A RESOLUTION of the City Council of the City of
Bremerton, Washington, adopting the 2006 - 2011 Six Year
Transportation Improvement Plan.
WHEREAS, after proper notice, the City Council ofthe City of Bremerton held a
public hearing at the regular meeting of the City Council at 5:30 p.m. on August 3, 2005, to
consider public testimony on the City's proposed 2006 - 2011 Six Year Transportation
Improvement Plan and, having considered public testimony to the Plan and in accordance with
the provisions ofRCW 47.80; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The 2006 through 2011 Six Year Transportation Improvement
Plan, set forth in Exhibit "A" attached hereto and herewith filed with the City Clerk, is hereby
adopted.
SECTION 2. Severability. If anyone or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion ofthis Resolution and the same shall remain in full
force and effect.
SECTION 3. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
PASSED by the City Council of the City of Bremerton, Washington this &d~
day of ({.ufj~d-; ,2005.
~~
OVICH, City Attorney
R:\LEGAL\Resolutions\Public Works\2006 Resolution for TIP.doc
APPROVED AS TO FORM:
1
Six Year Transportation Plan
...... Six Year Transportation Improvement Program
~II Washington State Department of Transportation
Agency: Bremerton From 2006 to 2011
Co. No.: 18 Co. Name: Kitsap Co.
Hearing Date: 8/3/2005 Adoption Date:
City No.: 0115 MPO/RTPO: PSRC Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars I Federally Funded
"'ffi ~Ci3 A. Federal Aid No. B. Bridge No. e :; ., I Fund Source Information Expenditure Schedule Projects Only
., Q)
c Ul E$ Cl 't:l (Local Agency)
.C ..c C. Project Title ., c 0 Ul I
.2 en " ., C\l ,,,.,,,, ,-", i
oj!! .QE .,., 0 .c: RIW
>", 'l;j ...
50 ....:J D. StreeURoad Name or Number [~ ~ a.
ll.Z in iii t5 Phase I Federal I Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road .E '0 5 Q) Start Fund Cost by Fund State Local Total Envir. Date
I- "e 1st 2nd 3rd Thru
Funds Funds Funds Type (MM/YY)
F. Describe Work to be Done a. (mm/ddlyyyy) Code Phase Code 6th
2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 I 14 15 I 16 17 18 1!1 I 20 21
I I I I I I 46631 I I I
14 1 1 1 HP-1998(029) 01 S 0.45 P PE [ 5/1/2003 I Discretionary I 46631 1 I 19271 1 60171 I EA
Downtown Pedestrian/BTC Access Improvements 06 G RW 9/1/2005 Discretionary 5100 I 1 51001 49001 1 Yes
SR304/Pacific Ave. 07 T CN 91112006 Discretionary 2005B I I 200581 20061 120351
W
Ifrom: Ferry Terminal to: Warren Avenue 04 C I
Improve pedestrian and vehicle mobility in downtown Bremerton 9/1/06
0
Totals 29B21 29821 8833 12035 6017
14 I 2 I 03 S .9 g IALLI 6/1/2004 I I I WSDOTI 110001 5221 115221 30501 35001 lEIS
SR 304 TIP - Stage 10 - Navy Yard Highway Phase 04 Yes
SR 304 06 P
Ifrom: Charleston Beach Rd S
to: SR3 07 01
HOV Improvements, overlay, widening, reconstruction I 5/1/06
Totals 11000 522 11522 3050 3500
14 I 3 1 I ~~ I S I .14 I ~ I~~I 1/1/2005 I I I AIPI 501 591 1091 39\ I
Warren Ave. Off-ramp 9/112005 AIPI 2001 1 2001 1501 I
SR 303 6/1/2006 AIPI 6111 I 6111 2111 4001
Ifrom: Sheridan Ave to: Callahan Drive
Construct off ramp connecting southbound SR 303 with Callahan Drive
I I I I I Totals 0 861 59 920 400 400
17 1 4 06 S 0.18 P PE I 111/2005 I STP(U) I 130[ 1 1 201 1501 501 I I CE
r~ww--' 07 RW 9/112005 STP(U) 43 I I 71 501 I 1 I Yes
Auto Center Way 12 CN 61112006 STP(U) 727 I I 1231 8501 4501 4001
om: 6th Street to: SR 3 onramp 05 I 6/1106
Extend second multipurpose lane to improve operation at SR 3 onramp
I I I I I Totals 900 150 1050 500 400
Report Date: July 13, 2005
Page 1
v. 5.6 - Supersedes previous editions
...... Six Year Transportation Improvement Program
~II Washington State Department of Transportation
Agency: Sremerton From 2006 to 2011
Co. No.: 18 Co. Name: Kitsap Co.
Hearing Date: 8/3/2005 Adoption Date:
City No.: 0115 MPO/RTPO: PSRC Amend Date: Resolution No.:
Project Identification Project Costs in Thousands of Dollars I Federally Funded
"'ffi A. Federal Aid No. B. Bridge No. - :; ~ I Fund Source Information Expenditure Schedule Projects Only
cO> l: Q)
.~ ~ ~Ul Cl 't:l (Local Agency)
"C .c C. Project Title ., l: 0 Ul I I
.Q E ~I .a ., 0 C\l Federal Funding I
tsJQ ... .c: RIW
5<..:1 ....:J D. Street/Road Name or Number Cll ~ a.
ll.Z a.~ in iii t5 Phase Federal I Federal I State I I 4th Required
LL E. Beginning MP or Road - Ending MP or Road .E '0 ; Q) Start Fund Cost by Fund State Local Total I Envir. Date
I- Thru
'e- Funds Funds Funds 1st 2nd 3rd Type
F. Describe Work to be Done a. (mm/dd/yyyy) Code Phase Code 6th (MM/YY)
2 3 4 5 6 7 I 8 1 9 10 I 11 1 12 I 13 14 1 15 I 16 17 1 18 I 19 I 20 21
I ~~ I I I I I 501 I I I I CE
171 5 I 1321 S 1 I P 1/1/2006 STP(U) I 441 I 61 501 I I
Harlow DrivelKitsap Lake Elementary Pedestrian Improvements C 61112006 STP(E) 206 1 341 2401 2401 I No
Harlow Drive T
Ifrom: Lakehurst Drive to: Osprey Circle
Construct a pedestrian pathway along the west side of Harlow Drive
I
Totals 250 40 290 290
19 I 6 I 07 S I IALLI 1/1/2006 I I 1 15001 15001 2501 2501 2501 750
Miscellaneous (Local Program Support) 06
City Wide 32
Ifrom: N1A to: NIA 12
Miscellaneous projects to improve safety and operations; non-motorized I I I I NIA
transportation; roadway preservation
Totals 1500 1500 250 250 250 750 I
17 I 7 I 05 P .0.5 P IALLI 1/1/2007 I I 1 50001 50001 1 25001 25001
Arsenal Way/Patton Ave. Safety Improvements 06 5
Arsenal WaylPatton Avenue 07 T
Ifrom: Loxie Eagans Blvd W
to: Lafeyette 12 G
Safety improvements including curb and gutter, sidwalks, lighting, roadway
widening, and intersection improvements C
o I Totals 5000 5000 2500 2500
14 I 8 I 05 P 0.06 C I PE I 1/1/2007 \ I I 1 1 1101 1101 1 110 I
SR 303 at 11th Street Intersection Improvement G RW 1/1/2007 I I 10801 1080 1 10801
SR 303 P CN 6/112007 I I 5401 540 I 5401
Ifrom: 11th 51. to: 13th 51. S
Lengthen existing right turn lane from southbound SR 303 to westbound T
11th Street. W
I
Totals 1730 1730 1730
Report Date: July 13, 2005
Page 2
v. 5.6 - Supersedes previous editions
~ --.-"""'- ..,.........-
,
~enc'/: 6retnertoll ~
o. Mo.' ~~,,",,'~;' M....' ~.//--
~it'/NO.: ~ MP01RTPO: ~
8. Bridge No.
"'
C <Il
o <Il
~.!1!
cO
?
U.
project identification
p... federal Aid No.
C. pro}ect'Title
O. street/Road Nal1\e or NUl1\bElr
.. .......... '". 0' .... . ...... '". ",-
f. oescri~ooe
'ai
~.Q
o~
"t:::>
o..';Z.
2
'\4
9
Lower Wheaton WaY Realignment
Wneaton way .
ltro\1\: Callanan Or to: snendan Rd
Realign Wneaton Way to north SOU"' configuration
'\4 \ '\0 \ rt"" COrridor
SR 303 aremerton to Silverdale TransPO ~uon
SR 303 . Riddell
\lforn'. BUf'Nell 51 to. .
Implement recommendations 01 SR 303 COmdOI stud'!
00
'\'\
-
RelJOr\. oate: JulY '\ '3. 2005
~ %,
E~ .. "
" 5
"'''' ..
~~ iii ~
~ '\5
I-"
4 5 6
'\2 P .'\2
02
M
06
~2
0'\
03
M
05
06
~2
p
p
1
\
SOl 1 ~.....
state
fund
COde
\
'\2
~
~ .__ 30971
Grand Tota\S tor Bremerton
w
P
PE\
RW
cN
'\1'\12009 \
'\11120'\0
'\1112010
~\
ALL \
c I
2.8 \ G
P
I
W L--- \
~
\ t pE \
Page '3
frol" ~
A.doption oate:
. 81312005 .'
Hearing oate. ~ Resolution No.. ~
M"'end oate: ~ federally funded
Prolects only
swte
funds
Local
funds
port BlakelY AlternatiVe Route AnalysiS
,variOUS to: NIl'.
Ilfofll: NIl'. . to N \113 port 6taKelV
conduct ana\"tSis of potential tlanportatiOn routes se e
Planning area
"ro}eet costs iO'ThOUSaodS of Dollars
fuod Source 10forl1\at\00
----
federal funding
federal federal
fund cost bY
COde Phase
'\0 '\'\
'\3
'\4
--r
132\
21B\
'\005\
\
\
\
1405
liOo\
\ \
H861
E)tpenditUre Schedule
llocal Agency)
E.n'll!.
Type
20
lowl
fuOdS
20d
3rd
4th
ThfU
6th
W
-1
\ '\82
2'\3
1005
,
----
1405
\ --wo
'\st
'\5
'\6
'\7
'\8
'\32
2'\8\
'\005\
\
\
\
\
\
\
1405
~
~ ,\00 ~ -
~ \ \ \
~ '\25~
1~ 13323YS15 8767
Rl'N
Required
oate
\MMf'{Y)
2'\
'\00
---"
125
'\25
----
2380
v. 5.6' SupersedeS previoUS edlS"s
-----
-----
-----