CITY AUDITOR
June 15, 2012
Honorable Patty Lent, Mayor
Members of the City Council
Attached is a report on the 2011 Overhead Cost Allocation. The Washington
State Auditor's Office has placed this subject on their agenda for future audits.
This report is intended to start the discussion of cost allocation in the City.
The cost allocation in 2011 was done with nine standard monthly journal entries.
They are not supported by a written cost allocation plan as recommended by the
State Auditors Office. Data supporting some allocations appear to contain errors.
The total overhead for Equipment Services should be reviewed to determine why
it is not more closely aligned with commercial operations.
Responses to observations and recommendations were provided by City
Attorney Roger Lubovich and Public Works Director Katy Allen. No other
responses were received.
The assistance of Risk Manager Thelma Swem, Fire Chief AI Duke, and
Equipment Services Division Supervisor Chuck Ernst is greatly appreciated.
Please let me know if you have any questions.
'SRcerely,
ary�WN`ystul��------------.
cc: City Attorney
Director of Financial Services
Director of Public Works
OVERHEAD COST ALLOCATION
Pu rpose
The City Auditor reviews various phases of city operations for compliance and
performance. This review of Overhead Cost Allocation was scheduled in the 2012 work
plan. This audit is to review and analyze the process and procedures used for overhead
allocation.
The Washington State Auditor's Office has recently issued a report of their performance
audit of Local Government Allocating Overhead Costs. This review is to also compare
the SAO findings and recommendations with current practices of the City. The SAO is
anticipated to be reviewing Overhead Cost Allocation procedures in future audits of the
City.
Scope
This is a review of Overhead Cost Allocation for the year 2011. The financial data is as
of March 16, 2012. The City will not complete the year end closing and preparation of
final financial statements for several months. Therefore, some amounts used may not
agree with the final financial statements.
Statement of Auditing Standards
This performance audit was conducted in accordance with Generally Accepted
Government Auditing Standards, except Standard 3.50 requiring an external quality
control review. Those standards require that the auditor plan and perform the audit to
obtain sufficient, appropriate evidence to provide a reasonable basis for findings and
conclusions based on audit objectives. The auditor believes that the evidence obtained
provides a reasonable basis for the findings and conclusions based on the audit
objectives.
Objective
The objectives of this audit are:
• A performance audit of Overhead Costs Allocation during 2011
• Compare methods used by the City to those recommended by the SAO
Summary of the Results
• An overhead allocation plan has not been written
• Some values used for insurance appear to be incorrect
• Cost allocation for Equipment Services needs addressing
• Some allocations follow recommended practices
Background
City governments use a number of funds to account for the revenue and expenses of city
operations. These separate funds are required by law, standard or regulation. As a result,
some services paid from one fund may benefit another fund. For example, some
expenses paid in the General fund benefit other funds. The Human Resources
Department assists in managing personnel in all departments of the City, but it is paid
from the General Fund. Many departments that benefit from HR are in the General Fund,
but others, such as the Water Utility, are not. It is permissible and a good business
practice for the General Fund to ask the Water Utility to pay for the fair value of the
benefit it receives from I IR. Several similar conditions exist for other services in the
General Fund which benefit other funds.
State Iaw at Section 43.09.210 RCW allows services rendered by one department to
another to be paid at its true and full value (overhead cost allocation). The amounts can
be calculated by various methods depending on the nature of the service. The method
used should allocate the costs equitably.
Typical allocation methods include using the number of FTEs or number of payroll
checks to allocate payroll. The use of hours worked can be used to allocate legal costs.
The number of transactions could be used for accounting or accounts payable.
Insurance costs could be allocated by claims or loss history, property values insured or
risk factor. The method used should have a logical relationship to the service and be
reasonably measured.
The BARS Manual, issued by the State Auditor's Office, is an accounting reference
manual that local governments are required to follow. It states that the cost allocation
process should be guided by a written overhead cost allocation plan. The City does not
have a written plan.
OVERHEAD ALLOCATIONS
There are several overhead allocations in the annual budget. The following narrative
describes these overhead allocations in 2011, and the methods used to calculate the
various costs.
Administration
The largest overhead allocation is for administration which was budgeted at
$1,448,170. This assessment is made for services rendered by Mayor, City
Council, Finance, Human Resources, Legal, Internal Auditor, and Facilities.
Costs for these services are allocated to Water, Wastewater, Stormwater, Golf,
ERR, and Information Technology. This overhead allocation for administration is
made in two calculations. One is the ratio of the number of employees (FTEs) in
a department to the total of all city employees and is used to compute 75% of the
charge. The other 25% is the ratio of the department's operating budget to total of
the operating budgets for Water, Wastewater, Stormwater, Golf, ERR, IT,
General and Street.
For example, the amount the Water Utility is charged for HR is its percent of total
city FTEs (15.1%) multiplied by 75% of the HR budget of $338,325. In addition,
25% of the ratio of the Water operating budget to total of the budgets of the above
listed funds (14.1%) multiplied by the HR budget. As a result, in 2011 Water was
charged $50,241 for HR services.
Similar calculations are made for the other departments whose costs are allocated
to the listed funds. One exception is that Facilities costs include 53.36% of the
owner fees paid for the Norm Dicks Government Center (city hall).
The BARS manual cautions local governments to carefully consider the
assessment of costs of elected officials to utility funds. It notes some recent
Iitigation and sources they examined suggest that elected executive and legislative
costs should not be paid by utility funds.
Insurance
Various funds are assessed for the cost of Risk Management, including insurance
premiums and the maintenance of a cash claims payable account. The total
budget to allocate in 2011 is $1,040,400. The city purchases commercial
insurance policies for excess liability, property, pollution legal liability, employee
honesty, and excess workers' compensation. The city also maintains a cash
balance to pay the portion of self-insurance claims these policies do not cover.
The estimated cost of the property policy is allocated based on each funds
statement of replacement values for buildings and contents. The funds include
General, Water, Wastewater, Stormwater, Golf, Street, Equipment Services,
Parking, and Conference Center. This method of assessment matches the risk to
the premium being paid.
The allocation of the estimated cost of the liability premium is based on two
computations. One computation for one half of a department's share is based on
the budget for personnel, and supplies and services of the department. This is
compared to the total of personnel, and supplies and services budget for the
General, Water, Wastewater, Stormwater, Golf, Street, ERR, Parking, Conference
Center and IT. The other computation is the ratio of the liability losses incurred
in the last five years by each fund to the total liability losses.
An amount is also calculated to assess for the cash balance of the claims payable
amount in the budget. For 2011 this was $335,000. The amount assessed is
calculated using the same ratio as the liability premium which is a reasonable
method.
Electronics Support
Expenditures for the maintenance of the city telephone system are paid from the
Street Fund which is reimbursed by the General Fund. The costs are recorded by
both project number and object code. The General Fund expenditures are not
included in any overhead cost base.
Interfund Rent
The shop building used by the Equipment Services Division is owned by the
General Fund. The ESD reimburses for the use of the building at a rate calculated
with the assistance of a commercial real estate agent. The annual rate of $46,080
was charged in 2009, 2010, and 2011. Using a rental rate that would be used in
the private sector appears reasonable and equitable.
Vehicle Maintenance
The Equipment Services Division repairs the automobiles, pickups, trucks, lire
engines and etc. of the City. It is an internal service fund which must be self
supporting by recovering its costs through fees and charges.
A fixed monthly assessment is made for all departments that use the services.
The annual cost estimate is made by the ESD manager who reviews historical
maintenance costs for two or three years for each piece of equipment or vehicle.
This projection for expected repair costs for the budget year is equal to
approximately one half of the department cost. The second portion of the
computation is the ratio of the historical cost of each piece of maintained
equipment in a department to the total of all equipment. This ratio is used to
allocate the balance of the department budget which could be considered mostly
overhead items such as administrative salaries, insurance, administrative transfer,
and technology.
M
Actual work performed as recorded on work orders would be a typical method to
allocate costs. During the year all shop work is recorded on work orders which
make a charge for labor, materials, sublet, and equipment costs. These are used
for management information and there is no reconciliation to actual costs. In
2011 only about 50% of the department total cost would have been recovered if
work orders had been used for overhead cost allocation.
Computer Maintenance
The cost of maintaining the Information Technology Department is allocated
based on the number of personal computers each department has. Some
departments also have additional costs for unique software they use. For
example, the Finance Department is assessed for the accounting software. In
addition, some departments are charged for photo copier use. The use of the
number of computers is a typical method to allocate IT cost.
Facilities Maintenance
The Facilities Maintenance division maintains many city buildings, including
plumbing, painting and repair, HVAC and other systems in these buildings. The
overhead allocation is for the work performed by Facilities at the Harborside
Parking Garage, Conference Center, downtown parking garage and city parking
lots. The amount is reportedly based on the history of actual costs incurred.
FINDINGS AND RECOMMENDATIONS
1. A written overhead allocation plan.
The State Auditors Office recommends that an Overhead Allocation Plan be written.
However, the City plan has not been written. One Finance Department Excel worksheet
does contain notes as to how the allocation for administrative overhead was calculated.
The BARS manual states "The cost allocation process should be guided by an overhead
cost allocation plan that describes how the organization will allocate costs reasonably
and equitably across,funds and departments and indentifies the documentation required
to support the charges."
Recommendation. The City should prepare a written overhead allocation plan which
describes the costs being allocated, how they are calculated, and the basis for the
decisions.
5
2. The allocation and costs for equipment services needs to be reviewed.
The Equipment Services Division is an internal service fund which provides maintenance
and repair to the fleet. The expense to operate the ESD must be recovered from the users.
The equitable method to recover this cost is based on the actual repair and maintenance
performed during the year.
The present method uses an annual budgeted recovery that is based on estimates from
prior year work orders and department overhead. The users are billed 1112 of their
allocated amount each month regardless of the amount of work performed.
Work orders are prepared for all services performed which is a procedure comparable to
commercial service operations. They calculate costs for labor, repair parts, sublet work,
and equipment used. The department total cost for 2011 is $1,087,000. The amount
computed using the work order system is $546,000. The difference is $541,000.
Had the full department cost been recovered using work orders a surcharge of $262 per
work order would need to be made. Alternatively, an increase of $142 in the labor rate
would be needed to recover all costs. The work orders used a cost of $72 per hour for
labor which would be competitive with commercial businesses. However, a total labor
charge of $214 would not be realistic.
The amount required to be allocated using the surcharge or increased labor rate in order
to recover total cost indicates there are either too many overhead costs or not enough
work. The labor cost computed on work orders would recover about 48% of total labor
charged to the department. About 90% of the cost of parts was computed on work orders.
The following table compares the 2011 budgeted maintenance amount and the value
computed on actual work orders for each department.
G
Fund/Dept
Budget
Work Orders
% of Budget
Community Development
$ 7,000
$ 1,738
24.82%
Municipal Court
6,000
3,056
50.93%
Police
253,000
126,069
49.83%
Fire
171,000
72,607
42,46%
Facilities
2,000
184
9.19%
Parks
102,000
48,202
47.26%
Cngineering
8,000
2,126
26.58%
Roadway
227,000
75,410
33.22%
Golf
2,000
5,828
291.40%
1T
1,000
211
21.10%
BKAT
2,000
287
14.33%
Water
168,000
90,819
54.06%
Wastewater
93,000
63,515
68.30%
Stormwater
110,000
44,907
40.82%
Equipment Services
11,421
n/a
Total
$1,152,000
$546,379
Recommendation. The Administration should review the cost of operation of the
Equipment Services Division.. The amount of overhead and the amount of time charged
on work orders needs to be examined. Comparisons to commercial facilities will give
some measure of reasonableness. The cost allocation should consider procedures used
with commercial facilities where the work orders recover all of the overhead costs.
3. There are errors in the statement of values used for property
insurance.
The methods of allocating insurance costs by using liability loss history and replacement
values of property are equitable methods. The statement of values is a listing of the
replacement cost of city buildings and contents. The total value of all buildings and
contents is used to determine the premium for the insurance policy as well as to allocate
the share of premium to the various departments.
The historical cost or an estimate is used in the year of acquisition to determine the value
of a building. In subsequent years, a building cost index is used to determine the change
in the cost to replace the building or contents. The current index is the FM Global
Building Cost Index. This is a reasonable method to calculate replacement costs.
However, no replacement cost appraisals have been done recently of any buildings or
contents for insurance purposes.
A cursory review of the statement noted several errors in the values used. They are
summarized as follows.
Fire Stations Number 2 and 3 were built approximately one year apart in the
1980's. Based on historical cost recorded in the financial accounting system, the
7
Station 2 cost is 1.71% more than Station 3. Improvements to the stations have
been fairly equal over the years. However, in 2010 the Station 3 amount in the
statement of values is 22.9% more that Station 2. This is a difference of
$444,917.
The Special Operations Group is located in a metal building formerly used as a
warehouse by the fire department. The interior of the building was remodeled in
2003 and the cost of the remodel is recorded in the statement of values. However,
there is no amount for the value of the building.
The Girl Scout building formerly located at 11`x' and Warren and valued at
$241,044 was demolished in April 2010. However, its value was used in
determining the 2011 allocation.
Two John Deere graders are listed with a value of $90,252 and $77,203. The city
only owns one grader. No other vehicles or equipment are listed on the statement.
These values should not have been used.
The value of contents of the water utility building on Olympus Drive is listed at
$1,913,984. The only remaining water function in that building is Water
Resources. They estimate the replacement cost of contents in their portion of the
building, including SCADA, at $125,000.
The Risk Manager sends out lists of values to the Departments to review annually. There
appear to be errors in getting the value of improvements added by the Departments.
There is also uncertainty about what to include as "contents."
Recommendation.
• The Risk Manager should review and make necessary corrections to the statement
of values. Accurate values fairly allocate costs to all departments. Departments
need to provide complete and accurate information to the Risk Manager.
• Assistance should be provided to the departments to ensure they understand what
is to be included in the building value and in the contents value.
• The City should consider obtaining an appraisal of city buildings and contents for
replacement value. However it is not practical to appraise all property, but some
comparisons of appraisal and book values should be made.
4. The amount of overhead allocated and the methods used should be
reviewed in certain areas.
The cost of the city telephone system is paid from the Street Fund. An overhead
allocation is made by the General Fund each month based on estimated cost. There are
two amounts to compute cost. Both a project number and an expenditure account have
been used to accumulate expenditures for the phone system. These amounts should be
8
similar. However, in 2011 the expenditure accounts were $46,138 and the project
amounts were $21,813,
Facilities maintenance is intended to be reimbursed for actual work on the I larborside
Parking, Conference Center, downtown parking garage, and parking lots. The amount
transferred was $69,000 and the actual expenses incurred were $54,476.
The SAO BARS manual, the SAO performance audit report, and OMB Circular A-87 all
suggest that the number of employees is a reasonable method to allocate costs for HR.
The number of transactions is appropriate for accounting costs. However, the allocation
for Administration uses 75% of the computation based on FTEs and 25% on operating
budgets.
Recommendation. The Administration may wish to review the procedures used to
allocate these costs.
RACity Auditorlindirect Cos6REPORT.doc
9
Office of the City Attorney
Roger A. Lubovich, City Attorney
Memorandum
10"I"11
TO: Gary Nystul
ROM: Roger A. Lubovich
Re: Audit Report
Date: May 15, 2012
This memo is provided in response to the Draft Audit Report regarding overhead cost allocation
that you transmitted to me on April 24, 2012. My response is confined to the findings and
recommendations addressed in Number 3, "There are errors in the statement of values used for
property insurance."
The City of Bremerton Property Schedule for 2011 insurance renewals lists 177 properties with
at total value of $31.5,670,433. Responses to the discrepancies noted in the report follow:
Fire Stations 2 & 3 were built approximately one year apart in the 1980's. Based on
historical cost recorded in the financial accounting system, Station 2 cost is 1.71% more
than Station 3. Improvements to the stations have been fairly equal over the years.
However, in 2010 the Station 3 amount in the statement of values is 22.9% more than
Station 2. This is a difference of $444,917.
The values far Fire Stations 2 and 3 have been increased by the same percentages annually since
2001. Fire Station 3 is 2,202 square feet larger than Station 2. The square footage cost
calculation reveals that Station 3 is valued at $202.36 per square foot and Station 2 is valued at
5202.43 per square foot. I believe this is abetter value comparison analysis. The 2011
construction cost estimates for fare stations in the Seattle area was $171.68, so the properties
may be slightly, but not significantly, over -valued. This will be examined during the 2013
renewal cycle.
The Special Operations Group is located in a metal building formerly used as a warehouse
by the fire department. The interior of the building was remodeled in 2003 and the cost of
the remodel is recorded in the statement of values. However, there is no amount for the
value of the building.
Prior to the remodel of this building, the current building was listed on the property schedules as
a Fire Station Warehouse. The value calculated for this building (without contents) during the
2003 renewal cycle was $162,631, The capital cost of the remodel in 2003 was $179,379. It
appears that the property schedule was not updated to reflect the remodel. Current square
footage construction costs to replace this type structure range from $56 to $87 per square foot.
May 15, 2012
Page: 2
The property schedule will be updated to reflect a more accurate valine during the 2013 property
renewal cycle.
The Girl Scout building formerly located at IIx' and Warren and valued at $241,044 was
demolished in April 2010. However its value was used in determining the 2011 allocation.
The Girl Scout building was not listed on the property schedules for the 2011 property insurance
renewal that was submitted to the City's broker.
Two John Deere graders are listed with a value of $90,252 and $77,203. The city only owns
one grader. No other vehicles or equipment are listed on the statement. These values
should not have been used.
The City sloes only have one John Deere grader. The grader was listed (twice) incorrectly
during the 2011 property insurance renewal process and removed during the 2012 insatranee
renewal process.
The value of contents of the water utility building on Olympus Drive is listed at $1,913,9$4.
The only remaining water function in that building is Water Resources. They estimate the
replacement cost of contents in their portion of the building, including SCADA, at
$125,000.
Currently the Engineering Division, Water Resources Division and City record storage reside in
the batilding located at 3027 Olympus. The value of the contents for Engineering is estimated at
$165,000. The value of the contents in Water Resources is estimated at $125,000. Records care
stored on the first floor of the facility and the valise of the shelving is estimated tat $3, 000.
Additionally a generator supplies the building and is valued at $50,000. A more accurate content
value for this facility is $343,000 and will be reflected in the 2013 insurance renewal
submission. The value of the building and contents will be split between the Water Utility and
the General Fund.
RECOMMENDATIONS.
1. The Risk Manager should review and make necessary corrections to the statement
of values. Accurate values fairly allocate costs to all departments. Departments need to
provide complete and accurate info to the Risk Manager.
The property statement of values is reviewed annually by the Risk iLlanagement Specialist.
During the 2011 property insurance renewal cycle, the statement of values was compared to the
City's capital asset list. In other years, the statement of values is provided to departments.for
their review and recommended changes. Changes and corrections to the schedule are made as
they are identified. Risk Management is committed to providing accurate values to allocate
costs to all departments.
May 15, 2012
Page: 3
2. Assistance should be provided to departments to ensure they understand what is to
be included in the building value and in the contents value.
The Risk Management Specialist currently responds to all inquiries from departments when
updating the statement of values. Additional information related to determining the difference
between building valine and content value will be provided in the departmental memorandum
during the 2013 property insurance renewal process.
3. The City should consider obtaining an appraisal of city buildings and contents for
replacement value. However it is not practical to appraise all property, but some
comparisons of appraisals and book values should be made.
Appraisals erre expensive and not budgeted for in the Risk Management Fund. ff directed the
Risk Management Specialist will allocate fiends to departments during the 2013 budget process
to have buildings appraised
It may be more practical to review and value the properties using current square foot
construction cost estimates. Considering there are .177 properties on the asset schedule, review
of all the properties will take a considerable amount of time. This review has been commenced
and Risk Management will continue its review of sample properties using the square footage
construction cost calculation method unless directed to allocate funds and begin appraising
properties.
cc: Mayor Patty Lent
Katy Allen
Becky Hasart
Public Works and Utilities Department -- Administration
3027 Olympus Drive • Bremerton, WA 98390 • (360) 473-2327 • FAX (360) 473-5018
MEMORANDUM
TO: Gary Nystul
FROM: Katy Allen-�
DATE: May 18, 2012
SUBJECT: Audit Report on Overhead Cost Allocation
This memo is provided in response to the Draft. Audit Report regarding
overhead cost allocation that you submitted to me on April 24, 2012. My
response is confined to the findings and recommendations addressed in
Number 2, "The allocation and costs for equipment services needs to be
reviewed."
agree with your recommendation. In coordination with the Finance
Department, our Fleet Manager, Jim Orton, will review the cost of operation
of the Equipment Services Division. The amount of overhead and the
amount of time charged on work orders will be examined. As you
recommend, the cost allocation mythology will be considered in comparison
to commercial facilities.
cc: Mayor Patty Lent
Roger Lubovich
Becky Hasart