HomeMy WebLinkAbout02/01/2017 5IAGENDA BILL �� CITY OF BREMERTON CITY COUNCIL SUBJECT: Interlocal Agreement with Kitsap Study Session Date: January 25, 2017 County to Share Installation Costs of Lining COUNCIL MEETING Date: February 1, 2017 the Sewer Main Under State Route 3 Department: Engineering Presenter: Tom Knuckey Phone: (360) 473-2376 SUMMARY: This Interlocal agreement (ILA) provides a mechanism through which the County and City share installation costs incurred by the city to install a liner in the shared sewer main. The sewer main is owned by the County, however, both jurisdictions convey wastewater through it, and the City's flow greatly exceeds the County's both in flowrate and sewer strength. The County's preferred method to replace the pipeline is to slipline it at reduced capacity; with the ILA they will contribute the estimated cost for that work to the City's cure in place project. This cost contribution is consistent with work completed in 2011 for pipe repairs downstream, and results in the County's share being $16,400 of the $58,000 construction cost. Exhibit A of the ILA details the cost calculation method. ATTACHMENTS: 1) ILA FISCAL IMPACTS (Include Budgeted Amount): This work is included in the 2017 capital budget. The agreement provides $16,400 in revenue to the project. STUDY SESSION AGENDA: o No Presentation ❑ Full Presentation STUDY SESSION ACTION: o ConsentAgerida ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the Interlocal Agreement with Kitsap County to share costs of lining the sewer main under State Route 3; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: [Approve Form Updated 01/07/15 ❑ Deny ❑ Table ❑ Continue ❑ No Action