HomeMy WebLinkAbout3271 RESOLUTION NO. 3271
A RESOLUTION of the City Council of the City of
Bremerton, Washington, adopting the 2017 — 2022 Six Year
Transportation Improvement Plan.
WHEREAS,after proper notice,the City Council of the City of Bremerton held a
public hearing at the regular meeting of the City Council at 5:30 p.m. on July 6, 2016 to consider
public testimony on the City's proposed 2017 -2022 Six Year Transportation Improvement Plan
and, having considered public testimony to the Plan and in accordance with the provisions of
RCW 47.80;NOW THEREFORE, �
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
. SECTION 1. The 2017 through 2022 Six Year Transportation Improvement
Plan, set forth in Exhibit"A" attached hereto and herewith filed with the City Clerk, is hereby
adopted.
SECTION2. Severabilitv. If any one or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect. '
SECTION3. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
PASSED by the City Council of the City of Bremerton, Washington this 6th day
of July, 2016.
Eric Younger, uncil sident
APPROVED AS TO FORM: ATTEST:
O �
� RO A. LUBOVICH, City Attorney SHANNON COR1N, City Clerk
1 Six Year Transportation Plan
CITY OF BREMERTON PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM 2017-2022
Project Title 2017 2018 2019 2020 2021 2022 Grand Total
Highway Safety Improvements Project-Phase 2 as�,000 0 0 0 0 o asi,000
Crosswalk Project Bundle o 0 0 0 0 0 0
ADA Transition Plan 30,00o zo,000 zo,000 zo,000 0 o so,000
Non-motorized Transportation Plan Update o 0 0 0 0 0 0
Traffic Calming 30,00o so,000 so,000 so,000 30,00o so,000 �eo,000
Sidewalk Improvements(For BMC 11.08.090,Sidewalk Abatement Fund) so,000 soo,000 soo,000 soo,000 soo,000 soo,000 z,sso,000
Ciry Safety Improvement-Annual Program �oo,000 too,000 �oo,000 �oo,000 ioo,000 �oo,000 soo,000
Signal System Upgrades �oo,000 200,00o zoo,000 200,00o zoo,000 zoo,000 �,�oo,000
Install yellow-flashing lights on left turns city-wide �s,000 0 0 0 0 0 �s,000
Replace traffic signs to meet retroreflective requirements to,000 �o,000 �o,000 �o,000 io,000 �o,000 so,000
Lebo Blvd Reconstruction,Wheaton Way to City Limits a,soo,000 �oo,000 0 0 0 o s,zoo,000
Sidewalk Improvement Wheaton Way at Callahan 2s,s�o �si,iaa o 0 0 �s�,saa
Pavement Preservation including Transportation Benefit District 200,00o aoo,000 aoo,000 aoo,000 aoo,000 aoo,000 z,2oo,000
Arterial Streets Major Maintenance and Reconstruction o z,zoo,000 2,200,00o z,2oo,00o z,2oo,00o z,2oo,000 ��,000,000
Local Street Major Maintenance and Reconstruction o a,soo,000 s,soo,000 s,soo,000 a,soo,000 s,soo,000 ��,soo,000
6th Street Preservation,Callow through Naval Intersection o �zo,000 sss,000 0 0 0 �es,000
City-Wide Motorized and Nonmotorized Traffic Circulation/Corrridor Capacity Study �s,000 �so,000 0 0 0 o zzs,aoo
Crownhill Elementary Safe Routes to Schools soo,000 0 0 �o,000 �oo,000 o �,z7o,000
Kitsap Lake Elementary-Safe Routes to Schools �so,000 t,sso,000 0 0 0 0 �,soo,000
View Ridge Safe Routes to Schools �oo,000 eoo,000 0 0 0 o soo,000
Naval Avenue Safe Routes to Schools o eo,000 soo,000 0 0 o sso,000
NationaUArsenal Safe Routes to School for STEM Academy(Joint w/County) o o �oo,000 �,000,000 0 0 �,�oo,000
Armin Jahr Elementary Safe Routes to Schools o 0 o so,000 soo,000 o eso,000
Anderson Cove Sidewalks; 19th 8 Naval to 15th-(Not a Safe Routes Project) o 0 o ao,000 aoo,000 o aao,aoo
Matan&Lillian 8�James Walker Park Sidewalk Connector;Bloomington&Olympic o 0 o ao,000 aoo,000 o aao,000
Manette E. 11 th Sidewalk/Storm Low Impact Development Retroflt(joint w/Storm) �s,000 zoo,000 0 0 0 o z75,000
Washington Avenue,Warren to Manette Bridge o 250,000 2,500,000 0 0 o z,�so,000
East Bremerton Shared Use Path(WSCC Initiative;connects to County) o eo,000 soo,000 0 0 o sao,000
East Bremerton Sharrows(1 st step proejct above) o so,000 0 0 0 o so,000
Streets Electrical Cabinet Replacement Program o ss,000 35,00o ss,000 35,000 0 �ao,000
Belfair Valley Road Shoulder Widening for Multimodal o aso,000 0 0 0 o aso,000
4th Street Reconstruction,Washington to Pacific 2s,000 aoo,000 0 0 0 o azs,000
Warren Avenue-Pedestrian Connector Under Bridge South Approach o 0 o so,000 sso,000 o i,000,000
Warren Avenue Shared Use Path(North of Bridge) o sso,000 3,�so,000 0 0 o s,5oo,000
Warren Avenue Bridge Shared Use Path o soo,000 so,000 a,aso,000 0 o s,000,000
Bridge to Bridge Trail Wa�nding o �s,000 0 0 0 0 �s,000
Warren Avenue: SR303 Corridor Improvements-Burwell to Riddell o z5o,000 z,000,000 a,000,000 a,000,000 o �o,zso,000
Warren Avenue-extend left turn pocket from 16th south to 13th o o �oo,000 soo,000 0 0 �oo,000
Warren Avenue-Pedestrian/Bike Improvements 11th to Bridge South Approach o aoo,000 2,soo,000 0 0 0 2,soo,000
Oyster Bay Avenue Improvements o 0 0 0 �oo,000 soo,000 �oo,000
Marine Drive NMT Improvements o �so,000 soo,000 0 0 o aso,000
Kitsap Way Bike Lane Improvements(See WSCC Proposal) o tso,000 soo,000 0 0 o t,oso,000
Chico Way/Northlake Blvd Roundabout so,000 200,000 �50,000 �50,000 0 0 �,�50,000
Install Speed Signs-multiple locations city-wide o 50,000 0 0 0 o so,000
New sidewalks on State Street-Gregory to Burwell o �s,000 azs,000 0 0 o soo,000
Kitsap Way Multi-modal Conversion Phase I: Lakehurst to Northlake o 0 o aso,000 a,000,000 o a,aso,000
�X1-lI i3« /-�
CITY OF BREMERTON PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM 2017-2022
-•---- ----T-----------��,_�_F._ ._._..--- �_�....----- �-:-- ----� -- . -------:•-.:::-_-:--
- . -,ro'ect�Title � - � 2017�- .- 2018 2019 MT:� - 2020 Y021 .-.. -2022 � .Grand Total
...
' �. : _.-___�..__..- �---P....J _ - -- _-�--- .�... _____—..__�.� _.:____... _ ._...... ...... ,�._....�
Kitsap Way Multimodal Conversion Phase 11 Lakehurst to SR-3 0 0 0 o aso,000 s,000,000 s,aso,000
Multimodal Conversion Auto Center Way Loxie Eagans north to Southbound Freeway Entrance o 0 0 0 o z,soo,000 z,soo,000
Perry Avenue Reconstruction,E. 11th to E. 17th o aso,000 a,000,000 0 o a,aso,000
National Avenue Reconstruction,Kitsap Way to County Jurisdiction(Joint w/Kitsap Counry) o 0 0 o soo,000 i,eoo,000 2,�00,000
Construct Werner Road widening and signal improvements � o o 0 0 0 3,000,00o s,000,000
Arsenal Way/Patton Ave Safety Improvements o 0 0 0 0 �oo,000 �oo,000
Gorst Sinclair Trail(Planning) o 0 0 0 o zoo,000 200,000
Access ways in Dockside(Planning) o 0 0 0 o so,000 so,000
Naval Ave Road Diet o 0 0 o aoo,000 a,000,000 a,aoo,000
Construct street lighting on Pine Road o 0 0 o aoo,000 aoo,000
Construct street lighting on Ricky Road per 2008 developer agreement o 0 0 0 0 200,00o zoo,000
Shore Drive Bike Boulevard o 0 0 o so,000 o so,000
West Belfair Valley Road Guardrails-Evaluation and Implementation o 0 0 o so,000 soo,000 sso,000
City Street Lighting-evaluation and upgrade for compliance with standards o 0 0 o so,000 o so,000
Lower Wheaton Way Reconstruction Lebo to Sheridan o 0 0 o soo,000 a,000,000 a,soo,000
Extend Left Turn Pocket on Warren Avenue for College Main Entrance o 0 0 o aoo,000 o aoo,000
Repair powntown Street Standard Banner Supports o �oo,000 0 0 0 0 �oo,000
4th and 5th Street Bike Boulevard,Washington to Naval o 0 o so,000 0 o so,000
Lower Wheaton Way Re-Stripe for Bikes o 0 0 0 30,000 o so,000
Improve extension of Shorewood Drive through the NAD Park to Jackson Park o 0 0 0 o soo,000 soo,000
----._..._..._.._........ _._.._...__....----..............._,.... ..........._.. ....._....._._..........__ ._..........�._.............. ... ........ ..._..._.
IL`� ��-`^— � �� " - 6;501,000:__74,391,370::25,696;134`;_:_18,555,000 ,20,175,000_��;30,790,000.;_;:.1'16,108;504�
�����T �