Loading...
HomeMy WebLinkAbout07/18/2018 7GAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Contract Award to Transblue, LLC for Pedestrian Crossing and Sidewalk Improvements Project Study Session Date: COUNCIL MEETING Date: Department: Presenter: Phone: 7G Updated July 11, 2018 July 18, 2018 PW&U Tom Knuckey (360) 473-2376 SUMMARY: The work in the Bid Documents includes construction of 8 ADA curb ramps, and sidewalk repairs at 11 locations. Two bids were received; the lowest was from Transblue, LLC from Edmonds, Washington. While the bid cost from Transblue for the ADA curb ramps (Bid Schedules A — D) was consistent with the Engineer's Estimate, recent experience with City construction on residential streets indicates significant cost savings can be achieved if these ramps are constructed using in-house staff. The projected cost savings for the sidewalk repairs (Bid Schedule E) is more modest since the City would contract out the tree removal. In the Bid Documents, staff included language to allow the City to adjust the project scope. The Staff recommendation is to award the Sidewalk Repair work only (Bid Schedule E), and authorize amendments to the contract up to a total expenditure of $107,000 to match the project budget. ATTACHMENTS: 1) Bid Tab 2) Contract 3) Sidewalk Repair Site Plans FISCAL IMPACTS (Include Budgeted Amount): This work is included in the Residential Streets and Transportation Capital Budgets under ADA Sidewalk Improvements ($90K for curb ramps), and Sidewalk Abatement ($70K for sidewalk repairs.) The project would combine these funds for sidewalk repairs. STUDY SESSION AGENDA: ® Limited Presentation ❑ Full Presentation STUDY SESSION ACTION: ❑ Consent Agenda ® General Business ❑ Public Hearing RECOMMENDED MOTION: Move to award Bid Schedule E of the contract titled Pedestrian Crossing and Sidewalk Improvements Project to Transblue LLC, authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented, and authorize amendments to the contract up to a total expenditure of $107,000 to match the project budget. COUNCIL ACTION: 2Approve Form Updated 01/02/2018 ❑ Deny ❑ Table ❑ Continue ❑ No Action