HomeMy WebLinkAbout5701AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Commercial Line Extension Study Session Date: June 28, 2017
Agreement with Puget Sound Energy for COUNCIL MEETING Date: July 5, 2017
Pump Station KL -Z Department: PW&U/WWTP
Presenter: Pat Coxon
Phone: (360) 473-5448
SUMMARY: The current electrical power at Pump Station KL -2 (1976 Price Road) is 480v corner
grounded delta, and it needs to be upgraded to a true "Y" 277/480v connection.The existing power is
inherently unsafe for staff to work on and has continued to cause motor/pump and generator issues
at the station.
We requested a proposal from PSE (Puget Sound Energy), and they provided a quote of $39,616.86
to install the new pad mounted transformer and electrical conductors.
This electrical upgrade will ensure a much more efficient electrical system and it will be a lot safer to
work on.
ATTACHMENTS: 1) Puget Sound Energy Quote
FISCAL IMPACTS (Include Budgeted Amount): This electrical upgrade at pump station KL -2 is
budgeted through the 2017 WW CIP, and has a budget of $250,000. The total cost for the electrical
upgrade is $39,616.86
STUDY SESSION AGENDA: 0 No Presentation ❑ Full Presentation
STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to approve the Commercial Line Extension Agreement with
Puget Sound Energy for $39,616.86; and authorize the Mayor to finalize and execute the agreement
with substantially the same terms and conditions as presented.
COUNCIL ACTION: [Approve
Form Updated 01/07/15
❑ Deny ❑ Table ❑ Continue ❑ No Action
DociiSignErwerope iD 4oPA083A-175D-417A-9E7$-3F9813A5C5A7
PUGET SOUND ENERGY
Puget Sound E.nergg
P.O Sox 97034
Sdevua, WA 9t3t]09-9734
PSt`ccaRa ,
June 13, 2017
Ty Loper
City of Bremerton
345 6th St, Ste 600
Bremerton, WA 98337
Cammardai Line Extenetnrt Anrne�nee►t
PSE Order 10,:105084852
Dear Ty Loper
Thank you for the opportunity to provide electrical service for your project at:-:
1976 Price Rd. Bremerton
We look forward to serving you and your project's energy needs. This agreement outlines the costs for
performing the needed work per the attached PSE drawing and scope description: These costs represent
doing the work during normal working tours and exclude trenching and other excavation related work that
Is your responsibility, to provide.
(+ROJ T S -OPE X? ANATiON
3 phase primary underground tine extension
PROJECT COST BREAKDOWN — LINE EXTENSION
Construction Costs $ 0.00
TransformerCharge
Less: Applicable Margin Allowance 40.00
Sub -Total (Eligible for partial refund under certain conditions) 00 (1)
Permitting Fees $327.32
Relocationfremoval of existing facli ties +$3,670.91
Other Non -Refundable Construction: +,S36,618.63
Other Costs +$0.00
Costs Sub -Total (Non -Refundable Costs) MS39,616.66 (2)
Amount to Be Sifted tinder This Agreement X39.618:8_(1+2)3
mer
CustoIns
lf
PERMANENT AND TEMPQp MY SERVICE CHARGES ARE NOT MQ jQg M YOUR LIN RUM /+y
Any applicsbh charges Wad below We be Mad after yaw sere cs Una instarta0on, Current costs effective 091 no1s.
C-M-ehs-nee-Ah-kM-4.F -6..@.U--f....6 _________ p,•w 0— e
ServiceType
a CO rA
Sin wire run to handhole or transformer
$544.00
Each additional run of wire(per circuits
$126,05
Each additional trip bow nd 1 trip due to customer refrements
$372.62 per '
Houdy rate for additional ortaineering
$16254
Underground Temporary Service Ch
$186.00
Overhead Temporary Service Ch a
$248.00
Overhead Permanent Service Cha a
$694.38
1f
Customer tNttals
DocuSlgn Envelope ID: 48FA083A-7750417A4)E78.3FSB13A5C5A7
AO costs are calculated in accordance with Puget Sound Energy's (PSE) Tariff G. Rate Schedule 85 'Une
Extensions', available at pse.com. This cost information is valid for 90 days from the date of this letter. Should
we receive your agreement atter this period, the costs will be subject to changes.
The amount noted on this agreement is an estimated cost; however PSE's Schedule 85 line extension tariff
requires customers to pay the actual cost of construction. PSE will determine the actual cost of the job once
construction is complete. If the actual cost of the job is 10% above or below the estimated cost, an additional
balling or refund will result to account for the difference.
PROJECT CHEt'- L14T
1. The attached PSE drawing shows the proposed scope of your project Including the location of
permanent, above ground electrical facilities required to provide electrical service to your project. ,
Fault current information for transformers associated with your project Is noted on the work sketch
drawing. Please review this drawing las soon as possible to ensure there are' no unforeseen conflicts
between PSE's design and your project. If you determine there are conflicts or it you identify a
discrepancy while reviewing the drawing for your project. please contact me at the number below,
2. Additional construction -related Information and Information on metering and service entrance
requirements are provided in PSE's Electric Service handbook for commercial projects. If you would
tike a copy of the handbook please contact me at the number below. It is your responsibility to provide
your project manager, site superintendent, and/or subcontractors with any relevant information from
this correspondence that apply to their work in support of your project.
3. The Excavation Requirements & Final Grade Certification must be signed by the project owner or
designee and returned to me along with a signed copy of this letter and your payment.
4. If a project is developed by a United -Liability Companies (LLC), you are required to provide contact
Information for all managing members in addition to a copy of your Master Business Application. This
kmtornation must also be provided prior to commencing construction of your project.
5. Transformers have been sized for diversified commercial bads only, and shat not be used for high bad
factor (continuous) temporary power uses, such as electric heaters for dry -out. Fault currents for non-
residential transformers in your project are noted on the attached PSE desitin drawing. Please notify
the PSE representative listed on this agreement Immediately If you believe there are conflicts between
this design and your project. It Is your responsibility to provide your project manager, site
superintendent, and subcontractors with any information from this correspondence and Its
attachments that apply to their work.
POTENTIAL REFUNDS
If PSE has not provided a Margin Alkmwance or If your Margin Allowance exceeds $75,000, PSE agrees to
calculate and refund the Margin Allowrance, subject to Schedule 85, up two (2) years after the Me extension is
energized. Other refunds associated with the line extension charge may be available if additional permanent
service hook-ups are made to your tine extension. These service hook-ups must be made within five (5) years
of the dale on which your project is Initially energized Customers are responsible for making all refund
requests. A refund maybe requested one (1) time within six (6) years of the dale on which your One extension
Is initially energized. Your refund request should be directed to PSE's Customer Accounting Coordinators at
schedule85retundreauestsanse.corn or your project manager.
UN12ERGROUND CONVERSIONS 8 STREET LIGHTING COSTS
11
This agreement does not cover underground conversions or street lighting: To obtain these services please
contact your project manager for further details or information.
By signing this agreement you are authorizing" PSE to continue with all the needed elements to complete your
project. Please do not send payment with this agreement. Upon receipt of a signed agreement, PSE will bill
you for the amount Indicated at the mailing address shown on the agreement, PSE requires payment prior to
firming up a construction date; delaying payment may result in a construction delay, Changes in the scope of
the project requested by you may result In either additional charges or refunds to the amount billed an this
agreement.
i have read and agree to the terms and conditions described In this agreement and the corresponding
attachments.
Customer Marne: Ty toper
Customer Signature.
Date: 7/10/2027
Regards,
Jeremy Paz, Project Manager
360.333-7056
jeremy.paz@pse.com
DocuSign Envelope ID: UFA083A-7760 417A-gE7&3FOB13ASMA7
�' PUGE I SUUN0 ENERGY
Puget Sound Energy
P.O. Box 97034
Beilevue, WA 48th -9734
PSEcort1
PSE ELECTRICAL FACILITIES
EXCAVATION REQUIREMENTS AND FINAL GRADE CERTIFICATION
PURPOSE
This document is an agreement between Puget Sound Energy (PSE) and the Owner/Developer (Developer) who is
providing excavation for the installation of PSE's facilities. This document does not provide an easement for operating
rights. if PSE determines that a recordable easement on the Developer's property or other property is necessary, it shall be
the Developer's responsibility to obtain such easements in a form acceptable to PSE prior to construction.
EXCAVATION REQUIREMENTS
The requirements and conditions outlined below apply when you provide the excavation for PSE's electrical facilities as a
condition of receiving electrical service for your project. if you need additional information,, please call the PSE contact
person listed below.
1. Developer is responsible for acquiring utility locates by calling One -Call, 1-800-424-5555 at least 48 hours (two full
working week days) prior to digging. The excavation must meet the requirements of the Washington Administrative
Code and Safety Standards.
2. Developer shall call the PSE contact person noted below for trench and route approval prior to starting excavation.
3. The electrical primary trench shall be excavated to provide a minimum of 36 inches of facility coverage, to a maximum
trench depth of 48 inches. The electric service trench shall be excavated to provided a minimum of 24 inches of facility
coverage, to a maximum trench depth of 36 inches. A 12 inch horizontal separation is required between PSE electrical
facilities and other utilities within a joint trench.
4. All back fill must be free of sharp objects and construction debris. Developer shall provide and install sand bedding and
shading for electrical facility protection as directed by PSE's contact person. Developer is responsible for any damages
caused by Improper backfill or compaction.
5. Developer agrees to maintain a minimum of 2 feet of horizontal clearance between PSE conduit, pipe or conductors and
any foundation on Developer's property.
6. The vault excavation shall be dug to the dimensions noted on the attached work sketch. Vault holes shall have a solid
level bottom with a 6 inch deep layer of crushed "rock bedding.
7. Developer shall provide the excavation for PSE electrical facilities within the designed location. Developer shall identify
and provide final grade; property lines, and utility easements prior to installation of PSE's electrical facilities.
S. Developer will be financially liable for the relocation of PSE's facilities which are inadequately covered, located outside
the area where PSE has adequate operating rights, improperly graded inhibiting standard access and/or any damages
resulting from dig -ins due to changes or variations in grade that are made after the installation of PSE's facilities.
FINAL GRADE CERTIFICATION
By my signing below, I certify that the electrical facilities work area shall be at final grade prior to excavation. I assume full;
responsibility for my excavation work and the resulting location of these facilities. I also agree to indemnify, defend, and hold
harmless Puget Sound Energy from all liability arising out of,. or In connection with my work, including but not limited to'all
claims, losses, damages, and expenses, including reasonable attorney's fees, which resultfrom my failure to excavate
within easement areas or rights -of --way, or from digging without adequate rights on adjoining properties.
7/10/2017
Date:
Ty Loper 5 iL
Owner or Developer: Signature:
PLEASE PRINT Fav7CSad185A4pe.;..;
Project Address: 1976 Price Rd, Bremerton
Jeremy Paz, Project Manager 105084652
PSE Contact person: PSE Work Order
2806 vans
DocuSign Envelope ID:.48FA083A-775D-417A-9E78-3F9B13A5C5A7
PUGET SOUND? ENERGY
Puget Sound Emr9y
P.0, Box 870U
Wevue, WA 98009-9734
PSE.com
Job Number: 145084652
Trench Location: 1976 Price Rd, Bremerton
Customer Name: Ty Loper
I AGREE TO ADHERE TO THE ABOVE CONDITIONS
c dam— br- ;.
Customer Signature
9o7c �asa.2e.:.
Date 7/10/2017
ELECTRICIAN
Title
R 08-23-2015
DocuSign Envelope ID,, 4$FA083A-775D.417A-9E78.3F9Bt3A5CSA7
PUGET SOUND ENERGY
Puget Sound Energy
PO. Box 97034
Bellevue, WA 99004-9734
PSE.com
REQUIREMENTS FOR TRENCHING BY CUSTOMERS ON PUBLIC RIGHT-OF-WAYS
AND/OR ON PUGET SOUND ENERGY, INC. EASEMENTS
The following outlines most local governmental guidelines and company standards for trenching on a public right-of-way
or Puget Sound Energy, Inc. (PSE) easement. Any trenching performed by the customer, or their contractor, under a PSE
permit or easement must comply with these requirements.
1. All trench construction must be performed by a Washington State
licensed and bonded contractor.
2. Trench excavation, backfill, restoration, and facility placement must be coordinated with a PSE designated
representative, and receive on-site approval by that representative, and local jurisdiction.
3. Right-of-way easement trenching and backfill must be performed during normal business hours, Monday through
Friday. Same day excavation and backfill is required for all trenching. Job start notification to the local jurisdiction is
the responsibility of Puget Sound Energy. Customer shall notify PSE Project Manager three working days prior to
trenching. Penalties for failure to comply with this requirement will be borne by the customer.
4. if the job scope requires excavation beyond a single day, fencing and barricading must be installed around utility
facilities exposed above the trench, if allowed, must be In accordance with local regulatory requirements.
S. PSE, all participating utilities, and One -Call Locate, must be notified a minimum of 72 hours in advance of the date and
time for right-of-way trenching and facility placement. The One -Call Locate number is 1-800-4245555. State law
requires locating service notification.
6. Excavated material must remain clear of the roadway whenever possible. Excavation material, spoils, and debris shall
be removed off-site each day, In accordance with local regulatory requirements. All erosion control requirements in
accordance with local regulatory requirements are the responsibility of the customer.
7. Material excavated from the shoulder of the right-of-way shall be property disposed, and replaced with select backfill
material in accordance with local regulatory requirements.
8. Proper compaction is required to comply with local regulatory specifications. If the permit requires compaction testing,
the cost of said testing is the responsibility of the customer.
9. All permit requirements, traffic control plans, traffic control and flagging shall meet local regulatory specifications and
satisfaction.
10. In the event of failure to abide by the above requirements, PSE reserves the right, at Its sole discretion, to assume
trenching. In the event of delays due to equipment failure, PSE may assume trenching to meet regulatory and joint
construction requirements. The customer is responsible for all trenching costs, and will reimburse the company for costs
should PSE perform ching.
(initial)
11. The customer agrees to indemnify, defend and hold harmless PSE from all liability (including reasonable attorneys'
fees) arising out of, or " nection with, the above mentioned trenching activities.
(initial)
R 08-23-2015
Mayor Patty Lent
July 31, 2017
I, Patty Lent, Mayor of the City of Bremerton, designate Ty Loper to sign a contract with Puget Sound
Energy for the Commercial Line Extension Agreement (PSE Order No.: 105084652).
G/U
Patty L n , Mayor
r
ATTEST: 00 "UX�.
Shannon Corin, City Clerk
I BRAE WF -R40 N
THE c•ITY OF PRIDE AND OPPORTUNITY
Mayor Patty Lent
July 31, 2017
I, Patty Lent, Mayor of the City of Bremerton, designate Ty Loper to sign a contract with Puget Sound
Energy for the Commercial Line Extension Agreement (PSE Order No.: 105084652).
G/U
Patty L n , Mayor
r
ATTEST: 00 "UX�.
Shannon Corin, City Clerk