Loading...
HomeMy WebLinkAbout09/05/2018 5FAGENDA BILL CITY OF BREMERTON 5F CITY COUNCIL SUBJECT: Change Order No. 1 with Study Session Date: Hokkaido Drilling, Inc. for Pump and Motor COUNCIL MEETING Date: Replacement at Well 20 Department: (Attachments Added) August 22, 2018 September 5, 2018 PW&U Presenter: Cami Apfelbeck Phone: (360) 473-5207 SUMMARY: The bid to replace the pump motor for Well 20 was $57,770.00 including Washington State sales tax. When the contractor pulled the existing pump, motor, check valve and column from the well, the equipment was in poor condition with excessive pitting and corrosion. We also added a video scan of the well for additional inspection of the well condition. Due to the hot weather and the importance of this well to the system demands, the decision was made to move forward with replacing the column, check valve and power cable with minimal delay to get the well back into service. The cost to replace the additional components, and video scan, was $19,511.00 including Washington State sales tax. U-1161de;l►1ritwilM*91 1) Change Order No. 1 2) Public Works Agreement 3) Invoice No. 3577 Hokkaido Drilling, Inc. 4) Purchase Order No. 18175 5) Hokkaido Drilling, Inc. Bid FISCAL IMPACTS (Include Budgeted Amount): The 2018 Capital Improvement Plan listed this as a combined project to replace the pump motor and VFD controller with a budget estimate of $75,000. STUDY SESSION AGENDA: ❑x Limited Presentation ❑ Full Presentation STUDY SESSION ACTION: 0 Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve Change Order No. 1 with Hokkaido Drilling, Inc. for the pump and motor replacement at Well 20 in the amount of $19,511.00 including Washington State sales tax; and authorize the Mayor to finalize and execute the change order with substantially the same terms and conditions as presented. COUNCIL ACTION: .) Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/02/2018