Loading...
HomeMy WebLinkAbout3281 RESOLUTION NO. 3281 A RESOLUTION of the City Council of the City of Bremerton in support of a capital budget request for the Quincy Square on 4th Downtown Revitalization Project. WHEREAS, the Quincy Square on 4th Downtown Revitalization Project("Quincy Square Project") concept has been developed over the past two years by a grass roots consortium of active and interested citizens, professional groups and developers; and WHEREAS, the Quincy Square Project, located on 4th Street between Washington Avenue and Pacific Avenue, is an integrated urban revitalization project that, when completed, will be one of the Puget Sound's great public spaces and a model for what livable downtown neighborhoods should look like; and WHEREAS, the Quincy Square Project vision seeks to turn a long-neglected city block into an active, housing based day-to-night urban center with focused arts, entertainment, and evening-centric retail spaces; and WHEREAS, the strategic combination of residential and commercial uses lining a modern workable and walkable streetscape will yield a result whose impact will be felt throughout Bremerton and the region; and WHEREAS, the Quincy Square Project will assist Bremerton in eliminating its chronic designation downtown as a severely distressed blight zone, spurring new investment by attracting new residents to live downtown, creating demand for new housing which will spur badly needed market rate and affordable apartments and spot retail; and WHEREAS, the Quincy Square Project supports local needs and generates increased business traffic while drawing new visitors to downtown Bremerton; and WHEREAS, the Quincy Square Project will attract a minimum of$17.2 million of additional investment in the buildings fronting 4th street, including 43 new residential units fronting 4th street in the short term, with many additional units possible in the future; and WHEREAS, the Quincy Square Project will contribute to a reduction in greenhouse gas emissions because it will attract new, permanent residents to Bremerton's downtown area, many of whom will make the choice to not own a car because of the easy walking proximity of downtown services, including public transportation (Ferry to Seattle; Bremerton Transportation Center just 3 blocks away); and the unique downtown ambience created by the Quincy Square Project will continue to attract new, no-car residents; and. 1 Quincy Square Project WHEREAS, private investment of$17.2 million, to renovate four(potentially six) derelict,blighted, 30-yr vacant 4th Street buildings into market rate and affordable housing with spot retail, is already under way; and WHEREAS,private investment into the buildings that line the street will create new property tax revenue, sales tax revenue, and business occupation tax revenue: 16,000 square feet of potential retail space along 4th Street currently sits vacant, representing $4 million in annual projected, taxable retail sales (at$250/sf); and WHEREAS, with a$21.9 million(private+public right-of-way) investment on this block of 4th street, assuming a job is created or retained for each $60,000 of investment, this project will create or retain 365 jobs during design and construction; and in the long term, the Quincy Square Project will create a desirable urban neighborhood and a flexible public gathering space ideal for hosting a wide range of festivals, markets, and other community events; and WHEREAS, the Quincy Square Project will be a catalyst for re-development throughout Bremerton, as evidenced by four new projects along the adjacent blocks, a 20-unit residential project valued at $2.5 million, a 50-unit residential project and grocery store valued at 7.3 million, and two additional commercial developments valued at $500,000 each currently planned for development as a result of the Quincy Square Project, representing 180 new/retained jobs; and WHEREAS, the Quincy Square Project leverages momentum behind the historic Roxy Theater as a project centerpiece, tying in new music and film events while honoring an inspirational Bremerton raised role model, Quincy Jones; and WHEREAS, Quincy Jones has embraced the concept and provided his permission to use his name for the project; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The recitals set forth above are hereby incorporated as if set forth herein in full. SECTION 2. The City Council of the City of Bremerton is in support of the Quincy Square on 4t Downtown Revitalization Project and further supports a capital budget request of$500,000 for design work for the project. SECTION 3. Severability. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. 2 Quincy Square Project SECTION 4. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. II _ PASSED by the City Council of the City of Bremerton, ashington this l0 day of (.uQ,V410Q,r , 2016. ERIC YOUNJ R, '• .ncil President APPROVED AS TO FORM: ATTEST: AIII R• ER A. LUBOVI , ' Attorney SHANNON CORIN, City Clerk R:\Legal\Legal\Resolutions\Public Works\Quincy Square on 4th Resolution of Support.docx 3 Quincy Square Project