Loading...
HomeMy WebLinkAbout02/13/2017 6MAGENDA BILL CITY OF BREMERTON 6M CITY COUNCIL SUBJECT: Repair, Refurbishment, and Modification to the Fairbanks Morse Pump No. 3 at Pump Station WB -3 by Granich Engineered Products, Inc. of Seattle, WA Study Session Date: February 8, 2017 COUNCIL MEETING Date: February 13, 2017 Department: Presenter: PW&U/WWTP Pat Coxon Phone: (360) 473-5448 SUMMARY: Pump No.3 (Fairbanks Morse model 10") at pump station WB -3, experienced a failure to its mechanical seal and was pulled by staff for repairs. Once the pump was dismantled at the factory repair shop, the pump's cooling water jacket was found to be plugged with grit, which led to the mechanical seal failure. The cost for the repair of this pump is $25,854.30 from Granich Engineered Products Inc. This style of pump is a sewage cooled pump, and we cannot control the amount of fine grit that we receive at this station which led to this pump failure. Staff has devised a modification to the pump so that we can utilize a closed loop cooling system to keep this failure from occurring in the future. This will be the first of the three pumps that will be repaired and modified, and will extend the life of these pumps by another 25 — 30 years. ATTACHMENTS: Granich Engineered Products Inc. quote, and pictures of the pump dismantled. FISCAL IMPACTS (Include Budgeted Amount): Included in the 2017 WW CIP — WWTP & Pump Stations Improvement Program $250,000 N STUDY SESSION AGENDA: o No Presentation ❑ Full Presentation STUDY SESSION ACTION: o ConsentAgenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the repair, refurbishment, and modification to the Fairbanks Morse Pump No. 3 at Pump Station WB -3 by Granich Engineered Products, Inc., in the amount of $25,854.30 (includes tax). COUNCIL ACTION: [Approve Form Updated 01/07/15 ❑ Deny ❑ Table ❑ Continue ❑ No Action