Loading...
HomeMy WebLinkAbout2979 RESOLUTION NO. ~q1't A RESOLUTION of the City Council of the City of Bremerton, Washington, adopting the City of Bremerton Wastewater Comprehensive Plan. WHEREAS, the City of Bremerton desires to plan for the future and growth in its wastewater system service area; and WHEREAS, a wastewater comprehensive plan provides a means to meet future wastewater collection system and wastewater treatment plant needs; and; WHEREAS, the City has not adopted a wastewater comprehensive plan since the Wastewater Comprehensive Plan completed in 1995; and WHEREAS, the requirements for comprehensive wastewater planning are specified in State of Washington, Department of Ecology regulations promulgated under Washington Administrative Code 173-240-020 and 173-240-050; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The City of Bremerton Wastewater Comprehensive Plan Update Final Draft dated July 22, 2005 is hereby incorporated as if fully set forth herein and adopted as the City of Bremerton Wastewater Comprehensive Plan. SECTION 2. Severability. If anyone or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 3. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council ofthe City of Bremerton, Washington thisQUd: day of )L1RptdArVl.A.f.A ) , 2005. resident D R:\LEGAL\Resolutions\Public Works\Wastewater Comprehensive Plan. doc City of Bremerton 2005 Wastewater System Plan Update CERTIFICATION This 2005 W astewatE~r System Plan Update for the City of Bremerton has been prepared under the direction of the following Registered Profession-al.Engineer. Contents Executive Summary Section 1 Introduction 1.1 Background and Existing System .......................................................................... 1-1 1.2 Regulatory Requirements ................ ............. ......... ............. ........... ....... ....... ........... 1-6 1.2.1 Federal Regulations ................... ............ ........................... ..... ............. ...... 1-6 1.2.2 Washington State Regulations .................................................;.............. 1-7 1.3 Compliance Status.. .......... ............. ..... .................... ......... .... ...... ............ .................. 1-9 1.4 Enforcement Actions ..... ....... .......... .............. ....... ................................. ......... .......... 1-9 1.5 Planning Information Sources.............................................................................. 1-10 1.6 Plan Organization and Contents.......................................................................... 1-11 Section 2 Service Area and System Characteristics 2.1 Surrounding Vicinity Characteristics.... ...... ............. ...... ..... ........ ............. ...... ....... 2-1 2.1.1 City of Bremerton ............. ............... ....... ...... ........... ...... ............... ...... ...... 2-1 2.1.2 Topography......... ..... ....................... ................... ..... .... ........... ................... 2-1 2.1.3 Geology and Soils ... ............... .... ............ ........... ........ ...... ........... ............... 2-1 2.1.4 Climate and Air Quality .......................................................................... 2-2 2.1.5 Water Resources... .............. ........ ...... ........ ......... .............. ..... ..................... 2-2 2.1.6 Wildlife and Endangered Species........................................................... 2-5 2.2 Plan Service Area ........ .................................... ........ ............ ...... ............ ................... 2-6 2.2.1 Basins. ............ .... ..... .... ............ .......... ...... ........... ......... .... ... ....... ....... ........... 2-6 2.2.2 Service Agreements ..... ........ ................ ........... .......................................... 2-7 2.3 Infrastructure Description.......... ............................. ....... .................... ......... ........... 2-7 2.3.1 Collection System. ......... .............. ........... .... ......... .................. ................... 2-7 2.3.2 Pump Stations ............ .............................. ....... ................. ....... ................ 2-10 2.3.3 Major Pipelines........ ........... ........... .... ...... ........................ ....... ................. 2-14 2.3.4 Combined Sewer Overflow Structures ................................................ 2-15 2.3.5 Odor Control.......... .................... .................. ........................................... 2-15 2.3.6 Treatment Facilities ........... .................. ........................... ............. ........... 2-16 Section 3 Wastewater System Planning Information 3.1 Land Use and Zoning.............................................................................................. 3-1 3.2 Population Projections .................. ................................ ........ ...... .......... .......... ........ 3-1 3.2.1 Current Population Estimate for Bremerton Service Area ................. 3-2 3.2.2 Future Population Estimate for Bremerton Service Area.................... 3-2 3.3 Flow Projections .................. ...................... ..................... ..... ..................................... 3-4 3.4 Collection System Flow Projection ........................................................................ 3-4 3.5 Wastewater Treatment Plant Flow........................................................................ 3-4 CEllI iii P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Table of Contents. doc Contents 3.5.1 Historical Flows and Loads..................................................................... 3-5 3.5.2 Seasonal Influence on Flows and Loads................................................ 3-6 3.5.3 Current WWTP Influent Flow................................................................ 3-7 3.5.4 Per-Capita Treatment Plant Flows and Peaking Factors..................... 3-8 3.5.5 Future WWTP Influent Flow Projections .............................................. 3-9 3.5.6 WWTP Influent BODs and TSS Characterization............................... 3-10 Section 4 Collection System Evaluation 4.1 Planning Criteria and Regulations ........................................................................ 4-1 4.2 Capacity Requirements and Limitations .............................................................. 4-1 4.2.1 Combined Sewer Overflow Reduction..............................................:... 4-1 4.3 Improvement Alternatives................ ......... ........ .................... .... .... .... ....... ............. 4-5 Section 5 Wastewater Treatment Plant Evaluation 5.1 Liquid Stream Issues ..... ............... .... ....... .............. .......... .......... .............. .......... ...... 5-1 5.1.1 Effluent Standards ... .............. .......... ........ ..... ......................... ................... 5-1 5.1.2 Compliance Issues ........... ............... ...... ......... ....... ........ ...... ......... ............. 5-2 5.1.3 New Discharge Standards ....................................................................... 5-2 5.1.4 Current TMDL Process ............................................................................5-2 5.1.5 Eastside Treatment Facility Permit ........................................................ 5-4 5.2 Liquid Stream Capacity ....... ....................... ........... ......... ........................... ......... .... 5-5 5.2.1 Westside WTP ................. ........................ ......... .............. ...... ......... ....... ..... 5-5 5.2.2 Eastside Treatment Facility ................................................................... 5-15 5.3 Wastewater Reuse ..... ............. ................. ........ .... ............ ............ ................ ...... ..... 5-16 5.3.1 Planning Criteria and Regulations ....................................................... 5-16 5.3.2 Capacity Requirements and Limitations ............................................. 5-17 5.3.3 Improvement Alternatives .............. ....... ......... ............. ......... .......... ...... 5-20 5.3.4 1998 Recommendations ..... ........... ........ ............. ........ .... ............ ............ 5-22 5.4 Biosolids Management. ........... ........ .......... ............ ................ ....... .............. ........... 5-24 5.4.1 Planning Criteria and Regulations ....................................................... 5-24 5.4.2 Capacity Requirement and Limitations............................................... 5-25 5.4.3 Improvement Alternatives. ......... ........... ......... ............. ........ ....... .... ...... 5-30 5.5 Odor Control.. ............. ..... ........... ........ ......... ........ ........ .... ............................ ........... 5-37 5.5.1 Planning Criteria and Regulations ....................................................... 5-38 5.5.2 Capacity Requirements and Limitations ............................................. 5-39 5.5.3 Improvement Alternatives ...................... ..... .......................... ........ ....... 5-39 5.5.4 Recommendations .................................................................................. 5-39 Section 6 Capital Improvement Program 6.1 Recommended System Improvements ................................................................. 6-1 6.1.1 WWTP Wet Weather and Reliability Improvements .......................... 6-1 6.1.2 WWTP Immediate Needs ........................................................................ 6-1 6.1.3 WWTP Longer-Term Needs.................................................................... 6-6 6.1.4 Ultimate Site Layout............................................................................... 6-10 CEllI IV P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\ORAFT AFTER JUNE 2005\Text\Table of Contents.doc Contents 6.2 CIP Development........ ............. ..... ........ ............. ..... ....... ................. ........ ....... ........ 6-11 6.3 Financial Analysis ................. .................... ...... ...... ....... ......... ....... ....... ..... ....... ....... 6-11 Section 7 Operations 7.1 Utility Organization........ ...... ...... ........ ............ ...... ................................................... 7-1 7.2 System Operation and Maintenance ..................................................................... 7-1 7.2.1 Collection System ..................................................................................... 7-1 7.2.2 Treatment Facilities. ......... ........ ............... ..... ........ ............ .... ............. ....... 7-3 7.2.3 Data Collection and Management.......................................................... 7-3 7.3 Additional Staff Requirements ....... .............. ......... ................... ...... ..... ......... ......... 7-4 7.3.1 Staff Requirements Due to System Growth .......................................... 7-4 7.3.2 Staff Requirements to Meet Additional Program Needs .................... 7-4 Section 8 Implementation .8.1 Plan Adoption .. ....... ....... ................. ........... ........... .............. ................ ................. .... 8-1 8.2 Coordination with Kitsap County .........................................................................8-1 8.3 Environmental Impact. .................. ......... ..... ........ .... ........... ............... ............. ......... 8-1 8.4 Future Additions to the Wastewater Comprehensive Plan ............................... 8-2 Section 9 References........ .......... .......... ................ ............. ....... .......... ..... ....................... ............. ....... 9-1 Appendices Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Tables Table 2-1 Table 2-2 Table 2-3 Table 2-4 Table 3-1 Table 3-2 Table 3-3 Table 3-4 Table 3-5 Table 3-6 Table 3-7 CDI NPDES Permit Beach Main Hydraulic Profile Port Blakely Sanitary Sewer Evaluation Plant Capacity Rerating Study Mixing Zone Study Bremerton Beach Main Pigging Technical Memorandum Major Water Resources ......... ....... ....... ....... .......... ................... .................... 2-4 Threatened, Endangered, Proposed, and Candidate Species Identified by USFWS and NMFS as Potentially Occurring Within the Project Area ............................................................................... 2-5 West Bremerton Sewer Basins.................................................. .............. .... 2-6 Pump Stations... ................. ..... ......... .............. .................................... ......... 2-10 Census Data for Bremerton City Limits.................................................... 3-1 Population Estimates for Bremerton Service Area.................................. 3-3 City of Bremerton Eastside Treatment Facility Discharge Data............ 3-5 City of Bremerton WWTP Historical Influent Flows and Loads .......... 3-6 Residential, Commercial, and Infiltration Flow Characteristics ........... 3-8 Influent BODs and TSS Characteristics ................................................... 3-11 Influent Wastewater Loads.. ........ ...... .... ............. .............. ........ ........ ........ 3-11 v P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2QQ5\Text\Table of Contents.doc CEllI Table 4-1 Table 4-2 Table 4-3 Table 4-4 Table 4-5 Table 4-6 Table 4-7 Table 4-8 Table 4-9 Table 4-10 Table 4-11 Table 4-12 Table 4-13 Table 4-14 Table 4-15 Table 4-16 Table 4-17 Table 5-1 Table 5-2 Table 5-3 Table 5-4 Table 5-5 Table 5-6 Table 5-7 Table 5-8 Table 5-9 Table 5-10 Table 5-11 Table 5-12 Table 5-13 Table 6-1 Table 6-2 Table 6-3 Table 6-4 Table 6-5 Table 6-6 Table 6-7 Contents Former Collection System Odor Control Facilities Taken Offline in 1995......... ......... ............... ........ ........ ............... ................... 4-3 Existing Collection System Odor Treatment............................................ 4-3 Anderson Cove Basin ......... ......... .................. .................... ....... ................... 4-5 Callow Avenue Basin.... ........ ........ ........ ....... ..... ...... .................. .................. 4-9 Cherry Avenue Basin ................................................................................ 4-13 East Park Basin.. ......... ........ ..... .......... ......................... ............ .............. ...... 4-15 Kitsap Lake Basin........... ....... ............... .............. ............................. ........... 4-17 Marine Drive Basin....... ........ ..... ..... .................... ....... ................. ............... 4-21 Oyster Bay Basin .......... .................. ............ ..... ........................ ................... 4-24 Pacific Avenue Basin .. .................. ..... ......... ................... ...... ............ .... ...... 4-29 Phinney Bay Basin..... .......................... .............. ......... ....................... ......... 4-33 Pine Road Basin.. ...... .............. ................ ............ ........... .......... ...... ............. 4-35 Sinclair Park Basin ..................................................................................... 4-38 Stevens Canyon Basin .............. ...................... .............................. ............. 4-41 Tracy ton Park Basin..................... ... ...... ...... ...... .... ........ ......... ........ ........ .... 4-43 Trenton Avenue Basin............................................................................... 4-46 Warren Avenue Basin. ....................... ......... ....... ..... ....... ...... ...................... 4-51 Existing NPDES Permit Requirements ..................................................... 5-1 Fecal Coliform Performance. ..... ................. .......... ........ .............. ..... .... ....... 5-5 WWTP Performance with Blending During High Flows..................... 5-10 Design Criteria, Capacity, and Projections - Liquids ........................... 5-12 Expansion Needs for Nitrification........................................................... 5-14 Expansion Needs for Total N Removal.................................................. 5-15 Class A Reclaimed Water Criteria ........................................................... 5-17 Comparison of Water Reuse Alternatives (B&C, 1998) ........................ 5-20 City of Bremerton WWTP Solids Balance Model Performance Variables ..... .......... ......... ...... ................................. ............... 5-26 Solids Balance Results (2003) ........... ........ ............ .................... ......... ........ 5-27 Sludge Production Projections.... ..................... ............... ...... ................... 5-27 Design Criteria, Capacity, and Projections - Solids .............................. 5-28 Design Criteria, Capacity, and Projections - DAFT .............................. 5-29 Backup Thickener Needs ...................... .... ............. ..... ..... ................. .......... 6-2 Dewatering Needs ....................................................................................... 6-2 Alternatives Description .............. ..................... ....... ....... .......... .................. 6-6 O&M Requirements for Oass A System................................................... 6-7 Present Worth Summary......................................... ................ .................... 6-7 Recommended Capital Facility Plan ....................................................... 6-13 Financing Summary.... ................................ .................................... ........... 6-15 VI P:\Bremerton\Comp Plan\Amenc:lment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Table of Contents.doc Figures a:IW Figure 1-1 Figure 1-2 Figure 1-3 Figure 2-1 Figure 2-2 Figure 2-3 Figure 2-4 Figure 3-1 Figure 3-2 Figure 3-3 Figure 3-4 Figure 4-1 Figure 4-2 Figure 4-3 Figure 4-4 Figure 4-5 Figure 4-6 Figure 4-7 Figure 4-8 Figure 4-9 Figure 4-10 Figure 4-11 Figure 4-12 Figure 4-13 Figure 4-14 Figure 4-15 Figure 4-16 Figure 6-1 Figure 6-2 Figure 6-3 Figure 6-4 Figure 6-5 Figure 7-1 Contents Vicinity Map ....... ...... ......... ........... .................................... ....... ......... ........ .... 1-2 Sewer Service Area ........ ........ .......... ............. .......... ........ ........... .................. 1-3 Major Overflow, Conveyance, and Treatment Facilities........................ 1-5 Eastside Wastewater Treatment Facility................................................. 2-17 Eastside Treatment Process Diagram...................................................... 2-18 Westside Wastewater Treatment Facility ...............................................2-19 Westside Treatment Process Flow Diagram .......................................... 2-20 Historic WWTP Flows (1998-2003)............................................................ 3-7 Average WWTP Flow (1998-2003) ............................................................. 3-8 Projected Dry Season Flows for WWTP ................................................... 3-9 Projected Wet Season Flows for WWTP .................................................3-10 Map of Basins.. ...................... ...... ..... ........... .............. ..... .............. ......... ....... 4-4 Anderson Cove Basin .................................................................................. 4-8 Callow Avenue Basin ................................................................................ 4-12 Cherry Avenue Basin ................................................................................ 4-14 East Park Basin ............... ........ .... ..... ........... ......... ....... .............. .......... ........ 4-16 Kitsap Lake Basin.... .... ........... .......... ............. .... ............ ....... .......... ..... ....... 4-20 Marine Drive Basin.. .... .................................. ............ ......... ..... ..... ............. 4-23 Oyster Bay Basin ........................................................................................ 4-28 Pacific Avenue Basin............ .......... ............ .................... ........ ..... .............. 4-32 Phinney Bay Basin........ ........ .............. ............ ..... ........ ............. .................. 4-24 Pine Road Basin. ............ ...... .................. ......................... ........... ................. 4-37 Sinclair Park Basin......... ................... ......... ........ ........ ................................ 4-40 Stevens Canyon Basin ................................ ................ ............................... 4-42 Tracy ton Park Basin........ ............ .... ..... ....... ....... ...... ......... ....... ....... ........... 4-45 Trenton Avenue Basin.. .............................. ................ .......... .... ..... ............ 4-50 Warren Avenue Basin................................................................................ 4-54 WWTP Proposed Facilities Plan ................................................................ 6-3 Westside WWTP Outfall Expansion ......................................................... 6-5 TP AD Layout..... .................... ........................ ...... ........ ..... ....... ......... ..... ....... 6-8 Dewatering/ Pasteurization Layout............ .............. ......... .......... ............. 6-9 Ultimate WWTP Layout. ................................ ........... ....... ............ ...... ....... 6-12 Department of P:ublic Works and Utilities Organizational Chart......... 7-2 vii P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\ORAFT AFTER JUNE 2005\Text\Tabte of Contents.doc Executive Summary Executive Summary The City of Bremerton has prepared this Comprehensive Wastewater Plan to ensure adequate existing and future wastewater capacity and to plan for wastewater system improvements. The plan objective is to summarize planning strategies, policies, and regulatory compliance efforts for the City of Bremerton wastewater utility. The plan that follows establishes long-term system planning and service criteria and evaluates the capacity, condition, and regulatory compliance of the City's wastewater utility facilities in accordance with the Washington State Growth Management Act and the City of Bremerton's Comprehensive Plan. The plan uses a 20-year planning horizon with intermediate planning timeframes of 5 and 9 years (i.e., 2010, 2014, and 2024), and has been developed to comply with federal, state, and local regulations. Background The City of Bremerton, located in the central part of Kitsap County, is surrounded by two waterways, Sinclair Inlet and Dyes Inlet, which separate the City into two portions: West Bremerton and East Bremerton. The City of Bremerton currently operates two wastewater treatment facilities. The Westside Wastewater Treatment Plant (WWTP) in West Bremerton provides secondary treatment for the entire wastewater system service area and discharges to Sinclair inlet. The Westside WWTP currently has a peak hydraulic capacity of 42 mgd, and operates as a conventional activated sludge secondary treatment process. The Eastside Treatment Facility provides treatment for wet weather combined sewer flows in East Bremerton. This facility discharges to Port Washington Narrows and has a maximum hydraulic capacity of 20 mgd. Projected peak flow to this facility during a design storm event is 15 mgd. Processes at the Eastside Treatment Facility include high rate clarification followed by ultraviolet (UV) disinfection. A network of gravity sanitary sewer pipelines, pump stations, and force mains delivers flows from the collection system to these treatment facilities. The sewer service area and collection system is divided into nine West Bremerton and six East Bremerton sewer drainage basins. The six East Bremerton drainage basins are serviced by a combined sewer, in which the stormwater and sanitary sewage are collected within the same conveyance system. Four of the nine West Bremerton drainage basins are also on a combined sewer system. Four other drainage basins have dedicated separate sanitary sewers and stormwater is conveyed and handled separately. Additionally, a proposed drainage basin (known as Port Blakeley) eventually may be added as a sewer drainage basin to the West Bremerton sewer basins. The City's combined sanitary sewer collection system mains range in size from 6 to 42 inches in diameter for gravity mains and from 4 to 36 inches in diameter for force mains. When the flow capacities of the combined sanitary sewers and conveyance systems are exceeded, excess flows are discharged from the combined sewer. overflow structures inPthe system. The City has completed improvements to reduce overflows to one event per CONI P:\ Bremerton\ Camp Plan\ Amendment\ 7 PROJDOC\DRAFT AF1ER JUNE 2005\ Text\Execulive Summary.doc year, per outfall, on a 5-year average during a design storm, in all but two sewer drainage basins. Overflows from these basins are minor and will be reduced to one event per year within the next 5 years. Bremerton's current land use and zoning information indicates that approximately 72 percent of the City and surrounding areas is urban residential development. Approximately 18 percent of the City and surrounding areas is designated as industrial, and approximately 7 percent of the City and surrounding areas is designated as commercial. Approximately 3 percent of the City and surrounding areas is comprised of parks and public facilities. The population in Bremerton has been relatively stable over the past 10 years. The City of Bremerton's service area extends beyond the boundary of Bremerton city limits. The current population served by the City is estimated to be 36,120. Bremerton's Comprehensive Plan estimates the service area population to increase to 42,387 by the year 2010; 45,198 by 2014; and 52,321 by 2024. CSO Reduction The City updated the CSO Reduction Plan for Bremerton's drainage basins with a series of documents, including a CSO Reduction Facility Plan Update dated October2000. The CSO reduction improvements generally utilize all system capacity. Basin-specific analysis and CSO Reduction Plan amendments have subsequently been submitted to DOE for review/approval. The City produces a CSO report that is submitted to the Washington State Department of Ecology on an annual basis. This report shows that the CSO reduction program has been very successful in reducing total overflow volume and frequency, with a volume reduction of 99.7% and frequency reduction of 97.2% for 2004. Basin Improvements Hydraulic improvements for the sewer basins include upgrades to existing pump stations, new pump stations, sewer extensions, and improvements to existing sewers, including reduction of inflow and infiltration. Basin descriptions and general improvements are summarized in this Comprehensive Plan. Plant Cavacitv Needs Both the WWTP and Eastside Treatment Facility have adequate liquid treatment capacity to handle current and future conditions in Bremerton. The WWTP is currently permitted for a maximum monthly average flow of 10.1 mgd. The current NPDES Permit has expired and the plants are operating under an agreement with Ecology to extend the old permit. With a few minor exceptions, the WWTP has been in compliance with all discharge standards since the City took control of plant operations in 1995. The Permit requires the City to begin planning for expansion when the actual flow reaches 85 percent of the permit capacity for three consecutive months. With the exception of extreme wet CONI P:\13I'€merton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\ Text\Executive Summary.doc weather months, actual flow will never reach the 10.1 mgd capacity during this Plan's planning period. This Comprehensive Plan Update does not anticipate more restrictive discharge requirements will be imposed in the foreseeable future. The dry weather mass limits are based on the plant's 1980 design flow of 10.1 mgd and should never be exceeded over the period covered in this plan update. If mass limits for extreme wet weather events become a compliance issue, the City has a plan to construct blended treatment using high rate clarification (similar to Eastside) and force additional flow to Eastside Treatment Facility. In recent years, the WWTP has treated a peak month flow greater than 10.1 mgd and met discharge concentration and mass limits. In 2001, the City developed a rerating study for Ecology to assist the agency in modifying the NPDES permit limits. Peak month flow has increased as the City brings more CSO to the WWTP though major improvements to the collection system. Recommended Immediate System Improvements WWTP recommendations center on improvements to plant reliability and capacity, wet weather capabilities, and biosolids handling. Eastside Treatment Facility recommendations involve improvements to the existing outfall. Immediate wastewater system needs center on biosolids processing at the WWTP. Thickener Capacity Installation of a second backup DAF is very expensive and almost impossible to construct due to the close proximity of the secondary clarifier and the east plant boundary. The new gravity belt thickener can be installed in an expanded centrifuge area or in a building on top ofthe existing DAF if the structure can support the load. These locations put the thickener close to polymer handling and other solids processing operations. Dewatering Capacity The existing, aging centrifuge dewatering unit will be converted to a backup unit and a new unit will be installed in an expanded centrifuge area. The loading bay will also be expanded to accommodate a second dump truck or a commercial sludge hauling trailer. This building addition will be large enough to handle a drum thickener/screw press type approach should the City decide to move toward a Class A biosolids product. The old centrifuge would be replaced with a screw press under that scenario. Generator Upgrades The other immediate WWTP need is a new standby generator. The existing unit is outdated, unreliable, and cannot power the entire plant during a power outage. Partially treated discharges will occur during a power outage at wet weather flows. A new 1,250 kW unit will handle the existing plant with enough capacity for future plant needs. CONI P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AF1ER]UNE 2005\ Text\Executive Summary.doc Sinclair Inlet Outfall Capacity The 2003 Facilities Plan recommended a new, low head pump station as the cheapest and least disruptive alternative for expanding the Sinclair Inlet Outfall capacity. The recommendation of this plan is to coordinate a new, larger pipe during the upgrade and remodeling of the SR3/SR304 interchange. Eastside Outfall Improvement The existing Eastside Treatment Facility outfall was constructed at the site of the old Mannette Primary Treatment Plant, which was decommissioned in 1985. A new 36-inch diffuser section was added in 1972. The capacity of the Eastside outfall is limited to approximately 15 mgd by the first 250 feet of 20-inch reinforced concrete pipe. Replacement of this section from the treatment plant, through the bank, and to just below the low tide line on the beach with a 36-inch line will increase the outfall capacity to 30 mgd. The permit for the outfall easement expires in 2010. As part of the renewal process with the Department of Natural Resources, the permits for replacing the 20-inch section with new pipe should be pursued. Schedule for Immediate Improvements Implementation of immediate needs will take place over the next 5 years, with the wet weather capacity upgrades to the WWTP starting in 2005 followed by improvements to both outfalls. The timing of the Sinclair and Eastside outfall projects will be coordinated with SR3 improvements and lease renewal activities, respectively. Recommended Longer- T enn System Improvements BreIDerton has no requirement at this time to achieve a Class A biosolids product. However, planning for improved biosolids quality will allow immediate thickening and dewatering improvements to fit into a longer range plan for Class A. There are two feasible alternatives. . Conversion to Temperature Phased Anaerobic Digestion (TP AD) - requires a third digester as well as heating, thickening, and dewatering enhancements to the existing system. . Dewatering/Pasteurization - requires a thickener screw press with lime and steam addition. The recommended approach to meeting the wet weather, solids loading processing needs is to install a thickener and new centrifuge immediately. Capital improvements in the short and medium term will be funded through utility and non-utility financing sources. Sources of utility funding available to the utility include annual rate funded capital, system development charges, and revenue bonds. In addition, new revenne bonds are planned for Bremerton. A number of state and federal CONI P;\ Bremerton \ Comp Plan\ Amendment\ 7 PROJDOC\DRAFT AFTER JUNE 2005\ Text\Exoculive Summary.doc grants and loans are available to the City. These include Public Works Trust Fund and State Revolving Fund loans, and EP A grants. The total amount of funding to be obtained through the utility and non-utility funding sources through 2011 is $26,510,979. Additional Staff and Equipment Requirements No additional staff have been added to operate and maintain construction of new treatment facilities and expansion of existing facilities since 1995. An increase of two full-time employees for the Wastewater Division (treatment plants/pump stations) and one full-time employee for the Utility Operations Division (storm/ sewer collection system maintenance) is required to restore manpower to the 1995 level. Additional staff would be required to implement future expanded program requirements as well, including collection system evaluation, infiltration and inflow reduction, clean-out installation, and cleaning of beach mains and inverted siphons. In addition, the existing collection system television equipment, backhoes, and Vactor trucks, which would be an integral part of these programs, are nearing the end of their service life expectancy, and replacement should be included in equipment replacement planning as their usage increases. Comprehensive Plan Implementation This Wastewater Comprehensive Plan addresses system additions and improvements that will be required to fully develop the service area. Potential projects are recommended through the year 2014. CDM recommends that the City periodically review progress it has made in implementing the plan before the next plan is due. The City should assess the effectiveness of its improvements to biosolids production, CSO reduction, basin pump station and conveyance improvements, developments in wastewater reuse opportunities, and expansion of conveyance and plant capacities. Current population, population projections, and current and future financial resources should be reviewed and adjusted as necessary to reflect actual conditions and accommodate future project implementation. CONI P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFf AFfERJUNE 2005\ Text\Executive Summary.doc --I I ,., , I n I 'I ! I I ..... 'on.... ~, - - . ,~ ~ - . - . - . ., . - - 0.. . ~. . One i .....1 Section 1 Introduction The City of Bremerton Department of Public Works and Utilities is responsible for providing wastewater service to Bremerton and surrounding areas. The City prepared this Comprehensive Wastewater Plan to ensure adequate existing and future wastewater capacity and to plan for wastewater system improvements. The Comprehensive Wastewater Plan, also commonly referred to as the "general sewer plan" fulfills the requirements of Washington Administrative Code (WAC) 173-240- 020 and minimum comprehensive plan content requirements outlined in WAC 173- 240-050. The intent of the regulations are to provide the City with preliminary information in sufficient detail to ensure that future reports/ facility plans can be developed from them without substantial alterations to the concept and basic considerations. The last general sewer plan was completed in December 1995 and adopted through Resolution No. 2549 by the City Council on May 22, 1996. This 2004 plan updates that plan and uses a 20-year planning horizon with intermediate planning timeframes of 5 and 9 years (i.e., 2010, 2014, and 2024). Periodic plan review and revisions may be necessary to address regulation changes or other changes in conditions. 1.1 Background and Existing System The City of Bremerton, located in Kitsap County approximately 15 miles west of Seattle across Puget Sound, owns, maintains, and operates a sanitary sewer collection and treatment system that provides service to West Bremerton, East Bremerton, and surrounding areas of unincorporated Kitsap County as shown in the vicinity map in Figure 1-1 and the sewer service area map in Figure 1-2. The system also accepts sanitary sewer flows from the U.s. Navy Puget Sound Naval Shipyard (PSNS), other U.S. Navy Facilities, and Kitsap County Sewer District No.1 (KCSD No.1) in West Bremerton. Other than the U.s. Navy, the system does not provide sewer service for any significant industrial dischargers. The City's sewer system is composed of several components: .. Combined sanitary and stormwater sewers .. Gravity sewers .. Gravity-pressure sewers .. Sanitary sewer pump stations and force mains .. Combined sewer overflow (CSO) structures II Wet weather treatment facility .. Conventional wastewater treatment facilities .. Odor Control Stations CONI 1-1 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 1.doc - '0: o\l :c <ll 'c <.C N ~ 10 ;f ~. <ii o ~ .q- o "'- IN o '- <.C o .... 1 ... I 0' Ii: /' @ZOOQ DELORME, xMAP BUSINESS; @ 2000 GOT INC, REl Q4!2000 0. 'l> OC /' Ie (J;) d'! ... o J'-~'-'-.l \ f- \ \ ~f&Nlj'( \ 1.._' \........---,...,..---_-k.~..~ Washington ,;;f / "l" l"1 N ~ &. 105 0 10 ~ i---=::3 SCQle in Miles C\TY OF BREMERTON Figure 1-1 Vicinity Map I'!nM L "0 .0 I"- X r- If) u.. w a:: x , , ,".' , I , , , , , , PORT I , BLAKELY , ~t:JU"'AN610N AREAl , "' I I , I , , I , I " I ,# ,.- &.. .... o ...... <t- o E o '!1 N If) o "- OJ r- "- f"- a ('~ I Ol l.L /" c: .2 (L a. E o u /" to 0Cl 0) 't" /- "<I- rf) ('~ 0) /' n.: CDM DYI:$ fNlEf I ,...-. . . ~. , . t , \ K11SAP tAKE SEWERED r*un.IIONS NON-$EWERED PORTIONS OF BASINS OF BASINS , , , , . . 1 " Klt8ap Lake ~r / I' / I / /' SfNCt..A/R INLET CITY OF BREMERTON ~EGEND: WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY CITY LIMITS .............~~"" --- - REFERENCE: WASTEWATER COMPREHENSIVE PLAN. ell'r' OF BREMERTON, CH2MHILL, 1995, FIGURE 2-2 SERVICE AREA ~ ~J ~ NOT TO SCALE Figure 1-2 Sewer Service Area - 1 I , , I CONI Section 1 Introduction The City of Bremerton currently operates two wastewater treatment facilities. The Westside Wastewater Treatment Plant (WWTP) in West Bremerton provides secondary wastewater treatment for the entire system wastewater service area and discharges to Sinclair inlet. The Eastside Treatment Facility provides treatmentfor wet weather combined sewer flows in the Pine Road Basin of East Bremerton and discharges to Port Washington Narrows. As shown in Figure 1-3, a network of gravity sanitary sewer pipelines, pump stations, and force mains delivers flows from the collection system to these treatment facilities. The various East Bremerton sewer basins collect wastewater with gravity sewers, pump stations, and force mains that deliver combined sanitary sewer flows to the East Bremerton beach main. From the East Bremerton beach main, East Bremerton flows are delivered to West Bremerton through 16-inch and 24-inch inverted siphons during normal dry weather operations, then pumped into the Crosstown Pipeline force main and gravity-pressure sewer main system by pump station CE-l, along with flows from various West Bremerton basins. The Crosstown Pipeline 9-elivers these pumped flows to the.Westside WWTP. Wastewater from the remaining West Bremerton service areas is delivered to the WWTP via gravity sewer mains and pump stations. During wet-weather conditions most of the combined sewage flow from East Bremerton is diverted to the Eastside Treatment Facility via the East Bremerton beach main, where the flow is treated and discharged to Port Washington Narrows. During wet-weather conditions the East Bremerton beach main is pressurized by pump station EB-2 to increase peak flow capacity to the Eastside Treatment Facility. Since a portion of the City of Bremerton sanitary sewer collection system is composed of combined sewers, flows are derived from the following types of sources: .. Conventional wastewater and sanitary sewage .. Stormwater inflow .. Groundwater infiltration, including rainfall-induced infiltration The hydraulic capacity of the City's combined sanitary sewer collection system and associated components is adequate to convey dry weather wastewater flows to the Westside WWTP for treatment. However, during extreme wet weather storm events, combined sewer flows can exceed hydraulic capacity of the City's existing combined sanitary sewer conveyance and Westside/Eastside treatment system. When this occurs, excess untreated combined sanitary sewer flows have historically been allowed to overflow to receiving waters of Puget Sound. As a result of increasing water quality and environmental mandates, federal and state regulations have been developed to limit the occurrence of untreated combined sewer overflows. As detailed in the City of Bremerton CSO Reduction Plan Update, (dated October 2000), the City is currently taking steps to comply with these requirements and is implementing a number of efforts to reduce the occurrence of untreated P:\8remerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 1.doc 1-4 Q) ..., Vi I ~ ro en i.J... w 0:: X :S, ..., z ..... o E r--- o .0 LC) o ......... N ......... r--- o I"") I ~ O'l Li:: ./ c o 0:: Cl. E o u ./ CD CO (j) v ./ v I"") N (j) <': D.. l.... "'0 ..Q r--- x ~OTES: 1. CE-6 DISCHARGE POINT WILL CHANGE BY DECEMBER 31. 2006 2. PORT BLAKELY SERVICE AREA WILL BE EXPANDING AS SHOWN LEGEND: OF-B'" OVERFLOW STRUCTURE CW-1. PUMP STATION ------ MAJOR PIPELINE BASIN BOUNDARY ... SERVICE AREA BOUNDARY COllI >. D~ 1~3!"r~'" "<: INLET ~~,- ?~~% Q) <:I II: "<: :x: <> II: C "- II: C ll. PORT WASHINGTON NARROWS INVERTED SIPHONS ,,~ .,*"I " 4' ..,. WI!> " iii iii g E iii iii iii E , , ,," PORT , $ BLAKELY l l (EXPANSION AREA) f , 4' , $ E , E I iii 4>f fj 4'4> iii 4'4f; '$j,~ "" ",,4f; ~ 'l:- 't -<- CJ c'l:- -I. 't " <0 'l:- () ~ &7b "II'- el. ~ s I \ ~ I. ~ CENTRAL BREMERTON FORCE MAIN / PP-1~ WESTSIDE' " WASTEWATER TREATMENT PLANT ~ N o 1" = 3000' r---_-.J.u~&JI..."~.""~oI.i.wuJjilll.ll"".i..lllJ....I&lJ 1 500 0 30! CITY OF BREMERTON Figure 1-3 Major Overflow, Conveyance, and Treatment Facilities CDIVI Section 1 Introduction combined sewer overflows to less than 1 per year per outfall, in compliance with WAC 173-245. These include: · Separation projects to reduce the stormwater inflow component of flows in the sanitary sewer system by providing separate collection and conveyance systems for sanitary sewage and stormwater. Sanitary sewer rehabilitation and repair projects to reduce and eliminate infiltration sources within the collection system. Construction of storage facilities. . Sanitary sewer improvements to redirect existing flows, increase combined sewer conveyance capacity, and reduce the system hydraulic capacity limitations that can result in untreated combined sewer overflows within the collection system. . A wet weather treatment facility to provide appropriate treatment of combined sanitary sewer flows before they are released to Puget Sound receiving waters reducing the occurrence of untreated combined sewer overflows. · Ordinances requiring separation of private property stormwater systems from the sanitary sewer system, as well as required repair and maintenance of private service laterals to reduce infiltration from private property sources. The Eastside Treatment Facility has been designed to provide treatment for the East Bremerton sewer flows during wet weather storm events to meet Puget Sound water quality standards. The Eastside Treatment Facility was functional in December 2001 and completed in 2002. Additional system improvements are being implemented to increase combined sanitary sewer conveyance capacity to the City's WWTP and Eastside Treatment Facility for treatment prior to discharge. 1.2 Regulatory Requirements This Wastewater Comprehensive Plan addresses relevant federal, state, county, and local regulatory requirements. 1.2.1 Federal Regulations The Federal Water Pollution Control Act of 1972 (PL 92-500), as amended by the Clean Water Act of 1977 (PL-95-217) and the Water Quality Act of 1987 (PL-I00-4)- commonly referred to as the Clean Water Act (CW A) - are the federal requirements over wastewater collection, treatment, and disposal. The CW A gave the United States Environmental Protection Agency (EP A) the authority to implement pollution control programs such as setting wastewater standards. EP A has the authority to delegate enforcement to the states, when state regulations are at least as strict as the federal regulations. In the State of Washington, Washington Department of Ecology (Ecology) administers and enforces the CW A. Federal regulations for biosolids treatment and disposal are contained in Title 40 Part 503 of the Code of Federal ReQ111ations (CFRL Biosolids.. as. defined bv EP A Part SLlq u- ------" ----r- -----~r~ -----.r --~~~~...--~ regulations, are divided into two classifications, Class A and Class B, based on the P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 1.doc 1-6 CDIII Section 1 Introduction resulting pathogen density level achieved by the treatment process. All biosolids that are to be land applied for beneficial use must meet the requirements of one of these classifications. Class B biosolids are usually achieved through a Process to Significantly Reduce Pathogens (PSRP). These processes include conventional aerobic and anaerobic digestion, composting, lime stabilization, composting, and drying. There are a number of restrictions on the harvesting of food crops, grazing of animals, and public access to land where Class B biosolids have been applied. Class A biosolids can be achieved through a Process to Further Reduce Pathogens (PFRP). These processes include composting, heat drying, thermophilic aerobic digestion, and pasteurization. The production of higher quality, Class A biosolids offers the advantage of increased flexibility since there are few restrictions on the beneficial use or sale of Class A biosolids. In order to be recognized as producing Class A biosolids with anaerobic digestion alone (i.e., pasteurization or heat drying), either the process must satisfy the time- temperature criteria specified in Part 503 or obtain a PFRP equivalency recommendation from EP A' s Pathogen Equivalency Committee (PEe). Class A biosolids can be produced by coupling mesophilic digestion with pasteurization or heat drying. Thermophilic digestion can produce Class A biosolids by meeting the time-temperature criteria and obtaining a PFRP equivalency certification from the PEe. It must be recognized that the EP A Part 503 regulations also regulate pollutant concentration, vector attraction reduction, and management practices. Due to the excellent industrial pretreatment requirements by most wastewater agencies, pollutant levels are generally quite low. Properly operated conventional and high performance anaerobic digesters can meet the vector attraction reduction criteria. Biosolids very low in pollutant levels, Class A in pathogen density levels, and meeting vector attraction reduction criteria can be classified as Exceptional Quality (EQ). The EP A has established minimum requirements for states to use in enacting regulations for wastewater reuse and reclamation. 1.2.2 Washington State Regulations States are required under Section 303( d) of the CW A to identify water bodies that are impaired by pollution and to establish a priority ranking of these impaired waters. States must establish a total maximum daily load (TMDL) of pollutants for each of these water bodies including identification of sources, and develop and submit an implementation plan to meet the TMDL. The primary driver for the State's TMDL program is a 1997 Memorandum of Agreement between EP A and Ecology regarding Section 303(d) implementation. The governing Washington State laws for the planning and designing of wastewater facilities are the Revised Code of Washington (RCW) 90.48.110. Washington 1-7 P:\Bremerton\Comp Plan\Amendment\7 PROJDQC\DRAFT AFTER JUNE 2005\Text\section 1.doc CONI Section 1 Introduction Administrative Code (WAC) Chapter 173-240 implements the "plans and specifications" from RCW 90.48.110 and include the requirements for engineering reports, plans and specifications, and general sewer plans. WAC Chapter 173-240 includes the following: .. Planning requirements and review procedures .. Plan contents .. Requirements for engineering reports for specific projects, ownerships, operation and maintenance .. Public notification procedures for construction of wastewater facilities CSO regulations are addressed in the RCW 90.48.480 and WAC Chapter 173-245. These regulations call for "the greatest reasonable reduction in CSOs at the earliest possible date." The WAC Chapter 173-245 regulations developed from this law allow only one CSO per year per CSO site. The CSO regulations have been addressed in the City of Bremerton's CSO Reduction Plan, October 2000. Mirroring associated federal regulations, WAC 173-308 and WAC 173-351 govern the management, beneficial use, and disposal of biosolids generated by wastewater treatment processes. Title 90.26 of the Revised Code of Washington (RCW) establishes Washington State law governing the use of reclaimed wastewater including treatment requirements according to types of use. Growth Management Act The State of Washington's Growth Management Act (GMA) was enacted by the 1990 Legislature and its administrative regulations were adopted by Ecology in 1992. The GMA regulations are contained in Chapter 365-195 WAC and require all counties and cities with specified populations and growth rates to meet the requirements of the Act. One of the requirements of the GMA is development of a comprehensive plan. Comprehensive plans must include maps and descriptive text covering the objectives, principles, and standards used to develop the plan. One of the required elements of the comprehensive plan, which relates to the planning for and construction of wastewater collection and treatment facilities, is the capital facilities plan element. The capital facilities plan element must meet the requirements of RCW 36.70A.070 and WAC 365-195-315. These requirements include: .. An inventory of existing capital facilities owned by public entities, including the locations and capacities of these facilities .. A forecast of the future needs for the capital facilities .. The proposed locations and capacities of expanded or new capital facilities .. A requirement to reassess the land use element if the probable funding falls short P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section i.doc 1-8 COM Section 1 Introduction General Sewer Plans A general sewer plan as defined in WAC 173-240-020 is /I a comprehensive plan for a system of sewers adopted by a local government entity." General sewer plans should include the general location and description of the following: . Treatment and disposal facilities . Trunk and interceptor sewers . Pumping stations . Monitoring and control facilities . Local service areas and a general description of the collection system to serve these areas The required contents of a general sewer plan are further described in WAC 173-240- 050. This City of Bremerton Wastewater Comprehensive Plan has been developed to comply with the above federal and state regulations. 1.3 Compliance Status EP A has delegated responsibility for administering CW A National Pollution Discharge Elimination System (NPDES) permits to the State of Washington. Bremerton's NPDES Permit (W A-002928-9) (Appendix A) was issued on June 21, 1996. Although the permit has expired, the City has submitted an application for permit renewal, and, in the interim, is complying with existing permit requirements. The treatment plant has met monthly and weekly effluent biochemical oxygen demand (BODs) and total suspended solids (TSS) permit standards with few minor exceptions since 1995, when the City took control of plant operations from the Contracted Operator. The last compliance violation occurred in January 1998 with an average weekly effluent TSS mass discharge violation. Prior to that, a small number of violations occurred in 1996 and 1997. From a compliance standpoint, the Westside WWTP has done very well, including receiving an Outstanding Performance Award from Ecology in 1999. More detailed information on specific permit compliance issues are discussed in Section 5. 1.4 Enforcement Actions There are two Consent decrees that resulted from legal actions by private parties against the City of Bremerton. In addition, Ecology issued a consent order to the City. The following are descriptions of these actions: . In 1992, Puget Soundkeeper Alliance (PSA) sued the City of Bremerton for failure to implement CSO control measures under the Federal Clean Water Act. The City settled the suit with a federal consent decree requiring implementation of the City's CSO Reduction Plan, including strict monitoring requirements, by 2011. In 1 QQ7 P~A filDrt ~ ~"l"lh(!Dn"l"lDn--t.. ~'L,,--i+ c\llnm"l"\.n" foho. r~.I~"u" 'U_I~D- ~-I- -L~ L"'IL"'IL____t~~_L'"Ip. 'tk!-Lr' -bu~ -b["kr[~ --=..r-..r-r-, ...0;; ~..c ~ .r..LI:~1IiO.'I: ~ IJtalV".............'1~~.J:Ct; ~~LI; U-L.J:~5..u::1:15 LJ:~ '-'.c~y vv-uu r~ LeI:: ~V~L[YllClL[L,-,." L _ 1-9 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 1.doc Section 1 Introduction consent decree. Through substantial mediation and negotiation, an amended consent decree was issued by the court with substantially modified terms. III In 1992, the City along with Metcalf and Eddy (M&E, a contract operator of the WWTP) and CH2M HILL (WWTP designer) were sued by the West Hills Neighborhood Association for failure to control odors at the WWTP. In the process, Puget Sound Air Pollution Control Authority (PSAPCA) issued a consent order to abate odors at the plant by December 31, 1995. The City settled with the plaintiffs for $4.3 million and made odor control upgrades in compliance with the consent order in the amount of $7 million. In 1996, a second. suit was filed by the Charleston Beach Neighborhood Association and was settled for $3.4 million. III In 1993, Ecology issued Order on Consent No. 93WQ-150 to the City of Bremerton; this order set out the schedule for completing the individual elements in the City's CSO Reduction Plan. The Order on Consent was later amended in 2000 to extend the time allowed for completion of elements of the Callow A venue Basin CSO Reduction. For compliance with the Order on Consent, the City is required to have completed all CSO Reduction activities by December 31, 2011 - the City is well ahead of this schedule. The City successfully defended a suit for environmental trespass by A&K Trust, a shellfish grower in Dyes Inlet. The suit claimed the City's CSO program was in violation of its NPDES Permit and was the cause for the Department of Health's denial of an application to license shellfish beds. Subsequent data have demonstrated no water quality impact to the shellfish beds of Dyes Inlet. 1.5 Planning Information Sources Information sources used in preparation of the following plan elements include: III Population · United States Census Bureau, 1990 and 2000 census data Kitsap County-Wide Planning Policy, December 15, 2003 III Land Use · Kitsap County Comprehensive Plan, 2002 · City of Breffierton Comprehensive Plan, April 5, 1995 (New plan pending). · City of Bremerton Zoning Ordinance, June 9, 2003 III Drinking Water Impacts · City of Bremerton Water System Plan, 1999 III Water Quality Plans CDNI 1-10 P:\BremeJton\Comp PJan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 1.doc Section 1 Introduction . City of Bremerton CSO Reduction Plan, October 2000 1.6 Plan Organization and Contents The plan objective is to summarize planning strategies, policies, and regulatory compliance efforts for the City of Bremerton wastewater utility. The plan that follows establishes long-term system planning and service criteria and evaluates the capacity, condition, and regulatory compliance of the City's wastewater utility facilities in accordance with the Washington State Growth Management Act and the City of Bremerton's Comprehensive Plan. The plan uses a 20-year planning horizon with intermediate planning timeframes of 5 and 9 years (i.e., 2010, 2014, and 2024). Specific plan components include: .. Introduction (Section 1) - Summarizes the relevant background information, provides descriptions of the existing system including applicable regulatory and other requirements, and identifies related documents and planning information sources. .. Service Area and System Characteristics (Section 2) - Provides a description of the surrounding vicinity characteristics, the plan service area, and the current infrastructure. .. Sewer System Planning Information (Section 3) - Documents existing and anticipated future population, land use, sewer flows and loads, and utility impacts throughout the plan service area. .. Collection System Evaluation (Section 4) - Presents necessary system improvements to the sanitary sewer system. Combined sewer system improvements are addressed in the October 2000 CSO Reduction Plan prepared for the City of Bremerton, and include: · Sewer Main Replacement · Pump Station Improvements · Washington Beach Main Abandonment . Anderson Cove Basin Combined Sanitary Sewer Project (OF-12) . Trenton and Cherry Avenue Basins Combined Sewer Overflow Project (OF-16) . Wastewater Collection and Transmission System Improvements for Oyster Bay · Anderson Cove Inflow and Infiltration Study . Tracy ton Pump Station (EB-6) Construction/Improvement, and · Campbell Bay Beach Access at Main Street .. Wastewater Treatment Plant Evaluation (Section 5) - Establishes relevant planning and design criteria and assessed the potential impacts of anticipated sewage flows on treatment processes and facilities with regard to treatment standards and requirements. Identifies treatment and process improvements necessary to accommodate anticipated waste flows and loadings, including those necessary for proper ancfbeneficial use and disposal of effluents and solids. COM 1-11 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Seclion 1.doc CONI Section 1 Introduction . Capital Improvement Program (Section 6) - Summarizes, schedules, and prioritizes improvements identified in the wastewater comprehensive plan to include implementation and cost estimates. Also includes a financial analysis of the current revenues and expenditures to assess financial resources and requirements. . Operations (Section 7) - Describes the Utility's organization and operation and maintenance procedures and programs. . Implementation (Section 8) - Discusses the process to be followed to coordinate and implement this comprehensive plan, the environmental impact from the implementation of this plan, and future updates to this plan. 1-12 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 1..doc ~ Oil --r- JWO COM Section 2 Service Area and System Characteristics This section provides a description of the surrounding vicinity, the plan service area, and the current infrastructure. 2.1 Surrounding Vicinity Characteristics 2.1.1 City of Bremerton The City of Bremerton is located in the central part of Kitsap County about 15 miles west of Seattle, just southwest of Bainbridge Island. Bremerton is located on the west side of Puget Sound and is surrounded by two waterways, Sinclair Inlet and Dyes Inlet. Port Washington Narrows connects Sinclair and Dyes Inlet and separates the City into two portions. The northeastern portion of the City is commonly called East Bremerton and the southwestern portion of the City is commonly called West Bremerton. Figure 1-2 illustrates the City and the surrounding vicinity characteristics. 2.1.2 Topography The Kitsap County area lies in a structural downfold between two mountain ranges known as the Puget Trough or Puget Sound Lowland. The county is located in a long, narrow, irregular-shaped part of the Kitsap Peninsula and is indented by many bays and smaller inlets that form a very long, irregular-shaped coastline. Waters of the Puget Sound bound all except the southern part of the county. The relief of the area is moderately subdued with undulating to rolling lowlands. 2.1.3 Geology and Soils Bremerton is part of the Puget Lowland, and is part of the large glacial drift plane. This plane is characterized by the low, gently rolling north-south trending ridges that are separated by valleys and marine embayment. This area is mantled by glacial till underlain by older glacial and interglacial deposits. The till in this area ranges in depths from several to 100 feet in depth. Tills are generally composed of cobbles and coarse gravel bound in clays, silts, and sands and is usually very dense. Underlying the till, from Bainbridge Island to Bremerton, are the Blakely Formation sediments. The Blakely Formation is composed of massive to moderate bedded, dark reddish-brown cobble to boulder conglomerate in well-cemented matrix of coarse- grained, poorly sorted sandstone. Sandstone and conglomerate are composed of sub angular to well-rounded groups of basalt, andesite, hard well-cemented basaltic sandstone, dark gray siltstone, and a few quartzite and metamorphic rock fragments. Thin layers of lighter gray-brown clay mudstone, carbonaceous siltstone, and coal are interbedded. From Bremerton west there is a large outcrop of areas of Eocene Crescent volcanic rocks. 2-1 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sect;on 2.doc CONI Section 2 Service Area and System Characteristics 2.1.4 Climate and Air Quality A cool maritime climate prevails within the service area because of its proximity to the Pacific Ocean and the influence of Puget Sound. In addition to marine influences, the regional climate is affected by the Cascade and Olympic Mountain ranges, located east and west of the City, respectively. Bremerton experiences relatively short, cool, dry summers and prolonged, mild, wet winters. Falls and winters are generally accompanied by prevailing southwesterly winds, while the winds in the spring and summer are generally from the northwest. Precipitation in the county ranges from just under 30 inches per year in the north to almost 70 inches per year in the southwest portion. On a seasonal basis, nearly 80 percent of the precipitation in Bremerton occurs in the 6-month period from October through March. Precipitation as snowfall occurs infrequently and is generally light, at a depth that seldom exceeds 3 to 6 inches in the lower elevations. Snowmelt typically occurs within the first 24 hours after a snowstorm. The Puget Sound Clean Air Agency (PSCAA) is the regional air quality management agency for Kitsap County. PSCAA represents the U.S. Environmental Protection Agency, and monitors and manages air quality in the Puget Sound Region. Under the authority of the Clean Air Act, EP A established the National Ambient Air Quality Standards (NAAQS), which specify maximum concentrations for a set of "Criteria Pollutants." These pollutants include: CO, PM-10, ozone, sulfur dioxide, lead, and nitrogen dioxide. Areas of the country where air pollution levels persistently exceed the national ambient air quality standards may be designated by the EP A as "Non- attainment" areas. The planning area is not located in a designated non-attainment area for any of the federal criteria pollutants. 2.1.5 Water Resources Freshwater and marine resources in this area of Water Resource Inventory Area (WRIA) 15 include the Sinclair Inlet, Dyes Inlet, and the Port Washington Narrows, and the associated watersheds that flow into these marine systems. Both Fresh and Marine waters are classified under the following system and earn these designations by meeting or exceeding established criteria related to watershed use and water quality. These designations are determined by the State of Washington (173-201A WAC). Designation Quality AA A B C Extraordinary Excellent Good Fair P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc 2-2 CONI Section 2 Service Area and System Characteristics Fresh Water Sinclair Inlet Watershed The Sinclair Inlet Watershed is located south of Bremerton in central Kitsap County. Surface waters flowing into the Sinclair Inlet are primarily designated as Class A or excellent waters by the State of Washington (173-201A WAC). The following fresh water bodies are within the Sinclair Inlet Watershed: III Anderson Creek Annapolis Creek Beaver Creek III III III Blackjack Creek III Gorst Creek III Karcher Creek III Ross Creek III Ruby Creek (a tributary to Blackjack Creek) III Sacco Creek All these fresh water bodies are designated Class A quality except Beaver Creek, which is classified as Class AA (extraordinary) water. Dyes Inlet Watershed The Dyes Inlet Watershed is located west of Bremerton in central Kitsap County. Surface waters of this watershed are designated Class A waters by the State of Washington (173-201A WAC). The following fresh water bodies are within the Dyes Inlet Watershed: III Barker Creek iii Chico Creek .. Clear Creek III Dickerson Creek II Kitsap Creek III Mosher Creek II Ostrich Bay Creek .. Pahrmann Creek III Ridgetop Creek III Strawberry Creek P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc 2-3 CONI Section 2 Service Area and System Characteristics Water Resources Management Area The head waters of the Union River have been impounded to form Bremerton's main water supply. Approximately 65 percent of the City's potable water comes from the Union River. Additional water comes from wells located near Anderson Creek and Gorst Creek (both creek's are located within the Sinclair Inlet Watershed) and from wells in the Central Kitsap area to the north of East Bremerton. The wells extend to depths of 950 feet and yield water from 300 to 1,100 gallons per minute (gpm). Marine Water Sinclair Inlet The Sinclair Inlet is a shallow estuary with a smooth, muddy bottom. This water body is characterized by weak tidal currents that result in a low flushing rate for the inlet; thus contaminants entering the inlet are not always flushed out and can remain and degrade water and habitat quality. The Sinclair Inlet has been classified as Class A Waters by the State of Washington (173-201A WAC). Dyes Inlet and Port Washington Narrows The Port Washington Narrows flows between Dyes and Sinclair Inlet's and strong currents - associated with the tidal cycles - characterize movement of water through Port Washington Narrows. Dyes Inlet is a shallow estuary with a muddy bottom. This water body is characterized by weak tidal currents that result in a low flushing rate for the inlet, thus contaminants entering the inlet are not always flushed out and can remain and degrade water and habitat quality. Dyes Inlet and Port Washington Narrows are classified as Class A Waters by the State of Washington (173-201A WAC). Other Water Resources The waters within the City's boundary area have differing water quality due to natural conditions as well as historical practices. Based on a cursory review of past water quality studies and planning documents, a general assessment of the water quality of major water resources is provided in Table 2-1. Table 2-1 Major Water Resources Water Body Current Water Quality Kitsap Lake (1)(2) Good Sinclair Inlet (1 )(3) Excellent Dyes Inlet (1)(3) Excellent Port Washington Narrows (1 )(3) Excellent Chico Creek Excellent Gorst Creek (1) Excellent Anderson Creek Excellent Union River Excellent Source: Kitsap Co. Health Dist. (SSWM) 2001-2002 Water Quality Monitor Rpt (1) Water body is 303(d) listed for fecal coliform bacteria (2) Water body is 303(d) listed for phosphorous (3) Water body is 303(d) listed for heavy metal, organic, and/or inorganic parameters P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc 2-4 CDIVI Section 2 Service Area and System Characteristics Wetlands, Floodplains, and Coastal Zones Known wetlands exist within the study area. Adjacent coastal zones include Port Washington Narrows, Sinclair Inlet (adjacent to Callow Avenue Basin), and Port Orchard Bay (adjacent to Trenton Avenue Basin). The Flood Insurance Rate Map (FIRM) published by the U.S. Dept of Housing and Urban Development breaks the City down into three flood zones. FIRM zones and areas include: · Zone AI, defined as areas of 100-year flood; base flood elevations and flood hazard factors determined. This zone includes the entire City coastline and Kitsap Lake (shoreline, eL 10) (Kitsap Lake, eL 159). · Zone B, defined as areas between limits of the lOa-year flood and 500-year flood; or certain areas subject to 100-year flooding with average depths less than one foot or where the contributing drainage area is less than one square mile; or areas protected by levees from the base flood. A smallS or 6 block area south of KitSap Way (low area) is considered zone B. · Zone C, defined as areas of minimal flooding. This zone designation includes the rest of the City. 2.1.6 Wildlife and Endangered Species The following threatened, endangered, proposed, or candidate species listed in Table 2-2 have been identified by the U.S. Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and the Washington Department of Fish and Wildlife (WDFW) as species that may occur in the planning area. Table 2-2 Threatened, Endangered, Proposed, and Candidate Species Identified by USFWS and NMFS as Potentially Occurring within the Project Area Common Name Scientific Name Federal Status State Status USFWS Bald eagle Haliaeetus leucocephalus Salvelinus confluentus Brachyramphus marmoratus marmoratus Species Threatened Threatened Bull trout (Coastal-Puget Sound DPS) Marbled murrelet Species Threatened Candidate Species Threatened Threatened NMFS Chinook salmon (Puget Sound ESU) Oncorhynchus tshawytscha Coho salmon (Puget Sound/Straight of Oncorhynchus kisutch Georgia ESU) Source: USFWS 2001; NMFS 2001; WDFW 2001 Species Threatened Threatened Species Candidate None Sinclair Inlet, Port Washington Narrows, and the adjacent Dyes Inlet are considered environmentally sensitive areas. Bald eagles, which are in the process of being removed from the endangered species list, have been observed in the study area. Also, Puget Sound Chinook salmon, which recently have been listed, are present in Sinclair Inlef and Fort Wasbington Narrows at various times of tIle year. P:\Elremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Texl\Section 2.doc 2-5 CONI Section 2 Service Area and System Characteristics 2.2 Plan Service Area Bremerton's sewer service area is shown in Figure 1-2. 2.2.1 Basins The sewer service area and collection system is divided into six East Bremerton and nine West Bremerton sewer drainage basins as shown in Figure 1-2. The six East Bremerton drainage basins are serviced by a combined sewer, in which the stormwater and sanitary sewage are collected within the same conveyance system. The six East Bremerton drainage basins as shown in Figure 1-2 are listed below: . Cherry Avenue . East Park . Pine Road . Stevens Canyon . Tracy ton Beach . Trenton Avenue The West Bremerton area is divided into nine drainage basins. Four of the nine drainage basins are on a combined sewer system: Anderson Cove, Callow A venue, Pacific Avenue, and Warren Avenue. Four other drainage basins have dedicated separate sanitary sewers and stormwater is conveyed and handled separately: Kitsap Lake, Oyster Bay, Phinney Bay, and Sinclair Park. The other basin, Marine Drive, is within Kitsap County's service area and is primarily unsewered. Table 2-3 summarizes this information. Oyster Bay Sinclair Park Basins (Unsewered) Marine Drive I Additionally, a proposed drainage basin (known as Port Blakeley) eventually may be added as a sewer drainage basin to the West Bremerton sewer basins. Port Blakeley is an approximately lOO-acre development area located just west of Kitsap Lake. 2.2.2 Service Agreements The City of Bremerton has Negotiated Sewer Service Contracts - which are on file with Bremerton Wastewater Utility-with the U.S. Navy and KCSD No.1 in West Bremerton. The service agreements for the U.S. Navv and KCSD No.1 have not ~ - changed since the last wastewater comprehensive plan was developed in 1995. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc 2-6 CDIVI Section 2 Service Area and System Characteristics u.s. Navy The U.S. Navy Contract includes metered discharges from the U.S. Navy Puget Sound Naval Station (PSNS), Jackson Park family housing, and the Naval Regional Medical Center. (The East Park family housing, formerly owned by the Navy, has been turned over to the City and sold for development. The East Park's 1940s sewers are scheduled to be replaced.) The U.s. Navy Contract states that the Utility will transmit and treat sewage discharges from these facilities. However, the U.S. Navy owns and maintains the onsite sewage collection system for its facilities and discharges to the City's system at designated discharge locations. The discharge locations and discharge limitations are detailed in the Negotiated Sewer Service Contract. The Navy's contracted peak discharge is 3.79 million gallons per day (mgd). The City of Bremerton and the Navy are currently renegotiating the contract to clarify discharge limits. Kitsap County Sewer District No.1 KCSD No.1 is located directly north and east of the WWTP. KCSD No.1 discharges to the City through two pump station (WB-1 and WB-2) and on gravity discharge, all discharges are metered. The Contract was established in 1992, and allows KCSD No. 1 to discharge up to 400,000 gallons per day (gpd) from the three discharge locations. The City is responsible for treatment and disposal of these contracted discharges. Major Industries Other than the PSNS, there are no major industries in the study area. Most commercial businesses include beauty salons, food service, gasoline and automotive services, and medicalj dental offices. Non-residential land use includes commercial and retail areas, as well as some parks. 2.3 Infrastructure Description 2.3.1 Collection System The City's combined sanitary sewer collection system mains range in size from 6 to 42 inches in diameter for gravity mains and from 4 to 36 inches in diameter for force mains. The sewers have been constructed with a variety of materials including clay, concrete, PVC, asbestos cement, cast iron, ductile iron, and HDPE. Some portions of the system date from 1910 to 1920. The major conveyance, overflow, and treatment facilities in the sewer system are shown in Figure 1-3 along with the points of connection for the U.S. Navy and KCSD No.1. In most of the sewer basins, the distance from the farthest point in the basin to the bottom of the basin is relatively short. The longest piped distance within each basin is less than 11,000 feet. Typical sewer grades range from 0.5 to 12 percent. These slopes provide for varied flows from very low to high collection system flow velocities. The time of concentration, or the time it takes water to flow through the system onceintroduced, varies from minutes to more than 24 hours. 2-7 P:\Bremerton\Comp Plan\Amendrnent\7 PROJDOC\DRAFT AFTER JUNE 2005\Texl\Seclion 2.doc COM Section 2 Service Area and System Characteristics East Bremerton Flows in East Bremerton are collected from the six sewer basins (listed earlier) through a series of pumping stations, gravity pipelines, and pressure mains that discharge to the East Bremerton beach main. The flows from the East Bremerton beach main gravity flow to a 16-inch and 24-inch siphon under the Port Washington Narrows. In the Tracy ton Beach Basin, combined sewers discharge through Overflow Structure OF-6 to Pump Station EB-6; this delivers flows through an 8-inch-diameter force main to OF-l in the Pine Road Basin. Similarly, in the Trenton Avenue Basin, the combined flow transits through OF-7 to Pump Station EB-3 and to Pump Station EB-2. These pump stations currently discharge to the beach main and during high flow events the East Bremerton beach main changes from gravity to pressure. During low flow periods, all flow from East Bremerton is conveyed through two inverted siphons under the Port Washington Narrows to pump station CE-1 for subsequent conveyance to the City's Wastewater Treatment Plant. Sluice gates have been installed on the inverted siphons at pump station CE-l. These sluice gates have the ability to throttle flow from the siphons to ensure that inflow to pump station CE- 1 does not exceed the station capacity, causing overflows at OF-13. As flows in the East Bremerton beach main increase, the limited capacity of the inverted siphons and throttling at CE-l increase the hydraulic grade (HGL) in the beach main. The HGL will rise to the point that the flow north of the inverted siphons will reverse, conveying the surcharged flow to a storage facility located at the Eastside Treatment Facility. As flows continue to increase, the Eastside Treatment Facility will begin to operate and treat the flows that would otherwise become CSOs. The capacity of the 20-inch beach main north of the inverted siphons limits the flow to the treatment plant to approximately 6,650 gpm. During the design storm, a calculated flowrate of 2,300 gpm is required to be conveyed to pump station CE-l to maintain the HGL below the OF-3 weir. Refer to Appendix B for hydraulic profile. In accordance with the City's CSO Reduction Plan, a series of improvements have been completed in the East Park Basin. East Park flows have been redirected to the adjacent Cherry Avenue and Trenton Avenue Basins. As part of these upgrades, Trenton Avenue Basin pump station and force main conveyance capacity has been increased and the associated flows are pumped directly to the beach main. The beach main conveys East Bremerton flow to a pair of inverted siphons, 16 and 24 inches in diameter, which convey East Bremerton flow across Port Washington Narrows to Pump Station CE-l in West Bremerton. From there, flow is delivered to the WWTP via the Crosstown Pipeline. Some East Bremerton wet-weather flows in excess of conveyance capacity to the WWTP can also be treated at the Eastside Treatment Facility, located at OF-l, which discharges through the old Manette Primary Plant outfall to the Port Washington Narrows. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc 2-8 CONI Section 2 Service Area and System Characteristics West Bremerton In West Bremerton, combined sewer system flows from the Pacific Avenue, Warren A venue, Anderson Cove, and Callow A venue Basins as well as East Bremerton are pumped into the Crosstown Pipeline system, which conveys flow to the WWTP. Flows from the Warren Avenue Basin are delivered to Pump Station CE-l, which pumps both Warren Avenue and East Bremerton flows from the Port Washington Narrows inverted siphons to the beginning of the Crosstown Pipeline through a 24- inch-diameter force main. Pacific A venue Basin combined sewer flows are directed to Pump Stations CE-4 and CE-6. Each of these pumps stations discharge into the 14-inch-diameter Central Bremerton force main, which discharges to the Crosstown Pipeline. Refer to Appendix B for hydraulic profile. In the Anderson Cove Basin, combined sewer flows are divided into five subbasins. Flows from four of these subbasins are conveyed to Pump Station CW-1, which discharges to the Crosstown Pipeline via the 12-inch-diameter Naval Avenue Force main. Flows from the CW-2 subbasin are delivered to the Callow Avenue Basin via Pump Station CW -2. During low flow periods a diversion can be used to route the discharge from CW-2 to CW-1. In 2005, CW-4 will be revised to discharge to the Crosstown Pipeline. In the Callow A venue Basin, combined sewer flows and those from the PSNS flow to Pump Station WB-3, which discharges to the Crosstown Pipeline. The Callow Avenue Basin also receives flows from the Phinney Bay Basin via a discharge at 15th and Cambrian, as well as those from Anderson Cove Pump Station CW-2. To limit the occurrence of CSO in the Callow A venue Basin, the City has completed the construction of wet-weather Pump Station WB-6 near Pump Station WB-3. Pump Station WB-3 cannot pump at capacity because the incoming 24-inch gravity sewer line hydraulically limits flow into the station. Wet-weather flows that exceed the capacity of WB-3 are diverted to Pump Station WB-6 and pumped to the Crosstown Pipeline. The Crosstown Pipeline delivers flows to the WWTP. Sanitary sewer flows in Oyster Bay and Kitsap Lake Basins are conveyed through a series of pump stations that ultimately flow into the Sinclair Park Basin, and then to the WWTP by gravity. 2.3.2 Pump Stations The system pump stations are summarized in Table 2-4. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc 2-9 Section 2 Service Area and System Characteristics Table 2-4 Pump Stations Discharge Pump Operating Capacity Tributary Areas / Location/Force Station Type (gpm) Pump Controls CSO Outfall Main CE-1 Wet well dry well, Two variable speed Lead-Lag. Warren Avenue Crosstown caisson, constructed pumps and two Magna Fourth pump on Basin & East Pipeline. 1985. VSDs replaced Drive; two rated for standby if a Bremerton. CSOs with Magna Drive units 7,000 gpm and two pump fails. are controlled by in 2001. rated for 1 ,500 gpm OF-13 and OF-14. each at 167 feet TDH. CE-2 Package pump station, Two pumps rated for Lead-Lag. Two Warren Avenue Park Avenue constructed in 1973. 200 gpm at 51 feet pumps total. Basin. Conveyance Line TDH. which flows to pump station CE- 1. CE-3 Custom built pump Two pumps rated for Lead-Lag. Two Warren Avenue To pump station station, constructed in 200 gpm at 62 feet pumps total. Basin. CE-1. 1973. TDH. Pump station controls upgraded in 2002. CE-4 Wet well dry well, Three pumps; two Lead-Lag. Two Pacific Avenue Central Bremerton caisson, constructed in rated for 1,940 gpm at pumps total. Basin, PSNS. Force Main to the 1989. 238 feet TDH; the third Third pump to Crosstown is rated for 200 gpm flush line to CE- Pipeline. and is used to flush the 3. : 8-inch force main. CE-6 Wet well dry well, 10-ft Three pumps; each Lead-Lag; Third Pacific Avenue Central Bremerton diameter, metal dry well, rated for 600 gpm at pump on standby Basin. CSOs Force Main to the constructed in 1989. 202 feet TDH. if pump fails. controlled by Crosstown OF-16. Pipeline. CW-1 Wet well dry well, Three VFD pumps with Lead-Lag with Anderson Cove Naval Avenue caisson, constructed PLC, each rated at 900 pump and level Basin, CSOs Force Main to 1984. Updated in 2001. gpm at 175 feet TDH. controls. Third controlled by OF- Crosstown Only two pumps pump is strictly 9, OF-10A, OF-11 Pipeline. operating, third is standby if one of and OF-12. strictly stand-by. the other pumps fails. CW-2 Submersible, cast in Three submersible Two pumps Anderson Cove Callow Avenue place, constructed 1949. pumps, each rated at operate; third Basin. CSOs sewer system with Reconstructed in 1999. 800 gpm at 175 feet pump on standby controlled by inner-tie to TDH. if a pump fails. OF-8. discharge to Anderson Cove CW-1. CW-3 Submersible grinder Two submersible Lead-Lag. Anderson Cove To pump station pumps, constructed in pumps, each rated for Second pump is Basin. CSOs CW-2. 1970s~upgradedin 50 gpm at 40 feet strictly standby. controlled by 2003. TDH. OF-B. CW-4 Duplex submersible, Two submersible Lead-Lag. Anderson Cove Anderson Cove constructed in 1984. pumps, one is rated at Second pump is Basin. CSOs Basin High Ave. Upgraded in 2000's. 450 gpm at 45 feet strictly standby. controlled by Gravity Sewer. TDH and the other is OF-12. rated at 250 gpm at 45 feet TDH. CDIVI 2-10 P:\Bremerton\Comp Ptan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sectior\ 2.doe Section 2 Service Area and System Characteristics WB-1 Owned by Kitsap Co. 230 gpm at 50 feet Lead-Lag. Two Sinclair Park Crosstown Wet well, mounted; TDH with two pumps pumps total. Beach-front Pipeline. constructed in 1989. operating. Properties. WB-2 Owned by Kitsap Co. 780 gpm at 70 feet Lead-Lag. Third KCSD No.1. Crosstown Wet well dry well, TDH with two pumps pump on standby Pipeline. constructed of 96-inch- operating. if a pump fails. dia. precast concrete manhole sections. Constructed in 1989. WB-3 Custom pump station The 2 smaller pumps Lead-Lag with Callow Avenue Crosstown built in 1984. are each rated at 840 level control. Basin, PSNS, Pipeline. Belowground wet and gpm at 55 feet TDH. Two smaller Phinney Bay, dry wells and The other three pumps pumps operate Anderson Cove aboveground motor and are each rated at 5300 together based Basin 8. CSOs engine generator room. gpm at 110 feetTDH. on wet-well level. controlled by OF- Reconstructed in A maximum flow of The smaller 17. 2002/2003. 10,000 gpm. pumps will turn off when flow increases and two of the three larger pumps will turn on. Third pump on standby if a pump fails. WB-4 Package pump station Two pumps each rated Lead-Lag. Two Callow Avenue Gravity sewer that built in 1971. at 100 gpm at 42 feet pumps total. Basin. goes to Crosstown TDH. Pipeline. WB-6 Constructed in early Three submersible Lead/Lag with Callow Avenue Crosstown 2003. pumps, each pump is level control; third Basin, Phinney Pipeline. rated at 3,750 gpm at pump is standby. Bay, Anderson 130 feet TDH. I Cove Basin 8. I CSOs controlled by OF-17. KL-1 Custom pump station Two pumps. Each Lead-Lag. Two Kitsap Lake 16 - inch constructed in 1970s. pump is rated for 520 pumps total. Basin. Conveyance Line gpm at 88 feet TDH. Pump controls leading to WWTP. upgraded in 2001. KL-2 Custom pump station Two pumps. Each Lead-Lag. Two Kitsap Lake 16 - inch constructed in 1970s. pump is rated for 500 pumps total. Basin. Conveyance Line gpm at 148 feet TDH. Pump controls leading to WWTP. upgraded in 2001. KL-3 Custom pump station Two pumps. Each Lead-Lag. Two Kitsap Lake 16 - inch constructed in 1970s. pump is 500 gpm at 14 pumps total. Basin. Conveyance Line Two new dry-pit feet TDH. Pump controls leading to WWTP submersible pumps upgraded in installed in 2002. 2001. CONI 2-11 P:\Bremerton\Comp Plan\Amendmenl\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc Section 2 Service Area and System Characteristics KL-4 Custom pump station constructed in 1970s. One new dry-pit submersible pump installed in 2003. Two pumps. Each rated at 450 gpm and 16 feet TDH. Lead-Lag. Two pumps total. Kitsap Lake Basin. 16-inch Conveyance Line leading to WWTP. MD-1 Constructed in 1994. Two pumps. Each rated for 475 gpm at 136 feetTDH. Lead-Lag. Two pumps total. Marine Drive Basin. To OB-1 pump station. OB-1 Wet well, dry well; Dry-pit submersible Lead-Lag. Third Oyster Bay Basin Gravity Sewer at constructed 1966. pumps; each rated at pump on standby & Marine Drive Bremerton Blvd. & Upgraded in 1984, and 755 gpm at 212 feet if a pump fails. Basin. Arsenal Way. to be further upgraded TDH. Station controls in 2004. currently being upgraded. OB-2 Wet well, dry well; Two pumps. Each Lead-Lag. Two Oyster Bay Basin. Oyster Bay Force custom pump station, rated for 750 gpm at pumps total. Main. constructed in 1966. 65 feet TDH. Pump controls upgraded in 2002. OB-3 Wet well, dry well; Two dry-pit Lead-Lag. Two Oyster Bay Basin. Oyster Bay Force custom pump station, submersible pumps. pumps total. Main. constructed in 1970. Each rated for 400 Pump controls Pumps replaced in gpm at 13 feet TDH. upgraded in 2000. 2002. OB-4 Wet well, dry well; : Two dry-pit Lead-Lag. Two Oyster Bay Basin. Oyster Bay Force custom pump station, . submersible pumps. pumps total. Main. constructed in 1970. I Each rated for 150 Pump controls Pumps replaced in ! gpm at 46 feet TDH. upgraded in 2001. 2002. OB-5 Wet well, dry well; . Two pumps. Each Lead-Lag. Two Oyster Bay Basin. Oyster Bay Force custom pump station, rated for 550 gpm at pumps total. Main. constructed in 1966. 47 feet TDH. . Pump controls upgraded in 2002. OB-6 Wet well, dry well; ! Two pumps. Each Lead-Lag. Two Oyster Bay Basin. Oyster Bay Force custom pump station, rated for 490 gpm at pumps total. Main. constructed in 1966. 40 feet TDH. Pump controls upgraded in 2002. OB-7 Constructed in 1993. Two pumps. Each Lead-Lag. Two Oyster Bay Basin. Oyster Bay Force rated for 375 gpm at pumps total. Main. 70 feet TDH. Pump controls upgraded in 2002. PB-1 Wet well, dry well . Two pumps. Each Lead-Lag. Two Phinney Bay Callow Ave Basin Package pump station. rated for 150 gpm at pumps total. Basin. Pipeline. Constructed in 1970s. 100 feet TDH. CONI 2-12 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFrER JUNE 20D5\Text\Section 2.doc Section 2 Service Area and System Characteristics PB-2 Wet well, dry well. Package pump station. Constructed in 1970s. Two pumps. Each rated for 100 gpm at 20 feet TDH. Lead-Lag. Two pumps total. Phinney Bay Basin. To pump station PB-1. EB-2 Custom station Two small pumps; Lead-Lag with Trenton Avenue East Park Basin. constructed in 1973. each rated for 270 gpm level control. Basin, CSOs Upgrade will pump Split wet wells, one for at 30 feet TDH for Two smaller controlled by directly into East local/low flow and one lower flows. Three pumps operate OF-7. Bremerton Beach for stormwater/high flow. larger pumps; each together based Main. Reconstructed in 2003. rated for 2175 gpm at on level. Two 91 feet TDH for larger smaller pumps flows. will turn off when flow increases and 2 of the 3 larger pumps will turn on. Third pump on standby if a pump fails. EB-3 Wet well dry well; Pumps were converted Second pump on Trenton Avenue East Park Basin constructed 1972. to dry-pit submersible standby if first Basin, CSOs Beach Main. Upgraded in 1984 and pumps and are rated at pump fails. controlled by will be completely 750 gpm at 64 feet Pump controls OF-7. updated in 2004. TDH. upgraded in 2002. EB-4 Wet well mounted Two pumps. Each Lead-Lag. Two Trenton Avenue East Bremerton station constructed in rated for 100 gpm at pumps total. Basin. Beach Main. 1940s, later converted 80 feet of TDH. Electrical service, to submersible pump pump controls, station. and panel upgraded in 2003. EB-5 Ejector pump station Two pumps. Each Lead-Lag. Two Trenton Avenue East Bremerton constructed in late rated for 50 gpm at 40 pumps total. Basin. Beach Main. 1970s, upgraded to feet ofTDH. submersible pump station in 1995. EB-6 Wet well dry well; cast in Two pumps Each rated Pumps alternate; Tracy ton Beach East Bremerton place; constructed in for 625 gpm at 102 feet Two pumps Basin. Beach Main. 1947; were upgraded in TDH. operate at peak 2004. flow. New pump controls and electrical service to be upgraded in 2004. EB-8 Package pump station Two pumps. Each Lead-Lag. Two Pine Road Basin. East Bremerton constructed in 1971. rated for 200 gpm at pumps total. Beach Main. 51 feet of TDH. EB-9 Wet well mounted pump Two pumps. Each Lead-Lag. Two Pine Road Basin. East Bremerton station constructed in rated for 100 gpm at pumps total. Beach Main. early 1970s. 75 feet ofTDH. PP-1 Custom-built Two pumps. Rating Lead-Lag. Two Serves Pipeline from KL-1 submersible constructed unknown. pumps total. Pendergast Park to Westside in 19905. only. Treatment Plant. Source: 1996 Wastewater Comprehensive Plan, 2000 CSO Reduction Plan Update, and :iTaormatia.rr prOVided byPatrreCaxon, CiIyof Bremerton). CONI 2-13 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc CONI Section 2 Service Area and System Characteristics 2.3.3 Major Pipelines East Bremerton Beach Main The East Bremerton beach main conveys wastewater from the East Bremerton basins to the inverted siphons and/ or the Eastside Treatment Facility. This main includes 20-inch-diameter piping (dating from 1946) between OF-1 and the Port Washington Narrows inverted siphons, and 18-inch and 16-inch-diameter piping (dating from 1983) from OF-4 to the siphons. Port Washington Narrows Inverted Siphons Two inverted siphon pipelines convey combined sanitary sewer flows from East Bremerton across the Port Washington Narrows to Pump Station CE-1 in West Bremerton. They include a 16-inch-diameter cast iron line constructed in 1946 and a 24-inch concrete lined ductile iron line constructed in 1983. The capacity of the inverted siphons varies with the hydraulic gradeline and head in the East Bremerton beach main. Since the sewer conveyance improvements for Trenton Avenue Basin are complete, the predicted head in the East Bremerton beach main provides a combined inverted siphon conveyance capacity of over 4,000 gpm. In early 2000, the City installed fiberglass sluice gates on the discharge of the inverted siphons at Pump Station CE-1. These gates provide for increased regulatory compliance by allowing the City to prevent East Bremerton flows from causing overflows at OF-13. During major storm events when flows entering CE-l from East Bremerton must be restricted, excess East Bremerton flows can be treated and released at the Eastside Treatment Facility. By allowing excess East Bremerton flows to be treated, more capacity is available for west side flows in the Crosstown Pipeline. Crosstown Pipeline The Crosstown Pipeline transports flows from various East and West Bremerton pump stations across the City to the WWTP. Pump Station CE-l feeds flows into the Crosstown Pipeline at its end near the Port Washington Narrows. Pump Station CW- 1 discharges to the Crosstown Pipeline through the Naval Avenue force main, Pump Stations CE-4 and CE-6 discharge through the Central Bremerton force main, and Pump Stations WB-3, WB-6, and WB-2 discharge directly into the Crosstown Pipeline. The alignment of the Crosstown Pipeline is shown in Figure 1-3. The pipeline is constructed from concrete cylinder pipe, polyethylene lined ductile iron, and cement- lined ductile iron. The first length of the pipeline from Pump Station CE-l is a 24-inch force main that discharges to the 13th and Naval Avenue surge chamber. Downstream of the surge chamber the pipeline is a gravity-pressure main that operates as an inverted siphon. The diameter increases to 30 inches and then increases again to 36 inches in diameter near Pump Station WB-3. Pump Station CW-l discharges into the Crosstown Pipeline at the 13th and Naval surge chamber. The Central Bremerton force main from pump stations CE-4 and CE-6 discharges into the 2-14 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc CDIVI Section 2 Service Area and System Characteristics Crosstown Pipeline at First and Montgomery. Once modified, Pump Station CW-4 will pump directly into the Crosstown Pipeline at 13th and Ohio. 2.3.4 Combined Sewer Overflow Structures When the flow capacities of the combined sanitary sewers and conveyance systems are exceeded, excess flows are discharged from the combined sewer overflow structures in the system. The City has completed improvements to reduce overflows to one event per year, per outfall, on a 5-year average during a design storm, in all but two sewer drainage basins (Cherry Ave beach main, Tracy ton Beach (EB-6). The Pacific Avenue and Anderson Cove Basins are the only two basins that do not meet Washington CSO Requirements. Overflows from these basins are minor and will be reduced to one event per year within the next 5 years. Additional information regarding the City's efforts to reduce the CSO occurrences is provided in the City's current CSO Reduction Plan and subsequent updates. 2.3.5 Odor Control The primary air quality concern for projects involving collection and treatment of wastewater is odors. In 1992 the City of Bremerton entered into a consent order with the Puget Sound Air Pollution Control Authority (now the Puget Sound Clean Air Agency) to abate odors at the Westside WWTP by December 31, 1995. The City has made odor control upgrades as required by the consent order. Odor control measures and facilities currently in place at the WWTP include: II Odor containment enclosures, buildings, and covers for major plant facilities II Conveyance of foul air to packed tower scrubbers for treatment II Two-stage, packed tower air treatment for screenings and grit removal facilities, primary clarifiers, the old headworks, the overflow chambers for the primary effluent pump station wet well, the gravity thickener and overflow chamber for the gravity thickener when in service, the dissolved air flotation thickener, digester vents, the centrifuge area, and the sludge loading facility II Odor control enclosures for grit removal system Odor control for the collection systems is discussed in Section 4. Specific equipment and flows of the plant odor control system are discussed in Section 5. 2.3.6 Treatment Facilities The City of Bremerton owns, operates, and maintains two wastewater treatment facilities as shown in Figure 1-3. Both sites are located outside the boundaries of established floodplains and shorelines and do not contain any onsite environmentally sensitive areas or wetlands. 2-15 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text:\Sectiofl 2.doc CONI Section 2 Service Area and System Characteristics East Side Treatment Facility The Eastside Treatment Facility is located in the Pine Road Basin in East Bremerton. The Eastside Treatment Facility, shown in Figure 2-1, provides treatment for wet weather combined sewer flows in East Bremerton. This facility has a maximum hydraulic capacity of 20 mgd. The processes at the Eastside Treatment Facility include high rate clarification followed by ultraviolet (UV) disinfection as shown in the process flow diagram in Figure 2-2. A pre-existing outfall delivers treated effluent to Port Washington Narrows, which is a contiguous water body to Sinclair and Dyes Inlets. Westside Wastewater Treatment Plant The Westside WWTP is located in Southwest Bremerton off Sinclair Inlet near State Route 3. The WWTP currently provides wastewater treatment for the entire system, has a peak hydraulic capacity of 42 mgd1, and operates as a conventional activated sludge secondary treatment process. A site plan of the overall WWTP is shown in Figure 2-3. A treatment process diagram is shown in Figure 2-4. 1 The City estimated 54 mgd peak flow was treated during the October 22, 2003, 100- yr storm. 2-16 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 2.doc pe\923<\419S6\C9mp P100\ FigL 1 07/19/05 12e26 moflotjh XREFSe 8X11 LBDR ot>OR coNiRQL. S\...O'ilER. - ABANDONED UNES "' \\ \u Q \ \_ COeR COl'lTROL eLOWER ~vatT SCREEN ',--- p ,\RSAA\J... F\..OMt Po -9)- SSMK-A RIM 133.2 20" RCP IE 118.22 "'-1 oS .yl~ 0,. 01' l' MANETTE OUTFAlL~4-9 -250' 2i!( RCP TO IE -95 /t -100' 36" RCP TO IE -83 .. 84' 30" RC' DIffuseR AT Ie 83 I · GalERAiOR C\1Y OF 8REMERTON -....a. Ii ~ $,.~ G ~4'$0;I.- S1-A., . . 'C;~l" \}:"2, 1":.. 50' ~-~o Figure 2- '\ Easts'\de Wastewater Treatment Facility P:\9234\41986\Comp Plan\ Fig2_2 07/20/05 13:22 moffatjh XREFS: 8X11LBDR PUMP STATION OF-1 BEACH MAIN COAGULANT PAC I I ('".''''''''''''''' I , FLOWMETER SCREENINGS SLUDGE ,.11 ~fWlIIlJJJjm"i II ,1111, ,. 1."",.;,",1,1,1" I,ll Ilj",11111 ,j" 11,~dW ".: '."111,1.111 11111:1... "" I I jllllll.'~I'U"III" II, l.lh ,: ~I CONI POLYMER SAND '. . '.. j ~. :'".\.: "..;" . ~'" ...... . .': ": : . .,~' ': ':-'~::il""llliIIlll"'III' 111:111, I IIJ",,';.IIoI,II." '1/'. '. ..1 CYCLONE BALLAST/SLUDGE SEPARATORS CITY OF BREMERTON II II II IIIII -- DISCHARGE TO PORT WASHINGTON NARROWS Figure 2-2 Eastside Treatment Process Diagram -=::::)--- Z ----c::::::J I~ ~--- ,,,,"'" v.,.v~ f "" f ''-'''''' (I / >">~ ~ I /y ~~ / ~~~~ 'J: '- >', "'." ~.>>~-.., o CO II ~ } II I JpqL lX II 'al!S :Sj~~>~>..>>. 4flDlj.s:>~ zz:{:.L ngo/EltL~Q ~=]~~!,:! \u~.lsL~~oJ\@~"ElJ t\t~Z€i\:d c::, (() tr)L..>, I Q) ~ -1--'- N 0'- ~ g . Q) l..L 0-1--' zw-l--' a c Q) 3: Q) ~ Q) E .Q1-a -0 l..L . en Q) -I--' L wI- Q) 3: C::l CI -.t' z o I- er w ~ w er m l..L o ~ o ft (/) lL. W U:: x ~ .E 4- C E o r:J ~ ~ 11") o "- o C-~ "- I' o ~ I c-~ Ol L: ./' c o a: 0- E o u ./ CO ex) OJ ~ ~ ./ ~ i"'1 c-~ O'J --/ 0.: Biofilter Aeration Secondary Chlorine o (out of service) Basins Clarifiers Rapid Mix p-----------------------------, I e I Final Effluent ~l .... ..'l~ G .1 Sampler I I I I I I I I I I I I CW-1 CE-1 WB-1 WB-2 WB-3 Grit Tanks Preaeration Primary Clarifiers Bar Screens '71~ 08-1 KL-1...... ., e."."",,,,,, "'''." Gravity Influent Flow Meter 1t) Screenings to Disposal f) fDlps GlIPS 4D RAS Grit to Disposal '- -0 ..0 f"'. ~ x ~ ~ - ,"""-~~~"'~,--,-....--""'~- 4~_~_i AI> WAS " II. .110 "I",j.l .1. i ,; "III, I '" L ,II "" ,,,,j,,ll, i.,,~',;I,"",I,',. ili., "I, 1,1" i,~ ,I ,.. J", j J,~, ,1111 0,1,", . , ".,1"", I"u;~,...... ....I~.I, ,t..JO",,~I.~ "",.",.."1..."".",.".1,, ". ',n ",,..J,,;.,,, ,j, ,. ....,..,"".J,;~..,...."., Dissolved Air Flotati on Th ickener e CD Anaerobic Digester No.1 Spiral Heat Exchanger Serpentine Heat Exchanger Holding Tank Anaerobic Digester No.2 tl) Centrifuge Gravity Thickener (out of service) ~:.::: ~. ..... .1 .~ . Liquid Sludge or Oewatered Sludge to Silva culture Note: Digesters Operate in Parallel for Class B CITY OF BREMERTON CDM Chlorine Dechlorination Contact Basins Parshall Flume Flow Meter LABEL FLOW STREAM LIQUIDS . Raw Wastewater . Primary Influent o Primary Effluent o Primary Effluent . Primary Effluent (Biofilter Bypass} e Aeration Basin Influent o Secondary Clarifier Influent o Secondary Clarifier Effluent o DAF Thickener Underflow cr:> Gravity Thickener Overflow CD Centrate . Effluent (io Sinclair Inlet) CD Screenings BIOSOLIDS G) Grit C9 Primary Sludge (PS) o Return Activated Sludge (RAS) CD Waste Activated Sludge {WAS) CD Primary Sludge (Gravity Thickener Bypass) G> DAF Float Eli) Thickened Primary Sludge G) DAF B-ypass E) Digester No.1 Influent Q) Digester No. 1 Effluent €I) Digested Biosolids e Dewatered Bioso/ids i lll~,il~illli l.lWlI . IiIIJIII..l,u II. .., :~,! l.~lIl,I1U IlIlill: IU,III, 111~,:jl!l ~ I!.,lliill ~illl,il~lJll,i J~I, 111111 1~~~~11 iIIi llll~ Ilillli.lll.I~IlIII,!.j ~I.illl*'ilj~j~ li~ Illj i,Il~i.lI,I,ihJI i,1 Wiujl 1IiIIilliii~jWI~ll.vl U6i,iil~~~li; Figure 2-4 Westside Treatment Process Diagram r"l f........1......... 1.1 n I H I iLl I COM Section 3 Wastewater System Planning Information Planning for wastewater infrastructure involves determination of the flowrate and mass loading variations. Quantifying these variations is important in design and operation of treatment and conveyance facilities. This section discusses historical and projected wastewater loads, seasonal influence on flow and loads, average daily and maximum monthly flows, influent peaking factors, and influent BODs and TSS characterization. 3.1 Land Use and Zoning Bremerton's current land use and zoning information indicates that approximately 72 percent of the City and surrounding areas is urban residential development. Approximately 18 percent of the City and surrounding areas is designated as industrial, and approximately 7 percent of the City and surrounding areas is designated as commercial. The industrial areas include a portion of the proposed Port Blakely property, the Port of Bremerton industrial park, the Bremerton National Airport, and proposed industrial development areas west of Anderson Creek and southwest of the airport. Approximately 3 percent of the City and surrounding areas is comprised of parks and public facilities. 3.2 Population Proj ections Population estimates are used to determine the contribution of sanitary flow from residential areas to the total sewage flow. Population growth estimates can then be used to predict future sanitary flows. The 1995 Wastewater Comprehensive Plan discusses population forecasts for Bremerton developed by Kitsap County and the City of Bremerton Comprehensive Plans. The Kitsap County forecast, developed in 1990, estimated a population of 68,425 in the year 2000, and 81,408 by the year 2014. The 2000 growth projection has not been realized. The population in Bremerton has been relatively stable over the past 10 years. Table 3-1 compares 1990 and 2000 census data within Bremerton city limits. The data shows a small drop in population, and an increase in dwelling units, resulting in a net decrease in the number of people living in each household. Table 3-1 Census Data for Bremerton City Limits No. of Occupied Dwelling No. of People per Occupied Units Household 15,693 2.43 15,096 2.30 Year 1990 2000 No. of People 38,142 37,259 3-1 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\1"ex\\Section 3.doc CONI Section 3 Wastewater System Planning Information 3.2.1 Current Population Estimate for Bremerton Service Area The City of Bremerton's service area extends beyond the boundary of Bremerton city limits. The 1995Wastewater Comprehensive Plan estimated the number of the single family, duplexes, and multifamily dwelling units in each basin by using zoning maps and aerial photographs. From this information and assuming 2.30 persons living in each dwelling unit per the 2000 census results, a total population of 44,330 was determined to be living in the overall service area, including KCSD No.1 and Navy housing complexes. Removing the population served by septic tanks, the population served by the City was finally estimated to be 36,120. 3.2.2 Future Population Estimate for Bremerton Service Area Population estimates were developed in the 1998 City of Bremerton Comprehensive Plan (BCP) using 1990 census data. Estimates in this report are derived from assumptions made in the BCP with updates from 2000 census data. The BCP developed population forecasts derived from anticipated growth rates developed by the State Office of Financial Management (OFM) and the Puget Sound Regional Council (PSRC). The OFM population forecast assigns a Low, Intermediate, or High forecast to Kitsap County. The PSRC forecast is similar to the OFM Intermediate forecast, which assigns a growth rate of approximately 1.0 percent per year. Gorst is an unincorporated area of Kitsap County, located between Port Orchard and Bremerton at the intersection of State Route 3 and State Route 16. This area (approximately 500 acres) contains commercial and residential entities that are served by Bremerton water, but are on septic systems and under the jurisdiction of Kitsap County Public Works and Utilities. Historical studies by the Kitsap County Health Department have concluded there are numerous septic systems that have failed, resulting in partially or untreated wastewater entering surface and ground water within the area. Therefore, Kitsap County Public Works has commissioned several studies to determine the feasibility of providing sanitary sewer service to this area. Sewer service to Gorst can be provided by Port Orchard or by Bremerton. Kitsap County has not yet determined the fate of sewer service to the Gorst area at this time due to funding issues. As a result, plans to provide sewer service to Garst are undefined at this juncture, and have not been included as part of this planning document. A planned development at Port Blakely is another area of future increased sewer flows, potentially to be serviced by the City. The Port Blakely development,located on the west side of Kitsap Lake in the Kitsap Lake Basin, is in planning stages to begin building in 18 months to 2 years. The current plan is to construct the development in several stages and progressively amend the conveyance and sewer system. In 2003, CDM conducted a desk-top study to estimate discharge flows from build-out in phases. Study results are included in the Port Blakely Sanitary Sewer Evaluation Project Summary Letter in Appendix C. Phase I would include Yz build-out for both P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 3.doc 3-2 CONI Section 3 Wastewater System Planning Information residential and commercial properties (450 single family residences and 1,250,000 ft2 of commercial space) on 100 acres. Discussions with the City indicate that it may be possible to accommodate flows from Phase I development within the existing City wastewater infrastructure, although actual flow measurements and modeling studies would be required for confirmation and determination of actual infrastructure requirements. Study results (centered on four separate cases; see Section 4) indicate that estimated average and peak instantaneous flows from Phase I implementation range from 105.6 gpm to 131.1 gpm and 309.6 gpm to 424.9 gpm. Full build-out would involve 1,000 single-family residences and 2,350,000 ft2 of commercial space on 300 acres, more than doubling average flows from Phase 1. Estimated average and peak instantaneous flows at full build-out ranged from 222.3 gpm to 306.6 gpm and 678.1 gpm to 897.5 gpm. Port Blakely accomplishments to date include: · Development of a sub-area plan by Port Blakely development staff · Annexation into the City, including a development agreement and zoning · Three-party agreement between the County, City, and Port Blakely Items that must still be completed include a Master Plan and an Environmental Impact Statement (EIS) for the development. Ordinance No. 4890 was recently signed by the City approving an amendment to the Initial Development Agreement with Port Blakely relating to the submission of the Master Plan and EIS. In addition, an EIS may be required for access routes to the development. The population forecast for the City of Bremerton sewer service is summarized in Table 3-2. Table 3-2 Population Estimates for Bremerton Service Area I Year2004 Year 2010 Year 2014 Year 2024 City Limit 37,260 39,552 41,158 45,464 Incorporated Port Blakely 0 2,230 2,230 2,230 Outside Limits I 7,070 7,505 7,810 8,627 Total Population I 44,330 49,287 51,198 56,321 Population wi Septic Tanks 8,210 6,900 6,000 4000 Total Sewered Population 36,120 42,387 45,198 52,321 3.3 Flow Proj ections Sewage flows are comprised of several different components as discussed below: · Sanitary - Contribution to sewage flow from residential and commercial areas P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 3.doc 3-3 CONI Section 3 Wastewater System Planning Information · Infiltration - Composed of groundwater entering the sewer system through fractured or defective pipes, leaking joints, manholes, and other areas · Inflow - Composed of stormwater runoff that enters through direct connections from roof, street and other locations · Contract Flows - The u.s. Navy and KCSD. No.1 is permitted to discharge wastewater into the City's at conveyance and treatment system · Rainfall- Induced infiltration that occurs after a rainfall event as water soaks into the ground and into sources of infiltration Each of these components contributes to existing and future sewage flows to the collection system and the treatment plant. Existing flows are used to determine how ' much growth may be accommodated before the capacities of existing facilities are reached. Projected flows are used to determine the improvements required for intermediate and longer-term development. 3.4 Collection System Flow Proj ection The collection system within the Bremerton service area consists of sanitary sewers and combined sewers (sanitary and storm sewers). The existing collection system is approximately 40 percent combined, resulting in a significant contribution of inflow to total sewage flow during storm events. Those areas served by combined sewers have been modeled extensively, resulting in specific recommendations to reduce CSO as described in the Bremerton's CSO Reduction Plan dated October 2000. Bremerton is implementing this plan and has reduced combined sewers from 60 percent of the total system in 1995 to approximately 40 percent in 2004. Most inflow is from residential sources, including foundation drains and sump pumps. Infiltration comes from multiple sources. Combined sewer reduction efforts will continue and Bremerton is in the process of separating all reasonable flow; however, for this report, 40 percent combined sewers is assumed. 3.5 Wastewater Treatment Plant Flow The City operates two wastewater treatment plants. The Eastside Treatment Facility was constructed to treat CSO flow as part of the CSO reduction plan. Projected peak flow to this facility during a design storm event is 20 mgd, and is documented in the 2000 CSO Reduction Plan Update. The Eastside facility was completed in December 2001. Table 3-3 summarizes the plants operation data though February 2004. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTE:.R JUNE 2005\Text\Section 3.doc 3-4 CDI\II Section 3 Wastewater System Planning Information Table 3-3 City of Bremerton Eastside Treatment Facility Discharge Daa Flow (mgd) Total Peak Flow Flow (MG) (mgd) 0.93 6.74 0.82 7.79 1.66 6.04 3.12 6.06 Fecal Coliform Average (mg/L) Effluent 17 Date 1/2/03 1/2/03 1/25/03 3/12/03 3/13/03 3/14/03 3/22/03 3/22/03 10/20/03 11/18/03 11/18/03 11/19/03 12/5/03 12/5/03 1/7/04 1/29/04 2/19/04 10 46 0.11 2.71 1.29 6.75 30 42 4.71 14.90 78 6.29 8.81 47 18 20 0.45 3.35 23 10 1.00 2.75 10 0.03 3.79 55 0.13 3.76 10 This evaluation centers on the Westside Wastewater Treatment Plant (WWTP). Development of WWTP flow and waste-load estimates are discussed below. 3.5.1 Historical Flows and Loads The City of Bremerton took over treatment facility operations from the Contract Operators in December 1995. Since then, the City has implemented many CSO reduction measures, resulting in an increase in volume of water pumped to the treatment plant. In addition to minimizing CSO, the City changed the method of influent sampling so that plant recycle streams no longer contaminate influent samples. Historical records confirm a significant decrease in influent BODs and TSS after 1996 as shown in Table 3-4. Hence, only data from 1997 to 2003 was used to characterize influent wastewater in this report. ^~ 3-5 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 3.doc Section 3 Wastewater System Planning Information Table 3-4 City of Bremerton WWTP Historical Influent Flows and Loads Floy' (mgd) Biochemical Oxygen Demand Total Suspended Solids Average Max. Month Ave.age Max. Month Process Ave. Max. Parameter Day Month (Ibs.) (mg/L) (Ibs.) (mg/L) (Ibs.) (mg/L) (Ibs.) (mg/L) Design 7.60 10.10 11 ,300 178 18,100 215 11 ,300 178 22,600 268 1996 6.39 9.85 10,274 206 20,523 318 15,038 282 53,415 857 1997 6.80 11.23 7,818 152 9,256 228 8,100 154 9,292 209 1998 6.61 12.22 7,405 150 8,517 184 8,128 165 9,506 234 1999 6.93 14.04 7,509 157 9,046 221 7,845 158 8,767 214 2000 5.15 7.92 7,268 178 7,733 215 7,148 172 8,262 191 2001 5.09 10.03 7,430 181 8,477 201 7,333 178 8,600 208 2002 5.04 8.56 7,275 186 8,181 226 7,230 185 8,009 238 2003 5.25 8.04 7,192 175 10,275 207 7,480 177 10,781 210 3.5.2 Seasonal Influence on Flows and Loads High flows during winter months have made it necessary to characterize the waste stream seasonally. Flows for the two permitted seasons are characterized as follows: · Average Annual- The average loading condition taken over the whole year. · Dry jSummer Season - This is the period between May 1 and September 30. The main contribution during this period is from residential and commercial sanitary sewage, as well as contract flows. · Wet/Winter Season - This is the period between October 1 and April 30. For each of these periods, the flow is further characterized into average daily and maximum month parameters described below. This characterization allows plant performance to be evaluated under various operating conditions. The flow parameters correspond to typical plant design criteria. iii Average Daily - Average of total daily influent flow for the given period III Maximum Month - Highest monthly average of total daily influent flow occurring during the stated period CONI 3-6 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sectlon 3.doc COM Section 3 Wastewater System Planning Information 3.5.3 Current WWTP Influent Flow Historical data from 1999 through 2003 were analyzed to determine the average daily and maximum month flows for the annual average and seasonal conditions. The results are shown in Figures 3-1 and 3-2. Flow components have been categorized into the following: . Puget Sound Naval Shipyard (PSNS), a large and measurable volume, which was assumed to be relatively constant at 0.5 mgd; however, for all maximum month projection, 1.0 mgd is assumed. Infiltration/Domestic/Commercial, which is assumed to be the major component of dry season flow. This is subject to population fluctuations. . Inflow is the major contributing component that accounts for the difference in dry and wet season flows. This component is independent of population. The peak flow for 2003 was 58.7 mgd. 70 - 60.- 1ii111999 [] 2000 02001 02002 1liI2003 58.7 50 C 40 CI e :c If. 30 20 14.0 O. Annual Average Maximum Month Maximum Day Peak Figure 3-1 Historic WWTP Flows (1999-2003) P:\Bremerton\Comp Plan\Amendmenl\7 PROJDOClDRAFT AFTER JUNE 2005\Text\Secllon 3.doc 3-7 CDN1 Section 3 Wastewater System Planning Information 16.0.- ==::! Inflow 10.1 MGD Ilii.lililifIlJ Domestic/Commercial/Infiltration 13.97 MGD / 14.0- _PSNS / - Permitted Capacity for Max Month Flow 12.0 - / - 10.0. ,- - - - '6" '" 8.92 .s. 8.0 .. 0 6.46 MGD ;;: 5.68 MGD 6.0 5.05 MGD 1.32 2.0 - 0.0-- Annual Average Max Month Annual Average Max Month Annual Average DRY SEASON WET SEASON Figure 3-2 Average WWTP Flow (1999-2003) The plant effluent flow meter was designed to record a maximum flow rate of 32.5 mgd. Plant staff has observed flow rates as high as 58.7 mgd by reviewing instantaneous flow readings from the two influent parshall flumes. These meter readings have recently been incorporated into the plant's Supervisory Computer- Aided Data Acquisition (SCADA) system. 3.5.4 Per-Capita Treatment Plant Flows and Peaking Factors Per-capita flow to the treatment plant was calculated to assess whether existing plant capacity is sufficient for future plant flows as determined by the 2024 development population. This per-capita flow is only relevant to dry season flow, excluding PSNS flow. Remaining Navy facilities and KCSD No.1 are considered part of the sewered population. The per-capita flow was determined using the population of 36,119 for year 2003 and the dry season flow rate of 3.54 mgd for 2003. In addition to a per-capita flow rate, a peaking factor for dry season flow was developed for the maximum month parameter by dividing the average annual flow into the average maximum month flow. Again, the PSNS flows were excluded in this analysis. Table 3-5 summarizes the results of both calculations. Table 3-5 Residential, Commercial, and Infiltration Flow Characteristics Dry Season Per Capita Flow Rate = 3.54/36,120 Peaking Factor = 4.05/3.86 98.0 gal/capita/day 1.05 P:\Bremerton\Comp Plan\Amendmen~7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 3.doc 3-8 Section 3 Wastewater System Planning Information The result is within the characteristics of treatment plant flows for Northwest cities located on the west side of the Cascades. Summer (dry) season per-capita flows typically range from 80 to 130 gal! capital day. 3.5.5 Future WWTP Influent Flow Projections The per-capita flow rate of 98.0 gal! capital day and the future population estimates were used to determine the residential, commercial, and infiltration component for the planning horizons of 6, 10, and 20 years in the future. The PSNS component was assumed to be unchanged. Figure 3-3 compares existing and future dry season annual average and maximum month flow rates. 6.0 iii Domestic/Commercial/Infiltration IIiIPSNS 5.68 MGD 4.93 MGD 5.0 4.04 MGD 4.0 - -.65 MGD 'D Cl S3.0 - :: o u: 0.0 Annual Average ~ Population: 36,120 Annual Average 6!W! Population: 42,387 Annual Average ~ PopUlation: 45,198 Annual Average ~ Population: 52,321 Figure 3-3 Proj ected Dry Season Flows for WWTP The inflow component of the wet season flow must be estimated to determine future wet season flows for the WWTP. The CSO Reduction Plan details recommended system improvements, which include increasing the capacity of existing pump stations. One of the improvements implemented was expanding the existing Callow Basin pump station WB-3 and constructing a new pump station, Callow Basin pump station WB-6. This was completed in 2003. The net increase in flow directed to the treatment plant from these pump stations is 13.4 mgd as detailed in the amendment to the CSO Reduction Plan. The CW-4 flow revision will increase the peak flow in 2005. This increase in flow will impact peak hydraulic flow rates into the system, increasing the existing peak flow by approximately 14 mgd. The anticipated range in peak flow is 46 mgd to 58 mgd, depending on whether recorded or observed peak rates are used. CONI 3-9 P:IBremertonlComp PlanlAmendmentl7 PROJDOCIDRAFT AFTER JUNE 20051TextlSection 3.doc Section 3 Wastewater System Planning Information The additional capacity of the pump stations is assumed to have minimal impact on maximum month and daily average flow rates because the increase in flow during a storm event only occurs for a relatively short period. For projection purposes, the inflow component is calculated from the maximum month from the last 5 years (February 1999) with a maximum monthly flow of 13.97 mgd. Maximum monthly flows exceeding the plant's capacity have not been experienced since that month, and maximum monthly flows exceeding 85 percent plant capacity have only occurred in 5 months (non-consecutive) since then (see Figure 3-1). Figure 3-4 shows the projected wet season flows. 20.0 18.0 - c=:::J Inflow __ Domestic/Commercialllnfiltratlon _PSNS - Permitted Capacity for Max Month Flow - Actual Process Capacity" 14.1 MGD 10.1 MGD 16.0 - 14.61 MGD 15.64 MGD 9.26 9.26 9.26 9.26 13.97 MGD 14.0- -...- - - - - - -- 12.0 - :s Cl .s 100 - := . o ii: -- 8.0 1.64 _1.64 1.64 6.0 . 5.38 4.0 2.0 1.0 0.0 . Annual Max Month Average ~ PopUlation: 36,120 Annual Max Month Average Annual Max Month Average Annual Max Month Average 2!!ll Population: 42,387 2014 Population: 45,198 &QM Population: 52,321 ** _ Suggested permit limit for max month flow designated by the 2001 draft re-rating study. Figure 3-4 Projected Wet Season Flows for WWTP 3.5.6 WWTP Influent BODs and TSS Characterization The influent BODs per-capita load and peaking factors were determined using the BODs data for the years of 1997 through 2003. The BODs loads for 1996 were not used because they are abnormally high due to the effect of in-plant recycle streams in early 1996. The per-capita load is determined by dividing the population into the average BODs mass load. The analysis provided an average annual per-capita BODs load of 0.2 lb I day. This is a typical value for treatment systems. This value typically ranges from 0.18 to 0.22lb/capita/day in the Northwest area of the United States. The TSS per-capita load is 0.2 lb I capital day on an average annual basis. This is also typical of a municipal wastewater treatment plant (Reference - 2001 Draft Rerating Study). CDIVI 3-10 P:IBremertonlComp P1an\Amendmenl\7 PROJDOClDRAFT AFTER JUNE 2005lText\Section 3.dao CONI Section 3 Wastewater System Planning Information BODs peaking characteristics were also evaluated for the plant influent BODs mass load for the years of 1997 through 2003. For each year, the average daily and maximum month loads were identified. The peaking factor for each of these years was then determined by dividing the respective BODs load by the average BODs load for the year. These peaking factors were then averaged for the study period to determine the characteristic peaking factor. The influent TSS per-capita loads and peaking factors were determined using the same methodology that was used to determine the BODs characteristics. The results of these analyses are shown in Table 3-6. Table 3-6 Influent BODs and TSS Characteristics Pounds per capita Max. Month Peaking Factor Period Average Annual - Influent BOD5 Average Annual - Influent TSS 0.21 1.19 0.21 1.19 Taking the current per-capita loads and peaking factors and applying them to a population of 38,000 determined the current wastewater characteristics. These loads are shown in Table 3-7. These are the wastewater concentrations that will be used to determine the existing capacity of the wastewater treatment plant. It is assumed that BODs and TSS concentrations will be stable as flows increase due to population growth. Process Parameter Table 3-7 Influent Wastewater Loads 2 Biochemical O'\:ygen Demand Total Sus ended Solids Average Max. Month Average Max. Month (Ibs.) (mg/L) (Ibs.). (mg/L) (Ibs.) (mg/L) (Ibs.) (mg/L) 11,300 178 18,100 215 11,300 178 22,600 268 Design 1 Average Annual Dry Season Swet 7,466 145 8,424 190 8,009 150 8,915 eason 1 Reference: design sheet in original plant specifications developed by CH2M HILL 2 Based on a population of 38,000 and current per capita 7,414 169 170 9,031 215 8,784 212 7,609 7,362 7,210 8,172 211 189 193 8,185 211 194 3-11 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sectiorl '3.doc ~l 1 '] ; '] Pl -1 I ..1 -, J '] ] ~J . Ion .......... .'. ou'.....~ ~ w ~ ~ 1 J '1 .J ...., iJ ,] 1 J I , .J ClIVI Section 4 Collection System Evaluation This section describes necessary improvements to the sanitary sewer system. 4.1 Planning Criteria and Regulations Planning criteria for the design, construction, operation, and maintenance of gravity and low-pressure sewers and manholes as well as sewage pump stations and force mains are dictated in Section C1 and C2 of the DOE Criteria for Sewage Works Design. The criteria stipulate requirements such as location and site selection, design flow rates and hydraulics, odor control specifics, reliability factors, and special design details for pump stations. 4.2 Capacity Requirements and Limitations 4.2.1 Combined Sewer Overflow Reduction As discussed in Section 2.2.1, all but four of the Bremerton sewer basins are on a combined sewer system. To address intermittent flows associated with combined systems and comply with national level CSO control policy requirements, DOE adopted WAC 173-245, which stipulates that CSO reduction plans be developed to U control each CSO such that an average of one untreated discharge may occur per year." To fulfill the requirements of WAC 173-245, the City updated the CSO Reduction Plan for two basins with the following two documents: Anderson Cove CSO Reduction Facility Plan (dated July 1999) and Pine Road Basin CSO Reduction Facility Plan (dated May 2000). The City then developed an update for all of the remaining basins in a document titled CSO Reduction Facility Plan Update, dated October 2000. As the CSO reduction improvements were constructed, additional flow data were evaluated to confirm the necessary improvements in the individual basins. Basin-specific analysis and CSO Reduction Plan amendments have subsequently been submitted to DOE for review/approval. These amendments to the CSO Reduction Plan are as follows: 1. Amendment to Anderson Cove CSO Reduction Facility and CSO Reduction Facility Plan Update, dated October 24, 2001. This amendment revised proposed improvements in the Anderson Cove and Callow A venue Basins. 2. Amendment to 2000 CSO Reduction Plan Update, dated August 14,2003. This amendment revised the proposed improvements in the Pacific A venue Basin. 3. CSO Reduction Facility Plan Update - Amendment to Tracy ton Beach Basin Improvements, dated August 25, 2004. 4. Anderson Cove CSO System CSO Plan Amendment, dated September 20, 2004. P:\Bremerton\Comp Plan\Arnendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc 4-1 COM Section 4 Collection System Evaluation 5. CSO Reduction Plan - 2005 Amendment, dated February 10, 2005. The City produces a CSO report that is submitted to the Washington State Department of Ecology on an annual basis; the most recent report was submitted on January 31, 2005. Specific information regarding compliance of the various basins is documented in the report. This report shows that the CSO reduction program has been very successful in reducing total overflow volume and frequency, with a volume reduction of 99.7% and frequency reduction of 97.2% for 2004. For compliance with WAC 173-245, CSO reduction plans are required to be amended every 5 years. Per 173-245-090(2), the amendment is required to be submitted at the renewal of its NPDES permit. The most recent CSO Reduction Plan amendment is dated February 10, 2005. 4.2.2 Odor Control Combined systems have characteristics, such as high residence times during dry weather, that can lead to odor production. The unsatisfactory odors produced by wastewater are generally attributed to hydrogen sulfide, or H2S. The potential for H2S production and release increases with higher BODs, temperature, and detention time, and lower pH. When high-capacity combined systems have periods of low flow, detention times increase, typically in the summer when temperatures are high. Untreated wastewater conveyed to the plant is high in BODs, creating anoxic conditions in which H2S is produced. In February of 1993, "chemical injection in the Bremerton wastewater collection and transmission system was identified as the highest priority activity to reduce odors at the Bremerton WWTP" (Parametrix,1993). In October 1992, the sulfide level in the incoming wastewater ranged between 9 and 12 mg/L, compared to the recommended level of 1 mg/L for odor control (Parametrix, 1993). In 1993, the City was performing chemical injection using 55-gallon drums of sodium hypochlorite and 150-lb cylinders of gaseous chlorine. Usage rates were high, making the sources of chemicals costly while failing to reduce sulfide to desired levels (Parametrix,1993). A system using gaseous chlorine chemical injection from I-ton cylinders at three pump stations and 100-lb cylinders at three pump stations was recommended. In 1996, the City modified the conveyance system odor control structures to reduce sulfide levels in raw wastewater entering the plant. Six chemical injection facilities built between 1990 and 1992 were taken offline. Their locations and types are shown in Table 4-1. Table 4-2 shows the current seven odor control stations, five of which were added in 1996. Odor Control Stations (OCS) 1 through 3 are packed tower scrubbers that use sodium hypochlorite and caustic soda, while OCS-4 through 7 are Granulated Activated Carbon (GAC) towers installed on the wet wells. OCS-l uses 500-gallon storage tanks of both sodium hypochlorite and caustic soda, while OCS-2 and OCS-3 both use 750-gallon storage tanks for each chemical. The tanks are refilled approximately three times per year. P:\Bremerton\Comp Plan\Amendment\7 PROJOOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc 4-2 CDM Section 4 Collection System Evaluation Table 4-1 Former Collection System Odor Control Facilities Taken Offline in 1995 Basin or Area Type of Chemical Served Injection Pump Station Year Built Oyster Bay Sodium Hypochlorite OB-1 1990 Oyster Bay Chlorine OB-6 1992 Kitsap Lake Sodium Hypochlorite KL-1 1992 East Bremerton Chlorine Former Manette WWTP 1992 West Central Bremerton Sodium Hypochlorite CW-1 1990 PSNS Sodium HYPochlorite WB-3 1992 Table 4-2 Existing Collection System Odor Treatment Station Name Location Pump Station or Area Type of Facility Served a Year Built Packed tower scrubber with sodium hypochlorite and caustic injection CE-1 1996 Packed tower scrubber Junction of CW-1 and with sodium CE-1 at transition from hypochlorite and pressure sewer to caustic injection gravity sewer 1996 Packed tower scrubber Junction of CE-4, CE-6 with sodium at transition from hypochlorite and pressure sewer to caustic injection gravity sewer 1996 Carbon tower scrubber CW-1 1996 Carbon tower scrubber WB-3 1996 Carbon tower scrubber CE-4 1989 Carbon tower scrubber CE-6 1989 OCS~1 1740 Park Ave. OCS-2 2100 12th S1. OCS-3 200 High Ave. OCS-4 2304 19th S1. OCS-7 622 Burwell S1. a The locations of these pump stations are shown in Figure 4-1. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\ORAFT AFTER JUNE 2005\Text\Section 4.doc 4-3 OCS-5 416 S. Cambrian OCS-6 100 2nd S1. l- -0 f ~ a> "l- f) 'I 'I> ill Ii) t it:: l< ~ '::> 2 l- to ,) Ll') o ';...... .- ;-.J ~....... I~ o ;1 .t ':Y> tz --; 2 0.. E o \) >'" h ::> ill v ....- t- .) \j ) --:: 0.. >- "'< OJ orcs INLET CHICO BA Y ~ ll: "'< :t t.> ll: o i- ll: o ll.. PORT WASHINGTON NARROWS INVERTED SIPHONS - / I , , , I ~EGEND~ I ~ PORT OF-a... OVERFLOW STRUCT)JREBLAKELY I I (EXPANSION AREA), CW-1. PUMP STATION I I - - - - MAJOR PIPELINE I I , I ~ - BASIN BOUNDAR/( , ~ , , , . ...... SERVICE AREA BOO'NDARY V~SANITARY BASINS <;) 'l- ~ -{- C, ,}-I. ~ " ~ 'l- Cl <( ~\\'- c" ~ S \ \ tI" ~ WESTSIDE WASTEWATER TREATMENT PLANT '/ / / / / / 1" = 3000' P----~'~liIdili~j~IJI!I~I.iII~II!JJI!iIJ 1 500 0 3000 CITY OF BREMERTON ~ N o CONI Figure 4-1 Map of Basins Section 4 Collection System Evaluation 4.3 Improvement Alternatives Improvements to the collection systems of the combined basins required for combined sewer overflow reduction are discussed in detail in the CSO Reduction Plan and plan amendments. The CSO reduction improvements generally utilize all system capacity. Hydraulic improvements for the sewer basins include upgrades to existing pump stations, new pump stations, sewer extensions, and improvements to existing sewers, including reduction of inflow and infiltration. Tables 4-3 through 4-17 provide general overall information on each basin as well as facility descriptions, recommended improvements, and cost information. A short summary of every existing pump station is included whether or not facility improvements are recommended at this time. Table 4-3 Anderson Cove Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 370 Acres 90% Residential and Business Park Combined There are four pump stations (CW-1 through CW-4) along the collection system. A capacity upgrade was constructed for CW-2 in 1999, and a capacity upgrade for CW-1 is scheduled in 2005 (the capacity for CW-1 presented below assumes the upgrade is complete.) Both of these upgrades are for CSO reduction. A downstream level control valve was installed on the beach main that conveys flow from Basins 10, 11, and 12 to CW-1. The valve is a motor-operated gate valve located upstream of the CW-1 wet well. The gate valve actuates upon CW-1 wet well level. This valve causes a surcharge in the beach main to allow the collection system to be used as storage during peak storm events. A force main was installed from CW-4 to 13th Street in anticipation of a future pump station upgrade. The pipe is 8-inch ductile iron, and is capped at both ends. There is currently no plan to upgrade CW-1; therefore, this pipe may be used for other purposes. Pump Station Capacity (gpm) Flow (gpm) CW-1 CW-2 CW-3 CW-4 Not available Not available 3,500 1,600 50 500 Not available Not available C2IVI 4-5 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\OR'AFT AFTER JUNE 2005\Text\Section 4.doc Section 4 Collection System Eva/uation Table 4-3 Anderson Cove Basin (cont.) Facilities and Recommended Improvements/Additions Existing Pump Stations: CW-1 Type: Custom, Wet Number of pumps: 3 Dry-Pit Submersible, all have VFDs Well-Dry Well Date built: 1984 Rating of pumps: 900 gpm at 175 ft, 75 hp (ea) Projected peak Not available Area directly Not available flow: tributary/percent developed: Notes: Walls show deterioration and damage. Currently unsewered and undeveloped areas zoned for Residential and Industrial Park will cause flow increases if developed. Industrial Park is a gravel pit and is unlikely to be developed in the near future. Development will require this pump station to be upgraded. The potential exists for KL-1 to be abandoned, and the flow redirected to Harlow (see the Sinclair Park Basin discussion for details). Improvements since 1998: Pump controls were upgraded in 2005. Recommended improvements/additions: CW-1 is scheduled for capacity upgrades in 2006. CW-2 Type: Custom, Wet Well wi Forebay 1949 Not available Number of pumps: Rating of pumps: Area directly tributary/percent developed: 3 Submersible, all have VFDs Date built: Projected peak flow: 800 gpm at 175 ft, 75 hp (ea) Not available Notes: The force main from CW-2 includes a tee and valve at 19th Street. During dry weather conditions, the discharge from CW-2 is directed to the collection system on 19th Street and conveyed to CW-1. During periods of anticipated wet weather, the valves at 19th Street are configured so that the discharge from CW-2 is directed to 13th Street, where it flows through the Callow Avenue Basin collection system, and eventually to WB-3. Improvements since 1998: Pump controls were upgraded in 1999. CEllI 4-6 P:\BremertOl'l\Comp Plan\Amendment\7 PROJOOC\DRAFT AFTER JUNE 2005\Text\Section 4,dac Table 4-3 Anderson Cove Basin (cont.) Section 4 Collection System Eva/uation Facilities and Recommended Improvements/Additions CW-3 Type: Smith & Loveless Number of pumps: Date built: 1970s Rating of pumps: Area directly tributary/percent developed: I ; I I Projected peak flow: Not available 2 Submersible Grinder 50 gpm at 40 ft, each Not available Notes: This station was upgraded in 2002 with the addition of two submersible grinder pumps. The electrical and control panel was also upgraded and is now equipped with a transfer switch and a receptacle for portable standby power. CW-4 Type: Custom Number of pumps: 2 Submersible Area directly tributary/percent developed: Notes: The pump station discharges to a beach force main that discharges at OF-11 at the north end of High Avenue. An 8-inch force main was installed from CW-4 to 13th Street in 1999 assuming that the pump station discharge would be revised as follow-on CSO reduction work. The upgrade to CW-4 was eliminated from the CSO reduction scope, and the force main is a dry line. Date built: Upgrade in 1984 Rating of pumps: Projected peak flow: Not available Improvements since 1998: None. 1 pump at 250 gpm at 45 ft, 1 pump at 450 gpm at 45 ft Not available Recommended Improvements/Additions: Install a check valve vault and flowmeter (cost = $50,000). Install a transfer switch and receptacle to provide for a portable standby generator (cost = $10,000). IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: Infiltration to the combined system is known to be high in the Anderson Cove Basin, particularly in Basins No.8 and 9. The CSO reduction improvements constructed increased the conveyance capacity out of the Anderson Cove Basin; however, the high levels of infiltration have not been addressed. The net effect of the increased conveyance was to increase flows up to the system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and Infiltration reduction as an ongoing project is outlined in detail in Section 7. caw P:\Bremerton\Comp Plan\A!ne\'\dme\1t\7 PROJOOC\DRAFr AFTER JUNE 2005\Text\Section 4.dac 4-7 t I I I I I Jt-1-- LEGEND-SANITARY ( .._._.~ -, I. I I I I I I I I , I I . , \ r - ( . \ I IIlo - \ ~ v ~ l: r--- W ::::l <= W s~ CD -0 >- <= en lOF-11 CW-4 t OF-12 ~ ~J~ T~ ~ I ANEDERSON COVL BASIN !I~ I I () I " , .L , .~ \ " ,. -1---_' I OF 9 - ,- ...."',!" l 1.J... L, ! I .1 I '_'_ I I I I I r'" , I ~ ~..! :;'-r~- I I ~ I r I . L-+~ I I I I - f 21 .--./ Wi "Ej> (() '- ~ _.._.0) ::;> <= <P > --"" .s:;; 0> :E FM - r ~ -as > ro :z ~ 13th Street .1' ....-. --. t'" "''''L .- ' - - -r U!!-_ !I!!!!!I" lJr-----. ------__. I -~ .-____1 ,- '----I -- --;; ...;r---- "1IIl I ., ----r+-; I I . ...,.J. WASTEWATER COMPREHENSWE PLAN SERVICE AREA BOUNDARY _______ BASIN BOUNDARY - . - CITY LIMITS EXISTING GRAVITY SEWER - - - FM - - - EXISTING FORCE MAIN - - - - - - - EXISTING GRAVITY.PRESSURE SEWER _ EXISTING CSO OUTFALL DEB-) EXISTING PUMP STATION & ND. o EXISTING CSO REGULATOR DEB-) EXISTING PUMP STATION TO WHICH " MODIFICATIONS ARE PROPOSED & NO. '"" PIPE SIZE .. PROPOSED PUMP STATION .. .. .. FM" .... PROPOSED FORCE MAIN . .. .. .. .. ... PROPOSED SEWER REPLACEMENT . .. .. .. .. ... PROPOSED GRAVITY SEWER 'i1 EXISTING FLOW DIVERSION I ; ~ ~~ , .I SCALE 1" = 1000' FIGURE 4-2 ANDERSON COVE BASIN Section 4 Collection System Evaluation Table 4-4 Callow Avenue Basin r Descriptive Information I Size: Percent Developed: Zoning: Type of Sewer System: 625 Acres 95% Residential and Commercial Combined This basin receives flow from the Phinney Bay Basin continuously, and also from the Anderson Cove Basin (CW-2) during wet weather. There are six pump stations (WB-1 through WB-6) along the collection system. WB-1 and 2 are part of the KCSD NO.1 system and are not included in this plan. WB-5 also is not addressed in this plan. In 2003, the City constructed WB-6, and at the same time upgraded WB-3. WB-6 is a true CSO pump station in that it operates only upon surcharge in the collection system during peak flows. The WB-3 upgrade was required to address the increased discharge head due to the added surcharge in the Crosstown Pipeline from WB-6, and to maximize flow out of the basin. Pump Station WB-3 WB-4 WB-6 Capacity (gpm) I 0,000 Not available 7,500 Flow (gpm) Not available Not available Not available Facilities and Recommended 1m rovements/Additions Existing Pump Stations: WB-3 Type: Custom, Wet Well-Dry Well Number of pumps: 5 Dry-Pit Submersible, all have VFDs Date built: 1984 Rating of pumps: 2 @ 840 gpm at 55 feet each 3 @ 5,300 gpm at 110 feet each Area directly tributary/percent developed: Improvements since 1998: Pump controls were upgraded in 2003. Projected peak flow: Not available Not available Recommended improvements/additions: None. WB-4 Type: Package Number of pumps: 2 Date built: 1971 Rating of pumps: 100 gpm at 42 ft (ea) Projected peak flow: Not available Approx. 16 houses Area directly tributary/percent developed: There is no transfer switch installed for this pump station. During power outages, flows are contained using vactor Notes: trucks. Recommended improvements/additions: None. 4-9 P:\Bremerton\Comp Plan\Amendment\7 PRQJDOC\DRAFT AFTER JUNE 2Q05\Text\Section 4.doc Section 4 Collection System Evaluation Table 4-4 Callow Avenue Basin (cont.) Facilities and Recommended Improvements/Additions WB-6 Type: Custom Number of pumps: 3 Submersible Date built: 1994 Rating of pumps: 3,750 gpm at 130 ft, 200 hp (ea) Projected peak Not available Area directly Not available flow: tributary/percent developed: Notes: WB-6 operates as a true CSO pump station; flow enters WB-6 upon surcharge of the collector sewers in Callow Avenue. Operation of WB-6 is initiated by closing the sluice gate at WB-3 and thereby surcharging flow back to WB-6. This operation should not be conducted other than during dry weather since the surcharge at WB-3 increases significantly as the HGL raises to drive flow to WB-6. PSNS personnel need to be notified when the influent sewers are surcharged because their influent capacity is reduced due to the elevated HGL. Recommended improvements/additions: None. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: The CSO reduction improvements constructed increased the conveyance capacity out of the Callow Avenue Basin. The net effect of the increased conveyance was to increase flows up to the system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and infiltration reduction as an ongoing project is outlined in detail in Section 7. Collection System Evaluation and Repair: During construction of the WB-3 upgrade, severely deteriorated sewers were identified influent to the old WB-3 wet well. During construction of the SR 304 improvements, cracked and bellied sewers were uncovered along Cambrian Avenue. These sewers were replaced as a part of the projects; however, their discovery highlights a larger problem with the condition of the existing collection system. The City currently has no systematic program for evaluating its collection system and identifying failing sewers. Due the age of the collector sewers in the Callow Avenue Basin, it is anticipated that a thorough evaluation would identify several spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. Specific improvements to existing sewers in the Callow A venue Basin are summarized below. Cambrian Ave Sewer Rehabilitation: Determine the extent of the degraded sanitary sewer main and cure-in-place line as necessary. Parallel Crosstown Pipeline: The existing gravity-pressure portion of the Crosstown Pipeline has no redundancy and no isolation valves. A parallel mil 4-10 P:\Bremerton\Comp Ptan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc Section 4 Collection System Evaluation main should be constructed to provide redundancy and allow maintenance on this critical facility. " -! l " l Crosstown Pipeline Ventilation and Odor Control: The Crosstown Pipeline was constructed with air-vacuum/ release stations located at the intersection of 9th Street and Rainier Avenue (STA 113+25,) and at the intersection of 10th Street and Naval Avenue (STA 129+20.) The pipe flows as an open channel during low flow periods at these locations, and the air vacuum valves tend to "breath" during cycling of CE-l and CW-l. The regular release of odorous air has generated complaints. Operations staff have isolated these valves; however, in doing so, the protection afforded by the valves has been eliminated. The Crosstown Pipeline ventilation should be reviewed, and the stations either permanently isolated or re-established with the odor issues addressed. Central Bremerton Force Main: The Central Bremerton force main was constructed with air release or air vacuum/release (A V / AR) stations located at several locations along its length. There are no odor issues associated with these stations; however, there is a potential problem associated with the original construction. The A V / AR stations installed for the Crosstown Pipeline had galvanized iron nipples installed between the main and the isolation valve that corroded over time, and failed in place. All of the nipples on the Crosstown Pipeline have been replaced. It is believed that the configuration of the A V / AR valves for the Central Bremerton force main are of similar construction. The City should investigate to confirm that galvanized nipples were installed at these locations, and replace them. ClIVI 4-11 P:\Bremerton\Comp Plan\Amef\dmern.\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sect'lon 4.doc +- - ~]--; 1s~eet _ J..__ -=~C_-=.~-::: f..... .....Iloo__ - . lii- I (I):;; ::Jc::: c:~ Q)~ - --~=T - an ' ..2 ~ 8i NB-6 ' 1.---= (r- (1'1 ;piB-;j.. r 1,1' --I I I I I , . I r r-' J CW-1 "f-..l, T70-9 . I I .J I -- I 14- I - I [L I -Ll_' ...-_----: l~_. -T--- ..L I i .~ ~ I .- r 1 I L I i r =-r ----,- - l~ ----.. -- I C. - - -,.. ,. ....- ...J..._' J.L- 6th ":tree! L I . . _ \ CALL07J 8 I 1- --'.... . I " . \ \lS.4- =_ ~ J\ LEGEND-SANITARY WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY __B. BASIN BOUNDARY .-- - CITY LIMITS -. EXISTING GRAVITY SEWER - - .::: :: ~~i~i:~g ~~~~~ESSURE SEWER . - EXISTING CSO OUTFALL - EXISTING PUMP STATION & NO. D EB-7 EXISTING CSO REGULATOR o EXISTING PUMP STATION TO WHICH D EB-7 MODIFICATIONS ARE PROPOSED & NO. w " " PIPE SIZE AND PIPE CHANGE III PROPOSED PUMP STATION PROPOSED FORCE MAIN . · . f.. .. PROPOSED SEWER REPLACEMENT . · . . . .. PROPOSED GRAViTY SEWER EXISTING FLOW DIVERSION 'V SEWER PROJECT NO. (1) ABANDON EX. SEWER/PUMP STATION -I-I-I-I-I-H ~I SCALE 1" = 1200' .. , T --I t ~ " OF-17 " " .~I\ t:.'I FIGURE 4-3 CALLOW A VENUE BASIN Section 4 Collection System Evaluation Table 4-5 Cherry Avenue Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 175 Acres 100% Residential with some Commercial Combined The sewers in Cherry Avenue from Ash Street to Cherry Place become overloaded during large storms, resulting in flooding of commercial businesses. Backwater valves have been installed at the right-of-way for businesses on Cherry Avenue in this vicinity. The main is additionally known to have root intrusion, which further reduces system capacity. It is recommended that this root intrusion be evaluated as part of the proposed collection system evaluation program to identify how extensive the problem is, and how it would be best addressed. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: The constructed CSO reduction improvements increased the conveyance capacity from East Bremerton. The net effect of the increased conveyance was to increase flows up to system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and infiltration reduction as an ongoing project is outlined in detail in Section 7. Collection System Evaluation and Repair: This basin has known areas of root damage to the sewers. The City currently has no systematic program for evaluating its collection system and identifying failing sewers. It is anticipated that a thorough evaluation of the collection system would identify several spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. Specific improvements to existing sewers in the Cherry Avenue Basin are summarized below. Improvements on Cherry Street to Lower Wheaton Way: Replace approximately 1,500 If of existing lO-inch sanitary sewer main on Cherry A venue from Ash Street to Cherry Place. Determine the required main size during pre-design. Trenton & Cherry Avenue Basins CSO Reduction: Replace the 12-inch pipe connection from the manhole at the top of the bluff to the Beach main with 18- inch pipe. Additionally, the piping from the Cherry Basin Beach main connection to the 16-inch inverted siphon is constricted and restricts flow to the Eastside Treatment Plant. The piping should be replaced with 24-inch pipe, and isolation valves and cleaning stations should be incorporated into the design to allow cleaning of the inverted siphons. CDM 4-13 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc L JJ 1 '-- ---- -' D VG70,v ~ . F-1r~-"". I I . . . . . \ 1 ,l r-~ "''''(2 ,"j" I /~ :tX~ I/r--&, II" '1>0 ~ ... '\ \ OF-4 --~~ SCALE 1" = 1000' . . . . . . I . I . . I - I . I I ._ .---1----~ . . f . · . I I -.. . . . . . . . . . I . . I rL ;~, ~ 1.._-. r-.J I ._. L_..I . . . I ,.....-..-. II L , \ -- 'v LEGEND-SAN IT ARY WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY _______ BASIN BOUNDARY - . - CITY LIMITS EXISTING GRAVITY SEWER - - - FM - - - EXISTING FORCE MAIN . - - - - -. EXISTING GRAVITY-PRESSURE SEWER __ EXISTING CSO OUTFALL r:J E8-1 EXISTING PUMP STATION & NO. o EXISTING CSO REGULATOR r:J EB-7 EXISTING PUMP STATION TO WHICH '" ;' " MODIFICATIONS ARE PROPOSED & NO. .. PIPE SIZE AND PIPE CHANGE ... PROPOSED PUMP STATION . . . FM. .. PROPOSED FORCE MAIN . . . . . .. PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER "il EXISTING FLOW DNERSION (1) SEWER PROJECT NO. -t-t-t-t-t-H ABANDON EX. SEWERiPUMP STATION FIGURE 4-4 CHERRY A VENUE BASIN Section 4 Collection System Evaluation Table 4-6 East Park Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 350 Acres 90% Residential Combined The 1995 w.N Comprehensive Plan indicated that this basin was 90% developed. In the intervening years, the Navy's East Park Housing was razed, and is currently awaiting redevelopment. The collection sewers within the East Park area are known to have high rates of infiltration, and should not be reconnected to the sewer system without complete rehabilitation. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: The CSO reduction improvements constructed increased the conveyance capacity from East Bremerton. The net effect of the increased conveyance was to increase flows up to the system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and Infiltration reduction as an ongoing project is outlined in detail in Section 7. Collection System Evaluation and Repair: The City currently has no systematic program for evaluating its collection system, and identifying failing sewers. It is anticipated that a thorough evaluation of the collection system would identify several spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. Specific improvements to existing sewers in the East Park Basin are summarized below. Improvements between Schley and Fir Street: This line has extensive root intrusion, and also has a "belly." Improvement on Homer Jones from the YMCA to the Parking Lot to the South: This line has significant root intrusion. mil 4-15 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc I I I 1_--. ,.-..J I ._. L_... . . I -I I I . I ,.,.) I I I I I I I I . , --~ \.- I OF-4 . I .....1 --~ ~~_ I ---.__..._------~-......_~--- ~ \:- ~ ,- '\ I I I I ...I- I I I I . . . r I I I I . I I I I I I I I I I I I I I . _ ._ I---i----f I f . I ~ \ r / ~ ,~ L ~i ~i ../ J (2) EAST PARK BASI j::) '0 % '--.-- ) -- SCALE 1" = 1000' I I I I -:1; <<~I=Ib-:=,:!;~~!~,~~~,~=t!'Jt.== -- \ :L "-- - , / --l ~ LEGEND-SANITARY WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY ------- BASIN BOUNDARY - . - CITY LIMITS EXISTING.GRAVITY SEWER - - - FM - - - EXISTING FORCE MAIN . - - - - -. EXISTING GRAVITY.PRESSURE SEWER EXISTlNG.CSO OUTFALL EXISTING PUMP STATION & NO. EXISTING CSO REGULATOR EXISTING PUMP STATION TO WHICH MODIFICATIONS ARE PROPOSED & NO. PIPE SIZE AND PIPE CHANGE PROPOSED PUMP STATION . . . FM. .. PROPOSED FORCE MAIN . . . . . .. PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER 'V EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -I-I-I-H-H ABANDON EX. SEWERlPUMP STATION -- DEB.' o I!I ,a., 12 18112 . FIGURE 4-5 EAST PARK BASIN Section 4 Collection System Eva/uation Table 4-7 Kitsap Lake Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 770 Acres 40% Rural, Residential, Commercial, and Industrial Park Separate Kitsap Lake Basin is a 770-acre basin with a separate sanitary collection system. The basin is 40% developed; however, a development at Port Blakely, located on the west side of Kitsap Lake in the Kitsap Lake Basin, may be constructed in phases. . The current plan is to construct the development in several stages and progressively amend the conveyance and sewer system. Phase I would include % build-out for both residential and commercial properties on 100 acres. Infrastructure improvements including pump stations and gravity and pressure mains will be required for any significant development. Kitsap Lake Basin currently has four pump stations (KL-1, KL-2, KL-3, and KL-4) along the collection system. Current flows are within the capacity of the current sewer, although KL-1 discharges to overloaded sewers in the Sinclair Park Basin. Pump Station KL-1 KL-2 KL-3 KL-4 Capacity (gpm) 520 500 500 450 Flow (gpm) 360 340 300 50 Facilities and Recommended Improvements/Additions Existing Pump Stations: KL-1 Type: Custom Number of pumps: 2 Date built: 1970s Rating of pumps: 520 gpm at 88 feet TDH Area directly tributary/percent developed: Notes: Wet and dry wells are belowground, and motor room is aboveground. Wet well accessible by motor room building. Separate building houses engine generator. Wet well walls show deterioration and damage. Currently unsewered and undeveloped areas zoned for Residential and Industrial Park will cause flow increases if developed. Industrial Park zoned area is a gravel pit and unlikely to be developed in the near future. Development will require this pump station to be upgraded. The potential exists for KL-1 to be abandoned and the flow redirected to Harlow (see the Sinclair Park Basin discussion for details). Projected peak flow: 1> 770 gpm, including discharge from KL-2 75 acres/20% developed and sewered Improvements since 1998: Pump controls were upgraded in 2001. Recommended improvements/additions: The potential exists for KL-1 to be abandoned and the flow redirected to Harlow (see the Sinclair Park Basin discussion for details). CDII 4-17 P:\Bremerton\Comp Plan\Amendment\7 PROJOOC\DRAFT AFTER JUNE. 20D5\T9xt\$eclion 4.00c Section 4 Collection System Evaluation Table 4.7 Kitsap Lake Basin (cont.) KL-2 Facilities and Recommended Improvements/Additions Type: Custom Number of pumps: Date built: 1970s Rating of pumps: 2 500 gpm at 148 feet TDH Area directly tributary/percent developed: Notes: Wet and dry wells are belowground, and motor room is aboveground. Wet well accessible by motor room building. Separate building houses engine generator. Future development will likely occur in Residential zones by Kitsap lake and Industrial Park zoning in the southeast area. Approximately 6% of the basin (Rural) will likely never be sewered. Development will require this pump station to be upgraded. Projected peak flow: 1,570 gpm, including discharge from Kl-3 380 acres/10% developed Improvements since 1998: Pump controls were upgraded in 2001. Recommended improvements/additions: Development will require this pump station to be upgraded. KL-3 Type: Custom Number of pumps: 2 Date built: 1970s Rating of pumps: 500 gpm at 14 feet TDH Projected peak 660 gpm, including Area directly 135 acres/85% developed, flow: discharge from Kl-4 tributary/percent 70% sewered developed: Notes: Wet and dry wells are belowground. Motor and engine generator room is aboveground. Wet well can be accessed by motor room building. Walls of wet well show deterioration and damage. Existing collection system can be altered to serve newly developed and sewered areas. Improvements since 1998: Pump controls were upgraded in 2001; the pumps are new as of 2002 (dry-pit submersible). Recommended improvements/additions: None. KL-4 Type: Custom Number of pumps: 2 Date built: 1970s Rating of pumps: 450 gpm at 16 feet TDH Projected peak 280 gpm Area directly 180 acres/80% developed, flow: tributary/percent 16% sewered developed: Notes: Wet and dry wells are belowground. Motor and engine generator room is aboveground. Wet well can be accessed by motor room building. Walls of wet well show deterioration and damage. The currently unsewered area is Residential and 75% developed. Improvements since 1998: Pump controls were upgraded in 2001; one ofthe two pumps is new as of 2003 (dry-pit submersible) and the other is scheduled for replacement in 2005. Recommended improvements/additions: None. a:at 4-18 P:\Bremerton\Comp Plan\Amen.dment\7 PROJDOC\ORAFT AFTER JUNE 2005,iext\Sect\on 4.tlo(; Section 4 Collection System Evaluation Table 4-7 Kitsap Lake Basin (cont.) 1 ! Facilities and Recommended Improvements/Additions New Pump Stations: Chico Way Pump Station (KL-5) and Force Main: Construct a 120-gpm submersible pump station and approximately 2,000 If of 4-inch force main. Cost = $350,000. IMPROVEMENTS TO EXISTING SEWERS AND/OR SEWER EXTENSIONS: Kitsap Lake Main Replacement: The existing sanitary sewer is located in the lake from KL-4 to KL-2. The main is not accessible for maintenance. The main is gravity north of KL-4; this portion is deteriorated. From KL-4 to KL-2 it is gravity-pressure - residences flow by gravity to the main, which KL-4 and KL- 3 pump into. Backwater valves have been installed on residences to avoid flooding. Extreme high lake levels exceed the manhole rimelevationsi therefore, high infiltration/ inflow is experienced. Chico Way Trunk Sewer: Construct 1,700 If of 8-inch sewer from the Chico Way Forcemain discharge. Cost = $250,000. aIVI 4-19 P:\8remerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\TeJd\Sectiot\ 4.doc /. ~ ~~ I - .J I .. - ~ f~ I ----., ---- . . . (1) . . . . . . . . . I I I I I I I I I I I if I . I Y . I \ I I I I I I I I I I I I I I I I- I . I if I . I II I. I . ------_111- KITSAP LAKE ( ~ \ , \ , KITSAP LAKE BASIN " KL-1 ~ I )( LEGEND-SANITARY I , I ~ I I I r '\ " \ L ~ 117.~------~1l--------~ I . I' -, , I ~ I . 1___- -, , WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY ..______ BASIN BOUNDARY - . - CnY LIMITS EXISTING GRAVnY SEWER - - - FM - - - EXISTING FORCE MAIN . - - - - -. EXISTING GRAVnY-PRESSURE SEWER __ EXISTING CSO OUTFALL o EB.7 EXISTING PUMP STATION & NO. D EXISTING CSD REGULATOR o E'.7 EXISTING PUMP STATION TO WHICH IZ MODIFICATIONS ARE PROPOSED & NO. " I IZ PIPE SIZE AND PIPE CHANGE 11II PROPOSED PUMP STATION _ . _FM. _ _ PROPOSED FORCE MAIN . . . . . .. PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER '\1 EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -1-1-1-1-1-1-1 ABANDDN EX. SEWERlPUMP STATION .J L,,-~ I II I I J ~, "................._ftJ . I I I I . SCALE 1" = 1500' L- . ~ , \ . , ., FIGURE 4-6 KIT SAP LAKE BASIN Section 4 Collection System Eva/uation Table 4-8 Marine Drive Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 210 Acres 80 Residential with some Commercial Unsewered It is recommended that sewage be pumped out of the basin to Pump Station OB-1 in the Oyster Bay Basin. The capacity of the force main serving OB-1 can accommodate these flows, but the capacity of the pump station will need to be increased by 40%. The 1995 WW Comprehensive Plan indicated that an alternative would be to pump the sewage to the Callow Avenue Basin. This is no longer considered an alternative since the CSO events in the Callow Avenue Basin have been reduced for compliance with 173-245 WAC. Pump Station MD-1 Capacity (gpm) Not available Flow (gpm) Not available Facilities and Recommended Improvements/Additions Existing Pump Stations: MD-1 Type: Date built: 1994 Number of pumps: Rating of pumps: 2 475 gpm at 136 ft (ea) Custom Projected peak flow: Not available Area directly tributary/percent developed: 55 acres/30% developed Notes: MD-1 was constructed by a developer to serve an area bounded by Kitsap Way on the south, Bertha Avenue on the east, the extension of 1ih Street on the north, and Marine Drive, Lower Marine Drive, and Oyster Bay on the west. Sewage is pumped through 1,090 If of 6-inch force main and discharges to a gravity sewer on Kitsap Way. Improvements since 1998: None. Recommended improvements/additions: None. CDII 4-21 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.t1oc Section 4 Collection System Eva/uation Table 4-8 Marine Drive Basin (cont.) Facilities and Recommended Improvements/Additions New Pump Stations: Madrona Place PS & FM: Construct a 50-gpm submersible pump station and 580 If of 4-inch-diameter force main. Cost = $250,000. Larrel Avenue PS & FM: Construct a 30-gpm submersible pump station and 340 If of 4-inch-diameter force main. Cost = $250,000. Marine Drive PS & FM: Construct a 120-gpm submersible pump station and 400 If of 4-inch-diameter force main. Cost = $250,000. Cedars Way PS & FM: Construct a 30-gpm submersible pump station and 560 If of 4-inch-diameter force main. Cost = $250,000. North Oyster Bay PS & FM: Construct a 30-gpm submersible pump station and 40 If of 4-inch-diameter force main. Cost = $250,000. Mud Bay PS & FM: Construct a 400-gpm submersible pump station and 4,480 If of 6-inch-diameter force main. Cost = $1,500,000 Notes: To serve Madrona Point with a typical gravity collection system, six pump stations are required, as summarized above. Before development occurs, the potential for an alternative collection system, such as a vacuum system, should be investigated to minimize new facilities. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Marine Drive Trunk: Construct 4,460 1f of 8-inch sewer. Cost = $650,000. Kitsap Way Trunk: Construct 2,760 If of 10-inch sewer. Cost = $400,000. CDM 4-22 P:\Bremerton\Comp Plan\Amenrlment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc j /\ 00. r ( I ~ LEGEND-SANITARY WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY _______ BASIN BOUNDARY - . - CITY LIMITS EXISTING GRAVITY SEWER - - - FM - - - EXISTING FORCE MAIN . - - - - -. EXISTING GRAVITY.pRESSURE SEWER __ EXISTING CSO OUTFALL 8 EB.7 EXISTING PUMP STATION & NO. o EXISTING CSO REGULATOR I!I EB-7 EXISTING PUMP STATION TO WHICH " MODIACA nONS ARE PROPOSED & NO. " I " PIPE SIZE AND PIPE CHANGE 11IIII PROPOSEO PUMP STATION .. .. .. FM.. .... PROPOSED FORCE MAIN . .. .. .. .. ... PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER '\1 EXISTING FLOW DIV.RSION (1) S.W.R PROJ.CT NO. -1-1-1-1-1-1-1 ABANDON .X. S.W.R!PUMP STATION SCALE 1" = 1500' OSTRICH BAY ( \ \ \ \ ~ # , / .. - L I~ iii L.U > 0:: Cl L.U :z 0:: .<( .::E \ (4' . . j~ ( -a.. 1! , I I } 1, ( PHINNEY . BAY ..." --1. FIGURE 4-7 MARINE DRIVE BASIN Section 4 Collection System Evaluation . Table 4-9 Oyster Bay Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 725 Acres 80% Residential, Commercial, General Industrial, Industrial Park Separate Sanitary Collection There are seven pump stations (OB-1 through OB-7) along the collection system. Current and projected flows are within the capacity of the current sewer system (most sewers use less than 20% of sewer capacity). The section of the basin north of OB-5 contains a military reservation, with the Navy Regional Medical Center and Navy housing. The military reservation serves Jackson Park Elementary School, which is located outside the reservation. North of Jackson Park Elementary School between the military reservation and SR-3, land will be developed and zoned as Multi-Family (MF). OB-7 and the force main were constructed so the Navy sewer system would not have to support this area. Undeveloped areas currently include the southwest portion of the military reservation, which can be served in the future by the new gravity sewer built with OB-7. These changes would be in lieu of increasing the capacity of OB-5 and adding a beach force main between OB-5 and OB-2. Pump Station OB-1 OB-2 OB-3 OB-4 OB-5 OB-6 OB-7 Capacity (gpm) 1000 750 400 150 550 490 375 Flow (gpm) 840 620 160 50 390 280 Not available Facilities and Recommended Improvements/Additions Existing Pump Stations: OB-1 Type: Custom Number of pumps: 3 Date built: Built 1966, modified 1984 Rating of pumps: 2 replaced pumps: 755 gpm at 212 feet TDH, third pump: 500 gpm at 212 feet TDH Projected peak flow: 1860 gpm, including discharge from OB-2 and future flow from Marine Drive Basin Area directly tributary/percent developed: 200 acres/80% developed, 70% sewered Notes: Unsewered area (45% developed) is zoned Residential and Industrial Park. CDII 4-24 P:\Bremerton\Comp Pfan\Amendrnent\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc Section 4 Collection System Eva/uation Table 4~9 Oyster Bay Basin (cont.) Facilities and Recommended Improvements/Additions Improvements since 1998: Two of the three pumps were replaced with dry-pit submersible pumps. The third pump is scheduled for replacement in 2005. Station controls were upgraded in 2004. Recommended im provements/additions: None. OB-2 Type: Custom Number of pumps: 2 Date built: 1966 Rating of pumps: 750 gpm at 65 feet TDH Projected peak 1230 gpm Area directly 280 acres/80% developed, flow: tributary/percent 50% sewered developed: Notes: Wet and dry wells are belowground, and the motor room is aboveground. Wet well is accessible by motor room I building. A portable standby generator is compatible with the stations. Separate force mains were built to prevent house flooding due to high hydraulic gradient. One force main is a 10- and 18-inch-diameter, high-pressure pipe. The other is a I low-pressure, 12-inch main that connects to house services and has a relief vent at the pump station. The area that is i unsewered is mostly Residential, and about 60 percent developed. The sewered area is developed, and is generally . Commercial and General Industrial. Improvements since 1998: Pump controls were upgraded in 2002. Recommended improvements/additions: Standby emergency generator. 'OB_3 Type: Custom Number of pumps: 2 Date built: 1970 Rating of pumps: 400 gpm at 13 feet TDH Projected peak 160 gpm Area directly 24 acres/100% developed flow: tributary/percent developed: I Notes: Zoned Residential. Wet and dry wells are belowground. Motor room is aboveground. Wet well can be accessed I by motor room building. Station can be supported with a portable standby generator. i Improvements since 1998: Pump controls were upgraded in 2002, and pumps were replaced with dry-pit submersible pumps in 2000. Recommended improvements/additions: None. OB-4 Type: Custom Number of pumps: 2 Date built: 1970 Rating of pumps: 150 gpm at 46 feet TDH Projected peak 50 gpm Area directly 12 acresl1 00% developed flow: tributary/percent developed: Notes: Zoned Residential. Wet and dry wells are belowground. Motor room is aboveground. Wet well can be accessed by motor room building. Station can be supported by a portable standby generator. CDII 4-25 P:\8remerton\Comp Plan\Arnendment\7 PROJPOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc Section 4 Collection System Evaluation Table 4-9 Oyster Bay Basin (cont.) Facilities and Recommended Improvements/Additions Improvements since 1998: Pump controls were upgraded in 2002, and pumps were replaced with dry-pit submersible pumps in 2001. Recommended improvements/additions: None. 08-5 Type: Custom Number of pumps: 2 Date built: 1966 Rating of pumps: 550 gpm at 47 feet TDH Projected peak 370 gpm Area directly 240 acres/75% developed flow: tributary/percent developed: Notes: Wet and dry wells are belowground. Motor room is aboveground. Station can be supported by a portable standby generator. There is an existing 10-inch, low-pressure force main for house service, with capabilities to add a high-pressure 16-inch force main. Areas served include the Navy Jackson Park Housing and Regional Medical Center, the Kitsap County Health Department, and Jackson Park Elementary School. Improvements since 1998: Pump controls were upgraded in 2002. Recommended improvements/additions: Pump replacement with dry-pit submersible style pumps. Install a standby ! emergency generator; cost = $50,000. 08-6 Type: Custom Number of pumps: 2 Date built: 1966 Rating of pumps: 490 gpm at 40 feet TDH Projected peak 340 gpm Area directly Not available flow: tributary/percent developed: Notes: Wet and dry wells are belowground. Motor room is aboveground. Station can be supported by a portable standby generator. Improvements since 1998: Pump controls were upgraded in 2002. Recommended improvements/additions: Pump replacement with dry-pit style submersible pumps. Install a standby emergency generator; cost = $50,000. mM 4-26 P:\8remerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc Section 4 Collection System Eva/uation Table 4-9 Oyster Bay Basin (cont.) OB-7 Facilities and Recommended Improvements/Additions Type: Custom Number of pumps: 2 Date built: 1993 Rating of pumps: 375 gpm at 70 feet TDH Projected peak flow: Not available Area directly tributary/percent developed: 34 acres/20% developed Notes: Submersible pump station built to serve north of Jackson Park Elementary School between SR-3 and the Navy military reservation. A 4,300-lf force main carries sewage between the service area and existing gravity sewer on Shorewood Drive. The sewage is pumped through a newly built gravity sewer through NAD Park. Improvements since 1998: Pump controls were upgraded in 2002. Recommended improvements/additions: None. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: WW Collection and Transmission System Improvements - Oyster Bay: The existing gravity-pressure main on the beach serves adjacent homes by gravity, pump station OB-5 pumps into it. The residences have backwater valves installed to avoid flooding since the BGL regularly surcharges above the elevation of the residences. Main replacement is necessary. ClIVI 4-27 P:\Bremerton\CQmp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc ) --- ( ) \ (" I l.i: J I /) I ..f.. ~I '--=-.., - I I I l 1- 11 LEGEND-SANITARY WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY .._____. BASIN BOUNDARY - . - CITY LIMITS EXISTING GRAVITY SEWER - - - FM - - - EXISTING FORCE MAIN . - - - - -. EXISTING GRAVITY-PRESSURE SEWER ~ EXffiTINGamOU~~L DEB.' EXISTING PUMP STATION & NO. o EXISTING CSO REGULATOR DEB.' EXISTING PUMP STATION TO WHICH 12 MODIFICATIONS ARE PROPOSED & NO. ^' I " PIPE SIZE AND PIPE CHANGE /III PROPOSED PUMP STATION . . . FM. .. PROPOSED FORCE MAIN . . . . . .. PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER \l EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -1-1-1-1-1-1-1 ABANDON EX. SEWERlPUMP STATION SCALE 1" = 1600' / ! r PHI;- tl ,,~---- FIGURE 4-8 OYSTER BA Y BASIN Section 4 Collection System Eva/uation Table 4-10 Pacific Avenue Basin Descriptive Information Size: 95 Acres Percent Developed: 100% Zoning: Commercial with Some Residential Type of Sewer System: Combined I CSO reduction improvements in the Pacific Avenue Basin include upgrade to Pump Station CE-6, construction of a large- diameter trunk storm drain from CE-6 to the ferry terminal, construction of various collector sewers, and inflow & infiltration reduction through rehabilitation of specific facilities. A portion of the inflow & infiltration projects were completed in 2004, with ; the remainder scheduled to occur in 2005. A portion of the trunk storm drain is scheduled to be constructed in 2005, with the I remainder constructed in 2006. The pump station upgrade involves re-directing the discharge from the Central Bremerton : force main to a discharge located at the manhole at Park Avenue and ih Street. Discharge from CE-6 will then flow through the collection system to CE-1 in the Warren Avenue Basin. Pump Station CE-4 CE-6 Capacity (gpm) 1,940 Flow (gpm) Not available Not available Not available Facilities and Recommended 1m rovements/Additions i Existing Pump Stations: i CE-4 Type: ! Custom Date built: 1973 Number of pumps: Rating of pumps: 3 2 @ 1,940 gpm at 238 ft (ea) 1 @ 200 gpm Projected peak Not available Area directly 55 acres/100% developed flow: tributary/percent developed: i Notes: CE-4 is actually two pump stations; the primary station conveys flow through the Central Bremerton force main to the , Crosstown Pipeline, the secondary station consists of a flush pump with integral relief vent that flushes the Washington Beach I main to regularly generate cleaning velocities in the main and reduce the potential/frequency of blockages. Capacity of CE-4 is currently reduced when CE-6 operates since they pump to a common force main. The 2005 upgrade of CE-6 will actually I increase the capacity of CE-4 during storm events due to the lower discharge head conditions. Improvements since 1998: Recommended improvements/additions: CE-6 is scheduled for pump station upgrade in 2005. CE-6 Type: Package Number of pumps: 3 Date built: 1989 Rating of pumps: 600 gpm at 202 ft (ea) Projected peak Not available Area directly 35 acres/100% developed flow: tributary/percent developed: Notes: CE-6 will be upgraded in 2005 to a capacity of approximately 1,200 gpm; the August 2003 CSO Plan Amendment identifies inflow to CE-6 at 1,000 gpm during the CSO design storm. Recommended improvements/additions: Upgrade of pump station required for CSO reduction in 2005. Specifics regarding upgrade are identified in an August 14, 2003 letter report entitled "Amendment to the 2000 CSO Reduction Plan Update." CDM 4-29 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc call Section 4 Collection System Evaluation IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: The constructed CSO reduction improvements have generally increased flow to the WWTP up to system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and Infiltration reduction as an ongoing project is outlined in detail in Section 7. Collection System Evaluation and Repair: The City currently has no systematic program for evaluating its collection system and identifying failing sewers. It is anticipated that a thorough evaluation of the collection system would identify several spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. Specific improvements to existing sewers in the Pacific Avenue Basin are summarized below. Ever ~ince its construction in 1989, the Central Bremerton force main has experienced problems with surcharging at the surge chamber, resulting in flooding of the associated odor control facility. Vents were installed downstream of the surge chamber, which greatly reduced surcharge events; however, surcharging still occurs. The main regularly operates without surcharge during low flow and high flow conditions; however, infrequently surcharges will occur, resulting in flooding of the odor control station. A study was conducted in December 2004 to evaluate the surcharge and attempt to explain the cause. It is believed that during low flow conditions when the surcharge in the Crosstown Pipeline is low, flow through the Central Bremerton force main flows from subcritical to supercritical, and back several times. Air locks developed within the pipe are not relieved through the vents, resulting in the surcharges. Since the flooding occurs only infrequently, it is believed that the critical flow rate is caused when both CE-4 and CE-6 operate at the same time. Redirecting the discharge of pump station CE-6 away from the Central Bremerton force main and to the Warren A venue Basin (Pump Station CE-l) should eliminate the flooding problem. Construct Storm Drain Collection System: An August 14, 2003 letter report entitled" Amendment to the 2000 CSO Reduction Plan Update" identifies construction of a storm drain collection system as a component of CSO reduction in the Pacific A venue Basin. The capacity upgrade to CE-6, coupled with the Trunk SD construction and identified inflow and infiltration construction, is sufficient to reduce CSO in this basin in compliance with WAC 173-245. The purpose of the storm drain collection system is to reduce loading on the sanitary collection system, reduce O&M costs, and develop a safety factor for future growth. The collection system is not shown in this figure for clarity . 4-30 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4,doc Section 4 Collection System Evaluation Washington Avenue Beach Sewer: The Washington Avenue beach sewer collects flow from residences and commercial businesses along the east side of Washington A venue between the extension of 2nd Street and Highland Avenue. The sewer main conveys flow from the Pacific Avenue Basin north to the W arren Avenue Basin. Specifics regarding this project are discussed under the W arren Avenue Basin improvements to existing sewers. CE-6 Force Main (Pacific Avenue CSO Project, OF-16): Install a new forcemain from pump station CE-6 to redirect flow to pump station CE-1 via the Park Avenue Sanitary Sewer. Trunk Storm Drain (Pacific Avenue CSO Project, OF-16): Construct a large diameter trunk storm sewer from Park Avenue to the Ferry Terminal. Storm Drain Separation Projects (Pacific Avenue CSO Project, OF-16): Separation of inflow from the right-of-way is required at four locations: the alley between 4th and Burwell Streets just west of Park Avenue, the alley between 6th and 7th Streets just west of Park Avenue, the catch basin at the northwest corner of 6th Street and Pacific Avenue, and the alley between Burwell and 4th Street just east of Pacific Avenue. Replace or reline the Gregory and High Surge Chamber: The surge chamber at Gregory and High has evidence of extensive sulfide damage. The extent of structural damage must be investigated, and the structure should either be replaced or lined to prevent further degradation. all 4-31 P:\Bremerton\Comp PlanVtmendment\7 PROJDOC\DRAFT AFTER JUNE 20D5\Text\Secljon 4.doc . I I OF-12f'---' I I I I I I I I :l , I \ ~~T---- -,- i -..w _ .:;:' __I -- - -q I'M _ ____ ....... -=.::-~I-- i......J L_ ./"1 ! .------.. --,I I '-_ I r----.... 1.,;----, --/----_. ..- -.... I ' I -1--. I 1 . I I --lJ ~ 1'6, 1'- ,I VENl.lE BASil J --------- - '\ \ ~ \ \~ CE-3 ~ ~ --- ...--.. \ ~ I: \ --1..1 I-'.--":r ,.._ I 1l '-il ! : ..J I I ff( . "- . / 1./ (6) Grego~ I Street ,~ - -f-M- ____.J._____1 ._--_..~ LEGEND-SAN IT ARY OF-15 0 _~10 WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY _______ BASIN BOUNDARY - . - CITY LIMITS EXISTING GRAVITY SEWER - - FM - - EXISTING FORCE MAIN - - - - EXISTING GRAVITY.PRESSURE SEWER __ EXISTING CSO OUTFALL o E"7 EXISTING PUMP STATION & NO. o EXISTING CSO REGULATOR D E"7 EXISTING PUMP STATION TO WHICH u MODIFICATIOHS ARE PROPOSE[) & NO. " I " PIPE SIZE AND PIPE CHANGE II PROPOSED PUMP STATION .. .. .. FM.. .... PROPOSED FORCE MAIN . .. .. .. .. ... PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER V EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -I-I-I-I-I-H ABANDON EX. SEWERlPUMP STATION fl f --- ...... , -l SCALE 1" := 800' FIGURE 4-9 PACIFIC A VENUE BASIN Section 4 Collection System Evaluation Table 4-11 Phinney Bay Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 140 Acres 80% Commercial and Residential Separate Sanitary This basin is 100% 5ewered. There are two pump stations (PB-1 and PB-2) along the collection system. Current and projected flows are within the capacity of the current sewer system. Pump Station PB.1 PB-2 Capacity (gpm) 150 100 Flow (gpm) 60 50 Facilities and Recommended Improvements/Additions Existing Pump Stations: PB.1 Type: Package Number of pumps: Date built: 1970s Rating of pumps: Projected peak Area directly flow: 60 gpm, including tributary/percent discharge from PB-2 developed: 2 150 gpm at 100 feet TDH 80 acres/70% developed and sewered Notes: Wet and dry wells are constructed of concrete and are accessed by a steel tube 3 feet in diameter. Phinney Bay Drive is a source of surface runoff to the dry well. Zoned Residential and Commercial. Improvements since 1998: None. Recommended improvements/additions: Upgrade to submersible pumps due to limited access. Reconstruct the existing hatch and piping. Cost = $200,000. PB-2 Type: Package Number of pumps: 2 Date built: 19705 Rating of pumps: 100 gpm at 20 feet TDH Projected peak flow: 40 gpm Area directly tributary/percent developed: 60 acres/90% developed Notes: Wet and dry wells are constructed of concrete and are accessed by a steel and concrete tube 3 feet in diameter. Zoned Residential. Improvements since 1998: None. Recommended improvements/additions: None. CDII 4-33 P:\Bcemerlon\Comp Plan\Amerldlml\)t\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc ~ ........... PHINNEY I BAY LEGEND-SANITARY ;_&~ WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY _______ BASIN BOUNDARY - . - CITY LIMITS EXISTING GRAVITY SEWER - - FM - - EXISTING FORCE MAIN -- - EXISTING GRAVITY-PRESSURE SEWER __ EXISTING CSO OUTFALL 8 EB.7 EXISTING PUMP STATION & NO. o EXISTING CSO REGULATOR 8 EIl-7 EXISTING PUMP STATION TO WHICH " MODIFICATIONS ARE PROPOSED & NO. " I " PIPE SIZE AND PIPE CHANGE .. PROPOSED PUMP STATION . . . 'M. .. PROPOSED FORCE MAIN . . . . . .. PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER V EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -H-+.I-f-H ABANDON EX. SEWERlPUMP STATION SCALE 1" = 800' -, ~ I I I .... I I I I I I , I I I I . I I - ~ I I I i. I I ~-- L__ l I I I I I I I I I I I I I I I I I I I ii I I . II ! . 0-:::r'-- \ r---J I I@_.,J m"RTNNEY' r----. r.IJ -, III.... l. r . i' SAY . I I , _~':::.. J I ,. ~.J_! , I I . ..1_. I ~ I I % I I r~ I I I ~ I. . I ~ ---H-J-~- I I / ( \ v OF-8 \ / , Q) :::l c:: Q) ~ ....... Q) "0 >- c:: U) _ 19th:; 1 I I --"'" / - I I I I I I I -~- I I I I I.... I I 1.-.-' "" - - '<I"""":!"'~- ~ -_._-.~ FIGURE 4-10 PHINNEY BA Y BASIN Section 4 Collection System Evaluation Table 4-12 Pine Road Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 790 Acres 80% Residential with Some Commercial Combined The City constructed a CSO storage facility in this basin in 2000, and a trunk sanitary sewer/in-line storage facility as well as the Eastside Treatment Plant (CSO Treatment Plant) in 2001. The trunk sanitary sewer connects the downstream end of the Stevens Canyon Basin to the inlet to the Eastside Treatment Plant. During peak flow conditions, the beach main downstream of OF-2 in the Stevens Canyon Basin will surcharge and reverse flow in the trunk sewer to convey it to the Eastside Treatment Plant. During the design storm, all flow from east Bremerton is directed to this treatment plant. Details on the treatment plant are included in Section 2. Pump Station EB-8 EB-9 Capacity (gpm) 200 100 Flow (gpm) Not available Not available Facilities and Recommended 1m rovements/Additions Existing Pump Stations: I EB-8 Type: Date built: Package 1971 Number of pumps: Rating of pumps: 2 200 gpm at 51 ft (ea) Projected peak flow: Not available Area directly tributary/percent developed: Approx. 35 single & multifamily houses Improvements since 1998: None. I Recommended improvements/additions: Install a transfer switch and receptacle for connection of a portable generator. Cost = $10,000. Upgrade telemetry. Cost = $20,000. EB.9 Type: Custom Number of pumps: 2 Date built: 1970s Rating of pumps: 100 gpm at 75 ft (ea) Projected peak Not available Area directly Approx. 50 single & multifamily flow: tributary/percent houses developed: Recommended improvements/additions: Evaluate the condition and size of the emergency holding tanks. Increase the size of the parking area for maintenance vehicles. Install new Flygt submersible pumps. Cost = $25,000. aIVI 4-35 P:\Bremertoo\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.ooc I I , COlI Section 4 Collection System Evaluation IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: The constructed CSO reduction improvements have generally increased flow to the WWTP up to system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and Infiltration reduction as an ongoing project is outlined in detail in Section 7. Collection System Evaluation and Repair: The City currently has no systematic program for evaluating its collection system and identifying failing sewers. It is anticipated that a thorough evaluation of the collection system would identify several spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. Specific improvements to existing sewers in the Pine Road Basin are summarized below. Improvements behind Lowes Hardware from Almira to Wheaton Way: This pipe has extensive root damage. The Lowes Hardware building is currently proposed for demolition and reconstruction. Replacement of the main in conjunction with this new construction is anticipated. Improvements in Utility Easement between Broadmoor Village & Hanford Avenue: The main has extensive root damage and a "belly." The main requires replacement. Improvements on McClain running west on Sheridan to Elm to Hefner to Lebo: To eliminate a downstream surcharge, the sanitary sewer has been diverted. Due to the diversion, a surcharge is required to convey flow downstream. New sanitary sewer is required along this route. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc 4-36 ------. I I- I 1\ I I f..:.., : :J!!' i ~_ ! ~ i L, TI ~Ylla -. 121 .,~___.L -=-l I PINE KOAD BASIN .,-~ ,lit &?J , - i (1) ;>1' yL \S- t;.-. '--------. I I I I I I I I ) L..~. --. - i Ie ,.' .... .. I . J I ,-(-------~-;-_. I I I . : Sl!lv~n 8~orl - I~-----~---~-- I I I I I I I I I T- +-l-- y ~-- I I I I -LJ L. I "0 o '" a:: Q) c c: ---, !.2 LEGEND-SANITARY WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY _______ BASIN BOUNDARY - . - CI1Y LIMITS EXISTING GRAVITY SEWER - - - FM - - - EXISTING FORCE MAIN . - - - - -.. EXISTING GRAVrrv-PRESSURE SEWER ___ EXISTING CSO OUTFALL o EB-7 EXISTING PUMP STATION & NO. c EXISTING CSO REGULATOR o '8.7 EXISTING PUMP STATION TO WHICH 12 MODIFICATIONS ARE PROPOSED & NO. " I 12 PIPE SIZE AND PIPE CHANGE iii PROPOSED PUMP STATION . . . FM. .. PROPOSED FORCE MAIN . . . . . .. PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER "il EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -H-I..++-f-l ABANDON EX. SEWERlPUMP STATION ~ CI: i:;, II ~..A, // ?w I :.s;.~ (;'> CE-1 ~-t- I > I OF-1ar""".. I I ......... SCALE 1" = 1200' FIGURE 4-11 PINE ROAD BASIN Section 4 Collection System Evaluation Table 4-13 Sinclair Park Basin Descriptive Information Size: Percent Developed: Zoning: ; Type of Sewer System: 960 Acres 50% Residential with Commercial and Light Industrial Separate Sanitary Sinclair Park Basin is 50% sewered. Current sewer capacities are exceeded in the following sewers: 1) Jones Street from Cottman Avenue to Oyster Bay Avenue, and 2) Kean Street and Rodgers Street from Wilkes Avenue to SR-3. Projected future flows exceed the capacity of KL-1 (which pumps into Sinclair Park Basin) and the current gravity sewer in the Sinclair Park Basin. Recommendations include abandonment of pump station KL-1 and the inverted siphon. ; OB-1 also pumps sewage into Sinclair Park Basin. Sewer conveyance systems from Oyster Bay Basin, Kitsap Lake Basin, ; and Sinclair Park Basin are owned by the City of Bremerton and run through KCSD No.1. KCSD NO.1 has three discharges, one of which is to these three sewers. i , Development of a plan to provide sanitary sewer service to the West 650 zone is not addressed in this update to the WW Comprehensive Plan. A plan for sewer service for this area should be developed. Pump Station PP-1 Capacity (gpm) 200 Flow (gpm) Not available Facilities and Recommended Improvements/Additions Existing Pump Stations: PP-1 Type: Custom Number of pumps: 2 Date built: Not available Rating of pumps: Not available Projected peak flow: Not available Area directly tributary/percent developed: Serves Pendergast Park facilities Improvements since 1998: Electrical upgraded in 2002. Recommended improvements/additions: None. New Pump Stations: Harlow Drive Pump Station (SP-1) and Force Main: Construct a 150-gpm submersible pump station and approximately 310 If of 4-inch force main. Cost = $350,000. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Old Kitsap Lake Interceptor: Replace 725lf of 8-inch sewer with a 12-inch sewer on Jones Street from 160 ft southwest of Cottman Avenue to Oyster Bay A venue. This project will not be required if the KL-l discharge is redirected, as flows will decrease. Cost = $150,000. CDM 4-38 P:\8remerton\Comp PClan\Amendment\7 PROJOOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc Section 4 Collection System Evaluation Kean Street Trunk Sewer: Replace 1,100 If of 10-inch sewer with IS-inch sewer on Kean Street from First Street to Wilkes Avenue. Replace 305 If of 10-inch sewer with 18-inch sewer and replace 1,580 If of 10- and 12-inch sewer with 21- inch sewer on Kean and Rodgers Streets from Wilkes Avenue to SR-3. This capacity upgrade is required to accept the added flow with the diversion that would be constructed when KL-l is abandoned. Cost = $450,000. Bay View Drive Trunk Sewer: Replace 790 If of 21-inch sewer with 24-inch sewer from 300 ft northwest of H Street to F Street. This capacity upgrade is required to accept the added flow with the diversion that would be constructed when KL-l is abandoned. Cost = $150,000. KL-l Interceptor: Construct 4,000 If of 21-inch sewer from Pump Station KL-1 along 0 Street, Sunnyhill Street, and Harlow Drive to Kean Street. This capacity upgrade is required to accept the added flow with the diversion that would be constructed when KL-l is abandoned. Cost = $1,000,000. Werner Avenue Trunk Sewer: Construct 8-inch sewer on Werner Road from 1,350 If west of Eden Road to the City limit. This improvement is required for development. Cost = $250,000. Northwest Sinclair Park Trunk Sewer: Construct 2,000 If of 8-inch sewer. This improvement is required for development. Southwest Sinclair Park Trunk Sewer: Construct 3,600 If of 8-inch sewer. This improvement is required for development. Cost = $500,000. West Sinclair Park Trunk Sewer: Construct 3,900 If of lO-inch sewer. This portion of the trunk will be a gravity-pressure sewer and connect to the Crosstown Pipeline near the WWTP headworks. This improvement is required for development. Cost = $500,000. Improvements on 4-inch line between Bruenn and Li.lac Lane: The existing sanitary sewer is installed very shallow and is on private property. The main is substandard. New sanitary sewer is required along this route. CDII 4-39 P:\Bremerton\Comp Plan\Amendment\7 PROJOOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc r---~~ - -I I I , I ' l " , ----,-------..."'" I --I I I I I I I I I I I I I I ~ ~ (, r \ .. '\ \.. '- "'0 '" o (5) 0::: :c >- c:: c:: ::> en 0--- L WelTJer Road I - .--'. SINCLAIR PARK BASI~ 'f pp-, c:f \ ., l~ LEGEND-SANITARY -.--.--.-- ---..---- WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY _______ BASIN BOUNOARY - . - CITY LIMITS EXISTING GRAVITY SEWER - - - FM - - - EXISTING FORCE MAIN . - - - - - - EXISTING GRAVITY-PRESSURE SEWER EXISTING CSO OUTFAlL EXISTING PUMP STATION & NO. EXISTING CSO REGULATOR EXISTING PUMP STATION TO WHICH MODIFICATIONS ARE PROPOSED & NO. PIPE SIZE AND PIPE CHANGE PROPDSEDPUMP STATION .. .. .. FM" ..... PROPOSED FORCE MAIN . .. .. .. .. ... PROPDSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER "i1 EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -I-I-I-I-I-H ABANDON EX. SEWER/PUMP STATION -- 0'&7 o DEB-7 .J -_.------ " 18112 IJI ( I SCALE 1" = 1200' FIGURE 4-12 SINCLAIR PARK BASIN Section 4 Collection System Evaluation Table 4-14 Stevens Canyon Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 230 Acres 90% (all areas are sewered) Residential with Some Commercial Combined The northern manhole at Lebo Boulevard and Juniper Street is at the boundary of the Stevens Canyon and Cherry Avenue Basins. Staff have installed sandbags in this manhole in the past to divert flow to the Cherry Avenue Basin for operational reasons. The City constructed a trunk sanitary sewer/in-line storage facility that connects the Stevens Canyon Basin to the Pine Road Basin/Eastside Treatment Plant. During peak flow conditions, the beach main downstream of OF-2 will surcharge and reverse flow in the trunk sewer and convey flow to the Eastside Treatment Plant. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Approximately 280 ft of sewer on Lebo Boulevard west of Juniper Street is in a wooded area, and is moderately to severely damaged by roots. The manhole in the center of this section of main essentially has a tree growing out of it. This section of main and associated manholes should be rehabilitated or replaced. Reduce Infiltration: The constructed CSO reduction improvements have generally increased flow to the WWTP up to system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, ahd provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and Infiltration reduction as an ongoing project is outlined in detail in Section 7. Collection System Evaluation and Repair: The City currently has no systematic program for evaluating its collection system, and identifying failing sewers. It is anticipated that a thorough evaluation of the collection system would identify several spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. Specific improvements to existing sewers in the Stevens Canyon Basin are summarized below. Improvements on Reid from Lebo to Stephenson: Main replacement is required due to a known significant infiltration problem in this vicinity. The extent of the project will be determined in predesign. Beach Main Replacement from Eastside Treatment Plant to 16-inch Siphon: Existing AC beach sewer is exposed in multiple locations. Replacement length is approximately 3,000 If. a:I\t 4-41 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc I I I I /" I I I- I I .---....... L ':'1 _____. I..... ~ .. I ,_. 1 --. I PO,o rr r w.. ~S1714J GrON TI -L1 (2) I I OF-1r....--1 SCALE 1" := 1000' -v- LEGEND-SAN IT ARY jit_ WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY _______ BASIH BOUNDARY - . - CITY LIMITS EXISTIHG GRAVfTY SEWER - - 'M - - EXISTING FORCE MAIN - - - - EXISTING GRAVITY-PRESSURE SEWER _ EXISTING CSO OUTFAll [J ".7 EXISTING PUMP STATION & NO. o EXISTING CSO REGULATOR [J EB-7 EXISTING PUMP STATION TO WHICH , MODIFICATIONS ARE PROPOSED & NO. '" I " PIPE SIZE AND PIPE CHANGE III PROPOSED PUMP STATIOH . .. .'M.. ... PROPOSED FORCE MAIN . .. .. . .. .. PROPOSED SEWER REPLACEMEHT PROPOSED GRAVITY SEWER '\l EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -I-I-I-I-I-H ABANDON EX. SEWERlPUMP STATIOH I I I I I I 1 1 1 1 ,-. I --I 1 I I 1 1 1 1 I I I I 1 1 1 1 I I I I 1___- -- ~ / '-.......... EAST 0f BASI.~ ~ . FIGURE 4-13 STEVENS CANYON BASIN Section 4 Collection System Evaluation Table 4-15 Tracyton Beach Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 210 Acres 50% Residential Combined Several sewers in this basin are deteriorated and require replacement. A complete list of required improvements is not currently developed. Pump Station EB-6 Capacity (gpm) 1,250 Flow (gpm) Not available Facilities and Recommended Improvements/Additions Existing Pump Stations: EB-6 Type: Custom, submersible Number of pumps: 3 Date built: 1947 Rating of pumps: 625 gpm at 102 ft (ea) Projected peak flow: Not available Area directly tributary/percent developed: Not available Notes: Pumps installed at EB-6 have very flat pump curves, and the station is currently pumping below its rated capacity due to higher headloss in the force main than anticipated. Should additional capacity be necessary to reduce CSO events, it is believed that cleaning the EB-6 force main by pigging would greatly reduce system headloss, thus increasing the station capacity. Improvements since 1998: Upgraded in 2005. Recommended improvements/additions: None. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: The constructed CSO reduction improvements have generally increased flow to the WWTP up to system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and Infiltration reduction as an ongoing project is outlined in detail in Section 7. Collection System Evaluation and Repair: The City currently has no systematic program for evaluating its collection system and identifying failing sewers. It is anticipated that a thorough evaluation of the collection system would identify several. spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. ClIVI 4-43 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 20Q5\Text\Section 4.doc ._._.~ .. I- I I ,~ I I I I I I I I I I I V 1_._. I- I I ----....... I LEGEND-SANITARY WASTEWATER COMPREHENSIVE PLAN SERVICE AREA BOUNDARY _______ BASIN BOUNDARY - . - CITY LIMITS EXISTING GRAVITY SEWER - - - fM - - - EXISTING FORCE MAIN . - - - - -. EXISTING GRAVITY-PRESSURE SEWER __ EXISTING CSO OUTFAlL DE'.) EXISTING PUMP STATION & NO. o EXISTING CSO REGULATOR o E~) EXISTING PUMP STATION TO WHICH " MODIFICATIONS ARE PROPOSED & NO. " I " PIPE SIZE AND PIPE CHANGE . PROPOSED PUMP STATION . . . fM. .. PROPOSED. FORCE MAIN . . . . . .. PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER \l EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -H-H-I-H ABANDON EX. SEWERlPUMP STATION I ;-=--\J .--. -L CYTON bEACH BASIN L, --W ~ -0 "-llr- ~ I 0:: >, .. Q)- I . [ ~r. L ..... I - -I-- . ..l ( -, ,. I I I 1Tr~~- I I , I I I I \ r-/ I \ I " CW-3 o \\ i \ \/ , CW-2 l'/ OF-8 ~. " -- - - .... ri SCALE 1" = 1000' FIGURE 4-14 TRACYTON BEACH BASIN Section 4 Collection System Evaluation Table 4-16 Trenton Avenue Basin Descriptive Information Size: Percent Developed: Zoning: Type of Sewer System: 780 Acres 70% (100% in City limits, 60% in the unsewered area in the County) Residential and Commercial Combined Pump Station EB-2 is actually two separate pump stations: EB-2 Local and EB-2 High Flow. EB-2 Local collects inflow from beach sewers, and pumps the inflow to a gravity main on the north side of the EB-2 electrical building. From there, gravity conveys flow through a check valve into the 18-inch EB-2 force main installed on the beach. This force main typically conveys flow as a gravity-pressure main; however, during high flow conditions the beach sewer on the east side of the Port Washington Narrows will surcharge and close the check valve. Once the check valve is closed, influent flowto the force main will divert to EB-2 High Flow through the "goose-neck" adjacent to the electrical building. At this point, the force main operates as a true force main, conveying the flow from EB-2 High Flow to the beach sewer and on to either Pump Station CE-1 (through the two inverted siphons under the Port Washington Narrows) or to the Eastside Treatment Plant (CSO Treatment Plant). The hydraulics OF influent to EB-2 are complicated, and include reversing of flows during storm events. Appendix B shows a flow schematic that presents the hydraulics in this basin. The following paragraphs describe the system hydraulics influent to EB-2. As flow to EB-3 begins to overwhelm the pump station, the sanitary sewer influent to the pump station begins to surcharge. A downstream level control valve (OLC), located at the intersection of Shore Drive and Trenton Avenue (in Bachmann Park), will begin to close and throttle flow to the capacity of EB-3. The resulting surcharge in the 18-inch main on Shore Drive will continue up Pitt Avenue to the manhole at the intersection of East 10th Street and Pitt Avenue (MH-2), where it will turn west and flow to pump station EB-2 High Flow. Since there is no overflow structure at the EB-2 pump station, a second OLC is located on the line influent to EB-2 High Flow to limit the flow to the pump station. Upon surcharge of this line, the OLC will close and initiate a CSO at OF-7B. Flow conveyed along Pitt Avenue north of East 10th Street is intercepted by Manhole 2 (MH-2), located at the intersection of Pitt Avenue, and East 10th Street. The flow is conveyed by gravity through a check valve to the EB-2 force main. MH-2 includes a center wall that separates flow north of 10th Street from the south. The purpose of this separation is to limit surcharge north of 10th Street. Surcharge north of East 10th Street must be limited to avoid flooding structures with basements. Pump Station EB-2 Local EB-2 High Flow EB-3 EB-4 EB-5 Capacity (gpm) 270 4,350 1,270 300 100 Flow (gpm) Not available Not available Not available Not available Not available Facilities and Recommended Improvements/Additions Existing Pump Stations: EB-2 Type: Local Custom, submersible Number of pumps: 2 Date built: 1973 Rating of pumps: 270 gpm at 30 ft (ea) Projected peak flow: Not available. Area directly tributary/percent developed: Beach sewers mil 4-45 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc Section 4 Collection System Evaluation Table 4-16 Trenton Avenue Basin (cont.) Facilities and Recommended Improvements/Additions Improvements since 1998: Upgraded in 2003. Recommended improvements/additions: None. EB-2 High Type: Flow Custom, submersible Number of pumps: 3 Date built: 1973 Rating of pumps: 2,175 gpm at 91 ft (ea) Projected peak flow: Not available Area directly tributary/percent developed: 780 acres/Entire basin Improvements since 1998: Upgraded in 2003. Recommended Improvements/Additions: None. EB-3 Type: Date built: Custom Number of pumps: Rating of pumps: 2 750-gpm at 64-ft (ea) 1973 Projected peak flow: Not available. Area directly tributary/percent developed: Beach sewers Notes: None. Improvements since 1998: Upgraded in 2004. Recommended improvements/additions: Install a standby emergency generator. Cost = $100,000. Type: Custom, Number of pumps: EB-4 submersible Date built: 1940s Rating of pumps: Projected peak Not available Area directly flow: tributary/percent developed: 3 100-gpm at 80-ft (ea) 780 acres/Entire basin Notes: The pumps are hard piped, and wet well entry is necessary for their removal. Improvements since 1998: None. Recommended improvements/additions: None; CD\fI 4-46 P:\Bremerton\Comp Plan\Amendment\7 PROJOOC\ORAFT AFTER JUNI:: 2005\Text\Sectjon 4.doc Section 4 Collection System Evaluation Table 4-16 Trenton Avenue Basin (cont.) EB-5 Type: Date built: Facilities and Recommended Improvements/Additions Ejector Number of pumps: 1970s Rating of pumps: 2 50 gpm at 40 ft (ea) Projected peak flow: Not available Area directly tributary/percent developed: Beach sewers Notes: The pumps are hard piped, and wet well entry is necessary for their removal. This station is proposed to be abandoned with the Trenton Avenue Pump Station and force main construction. Improvements since 1998: None. Recommended improvements/additions: Install a new transfer switch and receptacle for standby power. Cost = $15,000. New Pump Stations: Trenton Avenue Pump Station (EB-10) & Force Main: Construct a 600-gpm package PS and 900 If of 6-inch-diameter force main. Cost = $1,000,000. East 30th Street PS (EB-11) , East 3o'h Street Booster Pump Station (EB-12), and Force Main: The 1995 WW Comp Plan indicates that two 100-gpm rail-guided submersible pump stations and 1 ,400 If of 4-inch-diameter force main are required because one cannot produce the required head. The necessity of two pump stations at this location should be confirmed during predesign. Cost = $1,000,000. Cascade Avenue Pump Station (EB-13) & Force Main: Construct a 300-gpm submersible pump station and 600 If of 4- inch-diameter force main. Cost = $250,000. Notes: A possible alternative to the future configuration shown in Figure 4-15 would be to direct the discharge from the new Trenton Avenue Pump Station to the sewer on Stone Way in the East Park Basin. This would increase flows in the East Park Basin, but would eliminate the flow from being pumped by either EB-2 or EB-3. If sufficient capacity is available in the East Park Basin for this additional flow, discharge from the new Trenton Avenue Pump Station should be directed to the East Park Basin. The total cost to construct a sewer system (collection and transmission) for the area tributary to proposed pump stations EB- 11, 12, and 13 is known to be extremely high; however, to date it has not been identified. Since development of a sewer system would normally be funded through an LID, the high cost to each LID participant is expected to be cost prohibitive. It is anticipated that service in this area would only be practical if an external source of funding (grant funding) were to be procured. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: The constructed CSO reduction improvements have generally increased flow to the WWTP up to system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and Infiltration reduction as an ongoing project is outlined in detail in Section 7. COM 4-47 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc a:at Section 4 Collection System Evaluation Collection System Evaluation and Repair: The City currently has no systematic program for evaluating its collection system, and identifying failing sewers. It is anticipated that a thorough evaluation of the collection system would identify several spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. Specific improvements to existing sewers in the Trenton A venue Basin are summarized below. East 30to/Trenton Trunk Sewer: Construct 3,200 If of 8-inch sewer. Cost = $350,000. Cascade Trail Trunk Sewer: Construct 1,600 If of 8-inch sewer. Cost:::::: $200,000. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\ORAFT AFTER JUNE 2005\Text\Section 4.doc 4-48 -----.---------- "j ~~ I I I I I I I I I I I I I I I I I --- ---I / I -~ I I 1_-. ...J EAST (ARK I BASI~. W'"; c: r--- '" I ~ I: ~ I ~--l ---1J-Ji I ~ I ~ I :5 I 1': l!' I- ... I I I I I I I I I lal r :L. fkENTON A '-~-~li:: I I I _ .. ..I L ~2).. .... I I I I I I I I I I I I I I I I I I (4) ---- ---- .,.-- EB.5 l '\ I ~-- --~----~:~l:- / k!lil""'......'~ WASTEWATER COMPREHENSIVE PlAN SERVICE AREA BOUNDARY ---____ BASIN BOUNDARY - . - CITYUMITS EXISTING GRAVITY SEWER - - FM - - EXISTING FORCE MAIN - - - - EXISTING GRAVITY-PRESSURE SEWER --- EXISTING CSO OUTFAlL o EB.l EXISTING PUMP STATION & NO. o EXISTING CSO REGULATOR ~ EB-l EXISTING PUMP STATION TO WHICH " MOOIFICATIONS ARE PROPOSED & NO. " I " PIPE SIZE AND PIPE CHANGE II PROPOSED PUMP STATION .. .. _FM.. .. III PROPOSED FORCE MAIN . .. .. .. .. ... PROPOSED SEWER REPLACEMENT PROPOSED GRAVITY SEWER " EXISTING FLOW DIVERSION (1) SEWER PROJECT NO. -I-I-+-I-I-H ABANDON EX. SEWER/PUMP STATION / Hh S ell G~ / ~ SCALE 1" = 1000' FIGURE 4-15 TRENTON A VENUE BASIN Section 4 Collection System Eva/uation Table 4-17 W arren Avenue Basin Descriptive Information 1 \ Size: Percent Developed: Zoning: Type of Sewer System: 290 Acres 95% Residential with some Commercial and Park Lands. Combined There are three pump stations (CE-1, CE-2, and CE-3) along the collection system. CE-1 conveys all dry weather flows from all of east Bremerton, as well as all flow from the Warrant Avenue Basin. CE-2 and CE-3 flow to CE-1. Current and projected flows are within the capacity of the sewer system. Pump Station CE-1 CE-2 CE-3 Capacity (gpm) 8,500 400 400 Flow (gpm) Not available I , i Not available Not available Facilities and Recommended 1m rovements/Additions Existing Pump Stations: I CE-1 Type: Custom Number of pumps: 4 Date built: 1984 Rating of pumps: 2 @ 7,000 gpm at 167 ft (ea), & 2 @ 1,500 gpm at 167 ft (ea) Projected peak flow: Not available Area directly tributary/percent developed: Not available Notes: CE-1 conveys all dry weather flows from all of east Bremerton, as well as all flow from the Warren Avenue Basin. I Motor-operated sluice gates are installed in the wet well that actuate upon surcharge of the wet well during high flows. Once actuated, flow in east Bremerton is conveyed to the Eastside Treatment Plant (CSO Treatment Plant). Improvements since 1998: None. Recommended improvements/additions: None. CE-2 Type: Package Number of pumps: 2 Date built: 1973 Rating of pumps: 200 gpm at 51 ft (ea) Projected peak flow: Not available Area directly tributary/percent developed: 780 acres/Entire basin Notes: The pumps are hard piped, and wet well entry is necessary for their removal. cmI 4-50 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 4.doc Section 4 Collection System Evaluation Table 4-17 Warren Avenue Basin (cont.) Facilities and Recommended Improvements/Additions Improvements since 1998: None. Recommended improvements/additions: Install a transfer switch and receptacle to provide for a portable standby generator. Cost = $15,000. CE-3 Type: Custom Number of pumps: 2 Date built: 1973 Rating of pumps: 200 gpm at 62 ft (ea) Projected peak flow: Not available Area directly tributary/percent developed: 35 acres/100% developed (but not to density allowed) Notes: During pre-design of the Washington Avenue Beach Sewer, consideration should be given to upgrade or abandonment of this pump station. Improvements since 1998: None. Recommended improvements/additions: Install safety improvements to the dry well ladder. Install a gas-tight cover on the wet well hatch inside the building. Cost = $100,000. IMPROVEMENTS TO EXISTING SEWERS AND/OR NEW SEWER EXTENSIONS: Reduce Infiltration: The CSO reduction improvements constructed have generally increased flow to the WWTP up to system capacity. Reduction of infiltration is required to allow for growth, reduce pumping and treatment costs, and provide a "buffer," or "safety factor," that will ensure continued compliance with CSO regulations. Inflow and Infiltration reduction as an ongoing project is outlined in detail in Section 7. Collection System Evaluation and Repair: The City currently has no systematic program for evaluating its collection system and identifying failing sewers. It is anticipated that a thorough evaluation of tlle collection system would identify several spot repairs and entire sewer rehabilitation or replacement projects. A recommended program for collection system evaluation and repair is outlined in detail in Section 7. Specific improvements to existing sewers in the Warren A venue Basin are summarized below. ClIVI 4-51 P;\Bremerton\Comp Plan\Amendment\7 PROJDOC\ORAFT AFTER JUNE 2005\iext\Section 4.doc Section 4 Collection System Evaluation Improvements at 51111 tit Street: Replacement is required. Washington Avenue Beach Sewer: Sewage from the residences on the east side of Washington Street from 4th Street north to 13th Street flows eastward over the bluff and into a sewer pipe on the beach. Since the pipe was not installed on any gradient, it acts a gravity-pressure main. There is a connection from Pump Station CE-4 at the south end of the pipe that is used to flush the main regularly. There are a number of issues associated with the configuration of the beach main and laterals that make the existing configuration unfavorable, result in excessive maintenance, and make the main prone to failure. Approximately 90% of the laterals north of the Manette Bridge, and several of the laterals south of the Manette Bridge, are installed at grade down the bluff. Their at-grade installation makes them susceptible to damage from falling debris. The laterals are typically covered by vegetation, which conceals failures for extended periods of time. In addition, various parts of the bluff are unstable, and ground movement has exposed and broken several of the laterals. Also, many of the laterals are exposed at the toe of the bluff on the beach. During high tides, floating debris can impact the laterals and shear them off near ground level. The broken laterals allow beach sand and gravel to enter and partially or fully plug the pipe. The low flows in the pipe are not sufficient to remove the debris; therefore, it is believed that the main is partially obstructed. Additionally, there is limited access to the beach, and no improved roads on the beach for maintenance and repairs of the main. Equipment (backhoes, etc.) must be driven on the beach at low tide from Highland A venue. During previous repairs, the City has gotten equipment stuck on the beach. To date, staff have been able to recover the equipment ahead of incoming tides; however during each repair event the outcome is uncertain. The beach main requires replacement with a new structure, and associated access road. Cost = $2,000,000. CD\I 4-52 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 20Q5\Text\Section 4.doc OF-13 . I I OF-12,-"---' l~ I I I I I I I ~ \ 1/ " ~~T-- --- I , I .../}Y~ 1/ ~o 1/ ~ ~ --'.--t" -- 'I"" rn ~ I._a. I I - ..-J--L"i"~ = !. .------. -I I I r-----..I '-----. - - --:_____' ... ......0 I - I -I- ---.J' I I I .. -1- _.- """--- WA~RE \J A \IEN JE BAslt\.J-'-'~-- r'.J ----.- I ....1 . -, '-, I '-, _J- r------ ._-~ I I I I OF-16 I -0 CE-6A 0" ~ _ _ _...GJ _ _ .M I -------------. . ~----___~ I ~~ j I 1 -M - . -eM- I ----- ----~-----~____J I I I .--,.,. >< \, o \, OF-15A ~ /' I I I I ~ II LEGEND-SANITARY _~ WASTEWATER COMPREHENSIVE PlAN SERVICE AREA BOUNDARY _______ BASIN BOUNDARY - . - CITY LIMITS EXISTli'IG GRAVITY SEWER - '" - - EXISTING FORCE MAIN - - - - EXISTING GRAVITY-PRESSURE SEWER EXISTING CSO OUTFALL EXISTING PUMP STATION & NO. EXISTING CSO REGUlATOR EXISTING PUMP STATION TO WHICH MODIFICATIONS ARE PROPOSED & NO. PIPE SIZE AND PIPE CHANGE PROPOSED PUMP STATIOH .. .. .. FM.. .... PROPOSED FORCE MAIN . .. .. .. .. ... PROPOSED SEWER REPlACEMENT PROPOSED GRAVITY SEWER V EXISTli'IG FLOW DIVERSION (1) SEWER PROJECT NO. -I-I-I-I-I-H ABANDON EX. SEWERlPUMP STATION OF-15 o JL --- OEB-7 o DEB.7 ---- ,--- --- .4- " 1&) 12 II , SCALE 1" = 800' FIGURE 4-16 WARREN A VENUE BASIN '-'1 iJ I ,J -j f CEllI Section 5 Wastewater Treatment Plant Evaluation This section of the Plan examines the capacity needs of the existing Westside Wastewater Treatment Plant and the Eastside Treatment Facility. The section is divided into liquid treatment facilities, water reuse, biosolids management, and odor control. 5.1 Liquid Stream Issues Both the WWTP and Eastside Treatment Facility have adequate liquid treatment capacity to handle current and future conditions in Bremerton. The following subsections detail the capacity and issues associated with the plant's liquid processing units. 5.1.1 Effluent Standards The WWTP is currently permitted for a maximum monthly average flow of 10.1 mgd. Table 5-1 lists the current NPDES permit limits for the WWTP. The current NPDES Permit has expired and the plants are operating under an agreement with Ecology to extend the old permit. The mass loading limits for TSS and BOD5 were set using the flow rate of 10.1 mgd and the effluent concentration limits. Table 5-1 Existing NPDES Permit Requirements Permit Parameter Maximum Mor1th 10.1 18,100 22,600 Average Monthly 30 2,527 30 2,527 6.0-9.0 200 0.13 Influent Flow, mgd BOD5 Loading, ppd TSS Loading, ppd . Effluent BOD5 concentration, mg/L BOD mass loading, Ib/day TSS concentration, mg/L TSS mass loading, Ib/day pH Fecal coliform, cfu/1 OOml Total residual chlorine, mg/L N/A N/A N/A Average Weekly 45 3,790 45 3,790 6.0-9.0 400 0.37 The NPDES permit also requires that average monthly effluent concentrations for BOD5 and TSS not exceed 15 percent of the respective monthly average influent concentrations except during the wet weather months of October through April inclusive. The waiver of the federal 85 percent removal requirement recognizes that the Bremerton system collects CSO and the WWTP treats CSO flows to current water quality standards. 5-1 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.l1oc COM Section 5 Wastewater Treatment Plant Evaluation 5.1.2 Compliance Issues With a few minor exceptions, the WWTP has been in compliance with all discharge standards since the City took control of plant operations in 1995. The plant received an Outstanding Performance Award in 1998. The weekly average TSS mass limit has been exceeded once in 1996, twice in 1997, and once in 1998. The exceeding of the maximum week limit of 3,790 ppd occurs during extreme, back-to-back, wet weather events. Compliance with CSO issues is addressed in the CSO Plan and City's annual CSO compliance reports. The Permit requires the City to begin planning for expansion when the actual flow reaches 85 percent of the permit capacity for three consecutive months. With the exception of extreme wet weather months, actual flow will never reach the 10.1 mgd capacity during this Plan's planning period. 5.1.3 New Discharge Standards This Comprehensive Plan Update does not anticipate more restrictive concentrations will be imposed in the foreseeable future. The dry weather mass limits are based on the plant's 1980 design flow of 10.1 mgd and should never be exceeded over the period covered in this plan update. However, the City has made significant reductions in their CSO volumes and much of those flows now reach the Westside WWTP. The WWTP has the potential to exceed its weekly mass limit even though its effluent concentration is significantly below the 45 mg/l dictated by water quality standards. If mass limits for extreme wet weather events become a compliance issue, the City has a plan to construct blended treatment using high rate clarification (similar to Eastside) and force additional flow to Eastside Treatment Facility. This contingency plan is discussed in more detail in the recommendations. 5.1.4 Current TMDL Process Just as air pollution management is benefiting from emission trading, so too might Total Maximum Daily Limits (TMDL) planning gain from employing effluent pollution reduction credits. Air pollution emission reduction credits trading as a commodity is a concept gaining much popularity across the country. In each air quality attainment area or district, each business must comply with designated limitations for maximum emission of pollutants into the atmosphere. When a business is able to conserve a portion of its allocation, it may choose to trade as a commodity its excess to another business in need of additional allocation. This concept has been established by states and approved by the federal government. A model for this concept was established in California in 1997 when the California Air Resources Board (ARB) adopted a statewide regulation in Interchangeable Air Pollution Emission Reduction Credits. The regulation is codified as Health and Safety Code and requires ARB to develop and adopt a methodology for use by local air pollution districts to calculate the value of lIinterchangeable" emission reduction 5-2 P:\Bremerton\Comp I='lan\Amendment\7 PROJDOC\DRAFT AfTER JUNE 2005\Text\Section 5.doc COlI Section 5 Wastewater Treatment Plant Evaluation credits generated from stationary, mobile, and area sources. The purpose of the regulation is to promote compliance flexibility and cost effectiveness. The regulation sets out general requirements that local air pollution control districts and air quality management districts (" districts ") must meet when developing rules governing the generation and use of interchangeable credits. As specified in the regulation, an interchangeable credit is "an emission reduction credit generated from a stationary, mobile, or area source that can be used, traded, or banked among programs and/ or source categories." In order to standardize and facilitate credit trading, the proposed regulation establishes a uniform credit currency, expressed in pounds of pollutant in the year generated. Wastewater Effluent Pollution Model Air pollution emission reduction credits trading are a concept that could be applied to wastewater effluent pollution limit regulation to promote compliance and cost effectiveness in water quality management As TMDLs are established within a water body, each entity that discharges treated effluent into that body is allocated a maximum allowable pollution discharge limit As a treatment facility is retrofitted with upgraded treatment technology, it could choose to relinquish a portion of its allocation as a commodity to another entity within the same water quality attainment area. This could provide valuable incentives for upgrading technology and provide for new plant capacity for growth management Significant effort is being waged in establishing TMDLs for threatened water bodies. Currently, there is little effort, other than the regulatory "hammer," to provide incentives for cost effective pollution reduction methods. Implementation of wastewater effluent pollution limit regulation would, of necessity, be initiated at the federal level and offered to the states as a management technique. Since EP A regulations allow for the concept for air quality, current federal legislation may provide a comparable provision for water quality. It would require authorization at the state level within Chapter 173 WAC. A key principle of this pollution reduction credits trading concept is that of "equivalency," i.e., the use of interchangeable credits must not result in greater pollution discharge than would have occurred in the absence of the trading program. With this parameter as its baseline, there is little difference conceptually with the air pollution emission reduction credits trading program. Currently there exists no authority at the state level for such a program; however, the concept is rich with potential and merits earnest pursuit The City is encouraged to promote and support, possibly through Water Environment Federation and direct legislative involvement, the concept of wastewater effluent pollution reduction credits trading. P:\Bremerton\Comp Ptan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-3 CEllI Section 5 Wastewater Treatment Plant Evaluation Additional Considerations The marine waters surrounding Bremerton including Sinclair and Dyes Inlets have been identified as fecal coliform impaired. This impaired designation has resulted in the State of Washington Departments of Ecology and Health, Kitsap County Health District, and the City of Bremerton working cooperatively with the US Navy in initiating an aggressive program for identifying point and non-point sources for fecal coliform. This program, supported by the EP A, is in the research and development stage and has shown great potential as the next generation of analytical modeling for water quality analysis. This program, entitled ENVVEST, was initiated by the US Navy. The Navy developed this three dimensional pollution dispersion model enabling the layered analysis of the effects of pollutant discharge into marine waters. In the first phase, fecal coliform was analyzed for the Bremerton Area marine waters. The first phase of the ENVVEST model development has been completed, which, in part, illustrates the impact of the City's CSO upon Dyes Inlet. Phase 2 will address additional pollutant loadings and impacts on the marine waters, which include contributions from storm water outfalls, freshwater stream discharges, and wastewater treatment plant outfalls. Once the ENVVEST modeling is completed for Phase 2, State regulators have indiCated a desire to establish pollution units through the TMDL process utilizing ENVVEST for the marine waters surrounding Bremerton. The designation and allocation of pollution units will affect the region's potential for growth and will require storm water and domestic wastewater discharges to be considered in the unit process. This allocation of pollution units will be a component of the TMDL allocations and as improved controls and technological advances occur, the potential for effluent pollution reduction credits trading will be even more beneficial to overall growth management. 5.1.5 Eastside Treatment Facility Permit The Eastside Facility began treatment of CSOs in December 2001. The City initiated operation under an agreement reached through Federal Court. The plant is operated with the permission of Ecology using the City permit application of 2001. The facility is designed to a fecal coliform standard of 200 CFU /100 mL. Performance since the plant came online is summarized in Table 5- 2. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-4 CDII Section 5 Wastewater Treatment Plant Evaluation Table 5~2 Fecal Coliform Performance Year Month and Day Performance Fecal #/100 mL 17 10 46 30 42 78 47 18 23 10 10 55 10 2003 January 2 January 27 March 12 March 22 (7:30 am) March 22 (8:40 am) October 20 November 18 (12:45 pm) November 18 (6:40 pm) December 5 (1 :35pm) December 5 (3:30pm) January 7 January 29 February 19 2003 2003 2003 2003 2004 2004 5.2 Liquid Stream Capacity 5.2.1 Westside WWTP 2001 Rerating Study The peak month capacity limitations listed in Bremerton's NPDES Permit (W A- 002928-9) are 10.1 mgd, 18,100 lbs/ day, and 22,600 lbs/ day for maximum month flow, BODs, and TSS, respectively. These limits were taken from the April 1983 construction plans when the WWTP was expanded from primary to secondary treatment. In recent years, the plant has treated a peak month flow greater than 10.1 mgd and met discharge concentration and mass limits. In 2001, the City developed a rerating study for Ecology to assist the agency in modifying the NPDES permit limits. Peak month flow has increased as the City brings more CSO to Westside though major improvements to the collection system. The following is an excerpt from that study prepared by CDM in conjunction with Richwine Environmental (Appendix D). "The City of Bremerton's Westside wastewater treatment plant (WWTP) was originally designed for a maximum month flow rate of 10.1 mgd. The capacity of the treatment plant is based on the characteristics of the flows and loads that it receives. The City's treatment plant is unique in that it receives flows from the combined sewer system resulting in increased wet weather flows and high peaking factors. This results in a more dilute wastewater, which changes the capacity characteristics of the treatment plant. "The treatment plant was designed for a maximum month influent flow of 10.1 mgd at a BODs concentration of 215 mg/L and a TSS concentration of 268 5-5 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\ORAF'T AFTER JUNE 2005\Tex\.\Section 5.doc Section 5 Wastewater Treatment Plant Evaluation '" -., ! , t mg/L. These wastewater concentrations are comparable to the concentrations received today at the treatment plant during the dry season. The maximum month flow occurs during the wet season. A detailed analysis of the plant flows and loads for the period between 1997 and 2000 show that the BODs and TSS concentrations are 131 mg/L and 146 mg/L, respectively, at the maximum month flow. Therefore, the treatment plant needs to be rerated to provide a plant capacity under the actual maximum month wastewater characteristics. --1 i I "The Washington Department of Ecology (DOE) outlines in the Criteria for Sewage Works Design (Orange Book) the requirements for rerating a municipal wastewater treatment plant. Section Gl-5.4.2.A defines two methods for rerating a facility. These are the Standard Facility Rerating and the Nonstandard Facility Rerating. The City desires to rerate the treatment plant under the Standard Facility Rerating classification. "The capacity of the treatment plant is defined in the NPDES permit at a maximum month flow of 10.1 mgd. The actual capacity of the treatment plant is a maximum month average daily flow of 14.1 mgd. The maximum daily primary clarifier overflow rate of 1400 gpd/ft2limits the plant capacity. This value is higher than the Orange Book standard of 1200 gpd/ ft2, but was selected based on the historical performance of the system. " Another critical design criterion that must be considered is the maximum hydraulic flow that can be sent to the secondary process. The maximum daily secondary flow that can be adequately treated is 22.8 mgd. This is based on the peak secondary clarifier overflow rate of 1200 gpd/ ft2. This criteria is based on the design standard specified in the Orange Book and was confirmed with historical operating data. On each of the occurrences that the permit limits were exceeded, this design criterion was also exceeded. "The treatment plant receives flows greater than 22.8 mgd as maximum daily flows and on rare occasions as a daily average flow. During these periods, the influent wastewater is dilute resulting in primary effluent BODs and TSS concentrations in the range of 50-75 mg/L. Forcing these high flows to the secondary system degrades the effluent quality by flushing solids from the secondary clarifiers. The best alternative that will produce the best effluent quality is to maximize the flow to the secondary system to 22.8 mgd and blend the primary effluent flows greater than 22.8 mgd with the secondary effluent prior to disinfection. The treatment plant currently has the capability to provide this blended effluent. This process alternative will provide an effluent that will meet the effluent discharge standards specified in the NPDES permit. INFLUENT LOAD CHARACTERISTICS " An analysis of the influent flows and loads was performed for the period 1987 - 2000. The past four years of data, which is the period that the treatment CEllI 5-6 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc Section 5 Wastewater Treatment Plant Evaluation plant has been back under City operation, was determined to be the most representative of the influent flows and loads of the service population. This data was analyzed to determine the current system wastewater characteristics. The following conclusions were made: "The influent wastewater is municipal in composition with the average dry weather per-capita flow at 125 galj capital day. The average BODs load is at 0.20 lbsl capital day and the average TSS load is at 0.20 Ibsl capital day. "The maximum peaking factor experienced at the treatment plant exceeds 5.0, which is over twice the typical value of 2.38 for a city of this size. This is due to the combined sewer system. "The plant influent flow currently averages 6.50 mgd on an average annual basis. The average dry season flow is 4.75 mgd and the average wet season flow is 7.71 mgd. The maximum month flow from which the plant design is based is 11.3 mgd, which is 112% of the maximum month design flow, however, the dry weather flow is only 62% of the dry weather design flow. This difference is due to the high flows that are received during rainfall events. In addition, the City's combined sewer overflow (CSO) reduction program contributes significant flow to the WWTP that was previously discharged. "The plant influent BODs loading currently averages 7,638 Ibsl day with a maximum month loading of 8,936lbsl day. The design average BODs load is 11,300 lbsl day and the design maximum month is 18,100 lbsl day. The current loads are 68% of the average load and 49% of the design maximum month load. "The plant influent TSS loading currently averages 7600 lbsl day with a maximum month loading of 9424lbsl day. The design average TSS load is 11,300 lbsl day and the design maximum month is 22,600 lbsl day. The current loads are 67% of the average load and 42% of the design maximum month load. "This analysis shows that the treatment plant is at 68 % of the design based on average flows and loads. However, high flows created by the combined sewer system are experienced at the treatment plant during rain events. These cause the current maximum month design flow to be exceeded. UNIT PROCESS HISTORICAL PERFORMANCE "The influent concentrations become very dilute during high flow periods resulting in low removal rates in the primary process. The primary effluent concentrations tend to stay in the range of 50 - 75 mg/L during high flow periods when the removal rates become very low. "The aeration basins have performed well within the design organic loading rate of 120 lbsl day 11000 ft3. CDII 5-7 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Texl\Section 5.doc Section 5 Wastewater Treatment Plant Evaluation liThe critical process parameter to the successful performance of the secondary process has been the secondary clarifier overflow rate. The peak hydraulic overflow rate of 1200 gpdj ft2 cannot be exceeded without a high probability of loss of excess solids and poor effluent quality. liThe treatment plant has performed well over the past 5 years based on monthly and weekly effluent BODs and TSS permit standards. There have been seven times when permit standards have been exceeded: two for monthly TSS, two for weekly BODs and three for weekly TSS. These incidents have occurred during three separate events. Each of these three events was caused by peak flows greater than 22.8 mgd to the secondary process resulting in the flushing of solids from the secondary process. liThe performance of the treatment plant has continued to improve since the City began operation of the treatment plant in 1996. This is due to the reduction of recycle streams, improved maintenance of the facility, and optimization of the unit processes based on operational experience. CAPACITY EVALUATION "Each unit process in the treatment plant was evaluated to determine a dry season and a wet season capacity. The unit process capacities have been summarized in Table ES-1. Table ES-1 City of Bremerton WWTP Unit Process Capacity Rated Capacity Limiting Unit Process Maximum Month Flow Units (mgd) Condition Screening 30 Screen Capacity mgd Grit Removal 30 Hydraulic mgd Capacity Primary Treatment 14.1 Overflow Rate gpd/ft2 Secondary 14.2 Overflow Rate gpdltt Treatment Disinfection 30 Basin hrs Detention Time Gravity Thickening 15.2 Solids Ibs/day/ft2 Loading CEllI 5-8 P:\8remerton\Comp Plan\Amendment\7 PROJDOC\ORAFT AFTER JUNE 2005\Text\Seclion 5.doc CEllI Section 5 Wastewater Treatment Plant Evaluation Flotation Thickening Solids Loading Ibs/day/ft2 16.7 Anaerobic Digestion (One digester) Hydraulic Detention Time 14.9 days "The performance of the primary and secondary treatment processes and the quality of the plant effluent for the years 1996 through 2000 were evaluated to determine the operating characteristics of the system. This analysis consisted of a detailed evaluation of the operating data for the primary and secondary treatment processes and the plant effluent. Most of the emphasis on effluent quality and performance was given to the period of 1997 through 2000. This was the period of time when the plant has operated free of significant recycle streams and the laboratory database was the most complete. The following conclusions were made: "Percent BODs and TSS removal is not a good design variable due to the characteristics of the system. "The limiting dry season unit process is anaerobic digestion. This is based on the revised hydraulic detention time standards that were implemented with the EP A 503 regulations to ensure adequate pathogen kill for land application of the treated biosolids. This new criteria is more stringent that the original design criteria. "The limiting wet season unit process is the primary treatment process at 14.1 mgd. This process is limited based on the average day overflow rate. The rate specified in the Orange Book is 1200 gpdj ft2, but a rate of 1400 gpdj ft2 was used for this evaluation. This higher value is based on the historical performance of the primary clarifiers at these higher overflow rates. "The design maximum month condition as specified in the NPDES permit is based on the wet season design criteria. Therefore, the treatment plant should be rerated to a maximum month capacity of 14.1 mgd." The results of most of this study are still valid, and form the basis of the plant capacity assessment for the Comprehensive Plan. Plant data for the past few years has demonstrated the sludge production is lower than estimated in the Rerating Study. The plant currently has enough digester capacity to meet Class B requirements with one digester out of service. Biosolids processing capacity is discussed in more detail later in this section. Westside Hydraulic Capacity The WWTP has a hydraulic capacity of 32.5 mgd from its 1980 design. The primary effluent pump station limits the plant secondary capacity. The hydraulic analysis of P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE: 2005\Text\Section 5.doc 5-9 CEllI Section 5 Wastewater Treatment Plant Evaluation the existing plant and outfall completed for the 2002 Facility Plan determined that a maximum of 55 mgd could be accommodated without overflowing structures. The primary clarifiers and the disinfection facilities have passed a peak instantaneous flow of 58.7 mgd when Sinclair Inlet is not at extreme high tide. The plant meets NPDES Permit requirements while providing blending of 32.5 mgd of secondary effluent with primary effluent as summarized in Table 5-3. Table 5-3 WWfP Performance with Blending During High Flows Flow (mgd) Fecal Coliform CFU/100 mL Eff. Limit = 400 Effluent BOD (mg/L) TSS (mg/L) 24-hr Average Date (mgd) 11/18/03 27.03 01/27/99 16.77 01/28/99 26.81 01/29/99 19.86 02105/99 18.74 02/06/99 18.09 02/07/99 17.90 -- Not analyzed Peak Flow (mgd) >32.5 >32.5 >32.5 >32.5 >32.5 >32.5 >32.5 Eff. LilTJit = 45 Influent Effluent 149 23 54 23 Eff. Limit = 45 Influent Effluent 198 25 85 34 45 33 63 16 69 18 50 15 49 17 26 10 196 48 13 10 The Bremerton WWTP outfall is 568 feet long, 36 inches in diameter, and terminates at a depth of approximately -30 feet Mean Lower Low Water (MLLW) datum into Sinclair Inlet at a location west of Puget Sound Naval Shipyard (PSNS). The terminal portion of the outfall consists of a 20-port diffuser with 61/2 -inch-diameter openings at 6-foot spacing. The diffuser ports discharge horizontally in alternating directions at a depth of -29 feet MLLW. Effluent flow projections for the outfall are a maximum day flow of 10 mgd during dry weather and a maximum day flow of 58.7 mgd during wet weather. The current capacity of the WWTP outfall is approximately 50 mgd. Outfall capacity depends on several factors including tide stage and amount of sediment in the inlet section of the pipe. The discharge capacity can be increased to meet the instantaneous peak flow by allowing some flooding of the effluent meter during those rare, extreme wet weather events. A visual inspection of the WWTP outfall was completed on April 1, 2002. During this inspection, all 20 ports were flowing freely with no obstruction. Each port was surrounded by thick marine growth; however, the growth was not inhibiting flow. There was some silting inside the diffuser, particularly toward the middle and offshore end. This material was fine grained and filled the pipe up to an estimated 40 percent of the pipe diameter in places. It is not known how far back the outfall might be subjected to silting. During inspection of the outfall, joints and joint harnesses of P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-10 CEllI Section 5 Wastewater Treatment Plant Evaluation the RCP pipe were analyzed. There were no signs of spauling, damage, or decay on any visible surfaces of the pipe, joints, or end structure. Mixing Study Mixing zones have been designated by Ecology in the NPDES permit for the WWTP. The state water quality standards (WAC 173-201A) allow Ecology to establish these zones around discharges in determining water quality-based effluent treatment requirements. Both acute and chronic mixing zones are designated for toxicants in the wastewater effluent. Concentrations of these toxicants may not exceed water quality standards outside of these mixing zones. The dimensions of the authorized mixing zones are as follows: . The boundary of the chronic mixing zone is a horizontal distance of 200 feet plus the depth of water over the discharge ports at MLL W, or approximately 229 feet for the WWTP outfall, as measured from any diffuser port. Chronic water quality criteria for toxicants are applied at this boundary. . The boundary of the acute mixing zone is defined as 10 percent of the distance to the applicable boundaries of the chronic mixing zone, or 22.9 feet, as measured horizontally from any diffuser port. Acute water quality criteria for toxicants are applied at this boundary. . The acute and chronic mixing zone boundaries extend for the full depth of the water column. Ecology (1994) and EPA (1991) have established a statistical test of the "reasonable potential to exceed water quality standards" at the acute and chronic mixing zone boundaries. A Mixing Zone Study (Appendix E) was conducted to examine the potential to exceed these standards with the projected effluent from the WWTP after the wet weather facilities are constructed. Results from the Mixing Zone Study show that there is no reasonable potential to exceed standards for any water quality parameter. Process Capacity Needs Projected loadings are compared to existing plant capacity in Table 5-4. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-11 SectionS Wastewater Treatment Plant Evaluation Table 5-4 Design Criteria, Capacity, and Projections - Liquids 1980 Actual Capacity 2003 : Unit Design 2010 2014 2024 Capacity (Rerating (actual) Study) Raw Wastewater Actual Projected Annual Average (mgd) 7.6 5.7 6.3 6.6 7.3 Maximum Monthly Average (mgd) 10.1 14.1 14.0 14.6 14.9 15.6 Peak Instantaneous (mgd) 29.5 57.6 57.6 57.6 57.6 Raw Sewage Characteristics Annual Average - BODs 11,300 (Ibs/day) 6,900 8,200 8,700 10,100 Max. Month - BODs (Ibs/day) 18,100 8,100 9,500 10,100 11,700 Annual Average - TSS 11,300 (Ibs/day) 6,900 8,100 8,700 10,000 Max. Month - TSS (Ibs/day) 22,600 8,000 9,400 10,100 11 ,700 Headworks (screens and grit chambers) Actual Projected Mechanical Cleaned Bar Screens No. of Units 2 Capacity of each (mgd) 15 Manual Raked Bar Screens No. of Units 1 Capacity of each (mgd) 30 Grit Chambers No. of Units 2 Capacity of each (mgd) 15 Headworks Capacity Peak Flow (mgd) 30 30 52 52 52 52 Primary Clarifiers Actual Projected No. of Units 2 Diameter (feet) 80 Side water Depth (feet) 10 Overflow rate (OFR) Average Annual Flow (gpdfft2) 900 570 630 650 720 Maximum Monthly Flow (gpd/tf) 1,100 1,400 1,400 1,500 1,500 1,600 Peak Daily Flow (gpd/ft2) 3,300 5,700 5,700 5,700 5,700 OFR Flow Rate Maximum Month (mgd) 14.1 Secondary Treatment (aeration Actual Projected basins and secondary clarifiers) Aeration Basins No. of Units 2 Volume (each-ft~ 55,600 Side water Depth (feet) 13.5 Secondary Clarifiers No. of Units 2 ClIVI 5-12 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2.005\Text.\Sectlon 5,QOC Diameter (feet) Side water Depth (feet) Overflow rate (design year) Average Annual Flow (gpd/ft2) Maximum Monthly Flow (gpd/ft2) Secondary Treatment (aeration basins and secondary clarifiers) Maximum Month Flow Capacity (mgd) Peak Flow Capacity (mgd) Disinfection (Chlorine contact chambers) Chlorine Contact Chambers No. of Units Volume (each-ft3) Side water Depth (feet) Detention Time Annual Average (minutes) Peak Hour (minutes) Section 5 Wastewater Treatment Plant Evaluation 110 14 420 300 330 350 380 550 750 740 770 780 820 14.2 32.8 Actual Projected 2 28,000 14 ft 80 20 106 10 96 10 92 10 83 10 20 With the exception of the headworks screening and contact time during extreme wet weather events, the WWTP has adequate liquid stream capacity to meet the needs of the next 20 years. Future Discharge Standards Ecology is developing TMDLs for Sinclair Inlet. Nitrogen (N) loadings are one focus of the studies and modeling. For long range planning purposes, this section of the Plan addresses improvements needed if strict controls on ammonia or total nitrogen were to be proposed in permit requirements. Issues considered are: III Nitrification capacity of existing Westside WWTP and use of the existing biotower, in a future nitrification process III Expansion needs for nitrification of current flows III Expansion needs for nitrification at year 2024 loadings III Expansion needs for total N removal of current flows III Expansion needs for total N removal at year 2024 loadings Plan-it STOAT (version 1.1.0.220) was used for modeling the existing process and performing these investigations. The model was calibrated with existing plant data. Influent quality inputted into the model was the average of the 2003 dry weather BOD, TSS and ammonia concentrations (195/190/30 mg/L respectively). Modeling was performed at the minimum influent temperature of 120 C. CDM 5-13 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFrER JUNE 2005\Text\Section 5,doc COM Section 5 Wastewater Treatment Plant Evaluation Nitrification Nitrification takes place when the biomass of the activated sludge converts ammonia to nitrate. Nitrification is commonly used to reduce the toxicity of the effluent in some aquatic environments. This conversion takes place at sludge age greater than approximately 3 to 9 days depending on factors such as dissolved oxygen level and temperature of the aeration basin. The nitrification capacity of existing plant without and with the biotower is 3.0 and 3.5 mgd dry, respectively. The plant could not nitrify year-round at 2004 flows. The maximum capacity for nitrification was obtained when 90 percent of the flow was directed to the biotower as a roughing filter ahead of the activated sludge process, and 10 percent directly to the activated sludge process. At the high BOD loadings resulting from directing this much flow to the biotower (over 80 Ibs/1000 cf/ d), only 5 percent total N removal was assumed in the biotower. A 50 percent biotower recirculation flow was found to be necessary to achieve the benefits from the biotower. For the activated sludge process to achieve nitrification, a sludge retention time (SRT) of 7.2 days was needed. Achieving nitrification of current flows and loadings (4.0 mgd dry season and BOD, TSS and ammonia of 195/190/30 mg/L) would require doubling the aeration basin and final clarifier capacity (two additional aeration basins and final clarifiers equal in size to the existing basins, resulting in a more conservative design SRT of 9.5 days). Nitrification of 2024 loading requires a significant increase in plant facilities. The 2024 design loading used for planning was the maximum month dry season flow of 6.4 mgd indicated in Figure 3-2, and BOD/TSS/ammonia concentrations of 245/250/40 mg/L. Table 5-5 summarizes plant expansion needs for nitrification. Table 5-5 Expansion Needs for Nitrification Flow/Loadings Current Aeration Basins Final Clarifiers Comments Basins of equal size to existing. Numbers include the existing basins. 4 4 2024 6 6 Nitrification-Denitrification Total N removal is achieved by biologically converting nitrate to nitrogen gas. Achieving total N removal of current flows and loadings would require the addition of 27-foot-long by 45-foot-wide anoxic basins, to the head end of the four each 45-foot- wide by 90-foot-Iong aerations basins required for nitrification, plus mixed liquor recirculation pumping sized to pump twice the incoming flow (4 mgd dry season flow). Biotower operation as described above is required to achieve full nitrification of current flows. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sedion 5.doc 5-14 CEllI Section 5 Wastewater Treatment Plant Evaluation Total N removal for 2024 loading requires a significant increase in plant facilities. The 2024 design loading used was the maximum month dry season flow of 6.4 mgd indicated in Figure 3-2, and BOD /TSS/ ammonia concentrations of 245/250/40 mg/L. Expansion needs for total N removal are shown in Table 5-6. Table 5-6 Expansion Needs for Total N Removal Flow/Loadings , Aeration Basins* Final Clarifiers* Comments Anoxic Basins Current Anoxic basins 45 feet wide by 27 feet 4 4 long. 8 mgd mixed liquor recycle pumping Anoxic basins 45 feet wide by 40 feet 6 6 long. 15 mgd mixed liquor recycle pumping 4 2024 6 *Basins of equal size to existing. Numbers include the existing basins. At these high 2024 loadings, there was very little benefit from running the biotower to treat any portion of the flow. Summary of Ammonia and Nitrogen Removal Potential Both reliable nitrification and denitrification with the technology currently used at the plant is not feasible due to the limited site. Iftotal N removal needed to be accommodated at the Westside site, the City would need to investigate less conventional technology that requires a smaller footprint. Such technologies would be membrane bioreactors (MBRs) or nitrification processes that can be used on the secondary effluent such as biological submerged filters. 5.2.2 Eastside Treatment Facility Facilities in East Bremerton were constructed in 2001 to treat a portion of the CSO flow during storm events. The Eastside Treatment Facility was designed for a nominal flowrate of 15 mgd with a maximum hydraulic capacity of 20 mgd. The existing Manette Outfall limits the capacity to 14 mgd at extreme high tide. Mixing Study An effluent mixing zone study for the discharge of wastewater through the Manette Outfall was completed as part of the Engineering Report for the project. The mixing zone analysis found that the current diffuser size, depth, and configuration are adequate for flows up to 30 mgd. As stated previously, EP A and Ecology have adopted a statistical test to determine the reasonable potential for toxicants to exceed water quality standards for wastewater discharge. This test was applied to the effluent data furnished in the February 2000 dilution study in the Pine Road CSO Plan (HDR,2000). No parameters were predicted to have a reasonable potential to exceed water quality standards. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Seclion 5.doc 5-15 CEllI Section 5 Wastewater Treatment Plant Evaluation Outfall Condition and Capacity The Eastside Treatment Facility uses the 20-inch outfall built for the Manette Primary Treatment Plant for discharge into Port Washington Narrows. The Manette Primary Treatment Plant was demolished in 1985. The outfall is approximately 480 feet long. The first 200 feet is the origina120-inch cast iron pipe and is in fair condition (repaired on September 10, 2001). The remaining outfall and diffuser is 36-inch RCP constructed in 1971 and is in good condition. The 20-inch section limits the discharge to approximately 14 mgd at extreme high tid~. The Manette Outfall diffuser is 36- inches in diameter and 84 feet long. The terminal portion of the outfall consists of a 21-port diffuser with 5 %-inch diameter openings. Diffuser ports discharge horizontally in alternating directions at a depth of -24 feet MLLW. Process Capacity The first full wet season for the Eastside Treatment Facility was an extremely dry winter. The plant operated six times during the current winter of 2003-04. The operation challenges appear to be at low flows and modifications are underway to provide greater turndown capacity for the metering and chemical mixing systems. 5.3 Wastewater Reuse This section is a recap of the reuse plan developed by Brown & Caldwell in 1998. The recommendations of that plan have been modified to reflect current conditions. 5.3.1 Planning Criteria and Regulations Criteria regulating the production, quality, and usage limitations of reclaimed wastewater have been developed by Washington State Department of Health (DOH) in the Water Reclamation and Reuse Standards, September 1997 (WDOH, 1997). These standards were developed from the EP A's Guidelines for Water Reuse, 1992. For planning purposes, "Class A" waters are often designated; these waters are consistent with non-potable water use for landscape irrigation of open access areas such as parks and golf courses, anywhere where exposure to spray is possible. Class A Treatment Requirements The treatment requirements for Class A waters are at a minimum, treatment using secondary treatment, coagulation, filtration, and disinfection. Treatment is required to reduce the BOD to less than 30 mg/L, the TSS to less than 30 mg/L, to increase the dissolved oxygen concentration to greater than zero and the water must be nonputrescible. Filtration must be accomplished by passing secondary effluent through a natural undisturbed soils or a filter media to meet the final turbidity standards of less than or equal to a maximum of two Naphthalmetric Turbidity Units (NTUs) based on a 24-hour average, or less than or equal to a maximum of five NTUs based on complete record. Disinfection must be performed to reduce the total coliform count to less than 23 organisms (org) per 100 mL in any sample, and less than 2.2 org per 100 mL for a 7-day average. The residual chlorine concentration must be 1.0 mg/L residual after a modal contact time at peak flow of 30 minutes and a P:\6remerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\SeGtion 5.doc 5-16 Section 5 Wastewater Treatment Plant Evaluation chlorine concentration of 0.5 mg/L residual at the point of use (WDOH, September 1997). Reclaimed water criteria are summarized in Table 5-7. Table 5-7 Class A Reclaimed Water Criteria Standard Oxidized Secondary Effluent BOD TSS Dissolved Oxygen concentration Filtered Turbidity Requirement < 30 mg/L, maximum < 30 mg/L, maximum Greater than 0.0 .::: 2 NTU, maximum based on 24-hour average < 30 NTU, maximum based on complete record Disinfection Total Coliform Residual Chlorine ~ 23 organisms/100 mL in any sample ~ 2.2 organisms/100 mL, 7-day median 1.0 mg/L residual after a modal contact time at peak flow of 30 minutes 0.5 mg/L residual at the point of use 5.3.2 Capacity Requirements and Limitations The 1998, Brown and Caldwell (B&C, 1998) Water Reuse Feasibilihj Study (Reuse Study) identified the five potential reclaimed water users in the Bremerton area, including: the Gold Mountain Golf Complex, the Port of Bremerton Industrial Park, Puget Sound Naval Shipyard, Pendergrast Park, and the groundwater recharge area for stream flow augmentation of Gorst Creek. The reclaimed water uses and demands for these users are discussed below. The amount of reuse water that would be required for Gorst Creek to reach its In- Stream Flow Requirements exceeds the total output of WWTP; therefore, calculations are based on 50 percent of the Gorst Creek demand. When all potential users are taken into account, reuse water volume demand is closest to total historical plant effluent output between July and November. Each user has a unique water reuse demand in terms of volume and scheduling. Historical effluent production always meets or exceeds these demand projections, although projected supply equals projected demand in October, November, July, and August. Individual user demand can be summarized as follows: II Gorst Creek demand is by far the largest potential user. Demand peaks in December at 8 mgd over 24 hours, and is lowest in May at 1.75 gpd over 24 hours. II PSNS demand is 144,000 gpd between June and September, and 504,000 gpd between October and May, always over 24 hours per day. II Gold Mountain Golf course requires approximately 750,000 gpd spread over 24 hours per day between June and September. c:ICIIWI 5-17 P:\Brernerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sectlon 5.doc CDM Section 5 Wastewater Treatment Plant Evaluation . Pendergast Park demand peaks in June and July at 58,300 gpd, with the daily demand spread over an 8-hour nightly watering period. . Demand from Port of Bremerton businesses peaks at 39,700 gpd in July, with minimum demand at 13,600 gpd in December and January. If all users are taken into account, monthly demand peaks in December at just over 8 mgd, and drops to 2.3 mgd in May. Average summer demand (June-Sept) is 3.8 mgd, compared to the average winter demand (Oct-May) of 5 mgd. Peak hour demand rate is approximately 9.01 mgd (0.375 million gallons per hour) (B&C,1998). In addition to unique volume requirements, each listed user has unique requirements in terms of water quality for the reuse water. All users require water that at least meets Class A treatment standards, which are listed above. Plant water quality data collected between 1994 and 1996 show higher than acceptable levels of chloride, total dissolved solids (TDS), metals, and TN concentrations for the potential users. Of all the potential users, PSNS has the most stringent water quality demands. Nearly mineral-free water is needed for use in its boiler operations. For PSNS to be an end user of reuse water, reverse osmosis (RO) or ion-exchange treatment would be the only methods of sufficiently reducing TDS in the effluent (B&C, 1998). Gold Mountain Golf Complex The Gold Mountain Golf Complex is located on Old Belfair Valley Road, located just southwest of Bremerton (west of the Gorst Area). This golf complex is comprised of two 18-hole golf courses that are owned and operated by City of Bremerton Parks and Recreation Department. The golf course currently uses potable water for irrigation at a rate of 750,000 gpd from late May through late September. The potable water is pumped into one of two ponds, the Cascade pond and the Olympic pond, where it is stored. Storage capacity for irrigation water is approximately 20 million gallons. Current WWTP effluent would need to be blended with potable water at a ratio between (2:1) and (6:1) or undergo additional treatment to lower TDS and possibly nutrients. Because of the grass type on the golf course, the reuse report recommended a TDS limit of 2,000 mg/L. Nutrient removal may also be required to prevent algal blooms in the storage ponds. The large storage area eliminates "peak hour" requirements. A conveyance pipe is already in place for this use (B&C, 1998). Port of Bremerton Industrial Park In 1998, 23 companies operated within Port of Bremerton Industrial Park, 3 of which were "wet" industries with processes amenable to non-potable water use. The three businesses are Fred Hill Materials (cement preparation), Morrison Gravel (gravel mining and washing), and Express Pipe and Precast (no current records). The top water user was Fred Hill Materials, with almost 90 percent of the 21,100 - 43,900 gpd water demand of the three businesses. Fred Hill Materials would likely require reuse water to be blended at a ratio of (2:1) (reuse water: potable water) to meet its requirements for pH, turbidity, TSS, Chlorides, and Sulfate (B&C, 1998). P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 200S\Texf\Secfion 5.doc 5-18 CEllI Section 5 Wastewater Treatment Plant Evaluation Puget Sound Naval Shipyard Between 1992 and 1996, water and sewer use records show PSNS used approximately 2.3 mgd potable water and discharged only 1.0 mgd. The discrepancy has no clear explanation, but could be partially attributed to unknown pieces of the water system that were undocumented when built. The PSNS identified boiler feed and irrigation as the two feasible uses for reclaimed water. A separate piping system would need to be built to support these uses. Boiler Feed water demand averages about 504,000 gpd in the winter and 144,000 gpd in the summer. Respective peak flows are estimated to be 720,000 gpd in the winter and 216,000 gpd in the summer. Boiler water would require treatment at PSNS or RO treatment at the WWTP to remove minerals. Irrigable land acreage was only 2 to 4 acres in 1997. Building reuse water conveyance solely for irrigation would not be cost-effective (B&C, 1998). Pendergast Park The 50-acre Pendergast Park is on the north side of Gold Mountain. It is maintained and operated by the City of Bremerton Parks and Recreation Department. At the time of its opening in 1997, the irrigated area included three softball fields (with three more planned) and two soccer fields. The irrigation season is from April to September. Average daily demand is estimated at 32,600 gpd, with a peak of 58,300 gpd. A conveyance pipe is aheady in place for this use. Unlike sensitive golf greens, which cannot tolerate high salt concentrations, Pendergast Park is a potential user of Class A effluent with higher TDS and chloride. Gorst Creek Gorst Creek originates near Sunnyslope, joins the West Fork near the base of Gold Mountain, and discharges into the Sinclair Inlet. Instream Flow Requirements, which are the flows required to "retain perennial rivers and streams with flows necessary to provide for preservation and protection of wildlife, fish, scenic, aesthetic, recreational and other environmental values, and to preserve water quality," were established for Gorst Creek in 1981 in Chapter 173-515 WAC. Monitoring activities between October 18,1990 and November 25, 1995 indicated that Gorst Creek did not comply with Instream Flow Requirements on 63 percent of the recorded days. Reclaimed water used to augment flows in Gorst Creek would have to comply with RCW 90.46, and upon reaching Gorst Creek would be regulated by surface water standards described in WAC 173-201A. Regulations for using WWTP reclaimed water to recharge Gorst Creek are not directly applicable to the reclaimed water itself but to the stream water downstream of the recharge area. Therefore, pilot studies would have to be completed to determine the effects of dilution and natural II soil aquifer treatment" (SAT) between the infiltration galleries and the point of instream water quality monitoring. It estimated that a blending ratio of 6 parts potable water to 1 part reuse water would be required to reduce IDS and chloride to acceptable levels (B&C, 1998). The potential demand for reclaimed water to recharge Gorst Creek averages 7.18 mgd and ranges from 1.55 to 12.7 mgd, depending on daily, seasonal, and annual rainfall 5-19 P:\Bremerton\Comp Plan\Amendment\7 F'ROJOOC\DRAFT AFTER JUNE 20Q5\Text\Section 5.doc Section 5 Wastewater Treatment Plant Evaluation patterns. This generally exceeds the total average effluent flow from the Westside WWTP, which is 6.15 mgd (B&C, 1998). 5.3.3 Improvement Alternatives Six alternatives were developed in the Reuse Study, including: 1. Total Reverse Osmosis (RO) 2. Creek with Blending, no PSNS 3. Creek with Blending plus RO for PSNS 4. No Creek, no PSNS 4A. No Creek, No PSNS, Separate Secondary Facilities 5. No Creek, RO for PSNS Highlights of these alternatives are summarized in Table 5-8 and described in the following paragraphs (B&C, 1998): Table 5-8 Comparison of Water Reuse Alternatives (B&C, 1998) RO-treated Life Cycle Class A Water Cost ($ Produced Produces Users (potable millions - (millions of (millions of water: reuse water) total gallons per gallons per - if blending is present Alternative day) day) required worth) Alternative 1 - Total RO 4.45 4 Port of Bremerton, 80.8 Gold Mt. Golf Course, Pendergast Park, PSNS, Garst ! Creek ! Alternative 2 - Creek with 1.19 0 Port of Bremerton 20.6 Blending, no PSNS (2:1), Gold Mt. Golf Course (4:1), Pendergast Park, PSNS, Gorst Creek (1 :6) Alternative 3 - Creek with 1.75 0.5 Port of Bremerton 31.9 Blending, plus RO for (2:1), Gold Mt. Golf PSNS Course (4:1), Pendergast Park, PSNS, Gorst Creek (1 :6) Alternative 4 - No Creek, 0.69 0 Port of Bremerton 14.4 no PSNS (2:1), Gold Mt. Golf Course (4:1), Pendergast Park CEllI 5-20 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\SeClion 5.doc CEllI Section 5 Wastewater Treatment Plant Evaluation Alternative 4A - No Creek, no PSNS, separate secondary facilities 0.88 20.8 o Port of Bremerton, Gold Mt. Golf Course, Pendergast Park Port of Bremerton (2:1), Gold Mt. Golf Course (4:1), Pendergast Park, PSNS Alternative 1 ("Total RO") has the greatest non-economic value, producing over 4.45 mgd of Class A water and 4.00 mgd of RO-treated reusable water. Under this alternative, no blending with potable water is necessary to meet water quality needs of Gorst Creek, PSNS, Gold Mt. Golf Course, Port of Bremerton, and Pendergast Park. This option also has the highest life-cycle cost, estimated at $80.8 million. Alternative 5 - No Creek, RO for PSNS 1.25 0.5 27.6 Alternative 2 ("Creek with blending, no PSNS") produces 1.19 mgd of Class A water and no RO-treated water. Class A water would be used as-is by Pendergast Park. Gorst Creek, Gold Mountain Golf Course, and Port of Bremerton would blend Class A reuse water with potable water at ratios of (1:6), (4:1), and (2:1), respectively. Life cycle cost for this alternative is $20.6 million. Alternative 3 ("Creek with blending plus RO for PSNS") produces 1.75 mgd of Class A water, and 0.5 mgd of RO-treated water. RO-treated water would be used exclusively by PSNS. Class A water would be used as-is by Pendergast Park. Gorst Creek, Gold Mountain Golf Course, and Port of Bremerton would blend Class A reuse water with potable water at ratios of (1:6), (4:1), and (2:1), respectively. Life cycle cost for this alternative is $31.9 million. Alternative 4 ("No Creek, No PSNS") produces 0.69 mgd Class A treated water and no RO-treated water. Class A water would be used as-is by Pendergast Park. Gold Mountain Golf Course would blend Class A-treated water with potable water at a ratio of 4:1, and Port of Bremerton would require blending also at a ratio of 2:1. Life cycle cost for this alternative is $14.4 million. Alternative 4A ("No Creek, No PSNS, Separate Secondary Facilities") produces 0.88 mgd Class-A treated water, treated with additional secondary facilities, and no RO- treated water. The water treated with the additional secondary facilities would come from the Westside WWTP influent pipes that do not carry PSNS wastewater effluent. Pendergast Park, Gold Mountain Golf Course, and Port of Bremerton would use the treated water without blending. Life cycle cost for this alternative is $20.8 million. Alternative 5 ("No Creek, RO for PSNS") produces 1.25 mgd Class-A Treated water and 0.5 mgd RO-treated water. Class A water would be used as-is by Pendergast Park. Gold Mountain Golf Course would blend Class A-treated water with potable water at a ratio of 4:1, and Port of Bremerton would require blending at a ratio of 2:1. RO-treated water would be used exclusively by PSNS for boiler operations. Life-cycle cost for this alternative is $27.6 million. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Texl\Sec:lion 5.doc 5-21 CEllI Section 5 Wastewater Treatment Plant Evaluation Major assumptions affecting the cost of these alternatives include: . Users would provide all potable water where blending is necessary. · All reclamation facilities and storage would be located at the Westside WWTP. · Blending water from Twin Lakes would be used for Gorst Creek. . Water quality regulations for Gorst Creek would not change. · Chosen pipeline alignments, or similar alignments, would be feasible. . Property costs were not included in the cost estimates. · Life cycle costs assumed life cycle period of 20 years (40 years for static structures), with an annual interest rate of 6.0 percent and annual inflation of 2.0 percent. · The "planning level" cost estimates given for each alternative have a confidence interval of +50 percent and -30 percent. For any of the above options, all reuse water storage would be located at the Westside WWTP. Required storage volume is 45,780 gallons for Alternatives 2, 4, and 4A; and 81,780 gallons for Alternatives 1, 3, and 5. 5.3.4 1998 Recommendations The recommended alternative from Brown and Caldwell's 1998 study was Alternative 4A, the "No Creek, no PSNS, Separate Secondary Facilities" alternative. This alternative involves providing secondary treatment to a portion of the raw wastewater entering the treatment plant, followed by reclamation. The rerouted wastewater would be arriving from the southwest in lO-inch and 12-inch lines; these lines do not carry PSNS water, so that the wastewater would have lower levels of salinity than the total combined wastewater. The primary and secondary treatment would be provided via a small packaged plant membrane bioreactor or sequencing batch reactor system sized for 1 mgd of flow. Sludge from this system would be routed into the current solids processing facilities at the main treatment plant. This alternative would treat the secondary effluent to Class A standards for the following users: the Gold Mountain Golf Complex, Port of Bremerton, and Pendergrast Park. The total amount of reusable Class A-treated water made available to the users would be 0.88 mgd. The reclaimed. water would not be provided for the augmentation of Gorst Creek or for boiler feed at the PSNS. This alternative was chosen for the following reasons: Ii!I Blending of valuable potable water and reclaimed water is not required. 1/ No RO treatment is required. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-22 J CEllI Section 5 Wastewater Treatment Plant Evaluation . The treatment system could be used for reclaimed water as well as CSOs. . Additional secondary treatment system diverts raw sewage from the main plant, thus increasing the total Westside WWTP treatment capacity. . Future regulatory changes regarding Gorst Creek stream flow augmentation do not affect this alternative. . Compared to the other alternatives, capital and O&M expenditures are practical. . Many non-economic benefits are associated with this alternative. Under this alternative, demand peaks in the summer rather than the winter, and the primary user is Gold Mountain Golf Course. Average summer demand (June through September) is 0.82 mgd, while average winter demand (October through May) is 0.02 mgd. Peak month use is approximately 0.84 mgd, while peak hour use rate is 0.85 mgd. The plant would have the capacity to produce 0.93 mgd. PSNS and Gorst Creek are not users under Alternative 4A, which eliminates the need for costly RO treatment. Additional secondary treatment for the reuse stream is employed to achieve the required reuse water standards for the potential users. The influent water would be separated from influent coming from PSNS, and will be lower in salinity than the current blended waste stream. The secondary treatment for this portion of reuse water would m.eet the user's water quality requirements and eliminate the need for blending with potable water (B&C, 1998). For Ease of Operation, Alternative 4A ranked 3 (1 being least favorable and 6 being most favorable) compared to the other alternatives. Ease of Operation was described as Sf moderately complex process." The reason for this rating was the necessity of separating the raw waste into two streams for treatment. Benefits of this alternative compared to the other alternatives in this category are: No use of complex RO equipment, no infiltration galleries or groundwater monitoring, and less handling of chemical or brine wastes. Cleaning and maintenance of the conveyance pipe system will require less effort than raw water conveyance systems because there will be less settling of solids (B&C, 1998). Alternative 4A is described as a Sf... type of gateway alternative. It allows the City to reclaim a portion of the wastewater, but still preserves options for greater degrees of reuse in the future." Additionally, the reuse report stressed the need to plan for future flexibility when designing and implementing this alternative. There is potential that treatment will need to be enhanced to meet more stringent regulations, or reduced in response to higher-quality influent. The plan would meet current DOH criteria (B&C, 1998). In 1998, the reuse plan recommended implementing Alternative 4A in two phases. Completion of the plan is expected to take three years because considerable off-site piping and on-site treatment facilities must be designed and installed. Phase I, which P:\Bremerton\Comp PJan\Amendment\7 PRQJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-23 \ i CEllI Section 5 Wastewater Treatment Plant Evaluation involves irrigating Pendergast Park and some treatment plant landscaping with reuse water, was assumed to be easy to implement because it was assumed that the conveyance pipe to the Park was already in place. This pipeline has not been constructed. During Phase I, additional data would be collected on water quality, reuse water demands, and required facilities and equipment. Filtration units could also be compared during Phase 1. Planned implementation of filtration units is the use of two 12-square-foot filters in Phase I and four 50-square-foot filters in Phase II. Because a funding source for reuse has not been identified, and major facilities not part of the Westside Plant (storage, conveyance and service connections) have not been constructed, this plan update recommends keeping space at Westside for the facilities described in the 1998 plan. When reclamation becomes financially feasible, the City should consider a compact reuse facility at the Eastside site to serve users in East Bremerton. 5.4 Biosolids Management Sludge produced from the wastewater treatment process at the Westside WWTP consists of primary sludge (PS) and waste activated sludge (WAS). The gravity thickener at the plant was designed for PS thickening, but currently is not in service because 6 to 7 percent solids in the PS coming out of the primary clarifiers is being achieved. PS is pumped directly to the digesters as well as the primary scum floating in the primary clarifier. The dissolved air flotation thickener (DAFT) thickens WAS and secondary scum. A portion of the sludge was treated to Class A for vector attraction and pathogen reduction with a Pathogen Reduction Heat Treatment system, which includes treatment by a mesophilic anaerobic digester, heating by spiral and serpentine heat exchangers, detention in a holding tank, and cooling in a second anaerobic digester. This equipment is not in use. The sludge is dewatered by centrifuge. The resulting biosolids are land applied in nearby forests owned by the City. A plan view of the sludge processing facilities is shown in Figure 2-3 and a flow chart of the solids processing can be found in Figure 2-4. 5.4.1 Planning Criteria and Regulations Federally, biosolids regulations are listed in 40 CFR 503. The 503 regulations establish requirements for the final disposal of sewage biosolids when biosolids are beneficially applied to the land, distributed and marketed as fertilizer, used on other surface disposal sites, or incinerated. The requirements for each end use and disposal method limit the pollutant concentrations, such as heavy metals, in the biosolids. The regulations also address monitoring, record keeping, and reporting requirements. Biosolids regulation is delegated to Ecology. Biosolids management is governed under WAC 173-308, Biosolids Management. The purpose of WAC 173-308 is to protect human health and the environment when biosolids are applied to the land. It encourages the maximum beneficial use of biosolids, and is intended to conform to all applicable federal rules adopted under the Federal Clean Water Act. 5-24 P:\Bremel1on\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 20Q5\Text\Seclion 5.doc CEllI Section 5 Wastewater Treatment Plant Evaluation Biosolids, as defined by 40 CFR 503 regulations, are divided into two classifications, Class A and Class B, based on the level of vector attraction and pathogen reduction achieved by the treatment processes. All biosolids that are land-applied for beneficial use must meet the requirements of one of these classifications. Class B biosolids are achieved through a Process to Significantly Reduce Pathogens (PSRP). These processes include aerobic and anaerobic digestion, composting, lime stabilization, and drying. There are a number of restrictions on the harvesting of food crops, grazing of animals, and public access to land where Class B biosolids have been applied. Class B requires a significant level of record keeping to track cumulative loadings of several trace constituents. Class A biosolids can be achieved through a second Process to Further Reduce Pathogens (PFRP). These processes include composting, heat drying, thermophilic aerobic digestion, and pasteurization. The production of higher quality, Class A biosolids offers the advantage of increased flexibility since there are a few restrictions on the beneficial use or sale of Class A biosolids. In order to be recognized as producing Class A biosolids with anaerobic digestion alone (i.e., pasteurization or heat drying) the process must satisfy either the time- temperature criteria specified in 40 CFR 503 or be able to obtain a PFRP equivalency recommendation from EP A' s Pathogen Equivalency Committee. 5.4.2 Capacity Requirement and Limitations Review of Plant Operations Data As part of the evaluation of the wastewater solids, one year (2003) of operating data for the primary, secondary, sludge thickening, and sludge digestion were reviewed. The data consisted of daily values and averages for waste activated sludge, raw sludge, digested sludge, and dewatered sludge parameters. Solids Balance A solids balance is an evaluation of the solids production and removals at each of the liquids and solids unit processes in the treatment plant. The solids balance evaluates the effects of the recycle streams from the solids handling processes and incorporates them into the unit process loads. This evaluation is necessary to determine solids production for sizing of the solids handling unit processes. A solids balance was developed for each of the current seasonal loading conditions and future seasonal conditions. The solids balance provides the solids stream flows and loads that will be used to determine the solids processing unit capacities. Current plant data and some assumptions on the performance of each unit process must be made to determine the solids balance. Concentrations of TSS and BOD are assumed to stay in the current range at the future projection flows. Flows are expected to increase in the future with population growth. The relative accuracy of these assumptions is critical, so meaningful and representative results can be obtained 5-25 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DAAFT AFTER JUNE 2005\Text\Section 5.doc CEllI Section 5 Wastewater Treatment Plant Evaluation from the model. Process performance assumptions were determined by evaluating historical data and process performance at the treatment plant over the past 5 years. Table 5-9 shows the assumptions made in this model. The performance values that were assumed in this model were based on conservative values. This was done to ensure that the process capacity is available when a unit process does not perform optimally. Table 5~9 City of Bremerton WWTP Solids Balance Model Performance Variables Variable Basis Influent BOD & TSS Concentrations Peaking Factors VSS as % of TSS Historical Data Historical Data Historical Data Historical Data Historical Data Historical Data Yield (Ibs. VSS/lb. BODs Applied) Secondary Effluent TSS Secondary Effluent BODs Total Solids Cone. of WAS % Volatile Solids in WAS Historical Data Historical Data Historical Data Historical Data Historical Data Historical Data Historical Data Assum tion Historical Data Historical Data Dewatering Capture Efficiency Total Solids Cone. of Dewatered Sludge Assumption Historical Data The results of the solids balances are shown in Table 5-10. These loadings are used to determine the current solids handling process capacities. 5-26 P:\BremertonlComp PlanlAmendment\7 PROJOOCIDRAFT AFTER JUNE 2005\TexllSectiOn 5._ Section 5 Wastewater Treatment Plant Evaluation Table 5-10 Solids Balance Results (2003) ", TSS in Ibs/day I, I Average Annual Dry Season Wet S"\ason , i Flow Stream Ave Day Max Month Ave Day Max Month Ave Day Max Month Influent 6,900 8,000 6,400 6,900 7,500 8,000 Primary Sludge 2,'900 3,400 2,700 2,900 3,100 3,400 Waste Sludge 4,900 5,700 4,700 5,000 5,100 5,700 TWAS 4,600 5,400 4,500 4,700 4,800 5,400 Digested Sludge 4,600 5,400 4,400 4,700 4,900 5,400 Dewatered 4,400 5,100 4,200 4,500 4,600 5,100 Sludge Future Solids Loading Projections Using the future flow projections developed in Section 3 and the same assumptions, solids balance for future flows were developed. Table 5-11 summarizes the solids balance results for future solids loading. Design criteria and capacities for unit processes for future solid handling are shown in Table 5-12. Table 5-11 Sludge Production Projections TSS in Ibs/day Flow Stream 2010 2014 2024 Annual Max. Annual Max. Annual Max Ave. Month Ave. Month Ave. Month Influent 8,100 9,800 8,700 1 , ,400 10,000 12,000 Primary Sludge 3,400 4,100 3,600 4,300 4,200 5,000 WAS 5,700 6,800 6,100 7,300 7,100 8,500 TWAS 5,400 6,500 5,800 7,000 6,800 8,100 Digested Sludge 5,400 6,500 5,800 7,000 6,700 8,000 Dewatered 5,200 6,200 5,500 6,600 6,400 7,600 Sludge CEllI 5-27 P:\Sremerton\Comp Plan\Arnendment\7 PROJDOC\DRAFT AFTER JUNE 2Q05\Text\Section 5.doc Section 5 Wastewater Treatment Plant Evaluation Table 5-12 Design Criteria, Capacity, and Projections - Solids Actual Unit Design Capacity 2003-04 2010 2014 2024 (Rerating (actual) Study) Anaerobic Digesters No. 1 No. of Units 2 2 2 2 2 2 Volume (each) Active digestion (ft3) 40,800 40,800 40,800 40,800 40,800 40,800 Sludge Storage (ft3) 11,800 10,200 10,200 10,200 10,200 10,200 Total (ft3) 51,000 51,000 51,000 51,000 51,000 51,000 Diameter (ft) 50 Maximum Sidewater Depth (ft) 26 % TSS in Digester Feed 5.8% 5.8% 5.8% 5.8% 5.8% %VSS in Digester Feed 77% 77% 77% 77% 77% Primary Sludge and TWAS Flow (Digester Feed) Annual Average (Ib/day) 7,800 8,800 9,400 11,000 Annual Average (gpd) 16,200 19,000 20,300 23,500 Maximum month (Ib/day) 9,100 10,500 11,200 13,000 Maximum Month (gpd) 18,900 22,200 23,600 27,300 Hydraulic Retention Time (both digesters in service) Annual Average (days) 22.5 38 32 30 26 Maximum Monthly Average (days) 12.7 15.0 32 28 26 22 Detention Time (relative flow) Volatile Solids Loading Percent Volatile Solids Primary Sludge 70% 76% 76% 76% 76% WAS 80% 79% 79% 79% 79% Annual Average (Ibs VSS/ft3/day) 0.11 0.07 0.09 0.09 0.11 Maximum Monthly Average (Ibs VSS1ft3/day) 0.21 0.14 0.09 0.10 0.11 0.12 Centrifuge % TS in Digested Solid 3.5 3.4% 3.4% 3.4% 3.4% Digested Solids Flow Annual Average (Ibs/day) 4,636 5,400 5,800 6,700 Max Month (Ibs/day) 6,500 6,500 7,000 8,000 Max Month - 7 hr/day Operation (gpm) 80 45 52 55 64 Dissolved Air Floatation Thickener The DAFT is used to thicken waste activated sludge. The DAFT systems consist of the rectangular tank float collection mechanism inside the tank, and thickened WAS pumps. The air dissolution system was removed and replaced with an aspirating recycle pump, which has simplified and reduced the cost of operation. Table 5-13 lists the dimensions and sizes of equipment. COM 5-28 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Seclion 5.doc CEllI Section 5 Wastewater Treatment Plant Evaluation Unit Table 5-13 Design Criteria, Capacity, and Projections - DAFT Actual D' Capacity 2003-04 2010 eSlgn (Rerating (actual) Study) 2024 2014 Dissolved Air Floatation Thickener No. of Units 1 Size (ft2) 500 Sidewater Depth (ft) 13 WAS - Max Month, (gpm) 56 67 72 64 (Ib/day) 5,700 6,800 7,300 8,500 Solids Loading Rate (lbsIft2/hr) 2.0 2.0 0.46 0.57 0.61 0.71 Hydraulic Loading Rate (including recycle- gpm/ft2) 2.6 0.22 0.26 0.29 0.37 The tank provides about 10,000 lb/ day of solids loading based on 24-hour-per-day operation. The projected 2024 maximum month loading of 7,100 lb/ day is significantly less than the capacity of the unit. The existing DAFT is sufficiently sized for the solids future WAS loadings, but lacks a backup unit for reliable operation. Gravity Thickener The gravity thickener has a diameter of 30 feet and a sidewater depth of 10 feet. The gravity thickener is not used at this time by plant operations due to its high operating costs. Rather, primary sludge is thickened in the primary sedimentation tanks. The plant maintains 6 to 7 percent total solids (TS) sludge in the primary sedimentation tanks. Digestion A schematic of the WWTP solids handling and treatment facilities is shown in Figure 2-4. The plant has two identical cylindrical digesters constructed in the early 1980' s. The digesters are 50-feet in diameter and 26-feet deep, with an active digestion volume of 41,100 ft3 each and are mesophilic anaerobic digesters. Based on the solids projections in Table 5-11, these two digesters have adequate capacity to produce Class B digested biosolids over the life of the planning period. Digestion only reaches higher than acceptable loadings if one digester is out of service for maintenance, or one digester is being used as part of a Class A processing system. The improvement alternatives for this plant can be found in 5.4.3 Improvement Alternatives. IleatTreatmentSyst~ The heat treatment system can treat approximately 30 percent of the sludge production. In order to treat the entire solids flow from the digester, the system would need to be enlarged by approximately four times. Currently, the limiting process within the system is the detention tank. The detention tank is sized for approximately 10 gpm, or approximately one fifth of the estimated sludge flow in P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-29 CEllI Section 5 Wastewater Treatment Plant Evaluation 2010 if the system is run 7 hours per day. This system is currently in mothball condition. 5.4.3 Improvement Alternatives In general, wastewater agencies are searching for additional value from their sludge processing systems as well as planning to develop a Class A product. Many wastewater agencies are striving to reduce costs for sludge processing at the same time their options are diminishing for beneficial use or disposal of Class B biosolids, and they are being pressured to improve biosolids quality to satisfy users and the public. Some agencies are implementing productivity initiatives with objectives to competitive performance. High performance anaerobic digestion is part of the solution for many wastewater agencies. In the following paragraphs, the objectives of high performance anaerobic digestion are discussed, followed by some processes used to enhance digestion. After discussing these processes, a summary of the advantages and disadvantages will be provided. Improvement Alternatives The objectives of high performance digestion include: III Improved Biosolids Quality III Energy Conservation III Increased Digester Capacity III Enhanced Operating Characteristic III Reduced Solids Mass The City may want to achieve several of these objectives simultaneously. The following paragraphs will discuss how high performance anaerobic digestion can meet multiple objectives. Improved Biosolids Quality One of the driving forces for the development of high performance digestion technologies is the increasingly stringent regulatory requirement for biosolids handling. (Biosolids types and regulations are discussed in the section 5.4.1 Planning Criteria and Regulations.) With increased regulation, rising disposal costs, and a greater emphasis on public perception, the production of high quality biosolids is becoming more important. High quality biosolids have an improved public perception and a tremendous opportunity for beneficial use through land applications. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-30 I I i CEllI Section 5 Wastewater Treatment Plant Evaluation As mentioned earlier, to be recognized as producing Class A type biosolids with anaerobic digestion alone the process must satisfy the time-temperature criteria specified in Part 503, or obtain a process to further remove pathogens (PFRP) equivalency recommendation from EP A's Pathogen Equivalency Committee. Class A type biosolids can be produced by coupling mesophilic digestion with pasteurization or heat drying (currently the City is treating its biosolids with an anaerobic digestion coupled with digestion). Thermophilic digestion can produce Class A type biosolids by meeting the time-temperature criteria and obtaining a PFRP equivalency certification from the pathogen equivalency committee. Energy Conservation There are several ways that high performance digestion results in energy conservation. If Class A biosolids are produced, energy can potentially be conserved by reduced trucking requirements because distribution can occur at closer locations. Greater volatile solids reduction can conserve energy by reducing the amount of solids to be dewatered and transported. Improved dewatering characteristics from some high performance digestion processes can conserve energy by reducing the energy required for hauling because of the higher solids concentration and reduced water content of the biosolids product. An increase in volatile solids in volatile solids conversion or a slight percent increase in the solids concentration of dewatered biosolids can have significant impact on biosolids destruction in the digester and concurrent reduction in solids cost and reduced environmental impacts associated with production and transport of the polymer. Increased Digester Capacity High performance digestion to enable higher loading rates may be of interest either to avoid expansion of the existing facilities or decrease the size and cost of new facilities. Achieving stable digestion with higher loading rates results in increased digester capacity. Several wastewater agencies have considered implementing high performance digestion processes to increase digester capacity. When faced with limited space or the cost of new digester, enhancing digestion performance can be a viable alternative. Enhanced Operating Characteristics Some solids processing facilities at wastewater treatment plants have problematic operating characteristics. Some have difficult to digest sludges, odor control problems, foaming problems, instability episodes, poor dewatering characteristics, low volatile solids conversion rates, and low quality or quantity digester gas production. Sometimes the solution is fundamental improvements to conventional mesophilic digestion. Other times a high performance digestion process may be beneficial. High Performance Processes There are several opportunities for enhancing the anaerobic digestion process. Uniform feeding, better mixing, and more adequate and uniform heating are just 5-31 P:\Bremerton\Comp Plan\Amendment\7 PROJOOC\DRAFT AFTER JUNE 2005\Text\Seclion 5.doc CEllI Section 5 Wastewater Treatment Plant Evaluation some of the processes that can enhance the operating characteristics of conventional mesophilic digestion. Another process could create ideal environments for the key phases of digestion: e.g., acid-forming phase and gas-forming phase. There is an opportunity to increase the reaction rates while reducing pathogen concentrations by increasing temperatures that support mesophilic bacteria to temperatures that support thermophilic bacteria. Or a process could extend the solids retention to benefit from more solids reaction time. The processes mention above could also be combined. The following high performance processes are discussed below: · Optimizing the components of conventional mesophilic digestion . Operating at thermophilic temperatures · Separating the reactions of digestion into acid and gas phase · Increase the solid retention time greater than the hydraulic retention time Other processes that can be coupled with digestion that may be considered include: . Thermal, mechanical, or chemical hydrolysis . Chemical treatment . Enzyme or catalyst enhancement . Pasteurization Optimize Conventional In many cases the performance of conventional mesophilic digestion can be improved. Too often the performance of advanced digestion processes is compared to poorly performing mesophilic digestions. High performance mesophilic digestion can compete with some advanced digestion processes for improved operating characteristics including volatile solids reduction and digester gas production. For any anaerobic digestion process to be successful, major attention needs to be paid to pre-treatment. Specifically, efforts need to be addressed with respect to debris removal (fine screens and sludge screening), grit removal, and thickening. Additionally, intermediate grinding, energy conservation, heat recovery and mixing are critical areas that must be addressed. Typical operating temperatures of mesophilic digestion at wastewater treatment plants are 95 to 980 F. Most modern anaerobic digestion systems are single-stage high-rate digesters. Some features of a well-designed and well-operated mesophilic digester process are: P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-32 CEllI Section 5 Wastewater Treatment Plant Evaluation .. Uniform (or semi-continuous! continuous) feed of screened and de-gritted raw sludge .. Automatic removal (positive control) of floatables, scum, and foam .. Complete mixing .. Adequate heating .. Improved pre-thickening of feed Enhancing the features mentioned above can optimize a conventional mesophilic digester. Improvements to a conventional digester would be beneficial to a high performance digester as well. It makes sense to optimize the fundamental operating features of a conventional digestion before or in conjunction with advancing to high performance digestion. A disadvantage of mesophilic digestion is that it does not reduce pathogen concentrations enough to produce Class A type biosolids. In order to produce Class A type biosolids, mesophilic digestion would need to be coupled with another process, such as pasteurization (like the current system), heat drying, or chemical treatment. Such configurations would include mesophilic digestion followed by pasteurization followed by mesophilic digestion, mesophilic digestion followed by dewatering in a screw press with lime or steam addition. The City has piloted thermal and chemical conditioning applying lime using a screw press with good results. The demonstration unit produced 35 to 45 percent Class A cake from the existing digested sludge. The process involves raising Class B sludge cake to a pH of 12 for several hours followed by pressing the biosolids in a heated screw press. The screw press uses steam at 50 psig. Thermophilic Digestion Thermophilic anaerobic digestion is similar to mesophilic digestion except the process occurs at thermophilic temperatures, about 122 to 1400 F. Thermophilic digestion is based on the principle that higher temperatures reduce pathogens and thermophilic bacteria and result in more rapid reaction rates than mesophilic bacteria. There are several variations of high temperature digestion: thermophilic digesters in series, thermophilic followed by mesophilic, mesophilic followed by thermophilic followed by mesophilic. The most common is thermophilic followed by mesophilic. Thermophilic followed by mesophilic is often referred to as temperature phased anaerobic digestion (TP AD). Following thermophilic digestion with mesophilic digestion allows for this process to take advantage of thermophilic digestion without the disadvantage of greater odors from high volatile fatty acids (VF As) in the digested sludge. Advantages of thermophilic digestion are: P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-33 COlI Section 5 Wastewater Treatment Plant Evaluation . Increased volatile solids reduction for greater bioenergy conversion . Faster reaction rates for shorter retention times and greater capacity for a given volume . Increased pathogen destruction for improved biosolids quality . Improved dewaterability of the digested sludge The most frequent cited disadvantages of single-stage thermophilic digestion are: . More intense odor from the sludge resulting form a higher VF A content . Higher energy requirements for heating sludge to a higher temperature and maintaining the digesters at a higher temperatures . Greater thermal stress on concrete digesters due to higher temperatures . Increased moisture in the digester gas resulting in a substantial increase in condensate . Greater ammonia levels in the dewatering filtrate/ centrate (The increased ammonia level is a function of the amount of volatile solids destruction and the concentration feed) . Mechanical problems such as plugging of heat exchangers from caking due to higher operating temperatures Class A type biosolids can be produced from thermophilic digestion when time- temperature criteria specified in Part 503 is satisfied. The operational challenge is protection against short-circuiting and ensuring that every particle is exposed to conditions to reduce pathogens to acceptable levels. One method is to operate the thermophilic digester in a batch mode instead of a continuous or semi-continuous mode. Another approach is to operate several thermophilic digesters in series. Separate Acid/Gas Phases The acid gas process (AG process) consists of an acid-forming digester followed by a gas-forming digester. The theory behind the AG process is that creating separate ideal environments for the acid forming and gas forming bacteria can enhance digestion performance. The U acid digester" is highly loaded and has a short detention time of 1 to 2 days. A U gas digester" that is more lightly loaded and follows the acid digester, has a longer detention time of about 10 days. Biological hydrolysis occurs in the acid digester, but minimal amounts of methane gas are produced. The gas production from the acid digester is typically less than 6 percent of the total AG process. The gas composition from the acid digester has a lower quality gas than that from the gas digester and usually contains less than 40 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 200S\Text\Section 5.doc 5-34 CEllI Section 5 Wastewater Treatment Plant Evaluation percent methane. The relatively short detention time of the acid digester can be maintained by allowing the varying volumes in the digester corresponding to variations in the raw sludge flow. To create the desired environmental conditions in the gas digester, the conditions of a conventional digester must be met. The gas digesters are based on flow-through, constant volume reactors. Therefore, the detention time varies with the flow rate of raw sludge. There are several versions of the AG process where different operating temperatures are used for the acid and gas phases, these include mesophilic acid digester followed by mesophilic gas digester (AGMM), mesophilic acid digester followed by a thermophilic gas digester (AGMT), thermophilic acid digester followed by a mesophilic gas digester (AGTM). One of the reactors needs to be thermophilic in order to achieve Class A level pathogen reduction. Advantages of the AG process are: III Greater volatile solids destruction in a smaller volume than a conventional mesophilic digestion process III Achieving greater volatile solids destruction would result in a reduction of solids and consequently a reduction in solids processing and handling after digestion III Foam control III Increased gas production, stability III Class A potential with AGMT or AGTM configuration Disadvantages of the AG process are: II Increased complexity from multiple phases II Requires maintaining a short-detention time acid phase reactor II Requires separate handling of acid phase off-gases that have low concentrations of methane and potentially high concentrations of hydrogen sulfide III Significantly higher odor potential during maintenance of the acid phase digester Extend Solids Retention The extended solids retention (ESR) process involves separating the hydraulic and solids retention times in anaerobic digester by using sludge recycle thickening. The ESR process separates the solids from the digested sludge by using thickening equipment. The thickened digested sludge is then blended with the incoming raw sludge, and reintroduced back into the digester. This process allows for a longer P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sectlon 5.doc 5-35 Section 5 Wastewater Treatment Plant Evaluation solids residence time when compared to the hydraulic residence time since the solids are separated form the liquid and returned. The benefit of this process is to return active bacteria back to the digester so that they further decompose the organics and increase methane formation. An additional benefit may be the elutriation of inhibitory metabolic byproducts during the thickening process, thus resulting in more complete digestion. Thickening can be accomplished with various thickening techniques. These include gravity thickening, gravity belt thickening, and dissolved air floatation thickeners. There are several advantages for the use of ESR, including the following: .. Anaerobic digester volume can be decreased .. ESR allows for further organic conversion to methane gas II Potential for enhanced operating characteristics II Traditional thickening equipment already on site can be used, thus eliminating the cost for purchasing specialized treatment system .. Overall reduction in polymer usage could be achieved II The increased solids concentration can serve as a buffer to shock loadings II Reduced digester volume requirements may result in lower life cycle cost .. Separating the SRT from the HRT provides greater flexibility in solids removal from the ESR digestion process .. Increased solids concentration in the dewatering feed may result in improved dewatering Disadvantages of ESR are: II An additional thickening process is required .. Added complexity II Class A type biosolids are not produced unless this system is coupled with pasteurization, heat drying, or chemical treatment Most Viab Ie Alternatives for Class A for Bremerton There are three alternatives that should be considered for Bremerton at this time. II Expansion of the existing system - This alternative will require a new digester/holding tanks and a new processing building. CEllI 5-36 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 20Q5\Text\Sed.iQn 5.doc CEllI Section 5 Wastewater Treatment Plant Evaluation · TP AD - This alternative also requires a new digester and sludge control building with improvements to the boiler and odor control systems. · Screw Press - A screw press with lime addition could be installed downstream of the existing two mesophylic digesters. The plant staff believes a single unit could be installed on the roof of the digester control building and discharge directly into a truck. Both structural and odor control concerns need to be addressed before it could be determined if this approach is viable. Lime addition to sludge at sites where odors are a major concern (such as Westside) have been problematic on other projects. The high pH caused release of significant amounts of ammonia from the sludge. For the cost comparison in Section 6, it is assumed a new press building would be needed that would include new loading facilites with total containment of odors. The odor scrubber currently dedicated to the biotower could be incorporated into a new screw press building design. Class B dewatered or liquid land application would remain as a backup for all these alternatives. 5.S Odor Control When projects involve the collection and treatment of wastewater, odor emissions are encountered. In 1992, the City of Bremerton entered into a consent order with the Puget Sound Air Pollution Control Authority (now the Puget Sound Clean Air Agency) to abate odors at the WWTP by December 31, 1995. The City made odor control upgrades as required by the consent order. Bremerton has addressed the multiple sources of odor that are typical of a wastewater treatment plant. In 1996, amendments were made to the collections system to reduce the concentration of hydrogen sulfide in the plant influent. Additional improvements have been made to the wastewater treatment plant to control odor. The biofilter was covered in 1995 and taken offline in 1996. In 1996, Bremerton added two main packed tower chemical odor scrubbers to process odorous air generated in the Headworks, Primary Treatment, and Solids Handling areas, and one packed tower chemical odor scrubber for the biofilter. Sodium hypochlorite and sodium hydroxide are the chemical scrubbing agents. Air is collected from the following areas of the plant and processed in the two main scrubbers: · Screening (Headworks) · Gravity Thickener · Grit removal (Headworks) · Overflow chamber for gravity thickener (when in service) · Primary Clarifiers · Old Headworks · DAFT system . Primary Effluent Pump station wet well overflow chambers · Centrifuge area P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Seclion 5.doc 5-37 CEllI Odor containment enclosures, buildings, covers for major plant facilities, and other plant improvements have also been implemented. These include grit removal system capacity improvements, including rock traps, bar screens, an aerated grit channel, and additional grit storage. Hydrogen sulfide is monitored once daily from the scrubber stacks with an Arizona hydrogen sulfide monitor. The only public complaints about odor have occurred when a portion of the odor control system is taken offline for repair. There have been no major difficulties with odor since 1996 when the improvements were put in place. 5.5.1 Planning Criteria and Regulations Air quality and odor control for wastewater treatment plants in Kitsap County is governed by both qualitative and quantitative regulations. Section 9.11 of Puget Sound Clean Air Agency Regulation 1 ("Emission of Air Contaminant: Detriment to Person or Property") is a qualitative regulation of odor, and states the following (Puget Sound Clean Air Agency, 2001): (a) It shall be unlawful for any person to cause or allow the emission of any air contaminant in sufficient quantities and of such characteristics and duration as is, or is likely to be, injurious to human health, plant or animal life, or property, or which unreasonable interferes with enjoyment of life and property . (b) With respect to odor, the Agency may take enforcement action under this section if the Control Officer or a duly authorized representative has documented all of the following: (1) The detection by the Control officer or a duly authorized representative of an odor at a level 2 or greater, according to the following odor scale: level 0 - no odor detected; level 1 - odor barely detected; level 2 - odor is distinct and definite, any unpleasant characteristics recognizable; level 3 - odor is objectionable enough or strong enough to cause attempts at avoidance; and level 4 - odor is so strong that a person does not want to remain present; P:\Bremerton\Comp PlanlAmendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 5.doc 5-38 mil Section 5 Wastewater Treatment Plant Evaluation (2) An affidavit from a person making a complaint that demonstrates that they have experienced air contaminant emissions in sufficient quantities and of such characteristics and duration so as to unreasonably interfere with their enjoyment of life and property; and (3) The source of the odor. (c) Nothing in this Regulation shall be construed to impair any cause of action or legal remedy of any person, or the public for injury or damages arising from the emission of any air contaminant in such place, manner or concentration and to constitute air pollution or a common law nuisance. Puget Sound Clean Air Agency Regulation III, Appendix A, provides a quantitative, Acceptable Source Impact Level (ASIL) for a list of compounds, including hydrogen sulfide. The ASIL is equal to the worker 8-hour Permissible Exposure Limit (PEL) divided by 300. An instantaneous measurement of hydrogen sulfide at any property boundary must not exceed 0.9 Ogjm3, or 0.001 ppm. (Puget Sound Clean Air Agency, 2000.) There are also limits called" odor thresholds," which vary between publications and are not regulated, due to varying odor sensitivity among individuals. 5.5.2 Capacity Requirements and Limitations One of the three scrubbers is used continuously, and a second is used only during the summer months. The combined rate of odorous air removal from the above facilities is 16,200 scfm, which is maintained using a main 100 HP fan and a combination of booster fans. The scrubbers receive an average of 60 lbjhour (minimum 17.5lbjhour, maximum 102lbjhour) sodium hypochlorite and an average of 161bjhour (minimum 3lbjhour, maximum 30 Ibjhour) sodium hydroxide. The third scrubber is used when the biofilter is in operation. The biofilter scrubber has a 50-HP fan that moves odorous air at the rate of 9,000 sefm. The biofilter scrubber consumes an average of 1.0 lbjhour sodium hypochlorite, and an average of O.5lbjhour sodium hydroxide. 5.5.3 Improvement Alternatives Currently, the anaerobic digesters have floating covers, which allow the escape of odors when they foam. However, the plant has had no odor complaints in several years, and the odors from the digester covers impact the plant site only. 5.5.4 Recommendations No new odor control is recommended for the existing facilites. New sludge processing to produce Class A biosolids on the whole plant sludge production will need a comprehensive odor management plan specific to the alternative implemented. The existing biotower scrubber system could be incorporated into new odor control for sludge processing. 5-39 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2.005\Texl\Sec\i.on 5.ooc 1 ! j r-l I d C. '-.. I 0 f..'.-;.. ! , ~ - .., ~ " S'X CEllI Section 6 Capital Improvement Program This Section describes the Capital Improvements Program (CIP) for the Wastewater Utility, including cost estimate development for the CIP, recommended improvements, and funding sources. 6.1 Recommended System Improvements Primary recommended system improvements discussed in Section 5 involve those at the WWTP and the Eastside Treatment Facility. Major conveyance improvements are discussed in the 2000 CSO Plan Update. WWTP recommendations center on improvements to plant reliability and capacity, wet weather capabilities, and biosolids handling. Eastside Treatment Facility recommendations involve improvements to the existing outfall. 6.1.1 WWTP Wet Weather and Reliability Improvements As demonstrated in Section 5, immediate wastewater system needs center on biosolids processing at the WWTP. 6.1.2 WWTP Immediate Needs As Bremerton implements its CSO reduction programs, more wastewater load as well as flow is reaching the WWTP. Peak month BOD and TSS loadings can be as high as 40 percent more than average. By 2010, the WWTP will have 28 days of digester detention time with both digesters in service and less than 15 days with one unit out of service for maintenance or repair. The WWTP also has a single waste-activated sludge thickener (DAF) and a single dewatering centrifuge. Digester capacity will be exceeded with the DAF out of service. Using liquid digested sludge for land applications is the only backup to the single centrifuge and this method of applying biosolids to the City's forest is no longer viable. The plant needs to bring its solids handling up to prudent reliability standards during the sustained peak month periods attributable to wet weather flows The existing standby generator is 20 years old and not adequate to power the whole plant. This unit will be replaced with a new generator set as part of immediate improvements to the WWTP. The Eastside facility has standby generator capacity for the entire plant. Thickener Capacity The installation of a second backup DAF is very expensive and almost impossible to construct due to the close proximity of the secondary clarifier and the east plant boundary. Instead, a new gravity belt thickener (GBT) can be installed in an expanded centrifuge area or on top of the DAF. These locations put the thickener P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\SeClion 6.doc 6-1 CEllI close to polymer handling and other solids processing operations. The design criteria for the new GBT are found in Table 6-1. Table 6-1 Backup Thickener Needs 2010 2014 24 hours/day I 7 hours/day 24 hours/day 7 hours/day 6,800 6,800 7,300 7,300 0.9 0.9 0.9 0.9 63 217 68 233 283 971 304 1,043 1.50 1.50 1.50 1.50 42 145 45 156 0.9 0.9 0.9 0.9 45 I 45 45 45 90 90 90 90 108 262 113 278 Operation>> Waste Activated Sludge ppd %TSS gpm pounds per hour New GBT Width, meters Loading, gpm/meter Capture, % Belt Cleaning Flow, gpm Pressure, psig Total Filtrate, gpm The new gravity belt thickener will be installed in an expanded centrifuge area, as shown in Figure 6-1, or in a building on top of the existing DAF if the structure can support the load. Dewatering Capacity The existing, aging centrifuge dewatering unit will be converted to a backup unit and a new unit will be installed in an expanded centrifuge area. The loading bay will also be expanded or moved to accommodate a second dump truck or a larger commercial sludge hauling trailer. Design criteria for the new centrifuge are provided in Table 6- 2. The proposed location for the new centrifuge is shown on Figure 6-1. This building addition will be large enough to handle a drum thickener/screw press type approach should the City decide to move toward a Class A biosolids product. The old centrifuge would be replaced with a screw press under that scenario. The discussion in Section 6.1.3 contains more background information on various long- term biosolids process alternatives. Table 6-2 Dewatering Needs 2010 2014 Operation>> 24 hours/day 7 Hours/day 24 hours/day 7 Hours/day DiQested Sludge ppd 6,500 6,500 7,000 7,000 %TSS 3.4 3.4 3.4 3.4 gpm 16 55 17 59 pounds per hour 271 929 292 1,000 Cake %TSS 25% 25% 25% 25% Wet Tons/day 11.7 11.7 12.6 12.6 Capture, % 90% 90% 90% 90% P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 6.doc 6-2 _..:;:~:.:.:::~).. m.. ... .,.;, ..~~, ---' _ 0 ;00 ~ '~ "" ~ '." ',- ~~ 0 ~O "t o 00 II ~ ~ I f i I l / l I i i I i \ I , ! I ldaltth~J C \! N''''" " Q),c;i Hi/lie/gO 9v'SV'; i ,.q -Ii, I \~diitd\~jf}6 i t~\, t:.rC:6 '\ , ,J . ; ~ c: o I <'0 o (f) Z- ID ,-- ;t:: ID- L U :J 0 Q"lLL r..;: TI ID (f) o Q. () l- n... z o I- ~ W ~ LJJ c:r en I..L o (: o fi CEllI Generator Upgrades The other immediate Westside WWTP need is a new standby generator. The existing unit is outdated, unreliable, and cannot power the entire plant during a power outage. Partially treated discharges will occur during a power outage at wet weather flows. A new 1,250 kW unit will handle the existing plant with enough capacity for future plant needs. A skid-mounted, outdoor package unit with integral fuel tank is estimated to cost $250,000. The total project cost for an installed generator with pad and electrical connections is $750,000. The site for the new standby generator is shown on Figure 6-1. This location, near the electrical maintenance shop, minimizes new conduit runs and does not conflict with biosolids handling upgrades. Sinclair Inlet Outfall Capacity The 2003 Facilities Plan analyzed several alternatives for expanding the Sinclair Inlet Outfall capacity and recommended a new, low head pump station as the cheapest and least disruptive alternative. A new 42-inch-diameter pipe between the chlorine contact tank and the outfall South of SR3 was a close second in the ranking. The recommendation of this plan is to coordinate a new, larger pipe with the upgrade and remodeling of the SR3jSR304 interchange. The approximate layout of the new outfall is shown on Figure 6-2. Eastside Outfall Improvement The existing outfall was constructed for the Manette Primary Treatment Plant. A new 36-inch diffuser section was added in 1972. The diffuser section of the outfall is a 36- inch-diameter concrete cylinder pipe with 215.75-inch-diameter ports. The ports are located on alternating sides of the pipe at 4-foot spacing. The diffuser is located at a depth of -24 feet MLLW datum. The capacity of the Eastside outfall is limited to approximately 15 mgd by the first 250 feet of 20-inch reinforced concrete pipe. Replacement of this section from the treatment plant, through the bank, and to just below the low tide line on the beach will increase the outfall capacity to 30 mgd. The permit for the outfall easement expires in 2010. As part of the renewal process with DNR, the permits for replacing the 20-inch section with new pipe should be pursued. Schedule for Immediate Improvements Implementation of immediate needs will take place over the next 5 years, with the wet weather capacity upgrades to the WWTP starting in 2005 followed by improvements to both outfalls. The timing of the Sinclair and Eastside outfall projects will be coordinated with SR3 improvements and lease renewal activities, respectively. P:\Bremerton\Comp Plan\Amendmenl\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 6.doc 6-4 s\nc\a\r \n\et ~~ ~~ Not to SC<l\e Railroad "TracKs ~ \ \ \ \ , , \ , \ , , , \ , \ \ , \ , \ \ , , \ \ , , \ \ \ , \ \.,/ , , , , , , . "\50~o~42" concrete pipe , ' , ' , ' \ ' , ' , ' , ' \ ' , ' \ ' , ' , ' , ' , \ , ' , ' , ' , \ , ' , \ , . , State \-\ig\"wvaV ~ \ \ \ \ \ \ \ 24" pipe \ I \ M\-\-3 \ \ Q\\ \ ?It; NeW pressure \ Man\1o\es \ \ \ \ 555 ~ o~ 36" RCP pipe wit\1 "\ 28 ~ Oi~user section wit\1 20 Oisc\1arge Orinces, 6.5 in Oia. Increase OrifIce Number to 40 \ \ \ \ \ \ \ \ \ \ 359 tt o~ 24" concrete Pipe \. ""ests\de \f'JWfP p..pproy.imate 400~ of NeW 42" OuHa\\ pipe f\9ure 6..2 \Nestside WWTP Outfall Eltpal1s\OI1 42" C\1\orine contact Chamber CDIII 6.1.3 WWTP Longer-Term Needs Bremerton has no requirement at this time to achieve a Class A biosolids product. However, planning for improved biosolids quality will allow immediate thickening and dewatering improvements to fit into a longer range plan for Class A. There are two feasible alternatives. · Conversion to Temperature Phased Anaerobic Digestion (TPAD) or a heat treatment system - Each of these approaches requires a third digester as well as heating, thickening, and dewatering enhancements to the existing system. · Dewatering/Pasteurization - requires a thickener screw press with lime and steam addition. Because equipment needs and O&M costs for the heat treatment system would be very similar to TP AD, only TP AD is carried forward in the analysis. A description, operation and maintenance costs, and present worth comparison of the TP AD and dewatering/pasteurization alternatives are found in Tables 6-3, 6-4, and 6-5, respectively. Potential layouts for these two alternatives are shown in Figures 6-3 and 6-4. Table 6-3 Alternatives Description Immediate Needs(2004-06) Future Improvements (2010-11) TPAD o New Thermophylic Digester with control building . New Centrifuge or Belt Filter Press . New Gravity Belt Thickener · Boiler and Heat Exchanger Upgrades · Centrifuge or Belt Filter Press with Building Addition · Electrical and Instrumentation Improvements Dewaterina/Pasteu rization . Dewatering Building . Thickener/Screw Press . Holding Tank . Odor (Ammonia) Control . Electrical and Instrumentation · Thickener/Screw Press P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Seclion 6.doc 6-6 CEllI Table 6-4 O&M Requirements for a Class A System Mid- Planning Period Annual Flow, mgd 6.6 Average Sludge Production, Dry TonsAyr 1,060 Annual Cost, $ Alternative TPAD DewaterinQ/Pasteurization Power $120,000 $47,000 Chemicals Polymer 79,000 67,000 Lime -- 54,000 Labor O&M 28,000 45,000 Hauling/Reuse 84,000 37,000 Odor Control -- Equipment Replacement 192,000 59,000 Total $505,000 $420,000 Table 6-5 Present Worth Summary TPAD Dewatering/Pasteurization Capital Cost 2004-2006 2010-2011 $6,700,000 1,300,000 $3,200,000 1,400,000 Present Worth of Capital Present Worth of O&M Total Present Worth 7,500,000 5,900,000 $13,400,000 4,100,000 4,500,000 $9,600,000 The anaerobic digestion alternative (TP AD or heat treatment) with dewatering has a total present worth 40 percent more than the screw press alternative. Dewatering/ pasteurization has the lowest present worth cost for two reasons: · The initial cost is one half the cost of a digester based alternative · O&M costs are lower due to the dryer sludge and reduced handling requirements A screw press would be the best alternative if the City wanted to implement a Class A strategy now. Maintaining a Class B approach would allow the City to delay construction of a new digester. However, the present worth of this approach still favors the dewatering alternative using the screw press. If the digester was constructed in 2010 and Class A implemented at that time, the total present worth of TP AD and pasteurization/ dewatering is reduced to $8.5 million and $7.8 million, respectively. The screw press alternative is still slightly less expensive than a new digester later on. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Texl\Section 6.doc 6-7 ~'= "'" , ~ , . '''''''- ...Nbl:tCi Scale. ~, -......"........ ...,'<. ". ,""c ., -" .~.........,-'//.., . ...:~.".^P:~::.d.......--..~:..:...==..~..... ..-- ,4~'< .,....dO""'" _,~".__.<<,.,.......w..,^,.,,, .~.. LlE.A.,tlfO.~ i j. Un 'r<KS, G""".... , 'Kl ~ AND ~,,/;....~~~""'- W:\ProjeclS\2f9ilmFtgure 0.3 TPAl:t [ayoul.ai 02f2Bf05 JJT Figure 6-3 TPAD Layout CONI L[) o '- N '- t"- O '""" I CD 0> i.i:: /" c o CL 0. E o u /" CO CO m '""" /" '""" n N m --:: CL ..c: +' o "- a E ......tI!i:(to. Scale . N" -"""""''' """"",-'- ~_~_..__c 7~""-:""'.,....<"'''~ SECONDARY . DfUm Thipkener. Screw Press Steam3Boiler. PRIMARY CD L[) o _.<<~ CITY OF BREMERTON Figure 6-4 Dewatering/ Pasteurization Layout COM CEllI The recommended approach to meeting the wet weather, solids loading processing needs is to install a thickener and new centrifuge immediately. The alternative is the least capital intensive and will satisfy the immediate needs to meet the wet weather solids handling peak. The screw press option can be investigated as part of a project to meet Class A when that need arises. Addition of a new boiler and lime handling will also be needed to meet Class A requirements. A TP AD, heat treatment, or other digester-based approach requires construction of an expensive, third digester. 6.1.4 Ultimate Site Layout Wet Weather Treatment In response to a federal consent decree, and consistent with the City of Bremerton's adopted CSO Reduction Plan, combined sewer flows from existing City overflow sites will be rerouted to the new Eastside Treatment Facility or the WWTP. Additional overflows on the west side will be routed to the WWTP; these additional flows were to begin to arrive in January 2003. In response to this increase in load on the WWTP, the City began planning and design of a high rate clarification addition to the WWTP similar in capacity to the Eastside Treatment Facility. The scope of this effort is contained in the Westside Wastewater Treatment Plant Facility Plan (CDM, 90% submittal, June 2002). The project contained construction of a parallel primary treatment train to the existing plant for treatment of approximately 20 mgd of wet- weather flow. Elements of the proposed project included the following: iii Headworks: Additional flow metering, sampling, and screening capacity. II Solids Removal: High-Rate Clarification (HRC): An HRC system was to be installed to reduce TSS, BODs, some metals, and phosphorus. II Chemical Feed Systems: Coagulant and polymer feed systems for the HRC. II Chlorine Contact Chamber: A new chlorine contact chamber was proposed to be installed adjacent to the existing chambers for disinfection of wet-weather flows. II Infrastructure Upgrades (Odor Control, Sludge Handling, and Electrical): All of the new headworks and solids removal facilities were proposed to be covered and ducted to the existing odor control system, which have adequate capacity for the added facilities. Sludge from the new HRC was to be pumped to the existing sludge handling facilities and stabilized in the existing anaerobic digestion facilities. The effort was put on hold in 2003 in light of unknowns in the regulatory framework. High sludge loads but not the frequent high flows predicted in the CSO Plan have been experienced at the WWTP. This project could be considered in the future in response to the need to provide a high level of treabnent during extreme wet weather events. A placeholder is shown on Figure 6-5, the ultimate WWTP layout. The new HRC facilities would be located P:\Bremerton\Comp Plan\Amendment\7 PROJDOC'DRAFT AFTER JUNE 2005\Text\Section 6.doc 6-10 COM just east and south of the existing Primary Clarifiers No.2 and the new contact chamber would be located adjacent to the existing unit. Water Reuse The 1998 Water reuse study recommended a small, 1-mgd membrane bioreactor (MBR) plant be built that was fed from the 16-inch interceptor from the sewer basins that have low sea water contamination (Kitsap Lake, Sinclair Park, and Oyster Bay). A viable site for this facility is in the location of the existing biotower. The biotower has no use in the comprehensive plan at this time. This location is shown on Figure 6- 5. If salts are eliminated or reduced in the other portions of the City, more conventional filtration could be used in place of the more expensive MBR. Direct filtration of secondary effluent could be sited near the existing chlorine contact chamber and the new contact chamber could be used for disinfection of filtered effluent for reuse. A location for this approach is shown on Figure 6-5. 6.2 CIP Development The CIP was developed to address infrastructure needs to meet growth, environmental regulations, and improvements in existing operations and reliability. An 8-year Capital Improvement Plan and schedule have been developed outlining the Utility's project requirements from 2005 through 2011. The Capital Improvement Plan and schedule are summarized in Table 6-6. Costs are based on engineering estimates and actual costs from similar engineering and construction work. Costs include project construction bid estimates, a construction contingency factor of 20 percent, and an allowance for engineering, taxes, legal, and administrative fees of 45 percent. Estimated costs are in 2004 dollars and based on ENR's material and building cost indexes. 6.3 Financial Analysis As shown in Table 6-6, capital improvements in the short and medium term will be funded through utility and non-utility financing sources. Sources of utility funding available to the utility include annual rate funded capital, system development charges, and revenue bonds. In addition, new revenue bonds are planned for Bremerton. A number of state and federal grants and loans are available to the City, and comprise the non-utility funding shown in Table 6-7. These include Public Works Trust Fund and State Revolving Fund loans, and EP A grants. The total amount of funding to be obtained through the utility and non-utility funding sources through 2011 is $26,510,979. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Sectiofl6.doc 6-11 ::x:t= \:r ~ 80 ~ Advanced Pr\mGlry or .}-tR-G~ ~ea~eh1:~-- ----,/ --p- -- ~ .~ ~""'h:'-i~----'/-'-"-'" ,pJ'c"'~ ',-,' '" .- - --.- /up:grades .. . eRn ,:.lH) SECONOAf';Y G\gester No.3 lh\CKener and ;CiNrRiFt@:$water\ng Capac\ty FR\f,!"Wr . " JRf.A ' .' ",,",OCR NO ' i ReUse Fniers Rep\ace f3\'Q!\\ter w\th Membr~me . . .~ 6\0 Reactor' BL.fj~~tH e,.ii\J)\t4G ~_..r'."8'" ~~'-'h'_'O,._c,;_-~ __:0'; - .'. ....-\:'\:~'"::~~::,:.. ! i " I' "', New '''E'''''NC ",,,,. . cblbrlne contact GEl nerator ~~iia;),'i>u';;g 9"fanl<~r Wet Weather , ,,\'-' , ,c"<,='"V~,<=",,,w=ctl\S~o , /,~.,pc",,~~frF'~":~"--" ,-,'<< ,__".c"~--'" In ~g)~l} .1". Legend : \~ B'::.,:::m \ d' t ....1 dJ ::;;::1;;;i;:;:"vv: mme \a e l",eJ~. s ". --c,\ L J Future wetWeat~eT'1$atment C J ReUse Facilities l-, ,,,-' -- [' ::J WAD ClasS A Bi()solids processing ~.. ...,--~-- .,..... ...... _ _c__""~---- ',r<' ~,____=-1 -_. ~ Figure 6-5 U\t\mate WW1P Layout Table 6-1 Bremerton Utility District Recommended Capital Facility Plan Projecl Cost Schodule 2011 financing Loant.ir Total Rates ani 25,000 -I 200,000 -I 3,205,000 -I ....!.:!.. 250,000 -I 0 -I -I 100,000 -I 3,780,000 -- Projecl ~ Projoct Type projoct TIlle/Descrfptlon Projoct Cost New Roof on Control WB Treolmen! BuIlding 25,000 WWTP UpgradeJrronlage WB Treafment Improvements WB Treolmenl WWTP Upgrade WB Treatment OulfaU EB Trealment outtan WB Trealmenl Digester WB Trealment Water Reuse Subtotal- WWTP WWTP & Pump stallon Improvements -Including Fuel Tonk Replacements, TreatmenV Aulvmslle Switch Geor. CoIleeIion and Emergency Power ~ System Supply CoIIectlon CW System Sewer Main Replacament Washlnglon street Beach CoUectlon MoIn Abandonment ~ System (Design In 2005) Collection Pump station CE-1 WB System Control Sy5tem Upgrade Collection Kl-1, 2 Pump stallon WB System Upgrade, - CoHection Anderson Cove Basin WB System COO Project(CW-1) - CQllection PaCific Avenue COO WB System Project (OF-16) WW CoRectJon and Trans CoOecllon System Improvemenls- ~ System Oyster Bay Collection CW System Mise Equip - Dept 33 Collection Improvement on Schley ~ System from Shelldan 10 Callahon Improvement on Homer CoOection Jones from YMCA to ~ System PailIlng Lot 10 Soulh Collection Improvements between ~ System Schley and Ar street Improvements on Reed CoOection between Lebo and EB System stephenson Improvements on ,4..inch Collectlon wne between Bruenn and WB System Lilac lone, Collection Improvementsal51111th ~ System street Improvements In Utlnly Easement between Collection I3roadmoor VlOage end ~ System Hanford Avenue Improvements behind Collection Lowe's Hardware from EB System AlmIra to Wheaton Way Replace S8 on Sheldon Conectlon from Pacific 10 Evergreen ~ System Park Improvements on McClain, Collection running west on SheIIdan EB System to 8m to Hefner 10 Lebo Improvements on Cheny Collection st. to Lower Wheaton fB .System Way 500,000 l,500,OOC. [. 2,030,OOC' -I 2 80,000 O. 0 80,000 . -I .~ 175,000 -I o 0 0 1,000,000 -I 5 o 0 O' 3,800,000 4 2006 2007 2008 2010 550,000 2,375,000 -I 2009 350,000 l,625,OOC . o o 25,000 1,075,000 -I 15,00[' 90,000 -1.._ (I 0'-1.._. 200,000 200,000 3,200,000 450,000 2,755,000 0 250,000 0 0 0 250.000 500,000 0 2,000,000 0 0 0 100,000 D- ol 100,000 0 6,275,OOD. 450,001 ! 2,755,00[' 225,DOC. 100,000 01 250,000 II 30,00['-1.. _ 50,000.-1.. _ -1.._ 0.-1.._ -1.._ 0'-1.._ o -I -- 150,000 -1.. -2- -1.._ o -I Annua I Annua,1 225,OOL I 225,0001 500,000 350.0001 450,00C' 450,000 2OO,OOC' 200.0001 350,000' 350,000 13,500,0001 30,000' I [. C' 80,OOC. LI 175,000 (I (' 175,OOC 1,000,000 1,000,000 0 ( 3,800,000 1,800,000 2,200,000 1,100,OOll Annuall 250.000 . 15,0001 L' 15,0001 (I 15,0001 75,00( I 750,000 15,001.1 15,000 75,0011 ... l' II 30,OOll 50,0001 LI 1.1 30,OOll 0, I Co 01 50.000 50,OOC . ~~. o o 30,000 10,0001 o 10,000 o o 01 o 50,000 150,000 o 150.000. o. o 300,000 o o 30,000 o o Table 6-1 Bremerton Utility District Recommended Capital Facility Plan Project Cost Schedule financing Project Loan(,:jr Area Project Type Project TUleJDescl1pllon Project Cost 2006 2007 2008 2009 2010 2011 Total Rates ant - -- Kitsap Lake Main CoIJeclion Replecement (Design in WB System 2006) 2,200,000 ~ Beach Main Replacement Collection from ESTP to 16" Siphon EB System (includes design) 100,000 125,000 1,000,000 1,125,000 2 Collection Reline the surge chamber WB System Ell GregOl'J & High 35,000 ~ - Collection Reline surge chamber at WB System 13\h and Naval 35,000 ~ -- Crosstown Pipeline Collection ventilation and odor WB System control (Design In 2006) 1.100,000 65,000 800,000 865,000 ~ Cambrian Ave Sewer Collection Rehebililatlon (Design in WB System 2010) 275,000 ~ - Conection Access for BeachmBln CW System maintenance 150,000 0 ~ Oyster Bay RemodeV CW expansion 771,000 396,250 375,000 771,250 ~ - Collection Beachmaln & Cntlcal FM -- CW System Cleaning 475,000 75,000 200,000 200,000 475,000 ....L _ CoDeclion CoRectlon System CW System Evaluation & Inspection Annual 150,000 150,000 150,000 450,000 ~ - Collection Sanitary lateral I & I -- CW System Reduction Annual 160,000 180,000 200.000 540,000 ~ -- Collection Tracyton BlVd Air-Release WB System & Cleaning Access 100,000 0 ~ - Collection -- CW System Utility Bliling System 40,000 40,000 40,000 ~ Subtotal ~ CollecUon System 25,581,000 3,Oll5,OOO 2,815,000 1,616,25(' 3.220,OOE I 3,945,000 2,265,000 16,946,250 Tolal - WWTPI COLLECTION 31,856,000 3,535,000 5,570,000 1,941,250 3,320,000 3,945,000 2,515,000 GRAND TOTAL 20,726,250 we = West Bremerton EB ~ East Brem.rlon CW " City-wide Footnotes: 1 - Funding is by EPA STAG Grant and Rates. STAG Grant amount is $1,746,000 and requires a 45% match. 2 - Funding source is currently undefined. 3 - Funding is an SRF Step 3 loan, $1075,000. 4 - Funding is from multiple sources; a $1,940,000 STAG Grant, a $250k and $1,000,000 SRF Loan, and a $4,960,000 PWTF Loan. 5 - Funding Is from a $300,000 SRF (Design), and $475,000 PWTF (Construction, in-hand) and $525,000 PWTF (Pending.) 6 - Balance of design costs are from a new design loan, and balance of construction costs are from new construction loan. 7 - Funding is from new design and construction loan to be applied for in 2006 Project Cost Schedule Financing Project Project Non- Area Project Type Title/Description 2005 2006 2007 2008 2009 2010 2011 Total Utility Utility - New Roof on Control I WB Treatment Building 15,000 0 0 0 0 0 0 15,000 -.[ - Table 6-6 Bremerton Utility District Recommended Capital Facility Plan WWTP Solids Management (Centrifuge in 2006 and WB Treatment Gravity Belt in 2008) Headworks Mechanical WB Treatment Bar Screen WWTP Upgrade/frontage WB Treatment Improvements Class A Water Fiiler (included in Water WB Treatment Reuse) o 300,000 o 150,000 o o o 450,000 -.[ 100,000 o o o o o o 100,000....i..- _ o o 150,000 o o o o 150,000 ....i..-_ - ,WWTP Capacity WB ,Treatment Upgrades 200,000 - WB Treatment Generator 750,000 - I WB Treatment Outfall 0 - EB Treatment Outfall 0 - Biosolids Storage Pad WB Treatment (roof upgrade) 80,000 - WB Treatment Digester 0 - WB Treatment Water Reuse 0 Subtotal - WWTP 1,145,000 I WWTP & Pump Station o o o o o o o o -.[ o - 964,000 0 0 0 0 3,164,000 -.[ -.[ 0 0 0 0 0 750,000 -.[ 0 0 600,000 0 0 600,000 -.[ 500,000 0 0 0 0 500,000 -.[ 0 0 0 0 0 80,000 -.[ 0 0 0 2,000,000 0 2,000,000 -.[ 0 100,000 0 0 0 100,000 -.[ 1,614,000 250,000 600,000 2,000,000 0 7,909,000 2.000,000 o o o o o 2,300,000 'Improvements - /nc/uding Fuel Tank 'Rep/acements, Treatmenll Automatic Switch Gear, Collection and Emergency Power WB & CW System Supply 165,000 215,000 215,000 Collection Sewer Main CW System Replacement 300,000 300,000 300,000 Washington Street Beach Main Collection Abandonment (Design WB System in 2005) 0 150,000 0 700,000 500,000 0 0 1,350,000 ....i..- _ Pump Station CE-1 ,Coliection Control System WB System Upgrade 150,000 0 0 0 0 0 0 150,000 -.[ ,Coliection KL-1, 2& PB-1 Pump 01 01 01 01 01 100,0000=1 WB System Station Upgrade 100,000 0 Collection Anderson Cove Basins WB System CSS Project (OF-12) 650,000 0 0 0 0 {) 0 650,000 ....i..- _ Trenton & Cherry Ave Collection Basins CSO Reduc. (OF EB System 12) 750,000 0 0 0 0 0 0 750,000 -.[ Collection aCllC venue 1,166,667/ 1,166,666/ 0/ 01 0/ 3,700,000r:=D WB System Project (OF-16) 200,000 1,166,667 WW Coliection and Trans System Collection Improvements - Oyster WB System Bay 0 0 0 550,000 0 550,000 1,100,000 -.[ Tracyton PS (EB-6) -I CoIIeclloo COFtStFUE:tloo WB System /Improvement 600,000 0 0 0 0 600,000 Collection CW System Misc Equip - Dept 33 10,000 10,000 10,000 10,000 10,000 70,000 CDNI P:\BremertonIComp PlanlAmendment\7 PROJDOC\DRAFT AFTER JUNE 2005\TabieslSection 6\Bremerton CFP Table 6-6_ July2B.xls Table 6-6 Bremerton Utility District Recommended Capital Facility Plan -I Project Cost Schedule Financing Project Project I !'fan- Area Project Type Title/Description 2005 2006 2007 2008 2009 2010 2011 Total Utility Utility - Collection Quality and Quantity I cw System Meters - Dept 31 10,000 10,000 10,000 10,000 10,000 10,000 10,000 70,000 ...( Collection EB System Collection EB System Collection EB System - Collection EB System - Collection WB System - Collection WB System Collection EB System - Collection EB System Collection WB System Collection EB System Collection EB System - Collection WB System Collection EB System Collection WB System Collection WB System Collection WB System Collection WB System - improvement on Schley from Sheridan to Callahan o 0 0 0 0 73,600 0 73,600 ...( 0 0 0 19,200 0 0 19,200 ...( 0 0 0 0 38,400 0 38,400 ...( n 0 0 0 51,200 0 0 51,200 -L_ a 0 0 25,600 0 0 25,600 ...( 0 01 01 01 5,0001 01 5,0001~ Improvement on Homer Jones from YMCA to Parking Lot to South )mprovements between 'Schley and Fir Street Improvements on Reed between Lebo and Stephenson Improvements on 4-inch line between Bruenn and Lilac lane Improvements at 511 11th Street o o o o Improvements in Utility Easement between Broadmoor Village and Hanford Avenue o o o o o 6,000 o 6,000 ...( 'Improvements behind Lowe's Hardware from Almira to Wheaton Way Replace SS on Sheldon from Pacific to Evergreen Park I mprovements on McClain, running west on Sheridan to Elm to Hefner to Lebo Improvements on Cherry SI. to Lower Wheaton Way Kitsap Lake Main Replacement (Design in 2006) Beach Main Replacement from ESTP to 16" Siphon (includes design) Improvements along alley between Arsenal and Patton Reline surge chamber at_ 13th and Naval 0 0 0 0 0 0 50,000 50,000 ...( 56,000 0 0 0 0 0 0 56,000 ...( 0 0 0 0 282,000 0 0 282,000 ...:L _ 0 0 0 0 28,800 0 0 28,800 ...( 0 0 0 0 100,000 2,000,000 100,000 2,200,000 ...:L _ 0 0 0 1,000,000 0 0 0 1,000,000 --L.. _ 0 0 0 0 0 19,200 0 19,200 -:L_ 0 0 50,000 0 0 0 0 50,000 -:L_ a 0 0 0 0 100,000 1,000.000 1,100,000 ...( -- 15,000 250,000 0 0 0 0 0 265,000 ' ...( SUDIOlal . "-ouecuon I 1,781,6671 3,816.666/ 2.356,8001 3,012,2001 System 3,036,000 2,131,667 2.470,000 18,405,000 Total- WWTP/ COLLECTION 4,181,000 4,431,667 3,395,667 3,866,666 2,956,800 5,012,200 2,470,000 GRAND TOTAL 26,314,000 Collection CW System CDIVI Crosstown Pipeline ventilation and odor control (Design in 2006) Cambrian Ave Sewer Rehabilitation (Design in 2005) Access for Beachmain maintenance 30 000 30 000 30 000 30 000 30 000 o o 150000 ...( WB = West Bremerton EB = East Bremerton CW = City-wide P:\Bremerton\Comp PlanlAmendment\7 PROJDOC\DRAFT AFTER JUNE 2005\TableslSection 6\Bremerton CFP Table 6-6_ July2B.xls Table 6-7 Financing Summary Total (through 2011) Funding Source Utility: Annual Rate Funded Capital Non-Utility: Public Works Trust Fund Loans State Revolving Fund Loans EPAGrants $11,866,250 $3,924,000 $1,250,000 $3,686,000 TOTAL $20,726,250 CEllI Table 6-7 Financing Summary Funding Source Utility Annual Rate Funded Capital System Development Charges New Revenue Bonds Transfer from Stormwater Non-Utility Public Works Trust Fund Loans State Revolving Fund Loans EPA Grants TOTAL Total (through 2011) $12,028,979 800,000 981,000 100,000 5,340,000 2,825,000 4,436,000 $26,510,979 Annual project costs are a function of commodity and labor costs. These costs and bond ratings change on an annual basis. Each year, the City reviews the capital funding budget and modifies the budget as needed to address these changes. P;\Bremerton\Comp PJan\Amendmenl\7 PROJDOC\DRAF=T AFTER JUNE 2005\Text\Section 6.doc 6-15 I Section Seven CEllI Section 7 Operations Operation and maintenance of the wastewater system includes the collection system pipes in the ground, wastewater pump stations, odor control stations, CSO sites, the Westside Wastewater Treatment Facility, and the Eastside CSO Treatment Facility. The following entities have responsibility for the infrastructure described above: Collection System and CSO Sites: Utility Operations Division Pump Stations: Wastewater Division Odor Control Stations: Wastewater Division Westside Wastewater Treatment Facility: Wastewater Division Eastside CSO Treatment Facility: Wastewater Division 7.1 Utility Organization The Wastewater Utility has been organized to meet system needs with persons assigned based on availability of personnel and their expertise. The Director of Public Works and Utilities has the responsibility for the Wastewater Utility. This includes planning, financing, operation, maintenance, capital improvement program, and personnel. An organization chart of the Department of Public Works and Utilities is shown on Figure 7-1. 7.2 System Operation and Maintenance Operation and maintenance of the wastewater system is completed by the City of Bremerton's staff with City-owned equipment. The City owns and maintains the necessary equipment for the system's normal and emergency needs. A detailed list of equipment and special tools can be obtained from the City's asset management program. Complex or unusual repairs may be completed by a contractor. 7.2.1 Collection System The collection system was first installed in the late 1800s to transport untreated sewage and storm water to the marine waters of Puget Sound. The lines were combined to allow the storm water an opportunity to flush the raw sewage to the receiving body of water. In the 19305, attempts were made to screen or grind the wastewater material prior to discharge. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Secfion 7.doc 7-1 CITY OF BREMERTON DEPARTMENT OF PUBLIC WORKS AND UTILITIES UTILITIES OPERATIONS -" ,- . .......-.. ," .- '--'-, --'.. ;".- - ,'. ADMINISTRAT(vE.. .0 MA.NAGER . WASTEWATER MANAGER .'0" .. ..,',.......,_._.,.. ,," - -,....-<.,. UTILITIES.OPERATIONS ..~ MANAG~R . . . . . . I .. AASR II ADMINISTRATION I CUSTOMER SERVICE/II WWTP I WWTP] WATER DISTRIBUTION l CROSS l FACILITIES/ WATER DISTRIBUTION J UTILITY BILLING OPS SUPV MAINT SUPV SUPV CONNECTION INV SUPV SUPV AA SR I I OAS SPEC I UTILITY BILLING I I I WWTP I WWTP MAINT I WATER DIST I I WA~ER II I CROSS CONN I MAl NT II LEAD UTIL II LEA~ UTIL SUPV I OPERATOR II TECH MAINS SPECIALTIES '1 CON SPEC COORD II SERV SPEC SERV SPEC AA SR I I OAS I AA SR I WWTP I WWTP MAINT [ LEAD UTIL ! UTIL CUST MAIN I UTIL SERV I H UTIL SERV OPERATOR II TECH SERV SPEC SERV REP COORD I SPEC SR SPEC SR AASR I I OAS I AASR I WWTP I WWTPMAINT [ UTILSERV !LEADWATER UTILSERV I UTILSERV I H UTILSERV (Vacant) OPERATOR I TECH SPEC SR DIST SPEC SPEC SPEC SPEC SR I OA II I AA II I WWTP I WWTP MAINT [ UTIL SERV ! UTILMETER UTIL SERV I U UTIL SERV OPERATOR I TECH (Vacant) SPEC SR READER SPEC "1 SPEC I OA II I AA II I WWTP I WWTP CMMS l UTll SERV ! UTll SERV UTIL SERV I OPERATOR I TECH SPEC SR SPEC SR SPEC AA II J-I I WWTP LAB I. ELECTRONICS l UTIL SERV TECH TECH SPEC 'JOURNEY LEVEL l UTIL SERV ELECTRICIAN SPEC l UTll SERV SPEC l UTll SERV SPEC '.'-',--" ----,.. -,"'---'-" '. '-'-- ."- ,,', ,- .,' .',"',-- - .. ',-" ,"., -,' '-. <-- ," -- - .. ." -- "-: .'.,-',--',- - '. --' WATER RESOURCES MANt~,~~, F<We:SIR'( MANAGER. WATER RESOURCESJ I FORESTRY SERV MANAGER SPEC SUPV WATER RESOURCESJ I FORESTRY SERV OPSSUPV SPECSR OPERATOR j. I FORESTRY SERV LEAD WATER SPEC SR OPERATOR SR WATER OPERATOR SR ] WATER (Vacant) WATER OPERATOR WATER OPERATOR ENVIRONMENTAL J TECH ENVIRONMENTAL J TECH WATER RESOURCE J ASSISTANT j J j CEllI Section 7 Operations In the 1940s, the US Department of Defense constructed two primary wastewater facilities, one at Charleston Beach and the other at Lions Field. Today, the collection system consists of PVC, asbestos/ concrete, clay, concrete cylinder, ductile iron pipe from 6 to 36 inches with total lineal footage estimated at 225 miles. There are a total of 35 pump stations ranging from simple 5-horsepower pumps to 400-horsepower pumps capable of pumping from tens to thousands of gpm. In most cases the pump stations have emergency power supplies in the event commercial power is lost. 7.2.2 Treatment Facilities There are two wastewater treatment facilities serving the Bremerton wastewater system. All wastewater sludges are collected at the Westside WWTP, anaerobically digested, treated to Class B standards, dewatered, and applied to the City's silviculture site for reuse. The Westside WWTP is a biological secondary treatment process and is in continuous operation, with effluent discharge to Sinclair Inlet. Flows range from a dry weather flow of 1,000 gpm to wet weather flow of 37,000 gpm. The Eastside Facility is a High-Rate Clarification physical/ chemical treatment system that can start automatically or in the manual mode. The primary purpose of this facility is to treat diluted wet weather flows and provide UV disinfection to meet secondary water quality standards. The treatment system can treat from 0 to 20,000 gpm in 15 minutes. 7.2.3 Data Collection and Management Data collection is completed with hands-on inspection of all equipment and processes. Some data is collected and recorded on paper. Critical information is recorded into the Westside computer system for archiving. Most of the data is collected by programmable logic control (PLC) systems that measure, calculate, and execute prescribed functions for many in-plant and pump station functions. The information generated within the WWTPs and pump stations is stored/ archived in an electronic format at the Westside facility for reference. Operation data is logged into the electronic archive system. Examples of the data include laboratory results, operator inspection results, and process performance(s). Maintenance data is managed by a computer software package purchased by the City of Bremerton. Customizing activities have been completed, allowing the software to document preventative maintenance, corrective maintenance, predictive maintenance, inventory control, and purchase orders. Details on the software system capability can be obtained at the WWTP. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Secfion 7.doc 7-3 mil Section 7 Operations All data is stored in a dual archiving system that provides complete backup of all information. This is accomplished by a side-by-side (mirror) system that exchanges information every 5 seconds. 7.3 Additional Staff Requirements 7.3.1 Staff Requirements Due to System Growth Since 1995, the City has constructed a new treatment plant (Eastside CSO Treatment Plant), expanded the existing Westside WWTP (headworks, grit chambers, and odor control), expanded biosolids operation (dewatering), installed five new remote odor control stations (CE-1, Gregory & High, 12th & Naval, CW-l, and WB-3), constructed two new pump stations (EB-2 High and WB-6), expanded operations at five pump stations (EB-2 Low, WB-3, CW-2, EB-3, and EB-6), expanded the collection system by over 25 miles, and in 2005 will construct expansions to two additional pump stations (CW-1 and CE-6). No additional staff have been added to operate and maintain these new and expanded facilities; therefore, operations and maintenance of the utility infrastructure has been affected. Staff has scaled back maintenance activities in order to meet typical day-to-day operational demands. While it is difficult to identify a threshold for adding staff on the basis of growth, this section includes a recommendation to be used for planning and budgeting purposes. As presented earlier, the Wastewater Division operates and maintains the City's pump stations, odor control stations, and treatment plants. The Wastewater Division currently has sufficient staff to operate and maintain these facilities during dry weather; however, since both the Westside WWTP and the Eastside CSO Treatment Plant require 24-hour staffing during high/wet weather flows, operations must rely heavily on overtime to operate and maintain these facilities. This is illustrated by the creation of an additional standby/on-call schedule utilizing existing operations staff for the Eastside Treatment Facility, and response to startups during the wet weather months of October through April. During high flow wet weather events, a staffing reduction of two full-time employees (FTEs) is created at the Westside Plant. Maintaining the equipment at the Eastside Treatment Facility has also resulted in an additional 8 hours (0.2 FTE) spent each week throughout the year. An increase of two FTEs for the Wastewater Division (treatment plants/pump stations) and one FTE for the Utility Operations Division (storm/ sewer collection system maintenance) is required to restore manpower to the 1995 level. 7.3.2 Staff Requirements to Meet Additional Program Needs Collection System Evaluation The Utility Operations Division is responsible for operation and maintenance of the collection system and CSO sites. The Division's many duties include street sweeping; responding to citizen complaints; cleaning catch basins, manholes, etc.; investigating problems with the collection system; repairing failing facilities; supporting capital P:\Bremerton\Comp Plan\A.mendment\7 PROJDOC\DRAFT AFTER JUNE. 2005\Text\Section 7.doc 7-4 . 1 .. I ! CEllI Section 7 Operations construction projects (design assistance, locates, constructability assistance, potholing, etc); supporting other departments in operations, maintenance, and construction; and construction of extensions to the collection system. Given the age of Bremerton's collection system, many areas of the system are known or suspected to be in disrepair. The City has video equipment to perform pipeline inspections and assess condition; however, currently pipe inspection is limited to investigating problems and confirming quality of new construction. Staff have identified a goal of establishing a program to perform a systematic inspection of all pipes and structures within the collection system to identify structural deficiencies and develop rehabilitation actions. The primary benefit of this program is to ensure that structures requiring major rehabilitation or replacement are identified and addressed before a failure occurs. The program also helps to ensure proper management and prioritization of the Capital Improvement Program. Inspection work associated with meeting the goal entails vactor cleaning of the utility line to be inspected, immediately followed by video inspection of the main and condition assessment and rating. The product of this investigation would be a prioritized list of substandard mains, manholes, and associated appurtenances that require rehabilitation or replacement. A total of approximately 23 miles of collection system would need to be inspected annually in order to achieve an inspection frequency of 10 years for the City's entire existing collection system. As the system continues to expand, the annual evaluation length would need to increase proportionately. Inflow and Infiltration Reduction To obtain CSO reduction for compliance with 173-245 WAC, the City generally separated all inflow to the combined system from right-of-way and many private sources, and additionally increased the conveyance capacity to its Wastewater Treatment Plant. As a result of these activities, the conveyance system for the combined basins is currently at capacity during the CSO design storm. To allow for growth, reduce pumping and treatment costs, and provide a "buffer" or "safety factor" that will ensure continued compliance with CSO regulations, it is recommended that the City implement an inflow and infiltration reduction program with the goal of reducing peak sanitary flows to the combined system. The recommended program would identify areas with large amounts of infiltration, and repair leaking sanitary laterals using a combination of cure-in-place pipe, lateral replacement, or point repairs. As with the collection system evaluation program previously mentioned, additional staff would be required to implement this program. Clean-out Installation The property line is the location where ownership of sanitary sewer laterals transfers from property ownership to the City. New sanitary sewer laterals are installed with a clean-out at the property line; however, this standard is fairly new and most residences do not have a clean-out in this location. When problems exist with conveyance of sewage from a residence, the City is typically called to investigate. To 7-5 P:\Bremerton\Comp PJanlAmendment\7 PROJDOCIDRAFT AFTER JUNE 2005\Texl\Section 7.doc CEllI Section 7 Operations investigate, the City must dig up the lateral and install a clean-out. Once the clean- out has been installed, the City can evaluate the problem and address it. Although this program works, it is recommended that a program to install clean-outs on all residences be established. Systematic installation of future clean-outs throughout the City would reduce later retrofitted clean-out installation costs, and would improve efficiency and allow quicker response to citizen complaints. It is anticipated that two new FTEs would be the minimum amount of additional staff required to support these three proposed programs (collection system evaluation, inflow and infiltration reduction, and clean-out installation). The two new FTEs would split their time at approximately 4-month intervals between the three programs, and would accomplish the following: installation of approximately 80 clean-outs, repair of approximately 80 laterals, and video inspection/ evaluation of approximately 23 miles of collection system. In addition to the added staff, other program startup costs include a new service truck and lateral cure-in-place repair equipment that is expected to cost approximately $100,000. Annual costs for personnel and materials are expected to be on the order of $250,000 using these assumptions. The existing CCTV equipment, backhoes, and vactor trucks, which would be an integral part of these programs, are nearing the end of their service life expectancy, and replacement should be included in equipment replacement planning as their usage increases. Cleaning of Beach Mains and Inverted Siphons Several critical components of the City's conveyance system were installed without cleaning and maintenance provisions incorporated into the original design. These system components include the various beach mains, the two inverted siphons that convey combined flow under the Port Washington Narrows to West Bremerton, the Naval Avenue force main, the Central Bremerton Pipeline, and the Crosstown Pipeline. During model development and calibration associated with CSO reduction, it became evident that portions of the East Bremerton beach main had become partially obstructed with rocks and debris. Since cleaning facilities for the beach main were not considered during the original design, removal of the debris is currently not possible; however, rock trap manholes were installed at entry points to the beach main to help minimize further deposition. As a component of the Trenton and Cherry Avenue CSO reduction project, a document entitled "Bremerton Beach Main Pigging Technical Memorandum" was developed (see Appendix F). The purpose of this document was to identify a cleaning strategy for the East Bremerton beach main and inverted siphons, and to identify necessary access locations and isolation valves to be incorporated into a beach main upgrade that is scheduled for 2005. Proposed modifications to the East Bremerton beach main are shown on Appendix B (Figure 7- 2, HDR, 2001 CSO Report). P:\Bremerton\Comp Ptan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Seclion 7.doc 7-6 CEllI Section 7 Operations The City anticipates cleaning the East Bremerton beach main in 2006. This is anticipated to be a very costly undertaking that could involve anchoring barges at the inverted siphon connections to the beach main during pigging operations. Follow-on cleaning of the other critical components of the conveyance system (critical force mains and gravity-pressure sewers) should also be scheduled. After this initial cleaning has been accomplished, regular cleaning of these critical pipelines should be scheduled at a frequency of once every 5 years. 7-7 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 7.doc C~[ OIl -.r- 9 ;-"_:.. ~ !~~.~ - ~ ~- ~ - g ~ , - ~ ~ - ~ -, ~ ~ i ~ ~ ] CEllI Section 8 Implementation Adoption of a Wastewater Comprehensive Plan must be coordinated with Ecology and Kitsap County, and correspond with State Environmental Policy Act (SEP A) requirements. The steps associated with plan implementation are discussed below, along with recommended future updates to the Wastewater Comprehensive Plan. 8.1 Plan Adoption The preparation, review, and adoption of comprehensive sewer plans are determined by local and state procedures. A Wastewater Comprehensive Plan should be produced every 5 years. The plan is then reviewed by both the City and Ecology. Other parties that will have access to the plan are Kitsap County, nearby sewer systems, water purveyors, local libraries, and other interested parties. The Wastewater Comprehensive Plan should be adopted by the City Council before implementation. 8.2 Coordination with Kitsap County Kitsap County has a similar plan on a county-wide scale. The Kitsap County Comprehensive Plan was most recently updated in June 1999. The City of Bremerton supports Kitsap County objectivesi therefore, the City's Director of Public Works and Utilities will continue being involved in the County Utility Coordinating Committee. The City believes that the County Comprehensive Plan should apply the following guidelines: . Environmental impacts, regulatory concerns, and public health and safety be addressed and funded using a common approach . Sound engineering and economic principles be used to delineate service boundaries, project future use and capacity, manage growth, and select infrastructure and service standards . The plan be area wide, incorporating urban areas of the County 8.3 Environmental Impact According to SEP A (RCW 43.21 C), environmental documentation must be prepared on proposals for legislation and other major actions having a probable significant, adverse environmental impact. A Draft 2002 Environmental Assessment has been prepared for the proposed Westside WWTP wet-weather facility. The Port Blakely Communities Development group is in the process of initiating a Master Plan and an EIS for the Port Blakely development. In addition, an EIS may be required, and funded by the Port Blakely communities, for access routes to the Port Blakely development. Going forward, it is anticipated that National Environmental Policy Act (NEP A) and SEP A will be addressed on a project-by-project basis. It is 8-1 P:\6remerton\Comp Pl"an\A.mendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 8.doc CDII Section 8 Implementation anticipated that new developers would fund environmental impacts studies as required. 8.4 Future Additions to the Wastewater Comprehensive Plan This Wastewater Comprehensive Plan addresses system additions and improvements that will be required to fully develop the service area. Potential projects are recommended through the year 2014. CDM recommends that the City periodically review progress it has made in implementing the plan before the next plan is due. The City should assess the effectiveness of its improvements to biosolids production, CSO reduction, basin pump station and conveyance improvements, developments in wastewater reuse opportunities, and expansion of conveyance and plant capacities. Current population, population projections, and current and future financial resources should be reviewed and adjusted as necessary to reflect actual conditions and accommodate future project implementation. 8-2 P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Seclion 8.doc " . eCT1o-n N'ne i ,j I I ,J CDlVI Section 9 References Beak Consultants Incorporated, 1998. City of Bremerton NPDES Sediment Monitoring Report, Beak Project No. 22319, August 1998 Brown and Caldwell, 1998. Final Report, Water Reuse Feasibility Study, City of Bremerton, September 17, 1998. Camp Dresser & McKee, Inc. in Association with Richwine Environmental, Inc., 2001. Draft City of Bremerton Westside Wastewater Treatment Plant Rerating Study, July 2001. CH2MHill,1992. Combined Sewer Overflow Reduction Plan, City of Bremer ton, October 1992. CH2MHill,1995. Wastewater Comprehensive Plan, City of Bremer ton, December 1995. City of BreIDerton Department of Public Works and Utilities, 2002. Combined Sewer Overflow Annual Report for 2001, NPDES Permit #WA-002928-9, January 31,2002. Cosmopolitan Engineering Group, 2003. Sinclair Inlet Sediment Monitoring Report, Project No. BRE002, August 2003. HDR Engineering, Inc., 2000. City of Bremer ton CSO Reduction Plan Update, October 31, 2000. Kitsap County Sewer District #1 and the City of Bremerton, 1992. Interlocal Agreement for Discharge of Sewer, Sewer District #1, July 28, 1992. Parametrix,1993. Feasibility Report, Wastewater Collection System Chemical Injection Odor Control Program, CihJ of Bremer ton, February 1993. Plant-it STOAT WWTP Modeling Program. 2003. WRcjCDM, version 1.1.0.220, November 2003. Puget Sound Clean Air Agency, 2000. Regulation III, Appendix A. Acceptable Source Impact Levels. April 2000. Puget Sound Clean Air Agency, 2001. Regulation 1, Section 9.11. Emission of Air Contaminant: Detriment to Person or Property. September, 2001. RW. Beck, 1994. Final Basis of Design, Technical Appendices D, E, Wastewater Treatment Plant Odor Control Project, City of Bremer ton, December 1994. Shapiro and Associates, 2002. Draft Bremerton Westside Wastewater Treatment Plant Wet Weather Facilities, Environmental Assessment, Apri125, 2002. 9-1 P:\Bremerton\Comp Plan\A.rnendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 9.doc CDIVI Section 9 References Washington State Department of Ecology, October 1997. Memorandum of Agreement between the United States Environmental Protection Agency and the Washington State Department ofEcologLj Regarding the Implementation of Section 303(d) of the Federal Clean Water Act, October 29, 1997. Washington State Department of Ecology, 1998. Criteria for Sewage Works Design, Publication Number 98-37, December 1998. Washington State Department of Ecology, 2002. Draft Permit and Fact Sheet, State Waste Discharge Permit Number ST-7374for the Puget Sound Naval Shipyard, Code 106.31, Building 427, Bremerton, WA 98314-5000, June 4,2002. P:\Bremerton\Comp Ptan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Text\Section 9.doc 9-2 . ! ii r j I ! d idx A Appendix A NPDES Permit CDIVI P:\Bremerton\Comp Plan\Amendment\7PROJDOC\ORAFT AFTER JUNE 2005 eo" STATE OF WASHINGTON DEPARTMENT OF ECOLOGY Northwest Regional Office, 3790 . 760th Ave S.E. · BeJlevue, Washington 98008.5452 · (206) 649.7000 June 21, 1996 CERTIFIED ' d P 140 707 812 i i. ;1 II 'i '1 CERTIFIED MAIL P 140 707 812 .~."" ,:/!o':-''':';'') Mr . John Poppe, Wastewater Manager City of Bremerton 3027 Olympus Drive Bremerton, W A 9831.0 RECEiVED JUN 24 1996 Dear Mr. Poppe: Dept. VI n...o.I"tl.,o 'HUIl\;:l and Utilities RE: NPDES Permit Issuance City of Bremerton City of Bremerton Wastewater Treatment Plant; Permit No. W A 002928-9 Expiration Date: June 21, 2001 Under the provisions of Chapter 90.48 RCW Water Pollution Control Laws as amended and the Federal Water Pollution Control Act (The Clean Water Act) Title 33 United States Code, Section 1251 et seq., the enclosed NPDES Pennit No. WA 002928-9 is hereby issued to the City of Bremerton Wastewater Treatment Plant located at 160 Oyster Bay Road, Bremerton, Washington (Kitsap County). The permit authorizes the Permittee to discharge treated wastewater to marine water of the State of Washington subject to the tenns and conditions of the permit. Pursuant to RCW 90.48.465, a pennit fee will be assessed. Semi-annual notices for payment will be mailed to you from our office in Olympia. Any person feeling aggrieved by this State Waste Discharge permit may obtain: review thereof by application, within 30 days of receipt of this pennit, to the Washington Pollution Control Hearings Board, Post Office Box 40903, Olympia, WA 98504-0903. Concurrently, a copy of the application must be sent to the Department of Ecology, Post Office Box 47600, Olympia, WA 98504-7600. These procedures are consistent with the provisions of Chapter 43.21B RCW and the rules and regulations adopted thereunder. ---- p. Mr. John Poppe, Wastewater Manager City of Bremerton June 21, 1996 Page 2 ORIGINAL Any appeal must contain the following in accordance with the rules of the hearings board: a) The appellant's name and address; b) The date and number of the permit appealed; c) A description of the substance of the pennit, that is the subject of the appeal; d) A clear, separate, and concise .statement of every error alleged to have been committed; e) A clear and concise statement of facts which the requester relies to sustain his or her statements of error; and t) A statement setting forth the relief sought. An application for pennit renewal must be made at least 180 days prior to the expiration date of this permit. If at any time during the tenn of this pennit a question should arise regarding the pennit or discharge, or if there is a significant change in the discharge or operation, please contact Mike Dawda at (206) 649-7027. Enclosed is a copy of the Discharge Monitoring Report (DMR) form as specified in Special Condition S3. of your permit. Please make copies as needed. Sincerely, Aj;{ 11~ ohn H. Glynn . Water Quality Supervisor Northwest Regional Office JHG:CJS:cs Enclosures: Permit & Fact Sheet DMR form with instructions cc: Bev Poston, Permit Fee Unit Mike Dawda, Facility Manager Laura Fricke, Unit Supervisor Chris Smith, WPLCS Central Files: 11 iI 1 4, Kitsap, W A 002928-9 WQ 1./ Page 1 of 36 Permit No. W A-002928-9 Issuance Date: June 21, 1996 Effective Date: July 1, 1996 Expiration Date: June 21, 2001 , I NATIONAL POLLUTANT DISCHARGE ELTh11NATION SYSTEM WASTE DISCHARGE PERMIT State of Washington f:~ ~,y DEPARTMENT OF ECOLOGY Northwest Regional Office . . 3190 160th Avenue SE Bellevue, W A 98005-5452 1 . : In compliance with the provisions of The State of Washington Water Pollution Control Law Chapter 90.48 Revised Code of Washington and The Federal Water Pollution Control Act (The Clean Water Act) Title 33 United States Code, Section 1251 et seq. R. -- ,;. -- C E ,-V E D JUN 2.4 1996 1 . ~ CITY OF BREMERTON 239 Fourth Street Brernerton, Washington 98337 "";CIJ', '-'; . ........"JW vvorKS and Utilities . City of Bremerton Plant Location: Receiving Water: 1600 Oyster Bay Road Bremerton, W A 98312 Sinclair Inlet Puget Sound Water Body LD. No.: Discharge Location: 07-15-03 Latitude: 470 32' 59" N Longitude: 1220 40' 11" W Plant Type: Biofilter/ Activated Sludge Secondary Treatment System is authorized to discharge in accordance with the special and general conditions which follow. Page 2 of 36 Permit No. WA-D02928-9 TABLE OF CONTENTS SUNIMARY OF SCHEDULED PERMIT REPORT SUBMITTALS .............. 5 SPECIAL CONDmONS S 1. .Effluent Limitations ........................................ 7 A. Effluent Limitations B. Mixing Zone Descriptions S2. Testing Schedule .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~ . . . . . . . .9 A. Compliance B. Process Control C. Toxics D. Whole Effluent Toxicity S3. Monitoring and Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 A. B. c. D. E. F. G. H. 1. J. K. Reporting Records Retention Recording of Results Representative Sampling Test Procedures Flow Measurement Laboratory Accreditation Additional Monitoring by the Permittee Signatory Requirements Reporting of Unauthorized Discharges Reporting - Sediment Quality Data I I S4. Prevention of Facility Overloading ............................. 16 A. Design Criteria B. Plans for Maintaining Adequate Capacity C. Notification of New or Altered Sources S5. Operation and Maintenance of Municipal Facilities ................... 18 A. Certified Operator B. O&M Manual C. O&M Program D. Short-Term Reduction E. Electric Power Failure F.- Prevent Connection of Inflow Page 3 of 36 Permit No. W A-002928-9 TABLE OF CONTENTS (continued) 56. Construction or Maintenance-Related Overflow or Bypass . . . . . . . . . . . . . . . 19 S7. Residual Solids ......................................... 20 S8. Pretreatment........................................... 20 S9. Acute Toxicity ......................................... 22 A. Effluent Characterization B. Effluent Limit for Acute Toxicity _ C. Monitoring for Compliance With an Effluent Limit for Acute Toxicity D. Response to Noncompliance With an Effluent Limit for Acute Toxicity E. Monitoring When There Is No Permit Limit for Acute Toxicity F. Sampling and Reporting Requirements S10. Chronic Toxicity ............ ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 A. Testing Requirements B. Sampling and Reporting Requirements S 11. Sediment Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 A. Sediment Sampling B. Sediment Data Report S12. Combined Sewer Overflows . . . . . . . . , , . . . . . . . . . . . . . . . . . . . . . . . 29 A. Discharge Locations B. Combined Sewer Overflow Report C. Combined Sewer Overflow Reduction Plan Amendment D. Compliance Schedule GENERAL CONDITIONS G 1. Discharge Violations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 G2. Proper Operation and Maintenance ............................. 32 03. Reduced Production for Compliance ............................ 32 04. Noncompliance Notification ................................. 32 Page 4 of 36 Permit No. W A-002928-9 TABLE OF CONTENTS (continued) G5. Bypass Prohibited . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 G6. Right of Entry. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 G7. Permit Modifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 '1 G8. Permit Modified or Revoked . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 .. I ~ "; G9. Reporting a Cause for Modification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 - G10. Toxic Pollutants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 G 11. Plan Review Required . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 36' G12. Other Requirements of 40 CFR ............................... 36 G13. Compliance With Other Laws and Statutes ........................ 36 G14. Additional Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 G 15. Revocation for Nonpayment of Fees ............................ 36 G16. Removed Substances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 G 17. Duty to Reapply ........................................ 36 . I I Page 5 of 36 Permit No. W A-002928-9 SUMMARY OF PERMIT REPORT SUBMITTALS i Permit First Section Submittal Frequency Submittal Date . j S3.A. Discharge Monitoring Report Monthly, no later than the \ 15th day of the month Discharge Summary Report following the completed reporting period S4.B. Plan for maintaining adequate as necessary capacity S4.C. Notification of new or altered sources as. necessary S5.B. Updated Operation and Maintenance as necessary Manual . , I S5.D. Notice of Short-term Reduction in as necessary Treatment Level S6. Report on Construction- or as necessary Maintenance-related Bypass S8.C. Notice of New Significant Industrial as necessary Users S9.A. Acute Toxicity Characterization Data 4/year during the fIrst Within 60 days year after the first of the four final test results S9.A. Acute Toxicity Characterization l/permit cycle Within 90 days Summary Report after the last monitoring results are final S9.E. Acute Toxicity Tests Data 2/permit cycle, provided With the monitoring for compliance application for is not required permit renewal SIO.A. Chronic Toxicity Tests Data 2/permit cycle With the application for permit renewal SlI. Sediment Data Report l/permit cycle June 30, 1998 S12.B. Combined Sewer Overflow Report Annually May 31, 1997 Page 6 of 36 Permit No. WA-002928-9 Permit Section First Submittal Date With the application for permit renewal 180 days prior to permit. expiration (or earlier) Submittal Combined Sewer Overflow Reduction Plan Amendment Frequency 1/permit cycle S12.C. Application for permit renewal l/permit cycle G17. -_OJ j I -, 1 I i i I . I " ; ~ i Page 7 of 36 Permit No. W A-002928-9 SPECIAL CONDmONS S1. EFFLUENT LIMITATIONS A. Effluent Limitations Beginning on the effective date of this permit and lasting through the expiration date the Permittee is authorized to discharge municipal wastewater at the permitted location subject to the following limitations: EFFLUENT LIMITATIONS a: OUTFALL # 001 Parameter Biochemical Oxygen Demandb 5 day Total Suspended Solidsb Fecal Coliform Bacteria A verage Monthly Average Weekly 45 mg/L, 3790 lbs/day 45 mg/L, 3790 lbs/day 400/100 mL 30 mg/L, 2527 lbs/ day 30 mg/L, 2527 lbs/day 200/100 mL pH : shall not" be outside the range 6.0 to 9.0 Parameter Average Monthly Maximum Daily II , I Total Residual Chlorinec 0.13 mg/L 0.37 mg/L ' I I aThe average monthly and weekly effluent limitations are based on the arithmetic mean of the samples taken with the exception of fecal coliform, which is based on the geometric mean. bThe average monthly effluent concentration for BOD5 and Total Suspended Solids shall not exceed 30 mg/L or 15 percent of the respective monthly average influent concentrations, whichever is more stringent. The minimum reduction requirement does not apply during wet weather months, October through April, inclusively, when the plant flows are influenced by combined sewage. , cThe maximum daily value,for Total Residual Chlorine is the maximum of the daily values during a calendar month. The daily value is defined as the arithmetic mean of the sample I measurements taken during a calendar day. , The average monthly value for Total Residual Chlorine is the arithmetic mean of the daily values during a calendar month. Page 8 of 36 Permit No. W A-Q02928-9 S1. EFFLUENT LIMITATIONS: (continued) B. Mixing Zone Descriptions 1. The diagram below shows dimensions and boundaries of the allowable zones of chronic criteria exceedance and acute criteria exceedance surrounding the outfall diffuser. The shaded area is the zone of acute criteria exceedance. 120 FEET LONG DIFfUSER WITH lWEmY &oS INCH DIAMETER flORTS . ~ll 454ft o CHRONIC I.lOONG ZONE 8ACUlE WIXING ZONE ~-.. ~u. I -120a- .I .1514 II ., [NOTTQSClUI " 2. Chronic Mixing Zone Boundaries The height of the chronic mixing zone extends vertically from the outfall diffuser to the water surface at Mean Lower Low Water (MLL W). The diagram above depicts other dimensions and boundaries. 3. Acute Mixing Zone Boundaries The height of the acute mixing zone extends vertically from the outfall diffuser to the water surface at Mean Lower Low Water (MLL W). The shaded area in the diagram above depicts other dimensions and boundaries. 4. Dilution Ratios The dilution ratios for aquatic life criteria, as determined by the water quality modeling analysis are as follows: (i) Receiving Waters:Facility Effluent = 69:1 for the chronic mixing zone. (ii) Receiving Waters:Facility Effluent = 25: 1 for the acute mixing zone. Page 9 of 36 .. ) Permit No. W A-002928-9 S2. TESTING SCHEDULE The Permittee shall monitor the wastewater and sludge according to the following schedule: B. PROCESS CONTROL: Tests Sample Point Sampling Frequency Sample Type Aeration Basin 7/week 3/week 3/week 3/week 3/week 3/week 3/week grab grab grab grab grab grab grab pH Plant Influent Primary Digesters Plant Influent Primary Digesters Plant Influent Aeration Basin Temperature Dissolved Oxygen Mixed Liquor I Suspended Solids (MLSS) Page 10 of 36 Permit No. W A-002928-9 .. Tests . Sample Point Sampling Frequency Sample Type IMx~ Aeration Basin 3/week grab LIquor Volatile Suspended Solids (ML VSS) 30 minute Aeration Basin 3/week grab Settleability Sludge Aeration Basin lIweek calculate Volume Index (SVI) CO2 Primary Digesters 3/week grab Analysis and Volume Alkalinity Primary Digesters 3/week grab I Volatile Primary Digesters 3/week grab Acids C. TOXICS: Tests Sample Point Sampling Frequency Sample Type Ammonia-N Final Effluent l/month 24.,.hr flow (NH3~N) proportion composite Total Plant Influent 1/2 months 24-hr flow Recoverable Final Effluent 1/2 months proportion Metals: (in January, March, composite Arsenica May, July, Cadmium September, and Chromium November) Copper Lead Mercury Nickel Zinc Page 11 of 36 I Permit No. W A-Q02928-9 ! Tests Sample Point Sampling Frequency Sample Type Cyanide 07V eak Plant Influent 1/2 months grab Acid I)issociable) Final Effluent 1/2 months grab (in January, March,- \ May, July, , \ September, and , November) Priority Pollutant Plant Influent Twice during the 24-hr flow Metals (Total Final Effluent permit term - Once proportion Recoverable) : during August 1999 composite i Antimony and once during Beryllium January 2000 Selenium Silver Thallium Priority Plant Influent Twice during the grab Pollutant: Final Effluent permit term - Once I Phenols during August 1999 . ,! and once during January 2000 q, .. Priority Pollutant Plant Influent Twice during the 24-hr flow Organics: Final Effluent permit term - Once proportion Acid during August 1999 composite Extractables and once during Base-Neutrals January 2000 Pesticides PCBs \ Priority Pollutant Plant Influent Twice during the grab l Organics: Final Effluent permit term - Once I .. i Volatile during August 1999 Organics and once during January 2000 ; i aThe method number and method detection levels (MDLs) for total recoverable , arsenic shall be as shown in the following table. Page 12 of 36 Permit No. W A-002928-9 S2. TESTING SCHEDULE: (continued) Parameter Total Recoverable Arsenic Method Detection Level EP A Method Number (1\1DL) 206.2 (GFAA) 1 ug/L Footnotes: (1) The method detection level (MDL) for arsenic is 1 fJ.g/L using graphite furnace atomic absorption spectrometry and method number 206.2 from 40 CPR Part 136. The quantitation level (QL) for arsenic is 5 fJ.g/L (5 x: MDL). (2) The analytical methods to be used are described in Condition S3.E. of this permit. (3) Average values shall be calculated as follows: measurements below the MDL = 0; measurements greater than the MDL = the measurement. Tests Sample Point Final Effluent Sampling Frequency Sample Type (i) 4/year during the fIrst 24-hr composite year, for characterization (in August and November 1996, and February and May 1997) D. WHOLE EFFLUENT TOXICITY: Acute Toxicitya (ii) 2/year (in January and August) for compliance, if necessary 24-hr composite 24-hr composite Final Effluent (ill) 2/permit term; In January and August 2000 (only if compliance monitoring in (ll) is not required) 2/permit term; In January and August 2000 Chronic Toxicityb 24-hr composite aThe testing and reporting requirements for the Acute WET tests are described in Condition S9. (Acute Toxicity) of this permit. bThe testing and reporting requirements for the Chronic WET tests are described in Condition S10. (Chronic Toxicity) of this permit. Page 13 of 36 Permit No. W A-002928-9 53. MONlTORlNG AND REPORTING The Permittee shall monitor and report in accordance with the following conditions. . I A. Reporting I . I Monitoring results obtained during the previous month shall be summarized and reported on a form provided, or otherwise approved, by the Department, to be submitted no later than the 15th day of the month following the completed reporting period. The report(s) shall be sent to the Department of Ecology, Northwest Regional Office 3190 160th Avenue 5E, Bellevue, Washington 98008-5452. Monitoring shall be started on the effective date of the permit and the first report is due on the 15th day of the follQwing month. 1 1 i In addition to the monthly report, a monthly summary report form (BPA No. 3320-1) shall be submitted no later than the 15th day of the following month. This report is limited to the parameters specified in condition S 1.A. and the flow. Monitoring results for metals and other toxic compounds must be submitted no later than the 30th day of the following month. Monitoring results of the whole effluent toxicity (WET) tests shall be submitted in accordance with Conditions 59. and S10. of this permit. B. Records Retention The Permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original recordings for continuous monitoring instrumentation, copies of all reports required by this permit, and records of all data used to complete the application for this permit, for a period of at least 3 years. The Permittee shall retain for a minimum of five (5) years all records pertaining to the monitoring of sludge. This period of retention shall be extended during the course of any unresolved litigation regarding the discharge of pollutants by the Permittee or when requested by the Director. C. Recording of Results For each measurement or sample taken, the Permittee shall record the following information: (1) the date, exact place and time of sampling; (2) the individual who performed the sampling or measurement; (3) the dates the analyses were performed; (4) who perfonned the analyses; (5) the analytical techniques or methods used; and (6) the results of all analyses. Page 14 of 36 Permit No. W A-002928-9 I i S3. MONITORING AND REPORTING: (continued) D. Representative Sampling Samples and measurements taken to meet the requirements of this permit shall be representative of the volume and nature of the monitored discharge, including representative sampling of any unusual discharge or discharge condition, including bypasses, upsets and maintenance-related conditions affecting effluent quality. E. Test Procedures All. sampling and analytical methods used to meet the wastewater monitoring requirements specified in this permit shall conform to the Guidelines Establishing Test Procedures for the Analysis of Pollutants contained in 40 CFR Part 136, unless otherwise specified in this permit or approved in writing by the Department. The analytical method for "total recoverable arsenic" shall be in accordance with the Test Method 206.2 (GFAA) of the Methods for Chemical Analysis for Water and Waste. EPA-600/4-79-020. Revised March 1983. The analytical methods for "total recoverable metals" (except arsenic) shall be in accordance with the Test Method 4. 1.4 of the Methods for Chemical Analysis for Water and Waste. EPA-600/4-79-020. Revised March 1983. The analytical method for mercury shall be II Cold Vapor Atomic Absor:ption Spectrometric Method." 3112 B.. Standard Methods for the Examination of Water and Wastewater. 19th Edition. 1995 and as revised. The analytical method for "weak acid dissociable cyanide" shall be in accordance with Standard Methods for the Examination of Water and Wastewater. 4500-CN 1.. 19th Edition. 1995 and as revised. F. Flow Measurement Appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. The devices shall be installed, calibrated, and maintained to ensure that the accuracy of the measurements are consistent with the accepted industry standard for that type of device. Frequency of calibration shall be in conformance with manufacturer's recommendations or at a minimum frequency of at least one calibration per year. Calibration records shall be retained for at least three years. Page 15 of 36 Permit No. W A-002928-9 53. MONITORING AND REPORTING: (continued) G. Laboratory Accreditation All monitoring data, except for flow, temperature, settleable solids, conductivity, pH, and internal process control parameters, shall be prepared by a laboratory registered or accredited under the provisions of, Accreditation of Environmental Laboratories, Chapter 173-50 WAC. Conductivity and pH shall be accredited if the laboratory must otherwise be registered or accredited. Sediments, soils and hazardous waste data are exempted from this requirement pending accreditation of laboratories for analysis of these media by the Department. H. Additional Monitoring by the Permittee If the Permittee monitors any pollutant more frequently than required by this permit (S2.) using test procedures specified by Condition 53.E. of this permit, then the results of this monitoring shall be included in the Permittee's self- monitoring reports. 1. Signatory Requirements All applications, reports, or information submitted to the Department shall be signed and certified. 1. All permit applications shall be signed by either a principal executive officer or ranking elected official. 2. All reports required by this permit and other information requested by the Department shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described above and submitted to the Department, and b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility, such as the position of plant manager, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.) Page 16 of 36 Permit No. W A-002928-9 S3. MONITORlNG AND REPORTING: (continued) 3. Changes to authorization. If an authorization under paragraph I.2.b is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of I.2.b must be submitted to. the Department prior to or together with any reports, information, or applications to be signed by an authorized representative. 4. Certification. Any person signing a document under this section shall make the following certification: "I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information v submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for willful violations. " J. Reporting. of Unauthorized Discharges Unauthorized discharges such as collection system overflows, plant bypasses, or failure of the disinfection system, shall be reported immediately to the . Department of Ecology, the Department of Health, Shellfish Program, and the Bremerton-Kitsap County Health District. The Department of Ecology's Northwest Regional Office 24-hr number is 206-649-7000, the Bremerton- Kitsap County Health District's 24-hr number is 360-692-3611, and the Department of Health's Shellfish 24-hr number is 360-753-5992. S4. PREVENTION OF FACILITY OVERLOADING A. Design Criteria Flows or waste loadings of the following design criteria for the permitted treatment facility shall not be exceeded. Average flow for the maximum month: Influent BOD5 loading for maximum month: Influent TSS loading for maximum month: 10.1 MGD 18,100lbs/day 22,600 Ibsl day Page 17 of 36 Permit No. W A-002928-9 S4. PREVENTION OF FACILITY OVERLOADING: (continued) B. Plans for Maintaining Adequate Capacity ....,.....~---.~-~ . \ ! I ! .' When the actual flow or wasteload reaches 85 percent of anyone of the design criteria in S4.A. forthree consecutive _monthstor when the projected increases would reach design capacity within five years: whichever occurs first, the Permittee shall submit to the Department, a plan and a schedule for continuing to maintain capacity at the facility sufficient to achieve the effluent limitations and other conditions of this permit. This plan shall address any of the following actions or any others necessary to meet this objective. 1. Analysis of the present design including the introduction. of any process modifications that would establish the ability of the existing facility to achieve the effluent limits and other requirements of this permit at specific levels in excess of the existing design criteria specified in paragraph A above. 2. , j 3. ! , 4. Reduction or elimination of excessive infiltration and inflow of uncontaminated ground and surface water into the sewer system. Limitation on future sewer extensions or connections or additional wasteloads. Modification or expansion of facilities necessary to accommodate increased flow or wasteload. 5, Reduction of industrial or commercial flows or waste loads to allow for increasing sanitary flow or wasteload. ! The plan must meet the requirements of WAC 173-240-060, "Engineering Report," and be approved by the Department prior to any construction. The plan shall specify any contracts, ordinances, methods for financing, or other arrangements necessary to achieve this objective. - I I J c. Notification of New or Altered Sources The Permittee shall submit written notice to the Department whenever any new discharge or increase in volume or change in character of an existing discharge into the sewer is proposed which: (1) would interfere with the operation of, or exceed the design capacity of, any portion of ~e collection or treatment system; Page 18 of 36 Permit No. W A-002928-9 84. PREVENTION OF FACILITY OVERLOADING: (continued) (2) would increase the total system flow or influent waste loading by more than 10 percent; (3) is not part of an approved general sewer plan or approved plans an~ specifications; or would be subject to pretreatment standards under 40 CFR Part 403 and Section 307 (b) of the Clean Water Act. This notice shall include an evaluation of the system's ability to adequately transport and . treat the added flow and/or wasteload. In accordance with Chapter 173-230 WAC, the Permittee shall provide an adequate operating staff which is qualified to carry out the operation, maintenance, and testing activities required to ensure compliance with the conditions of this permit. An operator certified for a Class N plant by the State of Washington shall be in responsible charge of the day-to-day operation of the wastewater treatment plant. A Class III operator shall be present at the facility during all shifts when major operational changes are made to the treatment process. 85. OPERATION AND MAINTENANCE OF MUNICIPAL FACILITIES A. Certified Operator B. 0 & M Manual The approved operation and maintenance manual shall be kept available at the treatment plant. All operators are responsible for being familiar with, and using, this manual. The operation and maintenance manual shall be updated as needed. Updated portions of the operations and maintenance manual shall be submitted to the Department for review and approval. C. 0 & M Program The Permittee shall institute an adequate operation and maintenance program for their entire sewage system. Maintenance records shall be maintained on all major electrical and mechanical components of the treatment plant, as well as the sewage system and pumping stations. Such records shall clearly specify the frequency and type of maintenance recommended by the manufacturer and shall show the frequency and type of maintenance performed. These maintenance records shall be available for inspection at all times. Page 19 of 36 Permit No. W A-002928-9 S5. OPERATION AND MAINTENANCE OF MUNICIPAL FACILITIES: (continued) D. Short-term Reduction If a Permittee contemplates a reduction in the level of treatment that would cause an exceedance of permit effluent limitations on a short-term basis for any reason, and such reduction cannot be avoided, the Permittee shall give written notification to the Department, if possible, 30 days prior to such activities, detailing the reasons for, length of time of and the potential effects of the reduced level of treatment. If such a reduction involves a bypass, the requirements of Conditions. G5. and S6. apply. E. Electrical Power Failure 1 I , , , The Permittee is responsible for maintaining adequate safeguards to prevent the discharge of untreated wastes or wastes not treated in accordance with the requirements of this permit during electrical power failure at the treatment plant and/or sewage lift stations either by means of alternate power sources, standby (on-site or portable) generator, or retention of inadequately treated wastes. The Permittee shall maintain Reliability Class II at the wastewater treatment plant, which requires primary sedimentation and disinfection. F. Prevent Connection of Inflow The Permittee shall strictly enforce their sewer ordinances and not allow the connection of inflow (roof drains, foundation drains, etc.) to the sanitary sewer system. S6. CONSTRUCTION OR MAINTENANCE-RELATED OVERFLOW OR BYPASS Bypasses of untreated or partially' treated sewage during. construction or maintenance shall be avoided if at all feasible. t , i I If a construction or maintenance-related overflow or bypass is contemplated, the Permittee shall submit to the Department, not less than 90 days prior to the contemplated overflow or bypass, a report which describes in detail any construction work which will result in overflow or bypass of wastewater. The report shall contain: (1) an analysis of all known alternatives which would eliminate, reduce, or mitigate the need for bypassing; (2) a cost-effectiveness analysis of alternatives including comparative resource damage assessment; (3) the minimum and maximum duration of bypass under each alternative; (4) a recommendation as to the preferred alternative for conducting the bypass; (5) the project date of bypass initiation; (6) a statement of compliance with SEP A; and (7) a request for a water quality modification, as provided for jn WAC 173-20IA-llO. Page 20 of 36 Permit No. W A-002928-9 56. CONSTRUCTION OR MAINTENANCE-RELATED OVERFLOW OR BYPASS . I ! I For probable construction bypasses, the need to bypass is to be identified as early in the planning process as possible. The analysis required above shall be considered during preparation of the engineering report or facilities plan and plans and specifications and shall be included to the extent practical. In cases where the probable need to bypass is determined early, continued analysis is necessary up to and including the construction period in an effort to minimize or eliminate the bypass. Final authorization to bypass may be granted after review of the above information, in accordance with General Condition GS. Authorization to bypass will be by administrative order. 57. RESIDUAL SOLIDS Residual solids include screenings, grit, scum, primary sludge, waste activated sludge and other solid waste; The Permittee shall store and handle all residual solids in such a manner so as to prevent their entry into state ground or surface waters. The Permittee shall not discharge leachate from residual solids to state surface or ground waters. S8. PRETREATMENT A. General Requirements The Permittee shall work cooperatively with the Department to ensure that all commercial and industrial users of the wastewater treatment system are in compliance with the pretreatment regulations promulgated in 40 CFR Part 403 and any additional pretreatment regulations that may be promulgated under Section 307 (b) and reporting requirements under Section 308 of the Federal Clean Water Act. B. Discharge Authorization Required Significant commercial or industrial operations shall not be allowed to discharge wastes to the Permittee's sewerage system until they have received prior authorization from the Department in accordance with Chapter 90.48 RCW and Chapter 173-216 WAC, as amended. The Permittee shall . immediately notify .the Department of any proposed new sources, as defined in 40 CFR 403.3(1<:), from significant commercial or industrial operations. Page 21 of 36 Permit No. W A-002928-9 j S8. PRETREATMENT: (continued) , i ! i C. 1 , I General Prohibitions In accordance with 40 CFR 403.5(a), a nondomestic discharger may not introduce into the Permittee's sewerage system any pollutant(s) that would pass . through the treatment works or interfere with their operation or perfonnance. Cj i i D. 1. I l I 2. ! i ; I i 3. Specific Prohibitions In accordance with 40 CFR 403.5(b), the following nondomestic discharges shall not be discharged into the Pennittee's sewerage treatment system. Pollutants that create a fire or explosion hazard in the POTW (including, but not limited to waste streams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees Centigrade using the test methods specified in 40 CFR 261.21). Pollutants that will cause corrosive structural damage to the Publicly Owned Treatment Works (pOTW), but in no case discharges with pH lower than 5.0 standard units, unless the works are specifically designed to accommodate such discharges. Solid or viscous pollutants in amounts that could cause obstruction to the flow in sewers or otherwise interfere with the operation of the POTW. 4. Any pollutant, including oxygen demanding pollutants, (BOD, etc.) released in a discharge at a flow rate and/or pollutant concentration which will cause interference with the POTW. 5. Heat in amounts that will inhibit biological activity in the -"EOTW resulting in interference, but in no case heat in such quantities such that the temperature at the POTW exceeds 400C (1040f) unless the Department, upon request of the Permittee, approves, in writing, alternate temperature limits. 6. Petroleum oil, nonbiodegradable cutting oil, or products of mineral origin in amounts that will cause interference or pass through. 7. Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity which may cause acute worker health and safety problems. Page 22 of 36 Permit No. WA-002928-9 S8. PRETREATMENT: (continued) 8. Any trucked or hauled pollutants, except at discharge points designated by the Permittee. E. Notification of Industrial User Violations The Permittee shall notify the Department if any nondomestic user violates the prohibitions listed in S8.C and S8.D above. F. Industrial User Survey If required by the Department, the Permittee shall perform an industrial user survey, or other activities (e. g., sewer use ordinance and local limits development), which are necessary for the proper administration of the state pretreatment program. S9. ACUTE TOXICITY A. Effluent Characterization The Permittee shall conduct acute toxicity testing on the final effluent to deter- mine the presence and amount of acute (lethal) toxicity. The two acute toxicity tests listed below shall be conducted on each sample taken for effluent characterization. Effluent characterization for acute toxicity shall be conducted quarterly for one year. Acute toxicity testing shall follow protocols, monitoring requirements, and quality assurance/quality control procedures specified in this Section. A dilution series consisting of a minimum of five concentrations and a control shall be used to estimate the concentration lethal to 50 % of the organisms (LCSO). The percent survival in 100% effluent shall also be reported. Testing shall begin within 60 days of the permit effective date. A written report shall be submitted to the Department within 60 days after each of the test results are final. A final effluent characterization summary report shall be submitted to the Department within 90 days after the last monitoring test results are final. This summary report shall include a tabulated summary of the individual test results and any information on sources of toxicity, toxicity source control, correlation with effluent data, and toxicity treatability which is developed during the period of testing. i , . I . I .. I i i . 1 , , ; , . .J Page 23 of 36 Permit No. WA-oG2928-9 59. ACUTE TOXICITY: (continued) Acute toxicity tests shall be conducted with. the following species and proto- cols: . 1) Fathead minnow, Pimephales promelas (96 hour static-renewal test, method: EPA/600/4-90/027F) 2) Daphnid, Ceriodaphnia dubia, Daphnia pulex, or Daphnia magna (48 hour static test, method: EPA/600/4-90/027F). The Permittee shall choose one of the three species and use it consistently throughout effluentcharactenaation. B. Effluent Limit for Acute Toxicity The Permittee has an effluent limit for acute toxicity if, after completing one year. of effluent characterization, either: (1) The median survival of any species in 100% effluent is below 80%, or (2) Anyone test of any species exhibits less than 65 % survival in 100 % effluent. The effluent limit for acute toxicity is no acute toxicity in a test concentration representing the acute critical effluent concentration (ACEC). The ACEC means the maximum concentration of effluent during critical conditions at the boundary of the zone of acute criteria exceedance assigned pursuant to WAC 173-201A-100. The zone of acute criteria exceedance is authorized in Section S1.B. of this permit. The ACEC equals 4% effluent. If no effluent limit is required by subsection B at the end of one year of effluent characterization, then the Permittee shall stop effluent characterization and begin to conduct the activities in subsection E. In the event of failure to pass the test described in subsection C. of this section for compliance with the effluent limit for acute toxicity, the Permittee is considered to be in compliance with all permit requirements for acute whole effluent toxicity as long as the requirements in subsection D. are being met to the satisfaction of the Department. Page 24 of 36 Permit No. WA-002928-9 59. ACUTE TOXICITY : (continued) C. Monitoring for Compliance With an Effluent Limit for Acute Toxicitv Monitoring to determine compliance with the effluent limit shall be conducted biannually for the remainder of the permit term using each of the species listed in 'subsection A above on a rotating basis and performed using 100 % effluent, the ACEC, and a control. The Permittee shall schedule the toxicity tests in the order listed in the permit unless the Department notifies the Permittee in writing of another species rotation schedule. The percent survival in 100% effluent shall be reported for all compliance monitoring. Compliance with the effluent limit for acute toxicity means no statistically significant difference in survival between the control and the test concentration representing the ACEC. The Permittee shall immediately implement subsection D. if any acute toxicity test conducted for compliance monitoring determines a statistically significant difference in survival between the control and the ACEC using hypothesis testing at the 0.05 level of significance (Ap- pendix H, EPA/600/4-89/001). If the difference in survival between the control and the ACEC is less than 10%, the hypothesis test shall be conducted at the 0.01 level of significance. D. Response to Noncompliance With an Effluent Limit for Acute Toxicity lithe Permittee violates the acute toxicity limit in subsection B, the Permittee shall begin additional compliance monitoring within one week from the time of receiving the test results. This additional monitoring shall be conducted weekly for four consecutive weeks using the same test and species as the failed compliance test. Testing shall determine the Le50 and effluent limit com- pliance. The discharger shall return to the original monitoring frequency in subsection C. after completion of the additional compliance monitoring. If the Permittee believes that a t~st indicating noncompliance will be identified by the Department as an anomalous test result, the Permittee may notify the Department that the compliance test result might be anomalous and that the Permittee intends to take only one additional sample for toxicity testing and wait for notification from the Department before completing the additional monitoring required in this subsection. The notification to the Department shall accompany the report of the compliance test result and identify the reason for considering the compliance test result to be anomalous. The Permittee shall complete all of the additional monitoring required in this subsection as soon as possible after notification by the Department that the compliance test result was not anomalous. 1 ~ ; . I Cl ! . , j ~ , ! , 1 I I I S9. Page 25 of 36 Permit No. W A-002928-9 ACUTE TOXICITY: (continued) If the one additional sample fails to comply with the effluent limit for acute toxicity, then the Permittee shall proceed without delay to complete all of the additional monitoring required in this subsection. The one additional test result shall replace the compliance test result upon determination by the De- partment that the compliance test result was anomalous. If all of the additional compliance monitoring conducted in accordance with this subsection complies with the permit limit, the Permittee shall search all pertinent and recent facility records (operating records, monitoring results, inspection records, spill reports, weather records, production records, raw material purchases, pretreatment records, etc.) and submit a report to the Department on possible causes and preventive measures for the transient toxicity event which triggered the additional compliance monitoring. If toxicity occurs in violation of the acute toxicity limit during the additional compliance monitoring, the Permittee shall submit a Toxicity Identification/Reduction Evaluation (TI/RE) plan to the Department within 60 days after test results are final. The TI/RE plan shall be based on WAC 173- 205-100(2). The TIJRE plan shall address areas where adequate guidance, procedures, or protocols are not available for implementation of the plan. The Permittee shall submit a revised TIJRE plan, in accordance with Department comments, within 30 days after receipt of the Department's comments. 'The Department will issue an administrative order to require implementation of the TI/RE in accordance with WAC 173-205-100(3). E. Monitoring When There Is No Permit Limit for Acute Toxicity The Permittee shall test final effluent once in the last summer and once in the last winter prior to submission of the application for permit renewal. All species used in the initial acute effluent characterization or substitutes approved by the Department shall be used and results submitted to the Department as a part of the permit renewal application process. F. Sampling and Reporting Requirements 1. All reports for effluent characterization or compliance monitoring shall be submitted in accordance with the most recent Department of Ecology specifications regarding format and content. Reports shall contain bench sheets and reference toxicant results for test methods. The effluent and reference toxicant test results shall also be submitted as electronic files on floppy disks in the Toxicity Standardized Electronic Reporting Format (TSERF). Page 26 of 36 Permit No. WA-002928-9 S9. ACUTE TOXICITY: (continued) 2. Testing shall be conducted on 24-hour composite effluent samples. Samples taken for toxicity testing shall be cooled to 4 degrees Celsius while being collected and shall be sent to the lab immediately upon completion. The lab shall begin the toxicity testing as soon as possible but no later than 36 hours after sampling was ended. 3. Permittees that potentially have ammonia and/or chlorine in the effluent shall measure total ammonia and/or chlorine from a sample collected for toxicity testing. All samples taken for toxicity testing shall have pH, total alkalinity, total hardness, dissolved oxygen, and conductivity or salinity measured prior to test initiation. . 4. All toxicity tests shall meet quality assurance criteria in the EP A manual listed in subsection A, or in its update. If test results are determined to be invalid or anomalous by the Department, testing shall be repeated with freshly collected effluent. If control performance does not meet protocol standards for acceptability, the test shall be repeated with freshly collected effluent. 5. Control water and dilution water shall be laboratory water or pristine natural water meeting the requirements of the EP A manual listed in subsection A and of sufficient quality for good control performance. 6. The whole effluent toxicity tests shall be run on an unmodified sample of final effluent. 7. The Permittee may choose to conduct a full dilution series test during complian~e monitoring in order to determine dose response. In this case, the series must have a minimum of five effluent concentrations and a control. The series of concentrations must include the ACEC. 8. All whole effluent toxicity tests, effluent screening tests, and rapid screening tests that involve hypothesis testing and do not comply with the acute statistical power standard of 29 % ~ defined in WAC 173- 205-020 must be repeated on a fresh sample with an increased number of replicates to increase the power. 9. Acids and bases shall not be added to samples or test solutions unless pH is outside of the range 6.0 to 9.0. Control of unionized ammonia toxicity due to pH rise shall only be accomplished by holding test chambers in a C02 atmosphere. Page 27 of 36 Permit No. W A-002928-9 S10. CHRONIC TOXICITY A. Testing Requirements The Permittee shall test final effluent once in the last summer and once in the last winter prior to submission of the application for permit renewal. All of the chronic toxicity tests listed below shall be conducted on each sample. The results of this chronic toxicity testing shall be submitted to the Department as a part of the permit renewal application process. I ! , j The Permittee shall conduct chronic toxicity testing on serial dilutions of effluent in order to determine the lCSO or ECSO. This series of dilutions shall include the acute critical effluent concentration (ACEC). The A:CEC equals 4 % effluent. The Permittee shall compare the ACEC to the control using hypothesis testing at the 0.05 level of significance as described in Appendix H, EP AI 600/4-89/001. Chronic toxicity tests shall be conducted with the following species and the most recent version of the following protocols: Saltwater Chronic Toxicity Test Species Method Silverside minnow Mysid shrimp Menidia beryllina Mysidopsis bahia EPA/600/4-87/028 EP AI 600/4-87/028 B. Sampling and Reporting Requirements 1. All reports for whole effluent toxicity testing shall be submitted in accordance with the most recent Department of Ecology specifications regarding format and content. Reports shall contain bench sheets and reference toxicant results for test methods. The effluent and reference toxicant test results shall also be submitted as electronic files on floppy _ disks in the Toxicity Standardized Electronic Reporting Format (TSERF) . 2. Testing shall be conducted on 24-hour composite effluent samples. Samples taken for toxicity testing shall be cooled to 4 degrees Celsius wpile being collected and shall be sent to the lab immediately upon completion. The lab shall begin the toxicity testing as soon as possible but no later than 36 hours after sampling was ended. Page 28 of 36 Permit No. WA-002928-9 510. CHRONIC TOXICITY: (continued) 3. Permittees that potentially have ammonia and/or chlorine in the effluent shall measure total ammonia and/or chlorine from a sample collected for toxicity testing. All samples taken for toxicity testing shall have pH, total alkalinity, total hardness, dissolved oxygen, and conductivity or salinity measured prior to test initiation. 4. All toxicity tests shall meet quality assurance criteria in the EPA manual listed in subsection A., or in its update. If test results are determined to be invalid or anomalous by the Department, testing shall be repeated with freshly collected effluent. If control performance does not meet protocol standards for acceptability, the test shaJl be repeated with freshly collected effluent. 5. Control water and dilution water shall be laboratory water or pristine natural water meeting the requirements of the EP A manual listed in subsection A. Dilution water for toxicity testing shall be of sufficient quality for good control performance. 6. The whole effluent toxicity tests shall be run on an unmodified sample of final effluent. 7. The Permittee may choose to conduct a full dilution series test in order to determine dose response. In this case, the series must have a minimum of five effluent concentrations and a control. The series of concentrations must include the ACEC. The ACEC may either substitute for the effluent concentration that is closest to it in the dilution series or be an extra effluent concentration. 8. All whole effluent toxicity tests that involve hypothesis testing and do not comply with the chronic statistical power standard of 39 % as defined in WAC 173-205-020 must be repeated on a fresh sample with an increased number of replicates to increase the power. 9. Acids and bases shall not be added to samples or test solutions unless pH is outside of the range 6.0 to 9.0. Control of unionized ammonia toxicity due to pH rise shall only be accomplished by holding test chambers in a CO2 atmosphere. Page 29 of 36 Permit No. W A-002928-9 .. 1 S 11. SEDTh.fENT MONITORING (MARINE) I , A. Sediment Sampling . , . I ! , Following Department approval of the Sediment Sampling and Analysis Plan, sediments will be collected and analyzed. No later than June 30, 1998, the Permittee shall submit to the Department, a Sediment Data Report containing' the results of the sediment sainpling and analysis. .j i \ B. Sediment Data Report The permittee shall submit a Sediment Data Report confonning with the approved Sampling and Analysis Plan and the guidance provideg in the Sediment Source Control Standards User Manual, Appendix B: Sediment Sampling and Analysis Plan Appendix (Department of Ecology, 1995). S 12. COMBINED SEWER OVERFLOWS A. Dischar~e Locations , ~ ~ , i The following is a list of combined sewer overflows (CSOs), which are occasional point sources of pollutants as a result of precipitation events. Discharges from these sites are prohibited except as a result of and during precipitation events. No authorization is given by this permit for discharge from a CSO that causes adverse impacts that threaten characteristic uses of the receiving water as identified in the Water Quality Standards, Chapter 173- 201A WAC. I I DISCHARGE I I NO. NAl\1E 002 Trenton A venue Basin 002a Trenton A venue Basin 003 Tracy ton Beach Basin 004 Anderson Cove Basin CSO DESIGNATION LOCATION , 47034 08" N , 1220 36 26" W , 47034 08" N , 1220 36 26" W , 47035 10" N , 122038 39"W Outfall #7a Outfall #7b Outfall #6 Outfall #9 , 470 34 45" N , 1220 38 47" W RECEIVlNG I WATER Port Orchard Bay Port Orchard Bay Port Washington Narrows Port Washington Narrows Page 30 of 36 Permit No. W A-002928-9 DISCHARGE CSO RECEIVING NO. NAl\tIE DESIGNATION LOCATION WATER , '005 Warren Outfall #13 470 35 40" N Port , A venue Basin 122037 45" W Washington Narrows I' 006 , Pacific Outfall #15 47033 43" N Sinclair Inlet , Avenue Basin 122037 26" W , 007 Anderson Outfall #12 47034 43" N Port , Cove Basin 122038 11" W Washington Narrows I 008 Anderson Outfall #11 470 34 44" N Port , Cove Basin 1220 38 '22" W Washington Narrows 009 Anderson Outfall #lOA 470 34' 44" N Port , Cove Basin 1220 38 26" W Washington Narrows I 010 Cherry Outfall #3 470 34 45" N Port , A venue Basin 1220 37 27" W Washington Narrows , 011 Stevens Outfall #'2 47034 57" N Port , Canyon Basin 1220 38 07" W Washington I. Narrows ,I , i 012 Pacific Outfall #16 470 33 38" N Sinclair Inlet , A venue Basin 122037 43" W , 013 Callow Outfall #17 470 33 15" N Sinclair Inlet , A venue Basin 122039 04" W , 014 Eastpark Outfall #4 470 34 29" N Port , Basin 1220 36 58" W Washington Narrows , 015 Anderson Outfall #8 470 35 05" N Port I Cove Basin 1220 39 00" W Washington Narrows ..' , 016 Pine Road Outfall #1 470 34 57" N Port , Basin 1220 37 45" W Washington Narrows .. , i . , ; . I i I .J Page 31 of 36 Permit No. WA-002928-9 S12. COMBINED SEWER OVERFLOWS: (continued) B. Combined Sewer Overflow Report No later than May 31 of each calendar year, the.Permittee shall submit an annual CSO report for the previous calender year to Ecology, for review and approval, which complies with the requirements of WAC 173-245-090(1). This report shall: 1. Include details of the past year's frequency and volume of combined sewage discharged from each CSO site, or group of CSO sites in close proximity, based on field monitoring. The report shall indicate whether a CSO site or group of sites has increased over the baseline annual conditon. If any increase has occurred, the Permittee shall propose a project and s~hedule to reduce that CSO site or group of sites to or below its baseline conditon. 2. Explain the previous year's CSO reduction accomplishments. 3. List the projects planned for the next year. C. Combined Sewer Overflow Reduction Plan Amendment In conjunction with the application for renewal of this permit, the Permittee shall submit an amendment of its CSO Reduction Plan to the Department for review and approval. The amendment shall comply with the requirements of W AC173-245- 090(2). D. Compliance Schedule In order to achieve the greatest reasonable reduction of combined sewer overflows at the earliest possible date, the elements of the approved combined sewer overflow reduction plan shall be accomplished in accordance with the schedule of milestone dates stipulated in the Order on Consent Number DE 93WQ-N150 and any amendment(s) thereto. E. The Permittee shall prohibit discharge of stormwater from new developments into a sanitary or a combined sewer system. Page 32 of 36 Permit No. WA-002928-9 GENERAL CONDmONS G 1. DISCHARGE VIOLATIONS All discharges and activities authorized by this permit shall be consistent with the terms and conditions of this permit. The discharge of any pollutant more frequently than, or at a concentration in excess of, that authorized by this permit shall constitute a violation of the terms and conditions of this permit. G2. PROPER OPERATION AND MAINTENANCE The Permittee shall at all times properly operate and maintain all facili~es and systems of collection, treatment, and control (and related appurtenances) which are installed or used by the Permittee for pollution control. G3. REDUCED PRODUCTION FOR COMPLIANCE The Permittee, in order to maintain compliance with its permit, shall control production and/or all discharges upon reduction, loss, failure, or bypass of the treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost, or fails. G4. NONCOMPLIANCE NOTIFICATION If for any reason, the Permittee does not comply with, or will be unable to comply with, any of the discharge limitations or other conditions specified in the permit, the Permittee shall, at a minimum, provide the Department with the following information: A. A description of the nature and cause of noncompliance, including the quantity and quality of any unauthorized waste discharges; B. The period of noncompliance, including exact dates and times and/or the anticipated time when the Permittee will return to compliance; and C. The steps taken, or to be taken, to reduce, eliminate, and prevent recurrence of the noncompliance. Page 33 of 36 Permit No. W A-002928-9 . I G4. NONCOMPLIANCE NOTIFICATION: (continued) ! 1 "1 i In addition, the Permittee shall take immediate action to stop, contain, and clean up any unauthorized discharges and take all reasonable steps to minimize any adverse impacts to waters of the state and correct the problem. The Permittee shall notify the Department by telephone so that an investigation can be made to evaluate any resulting impacts and the corrective actions taken to determine if additional action should be taken. . J [I 11 ~ In the case of any discharge subject to any applicable toxic pollutant effluent standard under Section 307(a) of the Clean Water Act, or which could constitute a threat to human health, welfare, or the environment, 40 CFR Part 122 requires that tl?-e information specified in Sections G4.A., G4.B., and G4.C., above, sh~ be provided not later than 24 hours from the time the Permittee becomes aware of the circumstances. If this information is provided orally, a written submission covering these points shall be provided within five days of the time the Permittee becomes aware of the circumstances, unless the Department waives or extends this requirement on a case-by-case basis. j i I Compliance with these requirements does not relieve the Permittee from responsibility to maintain continuous compliance with the conditions of this permit or the resulting liability for failure to compi y. G5. BYPASS PROHIBITED The intentional bypass of wastes from all or any portion of a treatment works is prohibited unless the following four conditions are met: I I A. , ~- 1 i i B. Bypass is: (1) unavoidable to prevent loss of life, personal injury, or severe property damage; or (2) necessary to perform construction or maintenance- related activities essential to meet the requirements of the Clean Water Act and authorized by administrative order; There are no feasible alternatives to bypass, such as the use of auxiliary treatment facilitles, retention of untreated wastes, maintenance during normal periods of equipment down time, or temporary reduction or termination of production; C. The Permittee submits notice of an unanticipated bypass to the Department in accordance with Condition G4. Where the Permittee knows or should have known in advance of the need for a bypass, this prior notification shall be submitted for approval to the Department, if possible, at least 30 days before the date of bypass (or longer if specified in the special conditions); Page 34 of 36 Permit No. W A-Q02928-9 05. BYPASS PROHIBITED: (continued) D. The bypass is allowed under conditions determined to be necessary by the Department to minimize any adverse effects. The public shall be notified and given an opportunity to comment on bypass incidents of significant duration, to the extent feasible. "Severe property damage" means substantial physical damage to property, damage to the treatment facilities which would cause them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. After consideration of the factors above anq the adverse effects of the proposed bypass, the Department will approve or deny the requ~st. Approval of a request to bypass will be by administrative order under RCW 90.48.120. 06. RIGHT OF ENTRY The Permittee shall allow an authorized representative of the Department, upon the presentation of credentials and such other documents as may be required by law: A. To enter upon the premises where a discharge is located or where any records must be kept under the terms and conditions of this permit; B. To have access to and copy at reasonable times any records that must be kept under the terms of the permit; C. To inspect at reasonable times any monitoring equipment or method of monitoring required in the permit; D. To inspect at reasonable times any collection, treatment, pollution management, or discharge facilities; and E. To sample at reasonable times any discharge of pollutants. G7. PERMIT MODIFICATIONS The Permittee shall submit a new application or supplement to the previous application where facility expansions, production increases, or process modifications will (1) result in new or substantially increased discharges of pollutants or a change in the nature of the discharge of pollutants, or (2) violate the terms and conditions of this permit. Page 35 of 36 Permit No. WA-002928-9 G8. PERMIT MODIFIED OR REVOKED After notice and opportunity for public hearing, this permit may be modified, terminated, or revoked during its term for cause including, but not limited to, the following: ~ 1 A. Violation of any terms or conditions of the permit; ! B. Failure of the Permittee to disclose fully all relevant facts or misrepresentations of any relevant facts by the Permittee during the permit issuance process; C. A change in any condition that requires either a temporary or apermanent reduction or elimination of any discharge controlled by the permit; D. Information indicating that the permitted discharge poses a threat to human health or welfare; E. A change in ownership or control of the source; or " I F. Other causes listed in 40 CFR 122.62 and 122.64. j " I Permit modification, revocation and reissuance, or termination may be initiated by the I Department or requested by any interested person. J G9. REPORTING A CAUSE FOR MODIFICATION A Permittee who knows or has reason to believe that any activity has occurred or will occur which would constitute cause for modification or revocation and reissuance under Condition G8. or 40 CFR 122.62 must report such plans, or such information, to the Department so that a decision can be made on whether action to modify or revoke and reissue a permit will be required. The Department may then require submission of a new application. Submission of such application does not relieve the Permittee of the duty to comply with the existing permit until it is modified or reissued. G 10. TOXIC POLLUTANTS If any applicable toxic effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is established under Section 307(a) of the Clean Water Act for a toxic pollutant and that standard or prohibition is more stringent than any limitation upon such pollutant in the permit, the Department shall institute proceedings to modify or revoke and reissue the pennit to conform to the new toxic effluent standard or prohibition. Page 36 of 36 Permit No. W A-002928-9 G 11. PLAN REVIEW REQUIRED I I i I i Prior to constructing or modifying any wastewater control facilities, detailed plans shall be submitted to the Department for approval in accordance with Chapter 173- 240 WAC. Facilities shall be constructed and operated in accordance with the approved plan. G12. OTHER REQUIREMENTS OF 40 CFR All other requirements of 40 CFR 122-.41 and 122.42 are incorporated in this permit by reference. G13. COMPLIANCE WITH OTHER LAWS AND STATUTES Nothing in the permit shall be construed as excusing the Permittee from compliance with any applicable federal, state, or local statutes, ordinances, or regulations. 814. ADDmONAL MONITORING The Department may establish specific monitoring requirements in addition to those contained in this permit by administrative order or permit modification. G 15. REVOCATION FOR NONPAYMENT OF FEES The Department may revoke this permit if the permit fees established under Chapter 173-224 WAC are not paid. G16. REMOVED SUBSTANCES Collected screenings, grit, solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of wastewaters shall not be resuspended or reintroduced to the final effluent stream for discharge to state waters. G17. DUTY TO REAPPLY The Permittee must reapply, for permit renewal, at least 180 days prior to the specified expiration. date of this permit. " 1. , \ . 1 i . I ".'1 . ! i ! , j ;. ~ , ;1 ~ , iI ~ ~ . i j 1 f . J FACT SHEET FOR NPDES.PERl\1IT W A-002928-9 CITY OF BREMERTON TABLE OF CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3 GENERAL INFORMATION . .. .. . .. . ... . . ..... . . . .. ...... .. . . . .. 3 BACKGROUND INFORMATION ................................. 4 WASTEWATER SOURCES ................................. 4 WASTEWATER CHARACTERISTICS. . . . . . . . . . . . . . . . . . . . . . . . .. 4 DESCRIPTION OF THE WASTEWATER TREATMENT FACILITY.. . . . . .. 5 DESCRIPTION OF THE WASTEWATER COLLECTION SYSTEM ....... 6 RESIDUAL SOLIDS ..................................... 6 PERMIT STATUS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 7 SUMMARY OF INSPECTIONS .............................. 7 EXISTING EFFLUENT LTh1ITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 7 SUMMARY OF COMPLIANCE WITH THE EXISTING PERMIT . . . . . . . .. 8 PROPOSED PERMIT LIMITATIONS AND CONDITIONS. . . . . . . . . . . . . . . . . . 10 DESIGN CRITERIA . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 TECHNOLOGY-BASED EFFLUENT LIMITATIONS. . . . . . . . . . . . . . . . . 10 SURFACE WATER QUALITY-BASED EFFLUENT LIMITATIONS. . . . . .. 11 SURF ACE WATER QUALITY CRITERIA ....................... 13 CONSIDERATION OF SURFACE WATER QUALITY-BASED LIMITS FOR NUMERIC CRITERIA ............................ 14 DETERMINATION OF DILUTION RATIOS: ..................... 14 REASONABLE POTENTIAL AND WATER QUALITY-BASED PERMIT LIMITS DETERMINATIONS ........................... 16 WHOLE EFFLUENT TOXICITY ............................. 18 HUMAN HEALTH CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 SEDWENT QUALITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 GROUND WATER QUALITY LIMITATIONS. . . . . . . . . . . . . . . . . . . . . 20 MONITORING AND REPORTING ............................ 20 COMBINED SEWER OVERFLOWS ........................... 21 OTHER PERMIT CONDmONS .................................. 22 PREVENTION OF FACILITY OVERLOADING . . . . . . . . . . . . . . . . . . . . 22 OPERATION AND MAINTENANCE (O&M) . . . . . . . . . . . . . . . . . . . . . . 22 RESIDUAL SOLIDS HANDLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 PRETREATMENT. . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 GENERAL CONDmONS .................'..................... 22 FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 2 TABLE OF CONTENTS (continued) PERhflTISSUANCEPROCEDURES ...............................23 PERMIT MODIFICATIONS . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . 23 RECOMMENDATION FOR PERMIT ISSUANCE . . . . . . . . . . . . . . . . . . . 23 REVIEW BY THE PERMITTEE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 REFERENCES FOR TEXT AND APPENDICES ........................ 23 APPENDIX A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 APPENDIX B .............................................. 25 APPENDIX C ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 APPENDIX D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 APPENDIX E ............................. . . . . . . . . . . . . . . . . . 31 APPENDIX F .............................................. 33 APPENDIX G . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 3 INTRODUCTION The Federal Clean Water Act (FCW A, 1972, and later modifications, 1977, 1981, and 1987) established. water qu.ality goals for the navigable (surface) waters of the United. States. One of the mechanisms for achieving the goals of the Clean Water Act is the National Pollution Discharge Elimination System of permits (NPDES permits), which is administered. by the Environmental Protection Agency (EP A). The EP A has delegated. responsibility to administer the NPDES permit program to the State of Washington on the basis of Revised Code of Washington (RCW) 90.48 which defines the Department of Ecology's authority and obligations in administering the wastewater discharge permit program. The regulations adopted. by the State include procedures for issuing permits (Chapter 173-220 Washington Administrative Code 0N AC)), technical criteria for discharges from municipal wastewater treatment facilities (Chapter 173-221 WAC) and water quality criteria for surface and ground waters (Chapters 173-201A and 200 WAC). These regulations require that a permit be issued before discharge of wastewater to waters of the state is allowed.. The regulations also establish the basis for effluent limitations and other requirements which are to be included in the permit. One of the requirements 0N AC 173-220-060) for issuing a permit under the NPDES permit program is the preparation of a draft permit and an accompanying fact sheet. Public notice of the availability of the draft permit is required at least thirty days before the permit is issued CWAC 173-220-050). The fact sheet and draft permit are available for review. Please see Appendix A--Public Involvement of the fact sheet for more detail on the Public Notice procedures). This fact sheet has been reviewed by the Permittee and any errors in fact sheets have been corrected. After the public comment period has closed, the Department will summarize the substantive comments and the response to each comment. The summary and response to comments (Appendix G) will become part of the file on the permit and parties submitting comments will receive a copy of the Department's response. The fact sheet will not be revised. Changes to the permit will be addressed in Appendix G--Response to Comments. GENERAL INFORMATION Applicant: City of Bremerton 239 Fourth Street Bremerton, Washington 98337 Facility Name and Address: Bremerton Wastewater Treatment Plant 1600 Oyster Bay Road Bremerton, Washington 98312 . Type of Treatment: Biofilterl Activated Sludge - Secondary Treatment System FACT SHEET City of Bremerton Permit No. WA-002928-9 Page 4 Discharge Location: Sinclair Inlet, Puget Sound Latitude: 470 32' 59" N Longitude: 1220 40' 11" W The secondary treated effluent is discharged to Sinclair Inlet, Puget Sound. The effluent is discharged through a 36-inch diameter outfall . pipe which extends 450 feet offshore and terminates with a 120-foot long diffuser. The 570-foot long outfall discharges into Sinclair Inlet approximately 27 feet below Mean Lower Low Water (MLLW), at a . location west of Puget Sound Naval Shipyard (PSNS). A diagram showing approximate location of the outfall discharge is included in Appendix C. Water Body ID Number: WA-lS-Q040 BACKGROUND INFORMATION 1. WASTEWATER SOURCES Bremerton Wastewater Treatment Plant (Facility) receives domestic sewage from residential and light commercial activities in the City of Bremerton, and Kitsap County Sewer District Number 1. The facility also receives wastewater discharge from Harrison Memorial Hospital. In addition, the facility receives domestic and industrial wastewater from PSNS. The domestic wastewater from PSNS includes wastewater from on-shore chemical toilet facilities and saline wastewater from toilet facilities on ships. The industrial wastewater from PSNS includes pretreated wastewater from the industrial wastewater treatment facility. 2. WASTEWATER CHARACTERISTICS Primary sources of wastewater received at the facility include domestic sewage from residential dwellings, and domestic sewage and process wastewater from commercial facilities in the service area. PSNS is a major industrial source which discharges all of its domestic wastewater and pretreated industrial wastewater to the facility. Wastewater sources at PSNS include on-shore chemical toilet facilities, saline wastewater from toilet facilities on ships, metal finishing facilities, and other industrial processes. PSNS is in the process of negotiating a State Waste Discharge Permit with the Department. Also, impacts to the facility from saline wastewater discharge from PSNS are currently being evaluated by PSNS. The influent wastewater characteristics (BODS and TSS) for the period of September 1993 through August 1995 are shown in the graphs in Appendix D. FACT SHEET City of Bremerton Permit No. WA-002928-9 Page 5 As part of the monitoring requirement in the permit, the Permittee has also submitted priority pollutant analysis for the facility influent. The analysis includes metals, volatile compounds, acid compounds, base/neutral compounds, and pesticides. 3. DESCRIPTION OF THE WASTEWATER TREATMENT FACILITY The liquid stream treatment at the facility includes screening through mechanical bar screens, grit chambers, primary clarification, secondary biological treatment in a biofilter and aeration basins followed by secondary clarification, disinfection by sodium hypochlorite, and dechlorination by sodium bisulfite. The solids stream treatment components at the facility include a gravity_ thickener, dissolved air flotation thickener (DAFT), anaerobic digesters, and a centrifuge. The solids removed in the primary clarifiers (primary sludge) are thickened in the gravity thickener. The secondary sludge is thickened in the DAFT. The thickened primary and secondary sludges are digested in two anaerobic digesters operated as primary digesters. The digested sludge is utilized on permitted forest lands owned by the City. Some of the digested sludge is dewatered in the centrifuge prior to its utilization on the forest lands. The recycle streams which include gravity thickener supernatant, DAFT underflow, and digesters supernatant are returned to the head of the plant for further treatment. Some improvements were recently completed at the facility to improve performance and operation and maintenance of the facility. The cyclone grit removal system for the primary sludge was removed and replaced with two grit chambers downstream of the new bar screens in the liquid stream treatment system. The dechlorination system at the facility has been installed to comply with the fmal chlorine limits in the existing permit. By August 1, 1996, the headworks will be moved to a new location (northeast of the primary clarifier no. 1) with new mechanical bar screens. The influent sample collection station will be located at the new headworks. Due to interference by the in-plant recycle streams at the existing location, the influent samples are generally not representative of the facility influent. When the influent sampling station is moved to the new location, the facility will be able to collect representative influent samples. An extensive odor control system has been installed at the facility in order to remove foul odors from various treatment units. The odor control system covers headworks, grit basins, primary clarifiers, biofilter, aeration basin fulet, primary sludge pump station, gravity thickener, secondary clarifier scum pits, DAFT, digester complex, and centrifuge area. The secondary treated effluent after dechlorination is discharged to Sinclair Inlet, Puget Sound. The effluent is discharged through a 36-incl1 diameter outfall pipe which extends 450 feet offshore and terminates with a 120-foot long diffuser. The 570-foot long outfall discharges into Sinclair Inlet at a location west of PSNS. The outfall diffuser consists of a 120-foot long pipe with twenty (20) 6.5-inch diameter ports 6.33 feet apart. The diffuser depth is approximately 27 feet below mean lower low water (NILL W). F ACT SHEET City of Bremerton Permit No. W A-002928-9 Page 6 The plant layout and the outfall location are shown in diagrams included in Appendix C. 4. DESCRIPTION OF THE WASTEWATER COLLECTION SYSTEM The wastewater collection system has been constructed in various phases as a result of changing regulations coupled with occasional rapid population growth and new development over the course of nearly 90 years. Sinclair Inlet Facilities Planning work conducted in mid-1970's indicated that some irifiltration occurs in existing sewers, although it is not a major component of the sewage flow and is not cost-effective to remove. Approximately 60 percent of the sewer system is composed of combined sewers and, consequently, inflow represents a significant portion of the total sewage flow. Most of the combined sewage (sanitary sewage combined with storm water) is received and treated at the Facility. Increased maintenance of the collection system will further allevaite problems with infiltration. There are 16 combined sewer overflow (CSO) sites in the collection system, which are composed of 21 structures and 17 outfaIls. As required by WAC 173-245, the City submitted a CSO Reduction Plan to the Department for review and approval. The CSO Reduction Plan, October 1992, was approved by the Department on November 20, 1992. The City is currently implementing this plan, which recommends a 20-year program to reduce CSOs to not more than one per year at each CS 0 site in confonnance with WAC 173-245. Storm drainage separation is the recommended method of CSO reduction for all but two of the CSO sites. This method will require removing 90 percent or more of the stann drainage currently conveyed. by the combined sewers. 5~ RESIDUAL SOLIDS Since June 1992, all biosolids (sludge) generated at the facility have been utilized on forest lands owned by the City. The .biosolids application/utilization sites are permitted by the Bremerton-Kitsap County Health District. The biosolids have been utilized as fertilizer to enhance timber growth, as well as an amendment to improve overall soil quality. Most of the biosolids utilized at the site are in liquid form. Smail percentage of the biosolids are dewatered by the centrifuge at the facility prior to utilization on the forest lands. The centrifuge is used as a back-up for the normal liquid mode of transport and application. Inclement weather and equipment down-time are the main reasons for the centrifuge operation. Monitoring reports for the application/utilization operations are submitted to the Brernerton-Kitsap County Health District. A copy of the 1994 Annual Report and Permit Renewal Application with the monitoring data was submitted to the Department in March 1995. FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 7 The screenings and the grit removed at the facility are transported to the Olympic View Sanitary Landfill for disposal. 6. PERMIT STATUS The existing permit for this facility was issued on August 11, 1993, and expires on June 30, 1996. An application for permit renewal was received by the Department on January 4, 1996. 7. SIDvIMARY OF INSPECTIONS The facility received its last Class I inspection on August 28, 1995. A,Class II inspection was conducted on October 18, 1995. The inspection reports are in the facility's record file at the Northwest Regional Office (NWRO) of the Department. 8. EXISTING EFFLUENT LIMITS The existing permit placed effluent limitations on 5-day Biochemical Oxygen Demand (BODS)' Total Suspended Solids (TSS), pH, Fecal Coliform bacteria, chlorine, copper, and mercury. The effluent limitations as stipulated in Condition Sl.A. of the existing permit are as follows: I Parameter Monthly Average Weekly Average r Biochemical Oxygen 30 mg!I, 2527 lbs/ day 45 mg/I, 3790 Ibs/day I r Dernand* (5 day)(BODS) :1 :i Total Suspended Solids* 30 mg!I, 2527 Ibs/ day 45 mg!I, 3790 Ibsl day (TSS) I :~ Colifonn Bacteria 200/100 ml 400/1 00 rnl shall not be outside the range 6.0 to 9.0 Parameter Monthly Average Daily Average Total Available (Residual) i I. I Chlorine: Interim Effluent Limitations 0.5 mg!! 1.0 mg!I ~ i I Parameter Monthly Average Daily Maximum I I Total Available (Residual) Chlorine: Final Effluent Limitations 0.08 mg!I 0.23 mg!I 6.74 Ibs/day FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 8 ! I Parameter Monthly Average Weekly Average Copper (Total Recoverable) : Interim Effluent Limitations Final Effluent Limitations 146 ug/l 12.31bs/day 16.3 ug/l 1.371bs/day 1.3 ug/l O.l1lb/day 268 ugll 45 ug/l Mercury (Total Recoverable) I 2.5 ug/l The monthly and weekly averages for BODS and TSS are based on the arithmetic mean of the samples taken. The averages for fecal coliform are based on the geometric mean of the samples taken. *The monthly average effluent concentration limitations for BOD5 and TSS shall not exceed 30 mg!lor 15 percent of the respective influent concentrations, whichever is more stringent. The minimum reduction requirement does not apply during wet weather months, October through March, inclusively, when the plant flows are influenced by combined sewage. The daily average for Total Available (Residual) Chlorine is the arithmetic mean of the samples taken during a calendar day. The monthly average is the arithmetic mean of the samples taken during a calendar month. . 9. SUMMARY OF COMPLIANCE WITH THE EXISTING PERMIT The facility flows and influent wastewater characteristics (BOD5 and TSS) for the period of September 1993 through August 1995 are shown in the graphs in Appendix D. The graphs are based on the monthly. plant monitoring data submitted by the facility as a requirement of its NPDES permit. For comparison purposes, the graphs also show the values for the facility design criteria and 85 % of the design criteria. A. COMPLIANCE WITH DESIGN CRITERIA The design criteria for the facility are stipulated in Condition S4.A. of the existing permit. As seen from the monthly average flow graph, the facility is generaily operating below its 85 % design flow capacity. Only twice during the last two years has the monthly average flow exceeded 85 % of the design capacity. The increased flows during wet weather months are the result of stonn water inflows from combined sewers. F ACT SHEET City of Bremerton Permit No. W A-002928-9 Page 9 As stated earlier, approximately 60 percent of the sewer system is composed of combined sewers and, consequently, inflow represents a significant portion of the total sewage flow during the wet weather months. A large portion of the combined sewage is received and treated at the Facility. Storm drainage separation is the recommended. method of CSO reduction for all but two of the CSO sites in the CSO Reduction Plan which the City is currently implementing. This method will remove 90 percent or more of the storm drainage currently conveyed by the combined sewers.. This should significantly reduce the influent flows to the facility in the future during wet weather months. The influent BOD and TSS graphs (mass loadings in pounds per day) indicate that the facility was operating above its design capacities for several months. However, the high BOD and TSS in the influent samples were probably caused by a problem with collecting representative influent samples at the facility. The facility's internal recycle streams were returning too close to the influent sampling station, and thus, artificially raising the influent loading values. This problem was pointed out in the Fact Sheet for the existing permit. The influent sampling station has recently been moved to a new location by the new headworks, and the facility is now expected to be able to collect representative influent samples. B. COMPLIANCE WITH EFFLUENT LIMITS: Current effluent limits for the facility are stipulated in Condition S 1.A. . of the existing permit. The effluent wastewater characteristics (conventional pollutants and toxics, with limits in the existing permit) for the period of September 1993 through August 1995 are shown in graphic form in Appendix D. The graphs are based on the monthly plant monitoring data submitted by the facility as a requirement of its NPDES permit. For comparison purposes, the graphs also show the effluent limits. The graphs show that the facility has been consistently in compliance with the effluent limits for all parameters except chlorine. Non compliance with chlorine limits occurred only twice during the two year period, one of which is only slightly above the effluent limit. It should be noted that the effluent mercury measurements shown as 0.2 PPB are actually less than 0.2 PPB, which is the method detection limit (MDL). The existing permit also contains final effluent limits for copper. A schedule for complying with these limits is stipulated in the Administrative Order Number DE 93WQ-N229. As required by the order, the City has submitted an "Effluent Taxies Evaluation Report" to the Department. FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 10 As part of the monitoring requirement in the permit, the Permittee has also submitted priority pollutant analysis for the facility effluent. The analysis includes metals, volatile compounds, acid compounds, base/neutral compounds; and pesticides. PROPOSED PERMIT LIMITATIONS AND CONDITIONS Federal and State regulations require that effluent limitations set forth in a NPDES permit must be either technology- or water quality-based. Technology-based limitations for municipal discharges are set by regulation (Code of Federal Regulations (CFR) 40 CPR 133, and Chapters 173-220 and 173-221 WAC). Water quality-based limitations are. based upon compliance with the Surface Water Quality Standards (Chapter 173-201A WAC), Ground Water Standards (Chapter 173-200 WAC) or Sediment Quality Standards (Chapter 173-204 WAC). The most stringent of these types of limits must be chosen for each of the parameters of concern. Each of these types of limits is described in more detail below. 1. DESIGN CRITERIA In accordance with WAC 173-220-130(1)(a), effluent limitations shall not be less stringent than those based upon the design criteria for the facility, which are contained in approved engineering plans, reports, or approved revisions. Also, in accordance with WAC 173-220-150 (l)(g), flows or waste loadings shall not exceed approved design criteria. The design criteria for this treatment facility ;lI'e taken from the construction. plans (April 1983) prepared by CH2M Hill, and approved by the Department. The de~ign criteria for the facility are as follows: Monthly average flow (max. month): Influent BODS loading (max. month): Influent TSS loading (max. month): 10.1 MGD 18,100lbs/day 22,600lbs/day 2. TECHNOLOGY-BASED EFFLUENT LIMITATIONS Municipal wastewater treatment plants are a category of discharger for which technology-based effluent limits have been promulgated by federal and state regulations. These effluent limitations are given in 40 CPR Part 133 (federal) and in Chapter 173-221 WAC (state). These regulations are performance standards that constitute all known available and reasonable methods of prevention, control, and treatment for municipal wastewater. The following technology-based limits for pH, fecal coliform, BODS' and TSS are taken from chapter 173-221 WAC are: FACT SHEET City of Bremerton Permit No. W A-Q02928-9 Page 11 Ill:I: shall be within the range of 6 to 9 standard units. '1 I J . i Fecal Coliform Bacteria: Monthly Geometric Meal?- = 200 colonies/lOO ml Weekly Geometric Mean = 400 colonies/IOO ml BODS: Average Monthly Limit is the most stringent of the following: - 30 mg/L - may not exceed fifteen percent (15 %) of the average influent concentration. Average Weekly Umit = 45 mg/L . I I . i . TSS: Average Monthly Limit is the most stringent of the following: - 30 mg/L - may not exceed fifteen percent (15%) of the influent concentration. . I i . I , Average Weekly Limit = 45 mg/L I . ! The following technology -based mass limits are based on WAC 173-220-130(3) (b) and 173- 221-030(11)(b) . The monthly average effluent mass loadings (lbs/day) were calculated as maximum monthly design flow (10.1 MGD) x Concentration limit (30 mg/L) x 8.34 (conversion 1 factor) = mass limit (lbs/day). I The weekly average effluent mass loadings (lbs/day) were calculated as maximum I monthly design flow (10.1 MGD) x Concentration limit (45 mg/L) x 8.~4 (conversion . I factor) = mass limit (lbs/day). 3. SURFACE WATER OUALITY-BASED EFFLUENT LIMITATIONS In order to protect existing water quality and preserve the designated beneficial uses of Washington's surface waters, WAC 173-201A-060 states that waste discharge permits shall be conditioned such that the discharge will meet established Surface Water Quality Standards. The Washington State Surface Water Quality Standards (Chapter 173-201A WAC) is a state regulation designed to protect the beneficial uses of the surface waters of the state. Water quality-based effluent limitations may be based on an individual waste load allocation (WLA) or on a WLA developed during a basin-wide total maximum daily loading study (TMDL). FACT SHEET City of Bremerton Permit No. WA-002928-9 Page 12 A. Numerical Criteria for the Protection of Aquatic Life . "Numerical" water quality criteria are numerical values set forth in the State of Washington's Water Quality Standards for Surface Waters (Chapter 173-201A WAC). They specify the levels of pollutants allowed in a receiving water while remaining protective of aquatic life. Numerical criteria set forth in the Water Quality Standards are used along with chemical and physical data for the wastewater and receiving water to derive the effluent limits in the discharge permit. When surface water quality-based limits are more stringent or potentially more stringent than technology-based limitations, they must be used in a permit. B. Numerical Criteria for the Protection of Human Health The state was issued 91 numeric water quality criteria for the protection of human health by the U.S. EPA (BPA 1992). These criteria are designed to protect humans from cancer and other disease and are primarily applicable to fish and shellfish consumption and drinking water from surface waters. C. Narrative Criteria In addition to numerical criteria, "narrative" water quality criteria rw AC 173- 201A-030) limit toxic, radioactive, or deleterious material concentrations below those which have the potential to adversely affect characteristic water uses, cause acute or chronic toxicity to biota, impair aesthetic values, or adversely affect human health. Narrative criteria protect the specific beneficial uses of all fresh CNAC 173-201A-130) and mari~e c:NAC 173-201A-140) waters in the State of Washington. D. Antidegradation The State of Washington's Antidegradation Policy requires that discharges into a receiving water shall not further degrade the existing water quality of the water body. In cases w.here the natural conditions of a receiving water are of lower quality than the criteria assigned, the natural conditions shall constitute the water quality criteria. Similarly, when the natural copditions of a receiving water are of higher quality than the criteria assigned, the natural conditions shall constitute the water quality criteria. More information on the State Antidegradation Policy can be obtained by referring to WAC 173-201A- 070. The Department has reviewed existing records and is unable to determine if ambient water quality is either higher or lower than the designated classification criteria given in chapter 173-201A WAC; therefore, the Department will use the designated classification criteria for this water body in the proposed permit. J' FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 13 Critical Conditions E. Water quality-based effluent limits are derived for the waterbody's critical condition, which represents the receiving water and waste discharge condition with the highest potential for adverse impact on the aquatic biota, human health, and existing or characteristic water body uses. F. Mixing Zones , ! The Water Quality Standards allow the Department of Ecology to authorize mixing zones around a point of discharge in establishing surface water quality- based effluent limits. Both "acute" and "chronic" mixing zones~may be authorized for pollutants that can have a toxic effect on the aquatic environment near the point of discharge. The concentration of pollutants at the boundary of these mixing zones may not exceed the numerical criteria for that type of zone. Mixing zones can only be authorized for discharges that are receiving all known, available, and reasonable methods of prevention and control (AKART) and in accordance with other mixing zone requirements of WAC 173-201A-100. . 1 I ~ The National Toxics Rule (EP A, 1992) allows the chronic mixing zone to be used to meet human health criteria. 4. SURFACE WATER OUALITY CRITERIA The facility discharges to Sinclair Inlet (puget Sound) which is designated as a Class Class "A" Marine water in the vicinity of the outfall. Characteristic uses include the following: water supply (domestic, industrial, agricultural); stock watering; fish migration; fish and shellfish rearing, spawning and harvesting; wildlife habitat; primary contact recreation; sport fishing; boating and aesthetic enjoyment; commerce and navigation. Water quality of this class shall meet or exceed the requirements for all or substantially all uses. Applicable criteria are defined in chapter 173-20 1A WAC for aquatic biota. In addition, U. S. EP A has promulgated human health criteria for toxic pollutants (EP A 1992). Water Quality Criteria for this waterbody are summarized below: Fecal Coliforms: Dissolved Oxygen: Temperature: pH: 14 colonies/1oo mL maximum geometric mean 7 mg/L minimum 13 degrees Celsius maximum 7.0 to 8.5 standard units FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 14 Turbidity: Toxics: Less than 5 NTU above background No taxies in toxic amounts 5. CONSIDERATION OF SURFACE WATER OUALITY-BASED LL\1ITS FOR NUMERIC CRITERIA Pollutant concentrations in the proposed discharge exceed water quality criteria with technology-based controls which the Department has determined to be AKART. A mixing zone is authorized in accordance with the geometric configuration, flow restriction, and other restrictions for mixing zones in chapter 173-201A WAC and are defined as follows: a. In estuaries, mixing zones, singularly or in combination with other mixing zones, shall: (i) Not extend in any horizontal direction from the discharge port(s) for a distance greater than two hundred feet plus the depth of water over the discharge port(s) as measured during mean lower low water; and (ii) Not occupy greater than twenty-five percent of the width of the waterbod y as measured during mean lower low water. b. In estuarine waters, a zone where acute criteria may be exceeded shall not extend beyond ten percent. of the distance established in a. above, as measured independently from the discharge port(s). The vertical limitations for both chronic and acute zones is the depth of water over the discharge port(s) as measured during mean lower low water. 6. DETERMINATION OF DILUTION RATIOS: The mixing zone boundaries for the facility discharge are depicted in Condition S 1.B. of the permit. The dilution ratios of receiving water to facility effluent that occur within the mixing zones at the critical conditions have been determined by the use of UDKHDEN model. The modeling analysis was conducted by CH2M Hill, the Permittee's consultant. The dilution ratios for the facility effluent under critical conditions for aquatic life criteria are predicted to be: (i) Receiving Water:Facility Effluent of 69: 1 for the chronic zone boundary; and (ii) Receiving Water:Facility Effluent of 25:1 for the acute zone boundary. FACT SHEET City of Bremerton Permit No. WA-002928-9 Page 15 I I \ The chronic dilution ratio is based on the existing maximum month flow of 9.8 MGD, and the receiving water conditions of maximum stratification with 50th percentile current speed of 4 em/second (assumed), at mean lower low water (MLLW). The acute dilution ratio is based on the existing maximum daily flow of 19.2 MGD, and the receiving water conditions of maximum stratification with current speed of 0 em/ second (assumed), at mean lower low water (MLL W). ~ , I The original dilution analysis was submitted by the Permittee with the last permit application. The dilution ratio in the acute mixing zone boundary in the proposed permit is lower (25: 1 as compared to 31: 1) for some taxies and higher (25: 1 as compared to 18:1) for the others. This is due to the fact that the Department's current Permit Writer's Manual allows the use of daily maximum flows_ for modeling in the acute zone boundary. For the existing permit, peak hourly flow was used for some taxies, and the maximum month flow for the others, to determine the acute zone dilution ratios. Because the daily maximum flow falls somewhere in between these flows, the dilution ratio in the proposed permit for the acute zone boundary is lower for some taxies and higher for the others. j The dilution ratios for human health criteria are based on annual average design flow (7.6 MGD) for carcinogens, and maximum month flow for the past three years (9.8 MGD) for non-carcinogens. Chronic design conditions are used for both initial mixing and far-field mixing calculations. The dilution ratios are based on the receiving water conditions of maximum stratification with 50th percentile current speed of 4 em/second (assumed), at mean lower low water (MLLW). The Department's Permit Writer's Manual recommends use of ambient density profile that results in average mixing, for modeling. However, the modeling was conducted for maximum and minimum stratification conditions only. The dilution ratios selected are based on the maximum stratification, which would be more conservative than the ones based on the density profile that results in average mixing. Based on the modeling, the predicted dilution ratios are (i) 74: 1 for carcinogens, and (ii) 69: 1 for non- carcinogens. The dilution ratio of 74: 1 for the annual average design flow of 7.6 MGD (for carcinogens) was taken from the dilution analysis of October .29, 1992, submitted by the permittee with. the previous permit application. - i g ~I , ~ The predicted dilution ratios for aquatic life criteria and human health criteria are summarized in the table below: Acute Chronic Aquatic Life 25:1 69:1 Human Health, 74:1 Carcinogen 1 Human Health, 69:1 ,I Non-carcinogen F ACT SHEET City of Bremerton Permit No. W A-002928-9 Page 16 7. REASONABLE POTENTIAL AND WATER OUALITY-BASED PERMIT LIMITS DETERMINATIONS [, Pollutants in an effluent may affect the aquatic environment near the point of discharge (near field) or at a considerable distance from the point of discharge (far field). Toxic pollutants, for example, are near-field pollutants--their adverse effects diminish rapidly with mixing in the receiving water. Conversely, a pollutant such as BOD is a far-field pollutant whose adverse effect occurs away from the discharge even after dilution has occurred. Thus, the method of calculating water quality-based effluent limits varies with the point at which the pollutant has its maximum effect. The derivation of water quality-based limits also takes into account the yariability of the pollutant concentrations in both the effluent and the receiving water. A. Conventional Pollutants (i) Temperature--Under critical conditions there is no predicted violation of the Water Quality Standards for Surface Waters. Therefore, no effluent limitation for temperature is placed in the proposed permit. (ii) pH--Because of the high buffering capacity of marine water, compliance with the technology-based limits of 6 to 9 will assure compliance with the Water Quality Standards for Surface Waters. (ill) Fecal Coliform--Under critical conditions there is no predicted violation of the Water Quality Standards for Surface Waters with the technology-based limit. Therefore, the technology-based effluent limitation for fecal coliform bacteria is placed in the proposed permit. B. Toxic Pollutants Federal regulations (40 CFR 122.44) require NPDES permits to contain ~ effluent limits for toxic chemicals in an effluent whenever there is a reasonable potential for those chemicals to exceed the surface water quality criteria. This process occurs concurrently with the derivation of technology-based effluent limits. Facilities with technology-based effluent limits defmed in regulation are not exempted from meeting the Water Quality Standards for Surface Waters or from having surface water quality-based effluent limits. A reasonable potential analysis (please see Appendix E) was conducted for the taxies r:vv AC 173-201A-G40) to determine the potential to exceed the water quality criteria for aquatic life. This would determine whether or not effluent limitations for these parameters would be required in this permit. The analysis was conducted using procedures given in EPA, 1991. FACT SHEET City of Bremerton Permit No. WA-002928-9 Page 17 The dilution ratios used in the reasonable potential calculations are shown in the table in the "Determination of Dilution Ratios II section above. \ ; j No valid ambient background data is available for any of the toxics, and therefore, background concentrations for all the toxics were assumed zero. In the future, the Department may conduct ambient monitoring in Sinclair Inlet to determine metals concentrations. ~ -~ 1 . f q As noted in the comment column of the reasonable potential analysis, some of the compounds show values below method detection limits (MDLs). All MDLs are very low. Therefore, reasonable poten~ analysis was not conducted for these compounds. It should be noted that in the priority pollutant analyses, none of these compounds were detected in the influent, effluent, and sludge. -- -~ ! The reasonable potential analysis shows that only chlorine has a reasonable potential to cause a violation of the Water Quality Standards. Effluent limits were calculated for chlorine using methods from EPA, 1991 as shown in Appendix F. The resultant effluent limits, which are stipulated in Condition S l.A. of the proposed permit, are as follows: 'Parameter Monthly Average Limit Daily Maximum Limit Total Residual Chlorine 0.13 mg/L 0.37 mg/L It should be noted that during the development of the existing permit, copper and mercury showed reasonable potential to violate water quality criteria for aquatic life. This was due to inadequate data base for the effluent metals. The water quality-based effluent limits for copper and mercury were calculated for and stipulated in the existing permit. Based on the effluent metals data currently available for the facility, neither copper nor mercury has a reasonable potential to violate water quality criteria for aquatic life. Therefore, no limits are specified for these pollutants in the proposed pennit. The Department had issued an Administrative Order to the City in August 1993, to require the City to comply with the final copper limits in the existing permit by August 1, 2003. Because copper in the effluent is no longer a concern based on the reasonable potential analysis, this Order will be rescinded by the Department. FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 18 ~ I I I 8. WHOLE EFFLUENT TOXICITY The Water Quality Standards for Surface Waters require that the effluent not cause toxic effects in the receiving waters. Many toxic pollutants cannot be detected by commonly available detection methods. However, toxicity can be measured directly by exposing living organisms to the wastewater in laboratory tests and measuring the response of the organisms. Toxicity tests measure the aggregate toxicity of the whole effluent, and therefore this approach is called whole effluent toxicity (WET) testing. Some WET tests measure acute toxicity and other WET tests measure chronic toxicity . Acute toxicity tests measure mortality as the significant response to the JOxicity of the effluent. Dischargers who monitor their wastewater with acute toxicity tests are providing an indication of the potential lethal effect of the effluent to organisms in the receiving environment. Chronic toxicity tests measure various sublethal toxic responses such as retarded growth or reduced reproduction. Chronic toxicity tests often involve either a complete life cycle test of an organism with an extremely short life cycle or a partial life cycle test on a critical stage of one of a test organism t s life cycles. Organism survival is also measured in some chronic toxicity tests. Accredited WET testing laboratories have the proper WET testing protocols, data requirements, and reporting format. Accredited laboratories are knowledgeable about WET testing and capable of calculating an NOEC, LCSO' ECSO' rcSO' etc. Ecology recommends that Permittees send a copy of the acute or chronic toxicity sections(s) of their permits to their laboratory of choiCe. . An effluent characterization for acute and chronic toxicity was conducted during the current permit term. Acute toxicity was measured during this effluent characterization. However, the Permittee has recently installed effluent dechlorination system as required by the permit, which could result in decrease in effluent toxicity. Therefore, the Permittee is required to repeat the effluent characterization for acute toxicity. If acute toxicity is measur'ed during effluent characterization at levels that, in accordance with WAC 173-20S-0S0(2)(a), have a reasonable potential to cause receiving water toxicity t then the proposed permit sets a limit on the acute toxicity. The proposed permit then requires the Permittee to conduct WET testing in order to monitor for compliance with the acute toxicity limit. The proposed permit also specifies the procedures the Permittee must use to come back into compliance if the limits are exceeded. I , J I I I I I n I I FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 19 The WET tests during effluent characterization indicate that no reasonable potential exists to cause receiving water chronic toxicity, and the Permittee will not be given a chronic WET limit and will only be required to retest the effluent prior to application for permit renewal in order to demonstrate that chronic toxicity has not increased in the effluent. If the Permittee makes process or material changes which, in the Department's opinion, results in an increased potential for effluent toxicity, then the Department may require additional effluent characterization in a regulatory order, by permit modification, or in the permit renewal. Toxicity is assumed to have increased if WET testing conducted for submission with a permit application fails to meet the performance standards in WAC 173-205-020, "whole effluent toxicity p.erfonnance standard". The Permittee may demonstrate to the Department that changes have not increased effluent toxicity by performing additional WET testing after the time the process or material changes have been made. Under certain circumstances, limited number of dilutions are required for acute and chronic WET testing. However, as stated in Conditions S9.F.7. and SlO.B.7., the permittee may choose to run the full dilution series. It is strongly recommended th~t the permittee run the full dilution series in order for better evaluation of the results. . 9. HUMAN HEALTH CRITERIA As required by the existing permit, the permittee has submitted effluent analysis for the priority pollutants. The analysis includes most chemicals of concern with human health criteria. The facility's high priority status is based on: (i) status as a major discharger, and (ii) knowledge of data indicating regulated chemicals occur in the discharge. . A determination of the discharge's potential to cause an exceedance of the water quality standards was conducted as required by 40 CFR 122.44(d). The reasonable potential determination was performed with procedures given in the Technical Support Document for Water Quality-Based Toxies Control (EPA/505/2-90-001) and the Department's Permit Writer's Manual (Ecology Publication 92-109). The reasonable potential analysis is included in Appendix E. As noted in the comment column of the reasonable potential analysis, most of the compounds show the values below method detection limits (MDLs). All MDLs are very low. Therefore, reasonable potential analysis was not conducted for these compounds. It should be noted that in the priority pollutant analyses, very few compounds were detected in the influent, effluent, and sludge. Some of the compounds were detected in the influent and the sludge but not in the effluent. F ACT SHEET City of Bremerton Permit No. W A-002928-9 Page 20 Based on the concentrations of these compounds found in the influent and the sludge, and the MDLs used for the effluent, none of these compounds would exceed human health criteria with the chronic dilution ratios of 74: 1 for carcinogens and 69: 1 for non-carcmogens. The reasonable potential analysis shows that none of the pollutants have a reasonable potential to cause a violation of the water quality standards based on human health criteria. Because of sampling results below MDLs, there is uncertainty about arsenic in the reasonable potential analysis. The reasonable potential calculation for arsenic was conducted with the 50th percentile concentration of 50 ug/L. However, the actual 50th percentile concentration is less than 50 ug/L.. As noted in the comment colul1lIl, 93 out of 94 analyses show arsenic concentrations below MDLs. The MDLs in 92 analyses were 50 ug/L. In order to better evaluate human health criteria for arsenic, Condition S2.C. (TOXICS) of the proposed permit requires the permittee to monitor for arsenic in the effluent at a much lower detection limit of 1 ug/L by Graphite Furnace Atomic Absorption (GF AA) method. Based on the results of the analyses during this permit term, human health criteria limits for arsenic will be evaluated during the next permit cycle. 10. SEDIMENT OUALITY The Department has promulgated aquatic sediment standards (Chapter 173-204 WAC) to protect aquatic biota and human health. These standards state that the Department may require Permittees to evaluate the potential for the discharge to cause a violation of applicable standards 0NAC 173-204-400). As required by the existing permit, the permittee has submitted a Baseline Sediment Monitoring Plan. The Department's Sediment Management Unit (SMU) has reviewed the plan and recommended conditional approval of the plan. :Minor revisions in the plan will be required as provided in the comments from the SMU. As specified in Condition S 11. of the proposed permit, the permittee is required to conduct sediment sampling and analysis as described in the approved plan. 11. GROUND WATER au ALITY LIMIT A TrONS This Permittee has no discharge to ground and therefore no limitations are required based on potential effects to ground water. 12. MONITORING AND REPORTING Effluent monitoring, recording, and reporting are required (WAC 173-220-210 and 40 CFR 122.41) to verify that the treatment process is functioning correctly and the effluent limitations are being achieved. The monitoring and testing schedule is detailed in the proposed permit under Condition S2. Specified monitoring frequencies take into account the quantity and J . I .\ i , , 13. . ~ FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 21 variability of discharge, the treatment method, past compliance, significance of pollutants, and cost of monitoring. The required monitoring frequency is fairly consistent with agency guidance given in the current version of the Department Permit Writer's Manual for activated sludge plants with greater than 5 MGD average design flow. In order to keep track of process efficency, and for the purposes of troubleshooting in case of noncompliance and/or plant upsets, the proposed permit also requires process monitoring. COMBINED SEWER OVERFLOWS The City has numerous combined sewers in its collection system. During precipitation events, the excess combined sewage overflows into the re(!eiving water body, rather than conveyed to the facility, if the capacity of combined sewer is exceeded. There are 16 combined sewer overflow (CSQ) sites in the collection system, which are composed of 21 structures and 17 outfalls. Condition 12. in the permit includes a list of the CSO outfalls. RCW 90.48.480 requires Ecology to work with local governments to develop reasonable plans and compliance schedules for the greatest reasonable reduction of CSO's. Chapter 173-245 WAC established a procedure and criteria for implementing RCW 90.48.480. In accordance with these laws, the City submitted the fmal "Combined Sewer Overflow Reduction Plan" to the Department in October 1992, which was approved on November 20, 1992. The plan includes improvement types and implementation schedules for the ultimate goal of greatest reasonable reduction of CSOs as defined in WAC 173-245-020(22). Conditions S12.B. and C. of the permit requires the City to submit the reports that are required by WAC 173-245. The City and the Department have entered into an Order On Consent (No. DE 93WQ - 150), which stipulates a compliance schedule for all the CSQ reduction projects. As required by the Order On Consent, the City has completed improved flow monitoring at each overflow site. Other improvements for the overflow sites are planned for the future. The City also completed the Warren Avenue Basin Separation project in October 1995. Construction of Phase I of the Callow Avenue Basin project has been completed. The remainder of the project is planned to be completed during this permit term. FACT SHEET City of Bremerton Permit Nq. W A-002928-9 Page 22 OTHlili PERMIT CONDmONS 1. PREVENTION OF FACILITY OVERLOADING Overloading of the treatment plant is a violation of the terms and conditions of the permit. To prevent this from occurring, RCW 90.48.110 and WAC 173-220-150 require the Permittee to take the actions detailed in Condition S4.B. of the proposed permit 2. OPERATION AND MAINTENANCE (O&M) - The proposed permit contains condition S5. as authorized under RCW 90.48.110, WAC 173-220-150, WAC 173-230, and WAC 173-240-080. It is included to ensure proper operation and regular maintenance of equipment, and to ensure that adequate safeguards are taken so that constructed facilities are used to their optimum potential in terms of pollutant capture and treatment 3. RESIDUAL SOLIDS HANDLING To prevent water quality problems the Permittee is required in permit condition S7. to store and handle all residual solids (grit, screenings, scum, sludge, and other solid waste) in accordance with the requirements of RCW 90.48.080 and State Water Quality Standards. The final use and disposal of sewage sludge from this facility is regulated by U.S. EP A under 40 CFR 503. The disposal of other solid waste is under the jurisdiction of the Bremerton-Kitsap County Health Department. 4. PRETREATMENT Since the pretreatment program has not been delegated to the permittee, the pretreatment condition S8. in the proposed pennit is a standard condition derived from the Federal Regulation40 CFR 403.5. GENERAL CONDmONS General Conditions are based directly on state and federal law and regulations and have been standardized for all individual NPDES permits issued by the Department. FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 23 PER.l\tIIT ISSUANCE PROCEDURES 1. PERMIT MODIFICATIONS The Department may modify this permit to impose numerical limitations, if necessary to meet Water Quality Standards, Sediment Quality Standards, or Ground Water Standards, based on new information obtained from sources such as inspections, effluent monitoring, outfall studies, and effluent mixing studies. The Department may also modify this permit as a result of new or amended state or federal regulations. 2. RECOMMENDATION FOR PERMIT ISSUANCE The proposed permit meets all statutory requirements for authorizing a wastewater discharge, including those limitations and conditions believed necessary to protect human health, aquatic life, and the beneficial uses of waters of the State of Washington. The Department proposes that this permit be issued for 5 years. 3. REVIEW BY THE PERMITTEE The proposed permit was reviewed by the Permittee for verification of facts. Only factual items were corrected in the draft permit and fact sheet. REFERENCES FOR TEXT AND APPENDICES (1) National Toxics Rule, Federal Register, V. 57, No. 246, Tuesday, December 22, 1992. (2) Technical Support Document for Water Quality-based Toxics Control, EPA/505/2-90-001, EPA, 1991. (3) Permit Writer's Manual, Department of Ecology, January 1996. (4) Wastewater Comprehensive Plan - Final Draft, City of Bremerton, April, 1992. FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 24 APPENDIX A PUBLIC INVOLVEMENT INFORMATION The Department has tentatively determined to reissue a permit to the applicant listed on page 1 of this fact sheet. The permit contains conditions and effluent limitations which are described in the rest of this fact sheet. The Department has published a Public Notice of Draft (PNOD) on in the Bremerton Sun to inform the public that a draft permit and fact sheet are available for review. Interested persons are invited to submit written comments regarding the draft permit. The draft permit, fact sheet, and related documents are available, for inspection and copying between the hours of 8:00 a.m. and 5:00 p.m. weekdays, by appointment, at the regional office listed below. Written comments should be mailed to: Water Quality Permit Coordinator Department of Ecology Northwest Regional Office 3190 160th Avenue SE Bellevue, W A 98008-5452. Any interested party may comment on the draft permit or request a public hearing on this draft permit within the thirty (30) day comment period to the address above. The request for a hearing shall indicate the interest of the party and the reasons why the hearing is warranted. The Department will hold a hearing if it determines there is a significant public interest in the draft permit 0N AC 173-220-090). Public notice regarding any hearing will be circulated at least thirty (30) days in advance of the hearing. 'People expressing an interest in this permit will be mailed an individual notice of hearing 0NAC 173-220-100). The Department will consider all comments received within thirty (30) days from the date of public notice of draft indicated above, in formulating a final determination to issue, revise, or deny the permit. The Department's response. to all significant comments is available upon request and will be mailed directly to people expressing an interest in this permit. Further information may be obtained from the Department by telephone, (206) 649-7201, or by writing to the address listed above. FACT SHEET . City of Bremerton Permit No. W A-002928-9 Page 25 APPENDIX B GLOSSARY Acute Toxicity-- The lethal effect of a compound on an organism that occurs in a short period of time, usually 48 to 96 hours. Ambient Water Quality-- The existing environmental condition of the water in a receivmg water body. Ammonia--Ammonia is produced. by the breakdown of nitrogenous materials in wastewater. Ammonia is toxic to aquatic organisms, exerts an oxygen demand, and contriQutes to eutrophication. It also increases the amount of chlorine needed to disinfect wastewater. Best Management Practices (BMPs)--Schedules of activities, prohibitions of practices, maintenance procedures, and other physical, structural and/or managerial practices to prevent or reduce the pollution of waters of the State. BMPs include treatment systems, operating procedures, and practices to control: plant site runoff, spillage or leaks, sludge or waste disposal, or drainage from raw material storage. BMPs may be further categorized as operational, source control, erosion and sediment control, and treatment B.MPs. BODs--Determining the Biochemical Oxygen Demand of an effluent is an indirect way of measuring the quantity of organic material present in an effluent that is utilized by bacteria. The BODS is used in modeling to measure the reduction of dissolved oxygen in a receiving water after effluent is discharged. Stress caused by reduced dissolved oxygen levels makes organisms less competitive and less able to sustain their species in the aquatic environment. Although BOD is not a specific compound, it is defmed as a conventional pollutant under the federal Clean Water Act. Bypass-The intentional diversion of waste streams from any portion of a treatment facility. Chlorine--Chlorine is used to disinfect wastewaters of pathogens harmful to human health. It is also extremely toxic to aquatic life. Chronic Toxicity-- The effect of a compound on an organism over a relatively long time, often 1/10 of an organism's lifespan or more. Chronic toxicity can measure survival, reproduction or growth rates, or.other parameters to measure the toxic effects of a compound or combination of compounds. Class 1 Inspection--A walk-through inspection of a facility that includes a visual inspection and some examination of facility records. It may also include a review of the facility's record of environmental compliance. F ACT SHEET City of Bremerton Permit No. W A-002928-9 Page 26 Class 2 Inspection--A walk-through inspection of a facility that includes the elements of a Class 1 Inspection plus sampling and testing of wastewaters. It may also include a review of the facility's record of environmental compliance. Clean Water Act (CW A)--The Federal Water Pollution Control Act enacted by Public Law 92-500, as amended by Public Laws 95-217, 95-576, 96-483, 97-117; USC 1251 et seq. Combined Sewer Overflow (CSO)-- The event during which excess combined sewage flow caused by inflow is discharged from a combined sewer, rather than conveyed to the sewage treatment plant because either the capacity of the treatment plant or the combined sewer is exceeded. Composite Sample--A mixture of grab samples collected at the same sampling point at different times, formed either by continuous sampling or by mixing discrete samples. May be "time-composite"(collected at constant time intervals) or . "flow-proportional" (collected either as a constant sample volume at time intervals proportional to stream flow, or collected by increasing the volume of each aliquot as the. flow increased while maintaining a constant time interval between the aliquots.. Construction Activity--Clearing, grading, excavation and any other activity which disturbs the surface of the land. Such activities may include road building, construction of residential . houses, office buildings, or industrial buildings, and demolition activity. Critical Condition-- The time during which tlJ.e combination of receiving water and waste discharge conditions have the highest potential for causing toxicity in the receiving water environment. This situation usually occurs when the flow within a water body is low, thus, its ability to dilute effluent is reduced. Daily Maximum Discharge Limitation-- The greatest allowable value for any calendar day. Dilution Factor--A measure of the amount of mixing of effluent and receiving water that occurs at the boundary of the mixing zone. Expressed as the inverse of the effluent fraction. Engineering Report--A document which thoroughly examines the engineering and administrative aspects of a particular domestic or industrial wastewater facility. The report shall contain the appropriate information required in WAC 173-240-060 or 173-240-130. Fecal Coliform Bacteria--Fecal coliform bacteria are used as indicators of pathogenic bacteria in the effluent that are harmful to humans. Pathogenic bacteria in wastewater discharges are controlled by disinfecting the wastewater. The presence of high numbers of fecal coliform bacteria in a water body can indicate the recent release of untreated wastewater and! or the presence of animal feces. FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 27 Grab Sample--A single sample or measurement taken at a specific time or over as short period of time as is feasible. Industrial Wastewater--Water or liquid-earned waste from industrial or commercial processes, as distinct from domestic wastewater. These wastes may result from any process or activity of industry, manufacture, trade or business, from the development of any natural resource, or from animal operations such as feed lots, poultry houses, or dairies. The term includes contaminated storm water and, also, leachate from solid waste facilities. InIlitration and Inflow (Ifn--"Inflltration" means the addition of ground water into a sewer through joints, the sewer pipe material, cracks, and other defects. "Inflow" means the addition of rainfall-caused surface water drainage from roof drains, yard d~s, basement drains, street catch basins, etc., into a sewer. Mixing Zone--An area that surrounds an effluent discharge within which water quality criteria may be exceeded. The area of the authorized mixing zone is specified in a facility's permit and follows procedures outlined in state regulations (chapter 173-201A WAC). Monthly Average Discharge Limitation-- The average of the measured values obtained over a calendar month's time. National Pollutant Discharge Elimination System (NPDES)-- The NPDES (Section 402 of the Clean Water Act) is the Federal wastewater permitting system for discharges to navigable waters of the United States. Many states, including the State of Washington, have been delegated the authority to issue these permits. NPDES permits issued by Washington State permit writers are joint NPDES/State permits issued under both State and Federal laws. pH--The pH of a liquid measures its acidity or alkalinity. A pH of 7 is defined as neutral, and large variations above or below this value are considered harmful to most aquatic -life. State Waters--Lakes, rivers, ponds, strearns,.inland.waters, underground waters, salt waters, and all other surface waters and watercourses within the jurisdiction of the state of Washington. Stormwater-- That portion of precipitation that does not naturally percolate into the ground or evaporate, but flows via overland flow, interflow, pipes, and other features of a storm water drainage system into a defined surface' water body, or a constructed infiltration facility. Technology-based Effluent Limit--A permit limit that is based on the ability of a treatment method to reduce the pollutant. Total Suspended Solids (TSS)-- Total suspended solids is the particulate material in an effluent. Large quantities of TSS discharged to a receiving water may result in solids accumulation. FACT SHEET City of Bremerton Permit No. W A-Q02928-9 Page 28 Apart from any toxic effects attributable to substances leached out by water, suspended solids may kill fish, shellfish, and other aquatic organisms by causing abrasive injuries and by clogging the gills and respiratory passages of various aquatic fauna. Indirectly, suspended solids can screen out light and can promote and maintain the development of noxious conditions through oxygen depletion. Water Quality-based Effluent Limit--A limit on the concentration of an effluent parameter that is intended to prevent the concentration of that parameter from exceeding its water quality criterion after it is discharged into a receiving water. Upset--An exceptional incident in which there is unintentional and temporary noncompliance with technology-based permit effluent limitations because of factors beyond the reasonable control of the Permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, lack of preventative maintenance, or careless or improper operation. FACT SHEET City of Bremerton Permit No. W A-002928-9 Page 29 APPENDIX C (i) W ASTEW A TER TREATMENT FACILITY LAYOUT riD OUTFALL LOCA nON i ! "'-' "'iI , 1 i I .1 f,' I, i1r ! : i ! , ! " !; i . ! j 1 l .,<--_1 1 1 1 HI -- ;'~~~'."~)~l~~\-: ~-h: ~f"!Jri') .~~5)h:lfJ.i)9~N' \ r~u. .~- 1 I-;'Ii, ~,~ <~ p~ll )J.~.\\\ f{" Ie::,. ,,'.,.... ',' J,r.. ~" ,... ':t~ ':~. ~t,~}\ ~~\ ~.J{ .. .... :)\'1 ~,,'. j,~)\ P,' Il.. ..~ III. ~l ,. I ~r ~j ~ al!l~ '"T\~'~;'~~: · .... ~~i J"'" .,:\~;~ I IF: -, ~~> {'JlLDSeJi' '. r'.: .1 ~'il ..:.l'r j . ~J~,.. -. ..it'., ....,,.;."'\1, I \ It". T 11 ,: ~-1 ...., ., ~ Po ';; Ov."~ Bov '.\.,,;>," :::e .}. ". '. I~:~ " .!),..~ . f:. , ~ ~. ~"',: '/ J:.:-- · \'.!'_ ~~_....., <; ~ ~ ~ __' I " U _ ,In ! '-: j oJ ,i ~ ;. .1~ ,\0, . ~ ." .",~ .. J ' . ~~.;;~. 't,.~.\\..... ..~ .\ . ~~l u\,U ~ "1 I~ . . UIP'\~~Ii'.!)-)"lr"A1!,TM.10'7~~J"''':'''" .~... .~~ J . " ~~. . ... ~ I;~ lSj~J~7.df~~\~ ~~ "-:~ .;-~... t:- ~i ';! ...l~, I ", . . ~ ~~~~~~: r~~~:~'Jl~f::~'c.r1~-*f~"'::' :~l ::;1' ,. t ~~~.m- 'I~-" ~~~ ..~.=~f.";'r~.. :r'_."'"'1.~ .~M\\:a. "~ji ... I~ I .. fooO ~7 1)1 . ~~~ ~ ..w~~ t'\v . ~ !\ = ~'I ~ ',.i . \ _ ( " . . .2: !_:: t; r t. '{ ...~...::/!~~~ .. :' r( U.I 'Ii ~ )!tf~ : .'r' , ~~\~ UW~. 7/; ~,,"\' L: /../:: :ll ~....+ \. \v~.., I :. I ,). ~ ..... l._\~l .' i ~ , '"" '""\l 4 ;, V\'.'~l' ,- ;r--_ !\~~~ ~\ ~, ~~. ~ ,,~tll rr \ 6'~.. )::. ~ ... _ 1) ~ ;j. '::; \ ~~' ",,"~,'::, ~ I .. ~,~ ~ :,!,)(', .L",:"' '::' I t-J ),; . .~ ~ I ~~ )~, ~'~" " ...~ li.,..r~~r1 ';.!,If) !!!Jt 1,1..I/~~ [, ,,_, ::\" ,1; , _j.:6 .....,~>#- "~~' - ~ \~ . - \ ~'\'J '~; 1tf.; ili'''~ ~ , < '(,'~i0 :, ~ ~~, .~, ~t" t .. "'< 1."'"1;1" ,J · ' ~.. 1:\ '1lMdl.' , t ~. -'\\N~~. PT."''':~ ..1.')~:~\r~~"'I~:r..:;; v~I~;,.~,.., I'~C -'rr':-." ~ ~l))" LV ~~ \ .I-\\'\'1~11~ ~. III :. '. ., .; 'i.~' ~.\\ lp.!. '11~ 1IIQL ~ : I ',,, \\\::' - orp ~~rd)l., rtl.i ",~'~ ",',~ ." ...', ", ; . J ~ , r'ht8~\ :1,.~,JAlfl~J ',.41.~ "'\1, . .;.%"'~.\. '- ._._./ 1', jO l\~'------ flit, r~' .'7 \,x'''' I 1 ' I ) 7"/1U14,...,.,A.Jr,,~ -"~i~ (.~. " , '\ ~) ,) ::;~f. · r,(" ;r, ~ I'" . ,./ '. '....<;., J ,,",'0::::;''-:/,.) - ~-...'::---./ j./--,~ ~ ./ \ '.:"', ~.__ f' .),...:.i ~ ...........h~Jl... ~l ~ I ~ /JC#.MUfIetI -........1'1I......,..... '\', :~...... ~ ':. - ...{ j..f{ /J~ . ,..,..."............,. ~.8II.rI"1 A& .. '")... ~ '\ .P~/ \~~- ~~-. if:... r Dr-.................. CIID~ '...;.r ',~ "\ i<'. -- \\\~,t. ~' ~. r \ /' I " " ) ~}).. .~f~'~' 'V'.. ~ 1. tt. I ",', 7. ~fkJ7~\r'T,;D":' ~~ ! "'.. >- ~t';fi'a U U" I V" + - · ~_, ~~~ '~A ~',~} ~~!~. ~!~:'~ ..,. Ll. ,l""'::""-~'~ ,~' ~. ...., ~. ',~ """'yil ,J"1lIIUl .~~ ~:..~ ~ _ 7 ..." 1JjJ:~~ .:~~ ~ I ~.;=~.~ ~ .- . ~ . <~/'I\ -~~~. lij ; ~-L:_~ ..... . . . h' ~l\..l~ ( , " ;\' ~+-~ ".......'" .III i IITIf ... 11IIO I.. IiVlllM&IIIIl:' IIIl3m9 h."'- . - ~-., . .-- . 'J:.ik,l.l \,7"" IJ l C(CUMnrar '" ennu S SMCn · -,..~,:,- ': .......... ~~.g~/i 1J~1I I SCAlE l:~-IlXD , ::,...;;-:"""~.,;;'f., ..... ..' ~~ ~ I ~. .... ~'"I" ~ . =.~)::l%~~l~? ..... ~.... ~ f.. - __ ,:::;;.';~::~'~::;~:.~.:.: ';'~~~i;":~;;';~. ." .,:':'," " :-- 0.' v~4S ,..., fS4Q"fI4."""'- "'a~ o.%\\7'i"ii:-tliit """"00.""'."",.. .".'. . ~ . , ":."~}:~'cT' ~'J;~'::~:Z-~l--tl.~~:; \j;' ~ .:~~.~:,. . · .' ~~ 4.~FMIif ,..,. ';I~~t~~.,t'!'::~'I'.".'\\!:;~~~~.4~f" .... ~ . w). p:r1 ~. . ~ .411."'~,.,..,. -4"'-.I"P~ ~~:W.::.:.:;t,;::,!::,: :'" J'~ ...,.~..,. " . ~:i~ 7 '\"" t~)~;.. ~ (~._,. "&.A-"" '~N.;r..,. '..-1 "'" ~_'l \ " '1 ; ., fItItIV ~t:~'~., .. P". , 1!Ii~"f'1 ^ 5-<6..&(,...., wOil4......m- --~ -"--'_..._U'". . \. ',"" ""lI!r,.. '. _ I , ,.....~ -'" FACT SFIEET City of Bremerton Permit No. W A-002928-9 Page 30 APPENDIX D INFLUENT AND EFFLUENT CHARACTERISTICS GRAPHS ~ .; .. .. i ::I t. -I ~g ..oe >0 "".. ~; i~ r z " ... 15 al \l; ~ ~ Odd '!!:11N'JnUHf JDYVJ^'t ~ ~ ci c .. ~ ... ::I Ii. z,. -.. ...~ h .... >0 ..... i! i!i~ i'" z o Ii: ... :E .. lli i ~ ,. t;81lfl I: ~""r. '51lf~ i:~ ~: 0' ~ ;;' 8 ~: ; i: .. ~I ! VI 8 i: . o. r o. ~ #.. :1:. IIIIIi ,- IIIIi .. .. .... .. -- . iii IIIIIIi iii ! I ~: I.' i~ ~: 8 ;. -: I' ~ :3: i !: II c!. C 01 i .,., ~ ~f I _J i 1- = .. 1"- i ... i ~ .- ... ~ ~ ~ ~ ;tI/IH' 911'/1ft Isn!t 98111~ ,ATm Hlflfll ,,1I1f11 HUttOl HUIII!I e ~ .Sflll .""IfL Ufl/V .'11'''' twlf" tt;l'&rt Will: Will tllUll UIIIII tK/1fOI [61UG ~ 981tf8 '811ft 9511101 '811'; 98fl,t 18I'lft gllft,t ,"111 t81lftl Ul1111 HlfIfO' ~"" ~ ~ "511" ..81"t HI 110 Htflfg "81"" ..9'"[ .~1tr ,.811ft t&'Hll rBl'Hlr [BlUell EIII/6 .; .. ... i ::I Ii Ill: ..", ~~ ~c ~~ oeo ..... U !i~ r z o l- I< ! \l; l ci Ii! i ::I ~l ...~ ai >0 ""... ~~ n r f !l f :J f I I , . ~ !:! ! ~ ~ ndd 'UI1H;lnl}:f1 J'D"t'1fJI\Y f !l ! J ---, 1 I I I J I : J ;sa z o !5 al 15 ; I 1 I :: g !' !! '81118 -Ul1ll 'BlI/Cl 'BJI', ""lft '1ll'1It '811ft 111'" HII lit I ..,1111 ttll'ltOt Wlfl!l l! ~ HI/III HlIl1l Hfl/D HI1111 Hflrt "'Ut .slUt HlIII nll111 t.ftlll1l t81lm. [8'''8 'AfU. ''''''l 981lfO 'Afll' '81"" 18I'''t ,Wlrl 18111' H/HU Hl/HII HVHOt tN'If' =: <'l HVHlJ t<</lll HlIID tW1'" ",11" .-81lft Wlft 9-81"1 tftllfU till 11 I I t81110' t81lfl!l ~ ! i ~E !;; ~~ ~g ii ~Q i ~ I ~ ci i i. ~~ "Ii @~ ..0 ii ii z. I lli r 'I!!I'III"'!I!l~!. "'''10 , ~ N '" 'IJItlt ~ J .- - 98111' '11111 ,.,,,. '811ft Iw"t IIIIft Hllltl ."'''''1 ....,'rol .. I- .. ~ 1-- i'" ",111 I! <'l tR11" K1Ul ",II' "III' HlI" Hllft Hltft WHI tl/lltl U"'''I ~"III'i~II'III!!l1f to"/O' _ tol\ll , ~ ~ ~ ~ ~ ~ OU 'I!11N'1n1HJ '''V1I11'lV r '81111 ,fll'l ~ ... :'l I . I ~ J 181'" ! 1 _n J I , '811" III"" '''lit '81Hl 'If'" HIli! I Hlfllll '..J Hilmi ,..,,,. ~ c .81111 0 ,... HlfHt HlI" HIli' HI1'" t81lft H111E H1111 tilliE' tWit II ~ ~ ~ '111l1l'~,""II!I!l' rwmn r!I'I'!'!"Il'I!'IT'll!~TT~i n___ M' __._ ~~!,~ 1:8111' 1:811101 I '81'" '''Ul IBlII. ; OSlU'; I :l I. ...~ lJC m:i >e il ~i i ! J O"IIt 0111'1' .II.'! ."HI ""11t' ,..,UlI ",1"'1 ~,~ HI"I \!! ...-- ! ..~.,. HlHI .,"" "'v, HI"t ..... ... z I I t<<IIII: HInt HIli' _ tlll1t' "lllI'I~!!I'~IIIIII'II!IIIM~ "1\11' n\'II!l!!IIIl!il"'."~~~ tOl'/O' u,,,, ~ R I = ill ~ : J.N1jVJ..I 'l.I\O"'nI !'It t!J'f'V1,^Y I l&fl1l ; 'Wtfl 5 ~ Ie i I.. i! lJl b ii i ! J. 11V"" 'lfi" '''H' '''''I: It/Hl 1"111 Hlfl,rl Hliftl Hft,,:n ,III''''!''' Wir' = c o HI'IO Wilt _ ...,,,, oJ "'''t ......H,. Z D .. I< i lli ......,'r ",tll .....,1 ttlfHU tlllH' tBl'fI" UtilI !! ~ __t ~ ~ _.J~_._= ! __~_"'._. i ~ o UOI S! "''' .." .... "0 ~I- .... ::= ..~ ~~ o ~ i z o l- i !li i ~ .. 95tH! 951lfl - .... j r r=~ =l I ' I j 98fl19 95111~ ,SIll,. ''''1ft IlVlIl: 96ftfl t8llfll .811(11 tSftfOI , IIIIi , "tiT.,! ~ ~ t-51wr -- < ttJ/lIl t8TlfD ...... t81lf~ .6111. ,.grtlt t51t1t '51'" unltl [5f1fl ~ nfl/Ol g g g e ~ g ~ g g ~ 0 i_tR1115 ~ 9 .. w " :=: ..... >- .... .." ~~ Zl- 0.. l!1l H Z o Ii: ... :i w .. .. 1" DOH" "l'YlfO,fnu::y ,...:)),1 JD'flJ1.....V I I , I 1 I .1 , I " " ~ III ~I ~I j, ~I II 1;1 ~I , , I I I I I , I 1-- ~ ! a i ,l; !" 95f111 !isn't 9G'''V .., 9&1t/9 tIS'". 9t;1I/[ !I,lfl 9STl1I .';1"ll ~11l1 .!lVllot tSl.,5 r! :! HVHI "81lf( "'I'. t!.Ilf; ."fl/. .s'"t H!;flfl Hi'''1 [&llIll (6ft'I' (1;11101 U1115 I ~ .. .. Z E.. Oil .... ;I;~ u" w" ".. ~o ....... ~~ .... ~~ 0'" ~ i z o .... 0: .. l! .. lli e d I ~ " d ! J .. " I . w.u "lVnOlnv JHfYO'''':J JDYV1^Y . d " d N d I :i " o ;;; '" .. .. z.. ~! x.. u" .... "0 ~.... ~a "- ~li: ..... 0", i Z o .,. 0: ~ lli _ Uflll -"8/1" ''''11' - ..- :-.1 ! -- ( .... ~ .. .. -- .. r'II'II'III\l!II"': to/I/O' ... [8'1"5 ,.; '8f1" '81tH 111111 '1IfH' '111". '111m: 'llIlfl '1111'1 "lVllll tll1l1l1 t81I1DI "81111 I! ~ tel'" tIII}lfl HlIII """9 .I1l1t HIIII: ..,.,t .&1111 l:81lftl tIlVVI' [entol Ufll8 d '81111 '81If" ~81Ut 981l1t "l/III "SWll "1'11111 ""lrol .'"I ItI = 4 .,81111 10 .81 1ft HIli. ""HI .,.,.,. tell'!: ""Hlt .8f1tl Ufllfl tll11111 ~ " [ e . r ri. [ o u ~ ~ ~ 8" lI!~ ~" b~ ...." ~:; :~ ~t ..'" ~ Z o l! i I ! ! J ..e.rlfl '!II! I''''IIII!I!II!~II!III'IIIII'III'''!~ tOIl" _ U"'t 1~1"1"'~I"r!~'! ~llllllill~!' '!III!"'!II 'I~III'; .,811 If Z o Ie ... ! lli ~~ ~ ~ 2 :'! ..,. 'KUdO:J nllll!).,IIJ,I\Y A lfUNO" I . e t I ri. ~ I ! ; ~ '" > 0" ~= ",- ..." .." ...... 0" Ii ~~ :I", .. .t .. o i z o .... 0: ! .. .. n/l1ll r!I~"~I~1111'1!11!1!!!!i!IIIIIII!!i!II!III~111I r lil"r~'11 I!, ~:I!"I~I~il~!! Ill'lr [Sf 1 ~OI ''\1'~mm~",'1 u.ttr; ~ !! !" ~ ~ '''1111 'SlIft '81'" IItltg '8111" ''''lft '1JIItt: 'Wilt HUltll "5111I1 HIlmi ...'1t8 r! 4 D ..",,,. ttrtHl "BItt.. .'fIfI ttltllll l:81utt r:tI'UO, [Bllllj nfl" nT"f '11111' '81"'ll .1111. '1111t 'l;/ltl ""'11 U'''l' HI,lnl ",IrOl "rue t' ~ ..tlf.,1 HI"l Kf'" HI"'ll HIli'" U..'If[ Ki'IFI Wtrl U/"tl ( ~ I i liE lil_ :i!l ;!.. 00 ........ -.. ~! ~~ ..", ~ z i i z o .... 0: ! 0: .. ( ~ ; ; ~ 1;, lil. ..- ..." ~SI ge U n .. = o i z o Ii: i lli I .illI' . i ~ I I i I ,trl'l litll' '''''1 "'1 It ..,.,. '''"t ~"UI W"tl HlrI'1I """01 ....,,,, I! 4 C HVIII HI."'l .....,. ""1" .51". .. lit ll"~"!~ ":' '11I1"II"m" IIM'IiI! II'I~ KII'1 HI'" tltlHr:1 -II1IHI (111101 u",,, d ~ d ~ ~ ~ d ~ o 0 0 0 """ ......":JIIJ" Ivil lont),I\Y A1H.f.HOft' = ~ ~I' i ,11IIIII( I I., il: ~ I, I,~ il,l I~ ~111I111I!"IIIII~"I'I"I!I'IIIII"rllll"'IIIII!I'''11111111~ . . I I : .. I ' ...- , - =; .. .. .. - .. l"'II~I"!lI"III!I'lllrll'j ~ ~ ~ -- r '811ft '81 lit '811" tlltllt 'II"" .11I1111: Wlllft Wmlll ...,IIEI Hllfll Hllrol HIII/' ~ Hl1" WII'l HI I" Hltl1l HI"" Hi/lit "I,r Hrlll t.....1't1 tmlHI tllllOI ntH8 - ft . ~ . ~ ~ " N - 10 o 0 0 0 0 d 0 ~ 0 I FACT SHEET City of Bremerton Pennit No. WA-002928-9 Page 31 APPENDIX E REASONABLE POTENTIAL CALCULATIONS FOR TOXIeS The reasonable potential calculations performed for the toxics are shown in Tables 2 and 3 below. Table 2 shows the reasonable potential calculations for aquatic life criteria, and Table 3 shows the reasonable potential calculations for human health criteria. The procedure and calculations in the statistical analysis in the spreadsheet are performed as per the procedure in Technical Support Document for Water Quality-based Taxies Control, US EP A, March 1991 (EPA/505/2-90-001) (section 3.3, page 55). The dilution factors used in the calculations are taken from the mixing study s~bmitted by the permittee. The input (effluent) variables for the calculations for all parameters are based on the monitoring data submitted by the permittee. Table 1 below lists the input variables for ammonia, chlorine, cyanide, and metals, used for the reasonable potential analysis for the aquatic life criteria evaluation. Table 1 Parameter Number of Maximum 90th Coefficient Comments Samples Concentration nmeat.dmtion of (ug/L) (ug/L) Variation Amrnonia- N 111 21,000 16,000 0.384 (NH3- N) Chlorine 60 1,200 0.7 Cyanide 50 0.015 0.011 0.6 40 samples < 0.005 uo/L .. C> Arsenic 94 < 250 < 50 0.6 92 samples < 50 ug/L ,I Cadmium 107 < 15 < 3 0.60 104 samples < 3 ug/L I, 0.60 i Chromium 107 < 25 < 5 105 samples ! < 5 ug/L I Copper 107 34 23 0.393 Lead 107 < 250 < 30 0.60 98 samples < 30 ug/L Mercury 107 < 1 < 0.2 0.60 104 samples < 0.2 ug/L F ACT SHEET City of Bremerton Permit No. W A-002928-9 Page 32 Nickel 107 < 100 < 20 0.60 106 samples < 20 ug/L 0.6 7 samples < 20 ug/L; 86 samples < 50 ug/L 0.456 Selenium 94 < 100 < 50 I Zinc 107 87 29 Note: (i) Coefficient of Variation is assumed 0.6 for parameters with most values below detection limit. (ii) 90th percentile values for ammonia, cyanide and metals were used in the reasonable potential calculations. - (iii) The maximum concentration and the coefficient of variation for chlorine are based on randomly selected values from the 1994 monitoring data. A total of 60 sample values (five fro{I1 each month) were selected for calculations. 90th percentile value for chlorine was not calculated. because only small number of samples were selected from a very large data base. As shown in Table 2 below, of the parameters considered in the reasonable potential calculations, only chlorine has a reasonable potential to violate water quality standards for aquatic life criteria. Water quality-based effluent limits for chlorine are calculated in Appendix F. The reasonable potential analysis in Table 3 shows that none of the pollutants have a reasonable potential to cause a violation of the water quality standards based on human health criteria. Because of sampling results below MDLs, there is uncertainty about arsenic in the reasonable potential analysis. The reasonable potential calculation for arsenic was conducted with the 50th percentile concentration of 50 ug/L. However, the actual 50th percentile concentration is less than 50 ug/L. As noted in the comment column, 93 out of 94 analyses show arsenic concentrations below MDLs. The :MDLs in 92 analyses were 50 ug/L. As stated. earlier in this Fact Sheet, in order to better evaluate human health criteria for arsenic, Condition S2.C. (TaXICS) of the proposed permit requires the permittee to monitor for arsenic in the effluent at a much lower detection limit of 1 ug/L by Graphite Furnace Atomic Absorption (GFAA) method. Based on .the results of the analyses during this permit term, human health criteria limits for arsenic will be evaluated during the next permit cycle. REASONABLE POTENTIAL CALCULAT~s PmtNo. WA.002928-9 ( t. l".t:" .t.) Bremerton WWTP aqua IC he cn erla Appendix E, Table 2 Max concentration at State Water Quality Con edge of... Standard 4/15/969:06 AM BR.XL W , I e 1 PARAMETER Ammonia - N Arsenic Cadmium Chlorine Chromium (Hex) Copper Cyanide Lindane Lead Mercury Nickel Selenium l Zinc I Aldrin i Chlordane I. I DOT (and metabolites) I Dieldrin , Endosuffan I 1 Endrin , j Heptachlor Pentachlorophenol PCBs Toxaphine Ambient Acute Chronic Concentr Mixing Mixing ation Zone Zone Acute Chronic uglL . ug/L ug/L ug/L ug/L 575.17 208.39 5900.00 890.00 1.77 0.64 69.00 0.10 0.04 42.00 47.62 17.25 13.00 0.17 0.06 1100.00 0.83 0.30 2.40 0.00 0.00 1.00 0.01 0.00 0.16 1.03 0.37 210.00 0.01 0.00 1.80 0.69 0.25 74.00 1.77 0.64 290.00 1.03 0.37 90.00 #DIV/O! #OIV/OI 0.71 #OIVlOl #OIV/OI 0.09 #OIV/O! #ON/O! 0.13 #OIV/O! #ON/Ol 0.71 #DIV/O! #OIV/O! 0.034 #DIV/O! #DIV/O! 0.037 #OIVlO! #ON/O! 0.053 #OIV/O! #DIV/O! 13.00 #DIV/O! #DIVIO! 10.00 #OIV/O! #DIV/O! 0.21 0.95 Page 1 36.00 9.30 Probabi LIMIT Iity REQ'O? Basis NO 0.95 NO NO 7.50 YES 50.00 NO 2.40 NO Ii:! li:i:llj','{ If NO .\'.'/.1 Il.'/.'l fill NO 8.10 NO 0.025 NO 8.20 71.00 81.00 0.0019 0.004 0.001 0.0019 0.0087 0.0023 0.0036 7.90 0.03 0.0002 NO NO NO #DIVlO! . #DIV/O! #DIV/O! #DIV/O! #DIVlO! #DIV/O! #DIV/O! #DIV/O! #0 IV/O! , #DlV/O! 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 4/15/969:06 AM BR.XL W REASONABLE POTENTIAL CALCULAT~s Pmt No. WA-002928-9 (aquatic life criteria) ABremd~rton WWTP open IX E, Table 2 Confidence Le decimal)> 0.95 Max cone. Coeff measure Variati d on PARAMETER Pn I ugll cv I s n Ammonia - N 0.97 16000 0.384 0.37 111 0.8987 25 69 Arsenic 0.97 50 0.60 0.55 94 0.8870 25 69 Cadmium 0.97 3 0.60 0.55 107 0.8599 25 69 Chlorine 0.95 1200 0.700 0,.63 60 0.9920 25 69 Chromium (Hex) 0.97 5 0.60 0.55 107 0.8599 25 69 Copper 0.97 23 0.393 0.38 107 0.9020 25 69 Cyanide 0.94 0.011 0.60 0.55 50 1.0421 25 69 Lindane 0.47 0.057 0.60 0.55 4 2.5853 25 69 Lead 0.97 30 0.60 0.55 107 0.8599 25 69 Mercury 0.97 0.2 0.60 0.55 107 0.8599 25 69 Nickel 0.97 20 0.60 0.55 107 0.8599 25 69 Selenium 0.97 50 0.60 0.55 94 0.8870 25 69 Zinc 0.97 29 0.456 0.43 107 0.8884 25 69 Aldrin 0.47 0.048 0.60 0.55 4 2.5853 Chlordane 0.47 0.24 0.60 0.55 4 2.5853 DOT (and metabolites) 0.47 0.048 0.60 0.55 4 2.5853 Dieldrin 0.47 0.048 0.60 0.55 4 2.5853 Endosulfan 0.47 0.048 0.60 0.55 4 2.5853 Endrin 0.47 0.048 0.60 0.55 4 2.5853 Heptachlor 0.47 0.048 0.60 0.55 4 2.5853 Pentachlorophenol 0.47 0.96 0.60 0.55 4 2.5853 PCBs 0.47 0.48 0.60 0.55 4 2.5853 Toxaphine 0.47 0.48 0.60 0.55 4 2.5853 #of samples Multiplie r Acute DiI'n Factor Chronic DiI'n Factor I I I Page 2 4/15/969:06 AM BR.XL W REASONABLE POTENTIAL CALCULAT~sPmtNo. WA-002928-9 ( t. I..c .t.) Bremerton WWTP aqua IC he cn ena A d' E T bI 2 oo'n[ IX . a , PARAMETER COMMENTS Ammonia - N Max cane = 90th percentile = 16,000 ug/L Arsenic Max cone = 90th percentile = < 50 ug/L 92 samples < 50 ug/L Cadmium Max cone = 90th percentile = < 3 ug/L; 104 samples < 3 ug/L Chlorine - Chromium (Hex) Max Cone = 90th percentile Total Cr = < 5 ug/L 105 samples < 5 ug/L Total Cr Copper Max cone = 90th percentile = 23 ug/L Cyanide Max cone = 90th percentile = 0.011 ug/L; 40 samples < 0.005 ug/L Lindane Max Cone < ROL Of 0.112 ug/L Lead Max cone = 90th percentile = < 30 ug/L; 98 samples < 30 ug/L. 8 samples < 50 ug/L. 1 sample < 250 ug/L Mercury Max cone = 90th percentile = < 0.2 ug/L; 104 samples < 0.2 ug/L, 1 sample < 1 ug/L Nickel Max cone = 90th percentile = < 20 ug/L; 106 samples < 20 ug/L, 1 sample < 100 ug/L Selenium Max cone = 90th percentile = < 50 ug/L; I 7 samples < 20 ug/L, 86 samples < 50 ug/L, 1 sample < 100 ug/L Zinc Max Cone = 90th percentile = 29 ug/L Aldrin Max Cone < MOL Of 0.048 ug/L Chlordane Max Cone < MOL of 0.24 ug/L DOT (and metabolites) Max Cone < MOL Of 0.048 ug/L ~ieldrin Max Cone < MOL Of 0.048 ug/L Endosulfan Max Cone < MOL Of 0.048 ug/L Endrin Max Cone < MOL Of 0.048 ug/L Heptachlor Max Cone < MOL Of 0.048 ug/L Pentachlorophenol Max Cone < MOL Of 0.96 ug/L PCBs Max Cone < MOL Of 0.48 ug/L Toxaphine Max Cone < MOL Of 0.48 ug/L . Page 3 4/26/9611:38 AM BMHH.XLW REASONABLE POTENTIAL ~E.tftn."'1p'1(9N928-9 Bremertcn WvVrP Appendix E, Table 3 tat Water Quality Contidence L Standard decimal)>> I . ! I I Parameter ugA. uglL uglL I uglL I uglL I Pn ARSENIC (inorganic) 0.00 0.60 1##### 0.14 YES 0.95 0.97 I MERCURY 0.00 0.00 ##### 0.15 NO 0.95 0.97 INICKEL 0.00 0.25 ##### 4600 NO 0.95 0.97 ICY ANIDE 0.00 0.00 ##### 220000 NO 0.95 0.94 CHLOROFORM 0.00 0.10 ##### 470 NO 0.95 0.47 ISIS(2-ETHYLHEXYL) PHTHAl..A.TE 0.00 0.14 ##### 5.9 NO 0.95 0.47 SHC - GAMMA (LINDANE) 0.00 0.00 ##### 0.063 NO 0.95 0.47 I I I Ambient Concentrati on Acute Mixing Zone Chronic Mixing Zone Acute Chronic LJMIT Probabili REQ'O? ty Basis Page 1 4/26/96 11: 38 AM BMHH.XLW REASONABLE POTENTIAL ~[~vr1GN928-9 Bremerton WWTp bh~''Tlan "eal1:h ~Titeria) Appendix E, Table 3 C n . de 0.95 Max cane. Coeff measure Variatio d n #of sample s Acute DiI'n Multiplier Factor Chronic DiI'n Factor Parameter ugIL I CV I s I n I I I ARSENIC (inorganic) 50.00 0.60 0.55 94 0.89 ,~r ,'.f:l:: ,1,'," 74 MERCURY 0.20 0.60 0.55 107 0.86 .'.'..:,.i.1.....1 69 NICKEL 20.00 0.60 0.55 107 0.86 .1:i:r:!.r :r 69 CYANIDE O.OOS 0.60 0.55 sa 1.04 .r:r.Y U:r.Y 69 CHLOROFORM 3.00 0.60 0.55 4 2.59 i:,~ f/:iH 74 BIS(2-ETHYLHEXYL) PHTHALATE 3.90 0.60 0.55 4 2.59 ,Y,'iJ,TJ.1 74 BHC-GAMMA(UNDAN~ 0.057 0.60 0.55 4 2.59 ,':,',',l,',','l,'1 74 c....~.ft " , , . f. ." 'I i ~ 4/26/96 11 :38 AM BMHH.XLW REASONABLE POTENTIAL ~~~vr.f(9t:i928-9 Bremerton WWfP (hu'man health ~riteria) Appendix E, Table 3 I I I Parameter ARSENIC (inorganic) COMMENTS Reasonable Potential Uncertain Max cone = 50th percentile = < 50 ug/L; 92 samples < 50 ug/L, 1 sample < 250 ug/L Max cone = 50th percentile = < 0.2 ug/L; 104 samples < 0.2 ug/L, 1 sample < 1.0 ug/L Max cone = 50th percentile = < 20 ug/L; 106 samples < 20 uglL, 1 sample < 100 ug/L Max cone = 50th percentile = o.aas ug/L; 40 samples < 0.005 ug/L Max Cone = Max EffI Cone x 1.0 Max Cone = Max EffI Cone x 1.0 Max Cone = Max Effl Cone x 1.0 Max conc < RDL of 0.112 ug/L Page 3 4/15/96 2:40 PM BMHH.XLW REASONABLE POTENTiAL ~~EUt!:JttAvr1<9t1928-9 Bremerton 'NWTP (human health crite~;aJ. Appendix E. Table 3 Max concentration at tat Water Quality Confidence L edge af... Standard decimal)>> Ambient Concentrati on Acute Mixing Zone Chronic Mixing Zone Acute Chronic LIMIT Probabili REQ'D? ty Basis Parameter ugIL I ug/L I ug/L ug/L I ugIL I Pn ACROLElN #DIV/OI #DIV/OI ##### 780 #DIV/OI 0.95 0.47 ACRYLONITRILE #DIV/O! #DIV/Ol ##### 0.66 #DIV/OI 0.95 0.47 BENZEN E #DIV/O! #DIV/Ol ##### 71 #DIV/OI 0.95 0.47 BROMOFORM #DIV/O! #DIV/Ol ##### 360 #DIV/OI 0.95 0.47 CARSON TETRACHLORIDE #DIV/O! #0 IV/O! ##### 4.4 #DIV/OI 0.95 0.47 CHLOROBENZEN E #DIV/O! #DIV/O! ##### 21000 #DIV/OI 0.95 0.47 CHLOROOIBROMOMETHANE #OIV/Ol #OIV/O! ##### 34 #DIV/OI 0.95 0.47 DICHLOROBROMOMETHANE #DIV/O! #OIV/Ol ##### 22 #D IVlO I 0.95 0.47 DICHLOROETHANE 1,2 #OIV/O! #OIV/O! ##### 99 #DIV/OI 0.95 0.47 1,1 DICHLOROETHYLENE #DIV/O! #OIV/OI ##### 3.2 #DIV/OI 0.95 0.47 1,3 -OICHLOROPROPYLENE #0 IV/O! #OIV/O! ##### . 1700 #DIV/OI 0.95 0.47 ETHYLSENZENE #DIV/O! #OIV/O! ##### 29000 #DIV/OI 0.95 0.47 METHYL BROMIDE #DIV/O! #OIV/O! ##### 4000 #DIV/OI 0.95 0.47 METHYLENE CHLORIDE #DIV/O! #OIV/O! ##### 1600 #DIVlOI 0.95 0.47 TETRACHLOROETHANE 1,1,2,2 #DIV/O! #OIV/O! ##### 11 #DIV/OI 0.95 0.47 TETRACHLOROETHYLENE #DIV/Ol #DIV/O! ##### 8.85 #DIV/OI 0.95 0.47 TOLUENE #DIV/O! #DIV/O! ##### 200000 #DIVlO I 0.95 0.47 TRICHLOROETHANE 1,1,2 #DIV/O! #0 IV/O! ##### 42 #DIV/OI 0.95 0.47 TRICHLOROETHYLENE #DIV/O! #DIV/O! ##### 81 #DIV/OI 0.95 0.47 VINYL CHLORIDE #DIV/O! #OIV/O! ##### 525 #DIV/OI 0.95 0.47 DICHlOROPHENOL 2,4 #DIV/O! #OIV/O! ##### 790 #DIVlOI 0.95 0.47 2-METHYl-4,6 -DINITROPHENOL #OIV/O! #DIV/O! ##### 765 #DIV/OI 0.95 0.47 2,4-DINITROPHENOL #DIV/O! #DIV/O! ##### 14000 #DIV/OI 0.95 0.47 PENTACHLOROPHENOL #DIV/O! #OIV/O! ####If. 8.2 #D IV/O I 0.95 0.47 PHENOL #DIV/O! #DIV/O! ##### 4600000 #DIV/OI 0.95 0.47 TRICHlOROPHENOL 2.4,6 #DIV/O! #DIV/O! ####If. 6.5 #DIV/OI 0.95 0.47 ANTHRACENE #DIV/O! #DIVlO! ####If. 11 0000 #DIV/OI 0.95 0.47 BENZIDINE #DIV/Ol #DIV/OI ##### 0.00054 #DIV/OI 0.95 0.47 BENZO(a)ANTHRACENE #DIVIO! #DIV/OI ##### 0.031 #DIV/OI 0.95 0.47 BENZO(a)PYRENE #DIV/O! #DrV/OI ####If. 0.031 #DIV/OI 0.95 0.47 BENZO(b)FLUORANTHENE #DIV/O! #DIV/O! ####If. 0.031 #0 IV/O I 0.95 0.47 BENZO(k) FLUORANTHENE #DtV/O! #DIV/O! ##### 0.031 #DIV/OI 0.95 0.47 BIS(2-CHLOROETHYL)ETHER #DIV/O! #DIV/O! ####If. 1.4 #OIVlOI 0.95 0.47 8/5(2 CHLOROISOPROPYL)ETHER #DIV/O! #DIV/Ol ####If. 170000 #DIV/OI 0.95 0.47 CHRYSENE #DIV/O! #DIV/Or ####If. 0.031 #DIV/OI 0.95 0.47 DIBENZO(a,h)ANTHRACENE #DIV/O! #DIV/OI ##### 0.031 #DIV/OI 0.95 0.47 1,2 DICHLOROBENZENE #DIV/Ol #DIV/OI ####If. 17000 #D IVlO I 0.95 0.47 1,3 DICHLOROBENZENE #DIV/O! . #DIV/O! ####If. 2600 #DIVlOI 0.95 0.47 1,4 DICHLOROBENZENE #DIV/O! #DrV/O! ##### 2600 #DIV/OI 0.95 0.47 3,3 DICHLOROBENZJDINE #DIV/Of #DIV/O! ##### 0.077 #DIV/OI 0.95 0.47 DIETHYlPHTHALA TE #DIV/O! #DIV/O! ##### 120000 #DIV/OI 0.95 0.47 DIMETHYLPHTHAI.A TE #DIV/O! #DIV/O! ##### 2900000 #DIV/ot 0.95 0.47 ...--- .. , . . - .; REASONABLE POTENTIAL ~[~vr1GtN928-9 Bremerton'MNTP cbR~'man "eal~h criteria) Appendix E, Table 3 de 0.95 Max cone. Coeff measure Variatio d n 4/15/96 2:40 PM BMHH.XLW #of sample s Acute DiI'n Multiplier Factor Chronic DiI'n Factor Parameter ug/L cv s n ACROLEIN 5.00 0.60 0.55 4 2.59 ACRYLONITRILE 5.00 0.60 0.55 4 2.59 BENZENE 1.00 0.60 0.55 4 2.59 BROMOFORM 1.00 0.60 0.55 4 2.59 CARBON TETRACHLORIDE 1.00 . 0.60 0.55 4 2.59 CHLOROBENZENE 1.00 0.60 0.55 4 2.59 2.59 2.59 - 2.59 2.59 2.59 2.59 2.59 2.59 I I . j 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 A 5.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 1.00 0.60 0.55 4 0.96 0.60 0.55 4 1.9Q 0.60 0.55 4 1.90 0.60 0.55 4 0.96 0.60 0.55 4 3.80 0.60 Q]5 4 3.80 0.60 0.55 4 0.58 0.60 0.55 4 23.00 0.60 0.55 4 0.58 0.60 0.55 4 0.96 0.60 0.55 4 1.50 0.60 0.55 4 1.50 0.60 0.55 4 0.58 0.60 0.55 4 1.90 0.60 0.55 4 0.58 0.60 0.55 4 1.50 0.60 0.55 4 0.58 0.60 0.55 4 0.58 0.60 0.55 4 0.58 0.60 0.55 4 0.96 0.60 0.55 4 0.96 0.60 0.55 4 0.38 0.60. 0.55 4 2.59 2.59 ~ 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 2.59 PaQe 5 4/15/96 2;40 PM BMHH.XLW REASONABLE POTENTIAL ~E~vr-k9N928-9 Bremertcn 'NWTP (h'llnan health criteria) Appendix E, Table 3 Parameter COMMENiS ACROLEIN All samples < MDL of 5 ug/L ACRYLONITRILE All samples < MDL of 5 ug/L BENZENE All samples < MDL of 1 ug/L BROMOFORM All samples < MDL of 1 ug/L CARBON TETRACHLORIDE All samples < MDL of 1 ug/L CHLOROBENZENE All samples < MDL of 1 ug/L CHLORODIBROMOMETHANE All samples < MDL of 1 ug/L DICHLOROBROMOMETHANE All samples < MDL of 1 ug/L DICHLOROETHANE 1,2 All samples < MDL of 1 ug/L 11,1 DICHLOROETHYlENE All samples < MDL of 1 ug/L 11,3 -OICHLOROPROPYLENE All samples < MOL of 1 ug/L ETHYlBENZENE All samples < MOL of 1 ug/L METHYL BROMIDE All samples < MDL of 1 ug/L IMETHYLENE CHLORIDE All samples < MDL of 5 ug/L ITETRACHLOROETHANE 1.1,2.2 All samples < MDL of 1 ug/L TETRACHLOROETHYLENE All samples < MDL of 1 ugiL TOLUENE All samples < MDL of 1 ug/L ITRICHLOROETHANE 1,1,2 All samples < MDL of 1 ug/L ITRICHLOROETHYlENE All samples < MDL of 1 ug/L VINYL CHLORIOE All samples < MOL of 1 ug/L DICHLOROPHENOL 2,4 All samples < MOL of 0.96 ug/L 2.METHYL-4,6 -DINITROPHENOL All samples < MDL of 1.9 ug/L 2,4-DINITROPHENOL All samples < MDL of 1.9 ug/L PENTACHLOROPHENOL All samples < MOL of 0.96ug/L . ,.'1 l =. - I ! 'c I. . PHENOL TRICHLOROPHENOL 2,4,6 All samples < MDL 0(,3.8 ug/L All samples < MOL of 3.8 ug/L , , J., . ANTHRACENE All samples < MOL of 0.58 ug/L BENZIDINE All samples < MDL of 23 ug/L BENZO(a)ANTHRACENE All samples < MDL of 0.58 ug/L 8ENZO(a)PYRENE All samples < MOL of 0.96 .ug/L BENZO(b)FLUORANTHENE All samples < MDL of 1.5 uglL 8ENZO(I<) FLUORANTHENE All samples < MDL of 1.5 ug/L BIS(Z..cHLOROETHYl)ETHER All samples < MOL of 0.58 ug/L 81S(2 CHLOROISOPROPYL)ETHER All samples < MDL of 1.9 ug/L CHRYSENE All samples < MOL of 0.58 ug/L DIBENZO(a,h)ANTHRACENE All samples < MDL of 1.5 ug/L 1,2 DICHLOROBENZENE AU samples < MOL of 0.58 uglL 1,3 DICHLOROBENZENE All samples < MDL of 0.58 ug/L 1,4 DICHLOROBENZENE All samples < MOL of 0.58 ug/L 3,3 DICHLOR08ENZIDlNE All samples < MDL of 0.96 ug/L DIETHYLPHTHAU\TE AU samples < MDL of 0.96 ug/L DIMETHYlPHTHA~ TE All samples < MDL of 0.38 ug/L . ;~.. , l""I___ ~ REASONABLE POTENTIAL ~fOOtAvr-t(9N928-9 Bremerton WVIJTP Appendix E, Table 3 tat Water Quality Confidence L Standard decimal)>> 4/15/962:47 PM BMHH.XLW i.. i1, ! I ~ I . i I Parameter DI-n-8UTYL PHTHALA. TE DINITROTOLUENE 2,4 IDIPHENYLHYDRAZINE 1,2 FLUORANTHENE FLUORENE IHEXACHLOROBENZENE . HEXACHLOROBUTADIENE I HEXACHLOROCYCLOPENTADIENE I I HEXACHLOROETHANE ,NDENO(1,2,3-<:d)PYRENE iSOPHORONE !NITROBENZENE NITROSODIMETHYLAMINE N NITROSODIPHENYLAMINE N IPYRENE ~LDRIN 3HC - ALPHA ,. I . jBHC - BETA . I :HLOROANE I JOT lOOT METABOLITE (DOE) JOT METABOLITE (ODD) JIELDRIN IENDOSULFAN a :NDOSULFAN b =NoOSULFAN SULFATE IENDRIN =NDRIN ALDEHYDE ~EPTACHLOR .lrlEPTACHLOR EPOXIDE ~ca -1242 :lca -1254 Irca -1221 -::lca - 1232 :lCB -1248 !,:lCB - 1260 o;,ca - 1016 rOXAPHENE ~"l 1 I I I . .I J I , I . 'j . 1 .. ~ Ambient Concentrati on ug/L . ! ~ : I Acute Mixing Zone ug/L #DIV/O! #DIV/O! #DIV/O! #DIV/O! #DIV/Ol #DIV/O! #DIV/OI #DIV/O! #DIV/O! #0 IV/O! #DIV/O! #DIV/O! #DIV/O! #DIV/O! #DIV/O! #0 IV/O! #DIV/O! #DIV/O! #0 IV/O! #DIV/O! #OIV/O! #0 IV/O! #DIV/O! #DIV/O! #DIV/O! #DIV/O! #DIV/O! #DIV/O! #DIVlO! #DIV/O! #DIV/O! #0 IV/O! #DIV/O! #DIV/O! #0 IV/O! #DIV/O! #DIV/O! #DIV/O! Chronic Mixing Zone Acute ug/L ug/L - #DIV/O! ##### #DIV/O! ##### #0 IV/O! ##### #DIV/O! ###11# #DIV/O! ###11# #DIV/O! ###11# #0 IV/O! ###11# #DIV/O! ##### #OIV/O! ##### #DIV/O! ##### #DIV/OI ##### #DIV/O! ##### #DIV/OI ##### #DIV/O! #iiii# #DIV/O! ##### #OIV/O! ##### #DIV/O! ##### #0 IV/O! ##11## #DIV/O! ##### #0 IV/O! ###11# #0 IV/O! #iiii# #OIV/O! ##### #DIV/O! #iiii# #DIV/O! ##### #DIV/O! ##### #OIV/O! ##### #OIV/OI ##### #DIV/O! ##### #DIV/O! ##### #DIV/O! ##### #OIV/O! #iii## #DIV/O! ##### #OIV/O! ##### #DIV/O! ##### #DIV/O! ##### #DIV/OI #iiiii #DIV/O! ##### #0 IV/O! ##### Chronic LJMIT Probabili REQ'D? rt Basis ugA. Pn 12000 #DIV/OI 0.95 0.47 9.1 #DIV/OI 0.95 0.47 0.54 #DIV/OI 0.95 0.47 370 #DIV/OI 0.95 0.47 14000 #DIVlOI 0.95 0.47 0.00077 #DIV/OI 0.95 0.47 50 #DIV/OI 0.95 . 0.47 17000 #DIV/O! 0.95 0.47 8.90 #0 IV/O! 0.95 0.47 0.031 #OlY/O! 0.95 0.47 600 #OIV/OI 0.95 0.47 1900 #0 IV/O I 0.95 0.47 8.10 #0 IVlO I 0.95 0.47 16 #OIV/OI 0.95 0.47 11 000 #D IVlO I 0.95 0.47 0.00014 #0 IV/O! 0.95 0.47 0.013 #DIV/OI 0.95 0.47 0.046 #DIV/OI 0.95 0.47 0.00059. #OIV/OI 0.95 0,47 0.0006 #DIV/OI 0.95 0.47 0.00059 #OIV/OI 0~95 0.47 0.00084 #DIV/OI 0.95 0.47 0.00014 .#OIV/OI 0.95 0.47 2 #OIV/O! 0.95 0.47 2 #OIV/OI 0.95 0.47 2 #OIV/OI 0.95 0.47 0.81 #DIV/OI 0.95 0.47 0.81 #OIV/OI 0.95 0.47 0.00021 #OIVlOI 0.95 . 0.47 0.00011. #0 IV/O I 0.95 0.47 0.000045 #DIV/OI 0.95 0.47 0.000045 #OIV/OI 0.95 0.47 0.000045 #OIV/Ol 0.95 0.47 0.000045 #OIV/OI 0.95 0.47 0.000045 #OIVlOI 0.95 0047 0.000045 #0 IV/O I 0.95 0.47 I 0.000045 #OIVlOI 0.95 0.47 0.00075 #OIV/OI 0.95 0.47 Page 7 4/15/962:47 PM SMHH.XLW REASONABLE POTENTIAL ~fWt.:A.vr1<9Ns28-9 Sremerton WlVTP hh~'~an "ealth criteria) Appendix E, Table 3 C nn . de 0.95 Max cone. Coeff measure Variatio d n Parameter ugJl. I cv I s I n I DI-n-SUTYL PHTHALA.TE 0.96 0.60 0.55 4 2.59 DINITROTOLUENE 2,4 0.38 0.60 0.55 4 2.59 DIPHENYlHYDRAZINE 1,2 1.90 0.60 0.55 4 2.59 FLUORANTHENE 0.58 0.60 0.55 4 2.59 FLUORENE 0.5S 0.60 0.55 4 2.59 HEXACHLOROBENZENE 0.58 0.60 0.55 4 2.59 HEXACHLOROBUTADIENE 0.96 0.60 0.55 4 2.59 HEXACHLOROCYClOPENT ADIENE 0.96 0.60 0.55 4 2.59 HEXACHLOROETHANE 0.96 0.60 0.55 4 2.59 INDENO(1,2,3-cd)PYRENE 0.96 0.60 0.55 4 2.59 - ISOPHORONE 0.96 0.60 0.55 4 2.59 NITROBENZENE 0.96 0.60 0.55 4 2.59 NITROSODIMETHYLAMINE N 3.80 0.60 0.55 4 2.59 NITROSODIPHENYLAMINE N 0.96 0.60 0.55 4 2.59 PYRENE 0.58 0.60 0.55 4 2.59 ALDRIN 0.048 0.60 0.55 4 2.59 SHC - ALPHA 0.048 0.60 0.55 4 2.59 SHC. BETA 0.048 0.60 0.55 4 2.59 CHLORDANE 0.24 0.60 0.55 4 2.59 DOT . .0.048 0.60 0.55 4 2.59 DOT METABOLITE (DOE) 0.048 0.60 0.55 4 2.59 DOT METABOLITE (ODD) 0.048 0.60 0.55 4 2.59 DIELDRIN 0.048 0.60 0.55 4 2.59 ENDOSULFAN a 0.048 0.60 0.55 4 2.59 ENDOSULFAN b 0.048 0.60 0.55 4 2.59 ENDOSULFAN SULFATE 0.048 0.60 0.55 4 2.59 ENDRIN 0.048 0.60 0.55 4 2.59 ENDRIN ALDEHYDE 0.048 0.60 0.55 4 2.59 HEPTACHLOR 0.048 0.60 0.55 4 2.59 HEPTACHLOR EPOXIDE 0.048 0.60 0.55 4 2.59 PCB -1242 0.048 0.60 0.55 4 2.59 pca -1254 0.048 0.60 0.55 4 2.59 PCB. 1221 0.048 0.60 0.55 4 2.59 pca - 1232 0.048 0.60 0.55 4 2.59 pca - 1248 0.048 0.60 0.55 4 2.59 pca - 1260 0.048 0.60 0.55 4 2.59 PCB - 1016 0.048 0.60 0.55 4 2.59 TOXAPHENE 0.048 0.60 0.55 4 2.59 # of Acute sample Dilln s Multiplier Factor Chronic DiI'n Factor ! ! i . I - I ,~ 1 f: . i. ., ~. . 4/15/962:47 PM BMHH.XLW REASONABLE POTENTIAL ~~Ul!1t!A.vr1<StN92S-9 Bremertan WWTP (human health criteria) Appendix E, Table 3 Parameter COMMENTS OI-n-8UTYL PHTHALATE All samples < MOL of 0.96 ug/L DINlTROTOLUENE 2,4 All samples < MOL of 0.38 ug/L DIPHENYLHYDRAZ1NE 1,2 All samples < MOL of 1.9 ug/L FLUORANTHENE All samples < MOL of 0.58 ug/L FLUORENE All samples < MOL of 0.58 ug/L HEXACHLOROBENZENE All samples < MOL of 0.58 ug/L HEXACHLOROBUT AolENE All samples < MOL of 0.96 ug/L HEXACHLOROCYCLOPENT AolENE All samples < MOL of 0.96 ug/L HEXACHLOROETHANE All samples < MOL of 0.96 ug/L INDENO(1,2,3-cd)PYRENE All samples < MOL of 0.96 ug/L ISOPHORONE All samples < MOL of 0.96 uglL NITROBENZENE All samples < MOL of 0.96 ug/L NITROSOOIMETHYLAMINE N All samples < MOL of 3.8 ug/L NITROSODIPHENYLAMINE N All samples < MOL of 0.96 ug/L PYRENE All samples < MOL of 0.58 ug/L ALDRIN All samples < MOL of 0.048 ug/L BHC - ALPHA All samples < MOL of 0.048 ug)L BHC - BETA All samples < MOL of 0.048 ug/L CHLORDANE All samples < MOL of 0.24 ug/L DOT All samples < MOL of 0.048 ug/L DOT METABOLITE (DOE) All samples < MOL of 0.048 ug/L DOT METABOLITE (ODD) All samples < MOL of 0.048 ug/L DIELDRIN All samples < MOL of 0.048 ug/L ENDOSULFAN a ENDOSULFAN b ENDOSULFAN SULFATE ENoRIN ENDRIN ALDEHYDE HEPTACHLOR HEPTACHLOR EPOX1DE pca -1242 PCB - 1254 PCB - 1221 PCB - 1232 pca - 1248 [Pca - 1260 pca - 1016 TOXAPHENE All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L All samples < MOL of 0.048 ug/L Pace 9 co 1 I . ; I F ACT SHEET City of Bremerton Permit No. W A-002928-9 Page 33 APPENDIX F WATER QUALITY-BASED PERMIT LIMIT CALCULATIONS FOR TOXICS The water quality-based effluent limits for chlorine (with reasonable potential to violate water quality standards as determined in Appendix E) are shown in table 2 below. The procedure and calculations in the statistical analysis in this spreadsheet are performed as per the procedure in Technical Support Document for Water Quality-based Toxics Control, US EPA, March 1991 (EPA/505/2-90-001) (section 5.4, page 98). Table 1 below summarizes the calculated effluent limits. Table 1 Parameter Monthly Average Limit Daily Maximum Limit Total Residual Chlorine 0.13 mg/L 0.37 mg/L 4/15/96 9:14 AM WATER QUALITY BASED NPDES Pmtt No. W A-002928-9 BR.XL W PERMIT LIMIT CALCULATIONS Bremerton WWTP Water Water Apoendix F, Table 2 Average Acute Chronic Ambient Quality Quality Monthly Maximum DiI'n DiI'n Concentr Standard Standard Limit Daily limit ! I Factor Factor ation Acute Chronic (AMl) (MOL) PARAMETER uglL uglL ugll.. ug/l ug/L CHLORI:NE 2S 69 0.00 13.00 7.50 127.59 371.39 LTA # of Coeff. LTA Coeff. AML MOL Samples WLA 'NlA LTA LTA Var. Prob'y Limiting Var. Prob'y Prob'y per Acute Chronic Acute Chronic (CV) Basis LTA (CV) Basis Basis Month uglL ug/L uglL uglL decimal I decimal uglL . decimal decimal 1 decimal n 325.00 517.50 104.33 272.92 I 0.60 1 0.99 30 . 1 104.33 0.70 I 0.95 0.99 FACT Sl1EET Ci.ty of Breroerton Permit "No. WA-002928-9 Page 34 (CtaJ ~ DISCHARGE MONITORING REPORT (DMR) INSTRUCTIONS To avoid processing delays and the need to resubmit your DMR's, please comply with the following requirements: . . Enter the monitoring period at the top of the form. Monitoring periods consist of a calendar month or months (quarterly reporting). (For example July 1-July 31, not June 27-July 27.) . The forms must be received at the Department of Ecology Northwest Regional Office by the date specified in your permit. Address the envelope to the attention of Chris Smith, WPLCS Coordinator, 3190 160th Ave. SE, Bellevue, WA 98008-5452. . All entries on the forms must be in ink or typewritten. The forms must be signed in ink by the responsible official for the facility or by a person who has been designated authority to do so in writing by the responsible official. The Department must have a record of the designation letter on file to accept signatures by persons other than the responsible official. 'I A' . Circle permlt violations and provide a written explanation of the cause of the violation and remedies used to correct the problem. The number of violations must be entered on the DMR form under the "No. Ex" column on the right side of the DMR form. See the instructions on the back of the DMR form for details on how to fill in that column. . Failure to report the results of tests required by your permit is a permit violation. If your facility did not discharge during the monitoring period, indicate by writing in "ND" for no discharge. Items that are not required for the monitoring period (such as tests done once per quarter) should be labeled "NAil for not applicable. If you encounter difficulty using the 'enclosed form, contact your facility manager. Enclosed are double sided forms. Keep at least one blank form to photocopy. You are responsible for keeping forms on hand for use at your facility. Questions; contact Chris Smith, WPLCS Coordinator (206) 649- 72J.4. 1_....J..l J.j,.,e,. .llJo.I.,I:./llUJ.,."l;..::J...J DISCHARGE MONITORING REPORT (DMR) Ilnclude Name/Location if differentl #696 I 001 DISCHARGE NUMBER I I Discharge Location Lat 410 32' 59" N Long 1220 40' 11" W CITY OF BREMERTON 239 4TH STREET BREMERTON, WA 98337 SAME AS ABOVE" 1600 OYSTER RD. BREMERTON 98312 NAME ADDRESS FACILITY LOCATION PARAMETER FLOW BODS II I I BODS " REMOVAL TSS TSS \ REMOVAL FECAL COLIFORM pH WA-00292B9 PERMIT NUMBER YEAR I. MO I MONITORING DAY I TO MO IDAY I NOTB: Read in,tructtons before complet1ng th1s form PERIOD 1 YEAR I. .__._---- ..... . .. nnANTI'J'V OR LOADING --r;":rago t Maximum I Units ::: ==; liiliiJti~T I ~i<ji~ii,.1 MGO sample He~~t" I ~ Ib/day l'era1t Recjtiir~i1': I. 1.~j1 :'. I: . j1~~:::'.1 ::::::+1 :;ri;:: 1:::::;;,1'" ...:.... ...;....;...;;.. HI I lIb/daY ::::E::::r !::;:~i~: r::tI!~~I'" ~mple 'HeasuJ:.-nt: 1 BU.". .1. ~~~~*~,.::I... . i>eriidi:. ilequi. ~':~;;t: : L :~H i~ HI:: h i:; ~ ~(,; ~lIIpi~ He~e~t: I **.**~* I .....~..:I ... i>iadt. ~~":~::,'+:;~. JJ,h~~J~ 1.:..**;;;:.. u~ 1:: _____..QUAJ.ITY OR CONCENTRATION Mini~~~ AVe~ag'e Maximum I Units I .**.*** ******* *.**..* 1 *.* I :,:.::;:;:- .;:':y.:f...;~.'.::...: ...<.:,::;;;.... '..:. .;.:. .:;. . U:.,,;:"' .:;. ;.::..;..:..:....... . :~Hn'H;t:'.':I.':i.'*hH.'::1 i:'ii:...;t~;l.'.. " I' : .,,, ,....."- .... ******* mg/L ',' iHilU ':: I,h\:~.>!~ ~ \;. '=: I, ':1 W'/ I I I * * * * *".. . 1 . _.... I *.". ~ ~. * I " I . ::. '.:. '.' :;. .::; ;:. .~. : ;.... :. :.; . '.. .'. . '. .::". . ". ..: :.,"nun:. '.I'}':.:: :';'~~'i.d. 'hii~;l; I'~~~~*~.* I ,... ....-. I .... '. '" I mg/L I. " .}.:;~:. :".} .}..:,:,'..;; ,',1 :'. .:;:::,,: .;:k:.. .;::;,;..1 ': :',. ':, f..<. ,:(,.~. .:,.' ;:'k.............. ,.,.,':". "~h :',": ...'" "4'r;'..:: . '. I..**~**. I -"'1 **.~~** 1 t 1 :;::jJ l ilt:{): Iw;\;fi:.~~if:t,lti h .;;'i't'.::f:: I ***.*~'. r -., 1 ' I #/100 I . i',-:"",::.:;',:,,,,~,;-:, :". ..". ";.}"". ::::1", ':'. ....:.: :.:'.:.'.;,... ml 1:.....-i.. ......>. ""~' I.............. w '. . .... .:. I........ .'. .. .'.w.' . 1:;:~\h*:*1t:"'I:'::::~*~::~:'I;::: "40~ '.: I sm I :;.:::,. ':"" .'1"": '\:':'. ..$.:., , ';".: I':'" ',..::,'. .A:B 0\.:': ;':lr~.*i\'***=:: ::: ",. 9.~.O:' . . .., . N l1requency O. of Ex Analysis CONT.: ,:'. Oi/01 01/30 OJ/OT' 'di13o us/iii ':' . \ I 07/07. I Sample Type MEAS. 24 He CAL. 24 lIC CAr.. GRAB GRAB NAME/TITLB PRINCIPAL EXECUTIVE OFFICER I CERTIFY UNDER PENALTY OF Ll\W THAT nns TELEP/lONE NUMBER DATE DOCUMENT AND ALL IITTACIIMENTS WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH II SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE TilE INFORMATION SUBMITIED. BASED ON MY INQUIRY OF TilE PERSON OR PERSONS WHO MANllGE THE SYSTEM, OR TIIOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING TUB ( ) INFORMATION, THE INFORMATION SUBMITTED AREA CODE TYPED OR PRINTED IS, TO THE BEST OF MY KNOIILEDGB AND SIGNATURB OF PRINCIPAL EXECUTIVE BELIEF, TRUB, ACCURATE, AND COMPLETE. I OFFICER OR AUTHORIZED AGENT AM AHARE THAT TIIERE ARE SIGNIFICANT YEAR HOtl1ll DATE PENALTIES FOR SUBMITTING FALSE. I IlFORMATIotl , INCLUDING TilE POSSIBILITY OF FlNB AND IMPRISONMENT fOR ~OIlING VIOLATIONS. '. GO~~ENT AND EXPLANATION OF ANY VIOLATIONS IRefereoce all attachments bere! ~ * - THE LIMIT DOES NOT APPLY OCTOBER TURU APRIL. Page I of 1 '.~ Paperwork Reduction Act Notice .- Public reporting burden for this collection of inform:ltion is ~stim:1ted to vary from a iJIlge of 10 hour3 as an aver.1ce per r~...ponse for ~ome minor f:J.cdities. to 110 hours as an aver:J.ge per response for some major facilities. wllh- a \\ elghted aver.lge for major and minor f:J.cilities of 18 hourS' per n::sponse. Including time for reviewing instnlctions. )t::J.rching eXlstlng data sources. gathering and maint<lming the data needed. :lnd completing and reviewing the collection of inform:J.tlon. Send comments reprding the burden esrim:ue or any ather :J.spect of this collection of informauon. inducting suggestions for reducing this burden. [0 Chief. Inform:ltIon Policy Branch. PM-223. U.S. Envlronmemal Protection Agency .+0 I M Srreet. SW. W;1shingto"l. DC 10-+60: md to the Office of [nformanon md Regulatory Aff:J.lfS. Office of Management and Budget. Washington. DC 20503. '., General Instructions l. If form has been partiaily completed by preprinting. disregard insrructions directed at entty of that information already preprinted. 2. Enter "Permittee Name/Mailing Address (and facility nameilocarion. if different)." "Permit Number." and "Discharge Number" where indicated. (A separate form is required for each discharge.) 3. Enter d:ltl:s beginning and ending "Monitoring Period' covered by form where indicated.. 4. Enter each" Parflmeter" as specified in monitoring requirements of permiL 5. Enter "Sample Measurement" data for each parameter under "Quantity'. and "QuaLity" in units specified in permit. "A~'erage" is normally arithmetic average (ge~metric average for bacterial parameters) of all sample measurements far each parameter obtained during "Monitoring Period"; "Maximum" and "Minimum"are normally extreme high and low measurements obtained during "Monitoring Period." (Note to municipals with se1:ondary treatment requirement: Enter 30-day average of sample measurements under "Average,'. and enter maximum 7 -day average of sample 'me;1surements obtained during monitoring period under "Maximum.") 6. Enter" Permit Requirement" for each parameter under "Quantity" and '.Qualiey" as specified in permit. 7. Under "No Ex" enter number of sample measurements during monitoring period that exceed maximum (and/or minimum or 7~y average as appropriate) permit requirement for each parameter. If none. enter "0:' 8. Enter ,. Frequency of AnaLysis" both as "Sample Measurement'. (actual frequency of sampling and analysis used during monitoring period) and as "Permit Requirement" specified in permit. (e.g., Enter "COnl." for continuous monitoring. "117" for one day per week. "1130" for one day per month. "1/90" for one day per quarter. etc.) 9. Enter '.Sample Type" both as "Sample Measurement" (actual samplf: type used during monitoring period) :J.nd as "Permit Requirement." (e.g., Enter '.Grab" for individual sample, "J.4HC'" for 24-nour composite. "N/A" for continuous monitoring, etc.)' . 10. Where violations of pennit requiremeius a~ reponed. attach a brief explanation to describe cause and corrective o.ctions taken. and n::fcrencc each violation by date. II. If "no disch:u-ge'. occurs during monitoring period. enter "No Discharge" across form in place of data entry. 12. Enter "NameiTitle of Principal E.tecutive Officer'. with "Signature of Principal Executive Officer of Authori:ecl Agem." "Telephone Number," md "Date" at bonom of form. . , . . 13. Mail :iigned Report to Oftice(s) by darc(s) 'spedfied in permit. Retain copy for1ourrecords. 14. More detailed insr:ructions for use of this Discha;.gl! Monitoring Reporr (DMR) form may be obtained from Officel") specified in permIt. Legal Notice This report is n:quired by law (33 U.S.C. \318; 40 e.ER. 1".:.5.17). Failure to report or failure to report truthfully -.::111 result in civil penalties not to exceed S 10.000 per day of viol:i11nn: or 10 crimin:!1 penalties not to exceed S25.ooo IXr ,Ll\ of violation. or by Imprisonment for not more than one: ye:lr. or ~~ ~\llh. EPA Form 3320-1 (Rev. 9-88) ~ i: U1\!-II. .\1 ~ 1-'.: .' I ~I: -I,. ~.. u.un"I','_'ri1tj~'1I il .jiLtfn.!'lItJ 1'1 i\/.I E 11696 DISCHARGE MONITORING REPORT (DMR) WA- 0.02 92 B 9 PERMIT NUMBER jd 'I 'RE.C;~: CITY OF BREMERTON ~J9 .JTIl STREET BRE1>IERTON. \'lA 9B337 SAt-IE AS ABOVE 1600 OYSTER -RD. BREfvJERTON 98312 YEAR FACILITY r.')GiTIO/l P1\RAMETER QUANTITY OR LOADING - I Avetage Sample Meanuc-ePICu!: I ...**..... J'rnnil: Rcquirement I ******" I ******* Sample Measuren>ent I ,ooO,o***oO 1******* Pcronit Requirement I .. *,o.... * * I ... ,o...". ir.. I Sample Measurement I I '1 Permit Requirement I I Is"mple Measurement I .1 Peronit Requirement I I I s~mple Heasurement I I Permit Requirement I I ., Sample t1easureroent: I I I Permit Requirement: I I Sample t1easurement I 1 Permit Requirement I 1 ,o,o* MO MONITORING DAY I TO f'1aximum Units I Minimum TOTAL RESIDUAL CIILOIUHE ***.*.... ... I ....*** ******* j,/4MONIJ\ - N (NH3-N) I ut I I I -I I 001 DISCHARGE PERIOD IYEAR I I I o 11 **..**** **.....*...... 1l'''''','-T1TLE rR WCI P/\I, EXEaITIVr. OFFICER I CERTIF\' UNDER PENALTY OF 1.1\101 THl\T TillS COCUHEtlT /\NO l\I.l. ATTACIIMENTS IlERE l'IlEP^,iED UNPER MY flIIlECTION OR SUFERVISION IN IICClJRDANCE WlTlI II SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVIILUATE TilE INI'ORHIITION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS HHO MANAGE THE SYSTEM. OR THOSE PERSONS t'IRECTLY RESPONSIBI,E FOR. GATHERING TilE INFORHIITION. THE INFORMATION SUBMITTED IS, TO THE BEST OF MV KNOWLEDGE AND BELIEI'. TRUE. ACCURATE, AND COMPLETE. I AM AWARE THAT TIIERE ARE SIGNIFlCI\NT rENALTIES FOR SUBMITTING fllLSE INFOR~IATlON. INCLUDUIG TilE POSSIBILITY Of fINE AND IHPRISOlltlENT fOR KNOIHNG V lOLI\TIONS . TYrEll OR I'R IIHEIl NUMBER I I Discharqe Location Lat 470 32' 59" N Long 1220 40' 11" W MO I DAY I NOTE: Read instructions before completing this form No. Ex ,- frequencl' of IIllaly~is I I 07/07 /- I 01/30 I I I I I I I I I Sample Type GEAB 24 He I II I; I _"J QUALITY OR rONCENTRATION Average I-Ma~i~:T~~its I mg/L I mg/L f 0.37 REPORT I I I I j 1 L_-_.__--D SIGNATURE Of PRINCIPAL EXECUTIVE OfFICER OR IIUTIlORlZED AGENT TELEFIlONE tlUMBER .( ) l\RE/\ CODE yr.A" t'IITf. MOUTH 1'1111' " .':'U'II-:IIT IINll FXrLJlfIA"'~)II OF AllY VIOlJlTIONS IReference all attachments here) 2 Page 2 at Paperwork Reduction Act Notice Pu!1II'- rl::ron1ng burd~n tor this \:(')lIe<:tlon oi InltJnTI:llion 1\ I::stlm:lIed to V:lT:r irom a range of 10 hour3 as J.I] a~eral:e rer r"'rlln~e IN ,ome minor f:lc.:t1It1es. 10 Illl hours a~ :.m Jverage per response lor some m:lJor i:J.cIIlCes. ....'th.;l \\ ,",::hl-:,d J "l::rJ:;e tor m:J.lor Jnd mInor iJcilllles 01 I ~ hour,; per n:spome. Includmg nme for n:viewmg mstrUCllom. ~":Jrchln~ ~\I\lmg dJlJ ,uurces. plhering Jnd mJmlJlnlng the dala needed. and completing and reviewing lhe clJll::c.:wm (11 InINm:lllan. Send comments reprdm!,! the burden esnm:l!e or :my Olher aspect of thiS colleclIon 01 Inll1rmJl1l1n. 1n~luu'n~ ,U;;~":\IIOnS for reduL:lng thIS burden, 10 Chief. Inform:l!Ion Policv Branch. PM.223, U.S. Fn\"lrnnm~nl:l1 PrOlel'llon :~gt'"ncy ..lOt M Screet. SW. W:1shtng!o." DC 2~OO: :md to the Office of lnformatlon a."d Rc:;uIJlory :1.n:'llr~. Office 01 \.bnagement and Budge!. Washmgton. DC :20503. General Instructions If form has been partially completed by preprinting. disregard instructions directed at entry of that information already preprinted. Enter "Permwet! Name/Mailing Address (and facility namellocation. if different)," "Permit Number," and "Discharge Number'" where indIcated. (A separate form is required for each discharge.) Enter dales beginning and ending "Monirorrng Period" covered by form where indicated. Enter each "Parameter" as specified in monitoring requiremen15 of permit. Enter "Sample ,\-feasuremenr" data for each parameter under "Quantity" and "Quality" in units specified in permit. "A\'uage" is normally arithmetic average 1geometric average for bacterial parameters) of all sampk measurements for each parameter obtained during "Monlloring Period"; "Maximum" and "Minrmum" are normally extreme high and low measurements obtained during "Moniroring Period." (Note to municipals with secondary treatment requirement: Enter 30-day average of sample measurements under "Average." and enter maximum 7.d:lj :lverage of sample measurements obtained dwing monitoring period under "Maximum:') Enter" Permit ReqUIrement" for each parameter under "Quantirv" and "Quality" as specified in permit. Under "No Ex" enter number of sample measurements during monitoring period that exceed maximum (and/or mmimum or 7-day average as approprialC:) permit requIrement far each parameter. If none. enter "0." Enter" Frequency of Analysis" both as "Sample M easu.rement" (actual frequency of sampling and analysis used during monitoring period) and as "Permit Requ.lrement" specified in permi!. (e.g., Enter "Coni," for continuous monitoring. "i/I' for one day per week. "/130" for one day per month, "1I9(],' for one day per quarter. etc. I Enter "Sample T.\"pe" both as "Sample Measurement" (actual sample type used' during monitoring period I and as "Permit Requirement," (e.g., Enter "Grab" for individual sample. "2-lHC" for 24-hour composl!e. "N/A" for continuous monitoring. etc.) . I O. Where v iolations of permit requiremeins are reported. a!!ach a brief explanation to describe cause and correCll \"c: actions taken. and reference each violation by date. I. 1 3. .+. s. 6. ~ i. 8. 9. II. If "no discharge" occurs during monitoring period. enter "No Discharge" across form in place of data enrry. l2. Enter ";\'umeiTirle of Principal E:cecutive Officer" with "Signature of Principal Eucurive Officer ojAllthon:/',1 Al.!ellt." '"Telephone Number," and "Date" atbanom of iorm. I \ .\ l:1i I SI !;ned Report to Office(s 1 by date(s) specified in pe[T\1it. Retain copy for ytourrecords. I..L \h're det:.liled In'itruclions for use of rhis Dischar~e Mnnllnrtnf! Report IDMR) form may be obtained from Office\' specilied In permIt. Legal T\ otice ThIS report i~ reqUIred h~ law 133 USe. IJ 18: 40 e.FR 12:: :-1 F:lilure to report or f:lilure to report rruthfull~. ",. rC'iUll In CIvil penaltie) nOI 10 e,<ceed S 10,000 per d;JY (11 \ In:'IIIo'!l ,'r In ....nmlnJl penalties not to e:<ceed 525.000 r.:r 01 '. lol:llJon. or n\ Irnrn~onmem tor nor more th:m one ye;lr. ,'r "'\ ;1, till EP.'\ Form JJlO-I rRe..... 9.R81 (Include Name/~ocation if different) DISCHARGE MONITORING REPORT (DMR) NAME CITY OF BREMERTON 1#696 I WA-00292B9 I I 001 j I Dischar1e Location PERMIT NUMBER J DISCHARGE NUMBER Lat 4 0 32' 59" N ADDRESS 239 4TH STREET Long 1220 40' 11" W BREMERTON. WA 98337 I MONITORING PERIOD j FACILITY SAME AS ABOVE YEAR I MO I DAY I TO IYEAR I MO IDAY HOTS: Read in,truct~on8 LOCATION 1600 OYSTER RD. BREMERTON 98]12 . " " before complet1ng th1S forn II --.-'--."__'_'u I QUANTITY OR LOADING PARAM:ETER ARSENIC (TR) INFLUENT ARSENIC (TR) EFFLUENT II I I CADMIUM (TR) INFLU8NT CADMIUM (TR) EFFLU8NT CHROMIUM (TR) INFLUENT CHROMIUM (TR) EFFLUENT COPPER (TR) INFLUENT ~verage I Maximum Units OIJ-!\.T.~!TI ("Ill. CQNCENTRATION Minimum I Average I Maximum I Units ******* *'it***** Saarple Heasurement ******* I ******* I. =~~z.ri~~~;;~;f~;:~~;. ~~~ ~sur"':""'t I ** ** **.. r;~ ** ~ ** Permit R..q..~r~t.:-I : ~ ~ ~'~i ~: ~' I : ~"i i i 1 ~:i" Sa""le Heasuremen~ I ******~ I ****~~~ ' Sample ~asurement. I I\- ** ** ** I ** ~ ** ** P~ridt',~~:"-':~;;:~;';:,I(:'H li*- ti :., J l ~ j;:#;':!i'1 ., '.~.-..'-',""-'-' *...* *** *** *** *...... *..." ...** i, d,.~~H ~y. it':fi~P6~~:;r::\h h14/i': ******* ...*****. I iHili:it}/ )f ii~a~~il; I'/i Hi:::'i:r:. -"'''''. 'l .***.*. ******* rHiiiH,' 1;'/'~~pri;*':~ljHHii' 1"*******' 'I ",..co ~'" 1 ******* I :i:l~ iJ:ff~;:\I,k::(~Q~Aa,+I<H j'fii;}.: I *...*~*** I ..'-~ -,,"- I '....***** I i;;,l'jlilh::: h{j:~~b~it*::tl:::i l"l-iti:H ,:, I *..........** I . HC",' - I *...**......... I 'idJJjJ:L;:;ktii~8ti*rl.~ iJUh'.L I ****.-** "" I ~"'**"'''''''I ';.~~~.~i:i.=i :1{:}:ii~~okf:';'I:.: l~ i~ h., . I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACI~,.....S HERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCOIlDAtlCE WITII A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATB THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS HHO MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING TUB INFORMATION, THE INFORMATION SUBMITTED IS, TO THE BEST OF MY kNOWLEDGE AND BELIEF, TRUE, ACCURATE.. AND COMPLETE. I AM AWARE THAT TIIERE ARE SIGNIFI-CANT , PENALTIES FOR SUBMITTING FALSE INFORMATION. INCLUDING TilE POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING VIOLATIONS. NAME/TiTLE PRINCIPAL EXECUTIVE OFFICER TYPED OR PRINTED ( ) SIGNATIlRB OF PRINCIPAL EXECUTIVE I AREA CODE OFFICER OR AI1fHORIZED AGBHr - -- ---- --- -- ,- --- -_. ,.... .- ,-". -- . ~--,-- ~--,_._--- I, tOI1MENT AND EXPl.ANATION OF ANY VIOLATIONS (Reference all at~acluaen~B bere) s' mg/L mg/L mg/L mg/L mgfL mg/L mg/L TELEPHONE NUMBER I' " . ., I I I: . I , I ,." ., " ";-."';;;' ". ",. ;'. .... No. Ex Frequency of Analysis sample Type I iJi 16&' I 24 HC I I ~/tiij .:' 124 HC I oVtid I :l4 HC I I I 01160 124 He I , I dli~o. I 24 He I I I oind . I 24 HC I I , oi/60 ." 24 HC I - DATE YEAR MOtu" D1ITE Page of 1 .~ Paperwork Reduction Act Notice-- Publi..: repomng burden for this collection of information is ~stim:J.[ed to vary from a r:mge of 10 haur3 as an aver:ll::e per re~ponse for ~ome minor facilities. to 110 hours as an average per response for same major r:lcilities. wah- a \~ ell;hted :J.verJge for major ;.md mInor fJcilities of 18 hours pet' response. including time far reviewmg instructions. )c:1rchlng eXisting data sources. g:uhering and maintaimng the dOlt:l needed. and completing and reviewing the collectltln (1f infonn:mon. Send commentS regarding the burden esrim:lte or any other aspect of this collection of iniormatlon. including suggestions for reducing this burden. to Chief. Inform:ltion Policy Branch. PM-22J. U.S. Envlronment:ll Protet.:tlon Agency, ..0 I M Street. SW. Washingro.,. DC :0460: :md to the Office of Informauon and Regulatory AffJlrs. Office of Management and Budget. Washington. DC 20503. "~. General Instructions l. If form has been partially completed by preprinting. disregard instructions dirCl:ted at entry of that information already preprinted. 2. Enter ,. P ermirree Namel Mailing Address (and facility namel1ocation. if different)." "Permit Number," and ,. Discharge Number" where indicated. (A separate fonn is required for each discharge.) 3. Enter dates beginning and ending "Monitoring Period. covered by fonn where indicated. 4. Enter each '.Parilmerer" as specified in monitoring requiremenu of permit. 5. Enter "Sample Measurement" data for each parameter under "Quantiry" and "Qualiry" in units specified in permit. "A\'erage" is normally arithmetic average (ge~metric average for bacterial parameters) of ail sample measurements for each parameter obtained during "Moniroring Period'.; '.Ma:timum" and "Minimum" are normally exrreme high and low measurements obtained during "Moniroring Period." (Note to municipals with secondary treatment requirement: Enter 30-day avemge of sample measurementS under "Average.'. and enter maximum 7-day avemge of sample 'measurements obtained during monitoring period under "Maximum.") 6. Enter" Permir Requiremenr" for each parameter under "Quantiry'. and "Quality'. as specified in pennit. 7. Under "No E.r." enter number of sample measurements during monitoring period that exceed maximum (and/or minimum or 7 -day average as appropriau:) pennit requirement for each parameter. If none. enter "0". 8. Enter '. Frequency of Analysis'. both as '.Sample Measuremenr" (actual frequency of sampling and analysis used during monitoring period) and as "Permir Requirement'. specified in permit. (e.g., Enter "Cont." for continuous monitoring. '.1/7" for one day per weelc. "1130'. for one: day per momh. "lI9(]. for one day per quaner. etc.) 9. Enter '.Sample Type" both as '.Sample Measurement" (actual sampl~ type used during monitoring period) and as "Permir Requirement," (e.g.. Enter "Grab" for individual sample, "'24HC' for 24-hour composite. "NIA" for continuous monitoring, etc.)' . 10. Where violations of permit requirements ~ reponed. attach a brief explanation to describe cause and corrective :lctions taken. and reference each violation by date. . 11. If "no discharge" OCCU13 during monitoring period. enter "No Discharge" across fonn in place of data enrry. l:!. Enter "Name/TIlle of Principal E~ecurive Officer" with "Signarure of Principal E~ecurive Officer of Aurhori:ec.l Agent." "Telephone Number," and "Date" at bonom of form. . . - . 13. Mail signed Repon to Office(s) by date(s} 'spedfied in permit. Retain copy for10ur ~cords. 14. More detailed instructions for use of this DiscJrarg~ Monitoring ReportfDMR) fonn may be obtained from Office\s I specified in penn it. Legal Notice This report is required by law (33 U.S.C. 1318; 40 C.F.R. 125.271. Failure to repoa or failure to report truthfully -::111 result in civil penalties not [0 exceed 510.000 per day of violallnn: or in criminal penalties not to exceed $25.000 pl:r ,!:l\ of violation. or by imprisonment for not more than one ye:1r. C1r r.~ r.lllh. EPA Form 3320-1 (Rev. 9.88) (lllclucle Name/Locat iOIl if dit terentl NAME ADDRESS CITY OF BREMERTON :239 4TH STREET BREMERTON. WA 98337 SAME AS ABOVE 1600 OYSTER RD. BREMERTON 98312 FACILITY LOCATION PA.R.AMETER COPPER (TR) EFFLUENT LEAD (TR) INFLUENT I I I LEAD (TR) EFFLUBNT MERCURY (TR) INFLUBNT MERCURY (TR) EFFLUENT NICKEL (TR) INFLUENT NICKEL (TRI EFFLUENT -- OUANTITY OR LOADING Ayerage Sample Heasurement Permit Jl~i~ed.eb.t::': ******* .a~h:~ ....~,.; ......,,-~ ----' Discharge Location Lat 470 32' 59" N Long 1220 40' 11" W MO NOTS: Read inftructioos before completing this form <l;OMMEIO" /\ND EXPLJlNATION OF ANY VIOLATIONS (Reference all atta<:hmeots here) Sample MeasurellleDt: ***....** *HJ:..:. PenJt: ~lL~'l.Ai . . . . 8aJnple Heasur_t. *.***** Pe~t; lieqtii, :.~,' ,,:':'~(l /l H:~ l'l," I .hh ::lJiJ' 8aJnple Heasure-..t ******... Peiwit:'~',-;::hf,::;l iHHJ~, I,~i{;;ltrn Sample Measurement "~i; j.;q;.ir~p ..*.... H~:liH DISCHARGE MONITORING REPORT (DMR) , 001 ~E mx.BER I I I frequency of Analysis , I 01/60 I I ch/5o I I ai/50 I , oiJiio ;,. ai/60 Sample Heasur_t. **.*.** 11696 WA-0029289 PERMIT NUMBER ,.., 6060': p~~t Ii~h~~fi~l,: it ~t:l';i Sample Heasuremeut *.***** YEAR MONITORING PERIOD DAY I TO IYEAR I MO /DAY f HI oiJ.~o . I I I I I I 1._ I - . - - - - -'-.-' r-.' - NAME/TITLE PRINCIPAL EXECUTIVE OFFICER I CERTIFY UNDER PENALTY OF LAH THAT THIS TEL8PHONB NUMBER DATE DOCUMENT AN[) ALL ATTACHMENTS HERE PRE~ARED UNDER MY DIRECTION DR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATB I J THE INFORMATION SIJBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS HHO MANAGE THE SYSTEM, DR THOSE PERSONS DIRECTLYRESPONSIflLE FOR GATIIERING THB ( ) INFORMATION, THE INFORMATION SUBMITTBD AREA CODE TYPED OR PRINTED IS. TO THE BEST OF MY KNOWLEDGB 1IND SIGNATURB OF PRINCIPAL EXECUTIVE BELIEF. TRUE. ACCURATE, AND COMPLETE. 1 OFFICER OR AUTHORIZED AGENT AM AHARE THAT TIIERE ARE SIGNIFICANT Y EAJl HOIO"II DATE PENALTIES FOR SUBMITTING FALSE INFOllMATlON. INCLUDING TilE POSSIBILITY OF FINE AND IMPRISONMEIO" FOR /(NOWING VIOLATIONS. . pe~i:lteqti~~:~~i;,Ji * ~ ~Ai'i. Maximum ~P~~TY PH CONCENTRATION Minimum I Av~~~';~'l;~ximum , Units f ~~. iiii;i;; IHn~illii; ,ii;;;;i, I mg/L Ii ..*~~*~~*. ..... . ..... J .u*~.~..~~. j mg/L I ''''''. ..:.'.?- ::::':~::':".... , :........ .':': .... ~.:...; ., ,....' ~ . ".','.:"'~'::'~.",.:.,: :'HI'UU;::" ):"'fiiioRTf! (it Hit'n':: ':: ~~it~.~I\~'~~iili~;lii;t;ii .1 "./L I.. ......./ "O/L 10' Units ******* ~:.~;i4ait *** ******* *** ih ~ U~:::: **.***. **. *..**** ***..** *.* .....*. ~:J i ~1f~n i' 't;i,:ki!pbftt ::. **....* .diiHf , ....... W,.it~~oit~: f: lt1f~~l mg/L ... ....... i:liHliii :iH:ia~} **....... I ... .... * itltilY ..**..* .*....*** mg/L O::H'll:l'W:t j I /:i:k~W6fi+\'r::: t i l~:t ~ f: .*.**** :i' i.~~lU:t .** ....... .*****... mg/L ',:.I:; i *iH:;:. ':b.iik~oa;f,':i:LH ~J~ i ~: Page 2 ot J ,~. Paperwork Reduction .l\ct Notice ..- Publil: repomng burden for this collection of infonn:l.tion is ~stim:lted to VJIY from a r.mge of 10 hour3 as an aver.tt:e . per r~...ponse for ~ome minor fJcdities. to 110 hours as an aver:lge per response for some major fJcilities. wuh- a \\elght~d J. ver:J.ge for. major and minor facilities of 13 hours pet' response. including time for reviewmg instructions. )~:J.rch in g e:ustlng dJt:J. sources. gJthenng ,md maintaming the dat:l needed. and completing and rev1ewing the collect Inn (1f infonn:mon. Send commentS reg:J.rding the burden esnm:lte or any other aspect of this cc: ,.:ction of informatlon. including suggestions for redUCIng: this burden. to Chief. Inform:ltion Policy Branch. PM- .13. U.S. F.nvlrnnmem:J.l Protet.:llon Agency ~O I M Street. SW, Washing-to.,; DC ::'Q...+60~ and to the Office of Info~auon and Regulatory AffaIrs. Office of Management and Budget. Washi;gton. DC 20503. '-, General Instructions 1. If form has been partially completed by preprinting. disregard instructions direr:red at entry of that information aiready preprinted. 2. Enter" Permittee Name/Mailing Address (and facility namellocaaon. if different)." "Permit Nrunber," and "Discharge Number" where indicated. (A separarc form is required for each discharge.) 3. Enter dOltes beginning and ending "Monitoring Period. covered by fonn when: indicated. 4. Enter each '~Partlmeter" as specified in monitoring requiremencs of penniL 5. Enter "Sample Measurement" data for each parameter under "Quantity" and "Quality" in units specified in permit. "A\'erage" is normally arithmetic average (ge~metric average for bacterial parameters) of all sample measurements for each parameter obtained during "Monitoring Period"; '.Maximum" and "Minimum'. ai'enonnally extreme high and low me:lsurementS obtained during "Moniloring Period." (Note to municipals with sei:ondary treatment requirement: Enter 30-<fay aver:Jge of sample measurements under "Average," and enter maximum 7-day :l.vemge of s:lmple 'measurementS obtained during monitoring period under "Maximum.'.) 6. Enter" Permit Requiremem" for each parameter under '.Quantity" and "Quality" as specified in pennit. 7. Under "No E.t" enter number of sample measurements during monitoring period that exceed maximum (and/or minimum or 7 -<fay average as appropril1te) pennit requirement for each parameter. If none. enter "0." 8. Enter .. Frequency of Analysis" both as "Sample Measurement" (actual frequency of sampling and analysis used during monitoring period) and as "Permit Requirement" specified in permit. (e.g., Enter "COllt." for continuous monitoring. "111 for one day per week. "1 r 30" for one day per month. "119(]" for one day per quaner. etc.) 9. Enter ,. Sample Type" both as "Sample Measurement" (actual sampl~ type used during monitoring period) and:lS "Permit Requirement." (e.g., Enter "Grab" for individual sample, "24HC" for 24-l1our composite. "N/A" for continuous monitoring. etc.)' . 10. Where violations of pennit requirements ~ reponed. attach a brief explanation to describe cause and corrective actions taen. and reference each violation by date. II. If '.no disch:lrge" occurs during monitoring period. enter "No Discharge'. across form in place of data entry. 11. Enter "NameiTitle of Principal E.tecutive Officer" with "Signature of Principal E.tecut;ve Officer of Authori:ecl Agent," "Telephone Number," JDd "Dale" at bottom of form. . . . 13. M:1il signed Report to Office{s) by dace(s) .spedfied in pennix. Retain copy for your records. 14. More detailed instrUctions for use of this DiscJrargf! Monitoring Reporr (DMR) form may be obtained from Office!'i) specified in permit. . Legal Notice This report is required by law (33 U.S.c. Uta; 40 C.F.R. 1:5.17). Failure to report or failure to report trUthfully ,,::n result in civil penalties not to exceed 510.000 per d:lY of violallon: or in crimin:1! penalties not to exceed 525.000 pl:r ,:.1\ of viol<:1tion. or by imprisonment for not more than one ye:lr. or l"I~ hOlh. EPA Form .3.320-1 (Rev. 9.88) 'ERMITIEE NIIJ-IE/I\ODRESS Include ~ame/Location it differentl DISCHARGE MONITORING REPORT (DMR) lAME lDDRESS WA-00292B9 PERMIT NUMBER I 001 DISCHARGE CITY OF BREMERTON 239 4TH STREET BREMERTON. WA 98337 SAME AS ABOVE 1600 OYSTER RD. BREMERTON 98312 fl696 MONITORING PERIOD I YEAR I ~ACILITY .OCATION YEAR DAY TO MO HLOiBER I I MO I DAY I Discharge Location Lat 470 32' 59" N Long 1220 40' 11" W NOTB: Read instructions before completing this form 1 OUANTITY 0>> T.nADING QUALITY OR CONCE;-RATION PARAMETER I I Ave~age I Maximum I Units I Minimum I Average I Maxi~um I Units I ZINC (TR) SaDple Measuremeut I *****.ir , *****.*'- . *~~..., ******* I . 1 *..**** I mg/L INFLUENT I PBnIdt.'R-'';r~t;''1 /:!;;' .'. ':''':1 . . : '.' ;.' 1.>:t:";":~;;~:}:;"~';':.:I.':'.' ".:::.. ;...:.::.; ".1.:.:;=:;':;':'-':.':.' .:,.t:}::. . . ~~~'" . ';. '. ,:*****1\"*:': .******* ;:;ii;:~'*.*..**.:';,.: "';:;:;;R,RPOR'r. ..,..."*..,.* *-', . ZINC (TR) I s.aq>le Measurement I ~UU~* I UU**. .:* *~"".*.* '1' . ,....... '.~~***~*.I mg/L EFFLUENT . . ..... ..,;.,' ,.'.':'. ...... :: : :.;..;;;....; ...,:.;::, . .: . ..:,......,.: .,.....:.....: .. ..;.;.'". ~I:;' ~~~I:;.:I "=* ~ ** *...xl ** *..t....... * fH* h..~: !::if,::, iiPORT": I :.. H ~ *_..: CYANIDE I Sa~le -Hea~~t I *.*~*** 1 ******"* *"** **~****"I~. I ******* ~ mg/L ItlFLURNT Pendj:, RegtiL t 1 ...:...:;. ...;." ..': I' ::........ :.:.....:,...~:...:....:.:.:::::::.:;I.~;:...:;.k..,. ...:;:;:..;:. I. .:::'':~..::,'':. ::.:::::;:i.':' '.:. .'.: .': :;":.,\. ~::;. .::(; *.... .*::~: *.*.. ir ** U,:,i,* ** .*'j;: j<'i.;RBPOR.T' .;.**.. * * ,.j,.. CYAlfIDB I Saluple Hea...:u:ement I ******* I ******* *** ******* " , ******* I mg/L .. . " .... . n" .' _.,". :-..:-:.;.;_..; :':.:..:.;.; : . ..:.. . ..... .....::. .','" EFFLUENT Pendt ~ement I::;l*~~~';.~ I ~i~*-irn;;;~a*j:t;h;'IiEP6RT l'::i..~***.;.*. I Saa>ple Heasuremeut " I . , Pendit. R ,. r....eut ':/10..:.' . ...:'.:; "'. ":.. :. ::.... \.;;".;,:,::\.} .,\.:' j,.': :g,..~ /:,: ',;' "::W., ',': )f:'?!. . ::'.:.::::k ~ .1....,... ..1......... .......................1..............1... .-...... I SalDpIe He"':""':'t "" ..........,. '. I . ....... .......:,.... .....: .,.... '.. I Pendil: RequL~.. ...,.~ h++~. ..: ..:)i::;:" I .:, .,,:'1 !,(::tV+:f:jt':,":i; I ;,~t::.:..::.~L.::::;,:;,::: I::' ::;:: f ::: == I ,I ti, ".I , I ~AME/TITLE PRINCIPAL EXECUTIVE OFFICER I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE PREPARED L..uGR MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE 11IE INFOIIW;T10N SUBHITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS MHO MANAGE TilE SYSTEM. OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION, THE INFORMATION SUBMITTED IS. TO TIlE BEST Of MY KNOWLEDGE AND BELIEf, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT TIIERE ARE SIGNIFICIINT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING TilE POSSIBILITY OF FINE AND IMPRISONMENT FOR kNOHING VIOWlTIONS. SIGNAroRE Of PRINCIPAL EXEcurIVB OFFICER OR AUTHORIZED AGENT TYPED OR PRINTED MENT AND EXPWUIATION OF ANY VIOLATIONS (Reference all attachments herel TELEPHONE NUMBER ( ) AREA CODE No. Ex I Frequency of Analysis I I 01/60 1 ~/'O 1 DilDO I , 01/60 I I I I I I YEAR Page 3 Sample Type 24 HC 24 He GRAB GRAB DATE HOIrr" DATE ot 3 Paperwork Reduction Act Notice ..-- Public reponing burden for this collection of inform:uion is eSlim:llcd to VJIY from a rnnge of I D hour:! as an aver:lge per r~"ponse for ~ome minor f:lcilities, to tlO hours as iln ilverage per response for some m:ljor f:lcilities.. wllh- a \\ elghted :lver:lge for major and mlOor facilities of 18 hours per response. Including nme for reviewing instructions. ~~Jrching e~\Isllng d;ua sources. g:llhering and muinl..1lning the data needed. and completing and reviewmg the collection of inform:llJon. Send comments reprding the burden esnmate or any other aspect of this collecllon of iniormatlon. induding suggestions for reducing this burden. to Chief. Informallon Policy Branch. PM-22J, U;S. EnvIronmental PrOlel:1\On Agency 401 M Street. SW. Washingto'1. DC ~Q...I60; and to the Office of lnformauon and Regulatory AffJlr5. Office of Management and Budget. Washington. DC 20503. "~I General Instructions 1. If form has been partially completed by preprinting. disregard instructions directed at entry of that information already preprinted. 2. Enter "P'ermirru Name/Mailing Address (and faciliry namellocation. if different)," "Permit Number," and "Discharge Number" where indicated. (A separate fonn is required for each discharge.) 3. Enter dates beginning and ending "Monitoring Period"' covered by fonn where indicated. 4. Enter each "Parameter" as specified in monitoring requiremenu of penniL 5. Enter "Sample Measurement" data for each parameter under "Quantity" and "Quaii!y" in units specified in permit. .. A~'erage" is normally arithmetic average (ge.omctric average for bacterial parameters) of all sample measurements for each parameter obtained during "Monitoring Period"; "MtUimum" and "Minimum" arc normally extreme high and low measurements obtained during "Monitoring Period." (Note to municipals with secondary treatment requirement: Enter 30-day avernge of sample measurements under "Average,'. and enter maximum 7 -day average of samp.le 'measurements obtained during monitoring period under "MtUimum.") 6. Enter-"Permit Requirement" for each parameter under "Quantity" and "Qualiry"as specified in permit. 7. Under "No Ex" enter number of sample measurements during monitoring period that exceed maximum (and/or minimum or 7-day average as appropriate) pc:lTI1it requirement for each parameter. If none. enter "0," 8. Enter "Frequency of Analysis" both as "Sample Measurement" (actual frequency of sampling and analysis used during monitoring period) and as "Permic Requ.irement" specified in permit. (e.g., Enter "Cant." for continuous monitoring. "J Ii' for one day per week. "1/30" for one day per month. "1/90" for one day per quarter. etc.) 9. Enter "Sample T:,'pe" both as "Sample Measurement" (actual sampl.~ type used during monitoring period) and as "Permit Requirement," (e.g.. Enter "Grab" for individual sample, "24HC" for 24-hour composite. "N/A" for continuous ~onitoring. etc.) .' . 10. Where violations of permit requirements ar,? reponed. attach a brief explanation to describe cause and correctlve actions taken. and reference each violation by date. 11. If "no discharge" occurs during monitoring period. enter "No Discharge" across fonn in place of data enrry. 12. Enter "Name/Title of Principal Executive Office.r" with "Signature of Principal Executive Officer of AUlhori:eJ Agent." "Telephone Number," and "Date." at bonom of form. . 13. Mail signed RepoJ1 to Oftice(s) by d.ate(s) specified in permit. Retain copy for your records. 14. More detailed instructions for use of this Discharg~ Monitoring Reporr (DMR) form may be obtained from Officel ~) spt:citied in permit. Legal Notice This fepOrt i:s required by law (33 U.S.c. 1318; 40 C.F.R. I ~5.~7). Failure to repoe! or failure to report: trUthfull: ~':lll re~ult in civil penaltie~ not to exceed SID.DOO per day of \'\Olallon: or 10 Criminal penalties noc co exceed 525.000 per ,~.I\ of vlol:lllon. or by imprisonment for not more than one year. Of ~~ r-I)(h. EPA Form 3J20-1IRev. 9-88) '"~"I i n !] ] fl '] [] '] n d n il r~1 ~ , u 'J I d ~.J...... . ~I d n ; I U .il , . I L,J I ,J Appendix B Beach Main Hydraulic Profile CDIVI P:\Bremerton\Comp Plan\Amendment\7PROJDOC\DRAFT AFTER JUNE 2005 - - ,- - - ""'.-, ",,,,..,J "."..."..',..." ,-, "", ,..,,' ,,,-,,,, ,.,,"," "".... ".,,~""",,"" 260- Jj .7onj 250 ~-=- Jj.. 240 TRACYTON BEACH BASIN 230 220 210- 200- 190- 180- 170- 160- t $l <C 5 '" g -0 J1 o <fl U o 1: ~ i 150- 1\0- o ;:;- <;! i ~ -& w ~ ~ 0.: 100- 90- 80 w ~ C1 E g ,:; E ...... '" ::::. E Ii ~ 0.. '" ~ ~ o u '" I '" I .", IZ -\ ,~ - ), ~ HGl FOR 2,300 GPM / ~W TO CE:-1 \./\1 __ 1 ~ HGl FOR 4,000 GPM / ,.r \ FLOW TO CE-1 / -,' - I \ I- I I I \ TO CONVEY MODIFICATI~N~O EB-2 PIPING FROM OF- _, FLOWS _ f ~ // \ ---- \ / .~ ~ ~~~O~~rws \\..Lr).- _ <~.~ \_ - m"-' rr /""_,! \ -~,~ ~ ".-"- ----'\:"B--.2" CA~PAp STATION --== ~ PUM . = . - ~ \ - ~OOJ- 1 \ Jj.. -\ -' -' PINE ROAD \ \ BASIN \ - - -\ \ \ ~ Jj.. -,/ / / / ~ ~ r~ i:::= . Jj.. EAST PARK BASIN CHERRY AVENUE BASIN ,/ / / / / -,/ ~ ,/// ,/ ~rlNG MODIFICATIONS -' TO DIVERT FLOWS DOWNSTREAM OF OF-3 \ /" \...r'/- / \. \ \ \ CANYONr STEVENS BASIN [\ l'- " \-' \ \ I \ I \ \ \ REDIRECT FLOWS DIVERTED FROM STEVENS CANYON TO \\..nI:..KKl t\vt.NUI:.. b~\.ij{""" \U STEVENS CANYON ~ ~ ~~~ \\ ~ ~""'"~ /'\" " / ~ '"'" RIM 1 gsj./ :?W"-." _ "",,~/EL 153.6 --- "- "- "- "- ~"'" \\ ~ , - __ 260 __ 250 _- 240 __ 230 -220 _210 _200 _190 -180 -170 _160 -150 _140 -~ ~ EL 119.1 120 ~ 118. ~110 .QE::Th TRENTON AVENUE BASIN -- - PIPING MOOIFICATIONS TO CONVEY FLOW FROM !,;TJ:YFN!'; C-A"'VON .I{' MANEITE AND INCREASE '" C/lPACI1Y FROM PINE ROAD BASIN TO ~ ~~~~N~SO"- FACILl1Y , \ . \ " ~. -~ ~ E EXISTING ~ REPLACe". HiGHER "~WI~ MEA~ WATER ../ ~E 121.6 _ 'Jle" _ ~ EAN LOWER eOW WATER ,00' 16" ASSUMES 4,000 GPM _ c:'10W-10--("C'_1 20"~ 24" -\ 2-4::-- ~;l:;50) 2,300 GPM lllL- ~SSUMro CE-1 '7 FL~W ~ .r:-. CONNECTIO~p~~N (d:Asrdr,S" r23QO) INVERTED 'C.:.? _ - -~ ~FECT TO SEE ABOVE HGL INSTALL 16" PIPE I u \..VI~VI:'.. '( fLUW::i FROM TRENTON I...""EASE CAPACITY PUMP STATION EB-6 AND ~lvKAI,.jI:.. MEAN LOWER ~ LOW WATER EL 109.6 ~ TREATEO EFFLUENT TO PORT WASHINGTON NARROWS ? ~ EAST BREMERTON BEACH MAIN PROFILE - - . - - (APPROXIMATE HORIZONTAL SCALE 1'~1 ,000 fEEf) ..-- ,...,."..-".......,.. ".""",.-','" ..,.-,. .,~,,,.,,--",,.....- ...._.... ~M "...""" L..,..."""""",.""".""".-., .",."",""...,,...,,',.,"'" ""'"'''''''''''''.-..'''''''''''''...''''.''''' _100 ~P STATION MODIFICATIONS TO CONVEY EillWS TO EB- 2 -90 ll2Ie:~ - GROUND ELEVATIONS BETWEEN BASINS REPRESENT THE GROUND ELEVATIONS ON LEBO BOULEVARD AND WHEATON WAY. - _80 LEGEND ~');:::\.) FLOW IN PIPE 4,500 FLOW PRODUCED IN BASIN \-J ~ _ HYDRAULIC GRADELlNE (HGL) N01E: ALL FLOWS ARE IN GPM -"".......-..' Jan 2001 -"....". CITY Of BREMERTON CSO REDUCTION fACILITY PLAN EAST BREMERTON - PROPOSED CONVEYANCE MODiFiCATiONS Figure 7-2 ."."....""....".....",,- ""lL'"",,,,,,,,,,,,,,,,,,,,,, ------ '1 f] n ] p1l u '] [] :J , I ~J :) U . nax C Appendix C Port Blakely Sanitary Sewer Evaluation CDIVI P:\Bremerton\Comp PlanlAmern:lmentI7PROJDOC\oRAFT AFTER JUNE 2005 CDNI P.O. Box 3885 (Zip 98009-3885) 11 B 11 N.E. 1 st Street. Suite 201 Bellevue. Washington 98005-3033 tei: 425453-8383 fax: 425 646-9523 March 28, 2003 Elizabeth Wilson Project Manager Port Blakely Communities 177512th Avenue NW, Suite 101 Issaquah, W A 98027 Subj~t: Port Blakely Sanitary Sewer Evaluation Project Summary Letter Dear Elizabeth: This letter summarizes the anticipated discharge flows (Task 1) from Phase I of the Port Blakely development (the development) located west of Bremerton, Washii1gton. Anticipated discharge flows from full build-out of the development are also summarized in this letter. As well as a project status summary. Included with this letter are population and zoning planning information, flow projection planning information, and flow calculations. Flows associated with both residential and industrial users Viere incorporated to calculate average and peak instantaneous flow rates from the development. Population and Zoning Planning Information This analysis took into account both Phase I of the development and the future .full build-out of the development. Phase I would include 1/2 build-out for both residential and commercial properties, which would result in approximately 450 single-family residences and 1,250,000 ft2 of commercial space on 100 acres. The commercial space would be split into Y2light industrial and Y2 business park. This assumption was based upon the maximum development . permissible given the exiSting traffic conditions. It is understood that Phase I may be further limited by the existing capacity of the wastewater system. Analysis of the full build-out discharge flows assumed a total of 1000 single-family residences and 2,350,000 ft2 of commercial space on 300 acres. Four separate discharge flows (case's 1-4) were calculated for analysis of Phase I and full build-out. In each discharge flow analysis both an average and a peak instantaneous flow rate were calculated. The average flow estimates the average daily flow rate that the conveyance system would experience, while the peak instantaneous flow gives an estimate of the maximum flow rate that the conveyance system would experience. The peak instantaneous flow is calculated by applying a peaking factor to the average daily flow, c:onsulting . engineering. c:onstruc:tion . operations CDNI Elizabeth Wilson March 28, 2003 Page 2 Case 1 utilized information from the most recent version of the City of Bremerton Wastewater Comprehensive Plan and the 1990 census. Residential sanitary sewage flow was set at 80 gallons per capita per day (gpcd), which is a typical value for the Pacific Northwest and consistent with average residential water use in the City of Bremerton. An average unit flow of 1800 gallons per acre per day (gpad) was used for commercial sanitary sewage floW. This unit flow number was developed from the City's water utility records and used in both the 1995 Wastewater Comprehensive Plan and the most recent Wastewater Comprehensive Plan. An infiltration allowance (i.e. defective pipes, leaking joints) of 500 gpad was applied in calculation of the total flow rate and is intended to include both infiltration and inflow. This infiltration allowance was used in previous City of Bremerton Comprehensive Plans and previous Port Blakely Development project calculations. A population density of 2.43 persons per dwelling from the 1990 census data was also incorporated in calculation of this flow rate. In order to calculate the peak instantaneous flow rate for Case 1 a peaking factor of 3.0 was used. TIris peaking factor was determined from a peaking factor curve developed by the Bureau of Engineering of the City of Los Angeles and was also used in the 1995 Bremerton Wastewater Comprehensive Plan. Case 2 is similar to Case 1 and used information from the most recent version of City of Bremerton Wastewater Comprehensive Plan to calculate discharge flows from the development; however, case 2 used 2000 census data instead of the 1990 census. This was done to account for an estimated decrease in population over the past 10 years. Population density in the Bremerton area reduced from 2.43 persons per dwelling in 1990 to 2.23 persons per dwelling in 2000. The third case used information obtained in the Washington State Department of Ecology Criteria for Sewage Works Design (Orange Book) and the City of Bremerton Wastewater Comprehensive Plan to calculate flow rates. The residential sanitary sewage flow from the Orange Book is 100 gpcd. Use of the per capita flows from the orange book is intended to cover normal infiltration and inflow for systems built with modem construction techniques; thus, a separate unit flow for infiltration was not used in this analysis. An average unit flow of 1800 gallons per acre per day (gpad) was used for commercial sanitary sewage flow. The peaking factor for Case 3 is 3.8 and was obtained from Figure C1-1 of the Orange Book. Case 3 also used the 1990 population density of 2.43 person per dwelling to calculate discharge flows. Case 4 is the same as Case 3 and used a combination of information from the Orange Book and the City of Bremerton Wastewater Comprehensive Plan to calculate discharge flows. However, the 2000 census data was used in place of the 1990 census data to account for the estimated decrease in population density in the Bremerton area. ClIVI Elizabeth Wilson March 28, 2003 Page 3 Discharge Flow Summary UtiliZing the information from above, an average daily flow and a peak instantaneous flow were calculated for 4 different cases of both Phase I and full build-out of the development. Table 1 below, summarizes the anticipated discharge flows from the development. Table 1 - Discharge Flow Summary Average Flow Peak. Instantaneous Flow (GPM) (GPM) Phase I - Case 1 131.1 324.6 Phase I - Case 2 126.3 309.6 Phase I - Case 3 111.8 424.9 Phase I - Case 4 105.6 401.1 Full Build Out - Case 1 306.6 711.5 Full Build Out - Case 2 295.5 678.1 Full Build Out - Case 3 236.2 897.5 Full Build Out - Case 4 222.3 844.7 In Cases 3 and 4 of Phase I and full build-out, the peak instantaneous flow is significantly higher than Cases 1 and 2. The reason for this is the peaking factor from the orange book is higher than the peaking factor used in Cases 1 and 2; furthermore, the average flow includes an infiltration allowance that cannot be separated out individually. Thus, the infiltration flow is multiplied by the peaking factor and gives a "false" peak instantaneous flow. Alternative Phasing Projections The amount of development associated with the first phase of the project may be decreased based upon the existing capacity of the wastewater conveyance and treabnent systems. The values stated above are the maximum values anticipated. The attached spreadsheets will allow Port Blakely to predict discharge flows associated with different levels of development. CDM Elizabeth Wilson March 28, 2003 Page 4 It was intended, as part of Task 2 of this project, to analyze wastewater conveyance and treatment capacity to develop possible routing and upgrades to support Phase 1. Initial feedback from discussions with the City indicate that it may be possible to accommodate the flows from phase I development within the existing City wastewater infrastructure. However, this feedback is based primarily on anecdotal evidence and not actual flow measurements or modeling studies. CDM understands that both Port Blakely and the City of Bremerton would like assurances on capacity prior to development. CDM obtained the model of the City's system, but the areas of interest are not completely modeled. The model has not been calibrated to actual flows. At this time, the model can not be used to predict accurate flow capacities. The City is interested in working with Port Blakely to install flow meters at key pump stations to verify system capacity. Port Blakely should discuss flow meter installation directly with Gene Sampley at the City of Bremerton. CDM would also be able to modify the existing model to produce theoretical values. If you would like to discuss modifying CDM's existing scope to include this modeling please let us know. The Comprehensive plan update has not yet been completed and is currently on hold. There is still time for Port Blakely's plans to be included in the Comprehensive Plan as Port Blakely wishes and is agreed to by the City of Bremerton. If you have any questions concerning the above information or the project in general, please do not hesitate to call us at (425) 453-8383. We will not continue with any additional Port Blakely work until directed by you. Very truly yours, ~J_\ \JGlU ~)~ Stacey A. Van 1'lorman, P.E. Project Manager Camp Dresser & McKee Ine. cc: John Poppe, City of Bremerton Gene Sampley, City of Bremerton Andrew Carson, CDM Bellevue File 4.01 ATTACHMENTS Phase 1 . Case 1 Assumptions: Residential Sanitary Sewage Flow = Commercial Sanitary Sewage Flow = Infiltration Allowance = Peaking Factor = Population Density = Total Area Developed = 80 gallons per capita per day (gpcd 1800 gallons per acre per day (gpad 500 gallons per acre per day (gpad 3 2.43 personsldwellin~ 100 acres Zoning Information: Number of Family Units = Commercial Space = 450 dwellings 1,250,000 rr Flow Calculations I Formulas Residential Flows: (Number of Residential Units). (Population Density) . (Residential Sanitary Sewage Flow) = Daily Flow in Gallons Commercial Flows: (Square Footage of Commercial Space). (Commercial Sanitary Sewage Flow) = Daily Flow in Gallons NOTE: Commercial Flows Indude Retail Flows Infiltration Flows (Total Area Developed). (Infiltration Allowance) = Tota/lnfiltration Flow in Gallons Total Flow: (Residential Flows)+ (Commercial Flows) + (Infiltration Flows) = Total Flow in Gallons Peak Instataneous Flow (Residential Flows + Commercial Flows). (Peaking Factor) + (Infiltration Flows)= Peak Flow in Gallons Flow Calculations: Residential Flows: 87,480 gallons per da) 60.8 gallons per minute Commercial Flows: 51,653 gallons per da) 35.9 gallons per minute Infiltration Flows 50,000 gallons per da) 34.7 gallons per minute Average Flow: 189.133 gallons per da) 131.3 gallons per minute Peak Instataneous Flow 467,399 gallons per da) 324.6 gallons per minute Phase 1 - Case 2 Assumptions: Residential Sanitary Sewage Flow = Commercial Sanitary Sewage Flow = Infiltration Allowance = Peaking Factor = Population Density = Total Area Developed = 80 gallons per capita per day (gpcd 1800 gallons per acre per day (gpad 500 gallons per acre per day (gpad 3 2.23 personsldwellinf 100 acres Zoning Information: Number of Family Units = Commercial Space = 450 dwellings 1,250.000 tt2 Flow Calculations I Formulas Residential Flows: (Number of Residential Units) . (Population Density) . (Residential Sanitary Sewage Flow) = Daily Flow in Gallons Commercial Flows: (Square Footage of Commercial Space) . (Commercial Sanitary Sewage Flow) = Daily Flow in Gallons NOTE: Commercial Flows include Retail Flows Infiltration Flows (Total Area Developed) . (Infiltration Allowance) = Total Infiltration Flow in Gallons Tolal FlOw: (Residential Flows)+ (Commercial Flows) + (Infiltration Flows) = Total Flow in Gallons Peak Instalaneous Flow . (Residential Flows + Commercial Flows) . (Peaking Factor) + (Infiltration Flows)= Peak Flow in Gallons Flow Calculations: Residential Flows: 80,2eo gallons per da~ 55.8 gallons per minute Commercial Flows: 51,653 gallons per da~ 35.9 gallons per minute Infiltration Flows SO,OOO gallons per da~ 34.7 gallons per minute Tolal Flow: 181,933 gallons per da~ 126.3 gallons per minute Peak Jnslalaneous Flow 445,799 gallons per da~ 309.6 gallons per minute Phase 1 - Case 3 Assumptions: Residential Sanitary Sewage Flow = Commercial Sanitary Sewage Flow = Infiltration Allowance = Peaking Factor = Population Density = Total Area Developed = 100 gallons per capita per day (gpcd 1800 gallons per acre per day (gpad o gallons per acre per day (gpad 3.8 2.43 personsldwellin~ 1 00 acres Zoning Information: Number of Family Units = Commercial Space = 450 dwellings 1,250,000 If Flow Calculations I Formulas Residential Flows: (Number of Residential Units) . (Population Density) . (Residential Sanitary Sewage Flow) = Daily Flow in Gallons Commercial Flows: (Square Footage of Commercial Space) . (Commercial Sanitary Sewage Flow) = Daily Flow in Gallons NOTE: Commercial Flows include ReteR Flows Infiltration Flows (Total Area Developed) . (Infiltration Allowance) = Total Infiltration Flow in Gallons Total Flow: (Residential Flows)+ (Commercial Flows) + (Infiltration Flows) = Total Flow in Gallons Peak Inslalaneous Flow (Residential Flows + Commercial Flows) . (Peaking Factor) + (Infiltration Flows)= Peak Flow in Gallons . Flow Calculations: Residential Flows: 109,350 gallons per da) 75.9 gallons per minute Commercial Flows: 51,653 gallonsperda) 35.9 gallons per minute Infiltration Flows gallons per da) 0.0 gallons per minute Total Flow: 161,003 gallons per da) 111.8 gallons per minute Peak Inslataneous Flow 611,811 gallons per da) 424.9 gallons per minutE Phase 1 - Case 4 Assumptions: Residential Sanitary Sewage Flow = Commercial Sanitary Sewage Flow = Infiltration Allowance = Peaking Factor = Population Density = Total Area Developed = 100 gallons per capita per day (gpcd 1800 gallons per acre per day (gpad o gallons per acre per day (gpad 3.8 2.23 personsldwellin~ 100 acres . Zoning Information: Number of Family Units = Commercial Space = 450 dwellings 1,250,000 If Flow Calculations I Formulas Residential Flows: (Number of Residential Units) . (Population Density) . (Residential Sanitary Sewage Flow) = Daily Flow in Gallons Commercial Flows: (Square Footage of Commercial Space) . (Commercial Sanitary Sewage Flow) = Daily Flow in Gallons NOTE: Commercial Flows indude Retail Flows Infiltration Flows (Total Area Developed) . (Infiltration Allowance) = Total Infiltration Flow in Gallons Tolal Flow: (Residential Flows)+ (Commercial Flows) + (Infiltration Flows) = Total Flow in Gallons Peak Instalaneous Flow (Residential Flows + Commercial Flows) . (Peaking Factor) + (Infiltration Flows)= Peak Flow in Gallons Flow Calculations: Residential Flows: 100,350 gallons per da} 69.7 gallons per minute Commercial Flows: 51,653 gallons per da} 35.9 gallons per minute Infiltration Flows gallons per da} 0.0 gallons per minute Tolal Flow: 152,003 gallons per da} 105.6 gallons per minute Peak Instalaneous Flow 577,611 gallons per da} 401.1 gallons per minute ., Full Build Out - Case 1 Assumptions: Residential Sanitary Sewage Flow " Commercial Sanitary Sewage Flow " Infiltration Allowance" Peaking Factor" Population Density " Total Area Developed " 80 gallons per capita per day (gi:>cd) 1800 gallons per acre per day (gpad) 500 gallons per acre per day (gpad) 3 2.43 persons/dwelling 300 acres Zoning Information: Number of Family Units" Commercial Space '" 1000 dwellings 2,350,000 tf Flow Calculations I Formulas: Residential Flows: (Number of Residentia/ Units) . (Popu/ati9f1 Density) . (Residential Sanitary Sewage Flow) '" Daily Flow in Gallons Commercial Flows: (Square Footage of Commercial Space) . (Commercial Sanitary Sewage Flow) '" Daily Flow in Gallons NOTE; Commerr:ial Flows include Retail Flows Infiltration Flows: (Total Area Developed) . (Infiltration Allowance) " Tota/lnfiltration Flow in Gallons Total Flow: (Residential Flows)+ (Commercial Flows) + (Infiltration Flows) '" Total Flow in Gallons Peak Instataneous Flow: (Residential Flows + Commercial Flows) . (Peaking Factor) + (Infiltration Flows)'" Peak Flow in Gallons Flow Calculations: Residential Flows: 194,400 gallons per day 135.0 gallons per minute Commercial Flows: 97,107 gallons per day 67.4 gallons per minute Infiltration Flows: 150,000 gallons per day 104.2 gallons per minute Total Flow: 441,507 gallons per day 306.6 gallons per minute Peak Instataneous Flow: 1,024,522 gallons per day 711.5 gallons per minute Full Build Out - Case 2 ,Assumptions: Residential Sanitary Sewage Flow = Commercial Sanitary Sewage Flow = Infiltration Allowance = Peaking Factor = Population Density = Total Area Developed = 80 gallons per capita per day (gpcd) 1800 gallons per acre per day (gpad) 500 gallons per acre per day (9pad) 3 2.23 persons/dwelling 300 acres Zoning Information: Number of Family Units = Commercial Space = 1000 dwellings 2,350,000 tr Flow Calculations J Formulas: Residential Flows: (Number of Residential Units) . (Population Density) . (Residential Sanitary Sewage Flow) = Daily Flow in Gallons Commercial Flows: (Square Footage of Commercial Space) . (Commercial Sanitary Sewage Flow) :: Daily Flow in Gallons NOTE: Common:ial Flows include Retail Flows Infiltration Flows: (ToIal Area Developed) . (Infiltration Allowance) :: Total Infiltration Flow in Gallons Total Row: (Residential Flows)+ (Commercial Flows) + (Infiltration Flows) = Total Flow in Gallons Peak Inslataneoos Flow: (Residential Flows + Commercial Flows) . (Peaking Factor) + (Infiltration Flows)= Peak Flow in GaHons Flow Calculations: Residential Flows: 178.400 gallons per day 123.9 gallons per minute Commercial Flows: 97,107 gallons per day 67.4 gallons per minute Infiltration Rows: 150,000 gallons per day 104.2 gallons per minute Total Flow: 425,507 gallons per day 295.5 gallons per minute Peak Instalaneous Flow: 976,522 gallons per day 678.1 gallons per minute Full Build Out - Case 3 Assumptions: Residential Sanitary Sewage Flow = Commercial Sanitary Sewage Flow = Infiltration Allowance = Peaking Factor = Population Density = Total Area Developed = 100 gallons per capita per day (gpcd) 1800 gallons per acre per day (gpad) o gallons per acre per day (gpad) 3.8 2.43 persons/dwelling 300 acres Zoning Information: Number of Family Units = Commercial Space = 1000 dwellings 2,350,000 tr Flow Calculations I Formulas: Residential Flows: (Number of Residential Units) . (Population Density) . (Residential Sanitary Sewage Flow) = Daily Flow in Gallons Commercial Flows: (Square Footage of Commercial Space) . (Commercial Sanitary Sewage Flow) = Daily Flow in Gal/ons NOTE: (::ommercial Flows include Ralai/ Flows Infiltration Flows: (Total Area Developed) . (Infiltration Allowance) = Total Infiltration Flow in Gallons Tolal Flow: (Residential Flows)+ (Commercial Flows) + (Infiltration Flows) = Total Flow in Gal/ons Peak Instataneous Flow: (Residential Flows + Commercial Flows) . (Peaking Factor) + (Infiltration Flows)= Peak Flow in Gal/on Flow Calculations: Residential Flows: 243,000 galions per day 168.8 gallons per minute Commercial Flows: 97,107 gallonsperday 67.4 gallons per minute Infiltration Flows: gallons per day 0.0 gallons per minule Total Flow: 340,107 gallons per day 236.2 gallons per minute Peak Instataneous Flow: 1,292,408 gallons per day 897;5 gallons per minute Full Build Out - Case 4 Assumptions: Residential Sanitary Sewage Flow = Commercial Sanitary Sewage Flow = Infiltration Allowance = Peaking Factor = Population Density = Total Area Developed = 100 gallons per capila per day (gpcd) 1800 gallons per acre per day (gpad) o gallons per acre per day (gpad) 3.8 2.23 persons/dwelling 300 acres Zoning Information: Number of Family Units = Commercial Space = 1000 dwellings 2,350,000 It! Flow Calculations I Formulas: Residential Flows: (Number of Residential Units) . (Population Density) . (Residential Sanitary Sewage Flow) = Daily Flow in Gallons Commercial Flows: (Square Footage of Commercial Space) . (Commercial Sanitary Sewage Flow) = Daily Flow in Gallons NOTE: Commercial Flaws include Retail Flaws Infiltration Flows: (Total Area Developed) . (Infinration Allowance) = Totallnfinration Flow in Gal/ons Tolal Flow: (Residential Flows)+ (Commercial Flows) + (Infiltration Flows) = Total Flow in Gal/ons Peak Inslalaneous Flow: (Residential Flows + Commercial Flows) . (Peaking Factor) + (Infiltration Flows)= Peak Flow in Gallon Flow Calculations: Residential Flows: 223,000 gallons per day 154.9 gallons per minute Commercial Flows: 97,107 gallons per day 67.4 gallons per minute Infiltration Flows: gallons per day 0.0 gallons per minute Tolal Flow: 320,107 gallons per day 222.3 gallons per minute Peak Inslalaneous Flow: 1,216,408 gallons per day 844.7 gallons per minute \ Appendix B Sanitary Flow Peaking Factor Curve The peaking factor curve shown in Figure B-1 was developed by the Bureau of Engineering of the City of Los Angeles.1 . ,. 1 ary of Los Angles, Bureau of Enginoeting. ASCE-Monuais and R<para on Engin<<ring Practice No.37, "Design and Construction of Sanitary and Storm ScM:r." 1979. l002100F.5EM 3126192 B-1 QUANTITY OF SANITARY SEWAGE .., ... ~. 4 3 --'. 3 ctor 2--1 . - 2 I ;I / -zL, ----'_,_u. I ----- u .. .. .. .. Q. - :: .. 1 o :g 0.8 ~ .0.6 .. 4. --. 1 ., ,io V / / 0.04/ 0.3 0.8 B 0.6 .~ ~ 0.4 ::;: .. .. . 0.3 a.. 1/ / ;I V / or 0.2 ---- ....,.. - - - - -. 0.2 ---- ) ;.1 ~ ,- 0.1 "-~01 0.1 0.2 030." 0.60.8 1 . Aver.&e tlow, in cu ft per see ,- -=---- 10 8 6 .. S 0 U " ~ oM: .. 3 .. . a... 2 .- ,- l/ / / ;I / ?------- --- ~_~dl~- I --==-.1- -'_ 1::t J -r- - -/- - F;actor ---.1_ -- '--n- 1 1 2 6 8 10 20 30 40 60 80 100 Avefll',. tlow. in cu ft per see Ratio o.f peak flow to avenge daily flow (CCsX1.7=c:u m/min.) 1 400 600 1 000 3 '" 200 .. 11..000 . 3000 2000 :' . ,-: 1000 800 600 500 400 300 200 u .. ... ;; 100 CI. 80' =: :::J .. 60 .s 50 J 40 JtC ... 30 .. a... 20 10 8 6 S " 3 2 Figure B-1 SANITARY FLOW PEAKiNG FACTORS VS. DAILY FLOW CURVE B-2 G2-6 December 1998 Criteriafor Sewage Works Design should be based on planning projections derived from an official source. Any deviations should be based on sound engineering judgment substantiated in the engineering report. Table G2-1. Design Basis for New Sewage Works Flow Flow. BOD 55 Duration Discharge Facility Design Units (gpd) (Iblday) (Iblday) (hr) Dwellings per person 100 0.2 0.2 24 Schools with showers and cafeteria per person 16 .04 .04 8 Schools without showers and with per person 10 .025 .025 8 cafeleria Boarding schools per person 75 0.2 0.2 16 Motels at 65 gaVperson (rooms per room 130 0.26 0.25 24 only) Trailer courts at 3 persons/traller per trailer 300 0.6 0.6 24 Restaurants per seat 50 0.2 0.2 16 Interstate or through-highway per seat 180 0.7 0.7 16 restaurants Interstate rest areas per person 5 0..01 0.01 24 Service stations per vehicle serviced 10 0.01 0.Q1 16 Factories per person per 8-hr shift 15-35 0.03-0.07 0.03-0.07 Operating period Shopping centers . per 1,000 sq It ot ultimate 200-300 0.01 .' 0.01 12 floor space Hospitals per bed 300 0.6 0.6 24 Nursing homes per bed 200 0.3 0.3 24 Homes for the aged per bed 100 0.2 0.2 24 Doctor's office in medical center per 1,000 sq ft 500 0.1 0.1 12 Laundromats, 9 to 12 machines per machine 500 0.3 0.3 16 Community colleges per student and faculty 15 0.03 .0.03 12 Swimming pools per swimmer 10 0.001 0.001 12 Theaters, drive-in type per car 5 0.01 0.01' 4 Theaters; auditorium type per seat 5 0.01 0.01 12 Picnic areas per person 5 0.01 0.01 12 Resort camps. day and night, with limited plumbing per campsite 50 0.05 0.05 24 Luxury camps with flush toilets per campsite 100 0.1 0.1 24 "Includes normal infiltration G2~1.3 In-Plant Piping and Channels AIl piping and channels should be designed to carry the maximum expected flows. The incoming sewer should be designed for free discharge. Bottom comers of the channels should be filleted and pockets and corners where solids. can accumulate should be eliminated. Isolation gates should be placed in channels to seal off unused sections where sewage solids might accumulate. CI-6 December 1998 Criteria/or Sewage Works Design Cl-3.2.2 Collection Sewers Collection sewers (that is, laterals and submains) shall be designed for the ':Jltimate development of the tributary areas. "':;:, Ii Cl-3.2.3 Trunk and Interceptor Sewers Selection of the design period for trunk and interceptor sewers should be based on an evaluation of economic, functional, and other considerations. Some of the factors that should be considered in the evaluation are: . Possible solids deposition, odor, and pipe corrosion that might occur at initial flows. Population and economic growth projections and the accuracy of the projections. Comparative costs of staged construction alternatives. Effect of sewer sizing on land use and development. . . . i ( Cl-3.3 Design Basis Sewer systems shall be designed on the basis of per capita flows forthe design period in conjunction with a peaking factor, or approved alternative methods. Design calculations for trunk and interceptor sewers shall be submitted to the local jurisdiction for approval. Larger systems should have hydraulic modeling performed. Replacement mains or rehabilitation of existing mains shall be designed on the basis of measured flows with projections for the design period as applicable. Documentation shall be submitted for approval of the authorized entity and/or Ecology. Documentation of the alternative method shall be provided upon request. Cl-3.3.1 Design for Average Daily Flow Designing for average daily wastewater flows for new systems should be based on per capita flows in Table G2-1. These figures are assumed to cover nonnal infiltration, but an additional allowance should be made where conditions are unfavorable. If there is an existing water system in the area, water consumption figures can be, used to help substantiate the selected per capita flow. New sewer systems may be designed by methods other than on the basis of per capita flow rates. Alternative methods may include the use of per capita flow rates based on water consumption records, actual measured flows for the agency,. or other methods. Documentation' of the alternative method used shall be provided to Ecology for review and approval. r Cl-3.3.2 Peak Flow Generally, the sewers shall be designed to carry at least the peak hourly flow when operating at capacity. Peak hourly flow should be the design average daily flow in conjunction with a peaking factor in Figure C 1-1, Ratio of Peak Hourly Flow to Design Average Flow, which is extracted from "Recommended Standards for Wastewater Facilities, 1990 Edition (10 States Standards)." The peaking factor shall not be less than 2.5. An agency may use a local peaking factor curve, which is based upon actual local flow data.' Sewers December 1998 Cl-7 Ratio of Q peak hourly! Q design average 10.0 I 8.0 + ::~ . === ::::________I 2.0 ---------- 1.5 ~I_I~--I-I-L_L -- - -- - -- - -- - -- - -- - - -- ~:::: - -- -- ====I==[[[]-I___= - -- - - - ]1:: 1.0 0.1 0.2 I ' 0.3' 0.4 0.5 0.7 1.0 2.0 3.0 4.0 5.0 7.0 10.0 Population (in thousandS) 20.0 30.0 40.0 50.0 70.0 100.0 LEGEND Source: Fair, G.M. and Gayer. J.e. Water Supply and Wastewater Disposal, FIrSt Ed.. John ~ and Sons, Inc., New York (1954). p. 136. Q peak hourly Q design average Q peak hourly Q design average P 18 +V'P 4 +v'P = Maximum rate of wastewater lIow (peak hourly flow) = Design average daily wastewater flow . Population in thousa~ds Figure C1-1. Ratio of Peak Hourly Flow to Design Average Row Cl-3.3.3 infIltrationlInflow Use of the per capita flows (see Table G2-1) and the peaking factor (see Cl-3.3.2) is intended to cover normal I1I for systems built with modem construction techniques_ However, an additional allowance should be made for I1I with existing conditions such as high ground water, older systems, or a nwnber of illicit connections. III allowances for existing systems should be made from actual flow data to the greatest extent possible. Cl-3.4 Design Factors The design engineer shall utilize current design criteria. At a minimum, the design of gravity sanitary sewers will include the following: Peak sewage flows from residential, commercial, institutional, and industrial sources. . III. . Topography and depth of excavation. Treatment plant location. Soils conditions. Flow impacts from upstream pump stations, if applicable. . ../ "1 J LJ ~ 11 ~ d .~ I u , d I I j Doendix I j o Appendix D Plant Capacity Rerating Study CONI P:\Bremerton\Comp PlanlAmendment\7PROJDOC\DRAFT AFTER JUNE 2005 City of Bremerton Westside Wastewater Treatment Plant Rerating Study DRAFT Prepared for City of Bremerton, Washington Prepared by Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. July 2001 Bremerton WWTP CERTIFICATE OF ENGINEER This report was prepared under the supervision and direction of the undersigned, whose seal as a licensed professional engineer is affixed below. Camp Dresser & McKee. Inc. In Association with Richwine Environmental. Inc. TABLE OF CONTENTS EXECUTIVE SUMMARY Summary ......................................... .......... .................................................... ES-1 Influent Load Characteristics....... ................................................................. ES-2 Unit Process Historical Performance ............................................................ ES-1 Capacity Evaluation................ .................................................. '.' ...... ........... ES-3 1 I . I SECTION 1 - INFLUENT LOAD CHARACTERISTICS Introduction.............................. ....................... .......... ..... ................. ................ 1-1 Influent Wastewater Characteristics ..................... ......... ...................... ........... 1-1 Historical Wasteload Characteristics........................................................... 1-1 Influent Flow.......................... .................................................................... 1-1 Influent BOD and TSS.. ......................... ..... ............... ........................... ..... 1-2 Seasonal Influence On Flows and Loads .................................................... 1-4 Historical Flows and Loads ...................... ....... ........ ...... .................... ........... 1-5 Current Influent Flow Characteristics .... ........ ........ .... ................................... 1-6 Diurnal Flow Peaking.... ........................ ......... ........... ................................. 1-6 Current Influent BODs and TSS Characteristics .......................................... 1-7 Current Wastewater Characteristics............................................................ 1-9 SECTION 2 - OPERATIONAL HISTORY Introduction............................. ........................................................................ 2-1 Primary Treatment Process Performance ...................................................... 2-1 Historical BOD5 and TSS Removals ........ ..... ............................................... 2-1 Overflow Rate.... .......... ................................................................................ 2-2 BODs Removal.................... ............................................. ............. ......... ..... 2-3 TSS Removal......................... ....... ........... ...................... .............................. 2-9' Secondary Treatment Process Performance................................... .......... ..... 2-13 Aeration Basin Organic Loading .................................................................. 2-15 Food-to-Microorganism Ratio (F/M) ......... ....... ..... ... ..... ................... ............. 2-17 Secondary Clarifier Overflow Rate........ ............ ............. .............................. 2-19 Secondary Clarifier Solids Loading Rate ..................................................... 2-23 Plant Effluent Quality Evaluation.................................................................... 2-26 Plant Effluent Monthly Average Data Evaluation ......................................... 2-26 Plant Effluent Weekly Average Data Evaluation .......................................... 2-27 SECTION 3 - CAPACITY EVALUATION Introduction. .............. .......... .... .......... ............... ............................................... 3-1 Discharge Requirements .......................... ................ ...... ..... ..-............. .., ........ 3-1 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. TOC 1 of4 TABLE OF CONTENTS SECTION 3 - CAPACITY EVALUATION (cont) Current Wastewater Characteristics.... ......................................... .................. 3-1 Solids Balance.............:. ................................................................................. 3-2 Process Assumptions.................;..................................................... ...... ..... 3-2 System Reliability/Redundancy Requirements................. .............................. 3-4 Unit Process Capacity Analysis ..................... ........ .......... ....... ... ... ..... .... ..... .... 3-5 Screening..................................................................................................... 3-5 Grit Removal.................................................................. ................. ........ ..... 3-7 Primary Treatment.................... .................................................................... 3-7 Secondary Treatment.................................................................................. 3-8 Secondary Treatment Capacity Model...................................................... 3-8 Wastewater Characteristics............... ..................................................... 3-9 Model Kinetic Constants.................. ............. .......................................... 3-9 Clarifier Settling Model........................................................................... 3-10 Nitrification Safety Factor................. ....................................................... 3-10 Secondary Process Capacity Determination............................................. 3-11 Disinfection.................................................................................................. 3-12 Flotation Thickening......... ............ .............. ....... ............. .............................. 3-13 Gravity Thickening.................................................................. .... ........... ...... 3-13 Anaerobic Digestion......... ...... ...................................................................... 3-14 Treatment Plant Capacity....... ............................... ....... ..... ...... ... ..... .... ....... .... 3-14 SECTION 4 - WWTP RERATING Introduction............................ ................................. ........................................ 4-1 DOE Rerating Procedure................................................................................ 4-1 Rerating Results ...... ............... ........ ......... ................. .......... ......... ................... 4-2 Camp Dresser & McKee, Inc. in Association with Richwine Environmental, Inc. TOC2of4 TABLE OF CONTENTS LIST OF TABLES Table Number , 1 , I . I ES-1 1-1 1-2 1-3 1-4 1-5 1-6 1-7 2-1 2-2 2-3 2-4 2-5 2-6 2-7 2-8 2-9 2-10 2-11 2-12 2-13 3-1 3-2 3-3 3-4 3-5 3-6 3-7 3-8 3-9 3-10 3-11 3-12 I . ! Title Unit Process Capacity Influent Wasteload Characteristics Annual Averages Historical Influent Flows and Loads Influent Flow Characteristics 2000 Influent Diurnal Flow Statistics Influent 80D5 Characteristics Influent TSS Characteristics Current Influent Wastewater Loads 1997 - 2000 Primary Clarifier Performance Statistics Primary Clarifier Daily Average Overflow Rates Annual Primary Clarifier BOD5 Removal Primary Effluent BOD5 Summary Annual Primary Clarifier TSS Removal Primary Effluent TSS Summary Aeration Basin Organic Loading Aeration Basin F 1M Ratio Secondary Clarifier Overflow Tate Secondary Clarifier Solids Loading Rate Plant Effluent Monthly Average BOD5 Plant Effluent Monthly Average TSS Plant Effluent 7 -day Average BOD5 and TSS Current NPDES Permit Limits Solids Balance Model Performance Variables Solids Balance Results at 1.0-mgd Influent Flow Guidelines for Classifying Sewage Works Reliability Classification - Unit Process Requirements Electric Power System Reliability Primary Treatment Re-rated Capacity Assumed Wastewater Characteristics Used in Model Kinetic Coefficients Used in Activated Sludge Model Secondary Treatment Capacity Analysis Alternative Results Disinfection Process Loading Characteristics Unit Process Capacity Analysis Paqe ES-4 1-2 1-5 1-6 1-8 1-9 1-9 1-10 2-2 2-3 2-4 2-8 2-9 2-15 2-16 2-18 2-20 2-24 2-26 2-27 2-28 3-1 3-3 3-4 3-4 3-6 3-5 3-8 3-9 3-9 3-12 3-13 3-15 Camp Dresser & McKee, lne. In Association with Richwine Environmental, Inc. TOC3of4 TABLE OF CONTENTS LIST OF FIGURES I . I Fiqure Number Title Paqe i I 1-1 Average Annual Flow Rates 1-3 1-2 1994 - 2000 Annual Plant Flow vs. Annual Rainfall 1-3 1-3 Average Annual Influent BOOITSS Mass 1-4 1-4 2000 Influent Flow Evaluation 1-7 1-5 2000 Influent Flow Diurnal Pe.aking Factor 1-8 2-1 1997 - 2000 Primary Clarifier Overflow Rate 2-3 2-2 1997 - 2000 B005 Removal 2-4 2-3 1997 - 2000 Primary B005 Removal vs. Overflow Rate 2-5 2-4 1998 - 2000 Primary B005 Removal vs. Overflow Rate 2-6 2-5 1998 - 2000 Primary B005 Removal vs. Peak Day Overflow Rate 2-6 2-6 1998 - 2000 Primary Effluent B005 vs. Overflow Rate 2-7 2-7 1997 - 2000 Primary Effluent B005 Concentration 2-8 2-8 1997 - 2000 TSS Removal 2-10 2-9 1997 - 2000 Primary TSS Removal vs. Overflow Rate 2-10 2-10 1998 - 2000 Primary TSS Removal vs. Overflow Rate 2-11 2-11 1998 - 2000 Primary TSS Removal vs. Peak Day Overflow Rate. 2-11 2-12 1998 - 2000 Primary Effluent TSS vs. Overflow Rate 2-12 2-13 1998 - 2000 Primary Effluent B005 vs. TSS 2-13 2-14 1997 - 2000 Primary Effluent TSS 2-14 2-15 1998 - 2000 Primary Effluent TSS 2-14 2-16 1997 - 2000 Aeration Basin Organic Loading 2-16 2-17 1997 - 2000 AB Loading vs. Effluent B005 2-17 2-18 1997 - 2000 Aeration Basin F/M Ratio 2-18 2-19 1997 - 2000 Aeration Basin F/M Ratio vs. Effluent B005 2-19 2-20 1996 - 2000 Secondary Clarifier Overflow Rate 2-20 2-21 Secondary Clarifier Overflow Rate vs. Effluent TSS 2-21 2-22 1996 - 2000 Secondary Clarifier Peak Day OFR 2-22 2-23 Secondary Clarifier Peak Overflow Rate vs. Effluent TSS 2-22 2-24 1997 - 2000 Secondary Clarifier Solids Loading Rate 2-23 2-25 Secondary Clarifier Solids Loading Rate vs. Effluent TSS 2-25 2-26 Secondary Clarifier Peak Solids Loading Rate vs. Effluent TSS 3-1 Secondary Clarifier Solids Loading Diagram 3-10 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. TOC4of4 /': Bremerton WWTP Executive Summary SUMMARY . .\ The City of Bremerton's Westside wastewater treatment plant (WWTP) was originally designed for a maximum month flow rate of 10.I-mgd. The capacity of the treatment plant is based on the characteristics of the flows and loads that it receives. The City's treatment plant is unique in that it receives flows from the combined sewer system resulting in increased wet weather flows and high peaking factors. This results in a more dilute wastewater, which changes the capacity characteristics ofthe treatment plant. ~ I ~ \ , ,! The treatment plant was designed for a maximum month influent flow of 10.I-mgd at a BODs concentration of215 mg/L and a TSS concentration of268 mglL. These wastewater concentrations are comparable to the concentrations received today at the treatment plant during the dry season. The maximum month flow occurs during the wet season. A detailed analysis of the plant flows and loads for the period between 1997- 2000 show that the BODs and TSS concentrations are 131 mgIL and 146 mgIL, respectively, at the maximum month flow. Xherefore, the treatment plant needs to be rerated to provide a plant capacity under the actual maximum month wastewater characteristics. " '-~ I ! j The Washington Department of Ecology (DOE) outlines in the Criteria for Sewage Works Design (Orange Book) the requirements for re-rating a municipal wastewater treatment plant. Section Gl-5.4.2.A defines.two methods for rerating a facility. These are the Standard Facility Rerating and the Nonstandard Facility Rerating. The City desires to rerate the treatment plant under the Standard Facility Rerating classification. ~ ! " , , The capacity ofthe treatment plant is defined in the NPDES permit at a maximum month flow of 1O.I-mgd. The actual capacity of the treatment plant is a maximum month average daily flow of 14.1-mgd. The maximum daily primary clarifier overflow rate of 1400 gpd/:az limits the plant capacity. This value is higher than the Orange Book standard of 1200 gpd/ft2, but was selected based on the historical performance of the system. Another critical design criterion that must be considered is the maximum hydraulic flow that can be sent to the secondary process. The maximum daily secondary flow that can be adequately treated is 22.8-mgd. This is based on the peak secondary clarifier overflow rate of 1200 gpd/ft2. This criteria is based on the design standard specified in the Orange Book and was confirmed with historical operating data. On each ofthe occurrences that the permit limits were exceeded, this design criterion was also exceeded. The treatment plant receives flows greater than 22.8-mgd as maximum daily flows and on rare occasions as a daily average flow. During these periods, the influent wastewater is dilute resulting in primary effluent BODs and TSS concentrations in the range of 50-75 mgIL. Forcing these high flows to the secondary system degrades the effluent quality by flushing solids from the secondary clarifiers. The best alternative that will produce the best effluent quality is to maximize the flow to the secondary system to 22.8-mgd and blend the primary effluent flows greater than 22.8-mgd with the secondary effluent prior Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. ES-1 Bremerton WWTP Executive Summary to disinfection. The treatment plant currently has the capability to provide this blended effluent. This process alternative will provide an effluent that will meet the effluent discharge standards specified in the NPDES permit. INFLUENT LOAD CHARACTERISTICS An analysis ofthe influent flows and loads was performed for the period, 1987 - 2000. The past four years of data, which is the period that the treatment plant has back been under City operation, was determined to be the most representative of the influent flows and loads of the service population. This data was analyzed to determine the current system wastewater characteristics. The following conclusions were made: · The influent wastewater is municipal in composition with the average dry weather per-capita flow at 125 gal/capita/day. The average BODs load is at 0.20 lbs.lcapita/day and the average TSS load is at 0.20 lbs.lcapita/day. . The maximum peaking factor experienced at the treatment plant exceeds 5.0, which is over twice the typical value of2.38 for a city of this size. This is due to the combined sewer system. . The plant influent flow currently averages 6.50-mgd on an average annual basis. The average dry season flow is 4.75-mgd and the average wet season flow is 7.71- mgd. The maximum month flow from which the plant design is based is 11.3- mgd, which is 112% of the maximum month design flow, however, the dry weather flow is only 62% of the dry weather design flow. This difference is due to the high flows that are received during rainfall events. In addition, the City's combined sewer overflow (CSO) reduction program contributes significant flow to the WWTP that was previously discharged. . The plant influent BODs loading currently averages 7,638 lbs/day with a maximum month loading of 8,936 lbs/day. The design average BODs load is 11,300 lbs.lday and the design maximum month is IS, 1 00 lbs.lday. The current loads are 68% of the average load and 49% of the design maximum month load. . The plant influent TSS loading currently averages 7600 lbs.lday with a maximum month loading of 9424 lbs.lday. The design average TSS load is l1,300 lbs.lday and the design maximum month is 22,600 lbs.lday. The current loads are 67% of the average load and 42% of the design maximum month load. This analysis shows that the treatment plant is at 68% of the design based on average flows and loads. However, high flows created by the combined sewer system are experienced at the treatment plant during rain events. These cause the current maximum month design flow to be exceeded. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. ES-2 Bremerton WWTP Executive Summary I , I , UNIT PROCESS HISTORICAL PERFORMANCE The performance of the primary and secondary treatment processes and the quality of the plant effluent for the years 1996 through 2000 were evaluated to determine the operating characteristics of the system. This analysis consisted of a detailed evaluation of the operating data for the primary and secondary treatment processes and the plant effluent. Most of the emphasis on effluent quality and performance was given to the period of 1997 through 2000. This was the period of time when the plant has operated free of significant recycle streams and the laboratory database was the most complete. The following conclusions were made: . Percent BODs and TSS removal is not a good design variable due to the characteristics of the system. The influent concentrations become very dilute during high flow periods resulting in low removal rates in the primary process. The primary effluent concentrations tend to stay in the range of 50 - 75 mg/L during high flow periods when the removal rates become very low. . The aeration basins have performed well within the design organic loading rate of 120-1bs/day/1000 fe. . The critical process parameter to the successful performance of the secondary process has been the secondary clarifier overflow rate. The peak hydraulic overflow rate of 1200 gpdlft? cannot be exceeded without a high probability of loss of excess solids and poor effluent quality. . The treatment plant has performed will over the past 5-years based on monthly and weekly effluent BODs and TSS permit standards. There have been seven times when permit standards have been exceeded: two for monthly TSS, two for weekly BODs and three for weekly TSS. These exceedances have occurred during three separate events. Each of these three events was caused by peak flows greater than 22.8-mgd to the secondary process resulting in the flushing of solids from the secondary process. The performance of the treatment plant has continued to improve since the City began operation of the treatment plant in 1996. This is due to the reduction of recycle streams, improved maintenance of the facility and optimization of the unit processes based on operational experience. CAP ACITY EVALUATION Each unit process in the treatment plant was evaluated to determine a dry season and a wet season capacity. The unit process capacities have been summarized in Table ES-l. Camp Dresser & McKee, Ine. In Association with Richwine Environmental, Inc. ES-3 Bremerton WWTP Executive Summary Table ES-1 City of Bremerton WWTP Unit Proce is Capacity Rated Capacity Unit Process Maximum Month Limiting Units Flow Condition (mgd) Screening 30 Screen Capacity mgd Grit Removal 30 Hydraulic mgd Capacity Primary Treatment 14.1 Overflow Rate gpdlft2 Secondary 14.2 Overflow Rate gpd/fr Treatment Disinfection 30 Basin hrs Detention Time Gravity Thickening 15.2 Solids Ibs/day/fr Loading Flotation Thickening 16.7 Solids Ibs/day/fr Loading Anaerobic Digestion 14.9 Hydraulic days Detention Time The limiting dry season unit process is anaerobic digestion. This is based on the revised hydraulic detention time standards that were implemented with the EP A 503 regulations to ensure adequate pathogen kill for land application of the treated biosolids. This new criteria is more stringent that the original design criteria. The limiting wet season unit process is the primary treatment process at 14.1 mgd. This process is limited based on the average day overflow rate. The rate specified in the Orange Book is 1200 gpd/ft2, but a rate of 1400 gpd/ft2 was used for this evaluation. This higher value is based on the historical performance of the primary clarifiers at these higher overflow rates. The design maximum month condition as specified in the NPDES permit is based on the wet season design criteria. Therefore, the treatment plant should be rerated to a maximum month capacity of 14.1-mgd. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. ES-4 Bremerton WWTP Section 1 - Influent Load Characteristics INTRODUCTION > ! . , ! j The City of the Bremerton took over operations of the treatment facility from a contract operator in December 1995. Since that time, the City has optimized the operation of the treatment plant to maximize the treatment capability during wet weather events. In conjunction with the optimization of the treatment plant, the City has improved the capacity of the pumping stations in an effort to minimize Combined Sewer Overflows (CSOs). The result ofthese efforts is a reduction in CSOs and an increase in the volume of water that is pumped to the treatment plant for treatment. \ ! i , .J In addition to the City's work to minimize CSOs, there has been a concerted effort to minimize plant recycle streams. Prior to 1997, plant recycle streams contaminated the influent sample as they were introduced before the influent sample was taken. Since that time, the sample has become representative of the actual influent flows and loads due to the reduction of in-plant recycle streams and the construction of a new headworks allowing for an influent sample to be taken before the recycle streams are introduced into the plant flow. This section summarizes the analysis of influent flows and loads that was performed. I I , I INFLUENT WASTEWATER CHARACTERISTICS I I I . ! The influent wastewater can be characterized to many levels of detail. The parameters of plant flow, BODs and TSS were used in this evaluation. Each ofthese variables has been evaluated for the 14-year period between 1987 and 2000. A more detailed analysis has been performed for the years 1997 through 2000, This was done because this data is most representative ofthe actual wastewater characteristics because it is not contaminated by the plant recycle streams. Historical Wasteload Characterization Plant records for each of the 14 years between 1987 and 2000 have been evaluated and the results summarized for each of the three parameters. Table 1-1 summarizes the average annual values for each of these parameters. Influent Flow Figure 1-1 shows the average annual daily flow for each of the 14 years. This plot shows that the flow decreases from an average annual value of 7 .1-mgd in 1987 to between 5.2 and 5.9-mgd between the years of 1988 through 1994. The average annual flows then increased to between 6.1 and 6.9-mgd for the years 1995 through 1999. The increased average annual flow in these years is due to higher than normal rainfalls. The normal rainfall for the City of Bremerton is 51.65 inches. The rainfall for these years was 55.57,54.44 and 58.93 inches, respectively. The average annual flow dropped to 5 .15-mgd in the year 2000 when a dry year was experienced with only 33.39 inches of annual rainfall. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 1-1 Bremerton WWTP Section 1 - Influent Load Characteristics Another factor that has contributed to higher flows to the treatment plant in the years following 1997 is the improved pump station operation. Improved pump station operation has allowed more flow to be pumped to the treatment plant during wet weather events resulting in more wastewater being treated at the treatment plant and less flow escaping the collection system through the Combined Sewer Overflow (CSO) outfalls. Table 1-1 Bremerton WWTP Influent Wasteload Characteristics Annual Averages Average BODs TSS Annual Ave. Ave. Ave. Ave. Flow Conc. Load Conc. Load (mgd) (mg/L) (Ibs.lday) (mg/L)' (Ibs./day) 1987 7.1 176 9524 268 14712 1988 5:9 173 8350 211 10920 1989 5.4 325 13288 457 18986 1990 5.9 193 8865 332 16032 1991 5.7 248 11145 393 18179 1992 5.9 313 14920 427 20637 1993 5.2 241 10430 302 13413 1994 5.5 252 11243 342 15875 1995 6.6 328 17189 640 34543 1996 6.1 209 10598 291 15958 1997 6.8 150 7797 152 8156 1998 6.6 151 7400 168 8064 1999 6.9 158 7518 151 7868 2000 5.2 178 7266 171 7198 A plot of the annual rainfall to the average annual flow was generated and is shown in Figure 1-2. A regression analysis was performed on this data with the results showing an R2 value of 0.94. This represents an excellent correlation between annual rainfall and plant flow. Influent BODs and TSS Figure 1-3 shows the average annual BOD5 and TSS mass load for each of the 14 years. This plot shows that the average annual daily BOD5 mass load ranged from 8300 to 17,000 lbs.lday between 1988 and 1996. This plot also shows that the average annual daily TSS mass load ranged from lO,900 to 34,500 lbs.lday over this same period of time. These high loads were due to the contamination of the plant influent sample with recycle streams from the gravity thickener, flotation thickener and other drains within the treatment plant. The operations staffbegan to minimize the in-plant recycles in 1996 resulting in an influent sample that was truly representative of the plant influent flow. The new headworks was also constructed and placed in operations in 1996. This provided for the influent sampler to be relocated to a point free from the effect of in-plant recycle streams. The new sample point Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 1- 2 Bremerton WWTP Section 1 - Influent Load Characteristics Figure 1-1 City of Bremerton WWTP Average Annual Flow 7.5 70 --E ~ I' 6.5 -"~,, I,~~ ~ '6' a e .. i i~ 06.0,- :, it C .. ~ 5.5'- a l!! ~ 5.0. )-,. ~~ . ~. 1'1 4,5. 4.0 . 1987 1988 1989 1990 1991. 1992 1993 1994 1995 1996 1997 1998 1999 2000 Year Figure 1-2 City of Bremerton WWTP 1994 - 2000 Annual Plant Flow ys. Annual Rainfall 7.5 y = 0.0.726x + 2.59 R' = 0.9403 7.0 . 6.5 ;g: :i! .5 6.0 Q! .. " c ~ 5.5 3 {? 5.0 . 4.5' 4.0 . 25 3Q 35 40 45 50 Average Annual Plant Flow (mgd) 55 60 65 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 1- 3 Bremerton WWTP Section 1 - Influent Load Characteristics Figure 1-3 City of Bremerton WWTP Average Annual Influent BODITSS Mass 40000 . 11600 Mass C1TSS Mass 35000 . >: .. ~ 30000 . ~ Ul Ul a 25000 . o lD 'C: ~ 20000 . ~ .. ~ 15000 . .. ~ r"_ 10000.- 5000 ._- o. 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 Year and the minimization of recycle steams provided for an accurate determination of influent BODs and TSS measurements during the years of 1997 through 2000. Seasonal Influence On Flows And Loads These plots demonstrate that the loading data prior to 1997 is not useful for determining the characteristics of the plant influent for the current service population. For this reason, only the data collected during the years 1997 - 2000 was used to characterize the influent wastewater in this study. The plant influent flows and loads have been characterized as the waste stream enters the treatment plant for each ofthe permitted seasons and on an annual basis. These conditions are defined as: . Average Annual - The annual average loading condition. The maximum month will represent the maximum 30-day average load that would be experienced at the plant during the year. . Dry Season - The dry season is the period of time between May 1 and September 30 each year. This period represents lower flows resulting in a higher concentration of BODs and TSS. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 1-4 Bremerton WWTP Section 1 - Influent Load Characteristics . Wet Season - The wet season is the period of time between October 1 and April 30 each year. This period represents higher flows due to increased infiltration and inflow due to the combined ~ewers. The permit does not require the effluent discharge requirement of85% removal during this period of time. This is due to the influence of the combined sewers on plant flows and the dilution of the plant influent. All of the flows and loads have been characterized for these conditions. The wastewater character for each condition was used to determine the capacity of the treatment plant under the specific loads. Historical Flows and Loads 1 I .. , The years of 1997 through 2000 is the only period oftime when the sampling of influent wastewater is representative of the waste generated in the service area. Therefore, a detailed analysis ofthe influent wastewater was performed for the years 1997 through 2000 on the parameters ofinfluent flow, BODs and TSS. The year 1996 was not included in this analysis because there were still higher loads early in the year as the recycle streams were still being minimized and the headworks was not yet placed into operation. Table 1~2 shows a summary of the flows and loads for 1996 and the following four years used for the analysis. The results of this analysis were then analyzed with the representative populations to determine capita flows and loads and peaking factors. The results of this analysis are summarized in the following sections. Table 1-2 City of Bremerton WWTP Historical Influent Flows and Loads . Process Flow (mgd) Biochemical Oxygen Demand Total Suspended Solids Parameter Ave Max. Max. Average Max. Month Average Max. Month Day Month Day (lbs.) (mg/L) (lbs.) (mg/L) (Ibs.) (mg/L) (Ibs.) (mg/L) Design 7.6 10.1 29.5 11300 178 18100 215 11300 178 22600 268 1996 6.39 9.85 30.20 10274 206 20523 318 15038 282 53415 857 1997 6.80 10.24 29.30 7797 150 9256 232 8156 152 9511 214 1998 6.61 12.22 28.68 7400 151 8517 191 8064 168 9882 238 1999 6.93 14.04 28.32 7518 158 9307 227 7868 151 9235 218 2000 5.15 7.92 16.48 7266 178 8054 217 7198 171 8484 199 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 1. 5 Bremerton WWTP Section 1 - Influent Load Characteristics Current Influent Flow Characterization The plant influent flow was characterized on a "per-capita" basis for each of the years. The population figures for the City ofBremerton for the years 1997 through 2000 were obtained from the State of Washington Office of Financial Management. The "per-capita" flo~ is determined by taking the average day flow for the calendar year and dividing it by the population for the year. The results of this analysis are shown in Table 1-3 for the four years 1997 through 2000. Flow peaking characteristics were evaluated for the plant influent flow for the four-year study period. For each year, the average, maximum month, maximum week and maximum day flows were identified. The peaking factor for each of these periods was then determined by dividing the respective flow by the average flow for the year. These peaking factors were then averaged for the study period to determine the characteristic peaking factor. The result of this analysis is also shown in Table 1-3. Average Annual Summer Season Winter Season Max. Day 4.31 2.21 5.46 Period Table 1-3 City of Bremerton WWfP Influent Flow Characteristics gallons Peaking Factors per capita Max. Month Max. Week 171 1.73 2.43 125 1.20 1.29 203 2.38 3.33 The results of this analysis are characteristic of treatment plant flows for Northwest cities located on the west side of the Cascades. The winter season flows are higher than the summer season flows due to rainfall derived infiltration and inflow (RDll). Summer season 'per-capita" flows typically range from 80 to 130 gal/capita/day. The summer season value of 125 gal/capita/day is on the high end of this range. This should be expected of the . Bremerton system due to the potential influence of infiltration in the lines located in the tidal areas and the influence on flows by the Navy. Even with these typical results, additional analysis should be done prior to using these numbers in planning to verify the characteristics of the service population. Modeling the collection system to confIrm the maximum day and to determine the peak hour flows should be done to ensure that limitations ofthe collection system are considered in the analysis. Diurnal Flow Peaking An important characteristic that must be considered when evaluating the treatment facility is the diurnal peaking factor. The flows to the treatment plant will increase quickly during a rainfall event due to the nature of the combined sewer system. The diurnal peaking factor is calculated by dividing the average daily flow into the maximum daily flow. Figure 1-4 is a plot of the average daily flow and the maximum daily flow for the year 2000. This plot shows how the maximum daily flows vary greatly in relation to the average daily flow. Camp Dresser & McKee. Inc. In Association with Richwine Environmental. Inc. Page 1- 6 Bremerton WWTP Section 1 - Influent Load Characteristics -Average Dally Flow - Max Daily Flow Figure 1-4 City of Bremerton WWTP 2000 Influent Flow Evaluation 35 . ~ I 11 '. t ~ ~' 30. IJ_ 25. -'-r--- I!.-J'~I_ , ,I 1 ~I II .[20.' I II~:] i' , ,,-- .]il ~ II i I I ! I LJ. ' I I i C ! J " , I i I ,"[HJr -4-,-, I JJ~,: o 1/1 211 311 4/1 5/1 6/1 711 Date 811 9/1 1011 1111 1211 The diurnal peaking factor was calculated for each day. A statistical analysis ofthe year 2000 flow data was performed with the results shown in Table 1-4. A trend plot of these values is shown in Figure 1-5. The average diurnal peaking factor for the year 2000 was 1.87 with the maximum peaking factor being 5.23. A typical peaking factor for a system of this size (DOE Orange Book Figure C1-1) is 2.38. This is not to be used as an average value but as the peak value in design. This typical daily diurnal peaking factor is exceeded 15% of the time C85-Percentile). The treatment plant must be designed to handle peaking factors of this magnitude and this peaking factor must be considered when determining the plant capacity. I Another variable that must be considered is the minimum diurnal flow that the treatment plant receives. This is important in the sizing of pumps and other equipment that must provide adequate flow rates and chemical feed rates during low flow periods. The average diurnal minimum flow factor is 0.38. . Current Influent BODs and TSS Characteristics The influent BODs "per-capita" load and peaking factors were determined using the BODs evaluations for the years of 1997 through 2000. The BODs loads for 1996 were not used because they are abnormally high due to the effect of in-plant recycle streams in early 1996. The "per-capita" load is determined by dividing the populations for the respective year into the average BODs mass load. The analysis provided an average annual "per-capita" BODs Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 1- 7 Bremerton WWTP Section 1 - Influent Load Characteristics Statistic Max Min Ave 2 Percentile 8 Percentile 10 Percentile 25 Percentile Median 75 Percentile 90 Percentile 92 Percentile 98 Percentile Table 1-4 City of Bremerton WWTP 2000 Influent Diurnal Flow Statistics Ave Maximum Minimum Daily. Daily Daily Flow Flow Flow (mgd) (mgd) (mgd) Daily Max Flow PF Daily Min Flow PF 16.48 32.50 6.10 2.83 3.50 0.10 5.15 9.91 2.02 3.68 4.83 1.10 3.86 5.90 1.30 3.90 6.05 1.40 4.13 6.70 1.60 4.57 7.60 1.80 5.49 10.68 2.20 7.02 17.90 3.00 7.45 9.55 5.23 0.64 0.91 0.01 1.87 0.23 1.11 0.07 1.36 0.11 1.40 0.12 1.53 0.19 1.68 0.23 1.92 0.27 2.71 0.31 2.85 0.32 3.81 0.38 19.66 28.54 3.20 4.27 6 Figure 1.5 City of Bremerton 2000 Influent Flow Diurnal Peaking Factor 5. ~ ' , , i I i ... 4. ,S u .. II. '" C :;;; .. .. Go iii E ::I is o , 1/1/00 2/1/00 3/1/00 4/1/00 5/1/00 6/1/00 7/1/00 8/1/00 9/1/00 10/1/00 11/1/00 12/1/00 Date Camp Dresser & McKee, rnc. In Association with Richwine Environmental, Inc. Page 1- 8 Bremerton WWTP Section 1 - Influent Load Characteristics load of 0.201lbs./day of BODs. This is a very typical value for treatment plants. This value typically ranges from 0.18 to 0.22lbs./capitalday depending on the demographics of the area. BODs peaking characteristics were also evaluated for the plant influent BODs mass load for the years of 1997 through 2000. For each year, the average, maximum month, maximum week and maximum day loads were identified. The peaking factor for each of these years was then determined by dividing the respective BODs load by the average BODs load for the year. These peaking factors were then averaged for the study period to determine the characteristic peaking factor. The results of this analysis are shown in Table 1-5. Period Table 1-5 City of Bremerton WWTP Influent BOD5 Characteristics Pounds Peaking Factors per capita Max. Month Max. Week 0.201 1.17 1.44 0.201 1.16 1.38 0.200 1.11 1.38 . Max. Day 1.93 1.68 1.83 '1 I i Average Annual Summer Season Winter Season The influent TSS "per-capita" loads and peaking factors were determined using the same methodology that was used to determine the BODs characteristics. The result of this analysis is shown in Table 1-6. The TSS "per-capita" load is 0.200 lbs./capitalday on an average annual basis. This is also typical of a municipal wastewater treatment plant. Average Annual Summer Season Winter Season 0.200 0.196 0.203 Table 1-6 City of Bremerton WWTP Influent TSS Characteristics Peaking Factors Max. Week 1.75 1.61 1.68 Max. Month 1.24 1.21 1.22 Max. Day 3.12 2.60 2.95 Period Pounds per capita Current Wastewater Characteristics The current wastewater characteristics were determined by taking the current "per-capita" flows, loads and peaking factors and applying them to a population of 38,000. This population was based on an estimated 2% growth rate for the year 2001. The year 2000 population was based on the 2000 Census data for the City of Bremerton of 37,259. Applying the estimated 2001 population to the calculated wastewater characteristics resulted in the flows and loads shown in Table 1-7. These are the wastewater concentrations that will be used to determine the capacity of the wastewater treatment plant. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 1- 9 Chapt<l' 1- lolluent l-oad Charaote'tstiCS aremerton WWlP -- - curreot \0\\\.1"'''- \Naste""p...-- __ s 1ota\ Susoeoded sonds f\oVol (mgd) 6iOChefl\ica\ Oll,,(len oefl\and jlNera(le Mall. Month" process Ave Max. MaX, Iweraae Mall. Month" (lbs:) (~) -(lbsI (fl\alL) (Ibs.) -(fl\(l/L) (Ibs.) (fl\(l/I..) parameter oa'} Month oa'} 178 22600 268 29.5 11300 178 18100 215 11300 oes\gn 7,6 10.1 '\65 7600 140 9424 174 J\\Jerage 6.50 '\ 1.3 25.9 7638 '\41 8936 J\nnua\ 224 7448 188 90'\2 227 Ory 4.75 5.7 10.5 7638 '\93 8860 season '\3'\ 771.4 120 941.1. '\46 Wet 7.71 1'\ .3 25.9 7600 ,\'\8 8436 se~ ---- 1ab\e ,,\.7 Lnad ** Based on popu\ation oi 38,000 page ,\_'\0 camP oresser 8. tv\cKee, inC. . _ """,,,ociation v.rit\l Ricnv.rine En"ironmentai, inc. Bremerton WWTP Section 2 - Operational History INTRODUCTION The performance of the primary and secondary treatment processes and the quality ofthe plant effluent for the years 1996 through 2000 were evaluated to determine the operating characteristics of the system. This analysis consisted of a detailed evaluation of the operating data for the primary and secondary treatment processes and the plant effluent. Most of the emphasis on effluent quality and performance should be given to the period of 1997 through 2000. This was the period of time when the plant has operated free of recycle streams and the laboratory database was the most complete. Performance data from 1997 was included to show the improvements in plant performance that have occurred with the removal of the recycle streams. PRIMARY TREATMENT PROCESS PERFORMANCE An evaluation of the historical performance of the primary treatment process was done to determine performance criteria to evaluate the solids handling and secondary treatment processes. This evaluation provides the basis for determining the effluent quality that can be expected from this process under varying hydraulic loading conditions. The evaluation of historical performance is discussed in the following sections. Historical BODs And TSS Removals The removal rates for BODs and TSS for the four-year study period are shown in Table 2-1. This table shows that these removals occurred at average day overflow rates ranging from 281 to 2915 gpd/fe. Typical average day design values for primary treatment overflow rates range from 900 to 1200 gpd/ft2 with a peak overflow rate between 2000 and 3000 gpd/ft2, depending on the flow characteristics. This system was designed for a daily overflow rate of 1140 gpd/ft2 and a peak overflow rate of3310 gpdlft2 at peak flow. BODs removal rates in primary treatment typically range from 25 to 40 % removal, depending on the type of waste. This system was designed for an average BODs removal rate of 30%. The average percent BODs removal for the study period was 23%, with the median BODs removal rate of30%. The BODs removal was 28% or better 60% of the time. This is on the lower end ofthe typical range. This is most likely due to the relatively high concentration of soluble BODs (SBODs) entering the treatment plant. One of the factors contributing to the high SBODs is the septicity that occurs in the collection system during the low flow periods. Another factor that is unique to this treatment plant is that the BODs removal rates are negative over 10% of the time. A closer evaluation showed that this occurs during high flow periods when the influent BODs concentration is very dilute. There may also be some flushing of solids from the clarifiers during high flows. BODs removal rates in the primary process that are lower than design will have an effect on the capacity of the secondary process. Careful consideration will need to be given to the primary effluent BODs and TSS loads during the secondary process analysis. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-1 Bremerton WWTP Section 2 - Operational History Table 2-1 City of Bremerton WWTP 1997 - 2000 Primary Clarifier Performance Statistics Overflow BOD TSS Statistic Flow Rate Influent Effluent Removal Influent (mgd) Effluent Removal (g pd/ft2) (mg/L) (mg/L) (%) (mg/L) (mg/L) (%) Max 29.30 2915 377 396 71% 566 903 86% Min 2.83 281 26 27 -189% 30 36 -728% Average 6.37 634 159 118 23% 162 87 40% Count 1461 1461 635 603 603 1093 1050 1046 10 Percentile 4.10 408 88 70 -10% 95 59 6% 25 Percentile 4.43 441 123 85 19% 128 67 38% 40 Percentile 4.79 477 153 102 28% 151 73 48% Median 5.13 510 166 111 30% 166 77 52% 60 Percentile 5.67 564 179 119 33% 176 81 55% 75 Percentile 6.82 679 195 140 38% 191 88 60% 90 Percentile 9.95 990 217 174 44% 213 106 65% TSS removal rates typically range from 50 to 65% removal. The average percent TSS removal for the study period was 40% with the median removal rate at 52%. The system was designed with a TSS removal rate of 60%. The removal rates are less than 38% over 25% of the time. This is also lower than expected. This is most likely due to the high overflow rates that are being experienced during rainfall events and the dilute flows that are received during wet weather periods. The historical BODs and TSS removal rates are lower than design. For this reason, the operating data was evaluated in more detail to determine if the reason for the low removal rates could be identified. This evaluation is discussed in the following sections. Overflow Rate A statistical analysis of the average day overflow rate for the primary clarifiers was calculated for each year of the study period. These results are shown in Table 2-2. Figure 2- 1 shows a trend plot of the daily average overflow rates. This analysis shows that the overflow rates have been less than 1200 gpd/ft2 over 90% of the time for each of the four years. The average overflow rate has been less than 700 gpd/ft2 and the median overflow rate less than 600 gpd/ff for each of the years. This analysis shows that the low removal rates are not due to high overflow rates; though low removals may be a problem when high flows do occur. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-2 Bremerton WWTP Section 2 - Operational History 1 ! i i. Table 2.2 I City of Bremerton WWTP , j Primary Clarifier Daily Average Overflow Rates Statistic 1997 1998 1999 2000 All Data Max 2915 2853 2817 1639 2915 Min 383 321 318 281 281 Average 677 658 690 512 634 10 Percentile 450 418 407 388 408 25 Percentile 483 442 441 411 441 40 Percentile 537 467 491 438 477 Median 567 500 537 455 510 60 Percentile 611 572 589 489 564 ,J 90 Percentile 710 724 745 546 679 90 Percentile 1005 1105 1246 698 990 , ~ i v Figure 2-1 City of Bremerton WWTP 1997 - 2000 Primary Clarifier Overflow Rate . I , j 3500 3000 . i 1 - j 2S00 .- ~ l I ~ 2000.- i . t ~15a0'-- --- '---f. ~ I I I I ~ : I ," I o ':~J~~I~l~~~~ ll~ f~, I n ! ~! O. Jan-97 Jul-97 Jan-98 Jul-98 Jan-99 Date Jul-99 Jan-OO Jul-OO BODs Removal The BODs removal rates were evaluated for each year of the study period. The statistical results ofthis evaluation are shown in Table 2-3. Figure 2-2 shows a trend plot of this data for the study period and Figure 2-3 shows a scatter plot of BODs removal vs. overflow rate for the four-year study period. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-3 Bremerton WWTP Section 2 - Operational History Table 2-3 City of Bremerton WWTP Annual Primary Clarifier BODs Removal 1997 1998 1999 2000 Statistic Max Min Average Median Count 55% 67% 71% -189% -113% -68% 3% 31% 24% 20% 37% 30% 138 154 156 -51% 10% -2% -11% 29% 18% 9% 35% 26% 20% 37% 30% 27% 39% 32% 31% 41% 35% 36% 46% 41% 10 Percentile 25 Percentile 40 Percentile 50 Percentile 60 Percentile 75 Percentile 90 Percentile All Data 54% 71% -68% -189% 30% 23% 31% 30% 155 603 17% -10% 25% 19% 30% 28% 31% 30% 33% 33% 39% 38% 45% 44% - % BOD Removal -10dayave Figure 2-2 City of Bremerton WWTP 1997 - 2000 BODs Removal 100% . 50% . 0% . ii > o e OJ II: -50%.---- c o III .... -100%'- -150% . -200% . Jan-97 Jan-98 J ul-98 Jan-99 Date Jul-99 Jan-OO Jul-OO Jul-97 Camp Dresser & McKee, inc. In Association with Richwine Environmental, Inc. Page 2-4 Bremerton WWTP Section 2 - Operational History 1 ; ~ . I Figure 2-3 City of Bremerton WWTP 1997 - 2000 Primary BODs Removal vs. Overflow Rate I I , t 80% . . . 60% . . . .- J 1 40% . ii 20%' > o e .. a: 0%' Q o a:I :.l! . -20%' . . . . . .. .. . . ... . . . . . . . . . . .. . . . . . . . . . . . . . -40% . . . . I " I , I . . .. . -60% . . .. . ... -80% . o 500 1000 1500 2000 Overflow Rate (gpd/ft2) 2500 3000 3500 . l I I The plot in Figure 2-2 shows that the BODs removal rates were poor in 1997, but has continued to improve with each year of operation. There are two factors that account for the improved removal rates since 1997. First there were periods oftime when the clarifiers were down for maintenance and coating of the mechanisms. Second, the operation staffstopped using the gravity thickener and began in-tank thickening of the primary sludge. This has resulted in the pwnping of thickened sludge directly from the primary tanks to the digesters. The trend plot in Figure 2-2 shows that the BODs removal rates in 1997 were much lower than the following years. Because of this, the 1997 data was removed from the plot in Figure 2-3 with a new plot of the 1998 - 2000 data created and shown in Figure 2-4. This plot shows a much better trend of degrading BODs removals with increased overflow rates. There are still some periods when poor BODs removal rates occur at low overflow rates. A third scatter plot was developed plotting the 1998 - 2000 data for BODs removal vs. peak day overflow rate. This plot is shown in Figure 2-5. This plot shows that the peak day overflow rate is not the reason for the low BODs removal rates at low flows. An explanation of this may be due to the septicity that occurs in the collection system creating additional SBODs during low flow periods that cannot be removed in the primary clarifiers. The evaluation of performance based on removal rates can be distorted when the influent concentrations become low due to the dilution of the waste. It is a basis understanding that the removal rates in the primary process will become lower when the influent concentrations become lower. For this reason, it is important to evaluate and determine the effluent Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2.5 Bremerton WWTP Section 2 - Operational History 60% Figure 2-4 City of Bremerton WWTP 1998.2000 Primary BODs Removal vs. Overflow Rate . . 60% . 40% . 20% . . iU > 0 E &! 0% . c 0 III ~ ~20% . . . . . -40% . -60% . .. -80% . 0 500 . . . . . . .. . . . . . . . . . '" . . . . . . . . . . . . 1000 1500 2000 Overflow Rate (gpd/ft2) 3000 . 2500 80% Figure 2-5 City of Bremerton WWTP 1998.2000 Primary BODs Removal VS. Peak Day Overflow Rate 60% . . . . . . . . . . ~ . . . . . .. . . . .. . :* . - . . ... . . .. . . . . . . . . . . . . . .. . . . . . . . . . .. '" . ~ . . . . . . . . . . . . . ~ . . . .. 500 1000 1500 2000 2500 3000 3500 Overflow Rate (gpd/ft2) 40% . iU 20%. -. > o E .. IZ: 0%. c o III i1- -20%. -40% . -60% . -80% . o Camp Dresser & McKee, fnc. In Association with Richwine Environmental, Inc. Page 2-6 Bremerton WWTP Section 2 - Operational History I ., concentrations that will be observed at higher overflow rates. Figure 2-6 was developed to evaluate the actual effluent quality to be expected at various overflow rates. This plot shows the primary effluent BODs vs. the average day overflow rate for the years 1998 - 2000. The plot shows that with the exception of two days, the primary effluent BODs concentration is less than 100 mglL at overflow rates greater than 1000 gpdlff. -[ I I Figure 2.6 City of Bremerton WWTP 1998 .2000 Primary Effluent BODs vs. Overflow Rate 350 300 . . 1 ! ; I :; 250 . a .s. Q 0200 . III ~ .. " ffi 150. ?: ] a: 100. t . .. .. .. .~~ . . . .\ ~: : . . .~. ~~~ ..- .. .~ :.. ~~... .... . ..... . ~ ..... ... . . . . . . . . : . . . . . . l I 50 o. o 500 1000 1500 Overflow Rate (gpdlfl2) 2000 2500 3000 It is necessary to determine a primary effluent BODs concentration to be used in the modeling ofthe secondary treatment process. As shown in Figure 2-7, the primary effluent BODs concentration varies seasonally based on the plant influent flow and primary clarifier performance. A statistical analysis of the primary effluent BODs concentrations was performed for each of the four years of the study period with the results summarized in Table 2-4. These results are provided for both the dry season and the wet season. This was done so that the secondary system can be modeled and a capacity determined for each of the seasonal operating conditions. An average BODs removal rate of 30% will be used in the solids balance to determine sludge production rates. This value was selected because it was equal to the median BODs removal rate for the past two years and the average BODs removal rate for the year 2000. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-7 Bremerton WWTP Section 2 - Operational History Figure 2.7 City of Bremerton WWTP 1997 . 2000 Primary Effluent BODs Concentration 450 . 400 . 350 . ::r a. 300, g c @ 250. C .. :::I 15 200.-. w ~ .~. 150. It 100'~. I :lfJildjl' ~ 50. 0., . Jan-97 Jul-97 Jan-98 Jul-98 Jan-99 Dale Jul-99 Jan-DO Jul-OO Table 2-4 City of Bremerton WWTP Primary Effluent BODs Summary Primary Effluent BODs Year Cone 'mg/L) Mass (I ls/day) Ave Max Me Ave Max Me 1997 Dry 202 256 7692 10138 Wet 102 185 5901 10865 1998 Dry 109 123 4154 5188 Wet 84 114 4883 8640 1999 Dry 144 201 5609 7249 Wet 81 172 5058 6638 2000 Dry 149 174 5282 6655 Wet 106 160 4541 5420 Camp Dresser & McKee, inc. In Association with Richwine Environmental, Inc. Page 2-8 Bremerton WWTP Section 2 - Operational History : I I I i TSS Removal -1 I The TSS removal rates were evaluated for each of the years between 1997 and 2000. The methodology that was used to perform this evaluation was the same as that used in the BODs evaluation. The statistical results of this evaluation are shown in Table 2-5. Figure 2-8 shows a trend plot and Figure 2-9 shows a scatter plot ofTSS removal vs. overflow rate for the four-year study period. Statistic Table 2.5 City of Bremerton WWTP Annual. Primary Cia 'ifier TSS Removal 1997 1998 1999 2000 All Data I I J Max 72% 86% 82% 82% 86% Min -728% -100% .349% -25% -728% Average -6% 47% 40% 55% 40% Median 30% 54% 50% 58% 52% Count 147 331 293 I 275 1046 10 Percentile -120% 19% 4% 39% 6% 25 Percentile -17% 44% 35% 50% 38% 40 Percentile 20% 52% 46% 55% 48% 50 Percentile 30% 54% 50% 58% 52% 60 Percentile 37% 57% 52% 60% 55% 75 Percentile 46% 61% 57% 62% 60% 90 Percentile 55% 65% 63% 68% 65% I , j 'i 1 i ! The TSS removal rates were poor in 1997, but have continued to improve with each year of operation, as did the BODs removal rates. The 1997 data was removed from the plot shown in Figure 2-9 with the new plot for the 1998 - 2000 data created and shown in Figure 2-10. This plot shows the trend of degrading TSS removals with increased overflow rates. ; (, I , J There are a few days when the TSS removal rates still occur at low overflow rates. Therefore, a third scatter plot was developed plotting the 1998 - 2000 data for TSS removal vs. peak day overflow rate. This plot is shown in Figure 2-11. This plot clearly shows the loss of performance with increased overflow rates. Due to the distortion that occurs in the TSS removal rates when the influent concentrations become low due to the dilution of the waste, a scatter plot of effluentTSS concentration vs. overflow rate was developed. This plot is shown in Figure 2-12. This plot shows the data for the years 1998 - 2000. Camp Dresser & McKee, Inc. In Association with Richwine Environmenta', Inc. Page 2-9 Bremerton WWTP Section 2 - Operational History - % TSS Removal -10-day Ave Figure 2-8 City of Bremerton WWTP 1997 - 2000 TSS Removal 100% I -- I, iii -100% . .'- -.I~ - > 0 E &! -150%' r--. 1- en en .... "a'I- -200% . -250% . -300% . -350% . -400% . Jan-97 Jul-97 Jan-98 Jul-98 Jan-99 Jul-99 Jan-OO JuJ-OO Date Figure 2-9 City of Bremerton WWTP 1997 - 2000 Primary TSS Removal vs. Overflow Rate 100% - 50% 0% c; €i E &! -50% . en ~ it -100% -150% -200% 0 ..~. .... .. .. . . ..... .... . . .. ~,. . ,... w. ....t .... . #l'." .: ~ ..... · .. · It"t · ... . . ,. +1#...,. ... \<P .. ... . ... +.. .. . ~. . . .. . . . , . .. . . . . . .. . \ . ~~ . . . ... .. . . . . . . . . . .. 1500 Overflow Rate (gpd/ft2) 2000 2500 3000 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2.10 Bremerton WWTP Section 2 - Operational History 1 \ 100% . , I 50% . 0%. jij > ~ ~ -50% . en en I- ~ .100% . -150% . -200% " 0 - ) Figure 2-10 City of Bremerton WWTP 1998 - 2000 Primary TSS Removal vs. Overflow Rate ..". . .. . . ,.. .. .. .....~~.~~..,.... . . ... ~... ........ .. · t .., ... . . t.. ..... . ... . ... .. . . . . . . . . .. .. . . .. . .- . . . . .. . . . . . . . 500 1000 1500 2000 Overflow Rate (gpdlft2) 2500 3000 3500 Figure 2-11 City of Bremerton WWTP 1998 - 2000 Primary TSS Removal vs. Peak Day Overflow Rate 100% - 50% . 0% ~ 0 E ~ -50% en f!! ~ -100% -150% -2000/0 . o. ... t .... ..~... ".. ~ . i$. - ~~..".. ~t. . · 1t. . .. ;;.. . . . · " .. ... ..., .. .... .. t" ... .. ... -.I. . .:. · ....~ ... .. t1.. f.. ....". . ... .... 0.... .,. , . .-. ........ ... . ...... ~I .. . . . ". .. . ... . .. .. ..: -- . . . . .... . .. . . . . . . . . . . 500 1000 1500 2000 Overflow Rats (gpd/ft2) 2500 3000 3500 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2.11 Bremerton WWTP Section 2 - Operational History Figure 2-12 City of Bremerton WWTP 1998 - 2000 Primary Effluent TSS V5. Overflow Rate 300. 250 - . ;;r CI 200 . .s. III ~ '5 150. = ffi ~ .. e 100. ;t . . . . . . . . t . . .. . .. 1 ~. .. # ft.~ ..... .. ~ ..~.. ~ ,:iI*. ~. ... . . . . . . ... . . . ~ .. . . . 50. .. . ... .. 500 1000 1500 2000 Overflow Rate (gpdlft2) 2500 3000 3500 o. o The plot is not as defInitive as the similar plot for the primary effluent BODs concentration was. This plot does show that the primary effluent TSS is typically between 50 and 100 mglL no matter what the overflow rate is. A scatter plot of the primary effluent BODs vs. the primary effluent TSS concentrations for the years 1998 - 2000 was created to determine ifthere was some type of correlation. This plot is shown in Figure 2-13. This plot shows an interesting correlation between primary effluent BODs and TSS. It appears from this analysis that the higher primary effluent BODs does not directly correlate with high TSS concentrations. There are many days where effluent BODs has exceeded 150 mglL. These appear to occur during periods when the flows and overflow rates are low, typically at overflow rates less than 500 gpd/fe, as shown in Figure 2-6. This shows septicity that occurS in the system at low flows will affect the primary BODs removal, but does not appear to have an affect on the TSS removal. The most probable cause for this is the solublization of BODs. A trend plot of the primary effluent TSS for the study period of 1997 - 2000 was created and is shown in Figure 2-14. This plot shows the poor removals that occurred during the summer and fall of 1997. A second plot was developed for the period of 1998 - 2000 so that the variability in the data could be evaluated. This plot is shown in Figure 2-15. Camp Dresser I{ McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-12 Bremerton WWTP Section 2 - Operational History 1 I 200. I 1 ; 1ao C-] 160. ! ! :::/,140 t Vi 120 l!.! ~ c 100 " " ~ r:- ao ~ .. a. 60 . . 40 20. 0- a Figure 2-13 City of Bremerton WWTP 1998.2000 Primary Effluent BOD5 V5. TSS . . . . . .. . . . . . . . . . 50 100 150 200 Primary Effluent BOO (mglL) 250 300 i ,1 The primary effluent TSS concentration varies seasonally based on the plant influent flow and primary clarifier performance. A statistical analysis of the primary effluent TSS concentrations was performed for each of the four years ofthe study period with the results summarized in Table 2-6. These results are provided for both the dry season and the wet season. This was done so that the secondary system can be modeled and a capacity determined for each of the seasonal operating conditions. 't .,' ~ An average TSS removal rate of 55% will be used in the solids balance to determine sludge production rates. This value was selected because it was equal to the average TSS removal rate for the year 2000 and is at the median removal rate for the year 1998. SECONDARY TREATMENT PROCESS PERFORMANCE J : I An analysis of aeration basin and clarifier loadings for the four-year study period was performed to develop some guidance for determining the capacity of the secondary system. The biotower is not being operated at this time so all of the treatment is being performed in the activated sludge process. This provides an opportunity to look closely at the capability of this critical part ofthe secondary treatment plant. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2.13 Bremerton WWTP Section 2 - Operational History Figure 2-14 City of Bremerton WWTP 1997 - 2000 Primary Effluent TSS 1000 900. 800. , I ::i 700. l <II 600 f!! 400. 500. 100'~ '-~~~,~ O' Jan-97 Jul-97 Jan-98 Jul-98 Jan-99 Data Jul-99 Jan-OO Jul-OO Figure 2-15 City of Bremerton WWTP 1998 - 2000 Primary Effluent TSS 250. 200. ~ If ~ 1501, I i'~ I~~~~.~~ \ -~:\'~~i~ O' Jan-98 Jul-98 Jan-99 Jul-99 Date Jan-OO Jul-OO Camp Dresser & McKee, Ine. In Association with Richwine Environmental, Inc. Page 2-14 Bremerton WWTP Section 2 - Operational History Table 2.6 City of Bremerton WWTP Primary Effluent TSS Summary Primary Effluent TSS Year Cone 'mg/L) Mass (Ibs/day) Ave Max Me Ave Max Me 1997 Dry 208 328 8713 13413 Wet 82 381 8918 29472 "" i 1998 Dry 81 99 3160 3946 I Wet 73 90 5278 9466 1999 { Dry 87 105 3324 4461 J Wet 69 98 3980 7886 2000 Dry 75 86 2675 3770 Wet 72 86 3092 4217 Aeration Basin Organic Loading The aeration basin organic loading is calculated by taking the pounds of primary effluent BODs and dividing it by the volume of the aeration basins. The results are presented in the units of lbs BODs/day/1000 fe. The original design criteria did not show this loading criteria, but using the loading criteria outlined in the liquids balance, the design annual average aeration basin BODs load was 83.7-lbs/day/1000 fe and the design max month average BODs load was 120 Ibs/day/1000 fe. These loading rates assume that the biotower is not in operation. A plot ofthe aeration basin organic loading was created for the period from 1997 - 2000. This plot is shown in Figure 2-16. The plot shows the daily loadings as a fine line and a 30- day or monthly moving average of the loadings as a bold line. This plot shows that there were daily high loadings as high as 256-lbs/day/l000 fe in 1997, but in the following years, the loading did not exceed 120-lbs/dayIl000 fe. Even with these periodic high organic loadings, the monthly average loading did not exceed 1 OO-lbs/day/l 000 ft3. This is less than the design loading of 120-lbs/day/1000 ft3. A statistical summary of the loadings on an annual basis is shown in Table 2-7. A relationship that is very important to consider is the quality of effluent that was produced at the different organic loadings. The effluent parameter that was evaluated in relation to organic loading was the plant effluent BODs. This was done by creating a scatter plot of the daily effluent BODs vs. the daily organic loading rate. Figure 2-17 shows this scatter plot. This plot shows that the plant has typically operated at an effluent BODs ofless than 20 mglL at loading rates less than 60-lbs/dayIl000 ft3. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-15 Bremerton WWTP Section 2 - Operational History Figure 2-16 City of Bremerton WWTP 1997.2000 Aeration Basin Organic Loading 300. ~ 250 o o ~ ">. .. :!! 200. g r o , I I I I I I I Jan-97 Jul-97 Jan-98 Jut-98 Jan-99 Jul.99 Jan-OO Ju~OO Date -Dally -Monthly Table 2-7 Bremerton WWTP Aeration Basin Organic Loading (Ibs/day BODsl1 000 fe) Statistic 1997 1998 1999 2000 Max 256.5 139.0 110.6 118.5 Min 35.1 27.9 14.4 25.5 Mean 65.7 45.8 50.7 46.5 Median 56.9 41.1 47.7 45.1 90 Percentile 92.7 63.4 71.5 56.7 92 Percentile 95.5 66.8 72.5 57.9 98 Percentile 159.5 98.7 83.8 103.3 Std. Dev. 29.6 17.0 14.3 13.9 Count 138 154 156 155 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2.16 Bremerton WWTP Section 2 - Operational History Figure 2-17 City of Bremerton WWTP 1997 - 2000 AB Loading vs. Effluent BOD5 80 70 . 80 . . i 50. .s. Q g 40, . . - c .. ::I ffi 30, .. .. . . . . . 20. . ~... .... .. .....+..~ '.' .. '0.. · 0 · .,;........: . . . -.. . .. . . . 10 ' o. o , 50 100 150 200 AS LoadIng (lbs/day/1000 /13) 250 300 There have been a few periodic excursions beyond the permit limit of30 mg/L, but these cannot be directly correlated to the aeration basin organic loading rate. There have been few periods of time when the loading rate has been in the range of the maximum month value of 120-lbs/day/l000 fe, but the plot shows that the daily effluent BODs values have consistently been less than 30-mg/L. The excursions beyond 30-mg/L have typically been at lower loadings when some factor other than organic loading would be the cause of the problem. This historical data supports the continued use of the original aeration basin design loading criteria~ Food-to-Microorganism Ratio (F/M) 1 I } ~ i FIM is another loading parameter used in the design of activated sludge treatment plants. The FIM is calculated in a variety of manners, but in this case, it was calculated by dividing the pounds of effluent BODs by the pounds of mixed liquor suspended solids (MLSS) in the aeration basins. The MLSS was used to calculate the FIM instead of the mixed liquor volatile suspended solids (ML VSS) because more data points for MLSS was available. The system design was based on an average annual F/M of 0.521bs BODsl1b ML VSS-day and a maximum monthly average ofO.84IbsBODs/lb MLVSS-day. Converting these criteria to the units comparable to those calculated in this evaluation results in an average annual FIM of 0.42 lbs BODs/lb MLSS-day and a maximum monthly average of 0.67 lbs BODs/lb MLSS-day. A plot of the FIM was created for the period from 1997 - 2000. This plot is shown in Figure 2-18. The plot shows the daily loadings as a fine line and a 3D-day or monthly moving Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-17 Bremerton WWTP Section 2 - Operational History Figure 2.18 City of Bremerton WWTP 1997.2000 Aeration Basin F/M Ratio '. I : I 2.5 . 2.0,- 0.5 . 0.0 " r I 1 r 1 I I Jan.97 Jul-97 Jan-98 Jul-98 Jan-99 Ju~99 Jan-OO Jul.OO Date -Daily -Monthly average of the loadings as a bold line. This plot shows that there were daily high loadings as high as 2.3 lbs BODs/lb MLSS-day in 1997, but in the following years, the loading did not exceed 1.5 lbs BODs/lb MLSS-day on a daily basis. Even with these periodic high F/Ms, the monthly average F/M did not exceed 1.0 lb BODs/lb MLSS-day. This is higher than the design maximum month F/M of 0.67 lbs BODs/lb MLSS-day. A statistical summary of the F/M on an annual basis is shown in Table 2-8. Table 2-8 City of Bremerton WWTP Aeration Basin F/M Ratio Statistic 1997 1998 1999 2000 Max 2.30 0.93 1.39 1.49 Min 0.09 0.15 0.10 0.19 Mean 0.43 0.34 0.45 0.49 Median 0.39 0.33 0.41 0.44 90 Percentile 0.65 0.46 0.69 0.75 92 Percentile 0.73 0.46 0.73 0.79 98 Percentile 1.21 0;67 0.92 1.13 Std. Dev. 0.28 0.13 0.18 0.21 Count 137 154 156 135 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-18 Bremerton WWTP Section 2 - Operational History r -'1 An evaluation ofthe quality of the effluent in relation to the FIM ratio was performed using the plant effluent BODs as the indicator of effluent quality. This analysis was done by creating a scatter plot of the daily effluent BODs vs. the daily F 1M ratio. Figure 2-19 shows this scatter plot. This plot shows that the times when the daily effluent BODs concentration exceeded 30 mg/L, the F/M ratio was always less than 1.0 lbs BODs/lb MLSS. This shows that the high effluent BODs was due to some other variable. Figure 2-19 City of Bremerton WWTP 1997 - 2000 Aeration Basin F/M Ratio vs. Effluent BODs 80 70 . 60 . . ~ so. '" .s. c 51 40. " " " ~ 30, . . . . . . . . . . . . . . . . . . . . . . 20. 10. o. 0.0 0.5 1~ ,~ Aeration Basin F/M Ratio 2.0 2.5 The F/M ratio is not only dependent on the primary effluent BODs load, but also on the amount ofMLSS that is carried in the aeration system. The system was designed around an MLSS concentration of2500 mg/L. The system can be operated at higher MLSS concentrations if the required level of oxygen can be applied and the design solids loading on the secondary clarifiers is not exceeded. For this analysis, the design F/M ratios will be used unless it is determined in the modeling effort that additional MLSS can be maintained in the system without a detrimental affect on process performance. Secondary Clarifier Overflow Rate The secondary clarifier overflow rate (OFR) is calculated by dividing the plant flow by the surface area of the secondary clarifiers. The units of this design parameter are gpd/ft2. The system was designed for an annual average OFR of 420 gpd/ft2, a maximum month average OFR of 550 gpd/ff and a peak OFR of 1640 gpd/ff. A plot of the secondary clarifier OFR was created for the period from 1996 - 2000. This plot is shown in Figure 2-20. The plot shows the daily loadings as a fine line and a 30-day or monthly moving average of the loadings as a bold line. This plot shows that there were daily Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-19 Bremerton WWTP Section 2 - Operational History Figure 2.20 City of Bremerton WWTP 1996 . 2000 Secondary Clarifier Overflow Rate 1800 1600,- 1400. ~ 1200,- " ... '" ;; 1000,- u. 0 - .. :~- :e co 13 u .. III 400 I 200. O. I Jan-9a Jul-9a J JI ..~ I Jan-97 I Jul-97 I Jan-9a I Jul-9a Dale I Jan-99 I I I Jul-99 Jan-OO Jul-OO -Daily -Monthly OFRs between 1500 and 1600 gpdl:fl? in each of the years 1996 - 1999. These OFRs are based on the average daily flow rate. The maximum month or 30-day average OFRs were as high as 750 gpd/ft2. This exceeds the maximum month design criteria of550 gpd/ft2. A statistical summary ofthe OFR for each ofthe years of the study period was calculated and the results are summarized in Table 2-9. Table 2;.9 City of Bremerton WWTP Secondary Clarifier Overflow Rate Statistic 1996 1997 1998 1999 2000 Max 1589 1542 1509 1490 867 Min 147 203 170 168 149 Mean 336 358 348 365 271 Median 284 300 265 284 240 90 Percentile 492 531 584 659 369 92 Percentile 531 588 662 745 392 98 Percentile 920 930 973 1030 502 Std. Dev. 174 177 194 212 88 Count 366 365 365 365 366 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2.20 Bremerton WWTP Section 2 - Operational History A process failure can occur when the secondary clarifier overflow rate is exceeded. This is due to the washout of solids from the secondary clarifier resulting in high effluent suspended solids (TSS) concentrations. To evaluate this, a scatter plot of the daily effluent TSS concentration was plotted against the daily secondary clarifier OFR for the period of time 1996 - 2000. This plot is shown in Figure 2-21. As shown in the plot, there were few occasions when the effluent TSS exceeded 30 mg/L on a daily basis. There was no direct correlation between the daily average OFR and the effluent TSS. Figure 2-21 City of Bremerton WWTP Secondary Clarifier Overflow Rate vs. Effluent TSS 100. 90 - 60. 70 - ::i e;, 60 - .s- UI f.! so- c .. :J 40 . 51 I ~o - f 20 .1 ., 10 I 0- 0 . . . . . . . . . . + # . . . . . . . .. . . ++ + ..+ ..+ + + + . + + 200 400 600 800 1000 Secondary Clarifier OFR (gpdlft2) 1200 1400 I 1600 The peak. OFR (maximum daily OFR) is more critical to the performance ofthe secondary clarifiers than the daily average OFR. The peak. OPR is determined by dividing the peak. daily flow by the secondary clarifier surface area. As discussed earlier, the design peak OPR was 1640 gpdlft2. The peak daily OFRs were calculated for the period 1996 -2000. A trend plot ofthe results is shown in Figure 2-22. This plot shows that the peak daily OFR of over 1650 gpdlft2 was reached many times each year. I i i j This plot shows that this value was capped at 1650 gpdlft2 due to the maximum flow meter reading of32.0 mgd. Operations staff have estimated peak flows up to and exceeding 42.0 mgd. A peak. flow of this rate would result in a secondary OFR of 2210 gpdlft2. This value exceeds that maximum peak flow design value of 1640 gpdlft2 by 35%. To determine the effect that the peak OFR can have on effluent quality, the peak OFR was plotted against effluent TSS in a scatter plot. Figure 2-23 shows this plot. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-21 Bremerton WWTP Section 2 - Operational History Figure 2-22 City of Bremerton WWTP 1996-2000 Secondary Clarifier Peak Day OFR 2500 2000. ~ a. '" ~ 1500 -.--- u. o ... .. " II. ... .. !€ 1000. .. U Ii .. rn --1r- ~I 'I I~__._l I i o. Jan-96 [ Jul-96 [ Jan-97 [ Jul.97 [ Jan-98 [ Jul-98 Date [ Jan-99 [ Jul.99 I [ Jan.OO -Daily [ Jul-OO -Monthly Figure 2-23 City of Bremerton WWTP Secondary Clarifier Peak Overflow Rate VS. Effluent TSS 100. 90 90 70. ;;! 60 '" .s. rn l!! 50 C .. ::l 40. ffi 30 20. 10. O. 0 . . . . . . . . . . .. . .. ... .. . . . . . . . . . 200 400 600 800 1000 1200 Secondary Clarifier OFR (gpdlf12) 1400 1600 1800 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-22 Bremerton WWTP Section 2 - Operational History I I Figure 2-23 clearly shows that the peak OFR is a major factor in process performance. This plot shows that in every instance when the effluent TSS has exceeded 40 mglL in the years 1996 - 2000 that the maximum daily OFR was greater than 1100 gpdlft. This demonstrates that the peak design OFR is too high and a more conservative value needs to be used when determining the peak hydraulic capacity of the secondary process. The DOE Orange Book Table T3-2 states that the design peak OFR for a conventional activated sludge plant should be 1200 gpdlft2. This is consistent with the historical performance of the secondary treatment process. Secondary Clarifier Solids Loading Rate The secondary clarifier solids loading rate (SLR) is calculated by dividing the sum ofthe plant flow and the return sludge flow by the surface area of the secondary clarifiers. In this analysis, a return sludge flow rate of 40% of the influent flow was assumed. The units of this design parameter are lbs/day/ft. The system was designed for an annual average SLR of 13.8 lbs/day/ff, a maximum month average SLR of 17.9lbs/day/ft2 and a peak SLR of 45.1 lbs/day/ft2. A plot of the secondary clarifier SLR was created for the period from 1997 - 2000. This plot is shown in Figure 2-24. The plot shows the daily loadings as a fine line and a 30-day or monthly moving average of the loadings as a bold line. This plot shows that the daily SLRs have only exceeded 40 Ibs/day/ft2 two times during the study period. Both of these occurred during 1997. The maximum month or 30-day average SLRs were as high as 24lbs/day/ft2 in Figure 2-24 City of Bremerton WWTP 1997 . 2000 Secondary Clarifier Solids Loading Rate 60 50. ~ ., i~ TI I' ~ 30.-------l-.I----.----h.- ---. :'-- --'-.--- s: ~. I I :; " '~. C3 . . U 20 .-' .' Jl \ 10. ~J~; O. Jan.97 I Jul-97 1 Jan.9a I Ju~98 I Jan-9g Data I Jul-99 I Jan~OO Jul-OO I -Daily --Monthly Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-23 Bremerton WWTP Section 2 - Operational History 1997 but have not exceeded 20 Ibs/day/ft2 since. This exceeds the maximum month design criteria of 17.9Ibs/daylft2. A statistical summary of the SLR for each of the years of the study period was calculated and the results are summarized in Table 2-10. Table 2-10 City of Bremerton WWTP Secondary Clarifier Solids Loading Rate Statistic 1997 1998 1999 2000 Max 57.8 40.5 40.6 22.5 Min 2.4 3.0 1.9 2.3 Mean 12.4 9.8 8.6 5.1 Median 10.0 6.6 6.7 4.5 90 Percentile 20.8 19.5 15.5 7.9 92 Percentile 21.9 21.0 17.2 8.6 98 Percentile 35.9 32.1 26.6 11.1 Std. Dev. 7.5 7.2 6.0 2.2 Count 334 362 365 334 A process failure can occur when the secondary clarifier solids loading rate is exceeded because the clarifier is not able to settle and remove the solids as fast as they are entering the clarifier. This design criteria can sometimes be exceeded for short periods of time, ifthe clarifier has storage capacity or if the sludge settleability is very good due to a low sludge volume index (SVI). Failure ofthe process due to high solids loading rate results in the washout of solids from the secondary clarifier resulting in high effluent TSS concentrations. To evaluate this, a scatter plot of the daily effluent TSS concentration was plotted against the daily secondary clarifier SLR for the period oftime 1997 - 2000. This plot is shown in Figure 2-25. As shown in the plot, there were few occasions when the effluent TSS exceeded 30 mglL Qn a daily basis. There was not direct correlation between the daily SLR and the effluent TSS. As with the peak OFR, the peak SLR is also critical to the performance of the secondary clarifiers. The peak SLR was determined by dividing the peak daily flow by the secondary clarifier surface area. A 40% return sludge flow rate was also assumed in this analysis. As discussed earlier, the design peak SLR was 45.1Ibs/day/ft2. The peak daily SLRs were calculated for the period 1997 - 2000. The results are shown as a scatter plot in Figure 2-26. This shows that the peak SLR of 45.1 has been exceeded on many occasions. Most of these values occurred in 1997. The plot shows that there is no direct relationship between peak SLR and TSS values greater than 30 mg/L. The effluent TSS standard has been exceeded at SLRs as low as 21Ibs/day/ft2. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-24 Bremerton WWTP Section 2 - Operational History '-1 ! I Figure 2-25 City of Bremerton WWTP Secondary Clarfier Solids Loading Rate VS. Effluent TSS 60 . . . 50. I . I I . 40 . . . ~ . . . .. .. . . l30' . . . : . Ul l!! .. . . . . . . 20. . . . .. 10. . . . . . . . . . . . . . . . 10 15 20 25 30 SLR (lblday/ft2) 35 40 45 50 60. 50 . 40, . ~ .. S 30. Ul Ul .... 20. 10. Figure 2-26 City of Bremerton WWTP Secondary Clarifier Peak Solids Loading Rate vs. Effluent TSS . + . + . . . .. . .. . ... . . . . . . .+ .. .t . + + + .. . . . . .. . . . . 20 40 60 60 100 120 SLR IlbItlayJn2) Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2.25 Bremerton WWTP Section 2 - Operational History The DOE Orange Book does not recommend a specific SLR for the design of an activated sludge process. The work by Daigger and Roper on the use of clarifier operating diagrams and the relationship of SVI to SLR was referenced as a methodology to be used in design. The activated sludge model that was used in this work to determine the maximum SLR is based on this work. Therefore, the design SLRs will be used unless the modeling shows that a higher SLR is possible under the specific scenario being evaluated. PLANT EFFLUENT QUALITY EVALUATION A detailed evaluation of the effluent produced by the treatment plant has been performed for the period oftime between January 1996 and December 2000. The variables that were evaluated were BOD5 and TSS for both concentration and mass load. The evaluation was performed for each of the seasons for each of the years. The seasons are defined as the dry season, which is from May 1 - September 30, and the wet season, which are the remaining months of the year. The following sections provide a summary of this evaluation Plant Effluent Monthly Average Data Evaluation The monthly average as defmed by CFR Part 133 - Secondary Treatment Regulation of the Clean Water Act is the arithmetic mean of the values for effluent samples collected in a period of 30 consecutive days. DOE can use the month average of the data based on the calendar month for monitoring of permit compliance as defmed in WAC 173-221-030(2). In this analysis, the monthly average has been evaluated based on the calendar month. Table 2-11 and 2-l2 are a summary of the analysis of the monthly average effluent BODs and TSS concentrations and mass based on a calendar month. (Effluent data for December 1996 was not available.) The maximum values allowed in the permit are 30 mglL and 2527 lbs/day as a monthly average. Month January February March April May June July August September October November December 1996 14 10 12 11 12 19 20 18 13 10 11 Table 2.11 City of Bremerton WWTP Plant Effluent Monthly Average BOD5 Concentration 1997 1998 18 15 13 9 21 8 11 11 12 10 12 5 12 6 17 14 12 11 23 10 12 8 11 12 mg/L) 1999 12 12 13 11 11 11 8 9 9 11 10 11 2000 11 13 12 16 12 13 11 14 14 8 11 10 1996 963 798 593 626 601 840 753 680 487 423 496 Mass (Ibs/day) 1997 I 1998 I 1999 1549 1711 1027 796 666 1521 1856 I 538 I 882 614 474 509 511 452 499 571 220 503 544 230 295 699 552 347 657 402 320 2519 406 407 1040 623 621 975 1188 1090 2000 676 789 597 631 482 618 387 505 447 290 583 378 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-26 Bremerton WWTP Section 2 - Operational History Month Table 2.12 City of Bremerton WWTP Plant Effluent Monthly Average TSS Concentration (mg/L) Mass (Ibs/day) 1996 1997 1998 1999 2000 1996 1997 1998 1999 17 21 21 16 14 1328 1645 2170 1645 13 18 16 17 12 1117 1057 1103 2016 10 29 15 19 16 471 2462 910 1345 14 12 14 15 15 1074 685 628 736 10 12 16 17 11 494 544 657 760 10 15 10 12 11 433 689 399 513 12 15 8 6 12 494 768 303 216 12 15 21 8 17 462 618 746 298 11 14 16 11 12 441 809 569 376 10 44 12 11 10 461 4979 492 410 11 21 15 12 11 504 1792 1417 926 19. 19 14 11 1675 1803 1129 2000 936 727 763 607 449 462 436 598 388 382 486 492 January February March April May June July August September October November December I , I J The data summary in this table shows that the plant has not exceeded the monthly average permit limits for BODs at any time during the 5-year study period. The highest monthly average concentration that has been discharged is 23 mglL and the highest monthly average mass has been 25191bs/day. . i \ The analysis summarized in Tables 2-12 shows that the monthly effluent permit limits have only been exceeded one time for TSS concentration and mass. Both of these occurred in the month of October 1997. This exceedance was the result of high effluent TSS values that occurred on October 28 and 29. This was due to peak flows of 31. 70-mgd and 32.00-mgd that were put through the secondary process on those days. These high flows caused washout of the secondary clarifiers resulting in the high effluent TSS values. C__ "l- I .. j Plant Effluent Weekly Average Data Evaluation The weekly average is defined as the arithmetic mean of the values for effluent samples collected in a period of 7 consecutive days. The definition ofthe weekly average is also taken directly from the permit and is based on language in CFR Part 133 - Secondary Treatment Regulation of the Clean Water Act. DOE can base this calculation on the calendar week for determining compliance with permit conditions as defined in WAC 173-221- 030(1). In this evaluation, the analysis of the effluent BODs and TSS concentrations were performed using a 7-day moving average. This technique provides the average of7 consecutive days on a continuous moving average basis as defined in the permit. The results of this analysis ofthe effluent data are shown in Table 2-13. For simplicity, this data has been summarized annually for each of the seasonal periods. The maximum weekly average values allowed in the permit are 45 mglL and 3790 1bs/day as a weekly average. These weekly limits were exceeded on three occasions during the 5-year study period. These were in October and December 1997 and in January 1998. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-27 Bremerton WWTP Section 2 - Operational History Table 2-13 City of Bremerton WWTP Plant Effluent 7-day Average. BODs and TSS Effluent BODs Effluent TSS Year Conc 'mg/L) Mass (Ibs/day) Conc . mg/L) Mass (Ibs/day) Ave Max Ave Max Ave Max Ave Max 1996 Dry 16 31 669 1202 11 22 473 1012 Wet 11 19 659 1484 13 23 831 2714 1997 Dry 13 24 590 1719 14 28 681 2125 Wet 16 60 1320 8440 23 128 2039 17955 1998 Dry 10 19 377 820 14 24 539 951 Wet 10 32 766 4944 16 42 1227 6508 1999 Dry 10 17 396 723 11 22 431 1088 Wet 12 26 886 2551 15 25 1187 3428 2000 Dry 13 26 491 1634 13 26 474 915 Wet 12 25 565 1959 13 19 629 1261 In October 1997 the effluent BODs 7-day moving average concentration was 60 mglL for 1- day and 49 mglL for 4-days. The 7 -day moving average mass discharge reached 8440 Ibs/day for I-day and 6791 for 4-days. These high values were due to the high flows that were being passed through the treatment plant. Flows of 17.5l-mgd and 17.1 O-mgd were treated on October 28 and 29, respectively. The 7-day moving average limit for BODs was also exceeded for I-day in December 1997 when it reached a value of 4622 lbs/day. This was due to the discharge of 41 mgIL of BODs on December 16 when the daily flow was 22.6l-mgd. The exceedance in 1998 was due to a discharge of 40 mglL on January 13 when the daily flow was 19.48-mgd. This resulted in a single day when the 7-day average mass reached a value of 4944 lbs/day. The high TSS values that were reported in 1997 and 1998 were due to the same occurrences that were described previously for BODs. The permit compliance history has been excellent for the treatment plant with the exception of the events that were described above. In each of these instances the permit value for BODs or TSS were exceeded due to the treatment of high flows through the secondary system resulting in the flushing of solids from the secondary system. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 2-28 Bremerton WWTP Section 3 . Capacity Evaluation INTRODUCTION - I I , A capacity study of the Bremerton WWTP was performed to determine the present and future treatment capabilities of the treatment plant. This capacity of each unit process was determined based on the capacity limiting parameter for the unit process. The criteria that was used to base the capacity for each unit process was the original design criteria, the original design hydraulic profile, the performance history of each unit process and the DOE Orange Book standards. The treatment plant capacity can be provided in different units depending on the unit process. For example, the capacity of influent screening is based solely on hydraulic capacity where the capacity of the secondary process is based on a combination of hydraulic capacity and organic loading. In this study, the capacity of each unit process is related back to a specific influent hydraulic capacity. This provides a common basis for permitting and planning. ! The hydraulic capacity of the treatment plant also varies between the dry season and the wet season. In the dry season, the plant must treat more concentrated wastes at low flow rates. In the wet season, the plant must provide treatment of high flows and the resultant dilute wastes. For this reason, both a dry season and a wet season capacity have been developed for each unit process. 'j I I DISCHARGE REQUIREMENTS The NPDES permit (W A-0029289) for the Bremerton WWTP provides for the discharge of treated wastewater into Sinclair Inlet on a year-round basis. The permit stipulates specific effluent limitations on BODs, TSS, pH, fecal coliform bacteria, chlorine, copper and mercury. The numerical permit limits are summarized in Table 3-1. The effluent mass load limits were based ona flow to the facility of 10.1-mgd. ! I Effluent Parameter Unit of Measure Table 3-1 Current NPDES Permit Limits Effluent Mass Limits (Ibs.lday) Monthly Weekly Ave Ave 2527 3790 2527 3790 Monthly Ave Weekly Ave BOD5 TSS Fecal Coliform 1 PH Chlorine Residual2 Notes: 1. Average values are based on a geometric mean. 2. Maximum daily Total Chlorine Residual is 0.37 mg/L. mg/L 30 45 mg/L 30 45 #/100 ml 200 400 Shall not be outside the range 6.0 to 9.0 mg/L I 0.37 I 0.23 I 6.74 The treatment plant is also required to meet the 85% removal requirement based on the definition of secondary treatment. This means that the treatment plant must remove 85% of the influent BODs and TSS mass or meet the 30 mglL standard for BODs and TSS, whichever is more stringent. The permit contains special language due to the combined Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3.1 Bremerton WWTP Section 3 - Capacity Evaluation sewer nature of the collection system that suspends this requirement during the period oftime between October 1 and April 30. The 85% removal is only required during the other five months. CURRENT WASTEWATER CHARACTERISTICS The wastewater characteristics of the waste that is received at the treatment plant will vary over time as the demographics of the service area change. The treatment plant was designed based on a set of characteristics derived from historical data taken at the original primary treatment plant that served the area prior to the construction of the current plant. The current treatment plant has been in operation for over IS-years. During this period of time there have been changes in the condition of the collection system and the demographics ofthe servIce area. An evaluation of the influent wastewater flows and loads was performed to determine the current wastewater characteristics. The results of this evaluation were summarized in Section I. These are the wastewater concentrations and characteristics that will be used in determining the capacity of the wastewater treatment plant. SOLIDS BALANCE A solids balance is an evaluation of the solids production and removals at each of the liquids and solids unit processes in the treatment plant. The solids balance evaluates the effects of the recycle streams from the solids handling processes and incorporates them into the unit process loads. This evaluation is necessary to determine solids production for sizing of the solids handling unit processes. The solids balance is a simple process model that assumes steady state conditions in the treatment plant under the defined loading and performance criteria. The model was developed using the Microsoft Excel spreadsheet. The effects of recycle streams are incorporated into the analysis and results are updated through many iterations of the calculations. The results are based on calculated values that have been iterated until a maximum change of 0.001 is obtained in the last calculation. A solids balance was developed for each of the seasonal loading conditions. The solids balance provides the solids stream flows and loads that were used to determine the solids processing unit capacities. Process Assumptions Assumptions on the performance of each unit process must be made to determine the solids balance. The relative accuracy of these assumptions is critical so meaningful and representative results can be obtained from the model. Process performance assumptions were determined by evaluating the historical data and process performance at the treatment plant over the past S-years. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3.2 Bremerton WWTP Section 3 - Capacity Evaluation Table 3-2 shows the assumptions made in this model. The performance values that were assumed in this model were based on conservative values. This was done to ensure that the process capacity is available when a unit process does not perform optimally. 1 . Table 3-2 City of Bremerton WWTP Solids Balance Model Performance Variables Variable I Value' Basis Plant Influent Influent BOD & TSS Concentrations Variable Historical Data Peaking Factors Variable Historical Data VSS as % of TSS 86% Historical Data % Soluble BOD5 46% Historical Data Primary Treatment Primary % TSS Removal 55% Historical Data Primary % BOD5 Removal 30% Historical Data Total Solids Cone. of Primary Sludge 5.0% Historical Data Secondary Treatment Yield (Ibs. TSS/lb. BOD5 Applied) 0.87 Activated Sludge Model Secondary Effluent TSS 15 mg/L Assumption Secondary Effluent BOD5 15 mglL Assumption Total Solids Cone. of WAS 0.5% Assumption % Volatile Solids in WAS 80% Historical Data WAS Thickening WAS Thickening Capture Efficiency 95% Assumption Total Solids Cone. of Thickened WAS 4.5% Assumption Lbs. Soluble BODs/lb. TSS In Recycle 0.01 Ib.Jlb. Assumption Anaerobic Digestion Digester Volatile Solids Destruction 45% Assumption Dewatering Dewatering Capture Efficiency 95% Assumption Total Solids Cone. of Dewatered Sludge 22% Assumption Lbs. Soluble BODs/lb. TSS In.Recycle 0.05 Ib.Jlb. Assumption I I .1 I , ! The results ofthe solids balances are shown in Table 3-3. This shows the estimated mass of solids that will be produced at each of the unit processes at a unit flow rate of 1. O-mgd. These unit flow rate process loads are used to determine the solids handling process capacities. The development of these unit solids productions provides the basis for development of capacities for the solids handling process units on an influent flow basis. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3-3 Bremerton WWTP Section 3 - Capacity Evaluation FI w Stre Table 3-3 City of Bremerton WWTP Solids Balance Results at 1.0-mgd Influent Flow Solids Mass in Ibs/day Average Annual Dry Season Wet Season Ave Day Max Month 1001 1221 587 716 601 734 572 699 726 886 693 846 0 am Ave Day Max Month Ave Day Max Month Raw Sewage 1334 1655 1568 1897 Primary Sludge 781 969 921 1115 Waste Sludge 763 959 978 1193 TWAS 726 913 932 1136 Digested Sludge 944 1178 1161 1411 Dewatered Sludge 901 1125 1109 1347 SYSTEM RELIABILITY/REDUNDANCY REQUIREMENTS The reliability/redundancy requirements establish the minimum leyel of treatment that can be provided when there is a failure of a process component. Three reliability classifications have been established. These three classes are defined in Table 3-4. The classification is based on the impacts that can occur to the receiving water quality and to public health when there is a component or system failure. The EP A established these criteria during the construction grants program. Specific requirements pertaining to each treatment plant unit process for each reliability class have been developed and are described in EP A's Technical Bulletin, "Design Criteria: for Mechanical, Electric, and Fluid System and Component Reliability, " EP A 430-99-74-001. Table 3-4 Guidelines for Classifying Sewage Works 1 Reliability Class Guideline These are works whose discharge, or potential discharge, (1) is into public water supply, shellfish, or primary contact recreation waters, or (2) as a result of its volume and/or character, could permanently or unacceptably damage or affect the receiving waters or public health if normal operations were interrupted. These are works whose discharge, or potential discharge, as a result of its volume and/or character, would not permanently or unacceptably damage or affect the receiving waters or public health during periods of short-term operations interruptions, but could be damaging if continued interruption of normal operations were to occur (on the order of several days). II III These are works not otherwise classified as Reliability Class I or Class II. 1. EPA Technical Bulletin - Design Criteria for Mechanical Eiectric and Fluid System and Component Reiiabiiity (EPA-430-99-74-001) Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3-4 Bremerton WWTP Section 3 - Capacity Evaluation The specific requirements pertaining to treatment plant unit processes and pumping systems are shown in Table 3-5. Unless specifically stated in Table 3-5, all unit processes in the main treatment flow stream must have the hydraulic capacity to handle the peak wastewater flow with the largest-flaw-capacity unit out of service. System hydraulics was not evaluated in this evaluation. The hydraulic profile that was developed in the original design and provided in the design documents was used as the basis of determining peak flow capacity. Two separate and independent sources of electric power must be provided to the plant either from two separate utility substations or from a single substation backed up by a generator located at the treatment plant. The electrical reliability classification does not need to be the same as the treatment plant reliability Classification. Electrical power system reliability classifications are defined in Table 3-6. I I ! , 1 Table 3-6 Electric Power System Reliability Features Common to Class I, II and III: Power sources - Two separate and independent electric power sources from either two separate utility substations or one substation and one standby generator. Reliability Class Minimum Capacity Sufficient to operate all vital components and critical lighting and ventilation during peak wastewater flaw conditions. The same as Reliability class I, except that vital components used to support the secondary process need not be operable to full level of treatment, but shall be sufficient to maintain the biota. II I I , j III Sufficient to operate the screening facility, the main wastewater pumps, the primary sedimentation basins, the disinfection facility, and critical lighting and ventilation during peak wastewater flaws. The Bremerton WWTP must be defined as a Class I treatment facility based on the effluent discharge permit. As defined in the Class I requirements, the effluent is discharged directly to a receiving stream that could place the public at risk, affect a public water supply or place any aquatic life in danger. For this evaluation, the reliability/redundancy requirements for a Class I facility were used. UNIT PROCESS CAPACITY ANALYSIS A desktop capacity of each unit process was developed for each of the major unit processes. This desktop analysis used the current influent wastewater characteristics developed in Section I and the design hydraulic capacities to determine the current unit process capacities. Screening The screening process consists of a two mechanical bar screens located in the inlet channels of the new headworks. A third channel provides a manually raked bar screen for periods when one of the mechanical screens is out of service. The design capacity of each screen is a maximum flow of 15-mgd. This provides a peak hydraulic capacity for the headworks of 45-mgd, with the firm capacity with one unit out of service at 30-mgd. Camp Dresser & McKee, Inc. rn Association with Richwine Environmental, Inc. Page 3-5 Bremerton WWTP Section 3 - Capacity Evaluation Unit Process Class I Reliability Table 3-5 Reliability Classification Unit Process Re uirements Reliability Requirements Pumping Systems Mechanically Cleaned Bar Screens Grit Removal Process A backup pump shall be provided for each set of pumps performing the same function. The capacity of the pumps shall be such that, with anyone pump out of service, the remaining pumps will have the capacity to handle the peak flow. A backup bar screen, designed for mechanical or manual cleaning, shall be provided. Facilities with only two bar screens shall have at least one bar screen designed to permit manual cleaning. Bypass should be capable of passing peak flow with unit out of service. Primary Sedimentation Basins Aeration Basins Aeration Blowers Air Diffusers Secondary Clarifiers The units should be sufficient in number and size so that, with the largest-flow-capacity unit out of service, the remaining units should have a design flow capacity of at least 50 percent of the total design flow. A backup basin will not be required; however, at least two equal-volume basins shall be provided. There shall be a sufficient number of blowers to enable the design oxygen transfer to be maintained with the largest- capacity-unit out of service. The air diffusion system for each aeration basin shall be d~signed so that the largest section of diffusers can be isolated without measurably impairing the oxygen transfer capability of the system. The units should be sufficient in number and size so that, with the largest-flow-capacity unit out of service, the remaining units should have a design flow capacity of at least 75 percent of the total design flow. The units should be sufficient in number and size so that, with the largest-flow-capacity unit out of service, the remaining units should have a design flow capacity of at least 50 percent of the total design flow. Reliability Class II - The Reliability Class I requirements shall apply except as modified below: Disinfection Contact Basins The units should be sufficient in number and size so that, with the largest-flow-capacity unit out of service, the remaining units should have a design flow capacity of at least 50 percent of the total design flow. Reliability Class 1/1 - The Reliability Class I requirements shall apply except as modified below: Primary Sedimentation Basins There shall be at least two basins. Secondary Clarifiers There shall be at least two basins. Aeration Basins A single basin is permissible. Secondary Clarifiers Aeration Blowers Thera shall be at least two blowers available for service. Aeration must be provided to maintain sufficient DO in the tanks to maintain the biota. Page 3-6 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Bremerton WWTP Section 3 - Capacity Evaluation " ! I The design intent ofthe headworks was to operate at a peak hydraulic capacity of30-mgd and the manual screen to operate only during periods of time when redundancy is required. Addition of another mechanical screen in the manual screen channel will provide 45-mgd of mechanical screening capacity. ,.., , . I , , Grit Removal A new grit removal system was installed with the construction ofthe new headworks at the treatment plant. The grit basins are of a horizontal flow type. Settled grit is removed by a system of flights and is hauled to a local landfill for disposal. This.system was designed to remove grit at the plant's peak hydraulic flow of 30-mgd. For this analysis, the capacity of the grit system will be at 30-mgd. It appears that these basins have been conservatively designed and additional capacity may be available. Primary Treatment I , I The treatment plant has two circular primary clarifiers. Floatables are skimmed from the surface of each tank and pumped directly to the digesters. Settled solids can be pumped on a continuous basis to the gravity thickener for thickening prior to being pumped to the digesters or the settled solids can be thickened in the primary clarifiers for pumping directly to the digesters. The solids are then processed in the anaerobic digesters. 1 I Primary clarifier capacity is based on surface overflow rate (OFR) expressed in the units of gpd/ft? A typical average day SOR is in the range of 800 - 1200 gpd/tf (Orange Book Table T2-2) with a peak day SOR of2000 - 3000 gpd/ft2. The original design criteria were at an average annual OFR of895 gpd/ft2, a maximum month OFR of 1140 gpd/ft2 and a peak OFR of3310 gpd/ft2. "I 'I j . J The evaluation of historical data preformed and summarized in Section 2 shows that percent removals for BODs and TSS decrease with increasing OFR, but the effluent BODs stays in the range of SO -75 mglL as the OFR increases at rates beyond 1000 gpd/ff. The TSS concentration is less predictable due to the potential to wash previously settled solids from the primary clarifiers during short-term diurnal peak flows. Based on this analysis, it would be acceptable to increase the design criteria for maximum month flow rate to 1400 gpdlft2. This increased OFR will not have an effect on the concentrations of effluent BODs and TSS, based on the historical data. A critical parameter for determining the capacity of the primary process is the peak hour OFR. The historical data shows the concentration of effluent BODs and TSS is more dependent on the influent concentration than it is the OFR. When the plant has experienced extremely high flows, the influent wastewater strength is very weak, providing lower concentrations of BODs and TSS concentrations than during lower flows. In this specific situation, it is appropriate to maximize the flow to the primary process to the greatest extent possible. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3-7 Bremerton WWTP Section 3 - Capacity Evaluation i I, Ii The primary clarifiers have a maximum month capacity of 14.1-mgd. Table 3-7 summarizes the rerated design criteria and the related process parameters for the primary treatment process. A review of the sludge pumping equipment was performed. There is no process limitation for this equipment at the rerated capacity. I i I I Maximum Month Peak Hour - 30 mgd 30 57 57 2984 - 35 mgd 35 49 49 3482 - 40 mgd 40 43 43 3979 1) Peak Hour BODs and TSS Concentrations based on Average Annual Loads Table 3-7 City of Bremerton WWTP Primary Rerated Capacity Influent Characteristics Flow BODs TSS (mgd) (mg/L) (mg/L) 14.1 131 146 Surface Overflow Rate (gpd/fr) 1412 Detention Time (hrs) 1.4 0.60 0.52 0.45 Secondary Treatment The secondary treatment process is a biofilter-activated sludge process. This process consists of a biotower followed by an activated sludge treatment system. The biotower removes soluble BODs through a fixed film treatment system. The remaining BODs, TSS and sloughed biomass are then treated in the activated sludge system. The biotower has recently been covered to eliminate the potential for odors from the system. The covered tower allows for the increased loading ofthe system without odors as a limitation. The capacity of the secondary treatment system was determined for operation with and without the biofilter. The capacity was determined based on the revised influent wastewater characteristics and the variables observed in the evaluation of the historical performance summarized in Section 2. This information was reviewed and modeled to determine the rerated secondary capacity. Secondary Treatment Capacity Model A biofilter-activated sludge model was developed to assist in the determination of the capacity and solids production for the system. The Biofilter Model is based on the Veltz equation. The Activated Sludge Model uses Monad Kinetics 1 for organic matter removal and nitrification. The basis of the model is similar to the IA WPRC Activated Sludge Model No. 1 outlined in the EP A Nitrogen Control Manual2. The clarifier settling model is based on the SVI settling relationships developed by Daigger and Roper as recommended by DOE in the Orange Book. Each of the models is interlinked to estimate the effluent BODs, nitrogen compounds, phosphorus removal and waste sludge production. l WEF MOP 8, Design of Municipal Wastewater Treatment Plants, 1998 2FPA MflTI11f11 NitTol1p.n rontTol RPA-n?'i--(n.OlO S~.ptp.mhp.T lqq1 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3-8 Bremerton WWTP Section 3 - Capacity Evaluation "I I Any model is only as good as the wastewater characteristics and process variables that are used as input. A careful evaluation of wastewater characteristics was performed to develop representative input for the model. Wastewater Characteristics The wastewater must be characterized into various fractions of its organic and TSS components to be evaluated in the model. The wastewater characteristics that were determined for each of the loading conditions were developed in Section I. There are some characteristics that could not be determined from the historical data. These values were assumed at values based on a "typical textbook" municipal wastewater. Use of these values will provide the accuracy desired in this analysis, but it may be worthwhile to refine the values if a more detailed modeling effort is desired in the future. Table 3-8 shows values of wastewater characteristics that were assumed in this evaluation. Table 3-8 City of Bremerton WWTP Assumed Wastewater Characteristics Used in Model Characteristic I Value I Units. Organic Characteristics Ratio of Ultimate 800/8005 1.5 Nonbiodegradable TKN 4 % of Inf. TKN Nonbiodegradable SCOD 12.5 % of Inf. SCOD TSS Characteristics Volatile Fraction 861 % Nonbiodegradable Fraction of VSS 20 % Volatile Fraction of Nonbiodegradable TSS 90 % COONSS Ratio 1.42 N-Content of VSS 8 % of VSS P-Content of VSS 1 % of VSS lVolatile fraction based on % Volatile of primary sludge , \ I Model Kinetic Constants - ! I , I The activated sludge model is based on the growth rates of heterotrophic and nitrifying bacteria to determine sludge age, MLSS concentrations and oxygen requirements. A detailed analysis to determine these growth rates was not performed for this evaluation. Growth rates for a "typical" activated sludge system were used and the model dynamics were checked against existing operating condtions. The values used in this analysis are shown in Table 3-9. Table 3-9 City of Bremerton WWTP Kinetic Coefficients Used in Activated Slud e Model Characteristic Value Units Heterotroph Growth Coefficients Ilm20 10 day"l e 1.035 Ks 50 mg/L Yo 0.73 mg TSS/m~ 8005 ~ 0.06 day" Nitrification Growth Coefficients 0.47 0.098 0.15 0.05 !In en Yn Kd da{l mg TSS/mg N03 day"l Camp Dresser & McKee, Ine. In Association with Richwine Environmental, Inc. Page 3-9 Bremerton WWTP Section 3 . Capacity Evaluation I ,! ! Clarifier Settlinl! Model The clarifier-settling model used in this analysis is based on the SVI settling relationships developed by Daigger and Roper. The model calculates and plots a maximum solids loading rate for the specific return sludge flow, MLSS concentration, and SVI conditions. The algorithm used in this model does not predict a TSS concentration in the secondary effluent. This value must be estimated and entered as a data input. The model provides a graphic of the solids loading-SVI relationship for the specific conditions being analyzed by the model. Figure 3-1 shows a sample of the secondary clarifier solids loading diagram. The diagram shows graphically that the solids loading to the secondary clarifier is adequate as long as the solids loading rate and underflow solids concentrations meet at a point on the loading line below the SVI curve. The point at which the loading line intersects the SVI curve is the secondary clarifier capacity for the given condition. Figure 3.1 City of Bremerton Secondary Clarifier Solids Loading Diagram 50 oJ = I:l::: on 20 .5 "" "' Q ....I ., :2 10 '0 <'n , I .: I Area = 19,007 SqFt ; .......... Inf= 12.5 mgd I RAS= 6.3 mgd~! MLSS = 3,174 mgl L I I I I .~i I ; ......1..'.. 'i~2~.11_ --;--; I/~ Ii ......; .~... ....1.....1 ,......1.1. Li.. 329 gpd/ SqFt. i ;.:" r , , , , : .+~I"F!~'~;':":!"" .....:.:~;..:.~:r..~;.... .+::F::;..+..:'" .~:I~:.+I ...=SVI' 175lm:u.;~ .~ ., ~ 40 "" ...' It .... .Q =:. 30 C! ~ "II o ..... .~ ....... r ,- .... ..._L""h.J.___.._". .L_. _.1 i , , i , I ..:L:l::~::. :t::- , I I ..._{-~ o 2 4 6 8 10 12 14 16 Underflow Solids Concentration, C. [gI L] = ~(I+l/ R) Secondary Process Capacity Determination The design flows are obtained by entering the specific influent BODs and TSS concentrations for the desired treatment condition. The model then develops a table of flows and loads at O.l-mgd increments. The design capacity is selected at a point when one of the performance parameters reaches a predetermined limitation. The limitations used in this analysis were clarifier solids loading as determined by the SVI settling model, a daily average secondary Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3-10 Bremerton WWTP Section 3 ~ Capacity Evaluation clarifier overflow rate of750 gpd/ft2, aeration basin detention time and aeration basin organic loading. A diurnal peaking factor of 1.3 was used in the analysis. ;-1 ! I The maximum month aeration basin oxygen transfer capability of 8640 lbs.lday, as defined in the original design documents was not used a limiting variable. A more thorough analysis ofthe oxygen transfer capability is required and beyond the scope of this project. It was assumed in this evaluation that the oxygen transfer capability would be upgraded to meet the oxygen transfer requirements necessary for the capacity of the rerated system, if necessary. .; i i A design value was developed for average and maximum month load conditions for each of the three loading conditions: average annual, dry season and wet season. The model also evaluated capacities at SVIs of200 and 175. A follow-up discussion with City staff on the differences associated with modeling under the different SVI conditions determined that an SVI of 175 provided a desirable safety factor. An SVI of 175 was used for the determining design flows. Table 3-10 is a summary of the input parameters and model results for each of the conditions. Capacities for the activated sludge system operating as a separate system were also developed. An SVI of 200 was used in determining the capacity of the activated sludge system. -I Table 3-10 I , City Bremerton WWTP Secondary Treatment Capacity Analysis Alternative Results Influent Characteristics Design Capacity 8005 TSS Temp SVI Biofilter Activated Sludge (mg/L) (mg/L) DegC Activated Sludge Only Design Max Month 215 268 16 200 10.2 7.3 Average Annual - Average 141 140 18 200 14.2 9.3 141 140 18 175 14.2 10.1 - Max Month 165 174 18 200 12.9 8.1 165 174 18 175 13.7 8.7 Dry Season ~ Average 193 188 18 200 11.5 7.9 193 188 18 175 12.3 8.5 - Max Month 224 227 18 200 10.2 6.9 224 227 18 175 10.9 7.5 Wet Season - Average 118 120 16 200 14.2 11.6 118 120 16 175 14.2 12.5 - Max Month 131 146 16 200 14.2 10.5 131 146 16 175 14.2 11.3 Peak Hydraulic 22.8 22.8 Camp Dresser & McKee, Inc. '" Association with Richwine Environmental, Inc. Page 3.11 Bremerton WWTP Section 3 - Capacity Evaluation The average annual flow and the wet season maximum month capacity of the secondary system were determined to be 14.2-mgd. The flow capacity is limited by the daily average OFR criteria of the secondary clarifiers of750 gpd/ft2. The maximum month dry season capacity was determined to be 13.7-mgd. This was based on the organic loading capacity of the system based on the mixed liquor suspended solids required and the limiting SLR on the secondary clarifiers at an SVI of 175 mVg. The peak flow capacity of the secondary system was determined to be 22.8-mgd based on the DOE Orange Book criteria fot secondary clarifier OFR of 1200 gpd/ff. This capacity limit was verified in the evaluation of historical operating data summarized in Section 2. Disinfection The disinfection system uses sodium hypochlorite for disinfection and sodium bisulfite for dechlorination. The design of a disinfection system is based on the chlorine dosage, contact time and required bacterial kill rate. The permit requirement for discharge requires that the process provide disinfection to a point below 200-colonies/1 00 ml on a monthly geometric mean. An assumed dosage of 4 mg/L under average flow conditions and 10 mg/L under peak flow conditions was used to determine the disinfection process capacity. The average dosage of 4 mg/L was used because it was the original design value. The dosage was increased incrementally at higher flow rates to provide for acceptable disinfection at lower detention times. The system capacity was developed using the contact time as the primary variable. This was done because it is the most difficult variable to change. If additional dosage is required, a larger feed pump can be installed fairly easily. This is not the case with adding an additional chlorine contact basin. With dechlorination, a higher chlorine dosage can be applied, allowing for the use of less contact time. This process logic will require the use of more sodium bisulfite, but will maximize the capacity ofthe existing tankage. For this analysis, a minimum contact time of 20 minutes was used to determine the capacity of the chlorination system. The capacity of the disinfection system was determined to be 30-mgd. The results of the analysis are shown on Table 3-11. Table 3.11 City of Bremerton WWTP Disinfection Process Loading Characteristics Plant Dosage Detention Flow Requirement Time (mgd) (mg/L) (Ibs./day) (min) Design Max Month 10.2 6 510 60 Plant Flow - 10 mgd - 15 mgd - 20 mgd - 30 mgd - 35 mgd - 40 mgd 10 4 334 60 15 6 750 40 20 6 1000 30 30 8 2000 20 35 10 2920 17 40 12 4000 15 Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3-12 Bremerton WWTP Section 3 - Capacity Evaluation Flotation Thickening A flotation thickener with a 500-fl? surface area is used to thicken the waste activated sludge prior to anaerobic digestion. The system was originally designed to thicken at a loading rate of2Ibs/hr/ft2. Using this same loading criteria and the waste activated sludge production determined in the solids balance and verified in the secondary treatment capacity models, the capacity of the flotation thickener was determined. A 20-hour per day operation of the thickener was assumed. The greatest secondary sludge production occurs in the dry season based on the solids balance work that has been done. Based on this sludge production of 1193 lbs/day, the relative maximum month plant hydraulic capacity of the flotation thickener based on secondary sludge production, is l6.7-mgd. Gravity Thickening ~1 I The gravity thickening process is used to thicken the primary solids for the treatment plant. The primary sludge is pumped continuously as a thin sludge from the primary clarifiers directly to the gravity thickener. The thickened sludge is pumped on a timed basis from the thickener to the anaerobic digester. 7 '1. i ! A gravity thickener is designed based on solids loading rate. The gravity thickening process was originally designed at a loading rate of 10.2 lbs/day/:tt2 and a maximum month loading of 20.3 lbs/day/ff. The WEF Manual of Practice No.8 states that a solids loading rate for a gravity thickener thickening primary solids only can be loaded from 20-30 lbs/day/ft2. A value of 24 Ibs/day/ft2 will be used to determine the existing thickener capacity. This value was selected to ensure that conservative estimates of capacity are provided for the solids handling systems. . The highest primary sludge production was determined to occur in the dry season based on the solids balance work that was done. Based on the sludge production of IllS lbs/day, the relative maximum month plant hydraulic capacity of the gravity thickener based on primary sludge production is 15.2-mgd. Anaerobic Digestion The treatment plant currently has two anaerobic digesters that can be operated in parallel as primary digesters. The design criteria for the original treatment plant used a maximum month VS loading of 0.21 lbs VS/ft3/day. The EP A 503 regulations require a minimum IS-days detention time to meet the requirements for Class B biosolids required for land application under the City's present land application program. The primary and secondary sludge productions were developed in the solids balance. The primary sludge was assumed to be 70% volatile and the secondary sludge was assumed to be 80% volatile, as per the original design criteria. These sludge productions relate to a Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3.13 Bremerton WWTP Section 3 . Capacity Evaluation maximum month dry season relative hydraulic capacity for the digesters of 12.7-mgd and the maximum month wet season relative hydraulic capacity of 18.4-mgd. i I I The volume of primary and secondary sludges produced was also determined in the solids balance. A thickened waste activated sludge (WAS) concentration of 4% TS and a primary sludge concentration of 5% TS have been confirmed with actual operating data lUlder current operating conditions. The use of a coagulant will optimize WAS thickening, hence a thickened WAS concentration of 4.5 was assumed. These sludge volumes relate to a maximum month dry season relative hydraulic capacity of the digesters of 9.3-mgd and a maximum month wet season relative hydraulic capacity of 14.9-mgd. The actual maximum month capacity of the anaerobic digestion process based on the design maximum month hydraulic capacity of the treatment plant is 14.9-mgd. This is based on the capability of the process to meet Class B requirements for land application based on the BODs and TSS loads and sludge productions that will occur at 14.9-rrigd. TREATMENT PLANT CAPACITY The capacity of the treatment plant is determined by evaluating the capacity of each unit process and then establishing the plant capacity as the capacity of the limiting unit process. All capacities have been standardized to a hydraulic capacity in the previous sections, even though the limiting condition may not be based on the hydraulic capacity. For example, if the limiting condition is based on BODs loading, the capacity at which the BODs loading becomes limiting is used as the limiting hydraulic capacity. Each of the unit process capacities has been summarized in Table 3-12. The limiting unit process capacity is the capacity of the primary treatment process. The process is limited by the average day overflow rate. Using an overflow rate of l400 gpd/ft2, the capacity is 14.1-mgd. The DOE Orange Book criterion for the daily overflow rate for primary clarifiers is 1200 gpd/ft2. Historical data has shown that the effluent BODs and TSS concentrations do not increase with an overflow rate of 1400 gpd/:ft? It is important to note that the peak secondary capacity is 22.8-mgd. This is based on the design criteria outlined in the DOE Orange Book specifying a peak instantaneous overflow rate to the secondary clarifiers of 1200 gpd/ft2. Historical records have demonstrated that the treatment plant cannot produce the required effluent quality when this parameter is exceeded. For this reason, the treatment plant should restrict the flow to the secondary system to a peak instantaneous flow of 22. 8-mgd and provide primary treatment only to any flows greater than that amount. The historical records show that the primary effluent is very dilute at flow rates greater than 22.8-mgd and blending of the secondary and primary effluents prior to disinfection will provide a plant effluent within the permit parameters for BODs and TSS concentration and mass. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3.14 Bremerton WWTP Section 3 - Capacity Evaluation Table 3-12 City of Bremerton WWTP Unit Process Capacity Analysis Rated Capacity Unit Process Maximum Month Limiting Units Flow Condition (mgd) Screening 30 Screen Capacity mgd Grit Removal 30 Hydraulic mgd Capacity Primary Treatment 14.1 Overflow Rate gpd/fe Secondary 14.2 Sec Clarifier gpd/fe Treatment OFR "I Disinfection 30 Basin hrs " I DT Gravity Thickening 15.2 Solids Ibs/day/fe , J Loading Solids Flotation Thickening 16.7 Ibs/day/ft2 Loading 'j Anaerobic Digestion 14.9 Hydraulic days DT 1 " i Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 3-15 Bremerton WWTP Section 4 -WWTP Rerating , ! INTRODUCTION .-1 . ! I " I I The City of Bremerton's WWTP was originally designed for a maximum month flow rate of 10.1-mgd. This flow was based on influent waste load criteria that were assumed by the designers based on historical flows and loads that entered the previous primary treatment plant. Since.startup of the current treatment plant in 1986, the service area demographics and wastewater characteristics have changed from those that were anticipated with the original design. ," f I ; The capacity of the treatment plant is based on the characteristics of the flows and loads that it receives. The City's treatment plant is unique in that it receives flows from the combined sewer system resulting in increased wintertime flows and high peaking factors. This results in a more dilute wastewater, which changes the capacity characteristics of the treatment plant. r '{ I I The treatment plant was designed for a maximum month influent flow of 10.1-mgd at a BODs concentration of215 mglL and a TSSconcentration of268 mgIL. These wastewater concentrations are comparable to the concentration received at the treatment plant during the dry season. The maximum month flow actually occurs during the wet season. A detailed analysis of the plant flows and loads for the period between 1997 - 2000 show that the actual BODs and TSS concentrations are 131 mglL and 146 mglL, respectively at the maximum month flow. Therefore, the treatment plant needs to be rerated to provide a revised plant capacity under the actual maximum month wastewater characteristics. I I . I DOE RERA TING PROCEDURE The Washington Department of Ecology (DOE) outlines in the Criteria for Sewage Works Design (Orange Book) the requirements for rerating of a municipal wastewater treatment plant. Section GI-5.4.2.A defines two methods for rerating a facility. These are the Standard Facility Rerating and the Nonstandard Facility Rerating. The difference in the two is that the standard rating is performed using Orange Book standards or other generally accepted manuals of practice. The nonstandard rating is done using methodology or criteria outside of the criteria set forth in the Orange Book. The City desires to rerate the treatment plant under the Standard Facility Rerating classification. DOE has specified some specific requirements for the gathering and submission of process data. These are: · The evaluation must be done under the guidance of a registered professional engineer experienced in sanitary engineering · The data used in the evaluation must be based on the full-scale operation of the facility treating a sewage that is representative of the waste to be treated · The evaluation period must be for a period of at least 12 months and must include both wet and dry weather performance · The data must demonstrate treatment plant performance under maximum and minimum design conditions. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 4-1 Bremerton WWTP Section 4 -WWTP Rerating This rerating study was done using the design criteria specified in the Orange Book and is based on operating data that has been collected over the past four years, as a minimum. Over this period, the treatment plant demonstrated the ability to effectively treat a wide range in flows. A registered professional engineer has done the data analysis and treatment plant rerating. A summary of this data evaluation was discussed in Sections 1 and 2. RERATING RESULTS The capacity of the treatment plant is defined in the NPDES permit 0N A-002989) ata maximum month flow of 10.I-mgd. The historical waste strength is weaker under the maximum month flow conditions than the treatment plant was designed for. The actual capacity of the treatment plant is a maximum month average daily flow of 14.I-mgd based on the limiting unit process capacity of the primary treatment process. This is based on a maximum daily primary clarifier overflow rate of 1400 gpd/ft . This value is higher than the Orange Book standard of 1200 gpd/ft2, but was selected based on the historical performance of the system. Another critical design criterion that must be considered is the maximum hydraulic flow that can be sent to the secondary process. The maximum daily secondary flow that can be adequately treated is 22.8-mgd. This is based on the peak secondary clarifier overflow rate of 1200 gpd/ft2. This criteria is based on the design standard specified in the Orange Book and was confirmed with historical operating data. On each of the occurrences that the permit limits were exceeded, this design criterion was also exceeded. The treatment plant receives flows greater than 22.8-mgd on diurnal flow peaks and on rare occasions as a daily average flow. During these periods, the influent wastewater is dilute resulting in primary effluent BODs and TSS concentrations in the range of 50 - 75 mglL. Forcing these high flows to the secondary system degrades the effluent quality by flushing solids from the secondary clarifiers. The best alternative that will produce the best effluent quality is to maximize the flow to the secondary system to 22.8-mgd and blend the primary effluent flows greater than 22.8-mgd with the secondary effluent prior to disinfection. The treatment plant currently has the capability to provide this blended effluent. This process alternative will provide the highest quality effluent and will meet the effluent discharge standards specified in the NPDES permit. Camp Dresser & McKee, Inc. In Association with Richwine Environmental, Inc. Page 4-2 '1 . f LJ 01 J I ,.J j L1 dlx ~ ~ .......... Appendix E Mixing Zone Study COM P:\Bremerton\Comp pran\Amendment\7PROJDOC\DRAFT AFTER JUNE 2005 Bremerton Westside WWTP Mixing Zone Study Prepared for: Camp Dresser & McKee, Inc. P.O. Box 3885 Bellevue, Washington 98009-3885. Prepared by: Cosmopolitan Engjneerin~ Group 117 South 8 Street Tacoma, Washington 98402 February 2002 CDM003 APPENDIX A MIXING ZONE STUDY TABLE OF CONTENTS Page S ECTIO N 1: PURPOSE .................... ........................................ .................................................. 1 SECTION 2: DISCHARGE DES CRlPTION ............................................................................ 2 2.1 Outfall Description.......................... ................................. ............................................ ..2 2.2 Outfall Inspection.................................................................................... .......................2 2.3 Effluent Flow.................................................................................................................3 2.4 Effluent Quality............................................................................................. ............. ...3 2.4.1 Concentration Data............................. .,'.......................... ............ ...... ....... .... ..... 3 2.4.2 Whole Effluent Toxicity.................... ...... ....................... ......................... ......... 4 SECTION 3: WATER AND SEDIMENT QUALITY STANDARDS ..................................... 5 3.1 Characteristic Uses.............................................................. .......... .................................5 3 .2 Water Quality Criteria.................. .................................... ..... .................................. .......5 3.3 Mixing Zones.......................................................................................................... .......5 3.4 Sediment Management Standards ..................................................................................6 SECTION 4: RECEIVING WATER CONDITIONS ............................................................... 7 4.1 Water Quality................................. ..................................... ........ ......... ..........................7 4.2 Sediment Quality......................... ......................... ....... ....... ........ ................................... 7 4.3 Current Speed........................................................ ........................... ..............................8 4.4 Conductivity, Temperature, and Depth Profiles ............................................................9 SECTION 5: DILUTION MODELING ................................................................................... 11 5.1 Model Description... ..................... ................................. .......................... .... ............... .11 5.2 . Model Results .................................. ......... ....................................... ............. ............. ..11 SECTION 6: WATER QUALITY ANALySIS....................................................................... 13 6.l Compliance with Water Quality Standards at the Mixing Zone Boundaries............... 13 6.1.1 Reasonable Potential to Exceed Standards ...................................................,. 13 6.l.2 Chlorine Limit. ......... ............................ ..................................... ....... ............... 13 6.2 BOD, Ammonia, and Nitrogen ..... ........................ .............. ........................... .......... ....15 6.3 Sediment Impacts................................................. .... ................................................ ....15 SECTI ON 7: CON CL USI 0 NS .................................................................................................. 17 SECTION 8: REFEREN CES .............................................................................................. ...... 18 BremertOll Wests ide WWTP Mixing Zone Study CDM003 February 2002 LIST OF TABLES Table 1 Table 2 Table 3 Table 4 Table 5 Page Effluent Flow Projections... ....... .......... .... ....: ..... ......... .......... ............ ......... ......... .... .......3 Effluent Toxicity Data Summary (l996-200 1) ................. .... ......... ..... ...........................4 Current Speeds for Dilution Modeling................................... ..................................... ..9 Summary of Dilution Model Runs............................................. .................................. I ] Reasonable Potential to Exceed Water Quality Standards ..........................................14 LIST OF ATTACHMENTS Attachment A: Outfall Drawing Attachment B: Effluent Data 1996-2001 Attachment C: 10/1/01 Drogue Study Data Attachment D: Dilution Model Output Attachment E: Water Quality Worksheets Bremerlon WeSlside WWTP Mixing Zone Study ii CDM003 Febrnary 2002 SECTION 1: PURPOSE C'j I I The last mixing zone study for the City of Bremerton Westside WWTP outfall into Sinclair Inlet was conducted by CH2M Hill in 1992. The study established acute and chronic dilution factors of 25: 1 and 69: l, respectively. These dilution factors were used by Ecology for the current NPDES permit issued in 1996. Ecology's Fact Sheet for the 1996 permit determined that there was no reasonable potential to exceed water quality standards except for chlorine. Therefore, the current NPDES permit includes a water quality-based effluent limit for chlorine only. The purpose of this appendix is to update the mixing zone study for effluent flows projected after construction of the proposed high rate clarification (HRC) facilities. The results of this study will be used by Ecology to establish effluent limitations for the next renewal ofthe NPDES permit. Bremenon Westside WWTP Mixing Zone Study J CDM003 February 2002 SECTION 2: DISCHARGE DESCRIPTION 2.1 OUTFALL DESCRIPTION The Bremerton Westside WWTP outfall is 568 feet long, 36 inches in diameter and terminates at a depth of approximately -30 feet Mean Lower Low Water (MLLW) datum into Sinclair Inlet at a location west of the Bremerton Naval Shipyard. The terminal portion of the outfall consists of a 20-port diffuser with 6~-inch diameter openings at 6-foot spacing. The diffuser ports discharge horizontally in alternating directions at a depth of -29 feet MLL W. Outfall construction drawings by KCM from 1971 are included in Attachment A. 2.2 OUTFALL INSPECTION Two certified divers and licensed professional engineers visually inspected the existing outfall and diffuser on October l, 2001. The outfall pipeline, diff1,tser and joints were found generally as shown in the outfall drawings. Soils surrounding the pipeline consist of fine-grain mud. No bedding or armoring materials were observed. The mud line along the diffuser varies from about 1 foot below the springline to the springline. All 20 ports were flowing fully with no obstructions or structural damage to the diffuser. Ports are at about the 2 and 10 o'clock positions on alternating sides of the pipe, discharging horizontally per the drawings. There was considerable biological growth on the concrete surface, consisting of tube worms, nudibranchs, stars, a few rock and spider crabs, and many shrimp. There was a large accumulation oftubewonns around the perimeter of the ports, which was not inhibiting flow. There was a slight decrease in the flow from the inboard ports to the last ports, which is typical of marine diffusers. The holddown chains were at an advanced state of corrosion. However, these were probably for construction and do not appear to have any current structural purpose. The pipe joints are fully restrained with stainless steel lugs and harnesses. The stainless steel lugs, threaded tie-rods and nuts are all intact. The Carnegie ioints are all intact above the mudline. Bremerton Westside WWTP Mixing Zone Study 2 CDM003 February 2002 There was some siltation inside the diffuser, particularly toward the middle and offshore end. This material was fine grained and filled the pipe up to an estimated 40 percent of the pipe diameter in places. It is not known how far back up the outfall might be subjected to siltation. A hydraulic test of the head loss in the pipeline and diffuser is recommended. 2.3 EFFLUENT FLOW Effluent flow criteria to be used in the mixing zone analysis are specified in Ecology's Permit Writer's Manual (Ecology, 1994). . For the acute mixing zone, the critical condition is defined as the highest daily maximum plant effluent flow. . For the chronic mixing zone, the critical condition is defined as the highest monthly average plant effluent flow. Construction of the proposed wet weather facilities at the Westside WWTP will significantly increase peak flow rates. CSOs previously discharged at remote outfalls will be discharged through the Westside WWTP outfall in the future. Dry weather flows will not be affected. The effluent flow proj ections are shown in Table I. Table 1 Effluent Flow Projections '::';.:~>:=~' ::~ . ." . . . .';'.: .: ;".i...:i ~:::' ..~ ,:-h ,......~.~M~,tjP~"!\i"~'.[ Wet Weather Dry Weather 20 5 50 10 2.4 EFFLUENT QUALITY 2.4.1 Concentration Data Chlorine, ammonia and metals effluent data are available from 1996 through 2000. Chlorine residual is sampled daily, ammonia weekly and metals approximately bi-monthly. Effluent data sheets are included in Attachment B. The statistical distributions of effluent data used in the water qualIty analysis per Ecology protocol are provided in Table Z. Bremerton Westside WWTP Mixing Zone Study 3 CDM003 Febmary 2002 Table 2 Effluent Toxicity Data Summary (1996-2001) Parameter. .. #~am~le~, . '.Mean ...... .95iI!P~tceIltil~'. Chlorine, mglL 69 0.044 0.130 0.069 Ammonia-N, mg/L 248 16.3 39.0 30.5 Mercury, flg/L 29 0.2 0.2 Arsenic, flg/L 29 1.6 3.3 3.0 Cadmil.U1l, flglL 29 0.8 0.8 . "\ Chromium, Ilg/L 29 6.6 78 8.6 ! Copper, IlglL 29 5.6 20.5 15.4 1 Lead, flglL 29 20 20 Nickel, flglL 29 9.7 20 20 Zinc, flgIL 29 33 190 91 Cyanide, flg/L 29 5.5 13 8.8 2.4.2 Whole Effluent Toxicity Acute whole effluent toxicity has been tested six times since 1996. The LC50 has exceeded 100 percent effluent in all tests on both daphnia and fathead minnows. The NOEC has been 100 percent effluent in each test and mortality in 100 percent effluent has not exceeded 7 percent in anyone test. Based on past performance, there is no reason to expect that there will be any problem with acute whole effluent toxicity after the proposed wet weather facilities are completed. However, since the city's effluent has failed the acute screening test, the permit will include an acute WET limit. Chronic whole effluent toxicity was tested twice in 2001 to support the NPDES permit renewal application. The LC50 for both test species exceeded 100 percent effluent. The NOEC was 50 percent effluent for the Mysid shrimp survival and 25 percent for growth. The CCEC is on the order of I percent effluent, so there is no chronic toxicity problem with the current discharge. Based on past performance, there is no reason to expect that there will be any problem with chronic whole effluent toxicity after the proposed wet weather facilities are completed. Bremerlon Weslside WWTP Mixing Zone Study 4 CDM003 February 2002 SECTION 3: WATER AND SEDIMENT QUALITY STANDARDS 3.1 CHARACTERISTIC USES Sinclair Inlet is a shallow bay approximately 3/4 mile wide and 5 miles long. MLL W depth varies from 20 to 25 feet at the west end to over 50 feet at the east end of the inlet. Class AA (extraordinary) receiving water quality standards in WAC 173-201A apply to Sinclair Inlet. Characteristic uses protected under this classification include: . Fish migration . Fish and shellfish rearing, spawning, and harvesting · Wildlife habitat . Primary contact recreation (swimming, skiing, diving, etc.) . Sport fishing · Boating and aesthetic enjoyment · Commerce and navigation 3.2 WATER QUALITY CRITERIA Numerical criteria for conventional pollutants and toxicants are provided in WAC l73-201A-060 and -070. The numerical criteria are listed in tables later in this appendix. 3.3 MIXING ZONES Mixing zones have been authorized by Ecology in the NPDES permit for the Westside WWTP. The state water quality standards (WAC 173-20IA) allow Ecology to establish these zones around discharges in determining water quality-based effluent treatment requirements. Both acute and chronic mixing zones are authorized for toxicants in the wastewater effluent. The concentrations of these toxicants may not exceed water quality standards outside of these mixing zones. The dimensions ofthe authorized mixing zones are as follows: · The boundary of the chronic mixing-zone is a horizontal distance <1f200 feet J1lu~ the aCp~}-od'o~~"ha....~b-~~ -~""n<:Lt-1ufLLUL,",~;_~+~1. ,'"l'"l(L~L"'lQ~~ ro-:r V'V"""~\FY.~.[ U-~};.R:JA~l"-"'''''''' _.. J;T;J;:J:JLJ rr, Qr-""'t'1-'.l.v.n.J.l.l,.1.U.",",,1.T;&;.--..;i.T-Tv\J~-,--u-~~ Bremerton Westside WWTP Mixing Zone Study 5 CDM003 February 2002 for the Westside WWTP outfall, as measured from any diffuser port. Chronic water quality criteria for toxicants are applied at this boundary. · The boundary of the acute mixing zone is defined as 10 percent of the distance to the applicable boundaries of the chronic mixing zone, or 22.9 feet (7.0 meters), as measured horizontally from any diffuser port. Acute water quality criteria for toxicants are applied at this boundary. · The acute and chronic mixing zone boundaries extend for the full depth of the water column. 3.4 SEDIMENT MANAGEMENT STANDARDS Marine sediment management standards are promulgated under WAC 173-204. The standards were developed by Ecology to: · Establish chemical, biological and other criteria to protect aquatic organisms and human health from sediment-borne contaminants · Facilitate source control and sediment cleanup · Allow for sediment impact zones (SIZ) in areas contaminated by historic or ongoing discharges during the period of sediment recovery or remediation. Bremerton Westside WWTP Mixing Zone Study 6 CDM003 February 2002 SECTION 4: RECEIVING WATER CONDITIONS 4.1 WATER QUALITY Water quality standards are met in Sinclair Inlet according to Ecology's biennial list of impaired water bodies prepared under Section 303(d) of the Clean Water Act. There are no water column parameters included in the current 303(d) list for Sinclair Inlet. Ecology's Sinclair Inlet Station SINOOI (Ecology, 1995) is used in conjunction with the 1992 Sinclair and Dyes Inlet Seasonal Monitoring Report (Albertson, S.L., et ai, 1995) to define critical ambient water quality, including maximum temperature, pH, and salinity used in setting acute and chronic ammonia criteria. Ambient toxicant data available from these sources include only background ammonia concentration. In 1979, scientists at the Pacific Marine Environmental Laboratory began investigating the sources, transformation, transport, and fate of pollutants in Puget Sound and its watershed under Section 202 of the Marine Protection, Research, and Sanctuaries Act of 1971 (P.L. 92-32). Background metals concentrations were measured by NOAA between 1979 and 1986 (Paulson, et aI., 1991). Ambient toxicant data used in the water quality analysis are included in tables later in this appendix. 4.2 SEDIMENT QUALITY Sinclair Inlet is 303(d) listed for 23 priority pollutants that exceed state sediment quality standards. These exceedences are generally found throughout Sinclair Inlet, but are greatest in number and magnitude near the Puget Sound Naval Shipyard. Bremerton completed a sediment sampling program and data report consisting of 10 sampling stations near the Westside outfall (Beak, 1998). Ecology reviewed the data and issued an interdepartmental memorandum of their conclusions (memo from Brett Betts to Mike Dawda dated June 1, 2000). The conclusions of Ecology's Sediment Management Unit include the followinK: Bremertol1 Westside WWTP Mixing Zone Study 7 CDM003 Febntary 2002 . The Westside outfall appears to be having an impact on nearby sediments from emichment of volatile solids and ammonia in the sediments · Failure of both amphipod and echinoderm sediment bioassays appears to be correlated to the unusually high ammonia in the sediments · Phlalates and mercury are at concentrations above the sediment quality standards, but may be due to other sources in Sinclair Inlet. Mr. Betts recommends in the June 2000 memo that the City of Bremerton submit an application for a sediment impact zone (SIZ) for the Westside outfall. Additional sediment and effluent sampling and modeling are recommended to proceed with sediment recovery. The City has initiated the process of applying for a SIZ and collecting additional data. The Navy is in the process of developing a TMDL model for cleanup or recovery of sediments in Sinclair Inlet. Ecology has been providing oversight in the development of this model. The model is expected to define the source control actions necessary to support recovery and prevent recontamination of the sediments after remediation. Therefore, it is not possible to predict at this time what final source control actions will be required for the Wests ide WWTP discharge. Ecology has established a policy for evaluating wastewater improvement projects that discharge to 303(d) listed waters during the period when the TMDL is in development, such as currently in Sinclair Inlet. In these cases, Ecology can only permit treatment facility improvements that do not increase the mass discharge oflisted pollutants (Ecology 200l). Furthermore, permit limits associated with such approvals are considered interim limits, which are subject to revision by the TMDL when completed. 4.3 CURRENT SPEED Ecology protocol requires that mixing zone modeling be representative of a range of tidal current speeds measured at the site. CH2M.Hill conducted their I 992 modeling at assumed current speeds of zero and four cm/sec, which were arbitrarily selected. However, Ecology (1994 and 1998) now require that currents be measured over at least one tidal cycle. The loth a:nd51Qth percentile current speeds must be used for acute modeling, and median current speed for chronic. Bremerton Westside WWTP Mixing Zone Study 8 CDM003 February 2002 Tidal currents at the Westside outfall are small compared to most other outfall locations in Puget Sound. Currents are listed in NOAA current tables as "weak and variable." Savonius rotor-type current meters (Aanderaa and Magnusyn) are not able to detect and measure currents as small as occur in Sinclair Inlet. For this study, currents were measured through the use of drogues (current drifters) released at approximately 90-minute intervals over one tide cycle on October 1, 2001. Tides were moderate, consisting of an 8.2-foot ebb followed by a 9.5-foot flood. The tidal currents were generally perpendicular to the diffuser. That is, ebb currents carried the drogues northeast toward the mouth, and flood tides carried the drogues southwest toward the head of Sinclair Inlet. Drogue data are presented in Attachment C. The current speeds used in the mixing zone modeling are presented in Table 3. Table 3 Current Speeds for Dilution Modeling " "."~~t,,~~!!'i~,/:;:(;.::...';';:!):.:j::1L[;f:i~:\;'.\' I.M::,! ':::.:!:~~W~~ii~:s~~'~~}:~mt~~~~:",:::;i~;'J[,::, 10 1.3 50 3A 90 4.8 4.4 CONDUCTIVITY, TEMPERATURE, AND DEPTH PROFILES Conductivity, temperature, and depth (CTD) profiles are necessary to run the mixing zone models. Previous mixing zone studies including the 1992 CH2M Hill study have used historical CTD data from the University of Washington. No profiles have ever been measured in the immediate vicinity of the Westside outfalll. Therefore, CTD casts were obtained concurrently with the drogue data on October 1, 2001. Six CTD casts were obtained at approximately 90- minute intervals on October I, 2001, using a SeaBird Model SBE-19DO. The casts were conducted approximately 80 yards offshore of the end of the diffuser. I In their review of an initial draft of this report, Ecology noted that there is long-term CTD monitoring at Station SINOO I, which is approximately one mile southeast of the Westside WWTP outfall. Model runs by Ecology with pmffies- represerrrirrg rrmxirrn:mrand- minimum stratification did not produce dilution factors significantly different than..iaJhi" r..nnrt . Bremerton Westside WWTP Mixing Zone Study 9 CDM003 February 2002 Eight CTD profiles were used in the dilution modeling: the six profiles measured October 1 plus two historical profiles from the UW data. The CH2M Hill 1992 mixing zone study evaluated dilution for 50 CTD profiles by UW between 1971 and 1975. They concluded that the maximum and minimum stratification profiles were 4114/71-0842 and 9/3/75-1700, respectively. These two CTD profiles reflecting maximum and minimum stratification are also modeled in this study. The six profiles measured in October 2001 and the two UW profiles are included with the modeling results. BrelllertOtl Westside WWTP Mixing Zone Study 10 CDM003 Febnwry 2002 SECTION 5: DILUTION MODELING 5.1 MODEL DESCRIPTION CH2M Hill used the UDKHDEN in the 1992 study. UDKHDEN is well suited to the buoyant nearfield mixing. However, it does not include a link to a farfield model. Therefore, the EP A computer model PLUMES (Baumgartner, 1993) is used to predict acute and chronic dilution factors. PLUMES is an interface linking the near-field model UM (Updated UMERGE) with a far-field module based on Brooks Equation (Fischer, 1979). PLUMES is ideally suited for buoyant discharges, and is the most commonly used model for Puget Sound outfall mixing zone studies. 5.2 MODEL RESULTS Table 4 summarizes the predicted acute and chronic dilution factors for all model runs. Table 4 Summary of Dilution Model Runs ,. :"': ~ t '{::.'r:t\~:\'l':"-; .::,['1;>. ",:.-;... """, ;,': '.- : ',"~'i :. ":I~:i~;;:\'.::\<' , ...,,'\:;';):6hfqll.'.i...~..,P. ..!ll.'!.iu.,,;~.iti...':..,~:.~.:.:::: ....:,::'.....!: . .'. ../ .':'::.'...w';. [.n.~~t'.tyh.:':e[!:r'...'..,(~.)..'...'.'...::"i,';;i:;j':'::W~ii .~TPlir~~~~g\\ ....,/.,... ;;r~#~t,~~.,,:.,,!. 10/01/01-0829 186 93 53 18.0 43 17.5 10/01/01 -0944 184 93 53 18.0 43 17.5 10/01/01-1139 181 92 53 18.0 43 17.5 10/01/01-1307 180 92 53 18.0 43 17.5 10/01/01-1437 180 92 53 18.0 43 17.5 10/01/01-1609 180 92 53 18.0 43 17.5 ---------------------------..----------------- ----------------- 09/03/75-1700 175 91 52 18.0 42 17.5 04/14/71-0842 186 93 53 18.0 43 17.5 (1) 10/01l01 CTn Profiles by Cosmopolitan Engineering with Seabird SBEl9 profiler. 1971-75 profiles by UW School of Oceanography. (2) Median current speed = 3.4 em/see (3) Dry weather maximum month average daily flow = 5 mgd (4) Wet weather maximum month average daily flow = 20 mgd (5) 90th percentile current = 4.8 em/see (6) lOth percentile current = 1.3 em/see (7) Dry weather peak day flow = H} rngd (8) Wet weather peak day flow = 50 mgd Bremertan Westside WWTP Mixing Zone Study 11 CDM003 February 2002 PLUMES model output files are included in Attachment D. Results and conclusions from the modeling are provided below: . The CTD profiles are of little significance because the plume surfaces in all cases. This was confinned by visual observations of the plume at the water surface on several occasions. Maximum and minimum stratification profiles produce nearly equivalent model predictions. . The modeling confirmed that the 4/14/71-0842 CTD profile represents maximum stratification, which produces the lowest dilutions by a very small margin. Therefore, the critical acute and chronic dilution factors are based on that CTD profile. . The current speeds are so small that the difference between loth and 90th percentile conditions is not excessive. However, the dilution predictions at loth percentile current speeds are in all cases lower than 90th percentile current speeds. Therefore, the 10th percentile current cases are critical for acute dilution predictions. . The critical acute and chronic dilution factors for wet weather effluent flows are I 7.5: I and 91: I, respectively. The critical acute and chronic dilution factors for dry weather effluent flows are 42:l and 175:1, respectively. Wet weather acute dilution is less than the 1992 study results due to the higher effluent flow. Wet weather chronic dilution is higher than the 1992 study results due in part to the farfield model not available to UDKHDEN. Bremerton Westside WWTP Mixing Zone Study 12 CDM003 February 2002 SECTION 6: WATER QUALITY ANALYSIS In this section, critical acute and chronic mixing ratios are applied to effluent and ambient water quality data to assess compliance with Washington State marine water quality standards for chlorine, ammonia, and metals. The need for effluent limitations in the next NPDES pennit for these parameters is determined. Potential impacts on other receiving water and sediment quality parameters are also addressed. 6.1 COMPLIANCE WITH WATER QUALITY STANDARDS AT THE MIXING ZONE BOUNDARIES 6.1.1 Reasonable Potential to Exceed Standards Ecology (1994) and EPA (1991) have established a statistical test of the "reasonable potential to exceed water quality standards" at the acute and chronic mixing zone boundaries. Table 5 presents the "reasonable potential" analysis for the projected discharge after the proposed wet weather facilities are constructed. The table is based on the critical dilution factors, ambient conditions, and maximum effluent concentrations cited in the previous sections of this appendix. Ammonia is considered seasonally in this analysis due to the variability between wet and dry weather effluent concentrations. All of the other parameters are considered at worst-case conditions. Water quality worksheets are provided in Attachment E. Table 5 shows that there is no reasonable potential to exceed standards for any water quality parameter. Therefore, there will be no need for water quality-based effluent limitations in the next NPDES permits, according to EP A and Ecology protocol. 6.1.2 Chlorine Limit Despite the determination of no reasonable potential to exceed the water quality standards, Ecology will probably continue to include an effluent chlorine limit in future NPDES permits. They may continue the existing effluentlimits of 0.13 mg/L average monthly and 0.37 mglL maximum daily. Ifwater quality-based chlorine limits are imposed, they may be as low as 0.09 mglL monthly and 0.23 mg.IL daily, as shown in Attachment E. Bremerton Westside WWTP Mixing Zone Study 13 CDM003 February 2002 Table 5 Reasonable Potential to Exceed Water Quality Standards ;'~i!~~;I~,q::~tE:c~I~Ier:=:t:I'~;~4'::~;:'.. ' Conventional Chlorine mg/L 0 0.069 0.013 0.0075 0.0039 0.0008 No Total Ammonia mg/LasN (1) 0.05 30.5 (4) 2.86 (4) 0.43 1.79 0.38 No Total Cyanide JigIL 0 8.8 1.0 - 0.50 0.10 No Metals Arsenic Jig/L 0 3.0 69.0 36 0.17 0.03 No Cadmium Jig/L (2) 0.081 0.8 42 9.3 0.12 0.09 No Chromium (Total) Jig/L 0 8.6 1100 50 0.49 0.09 No Copper JigIL (2) 0.54 15.4 4.8 3.1 1.24 0.67 No Lead Jig/L (2) 0.12 20 210 8.1 1.20 0.33 No Mercury Jig/L 0 0.2 1.8 0.025 0.010 0.002 No Nickel Jig/L (2) 0.41 20 74 8.2 1.52 0.62 No Zinc Jig/L (2) 0.49 91 90 81 5.38 1.43 No (I) Near Bottom Dissolved Total Ammonia Concentration at Station SD-2 (Albertson, 1995) (2) Highest Dissolved Metals Concentration Station MB86- I B (Paulson et aI., 1 991) (3) Metals criteria are as dissolved metal (4) Ammonia criteria based on highest pH=8.4, temp=l 80C, and S=30 ppt from Ecology Station SINOOI (Albertson, 1995) Acute dilution factor = l7.5 Chronic Dilution Factor = 91.0 Bremerton Westside WWTP Mixing Zone Study 14 No No No No No No No No No No CDM003 February 2002 6.2 BOD, AMMONIA, AND NITROGEN Sinclair Inlet is not included on the 303(d) list for dissolved oxygen. However, there have been historic violations of the dissolved oxygen standard in Sinclair Inlet (Albertson, 1995). Ecology has notified the local WWTP operators (Bremerton, Port Orchard, and KCSD5) that they intend to conduct a model study to determine the water quality impacts of the wastewater treatment plants in Sinclair Inlet. The study is being coordinated with the Navy ENVVEST project. The \ ENVVEST study is focused on sediment cleanup. However, the Ecology study may expand to include BOD, ammonia, and nutrient (nitrogen and phosphorus) loadings and impacts on dissolved oxygen. A total maximum daily load (TMDL) of these parameters may be developed in the future. Until the TMDL is completed, Ecology has notified WWTP operators that treatment facility modifications will be required to provide treatment that results in no net increase of mass loadings for BOD, ammonia, and nitrogen. There is no scheduled date of completion for the expected TMDL study. The proposed HRC facility improvements at the Westside and Eastside WWTPs will meet Ecology's requirement for no net increase in BOD, ammonia and nitrogen. The Bremerton service area will not be expanding, so there will be no change in the dry weather loading of these parameters. There will be a net reduction in wet weather loading of these parameters, because previously untreated CSO discharges will be treated before discharge after the HRC facility improvements are completed. The projected effluent loadings before and after the HRC improvements are provided in the Facility Plan. Projected effluent limits for BOD are also provided in the Facility Plan. There are no limits expected for ammonia or total nitrogen until a TMDL is completed. 6.3 SEDIMENT IMPACTS Sediments are the primary water quality concern in Sinclair Inlet, and a sediment TMDL is in process. As stated previously, Ecology can only approve the proposed HRC improvements if they can be shown to have a neutral impact or net benefit to the marine sediments compared to existing conditions. Using TSS as a surrogate for all of the sediment toxicants, the Facility Plan has demonstrated that mass loading from the Wests ide WWTP will decrease after the proposed Brenzertoll Westside WWTP Mixing Zolle Study 15 CDM003 February 2002 wet weather facilities are constructed. Therefore, the proposed HRC facility improvements are approvable pending the TMDL. Bremerton Westside WWTP Mixing Zone Study , 16 CDM003 February 2002 SECTION 8: REFERENCES Albertson, S.L. et al. March 1995. 1992 Sinclair and Dyes Inlet Seasonal Monitoring Report. Environmental Investigations and Laboratory Services Program, Washington State Department of Ecology. Olympia, Washington. Baumgartner, DJ. Frick, W.E., Roberts, P.J.W., Bodeen, c.A. June 1993. Dilution Modelsfor Effluent Discharges, United States Environmental Protection Agency, Pacific Ecosystem Branch, ERL-N, Newport, Oregon. CH2M Hill. 1992. Evaluation of Dilution and Compliance with Water Quality Standards, revised memorandum dated October 29, 1992 and submitted to Ecology for approval, included in Ecology's NPDES permit file for the Bremerton Westside WWTP. Ecology. 1993. National Pollution Discharge Elimination System (NPDES) Permit No. WA- 002034-6, Issuance and Effective Date May 28, 1993, Washington State Department of Ecology, Olympia, Washington. Ecology. 1994. Permit Writer's Manual, Washington State Department of Ecology Pub # 92109, Amended July 1994, Olympia, Washington. Ecology. 2001. Guidance to NPDES permit writers regarding permitting of wastewater facility modifications with discharge to 303(d) listed waters, amendment to the 1994 Permit Writer's Manual, adopted July 2001. Fischer, H.B. et al. 1979. Mixing in Inland and Coastal Waters. Academic Press. San Diego, California. Kramer, Chin & Mayo, Inc. 1981. Construction Drawingsfor Wastewater Facilities Improvements, Outfall and Diffuser Details, Drawing Number 13. Bremer/on Wes/side WWTP Mixing Zone Study 18 CDM003 February 2002 " Paulson, A.J. et al. April 1991. Trace Metal and Ancillary Data in Puget Sound: August 1986. NOAA Data Report ERL PMEL-32. Pacific Marine Environmental Laboratory, Seattle, Washington. United States Environmental Protection Agency. April 1989. Ambient Water Quality Criteria for Ammonia (Saltwater), Office of Water, Washington D.C. United States Environmental Protection Agency. 1991. Technical Support Documentfor Water Quality Based Toxies Control, EPN505/2-90-001, Office of Water, Washington D.C. Bn~merton Wests ide WWTP Mixing Zone Sludy 19 CDM003 Febnlary 2002 Page 1 of 1 Van Norman, Stacey r.:-::7-==--=;:'..=~:::====--==--=-----:::===-=--=--'==--====--==-~-=====-----:::::=----=:::"==-=----=====:-7::.':::.::':::'=::'::'=-"'::=':=.==-".==':::"_-,:.:::_ =..-=:....-=::.::':.~-;:'.:;-:.., From: Bill Fox [wpf@sprynet.com] Sent: Friday, February 08, 2002 12:26 PM To: mdaw461@ecy.wa.gov Cc: John Poppe; Van Norman, Stacey; Fernbach, Edward Subject: Dilution factor for Bremerton Human Health Criteria Mike: Per your request, I ran the dilution model for effluent flow criteria applicabe to the human health criteria. I understand that you need this for your development of the NPDES permit renewal. I will also add these results and discussion to the mixing zone study that will be appended to the facility plan that eDM is preparing. The Permit Writer's Manual stipulates annual average flow for carcinogens and dry weather design flow for non- carcinogens. The previous permit human health dilution for carcinogens only was based on annual average flow of7.6 mgd. We are proposing to use an effluent flow rate of 10 mgd for the human health calculation for both carcinogens and non-carcinogens. We believe this is a very conservative estimate for both sets of criteria. I have attached the PLUMES model printout for this case using the critical em profile of April 4, 1971 (the same profile as the aquatic life cases) and median currents. The resulting dilution factor for human health criteria is 121. Please contact me at (253)265-2958 if you have any questions or I have misunderstood your request. 2/14/2002 end'x ..- I- I Appendix F Bremerton Beach Main Pigging Technical Memorandum CDIVI P:\Bremerton\Comp PlanlAmendment\7PROJDOC\DRAFT AFTER JUNE 2005 "I , I "I City of Bremerton East Bremerton Beach Main and Inverted Siphon Pigging Concept Technical Memorandum fiR Date: To: From: SUBJECT: March 15, 2004 Tom Knuckey, Bill Davis Eric Bergstrom, Craig Tennock East Bremerton Beach Main Pigging Technical Memorandum INTRODUCTION This technical memorandum (TM) identifies the structural modifications required to be constructed on the East Bremerton Beach Main to facilitate the pigging of the beach main and inverted siphons including fittings, valves, and structures. This memo also summarizes the concepts for pigging this piping system. These pigging concepts were developed with the City and SFE, Inc. a contractor specializing in pipeline pigging. SFE was retained as a subconsultant to HDR in this effort. A detailed pigging plan for cleaning the beach main pipes will be developed at a later date by either the City or by a contractor such as SFE. BEACH MAIN CONFIGURATION A schematic plan of the East Bremerton Beach Main and the Port Washington Narrows Inverted Siphons is illustrated in Figure 1. Sewage from all of the East Bremerton structures (OF-2, 3, and 4), the Riptide Apartments, the East Side CSO Treatment Plant and Pump Station EB-2 flow into, or are pumped into, the beach main and discharged to pump station CE-l. The pressure or head in the pipeline on the east side is a function of the flow rate to Pump Station CE-I. As the '1 flow increases, particularly during wet weather, the pressure increases. At low flows the majority ! of the beach main remains full with very low velocities. Theses low velocities promote the deposition of solids in the pipeline. Currently, because of limited access into the pipeline the City has limited ability to clean the beach main and siphons. BEACH MAIN CLEANING A number of pipeline cleaning options have been considered; however, the most feasible method of cleaning is by pigging the pipeline. This entails inserting an object (pig) into the pipeline and using pressure to push the pig through the pipeline. The diameter of the pig is slightly smaller the pipeline. As the pig moves through the pipeline it pushes and scours solids in the pipe. The solids are removed at the end of the pipeline segment being cleaned. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 200S\Appendices\Appendix F - East Bremerton Beach Main 1M- 200403 IS.doc 1 Several considerations for pigging the beach main and siphons are discussed below: . Launching points for pigs - Addressed below. · Types and sizes of pigs to use - This issue will be addressed in a detailed pigging plan prepared by others at a later date. The types and sizes of the pigs used will affect the type and amount of solids removed. . Methods to induce the pressure in the pipeline to push the pig - Valves and pipeline fittings that are required for a pigging operation are identified below. The specific equipment and the operating plan for a pigging operation will be addressed in a detailed pigging plan. . Methods to retrieve the pig - The required pig retrieval structures are identified below. . Methods for handling the solids removed from the pipeline during the pigging - The location where solids may be removed are addressed below. The method of removing solids will be developed in a detailed pigging plan at a later date. · Pump Station EB-2 to the inverted siphons . Inverted siphons to the East Side CSO Treatment Plant or from the East Side CSO Treatment Plant to the inverted siphons . The inverted siphons Pigging the beach main and siphons would be completed in sections as shown in Figure 1. The sections are: Pigging these pipeline sections will require fittings and valves at the connection point of the siphons to the beach main as illustrated in Figure 2. Figure 3 presents an elevation view of the pig launch and retrieval structures identified in Figure I. The valves shown in Figure2 will allow flow to be stopped in either siphon to allow the launching of a pig. Removal of Pigging Solids Pump Station CE-l has a very small and deep wet well, and therefore removal of solids at the wet well is anticipated to be difficult. Since CE-1 pumps to the Crosstown Pipeline which is a large inverted siphon with low velocities, it is important that solids be kept from passing downstream of CE-I to the maximum extent possible. To reduce problems with solids downstream, it is anticipated that provisions will be made to remove solids at the end of each section of pipe cleaned. For the first two sections of the beach main identified above to be cleaned, it is anticipated that a settling tank may be located on the beach in the vicinity of the Pig Launch/Retrieval Structures for removal of solids. The specific tank size, location, and related settling issues will be identified in a detailed pigging plan developed at a later date. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 200S\Appendices\Appendix F - East Bremerton Beach Main TM- 200403 IS.doc 2 ~'l I '1 i 1 ! , j It is possible that solids could be removed at the East Side CSO Treatment Plant; however, this would need to be evaluated further in the detailed pigging plan. A detailed description ofthe pigging concept for each beach main section summarized below. EB-2 to Inverted Siphons A pig launch structure is provided at Pump Station EB-2. An 18-inch diameter pipe spool projects directly above the ground behind the CMU block retaining wall. A blind flange is located at the top of the pipe, along with an air release valve. The top of the blind flange is at elevation 130 feet. During dry weather and when Pump Station EB-2 is not operating, the static water surface elevation in the beach main is at elevation 125 or lower. When the water surface is at this elevation, the blind flange will be removed and the pig inserted into the pipeline. The blind flange will be replaced and a water source connected to the tap for the air release valve in the blind flange. To launch the pig, water will be introduced through this tap on the top of the blind flange. Once the pig is beyond the discharge header of the EB-2 pump station, the High Flow pumps may be used to advance the pig. Depending upon the required pigging pressure, other pumps may be used. A source of water will be required to advance the pig and could be from sewage, water from the drinking water system, or a combination of both. The OF-4 connection to the beach main needs to be pressurized so that as the pig approaches this connection, it will continue on to inverted siphons. A check valve was installed on the pipeline at OF-4 to allow the line to be pressurized and prevent back flow. During a pigging operation, the check valve will close, and normal flow into OF-4 will surcharge in the structure and be diverted to EB-2 through the gravity sewer on the beach. To insure that the pig advances in the beach main toward the siphons rather than up to OF-4, a supplementary source of water may need to be pumped into the air release valve connection at OF-4. The necessity of pumping water at this location should be identified in the detailed pigging plan that will be developed at a later date. The OF-3 connection to the beach main also needs to be pressurized in the same manner as OF-4 so that the pig will continue to advance. An isolation valve on the pipe will need to be provided on the pipe up to OF-3. A bypass connection is required to allow sewage flows to be pumped into the beach main while the valve is closed. A design concept of the isolation valve with a bypass connection is presented in Figure 4. At the connection point of the siphons to the beach main (See Figure 2) valves 1,2 and 6 would be closed and valves 3, 4 and 5 opened. System sanitary flow north of valve no. 1 would be conveyed to the CSO Treatment Plant for storage, or treatment and discharge. A pig retrieval chamber would be installed on Pig LaunchlRetrieval Structure No. l. Before valve 4 is opened the blind flange would be removed and replaced willi the retrievardiamber. A concept of the pig retrieval chamber is illustrated in Figure 5. The chamber would be provided by the pigging P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Appendices\Appendix F - East Bremerton Beach Main TM- 200403 IS.doc 3 contractor or the City. The retrieval chamber would be tapped and connected by a temporary pipe to Pig Launch Structure No.2 to allow forward flow to continue on to CE-l through the 16- inch inverted siphon. A settling tank would be installed between Structures No.1 and 2, so that system flow would exit the pig launcher/retriever at Structure No.1, flow through the settling tank, then exit the settling tank and flow into Structure No.2 for conveyance to CE-I. Alternatively, should the City decide to remove all pigging solids at Pump Station CE-I, Structures No.1 and 2 could be piped together with temporary piping to convey system flow, along with the pigging solids on to CE-1. I I i I East Side CSO Treatment Plant to the Inverted Siphons To pig the segment of the beach main from the East Side CSO Treatment Plant to the Inverted Siphons, valves 1, 4 and 5 would be open valves 2 and 3 closed. The pig retrieval device would be installed on Pig Launch/Retrieval structure No.1. The tapped connection on the retrieval chamber would be connected by piping to Pig Launch Structure No.2. Again, the settling tank would be installed between the two structures to capture solids removed during the pigging. The beach main would need to be isolated with a valve at the East Side CSO Treatment Plant so that the pig may be pushed to the inverted siphon connections. OF-2 and the Riptide Apartments connections would also need to be isolated with a valve to make sure the pig advances to the siphon. See Figure 4. However, the bypass connection is not required for the OF-2 and Riptide Apartments connections. At OF-2 the flows will surcharge and flow to the East Side CSO Treatment Plant through the 48-inch bypass pipe on Lebo Boulevard. The City operations staff indicated that locating a valve on the pipe at the top of the hill adjacent to the Riptide Apartments would be difficult. Their preference was to locate the valve on the beach at the beach main. During pigging operations the pipeline between the manhole and the valve could be used to store flow from the apartments. Another option would be to pig this section from the inverted siphons to the East Side CSO Treatment Plant. This would require removal of pigging solids at the treatment plant and storage of flow during the pigging operation. This would need to be evaluated further. Inverted Siphons The 16-inch siphon may be pigged by isolating valve 2, and the 24-inch siphon may be pigged by isolating valve 6. For the 16-inch siphon, the pig would be inserted into the pig launcher which would be installed on structure No.2. A pressurized water supply will be connected to the pig launcher to advance the pig. To start the pigging, valve 5 would be opened and the pig would be pushed to CE-l. The 24-inch siphon would be pigged in a similar manner by closing valve 6 and launching the pig through pig launch structure No.3. Provisions must be made to collect the pigging solids at pump station CE-1. One concept for capturing solids at CE-1 is illustrated in Figure 6. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Appendices\Appendix F - East Bremerton Beach Main TM- 200403 I5.doc 4 I . I I ~ I I .1 I ! j I I .~ REMOVAL OF AIR TRAPPED IN BEACH MAIN Currently, the connection point of the 16-inch inverted siphon to the Beach Main is a high point in the system and it likely traps air. This air pocket potentially impacted the flow of wastewater and limited the capacity of the system. The City tapped the l6-inch inverted siphon just downstream of the connection to the Beach Main and vented the air through an air release valve. The City has not experienced any problems recently in which the 16-inch siphon appears to be plugged. The air release valve appears to have eliminated the air that became trapped at this connection point. When the new valves are installed as shown in Figure 2, the piping will be sloped up from the 16-inch siphon connection to the OF-3 connection. This will eliminate the potential for air to accumulate at the 16-inch inverted siphon connection. In order to maintain a full pipe the crown of the beach main at the OF-3 connection should be constructed at elevation 120.5 feet or lower . assuming that the center line elevation of the inverted siphons entering CE-l is 120.7 feet as shown on the original CE-1 construction drawings. CLEANING THE CROSSTOWN PIPELINE Pump Station CE-I discharges to the Crosstown Pipeline. This piping system also operates as an inverted siphon. The City should investigate methods for cleaning this pipeline also. P:\Bremerton\Comp Plan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 200S\Appendices\Appendix F - East Bremerton Beach Main TM- 2004 03 IS.doc 5 Figure 1 Schematic Plan of the East Bremerton Beach Main and Port Washington Narrows Siphons Pump Station EB-2 OF-4 20" -- ;~ Beach Main Port Washington Narrows Inverted Siphons 16" 24" Pump Station CE-l r Figure 2 Plan View of Fittings and Valves at the Beach Main Connections to the Inverted Siphons From OF-2 From OF-3 Pig Launch! Retrieval Structure No.1 See Figure 3 Gate Valve and Number / From EB-2 6 ~. /5 ~. ' '7 """" Pig Launch Structure No.2 See Figure 3 't' 16-inch Siphon '" 24-inch Siphon Pig Launch Structure No.3 See Figure 3 P:\Bremerton\Comp Plan\Amehdment\7 PROJDOC\DRAFT AFTER JUNE 2005\Appendices\Appendix F - East Bremerton Beach Main TM- 200403 I5.doc 6 Figure 3 Elevation View of Pig Launch! Retrieval Structure Pig Launch Riser, Same -\ Size as Mainline Mainline ~ Blind Flange, ~ ~ I II below Su...." ~ Gate Valve ~ Ground Surface Figure 4 Isolation Valve at East Side CSO Treatment Plant, OF2, OF-3, and Riptide Apartments Connections Ground Surface \ Last Manhole or Other Structure before Connection to Beach Main l / ~ - ~i Bypass Connection, , Blind Flange 1 ft below Surface, Not Required at OF-2 or the Riptide Apartments - Beach Main \ . / Gate Valve At the Riptide Apartments connection the City determined that the gate valve would be more suitably located near the beach main connection. A bypass connection would probably not be required because normal sewage flow could be stored in the pipe during the pigging operation. P:\Bremerton\Comp PIan\Amendment\7 PROJDOC\DRAFT AFTER JUNE 2005\Appendices\Appendix F - East Bremerton Beach Main TM- 200403 I5.doc 7