SUBJECT: Contract Award to Coatings, Study Session Date: April 13, 2016
Unlimited for the Reservoir 16 — Exterior COUNCIL MEETING Date: April 20, 2016
Coating Replacement Project Department: PWBU
- Presenter: Tom Knuckey
Phone: (360)473-2376
SUMMARY: Reservoir 16 is a 1,000,000 gallon steel water reservoir located in East Bremerton.
The exterior of Reservoir 16 will be abrasive blast cleaned to remove the existing coating and new
coating wi�l be applied.
There were seven bids. Bids were opened on March 31, 2016. Coatings Unlimited was the lowest
responsible, responsive bidder in the amount of$315,610.45 (which includes sales tax).
ATTACHMENTS: 1. Council Summary; 2. Agreement; and 3. Bid Tabulation
FISCAL IMPACTS (Include Budgeted Amount): The project is included in the 2016 budget.
STUDY SESSION AGENDA: � No Presentation ❑ Full Presentation
STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION:
Move to award the construction contract for the Reservoir 16 — Exterior Coating Replacement Project
to Coatings Unlimited in the amount of$315,610.45 (which includes sales tax); and authorize the
Mayor to finalize and execute the agreement with substantially the same terms and conditions as
presented.