CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Contract Award to American Study Session Date: May 23, 2018
Construction Company, Inc. for the Eastside COUNCIL MEETING Date: June 6, 2018
Treatment Plant Outfall Replacement Project Department: Engineering
Presenter: Tom Knuckey
Phone: (360) 473-2376
SUMMARY: The work to be completed under this contract includes in -water work consisting of
removal of existing 20 -inch cast iron pipe, cure -in -place -pipe (CIPP) lining for 60 feet of 20" cast-iron
pipe, installation of 36 -inch reinforced concrete pipe, removal of an existing deep water diffuser, and
installation of a 36 -inch single port diffuser valve. Work will include shoring, excavation and
dewatering from a barge, implementing BMPs, and water quality monitoring.
Bids were opened on May 16, 2018. There were five (5) bids submitted. There were two bid
alternatives; (1) standard cofferdam construction which was the base bid, and (2) a contractor
proposed alternative. The lowest, responsive, responsible bidder was American Construction Co.,
Inc. in the amount of $1,836,650 for both Bid Alternatives. Staff recommend award to American
Construction Co., Inc. for Bid Alternative 1 (Base Bid) which includes sales tax.
ATTACHMENTS: 1) Agreement; 2) Bid Tabulation; 3) Vicinity Map
FISCAL IMPACTS (Include Budgeted Amount): The project is included in the 2018 Wastewater
Capital budget at $1,600,000. A budget adjustment may be required for this project.
STUDY SESSION AGENDA: ® Limited Presentation ❑ Full Presentation
STUDY SESSION ACTION: ® Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION:
Move to award the contract for the Eastside Treatment Plant Outfall Replacement Project to
American Construction Co., Inc., in the amount of $1,836,650 for Bid Alternative 1 (which includes
Washington state sales tax); and authorize the Mayor to finalize and execute the agreement with
substantially the same terms and conditions as presented.
COUNCIL ACTION: Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Forth Updated 01/02/2018