Loading...
HomeMy WebLinkAbout3300RESOLUTION NO. 3300 A RESOLUTION of the City Council of the City of Bremerton, Washington, approving Phase II of the East Park Final Plat (File No. BPI 00050). WHEREAS, on June 2, 2006, the Administrative Hearings Examiner granted Preliminary Plat approval (File No. BP06 00047) after holding an open record public hearing to divide 48 acres into 454 housing units; and WHEREAS, on November 19, 2008, the City Council passed Resolution No. 3071 granting approval for a portion of East Park known as East Park Phase I (AFN 200811200100) for approximately I 1 acres including 86 lots with associated open space tracts, and right-of-ways; and 11 WHEREAS, on August 7, 2014, an administrative approval was received for minor revisions to the Preliminary Plat for East Park (Preliminary Plat Amendment, File No. BP 14 00037); and WHEREAS, the East Park Preliminary Plat has been approved for two one-year plat extensions (File Nos. BP 16 00029 and BP 17 00058) and the Preliminary Plat will expire on October 4, 2018; and WHEREAS, Phase II of the East Park Final Plat includes 88 lots with associated open space tracts, Wildlife Corridor, and rights-of-way; and WHEREAS, after Preliminary Plat approval, the applicant submitted and received approval for Site Development Permit Plan (File No. BP13 00036) documenting the final infrastructure plans for the plat; and WHEREAS, the applicant has posted performance bonds for the public and private infrastructure required in the preliminary plat approval; and WHEREAS, the applicant has agreed to substantially complete all infrastructure, with the exception of the wildlife corridor, prior to occupancy of any residential structures within Phase lI. Occupancy for up to 20 of the residential structures within Phase II may be granted prior to the completion of the wildlife corridor; and WHEREAS, the applicant has agreed and signed a "Subdivision Improvement Agreement for Improvements for Tracts, Open Spaces and Wildlife Corridor" and two bond agreements to complete the plat improvements with the Department of Public Works and Utilities and the Department of Community Development; and WHEREAS, all applicable conditions set forth in the Preliminary Plat approval have been met or bonded for and Final Plat approval is requested; and WHEREAS, all applicable conditions set forth in the Preliminary Plat approval, Phase 11 Plat Amendment (File No. BP14 00037) approval have been met and Final Plat approval is requested; and East Park Phase II Final Plat WHEREAS, the City Engineer and Community Development Director recommend approval of Phase II of the East Park Final Plat, NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION]. The recitals and findings of fact set forth in this resolution are hereby incorporated as if fully set forth herein. SECTION2. Phase II of East Park Final Plat as represented by the schematic drawing in Exhibit A is hereby approved, subject to the following conditions: 1. Department of Community Development Bond: a. The improvements to the tracts, open spaces, wildlife corridor and lands outside the public right-of-ways including landscaping, irrigation, pathways and lighting contained in Phase II and bonded for with the Department of Community Development, shall be completed by the applicant and accepted by the City within the timelines established within the bonds unless an extension is granted by the Director of Community Development; 2. Department of Public Works and Utilities Bond: a. The stormwater maintenance agreement shall be executed with the City Public Works and Utilities Department and recorded against the property prior to the recording of the final plat document; and b. The Public infrastructure and onsite improvement requirements, constructed with Phase II and bonded for with the Department of Public Works and Utilities, shall be completed by the applicant and accepted by the City the timelines established within the bonds unless an extension is granted at the discretion of the City Engineer; and 3. No building permit within Phase II will allow occupancy for residential use unless the infrastructure improvements within that Phase ll, except for the Wildlife Corridor, have been substantially completed and accepted by the City. Occupancy for up to 20 of the residential structures within phase II may be granted prior to the completion of the wildlife corridor. Substantially complete shall generally include functional utilities and complete streets. At the discretion of the Community Development Director and City Engineer, the following types of items may not be required for substantial completion, but are required prior to bond release: a. Punch list type items that do not affect or impact occupancy of the residences. b. Installation of landscape materials. SECTION3. The City Council President is hereby authorized to sign the Mylar. East Park Phase II Final Plat SECTION 4. Severability. If any one or more sections, subsections, or sentence of this resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this resolution and the same shall remain in full force and effect. SECTION 5. Effective Date. This resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this 1701- day of 2018. APPROVED AS TO FORM: ROGER A. LUBOVICH, City Council Presid/it, CAIeVo"61C-4� ATTEST: SHANNON CORIN, City Clerk East Park Phase II Final Plat EAST PARK PHASE Exhibit A WestS®und Engineering,lnc. 217 S.W. WlWs Dave port Ordurd, Wa. 98366 Phone (360) 876-3770 Fax (360) 876-0439 108 k0,MOM SHR -J- OF—L 9(16