Loading...
HomeMy WebLinkAbout10/19/2016 7E AGENDA BILL � � CITY OF BREMERTON CITY COUNCIL SUBJECT: Amendment A for DWSRF Loan Study Session Date: October 12, 2016 for Reservoir 4 Cover Replacement COUNCIL MEETING Date: October 19, 2016 Department: Engineering Presenter: Ned Lever Phone: (360)473-2398 SUMMARY: A DWSRF loan (Loan DM15-952-026)was executed in June 2015 for the evaluation, design and construction of a new cover for Reservoir 4; the loan amount is $2.3M and has a term of 20 years. The scope of the work included a detailed evaluation of cover alternatives, and the project scope and loan value loan were based on installing a hard steel or aluminum cover over the facility since that would have been the most expensive alternative. The evaluation has been completed, and the conclusion is that a hard cover is cost prohibitive and would have a roof height that would not fit well into the neighborhood. As a result, a replacement floating cover(with an associated liner) has been selected as the preferred alternative. The current loan term is 20 years, but is being reduced to 10 years based on the floating cover life expectancy of 10 to 12 years. The loan term reduction is being required by the loan agency. The attached Amendment A changes only the term of the loan. The actual scope of work change will follow in a separate amendment once it is approved by the Public Works Board. ATTACHMENTS: Amendment A to Loan DM 15-952-026 FISCAL IMPACTS (Include Budgeted Amount): All project costs are loan eligible. The project is included in the 2016 and 2017 budgets. STUDY SESSION AGENDA: O No Presentation ❑ Full Presentation STUDY SESSION ACTION: o Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve Amendment A to DWSRF Loan DM15-952-026; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: [�Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/07/15