Loading...
HomeMy WebLinkAbout5545 ����-��= ��s AGENDA BILL �� CITY OF BREMERTON CITY COUNCIL � SUBJECT: Public Works Study Session Date: February 10, 2016 Agreement with Utter Associates COUNCIL MEETING Date: February 17, 2016 for Broadcast Equipment Upgrades Department: Finance in the Norm Dicks Govemment Presenter. Char Bumette Cer�ter Phone: (360)473-5011 SUMMARY: The plan is to upgrade and Iower three cameras, add a fourth camera and upgrade :;, broadcast equipment in the control room. Requests for bids were serrt to 5 businesses on �,I November 13,2015.There was a walk through with potential bidders held Friday, November 20. Bid opening was on Decembe�3. The one bid received was from Utter Associates,Seattle, WA. � ATTACHMENTS: Public Works Contract, Exhibit A Soope of Woric(as contained in the Notice Inviting Bids), Exhibit B Project Labor plan FISCAL IAAPACTS(Include Budgeted Amou�rt):This upgrade is funded through P.E.G.funds that - are earmarked for capital purchases. $100,000.00 was budgeted in the BKAT 2015 annual budget.The money was not spent in 2015.We are requesting$130,000.00 of available P.E.G. funds be added to the 2016 BKAT Capital Budget. This amount plus the budgeted amount of $30,000.00 will cover the entire cost of this project. Total cost: $142,778.60(plus tax) STUDY SESSION AGENDA: o No Presentation o Full Presentation STUDY SESSION ACTION: �ConsentAgenda ❑GeneralBusiness ❑ PublicHearing RECOlNMENDED MOTION: Move to approve Public Works Agreement with Utter Associates inthe amount of$142,778.60(p(us tax)for the purchase and installation of Broadcast EquipmentUpgrades in the Norm Dicks Govemment Center and authorize the Mayor to finalize and execute the agreemerrt with substantially the same terms and conditions as presented;and to increase the 2016 BKAT Capital Budget by$130,000.00 for this purpose. COUNCIL ACTtON: [�Approve ❑ D�rry ❑Tabie ❑CoMinue ❑ No Adion Form Updated 01/07/15 \ PUBLIC WORKS AGREEMENT THIS AGREEMENT, is entered into between the City of Bremerton, a Washington Municipal Corporation ("City"), and Utter Associates ("Contractor"),who's mailing address is 1008 Western Ave. Suite 201 Seattle WA 98104 The parties agree as follows: 1. CONTRACTOR SERVICES. The Contractor shall procure, install, integrate, test, and train staff on new broadcast equipment at the Council Chambers of the Norm Dicks Government Center,as set forth in Exhibit A "Scope of Work." � 2. TIME OF COMPLETION AND LIQUIDATED DAMAGES. Contractor shall complete the work within 90 calendar days from the date of issuance of the City's Notice to Proceed. � For each calendar day after the date fixed for completion that the work remains incomplete, the Contractor shall pay the City the sum of$500 per calendar day,as fixed agreed liquidated damage. 3. COMPENSATION. The City shall pay the Contractor the total amount of _$142,778.60 , plus any applicable Washington State Sales Tax, for the work and services contemplated in this agreement. The Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The�City payment shall not constitute a waiver of the City's right to final inspection and acceptance of the project. A• Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor,shall provide the City a performance bond for the full contract amount to be in effect until sixty (60) days after the date of final acceptance,or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor and Industries and until settlement of any liens filed under Chapter 60.28 RCW,whichever is later. B• Reta_inaee. The City shall hold back a retainage in the amount of five percent (S%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW,whichever is later. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Pavment• Waiver of Claims. THE ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. 4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times acting as an independent contractor and not as an employee of the City. The Contractor shall secure at its expense, and shall be responsible for all payments of income tax, social security, state industrial insurance compensation, unemployment compensation, and all other payroll deductions for the Contractor,officer, agents, employees and sub-contractors. The Contractor shall also secure all applicable business licenses, if required,in connection with the contract services, including all required licenses for Contractor's officers,agents, employees and sub-contractors. 5. TERMINATION. The City may terminate this agreement without notice for good cause. "Good cause"shall include,without limitation, any one or more of the following events: A. The Contractor's failure to supply sufficient skilled workers or suitable materials or equipment. B• The Contractor's failure to executE�the work with such diligence as will ensure its physical completion wit.hin the original physical completion time specified in this Agreement and ar�y extensions of time which may have been granted to the Contractor by chan.ge order or otherwise. C. The Contractor's failure to make fiall and prompt payment to subcontractors or for material or labor. D. The Contractor's disregard of federal,state or local laws, rules or regulations. E• The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F• The Contractor disregards the authority of the City. �• The Contractor performs work which deviates from the Contract, and � neglects or refuses to correct rejected work. H. The Contractor's failure to provide continuous competent supervision. 1. The Contractor otherwise violates in any material way any provisions or requirements of the contract. If the City terminates this agreement for good cause,the Contractor shall not receive any monies due under this agreement, if any, until the Contract work is completed. 6. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages,"with the State of Washington Department of Labor&Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington,as well as any other applicable prevailing wage rate provisions. Professional or support personnel such as engineers, clerical staff or security guards are not subject to prevailing wages. Certified pay rolls shall be submitted as requested by the Owner. :� 7. CHANGES. The City may issue a written or oral work change directive for any � change in the Contract work during the performance of this agreement. If the Contractor determines, for any reason,that a change order is necessary,Contractor must submit a written change order request to the City's project manager within two (2) business days of the date the Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance,the City will make an equitable adjustment. The City will attempt, in good faith,to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree,the City wil] determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written or oral work change directive from the City or a change order from the City. If the Contractor fails to require a change order within the time allowed,the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment the Contractor must complete the change order work; however,the Contractor may elect to protest the adjustment as provided below: A• Procedure and Protest b the Contractor. If the Contractor disagrees with anything required by a written work change directive, oral work change directive or change order, including any direction, instruction, interpretation, or determination by the City,the Contractor shall: 1• Give a signed written notice of protest to the City within one business day; 2• Supplement the written protest within five (5) calendar days with a written statement that provides the following information: a. The date of the Contract's protest. b. The nature and circumstances that caused the protest. c. The provisions in this agreement that support the protest. d. The estimated dollar cost, if any,of the protested work and how that estimate was determined. e. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. The Contractor shall keep complete records of extra costs and time incurred as a result of the protested work. The City shall have access to any of the Contractor's records needed for evaluating the protest. 3. The City will evaluate all protests, provided the procedures in this section are followed. If the City determines that a protest is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. B. Contractor's Dutv to Complete Protested Work. In spite of any protest,the Contractor shall proceed promptly with the work as the City has ordered. C. Contractor's Acceotance of Changes. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or(3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct,indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. D• Failure to Protest Constitutes Waiver. By not protesting as this section provides,the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations,and determination). E• Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section,the Contractor completely waives any claims for protested work and accepts form the City any written or oral order (including directions, instructions, interpretations,and determination). 8. CLAIMS. The Contractor shall give written notice to the City of all claims other than change orders within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this agreement or otherwise,shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicabte provisions of this agreement; or, if(and only i� no such provision is applicable, unless that claim is set forth in detail in writing and received by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum,a Contractor's written claim must include the information set forth regarding protests in Section 7.A.2.a.e. FAILURE TO PROVIDE A COMPLETE,WRITTEN NOTIF[CATION OF CLA[M WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVEN'�S SURROUNDING THAT CLA[M OR CAUSED BY THAT DELAY. Contractor must, in any event, file any claim or bring any suit arising from or connected with this agreement within 120 calendar days from the date the contract work is complete. 9. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the Contractor's acceptance of the City's final payment under this contract. When defects are corrected,the warranty for that portion of the work shall extend for one year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. if the Contractor does not accomplish the corrections within a reasonable time,the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City,its officers,officials,employees, agents and volunteers harmless from any and all claims, injuries,damages, losses or suits including all legal costs and attorney fees,arising out of or in connection with the performance of this agreement,except for injuries and damages solely caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115,then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the � Contractor and the City, its officials, employees, agents and volunteers,the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS INDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE TITLE 51 RCW,SOLELY FOR THE PURPOSE OF THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED TH[S WAIVER. The provisions of this section shall survive the expiration or termination of this agreement. 11. IIVSURANCE. The Contractor shall procure and maintain for the duration of this agreement, insurance against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the Contract work by the Contractor, its agents, representatives, employees or subcontractors. Before beginning the work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: Commercial General Liabilit insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $1,000,000 aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; Worker's Compensation within statutory limits and employer's liability insurance with limits of not less than $1,000,000.00. Any payment of deductible or self insured retention shall be the sole responsibility of the Contractor. The City reserves the right to receive a certified copy of all the required insurance policies. The City, its officials,employees, agents and volunteers shall be named as an additional insured on the insurance policy,as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor's insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Contractor's insurance shall be primary insurance as respects the City, and the City shall be given thirty(30) calendar days prior written notice by certified mail, return receipt requested, of any cancellation,suspension or material change in coverage. 12. MISCELLANEOUS. A. Nondiscrimination. In the hiring of employees for the performance of work under this Agreement or any sub-contract hereunder,the Contractor, its sub-contractors,or any person acting on behalf of such Contractor or sub- contractor shall not, by reason of race, color,sexual orientation,sex, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. B• Compliance with Laws. Contractor shall comply with all federal,state and local laws, rules and regulations throughout every aspect in the performance of this agreement. �• Work Performed at Contractor's Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees,agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Non-waiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of those terms and rights and they shall remain in full force and effect E. Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be available only through the jurisdiction,venue and rules of the Kitsap County Superior Court, Kitsap County,Washington. F. Attornev's Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties' performance of this agreement, each party shall be responsible for payment of its own legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to indemnification under Section 10 of this agreement. G. Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the bottom of this page,unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail,and shall be deemed sufficiently given if sent to the addressee at the address stated on this agreement. H. Assignment. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. I. Modification. No waiver,alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. 1. Seve_ rabilitv. If any one or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid,that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. K. Entire A reement. The written provisions and terms of this agreement, together with any attached Exhibits,supersede all prior verbal statements by any representative of the City,and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement,the terms of this agreement shall prevail. Notices to be sent to: Notices to be sent to: CONTRACTOR: CITY OF BREMERTON: Erik Utter Shannon Corin President- Utter Associates City Clerk 1008 Western Ave Ste 201 _ 345 6�h Str et Ste 600 Seattle WA 98104 Bremerton WA 98337 206-829-8171 I3601473-5323 erik(a�utterassociates com Shannon.CorinCa�ci bremerton wa us IN WITNESS WHEREOF,the parties below have executed this agreement. CONT CTOR THE CITY OF BREMERTON l� Print Name: Erik Utter Print Name: �N� Title: President Title:_ ��l�i� DATE_ Zl I�\�a\,�o _ DATE �7 ��� APPROV D AS TO FORM: AT EST: ✓ Bremerton City Attor e Bremerton City Clerk �..�...�.-- i I � �i I � i r I '�� CITY OF BREMERTON NOTICE INVITING BIDS Broadcast Equipment Upgrade for the Council Chambers at the Norm Dicks Government Center Project Scope: The City of Bremerton is accepting proposals from qualified vendors/installers for the procurement and installation of broadcast equipment in the Council Chambers located on the first floor of the Norm Dicks Government Center(NDGC). Background: Opened in 2004,the NDGC at 345 Sixth Street in Bremerton is home to the offices of the City of Bremerton. The "Condo" concept building also houses; Kitsap Health District, Housing Kitsap,Washington State University Cooperative Extension, and many smaller Government offices including Derek Kilmer's staff. The City Council and other government boards meet in the Chambers on the first floor of the Government Center. The existing broadcast equipment has reached its useful life and will be removed and replaced with new equipment. Scope of Work: The existing broadcast system in the Council Chambers,which consists of three cameras, shall be removed and replaced with new cameras and associated wiring, supports, and connectors. A fourth camera shall be purchased and installed at a location in the back of the room as directed by the City of Bremerton representative (Owner). The new cameras shall be installed at a lower height than the existing cameras as directed by the Owner. The new cameras shall installed,connected, integrated,and tested for use in LIVE and recorded meetings/events prior to acceptance by the City. All equipment, cables, supports, and any other items purchased and installed for the project shall be new and unused. Additionally, designated staff shall be trained on the use of equipment(2 hour minimum). Below is a list of equipment needed for the project; equipment used must be the same or better quality as those listed. Minimum Specifications: AW-HE130KPJ Panasonic-3MOS PT Cam 3G-SDI, Black 4 1 EXHIBIT A NB-AVCB-W NigelB White Finish Anti-Vibration Multi-Camera Bracket 3 NB-AVCB Nigel B- Black Finish Anti Vibration Camera Shelf 1 560849 Intellinet Network Solutions 16-Port Fast Ethernet PoE+Switch 1 VC-1-SC Roland Systems Group- Up/Down/Cross Scan Converter 1 to/from SDI/HDMI with Frame Sync MICA BroadcastPix- HD switcher with 8 HD/SD SDI inputs, 1 SDI key 1 cut input, 2 channels clips, 2 channels animations,4 channels graphics. Outputs 6 HD/SD SDI, 2 DVI, with program, preview, clean feed, PowerAuxA and B. Comes standard with 3 keyers witth option to upgrade to six keyers. Each keyer has a DVE for PiP. 250G6 Clip store holds up to 30 hours of H.264, ProRes and DNxHD clips. Harris GS CG. Fluent-View monitoring is customizable on 2 monitors with all inputs,file libraries, keys,4 outputs,clocks and touch-screen enabled. Fluent-Macros automate effects with switcher and file recalls.Virtual Sets with easy set creation. Network file-based workflow with Fluent Watchfolders. 3 panel licenses for physical and SoftPanels. Device control of AlA recorders and Blackmagic HyperDeck Studios and ViewCast Streamers. Minimal constant system delay.Version 4 .0 software with ClearKey chromakeyer. Mica is 4RU.Ships with keyboard, mouse, owners manual. Monitors not included. 1000 Panel Broadcast Pix- 1000- 1000 Control Panel 1 802 Broadcast Pix-Panasonic Camera Control, Control up to 9 1 Panasonic cameras, software only. 601 Broadcast Pix-On site Training 1 MG12XU YAMAHA 12-input,4-bus mixer with SPX effects,4 channels of 1 single-knob compression 8 D-PRE mic inputs,4 stereo inputs, and USB audio interFace. Includes Cubase AI. H55-CA Yamaha Powered monitor speakers, Black finish. 2 Z8601000 PRIMACOUSTIC Iso Wedge Isolation Kit- Monitor Speaker 1 2 EXHIBIT A 997-7346 Planar-PXL2430MW 24" Ciass Widescreen LED Backlit 2 Multi-Touch Monitor- 1080p, 1920 x 1080, 1000:1 Native, 60Hz,5ms, HDMI, DVI,VGA, USB IE-9112-S-14-F Innovative 9112-S Articulating LCD Monitor Arm Mount 3 BMD-CONVMAA52 BlackMagic Design - Mini Converter—Analog to SDI 2 Embeder 1 BMD-CONVMSDI... BMD-CONVMSDIDA Mini Converter—SDI Distribution* 1 BMD-CONVMASA Blackmagic Design -Mini Converter-SDI to Analog(PS Incl.) 1 Custom Console Custom Video Console 1 LN22D450 Samsung- 22" LCD HDTV(with RF Input and tuner) 1 INTEGRATION Design, documentation,and Integration services per attached scope of work and materials for integration Tentative Schedule: RFP Issued: November 13, 2015 Pre Proposal Meeting: November 20, 2015 1pm Proposals Due: December 1, 2015 2pm Decision to Award December 9, 2015 Estimated Contract Award December 16, 2015 Work shall be completed in entirety, including procurement, installation, integration,testing, and cleanup, no later than 90 days after contract award. Training shall be completed no later than 120 days after contract award. Pre-Proposal Meeting: Will take place at 1pm on Monday, November 23 in the meeting chambers of the Norm Dicks Government Center. The purpose of the meeting will be to allow interested parties the opportunity to look over the space a�d allow for questions and answers. Questions Regarding this RFP: All questions must be submitted in writing(email will suffice)to the RFP Coordinator. Questions and answers will be forwarded to all proposing suppliers who 3 EXHIBIT A provide contact information. No questions submitted after November 26 will receive a response. RFP Coordinator: Jon Rauch, Production Administrator City of Bremerton Phone: 360-473-5012 e-mail: jon.rauch@ci.bremerton.wa.us Submissions of Proposals: A sealed proposal package must be submitted by no later than 2:00 pm on Tuesday, December i,2015. The sealed package shoutd contain an original and three (3) printed copies of the proposal. Proposals received after the deadline will be returned to the supplier unopened. Proposals shalt be mailed to the following address or may be dropped off at the City Clerk's office on the 6th floor of the NDGC. � City of Bremerton Shannon Corin, City Clerk 345 Sixth St. Suite 600 Bremerton,WA 98337 Contents of proposal: At a minimum: Total cost for purchase of all equipment; installation, integration, and testing of al equipment;training.—including tax and training,etc Proposed schedule. The schedule shall demonstrate completion of work by the deadline given in the RFP. At a minimum, include dates for equipment delivery, installation, integration,testing,and training. Complete statement of qualifications and a list of three (3) references. References should be for work done on the supplier's most recent projects with a similar scope. Manufacturer's technical data sheets for all equipment to be installed. Criteria for Selection The lowest responsive, responsible bidder will be chosen. 4 EXHIBIT A Pricing and Bill of Materials Item Com onent - • p Manufacturer ' ;-�Pan Descrl tion' � • � Unit � . ExlenBed 110 HD to SD converters 1 AJA Video HD10MD4 HD-SDI to Analo Dox-nconverter b977 50 5977 50 120 Character generator PC 1 Dell Precision 5810 CG PC S1,980 00 51,980 00 130 Com uter Scan Cornerters 1 Ensemble Desi ns BEM4 Mitlo scan converter $1,394 95 37,394 95 140 S eakers 2 Mackie MRSmk3 S eaker5^ 313440 $26880 150 Console Desk 1 Martin 8 Zie ler Van uard 72 Fixed hei ht 72'tlesk wilh monitor irack $1,121 25 $1,121 25 160 HD Cameras and PTZ heads 4 Panasonic AWEHE130KPJ HD Camera 58,704 58 534,818 32 170 Camera PTZ Coniroller 1 Panasonic AWRP-50 Camera P1Z controller $2,070 00 52,070 00 180 Camera bracMets 3 Panasonic NB-AVCB-W White finish anti-vubrallon bracket $368 00 $1,104 00 190 Camera sheli 1 Panasonie NB-AVCB-Ni el 8 Black finish anti-virbra;ion Sheli 5368 00 5368 00 200 Audio wed e 1 Primacoustic Z8601000 Audio isolation wed e $39 60 339 60 210 Video Swit�her 1 Ross Video CPSSOLO-1012-001 Crossover Solo 8 in ut Production swdchei 56,895 40 56,895 40 220 Retlundant wr for switcher i Ross Video PSU-12V9A-6PIN Reduntlant Pow�er for switcher $560 20 $560 20 230 CharacterGenerator 1 RossVideo XDSO-0001-CPS XPressionLiveCG $2,155.39 52,155.39 240 Video converters lor monitors 1 Ross Video SHC-9642 3G/HD/SD SDI to HDMI Converler $32580 $325 80 250 SDI Video disiribution am 1 Ross Video SEA-9203 SDI video DA 334414 5344 14 260 Analog to SDI 1 Ross Video ADC-9033 Analo to SDI converter b5i6.64 $516 64 270 CG Trainin 2 Ross Video XPRESSION-OTR-IDAY XoressioNCiossover training da S1,539 56 $3,0791? 280 Training Travel 7 Ross Video TRAVEL-PRE-001 Pre- id travel for E�ression 52,472 50 52,472 50 290 CG antl Multiviewer Displa s 2 Samsung S22C650D Monitor �21965 5439 30 300 LCD HDN 1 Samsun LN22D450 22'HDN with tuner 5275.00 5275.00 370 Audio Board 1 Yamaha MG12XU 12 channel audio mixer $336 00 5336 00 320 Network Switch 1 Intellinet 560849 16 Port POE netw�ork switch $263 20 3263 20 330 LCD Arm 3 Innovative Essentials IE-9712-5-14-F Articuiating monitor arm $214 50 $643 50 Sub-Total Com onenis 362,448 60 Desi n 517.70000 Installation $17,600 00 Pro ect M mt 8 Admin 517,330 00 Trainin antlCommissioning 511,10000 Materials $8,000 00 Ship ing FOB Bremerton,WA $1,800.00 Insurance.Bond,Atlministration,ElecUical Sub 512,800 00 BASE BID Lum Sum $142,7T8.60 SALES TAX 8.7% 512,421.74 , � '•TOiAL LUMP SUM BID PflICE: ; $155,200.34 OPTIONAL ADD/ALT 410 Audia Leveler 1 A hex Compellor 320D Autlio leveler 51,263 90 51,263 90 420 Archivdl/Backu adeo recorder 1 AJA Video Ki Pro Rack Video recorders 53,962.54 $3,962 54 430 Video recorder drives 2 AJA Vitleo KI-STOR500-RU 500 GB 7200rpm stora e-USB 3 5387 41 $174 82 EXHIBIT A Project labor Plan Week WK3 WK2 WK3 WK4 WKS WK6 WK7 WK8 Week Beginning Monday 22-Feb 29-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr Total Weet Ending Friday 26-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr Hours ARivky INITIAL CD 100 DELIVERV DELIVERY INSTALL COMM GO LIVE CLOSE- Type DESIGN PROCURE F&E F&E TRAIN OUT ProJect Adminlstration Senior Project Manager-Sam Atkinson 20 15 4 2 20 20 32 20 133 Inventory Control-Sam Atkinson 4 4 8 Adminlstration-Amanda Kay Helmfck 4 10 2 2 2 2 4 10 36 ProJct Admin Total Hours 24 25 6 8 26 22 36 30 177 Engineering Sr Consutting Engineer-Erik Utter 40 30 8 78 Englneering Total Hours 40 30 0. 0 8 0 0 0 78 0 Systems Integrotion install Supervisor-Dave Williams 50 30 80 Install 1-Sal Cendejas 50 30 80 Install 2-Sam Atkinson 30 20 50 Integration total hours 0 0 0 0 80 50 0' 0 130 Systems Tert&Commission Sr Consulting Engineer-Enk Utter 30 24 10 64 Q Test&Commission Total Hours 0 0 0 0 0 30 24 10 64 � m Trefning 2 Sr Consulting Engineer-Erik Utter 10 10 w 'TrainingTotalHours 0 0 0 0 0 10 0 0 10