SUMMARY: The East Park Outfall reconstruction project was completed in September of 2017. The
work included removing beach armoring and placement of beach gravels to restore the beach.
Recent rains have caused significant erosion which is jeopardizing an existing sewer main and the
storm water outfall itself. Public Works has applied for emergency permits from the Army Corps of
Engineers, WDFW, and the DNR. This Resolution declares the emergency conditions, and
authorizes the Mayor and the Mayor's designee to execute the necessary contracts to expedite the
stabilization of the beach and protect the sewer main and storm water outfall.
ATTACHMENTS: 1) Resolution No. 3298 2) Photos
FISCAL IMPACTS (Include Budgeted Amount): The East Park Storm Water Outfall Project is
included in the 2017 Capital Budget and sufficient budget is available to fund this emergency -work.. -
Future reimbursement of costs associated with continuing work at this outfall will be considered.
STUDY SESSION AGENDA: ® No Presentation ❑ Full Presentation
STUDY SESSION ACTION: ® Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION:
Move to approve Resolution No. 3298 declaring an Emergency to stabilize the.East Park Storm
Water Outfall
COUNCIL ACTION: (Approve
Form Updated 01/07/15
❑ Deny ❑ Table ❑ Continue ❑ No Action
PUBLIC WORKSAGREEMENT
THIS AGREEMENT, is entered into between. the City of'Bremerton, a Washington Municipal
Corporation ("City"'), and Sjil.sclhi lims. hicl., ("Contractor"), who's mailing address is 1.110 Box
1111111�1 .......... . . . . ............... ............................
68697, Seattle WA 98 168 0697.,
The parties agree as follows:
1. ('ONTRACTO.R SERVICES. 'Ihe Contractor shall perform the following services
for the City:
Place rock. to stabilize the beach. and prevent further beach erosion below the East :Park�
Stormwater Outfa.11 as shown on the attached figure in. Appendix.E.. The work: shall be don. e
in compliance with. any permits attached to this contract., All work: shall be tracked asForce
.Account in accordance with WSDo,r 201.6 Standard Specifications section 1. -09.6.
2. TIME OF COMPI..,ETION. Contractor shall complete the work: within 30 caleridar
days from the date of issuuarnce of the City's Notice to.proceed,
3. (::'OCPE S ".riON. The City shall pay the Contractor an arriount -not to -exceed
$120,000, which includes any applicable Washingtor.i. State Sales Tax, for the wor1c and services
contemelated in this agreement. 'I'lie Contractor shall invoice the City up on. completion of the wank.,
I'he City willPay for the portion of.the work. described in the invoice that has been completed by the
Contractor and a.l.-Troved by the City. The City payment shall not constitute a waiver of the City's
right to final inspection and acceptance of the project.
A. Perforni,,jio-cc aiid_ _L_�Yy 1� tie"p! ljorid. Pursuant to Chapter 39.08 RCW, the
" - J IIII-1111—
Conp
tractor shall. provide the City performance and payment bonds for the full
contract amount to be in efficet until forty...five (45) days after th.e date of final
acce.13tance, or until receipt of all necessary releases from the State Department
of Revenue, Employment Security Department and the State DepartmeDt Of
L.abor and..Industries and until. settlement of any liens filed under Chapter 60.28
RCW, whichever is later. The bond forms are included. at the end of this
contract and shall. be filled out and submitted. to the City.
& Force Account Contract., All. work. shall be tracked and paid as fiorce account
......................... .......... . ............................ . . . . . ..................
(time .and materials). Reflerence WSDOT 2016 Standard Specifications
Section 1-09.6 (Force Account) for terms and requirements forforce account
work.. Markups for overhead, profit, bonding, insurance,B&O tax and other
related expenses as described in that section shall be as follows:
Labor 25%
E.quiprnerit and Malerials 20%
Services 201Yo
Subcomractor 10%
lic,forc commencing with any Ivo flc.,a.divity, the Own(,;r and C,ontractor inusl
agree in. w6ting to what labor and eqwiiprnent shall be used for tha.t activity.
Elxtra �abor and cqidprnent utilized by 1he Contractor in execss oftfie writtm
Public Works Agreement (p(auqe I of 11) h tva Park Slormwater Ou�fiffl Emergency Beach R(pair
(between (11 ify (?f'lits .°merfon and,)c'arse11a Bros. Jnc) Novrmher 2017
agreement shall. be at the Contractor's discretion and costs shall be borne by
the Contractor, All labor, equipment, and material quantities shaH be tracked
on as daily basis and mutually agreed upon at the end of each work: day, The
labor, equipment, and materials shall be tracked on. as form to be agreed upon
by both the City and Contractor., A representative from each party shall. sign
the form, ack.nowledgin.g agreei.nent of quantities, within 24 hours of the end
ofeacli day ww hen. the work was perfi)rmed. Copies ofactual in.voices for all
materials and rental equipment, and certified payrolls and tim.esheets of all.
employees working on the project, shall be submitted to the City with any'
payment request,.
C. pia lajpt'The City shall hold back as retainage in the ainount of five percent
(5%) ofany anid all. payTxiierits inade to contractor flor an. period of ftnty- we (45)
days after the date of final accepUin.ce,, or until receipt of all necessary releases
ftorn the State Det:)artment of Revenue and the State Department of 1-abor &
Industries and untit settlement of any, hems filed under Chapter 60.28 R.CW,
whichever is later.
D, Defective or Unauth.orized Work. The City reserves its right to withhold
- - . . ................ . . ................... . ......... -- -- ----------
payment from ontractor for any defective or unauthorized work.. Defective
or unauthorized work includes, without.1ii.nitati.orv: workkand tnaterials that do
not corifon.-ii to the requirements of this ag-eement" and extra. woric and
materials furnished without the City's written approval, If Contractor is
unable, for any reason., to satisfactorily coi.riplete any' portion of the work., the
City, may corriplete the ww ork. by contract or otherwise, and (...",ontractor shalt be
liable to the City for any additional, costs incurred. by the City.. "Add.itiOnat
costs" shall mean. all reasonable costs, including legal costs and attorney fees,
incurred by the City beyond the maximum. Contract price specified above. The
City further reserves its right to deduct the cost. to complete the Contract work..,,
including any Additional Costs, frorn. any and all arnOUX.Its due or to become
Dane the Contractor.
E. F. iLaLPa nienL Waiver rrf Claims, THEMAKING OF FTNALPAYMENT
(EXCLUDING wr'rHHEL.DR.E-rAE114AGE) SHALL PREC1,1 JDE AI,f.,
CLAfMS, EXCEP"r THOSE PREVIOUS.I.X AND PROPERLY MADE AND
IDENTIFIED 13Y (.."OS D.'RAC""TODS AS UNSET'rl...,ED AT THE TIME
REQUEST FOR FINAL, PAYMENT IS MADE,,
4. I.NDEPENI)ENI'(,'ON'TR..ACI'OR.. lontractor is and shall be at all dirnes actilag as
an independent contractor and not as an employee of the City. 1'he Contractor shall secure at its
expense, and shall. be responsible for all I.-Myrnents ofincorne tax, social security, state disability
hisurance cornl:)erisation, unemployment compensation., and all other payrolp deductions for the
Contractor, officer, agents, employees and sub-coritractors. The Contractor shall also secure all.
applicable business ficanses, if required, iur connection with the contract services, including all
reqLlired licenses for Contractor's officers, agents, employees and sub -contractors.
5. Tbe City rinay lerininate tliis agreement 66j, good cause, ",(iood
cause" shall iriclude, withoul hrnitallion, any one or rnore ofthe f6l1owing events -
Public Works Agreement (I)qqe 2 of'11) 1, ast Park Storm water Ou(lall Emergency Beach Repair
I
(between Citi ql'Bremprion andScarvella Bros. [no November 2017
A rhe Contractor"s refusal 01- f.ailUre to supply a sufficient number of properly
sh.illed workers or proper materials for completion of the Contract work.
Bl The Cntractor's failure to cornplete the work within the time speciFied in this
agreement.
C, The Contractor's failure tornake full and prompt payn,.ient to subcontractors or
for material or labor,
U The Contractor's persistent disregard of federal, state or local laws, rules or
regulations.
E., rhe Contractor's fifing for bankruptcy or becoming adjudged bankrupt.,
If the ( lity temiinates this agreement for good cause, the Contractor shall not receive any
ffirther monies due under this ap
greement until the Contract work is completed.
6. PREVA-11ANG WAGES. Contractor shall file a "'Statement of' Intent to Pay
Prevailing Wages," with the State of Washington Department of L.,abor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter
39.12 of the Revised. Code of Washington., as well as ally other applicable prevailing wage rate
provision.s. The Kitsap County prevailing wage rates in effect for t.h.is contract are attached. as
Appendix A.
7 CHANGES. The City may issue a written work change directive for arly change in
the Contract workkduring the perfo.rmance of this agreement. If the Contractor determines, for any
reason, that a change order is necessary,, Contractor must submit a written change orderrequest to the
City's project manager within two (2) business days of the date the Contractor knew or should have
known of the facts and events giving rise to the requested change., If the City deterinines that the
change increases or decreases the Contractor's costs or time for performance, the City, will make an
equitable adjustmerlit, 17he City will attempt, in good faith, toreach agreement with the Contractor on.
all equitable adjustments, However, if the parties are unable to agree, the City will determine the
equitable adjustment as it deems appropriate, The Contractor shall proceed with the change order
work upon. receiving a written work.. change directive or change order from the City. IftheContractor
fails to rrequire a change order within the tune allowed, the Contractor waives its right to make any
claim or submit subsequent change order requests for that portion. of the contract work., If the
Contractor disagrees with. the e(luitable adjustment the Contractor must complete the change order
worlc.,- however, the Contractor may elect to protest the adjustment as provided below:
A., Procedure �,,ind ProfcM by Ole Corfln'xtor. If the Contractor disagrees with
anything required by a work: change directive or change order, including ally
direction, instruction, interpretation, or determination by the City, the
Contractor shall:
hrriniediately give as sgned written nollice of'prollest to the Oty�"
2. Supplemcnt the written protest within finirteen (h `y calendar days with
a. written statement thal providcp ; the fbIlowing infbrmafion
Public Work,,; Ag
,reement (pqf1e 3 ol 11) kad Park Slormwater Ou(IWI h'mergengl Beach Repair
(belmleen Cify (#'Bremerlon and Scarsella Bros, Am) November 2017
a. T he date of the Contract's protest.
b. The nature and CirCU.Mstances that caUsed the protest.
C. 'rh.e provisions in this agreement that support the protest.
d. The estirnated dollar cost, if any, of the protested work and how
that estimate was deten-nin.ed.
e. An analysis of the progress schedule showing the schedule
change or disrUption if the Coritractor is asserting as schedule
change or disruption.
The Contractor shall keep complete records of extra costs and time
incurred as as result of the protested work.... The ity shall have access
to any of the Contractor"s records needed for evaluating the protest.
1 The (...ity will evaluate all protests, provided the procedures in this
section are followed. If the City determines that a protest is valid,, the
City will ad: ust payi.nent for work.. or time by an. equitable adjustment,
No a4justinent will be made fior an. invalid protest,
I
K Contractor's DUtY 10 Coinp(�j�, Prolested Work. In spite of any protest, tile
Contractor shall proceed. promptly with the work.. as the City has ordered,
Contractor's Atang:,� ot'Cl--RI nu es. The Contractor accepts all. requirements
E4- -
of as change order by: (1) endorsing it, (2) writing as separate acceptance, or (3)
not protesting in the way this section provides. A change order that as accepted
by Contractor as provided in this section. shall constitute full payrnentnand final
settlement of all claims for contract time and for direct, indirect arad
consequential costs, including costs of delays related to any work, either
covered or affected by the change,
1). Failure to Protest Constitutes Waiv ' er '„ By not protesting as this section
provides,, the Contractor also waives any additional entitlement and accepts
from the City any written order (including directions, instruefions,
interpretations, and determination).
Failure to Follow ProceduresConstitutes Waiver, By failing to follow the
- — -------------
procedures of this section, the Contractor completely waives any claims for
protested work.. and accepts form. the City any written order (including
directions,, in.stnictions, interpretations, and determination),
8. CL,AIMS. The Contrac to r shall give written notice tot he City of al I c lairn s other th all.
change orders within fourteen. (14) calendar days of the occurrence of the events giving rise to the
claims., Any claim. for damages, additional payment for any reason, or extension. of time, whether
under this agreement or otherwise, shall be conclusively deenied to have been waived by the
Contractor unless as timely written clairn is made in strict accordance with the applicable provisions
of this agreement,'- or, if (and only if) no such. provision is applicable, unless that claim is set forth in
detail in writing and received by the City within seven (7) calendar days from tbe date (."ontra.etor
knew, or should have known, ofthe facts giving rise to the claim.. At as minimum, a Contractor's
written claity.r must include the information set forth regi.irding protests in Section. 7,.A,2,a, e.
Public t,Vqrkv Agreement (d)alye 9 oj'81 E� ,zv,'Nwk Suoranvaler (4qfall Emeqenc,'P, Beach Repeur
(beh'veen a rr -� Ps IncA
) ,, lo vember 20 7 1
'y ql"Brcrnerfon andScarvefla W
1, AILURE TO PROVIDII," A COMPLE'll,", WRITTEIN NO]IFICATION 01,' ("I'MIM
W1111 III Tll]," 11M]ALLOW],]) S11ALL Illi, AN ABSOLUTP'l WAIVE.R OFANY 1,AIMS
I I,J AIM, OR
ARISINGINANY WAY [TOM'11'111" FACT' OREVENTIS)
CAUSED 13Y THATDELAY,
Contractor must, in. any event, file ariy claim or bring any suit arising from or connected with
this agreement within 120 calendar days fron.i the date the contract ww ork.. is complete,.
ef.)
10. INDEMNIFICATION. Contractor shall. defend, indemnify and hold the City, its
officer, officials, employees, agents and volunteers harmless ftorn any and all claims, injuries,
damages, losses or suits including all legal costs and attorney fLes, arisin.g out of or in connection
with. the performance of this agreement, except for injuries and darnages caused by the City"s sole
n.egligence.
The City's inspection or acceptance of any of Contractor's wn rk.. when completed shall.n.ot be
grounds to avoid any of these covenants of indemnification.
Should a court of competent,jurisdiction determine that this agreement is subject to RCW
4,24A 15, then, in tla.e event of liability for damages arising out of bodily in J ury to persons or damages
to property caused by or resulting frons. the concurrent negligen.ce of tire Contractor and the City, its
officials, employees, agents and. volunteers, the Contractor's liability hereunder shal.1 be only to the
extent of the Contractor's negligence,
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
I1f° DENP41FICATION CONSTITUI TS THE CON' TRA(." TORIS WAIVER. OF IMMUNITY
UJ114DER JNDlJS'l'RlAJ
L NSLJRAN 51 TCW, SOL,ELY FOR. THE PURPOSE OF TIIIS
.... . . . ....
INDEMNIFK.,ATION, TIIE PARTIES ACKNOWL,ET)GE THAT THEY HAVE MUTUALLY
NE(IOTIATED THIS WAIVER.,
11. INSURANCE. The Contractor shall procure and maintain for the duration. of this
agreement insurance ofthe tyT,)es and in the aniounts described below against clahns for in.juries to
persons or damage to property which. may arise frown. or in connection with the perflormarwe of the
work by the Contractor, its agents, representative, employees, sub consultants or subcontractom.
I
Before beginning work, on the proJect described in Cothis agreement, the ntractor shall. provide
as Certificate ofInsurance evideri.cin&
. .. ........ .. ..... .
AIJI(2 p i i o hJlc, 1,, 1. i Iy ins ' iiraiic(lwiW.h.l�rrin
.it�s��)](,,ssih.an$].,000,0c(�)m
00bin(,;(I
_
single hi nit pcx accident for bodily inJury and property darnage; and
Public Works Agreement (1)(yle S of'[?) Eas t Park Slorm water Ouyjll Emergewy Beach Repair
(between Ciiy of Bremerton andScaryella Bros, Ino No vember 2017
2,1" Gcllwn'd L'kand � insurance written on an occurrence basis with
. . ....... . .. ...... - - _
firnits no less that.). $1,000,000 combined single limit per occurrence and.
$2,000,000 general aggregate for personal inJui--y, bodily nkury and property
damage,, Coverage shall include but not be linlited to: blanket contnactual;
products/completed operations/broad form property damage; explosion,
collapse arid underground (XCU) and employer's liability.,
Exce'ss Lialj it,y nce
1-__1 -11.1 1.1-111 11-11, ,,-!- insurance with limits not less than $ 1,000,000 per occury.e
and aggregate,,
Any payrnent of deductible or self-insured retention shall be the sole responsibility of the
(..'ontractor.
The City, its officials, employees, agents and volunteers shall be named as an additional
insured on. the insurance policy, as respects work performed by or on behalf of the Contractor and a.
copy, of the endorsement naming the City as additional insured small be attached to the Certificate of
Insurance.
The Contractor's insurance shall con tain. as clause stating that coverage shall apply
separately to each. insured against whom claim is made or suit is brought, except with respects to the
limits of the insurer's liability,
`.rhe Consultant's insurance shall be primary and non.contributory insurance as respects the
City and shall. contain as waiver of subrogation against the City for claims arising out of any, operations,
liabilities and obligations to which coverage applies. It stiall be an affirniative obligation upon
Consultant to advise the City's Risk.. Manager by fax at. (360) 471-5161, or by certified. mail, return
receipt requested to City of Bremerton, Attn.:: Risk.man.agement, 345 611 Street, Suite 600, Bremerton,
WA, 98337 within two days of fl,ii.e cancel lation., suspensi I on or substantive change of any insurance
policy set out herein., and f ailure to do so shall be con.strued to be a. breach. of this Agreement..
The City reserves the right to receive a certified copy of all the required insurance policies.
12 MISCE1,11LANEOUS.
A., N " o " n " 0 " i scriminatiori. In. the hiring of employees for the performance of work..
um
under this Agreeent or any sub -contracthereunder, t1te Contractor, its sub -contractors, or any person
acting on behalf of such. Contractor or sub contractor shall not, by reason of race, religion., color, sex,
national origin, or the presence of any sensory, mental, physical disability-, or sexual orientation
discriminate again.st any person who is qualified. and available to perform. the work. to which the
employnientrelates.
B. Cmlpi is yjaqu Laws, Contractor shall comply with all. federal, state and
local laws, rules and regulations throughout every, aspect in the performance of this agreement.
Cl. W "ork I Perfi? r rri e( I z.11 Q o j.] ( ra (:.�to r '...s Risk. Contrador shall. take all precautions
ncces)sary and shall. be r(,*;ponsib1(:1 for the saftty of 4s (,�rnployees, agents, and subcontractors in the
perf6rimance ofthis, agr(,:ern(,,.nt. All workshall. be dorteat Contracl or's own risk, and Contractorshall
Public Works Agreement (wqoe 6 of 13) East ParkSlorm water Otqli.ill Emergency Beach Repair
(between Oly (?/ Bremerton and Scursella Bros. Im.) November 2017
be responsjble f6r any loss, ofor daniage, to malerials, toohi, or oil -ter arti(des used or Iteld fbr use in
connection Mth the work,
,DNonwaiv - e - r - of -- Br - eac her- I , i ,, The failure of the City to insist upon strict performance
of any of the terrils and rights contained ein, or to exercise any option herein conferiw] in one or
more instances, shall not be co.instructed to be a waiver or relinquishment of those terms and. rights
and they shall remain in full force and effect
E. vcrno t, ui\v'rhis agreement shall be governed and construed in
accordance with. the laws ofthe State of Washington, It'any dispute arises between. the City and
. lontractor under any of the provisions of this agreement, resolUti011 of that dispute shall be available
only through the jurisdictiort, venue and ru.les of the Kitsap County Superior Court, Kitsap County,
Washington.
R AIAOIIIJ)Igy"fir ,o�o ., To the extent not inconsistent with RC W 39.,04.240., in. any
clairn or lawsuit for daniages arising from the parties' pertbrirtance of this agreement, each party shall
be responsible for payment of its own legal costs and attorney's fees incurred in defending or bringing
such claim or lawsuit; however, nothing in this subsection. shall limit the City's right to
indemnification under Section 10 of this agreement.
G. Writ ' ten N( ' fi ce ., All cornmunications regarding this agreemerit shall be sent t
the parties at the addresses listed oil the signature page of this agreernent, unless otherwise notified.,
Any written notice shall become effective upon delivery, but in any event three (3) calendar days after
the date of mailing by registered or certi fied.mail, and shall be deem.ed sufficiently given if sent to
the addressee at the address stated on this agreement.,
H.- Asj i aej t., Any assignment of this agreement by the Contractor without the
written. consent of the City shall. be void.
I M(:)d4wation. No waiver, alteration, or modification of ano�f
y the pron
visios
................ - "
of this agmen
reet shall be binding unless in writing and signed. by a (July authorized representative of
the . lity and Contractor,
J., ., Severabilit_Y If ano
y nor m
e ore sections, sub -section, or sentences of this
......... . . — -----
agreement are held to be unconstitutional or invalid, that decision sliallnot affect the validity, of the
rernaini.ng portion of this agreetiaent and the rernainder shall remain. in full force and effect.,
K. Entire Agreg The written provisions and terms of this agreen'tent,
together with any attached Exhibits, supersede all prior verbal staternents by any representative of the
City, and those statements shall not be construed as forming a part of or altering in. any manner this
agreement. "'tris agreement and any attached Exhibits contain the entire agreement between the
parties., Should. anylanguage in any.Exhibit to this agreement conflict with any language contained
in this agreement, the terms of this agreement sh.a.11 prevail.
Public Works Agreement (1)(�oe 7 of 8) East Park,S'lormwater Oufull Emcrgency Beach Repair
(beh4leen City q)'Bremerfon andScarvella Brav, hn) November 2017
IN WITNESS WHEREOF, the parties below have executed this agreement..
Scarsella Bros. Inc
License # C 8111,;1;
UBI #:a ��1m
(Sip��m°�r.,�
Printed Name)
Title:V1..... �� ...
Date: L?.',
Notices to be sent to:
P.O. Box 68697
Seattle, WA 98168-0697
APPROVED AS TO FORM:
�...- .._ .. .... ......... m.
Bremerton City rney
Attachments:
The City of Bremerton
mA11-
.. ..... . .. ........ . .
(Signature)
..
...Pnnted... ..._..� .e.m� ..,_
( Name)
Title:, ....� �. "-.. _............__-..._,m.
?10
Date:....... ..... ,gym.....-... 7
Notices to be sent to:
345 Sixth Street
Suite 600
Bremerton, WA 98310
ATTEST:
. .......... — .........
Bremerton City Clerk
Appendix A - Kitsap County Prevailing Wage Rates
Appendix B - Agency Permits and City Resolution
AppendixC. - Construction Forms
Appendix -P -Construction Plans
Public Works Agreement (page 8 of 8) East Park Stormwater Outfall Emergency Beach Repair
(between City of Bremerton and Scarsella Bros. Inc) November 2017
EvoilixMil MIT
KITSAP COUNTY PREVAILING WAGE RATES
THIS PAGE LEFT INTENTIONALLY BLANK
11/17/2017 abouttlank
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe
benefits. On public works projects, worker's wage and benefit rates must add to not less than this
total. A brief description of overtime calculation requirements are provided on the Benefit Code
Key.
Journey Level Prevailing Wage Rates for the Effective Date: 11 /22/2017
County
Trade
Job Classification
Wage
HolidayOvertime Note
Kitsap
Asbestos Abatement Workers
Journey Level
$46.57
5D
1 H
Kitsap
Boilermakers
Journey Level
$30.34
1
Kitsap
Brick Mason
Journey Level
$55.82
5A
1 M
Kitsap
Brick Mason
Pointer -Caulker -Cleaner
$55.82
5A
1M
Kitsap
Building Service Employees
Janitor
$11.00
1
Kitsap
Building Service Employees
Shampooer
$11.00
1
Kitsap
Building Service Employees
Waxer
$11.00
1
Kitsap
Building Service Employees
Window Cleaner
$13.22
1
Kitsap
Cabinet Makers (In Shop)
Journey Level
$23.72
1
Kitsap
Carpenters
Acoustical Worker
$57.18
5D
4C
Kitsap
Carpenters
Bridge, Dock And Wharf
$57.18
5D
4C
Carpenters
Kitsap
Carpenters
Carpenter
$57.18
5D
4C
Kitsap
Carpenters
Carpenters on Stationary Tools
$57.31
5D
4C
Kitsap
Carpenters
Creosoted Material
$57.28
5D
4C
Kitsap
Carpenters
Floor Finisher
$57.18
5D
4C
Kitsap
Carpenters
Floor Layer
$57.18
5D
4C
Kitsap
Carpenters
Scaffold Erector
$57.18
5D
4C
Kitsap
Cement Masons
Journey Level
$57.21
7A
1M
Kitsap
Divers Et Tenders
Bell/Vehicle or Submersible
$110.54
5D
4C
Operator (Not Under Pressure)
Kitsap
Divers Et Tenders
Dive Supervisor/Master
$72.97
5D
4C
Kitsap
Divers Et Tenders
Diver
$110.54
5D
4C 8V
Kitsap
Divers Et Tenders
Diver On Standby
$67.97
5D
4C
Kitsap
Divers Et Tenders
Diver Tender
$61.65
5D
4C
Kitsap
Divers Et Tenders
Manifold Operator
$61.65
5D
4C
Kitsap
Divers Et Tenders
Manifold Operator Mixed Gas
$66.65
5D
4C
Kitsap
Divers Et Tenders
Remote Operated Vehicle
$61.65
5D
4C
Operator/Technician
Kitsap
Divers Et Tenders
Remote Operated Vehicle Tender
$57.43
5A
4C
Kitsap
Dredge Workers
Assistant Engineer
$56.44
5D
3F
Kitsap
Dredge Workers
Assistant Mate (Deckhand)
$56.00
5D
3F
abouttlank
1/16
11/17/2017
abouttlank
Kitsap
Dredge Workers
Boatmen
$56.44
5D
3F
Kitsap
Dredge Workers
Engineer Welder
$57.51
5D
3F
Kitsap
Dredge Workers
Leverman, Hydraulic
$58.67
5D
3F
Kitsap
Dredge Workers
Mates
$56.44
5D
3F
Kitsap
Dredge Workers
Oiler
$56.00
5D
3F
Kitsap
Drywall Applicator
Journey Level
$56.78
5D
1 H
Kitsap
Drywall Tapers
Journey Level
$57.43
5P
1E
Kitsap
Electrical Fixture Maintenance
Journey Level
$31.74
1
Workers
Kitsap
Electricians - Inside
Journey Level
$51.26
1
Kitsap
Electricians - Motor Shop
Craftsman
$15.37
1
Kitsap
Electricians - Motor Shop
Journey Level
$14.69
1
Kitsap
Electricians - Powerline
Cable Splicer
$73.93
5A
4D
Construction
Kitsap
Electricians - Powerline
Certified Line Welder
$67.60
5A
4D
Construction
Kitsap
Electricians - Powerline
Groundperson
$45.49
5A
4D
Construction
Kitsap
Electricians - Powerline
Heavy Line Equipment Operator
$67.60
5A
4D
Construction
Kitsap
Electricians - Powerline
Journey Level Lineperson
$67.60
5A
4D
Construction
Kitsap
Electricians - Powerline
Line Equipment Operator
$57.02
5A
4D
Construction
Kitsap
Electricians - Powerline
Pole Sprayer
$67.60
5A
4D
Construction
Kitsap
Electricians - Powerline
Powderperson
$50.76
5A
4D
Construction
Kitsap
Electronic Technicians
Journey Level
$45.26
7E
1 D
Kitsap
Elevator Constructors
Mechanic
$90.39
7D
4A
Kitsap
Elevator Constructors
Mechanic In Charge
$100.22
7D
4A
Kitsap
Fabricated Precast Concrete
Journey Level - In -Factory Work
$13.50
1
Products
Only
Kitsap
Fence Erectors
Fence Erector
$13.80
1
Kitsap
Fence Erectors
Fence Laborer
$11.60
1
Kitsap
Flaggers
Journey Level
$39.48
7A
31
Kitsap
Glaziers
Journey Level
$60.56
7L
1y
Kitsap
Heat Et Frost Insulators And
Journeyman
$67.93
5.1
4H
Asbestos Workers
Kitsap
Heating Equipment Mechanics
Journey Level
$78.17
7F
1E
Kitsap
Hod Carriers Et Mason Tenders
Journey Level
$48.02
7A
31
Kitsap
Industrial Power Vacuum Cleaner
Journey Level
$29.89
1
Kitsap
Inland Boatmen
Boat Operator
$59.86
5B
1 K
Kitsap
Inland Boatmen
Cook
$56.18
5B
1K
Kitsap
Inland Boatmen
Deckhand
$56.18
5B
1K
Kitsap
Inland Boatmen
Deckhand Engineer
$57.26
5B
1K
Kitsap
Inland Boatmen
Launch Operator
$58.59
5B
1K
Kitsap
Inland Boatmen
Mate
$58.59
5B
1K
Kitsap
Inspection/Cleaning/Sealing Of
Cleaner Operator, Foamer
$11.00
1
abouttlank
2/16
11/17/2017
abouttlank
Sewer Et Water Systems By
Operator
Remote Control
Kitsap
Inspection/Cleaning/Sealing Of
Grout Truck Operator
$11.48
1
Sewer Et Water Systems By
Remote Control
Kitsap
Inspection/Cleaning/Sealing Of
Head Operator
$12.78
1
Sewer Et Water Systems By
Remote Control
Kitsap
Inspection/Cleaning/Sealing Of
Tv Truck Operator
$24.17
1
Sewer Et Water Systems By
Remote Control
Kitsap
Insulation Applicators
Journey Level
$57.18
5D
4C
Kitsap
Ironworkers
Journeyman
$66.68
7N
10
Kitsap
Laborers
Air, Gas Or Electric Vibrating
$46.57
7A
31
Screed
Kitsap
Laborers
Airtrac Drill Operator
$48.02
7A
31
Kitsap
Laborers
Ballast Regular Machine
$46.57
7A
31
Kitsap
Laborers
Batch Weighman
$39.48
7A
31
Kitsap
Laborers
Brick Pavers
$46.57
7A
31
Kitsap
Laborers
Brush Cutter
$46.57
7A
31
Kitsap
Laborers
Brush Hog Feeder
$46.57
7A
31
Kitsap
Laborers
Burner
$46.57
7A
31
Kitsap
Laborers
Caisson Worker
$48.02
7A
31
Kitsap
Laborers
Carpenter Tender
$46.57
7A
31
Kitsap
Laborers
Caulker
$46.57
7A
31
Kitsap
Laborers
Cement Dumper -paving
$47.44
7A
31
Kitsap
Laborers
Cement Finisher Tender
$46.57
7A
31
Kitsap
Laborers
Change House Or Dry Shack
$46.57
7A
31
Kitsap
Laborers
Chipping Gun (under 30 Lbs.)
$46.57
7A
31
Kitsap
Laborers
Chipping Gun(30 Lbs. And Over)
$47.44
7A
31
Kitsap
Laborers
Choker Setter
$46.57
7A
31
Kitsap
Laborers
Chuck Tender
$46.57
7A
31
Kitsap
Laborers
Clary Power Spreader
$47.44
7A
31
Kitsap
Laborers
Clean-up Laborer
$46.57
7A
31
Kitsap
Laborers
Concrete Dumper/chute Operator
$47.44
7A
31
Kitsap
Laborers
Concrete Form Stripper
$46.57
7A
31
Kitsap
Laborers
Concrete Placement Crew
$47.44
7A
31
Kitsap
Laborers
Concrete Saw Operator/core
$47.44
7A
31
Driller
Kitsap
Laborers
Crusher Feeder
$39.48
7A
31
Kitsap
Laborers
Curing Laborer
$46.57
7A
31
Kitsap
Laborers
Demolition: Wrecking Et Moving
$46.57
7A
31
(incl. Charred Material)
Kitsap
Laborers
Ditch Digger
$46.57
7A
31
Kitsap
Laborers
Diver
$48.02
7A
31
Kitsap
Laborers
Drill Operator
$47.44
7A
31
(hydraulic, diamond)
Kitsap
Laborers
Dry Stack Walls
$46.57
7A
31
Kitsap
Laborers
Dump Person
$46.57
7A
31
abouttlank
3/16
11/17/2017
abouttlank
Kitsap
Laborers
Epoxy Technician
$46.57
7A
31
Kitsap
Laborers
Erosion Control Worker
$46.57
7A
31
Kitsap
Laborers
Faller Et Bucker Chain Saw
$47.44
7A
31
Kitsap
Laborers
Fine Graders
$46.57
7A
31
Kitsap
Laborers
Firewatch
$39.48
7A
31
Kitsap
Laborers
Form Setter
$46.57
7A
31
Kitsap
Laborers
Gabian Basket Builders
$46.57
7A
31
Kitsap
Laborers
General Laborer
$46.57
7A
31
Kitsap
Laborers
Grade Checker Et Transit Person
$48.02
7A
31
Kitsap
Laborers
Grinders
$46.57
7A
31
Kitsap
Laborers
Grout Machine Tender
$46.57
7A
31
Kitsap
Laborers
Groutmen (pressure) including
$47.44
7A
31
Post Tension Beams
Kitsap
Laborers
Guardrail Erector
$46.57
7A
31
Kitsap
Laborers
Hazardous Waste Worker (level A)
$48.02
7A
31
Kitsap
Laborers
Hazardous Waste Worker (level B)
$47.44
7A
31
Kitsap
Laborers
Hazardous Waste Worker (level C)
$46.57
7A
31
Kitsap
Laborers
High Scaler
$48.02
7A
31
Kitsap
Laborers
Jackhammer
$47.44
7A
31
Kitsap
Laborers
Laserbeam Operator
$47.44
7A
31
Kitsap
Laborers
Maintenance Person
$46.57
7A
31
Kitsap
Laborers
Manhole Builder-mudman
$47.44
7A
31
Kitsap
Laborers
Material Yard Person
$46.57
7A
31
Kitsap
Laborers
Motorman -dinky Locomotive
$47.44
7A
31
Kitsap
Laborers
Nozzleman (concrete Pump,
$47.44
7A
31
Green Cutter When Using
Combination Of High Pressure Air
Et Water On Concrete Et Rock,
Sandblast, Gunite, Shotcrete,
Water Bla
Kitsap
Laborers
Pavement Breaker
$47.44
7A
31
Kitsap
Laborers
Pilot Car
$39.48
7A
31
Kitsap
Laborers
Pipe Layer Lead
$48.02
7A
31
Kitsap
Laborers
Pipe Layer/tailor
$47.44
7A
31
Kitsap
Laborers
Pipe Pot Tender
$47.44
7A
31
Kitsap
Laborers
Pipe Reliner
$47.44
7A
31
Kitsap
Laborers
Pipe Wrapper
$47.44
7A
31
Kitsap
Laborers
Pot Tender
$46.57
7A
31
Kitsap
Laborers
Powderman
$48.02
7A
31
Kitsap
Laborers
Powderman's Helper
$46.57
7A
31
Kitsap
Laborers
Power Jacks
$47.44
7A
31
Kitsap
Laborers
Railroad Spike Puller - Power
$47.44
7A
31
Kitsap
Laborers
Raker - Asphalt
$48.02
7A
31
Kitsap
Laborers
Re-timberman
$48.02
7A
31
Kitsap
Laborers
Remote Equipment Operator
$47.44
7A
31
Kitsap
Laborers
Rigger/signal Person
$47.44
7A
31
Kitsap
Laborers
Rip Rap Person
$46.57
7A
31
Kitsap
Laborers
Rivet Buster
$47.44
7A
31
abouttlank
4/16
11/17/2017
abouttlank
Kitsap
Laborers
Rodder
$47.44
7A
31
Kitsap
Laborers
Scaffold Erector
$46.57
7A
31
Kitsap
Laborers
Scale Person
$46.57
7A
31
Kitsap
Laborers
Sloper (over 20")
$47.44
7A
31
Kitsap
Laborers
Sloper Sprayer
$46.57
7A
31
Kitsap
Laborers
Spreader (concrete)
$47.44
7A
31
Kitsap
Laborers
Stake Hopper
$46.57
7A
31
Kitsap
Laborers
Stock Piler
$46.57
7A
31
Kitsap
Laborers
Tamper Et Similar Electric, Air Et
$47.44
7A
31
Gas Operated Tools
Kitsap
Laborers
Tamper (multiple Et Self-
$47.44
7A
31
propelled)
Kitsap
Laborers
Timber Person- Sewer (lagger,
$47.44
7A
31
Shorer Et Cribber)
Kitsap
Laborers
Toolroom Person (at Jobsite)
$46.57
7A
31
Kitsap
Laborers
Topper
$46.57
7A
31
Kitsap
Laborers
Track Laborer
$46.57
7A
31
Kitsap
Laborers
Track Liner (power)
$47.44
7A
31
Kitsap
Laborers
Traffic Control Laborer
$42.22
7A
31
8R
Kitsap
Laborers
Traffic Control Supervisor
$42.22
7A
31
8R
Kitsap
Laborers
Truck Spotter
$46.57
7A
31
Kitsap
Laborers
Tugger Operator
$47.44
7A
31
Kitsap
Laborers
Tunnel Work -Compressed Air
$92.60
7A
31
80
Worker 0-30 psi
Kitsap
Laborers
Tunnel Work -Compressed Air
$97.63
7A
31
80
Worker 30.01-44.00 psi
Kitsap
Laborers
Tunnel Work -Compressed Air
$101.31
7A
31
80
Worker 44.01-54.00 psi
Kitsap
Laborers
Tunnel Work -Compressed Air
$107.01
7A
31
80
Worker 54.01-60.00 psi
Kitsap
Laborers
Tunnel Work -Compressed Air
$109.13
7A
31
80
Worker 60.01-64.00 psi
Kitsap
Laborers
Tunnel Work -Compressed Air
$114.23
7A
31
80
Worker 64.01-68.00 psi
Kitsap
Laborers
Tunnel Work -Compressed Air
$116.13
7A
31
80
Worker 68.01-70.00 psi
Kitsap
Laborers
Tunnel Work -Compressed Air
$118.13
7A
31
88
Worker 70.01-72.00 psi
Kitsap
Laborers
Tunnel Work -Compressed Air
$120.13
7A
31
80
Worker 72.01-74.00 psi
Kitsap
Laborers
Tunnel Work-Guage and Lock
$48.12
7A
31
80
Tender
Kitsap
Laborers
Tunnel Work -Miner
$48.12
7A
31
80
Kitsap
Laborers
Vibrator
$47.44
7A
31
Kitsap
Laborers
Vinyl Seamer
$46.57
7A
31
Kitsap
Laborers
Watchman
$35.88
7A
31
Kitsap
Laborers
Welder
$47.44
7A
31
Kitsap
Laborers
Well Point Laborer
$47.44
7A
31
Kitsap
Laborers
Window Washer/cleaner
$35.88
7A
31
Kitsap
Laborers - Underground Sewer Et
General Laborer Et Topman
$46.57
7A
31
abouttlank
5/16
11/17/2017
abouttlank
Water
Kitsap
Laborers - Underground Sewer Et
Pipe Layer
$47.44
7A
31
Water
Kitsap
Landscape Construction
Irrigation Or Lawn Sprinkler
$11.00
1
Installers
Kitsap
Landscape Construction
Landscape Equipment Operators
$11.00
1
Or Truck Drivers
Kitsap
Landscape Construction
Landscaping Or Planting Laborers
$12.92
1
Kitsap
Lathers
JOURNEY LEVEL
$21.00
1
Kitsap
Marble Setters
Journey Level
$55.82
5A
1M
Kitsap
Metal Fabrication (In Shop)
Fitter
$26.96
1
Kitsap
Metal Fabrication (In Shop)
Laborer
$11.00
1
Kitsap
Metal Fabrication (In Shop)
Machine Operator
$13.83
1
Kitsap
Metal Fabrication (In Shop)
Welder
$13.83
1
Kitsap
Millwright
Journey Level
$44.89
1
Kitsap
Modular Buildings
Cabinet Assembly
$11.56
1
Kitsap
Modular Buildings
Electrician
$11.56
1
Kitsap
Modular Buildings
Equipment Maintenance
$11.56
1
Kitsap
Modular Buildings
Plumber
$11.56
1
Kitsap
Modular Buildings
Production Worker
$11.00
1
Kitsap
Modular Buildings
Tool Maintenance
$11.56
1
Kitsap
Modular Buildings
Utility Person
$11.56
1
Kitsap
Modular Buildings
Welder
$11.56
1
Kitsap
Painters
Journey Level
$41.60
6Z
2B
Kitsap
Pile Driver
Crew Tender
$52.37
5D
4C
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$71.35
5D
4C
Air Worker 0-30.00 PSI
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$76.35
5D
4C
Air Worker 30.01 - 44.00 PSI
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$80.35
5D
4C
Air Worker 44.01 - 54.00 PSI
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$85.35
5D
4C
Air Worker 54.01 - 60.00 PSI
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$87.85
5D
4C
Air Worker 60.01 - 64.00 PSI
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$92.85
5D
4C
Air Worker 64.01 - 68.00 PSI
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$94.85
5D
4C
Air Worker 68.01 - 70.00 PSI
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$96.85
5D
4C
Air Worker 70.01 - 72.00 PSI
Kitsap
Pile Driver
Hyperbaric Worker - Compressed
$98.85
5D
4C
Air Worker 72.01 - 74.00 PSI
Kitsap
Pile Driver
Journey Level
$57.43
5D
4C
Kitsap
Plasterers
Journey Level
$54.89
7Q
JR
Kitsap
Playground Et Park Equipment
Journey Level
$11.00
1
Installers
Kitsap
Plumbers Et Pipefitters
Journey Level
$67.47
5A
1G
Kitsap
Power Equipment Operators
Asphalt Plant Operators
$60.49
7A
3C 8P
Kitsap
Power Equipment Operators
Assistant Engineer
$56.90
7A
3C 8P
abouttlank
6/16
11/17/2017
abouttlank
Kitsap
Power Equipment
Operators
Barrier Machine (zipper)
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Batch Plant Operator, Concrete
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Bobcat
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Brokk - Remote Demolition
$56.90
7A
3C
8P
Equipment
Kitsap
Power Equipment
Operators
Brooms
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Bump Cutter
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Cableways
$60.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Chipper
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Compressor
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Concrete Pump: Truck Mount
$60.49
7A
3C
8P
With Boom Attachment Over 42 M'
Kitsap
Power Equipment
Operators
Concrete Finish Machine -laser
$56.90
7A
3C
8P
Screed
Kitsap
Power Equipment
Operators
Concrete Pump - Mounted Or
$59.49
7A
3C
8P
Trailer High Pressure Line Pump,
Pump High Pressure.
Kitsap
Power Equipment
Operators
Concrete Pump: Truck Mount
$59.96
7A
3C
8P
With Boom Attachment Up To
42m
Kitsap
Power Equipment
Operators
Conveyors
$59.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Cranes Friction: 200 tons and
$62.33
7A
3C
8P
over
Kitsap
Power Equipment
Operators
Cranes: 20 Tons Through 44 Tons
$59.96
7A
3C
8P
With Attachments
Kitsap
Power Equipment
Operators
Cranes: 100 Tons Through 199
$61.10
7A
3C
8P
Tons, Or 150' Of Boom (Including
Jib With Attachments)
Kitsap
Power Equipment
Operators
Cranes: 200 tons- 299 tons, or
$61.72
7A
3C
8P
250' of boom including jib with
attachments
Kitsap
Power Equipment
Operators
Cranes: 300 tons and over or 300'
$62.33
7A
3C
8P
of boom including jib with
attachments
Kitsap
Power Equipment
Operators
Cranes: 45 Tons Through 99 Tons,
$60.49
7A
3C
8P
Under 150' Of Boom (including Jib
With Attachments)
Kitsap
Power Equipment
Operators
Cranes: A-frame - 10 Tons And
$56.90
7A
3C
8P
Under
Kitsap
Power Equipment
Operators
Cranes: Friction cranes through
$61.72
7A
3C
8P
199 tons
Kitsap
Power Equipment
Operators
Cranes: Through 19 Tons With
$59.49
7A
3C
8P
Attachments A-frame Over 10
Tons
Kitsap
Power Equipment
Operators
Crusher
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Deck Engineer/deck Winches
$59.96
7A
3C
8P
(Power)
Kitsap
Power Equipment
Operators
Derricks, On Building Work
$60.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Dozers D-9 Et Under
$59.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Drill Oilers: Auger Type, Truck Or
$59.49
7A
3C
8P
Crane Mount
Kitsap
Power Equipment
Operators
Drilling Machine
$61.10
7A
3C
8P
abouttlank
7/16
11/17/2017
abouttlank
Kitsap
Power Equipment
Operators
Elevator And Man-lift: Permanent
$56.90
7A
3C
8P
And Shaft Type
Kitsap
Power Equipment
Operators
Finishing Machine, Bidwell And
$59.96
7A
3C
8P
Gamaco Et Similar Equipment
Kitsap
Power Equipment
Operators
Forklift: 3000 Lbs And Over With
$59.49
7A
3C
8P
Attachments
Kitsap
Power Equipment
Operators
Forklifts: Under 3000 Lbs. With
$56.90
7A
3C
8P
Attachments
Kitsap
Power Equipment
Operators
Grade Engineer: Using Blue
$59.96
7A
3C
8P
Prints, Cut Sheets, Etc
Kitsap
Power Equipment
Operators
Gradechecker/stakeman
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Guardrail Punch
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Hard Tail End Dump Articulating
$60.49
7A
3C
8P
Off- Road Equipment 45 Yards. Et
OVer
Kitsap
Power Equipment
Operators
Hard Tail End Dump Articulating
$59.96
7A
3C
8P
Off-road Equipment Under 45
Yards
Kitsap
Power Equipment
Operators
Horizontal/ directional Drill
$59.49
7A
3C
8P
Locator
Kitsap
Power Equipment
Operators
Horizontal/ directional Drill
$59.96
7A
3C
8P
Operator
Kitsap
Power Equipment
Operators
Hydralifts/boom Trucks Over 10
$59.49
7A
3C
8P
Tons
Kitsap
Power Equipment
Operators
Hydralifts/boom Trucks, 10 Tons
$56.90
7A
3C
8P
And Under
Kitsap
Power Equipment
Operators
Loader, Overhead 8 Yards. Et
$61.10
7A
3C
8P
Over
Kitsap
Power Equipment
Operators
Loader, Overhead, 6 Yards. But
$60.49
7A
3C
8P
Not Including 8 Yards
Kitsap
Power Equipment
Operators
Loaders, Overhead Under 6 Yards
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Loaders, Plant Feed
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Loaders: Elevating Type Belt
$59.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Locomotives, All
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Material Transfer Device
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Mechanics, All (leadmen - $0.50
$61.10
7A
3C
8P
Per Hour Over Mechanic)
Kitsap
Power Equipment
Operators
Motor Patrol Graders
$60.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Mucking Machine, Mole, Tunnel
$60.49
7A
3C
8P
Drill, Boring, Road Header And/or'
Shield
Kitsap
Power Equipment
Operators
Oil Distributors, Blower
$56.90
7A
3C
8P
Distribution Et Mulch Seeding
Operator
Kitsap
Power Equipment
Operators
Outside Hoists (elevators And
$59.49
7A
3C
8P
Manlifts), Air Tuggers,strato
Kitsap
Power Equipment
Operators
Overhead, Bridge Type Crane: 20
$59.96
7A
3C
8P
Tons Through 44 Tons
Kitsap
Power Equipment
Operators
Overhead, Bridge Type: 100 Tons
$61.10
7A
3C
8P
And Over
Kitsap
Power Equipment
Operators
Overhead, Bridge Type: 45 Tons
$60.49
7A
3C
8P
Through 99 Tons
abouttlank
8/16
11/17/2017
abouttlank
Kitsap
Power Equipment
Operators
Pavement Breaker
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Pile Driver (other Than Crane
$59.96
7A
3C
8P
Mount)
Kitsap
Power Equipment
Operators
Plant Oiler - Asphalt, Crusher
$59.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Posthole Digger, Mechanical
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Power Plant
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Pumps - Water
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Quad 9, Hd 41, D10 And Over
$60.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Quick Tower - No Cab, Under 100
$56.90
7A
3C
8P
Feet In Height Based To Boom
Kitsap
Power Equipment
Operators
Remote Control Operator On
$60.49
7A
3C
8P
Rubber Tired Earth Moving
Equipment
Kitsap
Power Equipment
Operators
Rigger And Bellman
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Rigger/Signal Person, Bellman
$59.49
7A
3C
8P
(Certified)
Kitsap
Power Equipment
Operators
Rollagon
$60.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Roller, Other Than Plant Mix
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Roller, Plant Mix Or Multi-lift
$59.49
7A
3C
8P
Materials
Kitsap
Power Equipment
Operators
Roto-mill, Roto-grinder
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Saws - Concrete
$59.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Scraper, Self Propelled Under 45
$59.96
7A
3C
8P
Yards
Kitsap
Power Equipment
Operators
Scrapers - Concrete Et Carry All
$59.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Scrapers, Self-propelled: 45 Yards
$60.49
7A
3C
8P
And Over
Kitsap
Power Equipment
Operators
Service Engineers - Equipment
$59.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Shotcrete/gunite Equipment
$56.90
7A
3C
8P
Kitsap
Power Equipment
Operators
Shovel , Excavator, Backhoe,
$59.49
7A
3C
8P
Tractors Under 15 Metric Tons.
Kitsap
Power Equipment
Operators
Shovel, Excavator, Backhoe: Over
$60.49
7A
3C
8P
30 Metric Tons To 50 Metric Tons
Kitsap
Power Equipment
Operators
Shovel, Excavator, Backhoes,
$59.96
7A
3C
8P
Tractors: 15 To 30 Metric Tons
Kitsap
Power Equipment
Operators
Shovel, Excavator, Backhoes:
$61.10
7A
3C
8P
Over 50 Metric Tons To 90 Metric
Tons
Kitsap
Power Equipment
Operators
Shovel, Excavator, Backhoes:
$61.72
7A
3C
8P
Over 90 Metric Tons
Kitsap
Power Equipment
Operators
Slipform Pavers
$60.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Spreader, Topsider Et Screedman
$60.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Subgrader Trimmer
$59.96
7A
3C
8P
Kitsap
Power Equipment
Operators
Tower Bucket Elevators
$59.49
7A
3C
8P
Kitsap
Power Equipment
Operators
Tower Crane Up To 175' In Height
$61.10
7A
3C
8P
Base To Boom
Kitsap
Power Equipment
Operators
Tower Crane: over 175' through
$61.72
7A
3C
8P
250' in height, base to boom
Kitsap
Power Equipment
Operators
Tower Cranes: over 250' in height
$62.33
7A
3C
8P
from base to boom
abouttlank
9/16
11/17/2017
abouttlank
Kitsap
Power Equipment Operators
Transporters, All Track Or Truck
$60.49
7A
3C
8P
Type
Kitsap
Power Equipment Operators
Trenching Machines
$59.49
7A
3C
8P
Kitsap
Power Equipment Operators
Truck Crane Oiler/driver - 100
$59.96
7A
3C
8P
Tons And Over
Kitsap
Power Equipment Operators
Truck Crane Oiler/driver Under
$59.49
7A
3C
8P
100 Tons
Kitsap
Power Equipment Operators
Truck Mount Portable Conveyor
$59.96
7A
3C
8P
Kitsap
Power Equipment Operators
Welder
$60.49
7A
3C
8P
Kitsap
Power Equipment Operators
Wheel Tractors, Farmall Type
$56.90
7A
3C
8P
Kitsap
Power Equipment Operators
Yo Yo Pay Dozer
$59.96
7A
3C
8P
Kitsap
Power Equipment Operators-
Asphalt Plant Operators
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Assistant Engineer
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Barrier Machine (zipper)
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Batch Plant Operator, Concrete
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Bobcat
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Brokk -Remote Demolition
$56.90
7A
3C
8P
Underground Sewer Et Water
Equipment
Kitsap
Power Equipment Operators-
Brooms
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Bump Cutter
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Cableways
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Chipper
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Compressor
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Concrete Pump: Truck Mount
$60.49
7A
3C
8P
Underground Sewer Et Water
With Boom Attachment Over 42 M
Kitsap
Power Equipment Operators-
Concrete Finish Machine -laser
$56.90
7A
3C
8P
Underground Sewer Et Water
Screed
Kitsap
Power Equipment Operators-
Concrete Pump - Mounted Or
$59.49
7A
3C
8P
Underground Sewer Et Water
Trailer High Pressure Line Pump,
Pump High Pressure.
Kitsap
Power Equipment Operators-
Concrete Pump: Truck Mount
$59.96
7A
3C
8P
Underground Sewer Et Water
With Boom Attachment Up To
42m
Kitsap
Power Equipment Operators-
Conveyors
$59.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Cranes Friction: 200 tons and
$62.33
7A
3C
8P
Underground Sewer Et Water
over
Kitsap
Power Equipment Operators-
Cranes: 20 Tons Through 44 Tons
$59.96
7A
3C
8P
Underground Sewer Et Water
With Attachments
Kitsap
Power Equipment Operators-
Cranes: 100 Tons Through 199
$61.10
7A
3C
8P
Underground Sewer Et Water
Tons, Or 150' Of Boom (Including
Jib With Attachments)
abouttlank
10/16
11/17/2017
abouttlank
Kitsap
Power Equipment Operators-
Cranes: 200 tons- 299 tons, or
$61.72
7A
3C
8P
Underground Sewer Et Water
250' of boom including jib with
attachments
Kitsap
Power Equipment Operators-
Cranes: 300 tons and over or 300'
$62.33
7A
3C
8P
Underground Sewer Et Water
of boom including jib with
attachments
Kitsap
Power Equipment Operators-
Cranes: 45 Tons Through 99 Tons,
$60.49
7A
3C
8P
Underground Sewer Et Water
Under 150' Of Boom (including Jib
With Attachments)
Kitsap
Power Equipment Operators-
Cranes: A-frame - 10 Tons And
$56.90
7A
3C
8P
Underground Sewer Et Water
Under
Kitsap
Power Equipment Operators-
Cranes: Friction cranes through
$61.72
7A
3C
8P
Underground Sewer Et Water
199 tons
Kitsap
Power Equipment Operators-
Cranes: Through 19 Tons With
$59.49
7A
3C
8P
Underground Sewer Et Water
Attachments A-frame Over 10
Tons
Kitsap
Power Equipment Operators-
Crusher
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Deck Engineer/deck Winches
$59.96
7A
3C
8P
Underground Sewer Et Water
(power)
Kitsap
Power Equipment Operators-
Derricks, On Building Work
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Dozers D-9 Et Under
$59.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Drill Oilers: Auger Type, Truck Or
$59.49
7A
3C
8P
Underground Sewer Et Water
Crane Mount
Kitsap
Power Equipment Operators-
Drilling Machine
$61.10
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Elevator And Man-lift: Permanent
$56.90
7A
3C
8P
Underground Sewer Et Water
And Shaft Type
Kitsap
Power Equipment Operators-
Finishing Machine, Bidwell And
$59.96
7A
3C
8P
Underground Sewer Et Water
Gamaco Et Similar Equipment
Kitsap
Power Equipment Operators-
Forklift: 3000 Lbs And Over With
$59.49
7A
3C
8P
Underground Sewer Et Water
Attachments
Kitsap
Power Equipment Operators-
Forklifts: Under 3000 Lbs. With
$56.90
7A
3C
8P
Underground Sewer Et Water
Attachments
Kitsap
Power Equipment Operators-
Grade Engineer: Using Blue
$59.96
7A
3C
8P
Underground Sewer Et Water
Prints, Cut Sheets, Etc
Kitsap
Power Equipment Operators-
Gradechecker/stakeman
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Guardrail Punch
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Hard Tail End Dump Articulating
$60.49
7A
3C
8P
Underground Sewer Et Water
Off- Road Equipment 45 Yards. Et
Over
Kitsap
Power Equipment Operators-
Hard Tail End Dump Articulating
$59.96
7A
3C
8P
Underground Sewer Et Water
Off-road Equipment Under 45
Yards
Kitsap
Power Equipment Operators-
Horizontal/ directional Drill
$59.49
7A
3C
8P
Underground Sewer Et Water
Locator
Kitsap
Power Equipment Operators-
Horizontal/ directional Drill
$59.96
7A
3C
8P
Underground Sewer Et Water
Operator
Kitsap
Power Equipment Operators-
Hydralifts/boom Trucks Over 10
$59.49
7A
3C
8P
Underground Sewer Et Water
Tons
abouttlank
11/17/2017
abouttlank
Kitsap
Power Equipment Operators-
Hydralifts/boom Trucks, 10 Tons
$56.90
7A
3C
8P
Underground Sewer Et Water
And Under
Kitsap
Power Equipment Operators-
Loader, Overhead 8 Yards. Et
$61.10
7A
3C
8P
Underground Sewer Et Water
Over
Kitsap
Power Equipment Operators-
Loader, Overhead, 6 Yards. But
$60.49
7A
3C
8P
Underground Sewer Et Water
Not Including 8 Yards
Kitsap
Power Equipment Operators-
Loaders, Overhead Under 6 Yards
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Loaders, Plant Feed
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Loaders: Elevating Type Belt
$59.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Locomotives, All
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Material Transfer Device
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Mechanics, All (leadmen - $0.50
$61.10
7A
3C
8P
Underground Sewer Et Water
Per Hour Over Mechanic)
Kitsap
Power Equipment Operators-
Motor Patrol Graders
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Mucking Machine, Mole, Tunnel
$60.49
7A
3C
8P
Underground Sewer Et Water
Drill, Boring, Road Header And/or
Shield
Kitsap
Power Equipment Operators-
Oil Distributors, Blower
$56.90
7A
3C
8P
Underground Sewer Et Water
Distribution Et Mulch Seeding
Operator
Kitsap
Power Equipment Operators-
Outside Hoists (elevators And
$59.49
7A
3C
8P
Underground Sewer Et Water
Manlifts), Air Tuggers,strato
Kitsap
Power Equipment Operators-
Overhead, Bridge Type Crane: 20
$59.96
7A
3C
8P
Underground Sewer Et Water
Tons Through 44 Tons
Kitsap
Power Equipment Operators-
Overhead, Bridge Type: 100 Tons
$61.10
7A
3C
8P
Underground Sewer Et Water
And Over
Kitsap
Power Equipment Operators-
Overhead, Bridge Type: 45 Tons
$60.49
7A
3C
8P
Underground Sewer Et Water
Through 99 Tons
Kitsap
Power Equipment Operators-
Pavement Breaker
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Pile Driver (other Than Crane
$59.96
7A
3C
8P
Underground Sewer Et Water
Mount)
Kitsap
Power Equipment Operators-
Plant Oiler - Asphalt, Crusher
$59.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Posthole Digger, Mechanical
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Power Plant
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Pumps - Water
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Quad 9, Hd 41, D10 And Over
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Quick Tower - No Cab, Under 100
$56.90
7A
3C
8P
Underground Sewer Et Water
Feet In Height Based To Boom
Kitsap
Power Equipment Operators-
Remote Control Operator On
$60.49
7A
3C
8P
Underground Sewer Et Water
Rubber Tired Earth Moving
Equipment
abouttlank
12/16
11/17/2017
abouttlank
Kitsap
Power Equipment Operators-
Rigger And Bellman
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Rigger/Signal Person, Bellman
$59.49
7A
3C
8P
Underground Sewer Et Water
(Certified)
Kitsap
Power Equipment Operators-
Rollagon
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Roller, Other Than Plant Mix
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Roller, Plant Mix Or Multi -lift
$59.49
7A
3C
8P
Underground Sewer Et Water
Materials
Kitsap
Power Equipment Operators-
Roto -mill, Roto -grinder
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Saws - Concrete
$59.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Scraper, Self Propelled Under 45
$59.96
7A
3C
8P
Underground Sewer Et Water
Yards
Kitsap
Power Equipment Operators-
Scrapers - Concrete Et Carry All
$59.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Scrapers, Self-propelled: 45 Yards
$60.49
7A
3C
8P
Underground Sewer Et Water
And Over
Kitsap
Power Equipment Operators-
Service Engineers - Equipment
$59.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Shotcrete/gunite Equipment
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Shovel , Excavator, Backhoe,
$59.49
7A
3C
8P
Underground Sewer Et Water
Tractors Under 15 Metric Tons.
Kitsap
Power Equipment Operators-
Shovel, Excavator, Backhoe: Over
$60.49
7A
3C
8P
Underground Sewer Et Water
30 Metric Tons To 50 Metric Tons
Kitsap
Power Equipment Operators-
Shovel, Excavator, Backhoes,
$59.96
7A
3C
8P
Underground Sewer Et Water
Tractors: 15 To 30 Metric Tons
Kitsap
Power Equipment Operators-
Shovel, Excavator, Backhoes:
$61.10
7A
3C
8P
Underground Sewer Et Water
Over 50 Metric Tons To 90 Metric
Tons
Kitsap
Power Equipment Operators-
Shovel, Excavator, Backhoes:
$61.72
7A
3C
8P
Underground Sewer Et Water
Over 90 Metric Tons
Kitsap
Power Equipment Operators-
Slipform Pavers
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Spreader, Topsider Et Screedman
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Subgrader Trimmer
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Tower Bucket Elevators
$59.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Tower Crane Up To 175' In Height
$61.10
7A
3C
8P
Underground Sewer Et Water
Base To Boom
Kitsap
Power Equipment Operators-
Tower Crane: over 175' through
$61.72
7A
3C
8P
Underground Sewer Et Water
250' in height, base to boom
Kitsap
Power Equipment Operators-
Tower Cranes: over 250' in height
$62.33
7A
3C
8P
Underground Sewer Et Water
from base to boom
Kitsap
Power Equipment Operators-
Transporters, All Track Or Truck
$60.49
7A
3C
8P
Underground Sewer Et Water
Type
Kitsap
Power Equipment Operators-
Trenching Machines
$59.49
7A
3C
8P
Underground Sewer Et Water
abouttlank
13/16
11/17/2017
abouttlank
Kitsap
Power Equipment Operators-
Truck Crane Oiler/driver - 100
$59.96
7A
3C
8P
Underground Sewer Et Water
Tons And Over
Kitsap
Power Equipment Operators-
Truck Crane Oiler/driver Under
$59.49
7A
3C
8P
Underground Sewer Et Water
100 Tons
Kitsap
Power Equipment Operators-
Truck Mount Portable Conveyor
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Welder
$60.49
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Wheel Tractors, Farmall Type
$56.90
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Equipment Operators-
Yo Yo Pay Dozer
$59.96
7A
3C
8P
Underground Sewer Et Water
Kitsap
Power Line Clearance Tree
Journey Level In Charge
$48.54
5A
4A
Trimmers
Kitsap
Power Line Clearance Tree
Spray Person
$46.03
5A
4A
Trimmers
Kitsap
Power Line Clearance Tree
Tree Equipment Operator
$48.54
5A
4A
Trimmers
Kitsap
Power Line Clearance Tree
Tree Trimmer
$43.32
5A
4A
Trimmers
Kitsap
Power Line Clearance Tree
Tree Trimmer Groundperson
$32.68
5A
4A
Trimmers
Kitsap
Refrigeration Et Air Conditioning
Mechanic
$67.47
5A
1 G
Mechanics
Kitsap
Residential Brick Mason
Journey Level
$17.04
1
Kitsap
Residential Carpenters
Journey Level
$42.86
5D
4C
Kitsap
Residential Cement Masons
Journey Level
$30.87
1
Kitsap
Residential Drywall Applicators
Journey Level
$42.86
5D
4C
Kitsap
Residential Drywall Tapers
Journey Level
$20.00
1
Kitsap
Residential Electricians
Journey Level
$27.00
1
Kitsap
Residential Glaziers
Journey Level
$60.56
7L
1Y
Kitsap
Residential Insulation Applicators
Journey Level
$13.96
1
Kitsap
Residential Laborers
Journey Level
$16.89
1
Kitsap
Residential Marble Setters
Journey Level
$17.04
1
Kitsap
Residential Painters
Journey Level
$19.52
1
Kitsap
Residential Plumbers Et Pipefitters
Journey Level
$21.11
1
Kitsap
Residential Refrigeration Et Air
Journey Level
$17.64
1
Conditioning Mechanics
Kitsap
Residential Sheet Metal Workers
Journey Level (Field or Shop)
$28.95
1
Kitsap
Residential Soft Floor Layers
Journey Level
$19.38
1
Kitsap
Residential Sprinkler Fitters (Fire
Journey Level
$27.74
1
Protection)
Kitsap
Residential Stone Masons
Journey Level
$55.82
5A
1M
Kitsap
Residential Terrazzo Workers
Journey Level
$11.00
1
Kitsap
Residential Terrazzo/Tile
Journey Level
$30.26
1
Finishers
Kitsap
Residential Tile Setters
Journey Level
$31.14
1
Kitsap
Roofers
Journey Level
$49.27
5A
3H
Kitsap
Roofers
Using Irritable Bituminous
$52.27
5A
3H
Materials
abouttlank
14/16
11/17/2017
abouttlank
Kitsap
Sheet Metal Workers
Journey Level (Field or Shop)
$78.17
7F
1 E
Kitsap
Shipbuilding Et Ship Repair
CARPENTER
$19.29
1
Kitsap
Shipbuilding Et Ship Repair
ELECTRICIAN
$25.53
1
Kitsap
Shipbuilding Et Ship Repair
Heat Et Frost Insulator
$67.93
5.1
4H
Kitsap
Shipbuilding Et Ship Repair
Laborer
$19.64
1
Kitsap
Shipbuilding Et Ship Repair
MACHINIST
$19.29
1
Kitsap
Shipbuilding Et Ship Repair
OPERATOR
$19.44
1
Kitsap
Shipbuilding Et Ship Repair
Painter
$41.60
6Z
2B
Kitsap
Shipbuilding Et Ship Repair
PIPEFITTER
$19.29
1
Kitsap
Shipbuilding Et Ship Repair
RIGGER
$19.29
1
Kitsap
Shipbuilding Et Ship Repair
Sheet Metal
$22.21
1
Kitsap
Shipbuilding Et Ship Repair
SHIPFITTER
$19.29
1
Kitsap
Shipbuilding Et Ship Repair
WELDER/BURNER
$19.29
1
Kitsap
Sign Makers Et Installers
Journey Level
$20.58
1
(Electrical
Kitsap
Sign Makers Et Installers (Non-
Journey Level
$11.00
1
Electrical
Kitsap
Soft Floor Layers
Journey Level
$47.61
5A
3D
Kitsap
Solar Controls For Windows
Journey Level
$11.00
1
Kitsap
Sprinkler Fitters (Fire Protection)
Journey Level
$74.49
5C
1X
Kitsap
Stage Rigging Mechanics (Non
Journey Level
$13.23
1
Structural)
Kitsap
Stone Masons
Journey Level
$55.82
5A
1M
Kitsap
Street And Parking Lot Sweeper
Journey Level
$16.00
1
Workers
Kitsap
Surveyors
Assistant Construction Site
$59.49
7A
3C 8P
Surveyor
Kitsap
Surveyors
Chainman
$58.93
7A
3C 8P
Kitsap
Surveyors
Construction Site Surveyor
$60.49
7A
3C 8P
Kitsap
Telecommunication Technicians
Journey Level
$45.07
7E
1 E
Kitsap
Telephone Line Construction -
Cable Splicer
$38.84
5A
2B
Outside
Kitsap
Telephone Line Construction -
Hole Digger/Ground Person
$21.45
5A
2B
Outside
Kitsap
Telephone Line Construction -
Installer (Repairer)
$37.21
5A
2B
Outside
Kitsap
Telephone Line Construction -
Special Aparatus Installer 1
$38.84
5A
2B
Outside
Kitsap
Telephone Line Construction -
Special Apparatus Installer 11
$38.03
5A
2B
Outside
Kitsap
Telephone Line Construction -
Telephone Equipment Operator
$38.84
5A
2B
Outside
(Heavy)
Kitsap
Telephone Line Construction -
Telephone Equipment Operator
$36.09
5A
2B
Outside
(Light)
Kitsap
Telephone Line Construction -
Telephone Lineperson
$36.09
5A
2B
Outside
Kitsap
Telephone Line Construction -
Television Groundperson
$20.33
5A
2B
Outside
Kitsap
Telephone Line Construction -
Television Lineperson/Installer
$27.21
5A
2B
Outside
abouttlank
15/16
11/17/2017
abouttlank
Kitsap
Telephone Line Construction -
Television System Technician
$32.55
5A
2B
Outside
Kitsap
Telephone Line Construction -
Television Technician
$29.18
5A
2B
Outside
Kitsap
Telephone Line Construction -
Tree Trimmer
$36.09
5A
2B
Outside
Kitsap
Terrazzo Workers
Journey Level
$51.36
5A
1M
Kitsap
Tile Setters
Journey Level
$51.36
5A
1M
Kitsap
Tile, Marble Et Terrazzo Finishers
Journey Level
$12.00
1
Kitsap
Traffic Control Stripers
Journey Level
$44.93
7A
1K
Kitsap
Truck Drivers
Asphalt Mix Over 16 Yards (W.
$52.70
5D
3A
WA -Joint Council 28)
Kitsap
Truck Drivers
Asphalt Mix To 16 Yards (W. WA-
$51.86
5D
3A
Joint Council 28)
Kitsap
Truck Drivers
Dump Truck
$19.60
1
Kitsap
Truck Drivers
Dump Truck And Trailer
$19.60
1
Kitsap
Truck Drivers
Other Trucks
$18.37
1
Kitsap
Truck Drivers
Transit Mixer
$20.79
1
Kitsap
Well Drillers Et Irrigation Pump
Irrigation Pump Installer
$13.17
1
Installers
Kitsap
Well Drillers Et Irrigation Pump
Oiler
$14.08
1
Installers
Kitsap
Well Drillers Et Irrigation Pump
Well Driller
$14.40
1
Installers
8L
8L
abouttlank 16/16
F-IT'i 1001 MD.,
AGENCY PERMITS AND CITY RESOLUTION
THIS PAGE LEFT INTENTIONALLY BLANK
�1y try
dHN
S11alle of Was'hlhglloni
Department Of Fish h ire ii II II ii-f
Mailing Address: PO Box 43234, Olympia, WA 98504 3234, (360) 902-2200, FDD (360) 902-220 7
Main Office I.._ocation: Natural Resources Building, 1111 Washington Street SE, Olympia, WA
November 28, 2017
City of Bremerton
William John Davis
3027 Olympus Dr NE
Bremerton, WA 98310-4620
Dear William Davis:
SUBJECT: YOUR APPLICATION FOR EAST PARK STORMWATER OUTFALL BEACH
PROTECTION, WDFW APPLICATION ID: 13095
On November 8, 2017, Washington Department of Fish and Wildlife (WDFW) first received your
application materials for a Hydraulic Project Approval (HPA) for the project referenced above.
Your request for a minor modification of your existing HPA has been approved.
The project must follow the plans entitled "City of Bremerton East Park Stormwater Outfall,
Stormwater Outfall Emergency Beach Repair," submitted November 28, 2017. Habitat impacts will
be calculated from these plans and the as -built plans, as provisioned in the original HPA, and
mitigation will be agreed upon following project completion.
Please attach this letter to your HPA on-site.
If you have any questions, please call me at 360-895-4756.
Sincerely,
Brittany Gordon
Habitat Biologist
Washington Department of
Fish & Wildlife
u, HYDRAULIC PROJECT APPROVAL POBox 43234
Hmh, 1,,,,Deua,, Olympia, WA 98504-3234
FISH ad wrr,.DLIFr
(360) 902-2200
Issued Date: November 20, 2017 Permit Number: 2017-6-460+01
Project End Date: January 18, 2018 FPA/Public Notice Number: N/A
Application ID: 13095
PERMITTEE AUTHORIZED AGENT OR CONTRACTOR
City of Bremerton
ATTENTION: William Davis
3027 Olympus Dr NE
Bremerton, WA 98310-4620
Project Name: East Park Stormwater Outfall Beach Protection
Project Description: The construction of the new 36" diameter stormwater outfall was completed in August 2017.
Prior to this new outfall, there was an 18" corrugated metal pipe outfall (point discharge) that
discharged directly onto the beach into a rocked channel. With the new outfall, stormwater
flows down the hill through a 36" HDPE buried pipe and enters a 50' long diffuser pipe with
orifices which discharges and spreads the flow on the beach. During the first significant storm
event of the year on October 18, 2017, stormwater discharge from the diffuser eroded the
beach. The erosion resulted in a silt plume in the Port Washington Narrows, removed earthen
cover over an active 24" diameter pipe, and started to undermine a rock wall that supports the
diffuser. In order to prevent further erosion and possible damage to City sewer and stormwater
facilities, the City is proposing an immediate repair to the beach which includes placing angular
rock material to fill in the eroded areas and support the existing rock wall (see attached plan
and section). The total estimated volume of material is up to 50 CY and will be scheduled
upon agency approval and for the next daytime low tide that allows for construction on the
beach. This is a temporary remedy to prevent further erosion during the winter months and will
be replaced by more suitable rock (round rock suitable for fish habitat) at a later time. The City
will work with our design engineer and WDFW staff to develop and implement a permanent
solution that improves habitat while minimizing future erosion.
PROVISIONS
AUTHORIZED WORK TIMES
1. TIMING LIMITATION: This imminent danger expedited HPA is authorized from November 20, 2017 through January
19, 2018.
2. APPROVED PLANS: Work must be accomplished per plans and specifications submitted with the application and
approved by the Washington Department of Fish and Wildlife, entitled "City of Bremerton East Park Stormwater Outfall
Stormwater Outfall Beach Repair," submitted November 8, 2017, except as modified by this Hydraulic Project Approval.
You must have a copy of these plans available on site during all phases of the project construction.
3. MITIGATION: Due to the uncertainty of the nature, scale, and duration of impacts from this project and due to the
imminent danger that needs to be addressed, a Memorandum of Understanding between WDFW and the City of
Bremerton must be in place within 60 days of issuance of this Imminent Danger Expedited HPA. The Memorandum of
Understanding must be drafted by the City of Bremerton, signed by WDFW and the City, and must document measures
for monitoring and evaluating project impacts and establish a timeline for implementing mitigation actions.
4. POST -CONSTRUCTION MONITORING: Provide as -built plans to the Area Habitat Biologist within 30 days of
project completion. These as -built plans must include field benchmarks to show the location (plan -view) of rock placed
during construction, and these benchmarks must be maintained to serve post -project monitoring purposes for 5 years.
Page 1 of 5
Washington Department of
Fish & Wildlife
u, HYDRAULIC PROJECT APPROVAL POBox 43234
Hmh, 1,,,,Deua,, Olympia, WA 98504-3234
FISH ad wrr,.DLIFr
(360) 902-2200
Issued Date: November 20, 2017 Permit Number: 2017-6-460+01
Project End Date: January 18, 2018 FPA/Public Notice Number: N/A
Application ID: 13095
Benchmarks can be survey benchmarks or can be permanent structures, such as buildings or infrastructure. The as-
builts must also include the elevation of rock placed during construction.
NOTIFICATION
5. PRE- AND POST -CONSTRUCTION NOTIFICATION: You, your agent, or contractor must contact the Washington
Department of Fish and Wildlife by e-mail at HPAapplications@dfw.wa.gov; mail to Post Office Box 43234, Olympia,
Washington 98504-3234; or fax to (360) 902-2946 at least three business days before starting work, and again within
seven days after completing the work. The notification must include the permittee's name, project location, starting date
for work or date the work was completed, and the permit number. The Washington Department of Fish and Wildlife
may conduct inspections during and after construction; however, the Washington Department of Fish and Wildlife will
notify you or your agent before conducting the inspection.
6. PHOTOGRAPHS: You, your agent, or contractor must take photographs of the job site before the work begins and
after the work is completed. You must upload the photographs to the post -permit requirement page in the Aquatic
Protection Permitting System (APPS) or mail them to Washington Department of Fish and Wildlife at Post Office Box
43234, Olympia, Washington 98504-3234 within 30 -days after the work is completed.
7. FISH KILL/ WATER QUALITY PROBLEM NOTIFICATION: If a fish kill occurs or fish are observed in distress at the
job site, immediately stop all activities causing harm. Immediately notify the Washington Department of Fish and
Wildlife of the problem. If the likely cause of the fish kill or fish distress is related to water quality, also notify the
Washington Military Department Emergency Management Division at 1-800-258-5990. Activities related to the fish kill
or fish distress must not resume until the Washington Department of Fish and Wildlife gives approval. The Washington
Department of Fish and Wildlife may require additional measures to mitigate impacts.
STAGING, JOB SITE ACCESS AND EQUIPMENT
8. Establish the staging area (used for activities such as equipment storage, vehicle storage, fueling, servicing, and
hazardous material storage) in a location and manner that will prevent contaminants like petroleum products, hydraulic
fluid, fresh concrete, sediments, sediment -laden water, chemicals, or any other toxic or harmful materials from entering
waters of the state.
9. Limit the removal of native bankline vegetation to the minimum amount needed to construct the project.
10. Retain all natural habitat features on the beach larger than twelve inches in diameter including trees, stumps, logs,
and large rocks. These natural habitat features may be moved during construction but they must be placed near the
preproject location before leaving the job site.
11. Check equipment daily for leaks and complete any required repairs before using the equipment in or near the
water.
12. Operate vessels with minimal propulsion power to avoid prop scour damage to the bed and marine vegetation
habitats.
13. Operate vessels during tidal elevations that are adequate to prevent grounding of the barge.
14. Maintain anchor cable tension, set and retrieve anchors vertically, and prevent mooring cables from dragging to
avoid impacts to seagrass and kelp.
15. Do not conduct project activities when the work area is inundated by tidal waters.
ROCK BEACH PROTECTION
16. Construct the rock beach protection using 3 -man angular rock and 12 -inch angular rock.
17. Do not stockpile excavated materials containing silt, clay, or fine-grained soil waterward of the ordinary high water
line.
18. Prior to tidal inundation, backfill all trenches, depressions, or holes created during construction waterward of the
ordinary high water line.
Page 2 of 5
Washington Department of
Fish & Wildlife
u, HYDRAULIC PROJECT APPROVAL POBox 43234
Hmh, 1,,,,Deua,, Olympia, WA 98504-3234
FISH ad wrr,.DLIFr
(360) 902-2200
Issued Date: November 20, 2017 Permit Number: 2017-6-460+01
Project End Date: January 18, 2018
DEMOBILIZATION/CLEANUP
FPA/Public Notice Number: N/A
Application ID: 13095
19. Remove all trash and unauthorized fill in the project area, including concrete blocks or pieces, bricks, asphalt,
metal, treated wood, glass, floating debris, and paper, that is waterward of the ordinary high water line and deposit
upland.
20. Remove all debris or deleterious material resulting from construction from the beach area or bed and prevent from
entering waters of the state.
LOCATION #1: Site Name: Port Washington Narrows, bottom of Main Street
Main Street, Bremerton, WA 98310
WORK START: November 20, 2017 WORK END: January 19, 2018
IMM
15 - Kitsap
1/4 SEC: Section:
SW 1/4 12
Location #1 Driving Directions
Waterbody:
Wria 15 Marine
Township: Range: Latitude:
24 N 01 E 47.580426
Tributary to:
Puget Sound
Longitude: County:
-122.628172 Kitsap
There is no address or parcel number associated with the location. Heading north on Warren Avenue Bridge, take the first
exit off of the bridge. Circle down on Clare Avenue and take a left onto Lebo Boulevard. Turn right onto Old Wheaton Way
and take an immediate right onto Campbell Way. The road down to the outfall is on the left (water side) and unmarked.
APPLY TO ALL HYDRAULIC PROJECT APPROVALS
This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code,
specifically Chapter 77.55 RCW. Additional authorization from other public agencies may be necessary for this project.
The person(s) to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any
additional authorization from other public agencies (local, state and/or federal) that may be necessary for this project.
This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person
(s) to whom this Hydraulic Project Approval is issued and operator(s) performing the work.
This Hydraulic Project Approval does not authorize trespass.
The person(s) to whom this Hydraulic Project Approval is issued and operator(s) performing the work may be held liable
for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic
Project Approval.
Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one
hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment.
Page 3 of 5
Washington Department of
Fish & Wildlife
u, HYDRAULIC PROJECT APPROVAL POBox 43234
Hmh, 1,,,,Deua,, Olympia, WA 98504-3234
FISH ad wrr,.DLIFr
(360) 902-2200
Issued Date: November 20, 2017 Permit Number: 2017-6-460+01
Project End Date: January 18, 2018 FPA/Public Notice Number: N/A
Application ID: 13095
All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions, conditions, or
revocation if the Department of Fish and Wildlife determines that changed conditions require such action. The person(s)
to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals
are listed below.
MINOR MODIFICATIONS TO THIS HPA: You may request approval of minor modifications to the required work timing
or to the plans and specifications approved in this HPA unless this is a General HPA. If this is a General HPA you must
use the Major Modification process described below. Any approved minor modification will require issuance of a letter
documenting the approval. A minor modification to the required work timing means any change to the work start or end
dates of the current work season to enable project or work phase completion. Minor modifications will be approved only
if spawning or incubating fish are not present within the vicinity of the project. You may request subsequent minor
modifications to the required work timing. A minor modification of the plans and specifications means any changes in the
materials, characteristics or construction of your project that does not alter the project's impact to fish life or habitat and
does not require a change in the provisions of the HPA to mitigate the impacts of the modification. If you originally
applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a minor
modification through APPS. A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must
submit a written request that clearly indicates you are seeking a minor modification to an existing HPA. Written requests
must include the name of the applicant, the name of the authorized agent if one is acting for the applicant, the APP ID
number of the HPA, the date issued, the permitting biologist, the requested changes to the HPA, the reason for the
requested change, the date of the request, and the requestor's signature. Send by mail to: Washington Department of
Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234, or by email to HPAapplications@dfw.wa.gov. You
should allow up to 45 days for the department to process your request.
MAJOR MODIFICATIONS TO THIS HPA: You may request approval of major modifications to any aspect of your HPA.
Any approved change other than a minor modification to your HPA will require issuance of a new HPA. If you originally
applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a major
modification through APPS. A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must
submit a written request that clearly indicates you are requesting a major modification to an existing HPA. Written
requests must include the name of the applicant, the name of the authorized agent if one is acting for the applicant, the
APP ID number of the HPA, the date issued, the permitting biologist, the requested changes to the HPA, the reason for
the requested change, the date of the request, and the requestor's signature. Send your written request by mail to:
Washington Department of Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234. You may email your
request for a major modification to HPAapplications@dfw.wa.gov. You should allow up to 45 days for the department to
process your request.
APPEALS INFORMATION
If you wish to appeal the issuance, denial, conditioning, or modification of a Hydraulic Project Approval (HPA),
Washington Department of Fish and Wildlife (WDFW) recommends that you first contact the department employee who
issued or denied the HPA to discuss your concerns. Such a discussion may resolve your concerns without the need for
further appeal action. If you proceed with an appeal, you may request an informal or formal appeal. WDFW encourages
you to take advantage of the informal appeal process before initiating a formal appeal. The informal appeal process
includes a review by department management of the HPA or denial and often resolves issues faster and with less legal
complexity than the formal appeal process. If the informal appeal process does not resolve your concerns, you may
advance your appeal to the formal process. You may contact the HPA Appeals Coordinator at (360) 902-2534 for more
information.
Page 4 of 5
Washington Department of
Fish & Wildlife
u, HYDRAULIC PROJECT APPROVAL POBox 43234
Hmh, 1,,,,Deua,, Olympia, WA 98504-3234
FISH ad wrr,.DLIFr
(360) 902-2200
Issued Date: November 20, 2017 Permit Number: 2017-6-460+01
Project End Date: January 18, 2018
FPA/Public Notice Number: N/A
Application ID: 13095
A. INFORMAL APPEALS: WAC 220-660-460 is the rule describing how to request an informal appeal of WDFW actions
taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures. The following
information summarizes that rule.
A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request an informal
appeal of that action. You must send your request to WDFW by mail to the HPA Appeals Coordinator, Department of
Fish and Wildlife, Habitat Program, PO Box 43234, Olympia, Washington 98504-3234; e-mail to
HPAapplications@dfw.wa.gov; fax to (360) 902-2946; or hand -delivery to the Natural Resources Building, 1111
Washington St SE, Habitat Program, Fifth floor. WDFW must receive your request within 30 days from the date you
receive notice of the decision. If you agree, and you applied for the HPA, resolution of the appeal may be facilitated
through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution
is not reached through the informal conference, or you are not the person who applied for the HPA, the HPA Appeals
Coordinator or designee will conduct an informal hearing and recommend a decision to the Director or designee. If you
are not satisfied with the results of the informal appeal, you may file a request for a formal appeal.
B. FORMAL APPEALS: WAC 220-660-470 is the rule describing how to request a formal appeal of WDFW actions
taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures. The following
information summarizes that rule.
A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request a formal appeal
of that action. You must send your request for a formal appeal to the clerk of the Pollution Control Hearings Boards and
serve a copy on WDFW within 30 days from the date you receive notice of the decision. You may serve WDFW by mail
to the HPA Appeals Coordinator, Department of Fish and Wildlife, Habitat Program, PO Box 43234, Olympia,
Washington 98504-3234; e-mail to HPAapplications@dfw.wa.gov; fax to (360) 902-2946; or hand -delivery to the Natural
Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. The time period for requesting a formal
appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal, you may
request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in
response to the informal appeal.
C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal, the
WDFW action shall be final and unappealable.
Habitat Biologist
Brittany Gordon
Brittany. Gordon@dfw.wa.gov
360-895-4756
for Director
RIM 11111�w
Page 5 of 5
a a �oevs ova
NATIONWIDE PERMIT 18
Army Carps
of Terms and Conditions
of En meers a '� A
Seattle District
Effective Date: March 19, 2017
A. Description of Authorized Activities
B. U.S. Arany Corps of Engineers (Corps) National General Conditions for all NWPs
C. Corps Seattle District Regional General Conditions
D. Corps Regional Specific Conditions for this NWP
E. Washington Department of Ecology (Ecology) Section 401 Water Quality Certification (401
Certification): General Conditions
F. Ecology 401 Certification: Specific Conditions for this NWP
G. Coastal Zone Management Consistency Response for this NWP
In addition to any special condition that may be required on a case-by-case basis by the District Engineer,
the following terns and conditions must be met, as applicable, for a Nationwide Permit (NWP)
authorization to be valid in Washington State.
A. DESCRIPTION OF AUTHORIZED ACTIVITIES
Minor Discharges. Minor discharges of dredged or fill material into all waters of the United States,
provided the activity meets all of the following criteria:
(a) The quantity of discharged material and the volume of area excavated do not exceed 25 cubic yards
below the plane of the ordinary high water mark or the high tide line;
(b) The discharge will not cause the loss of more than 1/10 -acre of waters of the United States; and
(c) The discharge is not placed for the purpose of a stream diversion.
Notification: The permittee must submit a pre -construction notification to the district engineer
prior to commencing the activity if. (1) the discharge or the volume of area excavated exceeds 10 cubic
yards below the plane of the ordinary high water mark or the high tide line, or (2) the discharge is in a
special aquatic site, including wetlands. (See general condition 32.) (Authorities: Sections 10 and 404)
B. CORPS NATIONAL GENERAL CONDITIONS FOR ALL NWPs
To qualify for NWP authorization, the prospective permittee must comply with the following general
conditions, as applicable, in addition to any regional or case -specific conditions imposed by the division
engineer or district engineer. Every person who may wish to obtain permit authorization under one or
more NWPs, or who is currently relying on an existing or prior permit authorization under one or more
NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1 through 330.6 apply to every
NWP authorization. Note especially 33 CFR 330.5 relating to the modification, suspension, or revocation
of any NWP authorization.
1. Navigation. (a) No activity may cause more than a minimal adverse effect on navigation. (b) Any
safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be
installed and maintained at the permittee's expense on authorized facilities in navigable waters of the
United States. (c) The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required,
upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or
obstructions caused thereby, without expense to the United States. No claim shall be made against the
United States on account of any such removal or alteration.
2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate
through the area, unless the activity's primary purpose is to impound water. All permanent and temporary
crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to
maintain low flows to sustain the movement of those aquatic species. If a bottomless culvert cannot be
used, then the crossing should be designed and constructed to minimize adverse effects to aquatic life
movements.
3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the
maximum extent practicable. Activities that result in the physical destruction (e.g., through excavation,
fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized.
4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas
for migratory birds must be avoided to the maximum extent practicable.
5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity
is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or is a shellfish seeding
or habitat restoration activity authorized by NWP 27.
6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.).
Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see
section 307 of the Clean Water Act).
7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except
where the activity is for the repair or improvement of public water supply intake structures or adjacent
bank stabilization.
8. Adverse Effects From IMpoundments. If the activity creates an impoundment of water, adverse effects
to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be
minimized to the maximum extent practicable.
9. Management of Water Flows. To the maximum extent practicable, the pre -construction course,
condition, capacity, and location of open waters must be maintained for each activity, including stream
channelization, storm water management activities, and temporary and permanent road crossings, except
as provided below. The activity must be constructed to withstand expected high flows. The activity must
not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to
impound water or manage high flows. The activity may alter the pre -construction course, condition,
capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or
relocation activities).
10. Fills Within 100 -Year Floodplains. The activity must comply with applicable FEMA -approved state
or local floodplain management requirements.
11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other
measures must be taken to minimize soil disturbance.
12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and
maintained in effective operating condition during construction, and all exposed soil and other fills, as
well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at
the earliest practicable date. Permittees are encouraged to perforin work within waters of the United
States during periods of low -flow or no -flow, or during low tides.
13. Removal of Temporaiy Fills. Temporary fills must be removed in their entirety and the affected areas
returned to pre -construction elevations. The affected areas must be revegetated, as appropriate.
14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including
maintenance to ensure public safety and compliance with applicable NWP general conditions, as well as
any activity -specific conditions added by the district engineer to an NWP authorization.
15. Single and Complete Project. The activity must be a single and complete project. The same NWP
cannot be used more than once for the same single and complete project.
16. Wild and Scenic Rivers. (a) No NWP activity may occur in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible
inclusion in the system while the river is in an official study status, unless the appropriate Federal agency
with direct management responsibility for such river, has determined in writing that the proposed activity
will not adversely affect the Wild and Scenic River designation or study status. (b) If a proposed NWP
activity will occur in a component of the National Wild and Scenic River System, or in a river officially
designated by Congress as a "study river" for possible inclusion in the system while the river is in an
official study status, the permittee must submit a pre -construction notification (see general condition 32).
The district engineer will coordinate the PCN with the Federal agency with direct management
responsibility for that river. The permittee shall not begin the NWP activity until notified by the district
engineer that the Federal agency with direct management responsibility for that river has determined in
writing that the proposed NWP activity will not adversely affect the Wild and Scenic River designation or
study status. (c) Information on Wild and Scenic Rivers may be obtained from the appropriate Federal
land management agency responsible for the designated Wild and Scenic River or study river (e.g.,
National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife
Service). Information on these rivers is also available at: http://www.rivers.gov/.
17. Tribal Ri ts. No NWP activity may cause more than minimal adverse effects on tribal rights
(including treaty rights), protected tribal resources, or triballands.
18. Endangered Species. (a) No activity is authorized under any NWP which is likely to directly or
indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed
for such designation, as identified under the Federal Endangered Species Act (ESA), or which will
directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is
authorized under any NWP which "may affect" a listed species or critical habitat, unless ESA section 7
consultation addressing the effects of the proposed activity has been completed. Direct effects are the
immediate effects on listed species and critical habitat caused by the NWP activity. Indirect effects are
those effects on listed species and critical habitat that are caused by the NWP activity and are later in
time, but still are reasonably certain to occur. (b) Federal agencies should follow their own procedures for
complying with the requirements of the ESA. If pre -construction notification is required for the proposed
activity, the Federal permittee must provide the district engineer with the appropriate documentation to
demonstrate compliance with those requirements. The district engineer will verify that the appropriate
documentation has been submitted. If the appropriate documentation has not been submitted, additional
ESA section 7 consultation may be necessary for the activity and the respective federal agency would be
responsible for fulfilling its obligation under section 7 of the ESA. (c) Non-federal permittees must
submit a pre -construction notification to the district engineer if any listed species or designated critical
habitat might be affected or is in the vicinity of the activity, or if the activity is located in designated
critical habitat, and shall not begin work on the activity until notified by the district engineer that the
requirements of the ESA have been satisfied and that the activity is authorized. For activities that might
affect Federally -listed endangered or threatened species or designated critical habitat, the pre -construction
notification must include the name(s) of the endangered or threatened species that might be affected by
the proposed activity or that utilize the designated critical habitat that might be affected by the proposed
activity. The district engineer will determine whether the proposed activity "may affect" or will have "no
effect" to listed species and designated critical habitat and will notify the non -Federal applicant of the
Corps' determination within 45 days of receipt of a complete pre -construction notification. In cases where
the non -Federal applicant has identified listed species or critical habitat that might be affected or is in the
vicinity of the activity, and has so notified the Corps, the applicant shall not begin work until the Corps
has provided notification that the proposed activity will have "no effect" on listed species or critical
habitat, or until ESA section 7 consultation has been completed. If the non -Federal applicant has not
heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.
(d) As a result of formal or informal consultation with the FWS or NMFS the district engineer may add
species-specific permit conditions to the NWPs. (e) Authorization of an activity by an NWP does not
authorize the "take" of a threatened or endangered species as defined under the ESA. In the absence of
separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take"
provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any person subject to
the jurisdiction of the United States to take a listed species, where "take" means to harass, harm, pursue,
hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word
"harm" in the definition of "take" means an act which actually kills or injures wildlife. Such an act may
include significant habitat modification or degradation where it actually kills or injures wildlife by
significantly impairing essential behavioral patterns, including breeding, feeding or sheltering.
(f) If the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit with an
approved Habitat Conservation Plan for a project or a group of projects that includes the proposed NWP
activity, the non-federal applicant should provide a copy of that ESA section 10(a)(1)(B) permit with the
PCN required by paragraph (c) of this general condition. The district engineer will coordinate with the
agency that issued the ESA section 10(a)(1)(B) permit to determine whether the proposed NWP activity
and the associated incidental take were considered in the internal ESA section 7 consultation conducted
for the ESA section 10(a)(1)(B) permit. If that coordination results in concurrence from the agency that
the proposed NWP activity and the associated incidental take were considered in the internal ESA section
7 consultation for the ESA section 10(a)(1)(B) permit, the district engineer does not need to conduct a
separate ESA section 7 consultation for the proposed NWP activity. The district engineer will notify the
non-federal applicant within 45 days of receipt of a complete pre -construction notification whether the
ESA section 10(a)(1)(B) permit covers the proposed NWP activity or whether additional ESA section 7
consultation is required. (g) Information on the location of threatened and endangered species and their
critical habitat can be obtained directly from the offices of the FWS and NMFS or their world wide web
pages at http://www.fws.gov/ or http://www.fws.gov/ipac and http://www.nmfs.noaa.gov/pr/species/esa/
respectively.
19. Mi rg atga Birds and Bald and Golden Eagles. The permittee is responsible for ensuring their action
complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The
permittee is responsible for contacting appropriate local office of the U.S. Fish and Wildlife Service to
determine applicable measures to reduce impacts to migratory birds or eagles, including whether
"incidental take" permits are necessary and available under the Migratory Bird Treaty Act or Bald and
Golden Eagle Protection Act for a particular activity.
20. Historic Properties. (a) In cases where the district engineer determines that the activity may have the
potential to cause effects to properties listed, or eligible for listing, in the National Register of Historic
Places, the activity is not authorized, until the requirements of Section 106 of the National Historic
Preservation Act (NHPA) have been satisfied. (b) Federal permittees should follow their own procedures
4
for complying with the requirements of section 106 of the National Historic Preservation Act. If pre-
construction notification is required for the proposed NWP activity, the Federal permittee must provide
the district engineer with the appropriate documentation to demonstrate compliance with those
requirements. The district engineer will verify that the appropriate documentation has been submitted. If
the appropriate documentation is not submitted, then additional consultation under section 106 may be
necessary. The respective federal agency is responsible for fulfilling its obligation to comply with section
106. (c) Non-federal permittees must submit a pre-construction notification to the district engineer if the
NWP activity might have the potential to cause effects to any historic properties listed on, determined to
be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places,
including previously unidentified properties. For such activities, the pre-construction notification must
state which historic properties might have the potential to be affected by the proposed NWP activity or
include a vicinity map indicating the location of the historic properties or the potential for the presence of
historic properties. Assistance regarding information on the location of, or potential for, the presence of
historic properties can be sought from the State Historic Preservation Officer, Tribal Historic Preservation
Officer, or designated tribal representative, as appropriate, and the National Register of Historic Places
(see 33 CFR 330.4(g)). When reviewing pre-construction notifications, district engineers will comply
with the current procedures for addressing the requirements of section 106 of the National Historic
Preservation Act. The district engineer shall make a reasonable and good faith effort to carry out
appropriate identification efforts, which may include background research, consultation, oral history
interviews, sample field investigation, and field survey. Based on the information submitted in the PCN
and these identification efforts, the district engineer shall determine whether the proposed NWP activity
has the potential to cause effects on the historic properties. Section 106 consultation is not required when
the district engineer determines that the activity does not have the potential to cause effects on historic
properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district engineer
determines that the activity has the potential to cause effects on historic properties. The district engineer
will conduct consultation with consulting parties identified under 36 CFR 800.2(c) when he or she makes
any of the following effect determinations for the purposes of section 106 of the NHPA: no historic
properties affected, no adverse effect, or adverse effect. Where the non -Federal applicant has identified
historic properties on which the activity might have the potential to cause effects and so notified the
Corps, the non -Federal applicant shall not begin the activity until notified by the district engineer either
that the activity has no potential to cause effects to historic properties or that NHPA section 106
consultation has been completed. (d) For non-federal permittees, the district engineer will notify the
prospective permittee within 45 days of receipt of a complete pre-construction notification whether
NHPA section 106 consultation is required. If NHPA section 106 consultation is required, the district
engineer will notify the non -Federal applicant that he or she cannot begin the activity until section 106
consultation is completed. If the non -Federal applicant has not heard back from the Corps within 45 days,
the applicant must still wait for notification from the Corps. (e) Prospective permittees should be aware
that section 110k of the NHPA (54 U.S.C. 306113) prevents the Corps from granting a permit or other
assistance to an applicant who, with intent to avoid the requirements of section 106 of the NHPA, has
intentionally significantly adversely affected a historic property to which the permit would relate, or
having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after
consultation with the Advisory Council on Historic Preservation (ACNP), determines that circumstances
justify granting such assistance despite the adverse effect created or permitted by the applicant. If
circumstances justify granting the assistance, the Corps is required to notify the ACNP and provide
documentation specifying the circumstances, the degree of damage to the integrity of any historic
properties affected, and proposed mitigation. This documentation must include any views obtained from
the applicant, SHPO/THPO, appropriate Indian tribes if the undertaking occurs on or affects historic
properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a
legitimate interest in the impacts to the permitted activity on historic properties.
21. Discovery of Previously Unknown Remains and Artifacts. If you discover any previously unknown
historic, cultural or archeological remains and artifacts while accomplishing the activity authorized by this
permit, you must immediately notify the district engineer of what you have found, and to the maximum
extent practicable, avoid construction activities that may affect the remains and artifacts until the required
coordination has been completed. The district engineer will initiate the Federal, Tribal, and state
coordination required to determine if the items or remains warrant a recovery effort or if the site is
eligible for listing in the National Register of Historic Places.
22. Designated Critical Resource Waters. Critical resource waters include, NOAA-managed marine
sanctuaries and marine monuments, and National Estuarine Research Reserves. The district engineer may
designate, after notice and opportunity for public comment, additional waters officially designated by a
state as having particular environmental or ecological significance, such as outstanding national resource
waters or state natural heritage sites. The district engineer may also designate additional critical resource
waters after notice and opportunity for public comment. (a) Discharges of dredged or fill material into
waters of the United States are not authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43,
44, 49, 50, 51, and 52 for any activity within, or directly affecting, critical resource waters, including
wetlands adjacent to such waters. (b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36,
37, 38, and 54, notification is required in accordance with general condition 32, for any activity proposed
in the designated critical resource waters including wetlands adjacent to those waters. The district
engineer may authorize activities under these NWPs only after it is determined that the impacts to the
critical resource waters will be no more than minimal.
23. Miti ag tion. The district engineer will consider the following factors when determining appropriate and
practicable mitigation necessary to ensure that the individual and cumulative adverse environmental
effects are no more than minimal: (a) The activity must be designed and constructed to avoid and
minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site). (b) Mitigation in all its forms (avoiding, minimizing,
rectifying, reducing, or compensating for resource losses) will be required to the extent necessary to
ensure that the individual and cumulative adverse environmental effects are no more than minimal.
(c) Compensatory mitigation at a minimum one-for-one ratio will be required for all wetland losses that
exceed 1/10 -acre and require pre -construction notification, unless the district engineer determines in
writing that either some other form of mitigation would be more environmentally appropriate or the
adverse environmental effects of the proposed activity are no more than minimal, and provides an
activity -specific waiver of this requirement. For wetland losses of 1/10 -acre or less that require pre -
construction notification, the district engineer may determine on a case-by-case basis that compensatory
mitigation is required to ensure that the activity results in only minimal adverse environmental effects.
(d) For losses of streams or other open waters that require pre -construction notification, the district
engineer may require compensatory mitigation to ensure that the activity results in no more than minimal
adverse environmental effects. Compensatory mitigation for losses of streams should be provided, if
practicable, through stream rehabilitation, enhancement, or preservation, since streams are difficult -to -
replace resources (see 33 CFR 332.3(e)(3)). (e) Compensatory mitigation plans for NWP activities in or
near streams or other open waters will normally include a requirement for the restoration or enhancement,
maintenance, and legal protection (e.g., conservation easements) of riparian areas next to open waters. In
some cases, the restoration or maintenance/protection of riparian areas may be the only compensatory
mitigation required. Restored riparian areas should consist of native species. The width of the required
riparian area will address documented water quality or aquatic habitat loss concerns. Normally, the
riparian area will be 25 to 50 feet wide on each side of the stream, but the district engineer may require
slightly wider riparian areas to address documented water quality or habitat loss concerns. If it is not
possible to restore or maintain/protect a riparian area on both sides of a stream, or if the waterbody is a
lake or coastal waters, then restoring or maintaining/protecting a riparian area along a single bank or
shoreline may be sufficient. Where both wetlands and open waters exist on the project site, the district
engineer will determine the appropriate compensatory mitigation (e.g., riparian areas and/or wetlands
compensation) based on what is best for the aquatic environment on a watershed basis. In cases where
riparian areas are determined to be the most appropriate form of minimization or compensatory
0
mitigation, the district engineer may waive or reduce the requirement to provide wetland compensatory
mitigation for wetland losses. (f) Compensatory mitigation projects provided to offset losses of aquatic
resources must comply with the applicable provisions of 33 CFR part 332.
(1) The prospective permittee is responsible for proposing an appropriate compensatory mitigation
option if compensatory mitigation is necessary to ensure that the activity results in no more than
minimal adverse environmental effects. For the NWPs, the preferred mechanism for providing
compensatory mitigation is mitigation bank credits or in -lieu fee program credits (see 33 CFR
332.3(b)(2) and (3)). However, if an appropriate number and type of mitigation bank or in -lieu credits
are not available at the time the PCN is submitted to the district engineer, the district engineer may
approve the use of permittee -responsible mitigation. (2) The amount of compensatory mitigation
required by the district engineer must be sufficient to ensure that the authorized activity results in no
more than minimal individual and cumulative adverse environmental effects (see 33 CFR
330.1(e)(3)). (See also 33 CFR 332.3(f)). (3) Since the likelihood of success is greater and the
impacts to potentially valuable uplands are reduced, aquatic resource restoration should be the first
compensatory mitigation option considered for permittee -responsible mitigation. (4) If permittee -
responsible mitigation is the proposed option, the prospective permittee is responsible for submitting
a mitigation plan. A conceptual or detailed mitigation plan may be used by the district engineer to
make the decision on the NWP verification request, but a final mitigation plan that addresses the
applicable requirements of 33 CFR 332.4(c)(2) through (14) must be approved by the district engineer
before the permittee begins work in waters of the United States, unless the district engineer
determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure
timely completion of the required compensatory mitigation (see 33 CFR 332.3(k)(3)). (5) If
mitigation bank or in -lieu fee program credits are the proposed option, the mitigation plan only needs
to address the baseline conditions at the impact site and the number of credits to be provided. (6)
Compensatory mitigation requirements (e.g., resource type and amount to be provided as
compensatory mitigation, site protection, ecological performance standards, monitoring requirements)
may be addressed through conditions added to the NWP authorization, instead of components of a
compensatory mitigation plan (see 33 CFR 332.4(c)(1)(ii)).
(g) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits
of the NWPs. For example, if an NWP has an acreage limit of 1/2 -acre, it cannot be used to authorize any
NWP activity resulting in the loss of greater than 1/2 -acre of waters of the United States, even if
compensatory mitigation is provided that replaces or restores some of the lost waters. However,
compensatory mitigation can and should be used, as necessary, to ensure that an NWP activity already
meeting the established acreage limits also satisfies the no more than minimal impact requirement for the
NWPs. (h) Permittees may propose the use of mitigation banks, in -lieu fee programs, or permittee -
responsible mitigation. When developing a compensatory mitigation proposal, the permittee must
consider appropriate and practicable options consistent with the framework at 33 CFR 332.3(b). For
activities resulting in the loss of marine or estuarine resources, permittee -responsible mitigation may be
environmentally preferable if there are no mitigation banks or in -lieu fee programs in the area that have
marine or estuarine credits available for sale or transfer to the permittee. For permittee -responsible
mitigation, the special conditions of the NWP verification must clearly indicate the party or parties
responsible for the implementation and performance of the compensatory mitigation project, and, if
required, its long -tern management. (i) Where certain functions and services of waters of the United
States are permanently adversely affected by a regulated activity, such as discharges of dredged or fill
material into waters of the United States that will convert a forested or scrub -shrub wetland to a
herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may be required to
reduce the adverse environmental effects of the activity to the no more than minimallevel.
24. Safety of Impoundment Structures. To ensure that all impoundment structures are safely designed,
the district engineer may require non -Federal applicants to demonstrate that the structures comply with
established state darn safety criteria or have been designed by qualified persons. The district engineer may
also require documentation that the design has been independently reviewed by similarly qualified
persons, and appropriate modifications made to ensure safety.
25. Water Quality. Where States and authorized Tribes, or EPA where applicable, have not previously
certified compliance of an NWP with CWA section 401, individual 401 Water Quality Certification must
be obtained or waived (see 33 CFR 330.4(c)). The district engineer or State or Tribe may require
additional water quality management measures to ensure that the authorized activity does not result in
more than minimal degradation of water quality.
26. Coastal Zone Management. In coastal states where an NWP has not previously received a state coastal
zone management consistency concurrence, an individual state coastal zone management consistency
concurrence must be obtained, or a presumption of concurrence must occur (see 33 CFR 330.4(d)). The
district engineer or a State may require additional measures to ensure that the authorized activity is
consistent with state coastal zone management requirements.
27. Regional and Case -By -Case Conditions. The activity must comply with any regional conditions that
may have been added by the Division Engineer (see 33 CFR 330.4(e)) and with any case specific
conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA in its section 401 Water Quality
Certification, or by the state in its Coastal Zone Management Act consistency determination.
28. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete
project is prohibited, except when the acreage loss of waters of the United States authorized by the NWPs
does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a
road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization
authorized by NWP 13, the maximum acreage loss of waters of the United States for the total project
cannot exceed 1/3 -acre.
29. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with a
nationwide permit verification, the permittee may transfer the nationwide permit verification to the new
owner by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the
nationwide permit verification must be attached to the letter, and the letter must contain the following
statement and signature: "When the structures or work authorized by this nationwide permit are still in
existence at the time the property is transferred, the terns and conditions of this nationwide permit,
including any special conditions, will continue to be binding on the new owner(s) of the property. To
validate the transfer of this nationwide permit and the associated liabilities associated with compliance
with its terms and conditions, have the transferee sign and date below."
(Transferee)
(Date)
30. Compliance Certification. Each permittee who receives an NWP verification letter from the Corps
must provide a signed certification documenting completion of the authorized activity and
implementation of any required compensatory mitigation. The success of any required permittee -
responsible mitigation, including the achievement of ecological performance standards, will be addressed
separately by the district engineer. The Corps will provide the permittee the certification document with
the NWP verification letter. The certification document will include: (a) A statement that the authorized
activity was done in accordance with the NWP authorization, including any general, regional, or activity -
specific conditions; (b) A statement that the implementation of any required compensatory mitigation was
completed in accordance with the permit conditions. If credits from a mitigation bank or in -lieu fee
program are used to satisfy the compensatory mitigation requirements, the certification must include the
documentation required by 33 CFR 332.3(1)(3) to confirm that the permittee secured the appropriate
number and resource type of credits; and (c) The signature of the permittee certifying the completion of
the activity and mitigation. The completed certification document must be submitted to the district
engineer within 30 days of completion of the authorized activity or the implementation of any required
compensatory mitigation, whichever occurs later.
31. Activities Affecting Structures or Works Built by the United States. If an NWP activity also requires
permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently
occupy or use a U.S. Army Corps of Engineers (USACE) federally authorized Civil Works project (a
"USACE project"), the prospective permittee must submit a pre -construction notification. See paragraph
(b)(10) of general condition 32. An activity that requires section 408 permission is not authorized by
NWP until the appropriate Corps office issues the section 408 permission to alter, occupy, or use the
USACE project, and the district engineer issues a written NWP verification.
32. Pre -Construction Notification. (a) Timing. Where required by the terms of the NWP, the prospective
permittee must notify the district engineer by submitting a pre -construction notification (PCN) as early as
possible. The district engineer must determine if the PCN is complete within 30 calendar days of the date
of receipt and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30
day period to request the additional information necessary to make the PCN complete. The request must
specify the information needed to make the PCN complete. As a general rule, district engineers will
request additional information necessary to make the PCN complete only once. However, if the
prospective permittee does not provide all of the requested information, then the district engineer will
notify the prospective permittee that the PCN is still incomplete and the PCN review process will not
commence until all of the requested information has been received by the district engineer. The
prospective permittee shall not begin the activity until either:
(1) He or she is notified in writing by the district engineer that the activity may proceed under the
NWP with any special conditions imposed by the district or division engineer; or
(2) 45 calendar days have passed from the district engineer's receipt of the complete PCN and the
prospective permittee has not received written notice from the district or division engineer. However, if
the permittee was required to notify the Corps pursuant to general condition 18 that listed species or
critical habitat might be affected or are in the vicinity of the activity, or to notify the Corps pursuant to
general condition 20 that the activity might have the potential to cause effects to historic properties, the
permittee cannot begin the activity until receiving written notification from the Corps that there is "no
effect" on listed species or "no potential to cause effects" on historic properties, or that any consultation
required under Section 7 of the Endangered Species Act (see 33 CFR 330.4(f)) and/or section 106 of the
National Historic Preservation Act (see 33 CFR 330.4(g)) has been completed. Also, work cannot begin
under NWPs 21, 49, or 50 until the permittee has received written approval from the Corps. If the
proposed activity requires a written waiver to exceed specified limits of an NWP, the permittee may not
begin the activity until the district engineer issues the waiver. If the district or division engineer notifies
the permittee in writing that an individual permit is required within 45 calendar days of receipt of a
complete PCN, the permittee cannot begin the activity until an individual permit has been obtained.
Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked
only in accordance with the procedure set forth in 33 CFR 330.5(d)(2).
(b) Contents of Pre -Construction Notification: The PCN must be in writing and include the following
information:
(1) Name, address and telephone numbers of the prospective permittee;
(2) Location of the proposed activity;
(3) Identify the specific NWP or NWP(s) the prospective permittee wants to use to authorize
the proposed activity;
(4) A description of the proposed activity; the activity's purpose; direct and indirect adverse
environmental effects the activity would cause, including the anticipated amount of loss of wetlands,
other special aquatic sites, and other waters expected to result from the NWP activity, in acres, linear
feet, or other appropriate unit of measure; a description of any proposed mitigation measures intended
to reduce the adverse environmental effects caused by the proposed activity; and any other NWP(s),
regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of
the proposed project or any related activity, including other separate and distant crossings for linear
projects that require Department of the Army authorization but do not require pre -construction
notification. The description of the proposed activity and any proposed mitigation measures should be
sufficiently detailed to allow the district engineer to determine that the adverse environmental effects
of the activity will be no more than minimal and to determine the need for compensatory mitigation
or other mitigation measures. For single and complete linear projects, the PCN must include the
quantity of anticipated losses of wetlands, other special aquatic sites, and other waters for each single
and complete crossing of those wetlands, other special aquatic sites, and other waters. Sketches
should be provided when necessary to show that the activity complies with the terms of the NWP.
(Sketches usually clarify the activity and when provided results in a quicker decision. Sketches should
contain sufficient detail to provide an illustrative description of the proposed activity (e.g., a
conceptual plan), but do not need to be detailed engineering plans);
(5) The PCN must include a delineation of wetlands, other special aquatic sites, and other
waters, such as lakes and ponds, and perennial, intermittent, and ephemeral streams, on the project
site. Wetland delineations must be prepared in accordance with the current method required by the
Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters on the
project site, but there may be a delay if the Corps does the delineation, especially if the project site is
large or contains many wetlands, other special aquatic sites, and other waters. Furthermore, the 45
day period will not start until the delineation has been submitted to or completed by the Corps, as
appropriate;
(6) If the proposed activity will result in the loss of greater than 1/10 -acre of wetlands and a
PCN is required, the prospective permittee must submit a statement describing how the mitigation
requirement will be satisfied, or explaining why the adverse environmental effects are no more than
minimal and why compensatory mitigation should not be required. As an alternative, the prospective
permittee may submit a conceptual or detailed mitigation plan.
(7) For non -Federal permittees, if any listed species or designated critical habitat might be
affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat,
the PCN must include the name(s) of those endangered or threatened species that might be affected
by the proposed activity or utilize the designated critical habitat that might be affected by the
proposed activity. For NWP activities that require pre -construction notification, Federal permittees
must provide documentation demonstrating compliance with the Endangered Species Act;
(8) For non -Federal permittees, if the NWP activity might have the potential to cause effects
to a historic property listed on, determined to be eligible for listing on, or potentially eligible for
listing on, the National Register of Historic Places, the PCN must state which historic property might
have the potential to be affected by the proposed activity or include a vicinity map indicating the
location of the historic property. For NWP activities that require pre -construction notification, Federal
permittees must provide documentation demonstrating compliance with section 106 of the National
Historic Preservation Act;
(9) For an activity that will occur in a component of the National Wild and Scenic River
System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, the PCN must identify the Wild and Scenic River
or the "study river" (see general condition 16); and
(10) For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408
because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers
federally authorized civil works project, the pre -construction notification must include a statement
confirming that the project proponent has submitted a written request for section 408 permission from
the Corps office having jurisdiction over that USACE project.
(c) Form of Pre -Construction Notification: The standard individual permit application form (Form ENG
4345) may be used, but the completed application form must clearly indicate that it is an NWP PCN and
10
must include all of the applicable information required in paragraphs (b)(1) through (10) of this general
condition. A letter containing the required information may also be used. Applicants may provide
electronic files of PCNs and supporting materials if the district engineer has established tools and
procedures for electronic submittals. (d) Agency Coordination: (1) The district engineer will consider any
comments from Federal and state agencies concerning the proposed activity's compliance with the terms
and conditions of the NWPs and the need for mitigation to reduce the activity's adverse environmental
effects so that they are no more than minimal. (2) Agency coordination is required for: (i) all NWP
activities that require pre -construction notification and result in the loss of greater than 1/2 -acre of waters
of the United States; (ii) NWP 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52 activities that require pre -
construction notification and will result in the loss of greater than 300 linear feet of stream bed; (iii) NWP
13 activities in excess of 500 linear feet, fills greater than one cubic yard per running foot, or involve
discharges of dredged or fill material into special aquatic sites; and (iv) NWP 54 activities in excess of
500 linear feet, or that extend into the waterbody more than 30 feet from the mean low water line in tidal
waters or the ordinary high water mark in the Great Lakes. (3) When agency coordination is required, the
district engineer will immediately provide (e.g., via e-mail, facsimile transmission, overnight mail, or
other expeditious manner) a copy of the complete PCN to the appropriate Federal or state offices (FWS,
state natural resource or water quality agency, EPA, and, if appropriate, the NMFS). With the exception
of NWP 37, these agencies will have 10 calendar days from the date the material is transmitted to notify
the district engineer via telephone, facsimile transmission, or e-mail that they intend to provide
substantive, site-specific comments. The comments must explain why the agency believes the adverse
environmental effects will be more than minimal. If so contacted by an agency, the district engineer will
wait an additional 15 calendar days before making a decision on the pre -construction notification. The
district engineer will fully consider agency comments received within the specified time frame
concerning the proposed activity's compliance with the terms and conditions of the NWPs, including the
need for mitigation to ensure the net adverse environmental effects of the proposed activity are no more
than minimal. The district engineer will provide no response to the resource agency, except as provided
below. The district engineer will indicate in the administrative record associated with each pre -
construction notification that the resource agencies' concerns were considered. For NWP 37, the
emergency watershed protection and rehabilitation activity may proceed immediately in cases where there
is an unacceptable hazard to life or a significant loss of property or economic hardship will occur. The
district engineer will consider any comments received to decide whether the NWP 37 authorization
should be modified, suspended, or revoked in accordance with the procedures at 33 CFR 330.5.
(4) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide a
response to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservation
recommendations, as required by section 305(b)(4)(B) of the Magnuson -Stevens Fishery Conservation
and Management Act. (5) Applicants are encouraged to provide the Corps with either electronic files or
multiple copies of pre -construction notifications to expedite agency coordination.
District Engineer's Decision: 1. In reviewing the PCN for the proposed activity, the district engineer will
determine whether the activity authorized by the NWP will result in more than minimal individual or
cumulative adverse environmental effects or maybe contrary to the public interest. If a project
proponent requests authorization by a specific NWP, the district engineer should issue the NWP
verification for that activity if it meets the terms and conditions of that NWP, unless he or she determines,
after considering mitigation, that the proposed activity will result in more than minimal individual and
cumulative adverse effects on the aquatic environment and other aspects of the public interest and
exercises discretionary authority to require an individual permit for the proposed activity. For a linear
project, this determination will include an evaluation of the individual crossings of waters of the United
States to determine whether they individually satisfy the terms and conditions of the NWP(s), as well as
the cumulative effects caused by all of the crossings authorized by NWP. If an applicant requests a waiver
of the 300 linear foot limit on impacts to streams or of an otherwise applicable limit, as provided for in
NWPs 13, 21, 29, 36, 39, 40, 42, 43, 44, 50, 51, 52, or 54, the district engineer will only grant the waiver
upon a written determination that the NWP activity will result in only minimal individual and cumulative
11
adverse environmental effects. For those NWPs that have a waivable 300 linear foot limit for losses of
intermittent and ephemeral stream bed and a 1/2 -acre limit (i.e., NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51,
and 52), the loss of intermittent and ephemeral stream bed, plus any other losses of jurisdictional waters
and wetlands, cannot exceed 1/2 -acre. 2. When making minimal adverse environmental effects
determinations the district engineer will consider the direct and indirect effects caused by the NWP
activity. He or she will also consider the cumulative adverse environmental effects caused by activities
authorized by NWP and whether those cumulative adverse environmental effects are no more than
minimal. The district engineer will also consider site specific factors, such as the environmental setting in
the vicinity of the NWP activity, the type of resource that will be affected by the NWP activity, the
functions provided by the aquatic resources that will be affected by the NWP activity, the degree or
magnitude to which the aquatic resources perform those functions, the extent that aquatic resource
functions will be lost as a result of the NWP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region
(e.g., watershed or ecoregion), and mitigation required by the district engineer. If an appropriate
functional or condition assessment method is available and practicable to use, that assessment method
may be used by the district engineer to assist in the minimal adverse environmental effects determination.
The district engineer may add case -specific special conditions to the NWP authorization to address site-
specific environmental concerns. 3. If the proposed activity requires a PCN and will result in a loss of
greater than 1/10 -acre of wetlands, the prospective permittee should submit a mitigation proposal with the
PCN. Applicants may also propose compensatory mitigation for NWP activities with smaller impacts, or
for impacts to other types of waters (e.g., streams). The district engineer will consider any proposed
compensatory mitigation or other mitigation measures the applicant has included in the proposal in
determining whether the net adverse environmental effects of the proposed activity are no more than
minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the district
engineer determines that the activity complies with the terms and conditions of the NWP and that the
adverse environmental effects are no more than minimal, after considering mitigation, the district
engineer will notify the permittee and include any activity -specific conditions in the NWP verification the
district engineer deems necessary. Conditions for compensatory mitigation requirements must comply
with the appropriate provisions at 33 CFR 332.3(k). The district engineer must approve the final
mitigation plan before the permittee commences work in waters of the United States, unless the district
engineer determines that prior approval of the final mitigation plan is not practicable or not necessary to
ensure timely completion of the required compensatory mitigation. If the prospective permittee elects to
submit a compensatory mitigation plan with the PCN, the district engineer will expeditiously review the
proposed compensatory mitigation plan. The district engineer must review the proposed compensatory
mitigation plan within 45 calendar days of receiving a complete PCN and determine whether the proposed
mitigation would ensure the NWP activity results in no more than minimal adverse environmental effects.
If the net adverse environmental effects of the NWP activity (after consideration of the mitigation
proposal) are determined by the district engineer to be no more than minimal, the district engineer will
provide a timely written response to the applicant. The response will state that the NWP activity can
proceed under the terms and conditions of the NWP, including any activity -specific conditions added to
the NWP authorization by the district engineer. 4. If the district engineer determines that the adverse
environmental effects of the proposed activity are more than minimal, then the district engineer will
notify the applicant either: (a) that the activity does not qualify for authorization under the NWP and
instruct the applicant on the procedures to seek authorization under an individual permit; (b) that the
activity is authorized under the NWP subject to the applicant's submission of a mitigation plan that would
reduce the adverse environmental effects so that they are no more than minimal; or (c) that the activity is
authorized under the NWP with specific modifications or conditions. Where the district engineer
determines that mitigation is required to ensure no more than minimal adverse environmental effects, the
activity will be authorized within the 45 -day PCN period (unless additional time is required to comply
with general conditions 18, 20, and/or 31, or to evaluate PCNs for activities authorized by NWPs 21, 49,
and 50), with activity -specific conditions that state the mitigation requirements. The authorization will
include the necessary conceptual or detailed mitigation plan or a requirement that the applicant submit a
12
mitigation plan that would reduce the adverse environmental effects so that they are no more than
minimal. When compensatory mitigation is required, no work in waters of the United States may occur
until the district engineer has approved a specific mitigation plan or has determined that prior approval of
a final mitigation plan is not practicable or not necessary to ensure timely completion of the required
compensatory mitigation.
Further Information: 1. District Engineers have authority to determine if an activity complies with the
terns and conditions of an NWP. 2. NWPs do not obviate the need to obtain other federal, state, or local
permits, approvals, or authorizations required by law. 3. NWPs do not grant any property rights or
exclusive privileges. 4. NWPs do not authorize any injury to the property or rights of others. 5. NWPs do
not authorize interference with any existing or proposed Federal project (see general condition 31).
C. CORPS SEATTLE DISTRICT REGIONAL GENERAL CONDITIONS: The following conditions
apply to all NWPs for the Seattle District in Washington State, unless specified.
1. Proiect Drawings: Drawings must be submitted with pre -construction notification (PCN). Drawings
must provide a clear understanding of the proposed project, and how waters of the U.S. will be affected.
Drawings must be originals and not reduced copies of large-scale plans. Engineering drawings are not
required. Existing and proposed site conditions (manmade and landscape features) must be drawn to
scale.
2. Aquatic Resources Requiring Special Protection: Activities resulting in a loss of waters of the
United States in mature forested wetlands, bogs and peatlands, aspen -dominated wetlands, alkali
wetlands, vernal pools, camas prairie wetlands, estuarine wetlands, wetlands in coastal lagoons, and
wetlands in dunal systems along the Washington coast cannot be authorized by a NWP, except by the
following NWPs:
NWP 3 — Maintenance
NWP 20 — Response Operations for Oil and Hazardous Substances
NWP 32 — Completed Enforcement Actions
NWP 38 — Cleanup of Hazardous and Toxic Waste
In order to use one of the above -referenced NWPs in any of the aquatic resources requiring special
protection, prospective permittees must submit a PCN to the Corps of Engineers (see NWP general
condition 32) and obtain written authorization before commencing work.
3. New Bank Stabilization in Tidal Waters of Puget Sound: Activities involving new bank
stabilization in tidal waters in Water Resource Inventory Areas (WRIAs)
8, 9, 10, 11 and 12 (within the areas identified on Figures la through le on Corps website) cannot be
authorized by NWP.
4. Commencement Bay: The following NWPs may not be used to authorize activities located in the
Commencement Bay Study Area (see Figure 2 on Corps website):
NWP 12
— Utility Line Activities (substations)
NWP 13
— Bank Stabilization
NWP 14
— Linear Transportation Projects
NWP 23
— Approved Categorical Exclusions
NWP 29
— Residential Developments
NWP 39
— Commercial and Institutional Developments
NWP 40
— Agricultural Activities
NWP 41
— Reshaping Existing Drainage Ditches
NWP 42
— Recreational Facilities
NWP 43
— Stormwater and Wastewater Management Facilities
13
5. Bank Stabilization: All projects including new or maintenance bank stabilization activities require
PCN to the Corps of Engineers (see NWP general condition 32). For new bank stabilization projects only,
the following must be submitted to the Corps of Engineers:
a. The cause of the erosion and the distance of any existing structures from the area(s) being
stabilized.
b. The type and length of existing bank stabilization within 300 feet of the proposed project.
c. A description of current conditions and expected post -project conditions in the waterbody.
d. A statement describing how the project incorporates elements avoiding and minimizing adverse
environmental effects to the aquatic environment and nearshore riparian area, including vegetation
impacts in the waterbody.
In addition to a. through d., the results from any relevant geotechnical investigations can be submitted
with the PCN if it describes current or expected conditions in the waterbody.
6. Crossings of Waters of the United States: Any project including installing, replacing, or modifying
crossings of waters of the United States, such as culverts or bridges, requires submittal of a PCN to the
Corps of Engineers (see NWP general condition 32). If a culvert is proposed to cross waters of the U.S.
where salmonid species are present or could be present, the project must apply the stream simulation
design method from the Washington Department of Fish and Wildlife located in the Water Crossing
Design Guidelines (2013), or a design method which provides passage at all ife stages at all flows where
the salmonid species would naturally seek passage. If the stream simulation design method is not applied
for a culvert where salmonid species are present or could be present, the project proponent must provide a
rationale in the PCN sufficient to establish one of the following:
a. The existence of extraordinary site conditions.
b. How the proposed design will provide equivalent or better fish passage and fisheries habitat
benefits than the stream simulation design method.
If a culvert is proposed to cross waters of the U.S. where salmonid species are present or could be present,
project proponents must provide a monitoring plan with the PCN that specifies how the proposed culvert
will be assessed over a five-year period from the time of construction completion to ensure its
effectiveness in providing passage at all ife stages at all flows where the salmonid species would
naturally seek passage. Culverts installed under emergency authorization that do not meet the above
design criteria will be required to meet the above design criteria to receive an after -the -fact nationwide
permit verification.
7. Stream Loss: A PCN is required for all activities that result in the loss of any linear feet of stream
beds. No activity shall result in the loss of any linear feet of perennial stream beds or the loss of greater
than 300 linear feet of intermittent and/or ephemeral stream beds. A stream may be rerouted if it is
designed in a manner that maintains or restores hydrologic, ecologic, and geomorphic stream processes,
provided there is not a reduction in the linear feet of stream bed. Streams include brooks, creeks, rivers,
and historical waters of the U.S. that have been channelized into ditches. This condition does not apply to
ditches constructed in uplands. Stream loss restrictions may be waived by the district engineer on a case-
by-case basis provided the activities result in net increases of aquatic resource functions and services.
8. Mitigation: Pre -construction notification is required for any project that will result in permanent
wetland losses that exceed 1,000 square feet. In addition to the requirements of General Condition 23
(Mitigation), compensatory mitigation at a minimum one-to-one ratio will be required for all permanent
wetland losses that exceed 1,000 square feet. When a PCN is required for wetland losses less than 1,000
square feet, the Corps of Engineers may determine on a case-by-case basis that compensatory mitigation
is required to ensure that the activity results in minimal adverse effects on the aquatic environment.
Compensatory mitigation for impacts to marine waters, lakes, and streams will be determined on a case-
by-case basis. If temporary impacts to waters of the U.S. exceed six months, the Corps of Engineers may
require compensatory mitigation for temporal effects.
14
9. Magnuson -Stevens Fishery Conservation and Management Act — Essential Fish Habitat
Essential Fish Habitat (EFH) is defined as those waters and substrate necessary to fish for spawning,
breeding, feeding, or growth to maturity. If EFH may be adversely affected by a proposed activity, the
prospective permittee must provide a written EFH assessment with an analysis of the effects of the
proposed action on EFH. The assessment must identify the type(s) of essential fish habitat (i.e., Pacific
salmon, groundfish, and/or coastal pelagic species) that may be affected. If the Corps of Engineers
determines the project will adversely affect EFH, consultation with NOAA Fisheries will be required.
Federal agencies should follow their own procedures for complying with the requirements of the
Magnuson -Stevens Fishery Conservation and Management Act. If PCN is required for the proposed
activity, Federal permittees must provide the district engineer with the appropriate documentation to
demonstrate compliance with those requirements.
10. Forage Fish: For projects in forage fish spawning habitat, in -water work must occur within
designated forage fish work windows, or when forage fish are not spawning. If working outside of a
designated work window, or if forage fish work windows are closed year round, work may occur if the
work window restriction is released for a period of time after a forage fish spawning survey has been
conducted by a biologist approved by the Washington State Department of Fish and Wildlife (WDFW).
Forage fish species with designated in -water work windows include Pacific sand lance (Ammodytes
hexapterus), Pacific herring (Clupea pallasi), and surf smelt (Hypomesus pretiosus). This RGC does not
apply to NWP 48, Commercial Shellfish Aquaculture Activities. Please see specific regional conditions
for NWP 48.
11. Notification of Permit Requirements: The permittee must provide a copy of the nationwide permit
authorization letter, conditions, and permit drawings to all contractors and any other parties performing
the authorized work prior to the commencement of any work in waters of the U.S. The permittee must
ensure all appropriate contractors and any other parties performing the authorized work at the project site
have read and understand relevant NWP conditions as well as pians, approvals, and documents referenced
in the NWP letter. A copy of these documents must be maintained onsite throughout the duration of
construction.
12. Construction Boundaries: Permittees must clearly mark all construction area boundaries before
beginning work on projects that involve grading or placement of fill. Boundary markers and/or
construction fencing must be maintained and clearly visible for the duration of construction. Permittees
should avoid and minimize removal of native vegetation (including submerged aquatic vegetation) to the
maximum extent possible.
13. Temporary Impacts and Site Restoration
a. Temporary impacts to waters of the U.S. must not exceed six months unless the prospective permittee
requests and receives a waiver by the district engineer. Temporary impacts to waters of the U.S. must
be identified in the PCN.
b. No more than 1/2 acre of waters of the U.S. may be temporarily filled unless the prospective permittee
requests and receives a waiver from the district engineer (temporary fills do not affect specified limits
for loss of waters associated with specific nationwide permits).
c. Native soils removed from waters of the U.S. for project construction should be stockpiled and used
for site restoration. Restoration of temporarily disturbed areas must include returning the area to pre -
project ground surface contours. If native soil is not available from the project site for restoration,
suitable clean soil of the same textural class may be used. Other soils may be used only if identified in
the PCN.
d. The permittee must revegetate disturbed areas with native plant species sufficient in number, spacing,
and diversity to restore affected functions. A maintenance and monitoring pian commensurate with
the impacts, may be required. Revegetation must begin as soon as site conditions allow within the
same growing season as the disturbance unless the schedule is approved by the Corps of Engineers.
15
Native plants removed from waters of the U.S. for project construction should be stockpiled and used
for revegetation when feasible. Temporary Erosion and Sediment Control measures must be removed
as soon as the area has established vegetation sufficient to control erosion and sediment.
e. If the Corps determines the project will result in temporary impacts of submerged aquatic vegetation
(SAV) that are more than minimal, a monitoring plan must be submitted. If recovery is not achieved
by the end of the monitoring period, contingencies must be implemented, and additional monitoring
will be required.
This RGC does not apply to NWP 48, Commercial Shellfish Aquaculture Activities. Please see specific
regional conditions for NWP 48.
D. CORPS REGIONAL SPECIFIC CONDITIONS FOR THIS NWP: none
E. ECOLOGY 401 CERTIFICATION: GENERAL CONDITIONS
In addition to all the Corps National and Seattle Districts' Regional permit conditions, the following State
General Section 401 Water Quality Certification (Section 401) conditions apply to all Nationwide Permits
whether certified or partially certified in the State of Washington.
1. For in -water construction activities. Ecology Section 401 review is required for projects or
activities authorized under NWPs that will cause, or may be likely to cause or contribute to an exceedance
of a State water quality standard (Chapter 173-201A WAC) or sediment management standard (Chapter
173-204 WAC). State water quality standards and sediment management standards are available on
Ecology's website. Note: In -water activities include any activity within a wetland and/or activities below
the ordinary high water mark (OHWM).
2. Projects or Activities Discharging to Impaired Waters. Ecology Section 401 review is required for
projects or activities authorized under NWPs if the project or activity will occur in a 303(d) listed
segment of a waterbody or upstream of a listed segment and may result in further exceedances of the
specific listed parameter. To determine if your project or activity is in a 303(d) listed segment of a
waterbody, visit Ecology's Water Quality Assessment webpage for maps and search tools.
3. Application. For projects or activities that will require Ecology Section 401 review, applicants must
provide Ecology with a Joint Aquatic Resources Permit Application (JARPA) along with the
documentation provided to the Corps, as described in National General Condition 32, Pre -Construction
Notification, including, when applicable: (a) A description of the project, including site plans, project
purpose, direct and indirect adverse environmental effects the project would cause, best management
practices (BMPs), and any other Department of the Army or federal agency permits used or intended to be
used to authorize any part of the proposed project or any related activity. (b) Drawings indicating the
Ordinary High Water Mark (OHWM), delineation of special aquatic sites and other waters of the state.
Wetland delineations must be prepared in accordance with the current method required by the Corps and
shall include Ecology's Wetland Rating form. Wetland rating forms are subject to review and verification
by Ecology staff. Guidance for determining the OHWM is available on Ecology's website. (c) A
statement describing how the mitigation requirement will be satisfied. A conceptual or detailed mitigation
or restoration plan may be submitted. See State General Condition 5 for details on mitigation
requirements. (d) Other applicable requirements of Corps Nationwide Permit General Condition 32,
Corps Regional Conditions, or notification conditions of the applicable NWP. (e) Within 180 calendar
days from receipt of applicable documents noted above and a copy of the final authorization letter from
the Corps providing coverage for a proposed project or activity under the NWP Program Ecology will
provide the applicant notice of whether an individual Section 401 will be required for the project. If
Ecology fails to act within a year after receipt of both of these documents, Section 401 is presumed
waived.
16
4. Aquatic resources requiring special protection. Certain aquatic resources are unique, difficult -to -
replace components of the aquatic environment in Washington State. Activities that would affect these
resources must be avoided to the greatest extent possible. Compensating for adverse impacts to high
value aquatic resources is typically difficult, prohibitively expensive, and may not be possible in some
landscape settings. Ecology Section 401 review is required for activities in or affecting the following
aquatic resources (and not prohibited by Seattle District Regional General Condition): (a) Wetlands with
special characteristics (as defined in the Washington State Wetland Rating Systems for western and
eastern Washington, Ecology Publications #14-06-029 and #14-06-030):
• Estuarine wetlands.
• Wetlands of High Conservation Value.
• Bogs.
• Old-growth and mature forested wetlands.
• Wetlands in coastallagoons.
• Interdunal wetlands.
• Vernal pools.
• Alkali wetlands.
(b) Fens, aspen -dominated wetlands, camas prairie wetlands. (c) Marine water with eelgrass (Zostera
marina) beds (except for NWP 48). (d) Category I wetlands. (e) Category II wetlands with a habitat score
> 8 points. This State General Condition does not apply to the following Nationwide Permits:
NWP 20 — Response Operations for Oil and Hazardous Substances, NWP 32 — Completed Enforcement
Actions
5. Mitigation. Applicants are required to show that they have followed the mitigation sequence and
have first avoided and minimized impacts to aquatic resources wherever practicable. For projects
requiring Ecology Section 401 review with unavoidable impacts to aquatics resources, adequate
compensatory mitigation must be provided.
(a) Wetland mitigation plans submitted for Ecology review and approval shall be based on the most
current guidance provided in Wetland Mitigation in Washington State, Parts 1 and 2 (available on
Ecology's website) and shall, at a minimum, include the following:
i. A description of the measures taken to avoid and minimize impacts to wetlands and other waters of
the U.S.
ii. The nature of the proposed impacts (i.e., acreage of wetlands and functions lost or degraded).
iii. The rationale for the mitigation site that was selected.
iv. The goals and objectives of the compensatory mitigation project.
v. How the mitigation project will be accomplished, including construction sequencing, best
management practices to protect water quality, proposed performance standards for measuring success
and the proposed buffer widths.
vi. How it will be maintained and monitored to assess progress towards goals and objectives.
Monitoring will generally be required for a minimum of five years. For forested and scrub -shrub
wetlands, 10 years of monitoring will often be necessary.
vii. How the compensatory mitigation site will be legally protected for the long tern.
Refer to Wetland Mitigation in Washington State — Part 2: Developing Mitigation Plans (Ecology
Publication #06-06-01 lb) and Selecting Wetland Mitigation Sites Using a Watershed Approach (Ecology
Publications #09-06-032 (Western Washington) and #10-06-007 (Eastern Washington)) for guidance on
selecting suitable mitigation sites and developing mitigation plans. Ecology encourages the use of
alternative mitigation approaches, including credit/debit methodology, advance mitigation, and other
programmatic approach such as mitigation banks and in -lieu fee programs. If you are interested in
proposing use of an alternative mitigation approach, consult with the appropriate Ecology regional staff
person. Information on alternative mitigation approaches is available on Ecology's website.
(b) Mitigation for other aquatic resource impacts will be determined on a case-by-case basis.
17
6. Temporary Fills. Ecology Section 401 review is required for any project or activity with temporary
fill in wetlands or other waters of the state for more than 90 days, unless the applicant has received
written approval from Ecology. Note: This State General Condition does not apply to projects or activities
authorized under NWP 33, Temporary Construction, Access, and Dewatering
7. Stormwater pollution prevention: All projects that involve land disturbance or impervious surfaces
must implement stormwater pollution prevention or control measures to avoid discharge of pollutants in
storawater runoff to waters of the State.
(a) For land disturbances during construction, the applicant must obtain and implement permits (e.g.,
Construction Stormwater General Permit) where required and follow Ecology's current stormwater
manual.
(b) Following construction, prevention or treatment of on-going storawater runoff from impervious
surfaces shall be provided.
Ecology's Stormwater Management and Design Manuals and stormwater permit information are available
on Ecology's website.
8. State Section 401 Review for PCNs not receiving 45 -day response from the Seattle District. In the
event the Seattle District Corps does not issue a NWP authorization letter within 45 calendar days of
receipt of a complete pre -construction notification, the applicant must contact Ecology for Section 401
review prior to commencing work.
F. ECOLOGY 401 CERTIFICATION: SPECIFIC CONDITIONS FOR THIS NWP:
Certified, if all applicable State General Conditions are met.
G. COASTAL ZONE MANAGEMENT CONSISTENCY RESPONSE FOR THIS NWP:
(Note: This is only applies in the following counties: Clallam, Grays Harbor, Island, Jefferson, King,
Kitsap, Mason, Pacific, Pierce, San Juan, Skagit, Snohomish, Thurston, Wahkiakum and Whatcom)
Specific NWP Response: Ecology concurs that this NWP is consistent with the CZMP.
18
T Op
aE
srares of • •
Regulatory Branch
Mr. William J. Davis
DEPARTMENT OF THE ARMY
SEATTLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 3755
SEATTLE, WASHINGTON 98124-3755
City of Bremerton
3027 Olympus Drive Northeast
Bremerton, Washington 98310
Dear Mr. Davis:
November 22, 2017
Reference: NWS -2017-1024
Bremerton, City of
(East Park Stormwater
Outfall)
We have reviewed your proposal for emergency work to place no more than 25 cubic yards
of boulders and angular rock waterward of the mean higher high water mark in the Washington
Narrows at Bremerton, Kitsap County, Washington. Based on the information you provided to
us, we have determined that the work meets the U.S. Army Corps of Engineer's definition of an
emergency situation as described in 33 CFR 325.2(e)(4) and appears to meet most of the
requirements for Nationwide Permit (NWP) 18, Minor Discharges (Federal Register, January 6,
2017, Vol. 82, No. 4). We are unable to complete a NWP verification at this time but
considering the emergency situation, you may proceed with the proposed emergency work
provided you:
a. Conduct the work in accordance with the attached drawings dated November 22, 2017.
b. Apply for after -the -fact authorization to retain and/or modify the work within 60 days
from the date of this letter. You must submit a permit application which includes
appropriate measures for site clean-up, restoration, revegetation, monitoring and
mitigation.
Your permit application must also include a Biological Evaluation so that we can
complete post project Section 7 Endangered Species Act consultation with the U.S. Fish
and Wildlife Service and National Marine Fisheries Service and Magnuson -Stevens
Fishery Conservation and Management Act consultation with the National Marine
Fisheries Service.
d. Conduct the work in accordance with the attached Nationwide Permit 18 Terms and
Conditions.
-2 -
If human remains, historic resources, or archaeological resources are encountered during
construction, all ground disturbing activities shall cease in the immediate area and you shall
immediately (within one business day of discovery) notify the Corps, Seattle District, Regulatory
Branch. You shall perform any work required by the Corps in accordance with Section 106 of
the National Historic Preservation Act and Corps regulations.
We are unable to determine whether or not your project will require individual Water
Quality Certification (WQC) and/or a Coastal Zone Management (CZM) consistency
determination response from the Washington State Department of Ecology (Ecology). Please
contact Ecology regarding these requirements at: Washington Department of Ecology, Federal
Permit Coordinator, P.O. Box 47600, Olympia, Washington, 98504-7660; telephone:
(360) 407-6068; or email: ecyrefedpermits@ecy.wa.gov.
Please note that under Section 9 of the Endangered Species Act it is unlawful for anyone to
take a listed species or to significantly modify its habitat. This applies to private parties on
public or private land. The term "take" is defined to include harass, harm, injure, or kill.
Violations of Section 9 are punishable by civil and criminal penalties. By allowing you to
proceed with the emergency work, we are not allowing you to take any listed species or their
habitat.
We will be contacting the Suquamish Tribe and will inform you if they have concerns about
the project. If you do not comply with these requirements, we may take appropriate enforcement
action regarding the emergency work. Please not that this letter is not a permit. As described in
this letter, you must apply for a permit to authorize the work. Thank you for contacting us in a
timely manner about your emergency situation. If you have any questions about this letter,
please contact me at jerald.j.gregory@usace.army.mil or at (206) 764-6665.
Sincerely,
Jerald J. Gregory, Project Manager
Regulatory Branch
(Enclosures)
V 13 [ V, e ,,, I I\I , I I.eq, tnn n/v\zo , I I I I I I I_
0 8R �m
9\ a��s9go=�
11 maN<
0 / m> / 1 IuT"�pN�
'z
mooQuo=
ogom / a=5.
�� x
r/ N �� / / "PSI $ x 9 m
=nAa
�p r9�
oom
RN \
mid 1 A -
0
1 / a
? - -
m
za
ICE
a o=oa R^ aE�8
gQ N9 �£
%�o
m
u� zog m
A�of =8
> a�nos
aim=
On
_ 0
b f
�' -
_ � am
m
o age 2Z O
z _ ou p
n N mf
f f
F m "), 0
J
U1
x f x r
z
o m z J y
4
o
aR
9 m H CITY OF BREMERTON °AiE
o ^ y Kirsra courvtt wnsnirvcrory rvoreo
N � � EAST PARK STORMWATER OUTFALL GRAwn: SEI Q TT
43,Y'Ay UG 08bOIZ1P,�111C.
STGRMWATER OUTFALL CHECKED: BPB CONSULTING ENGINEERS
EMERGENCY BEACH REPAIR
Na. RENSIGN DATE
oR
nNx
�Nx
op
oa
$
n
A
��
m
o
A
A
O
�
D
N
�
m
m
N
H
�
2
APP° MPROYEG: BPB c, e�nc� e�v're�xia
Chal Martin — Director
Public Works & Utilities
100 Oyster Bay Ave. N.
Bremerton, WA 98312
lq F •� ��I
345 6th Street, Suite 104
Bremerton, 98337-1873
Telephone: 360-473-6289
360-473-5278
RE: Emergency Shoreline Exemption — East Park Stormwater Outfall
issuedevents associated with the East Park Stormwater Outfall facility. This Shoreline Exemption is
under the authorityof A I •
permanent solutionbe found.
' . - • - - • • • • - • • - - . • - * - • • . - • • - - - -
Pr-ROTYAr. RX1101w 9 •' • • • • - - • • - • - . - •
Chapter 7.030 •, • -• for • Net Loss of s s•Functions
Chapter91:0Shoreline.• •
Ryan E. Crater, Senior Planner, is currently working with Ecology's Shoreline Section and will have
comments submitted to your Department early next week as it relates to the emergency solution
being proposed to address the beach erosion. We look forward to working with you to help resolve
this situation.
�ncer,AIC'
HILARY S. FRANZ
COMMISSIONER OF PUBLIC LANDS
November 17, 2017
Mr. William Davis, P.E.
Department of Public Works & Utilities, Engineering Division
City of Bremerton
3027 Olympus Drive
Bremerton, WA 98310
Subject: Easement Agreement No. 51-089890
Dear Mr. Williams:
DEPARTMENT OF
NATURAL RESOURCES
SOUTH PUGET SOUND REGION
950 FARMAN AVENUE N
ENUMCLAW, WA 98022-9282
360-825-1631
TRS 711
SOUTH PUG ET„REGION@DNR,WA GOV
WWW. DNR,WA.GOV
Please consider this letter a formal response to your request for permisison to conduct
emergency repair work on easement 51-089890.
You are granted permission to perform emergency repair work on the beach within DNR
easement 51-089890, as described in your 11/15/17 email.
Please submit as built drawings, photos, and copies of permits upon completion.
Sincerely,
(ti /\
Trina Sunderland, Land Manager
Shoreline District Aquatics
(206) 455-1014
`� PRINTED ON RECYCLED PAPER. DNR IS AN EQUAL OPPORTUNITY EMPLOYER.
RESOLUTION NO. 3298
A RESOLUTION of the City Council of the City of
Bremerton, Washington, declaring an emergency at the East Park
storm water outfall, waiving any competitive bidding
requirements, and authorizing necessary contracts to address the
emergency.
WHEREAS, excessive erosion has occurred on the beach below the newly
constructed East Park storm water outfall which is jeopardizing an existing sewer beach main
and the storm water outfall itself;
WHEREAS, said erosion could result in the loss of the sewer main and the storm
water outfall if immediate action is not taken;
WHEREAS, environmental permits are being expedited by the Corps of
Engineers, the Washington Department of Fish and Wildlife, and the Department of Natural
Resources to allow for the stabilization of the beach below the outfall;
WHEREAS, RC W 39.04.280(1)(e) authorizes municipalities to waive
competitive bidding requirements for public works "in the event of an emergency",
WHEREAS, an emergency is defined at RCW 39.04.280(3) as unforeseen
circumstances beyond the eontrol of the municipality that will likely result in a material loss or
damage to property if immediate action is not taken.
WHEREAS, the City Council may grant the Mayor and the Mayor's designee the
authority to enter into emergency public works contracts, and waive any competitive bidding
requirements;
NOW THEREFORE,
THE CITY COUNCIL. OF THE CITY OF BREMEWI'ON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION]. The findings above are incorporated as if fully set forth herein.
SECTION 2. The excessive erosion at the East Park storm water outfall is an
emergency as defined by state statute, and any or all competitive bidding requirements under
state law are waived.
SECTION 3. The Mayor and the Mayor's designee are authorized to enter into
the necessary public works contracts to address the emergency at the Fast Park storm water
outfall in an amount not to exceed $200,000 for all contracts.
Page 1 of 2
Resolution East Park Storm Water Outfall
Rey. 0512017
SECTION 4. Severability. If anyone or more sections, subsections, or sentences
of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the
validity of the remaining portion of this Resolution and the same shall remain in full force and
effect.
SECTION5. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage?
PASSED by the City Council of the City of Bremerton, Washington this A day of
November. 2017.
APPROVED AS TO NORM:
R 'ER A. LUBOVICH, City�
x.
ERIC Y[3 GER, cil President
ATTEST:
r
SHANNON GRIN, City Clerk
R:ll.egall[,egallResolutions\Public Works\Outfall Resolution.doc
Page 2 of 2
Resolution East Park Storm Water Outfall
Rev. 05/2017
CONSTRUCTION FORMS
THIS PAGE LEFT INTENTIONALLY BLANK
J
Q
F-
F-
'^
/A
0
Z
Q
N
a
0
A
Z
0
N
W
5.W
m
LL
0
F -
E5
L•:
N
m
Z Z
C �
U
7 U
U C
�
Of > o
N
0-
0 0
Z
U
N
L
C
0
U
T
�
N
N
a
EO
N
m
E
U �
N cn
cn
D
N E
E
Q �
U
c
Y O N
E Z
O
U
U
C:
o
O d Y
Z X H
W
cn
N E
0--c
O =;
U U
E
O
U
E2
O
c
c
�
O
U
d
O
U
U7
N
N
d
E
O
U
N
m
0
C
c
U
(6
) a
a
O
Nz
�-
E
0-
C C
m
Y
E
N
N
m
E
O
1E t
0-
LO 0 U
V N
N N .N
O N
O �
0U
N N
N N
O N �
[6 V1 Y
O O
0 0 3
0-
Q) , t
O 0)
m E
U
O � O
E D
D 0) 0-
L)
O
O 'U O
ID N
N a
o c
[6
° w
CITY OF BREMERTON
REQUEST FOR INFORMATION
Log No.
Project Title:
Contractor:
Project No.:
Contract Date:
(For Contractor's Use)
Date: Subject:
Information Description:
Contractor's Authorized Signature:
(For Owner's Use)
Date: Subject:
Information Description:
Owner's Authorized Signature:
(Unique, Chronological)
CITY OF BREMERTON
WORK CHANGE DIRECTIVE (WCD)
WCD #: Date:
Project Name
Project #:
Contractor:
Notice to Proceed Date:
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
ATTACHMENT(S):
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
❑
Unit Price
❑ Contractor's Records
❑
Lump Sum
❑ Engineer's Records
❑
Time & Materials
❑
Other:
❑ Other:
Estimated increase (decrease) in Contract Price
41
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
RECOMMENDED:
CONTRACTOR
0
PAGE 1 OF 1
Estimated increase (decrease) in Contract Times:
Substantial Completion: 0 days;
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization.
AUTHORIZED:
M
CITY OF BREMERTON
It
/O
CL
4)
O C
.0 C
Qi .N 0
> v
� � V
M� Im Q
moi, i
O 4 LL
Vwo
.............................................................................................................................................................................................................................................................
O O OO O O O
O O O
O :-
O O O O O O O O
O O
O O
O:
O O O O
00
.
O 00
0 0 0 0 0 0 0
0 0 0
0:
O O O0
O0 O0 O0 O0 O
O O
O O
O
-. O O O O
99
O O
0 0 0 0 0 0 0
0 0 0
0
0 0
0
0 0
0 0
0
0 0 0 0
0 0
0 0
C
C
7
O
7
O
E
E
Q
Q
O
0
U
o
r
7
O 8-1 O- N
8-1�
O
=
O lJ c6
c0 _ O
V
O
O
L
o
O
2 2i
O 0 Ocn
O
m
� �
�
� :
�
) O
cn U)cn a` �
c6 O' 7
: J w � cn
7
U) m
7
cn
-
C
O
Ca'
O
�
O
Y
r
06
C
O
Z
O
O O
U
C
C
�
N
O -0
U O
Q
C O
O C
� O
O d
U
N
�
Q
�
O
O
..... ...........
.............
........................................................................................................................
z
....................................................................
z
.............. ....
:.
O O O O O O O O OO O
O O
O�
O O O O O O O O O O
O O O
O
O
:
O
999990.0. O O O O
O
O
O
�
O O O 99 O O O O O
O O O
O
O
O
O O O O O O O O 00 O
O
O
O
O O O 00 O O 00 O
O 000
O
O
7
O
7
O
E
E
Q
Q
o
o
T
0 0 0 0 0 0 0 0 0 0 O O O
/N
0 0 0 0 0 0 0 0 0 0
0 0
a
L
O
0
:
i
.
L
O
O
L
U)
Q
OO
O
O
2
O
O
C O
2
d
O
d
O
-:
J
J
J
Q
'L
w
w
w
am
C
U
a�
n
N
�
a U
D
C
i
O
L
of
_
W
(q
a� L
C
N
�
U
Y 7
O
_
�
0
Z
�
Q
C -
�
N 06
O
O 6
Z
O
O
:
w
O .°
Z
N
:
U
L)
U
Q
Nml
O
d
Z
Z
CONSTRUCTION PLANS
THIS PAGE LEFT INTENTIONALLY BLANK
ce (asa) czzse vm 'xoJ•xiwr ad9 :a3Ma ad 31tl Noll ON
o�Es3ans 'e 'sale '3n u3ass wasp a�as NlVd321 H3V39 A31139NM3
SH33NION3 ONI1lnSNOO ad9 a(D03110 sem.+. az lltl-no 213 —wNo1S
O�
n3s �nmvaa 11tl31f10 2131tlMW2101S N21tld 1Stl3
a31oN :31tla5 p\ ap -1111 srom urvno] eesllM N
RW :31W NOINWONS =10 U13
– c�z
m am
Z o o-
x
wz o w� u
o O a
J –
x x N
N J
OJ
K O
i An,,, 4
O m D
4
6aWF'u / J
ozu
oww D � ~
_„ Y z
wwwn O
Hg =e Oa'
auz N =a�a oga
m = rcN -
&��= o� _
Q. wm
sN .a s
S.
w�
o aw
tH
U
B.
��w
w
~ d Na4b3 N=
w
�wz
p� gQ
ogo
o Q 5
o
� rm 4 lil � =p
m� ow Z
Q
a
a "gyp w�
= a i
o = llj ooox
/ J
o z rsa '_^ zawl
w lI, Mr s- I ` f, 5z _
o o.
�x
/ \ zo"
a a dome=; a;
�N I z i uo � m
xwz0 � � r n as inN e
o n
5 3
W n
J ^^
fll a
H 3
Y
K
w ¢Y
Q
LU
0(V^ v I'll V 14L L40./L/ Lnn"llu ) C ,,
z
n\1--•\^Ji�ti+ lL.AS'4\ 1 i�B\'l
THIS PAGE LEFT INTENTIONALLY BLANK