Loading...
HomeMy WebLinkAbout03/07/2018 5PAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Repair, Refurbishment and Modification of Pump No. 1 at Pump Station WB -3 from Granich Engineered Products, Inc. of Seattle, WA Study Session Date COUNCIL MEETING Date Department: Presenter: Phone: February 28, 2018 March 7, 2018 PW&U/WWTP Pat Coxon (360) 473-5448 SUMMARY: In 2017, staff pulled another pump station WB -3 for repairs, pump #3, due to the failure of the mechanical seal. At that time, the pump was found to have a plugged cooling water jacket from grit entrained in the wastewater, which lead to the mechanical seal failure. This style of pump is a sewage cooled pump, and we cannot control the amount of fine grit that we receive at this station. Staff has devised a modification to the pump, so that we can utilize a closed loop cooling system to keep failures that occurred in 2017 from happening in the future. Pump #1 is the second of three pumps that will be modified, and it will extend the life of these pumps by another 25 - 30 years. The cost for the repair and modification of pump #1 is $27,032.00, from Granich Engineered Products Inc., who are the regional vendor and repair facility for Fairbanks Morse Pumps. ATTACHMENTS: Granich Engineered Products Inc. quote. FISCAL IMPACTS (Include Budgeted Amount): Included in the 2018 WW CIP — WWTP & Pump Stations Improvement Program - $500,000; 594.35325 STUDY SESSION AGENDA: N Limited Presentation ❑ Full Presentation STUDY SESSION ACTION: ® Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the repair and modifications to the Fairbanks Morse pump #1 by Granich Engineered Products, Inc. in the amount of $27,032.00 (includes tax), and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: [Approve Form Updated 01/07/15 ❑ Deny ❑ Table ❑ Continue ❑ No Action