Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
05/03/2017 6H
AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Contract Award to Simpson Study Session Date: April 26, 2017 Sandblasting & Special Coatings, Inc. for the COUNCIL MEETING Date: May 3, 2017 Reservoir 21 Exterior Coating Replacement Department: PW&U Project Presenter: Tom Knuckey Phone: (360) 473-2376 SUMMARY: Reservoir 21 is a 3 million gallon steel potable water reservoir located in N.A.D. Park and visible from State Route 3. The reservoir was last coated on the exterior in 1996. The exterior of Reservoir 21 will be abrasive blasted to remove the existing coating and a new coating will be applied. Bids were opened on April 13, 2017. There were 9 bids. Simpson Sandblasting & Special Coatings, Inc. was the lowest responsible, responsive bidder in the amount of $508,409.79 (which includes sales tax). ATTACHMENTS: 1. Location Map; 2. Agreement; 3. Bid Tabulation. FISCAL IMPACTS (Include Budgeted Amount): The project is included in the 2017 CIP Budget. STUDY SESSION AGENDA: © No Presentation ❑ Full Presentation STUDY SESSION ACTION: ® Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to award the construction contract for the Reservoir 21 — Exterior Coating Replacement Project to Simpson Sandblasting & Special Coatings, Inc. in the amount of $508,409.79 which includes Washington State sales tax; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: � Approve Form Updated 01/07/15 ❑ Deny ❑ Table ❑ Continue ❑ No Action