CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Contract Award and Agreement
with Simpson Sandblasting & Special
Coatings, Inc. for Exterior Coating
Replacement of Reservoirs 17 and 20
5R
Study Session Date: February 28, 2018
COUNCIL MEETING Date: March 7. 2018
Department: PW & U
Presenter: Tom Knuckey
Phone: (360) 473-2376
SUMMARY: Reservoirs 17 & 20 are each 1 -million gallon steel water reservoirs located side by side
in East Bremerton. The exterior coating on each reservoir is failing. An exterior coating assessment
report was prepared by Northwest Corrosion Engineering in January 2015 which included
recommendations for recoating of the exterior of these reservoirs. The exterior of each reservoir will
be abrasive blasted to remove the existing coating and a new coating system will be applied.
Bids were opened on February 15, 2018. Four (4) bids were received. Simpson Sandblasting &
Special Coatings, Inc. was the lowest responsible, responsive bidder in the amount of $627,323.34
including WA State sales tax.
ATTACHMENTS: 1. Location Map; 2. Agreement; 3. Simpson Sandblasting Bid Schedule; 4. Bid
Tabulation
FISCAL IMPACTS (Include Budgeted Amount): This project is included in the 2018 Water Capital
Budget.
STUDY SESSION AGENDA: ® Limited Presentation ❑ Full Presentation
STUDY SESSION ACTION: ® Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to award the construction contract for Reservoirs 17 & 20 —
Exterior Coating Replacement to Simpson Sandblasting & Special Coatings, Inc. in the amount of
$627,323.34 including Washington State sales tax and authorize the Mayor to finalize and execute
the agreement with substantially the same terms and conditions as presented.
COUNCIL ACTION: [Z/Approve
Form Updated 01/02/2018
❑ Deny ❑ Table ❑ Continue ❑ No Action