eqn 4.3-8) Unit shear force, v = WC,EL; = 307 pif (2008 NDS SDPWS Eqn 4.3-9) 7116 sheathing w/ 8d Nails @6" edge spacing = 360 pif (IBC Table 2306.3) for HF framing multiply capacity (1 -(0.5 -SG)) = 335 pif (IBC Table 2306.3 footnote a) dead load on walls = 140 plf Net uplift is W -0.6D = 2022 lbs Use MSTA30 Strap Area of (2) 2x6 studs is 16.5 int; tension/compression stress is 130.2 psi Use Double 2x6 studs at each end Allowable load on 5/8" anchors bolt in 2x sill = 1424 lbs shear (NDS Table 11 E) #of anchor bolts req'd = 1.0 Use 6/8" anchors at 6' on center Check Storer Drift in N -S Direction Shear Wall Deflection check 8vW vh dah 0 _-------- +------- + 0.75hen +-------- EAb Gt b Assume double 2x6 HF Studs at ends E = 1300000 psi Max shear, v = 921 plf wall height, h = 8 ft Using 8d @ 6", en = 0.014 Using 24/16 rated OSB, Gt = 83500 Win Assume deflection of 0.1 in 0 = 0.075 0.088 0.084 0.343 = 0.59 in Actual a = e/Co = 0.59 in Story drift ratio = Delta / height = 0.006 < 0.01 therefore OK Total Drift= 0.59 in Page 5 1 m �. r C PLAN"eHk " Dev Dev Office Only r f � 1� tray PE4M T # Will 00i PLAN Y. rovr e 1schocklist, 1 � . _% � . � � r"ringt �� t el t All_ 4 w.. i{".'r v . fen"' .. q :"� ��.,,�.Ii �l�1T�t.. C�Jtlpq��.� art �° "x x� . ,b .�*r w, ;rF° _.�'04•' -,.s� xr a ,h' •dux ? - �. _ . +fcSW 'au r* " t"' �s� ;a���5N > ��&N-mi, .a �� � � •�. � - .: �,� +:� � � Wim: g"� x. -.,.3- x - ., , x �r fc�tl�ri it i i lrr � r � f� � ed i���i ®�r' s Y I�brrtltif ��rr�,t _ s' as ,+. .K: -g'4+a .ur�r.u-Y u-_.eg,'d 'e '"-, - y' ISP omp E w. gra k i .,•,4 F` ,s II 14C ._64 !Mp..� qtz 1#q GAll t 1� 1 �1 r seg.ge �� i t I � :jli 1 r�P:' E t toriginly -.5. '•�" + 1 n mss s fVP N .. s �` . VM` 4M 16 na Of Q rese� ti 3`� ww'a °EE E _ "e,w- ='°�s'- ye g ns °�1E -f.w' a y- a' 'F* 1 1culd ion "'d ra,-a.. F...�`. ` s !-3 °c.`. cr`�a a, - ':�S .;a�'+•2.ye g` `°x ,y*'.* h I - 1 1 tl t s 4 tys a s �' I 3 y� * e .: Ar.. t 1 IW I -th e Figure 4: Typical Prescriptive Braced Wall Panel (per IRC Section R602.10.2, Method WSP) a R..... .... .. 4'-0" min. 2 - 2x Top plates. Sta Nail 16r joints oc. min. Nail 16d at 16" oc. ... � � u 2x studs spaced 24" o.c. max. End nail stud to top plate with 2-16d nails. Nail stud to sill plate with 4-8d toenails or 2-16d end nail. �ro Wood structural panel sheathing minimum 3/8" thick for studs 16" oc. and minimum 7/16" thick for studs 24" oc. Gypsum wallboard or other approved interior finish material inside of wall 2x Blocking installed against sheathing and � °��' nailed to studs with 16d nails at horizontal 01-011 panel edges (when sheathing is installed �'� �,r ��iw horizontally. Nail sheathing at 6" o.c. at Max. ��, ,^ �' "'" r -' panel edges and 12" o.c. in the panel field with 6d for 3/8" and 8d for 7/16" common or galvanized nails. 2x sill plate nailed to joist or blocking with 3-16d nails per 16". Approved floor system 2x Pressure treated mud sill 1/2" dia. anchor bolt with min. 7" embedment spaced 4'-0" on center for a two story building, 6'-0" on center for a single story building. One bolt within 12" of each end of each piece of plate material. 3"x3"x0.229" hot -dipped galvanized plate washers are required. Approved Foundation System, Braced wall panels (BWP or ABP) must be located at each end of each braced wall line. Or, IRC Section R602.10.1.4.1 allows the braced wall panel (BWP) to be located up to 8' from the end of the braced wall line, provided there is a hold down device at the end of the BWP nearest the end of the braced wall line. Additional options may also be available, See IRC 602.10 for more information. CITY OF BREMERTON DEPARTMENT OF COMMUNITY DEVELOPMENT RESIDENTIAL PLAN REVIEW CHECKLIST 21 M aunpson wrong-1-ieW Wall -Bracing -Length Calculator Pagel of2 2009 IRC Required Braced -Wall -Line Length Calculations PROJECT INFORMATION NAME: 857100002 Garage Basic ADDRESS: Bay Vista, Bremerton WA, 98312 WALL DIRECTION: Front to Back SEISMIC DESIGIN CATBWW- DY BASIC WIND SPEED: 86 mph WIND EXPOSURE CATEGORY: B STONE OR MASONRY WMEER: No !_....... Wall Lkw A4 • Wall Lits 13-1 Bnsoed.Wafi-Line l option 1st of 1-atrxy ------..- - 1st or 1-saxy Esys to R" H*M Aft ;` B tt... .. wr _Broad-WaM-Lms SpW 22 R ;22ft BraOed'Wal-Line Lef" :201t 20 ft I —-:Hftht - -... ::aft 'aft eeWSP :Vys P WS P _ WA 'N/A ' Gypsum WillBoard on Inside No "pip i Hor¢ortfal Joints Blocked Yes Yes Holdom Device Used No No .._..... Psf_ 8 paf RooNCakV Deed Load s 15 psf •s s 15 psf 'Tabulated VWndO `-- ---- It 3.8R 3.Sft Exposure NOW FaOcr ,.. _ 1 7 Eave-to-Ridps Heil;M Factor 0.76 .0.76 i Wind W1e11 Factor _0.9 i Number of BWL Faclor Holdown Fackm 1 ! Blocked JcW Factor :1 1 Gypsum on Inside Factor 1.5 1.5 Wind GB Coralruction Factor ' 1 Required_1Nind Bragg Amour 3.9 R 3.9 It '.SEISMIC Tabulated Seismic Bv Nnour 5-1 5 ft Seismic WIN He" Factor 1 y BWL Spm*V Factor 1 1 Blocked Joie Factor 1 1 ;Gypsum on Inside Factor 1.5 1.5 Seismic GB Construction Factor 1 t • , W1sti Dmd Load Factor 0.85 `0.85 Roof Daad Load Factor 1 1 Varier Factor 1 1 Required Sets_ mic Bra" Mrocsrt 6.384 6.38 ft `RESULTS - Length of waw Bracfn _.._...... 9 Required 6.38 ft 6.38 ft http://www.strongtie.com/webapps/BracedWall/ 1/10/2012 M . 11uyauii ouulig-i_iew wail-wacing-Length Calculator o R , 2009 IRC Required Braced -Wall -Line Length Calculations PROJECT INFORMATION NAPE: B31 100002 Garage Basic ADDRESS: Bay Vista, Bremerton WA, 98312 WALL DWJVnDN. gide To We SELUM DESIGN CATEGM. 02 BASIC WIND SPEED- 85 mph WIND EXPOSURE CATEGORY: B STONE OR MASONRY VENEER: No WDM Una 1-1 WON Una 2-1 ` !Inputs _.._.. ,._...... . Braoad-Wal-Lino Location• j lot of 1-sipry - f y ' 1ss t of titory Fave m Rklga Height ; 6 ft 6 it • _..... _ Braced-YYYI-Lme Spacing _. - . 20 ft r- -... 20 g Braoed-Yld{ Lme Lenylh 122 ft 22 8 V" Haight aft-- . :8ft '. Braarg Method - - VVSP ViiSP _ _ GB Construdpn Type WA WA ;Gypsum Y11o1 Board an Imide No 'No Horimrrtal JoitMt BkxMced Yea . Yes Hokbwn Devine Used No No _ Load S S psf 5 8 psf `Roof/Celiny Dmd Load 515 psi 515 psf 'IMND - Tabulated Wind Bracing Amount 3.5 ft 1. ft i Exposure Height Factor � 1 ' 1 i Eave-to-Ridge Height Factor :0.76 0.76 " Wnd Wag Heigh Factor 0.9 :0 9 Number of BVVL Factor 1 Hokk>wrr Factor 1 1 Blocked Joint Factor 1 1 Gypsum on Inside Factor 1.5 1.5 YVind G8 Conatruction Factor ' � -- .. _ 1 ._._ .. . Required Wind _. Bracing Braang Amourd 3.59 _ _ _ _ ; ft 3.59 ft SEISMIC • Tatwrlatad Seismic Bra" Amount 5.5 ft 5.5 it Seismic VW Height Factor 1 � _._.. ...... . j BWL Spacing Factor � 1 1 Bkxticad Jokd Factor '1 1 Gypsum on Inside Factor 1.5 1.5 ' Sakmic GS Construction Factor 1 VWA_Dead Load Factor -0.85 0,85 R_cof Load Factor - _Dead 1 1 Wiser Factor 1 1 r Raquirad Seianre Bradrg Amount `7.01 ft 7.01 ft ;RESULTS Length of Wag Bracing Required .7.01 ft 7.01 ft httP://www.strongtie-com/webapps/]3racedWall/ Page 1 of 2 1/10/2012 December 16, 2011 Attn: City of Bremerton Building Department Re: L.A. Williams Construction MD Designs hereby acknowledges that L.A. Williams Constructions has exclusive authority to submit the 20' x 22' Garage as a Base Plan for unlimited -use construction for Bay Vista Development. L.A. Williams Construction is recognized as the Owner and exclusive agent for the Plan for the purpose of submitting or receiving documents related to the Base Plan. Sincerely, John P. De Loma Principal/Project Designer SE I BACKS Side: Flear: �r,heeck us nnieastaed fro i,e pirc) 1 ;11 liirmadx:a �,tl!e finisf'r ex-terir,�+r mia,R. PERMIT # -3 1 BUILDING DIVISION 46th Street,Suite 600 Bremerton, 473-5275 ADDRESS: is 2 �, A b 4110 ilf 4 t - c -)r , '!�'/ ) " �e-- a, � se"47" cz, It Date: / 0--L " Phone: I' PECTOR �. # # ♦ �, # I R # ♦ � 1� ► ', � • til � I ■ #. .... APPROXIMATE .....� ._._......,�.,...,�.._ .......�_.. ...�.. BUILDING LAYOUT PAIN RESIDENCE SCALE 1" - 12' -.. NLO WILL RETURN TO THE SITE AT THE CONTRACTOR'S REQUEST. r.� C b r. Are Approved. Mn9perrrdts —SR. YES 0 NC If NO, wWaa,tl 'e bsuldN depaMa, P a Pr.1w N.. P.nnit H. N raxserr! dva . NLO`S ! i°.x._... 0 ...... �. Lu99m/95" WRJ Job KlWber JOD.Name ....._. ..... ,.,....,_._�.. 7888 Abalone 3 e�-AL. Ison Assocla t��Jp��i... .�"tartli�me" ...�..����. � ...... ___ "ime ���� Engineering, Planning and Summing ng2453 TifltA Aay ofVYeek BETHEL AVENUE 1330 1345 10110/2012 .'Wed P.O.. 80X'637 PORTORCHARD,`WASNINGTON9336"637 Sherr e ...,, ...__.a..... .. � ....... _ .- MIAO w cloudy cfoudy50a lo j (Daily Field port) ;1 hr°"a _._.mm., _ ..-- ...... Looaf[on 4525 Abalone ST _ .._.. clly Bremerton . . a�entlOvme� TDrr,$fFditams_...... G C.N. entlAnl ''. GIaOHsd SY Date Williams ...enerali�OnY Williams ,ITs .mm ....... ._—.._—. .,.w...,.._...., NLO WAS ON-SITE AT THE REQUEST OF THE GENERAL CONTRACTOR TO VERIFY THE V PROPOSED Bl11LI7ING'S SUBGRAIJE AREA, �. # # ♦ �, # I R # ♦ � 1� ► ', � • til � I ■ #. .... APPROXIMATE .....� ._._......,�.,...,�.._ .......�_.. ...�.. BUILDING LAYOUT PAIN RESIDENCE SCALE 1" - 12' -.. NLO WILL RETURN TO THE SITE AT THE CONTRACTOR'S REQUEST. r.� C b r. Are Approved. Mn9perrrdts —SR. YES 0 NC If NO, wWaa,tl 'e bsuldN depaMa, P a Pr.1w N.. P.nnit H. N raxserr! dva . NLO`S ! i°.x._... 0 BUILDING PERMIT `' 4526 ABALONE ST NEW SFR r Building Plumbing Mechanical E] Alarm/Sprinkler This Placard must be posted on or near building and the Permit & "Approved" plans must be at the site. - - - - - - - - - - Permit # BB12 00,441 POST ON SITE Inspection Property lines shall be properly identified and marked befor Date Notes --- ----- - --- — ---------- ... .. ..... ......... Geotechnical Report for Structural Fill and Compaction, Soil foundation footing inspection. Setbacks are measured to the Building Department Inspections Call: (360) 473-5870 finished wall structure. WATER - Public Works - Water: (360) 473-5927 - Reinspection fee may be assessed if inspection has been PW - Public Works - Engineering: (360) 473-5270 requested when not ready or corrections are not completed. HEALTH - Kitsap Co. Health District: (360) 337-5285 - Permit, approved plans, engineering, and inspection card shl Fire - Fire Department: (360) 473-5386 be on site during construction or Reinspection Fee may be L&I - Dept. of Labor and Industry: (360) 415-4000 assessed. Inspection Approved Date Notes --- ----- - --- — ---------- ... .. ..... ......... Geotechnical Report for Structural Fill and Compaction, Soil .. ........ oundationBeann . ........... FFootings, Property lines shall be properly identifiedk . .... . .. .. . ... . . ..................... . ....... . ................... - . . ..... ........ . . ....... . ..... Foundation Walls / Hold downs /1 j .... . ... .... . .... . ... ...... . ...... Underfloor Framing Inspection/Anchor Bolts & Washers/Hold Downs --------- --- .... . . [Shear —Wall Panels/Braced —", "'... W all Panels -- -- - ---- Mechanical Rough -in Cz .............. ..... Plumbing Rough -in . . .......... . . . . . ......... . .. .......... . . ........ . ...... . . . _, ...... . ........ . "FIRE Fire " Sprinkler/Fire - - - - - Alarm - - -- Cover, ........ . ........ . ...... .. ...... ...... ........................... ................ ...... ' LI - Electrical Cover Inspection Before Framing (State of �- Washington) -1 1—, - ...... . . . ..................... ­ . . . . . ... . . ................ . . ... . .............. .. ... . ................ . . ........ . . . .................... . . . ..... . . ..... Framing Inspection (Mechanical & Plumb Rough -In, Elect Cover 7- �� 2 Comp!pted),­_ - ­­­­­ ........... Insulation - Wall VV ..... ........ Sheetrock Nailing �2- ............ .......... . ...... . ...... . . .. . ..... ..... . ... . ........ ... Paved Driveway & parking areas - — - - - - ----------------- - ------- — .. .. ...... . ............ . . Insulation - Ceiling Insulation - Underfloor . . . ................ . .. . ....... . ........ . ..... ... ... Eiwi gy" n,,dL%` Ouc adg Dept- i°�' Energy Code - Air Leakage ......... ............ . . . . .. ... ......... . ................... . . ................ . . . . . . ................... . ..... . . ................. . . . ...... . . ........................................... . . ....... ® . . . . . L&I - Electrical Final Inspection . . . ... . ............................... . ............ . ...... . ............. . .. ...... PW - Sewer Lateral . ........ ..... ­­,­ . ..... . ..... ........ .. PW - Final Inspection - Utilities . ...... . . . . ... . ................... - . . .. ........... ....... . . .. ............. . ........ . .................... . ....... ..... . .. .. ...... ... . ...... ...... . . . . Final Inspection - Building ..... ................. . . .. . ....................... .... . . ­­­­­­ ............... . . . . . . ............. �JNAL BUILDING (360) 473-5870 .411 oj'the above must be approved. Occupancy approvalfor SFR only - Commercial structures require a separate Certificate oj*Occupancy. 0 1 go I KIWI] tj 02 3 ROUT 2 1 ; I MAI I i 11INt �gI o A � s a 0 0 w �r mw I I �A WILHAM5 FLAN 95OF „o 4526 AP&M 5TF\fEf $$ PURR v � i g e 13 EMUON, WA 95342 s 9� �gI o A � s a 0 0 K �A WILHAM5 FLAN 95OF 4526 AP&M 5TF\fEf $$ i g e 13 EMUON, WA 95342 s DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION 345 — 6th Street, Suite 600 Bremerton, Washington (360) 473-5275 INSPECTION REPORT PERMIT #: 0 11 ......................... ..........ADDRESS: 'ce .......- ..... S ------------ - - - -- -------- den -"f>-3 V44 -l -'Al -k -L (31 t'Lit �7 (1XIO(A-1) v) qfP4L re,�3 U.1 4;'- cyl-. . ............... Date: Phone: INSPECTOR k1pt,pil BF12 001,38 11/01/2012 IFIRESPR 13Dr�u�:�.°�������u�in0710812013 Parc!e,l #p5570-000-033-0000 Part-init #'BB 1 1-21, 1 0.04411 Akirld:r,#!!ss 14526" ABALONE'ST Date SuLiiiinditteiil 10/310/2012, )alte Mlosi,llfj: Illn'dieirit SFR -13D 'Ice CAAD iC "Al"J" coorn]"Jurte 1, as il,,� A clitnii 01/09/2013 4villilirtg Date taWs [)alte 01/07/2013 Stabins ISSUED 111P Uajjpdrii:.'? �- SWuijpjuress�'? fl'liwiir,?F Nev, Application Quory pHirilit Follia Lefters C"py (") 11 I DetaM Puvob Contacts contmeters valuadom Fees A"romd Conditions hopoeflons wwattoms CITY OF BREMERTON DEPARTMENT OF COMMUNITY DEVELOPMENT 345 - 6th Street, Bremerton, WA 98337 (360)473.5275 Fax: (360) 473-5278 PERMIT NUMBER: 131312 00441 DATE ISSUED: 10/01/2012 ASSESSOR NUMBER: 5570-000-033-0000 ZONING: WPSAP SITE ADDRESS: 4526 ABALONE ST APPLICANT NAME: WILLIAMS LA CONSTRUCTION LTI PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 OWNER NAME: WILLIAMS L A CONSTRUCTION LTC PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 CONTRACTOR: L A WILLIAMS CONSTRUCTION LTC PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 LENDER NAME: PHONE: 0- ADDRESS: SUBMITTED: 08/23/2012 APPROVED: 09/27/2012 EXPIRATION: 03/30/2013 STATUS: ISSUED VALUATION: $92,133.50 Residential Building Permit wl Mechanical/Plumbing Plan Review Fee $626.60 16-4580 NEW SFR Building Permit $964.00 2211 Building Code Edition: IBC 2009 Mechanical Fixture Fee $66.55 2215 Occupancy Group: State Surcharge $4,50 0236 Type of Construction: Plumbing Fixture Fee $83.00 2213 Flood Zone: State Energy Code $50.00 16-4580 Setbacks: (Front) (Side) (Rear) (Other) TOTAL FEES: $1,794.65 Sanitation Method: , 10. (DCD-02) DCD: Validity of permit. The issuance or granting of a permit shall not be construed to be a Number of Bedrooms: Square Footage: R-3 Residential, 1 & 2 Family, Type VB U Utility/Deck Covered (All Types) 930 52 Inspection Requests FIRE: Fire Inspections (360) 473-5386 DCD: Building Inspections (360) 473-5870 HEALTH: Kitsap County Health District (360) 337-5285 L&I: Department of Labor and Industries (360) 418-4000 PW&U: Public Works - Engineering (360)473-5270 This permit shall become null and void if the described work authorized by this permit has not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned at any time after the work is commenced for a period of 180 days. It is the responsibility of the permit holder to see that the required inspections are made. Failure to obtain required inspections may result in stoppage of the work until such time that the permit holder can susbstantiate to the City of Bremerton that the concealed work meets or exceeds code requirements. Any demolition, testing, or financial burden shall be born di ectly by the permit holder. Failure to substantiate code requirements will indemnify the City against any and all responsibility or liability connected with the construction. I hereby certi .trt I have read and examined this permit and know the same to be true and correct. All provisions of laws and ordinances goveming this type of work will be compir d with wheth or peci sd herein or not. The granting of a permit does not presume to give authority to violate or cancel provisions of any State or local law regulating construction or than, �rforma ace,of ti ayro struction. if listing the owner as general contractor, I certify that i am exempt from the requirements of the State Contractors Registration Law under Section 3 Catiaiter 1 6a .,ptivs of 1,9t"Y. All revisions to an approved plan require DCD review and approval prior to performing work. All building and tenant occupancy permits are required to pass mai ihsgeyt1'4 prior t a r6ermit expiration and obtain a certificate of occupancy prior to use or occupancy. I have read, and agree to abide b bye nditi J,% isP6T4tJncIud1ng all conditions of zoning, building codes, and State and Federal laws. � NER q SIGNATURE OF OWOR AGENT: PRINTED NAME: DATE: CONDITIONS City of Bremerton's approval of this application pertains only to the City's regulatory jurisdiction, and thus compliance with City regulations does not necessarily ensure compliance with federal or state laws. r Fee: All the building and the 10. (DCD-47} DCD: Reinspection approved plans, printed permit, permit inspection placard, are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, approval will not be granted. In addition, a re -inspection fee will be charged and must be collected by the Department of Community Development prior to any further inspections being performed or approvals granted.r� , 10. (DCD-02) DCD: Validity of permit. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Washington State ' Building code or of any other ordinance of the City of Bremerton. Permits presuming to give authority to violate or cancel the provisions of the Washington State Building code or other ordinances of the City of Bremerton shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is Page 1 of 4 CITY OF BREMERTON 345 - 6th Street, Bremerton, WA 98337 (360) 473-5275 Fax: (360) 473-5278 ASSESSOR NUMBER: 5570-000-033-0000 ZONING: WPSAP SITE ADDRESS: 4526 ABALONE ST APPLICANT NAME: WILLIAMS L A CONSTRUCTION LTI PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 OWNER NAME: WILLIAMS L A CONSTRUCTION LTC PHONE- (253) 381-0252 ADDRESS- PO BOX 111, FOX ISLAND, WA 98333 CONTRACTOR: L A WILLIAMS CONSTRUCTION LTC PHONE: (253) 381-0252 ADDRESS., PO BOX 111, FOX ISLAND, WA 98333 LENDER NAME, PHONE: 0- ADDRESS: SUBMITTED: 08/2312012 APPROVED09/27/2012 EXPIRATION: 03/3012013 STATUS: ISSUED sw Page 2 of 4 CITY OF BREMERTON We-kI ik 345.6th Street, Bremerton, WA 98337 (360) 473-6275 Fax: (360) 473-5278 ASSESSOR NUMBER: 5570-000-033-0000 ZONING: WPSAP SITE ADDRESS: 4626 ABALONE ST APPLICANT NAME: WILLIAMS L A CONSTRUCTION LTI PHONE. (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 OWNER NAME: WILLIAMS L A CONSTRUCTION LTE PHONE. (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 CONTRACTOR: L A WILLIAMS CONSTRUCTION LTC PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 LENDER NAME: R -Tub and/or Shower Unit PHONE.- 0- ADDRESS: R -Water Heater SUBMITTED: 08/2312012 APPROVED: 09/27/2012 EXPIRATION: 03130/2013 STATUS- ISSUED 30. (LU9) All driveways and areas used for loading, parking, and maneuvering motorized vehicles shall have a paved surface. 31. (OTHER) Development must comply with BMC and the Bay Vista Sub -Area Plan. 50. (DCD-50) Final Inspection Required: All building permits shall have a final inspection performed and approved by the City of Bremerton Department of Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration may require a reactivation fee, or a new permit application more t an a year as Dassed with no activitv. MINIMUM INSPECTIONS REQUIRED I *1011ftAIIAMINNOWN W.A.1i If, 610i:1"gol IAwv I r'Na"gitij I va-, I aywe"goi I q A 0H R, Geotechnical Report for Structural Fill and Compaction, Soil Bearing Foundation Footings, Property lines shall be property identified Foundation Walls / Hold downs Underfloor Framing Inspection/Anchor Bolts & Washers/Hold Downs Shear Wall Panels/Braced Wall Panels Mechanical Rough -in Plumbing Rough -in FIRE - Fire Sprinkler/Fire Alarm Cover LI - Electrical Cover Inspection Before Framing (State of Washington) Framing Inspection (Mechanical & Plumb Rough -in, Elect Cover Completed) Insulation - Wall Sheetrock Nailing Paved Driveway & parking areas Insulation - Ceiling Insulation - Underfloor Energy Code - Duct Testing - Provide signed affidavit to Bldg Dept Energy Code - Air Leakage L&I - Electrical Final Inspection PW - Sewer Lateral PW - Final Inspection - Utilities Final Inspection - Building Page 3 of 4 FIXTURE LIST Qt Description 2 R -Sink (Lavatory, Kitchen, Mop or Bar Sink) 1 R -Clothes Dryer with Exhaust I R -Water Closet and/or Urinal I R -Range Hood I R -Dish Washer 3 R -Bath Fan and/or Exhaust Fan I R -Clothes Washing Machine I R -Tub and/or Shower Unit 1 R -Water Heater 2 R -Hose Bibs Page 3 of 4 CITY OF BREMERTON DEPARTMENT OF COMMUNITY DEVELOPMENT 345.6th Street, Bremerton, WA 98337 (360)473-5275 Fax: (360) 473-5278 PERMIT NUMBER: BB12 00441 DATE ISSUED: 10/01/2012 ASSESSOR NUMBER: 5570-000-033-0000 ZONING: WPSAP SITE ADDRESS: 4526 ABALONE ST APPLICANT NAME: WILLIAMS L A CONSTRUCTION LTI PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 OWNER NAME: WILLIAMS L A CONSTRUCTION LTC PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 CONTRACTOR: L A WILLIAMS CONSTRUCTION LTC PHONE: (253) 381-0252 ADDRESS: PO BOX 111, FOX ISLAND, WA 98333 LENDER NAME: PHONE: 0- ADDRESS: SUBMITTED: 08/23/2012 APPROVED: 09/27/2012 EXPIRATION: 03/30/2013 STATUS: ISSUED Page 4 of 4 M D Designs 3220 North 26th Street Tacoma, WA 98407 T 253.756.1652 F 253.756 2025 and@mdarchitects.net August 22, 2012 Attn: City of Bremerton Building Department Re: L.A. Williams Construction Department of C0111m° nity Dc-x-lasrpent MD Designs hereby acknowledges that L.A. Williams Constructions has exclusive authority to submit Plan # 930R as a Base Plan for unlimited -use construction for Bay Vista Development. L.A. Williams Construction is recognized as the Owner and exclusive agent for the Plan for the purpose of submitting or receiving documents related to the Base Plan. Sincerely, John P. De Loma Principal/Project Designer W, Associated Earth Sciences, Inc. M [y] N 9J 0 046rafing Gwr25 'Yeats o[Samea ?M'sing — I TFUTUETS 110 Russell Road, P.O. Box 4460 Bremerton, Washington 98312 Subject: Subsurface Exploration, Geologic Hazard, and Preliminary Geotechnical Engineering Report Sector 2A Bay Vista Redevelopment Project Bremerton, Washington We are pleased to present the enclosed copies of the above -referenced report. This repo summarizes the results of our subsurface exploration, geologic hazard, and geotechnic engineering studies and offers recommendations for the preliminary design and development the proposed Sector 2A phase of the project. Our recommendations are preliminary in th definite building and construction details have not been finalized at the time of this report. We have enjoyed working with you on this study and are confident that the recommendations yresented in this report will aid in the successful completion of your project. If you should have any questions or if we can be of additional help to you, please do not hesitate to call. Sincerely, CIMTF:)' Kirkland, Washington JSK/ld KE090103A9 Projectsk20090103WEMP Kirkland Everett s Tacoma 425-827-7701 425-259-0522 253-722-2992 www.aesLyeo.com Environmental Assessments and Remediation Sustainable Development Services Geologic Assessments a Associated Earth Sciences, Inc. &01,wl,nw�F SECTOR 2A BAY VISTA Prepared for Housing Authority of the City of Bremerton Project No. KE090103A November 18, 2009 Sector 24 Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ton Pro'ect and Site Conditions I. PROJECT AND SITE CONDITIONS. 1.0 INTRODUCTION This report presents the results of Associated Earth Sciences, Inc.'s (AESI's) subsurface exploration, geologic hazard, and preliminary geotechnical engineering study for the Sector 2A construction phase of the Bay Vista Redevelopment project in Bremerton, Washington. The location of the site is shown on Figure 1 and a site map of the entire Bay Vista project is provided on Figure 2. The approximate locations of the explorations accomplished for this study are presented on the "Site and Exploration Plan," Figure 3. If any changes in the nature, design, or locations of the site development improvements are planned, the conclusions and recommendations in this report should be reviewed and modified, or verified. Landau Associates (Landau, 2006) conducted a previous geotechnical assessment for the Bay Vista site. Some of the explorations were located within Sector 2A and the logs are provided in Appendix A. AESI prepared a previous geotechnical report for Section 213, Iocated east of Sector 2A (AESI, 2009). The recommendations in this report are preliminary because grading plans and construction details were not finalized at the time of this report. Once development plans are substantially complete, the conclusions and recommendations in this report should be reviewed and modified, or verified, as appropriate. 1.1 Purose and Sco . e The purpose of this study was to provide subsurface data and design recommendations for design and development of the subject project. This study included a review of available geologic literature, excavation of exploration pits, and performing geologic studies to assess the type, thickness, distribution, and physical properties of the subsurface sediments and shallow ground water conditions. Geologic studies were completed to identify geologic hazards associated with the site. Where warranted, geologic hazard mitigations are recommended. Geotechnical engineering studies were also conducted to recommend the type of suitable foundation, allowable foundation soil bearing pressure, anticipated foundation settlements, basement/retaining wall lateral pressures, floor support recommendations, drainage considerations, and erosion mitigation recommendations. This report summarizes our current fieldwork and offers development recommendations based on our present understanding of the project. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/!d - KE090103A9 - Project.s1100901031KEMP Page 1 N SECTOR 2 Bremerton, Washington Prepared for: Housing Authority of the City of Bremerton 110 Russell Road, P.O. Box 4460 Bremerton, Washington 98312 Prepared by: Associated Earth Sciences, Inc. 911 5`h Avenue, Suite 100 Kirkland, Washington 98033 425-827-7701 Fax: 425-827-5424 November 18, 2009 Project No. KE090103A Sector 2A Subsurface Exploration, Geologic Hazard anN Bay Vista Redevelopment Project Preliminary Geotechnical Engilneeining Repo Sit CJ itio Bremerton, f�/ect and Site Ond • Our field study included excavating a series of exploration pits to gain subsurface information about Sector 2A. The exploration pits were completed by Hos Bros. Construction Inc the proiect construction contractor. The various types of sediments, as well as the �e where characteristics of the sediments changed, are indicated on the exploration, logs presented in Appendix B. The depths indicated on the logs where conditions changed may represent gradational variations between sediment types. Our explorations were approximately located 11 an r - ided W from known site features shown on a 0"o ra3hkA1_tey1 p ov by the client. The conclusions and recommendations presented in this report are based, in part, on the conditions encountered in the explorations completed for this study and previous studies. The number, locations, and depths of the explorations were completed within site and budgetary constraints. Because of the nature of exploratory work below ground, interpolation of subsurface conditions between the field explorations is necessary. D iffering subsurface conditions may be present outside of the area of the field explorations due to the random nature of deposition and the alteration of topography by past grading and/or filling. The nature and extent of any variations between the field explorations may not become fully evident until construction. If variations are observed at that time, it may be necessary to re-evaluate specific recommendations in this report and make appropriate changes. Previous explorations shown on, Figure 3 were conducted by Landau and are labeled " B-" for borings and "TP-" for exploration pits. Exploration pits conducted by AESI are labeled "EP-". Exploration pits EP- 154 to EP- 159, were excavated on September 10, 2009. and exploration pits EP -160 to EP -165 were excavated on November 4, 2009. Three exploration pits (EP -160, EP -161, and EP -163) were excavated to depths of at least 16 feet to characterize subsurface conditions below the deepest cuts for the planned buildings. The remaining exploration pits were excavated to shallower depths and were intended to characterize the depth to unweathered glacial till and the characteristics of the fill material above the glacial till. The pits permitted direct, visual observation of subsurface conditions. Materials encountered in the exploration pits were studied and classified in the field by geologists from our firm. All exploration pits were backfilled immediately after examination and logging. Selected samples were then transported to our laboratory for further visual classification and testing, as d=1W, November 18, 2009 ASSOCIATED EARTH SCIENCES, IN JSKIld - KEM103A9 - PrqJects1200W1031KE1WP Pagel Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Prelintinary Geotechnical Engineering Repoli Bremerton, Washington , Project and Site Conditions 1.2 Authorization Authorization to proceed with this study was granted by the Housing Authority of the City of Bremerton. This report has been prepared for the exclusive use of the Housing Authority of the City of Bremerton and their agents for specific application to this project. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering and engineering geology practices in effect in this area at the time our report was prepared. No other warranty, express or implied, is made. Paolo -9110M 9M MIX go 11144 2.1 Site Description The Bay Vista site is located in West Bremerton, Washington. The site is roughly ian la, 'r r it shape and is comprised of an area of approximately 83 acres. The site is bounded byTs Way on the north, Oyster Bay Avenue North on the east, and State Route (SR) 3 on the wes The existing Westpark public housing community was built for the U.S.-military in 1941 and currently owned and operated by the Bremerton Housing Authority (BHA). The surroundi area is a mixture of residential neighborhoods to the east, commercial and retail uses alo Kitsap Way, and light industrial uses south of As shown on Figure 2, Sector 2A is located in the center of the Bay Vista site abutting the southwest boundary. The site is currently occupied by a number of multi -unit residential structures with associated roads and landscaping. The buildings are in the process of being demolished. There is a soil stockpile in the west comer of Sector 2A covered with plastic. It is our understanding that this phase of work does not include any buildings in the soil stockpile area. Therefore, no explorations were conducted in the soil stockpile. The proposed master plan involves the redevelopment of the existing public housil'11M community. The proposed project includes redevelopment into a mixed-use, mixed-incom r!iedestrian-oriented community. We understand that the existing structures will be razed, existing roads removed, the existing utilities will be removed and/or abandoned, and existing landfill abandoned. The site will be regraded and new utilities installed. Ae" residential structures will be built after the new infrastructure is in place. I Current plans for redevelopment of Sector 2A include construction of a multi-level apartment building with 83 units and surface parking. Office space will be included in the first level of the building. No subsurface parking is currently included in the preliminary design. It is out understanding that excavations of up to 12 feet will be required to achieve subgrade elevations. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - Projects 120MI0.31KEI WP Page 2 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washington Project and Site Conditions The fill soils are generally high in silt and are expected to be moisture -sensitive. If the fill soils are wet or dry of optimum moisture at the time of construction, they will be difficult to reuse as structural fill. Vashon Lodgement Till Sediments encountered below the topsoil/fill at the locations of all the explorations generally consisted of medium dense to very dense, silty sand with gravel or gravelly sand with variable amounts of silt, and scattered cobbles.. We interpret these sediments to be representative of Vashon lodgement till. The Vashon lodgement till was deposited directly from basal, debris - laden glacial ice during the Vashon Stade of the Fraser Glaciation approximately 12,500 to 15,000 years ago. The reduced density occasionally observed within 1 to 5 feet of the ground surface is interpreted to be due to weathering. The high relative density of the unweathered till is due to its consolidation by the massive weight of the glacial ice from which it was deposited. As reported in AESI (2009), the lodgement till was observed to extend down to an elevation of approximately 60 feet (100 to 120 feet below ground surface in Sector 2A). The glacial till is high in silt and is expected to be moisture -sensitive. If the glacial till is wet or dry of optimum moisture at the time of construction, it will be difficult to reuse as structural fill. Advance Outwash Advance outwash has been encountered beneath the glacial till in explorations conducted during previous assessments at the site. This material generally consists of dense to very dense sand and gravel with generally trace to few silt and occasional little silt. These sediments are interpreted to be Vashon-age advance outwash. Advance outwash was deposited by meltwater streams emanating from the advancing Vashon-age glacial ice sheet and subsequently overridden by several thousand feet of ice. Consequently, these materials are generally dense and possess moderate to high shear strength and low -compressibility characteristics. The advance outwash is suitable for, structural fill, foundation, and pavement support provided the weathered zone is suitably compacted; however, the advance outwash deposits are not expected to be encountered during grading due to their depth. Limited storm water infiltration may be feasible in this deposit, and location -specific in-situ testing is recommended if infiltration is considered. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - Projects1200901031KEMP Page 5 Sector 2A Subsurface Exploration, Geologic Ha=zard ann, Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Re 10 Bremerton, Wasli�4�on Prn;,Prt nndqiti ;011 3.2 Grain SizeAnalysis Two samples of the glacial till soils were collected from EP -160 and EP -161 and submitted t* AESI's soils laboratory for grain size analysis. The results are provided in Appendix C. Subsurface conditions at the project site were inferred from the explorations accomplished for this study and previous studies, visual reconnaissance of the site, and review of topography provided on the topographic site plan. As shown on the exploration logs, most of the exploration pits generally encountered varying amounts of sediments interpreted to be fill (up to 6.5 feet thick) over glacial till sediments. Where fill and other unsuitable materials are encountered, they should be excavated and replaced with suitable fill. Table 4.1 below summarizes the depths of unsuitable fill and other materials and depths to suitable bearing soils. The following section presents more detailed subsurface information organized from the youngest to the oldest sediment types. IN&MMAM• Sod and/or topsoil was present at the ground surface at a number of explorations and generall ranged in thickness from 0.5 to 1.0 feet. Fill soils (those not naturally placed) we - encountered in most of the explorations in Sector 2A. The fill ranged in thickness fTom zero a 6.5 feet thick (TP -10). As noted on the exploration logs, the fill generally consisted of loose s medium dense, silty fine to coarse sand with various gravel, scattered debris, and organic. The fill consisted of silt with trace to few sand in EP -158. Old utility pipes were encounter ' in a number of explorations, and it is expected that many old and recent utilities will encountered during excavation. Any fill with high percentages of silt, organics, or debris considered unsuitable for reuse as structural fill. Some of the fill may be suitable for reuse, indicated in Table 4.1. The thicknesses shown in Table 4.1 are estimated based observations at the exploration locations in November 2009. Condition and thickness of fill may change and is expected to vary between our explorations. Other fill soils are assum to be present in the areas of the existing structures. Since the quality, thic, ..... a f t amn 6e fil is unsuitable for direct structural suT)Pcrm November 18, 2009 ASSOCIAM0 EARTH SCIENCES, INC. JSKIld - KE090103119 - Projects M090103MEI WP Page 4 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washington Project and Site Conditions 4.3 Hydrology Shallow ground water seepage was not observed in the exploration pits in the Sector 2A area. However, random areas of perched ground water are often encountered on top of dense to very dense, low -permeability Iodgement till sediments and may be encountered during grading. It should be noted that the occurrence and level of ground water seepage at the site may vary in response to such factors as changes in season, precipitation, and site use. Deep ground water was encountered in explorations MW -1 and MW -2 and will be addressed in a hydrogeologic report by AESI under separate cover. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSKIld - KE090103A9 - Projects1200901031KERP Page 7 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bretherton, Washington Protect and Site Conditions Table 4.1 Summary of Unsuitable Materials and Depths Exploration No. Approx. GS Elev. (feet) Fill Unsuitable for Reuse (feet)(feet) _ _ Fill Suitable for Reuse 0-0.5 Depth to Weathered Till (feet) - Depth to Dense Lodgement Till (feet) 0.5 B-5 174 TP -10 175 0-1 & 5.5-6.5 1-5.5 - 6.5 TP -11 168 0-1 i-4 _ 4 TP -12 180 0-2.5- - 2.5 TP -13 172 0-4 - _ 4 TP -14 155 01 - 1.0 4 EP -154 175 0-2.5 - 2.5 3 EP -1 55 179 0-1 - — 1 EP -156 180 0-1 - 1 EP -157 170 0-1.5 - - 1.5 EP -158 180 0-3 3 EP -159 176 0-4 - - 4 EP -160 178 0-0.5 0.5-2 2 5 EP -161 177 0-0.5 - 0.5 1.5 EP -162 158 0-1 - 1 3.5 EP -163 174 0-3 - 3 5 EP -164 179 0-0.5 0 0.5 1.5 EP -165 178 0-1.5 - 1.5 3.5 GS = Ground Surface. Elevations are approximate and based on topographic map. Suitability is based on visual assessment of organic and debris content. Suitability for reuse will also depend on soil moisture and weather conditions during grading and construction. Experience at Bay Vista has shown that debris content, moisture, gradation, and depth of fill soils can vary widely over short distances. 4.2 Geologic Mapping Review of the regional geologic map titled Geologic Map of Surficial Deposits in the Seattle 30' x 60' Quadrangle, Washington, compiled by Yount, Minard, and Demboff (1993), indicates that the area of the subject site is underlain by Vashon lodgement till (Qvt). Our interpretation of the sediments encountered at the subject site is in general agreement with the regional geologic map. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/1d - KEM103A9 - Project .s1200901031KE1WP Page 6 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Repon Bremerton, Washington Geologic Hazards and Mfti atiolis Due to the proximity of the site to the suspected fault trace, the risk for surficial ground rupture should be considered moderate to high during a significant seismic event connected to the Seattle Fault. Mitigation should consist of complying with the 2006 International Building Code (IBC) for this site. 5.2 Seismicallv Induced Landslides There are steep slopes within Sector 2A. However, we understand that they will mostly be flattened as a result of grading. Therefore, the potential for seismically induced landsliding is low due to the lack of steep slopes on the final graded site. If steep areas remain after grading or due to a change in the grading plan, we recommend that we assess the slope conditions at that time. 5.3 Liquefaction The encountered stratigraphy has a low potential for liquefaction due to its dense state and lack of adverse ground water conditions. No mitigation of liquefaction hazards is necessary. 5.4 Ground Motion The guidelines presented in the 2006 IBC Section 1613 should be used in the seismic design of the project. The USGS Java Ground Motion Parameter Calculator, Version 5.0.91, was used to determine interpolated probabilistic ground motion values in percent of gravity (g) for an event with a return period of 2 percent exceedance in 50 years. Using the calculator, the project area was submitted using latitude and longitude for mapped spectral accelerations of Ss = 1.512 for short periods (0.2 seconds) and Si = 0.537 for a 1 -second period. Based on the results of our subsurface exploration and our estimation of soil properties at depth utilizing available geologic data, Site Class "C", in conformance with Table 1613.5.2 of the IBC, may be used. These values, correspond to site coefficients Fa = 1.00 and Fv = 1.30 in conformance with IBC Tables 1613.5.3(1) and 1613.5.3(2), respectively. 6.0 EROSION HAZARDS AND MITIGATION As of October 1, 2008, the Washington State Department of Ecology (Ecology) Construction Storm Water General Permit (also known as the National Pollutant Discharge Elimination System [NPDES] permit) requires weekly Temporary Erosion and Sedimentation Control (TESC) inspections for all sites 1 or more acres in size that discharge storm water to surface waters of the state. The TESC inspections must be completed by a Certified Erosion and Sediment Control Lead (CESCL) for the duration of the construction. TESC reports do not 1 http://earthquake.usgs.gov/research/hazmaps/design/ November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. ISK/ld - KE090103A9 - Piojects1200901031KEI WP Page 9 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geoteclu:ical Engineering Report Bremerton, Washin ton Geolo is Hazards mid Miti ations The following discussion of potential geologic hazards is based on the geologic, topographic, and shallow ground water conditions as observed and discussed herein. Earthquakes occur in the Puget Lowland with great regularity. The vast majority of these events are small and are usually not felt by people. However, large earthquakes do occur, as evidenced by the 1949, 7.2 -magnitude event; the 2001, 6.8 -magnitude event; and the 1965, 6.5 -magnitude event. The 1949 earthquake appears to have been the largest in this region during recorded history and was centered in the Olympia area. Evaluation of earthquake return rates indicates that an earthquake of the magnitude between 5.5 and 6.0 is likely within a given 20 -year period. Generally, there are four types of potential geologic hazards associated with large seismic events: 1) surficial ground rupture, 2) seismically induced landslides, 3) liquefaction, and 4) ground motion. The potential for each of these hazards to adversely impact the proposed project 1s discussed below. 5.1 Surficial Ground Rupture The project site is located within the Seattle Fault Zone. Recent studies by the United States Geological Survey (USGS) (e.g., Yount and Gower, 1991, Bedrock Geologic Map of the Seattle 30'x 60' Quadrangle, Washington, USGS OFR 91-147; Johnson et al., 1994, Origin and Evolution of the Seattle Fault and Seattle Basin, Washington, Geology, v. 22; Johnson et al., 1999, Active Tectonics of the Seattle Fault and Central Puget Sound Washington - Implications for Earthquake Hazards, Geological Society of America Bulletin, v. 111, n. 7; and Blakely et al., 2002, Location, Structure, and Seismicity of the Seattle Fault Zone, Washington: Evidence from Aeromagnetic Anomalies, Geologic Mapping, and Seismic - Reflection Data, GSA Bulletin, v. 114 n. 1) suggest that a portion of the east -west trending thrust fault zone (Seattle Fault) may project approximately 1/z mile north of the site. The recognition of this fault is relatively new, and data pertaining to it are limited, with the studies still ongoing. According to the USGS studies, the latest movement of this fault was about 1,100 years ago when about 20 feet of surficial displacement took place. This displacement can presently be seen in the form of raised, wave -cut beach terraces along Alki Point in West Seattle and Restoration Point at the south end of Bainbridge Island. The recurrence interval of movement along this fault system is still unknown, although it is hypothesized to be in excess of several thousand years. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC JSK11d - KE090I03A9 - Projec►s1200901031KEMP Page 8 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Truta Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washington Geologic Hazards and Miti ations particles and can combine (flocculate) to form larger particles that will settle out of suspension. The sediments produced during the recent glaciation of Puget Sound are, however, most commonly the suspended soils that are carried by site storm water. The fine-grained fraction of the glacially derived soil is referred to as "rock flout," which is primarily a silt -sized particle with no electrical charge. These particles, once suspended in water, may require months to settle out of suspension. The flow length within a temporary sediment control trap or pond has virtually no effect on discharge water quality because of the long settling time compared to the time it takes to flow from one end of the pond to the other. Reduction of turbidity from a construction site is almost entirely a function of cover measures and flow control. Temporary sediment traps and ponds are necessary to control the release rate of the runoff and to provide a catchment for sand -sized and larger soil particles, but are ineffective at reducing the turbidity of the runoff. Silt fencing should be utilized as buffer protection and not as a flow -control measure. Silt fencing should be placed parallel with topographic contours to prevent sediment -laden runoff from leaving a work area or entering a sensitive area. Silt fences should not be placed across contour lines without having separate flow control in front of the silt fence. A swale/berm combination should be constructed to provide flow control rather than let the runoff build up behind the silt fence and utilize the silt fence as the flow -control measure. Runoff flowing in front of a silt fence will cause additional erosion and may cause a failure of the silt fence. 6.1 Erosion Hazard Mitigation To mitigate the erosion hazards and potential for off-site sediment transport, we would recommend the following: 1. The winter performance of a site is dependent on a well -conceived plan for control of site erosion and storm water runoff. It is easier to keep the soil on the ground than to remove it from storm water. The owner and the design team should include adequate ground -cover measures, access roads, and staging areas in the project bid ..for a workable site. The contractor must implement and maintain the required measures throughout the project duration. A site maintenance plan should be in place in the event storm water turbidity measurements are greater than the Ecology standards. 2. All TESC measures for a given area to be graded or otherwise worked should be installed prior to any activity within an area other than installing the TESC features or timber harvesting. The recommended sequence of . construction within a given area after timber harvesting would be to install sediment traps and/or ponds and establish perimeter flow control prior to starting mass grading. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/1d - KE090103A9 - Projens1300901031KE1 WP Page 11 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin8ton Geologic Hazards and !Utiations need to be sent to Ecology, but should be logged into the project Storm Water Pollution Prevention Plan (SWPPP). If the project does not require a SWPPP, the TESC reports should be kept in a file on-site, or by the permit holder if there is no facility on-site. Ecology also requires weekly turbidity monitoring by a CESCL of storm water leaving a site for all sites 5 acres or greater. Ecology requires a monthly summary report of the turbidity monitoring results (if performed) signed by the NPDES permit holder. If the monitored turbidity equals or exceeds 25 nephelometric turbidity units (NTU) (Ecology benchmark standard), the project best management practices (BMPs) should be modified to decrease the turbidity of storm water leaving the site. Changes and upgrades to the BMPs should be continued until the weekly turbidity reading is 25 NTU or lower. If the monitored turbidity exceeds 250 NTU, the results rinust be reported to Ecology within 24 hours and corrective action taken. Daily turbidity monitoring is continued until the corrective action lowers the turbidity to below 25 NTU. In order to meet the current Ecology requirements, a properly developed, constructed, maintained erosion control plan consistent with City of Bremerton standards and be management erosion control practices will be required for this project. It is often necessary make adjustments and provide additional measures to the TESC plan in order to optimize ii effectiveness. Ultimately, the success of the TESC plan depends on a proactive approach project planning and contractor implementation and maintenance. We understand that earthwork contractor will use a proprietary flocculent treatment and filtration system and th home builders will rely on temporary settling ponds. I The erosion hazard of the site soils ranges from low to high, depending on the gradation of thM soils and the slope. Maintaining cover measures atop disturbed ground provides the greate: el reduction to the potential generation of turbid runoff and sediment transport. During the loc wet season (October I" through March 31'), exposed soil should not remain uncovered • f more than 2 days unless it is actively being worked. Ground -cover measures can inclu - erosion control matting, plastic sheeting, straw mulch, crushed rock or recycled concrete, mature hydroseed. Flow -control measures are also essential for collecting and controlling the site runoff. Flow paths across slopes should be kept to less than 50 feet in order to reduce the erosion and sediment transport potential of concentrated flow. Ditch/swale spacing should be shortened with increasing slope gradient. Ditches and swales that exceed a gradient of 10 percent should include check dams to reduce the flow velocity and erosion potential within the ditch. Flow [saths that are constructed on gradients between 10 to 15 percent should be placed in a riprap- lined swale. Flow paths constructed on slope gradients steeper than 15 percent should be 114aced in a pipe slope drain. Some fine-grained surface soils are the result of natural weathering processes that have broken town parent materials into their mineral components. These mineral components can have an inherent electrical charge. Electrically charged mineral fines will attract oppositely charged November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - Projects1200901031KEMP Page 10 or 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, in ton Prefiminai2 Pfsi qn Re,clommendations Our exploration indicates that, from a geotechnical standpoint, the parcel is suitable for proposed development provided the recommendations contained herein are properly follow Previous grading on nearby Bay Vista Sector 2B encountered a highly variable thickness unsuitable fill in randorn locations.' Similar conditions may also occur on Sector,2A and contingency plan and budget should be included in the project grading phase to address zon of unsuitable fill material. Soil moisture and weather conditions will also have a signific impact on the suitability for reuse of the predominant moisture -sensitive soils at Sezctor 2 Wet season grading with moisture -sensitive soils increases costs for measures such as so admixture treatment or use of imported granular fill. The foundation bearing stratum relatively shallow in most areas, and conventional spread footing foundations may be utiliz for the new structures. However, local areas of deeper fill containing debris and organics ha been encountered and these fill soils will require selective removal and replacernen Consequently, foundations bearing on either the medium dense to very dense, natur lodgement till sediments, or on structural fill placed over these sediments, are capable providing suitable building support. Demolition of the buildings is currently underway and it is expected that site conditions will be different at the time of construction. Consistent with development of Sector 2B, all building debris, utilities, pavement, and foundations should be removed from the site. MMMMM=511_�M Site preparation of the planned building and pavement areas should include removal of all trees, brush, debris, and any other deleterious materials. These unsuitable materials should be properly disposed of. Additionally, any areas of organic forest duff/topsoil should be removed and the remaining roots grubbed. Topsoil thicknesses in our exploration pits ranged from 6 inches to 12 inches, but may vary outside this range, particularly in the vicinity of any previously disturbed/graded- areas. Topsoil should be expected to swell by approximately 25 percent relative to in-place volumes. Areas where loose surficial soils exist due to grubbing operations should be considered as fill to the depth of disturbance and treated as subsequently recommended for structural fill placement. =017- I M*10=3 ,2009 ASSOCIATED EARTH SCIENCES, INC ISKIld - KEW103A9 - Projects1200901031KEMP Page 13 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geolechnical Engineering Repon Bremerton, Geologic Hazards and Mti gations 0. During the wetter months of the year, or when large storm events are predicted during the summer months, each work area should be stabilized so that if showers occur, the • area can receive the rainfall without excessive erosion or sediment transport. The required measures for an area to be "buttoned -up" will depend on the time of year and the duration the area will be left un -worked. During the winter months, areas that are to be left un -worked for more than 2 days should be mulched or covered with plastic. During the summer months, stabilization will usually consist • seal -rolling the subgrade. Such measures will aid in the contractor's ability to get back into a worlq area after a storm event. The stabilization process also includes establishing temporary storm water conveyance channels through work areas to route runoff to the approved treatment facilities. 4. All disturbed areas should be revegetated as soon as possible. If it is outside of the growing season, the disturbed areas should be covered with mulch, as recommended in the erosion control plan. Straw mulch provides a cost-effective cover measure and can be made wind -resistant with the application of a tackifier after it is placed. 5. Surface runoff and discharge should be controlled during and following development. Uncontrolled discharge may promote erosion and sediment transport. Under no circumstances should concentrated discharges be allowed to flow over the top of steep slR1es. 6. Soils that are to be reused around the site should be stored in such a manner as to reduce erosion from the stockpile. Protective measures may include, but are not limited to, covering with plastic sheeting, the use of low stockpiles in flat areas, or the use of straw bales/silt fences around pile perimeters. During the period between October 1' and March 3 1', these measures are required. 7On-site erosion control inspections and turbidity monitoring should be performed in accordance with Ecology requirements. Weekly and monthly reporting to Ecology should be performed ♦ a regularly scheduled basis. TESC monitoring should be part of the weekly construction team meetings. Temporary and permanent erosion control and drainage measures should be aqjusted and maintained, as necessary, at the time of construction. It is our opinion that with the proper implementation of the TESC plans and by field-adjustim. appropriate mitigation elements (BMPs) during construction, as recommended by the erosi control inspector, the potential adverse impacts from erosion hazards on the project ml be mitigated. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JsK11d - KE090103A9 - Projects1200901031KEMP Page 12 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washington Prelimtna Diodon Recommendations 9.0 STRUCTURAL FILL Structural fill will be necessary to establish desired grades in some areas and to re-establish grade after unsuitable soils are removed. All references to structural fill in this report refer to subgrade preparation, fill type, and placement and compaction of materials, as discussed in this section. If a percentage of compaction is specified under another section of this report, the value given in that section should be used. 9.1 Subrade Comaction After overexcavation/stripping have been performed to the satisfaction of the geotechnical engineer/engineering geologist, the upper 12 inches of exposed ground should be compacted to a firm and unyielding condition. If the subgrade contains too much moisture, suitable compaction may be difficult or impossible to obtain, and should probably not be attempted. In lieu of compaction of the subgrade surface, the area to receive fill should be blanketed with washed rock or quarry spalls to act as a capillary break between the new fill and the wet subgrade. Where the exposed ground remains soft and further overexcavation is impractical, placement of an engineering stabilization fabric may be necessary to prevent contamination of the free -draining layer by silt migration from below. After compaction of the exposed ground is tested and approved, or a free -draining rock course is laid, structural fill may be placed to attain desired grades. 9.2 Structural Fill Compaction Structural fill is defined as non-organic soil, acceptable to the geotechnical engineer, placed in maximum 8 -inch loose lifts, with each lift being compacted to at least 95 percent of the modified Proctor maximum dry density using American Society for Testing and Materials (ASTM):D 1557 as the standard. Roadway and utility trench backfill should be placed and compacted in accordance, with applicable municipal codes and standards. The top of the compacted. fill should extend horizontally a minimum distance of 3 feet beyond the perimeter footings or pavement edges before sloping down at an angle no steeper than 2H:1V. Fill slopes should either be overbuilt and trimmed back to final grade or surface -compacted to the specified density. 9.3 Moisture -Sensitive Fill Soils in which the amount of fine-grained material (smaller than the No. 200 sieve) is greater than approximately 5 percent (measured on the minus No. 4 sieve size) should be considered moisture -sensitive. Use , of moisture -sensitive soil in structural fills should be limited to favorable dry weather conditions and near -optimum subgrade and fill moisture. We recommend that grading activities are conducted in the drier summer months to reduce the November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/td - KE090103A9 - Projec►s1200901031KEMP Page 15 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, WasNP ton Prelitnina2 Desi n Recommendations exposed subgrades should be compacted and backfilled with structural fill, which may consist of the overexcavated material, if suitable. If the existing fill is not suitable for reuse, it should be removed from the site and stockpiled and/or placed on the existing landfill. After stripping of the organic topsoil layer, removal of roots, and overexcavation of existing fill materials, we recommend that the soil exposed in the proposed roadway areas be recompacted to a firm and unyielding condition. The recompacted area should then be proof - rolled with a fully loaded, tandem -axle dump truck. Any soft or yielding areas identified during proof -rolling should be overexcavated and backfilled with structural fill. Following demolition of existing structures on the site, building and wall areas should be delineated and additional exploration pits excavated to evaluate the subgrade. Any unsuitable areas should be overexcavated and replaced with structural fill. 8.2 Tqmpor4Ky TemporaryCut Slopes In our opinion, stable construction slopes should be the responsibility of the contractor and should be determined during construction based on the local conditions encountered at that time. For planning purposes, we anticipate that temporary, unsupported cut slopes in the loose to medium dense, weathered till sediments can be made at a maximum slope of 1.5:1V (Horizontal: Vertical). Temporary cut slopes within the dense to very dense, unweathered lodgement till up to a 1H: IV inclination may be planned. As is typical with earthwork operations, some sloughing and raveling may occur, and cut slopes may have to be adjusted in the field. Flatter, temporary cut slopes should be anticipated in areas of ground water seepage. In addition, WISHA/OSHA regulations should be followed at all times. The shallow -depth site soils contain a high percentage of fine-grained material, which makes them moisture -sensitive and subject to disturbance when wet. Conversely, dry soil cannot be compacted to the specified density and is prone to wetting -induced settlement after the fill is placed. The contractor must use care during site preparation and excavation operations so that the underlying soils are not softened and that structural fill materials are moisture -conditioned to within approximately 2 percent of optimum moisture prior to compaction or reuse. If disturbance occurs, the softened soils should be removed and the area brought to grade with structural fill. If crushed rock is considered for the access and staging areas, it should be underlain by stabilization fabric (such as Mirafi 50OX or approved equivalent) to reduce the potential of fine-grained materials pumping up through the rock and turning the area to mud. The fabric will also aid in supporting construction equipment, thus reducing the amount of crushed rock required. We recommend that at least 10 inches of rock be placed over the fabric; however, due to the variable nature of the near -surface soils and differences in wheel loads, this thickness may have to be adjusted by the contractor in the field. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/td - KE090103A9 - Projec.s1200901031KE1Np page 14 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, nVftvon Preliminary Desion dations footings; however, all footings must penetrate to the prescribed strata, and no footings shou be founded in or above loose, organic, or existing fill soils. Footings should be at lea 14 inches wide for single -story structures, with 2 inches of width added for ea additional story. USE I , , 1 # The area bounded by lines extending downward at IH: IV from any foot' Ing must not intersect another footing or 'intersect a filled area that has not been compacted to at least 95 percent of ASTM:D 1557. In addition, a 1.5H:IV line extending down from any footing must not daylight because sloughing or raveling may eventually undermine the footing. Thus footings should not be placed near the edges of steps or cuts in the bearing soils. ago Anticipated settlement of footings founded as described above should be on the order of or less. However, disturbed soil not removed from footing excavations prior to food placement could result in increased settlements. I W: . . .. . . ...... ....... . - ---- -- All footing areas should be observed by AESI prior to placing concrete to verify that ths exposed soils can support the design foundation bearing capacity and that constructiom conforms with the recommendations in this report. Foundation bearing verification may aIsM be required by the governing munici opality. This is particularly important on this site whe numerous islated opooable beeod d be eod znes / ckets f unsuitfill have n funanmay ncuntere random locations. I Perimeter footing drains should be provided, as discussed under the -p �g"Djrai�na Considerations" section of this report. If gravity _ dra 0 e js iRqt ion of e, the port; structure below the drain level must be designed for combined soil and hydrostatic/buoya forces. r 6 1 W, 10—OF ASSOCIATED EARTH SCIENCES, INC. MIN - KE090103A9 - 1/'/ 1' Page 17 Sector 2A Subsurface Exploration, Geologic Hazard Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Repo Bremerton, Washington PreliminaLy DEt�n Recommendatilo potential for additional costs associated with over -optimum soils. It is likely that grading during wet periods of the year will be more expensive due to wet soils. Some of the on-site fill and lodgement till sediments are suitable for use as structural fill, but contain significant amounts of silt and are considered highly moisture -sensitive. In addition, construction equipment traversing the site when the soils are wet can cause considerable disturbance. If fill is placed during wet weather or if proper compaction cannot be obtained, a select material consisting of a clean, free -draining gravel and/or sand should be used. Free - draining fill consists of non-organic soil with the amount of fine-grained material limited to 5 percent by weight when measured on the minus No. 4 sieve fraction. RUMMMEME-MM The contractor should note that any proposed fill soils must be evaluated by AESI prior to their use in fills. This would require that we have a sample of the material at least 3 business days in advance to perform a Proctor test and determine its field compaction standard. A representative from our firm should inspect the stripped subgrade and be present durirm- placement of structural fill to observe the work and perform a representative number of i place density tests. In this way, the adequacy of the earthwork may be evaluated as fill* progresses and any problem areas may be corrected at that time. It is important to understal that taking random compaction tests on a part-time basis will not assure uniformity acceptable performance of a fill. As such, we are available to aid the owner in developing suitable monitoring and testing frequency. i11JU1 ROM 017M Spread footings may be used for building support when founded either directly on the medium -tense to very dense, natural glacial sediments, or on structural fill placed over these materials, ,?s described under the "Site Preparation" and "Structural Fill" - sections of this report. For footings founded either directly upon the medium dense to very dense glacial sediments, or on structural fill as described above, we recommend that an allowable bearing pressure of k,000 pounds per square foot (psf) be used for design purposes, including both dead and live loads. An increase of one-third may be used for short-term wind or seismic loading. 1111,7M I I 10111 IM 1 1JUIL-111) IS 0) 1 1 C4Q t$JKjJ4 November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - ProjecIA200901031KEMP Page 16 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ron Preliminary Desi n Recommendations Passive equivalent fluid = 250 pcf Coefficient of friction = 0.30 Both of these values include a factor of safety of 1.5. 11.4 Walls with Footin Surchar . es We are not aware of any retaining walls in Sector 2A that will be subject to loads from nearby footings. If any footings will be located within a 111: IV line from the base of a retaining wall, AESI should be contacted to review the design and provide additional recommendations. 12.0 ROCKERIES Rockeries may be used to prevent erosion of cut slopes; however, they are not engineered structures, and should not be used in place of retaining walls. Buildings and roads should be set back from rockeries so that a 1H: IV line extending up from the rear base of the rockery does not intersect the footing or pavement. Rockery construction quality depends largely on the skill of the builder. Although rockeries are commonly used, they should be considered a long-term maintenance item. Care must be exercised in selecting a rock source since some of the material presently being supplied is soft and disintegrates in a relatively short period of time. Samples of rock can be tested by AESI prior to their use in rockeries. The following notes present rockery design and construction considerations. In addition, the contractor should confirm that his configuration conforms to current City of Bremerton specifications. 1. The base of the rockery should be started by excavating a trench to a minimum depth of 12 inches below subgrade into firm, undisturbed ground. If loose, soft, or disturbed materials exist at the base rock location, they should be removed and replaced with free -draining sand and gravel or crushed rock. This backfill material should be compacted to a minimum of 95 percent of ASTM:D 1557. The gradation of the sand and gravel should be such that not more than 5 percent by weight should be finer than the No. 200 sieve, based on the minus No. 4 sieve. 2. The base rock should have a minimum width (perpendicular to the line of the rockery) of 40 percent of the height of the rockery. All rocks should also meet the following weight requirements: November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - Projects1200901031KEMP Page 19 Sector 2,4 Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washington Preliminar Design Recommendations horizontally backfilled, rigid walls that cannot yield should be designed for an equivalent fluid of 50 pcf. Walls that retain sloping backfill at a maximum angle of 2H:1 V should be designed for 55 pcf for yielding conditions and 75 pcf for restrained conditions. If parking areas are adjacent to walls, a surcharge equivalent to 2 feet of soil should be added to the wall height in determining lateral design forces. Undrained walls/structures must be designed for combined soil and hydrostatic pressures (85 pcf for yielding walls, 100 pcf for unyielding walls with horizontal backfill) and for buoyant/uplift forces. 11.1 Wall Backfill The lateral pressures presented above are based on the conditions of a uniform backfill consisting of either the on-site glacial sediments, or imported sand and gravel compacted to 92 percent of ASTM:D 1557. A higher degree of compaction is not recommended, as this will increase the pressure acting on the walls. A lower compaction may result in unacceptable settlement behind the walls. Thus, the compaction level is critical and must be tested by our firm during placement. The recommended compaction of 92 percent of ASTM:D 1557 applies to any structural fill placed behind the wall within a distance equal to the wall height and up to the elevation of the top of the wall. Structural fill used to construct slopes behind retaining walls should be compacted to at least 95 percent of ASTM:D 1557 if the fill is placed above the elevation of the top of the wall. Surcharges from adjacent footings, heavy construction equipment, or sloping ground must be added to the above -recommended lateral pressures. Footing drains should be provided for all retaining walls, as discussed under the "Drainage Considerations" section of this report. 11.2 Wall Drainage It is imperative that proper drainage be provided so that hydrostatic pressures do not develop against the walls. This would involve installation of a minimum 1 -foot -wide blanket drain for the full wall height (excluding the uppermost 1 foot of backfill) using imported washed gravel against the walls. The wall drain material must be hydraulically connected to the footing drain pipe. Wall foundation drains are discussed in Section 14.1 of this report. 11.3 Passive Resistance and Friction Factor Lateral loads can be resisted by friction between the foundation and the natural, medium dense to dense glacial sediments or supporting structural fill soils, or by passive earth pressure acting on the buried portions of the foundations. The foundations must be backfilled with compacted structural fill to achieve the passive resistance provided below. We recommend the following allowable design parameters: November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/td - KE090103A9 - Projects1200901031KEMP Page 18 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ton Prelimina Desii Recommendations If moisture intrusion through slab -on -grade floors is to be limited, the floors should be constructed atop a capillary break consisting of a minimum thickness of 4 inches of washed pea gravel or washed crushed rock (no fines). The pea gravel/washed rock should be overlain by a 10 -mil (minimum thickness) plastic vapor retarder. If a crushed or sharp aggregate is used, the aggregate should be rolled with a smooth steel drum or plate compactor to reduce punctures in the vapor retarder. Additional protection from the crushed aggregate should be provided by a geotextile (such as Mirafi 140N) or use of a puncture -resistant membrane compliant with ASTM,E 1345 Class A requirements for puncture resistance (such as StegoOWrap 15 millimeter vapor barrier). 14.0 DRAINAGE CONSIDERAATIONS The unweathered till sediments encountered in our explorations at depths up to 6.5 feet below ground surface are relatively impermeable, and water will tend to perch atop this stratum. Additionally, traffic across the till sediments when they are very moist or wet will result in disturbance of the otherwise firm stratum. Therefore, prior to site work and construction, the contractor should be prepared to provide drainage and subgrade protection, as necessary. 14.1 Wall/Foundation Drains All retaining and perimeter footing walls should be provided with a drain at the footing elevation. The drains should consist of rigid, perforated PVC pipe surrounded by washed pea gravel. The level of the perforations in the pipe should be set approximately 2 inches below the bottom of the footing, and the drains should be constructed with sufficient gradient to allow gravity discharge away from the buildings. All retaining walls should be lined with a minimum 12 -inch -thick washed gravel blanket provided to within 1 foot of finish grade, and which ties into the footing drain. Roof and surface runoff should not discharge into the footing drain system, but should be handled by a separate, rigid, tightline drain. Exterior grades adjacent to walls should be sloped downward away from the structures to achieve surface drainage. Final exterior grades should promote free and positive drainage away from the buildings at all times. Water must not be allowed to pond or to collect adjacent to foundations or within the immediate building areas. It is recommended that a gradient of at least 3 percent for a minimum distance of 10 feet from the building perimeters be provided, except in paved locations. In paved locations, a minimum gradient of 1 percent should be provided unless provisions are included for collection and disposal of surface water adjacent to the structures. Additionally, pavement subgrades should be crowned to provide drainage toward catch basins and pavement edges. Crawl -space areas should be provided with drains at low points to prevent water from accumulating. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. !SK/1d - KE090103A9 - Projects1200901031KEMP Page 21 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ton Preliminary Desi n Recommendations Mot ml ► '� •,►r500/2,200• r .► ► top/bottom roe, 5 feet or i! 111 pounds, ,►,d top/b'ottom rocla 3. The rock material should all be as nearly rectangular as possible. No stone should be used that does not extend through the wall. The rock material should be hard, sound, durable, and free from weathered portions, seams, cracks, or other defects. The rock density should be a minimum of 160 pcf. 4. Rock selection and placement should be such that there will be minimum voids and, in the exposed face of the wall, no open voids over 8 inches across in any direction. The rocks should be placed in a manner such that the longitudinal axis of the rock will be at right angles or perpendicular to the rockery face. Each rock should be placed so as to lock into two rocks in the lower tier. After setting each rock course, all voids between the rocks should be chinked on the back with quarry rock to eliminate any void sufficient to pass a 2 -inch square probe. The rockery should be limited to 8 feet in height. 5. A drain consisting of rigid, perforated, polyvinyl chloride (PVC) pipe enclosed in a 12 -inch -wide pea gravel trench should be placed behind the lower course of rock to remove water and prevent the buildup of hydrostatic pressure behind the wall. The remainder of the wall backfill should consist of quarry spalls with a maximum size of 4 inches and a minimum size of 2 inches. This material should be placed to a 12 -inch -minimum thickness between the entire wall and the cut material. The backfill material should be placed in lifts to an elevation approximately 6 inches below the top of each course of rocks as they are placed until the uppermost course is placed. Any backfill material falling onto the bearing surface of a rock course should be removed before the setting of the next course. 6. Any asphalt paving should be sloped to drain away from the rockery. In addition, the areas above rockeries should be planted with grass as soon as possible after rockery construction to reduce erosion. floorsbe constructed either directly on medium dense to very ►•[ natural sediments, or on structural fill placed over these materials. Areas of .► subgra that are disturbed (loosened) during construction should be recompacted to an unyieldi condition prior to placing the pea gravel, as described below. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/ld - KE090103A9 - Projects 000901031KE1WP Page 20 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Ysta Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ton Preliminary Design Recommendations We are also available to provide geotechnical engineering and monitoring services during construction. The integrity of the foundations depends on proper site preparation and construction procedures. In addition, engineering decisions may have to be made in the field in the event that variations in subsurface conditions become apparent. Construction monitoring services are not part of this current scope of work. If these services are desired, please let us know, and we will prepare a proposal. We have enjoyed working with you on this study and are confident that these recommendations will aid in the successful completion of your project. If you should have any questions or require further assistance, please do not hesitate to call. Sincerely, ASSOCIATED EARTH SCIENCES, INC. Kirkland, Washington Kindred, P.E. Engineer L. Bt o WAS , cc 4U 9 36BEI o Z Tsm S�orvk Eck /#(06/437 Bruce L. Blyton, P.E. Principal Engineer Attachments: Figure 1: Vicinity Map Figure 2: Bay Vista Site Plan Figure 3: Site and Exploration Plan Appendix A: Exploration Logs from Previous Assessments Appendix B: Exploration Logs Appendix C: Grain Size Analyses November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/Id - M090103A9 - Projects1200901031KEMP Page 23 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Wash fn ;ton Preliminar n Recommendations Portions of the site are underlain by a variable amount of fill that is generally unsuitable for road support. Beneath the fill (when present) is native weathered or unweathered medium dense to very dense lodgement till that is suitable for pavement support. AESI recommends removal of topsoil, all fill, organic debris, roots, and other unsuitable materials from the roadbed. If required, structural fill may then be placed to achieve desired subbase grades. Structural fills below proposed pavement areas should be compacted to at least 95 percent of ASTM:D 1557. The subgrade should be crowned to drain toward the edges of the paved area with grades of 2 percent. Following installation of utilities and rough -grading of the subgrade, the exposed soils should be compacted to a firm and unyielding condition, as determined by the geotechnical engineer or their representative, with a density that is at least 95 percent of maximum dry density determined using ASTM:D 1557. Given the high silt content of the native soils, moisture - conditioning may be necessary to obtain a firm and unyielding condition. During winter and spring months or following precipitation, the soils are likely to be too wet, and it may be difficult to dry the soils and obtain suitable compaction. Suitable compaction is also difficult to obtain if the soils are too dry, as generally occurs in the summer and fall. Dry soils can be most problematic because they can appear firm and suitable during construction, but soften and cause failure of the pavement when exposed to moisture. Prior to placing pavement materials, the subgrade should be proof -rolled with a fully loaded, tandem -axle dump truck. Any visibly yielding areas should be removed and replaced with structure fill. All aggregates used in the pavement section should be compacted to 95 percent of maximum dry density determined using ASTM:D 1557. The recommendations in this report are preliminary because grading plans and construction details were not finalized at the time of this report. We are available to provide additional geotechnical consultation as the project design develops and possibly changes from that upon which this report is based. If significant changes in grading are made, we recommend that AESI perform a geotechnical review of the plans prior to final design completion. In this way, our earthwork and foundation recommendations may be properly interpreted and implemented in the design. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. !SK/1d - KE090103A9 - Projects 1200901031KE1WP Page 22 m REP= S d z Sector 2A SubsurfaceGeologic Hazard and Bay ,I Redevelopment Project Preliminary GeotechnicalReport Bremerton, / f ------ Associated Earth Sciences, Inc. (AESI), 2009, Subsurface exploration, geologic hazard, and preliminary geotechnical engineering report, Sector 2B, Bay Vista redevelopment project, Bremerton, Washington, dated July 31, 2009. Landau Associates (Landau), 2006, Draft report, Westpark redevelopment, Bremerton, Washington, dated April 28, 2006. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. .ISK/Id - KE090103A9 - Projects1200901031KEmP Page 24 S-1 b2 731 W=7 S-2 b2 831 grades gravelly 10 S3- � b2 6W � W-7 6. is � 6W grades ally S4 b2 CD 0 -j 20 501 W=6 0 plated D4106= B dng Total ltpth!B0 ® 20.3 IL 25 wo K*171TOITINK Mi 11 Notes: 1. Straligraphic contacts are based on field . interpretations and we =ri subsurface conditions. 2. Reference to the text of this report Is necessary for a proper und 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. Westpark Redevelopment Log of Boring B-5 LANDAU Bremerton, Washington ASSOCIATES Figure A-6 B-5 SAMPLE DATA SOIL PROFILE -6 Drilling Meftd- E Z's —0 0 E >1 Ground Elevation (ft)- Not Measured CL 0) 2t 01 E U- 0- Q E Z U) I L) Drilled By: Cl a) .5 w m 12 0 PC cement concrete (6- thick) --§M— —Brown, very silty, fine to coarse SAND with gravel (very dense, wet) (gladal 90) S-1 b2 731 W=7 S-2 b2 831 grades gravelly 10 S3- � b2 6W � W-7 6. is � 6W grades ally S4 b2 CD 0 -j 20 501 W=6 0 plated D4106= B dng Total ltpth!B0 ® 20.3 IL 25 wo K*171TOITINK Mi 11 Notes: 1. Straligraphic contacts are based on field . interpretations and we =ri subsurface conditions. 2. Reference to the text of this report Is necessary for a proper und 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. Westpark Redevelopment Log of Boring B-5 LANDAU Bremerton, Washington ASSOCIATES Figure A-6 GM Gray -brown, silty, very gravelly, fine to 4 coarse SAND (dense to very dense, moist) (glacial till) 6 S-2 d =9• X, A--12 [Ell iD Boring Completed 04/05/06 Total Depth of Boring = &0 R Notes: 1. Strafigraphic contacts are based on field interpretations and are apprwdmate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key' figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log Of Boring TP -11 LANDAU Bremerton, Washington A. ASSOCIATES TP -11 SAMPLE DATA SOIL PROFILE GROUNDWATER m o Drilling Method' Rubber -tired Backhoe E o a o :d E Ground Elevation (ft)' Not Measured HZ mZ m E c � c m m is rn t>0 '0 Drilled By: Custom Backhoe ro m C3r0ca m to H tE 0 1 SM/ _ .......... .._..... ......... ML Brown, silty, fine to medium SAND with SM gravel (medium dense, moist to wet) (fill) Groundwater not encountered. S-4, d W=14 2 _ concrete debris on north face of pit GM Gray -brown, silty, very gravelly, fine to 4 coarse SAND (dense to very dense, moist) (glacial till) 6 S-2 d =9• X, A--12 [Ell iD Boring Completed 04/05/06 Total Depth of Boring = &0 R Notes: 1. Strafigraphic contacts are based on field interpretations and are apprwdmate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key' figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log Of Boring TP -11 LANDAU Bremerton, Washington A. ASSOCIATES 2 S�l - _Fj d W=14 4 6 6 S - W GS 6 .I 2 d Boring Completed 04/05/06 Total Depth of Boring = 6.5 ft. 10 t--12 1--14 x-16 Brown, silty, fine to coarse SAND I (medium dense, moist to wet) (fill) - concrete pipe at 4' - buried topsoil horizon with roots 3ray-6rown. silty, gravelly, fine to coarsi SAND (dense, moist) (glacial till) GROUNDWATER Groundwater not encountered. Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boring TP -10 �_ LANDAU Bremerton, Washington ASSOCIATES TP -10 SAMPLE DATA SOIL PROFILE Drilling Method: Rubber -tired Backhoe -� z CL }� °o E E. Ground Elevation (ft); Not Measured ,.a Z t n. m a a a 0 -- t a co U Drilled B Custom Backhoe a rn .6 N '' c m 1, E U' co :D 2 S�l - _Fj d W=14 4 6 6 S - W GS 6 .I 2 d Boring Completed 04/05/06 Total Depth of Boring = 6.5 ft. 10 t--12 1--14 x-16 Brown, silty, fine to coarse SAND I (medium dense, moist to wet) (fill) - concrete pipe at 4' - buried topsoil horizon with roots 3ray-6rown. silty, gravelly, fine to coarsi SAND (dense, moist) (glacial till) GROUNDWATER Groundwater not encountered. Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boring TP -10 �_ LANDAU Bremerton, Washington ASSOCIATES I 4 6 S2 d W.9 8 Boring Completed 04106/05 Total Depth of Boring = 8.0 it. 10 —12 fq 14 16 I'M ,Nl. MIFIr-W-0� Notes: 1. Stratigraphle contacts are based on field interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface condifions. 3. Refer to "Sell Classification System and KW figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boring TP -13 LANDAU Bremerton, Washington A-1 6' ASSOCIATES TP -13 SAMPLE DATA SOIL PROFILE GROUNDWATER .0 -6 Drilling Method,, Rubber-Ored Backhoe E Z — 6 1 0 E Ground Elevation (ft), Not Measured CL_w E a 0. E —0 = 0- 10 a) 0 Drilled By- Custom Backhoe .0 wally, silly, fine to coarse SAND with abundard mots (medwn dense, ffdsQ (fill) Grounclwater not encountered. I 4 6 S2 d W.9 8 Boring Completed 04106/05 Total Depth of Boring = 8.0 it. 10 —12 fq 14 16 I'M ,Nl. MIFIr-W-0� Notes: 1. Stratigraphle contacts are based on field interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface condifions. 3. Refer to "Sell Classification System and KW figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boring TP -13 LANDAU Bremerton, Washington A-1 6' ASSOCIATES Gray, silty, gravaity, fine to Coarse (dense, damp) (glacial Hit) 4 6 GT S-2 dW = 4 8 GS Boring Completed 04/06/06 Total Depth of Boring = 8.6 ft - 10 t 10 t--12 F— 14 1-16 Notes: 1. Stratigraphic contacts are based on fid interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. Figure 2 AL Westpark Redevelopment Log of Boring TP -12 A LAND U Washington Bremerton, [A ASSOC RTESg A 15 TP -12 SAMPLE DATA SOIL PROFILE GROUNDWATER Em E Drilling Method- Rubber -tired Backhoe z' 15 o rn a T Ground Elevation (tip Not Measured v W 2 _m X2 CL e E U.M g U @ to 0 Drilled By: Custom Backhoe m m O C15 rad fn m m H (9 .0 SWW T soli ML Brown, very silly, fine to medium SAND with SM gravel (medium dense, wet) (fill) Groundwater not encountered. S-1 d W = 26 abandoned utility pipes at 1.6 .2 Gray, silty, gravaity, fine to Coarse (dense, damp) (glacial Hit) 4 6 GT S-2 dW = 4 8 GS Boring Completed 04/06/06 Total Depth of Boring = 8.6 ft - 10 t 10 t--12 F— 14 1-16 Notes: 1. Stratigraphic contacts are based on fid interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. Figure 2 AL Westpark Redevelopment Log of Boring TP -12 A LAND U Washington Bremerton, [A ASSOC RTESg A 15 Exploration Logs 1--12 1-14 1-16 Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to " Soll Classification System and Key'" for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boring TP -14 LANDAU Bremerton, Washington "-1 6 14 ASSOCIATES TP -14 SAMPLE DATA .�. . SOIL PROFILE GROUNDWATER E Drilling Method:_, Rubber -tired Backhoe Z —m CL o 1 -a C ! E, Ground Elevation (fty Not Measured EE c EE c W U Drilled By:, Custom Backhoe m C1 co 06 rn m F C'3 in =) _... . 0 S TopsoA - ML Groundwater not encountered. SAA Red-bro9 Y. �Y.wn, r�re�-dine to coarse SAND (medium dense, moist to wet) (ablation till) ..2 S-1 d W=11 4 Sp- Gray, gravelly, fine to coarse SAND with silt SM (dense, moist to wet) (glacial till) ,g S2 d W= t2 GS it .8 .._.._...... ...... Boring Completed 04/06/06 Total Depth of Boring = 8.0 ft. 1--12 1-14 1-16 Notes: 1. Stratigraphic contacts are based on field interpretations and are approximate. 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to " Soll Classification System and Key'" for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boring TP -14 LANDAU Bremerton, Washington "-1 6 14 ASSOCIATES LOG OF EXPLORATION PIT NO. EP -154 This log is part of the report repared by Assoclated Earth Sciences, Ina (AESI) for the named pproject and should be a read together with that report for complete interpretation. This summary applies only to the locaEion of this trench at the time of excavation. Subsurface conditions may change at this location with the only of time. The data presented are 0 a simpification of actual conditions encountered. DESCRIPTION Loose to medium dense, dry, brown to grayish brown, silty fine to medium SAND, few to little gravel, scattered trash and concrete rubble, occasional cobble. 2 3 ] Dense to very dense, dry, brownish gray to gray, fine to medium SAND, little silt, few fine to coarse gravel (concrete -like diamict). 4 Few roots at 3'. n Bottom of exploration pit at 6 feet. 7 No seeps or sloughing. North end of pit intersects a -6° concrete storm sewer (?) pipe at 4.51, running east -west. HOS determined pipe is abandoned storm - backfilled. 8 9 10 11 12 13 14 15 16 17 18 19 E Bay Vista Sector 2A N Bremerton, WA 6 Associated Earth Sciences, Inc. Lagged by: SST project No. KE090103A � a o 9/10/09 Approved by: Y " °�o , GW . . . . . ...... ...... Well -graded gravel and I gravel with sand, little to no fines 0 0 ,00 000a, Boulders Poorly -graded gravel , 0 0 00 I 0 0 0 a GIP and gravel with sand, 0 0 0 0 0 4 to 10 little to no fines ?0?0- Medium Dense 10 to 30 Test Symbols 5% and 15% Silty gravel and silty 30 to 50 GIVII gravel with sand Very Dense >50 G =Grain Size 3 O"OD Thin -Wall Tube i' Clayey gravel and 1-44GC (including Shelby tube) clayey gravel with sand V.%%% I Well -graded sand and Very Soft SW sand with gravel, little ..... Soft to no fines DD = Dry Density Grained Soils Poorly -graded sand 4 to 8 SP and sand with gravel, Stiff 8 to 15 little to no fines Very Stiff Silty sand and sm silty sand with >30 gravel Clayey sand and liclayey SC sand With gravel Sift, sandy silt, gravelly silt, ML silt with sand or gravel Clay of low to medium CL plasticity; silty, sandy, or gravelly clay, lean clay Organic clay or silt of low OL plasticity -ElaSti Silt, Clayey silt, silt C MN� with micaceous or diatomaceous line sand or sit Clay of high plasticity, CH sandy or gravelly clay, tat clay With sand or gravel Organic clay or silt of ON medium to high plasticity I Peat, muck and other PT highly organic soils Sand 2ftq_Sl!y SPT blows/foot Size Range qd Sieve Number Boulders Very Loose 0 to 4 3" to 12' Coarse- Loose 4 to 10 31 to 3/4" Grained Soils Medium Dense 10 to 30 Test Symbols 5% and 15% Dense 30 to 50 3 25"•D. Spoon Ring Sampler -,blank casing Very Dense >50 G =Grain Size 3 O"OD Thin -Wall Tube i' I.Screened casing M = Moisture Content (including Shelby tube) Consistency SPTt2lbIowsfibot A = Atterberg Limits Very Soft 0 to 2 C = Chemical Fine- Soft 2 to 4 DD = Dry Density Grained Soils Medium Stiff 4 to 8 K = Permeability Stiff 8 to 15 Very Stiff 15 to 30 Hard >30 Sand Component Definitions Desai tip ve Term Size Range qd Sieve Number Boulders Larger than 12" Cobbles 3" to 12' Gravel 3" to No 4 (4 75 mm) Coarse Gravel 31 to 3/4" Fine Gravel 3/41 to No, 4 (4.75 mm) Sand No. 4 (4 75 mm) to No. 200 (0-075 mm) Coarse Sand No, 4 (4.75 mm) to No. 10 (2.00 mm) Medium Sand No 10 (2.00 mm) to No. 40 (0.425 mm) Fine Sand No. 40 (0,425 mm) to No. 200 (0.075 mm) Silt and Clay Smaller than No. 200 (0-075 mm) (*3) Estimated Percentage Moisture Content Dry - Absence of moisture, dusty, dry to the touch Slightly Moist - Perceptible moisture Moist - Damp but no visible water Very Moist - Water visible but not free draining from below water table Percentage by Compqn��nt Weight Trace <5 Few 5 to 10 Little 15 to 25 With - Non -primary coarse Bentonite constituents: > 15% is Description a - Fines content between Sampler 5% and 15% Moisture Content Dry - Absence of moisture, dusty, dry to the touch Slightly Moist - Perceptible moisture Moist - Damp but no visible water Very Moist - Water visible but not free draining from below water table (1) Percentage by dry weight (2) (SPT) Standard Penetration Test (3) (ASTM D-1586) In General Accordance with Standard Practice for Description and Identification of Soils (ASTM D-2488) (4) Depth of ground water Y_ ATD = At time of drilling -7 Static water level (date) b0§111 �Q' Classificirtions of soils in this report are based on visual field and1or laboratory observations, which Include density/consistency, moisture condition, grain size. and plasticity estimates and should not be construed to Imply field or laboratory testing unless presented herein. Visual -manual and/or laboratory classification methods of ASTM D-2487 and D-2488 were used as an Identification guide for the Unified Soll Classification System. 0 >1 Associated Earth Sciences, Inc. EXPLORATION LOG KEY . ................ . .... Blows/6"or Sampler ., , iCement grout Type surface seat 2,"OD 0 Sampler Ty M — pe Bentonite Split -Spoon is Description a (4) seal Sampler 3.0' OD Split -Spoon Sampler Filter pack with (SPT) 3 25"•D. Spoon Ring Sampler -,blank casing Bulk sample SeCrKM 3 O"OD Thin -Wall Tube i' I.Screened casing (including Shelby tube) or Hydrolip i': with filter pack Grab Sample J.-'Endcap Portion not recovered (1) Percentage by dry weight (2) (SPT) Standard Penetration Test (3) (ASTM D-1586) In General Accordance with Standard Practice for Description and Identification of Soils (ASTM D-2488) (4) Depth of ground water Y_ ATD = At time of drilling -7 Static water level (date) b0§111 �Q' Classificirtions of soils in this report are based on visual field and1or laboratory observations, which Include density/consistency, moisture condition, grain size. and plasticity estimates and should not be construed to Imply field or laboratory testing unless presented herein. Visual -manual and/or laboratory classification methods of ASTM D-2487 and D-2488 were used as an Identification guide for the Unified Soll Classification System. 0 >1 Associated Earth Sciences, Inc. EXPLORATION LOG KEY . ................ . .... LOG OF EXPLORATION PIT NO. EP -156 $ This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be a read together with that repori for complete interpretation. This summary applies only to the logiion of this trench at the time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are o a simpification of actual conditions encountered. DESCRIPTION Grass over Topsoil/Fill Loose to medium dense, dry, brown, silty fine to medium SAND, organic rich. 1 - Vashon Lodgement Till Dense to very dense, dry, light gray, fine to medium SAND, little silt, few to little fine to coarse 2 gravel, occasional cobble. 3 4 4 Bottom of exploration pit at 3 feet. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 NJ 19 y Bay Vista Sector 2A Bremertoti, WA ii Associated Earth Sciences, Inc. Project No. KE090103A � Logged by: SST CD Approved by: 1 9/10/09 F- a P4 z IM -M-1151 MA MR. - 0 '---r:... I I ns enIgunt"Z. I 11*4M ZA I a I Mok urass over'iasnon LOUgement i in v en e 91 li�'ht W4 fine to medium SAND. little silt. few to little fine to coarse qravel, 9 K 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 S Z- U E Bay Vista Sector 2A Bremerton, WA A A Associated Earth Sciences, Inc. Project No. KE090103A Logged by: SST Approved by: 9110109 1� M -W -7Y. [B SST,_ KE 0 t3 LOG OF EXPLORATION PIT NO. EP -158 This log is part of the report prepared by Assoaated Earth Sciences, Inca (AESII for the named rolect and should be read together with that report for �mplet� interpretation. Tttis summary applies only to the locatPon of this trench at the io time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are o a simpification of actual conditions encountered. DESCRIPTION Soft to medium stiff, dry, light brown, SILT, trace to few fine sand, few roots. 2 3 4 Very dense, dry, light gray, fine to medium SAND, little silt, little fine to coarse gravel, occasional Bottom of exploration pit at 4 feet. 5 No seeps or sloughing. Trench is excavated southwest to northeast. 2" steel pipe in northeast end of pit, 2' deep. Pipe was not damaged 6 7 8 9 10 11 12 13 14 15 16 17 18 19 E , Bay Vista Sector 2A CL Bremerton, VSA Associated Earth Sciences, Inc. Project No. KE090103A Logged by: SST � Approved by: f 9110109 MR ffi M9 Y 01MR, R" MI•... 1 . 11, Spa .9 11111�pli=n olf ��cta`l �,,r�dKn-s 1!Jz&i4qvl;A11q7L' urass over i -in Loose to medium dense, dry, tan, fine to medium SAND, with silt, little fine to coarse gravel. 2 1 vasnon LOagement i in Very dense, dry, light gray, fine to medium SAND, little silt, few to little fine to coarse gravel 3 (concrete -like diamict). 1H M Bottom of exploration pit at 5 feet. No seeps or sloughing. Ditch line runs north -south at west end of pit, 1 1/4' PVC pipe at -3.5'. Pipe was not damaged. 7 8 9 10 11 12 13 14 15 16 17 18 19 A 4U Bay Vista Sector 2A Bremerton, WA 9 A Associated Earth Sciences, Inc. Logged by: SST Project No. E090103A CL MW R Approved by: 9110109 M d KE 0 E m 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 LOG OF EXPLORATION PIT NO. EP -160 This log is part of the reportprepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be read together with that report for complete interpretation. This summary applies only to the location of this trench at the time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are a simplfication of actual conditions encountered. DESCRIPTION Asphalt over crushed base course. Fill Medium dense, dry, light brown, silty SAND, few gravel. Dense, dry, tan -brown, silty SAND, with gravel. Very dense, slightly moist to moist, olive -gray, gravelly SAND, with silt. 19 Bottom of exploration pit at depth 18.5 feet No caving. No seepage. m E z Bay Vista Sector 2A CL Bremerton, WA 9 Associated Earth Sciences, Inc. project No. KE090103A o Logged by: JSK a Approved by: November 2009 U LOG OF EXPLORATION PIT NO. EP -159 This log Is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be read together 1,1h that report complete interpretation. This summary agplies only to the location of this trench at the c va time Me o ex a n. Subsurface conditions may change at this location with the passage of time. The data presented are o a simpification of actual conditions encountered. IN] Z41 2 1 Lei k' I Loose to medium dense, dry, tan, fine to medium SAND, with silt, little fine to coarse gravel, includes concrete rubble (to 16"), rebar, glass bottles, old shoe. 2 - 3 d Root zone at 3'. 4 - Vashon Lodgement Till 5 Very dense, dry, light gray, fine to medium SAND, little silt, little fine to coarse gravel, occasional Bottom of exploration pit at depth 5 feet 6 No seeps or sloughing. 7 -4 8 -4 9 10 11 12 13 14 15 16 17 18 2 E 0 Bay Vista Sector 2A Z a. 0 Bremerton, WA ;V Logged by: SST Associated Earth Sciences, Inc. Project No. KE090103A Approved by: �i�t; , J 9110/09 0. 0. Q LOG OF EXPLORATION PIT NO. EP -162 L This log is part of the reportprepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be w read :together with that report for complete interpretation. This summary applies only to the location of this trench at the time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are v a simpltication of actual conditions encountered. DESCRIPTION Sod over topsoil. 1 Loose, dark brown, silty SAND, few gravel. Weathered Glacial Till 2 Dense, dry, brown, silty SAND, with gravel. 3 4 Very dense, slightly moist, olive -gray, silty SAND, with gravel. 5 6 7 8 9 10 11 - 12 At 12' transition to gravelly SAND, little silt. 13 14 15 16 Bottom of exploration pit at depth 16 feet 17 No caving. No seepage. 18 m E z Bay Vista Sector 2A Bremerton, WA Associated Earth Sciences, Inc. Project No. KE090103A Logged by. JSK o Approved b C9y: November 2009 U v 0 1 z -0 zo 0 0 T—J r. i'. of actual conditions encount'11�5 er . a 5707439MOMMIN Weathered Glacial Till _Dense, dry, tan -brown, silty SAND, with gravel. ... Glacial Till Very dense, slightly moist to moist, olive -gray, gravelly SAND, with silt. I. M 8 9 10 11 12 13 14 15 16 17 � Bottom of exploration pit at depth 16 feet No caving. No seepage. 18 19 E I Bay Vista Sector 2A Z Bremerton, WA Associated Earth Sciences, Inc. o Logged by: JSK Project No. KE090103A r a Approved by: November 2009 Y. . ...... . .. . ........ ;11 F - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 iq LOG OF EXPLORATION PIT NO. EP -164 This I the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be read together with that repo for complete interpretation. This summary applies only to the location of this trench at the time of excavation. Subsurface conditions may change at this location VVI the passage of time. The data presented are a simplfication of actual conditions encountered. DESCRIPTION .00se, dark brown, silty SAND, few gravel. Weathered Glacial Till )ense, dry, tan -brown, silty SAND, with gravel. Glacial Till tery dense, slightly moist to moist, olive -gray, silty SAND, with gravel. Bottom of exploration pit at depth 2 feet No caving. No seepage. Bay Vista Sector 2A Bremerton, WA Associated Earth Sciences, Inc. Logged by: JSK Project No. KE090103A Approved by: November 2009 91 **4q;AiU I L01 ki -ioa over topsoii. 1 Loose, dark brown, silty SAND, few gravel. Fill 2 Medium dense, slightly moist, light brown, silty SAND, few gravel. Bum layer at 2'. L Is Dense, dry, tan -brown, silty SAND, with grav I 9 A I Le W.- UT -a Bottom of exploration pit at depth 5.5 feet No caving. No seepage. 8 9 10 11 12 13 14 15 16 17 18 19 z 0 Bay Vista Sector 2A Bremerton, WA 9 Logged by: JSK Associated Earth Sciences, Inc. Project No. E090103A Approved by: November 2009 T V -k CL M r Grain Size Analyses 1 2 3 4 5 6 7 8 9 10, 11 12 13 14 15 16 17 it-] 19 LOG OF EXPLORATION PIT NO. EP -165 r'. 11, 130 1 IT a 11 ► Yi9v U.plWMicaUcn of actua conditions en=. I DESCRIPTION Loose, dark brown, silty SAND, few gravel. IFIIf__ — Medium dense, slightly moist, light brown, silty SAND, few gravel. Weathered Glacial Till Dense, dry, tan -brown, silty SAND, with gravel. (ery dense, slightly moist to moist, olive -gray, silty SAND, with gravel. Bottom of exploration pit at depth 4 feet No caving. No seepage. Old -6" diameter concrete pipe on west side of pit at 2', dl E ID 9 Bay Vista Sector 2A z IL a Bremerton. WA A A Associated Earth Sciences, Inc. Logged by: JSK Project No. KE090103A Approved by: November 2009 ... ...... . . .... .. . . ..... . ..... PERIZINUT CZNTEIF,�, Dtvl� of C,'O=l -I I - -.t - 7.` tr- Cl, mechanical Lil—I Plambing -C)i I. pm Plin-E IL .. ......... _LT ciry State Z' ctsta'�,t.l 2.1p: LLk,anse Fll,: �Pi i --Ll ........ .... cmian phona, ya, . . . ... . . . ? RECEIIUD AArTrP CENTER City of RremertFj2jjLkjvjLJL JL .. .. . ........ . . . . . . .. . ... ............. . .. .... jj, AUG 2 3 201Z RESIDENTIAL Department of Building Permit Application De a�ierkt f C�gmnia�Ti'�",J]Vvtgy_�Po %'ee'oo'�115 - _6a, Street Suite 600 - Bremerton - WA. - !L8337-1873 I! L_ — _ _ (360) 473-5275 * Fax (360) 473-5278 * www.dbremerton.wa.us Site Address: To apply fora property address, contact Public Works at (360) 473-5270 ' EW SINGLE-FAMILY RESIDENCE RESIDENTIAL REBUILD NEW DUPLEX RESIDENTIAL ADDITION NEW MANUFACTURED HOME RESIDENTIAL REPAIR E] NEW GARAGE/CARPORT NEW ACCESSORY BUILDING DEMOLITION sf Interior _sf Exterior- sf Foundation Wall** _sf Roof /Section** ** Separate demolition permit and fees required. Contact Public Works for sewer cap permit (473-5270). Sewer must be capped prior to demolition permit issuance. El OTHER: Scope of work proposed: Iduzm--tcl e-jlA- Square Footage: Building: 1st Floor Basement Garage: 1st Floor -WO7 2nd Floor Other 2nd Floor Deck(s): Application for which no permit 0, within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may the tc 'rl' turned to the applicant or destroyed by the building official. The building official may extend the time for action by the " lican a pen n?t exceeding 180 days on request by the applicant, showing that circumstances beyond the control of the applicant v -ii pre d froph being taken. No applicant shall be extended more than once. In order to renew action on an t shall resubmit plans and pay a new plan review fee. K /;Z2 Date Rev. Oct. 2008 (Continued on back) RESIDENTIAL SITE PLAN QUESTIONNAIRE a 1. Site Address:.���.• 2. Are any areas being developed on the site within 200 feet of the shoreline? Ye// N,o NOTE: If yes, please fill out a Shoreline Permit Submittal Checklist (WAC 173-27-180) CRITICAL AREA CHECKLIST: Slope is calculated by dividing the vertical distance by the horizontal distance and then multiplying the result by 100. Example: ,-, d Vertical 1 Distance = 20# �� x Horizontal Distance = 100' Vertical 20 feet Horizontal 100 feet =.2 X 100 = 20% slope Check all that apply to the site and areas within 200 feet of the site. Flat: less than 5 -feet elevation change over entire site. Rolling: slopes on site generally less than 15%. Hilly: slopes present on site of more than 15% and less than 30%. Steep: grades of greater than 30% present on site. Other (please describe): 4. Does the site or properties within 200 feet of the site contain areas of standing water, creek or an area where water flows across the ground surface? Yes Flo,/ 5. Is there an apparent wetland present on the site or on properties within 200 feet of the site? Yes eo) RESIDENTIAL DEVELOPMENT WORKSHEET: 6. What is the amount of grading proposed (in cubic yards), not including foundation area? Fill amount Cut amount Total grading NOTE: Grading over 50 cubic yards requires a separate permit. Will the grading material be imported or exported? Ye No 7. Please provide the following information. The setbacks are measured from the finished, exterior wall of a structure to the lot line, not from the foundation. Accurately represent your setbacks on site plan. *Use this as the second front' yard setback for corner lots and through lots. **Development Coverage is defined as that portion of a lot covered by impervious surface areas of all structures, and impervious paved areas,; such as driveways and walkways. Residential Questionnaire Revision: October 2008 Contractors or Tradespeople Printer Friendly Page General/Specialty Contractor A business registered as a construction contractor with Lftl to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name L A WILLIAMS CONSTRUCTION LTD UBI No. 601042510 Phone 2533810252 Status Active Address Po Box 111 License No. LAWILCL131RM Suite/Apt. License Type Construction Contractor City Fox Island Effective Date 12/14/1987 State WA Expiration Date 8/31/2014 Zip 983330111 Suspend Date County Pierce Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty Specialty Effective Expiration Status 1 2 Date Date WILLIC"148U WILLIAMS Construction General Unused 6/11/1986 _ � CONSTRUCTION Cont ctor 12/1/1987 Archived NMWPR•'148BU N M W PROPERTIES Constructron General Unused 1/31/1986 12/1/1986 Archived Business Owner Information Bond Information inc umeEff� Date Expiration Date Cancel ..ate Impaired Date Bond7682-- 08/29/2001U $1 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Page 1 of 2 /31/2001 https:Hfortress.wa.gov/lni/bbip/Print.aspx 10/26/2012 Contractors or Tradespeople Printer Friendly Page Page 2 of 2 `MARINE ISE p IN72LP5002440 09/12/2006 09/12/2007 1$1,000,000.00109/11/2006 Summons/Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions/Citations Information No records found for the previous 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 10/26/2012 iC f ty (A SEP 2 �ry�T:'S.a °.Ja1d:FhG ti:Y� ySEE ACKS the Di,c')�,r�ifi R�u��k No the fiuxus wx WA Permit Center 1 Dept. of Community Development 345 - 6th Street, Suite 600*Bremerton*WA*98337-1873 Department of Community Do ielolsracr t HOLE HOUSE VENTILATION USING THE PRESCRIPTIVE METHOD IN 2009 IRC Purpose: We have all heard about office and school buildings which cause people to become ill. If improperly ventilated, our homes can cause some of us to become ill too. With all of the new materials we use to construct and furnish our buildings, it is very important that our homes are ventilated in such a way as to provide us with a method to get the stale air out and fresh air in. Please check the appropriate box to describe which of the four prescriptive Whole House Ventilation Systems you will be using, and fill in any blanks or boxes under the system you choose. Option 1. Whole house Ventilation Using Exhaust Fans (IRC Section M1508)) • CFM Exhaust Fan Flow Rating Per Table M1508.2 (attached). Location of whole house exhaust fan(s) must be shown on the plans. • Fan Controls: 24 hour clock timer with capability of continuous operation, manual and automatic control 8 accessible • Whole house fans located 4 feet or less from the interior grille shall have a sone rating of 1.5 or less at 0.1 inches w.g. Outdoor Air shall be distributed to each habitable room by individual Outdoor Air inlets. Exception: Exhaust only ventilation systems do not require outdoor air inlets if the home has a"ducted forced air heating system that communicates with all habitable rooms and the interior doors are undercut a minimum of'/ inch. Option 2. Whole house Ventilation Integrated with a Forced Air Heating System (IRC Section M1508.5.1) • inch Fresh air duct, connected to the furnace return plenum, sized Per Table M1508.6.2. (attached) • Fresh Air inlet duct Damper Selection: (Choose one) Motorized Damper (no testing of ventilation flow rates as long as the prescriptive duct sizing per Table M1508.6.2.are met Manual Damper meeting Table 3-2 flow rates: CFM (see attached Table M1508.6.2.) Automatic Flow -Regulated Device (Requires field testing or calculation.) • Outdoor Air inlets shall be screened or otherwise protected from entry by leaves or other material and located • All Ventilation supply ducts in the conditioned space shall be insulated to a minimum of R-4 Option 3. Whole house Ventilation Using a Supply Fan (IRC Section M1508) • inch Outdoor air inlet duct, connected to the furnace supply air stream, sized Per Table M1508.6.2. (attached) Fresh Air inlet duct Back -draft Damper Selection: (Choose one) Calibrated manual volume damper installed and set to meet the measured flow rates in Table 3-2 (attached) by field testing with a pressure gauge and/or following manufacturer's installation instructions. 13 A manual volume damper installed and set to meet the measured flow rates specified in Table M1508.6.2.by field testing with a flow hood or flow measuring station. nAn automatic flow -regulating device sized to the specified flow rate in Table M 1 508.6.2.which provides constant flow over a pressure range of 0.20 to 0.60 inches water gauge. • Outdoor Air inlets shall be screened or otherwise protected from entry by leaves or other material and located • All Ventilation supply ducts in the conditioned space shall be insulated to a minimum of R-4 FlOption 4. Whole house Ventilation Using a Heat Recovery Ventilation System • All duct work in heat recovery system shall be at least 6 inches in diameter • Balancing dampers shall be installed on the inlet and exhaust side. • Flow measurement grids shall be installed on the supply and return. • System minimum flow rating shall not be less than specified in Table M1508.6.2. • Outdoor air inlets shall be screened or otherwise protected from entry by leaves or other material and located • Ventilation Supply Ducts in the conditioned space upstream of the heat exchanger shall be insulated to a minimum of R-4 THE FOLLOWING ARE REQUIRED IN ADDITION TO THE OPTION CHOSEN: • At the time of final inspection, the automatic control time shall be set to operate the whole house fan for at least 8 hours per day, • A label shall be affixed to the control that reads 'Whole House Ventilation" (see operating instructions) • 24-hour clock timer installed with capability of continuous operation, manual and automatic control, readily accessible. • Installer shall provide the manufacturer's installation, operating instructions, and a whole house ventilation system operation description. .2• Table M1508.2 Whole House Ventilaflon Minimum Ventilation Rates: Supply Fan Tested CFM at 0.40. 1� 11 111 1111 -7 lei M- moffma -420000rommul X Sm 6*1A PRESCRIPTIVE HEATING SYSTEM SIZING All heating equipment must be sized using a recognized engineering practice. Typical sources include: • ASHRAE Handbook of Fundamentals. • ACCA Manual J, 8th Edition- Residential Load Calculation. • ACCA Manual N- Commercial Load Calculation. WSEC: www.eneEgy.wsu.edu/code PRESCRIPTIVE HEATING SYSTEM SIZING All heating equipment must be sized using a recognized engineering practice. Typical sources include: • ASHRAE Handbook of Fundamentals. • ACCA Manual J, 8th Edition- Residential Load Calculation. • ACCA Manual N- Commercial Load Calculation. WSEC: www.eneEgy.wsu.edu/code August 22, 2012 Attn: City of Bremerton Building Department Re: L.A. Williams Construction MD Designs hereby acknowledges that L.A. Williams Constructions has exclusive authority to submit Plan # 930R as a Base Plan for unlimited -use construction for Bay Vista Development. L.A. Williams Construction is recognized as the Owner and exclusive agent for the Plan for the purpose of submitting or receiving documents related to the Base Plan. Sincerely, John P. De Loma Principal/Project Designer Glazing Schedule Attached to Document Does not apply. (SEE INSTRUCTIONS) gjjn���� All glazing and doors meet maximum U -factor. Alternate heating size method submitted. Option I or 11, Glazing to floor area limit (WSEC 602.7.2) Area weighted window, skylight or door U -factor (WSEC 602.7.2) E] As part of the heating system sizing calculation (IRC M1401.3 & WSEC 503.2.2) Radiant slab: 0 -10 foam insulation, continuous with thermal break (WSEC 502. 1.4.9) Chapter 9 Options j2jgLgLjSjjqjRjjcoirLd RECIAVED Department of Conitnunity Dq,­ichypinont ME WSEC Prescriptive Worksheet (2010 edition) Zone 1 WSUEEPIO-010 Copyright 2010 Prescriptive Energy Code Compliance for Single Family and Duplex Housing: one I ProjklInforma n Contact Information *;W'1775 7-le"1701;W11-11471? 4w�� This set of forms has been developed to assist permit applicants documenting compliance with the Washington to Energy d® (2009 edition). This set is for structures built under the IRC and located in Climate Zone 1. The following forms provide much of the required documentation for plan review. The details noted here must also be shown on the drawings (WSEC 104.2). This form is not a substitute for the energy code itself. To obtain a copy of the energy code, go to the following web address. hftp://www.energy.wsu.edu/code Glazing 4 0. Glazing U -Factor Door 9 Vaulted Wall n a11.in e Wall- ext 7Bel low 6 TSIab option Area' 2 Ceiling 3 Above Below FIoor5 0 on U -Factor Ceiling % of Floor Vertical Overhead" Grade Grade Grade Grade] R-49 or R-21 R-21 01 13% 0.34 R-10 0.50 0.20 R-38 R -38R-10 R-30 7 Adv. Int. TB 2? R-49 or R-21 R-21 25% 0.50 0.20 R-38 R-38 0.3� R-10 R-30 R-10 Int.7 TB Adv. T R49 or R-21 R-21 � R_'0 1II Unlimited 0.30 0.50 0.20 R-38 R-38 R-10 R]-30 lit.'TI3 Adv. 2? See WSEC table 6-1 for footnotes Glazing Schedule Attached to Document Does not apply. (SEE INSTRUCTIONS) gjjn���� All glazing and doors meet maximum U -factor. Alternate heating size method submitted. Option I or 11, Glazing to floor area limit (WSEC 602.7.2) Area weighted window, skylight or door U -factor (WSEC 602.7.2) E] As part of the heating system sizing calculation (IRC M1401.3 & WSEC 503.2.2) Radiant slab: 0 -10 foam insulation, continuous with thermal break (WSEC 502. 1.4.9) Chapter 9 Options j2jgLgLjSjjqjRjjcoirLd RECIAVED Department of Conitnunity Dq,­ichypinont ME WSEC Prescriptive Worksheet (2010 edition) Zone 1 WSUEEPIO-010 Copyright 2010 TABLE_ -1 ENERGY CREDITS (DEBITS) QP° "ION SCRIPTI4N CREDIT(S) 1a HIGH EFFICIENCY HVAC EQUIPMENT 1. Gas, propane or oil -fired furnace or boiler with minimum AFUE of 92%, or Air -source heat um; with minimum HSPF of 8.5. lb HIGH EF'FIC &NCX HVAC EQUIPMELff 2: Closed-loop ground source heat pump; 2 with a minimum Co. of 3.3. 1 C HIGHU EFFICIENCY HVACEOUIPMENT 3: DUCTLESS SPLIT SYSTEM HEAT P[JMPS, ZONAL CONTROL: In home where the primary space heating system is zonal 1 electric heating, a ductless heat pump system shall be installed and provide heating to at least one zone of the housing unit. HIGH EEHEI ' NCY HVAC IST ' B N All heating and cooling system components installed inside the conditioned space. All combustion equipment shall be direct vent or sealed combustion. Locating system components in conditioned crawl spaces is 1 not permitted under this option. Electric resistance heat is not permitted under this option. Direct combustion heating equipment with AFUE less than 80% is not permitted under this option. 3a EFFI IENT BUIL ING NVE PE 1 Prescriptive compliance is based on Table 6-1 , Option III with the following modifications: Window U .=.28 Ilir R- 38, slab on grade R-10 full, below grade slab-R_-101'ul"1. 0.5 r Component performance compliance: Reduce the Target UA from Table 5-1 by 5%, as determined using EQUATION 1. 3b (EFFICIENT BUILDINCG ENVELOPE 2: Prescriptive compliance is based on Table 6-1, Option III with the following modifications: Window U.=.25 and wall R-21 plus R-4 and R-38 floor, slab on grade R-10 full, below grade slab R-10 full, and R-21 plus R-5 below grade basement walls. or Component performance compliance: Reduce the Target UA from Table 5.1 by 15%, as determined using EQUATION 1. 3C SUPER -EFFICIENT BUILDING ENVELOPE 3: 'UWSEC Prescriptive Worksheet (2010 dffion) WSI"dEP10-010 Copyright 2010 0 RZ 6B WIT 2 N ptive compliance is based on Table 6-1, Option III the following modifications: Window U.=.22 and wall I plus R- 12 and R-3 8 floor, stab on grade R- 10 full, tw grade slab R- 10 full and R-21 plus R- 12 below grade ment walls and R-49 advanced ceiling and vault. *f gliall. be met with a heat recovery ventilation system in iccordance with Section M 1508.7 o.. Code. MU Water heating system shall include one of the following: Gas, propane or oil water heater with a minimum EF of 0.62. or Electric Water Heater with a minimum EF of .+,3. and for both cases All showerhead and kitchen sink faucets installed in the house shall meet be rated at 1.75 GPM or less. All other 2 lavatory faucets shall be rated at 1.0 GPM or less. Water heating system shall include one of the following: Gas, propane or oil water heater with a minimum EF of 0.82. or a miniiw-m st?-i4s?t-wstc heater. Solar water heating will provide a rated minimum g;s of 85 &u.,ims -7md Certification Corporation (SRCC) Annual Perforinance *-f OG -300 Certified Solar Water Heating Systems. M heat rmn water heater with a minimum EF of 2.0. Dwelling units less than 1500 square feet in floor area with Less than 300 square feet of window.+ door area. Additions .0 existing building that are less than 750 square feet of 4eated floor area. assessed a deduction for purposes of complying with ,tion 901 of this Code. IR W 0 M FW" 0 51 WSEC Prescvipfive Worksheet (2010 Edffion) WSUEP10-010 Copyright 2.010 D Footnotes: For each 1200 kWh of electrical generation provided annually by on-site wind or solar equipment a 0.5 credit shall be allowed, up to 3 credits. Generation shall be calculated as follows: For solar electric systems, the design shall be demonstrated toll) meet this requirement using the National Renewable Energy Laboratory calculator PVWATTs. Documentation noting 0.5 solar access shall be included on the plans. wind generation projects designs shall document annual ier generation based on the following factors: : wind turbine power curve; average annual wind speed at site; frequency distribution of the wind speed at the site height of the tower. 1. Interior Duct Placement: Ducts included as Option 2 of Table 9-1 shall be placed wholly within the heated envelope of the housing unit. The placement shall be inspected and certified to receive the credits associated with this option. EXCEPTION: Ducts complying with this section may have up to 5% of the total linear feet of ducts located in the exterior cavities or buffer spaces of the dwelling. If this exception is used the ducts will be tested to the following standards: Post -construction test: Leakage to outdoors shall be less than or equal to I CFM per 100 ft2 of conditioned floor area when tested at a pressure differential of 0.1 inches w.g. (25 Pa) across the entire system, including the manufacturer's air handler enclosure. All register boots shall be taped or otherwise sealed during the test. 2. Plumbing Fixtures Flow Ratings. Low flow plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following requirements: (a) Residential bathroom lavatory sink faucets: Maximum flow rate U 3.8 L/min (1.0 gal/min) when tested in accordance with ASME A112.18.1/CSA B125.1. (b) Residential kitchen faucets: Maximum flow rate l.) 6.6 L/min (1.75 gal/min) when tested in accordance with ASME A112.18.1/CSA B125.1. (c) Residential showerheads: Maximum flow rate i 6.6 L/min (1.75 gal/min) when tested in accordance with ASME A112.18.1/CSA B125.1 SEC prescriptive: Worksheet (2010 ditiori)UEP10,,,.010 Copyright 2010 Glazing Schedule Exterior Doors Plan Component Door Percent Width Height Glazing Door Door Sum of Glazing Area, Door Area, and UA (do not include exempt door) Area Weighted U = UA/Area Sum of Area and UA for Heating system size only (include exempt door) Vertical Glazing (Windows, Glazed doors using Exception 603.6 #1) Plan Component Glazing WSEC Prescriptive Worksheet (2010 Edition) Width Height Qt. Feet Inch Feet Inch Sum of Area and UA Area Weighted U = UA/Area WSUEEPIO-010 Copyright 2010 Overhead Glazing Plan Component Glazing Width height Area Weighted U = UAIArea Doube Glazed Garden Windowsti ®7®2 Exception Plan Component Width Height ID ®escri tion Ot. Feet 'n' Feet brach I I Sum of Area Sum of Area X 3 (This total is automatically included in the glazing area total.) Glazing UA for Heating System Size Only = Area X 0.63 WSEC Prescriptive Worksheet (2010 Edition) WSUEEP10-010 Copyright 2010 Simple Heating System Size- Climate Zon Project, Information Envelope Heat Load Sum of UA X AT ((Volume X U) X AT) X .01 8)) Building Design Heat Load Air Leakage + Envelope Heat Loss Contact Information [� Btu I Hour [==Btu / Hour Building and Duct Heat Load [:=13tu / Hour If ducts are located in unconditioned space: Sum of Building Heat Loss X 1 15 If ducts are located in conditioned space: Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 150% L-----3Btu / Hour Building and Duct Heat Loss X 1.50 WSEC Prescriptive Worksheet (2010 Edition) WSUEEPIO-010 Copyright 2010 .......... Envelope Heat Load Sum of UA X AT ((Volume X U) X AT) X .01 8)) Building Design Heat Load Air Leakage + Envelope Heat Loss Contact Information [� Btu I Hour [==Btu / Hour Building and Duct Heat Load [:=13tu / Hour If ducts are located in unconditioned space: Sum of Building Heat Loss X 1 15 If ducts are located in conditioned space: Sum of Building Heat Loss X 1 Maximum Heat Equipment Output 150% L-----3Btu / Hour Building and Duct Heat Loss X 1.50 WSEC Prescriptive Worksheet (2010 Edition) WSUEEPIO-010 Copyright 2010 CL SEC Prescriptive. Worksheet (2010 Edition) WSUEP1 0-010 Copyright 2010 Heating Heating Design Design Temp Temp Aberdeen 20 NNE 25.0 Medical Lake 4.0 Anacortes 24,0 Medina 24.0 Anatone -4.0 Mercer Island 25.0 Appleton 11,0 Metaline Falls -1 a0 Auburn 25.0 Mathew 2 W 1.0 Battleground 19.0 Mountlake Terrace 22.0 Bellevue 24,0 Mt. Spokane Summit -2.0 Bellingham 2N 19.0 Mount Vernon 3 WNW 20.0 Benton City 2 NW 111.0 Moxee City 10 E 8.0 Bickleton CO Mud Mtn. Dam 23.0 Blaine 17.0 Nespelern 2 S -4.0 Bothell 2 N 17.0 Newhalem 19.0 Bremerton 29.0 Newport -5.0 Brier 24.0 Normandy Park 24.0 Buckley 1 NE 26,0 Northport 2.0 Bumping Lake -5.0 Oak Harbor 16.0 Burlington 19.0 Oakville 20.0 Camas 21.0 Odessa 7.0 Castle Rock 23.0 Olga 2 SE 24,0 Cedar Lake 20.0 Olympia, AP. 17.0 Centralia 21.0 Omak 2 NW 3.0 Central Park 27.0 Opportunity 8.0 Chehalis 21.0 Oroville 5.0 Chelan 10.0 Othello 9.0 Cheney 4.0 Packwood 16.0 Chesaw -11.0 Palmer 3 SE 22.0 Chewalah 2 3 -9.0 Parkland 20.0 Chief Joseph Dam 6.0 Pasco 13.0 Clallarn Bay 1 NNE 28.0 Plain -3.0 Clarkston 10.0 Pleasant View 16,0 Clearbrook 19.0 Pt. Grenville 27.0 Clearwater 26.0 Pomeroy 10 Cie Elum 1.0 Port Angeles 28.0 Clyde Hill 24.0 Port Orchard 29.0 Colfax I NW 2.0 Pon Townsend 25,0 College Place 6.0 Priest Rapids Dam 14.0 Colville AP -2.0 Prosser 12.0 Conconully -7.0 Pullman Exp. Sta. 1.0 Concrete 19.0 Puyallup 19.0 Connell 4 NNW &0 Quilcene 2 SW 23.0 Cougar 5 E 25,0 Quillayute AP 23.0 Coulee Dam 1 SW 9.0 Quinault RS 25.0 Coupeville I S 21.0 Quincy I NE 4.0 Cushman Dam 22,0 Rainier, Longmire 15.0 Dallesport AP 14.0 Paradise RS 6.0 Darrington RS 110 Raymond 28.0 Davenport 5.0 Redmond 17.0 Dayton 1 WSW 5.0 Renton 24.0 Deer Park 2 E -5.0 Republic -9.0 Des Moines 25.0 Richland 11.0 Diablo Dam 15.0 Rimrock Tieton Dam 4.0 Dishman 9.0 Ritzville 6.0 East Bremerton 29.0 Rosalia 6.0 Edmonds 24.0 Ross Dam 14.0 Electron Headwks 16.0 St. John 15.0 CL SEC Prescriptive. Worksheet (2010 Edition) WSUEP1 0-010 Copyright 2010 Ellensburg AP 2.0 Sappho8 E 23.0 Elma 24.0 Satus Pass 10.0 Eltopia 6 W 9.0 Seattle: Sea -Tac AP 24,0 Elwha RS 24.0 Sedro Woolley I E 19,0 Enumclaw 26.0 Selah 11.0 Ephrata AP 7.0 Sequim 210 Everett JC 23.0 Shelton 23.0 Everett Paine AFB 21.0 Shoultes; 23.0 Fircrest 29.0 Skamania Fish Hatch. 24.0 Forks I E 23.0 Smyrna 8.0 Fort Lewis 24.0 Snohomish 21.0 Fruitvale 1.1 Snoqualmie Falls 22.0 Glacier IRS 13.0 Snoqualmie Pass 6.0 Glenoma (Kosmos) 18.0 South Broadway 11.0 Goldendale 7.0 So. Olympic Tree Farm 24.0 Grandview 12.0 Spanaway 20.0 Grapeview 30.0 Spokane AP 4.0 Grayland 2 S 28.0 Spokane CO 10.0 Grays River Hatchery 24.0 Spokane Fairchild AFB 4.0 Greenwater 1.4 Sprague 4,0 Grotto 21.0 Stampede Pass 7.0 Harrington 2 S 3.0 Startup 1 E 20.0 Hartline 7.0 Stehekin 3 NW 12.0 Hatton 8 E 1.0 Steilacoom 21.0 Holden Village 4,0 Stevens Pass 6.0 Hoquiam AP 26.0 Stockoill Ranch -14.0 Ice Harbor Dam 17.0 Sumner 19.0 Inchelium 2 NW 0.0 Sunnyside 12.0 Issaquah 23.0 Tacoma McChord 21.0 John Day Dam 19.0 Tacoma CO 29.0 Kelso AP 24.0 Tatoosh Island 31.0 Kennewick 10 SW 13.0 Thompson Place 20.0 Kent 21.0 Tietort Intake 6.0 Kid Valley 20.0 Toledo AP 17.0 Kirkland 17.0 Toppenish 11.0 Lacey 17.0 Trinidad 2 SSE 13.0 Lacrosse 3 ESE -3.0 Tukwila 24.0 La Grande 23.0 Tumwater 17.0 Lake Cie Elum -4.0 University Place 29.0 Lake Forest Park 20.0 Upper Baker Dam 14.0 Lake Kachess -2.0 Vancouver 22.0 Lake Keechelus 0.0 Vashon Island 28.0 Lakewood Center 23.0 Walla Walla AP 6.0 Landsburg 18.0 Walla Walla CO 13.0 Larson AFB 6.0 Wapato 10.0 Laurier -8.0 Washougal 8 ENE 21.0 Leavenworth -3.0 Waterville 1.0 Lemanasky Lake -7.0 Wawawai 2 NW 14.0 Lind 3 NE 6.0 Wellpinit 1.0 Linwood 10.0 Wenatchee AP 13.0 Little Goose Dam 22.0 Wenatchee CO 10.0 Long Beach 3 NNE 25.0 West Clarkston 10.0 Longview 24.0 Whidbey Island 11.0 Lower Granite Dam 14.0 White River RS 12.0 Lower Monument Dam 18.0 White Swan RS &0 Lynden 113.0 Whitman Mission 11.0 Lynnwood 24,0 Wilbur 4.0 Maloft 4,0 Willapa Harbor 26.0 Marietta 3 NNW 16.0 Wilson Creek 3.0 Marysville 210 Wind River 15,0 McMillin Res. 21.0 Winthrop 1 WSW -12.0 McNary Dam 11.0 Yakima AP 11.0 WSEC Prescriptive Worksheet (2010 Edition) WSUEP10-010 Copyright 2010 Associated Earth Sciences, Inc. ;S k4l, aj EL 1� iio 0 C 4 6ra 6nj Ow r 25 Vea ry ofService November 18, 2009 Project No. KE090103A 110 Russell Road, P.O. Box 4460 Bremerton, Washington 98312 Subject: Subsurface Exploration, Geologic Ha ' zard, Preliminary Geotechnical Engineering Repo Sector 2A Bay Vista Redevelopment Project Bremerton, Washington I We are pleased to present the enclosed copies of the above -referenced report. This report summarizes the results of our subsurface exploration, geologic hazard', and geotechnical engineering studies and offers recornmendations for the preliminary design and development of the proposed Sector 2A phase of the project. Our recommendations are preliminary in that definite building and construction details have not been finalized at the time of this report. We have enjoyed working with you on this study and are confident that the recommendations presented in this report will aid in the successful completion of your project. If you should have any questions or if we can be of additional help to you, please do not hesitate to call. Sincerely, ,LJSOCJATED EARTH SCIENC INC— Mffal'�,' I ISK/ld KED90103A9 Kirkland Everett Tacoma 425-827-7701 425-259-0522 253-722-2992 www.aeszeo.com Geotechnical Engineering Water Resources Environmental Assessments and Remediation Sustainable Development Services Geologic Assessments �e�r�rafJes��ice Subsurface Exploration, Geologic Hazard, and Preliminary Geotechnical Engineering Report SECTOR 2A BAY VISTA REDEVELOPMENT PROJECT Bremerton, Washington Prepared for Housing Authority of the City of Bremerton Project No. KE090103A November 18, 2009 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin tort Pro'ect and Site Conditions I. PROJECT AND SITE CONDITIONS. 1.0 INTRODUCTION This report presents the results of Associated Earth Sciences, Inc.'s (AESI's) subsurface exploration, geologic hazard, and preliminary geotechnical engineering study for the Sector 2A construction phase of±e Bay, Vista Redevelopment project in Bremerton, Washington. The location of the site is, shown on Figure 1 and a site map . of the entire Bay Vista project is provided on Figure 2. The approximate locations of the explorations accomplished for this study are presented on the "Site and Exploration Plan," Figure 3. If any changes in the nature, design, or locations of the site development improvements are planned, the conclusions and recommendations in this report should be reviewed and modified, or verified. Landau Associates (Landau, 2006) conducted a previous geotechnical assessment for the Bay Vista site. Some of the explorations were located within Sector 2A and the logs are provided in Appendix A. AESI prepared a previous geotechnical report for Section 2B, Iocated east of Sector 2A (AESI, 2009). The recommendations in this report are preliminary because grading plans and construction details were not finalized at the time of this report. Once development plans are substantially complete, the conclusions and recommendations in this report should be reviewed and modified, or verified, as appropriate. 1.1 PuMose and Scoe The purpose of this study was to provide subsurface data and design recommendations for design and development of the subject project. This study included a review of available geologic literature, excavation of exploration pits, and performing geologic studies to assess the type, thickness, distribution, and physical properties of the subsurface sediments and shallow ground water conditions. Geologic studies were completed to identify geologic hazards associated with the site. Where warranted, geologic hazard mitigations are recommended. Geotechnical engineering studies were also conducted to recommend the type of suitable foundation, allowable foundation soil bearing pressure, anticipated foundation settlements, basement/retaining wall lateral pressures, floor support recommendations, drainage considerations, and erosion mitigation recommendations. This report summarizes our current fieldwork and offers development recommendations based on our present understanding of the project. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. SKIMA;rc0o;o��s_D.;a.,.���„�,,,,��v��U,p Page 1 ME 10RIN R VAN Do 0.14 w Rol ' 1 MUM WeiMIS ,SECTOR 2A BAY VISTA PROJECT Bremerton, Washington Prepared for: Housing Authority of the City of Bremerton 110 Russell Road, P.O. Box 4460 Bremerton, Washington 98312 Prepared by: Associated Earth Sciences, Inc. 9115" Avenue, Suite 100 Kirkland, Washington 98033 425-827-7701 Fax: 425-827-5424 November 18, 2009 Project No. KE090103A Sector 2A Subsurface Exploration, Geologic Hazard and Bay VI,sta Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washn on Pro ect and Site Conditions 3.0 SUBSURFACE EXPLORATION Our field study included excavating a series of exploration pits to gain subsurface information about Sector 2A. The exploration pits were completed by Hos-Bros. -Construction, Inc:, the project construction contractor. The various types of sediments, as well as the depths where characteristics. of the sediments changed, are indicated on the exploration logs presented in Appendix B. The depths indicated on the logs where conditions changed may represent gradational variations between sediment types. Our explorations were approximately located in the field by measuring from known site features shown on a topographic site plan provided by the client. The conclusions and recommendations presented in this report are based, in part,. on the conditions encountered in the explorations completed for this study and previous studies. The number, locations, and depths of the explorations were completed within site and budgetary constraints. Because of the nature of exploratory work below ground, interpolation of subsurface conditions between the field explorations is necessary. Differing subsurface conditions may be present outside of the area of the field explorations due to the random nature of deposition and the alteration of topography by past grading and/or filling. The nature and extent of any variations between the field explorations may not become fully evident until construction. If variations are observed at that time, it may be necessary to re-evaluate specific recommendations in this report and make appropriate changes. 3.1 Exploration Pits Previous explorations shown on. Figure 3 were conducted by Landau and are labeled "B-" for borings and "TP-" for exploration pits. Exploration pits conducted by AESI are labeled "EP-". Exploration pits EP -1.54 to EP -159, were excavated on September 10, 2009.. -and exploration pits EP -160 to EP -165 were excavated on November 4, 2009. Three exploration pits (EP -160, EP -161, and EP -163) were excavated to depths of at least 16 feet to characterize subsurface conditions below the deepest cuts for the planned buildings. The remaining exploration pits were excavated to shallower depths and were intended to characterize the depth to unweathered glacial till and the characteristics of the fill material above the glacial till. The pits permitted direct, visual observation of subsurface conditions. Materials encountered in the exploration pits were studied and classified in the field by geologists from our firm. All exploration pits were backfilled immediately after examination and logging. Selected samples were then transported to our laboratory for further visual classification and testing, as necessary.. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KEM103A9 - ProjectA200901031KEMP Page 3 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, 1�r µ r r and Site Conditions Authorization to proceed with this study Was granted by the Housing Authority of the City of Bremerton. Thisjeport has been prepared for the exclusive use of the Housing Authority of the City of Bremerton and their agents for specific application to this project. Within the limitations of scoD6. schetule. and, budgetour rvices have bperformed in accordance , s,e een with generally accepted geotechnical engineering and engmeermig geology,practices in effect in this area at the time our report was prepared. No other warranty, express . or implied, is made. T40*00-1wo 0X*M - 60 The Bay Vista site is located in West Bremerton, Washington. The site is roughly triangular in shape and is comprised of an area of approximately 83 acres. The site is bounded by Kitsap Way on the north, Oyster Bay Avenue North on the east, and State Route (SR) 3 on the west. The existing Westpark public housing community was built for the U.S. mary in 1941 and is. currently owned and operated by the Bremerton Housing Authority (BHA). The surrounding area is a mixture of residential neighborhoods to the east, commercial and retail uses along Kitsap Way, and light industrial uses south of SR 3. As shown on Figure 2, Sector 2A is located in the center of the Bay Vista site abutting the southwest boundary. The site is, currently occupied by a number of multi -unit residential structures with associated r I oads and landscaping. The buildings are in the process of being demolished. There is a soil stockpile in the west comer of Sector 2A covered with plastic. It kq irlva an; % buildingg in the soil sto 1ile area. Therefore, no explorations were conducted in the soil stockpile. The proposed master plan involves the redevelopment of the existing public housing community. The proposed project includes redevelopment into a mixed-use, mixed -income, h I.P.,edestrian-oriented community. We understand that the d existing structures will be raze, t e existing roads removed, the existing utilities will be removed and/or abandoned, and the existing landfill abandoned. The site will be regraded and new utilities installed. New residential structures will be built after the new infrastructure is in place. Current plans for redevelopment of Sector 2A include construction of a multi-level apartment building with 83 units and surface parking. Office space will be included in the first level of the building. No subsurface parking is currently included in the preliminary design. It is out understanding that excavations of up to 12 feet will be required to achieve subgrade elevations. November 18, ASSOCIATED EARTH SCIENCES, INC JSKIld - KE090103A9 - ProjecI312009010.31KEMP Page 2 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Repon Bremerton, Washin ton Pro'ect:and Site Conditions The fill soils are generally high in silt and are expected to be moisture -sensitive. If the fill soils are wet or dry of optimum moisture at the time of construction, they will be difficult to reuse as structural fill. Vashon Lodgement 77111 Sediments encountered below the topsoil/fill at the locations of all the explorations generally consisted of medium dense to very dense, silty sand with gravel or gravelly sand with variable amounts of silt, and scattered cobbles. We interpret these sediments to be representative of Vashon lodgement till. The Vashon lodgement till was deposited directly from basal, debris - laden glacial ice during the Vashon Stade of the Fraser Glaciation approximately 12,500 to 15,000 years ago. The reduced density occasionally observed within 1 to 5 feet of the ground surface is interpreted to be due to weathering. The high relative density of the unweathered till is due to its consolidation by the massive weight of the glacial ice from which it was deposited. As reported in AESI (2009), the lodgement till was observed to extend down to an elevation of approximately 60 feet (100 to 120 feet below ground surface in Sector 2A). The glacial till is high in silt and is expected to be moisture -sensitive. If the glacial till is wet or dry of optimum moisture at the time of construction, it will be difficult to reuse as structural fill. Advance Outwash Advance outwash has been encountered beneath the glacial till in explorations conducted during previous assessments at the site. This material generally consists of dense to very dense sand and gravel with generally trace to few silt and occasional little silt. These sediments are interpreted to be Vashon-age advance outwash. Advance outwash was deposited by meltwater streams emanating from the advancing Vashon-age glacial ice sheet and subsequently overridden by several thousand feet of ice. Consequently, these materials are generally dense and possess moderate to' high shear strength and low -compressibility characteristics. The advance outwash is suitable for structural fill, foundation, and pavement support. provided the weathered zone is suitably compacted; however, the advance outwash deposits are not expected to be encountered during grading due to their depth. Limited storm water infiltration may be feasible in this deposit, and location -specific in-situ testing is recommended if infiltration is considered. November 18, 2009 _ ASSOCIATED EARTH SCIENCES, INC. JSK/1d - KE090103A9- Projecrs1200901031KE1WP Page 5 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project preliminary Geoleclinical Engineering Report Prniert Site Conditions Bremerton, ��on 3.2 Grain Size Analysis Two samples of theglacial till soils were collected from EP -160 and EP -161 and submitted AESI's soils laboratory for grain size analysis. The results are provided in Appendix C. 4.0 SUBSURFACE CONDITIONS Subsurface conditions at the� 'ect site �were inferred from.the =plorations accomplished,for . proi this studnd previous studies, visual reconnaissance of the site, and review�of topography provided on the topographic site. plan. varvinp, As shown on the exploration logs, most of the exploration pits generally encountered amounts of sediments interpreted to be fill (up to 6.5 feet thick) over glacial till sediments. Where fill and other unsuitable materials are �- encountered, they should be excavated and replaced with suitable fill. Table 4.1 below summarizes the depths of unsuitable fill and other materials and depths to suitable bearing soils. The following section presents more detailed subsurface information organized from thco youngest to the oldest sediment types. Sod and/or topsoil was present at the ground surface at a number of explorations and generally ranged in thickness from 0.5 to 1.0 feet. Fill soils (those not naturally placed) were encountered in most of the explorations in Sector 2A. The fill ranged in thickness from zero to 6.5 feet thick (TP -10). As noted on the exploration logs, the fill generally consisted of loose to medium dense, silty fine to coarse sand with various gravel, scattered debris, and organics. The fill consisted of silt with trace to few sand in EP�-158. Old utility pipes were encountered in a number of explorations, and it is expected that many old and recent utilities will be encountered during excavation. Any fill with high percentages of silt, organics, or debris is considered unsuitable for reuse as structural fill. Some of the fill may be suitable for reuse, as indicated in Table 4.1. The thicknesses shown in Table 4.1 are estimated based on observations at the exploration locations in November 2009. Condition and thickness of the fill may change and is expected to vary between our explorations. Other fill soils are assumed to be present in the areas of the existing structures. Since the quality. thickness, and compaction of the fill materials are unknown, the fill is unsuitable for direct structural support. November 18, 2009 ASSOCIAMD EARTH SCIENCES, INI JSK11d - KBD90103A9 - Projects 1200901031KEI WP Page M Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Wasill in ton Pro.ect and Site Conditions 4.3 Hydrology Shallow ground water seepage was not observed in the exploration pits in the Sector 2A area. However, random areas of perched ground water are often encountered on top of dense to very dense, low permeability lodgement till sediments and may be encountered during grading. It should be noted that the occurrence and level of ground water seepage at the site may vary in response to such factors as changes in season, precipitation, and site use. Deep groundwater was encountered in explorations MW -1 and MW -2 and will be addressed in a hydrogeologic report by AESI under separate cover. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. MIN - KE090103A9 - Proiects1300901031KEMP Paae 7 Sector 2A Subsurface Exploration, Geologic Hazard and Bay >rsta Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ,ton Project and Site Conditions Table 4.1 Summary of Unsuitable Materials and Depths 4.2 Geolois Ma in Review of the regional geologic map titled Geologic Map of Surficial Deposits in the Seattle 30' x 60' Quadrangle, Washington, compiled by Yount, Minard, and Demboff (1993), indicates that the area of the subject site is underlain by Vashon lodgement till (Qvt). Our interpretation of the sediments encountered at the subject site is in general agreement with the regional geologic map. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - Project.s1200901031KElff Page 6 Approx. Fill Unsuitable bill Suitable Depth to Depth to Dense Exploration GS Elev. for Reuse for Reuse Weathered Till Lodgement Till No. (feet) (feet) (feet) (feet) (feet) B-5 _ 0-0.5 _ 0.5 TP -10 0-1 & 5.5-6.5 1-5.5 - 6.5 TP -11 0-1 1-4 _ 4 7? -12 0-2.5 _ _ 2.5 TP -13 0-4 _ _ 4 TP -14 g175 0-1. - 1.0 4 EP -154 0-2.5 - 2.5 3 EP -155 0-1EP-156 0-1EP-157 0-1.5 1.5 EP -158 0-3 - _ 3 EP -159 176 0-4 - - 4 EP -160 178 0-0.5 0.5-2 2 5 EP -161 177 0-0.5 0.5 1.5 EP -162 158 0-1 - 1 3.5 EP -163 174 0.3 3 5 179 0-0.50.5 1.5 �EP-164 -165 178 0-1.5 - 1.5 3.5 GS = Ground Surface. Elevations are approximate and based on topographic map. Suitability is based on visual assessment of organic and debris content. Suitability for reuse will also depend on soil moisture and weather conditions during grading and construction. Experience at Bay Vista has shown that debris content, moisture, gradation, and depth of fill soils can vary widely over short distances. 4.2 Geolois Ma in Review of the regional geologic map titled Geologic Map of Surficial Deposits in the Seattle 30' x 60' Quadrangle, Washington, compiled by Yount, Minard, and Demboff (1993), indicates that the area of the subject site is underlain by Vashon lodgement till (Qvt). Our interpretation of the sediments encountered at the subject site is in general agreement with the regional geologic map. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - Project.s1200901031KElff Page 6 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin on Geolo is Hazards andMiti ations Due to the proximity of the site to the suspected fault trace, the risk for surficial ground rupture should be considered moderate to high during a significant seismic event connected to the Seattle Fault. Mitigation should consist of complying with the 2006 International Building Code (IBC) for this site. 5.2 Seismically Induced Landslides There are steep slopes within Sector 2A. However, we understand that they will mostly be flattened as a result of grading. Therefore, the potential for seismically induced landsliding is low due to the lack of steep slopes on the final graded site. If steep areas remain after grading or due to a change in the grading plan, we recommend that we assess the slope conditions at that time. 5,3 Liquefaction The encountered stratigraphy has a low potential for liquefaction due to its dense state and lack of adverse ground water conditions. No mitigation of liquefaction hazards is necessary. 5.4 Ground Motion The guidelines presented in the 2006 IBC Section 1613 should be used in the seismic design of the project. The USGS Java Ground Motion Parameter Calculator, Version 5.0.9', was used to determine interpolated probabilistic ground motion values in percent of gravity (g) for an event with a return period of 2 percent exceedance in 50 years. Using the calculator, the project area was submitted using latitude and longitude for mapped spectral accelerations of Ss = 1.512 for short.periods (0.2 seconds) and Si = 0.537 for a 1 -second period. Based on the results of our subsurface exploration and our estimation of soil properties at depth utilizing available geologic data, Site Class "C", in conformance with Table 1613.5.2 of the IBC, may be used. These values correspond to site coefficients Fa = 1.00 and FY = 1.30 in conformance with IBC Tables 1613.5.3(1) and 1613.5.3(2), respectively. 6.0 EROSION HAZARDS AND MITIGATION As of October 1, 2008, the Washington State Department of Ecology (Ecology) Construction Storm Water General Permit (also known as the National Pollutant Discharge Elimination System [NPDES] permit) requires weekly Temporary Erosion and Sedimentation Control (TESC) inspections for all sites I or more acres in size that discharge storm water to surface waters of the state. The TESC inspections must be completed by a Certified Erosion and Sediment Control Lead (CESCL) for the duration of the construction. TESC reports do not ' http://earthquake.usgs.gov/research/hazmaps/design/ November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/!d - KE090103A9 - Projects1200901031MWP Page 9 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geoiechnical Engineering Report Bremerton, !��ic Hazards mid . . . . . . . . . . "AKOTfir, � Af-, -11,11 1 - I I I The following discussion of potential geologic hazards is based on the geologic, topographic, and shallow ground water conditions as observed and discussed herein. OWN Earthquakes occur in the Puget Lowland with great regularity. The vast majority of these events are small and are usually not felt by people. However, large earthquakes do occur, as evidenced by the 1949, 7.2 -magnitude event; the 2001, 6.8 -magnitude event; and the 1965, 6.5 -magnitude event. The 1949 earthquake appears to have been the largest in this region during recorded history and was centered in the Olympia area. Evaluation of earthquake return rates indicates that an earthquake of the magnitude between 5.5 and 6.0 is, likely within a given 20 -year period. Generally, there are four types of potential geologic hazards associated with large seismic events: 1) surficial ground rupture, 2) seismically induced landslides, 3) liquefaction, ani 4) ground motion. The potential for each of these hazards to adversely impact the proposet 1iroject i's discussed below. The project site is located within the Seattle Fault Zone. Recent studies by the United States Geological Survey (USGS) (e.g., Yount and Gower, 1991, Bedrock Geologic Map of the Seattle 30'x 60 Quadrangle,Washington, USGS OFR 91-147; Johnson ►et al., 1994, Origin and Evolution ofthe Seattle Fault and Seattle Basin, Washington, Geology, v. 22; Johnson et al., 1999, Active Tectonics of the Seattle Fault and Central Puget Sound Washington - Implications for Earthquake Hazards, Geological Society of America Bulletin, and Blakely et al., 2002, Location, Structure, and Seismicity of the Seattle Fault Zone, Washington: Evidence finom Aeromagnetic Anomalies, Geologic Mapping, and Seismic - Reflection Data, GSA Bulletin, v. 114 n. 1) suggest that a portion of the ea*st-west trending thrust fault zone (Seattle Fault) may project approximately 1/2 mile north of the site. The recognition of this fault is relatively new, and data pertaining to it are limited, with the studies still ongoing. According to the USGS studies, the latest movement of this fault was about 1,100 years ago when about 20 feet of surficial displacement took place. This displacement can presently be seen in the form of raised, wave -cut beach terraces along Alki:Point in West Seattle and Restoration Point at the South end of Bainbridge Island. The recurrence interval of movement along this fault system is still unknown, although it is hypothesized to be in excess of several thousand years. November 18, ASSOCIATED EARTH SCIENCES, INC. -ISKIld - KE090103A9 - Projects1200901031KEMP Page 8 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ton Geolo is Hazards and Miti ations particles and can combine (flocculate) to form larger particles that will settle out of suspension. The sediments produced during the recent glaciation of Puget Sound are, however, most commonly the suspended soils that are carried by site storm water. The fine-grained fraction of the'glacially derived soil is referred to as "rock flour," which is primarily a silt -sized particle with no electrical charge. These particles, once ' suspended in ' water, may require months to settle out of suspension. The flow length within a temporary sediment control trap or pond has virtually no effect on discharge water quality because of the long settling time compared to the time it takes to flow from one end of the pond to the other. Reduction of turbidity from a construction site is almost entirely a functionofcover measures and flow control. Temporary sediment traps and ponds are necessary to control the release rate of the runoff and to provide a catchment for sand -sized and larger soil particles, but are ineffective at reducing the turbidity of the runoff. Silt fencing should be utilized as buffer protection and not as a flow -control measure. Silt fencing should be placed parallel with topographic contours to prevent sediment -laden runoff from leaving a work area or entering a sensitive area. Silt fences should not be placed across contour lines without having separate flow control in front of the silt fence. A swale/berm combination should be constructed to provide flow control rather than let the runoff build up behind the silt fence and utilize the silt fence as the flow -control measure. Runoff flowing in front of a silt fence will cause additional erosion and may cause a failure of the silt fence. 6.1 Erosion Hazard Miti gt 2p To mitigate the erosion hazards and potential for off-site sediment transport, we would recommend the following: 1. The winter performance of a site is dependent on a well -conceived plan for control of site erosion and storm water runoff. It is easier to keep the soil on the ground than to remove it from storm water. The owner and the design team should include adequate ground -cover measures, access roads, and staging areas in the project bid .for a workable site. The contractor must implement and maintain. the required measures throughout the project duration. A site maintenance plan, should be in place in the event storm water turbidity measurements are greater than the Ecology standards. 2. All TESC measures for a given area to be graded or otherwise worked should be installed prior to any activity within an area other than installing the TESC features or timber harvesting. The recommended sequence of construction within a given area after timber harvesting would be to install sediment traps and/or ponds and establish perimeter flow control prior to starting mass grading. November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/!d - KE090103A9 - ProjectsL00901031KEMP Page 11 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vsta Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin 7ton Preliminary Design Recommendations M. PRELIMINARY DESIGN RECOMMENDATIONS 7.0 INTRODUCTION Our exploration indicates that, from a geotechnical standpoint,the parcel is suitable for the proposed development provided the recommendations contained herein are properly followed. Previous grading on nearby Bay Vista Sector 2B encountered a highly variable thickness of unsuitable fill in random locations: Similar conditions may also occur on Sector 2A and a contingency plan and budget should be included in the project grading phase to address zones of unsuitable fill material. Soil moisture and weather conditions will also have a significant impact on the suitability for reuse of the predominant moisture -sensitive soils at Sector 2A. Wet season grading with moisture -sensitive soils increases costs for measures such as soil admixture treatment or use of imported granular fill. The foundation bearing stratum is relatively shallow in most areas, and conventional spread footing foundations may be utilized for the new structures. However, local areas of deeper fill containing debris and organics have been encountered and these fill soils will require selective removal and replacement. Consequently, foundations bearing on either the medium dense to very dense, natural lodgement till sediments, or on structural fill placed over these sediments, are capable of providing suitable building support. 8.0 SITE PREPARATION Demolition of the buildings is currently underway and it is expected that site conditions will be different at the time of construction. Consistent with development of Sector 2B, all building debris, utilities, pavement, and foundations should be removed from the site. 8.1 Clearing and Stri M in Site preparation of the planned building and pavement areas should include removal of all trees, brush, debris, and any other deleterious materials. These unsuitable materials should be properly disposed of. Additionally, any areas of organic forest duff/topsoil should be removed and the remaining roots grubbed. Topsoil thicknesses in our exploration pits ranged from 6 inches to 12 inches, but may vary outside this range, particularly in the vicinity of any previously disturbed/graded areas. Topsoil should be expected to swell by approximately 25 percent relative to in-place volumes. Areas where loose surficial soils exist due to grubbing operations should be considered as fill to the depth of disturbance and treated as subsequently recommended for structural fill placement. Existing utilities should be removed and/or abandoned and associated trenches and backfill overexcavated down to suitable bearing soils, as determined by an AESI representative. The �k November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - Projecrs1200901031KEMP Page 13 Sector 2-4 Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, 0 1 n rpnIna c Hazards and Mitigations 3. During the wetter months of the year, or when large storm events are predicted during the summer months, each work area should be stabilized so that if showers occur, the work area can receive the rainfall without excessive erosion or sediment transport. The required measures for an area to be "buttoned -up" will depend on the time of year and the duration the area will be, left un -worked. . During the winter months, areas that are to be � left� un -worked, for more than 2 days should. be mulched or covered with plastic. -rolling the During the summer months, stabilization wil ; usually consist of seal. subgrade. Such measures will.aid, in thecontrac . tor s ability to get back into, a work area after a stont. I The i; ll process also includes establishing temporary .storm: water conveyance channels through work areas to route runoff to the, approved treatment facilities. 4. All disturbed areas should be revegetated as soon as possible. If it is outside of the growing season, the disturbed areas should be covered with mulch, as recommended in the erosion control plan. Straw mulch provides a cost-effective cover measure and can be made wind -resistant with the application of a tackifier after, it is placed. 5. Surface runoff and discharge should be controlled during and following development. Uncontrolled discharge may promote erosion and sediment transport. Under no circumstances should concentrated discharges be allowed to flow over the top of steep slopes. 6. Soils that are to be reused around the site should be stored in such a manner as to reduce erosion from the stockpile. Protective measures;may include, but are not limited to, covering with plastic sheeting, the use of low stockpiles in flat areas, or the use of straw bales/silt fences around pile perimeters. During the period between October 1" and March 31thes I e measures are required. 7. On-site erosion control inspections and turbidity monitoring should be performed in accordance with Ecology requirements. Weekly and monthly reporting to Ecology should be performed on a regularly scheduled basis. TESC monitoring should be part of the weekly construction team meetings. Temporary and permanent erosion control and drainage measures should be adjusted and maintained, as necessary, at the time of construction. fit is our opinion that with the proper implementation of the TESC plans and by field -adjusting appropriate mitigation elements (BMPs) during construction, as recommended by the erosion control inspector, the potential adverse impacts from- erosion hazards on the project may be mitigated. November 18, 2009 ASSOCIATED EAR TH SCIENCES, INC JSK11d - KE090103A9 - Projects1200901031KEMP Page 12 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washington Prelimtna Desi n Recommendations. 9.0 STRUCTURAL FILL Structural fill will be necessary to establish desired grades in some areas and to re-establish grade after unsuitable soils are removed. All references to structural fill in this report refer to subgrade preparation, fill type, and placement and compaction of materials, as discussed in this section. If a percentage of compaction is specified under another section of this report, the value given in that section should be used. 9.1 Subgrade Com Faction After overexcavation/stripping have been performed to the satisfaction of the geotechnical engineer/engineering geologist, the upper 12 inches of exposed ground should be compacted to a firm and unyielding condition. If the subgrade, contains too much moisture, suitable compaction may be difficult or impossible to obtain, and should probably not be attempted. In lieu of compaction of the subgrade surface, the area to receive fill should be blanketed with washed rock or quarry spalls to act as a capillary break between the new fill and the wet subgrade. Where the exposed ground remains soft and further overexcavation is impractical, placement of an engineering stabilization fabric may be necessary to prevent contamination of the free -draining layer by silt migration from below. After compaction of the exposed ground is tested and approved, or a free -draining rock course is laid, structural fill may be placed to attain desired grades. 9.2 Structural Fill Com action Structural fill is defined as non-organic soil, acceptable to the geotechnical engineer, placed in maximum 8 -inch loose lifts, with each lift being compacted to at least 95 percent of the modified Proctor maximum dry density using American Society for Testing and Materials (ASTM):D 1557 as the standard. Roadway and utility trench backfill should be placed and compacted in accordance with applicable municipal codes and standards. The top of the compacted. fill should extend horizontally a minimum distance of 3 feet beyond the perimeter footings or pavement edges before sloping down at anangle no steeper than 211:1V. Fill slopes should either be overbuilt and trimmed back to final grade or surface -compacted to the specified. density. 9.3 Moisture -Sensitive Fill Soils in which the amount of fine-grained material (smaller than the No. 200 sieve) is greater than approximately 5 percent (measured on the minus No. 4 sieve size) should be considered moisture -sensitive: Use, of moisture -sensitive soil in structural fills should be limited to favorable dry weather conditions . and near -optimum subgrade and fill moisture.. We recommend that grading activities are conducted in the drier summer months to reduce the November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. 1S.Kfi-Y&fW!Q3�9 - P. i_'a_00_M1031KE!WP Page 15 Sector 24 Subsurface Erploration, Geologic Hazard Bay 141sta Redevelopment Project Preliminary Geotechnical Engineering R Bremerton, Wash#zgton Preliminary Design Recommendatiot M WIWRMOM�M The shallow -depth site soils contain a high percentage of fine-grained material, which make them moisture -sensitive and subject to disturbance when wet. Conversely, dry soil cannot b compacted to the specified density and is prone to wetting -induced settlement after the fill i placed. The contract I or must use care during site preparation and excavation operations so the underlying soils are not softened and that structural fill materials are moisturt-conditio to within approximately 2 percent of optimum moisture prior to compaction or reuse. disturbance occurs, the softened soils should be removed and the area brought to grade wi structural fill. If crushed rock is considered for the access andstaging areas, it should underlain by stabilization fabric (such as Mirafi 50OX or approved equivalent) to reduce potential of fine-grained materials pumping up through the rock and turning the aarea to The fabric will also aid in supporting construction equipment, thus reducing the amount crushed rock required. We recommend that at least 10 inches of rock be placed over fabric; however, due to the variable nature of the near -surface soils and differences in whe loads, this thickness may have to be adjusted by the contractor in the field. November 18, 2009 ASSOCIATED EARTH SCIENCES, JSK11d - KE090103A9 - ProjectsU00901031KEIVIT Page 14 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Georechnical Engineering Report Bremerton, 1,1' ! 11,11141,21on Prelimina � Desi On Recommendations footings; however, all footings must penetrate to the prescribed strata, and no footings should be founded in or above loose, organic, or existing fill soils. Footings should be at least 14 inches wide for single -story structures, with 2 inches of width added for each additional story. 10.3 Footin s Ad'acent to Cuts The area bounded by lines extending downward at IH: 1V from any footing must not intersect another footing or "intersect a filled area that has not been compacted to at least 95 percent of ASTM:D 1557. In addition, a 1.5H:1V line extending down from any footing must not daylight because sloughing or raveling may eventually undermine the footing. Thus footings should not be placed near the edges of steps or cuts in the bearing soils. 10.4 Footin Settlement Anticipated settlement of footings founded as described above should be on the order of 1 inch or less. However, disturbed soil not removed from footing excavations prior to footing placement could result in increased settlements. 10.5 Footing Sub ,rade Bearin Verification All footing areas should be observed by AESI prior to placing concrete to verify that the exposed soils can support the design foundation bearing capacity and that construction conforms with the recommendations in this report. Foundation bearing verification may also be required by the governing municipality. This is particularly important on this site where numerous isolated zones I pockets of unsuitable fill have been found and may be encountered at random locations. 10.6 Foundation Draina e Perimeter footing drains should be provided, as discussed under the "Drainage i draina a is not ossible, the portion of the structure below the drain level must be designed for combined soil and hydrostatic/buoyant forces. 11.0 LATERAL WALL PRESSURES All backfill behind walls or around foundations should be placed following our recommendations for structural fill and as described in this section of the report. Horizontally backfilled walls, which are free to yield laterally at least 0.1 percent of their height, may be designed using an equivalent fluid equal to 35"pounds per cubic foot (pcf). Fully restrained, November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSKIld - KE090103A9 - Projectsi200901031KE1 WP Page 17 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geolechnical Engineefing Report Bremerton, Washin,eton Prelimin�a� �endations potential for additional costs associated' with over -optimum soils. It is likely that grading during wet i)eriods of theyear will be more expensive due to Wet soils. Some of the on-site fill and lodgement till sediments are suitable for use as structural fill, but contain significant amounts of silt and are considered highly moisture -sensitive. In addition, construction equipment traversing the site when the soils are wet can 'cause considerable disturbance. If fill is placed. -during wet weather or if proper compaction cannot be obtained, a select rhaterial consistin� of a clean, free-draming gravel and/or'sand should be used. Free - draining fill consists of non-orgam'c soil with, the a.mount.-of fine-grained, material limited to, 5 p)ercent by weight when measured on the minus No. 4 sieve fraction. The contractor should note that any proposed fill soils must be evaluated by AESI prior to their use in fills. This would require that we have a sample of the mater al at least 3 business days in advance to perform a Proctor test and determine its field compaction standard. A representative from our firm should inspect the stripped subgrade and be present during )dacement of structural fill to observe the work and perform a representative number of irr-- jJace density test i s. In this way, the adequacy of the earthwork may be evaluated as fillin& progresses and any problem areas may be corrected at that time. It is important to understand that taking random compaction tests on a part-time basis will not assure uniformity or acceptable performance of a fill. As such, we are available to aid the owner in developing a suitable monitoring and testing frequency. 11 11 I'll, I# I a3M., Spread footings may be used for building support when founded either directly on the medium dense to very dense, natural glacial sediments, or on structural fill placed over these materials, as described under the "Site Preparation" and "Structural Fill" -sections of this report. For footings founded either directly upon the medium dense to very dense glacial sediments, or on structural fill as described above, we recommend that an allowable bearing pressure of 2,000 pounds per square foot (psf) be used for design purposes, including both dead and live loads. An increase of one-third may be used for short-term wind or seismic, loading- Perimeter footm*gs, for the,proposed buildings should be buried a minimum of 18 inches into the surrounding soil for frost protection. No minimum burial depth is required for interior November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK11d - KE090103A9 - Projecls12fIKEMP Page 16 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ton Prelimina Desi, n Recommendations • Passive equivalent fluid = 250 pcf Coefficient of friction = 0.30 Both of these values include a factor of safety of 1.5. 11.4 Walls with Footin pSurchares We are not aware of any retaining walls in Sector 2A that will be subject to loads from nearby footings. If any footings will be located within a 1H: IV line from the base of a retaining wall, AESI should be contacted to review the design and provide additional recommendations. 12.0 ROCKERIES Rockeries may be used to prevent erosion of cut slopes; however, they are not engineered structures, and should not be used in place of retaining walls. Buildings and roads should be set back from rockeries so that a IH: IV line extending up from the rear base of the rockery does not intersect the footing or pavement. Rockery construction quality depends largely on the skill of the builder. Although rockeries are commonly used, they should be considered a long-term maintenance item. Care must be exercised in selecting a rock source since some of the material presently being supplied is soft and disintegrates in a relatively short period of time. Samples of rock can be tested by AESI prior to their use in rockeries. The following notes present rockery design and construction considerations. In addition, the contractor should confirm that his configuration conforms to current City of Bremerton specifications. 1. The base of the rockery should be started by excavating a trench to a minimum depth of 12 inches below subgrade into firm, undisturbed ground. If loose, soft, or disturbed materials exist at the base rock location, they should be removed and replaced with free -draining sand and gravel or crushed rock. This backfill material should be compacted to a minimum of 95 percent of ASTM:D 1557. The gradation of the sand and gravel should be such that not more than 5 percent by weight should be finer than the No. 200 sieve, based on the minus No. 4 sieve. 2. The base rock should have a minimum width (perpendicular to the line of the rockery) of 40 percent of the height of the rockery. All rocks should also meet the following weight requirements: November 18, 2009 _ ASSOCIATED EARTH SCIENCES, INC., JSK/Jd - KE090103A9 - Projecnsl?00901031KEMP Page 19 Sector 2A Subsurface Exploration, Geologic Hazard.and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Repon Bremerton, Preliminary Design Recommendations horizontally backfilled, rigid walls that.cannot yield should be designed for -an equivalent fluid of 50 pcf. Walls that retain sloping backfill at a maximum angle of 211: IV should be designed for 55 pcf for yielding conditions and 75 pcf for restrained conditions. If parking areas are adjacent to walls, a surcharge equivalent to 2 feet, of soil should be added to the wall height in determining lateral design forces. Undrained walls/structures must be designed for combined soil and hydrostatic pressures (85 pcf for yielding walls, 100 pcf for unyielding walls with horizontal backfill) � and for buoyant/uplift forces. The lateral pressures presented above are based on the conditions of a uniform backfill consisting of either the on-site glacial sediments, or imported sand and gravel compacted to 92 percent of ASTM:D 1557. A higher degree of compaction is not recommended, as this will increase the pressure acting on the walls. A lower compaction may result in unacceptable settlement behind the . I walls. Thus, the compaction level is critical and must be tested by our firm during placement. The recommended compaction of 92 percent of ASTM:D 1557 applies to any structural fill placed behind the wall within a distance equal to the wall height and up to the elevation of the top of the wall. Structural fill used to construct slopes behind retaining walls should be compacted to at least 95 percent of ASTM:D 1557 if the fill is placed above the elevation of the top of the wall. Surcharges from adjacent footings, heavy construction equipment, #1 r slo ing ground must be added to the above -recommended lateral pressures. Footing drains should be provided for all retaining walls, as discussed under the "Drainage Considerations" section of this report. I U -M -MM, It is imperative that proper drainage be provided so that hydrostatic pressures do not develop against the walls. This would involve installation of a minimum #> #' blanket drain for the ftill wall height (excluding the uppermost 1 foot of backfill) using imported washed gravel against the walls. The wall drain material must be hydraulically connected to the footing drain pipe. Wall foundation drains are discussed in Section 14.1 of this report. Lateral loads can be resisted by friction between the foundation and the natural, medium dense to dense glacial sediments or supporting structural fill soils, or by passive earth pressure acting N n the buried portions of the foundations. The foundations must be backfilled with compacted structural fill to achieve the passive resistance p I rovided below. We recommend the following allowable design parameters: November 18, 2009 ASSOCIATED EARTH SCIENCES, INI JSK11d - KEM103,49 - Projects1200901031KEMP Page I Sector 24 Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ton Preliminal, Recommendations If moisture intrusion through slab -on -grade floors is to be limited., the floors should be constructed atop a capillary break consisting of a minimum thickness of 4 inches of washed pea gravel or washed crushed rock (no fines). The pea gravel/washed rock should be overlain by a 10 -mil (minimum thickness) plastic vapor retarder. If a crushed or sharp aggregate is used, the aggregate should be rolled with a smooth steel drum or plate compactor to reduce punctures in the vapor retarder. Additional protection from the crushed aggregate should be provided by a geotextile (such as Mirafi 140N) or use of a puncture -resistant membrane compliant with ASTM;E 1745 Class A requirements for puncture resistance (such as Stego®Wrap 15 millimeter vapor barrier). 14.0 DRAINAGE CONSIDERATIONS The unweathered till sediments encountered in our explorations at depths up to 6.5 feet below ground surface are relatively impermeable, and water will tend to perch atop this stratum. Additionally, traffic across the till sediments when they are very moist or wet will result in disturbance of the otherwise firm stratum. Therefore, prior to site work and construction, the contractor should be prepared to provide drainage and subgrade protection, as necessary. 14.1 Wall/Foundation Drains All retaining and perimeter footing walls should be provided with a drain at the footing elevation: The drains should consist of rigid, perforated PVC pipe surrounded by washed pea gravel. The level of the perforations in the pipe should be set approximately 2 inches below the bottom of the footing, and the drains should be constructed with sufficient gradient to allow gravity discharge away from the buildings. All retaining walls should be lined with a minimum 12 -inch -thick washed gravel blanket provided to within 1 foot of finish grade, and which ties into the footing drain. Roof and surface runoff should not discharge into the footing drain system, but should be handled by a separate, rigid, tightline drain. Exterior grades adjacent to walls should be sloped downward away from the structures to achieve surface drainage. Final exterior grades should promote free and positive drainage away from the buildings at all times. Water must not be allowed to pond or to collect adjacent to foundations or within the immediate building areas. It is recommended that a gradient of at least 3 percent for a minimum distance of 10 feet from the building perimeters be provided, except in paved locations. In paved locations, a minimum gradient of 1 percent should be provided unless provisions are included for collection and disposal of surface water adjacent to the structures. Additionally, pavement subgrades should be crowned to provide drainage toward catch basins and pavement edges. Crawl -space areas should be provided with drains at low points to prevent water from accumulating. November 181 2009 _vv ASSOCIATED EARTH SCIENCES, INC. !SK/id- KE090103A9 - Projects1200901031KEMP Page 21 Sector 2A Subsurface Exploration, Geologic Hazard and Bay 142sta Redevelopment Project Preliminary Geolechnical Engineering Reporl Preliminag Design Recommendations Bremerton, I; -MILM� ma��Mml Above 5 feet 50012,200 pounds, graded, top/bottom rocks 5 f-et'or les' -s.' 5 i! 11 0 pounds, grade d top/b . ottom. rock s 3. The rockmaterial should all be as nearly rectangular as possible. No stone should be used that does not. extend through the.wall. The rock material should be hard, sound, durable, and free from weathered portions, seams, cracks, or other.defects. The rock density should be a minimum of 160 pcf. 4. Rock selection and placement should be such that there will be minimum voids and, in the exposed face of the wall, no open voids over 8 inches across in any direction. The rocks should be. placed in a manner, such that the longitudinal axis of the rock will be at right angles or perpendicular to the rockery. face. Each.rock should be placed so as to lock into two rocks in the lower tier. After setting each rock course, all voids between the rocks should be chinked on the back with quarry rock to eliminate any void sufficient to pass a 2 -inch square probe. The rockery should be limited to 8 feet in height. 5. A drain consisting of rigid, perforated, polvvinvl chloride (PVQ pie eclosed in a IP n .12 -inch -wide pea gravel trench. should be placed behind. the lower course of rock to remove water and prevent the buildup of hydrostatic pressure behind the wall. The remainder of the wall backfill should consist of quarry spalls with. a maximum, size of 4 inches and a minimum size of 2 inches. This, material should be placed to a 12 -inch -minimum thickness between the entire wall and the cut material. The backfill material should be placed in lifts to an elevation approximately 6 inches below the top of each course of rocks as they are placed until the uppermost course is placed. Any backfill material falling onto the bearing surface of a rock course should be removed before the setting of the next course. 6. Any asphalt paving should be sloped to drain away from the rockery. In addition, the areas above rockeries should be planted with grass as soon as possible after rockery construction to reduce erosion. Slab -on -grade floors may be constructed eiiher directly on the medium dense to very dense natural sediments, or on structural fill placed over these materials. Areas of the slab subgrade that are disturbed (loosened) during construction should be recompacted to an unyielding condition prior to placing the pea gravel, as described below,i November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSKIld— KE090103A9 - Projects1200901031KEMP Page 20 Sector 2A Subsurface Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geotechnical Engineering Report Bremerton, Washin ton Prelimina Desi n Recommendations We are also available to provide geotechnical engineering and monitoring services during construction. The integrity of the foundations depends on proper site preparation and construction procedures. In addition, engineering decisions may have to be made in the field in the event that variations in subsurface conditions become apparent. Construction monitoring services are not part of this current scope of work. If these services are desired, please let us know, and we will prepare a proposal. We have enjoyed working with you on this study and are confident that these recommendations will aid in the successful completion of your project. If you should have any questions or require further assistance, please do not hesitate to call. Sincerely, ASSOCIATED EARTH SCIENCES, INC. Kirkland, Washington Kindred, P.E. Engineer pF WAS cc 9 68 FOISTEP� �1 SS/ONAL Bruce L. Blyton, P.E. Principal Engineer Attachments: Figure 1: Vicinity Map Figure 2: Bay Vista Site Plan Figure 3: Site and Exploration Plan Appendix A: Exploration Logs from Previous Assessments Appendix B: Exploration Logs Appendix C: Grain Size Analyses November 18, 2009 ASSOCIATED EARTH SCIENCES, INC. JSK/!d - KE090103A9 - ProjeciA200901031KE1WP Page 23 Sector Z4 Subsurf"e Exploration, Geologic Hazard and Bay Vista Redevelopment Project Preliminary Geolechnical Engineering Report Bremerton, T Preliminan Design Recommendations Portions of the site are underlain by a variable amount of fill-,thatis. generally unsuitable for road support. Beneath the fill (when.present) is native weathered or unweathered medium fense to very dense lodgement till that is suitable for pavement support. AESI recommends. removal of topsoil, all fill, organic debris, roots, and other unsuitable materials from the roadbed. If required, structural fill may then be placed to achieve desired subbase grades.. Structural fills below proposed pavement areas should be compacted to at least 95 percent of ASTM:D 1557. The subgrade should be crowned to drain toward the edges of the paved area with grades of 2 percent. Following installation of utilities and rough -grading of the subgrade, the exposed soils should be compacted to a firm and unyielding condition, as determined by the geotechnical engineer or their representative, with a density that is at least 95 percent of maximum dry density determined using ASTM:D 1557. Given the high silt content of the native soils, moisture - conditioning may be necessary to obtain a firm and unyielding condition. During winter and spring months or following I precipitation, the soils are likely to be too wet, and it may be difficult to dry the soils and obtain suitable compaction. Suitable compaction is also difficult to obtain if the soils are too dry, as generally occurs in the summer and fall. Dry soils can be most problematic because they can appear firm and suitable during construction, but soften and cause failure of the pavement when exposed to moisture. Prior to placing pavement materials, the subgrade should be proof -rolled with a fully loaded, tandem -axle dump truck. Any visibly yielding areas should be removed and replaced with structure fill. All aggregates used in the pavement section should be compacted to 95 percent of maximum dry density determined using ASTM:D 1557. The recommendations in this report are preliminary because grading plans and construction details were not finalized at the time of this report. We are available to provide additional geotechnical consultation as the project design develops and possibly changes from that upon which this report is based. If significant changes in grading are made, we recommend that AESI perform a geotechnical review of the plans prior to final design completion. In this way, our earthwork and foundation recommendations may be properly interpreted and implemented in the design. November 18, 2009 ASSOCL-17ED EARTH SCIENCES, IN JSK11d — KE090103A9 — Projects1200901031KEMP Page I ME W jpo.wtt Arm LIM I November 18,2009 ASSOCIATED EARTH SCIENCES, INC. MIN - KE090103A9 - Projecr.t1 Z00901031KEMP Page 24 Z g UW g m Q w m a am a m D �Io J ❑ O Z�4/ Q Az S-1 b2 731 Ww7 9" 5 f 831 grades gravelly S-2b2 10 S_3f b2 61 W=7 is - grades silly S_4 � b2 SO/ -W=6 20 S-5.3oaLtzkx-i I LL Boring Completed 04/06/06 Total Depth of Boring = 20.3 ft. 25 GROUNDWATER Grouriftater not encountered. Notes: 1. Strafigraphic contacts we based on field interpretations and are approximate. 2. Reference to the text of this report Is necessary for a proper understanding of subsawlece conditions. 3. Refer to 'Soil Classification System and Key" figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boeing B-5 Bremerton, Washington A-6 LANDAUBremerton, 14 —i B-5 SAMPLE DATA SOIL PROFILE -6 Drilling Method- —t!91-0"temhY0-r—,-,— E z eo 0 m E Ground Elevation (fty Not Measured CL z a) E ' 11 E to Drilled By. V-;; c- --.!j .0 PortlandWelt) SM �fir= coarse SAN6� Brown, very a0=, gaV(.y, (glacialtill) S-1 b2 731 Ww7 9" 5 f 831 grades gravelly S-2b2 10 S_3f b2 61 W=7 is - grades silly S_4 � b2 SO/ -W=6 20 S-5.3oaLtzkx-i I LL Boring Completed 04/06/06 Total Depth of Boring = 20.3 ft. 25 GROUNDWATER Grouriftater not encountered. Notes: 1. Strafigraphic contacts we based on field interpretations and are approximate. 2. Reference to the text of this report Is necessary for a proper understanding of subsawlece conditions. 3. Refer to 'Soil Classification System and Key" figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boeing B-5 Bremerton, Washington A-6 LANDAUBremerton, 14 —i [VIII -IIIA -0 :. Exploration Dogs from PreviousAssessments S-1� d W= 14 ; 2 4 6 S•2 d W=9 GS 1E Boring Completed 04/05/06 Total Depth of Boring = 8.0 ft. - concrete debris on north fete of ph Gray -Drown, sury, very gravelly, one to coarse SAND (dense to very dense, moist) (glacial till) GROUNDWATER Groundwater not encountered. Notes: 1. Stratigraphic contacts are based on field Interpretations and are approximate_ 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key' figure for explanation of graphics and symbols. Figure Westpark Redevelopment LAND?►U Lo Bremerton, Washington g of Boring TP -11 A �ASSOCIATES ti TP -11 SAMPLE DATA SOIL PROFILE E m a Drilling Method- Rubber -tired Backhoe Z W oo ) .—aa Ground Elevation (ft). Not Measured CD Z n E E d E >; 3 w is CO v Drilled By: Custom Backhoe C an e5 un I 0 m ►�- C9 ..p TDwdl L Brown, stitY, flrte to medium SAND with gravel (mum dense, moist to Wet) (ftil) S-1� d W= 14 ; 2 4 6 S•2 d W=9 GS 1E Boring Completed 04/05/06 Total Depth of Boring = 8.0 ft. - concrete debris on north fete of ph Gray -Drown, sury, very gravelly, one to coarse SAND (dense to very dense, moist) (glacial till) GROUNDWATER Groundwater not encountered. Notes: 1. Stratigraphic contacts are based on field Interpretations and are approximate_ 2. Reference to the text of this report is necessary for a proper understanding of subsurface conditions. 3. Refer to "Soil Classification System and Key' figure for explanation of graphics and symbols. Figure Westpark Redevelopment LAND?►U Lo Bremerton, Washington g of Boring TP -11 A �ASSOCIATES ti MIME= 6 o S -2 1111d W GS = 6 _ Boring Completed 041=6 Total Depth of Boring= 6.5 ft. -� 10 o- z Z 0 O - m gy --12 N 8 - buried topsoil horizon with roots ray -brown. S- ty, gravelly, rine to coarse SAND (dense. m6tst) (glacial tlll) Groundwater encwrdered. G .. e --14 W w. O 16 �o Notes: 1. Streagmphic contacts are based on field Interpretations and ere aproodrnate, 2Reference to the text of this report is necessary for a per � of subsurface cDndMwm g 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. a m a Figure Westpark RedevelopmentLog of Boring TP -9 0 IA -14 4 LANDAU Bremerton, Washington ASSOCIATES S SAMPLE DATA AMPLE SOIL PROFILE rillineth b r 4i a oeto ffDATA Ground Elevation (ft): of easure6 M-0 CL ruled y: Custom a ®d MIME= 6 o S -2 1111d W GS = 6 _ Boring Completed 041=6 Total Depth of Boring= 6.5 ft. -� 10 o- z Z 0 O - m gy --12 N 8 - buried topsoil horizon with roots ray -brown. S- ty, gravelly, rine to coarse SAND (dense. m6tst) (glacial tlll) Groundwater encwrdered. G .. e --14 W w. O 16 �o Notes: 1. Streagmphic contacts are based on field Interpretations and ere aproodrnate, 2Reference to the text of this report is necessary for a per � of subsurface cDndMwm g 3. Refer to "Soil Classification System and Key" figure for explanation of graphics and symbols. a m a Figure Westpark RedevelopmentLog of Boring TP -9 0 IA -14 4 LANDAU Bremerton, Washington ASSOCIATES �1 4 6 8 P '-2kLLL-- -IW:!1L- Boring Completed 04/06106 Total Depth of Boring = 8.01 10 12 14 very gravelly, 10 CDaMS W) ( d., on) Noter. 1. Stratigraphile contacts are based an field Interpretations and are approximate. Z Reference to the text of this report is necessary for a proper understanding of subsurfare.conditions. e. 3. Refer to'Soil Classification System and Key' figure for exlAanation of lgraphics and symbols. Figure Westpark Redevelopment Log of Boring TP -13 LANDAU Bremerton, Washington a-1 6 . 1A ASSOCLAnS TP -13 SAMPLE DATA SOIL PROFILE GROUNDWATER EJ0 -5 Drilling Method- Rubber4ired Backhoe E E F- Ground Elevation (ft).Aot Measured E LL W E V CL V) Q Drilled By. Custom Backhoe D CIO, coo F3 9 E (3 W 5 1 ---TflTWF W firm to coarse SMD with abundard roots (medium dense, moist) 1 (111) Groundwater not encountered. �1 4 6 8 P '-2kLLL-- -IW:!1L- Boring Completed 04/06106 Total Depth of Boring = 8.01 10 12 14 very gravelly, 10 CDaMS W) ( d., on) Noter. 1. Stratigraphile contacts are based an field Interpretations and are approximate. Z Reference to the text of this report is necessary for a proper understanding of subsurfare.conditions. e. 3. Refer to'Soil Classification System and Key' figure for exlAanation of lgraphics and symbols. Figure Westpark Redevelopment Log of Boring TP -13 LANDAU Bremerton, Washington a-1 6 . 1A ASSOCLAnS 6 S-2 d W=4 6 GS Boring Completed 04/06/06 Total Depth of Boring = 8.5 ft. 10 0 12 n� (dense, d ) (glacial ) 8-14 U W O tr 6 Q P-16 Notes: 1. Stratigraphic contacts are based on fid ederprefetions and are apprwdmete. 2. Reference to the text of this report is neoessary for a proper understanding of subsurface conditions. $ 3. Refer to -Soil Classification System and Key" figure for explanation of graphics and symbols. e Figure Westpark Redevelopment Log of Boring TP -12 L14ANDAU Bremerton, Washington �— 5 ASSOCIATES SAMPLE DATA SOIL riling -ti dBackhoe 0 B Ground Elevation (ft)' Not Measured .® 0 !i rill y: siren a 0 -6rn I to 1! 0 -0Sw T e vW silty, to IO vft grantSM ( t) (gyp Groundwater not encountered. -111],� d W=26 -abandoned at 1. 2 6 S-2 d W=4 6 GS Boring Completed 04/06/06 Total Depth of Boring = 8.5 ft. 10 0 12 n� (dense, d ) (glacial ) 8-14 U W O tr 6 Q P-16 Notes: 1. Stratigraphic contacts are based on fid ederprefetions and are apprwdmete. 2. Reference to the text of this report is neoessary for a proper understanding of subsurface conditions. $ 3. Refer to -Soil Classification System and Key" figure for explanation of graphics and symbols. e Figure Westpark Redevelopment Log of Boring TP -12 L14ANDAU Bremerton, Washington �— 5 ASSOCIATES /Im 11111 Exploration Logs 10 12 14 16 Notes: 1. stratigraphic contacts are based on field interpretations and are approximate. 2 Reference to Ura text ofthis report is necessary for a proper understanding of subsurface conditions. & Refer to "Soil Classification System and Key` figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boring TP -14 LANDAU Bremerton, Washington A_ 1 6 14 ASSOCi[ATES TP -14 SAMPLF DATA SOIL PROFILE GROUNDWATER °' m ° Drilling Method; Rubber -tired Backhoe m E Elevation (ft). Not Measured CL m e W a mGround io ca N Ddiled By: Custom Backhoe o moa m m m F- c!) -0 SW � ML Groundwater not encountered. `. SM Y. silly, fine to coarse SAND (medwm e. moist to wet) dens (ablation till) .,2 S-1 d W.11 ..q �I sp- Gray, gravelly, fine to coarse SAND with at I SM (dense, moist to wet) (glacial UIQ 6 S•2 W= 12 _ d GS 6 Boring Completed 0410=6 Total Depth of Boring = &0 ft. 10 12 14 16 Notes: 1. stratigraphic contacts are based on field interpretations and are approximate. 2 Reference to Ura text ofthis report is necessary for a proper understanding of subsurface conditions. & Refer to "Soil Classification System and Key` figure for explanation of graphics and symbols. Figure Westpark Redevelopment Log of Boring TP -14 LANDAU Bremerton, Washington A_ 1 6 14 ASSOCi[ATES LOG OF EXPLORATION PIT NO. EP -154 This log Is part of the report prepared by Associated Earth Sciences, Inc. (AES!) for the named project and should be t read together with that report for complete Interpretation. This summary appplies only to the location of this trench at the time of excavation. Subsurface conditions may change at this location witi� the passage of time. The data presented are p a simpificetion of actual conditions encountered. DESCRIPTION Loose to medium dense, dry, brown to grayish brown, silty fine to medium SAND, few to little gravel, scattered trash and concrete rubble, occasional cobble. 2 Vashon Lodgement Till 3 Dense to very dense, dry, brownish gray to gray, fine to medium SAND, little sift, few fine to coarse gravel (concrete -like diamict). 4 Few roots at 3'. 5 6 . Bottom of exploration pit at 6 feet. 7 No seeps or sloughing. North end of pit intersects a -6" concrete storm sewer (9) pipe at 45, running east -west. HOS determined pipe Is abandoned storm = backfilled. 8 9 10 11 12 13 14 15 16 17 18 19 m E Bay Vista Sector 2A Bremerton; WA Associated Earth Sciences, Inc. Project No. KE090103A Logged by: SST �cj. 0 9110/09 �, Approved by: :,- n KE Classifications of ,..lls In this report are +ss -r on visual field andlor laboratoryobservations,which « ._ density/consistency, moisture coneraon, grain size. arij: Plasticity estimatesand should notbe construed to implyfield or-laboralory testing unless presented herein. Visual -manual and/or laboratory classification 4i methods of ASTM r and F identification - Classification Associated Eat s, Inc. EXPLORATION LOG KEY a uw r�.r,r ♦�. u Terms ♦ . ,, r - r �. . . gravel�Wth sand, little to SPTOblowstfoot no sLoose ► „ a, Poorly -graded gravel Loose 4 to 10 GrainedS MediumDense 10 to Symbols 30 Test and gravel with sand, Dense 30 to 50 little to no fines MoistureG.= Grain Size Very Dam >50; M = ♦,: Condistengy , Afterberg Limits nSilty gravel and silty very Soft 0 to 2 C = ca 'to gravel a: :, ♦Fine -, D1 = Dry Density soft Grained Soils Stiff rMedium stiff i to 15 Clayey gravel�and Very Stiff 15 to 30 clayey gravel Wth sand Hard >310 Component 1 e r, Well -graded d and D ffive Term Size Ran le andSieve Number sand virith M vel, little Boulders Larger than, 12" ILII to no fines �S. Poorly -graded sand o No Coarse and fWith gravel,' ine Gravel 3/41 * No. w little to no fines ♦ No. M No. 10(0.075 ,i s Silt ♦Clay Smallerthan ♦ 00 ` ;. Clayey •and EstimatedPercentageContent clayey sand With gravel Dry - Absence of moisture, go �on e ri�t dusty, dry to the touch, `III t y n y ,. .� ► ♦ : ♦ r ' moisture Few 5 to 10 15 to 25 Moist - Damp but no visible With Non -primary coarse water Clayof low to medium constituents:Little ,I ♦visible '� sandy,ity; silty, Fines content w,, ►,,_ r gravelly �plastirl clay, I� water, usually ♦ below� water table s, Organic lI . or silt of r Symbols ► r' plasticity ►, + r, w: Sampler portion of 6" Cement grout +t Type surface seBl - iO 1 1 � *r ASampler D f BentorilleWith micaceous or * ..� r, • :r`r fi fine :; .. II Sampler 3.0* OD Split-SpoonSampler Filter pack %%ith -.. silt Clay of high plasticity,' Split -Spoon Ring Sampler (a) blankcasing . section Sandy or gravelly clay, tat ulk sample 3.0* OD Thin -Wall Tube Sampler Screened casing clay vvith sand or gravel or Hydrolip (including Shelby tube) v64th filter pack . Sample .i ' + y +� of Organic i Portion ♦ recovered rmedium to I� g plasticity Peat, and other .. highly organic soils Classifications of ,..lls In this report are +ss -r on visual field andlor laboratoryobservations,which « ._ density/consistency, moisture coneraon, grain size. arij: Plasticity estimatesand should notbe construed to implyfield or-laboralory testing unless presented herein. Visual -manual and/or laboratory classification 4i methods of ASTM r and F identification - Classification Associated Eat s, Inc. EXPLORATION LOG KEY a F - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 N t0 LOG OF EXPLORATION PIT NO. EP -156. This log is part of the report.prepared by Assoaated Firth Sciences, Inc. (AESI) for the named project and should be read together with that reporrtt for complete interpretation. This summary applies only to the location of this trench at the time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are a simpification of actual conditions encountered. DESCRIPTION Grass over Topsoil/Fill Loose to medium dense; dry, brown, silty fine to medium SAND, organic rich. Vashon Lodgement Till Dense to very dense, dry, light gray, fine to medium SAND, Tittle silt, few to little fine to coarse gravel, occasional cobble. Bottom of exploration pit at 3 feet. m ...... _. .... Bay Vista Sector 2A Bremerton, WA Associated Earth Sciences, Inc. Logged by: SST Project No. KE090103A st j EBa Approved by: "'—" 9/10/09 r U 4 a 0 0 MUM I Ma. 04 1 n of a al condiflons encounF. Grass over'i,asnon LGOgernent i m fine to I medium SAND , little silt, few to little fine to coarse gravAl occasional cobble (concrete -like diamict). IN KI M, Ga 4 4 11 ' ' I ' ' ' t f 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 I ,- w S E 2 CL N Bay Vista Sector 2A Bremerton, WA Associated Earth Sciences, Inc. Project No. KE090103A o Logged by: SST O Approved by: 9110109 � MW- LOG OF EXPLORATION PIT NO. EP -158 This log is part of the report prepared by Associated Earth Sciences, Inc {AES!) for the named project and should be a read together with that report for co Igor interpretation. This summary applies only to the location of this trench at the m time of excavation. Subsurface condltions may change at this location with the passage of time. The data presented are o a slmpification of actual conditions encountered. 2 3 DESCRIPTION Soft to medium stiff, dry, light brown, SILT, trace to few fine sand, few roots. Very dense, dry, light gray, fine to medium SAND, little silt, little fine to coarse gravel, occasional Bottom of exploration pit at 4 feet. 5 No seeps or sloughing. Trench is excavated southwest to northeast. 2" steel pipe in northeast end of pit, 2' deep. Pipe was not damaged. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 h a Bay Vista, Sector 2A Bremerton, WA Associated Earth Sciences, Inc. Project No. KE090103A Logged by: SST 9!10109 Approved by: MA F+ s i= I Q 4.1101 :4 1 :A I [a] L, wass over t7111 Loose to n-ediun de 2 Very dense, dry, light gray, fine to medium SAND, lile slit, few to little fine to coarse gravel 3 1 (concrete -like diamict). El VA 10 11 12 13 14 15 16 17 18 19 V Bottom of exploration pit at 5 feet. No seeps or sloughing. Ditch line runs north -south at west end of pit, 1 1/4" PVC pipe at -3.5'. Pipe was not damaged. ... ....... Bay Vista Sector 2A Bremerton, WA Associated Earth Sciences, Inc. Project No. KE090103A Logged by: SST g a_519/10109 Approved by: LOG OF EXPLORATION PIT NO. EP -160 This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named Project and should be Tres' together with that n:port for compplete interpretation. This summary gpQes only to the lova for of this trench at the a time of excavation. Subsurface condltions may change at this location with the passage of time. The data presented are o a simpitication of actual conditions encountered. DESCRIPTION Asphalt over crushed base course. Fill 1 Medium dense, dry, light brown, silty SAND, few gravel. Weathered Glacial Till 3 Dense, dry, tan -brown, silty SAND, with gravel. 4 5 Glacial TIII 6 Very dense, slightly moist to moist, olive -gray, gravelly SAND, with silt. 7 1 8 9 10 11 12 13 14 15 16 17 18 19 Bottom of exploration pit at depth 18.5 feet No caving. No seepage. m a z Bay Vista Sector 2A CL Bremerton, WA Associated Earth Sciences, Inc. project No. KE090103A Logged by: JSK M.�: .�.... w� t..... e Ann Approved by:� ��fivc�i�uc� awa U 101=0 ifr;ml 0 1=0 MIT 111 *Dq N I rin ne to coarse oravel- includes concrete rubble (to 16"), rebar, glass bottles, old shoe. ig ME R ". ".0 = In WVery dense, dry, light gray, fine to medium SAND, little silt, little fine to coarse gravel, occasional --- L1- Bottom of exploration pit at depth 5 feet No seeps or sloughing - 7 8 9 10 11 12 13 14 15 16 17 18 19 E Bay Vista Sector 2A Z Bremerton, WA Associated Earth Sciences, Inc. Project No. KE090103A Logged by: SST M Approved by: 9110/09 �z LOG OF EXPLORATION PIT N0: EP -162 This log is part of the report�pptepar�ed by As da Earth Scienc�ss, Inc. (AESQ for the named project and should be w read together with that reportfor complete interpretation. This summary applies only to the location of this trench at the a time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are p a simpiflcation of actual conditions encountered. DESCRIPTION boa over topsou. Loose, dark brown, silty SAND, few gravel. 1 Weathered Glacial 2 Dense, dry, brown, silty SAND, with gravel. 3 4 Very dense, slightly moist, olive -gray, silty SAND, with gravel. 5 6 7 8 9 10 11 12 At 12' transition to gravelly SAND, little silt. 13 14 15 16 Bottom of exploration pit at depth 16 feet 17 No caving. No seepage. 18 19 S N m z Bay Vista Sector 2A a Bremerton, A o Associated Earth Sciences, Inc. Project No. KE090103A S Logged by: JSK y ANprovcd by: ��J N r: November 2009 Cq L 1292-1U v e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 m a E LOG OF EXPLORATION PIT NO. EP -161 This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI)'for the named project and should be read together with thabreport for complete interpretation. This summary applies only to the location of this trench at the time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are a simpification of actual conditions encountered. DESCRIPTION Aspnalt over crusnea ease course. Weathered Glacial Till Dense, dry, tan -brown, silty SAND, with gravel. Glacial Till Very dense, slightly moist to moist, olive -gray, gravelly SAND, with sift. At 7' changes to little silt. Bottom of exploration pit at depth 16 feet No caving. No seepage. Z BayVista Sector 2A 'Bremerton, SVA N Associated Earth Sciences, Inc. Project No. KE090103A o logged by. JSK g oa Approved by: November 2009 U 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 LOG OF EXPLORATION PIT NO. EP -164 This log %p b Associated Earth Sciences; Inc. (AESI) for the named ro ect.and should be is r =01 socl �eta the loca - read together the e4sinterp on. applies only to f gonj of this trench at the time of excavation. Subsurface condi ons may change als,s Ma a the 0 C t is 1=11orrW passage firne. The data presented are a simpMcalon'of actual conditions encountered. DESCRIPTION --Topsoil .00se, dark brown, silty SAND, few gravel. Weathered Glacial Till )ense, dry, tan -brown, silty SAND, with gravel. Glacial Till (ery dense, slightly moist to moist, olive -gray, —Slity SAND, with gravel. Bottom of exploration pit at depth 2 feet No caving. No seepage. Bay Vista Sector 2A Bremerton WA Associated Earth Sciences, Inc. Project No. KE090103A Logged by: JSK /.....r.. -A 1 - November 2009 —ppew—U sod over topsoil. Loose,dar� M, l(Tiedium dense, slightly moist, light brown, silty SAND, few gravel. Bum layer at 2% R WDense, dry, tan -brown, silty SAND, with gravel. 61 Bottom of exploration pit at depth 5.5 feet No caving. No seepage. 8 9 10 11 12 13 14 15 16 17 18 19 -------- 20 .0 E z Bav Vista Sector 2A Bremerton, WA Logged by: JSK Associated Earth Sciences, Inc. Project No. KE090103A Approved 0by: November 2009 �1_ lid Ed Ka 0 L) X_ APPENDIX C Grain Size Analyses M- I IM I il 6f; 7 .10 Is 4 NIP, I - NA , Ification of actual conditions e Loose, dark brown, silty SAND, few gravel. Fill M di Qa rlinhtlymr* ' light brown, silty SAND,, few Prav Weathered Glacial Till Dense, dry, tan -brown, silty SAND, with gravel. Very dense. .411 MORKo—nal 6 7 8 9 10 11 12 13 14 15 16 17 18 SII 19 .... .. . . . ................ . ........... ..... . ... E z Bay Vista Sector 2A 7:1 i i M d ii-STIXTITEM F Associated Earth Sciences, Inc. Project No. KE090103A Logged by: JSK Approved by: November 2009 CL 'T PERMIT #: 6) r'e,4vtep vc-, DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION 345 — 6th Street, Suite 600 Bremerton, Washington (360) 473-5275 INSPECTION REPORT 0, L- axude b.J &4'z',L p t4o& j 4v-1 ,11� 6 Z ADDRESS: ­ 4 ct) p Date: 1/"V-"Phone.4,/3-�'Zl6 ........... ............... "I'll", ................. ... INSPECTOR