Loading...
HomeMy WebLinkAbout3271 RESOLUTION NO. 3271 A RESOLUTION of the City Council of the City of Bremerton, Washington, adopting the 2017 — 2022 Six Year Transportation Improvement Plan. WHEREAS,after proper notice,the City Council of the City of Bremerton held a public hearing at the regular meeting of the City Council at 5:30 p.m. on July 6, 2016 to consider public testimony on the City's proposed 2017 -2022 Six Year Transportation Improvement Plan and, having considered public testimony to the Plan and in accordance with the provisions of RCW 47.80;NOW THEREFORE, � THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: . SECTION 1. The 2017 through 2022 Six Year Transportation Improvement Plan, set forth in Exhibit"A" attached hereto and herewith filed with the City Clerk, is hereby adopted. SECTION2. Severabilitv. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. ' SECTION3. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this 6th day of July, 2016. Eric Younger, uncil sident APPROVED AS TO FORM: ATTEST: O � � RO A. LUBOVICH, City Attorney SHANNON COR1N, City Clerk 1 Six Year Transportation Plan CITY OF BREMERTON PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM 2017-2022 Project Title 2017 2018 2019 2020 2021 2022 Grand Total Highway Safety Improvements Project-Phase 2 as�,000 0 0 0 0 o asi,000 Crosswalk Project Bundle o 0 0 0 0 0 0 ADA Transition Plan 30,00o zo,000 zo,000 zo,000 0 o so,000 Non-motorized Transportation Plan Update o 0 0 0 0 0 0 Traffic Calming 30,00o so,000 so,000 so,000 30,00o so,000 �eo,000 Sidewalk Improvements(For BMC 11.08.090,Sidewalk Abatement Fund) so,000 soo,000 soo,000 soo,000 soo,000 soo,000 z,sso,000 Ciry Safety Improvement-Annual Program �oo,000 too,000 �oo,000 �oo,000 ioo,000 �oo,000 soo,000 Signal System Upgrades �oo,000 200,00o zoo,000 200,00o zoo,000 zoo,000 �,�oo,000 Install yellow-flashing lights on left turns city-wide �s,000 0 0 0 0 0 �s,000 Replace traffic signs to meet retroreflective requirements to,000 �o,000 �o,000 �o,000 io,000 �o,000 so,000 Lebo Blvd Reconstruction,Wheaton Way to City Limits a,soo,000 �oo,000 0 0 0 o s,zoo,000 Sidewalk Improvement Wheaton Way at Callahan 2s,s�o �si,iaa o 0 0 �s�,saa Pavement Preservation including Transportation Benefit District 200,00o aoo,000 aoo,000 aoo,000 aoo,000 aoo,000 z,2oo,000 Arterial Streets Major Maintenance and Reconstruction o z,zoo,000 2,200,00o z,2oo,00o z,2oo,00o z,2oo,000 ��,000,000 Local Street Major Maintenance and Reconstruction o a,soo,000 s,soo,000 s,soo,000 a,soo,000 s,soo,000 ��,soo,000 6th Street Preservation,Callow through Naval Intersection o �zo,000 sss,000 0 0 0 �es,000 City-Wide Motorized and Nonmotorized Traffic Circulation/Corrridor Capacity Study �s,000 �so,000 0 0 0 o zzs,aoo Crownhill Elementary Safe Routes to Schools soo,000 0 0 �o,000 �oo,000 o �,z7o,000 Kitsap Lake Elementary-Safe Routes to Schools �so,000 t,sso,000 0 0 0 0 �,soo,000 View Ridge Safe Routes to Schools �oo,000 eoo,000 0 0 0 o soo,000 Naval Avenue Safe Routes to Schools o eo,000 soo,000 0 0 o sso,000 NationaUArsenal Safe Routes to School for STEM Academy(Joint w/County) o o �oo,000 �,000,000 0 0 �,�oo,000 Armin Jahr Elementary Safe Routes to Schools o 0 o so,000 soo,000 o eso,000 Anderson Cove Sidewalks; 19th 8 Naval to 15th-(Not a Safe Routes Project) o 0 o ao,000 aoo,000 o aao,aoo Matan&Lillian 8�James Walker Park Sidewalk Connector;Bloomington&Olympic o 0 o ao,000 aoo,000 o aao,000 Manette E. 11 th Sidewalk/Storm Low Impact Development Retroflt(joint w/Storm) �s,000 zoo,000 0 0 0 o z75,000 Washington Avenue,Warren to Manette Bridge o 250,000 2,500,000 0 0 o z,�so,000 East Bremerton Shared Use Path(WSCC Initiative;connects to County) o eo,000 soo,000 0 0 o sao,000 East Bremerton Sharrows(1 st step proejct above) o so,000 0 0 0 o so,000 Streets Electrical Cabinet Replacement Program o ss,000 35,00o ss,000 35,000 0 �ao,000 Belfair Valley Road Shoulder Widening for Multimodal o aso,000 0 0 0 o aso,000 4th Street Reconstruction,Washington to Pacific 2s,000 aoo,000 0 0 0 o azs,000 Warren Avenue-Pedestrian Connector Under Bridge South Approach o 0 o so,000 sso,000 o i,000,000 Warren Avenue Shared Use Path(North of Bridge) o sso,000 3,�so,000 0 0 o s,5oo,000 Warren Avenue Bridge Shared Use Path o soo,000 so,000 a,aso,000 0 o s,000,000 Bridge to Bridge Trail Wa�nding o �s,000 0 0 0 0 �s,000 Warren Avenue: SR303 Corridor Improvements-Burwell to Riddell o z5o,000 z,000,000 a,000,000 a,000,000 o �o,zso,000 Warren Avenue-extend left turn pocket from 16th south to 13th o o �oo,000 soo,000 0 0 �oo,000 Warren Avenue-Pedestrian/Bike Improvements 11th to Bridge South Approach o aoo,000 2,soo,000 0 0 0 2,soo,000 Oyster Bay Avenue Improvements o 0 0 0 �oo,000 soo,000 �oo,000 Marine Drive NMT Improvements o �so,000 soo,000 0 0 o aso,000 Kitsap Way Bike Lane Improvements(See WSCC Proposal) o tso,000 soo,000 0 0 o t,oso,000 Chico Way/Northlake Blvd Roundabout so,000 200,000 �50,000 �50,000 0 0 �,�50,000 Install Speed Signs-multiple locations city-wide o 50,000 0 0 0 o so,000 New sidewalks on State Street-Gregory to Burwell o �s,000 azs,000 0 0 o soo,000 Kitsap Way Multi-modal Conversion Phase I: Lakehurst to Northlake o 0 o aso,000 a,000,000 o a,aso,000 �X1-lI i3« /-� CITY OF BREMERTON PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM 2017-2022 -•---- ----T-----------��,_�_F._ ._._..--- �_�....----- �-:-- ----� -- . -------:•-.:::-_-:-- - . -,ro'ect�Title � - � 2017�- .- 2018 2019 MT:� - 2020 Y021 .-.. -2022 � .Grand Total ... ' �. : _.-___�..__..- �---P....J _ - -- _-�--- .�... _____—..__�.� _.:____... _ ._...... ...... ,�._....� Kitsap Way Multimodal Conversion Phase 11 Lakehurst to SR-3 0 0 0 o aso,000 s,000,000 s,aso,000 Multimodal Conversion Auto Center Way Loxie Eagans north to Southbound Freeway Entrance o 0 0 0 o z,soo,000 z,soo,000 Perry Avenue Reconstruction,E. 11th to E. 17th o aso,000 a,000,000 0 o a,aso,000 National Avenue Reconstruction,Kitsap Way to County Jurisdiction(Joint w/Kitsap Counry) o 0 0 o soo,000 i,eoo,000 2,�00,000 Construct Werner Road widening and signal improvements � o o 0 0 0 3,000,00o s,000,000 Arsenal Way/Patton Ave Safety Improvements o 0 0 0 0 �oo,000 �oo,000 Gorst Sinclair Trail(Planning) o 0 0 0 o zoo,000 200,000 Access ways in Dockside(Planning) o 0 0 0 o so,000 so,000 Naval Ave Road Diet o 0 0 o aoo,000 a,000,000 a,aoo,000 Construct street lighting on Pine Road o 0 0 o aoo,000 aoo,000 Construct street lighting on Ricky Road per 2008 developer agreement o 0 0 0 0 200,00o zoo,000 Shore Drive Bike Boulevard o 0 0 o so,000 o so,000 West Belfair Valley Road Guardrails-Evaluation and Implementation o 0 0 o so,000 soo,000 sso,000 City Street Lighting-evaluation and upgrade for compliance with standards o 0 0 o so,000 o so,000 Lower Wheaton Way Reconstruction Lebo to Sheridan o 0 0 o soo,000 a,000,000 a,soo,000 Extend Left Turn Pocket on Warren Avenue for College Main Entrance o 0 0 o aoo,000 o aoo,000 Repair powntown Street Standard Banner Supports o �oo,000 0 0 0 0 �oo,000 4th and 5th Street Bike Boulevard,Washington to Naval o 0 o so,000 0 o so,000 Lower Wheaton Way Re-Stripe for Bikes o 0 0 0 30,000 o so,000 Improve extension of Shorewood Drive through the NAD Park to Jackson Park o 0 0 0 o soo,000 soo,000 ----._..._..._.._........ _._.._...__....----..............._,.... ..........._.. ....._....._._..........__ ._..........�._.............. ... ........ ..._..._. IL`� ��-`^— � �� " - 6;501,000:__74,391,370::25,696;134`;_:_18,555,000 ,20,175,000_��;30,790,000.;_;:.1'16,108;504� �����T �