HomeMy WebLinkAboutAUSTIN DR., 2900 JUN-11-2002 09:30 CORHERSTONE ARCH'l. GROUP 2066211'717 P.01/02 , ~. - !I- ". P. ). m...;.,~" ;,..Lb.- =-=--::..:. ~: -"==- .".". FACSIMILE TRANSMITTAL DATE: June 11, 2002 PAGES: 2 INCLUOING COVER SHEET PROJECT NO; 160101.00 PROJECT NAME: CKSD Reroof Projects 2001 TO: City of Bremerton Dept. Community Development ATTENTION: Valerie Wolf ....--.-- VOICE: 360-478-5244 FAX: 360.478-5278 o Urgent ~ For Review o Please Comment o Please Reply o !,Iease Recycle REMARKS; Ms. Wolf- Here is a letter requesting a start date for Jackson Park Elementary School Reroof later than July 3, 2002. Thank you, Copied to; Dave Myers, Snyder Rooflng Pete Andersen Signed: E~~ 40ft Single'foi1 '\". 1904 IH1RD &VfNUt, sum 500 SEATTlE, WASHlNGlON 98101 lHfPHONf: (ZOb) 682.5000 FAX: (06) 62i-7717 INlfRNEl: Cornentcnr4Hh.com - JUN-1l-20212 09: 31 CORt~ERS TONE APCH' L GRDijP 2065217717 P.02/02 I: . -- C 0 ~. N t .~ S 7 0 N ': .. A R ( H lit ( T U R A l G R 0 U P ~1! 'IIFI' 1904 THIRD AVENUf, ~UIH: 500 same vW~INGrON 98101 June 11,2002 Valerie Wolf, Building and Development Speclalist City of Bremerton Department of Community Development 2394th Street Brernerton, WA 98337 Re: Building Permit #01-0191 RerOCif of Jackson Park Elementary School Annex " .~. ~2.;*'~ti~~!]ij;~l1e." Dear Ms. Wolf: Per OJf telcon on June 11, 2002 I understand that we have been granted an extension of our building permit to reroof the above building and we are required to begin work no later than July 3. 2002. I am writing this letter to notify you that the contractor, for safety reasons, intends to start the project immediately after July 4 and no later than July 15 since- his experience jast year is that the site is extensivly used for fireworks during the holiday. ... We hope this arran ement is satisfactory. Thank you for your attention to this matter, Jo rgleton, Architect Cornerstone Architectural Group 611- tJA) 0- (( - u ~ JS/js iHHHONf .206.682.5000 www.tornEnloneorth.tQm , fACSIMilE 206.611.m7 TOTAL P. er2 ~ lo~ 0r 0 0A ; )cih : ~~ 5~ doG - CoJ-I- l { l/ ~~ "I ~ - S :J--44- rJ\ · 4l"o S)-i2' F'j J~ I d- -{)~ fi-< ~SJ o~ ~ ;# 01- 0 [ ell cC. '/~.OV\ .~ --<--- , Job Addr: Location: Parcel No: REMERTON PERM~T CENTER. 286 4th street~ Bremert n~ WA 98337 Phone: (360) 478-5275 FA: (360) 478-5278 BUILDING PERMI/T 1. cg@~w "----__n___ Permit No: Status: Applied: Issued: Expires: 01-0191 ISSUED 04/17/2001 07/03/2001 12/30/2001 ELE -Ni.ARY SCHOOL Applicant: CORNERSTONE ARCHITECTURAL GROUP 206-682-5000 JOHN SINGLETON 1904 THIRD AVE SUITE 50SEATTLE WA 98101 Owner: CENTRAL KITSAP SCHOOL DISTRICT 9102 DICKEY RD NW SILVERDALE WA 98383 ontractor: SNYDER ROOFING 425-290-981Lic #: SNYDERW014MT Exp: 06-01-2002 20203 BROADWAY AVE SNOHOMISH WA 98296 Subcontr: esc: TEAR-OFF & REROOF W/ADDN OF R-21 INSULATION ~~~*******************~*~~*****~*~*******~*********~~*~****************~***~******~****~**** Valuation * Permit Fees: 1,139.35 Total Calculated Fee: 1,8$4.43 126,000.00 * plan Check Fees: 740.58 Additional Fees: .00 * Other Fees: 4.50 Total Permit Fee: 1,884.43 ******************************************************************************************** his permit shall become null and void if the building or work authorized by this permit is not commenced within 80 days from the date of such permit, or if this building or work authorized by such permit is suspended or bandoned at any time after the work is commenced for a period of 180 days. iOTICE - It is the responsibility of the permit holder, not the City of Bremerton or Building Official to see o it that required inspections are made. The permit holder must notify the Building Official when ready for nspections. Failure of the permit holder to notify the Building Official of required inspections may result n the stoppage of the work until such time that the permit holder can substantiate to the building official hat the concealed work meets or exceeds code requirements. Any demolition, testing, or financial burden shall Ie borne directly by the permit holder. Failure to substantiate code requirements will indemnify the City 19ainst any and all responsibility or liability connected with the construction. , hereby cert~fY that I have read and examined this permit and know the same to be true and con"ect. All )r~~i~ions of/laws and ordinances governing this type of work will be complied with whether specified herein ,r no~ The/granting of a permit does not presume to give authority to violate or cancel the provisions of lny othe'y sta r local law regulating construction or the performance of construction. jignature~~\. ~ Date: l certify{that~m exempt from the requirements of the state contractor's registration law, under 3ection 3, Chapter 126, laws of 1967. :;ignature: Date: )ermit Center--ARProved By: au Date: 1?- 7 - :3 -0 ( K**~************~********** "llIlIIII , SNYDER ROOFING COMMERCIAL · INDUSTRIAL r\LL ~qD9 Aust\Y\ ~"KNAllONAL l;;/.I ...01 \5Il ROOFING [[ill~~~ February 19, 2002 D ( , . :O)jg~jgOWjg"1 bl fEB 21 2002 ..J BREMERTON BUILDING DEPARTMENT Bremerton Permit Center 286 4th Street Bremerton, W A 98337 Reference: Permit # 01-0191 To Whom It May Concern:: Before work on the Jackson Park Elementary School project was able to begin, our roofer's union went on strike. The school district did not want non-union workers on the job, or work done on the school while it was in session. As a result, work at the Jackson Park Elementary School has been delayed until after the close of the school year in June of2002. Snyder Roofing would like to request an extension on Building Permit #01-0191 so that we may begin work as soon as the school lets out for the summer. Please contact me it there are any questions or concerns regarding this request. Sincerely, '0~ 'II{. 'I1a~ ei~. North Snyder Roofing of Washington, LLC 3-- f- ()~ b € /0re ~62-I C ohll11e/1(!p UJ;f' OY) &VL- , d- I4U --() uU of Oregon LLC P.O. Box 23819 Tigard. OR 97281-3819 503 620-5252 503 684-3310 Fax OR CCB #135987 SNYDER ROOFING GROUP OF COMPANIES AN EQUAL OPPORTUNITY EMPLOYER Since 1922 of Washington LLC 20203 Broadway Ave. Snohomish, WA 98296 425 402-1848 Fax 42!:; 398-4444 WA LIC #SNYD,ERW014MT www.snyderroofing.com I ~,-~-.......--..,..." ~"~ , ~~__~-''-~''''~''''''''''''''''''''''''''''''''''''''r''.-~'~''''-"'''''''''"T:T-''-'''''''''''''7'T'--''~'-~--' -.._. -", ~ I ll!- '" ~REMERTON PERMIT CENTER 2864th $tr8et~ 8remerton~ UA 98337 Phone: (360) 478-5275 FAX: (360) 478~5278 BUILDING PERMIT I t l Job Addr: 2900 AUSTIN DR .Location= JACKSON PARK ELEMENTA~Y SCHOOL Parcel No= Pt:rrnit No: status: Applied: Issued: Expires: 01-0191 ISSUED 04/17/2001 07/03/2001 12/30/2001 i il i1 I .'1 Applicant: CORNERSTONE ARCHITECTURAL GROUP 206-682"'5000 JOHN SINGLETON 1904 THIRD AVE SUITE 50SEATTLE WA 98101 Owner: Ct:NTRAl KITSAP SCHOOL DISTRICT 9102 DICKEY RO NW SILVERDALE WA 98383 Contractor: SNYDER ROOFING 425-290-981Lic :fl:: SNYOERWOi4MT Exp: 06-01-2002 20203 BROfmWAY AVE SNOHOMISHWA 98;~96 Subcontr: I, I Bese: TEAR-OFF & REROOF W/ADoN OF R-21 INSULATION )I:)\()\(*)\()I( *ll( JI()\( ltll!t*******)I(.)\(* **)/( *')\( >K **)1( %)1()1( * *)1( )(<)I()I()/( * >I()\( l!(*)I:; ::i()!()K iK:+:>IOUOl(::<< *)f{Ji( **)\( ** ***)\(m)j( * * >lOlOI: * * ****)j( JI:::$;*)I()!l )!OK)\()/[)I( Valuation * Permit Fees: 1,13'.35 Total Calculated Fee: 1.884.43 :126,000.QO )/( Plan Check Fees: 740.58 Additional Fees: .00 )(< Other fees: 4.50 Total Permit Fee: 1~884.43 )I( ** %)1:: * l!:)\( W. *)/(*:+:* )/(**:1( * *)/( * **)/()f( * ** **)/::)!()\( *)I()/( **)/()I()I;: *' **)/l* ** ** ** ** ::1()IO~: * * *)/( ll<)\(*)1()/( >I( *** * )I(.>I()I()II)\()I(* *)\( >I()\( * )I(.)l:** )101:*** This;; p""'1'mHshaU bedomll! null and void if the buildins 01' wo1'k authoYind by this pet'mit is not comt'l1enced within lSOdaY$ hem t~he date ofl$Uch pe-l'l1lH, 01' if t.his building 01' woyk authoYi:z:ed by such peymH:. is suspended 01' .abandoned at any tim~ aHaI' the woYk i$ COl'rlfOOnced foy a pedodof 180 days. NOTICE'.' It. is the responeibi 1 i ty of t.he pE'YOli t holdIiH'. not the .. CUy o'F BnilllleYt.on 01' f"MUding Off ic:ial to '!ilee to it that y'equlYed inspections an.. made. The permit holde'r Olusi:: noUfythe Building Official when yeady foy inSpect-.:laM. Failuye of the permit hold~y to notify the Building Official of yequi'l'ed in$pElctions ma,y yesult in the- st.oppageof theWOYK until such time that the p(mrdt. holder Cl\ln substantiate '1::.0 the building official t,hat the conc~aled WOYK meet$ oy!?xceedecode requit'elllel"lt.$" An)'" demolition, testing. i)Y financial buYden shall be bo1'ne di yectly by ttw peymit hcldey. Fai luye to sub$bmiate code requi nameribs win il"lClemnif)o" the City ag<).\inet any and all yesPorlsibilH,y OY liability connected with the conetyucUon. ~~"'~' :r heYebvQeYt~' fy that.. I have yea,d andexafllined this peymH and know theesme to 00 tyue and conect. . ...,,11 PYOV'Si.OliS .;:.fi laws and cydina.nce$ gov<l11'ning this t:ype of \.\IOY\( will be comp.lied with whethey $pecified h~Yein ot not: rh r;,rrantinGlor a peymij: does Mot presume to give a\uthoYity to violate 01' c-Bnce). the pyovi$ibnS of . aw dt~ "'~'"'";. la" "rtli"" ="''". cUonoy the pe1'fOYmanc.~ of conet.yucHon. $19n'-'\tUYe~ __'iI.~~)'\__ . . .,,_~. ~,Oate=_. . !ceytify that ! am exempt fyOM the requiyements of the state contyactor's yegiatyation law. under Sl1!ction 3, Chaptoll1' :126. laws of 1967. \ .Si9natUYe;;,.~_';;"".__-,-....:o.......-,,",-_".~_~::.~~_____ Oate.=.___________.._._._ . )\(*'**)/()f(::i:W,>l<lIl)\()/()f(lKlI<)(()!::<<lK*;r,**:>KSUV:.. / A.,. ... '.. .... .. Da.t.....,... .. -f:2!::.... ...... -J - 3. - O. . . Per~itC.nt.h-Ap.Prov.d ,---1/-lI1cJ-, -~ I ~l' ">,,~,, f,~,~'~ili,ti~r.~\~~~f~~11&i:~ jJ;~i.~~~~~1,JMWH:)!.tIt~l.' ,,;t~'\., ~'~';"~'~;::'-"" ;,.'~;' '.\~", I, I Jbb Address~ 2900 ('-iUS Tnl OR Loeat.Joll:' JACKSON PARK ELEMENTAf<<Y SCHOOL rAssrAcctNo : I I I f t f I t, r f: r~ f ~.. f f I I r I ~. ! Building Pe~-mitNo : Status: Issued: Expires: ~i) 01"'-0191 \ ISSUED:. 07/03/jOOl 12/30/2t01 t 1 1 J " ,I ,J ~ I l 1 '1 i I :1 j . "" , # :L~,.4IJ!: eREMERTON PERM.IT CENTE;;,R 286 4t.h $t.reet* BtemertorJ* JtilI!t 98337 ;;'phcme:( 360 )478-5275 FAX: (360) 478-5278 .' ,- ,-Y.' R E.C ~ IRE 0 1 N $ P E ~.jJ'~AMrnG .. f;:;J . .~~~ Ite'rI'P02701 FINAL"'--FIRE. Item: 02700 FINAL ",".,~BL.DG C T lOIN S Dept= [)ept, : Dept= [)ept= BLDG BLDG FIRE BLDG Division: bivision: Division: Divislon: *******************************************************************~************* TESTllNG=Must be recog'(lized by thEa/Washington Association of. BuilCling Official SPECINSP= Must be'i'8g'isteYedlt4i th the State of W.A ST OF WA~ State of WA Dept. of LaboY and Industries j'iEAL TH=' Brernerton/Ki tsap Health .Oistr lct 478-4921 478-S\t35 ALL INSPECTIONS PERFORMED BY THE CITY OF 8RE:MERTON MUST BE SCHEDULED Pf:;;RMITCENTER,. (360) 478-5275. .' ***********,********************************************************************* . , ' , , . r. \:.;~i Date: ;:.....'.'.... "1 :1 1 ", '-""-"'~'-'1;i~'" ., i""1'..', :~~.-.:..tJ' . ",' ;"'-''-'';~:,.\,..'~~.~;';~ ~-. : '.,,'_:',": ',i ",".~ "~,.," .",. . " -,'.~ ',< ,-, "~J --,- ,m_-.---;'~'--~'TT.:'''~~;'''''''''~.;~i''~'..~;'''_~_\~~'~',~_--,...,...~: ,,' .,,~j.,__ _'It'~!,1r.:'~<'~Y'~,""'~,f'~-'_" "':;~~'~"" ''''''~'~;~'~~~~''~"-~'';.-,' ',.". ~--~" ,.'. ..'.'. . '....1 1"'1 ~'j j ;l , 1 I J .~ .~ I ) 191 BREMER TON :PliRMIT'CENTER PERMIT CONDITIONS . ~:; ,;~ I Job Addy' eS$t 2900 AUST XN DR .....'.'" Ass! Acct No: Loca.tion: JACks.ON PARK ELEI"IENTARY SCHOOL I: J r l ~ . . f f I I t ! r r t ! ~. I' Applied: 04/17/2001 Approved: 07/03/2001' Issued: 07/03/2001 Applicant: CORNERSTONE ARCHITECTURAL GROUP " -"- . Owner: CENTR~L~~T?.e.~.:?...C~~RJ.~_jnSTRICT . . Cant y a. ct9X,.;,_,SN.;:f*~.''F<OOFI NG, ,~:":,..~",..,.":,,,,,,,...od"",, , -' QescrJption: TE{~f:{~OFF &REROOFW/ADDN OF R"";21 INSULATION Conditio fl$: 1. FI f:{ E .(1) M~intalni f' i re webchatalltimes. .bJ Keep fire extinguishers on roof c):rf you have eV$,na small fIre call the f i Ye dept. right away. d) MaintaIn a> cellphone 'tt) call the fire department ~~,.....~ .p.e..:rrni.t....... O........l.d.. r... .' .... ...... .. .. .'. ... ... .. .... ...... . '.. .... ... ..l.~natur . ,.. ,., . ... .' '. . . .. .... ..$.9. ..._.~_ :~ ' J Ds.. te '--__~___~.,__;-:;.__~w--",_'" .1 J .~ I l "i~ ,,~ ,'1,11,'" V~,';\ , ' " t"""--"':')':-.....:-..j.;" ' ':~' -'-""'~~\' . \-, , -~,. ~~,~~ ';,J~,j"L- ~,:....-...:...:..~,'~Jj'i;....;~~......!.~,. .;.......'~~ji .-- '-,......-....,'.---".'"'-~- ---',- ...,.----.- ,'.-,...--.~.....-.---..."......---,"-~-- .~ ,--"'-'''' **********************************************************~***** pE:CEIPr ** * ~~;)f;,1j,**:*: * * 'lie * ;i~ )t: :<< ',,, >~' if,: '* '''I'. :,1; )j<:. {) ,?,,./() ,31'/(' 1 ~ t):3 I rj I t i, VI,J I 1 ....1 :!I. ", ~ t 'I I I J, 1,4:3., i5tS f~OC)F I-I~~G 1'40:; 0 1,' OJ, ';f:], '~",:!l:C~:;~'): 21 ".:}{)() {.~tJ~3"T' X i\f ion: JACKSON PARK ELEMENT;~Y SCHOOL T () 't, .;;~, .1 F' f:j;L$, ~7;' ~ nt 1.143.85 Total s y EtLOG 1:>EF~t'IIT.'NO 1"IECH/ '.1, ;.- ~:~ ~:1l~, N, i4:~ 'r g~ 1, G ~;:~ 4. t I. l t i I f I f E:~ 1f~ 1 ~~:t '0 ,c' ,t~;~' ~~ **************************************************************** 1::~~rfi{)f;,J n t r~ 2211 " 1,139, 4, ( (} 2' .3.t~~ ) "'~ ,~;.;. -,." ,. _.,,,, ',',\C, '",~' ,...t. -,,;,' i....,. 'Ii-, ";,' 20203 6<0"""'" A,e. · snown""' WA 9B2'I/iJ --_.~~ .""" ~ Brenwrton -penll1t Center 286 Ath Street Brelllerton, VJ A. 98337 tjY_. .J"""iqc. ... ... ... ff!J:.~!fS:;'S5 ,\'\5? opa 69 60 $ 00 .'3 it 98296 S985 ~IS\-lIN" ID\~~~r~l~~ \r\\ fEll. 21 Z61l2 ~ BREMER10~ BU\lmNG DE~l\t\iNlt~l - . ..... \" \ \ \' \\. .\1.\" .\...\1\. .\....n ,,1\.\,,\, .11." .n.\ ~_.,_..". ~'l.." ." ..'" ' ------ "~""-""'~ _/-/ ." Section 07555 Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 SBS Modified Bitumen Roofing SBS MODIFIED BITUMEN ROOFING 1. GENERAL 1.1. SUMMARY Provisions of the Bidding Requirements, Conditions of the Contract and Division 1 apply to all Sections of this Project Manual. Refer to Table of Contents for complete list of Bidding Requirements, Conditions, and Sections included in the Project Manual. 1.1.1. Work Included in This Section:, SBS membrane roofing system and roof insulation. . 1.1.2. Related Work in Other Sections: Refer to the following Sections for related Work: 01110 for projlect scope of work 01315 for pre-roofing conference. 01450 for inspections by Owner. 02070 for Selelctive Demolition. 02080 for Asbestos Abatement 06100 for Rough Carpentry 07600 for Flashing and Sheet Metal. 15430 for Roof and Area Drainage System 1.1.3. 1.1.4. 1.1.5. / 1.1.6. DESCRIPTION OF WORK Extent of SBS modified bitumen roof system work is indicated on drawings and by provisions of this section, and is defined to include the_ installation of a new cold-applied SBS modified bitumen roofing system over insulation, and the detailing of the membrane at all roof penetrations, odges, drains, and mechanical equipment at Central Kitsap High School and Jackson Park Elementary School Annex. PERFORMANCE REQUIREMENTS: 1.1.4.1.Prevent water migration from entering building through roof membrane and related flashings. 1.1.4.2.Providl~ system of components which results in Factory Mutual wind uplift rating of 1-90. 1.1.4.3.Fire RE~sistance Requirements: Maintain UL Class A rating per ASTM E108 for application and slopes indicated. . FIELD MEMBRANE J II E The exact configuration of each type of roof assembly, includi. .' . insulation and deck substrate is shown on the plans. The~roRfa~ ",- ..'" 'I. ~ 1\ ',- r".' '.' ~'" portion, in all cases consists of the following assembJ,~\~Wh'ilffi@ t8p~,~~;;;>,., down: ,/~1~0~~~ ':\,'\1 '1'n~ ~\) ("~'~ .~'4~j;:\, 1.1.5.1. -One ply SBS granular capsheet ./ 14.')"' ~'\' D"!.:, ;\A' \ ~;:)\ 1.1.5.2. - One ply SBS interply sheet {::: t ~ 71:~:\ 1.1.5.3. - One ply asphalt base sheet ! \1 -:P . 1 BASE FLASHING \ I / '\ ! 1.1.6.1. - One ply SBS base flashing ply \ .<~'''~,_._~_._.__.// ()(~4-lAf Page 1 of 13 CORNERSTONE ARCH'L GROUP, P.S. i ' Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen Roofing 1.1.6.2. - One ply flashing reinforcing ply 1.2. REFERENCES . Listed publications form a part of this Section to the extent indicated by references thereto. 1.2.1.1.Roofing and Waterproofing Manual, 4th Edition, National Roofing Contractors Association (NRCA) 1.2.1.2.American National Standards Institute (ANSI) 1.2.1.3.American Society for Testing and Materials, (ASTM) 1.2.1.4.Factory Mutual (FM) 1.2.1.5.Underwriter's Laboratory (UL) 1.3. SUBMITTALS Refer to Section 01330 for general submittal requirements. '1.3.1. Product Data: Submit manufacturers' published literature for specified products and accessories as applicable, including manufacturer's specifications, physical characteristics, and performance data. Submitas a supplement, manufacturers' instructions and directions for application if not included in manufacturers' puplished literature. 1.3.2. Shop Drawinos: Submit shop drawings of system(s) for review; show direction and amount of slope, cricket locations, lengths and details. 1.3.3. Insulation Fastenino: Submit diagram of tested insulation fastening pattern proposed for roof field, perimeter and corners to achieve specified wind uplift resistance. 1.3.4. Samples: Submit twelve inch by twelve inch samples of each component in the roofing assembly (except asphalt), including base flashing and fasteners. 1.3.5. Warranty/Guarantee: 1.3.5.1. Manufacturer's Guarantee: Submit executed copy of roofing manufacturer's standard Workmanship and Materials Guarantee agreement including flashing endorsement, signed by an authorized representative of membrane roofing system manufacturer, on form which was published with product literature as of date of contract documents, for a period of 20 (twenty) years from the date of final acceptance by the Owner. 1.3.5.2. Contractor's Workmanship Warranty: Warrant that the roofing system is installed in accordance with the manufacturer's recommendations and will be free from defective workmanship and will remain watertight and weatherproof with normal usage for a period of two (2) years following date of project final acceptance. Submit two (2) executed copies of the form included at end of this section for each building, covering work of this section including roofing membrane, composition flashing, roof insulation, vapor retarders, sheet metal, and roofing accessories, signed and countersigned by Installer (Roofer) and Contractor. .. ./ Page 2 of 13 CORNERSTONE ARCH'L GROUP, P.S, Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen Roofing 1.3.6. Technical Representative Letter: Submit letter from the roofing manufacturer's technical manager agreeing to the following: 1.3.6.1.The manufacturer's technical representative will be present at the pre-construction meeting. 1.3.6.2.The manufacturer's technical representative will be avail~ble on the jobsite with 24 hours"notice. 1.3.6.3.The manufacturer's technical representative will be present at start of roof membrane installation. 1.3.6.4.The manufacturer's technical representative agrees to visit the jobsite at least two (2) times per week during the time and hours that the roof membrane is being applied and approve work in progress prior to final surfacing. 1.3.6.5.The manufacturer's technical representative will develop punch list with roofing inspection firm and Architect, and conduct final inspection(s) as required by the District. A twenty-two (22) month re-inspection of all work and roof condition report is required. Forward twenty-two (22) month inspection report to Central Kitsap School District, ,Attention; Ladd Stejskal. 1.3.6.6.Furnish the maintenance procedures manual of the manufacturer's printed recommendations for proper maintenance of the specified roof system including inspection frequencies, penetration addition policies, temporary repairs, and leak call procedures. 1.3.7. Shop Drawinos and Specifications: Describe all proposed details which deviate from what is shown on plans with clear fully noted and drawn to scale details referenced to a roof plan (3 copies). Three copies of manufacturer's complete specifications. Any changes in installation details prior to or during installation must be submitted in writing to Architect and receive written approval prior to implementation of job. 1.4. QUALITY ASSURANCE 1.4.1. Subcontractor Qualifications: Must be approved by roofing materials manufacturer; must be a member in good standing of NRCA; must have at least five years' experience in the installation of this type of roofing system and be able to show installations (within a one hundred mile range of this project) in satisfactory and waterproof condition at least five years of age. 1.4.2. Installer Certification: Submit written certification from manufacturer of membrane roofing system that the installer is approved by manufacturer for installation of specified roofing system. Installer must be able to show a minimum of five installations in satisfactory and waterproof condition at least five years of age. 1.4.3. Materials: Provide only top quality materials of manufacturer, certified as to type and weight conformance with specifications. All materials shall be / manufactured or recommended by the roofing system manufacturer. 1.4.4. Fire Rating: Provide membrane roofing system and component material which have been tested for application and slopes indicated and are Page 3 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9. 2001 Section 07555 SBS Modified Bitumen Roofing // tested in accordance with UL, ICBO, and/or ASTM E108 by a nationally accredited laboratory. Provide roof covering materials bearing markings on bundle. package, or container indicating that materials have been produced under laboratory's inspection and follow-up service. 1.4.5. FM Listino: Provide insulation materials which have been evaluated by Factory Mutual System for fire spread, wind uplift, and hail damage and are listed and approved for Class 1-90 wind uplift construction. 1.4.6. Certificate of Compliance: Upon completion of the application of the roofing assembly, furnish letter on applicator's letterhead stating that base flashings and roofing have been applied in accordance with specifications. 1.4.7. Certificate of Analysis: Provide a Certificate of Analysis from the testing laboratory of the roofing materials manufacturer, confirming the physical and mechanical properties of the roofing membrane components used on this project. Testing shall be performed in accordance with the parameters published in ASTM 0 5147 and will indicate quality assurance and control data as required to meet specified properties. A separate Certificate is required for each production run of material delivered to the jobsite and shall indicate the following information: 1.4.7.1. Material type, 1.4.7.2. Lot number. 1.4.7.3. Production date. 1.4.7.4. Roll length and width (lowest values recorded during run) 1.4.7.5. Selvage width (lowest values recorded during run). 1.4.7.6. Total thickness (lowest values recorded during run). 1.4.7.7. Thickness at selvage (lowest values recorded during run). 1.4.7.8. Weight (lowest values recorded during run), 1.4.7.9. Physical and mechanical properties, such as low temperature flexibility, breaking load, ultimate elongation, dimensional stability, compound stability, granule embedment and resistance to thermal shock. 1.4.8. Material Markinos: Provide roof materials bearing FM approval marking on bundle, package or a container indicating that materials have been produced under FM examination and follow-up service. 1.4.8.1.Hot Asphalt Work: For work requiring hot asphalt application, provide on the asphalt bitumen label of each container, the flash point (FP), finished blowing temperature (FBT), softening point (SP), and equiviscous temperature (EVT) and type of asphalt. No bulk asphalt will be accepted. 1.4.9. Insurance Certification: Assist Owner on preparation and submittal of roof installation acceptance certification as may be necessary in connection with fire and extended coverage insurance on roofing associated work. Page 4 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9. 2001 Section 07555 SBS Modified Bitumen Roofing ~/ 1.4.10. Samples for Testing: The Architect or Owner retains the right to take no more than four (4) 4-inch by 36-inch sample cuts from the completed roof assembly for testing purposes to be repaired by the Contractor at no additional cost to the Owner. If thesample(s) indicate deviation from the specifications, the Contractor will take the necessary steps, without additonal charge to the Owner, to bring the roof system up to speCification. 1.4.11. Roofina Crew: Roofing contractor will employ a qualified crew foreman and alternate foreman; one foreman will be in attendance on the site at all times during roofing work. No substitutions of the foreman or the alternate foreman will be made without written request at least forty-eight (48) hours prior to substitution to the owner. 1.4.11.1.lf unauthorized substitution of foreman or alternate foreman, without written owner acceptance, is made, the job will be stopped. A new pre-roofing conference will be held before resuming work. Attendee's participation at new pre-roofing conference will be at the contractor's expense. 1.5. STORAGE/HANDLING 1.5.1. Store and handle roofing sheets in a manner which will ensure that there is no possibility of noticeable moisture pickup. Unless protected from weather or other moisture sources, do not leave unused sheets on the roof overnight or when roofing work is not in progress. Cover material so as to prevent condensation beneath covering. 1.5.2. Store materials and equipment in a manner so as to avoid significant and/or permanent deflection of deck. Spread loads of roofing materials on roof structures to avoid damage to existing structure. Use protective plywood as required. No material shall be stored on new roofing. 1.6. JOB CONDITIONS 1.6.1. Precautions: Install roofing only when correct temperatures for asphalt can be maintained; apply no roofing when deck surface temperature is less than 45 degrees F. Install no roofing material when water in any form is present on roof deck surface, or when materials are damp or wet. Proceed with roofing work only existing and forecasted weather conditions will permit work to be performed in accordance with manufacturer's recommendatiqnsand warranty requirements. 1.6.2. Temporary Roofina: When adverse job conditions or weather conditions prevent permanent roofing and associated work from being installed in accordance with requirements, and it is determined by Contractor that roofing cannot be delayed because of need forjob progress or protection of other work, proceed with installation of temporary roofing. Remove temporary roofing prior to proceeding with permanent roofing work. 1.6.3. Use of Hot Asphalt: Notify Owner no less than 48 hours in advance prior to beginning any hot mop application to allow Owner to regulate outside air intakes as required. 1.6.4. Asbestos Free Certification: All new materials and products installed as part of this work shall be certified to be free of asbestos in accordance with the requirements of Division 1. Each supplier and subcontractor Page 5 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen Roofing shall warrant to the Contractor that materials and products provided by them are free of asbestos. 1.7. PRE-APPLICATION ROOFING CONFERENCE: Approximately two weeks prior to scheduled commencement of roofing installation and associated work, meet at project site with Installer, installer of each component of associated work, and other work in and around roofing which must precede or follow roofing work (including mechanical work, if any), Archit~ct, Owner, roofing system manufacturer's representative, and other representatives directly concerned with performance of the work including (where applicable) Owners, insurers, test agencies, and governing authorities. Record (Contractor) discussions of conference and decisions and agreements (or disagreements) reached, and furnish copy of record to each party attending. Review foreseeable methods and procedures related to roofing work, including but not necessarily limited to the following: 1.7.1. Tour representative roof areas, inspect and discuss condition of substrate, roof drains, curbs, penetrations and other preparatory work performed by other trades. 1.7.2. Review required submittals, both completed and yet to be completed. 1.7.3. Review and finalize construction schedule related to roofing work and verify availability of materials, Installer's personnel, equipment and facilities needed to make progress and avoid delays. 1.7.4. Review weather and forecasted weather conditions, and proceduresfor coping with unfavorable conditions. 1.8. PROTECTIONS 1.8.1. Provide tarps or plastic sheeting, as required, to adequately protect opened roofs and flashings and to prevent entrance of moisture or rain water into the existing structure until new materials have been applied and roof is in a water tight condition. 1.8.2. Do not open up any more roof surface at one time than can be adequately covered and protected in the event of sudden unexpected rainfall. 1.8.3. Have necessary waterproof canvas or plastic sheeting handy in case of emergency. Contractor will be held liable for any damage to building interior due to his negligence. . 1.8.4. Deliver materials to job site in sealed, undamaged, original containers imprinted with manufacturer's name, product name, and pertinent identifying numbers or markings. 1.8.5. Protect from damage all exterior lighting, landsCaped and paved areas. 1.8.6. All surfaces to receive new membrane or flashing shall be thoroughly dry. Should excessive surface moisture occur, the Contractor shall provide the necessary equipment to dry the surface prior to application. 1.8.7. All new and temporary construction, including equipment and / accessories, shall be secured against wind blow-oft or damage. 1.8.8. The Contractor shall provide all necessary protection and barriers to segregate the Work area and to prevent damage to adjacent areas. Page 6 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen Roofing 1.8.9. Prior to and during application, all dirt, debris, and dust shall be removed from surfaces either by vacuuming, sweeping, blowing with compressed air and/or similar methods. 1.8.10. All roofing, insulation, flashings and metal work removed for construction shall be taken off the site to a legal dumping area for disposal daily. 2. PRODUCTS 2.1. SHEET MATERIALS Specification is based on Siplast Paradiene Specifications for cold adhesive application. Other acceptable systems are from Tamko and Soprema. 2.1.1. Field Membrane: 2.1.1.1. Surface Ply: Paradiene 30 FR, 90 Ibs/100 sf minimum or. Paradiene 30 FR TG, 100 Ibs/100 sf applied with a torch or " adhesive. 2.1.1.2.lnterply Sheet: Paradiene 20, 60 Ibs/100 sf applied with adhesive. 2.1.1.3. Base Sheet: Parabase, asphalt-coated fiberglass base sheet complying with ASTM 0-4601, Type II applied with adhesive. 2.1.1.4. Roofing Adhesive: Siplast PA-311 2.1.2. Membrane Base Flashina: 2.1.2.1. Flashing Reinforcement Ply: Paradiene 20, 60 Ibs/100 sf applied with adhesive. 2.1.2.2. Base Flashing Ply: Parafor 50 L T, Granule-surfaced SBS modified capsheet with a fiberglass-reinforced polyester mat applied with a torch or adhesive. 2.1.3. Reinforcina Ply in Field: (for all changes in slope) Paradiene 20,60 Ibs/100 sf applied with adhesive. 2.1.4. Dry sheet: 5-lb.lsq. red rosin sized building paper. 2.1.5. Vented Base Sheet: (for application over concrete deck) Asphalt-coated fiberglass base sheet with approximately 1.5-inch diameter perforations. 2.1.6. Base Sheet for Nailina: Para~las,. Fiberglass mat complying with ASTM 02178, Type IV. 2.2. ACCESSORY MATERIALS: 2.2.1. Asphalt: Type IV asphalt complyina with ASTM 0-312. 2.2.2. Sealants: Type as recommended by manufacturer, non-hardening, non- migrating, non-skinning and non-drying. // 2.2.3. Fasteners: Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions of FM 4470, designed for fastening roofing insulation to substrate, tested by manufacturer for required pullout strength, and acceptable to roofing system manufacturer. Page 7 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen Roofing 2.2.4. Plumbino Vent Flashino: ASTM B29, 4-lb. sheet lead, preformed size to fit condition. 2.2.5. Walkwav Protection: Siplast Trafbloc, consisting of chopped rubber and synthetic binders. 2.2.6. Roofino Cement: Asbestos free asphaltic cement; comply with ASTM D 2822 and be compatible with SBS membranes, Siplast PA-1021: or approved equal. 2.2.7. Perlite Cant: Manufacturer's standard bonded expanded perlite cant material. 2.2.8. Lead Flashino: ASTM B 749, Type L51121, copper-bearing sheet lead, minimum 4 Ib/sq. ft (O.0625-inch thick) except not less than 6 LB/sq. ft (O.0937-inch thick) where welding is indicated. 2.2.9. Mineral Granules: Loose mineral granules same color as granular surfaced cap sheets. 2.2.10. Term Bar: Pre-drilled aluminum bar, 0.100" thick x 1.35" with sealant lip and drip edge. Firestone "Rubbergard" termination bar or approved. 2.2.11. Nails: 1" square head ring shank roofing nails as manufactured by National Nail Corporation or approved equal for spot nailing sheathing paper to plywood and.for securing plies at parapet. For fastening wall flashing plies to plywood and nailers. 2.3. INSULATION MATERIALS 2.3.1. Coverboard: Perlite, 314-inch thickness, installed in hot asphalt, adhesive, or mechanically attached. Fesco by Johns Manville or approved. 2.3.2. Tapered Edoe Strips: Perlite, installed in hot asphalt, adhesive,. Rigid, perlite insulation board, complying with ASTM C 728. Fesco by Johns Manville or approved. 2.3.3. Rioid Board Insulation: Closed-cell polyisocyanurate foam board minimum density of 20 psi nom. per ASTM D-1621. Insulation board must be approved by the roof membrane materials manufacturer for installation in the specified installation. 48-inch by 96-inch or 48-inch by 48-inch boards; R-Max "Therma-roof, Johns Manville "E'NRG'Y 2", or project approved. 2.3.3.1. Thickness: R-20 minimum (2.7" for "E-NRG- Y 2") 2.3.4. Tapered Board Insulation: Closed-cell polyisocyanurate foam board minimum density of 20 psi nom. per ASTM D-1621. Insulation board must be approved by the roof membrane materials manufacturer for installation in the specified installation. 48 inch by 96 inch boards; R- Max "Therma-roof, Johns Manville "E'NRG'Y 2", or project approved. 2.3.4.1.Tapered where indicated on plans. Minimum W' per foot slope at crickets and saddles. / Page 8 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen Roofing 3. EXECUTION 3.1. GENERAL Contractor will keep at least one complete copy of drawings, specifications, and manufacturer's standard specifications. 3.2. REMOVAL OF EXISTING ROOFING All roofing materials shall be removed per Section 02070 and 02080 down to existing deck, including flashing, copings, cants, curbs, mechanical equipment, electrical conduit, etc., where required to do the work shown on drawings. 3.3. PENETRATIONS Extend as required all soil pipe stacks and through roof penetrations to be 12" above finished roof surface. 3.4. INSPECTION OF SUBSTRATE 3.4.1. Surfaces to receive the work of this contract shall be examined for unevenness, inadequate anchorage, foreign materials, and moisture which would prevent quality application and execution of the roofing system. . 3.4.2. Carefully examine substrate surfaces to receive membrane roofing system and associated work and conditions under which roofing will be installed. Notify Architect and inspector when discovering insulation deterioration or other damage. Do not proceed with roofing until unsatisfactory conditions have been corrected in a manner acceptable to inspector and installer. 3.4.3. Inspect and clean existing roof drains and replace any damaged or missing parts per plan notes. 3.5. PREPARATION Accurately layout work surfaces for materials application. Lay sheets perpendicular to the incline starting at the low point of the roof. 3.5.1. Cants: Provide cants at all intersections with vertical surfaces. Install in accurate lengths, cut to suit conditions, miter all corners and intersections. 3.6. GENERAL INSTALLATION REQUIREMENTS 3.6.1. Comply with Manufacturer's written instructions except where stricter requirements are indicated in this specification. 3.6.2. Provide 48 hours notice prior to intended start date to Owner and Architect. . 3.6.3. Cooperate with inspection and testing agenci~s engaged or required to perform services in connection with membrane roofing system installation. 3.6.4. Provide Owner with emergency phone numbers of personnel who can and will respond to roof-related emergencies at any time during the work of this contract. / 3.7. DRY SHEET Install a "dry" sheet beneath insulation over nailable roof decks to minimize dust, drippage or other negative impacts of roofing installation. Page 9 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen ~oofing 3.8. APPLICATION OF INSULATION 3.8.1. Install insulation in accordance with the manufacturer's instructions and in accordance with specified requirements for wind uplift resistance. The insulation shall be installed so that it is tightly butted at the end and sides, all joints staggered a minimum of 12 in. each direction. Fasteners shall be installed per manufacturer's recommendations and shall be flat. All voids shall be filled with insulation. 3.8.2. Where overall insulation thickness is more than 2 in., install required thickness in layers with the joints of additional layers staggered from joints of the first layer a minimum of 12 in. each direction using specified mechanical fasteners. Install additional layer in full mopping orhot asphalt, applied within temperature range of EVT .:t..25 degrees F. and at a rate of 25 Ibs/sf C:!: 25% on total job basis). 3.8.3. Provide one inch per foot taper at sumps. No cant strips allowed. , 3.8.4. Install coverboard in full mopping of hot asphalt 3.9. INSTALLATION OF REINFORCING PLIES 3.9.1. Install a reinforcing ply at all changes in roof slope prior to base sheet application. 3.9.2. Install one layer of SBS reinforcing ply in all sumped areas with a full sheet and in all waterways with a full sheet centered in the valley 3.10. APPLICATION OF ROOFING, GENERAL 3.10.1. Apply materials in accordance with the roofing system manufacturer's instructions and in accordance with specified requirements. 3.10.2. Extend roofing membrane to 4 in. minimum above top of edge of cant strip and terminate at walls. At. parapet and roof curbs, start reinforcing ply 4 inches from toe of cant and continue membrane up and over tops as indicated. 3.10.3. Install membrane flashing (as recommended by manufacturer) wherever roofing intersects vertical or inclined surfaces. Apply base flashing in accordance with manufacturer's recommendations to meet the requirements of the base flashing guarantee. 3.11. APPLICATION OF MEMBRANE ROO,FING 3.11.1. Installation of Plies: Except as otherwise indicated, install membrane with ply sheets layered uniformly to achieve required number of thicknesses of membrane throughout. Maintain minimum 3 in. side laps and 8 in. end laps, or as recommended by manufacturer. 3.11.2. Base Sheet and Interolv Sheets: A layer of base ply shall be solidly bonded to new coverboard with PA-311 or as recommended for condition of application by manufacturer followed by application of interply sheet. Side laps shall bea minimum of 3 in. and end laps a minimum of 8 in. Laps shall not coincide with the laps of the base layer or each other, / stagger minimum 24 in. Page 10 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen Roofing 3.11.3. Surface Plv: Install surface ply in PA-311 adhesive in accordance with manufacturer's instructions, whichever is more stringent. Broom or roll surface 3.12. STRIP FLASHING 3.12.1. Set flanges of sheet metal work which are to be incorporated into the roofing system into a uniform coating of asphalt roof cement, applied. over the sheets, and strip-in with one layers of reinforcing ply adhered to the tops of the flanges, roofing membrane, and to each other with coatings of asphalt. Extend felts 3 in. and 6 in., respectively, beyond the edges of the flanges and onto the asphalt roof membrane. After the cap sheet is installed apply a bead urethane sealant around roof jack or penetration. 3.13. ROOF DRAIN CLAMPING PROCEDURE: 3.13.1. Clean clamping surfaces of all cement and other material preventing continuo~s contact of clamping surfaces. 3.13.2. Pre prime metal drain flashings with two (2) coats asphalt primer. Set metal in ply sheet in even 1/8" layer of mastic. All field plies shall extend under clamping ring and shall be rubbed into place. Bolts at clamping ring are to be tightened in sequential fashion while membrane is still warm to evenly compress membrane. 3.14. WALK PAD INSTALLATION 3.14.1. Install 200 lineal feet of manufacturers walk pad as directed by Architect at Central Kitsap High School. No walk pad is to be installed at Jackson Park Elementary School. 3.14.2. Install per manufaCtures installation instructions. 3.15. PROTECTING AND cL.EANIN~j';'c1c(c' . ..> 3.15.1. Protect modified" bitumin()~s membrane roofing from damage and wear during remainder of construction period. When remaining construction will not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and District. 3.15.2. Correct deficiencies in or remove modified bituminous roofing that does not comply with requirements, repair substrates, reinstall roofing, and repair base flashings to a condition free of damage and deterioration at the time of Substantial Completion and according to warranty 3.16. REPAIR The Contractor shall repair or replace (as required) deteriorated or defective work at the time found. Installer shall repair damages to roofing which occurred subsequent to roofing installation. END OF SECTION 07555 / Page 11 of13 CORNERSTONE ARCH'L GROUP. P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9,2001 Section 07555 SBS Modified Bitumen Roofing SBS MODIFIED BITUMEN ROOFING GUARANTEE WHEREAS (Contractor) of (Address) herein called the "Roofing Contractor", has performed roofing and associated ("wor~") on following project: Owner: Address: Name and Type of Building: Address: Area of Work: Date of Acceptance: Warranty Period: Date of Expiration: AND WHERE Roofing Contractor has contracted (either directly with Owner or indirectly as a- subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period. NOW THEREFORE Roofing Contractor hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period he will at his own cost and expense, make or cause to be made such repairs to or replacement of said work as are necessary to correct faulty and defective work, and as are necessary to maintain said work in watertight condition. This Warranty is made subject to the following terms and conditions: 1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by: a) lightning, windstorm; b) fire; c) failure of roofing system substrate including cracking, settlement, excessive deflec:;tion, deterioration, and decomposition; d) faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the work, e) vapor condensation on bottom of roofing; and f) adtivity on roofing by others including construction contractors, other persons and animals whether authorized or unauthorized by Owner with the exception of normal light foot traffic by the Owner's authorized maintenance personnel. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Contractor, and until cost and expense thereof has been paid by owner or by another responsible party so designated. '2. The Roofing Contractor is responsible for damage to work covered by this Warranty, including consequential damages to building or building contents, resulting from leaks or faults or defects of work. Page 12 of 13 CORNERSTONE ARCH'L GROUP, P.S. Reroofing Projects 2001 CKHS & Jackson Park Reroofs and Roof Repairs at Various Sites April 9, 2001 Section 07555 SBS Modified Bitumen Roofing 3. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Contractor or Owner's qualified maintenance staff, including cutting, patching and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void upon date of said alterations, but only to eXtent said alterations affect work covered by this Warranty. If Owner engages Roofing Contractor to perform said alterations, Warranty shall not become null and void, unless Roofing Contractor, prior to proceeding with said work, shall have notified Owner in writing, showing reasonable cause for claim that said alterations would like damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty. 4. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void upon date of said change, but only to extent said change affects work covered by this Warranty. 5. The Owner shall promptly notify Roofing Contractor of observed, known or suspected leaks, defect or deterioration, and shall afford reasonable opportunity for Roofing Contractor to inspect work, and to examine evidence of such leaks, defects or deterioration. 6. This Warranty is recognized to be the only warranty of Roofing Contractor on said work, and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to him in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Contractor of responsibility for performance of original work in accordance with requirements of the Contract Documents, regardless of whether Contract was a. contract directly with Owner or a subcontract with Owner's General Contractor. IN WITNESS THEREOF, this instrument has been duly executed this _ day of ,20_. ROOFING CONTRACTOR GENERAL CONTRACTOR Page 13 of 13 CORNERSTONE ARCH'L GROUP, P.S. ______________ _.J CITY OF BREMERTON · 239 4th Street · Bremerton, WA 98337 CITY OF BREMERTON DEPARTMENT OF COMMUNITY DE~ELOPMENT May 03, 2001 CORNERSTONE ARCHITECTURAL GROUP JOHN SINGLETON 1904 THIRD AVE SUITE 500 SEATTLE WA 98101 SUBJECT: Application No: 01-0191 Site Address: 2900 AUSTIN DR JACKSON PARK ELEMENTARY SCHOOL REROOF/INSULATE ROOF Your building permit for the above site address is ready to issue. The balance due is $ 1,143.85. Permit Center office hours are from 8:00 a.m. to 5:00 p.m., Monday through Friday. Please contact me at (360) 478-5275 if you have any questions. Sincerely, tv arie / 0J rJlL(2 , lBUilding and Development Specialist I I I I I II !I II il !I II I · Celebrating 50 Years of Freedom · BREMERTON PERMIT CENTER 286 4t.h Street." Bremert.on" WA 98337 Phone: (360) 478-5275 FAX: (360) 478-5278 BUILDING PERMIT Applicant: CORNERSTONE ARCHITECTURAL GROUP 206-682-5000 JOHN SINGLETON 1904 THIRD AVE SUITE 50SEATTLE WA 98101 Penni t No: Status: Applied: Issued: Expires: 01-0191 PO/OING 04/17/2001 Job Addr: 2900 AUSTIN DR Location: JACKSON PARK ELEMENTARY SCHOOL Parcel No: Owner: CENTRAL KITSAP SCHOOL DISTRICT 9102 DICKEY RD NW SILVERDALE WA 98383 Contractor: TO BE SELECTED Lie :It: Exp: Subcontr: Desc: TEAR-OFF & REROOF W/AODN OF R-21 INSULATION ********************************************************************************************* Valuation * Permit Fees: 1,139.35 Total Calculated Fee: 1,884.43 126,000.00 * Plan Check Fees: 740.58 Additional Fees: .00 * Other Fees: 4.50 Total Permit Fee: 1,884.43 ********************************************************************************************* This pemli t shall becorne null and void if the building or work 8uthoYized by this permit is not commenced within 180 days f rom the date of such permit, 0.( if this building or wo~' k authoYized by such pemti t is suspended or abandoned at any time after the "Joyk is commenced foy a period of 180 days. NOTICE - It is the responsibility of the permit holder, not the City of Bremerton or Building Official to see to it that requi'red inspections a roe made. The pennit holder must notify the Building Official I,~hen ~'eady for ;"1--';:- inspections. Failure of the permit holdey to notify the Building Officia.l of yequired inspections may nilsult in the stoppage of the woyk until such time that the permit holder can substantiate to the building bfficial that the conceah:;d l,.Joyk meets or exceed\" code requiyements. Any demolition, testing, 01" financial buyden shall be bm-ne directly by the permit holder. Failure to substantiate code requirements 1,.Jill indemnify the City against any and all n,'sponsibili ty or liability connected with the construction. I hereby cEH,ti fy th'3.t I have read and examined this permit ,and lnolpJ the samE. to be t.Yue and cor.n:ct. All provisions of laws and ordinances gove~'ning this type of work will be complied with whether specified herein 0\" noL The 9r'anting of a permit does not p~'esume to give authority to violate or cancel th,? provisions of any other state 01" local la"-' regulating construction or the p~nformance of construction,. Date" ____'~~_~~_'~_""_~ I certify that I am exempt from the requinernents of the state contnactor's registration law, undey Section 3, Chaptey 126, I".ws of 1967. Signatuye:_.._________________,_..,,,____,__,,_,___ Date:"._"w_...__w_"_.,____.__._.~_.___,,w. *************************** \ L-t \ 7 -0 \ Date: Permit Centerw,,-Approved [3}':: _.'_,_w._",,_ ---- ~ It ',?:II!!!' -~ -- -.1 1 BREMER TON PERMIT CENTER 286 4th Street # Bremerton, ~ 98337 Phone: (360) 478-5275 FAX: (360).478-5278 BUILDING PERMIT ~';';<_<':.>l: .~".:...;,~ I APf;ilcant: CORNERSTONE ARCHITECTURAL GROUP 206-682-5000 ,,' .. JOHN SINGLETON 1904 THIRD AVE SllITE .50SEATTLE WA 98101 \';'" . ",':.," " Perfii'i t NO;:;i(}I~OFh S tat us :'f,f~NDING ,. 'j:":.':"," , Applied: 0~j,t7)2001 ISSueq;;",c";;'.c"",,, E x pi r e s;:"~~::~'"' ,- ,..".,.," ,\~ ',j' Job Addr= 2900 AUSTIN DR Location: JACKSON PARK ELEMENTARY SCHOOL Parcel No: Cotltractor: Lit :J:f: Exp: O)~~~DW~ nl APR 2 0 2001 ., .., Owne(: CENTRAL KITSAP SCHOOL DISTRICT 9102 DICKEY RO NW SILVERDALE WA 98383 TO BE SELECTED :J r , . .:Sllbcont r:. .:,>~~~:.._>~.. ~:;- ---, BREMERTON BUILDING DEPARTMENT ., Desc:TEAR."OfF 3.. RPWOF W/{)OON OF R-21 INSULATION **************~.***********************.********.*)/(*.*..*****...***~********)/(**.************* Valuation * Permit Fees: 1.139.35 Total Calculated Fee: 1.884.43 126.000.00 )/( Plan Check Fees: 740.58 Additiol1al Fees: .00 )/( Other Fees: 4.50 Total Permit Fee: 1.884.43 * ** *)/()\<)/()I( * )l()j()j( ** **)l(* >l(.*)/( **)/( * * lICI(:+::)I: *)1( W. *)/( * >>:*)/()I()/( *.)1( *::+::* **)I()I(:I( * * *)I()/( *)I()/( * *)/( **)I()I()/( ** * *)/()(( *)1::* *)1( **)/( * *)I()I()I:; * ***llOI( . .. ThiiS peymit $Jhall becomEi' null and void :if the buildins 91" ",)oyk au'thoyized by this peymit.is not c:ofllll!enced wit.rin .1;80 days hOlYt t.he dat~; of sUch peymit, 01" if this building ell" WOYk authoYized by such pel'ffiit is susPended 01" · abandofled at $onlY time aft.erthe wcrr'k is cOlnfoenced '1'01' a pedod of 180 day".. . NOT;rCE .;. It: i$.t~' tespone:ibility of the p&ymit holdey, notthe City o'F BrliNnel'ton 01" Buildill9 Official to \See tQit that YeqUiYe~1 inapections.a.ye ml:1\(;l~.. The peymit holda>y must not if>' the Building Official "Jhen l'esdy foY ,!,~,):~<',; , , . ' ' : '." " il'!$pect.ion$.F$.i1IJn~ of 'th~peYmit hol~y to noti fyth~ 8uilding Official of yeqLii n~d inspections may ye$u.lt. in.thlil stqpP$geor the !;.IOr'k until $IJch time that the peYMH hoIdel' can $ubsb:rtl:.iate to thebuildill9 offici,al tliatthEt conc;ealed wo)'k meets 01' exce~ code yequinwmente.. Any demolition. testing,ot' firw.ncial bun::kmshall be!:;iorne din~ci:ly by the peYt'llit holdey. Failuye; t.o substa.ntiate code r'equi yelYlents will indemni fy t~ City a,9aHl$tany and .al!. n<!spQnlllibil i t.y o\' liabil i ty conMcted with the cons'\:.YlJ.ction. ~. l ~~ \ \7~D 1 heieby Cf.!l'ti fY':l:,hat I have nw.dah(:! examined thi$ peymi t and krlOW t.he same to ":f!ie tyue corr'ec.i:.. .1,111.. . PYQvisioflS.of h,~J$ and oYdiliance$ goven'ling this type of ,~oyk ("Iill be coo!pHed with whetheY.$pedfied ~Ye.in . ?fnot,'<Jheg!,~SIrlt.iM9 of &. peYlrdt does not pYE!$Ume tog:ive alut.hodt>' to Violate 01' cancel the pl"ovisiol1$ elf . i:<w/.othey;.@t?'item local la,,1 n~gulating constYl!ction 01" the peyfoymance of const::(ucHl:lI1.. V*~,' S.ignatLlY.e~.._,_.,,~.,__~+_______.___,_~.____w:" Oate:______,________........ I, I :1:deytify that I. am exempt f!'ofll the yequin:,'fl*ntlll of the ",tate (;onh'acto.Y'$ yegistn;ation law, uncWY S~(;ti6n 3. Chapbw 126, laws of' 1967. si9natUye~___-:!"~.___..;...........__.___._.".--"---.--- O...t&=___.,___.___ )l<>lDl<:* *:;: Jl()!::.,!Ol< * **)lO(OIC*,)l(l!C<lClC!OIO/OIOIOf( .a .. J . Permit Center--Approved BY'W~ Date,'i~:L1-0~ IV () 'CJ N Q [7"1'" f"~ ... r--, it F --..-- ...-. ----. -"1'- ,".." , '~'~l~Wi!WM:t'?:{;;[~Jl~'Kr~j!~~1 ., eJ~E:MER''i"ON PERMIT CE.NTER ,286 4th Street, Bremer' tan 11 ~ . 98337 ;: (34!~O) " , FAX:: C,160J 478~"!S27t:i BUlL-DING PERt'frT ;>>J..~'~ ,.~ j 1 '1,\",' (iR(lUP 206"6H2~5000 5llSEAHLE iMP; 'j}3101 DISTRICT NW SIt vr~RnAtE tlJPI eH' ~ to :m~ SELECTED #: (xp:: r::: &$ltI::ROnr L\I/G:IPON or R~21 XNSUUHION * 1/l: ~* lli il\:II!:~ ~~ JlI ~,% Jt: lI(:<< ~lll **'* *$; :r.** * ~~.)1\(:;f(~ *!l( *~w. >!i:1!l:*:f.lIi: * )j(;+tJl\ **:4( Jll.l\!* Jl()~ *.l1\ * m It\ *' :$:JiI.* lit * ~jj(;(I;~ ~ ** ll\)j( i!<tltJl( Jjl; i4nK~)/( ~'* *l!IlIOIl~; It{:$(.;<< ~ * Valuation lIi: t':>erll'll.t -~ l~ 'fotal Calct!lah~d Fee!:[.1~~~84.43 00 )!tPlan Check Ff~ee;;; 74i.L f.H,1dit1onal .GO * Other. 4.50 Total Permit FeeS 1.88~,43 >li **lRJi'i>>.l.)\';:t:t ilDIf.JlIlliill:#: ~i'J: :<<.'1(11( e+::~!;jlot\:~."')\{ l!:llt)tll( **1<< ill lltJil:+t * ***** iIP!OIOIOKlliif. JK* ~'4';;i(*i!l Jl('lltil/:llill\ l!':)!t ~O\(**~~:+::4!>>l#, >>1*% )1(.** **1kl<<:lK:<< ~oinUtllt;;; ( P*,t'lllit M:l!:dl ~r.:~~ tlU.D i'l1't(,! I,1\;t:h;,! if t;.he> l:'Mild:!!':I(1J l;W ~jpr'k :!'I1.ttJ'\Qri:r..~ bY this f;'...rllli1~.i,;; not :t~l td:~'s 'f'rt)fllthl'lO d$;t~ Qf $li(;;h j:i'1f;lYlIl:l:!;" ,::;~, if thi$ blJildir-l;;:j OY\'lO'rW ~\H:ht;Yil!:'f1d bi" i!llA(~h p'*nnH: .i,;; ~!~tX:l('jr.';\I~:I. .;At;t,l)l1,yHlfflll ti\'i't';,~H'. thJg1.\~;JY'k j,~i! t:tlll'ItJ~Yll',;):lil;d f(~1.. $. t.'~wi"d elf 100 dl!l>"",, I"li ~hrrl w~",~doY ".,' I't:.hi t~ .~'~$pl;)mib:UJ. l:,}' 0'" tj'1i!l' t)(ilYI1\i\~ n.:)l(;;\I,w. tiO!t t~ CU>, (:If aY'fi!l)Wy.t.OI'j oi BI,,:l,lctirlQ. to.' ~* t;';;:i;it '\:,h\!l;t Y.l!'i;:,\>..i:h""d irl$?'~"ti<:'rll~ lWlrllr 'Ihi~ p~r'!!lit, ht\)lclirt' fll!..j:t~t riCft.'ify tJ"It!) 6tlHd:h19 Offi1:.~b1Ji wf~\'i \"~adY f,::ty i,l%iJii~~l;;:'t~,('\W~l), 1;"tl;H\J~'~ (")1' p~l"lt1it,t.t) tt",., ~lild:lxW;l. 01"l'id1ll1 ()f Y4Il'(;,j\,.d.j'~d iril'!lP~'?,li:t(~ il'/$;",' ~'$',zllJlt :intJ!ll\ t;;h~ '~jl'k lJ:tIt.U ~1l.1";h 'l:.imtJl> 'U'leIt, 'U~ P'\t'Yl~!H~ hr;lldj/,'T. Cliil.n$!,lbil>tant.i;!!l't.~ t~; th4!l !;;t,xildi:fiI,;l .~~h"';t 1',Ii';rykl:ll#'>I!>.t,,~ t~,\. ~>'G,!;t",d$ CtJ('~ \"~q'Jtt'~I*,'\'1t~. AI1~1 ,~l!lI.ll!..')lHion. t;J!lo$t,:i.fS, or fiYllal1t::li\l.l bur,~f'[\1lIl),."{U b~), l^)!'Jtfl'fll <:1~,.FIi!~rtl)'b~' t!'1'& p@ymil; hcl'1~r.I"wjhj,Y<!l '1;,;(') ~..t,lbt'l~rlth!l,t,(iI ~wd~ f~';.'IIJj,Y~f(ll!'Y'ft!il wiH ir:~1lll'):l.fy 'l:h!il j),~i("inlllt: :{!\l;r(i{00'~;1 \"W1!llll()y~:tl:::d,ht;)i .c.W :C~$.bil i i;y o.tJnn~c.t;iW:d Mi tFl th~1 l:;orjti!l1,rlICU~m. ,('Jf Th~ 1E.!\1'!";;;tt,;JlY(;.t.l'!,'bli' 0'1' 'l;;hI1It rhill,ve nill(:,,;;'i#Wnl:!ill,j~;IJ;Illi.r..,(;1 '!"hif:71 ~i:>t)>nir!,'\'; ~,nd kn,;lt4!;hlJ;' !;,l!l\fOO t;n.ilif .~.j1Cl ,)Yd:i.n;,IYll'::;l!;l', ~J<;,lv",nti.Y\;;;I .ty'potfr ,~f W<;)Y4< \4i.U tl>!'if {;~.'tjl1!~H$ld ~"ith~,hlil'M~I" ~}f ",p~nllit.cltllll"" 11O:t: Py~,,;,;.ull~ to\~:iV\il'! ;;;t\..rt.hl:'J'r'it}' tf;l violt\t:.l!I' ':Jr' CiIli'l'lf;;fel .t:JI<! pr(Jv:b..~,orl!fll 1';;~~;li\'1 IIt\,.~ (;,:Ol'!!;l't;Yuc1~;lcll') ':>1" t:J'VJ r,<!/'d'OY~'rlC,' ,;If GOI'li$t.t'y,,;:!:.ion, Ii, 5i~"1i.~:'r,;:t.l r'~y It; '\""'~"''''''''''P..,,,,,....#JW''~'''''',,~jWJ"''''~''"''M'''l'''''''~''''''''~''''''''''''''''~''''''''''''''''''''''~^'~__'"e"~_''""", I CfH'ti:h' t.hlllit, t am ~X1lll!rll!:'t; ,~l;;i,,~t, i~;.;n ;3" l~~fi . $t,,*t:ii:l t'.~i$ti'ath)I"1 lllliW. und~r (J , ..l!1r II ~,_,_,.,..""'."._"_._h..,,,._;..,__..._,,,,,,....'M_,...,,...,_.,,,M'_,,, >>:JF:lkli:***'*.lloj(~lft*lI(*:t;il!*~OIllf:~:iI()li*;<<* J . . .. .~- '\. . / v~f"'. oate.~.,_,~,:y.~,,,~ ( ~, / / ""~" Lt r---~ c.. . '. ~". '.' . (.' ".i...,.) ~;. / ". , \ to ' ,~' I ,',"" ~;::~:l;;~';< '",<'<mc.F">':'J,,', -,", ,--,"'J' ..,.;..,_'.I>....o.~ ~ . . " , . ;....-'...."."''J..:~~..;~-..:,;.~,J,;,~,;,;~''-:~,,;......:__'J..-_..........:,~:',~, 1..':' ,~.....;.^i-.."U4~"~:~~":;.;.~~~":rii..,,;;~~,;iL;,;d_.}~.~~:h,i;,,r,;~;',;.'hl..;.Ji1,,'.......... , I Ft:":TON PERt1,XY:.C 4f,;.h ,St,r"t,.Br__rt.o1t~ NA.... (36f>) 47fJ-S275 PAXf~ (360) 8U'It..DING PERMIT .-'-_.'.-._.~.- -.-- - ._-~._'-'-_._'_.---_.--._, .. '. .. .. . ,...~'..t"\. '.......'.!. I~...... g.'.l..:."! 'il.!...:.::.. ..iMi. ~.)...~.. ..U...'.'.'............. '.. . e:Ri~:.":','~:'.. "'.' ';:: i' H .. : . i1'S-S:27tJ ' i i:.. .. AP1R 23. ,~1!Jjmj1: : !'( , i " ~,- '. ,,'.'.' - - - ,- -" - ' ,,- , :' . ~ rIECTURAL(i~(jVP 206~~a~""$oOO JOHN :sINareloN1904 JH,XROAV!SUHE snSEAITlEWA 9a101 -, - ,. " . - /"'.(1.{. . " :@l'fiiMt:~r'Q:N r\. . . t. M ./3tJiJJ1D'lif:il'..FjfPARTMiE.Wl ~er_~ nO. ~~V~ ., Status; PENDING APpliedz 0411712001 !s$u~l.;h €x~i,xe!:~ "",~f"'JV..t~"",,:!,.~ . . 29()QAUS.lll'4 OR JACl<i$Q;NPARK f,:U:MEi'41AJ~Y$CHOOL. r: I; CENTRAt-, l<I1SAPSCHt}Ol GrS.IR!tT ,.,1()Z'91-C:l<tVR'U ~$ILVERDAtE: /,Il-A 'S3S:S C9iit.~ act oW'; '.flN'.. ....." . ,W 5~J~1C"'.r.:F.D Li(~ f; Exp: ,. 1 I. I, l O~tic: n::t\.R..,;G?:'. '$:RE~OIOft ,Wf,AriOHO:fR;.~trN$UL~ rro.f4 \. 't~ " . ~llt*lI\llt~**t)lill\'ll!:** **.~lU,(lW.t14liU;ll(lttlll*lflll\:lIIl11~:<< )Il:llI'lfllk.l<<1II:t)illlti(lltll{t:>>:U:alll.1U(llt* !It~'lIlJiOlot*JII*.J:;1k $lU**lfIlk:l:*>>:lf**lklk ll()l!lllt:**,Ul!:lJt VS.hhllHofl lit Pe.rmHf'ee7lll 1~13'f.35 lotaJ,Calcuhtedr-eee 1~8fJ4.43 ,~,26;~OOf) .00 .' llI,Pl.af\/ Che.fik:FeeSl S 74(,) ~;5a Add! tlonal F e:es: .. ., .00 . . ..* .....Otner Fee$~ . . <4 ~S.O. lotalP~tm.it f~e~ .3..804.43 .!lK:t; *l!tll{Jl{/lI{1!t):l!'JlJt)t( lI\'!I\ili/tlll'!I\)I(lI{ ~lK~ mlllit!l1!1tt lJt.J!*:<<.~ lJt:<<:**;l//;t *lJtl<< It;.lI( * lll* JIll<<lJt:ili.lt$lJ: lIllfllll'lk *' ::II.*)l; lJt *~*lIi:lI(*JII'***)fl*ltlll*lIlljl)fl;*llllfl*lIl**** llOk * It . .1'hifol ~\I1tj'll~t,$MU~I.'1lI1ft l'liilil JWIi'(1d '..<oirllil't~ oo:UtU~ (;:)of' W(l'rk alJ;izi)l.lt'i~by thhll p~'r'Il'Iii:..l'1Qt ~ wHh;h'l f~'tII>>.*:I1il!'.,.tlit' .'.~ ~eh,!:l~'1.111it.Q,\C if' t.hi.$b\~:ilcl~~oY \IIIt)'(k$,U1i.hori,:i'1~ by ~hp<li~'lI1it );$ ~~d.oY .~..(;jt i'/I;tl ..tA.ny1::::l.~<llitil'li'Y. 'th~ t<<:I-t'k ;f<l'~~'lOriKlfcw all p4l'l';i,lxl; of 1lli6da>'$!. . I ; . '" " , ~t!hlllv.l"!il1:ad'i'Md.td.~_:i~d cth:t-1\\l Al~ iN ~~Q~~f\!t:"~~n'\il'1li;lthi$ ~~ ~c.;:!lliP:n~cl Witf'l.w1'Wth$'Y~iOC:iH'$cl M'r~in .', 1i/1f. 11..~~!lf:rm;i.t,dii,i"l!:$ 1m, P'l"~WfIW:.t,o' ~1.Vll!r-lll.IJ.thQl:':t-tyt~.ViollJ!t.;S< ~r: ~ry:::~l t~p'1f'ovi1lll,1I:~ ~f 'i"!lfIWi~atirllOl o~~'U.;;;t.iorla~' tbliJ p$'ffOrmliIJ1e.'" :crfcorii1rt.l"uc.~tian. ;;.~ tt :/;$" '!;;h!lf )J-_~ibUltY Q'f. :t.~ p~rl'\1it holcl'-H"~. oot. t.h&City .(.1fBY~Ywl'l OYtlUildil"lS Qft'lci!ll.l t.l::l~' r.~i'~ 1~t;:tor~ . .. . Tt'i\t~l"mn: hol$Yll'!l~,t n\')~if')' t.~ llllJ:HQirIW(Jff:i~u.l\,jten r~l!iltdv ~Oy 'jlJI'~H~'{l'~.,Qt tf'~ p~i'''m1t.~ f .tQ riClti'!'y tM- fJuHeli!1iJ ltrffj"f.:i,l1!.l of Y~QYiY<<'li,l'lIlll'-'eoti~ _)lr~l.t '1.l;i'1.~!I'I:~!;l~~c:;f . ~t tJ:r!tUtIUOh tif~tl'1!lltiiM p~ymJthol$r (lal;11 ~~$t~ntiate .to. t:ht.. blJUdil19 of'i"Jc;iml . ..,/. ~,~ll:~t:~ ~ r.,~hil\lIl$in~. . ~ ~UtiGri. ~$t:\..I1Ii1~ i'ir~:i.lli;l ~l~li $hall t~~!lfr"&li'l;: I'lOl~Y~'P$.:UlJYI't' W~'tJIJ.I'lt.:iatlll c~ l"!lfql.li l'ii.'lflllmt,(;;'wHli:n::tel'm'lH)' ;t.tl$ Cil:y CI'I" lil'llil:;I'!,li.t;y with tl11'il ~tnl~t:iCl~, t,f~ ~t~ 1\7Orrt;r'~m"'$ yqi$.t.r<1l;tiol1~i~"w.Y:~r O.atli;t '~ tLt -i7 ~l) " .. '\ N,.'''. . . '~lZ)... ............... :' ',_ "" . j. h ., -" -,"- -, '\ ~ ' . \ "lii' , . ./:!1{~7:,:;,';::.;;j:;";.. . PAGE 02 CDtP Cf ~f5 04/15/2001 10:38 3504785278 COMMUNITY DEVELOPMEN ,...':, ._ding.Ber:Q)it}:,f," " 'I I '11 j iY'1~' ,. '.... 'I . 1 ,,' . CitY oiBrdnert~~~'w A 98337Pho~e:(360~:4. 01 0 I q J APPLICANT: DOWNER DCONTRACTOR}lJAUTHORIZED AGENT - Tax Account Number: '67'2.1"000"'0 Q~- - 0004 .-\dd.tess: 'lJO'Z DlCf::.S'f 12.oAD NW 5/l.,\fe.IZt)Ac(....E, WA qeS~3 Address: Site Address: 2.CfOO AUc:rr1 tJ D~/V/!E f312.eMEJ:Z.r~1J, WA Owner: Cla-H1"1ZAL ,<rrSAP ~c.+Jao1- D($ft<.IC r Contractor: TO BE=- t::&-1E:-IZJ111N.5-D Contractor License#: Expiration Date: Contact Person; '- IOU 5IN~/...E/{CJN '2.oh-~Z-~o Contact Phone#: -z..C)~ - (p e"Z.- ~Or::JO Check the type of application for below: o SF RESIDENTIAL NEW D COMMERCIAL NEW 0 GARAGE o DUPLEX 0 COMMERCIAL REMODEL 0 ACCESSORY BLDG D MANUFACTURED HOME 0 COMMERCIAL ADDITION .0 SIGN o RESIDENTIAL REMODEL 0 COMMERICAL REPAIR 0 DEMO o RESIDENTIAL ADDITION 0 MULTI-FAi\ULY 0 GRADING (Cubicyards:_.~) D RESIDENTIAL REPAlR 0 TENANT IMPROVEMENT A OTHER:~~F Scope ofWox:k Proposed: 3~ -OFF ~ TZ.p.~o1= W / Irf;otT/oN cj::;. 1Z...Z,1 JHWLMTdt-/ _f-LiL ~echlYJ ~r' ~. D",?~11ing~ '~,t;Soo , Garage: Decks: Square Footage: IS THIS PROPERTY WITHIN 200 FEET OF A SHORELINE? YES NO X , . "~Valr#90~~I~:~;'\"~!~: .:i' :.~'~ > . \. :11 'c\><: :j;i~;)~i~~:;?}p~rm'it.'r~~~i.1~;i;:1~~' \~;~~~.jl}i~~;f~' it I~($, 000 f'7-fO.5<2>. ~ , f<1-. -- Applications for which no permit ig issued within 180 days following the date of application shall expire by limitation, and plans and other data submined for teview may thereafter be returned to the applicant or destroyed by the building offu:ial. The buildi1lg official may extend the rime for action by the applicant for a period not clCceeding 180 days on request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. No applicant shall be extended more than once. In order to renew action on an application aftu expiration, the applicant shall resubmit plus and pay a new plan review fee. &~ j DATE: 0 " .......;-- ......,.-01;.._-_ """,~....",.;........,;'"""":,.-..'f"""-"""""',~q7""",,",,,,.~-~=,==I'~=:~~-:-::'-'~f~>-'P-~~~~'o'!,'~':;""P'?i ~~_.", ,~'" ~~,"""".~." ,.~, ..,,""""" "o:--,:~--""-,,-.~. '!:;- ;- ,-'~":"" ** ************** IPT **:w:';\( * *** *** ****** **)!' ** **:* ***** ** * ** ~~*** ****l'!~ ******* ********** ** * Number ~ ()1 t ."'tro()unt;: 740.6tl 04/1 1 F'kwmenthocl ;:CK ion ~C'OHhfE:r;:ST()NE CK 1 n1 t;: V{.J __.___~~_~__~~_~__~~~,~ ___~'___.___~'___~_____,___~__u~.___~q~~_~_____~____._ $1 T I I ! r [ ! t I I I' I , I TYP<'J;; aU)GONLYSU)(~ F\E],~\''LtT-'NO t1ECH./ i.!N Of~ El..EMENlAI::::V SCHOOL 1 1.8&4.43 1 ALL Pmts: 740.58 Balance= 1,143. ****************************** f~l'flOU nt~ ) Bur PLAN CHECK - '-~-_~___~'~~_~~~__-_~__'__~~____~_~ff__~' ... ,,":,". -c,,~.. "',",",.."c;,.~,. ....'7.,""'-.."1 1 I l I , 'I I ! I I [, I r r , .e . " .;'\ ) BRE:MERTON PERMI T CENTER 2$6 4th Street" Bre.mertan" WA 98337 Phone: (360) 478~5275 FAX: (360) 478-5278 BUILDING PERMIT !! -:j;..~'c;,..., " Job Addr= 2900 AUSTIN OR Lobation= JACkSON PARK Parcel No ~ Permit No~ Status~ Applied~ Issued~ Expires: 00..0262 ISSUED 06/01/2000 06/14/2000 12/11/2000 Applicant: CORNERSTONE ARCH> L GROUP 206-682-5000 PETER ANDERSEN 1904 3RD AVE. SUITE SOOSEAT1LE WA 98101 CENTHAL I<TTSAP SCHOOL DISTRICT 692-'3106 910Z0ICKEY RD NW SILVERDALE WA,98383 SNYDER ROOFING 20;203.BHOADWAY 425.-290-9S:fLic it: SNYDERW014MT E:xp: 06~Ol-'2001 98296 I . ... . ..,. I ......'lii:~'l!i:,)/(*ll(:t;)j(***>l<;<<*;m* **)t:iK~ *~**** ~Ol<::<<)\( *)1( ** *** ***)1:; u* ** l!(**:<<::<< n~u llOKn* *)/:)t;)t; ** n * n)l( *::<< lIt)l( u* U)/( U )1:,* *)1( U)!( ..ValU4tion. )1(.. P~(mit Fees: 783.75 Total Calculated Fee: 1,457.69 70:,OOO~OO>>: Plantheck Fees: 509.44 Additional fees: .00 . .' ... '* .' Other Fees: .164.50 Total Permit Fee:. 1,457.69 *-)kl!< ***)!()!;;}\( ** ** ** * )1(,:<<** *** >f::)I<:i()\( *)1(;;:::1<)1( * *:n **)1<:1<:>1<)1::>1:: **)\()j()\(:<<)I( *** **** >I< >>:)\( l!(;j()\()I()I( ** * :i:ilI::t:llO!( *::101<)/1;)1<: *:+:)\( *:+:)\()I(* )I::*lIOI()i()/(:>I:: 'Tht$'p~'rmi:t.~hall become null arid void if th~ building OY t-!Ork authodzad by this permit i$ rot. CiJtTllllenced within le0 daYshoili th<1l dat,e ofsuchpenYlit, OY if this building ,jr \"0l"1<: authoYiz:ed by $uch paY/nit is :suspel'ldedoy . . . abandoned at any tirM11 aft.:e)' the work is. commenced foy a peYiod of 180 da:;.'s. \'IlOT!CE ~. It i:;;; t.hanl$Poil$ibility of to.he p~~l"mit holder. not. t.he Ci.ty of BYlilrM11l"ton or 8uildil19 Of'ficial t.o see to it: that l"eqt.liYed inspections aye made. The permit. holder must notify the Building Official when l"ellldy '1'0)' iriSj:iectiorls.Failureorthe permit holdel" tonetify the Building Official of n~quil"ed insp~tiQns ma.y n~sIJ1t in the stopp~ of the WOYk until such t:in~ that thl? peymi t holder can substantiat.e to the building official t:...ha.... t,. tf.le-.cO\1C... ~.a.le9.. woyk l\'1e.et~) or exef.!. eds cod. e requireme. nts. Any. demo. lition, t.i'!ISting, or' financi"".l b\J.Ycler.\ shall bie poYi,e dlyect)y bytM .perfllit he lde I' .. Failu.re to $ub$tantiate c..'Ode )'equi rement$ will inderrW1ify the City .$.\;$in,,,,,t; an)>; and all, r~on$ibi1~ty or liability cOYmected with the conshuctien. hll!yeb<Cl?yt,:i:fY i:;,hatI have yeadand~xarnined th1$ penYllt and Know the $<i\me to be true andcom?Cb. Alt~. ph:ivieiWl1$of" r'~t~ and O;dina.nc€!s govemirl9 .this type ofwoyk ~~i11 be complied ~Jithwhet~yspecified hen~fn oyn(,Yt:.The9l"antil'igofa peyrnitdoes not PyesurM11togiveauthorltyl:o violate oy cancel \he pyovi$iol1e of ..::::::..ta'.,..Of~~~~i=":::~ =t'~ion'_ I'ce/,t'iil'y that I <l:mexlltI11Pi:. horn ttte- Y~qui n~m{tl1i$ oj' the staU contractor' $ r:egl\-st yation la.w, under "",*,,,,,\,, :?:i;t". ,..... oi' \9.7. $i_f",.._.....~.........~___ ba",,_~__ l!IJ;:un~::u)i:~'~)j(JI(iu)lot(nn*u . .... . . ' Permit Umtet--!\PPFQved By ,~ Date' ~~ tJ2) [ I 7l~,::t~1l!,~\;;'ir~:~1-~:~;k~:~ . ' ,"~l;t~);~~k:;~;:1;~~\,~/' . BREMERTON PERMI'-: Ce:NT.ER 286 4thStreet~ Bremerton;$ UA 98337 Phone:: (360) 478'-52;r$FAX: (360)4:78--5278 Job Address: 2900 (..\USTlJ:N DR loca~lons JACKSON P0RK AssrAcct Nc,': . Building Permit No: OO~0262 Status: ISSUED Issued: 06/~4/2000 Expires: 12/11/2000 R E QUI RED I. N S P E C T ION S Item: 02701 FINAL'-~FIRE Item: 02700 FINAL,--aLDG Dept: FIRE Dept= SLDG Division: Division: I I ***********************************************************#********************* TESTING:.f"tust be recognized by the Washington Association of. 8uildi ng Officials SPECINSP: Must be regi~tered with the State of MA ST or WA: State of WA ~ePt. of Labor and Industries 478-4921 HEALTH: 8remerton/Ki~sap Health District 478-5235 I ALL INSPECTIONS PERFORMED 8Y THE CITY OF 8REMERTON MUST 8E SCHEDULED THROUGH THE PERr-1ITCENTER. (360) 47~"-E?)275" ***********************~******************.************************************** perrnit HOl.d~r'~" .~ S i 9 1'121. tu r e : \ - ._-- ---" " ,"~--." " "--r~----"--~"'--'- ( J D ate : _....""_.___"._.,,.,,^_,,______.__,._._"__~~___. -'~'~~__" ,.ik. ',' ~~, ~.' ,,' .;;;;",~.. ,.~,-_,....... '~.,.,~~.'_~ ,'-c"" ,. ""-..j. . ._~ . Ik,' '-',"" . ,'~"'" '~',..", '<o~ ""',.', . 'K.' , ,.,:~...i.,....;. _.........:..~ 0 "'-' ~-.......... ;. .-.... .'.'., ' .~ '''-", ....! ::r::'~~;::!'::::':'~ ~.-~~-::::,:'!;:;, ~~ t;::=~::;;~ ~~ -::::.::.-; ~-== ~~=:::: 'Zt.;::;. ~ = ~ ~::r. = =::::. ":t!:.=;: =':1::. ~~;::;';: ~ =:::.== =: =. = ~.:= =::r::. = =: ~~;;;,?,::= ~:.: ='l".~r..:: =:=.:: =: -::::. =-~ ~ =: ~',=: ~~ Per In i t No: OO-'026~? 8REMERTON PERMIT CENTER PERMIl"CONDITIONS, Page: 1 ==~==~======~==============.===========:======::==~====================.======== Job Address: 2900 AUSTIN DR ':~ssY' jClcct No: Location: JACKSON PARK Applied: 06/01/2000 Approved: 06/14/2000 Issued: 06/14/2000 Applicart: CORNERSTONE ARCH'L GROUP Owner: CENTRAL KITSAPSCHOOL D.ISTRICT ~dnt r act;o(':$NYDER ROOFING PARK ELEI'1ENT(~RY SCHOOL Coni..iitlPDS: .. ... ,. . . A')Ref'er.toUnifof.rn FiFe Code Art.icle$7 . "Firesa.fety Our i lIg t~bnst.ructr9fi\.. Arteh~tion, or Demol i tio.no'f .. abulIdi n9 . .... dy'(rng'9pnstY7Uc~ion. . '.I;\~J~f' cimat't,1c,"0;r~eals created, extend' fire protect.ion into ,th~'.at.t.ic;;,are~. . . .,. '(')'Jf(~()nS:bruc'liiofl.co'stsexceed$5,OOO.O(;lormore, a storz: .alcjapterandblu~hydrantmarker is iequired. . If costs .>exc~ed$50 ,.000,00, Two storz adapters and blue hydrant .}nFt:r-K(r~. r ~(::jU i '(:eq. .~i~f;~~~~b~~)____ l.t ... ~ . \ \ . \.. ~~ Da t. e __w____,_~._~_..___.._u.. / "\. J~' Scope of work: Address: Owner: Contractor: BREMERTON BUILDING DEPARTMENT ~ Inspection Report DO - Od.-W - FOUNDA liON Inspection card/approved plans on site Footings: required steel placement Footings: required width & depth "-- Bearing soil (soils analysis if applicable) Setbacks Walls: required steel placement Walls: required size Special inspector (when applicable) I COMMENTS: FOOTINGS APPROVED: WALLS APPROVED: . Electrical approved Crawl space access (min. 18 X 24) Positive connections posts & beams Posts properly supported Mudsill: treated material Beams/girders: size & span Smoke detectors: all required locations Exhaust fans insulated: unconditioned space Fans terminating directly outisde Dryer exhaust vent Fireplace combustion air Windows: proper U valve ---,------- Ceiling heights .~-_._- Stairs: rise & run; proper width Fire blocking; stairs, soffits, lowered ceilings Fire blocking: lids in void spaces, shafts Sheetrock backing Rafters size/notGhing Attic access FRAMING I I Plumbing & mechanical approved Floor joists and beams/proper clearance to earth Foundation vents Anchor bolts: nuts & washers in place Floor joists: size & span Notching & drilling: joists & beams, studs Exhaust fans: where required Whole house fan, outside air intakes each bedroom Range hood All vent terminations: windows & property line Windows: meets egress requirements Windows: safety glazed where required Stairs: headroom clearance Fireblocking: wall to ceiling, furred walls every 10' Fire blocking: tubs/showers Fire blocking: stuff holes top & bottom plates Wall bracing Trusses: specs, bracing Attic ventilation Shear nailing Wall & roof sheathing --- Building dried in COMMENTS: ./roT ,-'5+(\Uv~L7uCe - 0(/r/Sj( lFJ'!ftCl fAlq, L 7< JV~jc/O..f.W(!)'( Ie. {.,fJPfJ ,~of ~ ~~ kJ' U.. 13~ _ APPROVED: t$N ~uJ ~ ~-= ~ / ..~-~l ENERGY CODE COMPLIANCE Insulation: proper fastening Bottom plates caulked to floors Electrical boxes gasketed or caulked Insulation: proper R value . Insulation: vapor barrier Penetrations caulked as required 6 mil black poly in crawl space COMMENTS: UNDER FLOOR/FOUNDA TION INSULATION APPROVED: . ~~ WALL INSULATION APPROVED: CEILING INS ULA TlON APPROVED:~~fi, ;tp_ I ~~ e~f\G* ~'f4 ttf;([.t PO~ MECIIANICAL ._"...-_.~-_.~- I\rpliance location and access, proper support ._._.._-~--_. ----._------- _.._----_.-~-_._'-_. -------.--- Venting clearance to C'Jmbustihles .__~__.......___.'_" __."._ ..__"'___..__._________--...-.. ,,__.__~__~__.._____..~__.~_._._.H._,".._ ____ __"_.._ __ ...,______. __._._.___........_.._________ Veilt termination Appliance clearance to combustibles . _____._.___..__..___.____________________4__ Venting size & support . Combustion air Gas pipe under test . ---,-- --.-.--...-..----. Gas pipe underground min. 12" below grade --....-.----..-..-.....--. Gas shul.off within 3' of applianca Gas logs: damper permanently open Wood stoves & fireplaces: Tight-filting doors Manufacturer's specs on site Chimney: separate flues when required Duels: size & support .--.-- ---.. Gas pipe. size & support Gas pipe: within 6" or underground-coated -,---.-. Gas logs safety shut-off ---~-, --- ----------.- Woodstoves: EPA certified Woodstoves & fireplaces: proper hearth Chimney liner: when required COMMENTS: GAS PIPING APPROVED: FURNACE APPROVED: OTHER APPLIANCES APPROVED: PLUMBING I I DWV: proper grade DWV: proper drainage fittings where required DWV: required c1eanouts All fixtures vented properly Shut-off valves on all fixtures I DWV & water piping under test DWV: proper sizing DWV & water piping: proper support ..- Vent termination Water supply: proper sizing Water heater gate valve on cold water supply ----.-- Water heater relief valve drain to outside R-10 pad under water heater when required ---- Grease trapsfinterceptors: where required Vacuum breakers: where required Water heater: siesmic strap ~---- Water-piping insulated as required Proper indirect wastes where required COMMENTS:._____________,__ PLUMBING GROUNDWORK APPROVED: Proper fastening: nails-?" D.C. horiz. plane Proper fastening: screws-12" o.c. horiz. plane (1/2") Proper fastening: screws-16" o.c, vert. plane (1/2") ..-.--- -.--- Proper fastening screws-12" oc, horiz, plane (5/8") Proper fastening: screws- 16" o.c. vert. plane (5/8") ----.--.-- Area & occupancy separation walls Usable space under stairs (5/8" required) Corridors COMMENTS: SHEETROCK APPROVED: FINAL r-- , E"ergy ;ode requirements met, exhaus~------ I - -, Plumbing &"mechanical -------..Garage/dwemi:~g door self closing sOlid-core --..------.-.----. Smoke detecto';--whc.rereqlJire-(j'-----.--..------------- --.-.---. -~I andraiis-&-g-llardraiis.~.asreqliire.d-.-----.--.------.---.- 'Flrer:aUrlQS-maintained ___.m__ -ExJSigns"vhell required --------- Emergency lighting when required ----bccupant load posted when applicable------. BlIi!ding weCllhertight .--- ------.----- -Wood siding to earth separation (6" Building Address posted ._._______ ____ ._._h _______.__Oh________... Radon monitor when required COMMENTS:...-LOO:t?I,,! 4:-- /:.6@ Ie So G-60 tJ _W4!t._~ /f~_~,L__-.S-GI-i()Ol {JJs..ICC".'....fi2_ ~~~~~~~- FINAL APPROVED, --4rL-~-----_.-.------ ""I BREMERTON PERMIT CENTER 286 4th Street~ Bremerton~ WA 98337 Phone: (360) 478-5275 FAX: (360) 478-5278 BUILDING PERMIT Job Addr: 2900 AUSTIN DR Location: JACKSON PARK Parcel No: Permit No: Qtatus: Applied: Issued: Expires: 00-0262 FINALJ 06/01/2000 06/14/2000 12/11/2000 Applicant: CORNERSTONE ARCH'l GROUP 206~682-5000 PETER ANDERSEN 1904 3RD AVE, SUITE 500SEATTLE WA 98101 Owner: CENTRAL KITSAP SCHOOL DISTRICT 692-3106 9102 DICKEY RD NW SILVERDALE WA 98383 Contractor: SNYDER ROOFING 425-290-981Lic #: SNYDERW014MT Exp: 06-01-2001 20203 BROADWAY AVE SNOHOMISH WA 98296 Subcontr: Desc: REROOF JACKSON PARK ELEMENTARY SCHOOL ********************************************************************************************* Valuation * Permit Fees: 783.75 Total Calculated Fee: 1,457.69 70,000.00 * Plan Check Fees: 509.44 Additional Fees: .00 * Other Fees: 164.50 Total Permit Fee: 1,457.69 **********~:********************************************************************************** This p.~, t shall boo=. rull and void if the buildi n9 ~' ~>lJa(,ltLiLed by this p.'mit is rot oomoonoed w"hi n 180 days horn the date of such peym1t, oy 1f th1s bU1~'7'im woykauthonzed by such peym1t 1S suspended oy abandoned at any time aftey the "Jork is commenc€1d 4-V peYiod of 180 days. ./7 to see NonCE - It isth'iit responsibility of thttp..ymit'holdey, to it that requin~d inspections aye I" The pennit he ld inspections. Failu Q. the pe,-mlt ~ eyto notify tht )~ in the stoppage of the woyk ~t~uch time th~t trterni that the concealed oyk sfC,r c ds code r mer-'. be borne diyectl:>, b e{~mit olde. Failur~. stanti . against an)' and a,. sponsibil i C)-' 0'( liabil ityl connected . Signatuye: , 0.... o . same to be tyue and COf'yect. All ng tfis type of wo will be complied with whethey specified heyein n01~::~ume to give authoYity to vfolate or cancel the pyovisions of 9 CO,\)~ction ot the pe'rfonnance of constr-uction. ___.____.______ Date:___. I hen~by certify that I have provisions of 13..~s and o'rdinance Ot noL The granting of any other state oy I certify that I am exempt from the yequirements of the state contractor's yegistration law, under Section 3, Chapt.er 126, laws of 1967. SignatUre: __ o.tN_ ~",,'-f Date'_---'l1.,~ ?"{<(' B>' : *************************** Permit Center--Approved . BREMERTON FIRE DEPT. 811 PACIFIC AVE. BREMERTON, WA 98337 (360) 478-5380 00- 02b~ FIRE MARSHAL'S OFFICE Fire Marshal 478-5384 Deputy Marshal 478-5385 Public Educator 478-5393 Date: 0- 2- 00 Business Name: :S-O ( It .5:Dn Time: Fire Management Zone: park Located at: Phone: Owner/ Manager: Occupancy type: Date of last service: Extinguishers Alarms Sprinkers 2)I-f an a+llc C1rea :Lice ~r6+ec-frO/l ~o a ~ (05+ ounr jj sa oo~ oil -Two 5-1o~ __p-ffrs f ue ^ y'd,,;;;- /JI)4({(pr (; o/lr:--o( , i <; ('(~a~d ~~nd 5\j sfrffJ S If! +0 ctf-l-/C (OS+5 arcq. Owner! Manager L n.n_~1 :ili * 'Ji(}~ :~W *)I'<~W\;* \j\.,1lt W.Ui)!!;,<<,~ mM!;W U!i<< jji.';j:)m}/!;;j( iii :l~ lji 1(; ,~till,~ :Wi)j! :ij(,:~;.*;*, jft~:W:<< llOll:.il; llf.lfI ~l( * jjI;;1I{ iII;j( $: YIi >>: ~ ~~ , REtEIPl ;i()K'~ /I( ,\Ii:;f, )t.\,,*~ *;+(* ~lt lK:<<)I()f( * :i( )101( ll;: Ji;:tnr. W, ~i)1< llI. )f()K.:'<< llt 1<< * * *)If )I( ;it: * ~;:I,( '*)/; ,'II ~~; * * l!nlC,,;)lt)l'; **)!\ :1'()~; it PECEJ:PT Nt.unb~t ~ 000004'16 f<lrtlOl.HrU 9410.2:;/ O(,./l,j/O() 1.4 e 50 P2\;iI}I~~nt tilethod:; CHI< Notat CKS;O .2S tr;it~ J( M_____~____________~.,~.._~W,~__~ ___H.___k~.'~~__'M_'~"__M'_'__'._~'__~____ t No t 00,,0262 T~/pI;J BLDGONtY 1:\I,.OG Pf:mtn hl~() l<iE:CH.( te Addresst 2'00 AUSTIN UR Locf,J,tiQn:, JflCKSON Pt\Rl< Tatal Fees: 1,457.69 T Payment 948. Total ALL Pmts: 1,457. . Balance~ .00 *~....**..**.*..***.*..I*...*...'W*****.*.**#**..*****.11**..*m. ~\tTount Ci.Jdl2l (1~IOljnt JJS "1()Ol ( U) eUn.OXNG PFJ?I"I]:T ~,~; . "?S 34-343.4006 (9710) STORZ ADAPT 150.00 ( ) HYDR~NJ REFLCCTORS 10.00 ( 02:3~,) :; T}~ 'IE OF lAlfi StJRCllill'XGf 4. SO ~.;, <4.' ,,,. ...... 'J'~ "'., ';" '</.. "" ~"" ""'._' oJ,. ""';':',\,., ^,~, ~~,. ..,.' .,,. """ 'M" "~' _i" ,,".,. ',." M' '~'. ""',- .." '"..' >J". "'" 0'" ,"~ ."", "',_' ,~.. ..,. ',.' .~" '''''' ',... ~'" "'. ,"" '..~ .~. ,h ,,.. ,"c' ...,."~ ""'''''''' ".,~ ',,~ .~, ~.'", '~," ,,'" .,.,~ ., J -,,,. ""*' IIJ'.,J 0 C H 4::,. C J" --" - t if ~.J. tel ., <' T~) , t". - "'l~l . (::,.. '" > L C 1'( ':?" ;;tit t ":",:' le? k::.) I 1 t) ~~ !f".. , l~j 'i,,,) I ,..II'~ ,"" .;t....~ . r~: ,A. . .jf\ ,;.:.. I'i t' '~ ::' (.:. ,.:\ l'th I. 7. ,'" ,,\>1) f \,1.:') {) ~ ~. t 'j ~,..f, "".'''j M' '"' bt !" AG () ,,," ! J1 " {lei I ,. BREMERTON MUNICIPAL UTILITIES 3027 Olympus Drive Bremerton, Washington 98310-4799 478-5318 4556 VTILITY SBRVICB AG~~E~NT Work Order No. Tap No, Receipt No. Bremerton, WAf , 19 --------------------------------------------------- Block J The undersigned Service Address: Legal Description: Plat SERVICE REQUIREMENT: [] Water [] Wastewater [] Stormwater SERVICE AREA: [] Marine Drive Water [] Sewer District #1 [J City [J North Perry Water [J Tracy ton Water [] County [] Port of Bremerton [J --------------------------------------------------------------------------- SERVICE CHARGES: Connection/Inspection Fee: Water: Domestic...............Size $ Fire .................. S i z e * Was tewa ter ............................. $: Storm Wa.ter ......................'.......$ BARS # Front Footage Fe~: Wa ter ................................... S Was te-wa ter .............................. $ Storm Water ............................. $ g~.n.eral Facili~ee: Water ......., of units Wastewater ..# of units Storm Water .' of units ~ $ Ci $ ~ $ $ $ $ System Development Charges: Water Wastewater Storm Water . . $ Temporary Service $ Road Permit [J City [J County... Street Restoration [] Asphalt [] Concrete $ Tapping Fee .............. 0 . . . . . . . . . . . . . . . . $: Deposit $ Other / ,S'rvrL ~~ ~ $ . TOT A . e _ _ . . . . . . . . . . . . . . $ J60, DO B4--31?it. /[)t) D 1. Utility charges are the responsibility to the owner regardless of whether the property is occupied by the owner or tenant. Unpaid charge shall become a lien on the property serviced. 2. By this agreement, the undersigned owner acknowledges that the owner assumes the risk and the City disclaims responsibility for all claims for damage or injury to person or property resulting from the following: a, Installation, maintenance and operation of all plumbing, fixtures or appliances connected to the water meter or wastewater main. (Building permit inspections are limited in scope and do not guarantee plumbing design or workmanship.) b. Changes in pressure, flow or temporary shut-off of services due to system maintenance, emergency or non-payment cf charges. Owner's Agent's Phone Number State ~ ZIP , 19 19 Date Date of Bremerton Municipal Utilities: Date 6 -- / f ' 1~9_O low Copies: Utilities Accounting 'ties Engineering Goldenrod Copy: Customer ~ \ ~4 r--- .~ ul "'7 - at P :t t- ~ ::) "-( i "" - ~ \ t l'ol\r. 1 I [l'Ot<T. 1 tS ~ ~ACKSON P ARK ELEM ft!-i A Rj.' SCj:IOOL, ~l. T.l5. [Pof.T. 1 t poI\T. 1 ~ *** *********************************** :,~***'I1I;.*)j':*:*:** IP',!" .--1 I i I i I ,}~ I F>l:~: C E J. ************************ tHrlCl\J nt ~ NI)ta.tion;;: ), nt jf;\l<:.(: Otl n t :1, i iCtJ1 lNG, ( 4S1'JO) ':;'O';t " CK = ~:!4 IT,-NO r1I~CH/ 1 .j!' r.,j 4,0;/ ,44 '7€.~g " ;7:\nlOU nt ,,44 ~_______~ yl._~~_~,___~ ~_,__~~_'__~d~_~,.~~~"_~~._..~.__~__~~_' .. ()O-O~&; ~ COi~ II APPliCANT: ploWNER DCONTRACTOR DOTHER Site Address: 2..9DO AL~i1N -PIC- Tax Account Number: '3"'t2.l'" ()()f}-oQ3",OOtf1 i~~A~""!I~ Contractor: 4.1 ~ e...roF-l ~ Address: . Contractor License #: Expiration Date: Check the type of application applied for below: o SFR 0 DUPLEX 0 MULTI-FAMILY o MOBILE 0 ACCESSORY BLDG 0 RES ADDN o RES REM 0 CO:MM: ADDN 0 CO:MM: REM o REPAIR 0 SIGN 0 DEMOLITION o NEW CO:MM:. 0 1ENANT IMPROVEMENT o GRADING (cubic yards: ) ft1 OTHER: ~iCooF- Nature of Work Proposed: R:t:::7 ect::t::' Square Footage: Dwelling Garage: Decks ..::':i::iil~~ij~~n::::.:i:::..::::'...'I~ti~:i~~:'::~::::il~t:Mt.;::':':j:::::f:$ij(m~t!~::::::::::j.::I:mQi~t.i~~i.j.:,:j'.: (, It:... ^ 000 Energy: $50.00 IT +4 State: $ 4.50 Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the building official. The building official may extend the time for action by the applicant for a period not exceeding 180 days on request by the a plication showing that circumstances beyond the control of the applicant have prevented action em n. No application shall be extended more than once. In order to renew action on an aR 'cation on, the applicant shall resubmit plans and pay a new plan review fee. APPLICANT'S SIGN