HomeMy WebLinkAbout03/02/2016 AGENDA �;---ll
i ;
�-----`I
�
i ` ' . i
CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 ❑ Phone (360)473-5280
MARCH 2, 2016
CITY COUNCIL MEETING AGENDA
1. BRIEFING: 5:00 to 5:30 P.M. in COUNCIL CONFERENCE ROOM 603
A. Review of Agenda
B. General Council Business (As necessary...)
2. CALL TO ORDER: 5:30 P.M. in the FIRST FLOOR CHAMBERS
A. Pledge of Allegiance
B. Invocation
3. MAYOR'S REPORT
4. KEDA QUARTERLY REPORT— Kathy Cocus, KEDA Business Development Director
5. COMPREHENSIVE PLAN UPDATE—Allison Satter, City Planner
A. Economic Development (Element 4)
6. PUBLIC RECOGNITION
7. CONSENT AGENDA
A. Claims & Check Register
B. Minutes of Meeting — February 17, 2016
C. Minutes of Study Session — February 24, 2016
D. Resolution No. 3265 authorizing the Mayor to submit a formal Grant Funding Assistance
Application to the Salmon Recovery Funding Board for Evergreen Rotary Park Nearshore
Restoration Design
E. Sole Source Purchase of a 2009 John Deere 135-D Tracked Excavator from United Rentals
of Bremerton, WA ,
F. Contract Supplement No. 2 with KPG for Sidewalk Improvements funded from the
Department of Commerce Grant received for the Burwell Pedestrian Tunnel
8. GENERAL BUSINESS— There are no Genera/Business items tonight...
9. COUNCIL MEMBER REPORTS
10. ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING
� Americans with Disabilities Act(ADA)accommodations provided upon request. Those requiring special
accommodations please contact the City Cleric at(360) 473-5323 at least 24 hours prior to the Meeting.
i -----�
I
i' •
! I
I
i
� �:
I� lU;��� �y" ,
��_�_;d i'c��.V�:i:7�-lc;1�;�
CITY COUNCIL 345 6th Street, Suite 600, Bremerton, WA 98337 ❑ Phone (360)473-5280
MARCH 2, 2016
CI�1( COUNCIL MEETING AGENDA
1. BRIEFING: 5:00 to 5:30 P.M. in COUNCIL CONFERENCE ROOM 603
A. Review of Agenda
B. General Council Business (As necessary...)
2. CALL TO ORDER: 5:30 P.M. in the FIRST FLOOR CHAMBERS
A. Pledge of Allegiance
B. Invocation
3. MAYOR'S REPORT
Kaap-R�sc,u S
4. KEDA QUARTERLY REPORT—Je , KEDA Executive Director
5. COMPREHENSIVE PLAN UPDATE—Allison Satter, City Planner
A. Economic Development (Element 4)
6. PUBLIC RECOGNITION
7. CONSENT AGENDA
A. Claims & Check Register
B. Minutes of Meeting —February 17, 2016
C. Minutes of Study Session— February 24, 2016
D. Resolution No. 3265 authorizing the Mayor to submit a formal Grant Funding Assistance
Application to the Salmon Recovery Funding Board for Evergreen Rotary Park Nearshore
Restoration Design
E. Sole Source Purchase of a 2009 John Deere 135-D Tracked Excavator from United Rentals
of Bremerton, WA
F. Contract Supplement No. 2 with KPG for Sidewalk Improvements funded from the
Department of Commerce Grant received for the Burwelt Pedestrian Tunnel
8. GENERAL BUSINESS— There are no General Business items tonight...
9. COUNCIL MEMBER REPORTS
10. ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING
� Americans with Disabilities Act(ADA)accommodations provided upon request. Those r�quiring special
accommodations please contact the City Clerk at(360) 473-5323 at least 24 hours prior to the Meeting.
C�
BREMERTON CITY COUNCIL
MEETING SPEAKERS LIST
PLEASE PRINT YOUR NAME BELOW IF YOU PLAN TO COMMENT
SO YOUR NAME CAN BE INCLUDED IN THE RECORD
�-1,� �� �.�� - ���
��y��' C�,���,Slr4. �� �i'<��,�
REQUESTS FOR INFORMATION MUST BE SUBMITTED IN WRITING TO THE CLERK
THANK YOU
' � � � � - � i�:..;."...�
• -� � �-
• V' -
•
• � • . . . � ' .
� • �
• � • • • . , • • • • • ' � • • . • • ,
• • • • • • � � � � � � • � � � • � � � • � � � � • • • � � � `
. � � - • • � • • • • • • � • �
�� �� �-
`� �3 L���►�.o�'�GcLtz.Q.�
� J ' � � , -' I � � '�-' I � r � � � --� � �� rJ r ' � �
�_.__� � _._.� �, _.., __._.� � _.__� _., � _._.� _� � � :�J ��___, �,
� � \ r 1 _\ � ��
_� �� � J � � �-�
. :`� .
. , - . . •
-. �. � - � �� � atur • a arc
- y,
. ::.�
_._, .
- - . . ' . . • • .
,
�i►
� .:�•�•:�'"-'' ���=L.' . .. :
,n��. .{ .5{� r��`.� .4 � �(�
�v . ��� . ,[ .�?-�/J•��" L 1� l
�( ���".�� �"`ti"�.�y ;r� � .�:..-�'`:'`".':�•:y �iti :"b_�:; ::C'{�1;� ,• . • l�` �•��'S'::,f
� ••Sy,_t .�E"!.r ".i, �i�����;^. �'� » ►A!:`yg�' tic: ^: �.:ti�.-, ?, "��a�� Y��y,,
� `4�� �; '��� Y.,� :;s�,' _i�'":-l�:.t: ,:l: rj�>..` .,-, ,�:-•`.t�
` � �: � , . ;�s+�'t,:ki�; '.•:' ''. ...t-• ��•_ f_ _ •�.:1' .t
.� .. � , ' . .#..'` 1.��:.. i+,.+' .• w� •., •:.T•
. �y f,:`�;`�i�'. . :.4� '''t„o-;y� .
. . .,r;� •n�y-
I ' ' • :; . '� .`.' :.'C`5�,. . • . . •'• � .'i�a..'�
J. :.,r' ,,'1�..���• /
I '\ _ �S. . , '4... . . � -" � _ .f r,.•
r � `" - '! '<', - ' ' w1 �-"
� � I � 1 � � 1 � � 1 : � I � � ( ' �. ?r
. . i � i 'I �t_ � � ,� �~ -C t�-�,`.a.�`. F . . . . .� �
, I I� I j � ry� - -':� _ .. ,•"����T � � .O . j��n(�• • �,,f'��, ��V�Y
fi , ' I *� �` .. ` . � ,-ic-._.:'^- .�- , 0 0 0 �4�4u:�ul�f � `_"""�J
"` i ',�.J; � / J'�..;....� .\�.� 1 �� ��. ` ` , -{. �` . . '
_ ,;,;:, �,� -.. ':�._.. ,�.ji' .�=="J.`�' \'c� � �t.• �� . . � , i
_ \ I L ..+� :� ,;, � _ . -,:;�`�� , _ . . � v • •��► �'
" !j �%' i ` �` � ���\ �:`4Y��-.�._ '�� �. � � _:1 �� . c, �
i (`� �.�"1 O �\\` O
.','�', ' . . __—_ i � - .: �,+ �.��,"-. . , � cc.
� i . 1���,`•�'�rr'c'` �. �.=�-, ' ~ J � I
.���:•' , ' . 1 ._.J % ` ' �� �.�. "� C,= v c� . �� +��bl i 1;�
. � � `� .w � ;'_� ^Y. � .-}\,!�\_ .�+', ' --�'1. / '� � . . ..•'-�.
_ � . �` � _ "� �..�►~� �;1 , .
• I � � �� \ 1 � �� i 1
��� a '.�t.
. ' � �� � ' � LSL:J 1-J� 3` - r . -
. . --�
• ' �^ � f' .`s. ��
,�.;` , "
I . �
�O I . ' . ��` �r
. � � �' '� , i � �~ • F•,
,�' .. � , � R-:► � , . � 1'riT.1 .� - ��,r � : �� �. `�� � '� I
;. . UI! UrW .� :� � �
,.,,� I I . •�� � ' � � � � ' .� ►� `s .� +.y . '�.' ♦ C�,^_ �-
yi'Jt:Jl.l � C:I11:J � \•�.. '� `�
.�`�. . .�, � � � �C�9C��3 � . � ���� . �.� "�' `;` ..., ��,�_
.. •.� ;�r:�:��.a.
-� • .` � . • • .'� ,.�,
�;i- '•',` � f � . � . - :� ,g; • _Y .�� `\` �'."Y ._._
�},�� ,��'y�, � � � �O O O I u I� ' ' ' 'v '�`� ' -/ , +` r . \. \' �'�`•=.,'7
�,• `� , . . �\, �� ' .���: .. . . , .. �G�-
�r��.+b.•j�l �r i��et:.i, ( � � � ' � ' �t'' . . .a ` - �' .� �
�[ ' 1 ' ( ,.�+`� 'c
� � �� r,l.�..�.�.:�Y:
�d '��' � � . �� � ' . � . . , . . •.... . . , - ` R_,,�..
�Na�'` .. :�� � . ;• . , . �.M��'.:, . . . , • `i�=:: ° �' 'is�
:�y` . _ , , .'. • . ._ . , , .' '. •:r' � .. . . , . yk.,_
• � . . . ' .,"� - L '`: .� . . , . ,. j�
- ,�
�BOE'�ivG � �euReka� �0��'� EMC= .� ,.,, e�9 wo�rtnnti � � � �
�— �.PIONEER. � �v�� �� � �aba,....,,. � � � m
s
OLYMPIC COLLEGE n+�^�;,':,;,�:�,� w��Ka�,�N caos.�:ar �.� M e,,,�,�„�,n,x„ � ScmdeF.nfic � 1��Io�r�s
i �
/ �
1 �
� sR � M � R�ro � /
` COMING SOON �
� � / �
�� APRIL 201 � ��
www.facebook.com/BroadHumor6remerton .
, �
�
5 r
�
� -
- � MorneroMaoRN000a ron sme
�p•,
�
� .� ; Bremerton
• Pond HoPPing
� �� .
___ _..._. __...
� r . . � -
. . ,�
� �
� � BEST PLACES T VE
�/ _ a..��_
�:;� . � . � f _ EAT pLAYAN� ; = 4 1 _ _��'� �
'� ; � '�"'F_ ra _- _ i•I ��;���
_ '�;z. � ';t i �� � �^ � ��+�
'� � 1 - -n. a
�- .�. / 1 ��..� .'� � -'•.c ' - '�� �ru�rn000
� � - � �� � - � :j I� ���.��.� .
0
,� _ � �,��.. ...
� s.�:. _ „, �:;a=�.m,„
1 -- - : : � � � __
't - �.
�{ :� •y i �.:;„"°��:e�.:^-
,Tf r�Y~ ht m°1
�'�OO�'9
dMv����er��e"�Vv�l
� �� � Am*N'l6Ymvp-.�urtrtdl/�+Va'qwRlmfdb�4mmlmrknNrwwn ���m�w��,��
� p+Mmfl��.Hr�/nbw.ny.erdtivnatt�9ln�nrHf'C.� �`�e�, ''�
l m
� ' oUKG.li1r.�U're��xc.. aryrtwsdln3013ua+up seybyyydme(rpy�e��
-- � o,�,�.,�r MmM..����e�o�k ^�...a,o;,;�:�
:�cx•:r��r., ` •i � in��.�.��,...r.ny �n.���ks.wmim, rnra�o=_°^+,.v.e,
;�•�• r�•.. — 4n�.mnumillmni,6m 2DIVMdmm.Am1.
�c�qi•.ci�:,+- y AREWEL091N� ���,�iro��h ��h��n�rm�r.r �����iyy';,'a` � �.a
I NaM ION/ hs�nryal!9.d10..nharlvng(myrlJe et�lo-f IhlMmm� �q�w1A �G��, �
��, vua aeue . ,. � �
� � ���.r��s��a r�m sro�+�.n�a ..�h��.,iu�ai� } v � ��".�""�ro n.'"a;,'"'"' �
�. . . _ ' ;TNESEARCNfOR p.m�h..h��,oR�,..��h,.b.�� �R..o-hmhe,.� - �/` �9,�. men� "k,��a,a
I . � SVfRITUAlIT1' .�,�R���h�pmm�qk.dyrn.,nm.. �c�rknd..��h��d f' � r��.�yt- ..�.sma„m. .,
na 6c d�u mudi d.rtm�E. '�k.nm�ang fx =� 'A,��
� (.7rylnJmluwha.�.n�.�lrpr��n. pmkv�mal.;dnln I� •�? \ir�
. ' , -. . ` \ _ ` I�dietlnblllryd�6circl�6mkmwn Cwnrymmmlvlvnn t `� : ^E��.+�t�4�#�;
..- . � , � p ANT9 n h�Iwme d iha i'upn bavd N,.�I c.i�M eo�m i ��t
SvaiN .,!*'::-T������
'..�... � If{p $hl�aid.�Mu.�imht�ehmpayl�{ IhinghaeuWhM . �oh
/ �.. . � � PAEV ,�rtn�dfi�K�rmien,.�.w,.�m�d• mo-�a�i��nqa .�
� J /) � .� � nyi�nym.�n�mui.,m�d�dp��i� md�I��M,�,�n� ._._
L� 7• \ � M klo"��"p�m.rm�n5[�� (yn.ldm� ..._._",
f
=�•.-'.3^� � � _ .`\ - �� � 9]0�1�YMM.COI�M�RCUW6 �IwMe��nn'^^SortL��1 MeM�.yqaY�We� �'n
�4AIn1910�rd n/����°^n �E�m��.'Jqi.9,j��� �–�MOI
� ^x�.�ra qwn�
4he unatlly�y,�nm� ��Obu�����&Am� wi,6�s�bMs V�.m
Nppu�qn^W m�b�'• 101Jr5eRmF'�l+Kaeidl�' Im �l�if��~�i`r
atr.�,,,e�„d Me,,,d.r,w, d«oi�o�,,,,��.:�i"„1°`°'^e r"�,,,,.�r...,."^�,e�F..
w�n.`�roa""�, �.n�i�RN���..,�r� m"�n�,,,,`A`��.r..,��
'�����^*umN� . ro m.�4 i
n�. 0.11aa�di. �^�w�M.M h�`A°°bn' m���°`i�r.F m
�,,, '�'^�m�e., nm �nru � �i4a
�n"`m'"+Aba �""c �a.�� .wiq.m�'"y"'`m.,.,,,u �+�"�r•w�^�+a, .~we
�a � .e �a`°'m;^�^�
�°�a.^m.�eam.�a,4" �mw i��mm�.�m "+e�.�re �� ; �N
�h"T'"Vurw..ltir,� N�fir:���N°ik46m we"s°v.r�
GbmW.`eY'Ie60na!' "8��1 ��j�•a+��
•
e'+s/i4.`N��pm
w�� "'�^+�ai
E C O N O M I C 4cn Quarter 2015 Economic Development Report
D E V E L O P M E N T City of Bremerton
October 1, 2015—December 31, 2015
ALLIANCE
BUSINESS RETENTION, EXPANSION AND ATTRACTION (BRER)—Q4
Retain, Expand and Assist Primary Businesses in Kitsap County
BRER Assistante Q4 Q3 Q2 Ql YTD Total yTD g6 Annual
Goal
Information Research&Referrals 63 58 55 98 274 137% 200
Companies Assisted 51 32 29 37 149 9996 150
Visits and Presentations 25 33 26 26 110 110% 100
Start-up Assistance 7 5 4 3 19 63% 30
Early Stage Technology Firms Z 1 1 0 4 40% 10
Contacted
Early Stage Technology Assisted 2 1 1 0 4 80% 5
-- - --- -..... .. ...... .........__. ._..... ,.. _ . _..._.__. .... _.. ..--
._. . - i
� Early Stage Early Stage �
i Start-up Technology Firms Technology � ;
Assistance�_ Contacted Assisted ,
� 3�'° _1% � 1%
! �
; Visits and______._— i
� Presentations Information �
20% Research& �
; Referrals +
� 49% ;
�
�
� Companies �
i Assisted �
' 26% '
: 2015 BRER ASSISTANCE I
�,...,_,..,._"_.. .._..____. ..._ _. ............ _...�
_..."' .... ....... ..."_"___'_'_' "..."'__ "'_"'_'_ ' _.. . _. . ... _.. .__.._._.__ .
__... .. ... .. . .. ___.. _. '_ '..._ ___ ' '_
1 . . ._. _ ... .. . .. .. .. . . . . . . .i
Q4 2015 ASSISTANCE
; ■BRE/PTAC ■Recruit nt ❑PTAC classes/events (attendees by location) ■Inquiries& Reports ':
i �
, i
,
, 9 I 11
I 9
; _..---._�- - --. .._ 12 lp i
;
._.._ _...- - ---.._.....__— -• -•--.. .._ � _._._.__ +
BAINBRIDGE ISLAND BREMERTON KITSAP COUNTY PORT ORCHARD POULSBO ;
I
I '
i
�
i �
Page � 1
/ E C O N O M t C 4tn Quarter 2015 Economic Development Report
D E V E L O P M E N T City of Bremerton
October 1, 2015— December 31, 2015
ALLIANCE
Busi�vEss Arrru►CrioN Acrivinr
�. .� - . ...
-.
12/18/2015 Projett Where's Q4:build to suit state of the art meat processing facility.400,000 SF facility heavy industrial.
the eeef Sent info on Overton property
11/9/2015 Project Skywest 44:DOC Lead seeking 40,000 SF and 35,000 SF for expansion;$60K average salary; multi
state search;submitted 3 sites;provided follow-up on FTZ status
li/i/2015 Project 3D 44 2015: French firm with Kitsap connections considering location for manufacturing facility.
I Project on hold while client works on US Patent
Q4 2015: large IT defense contractor seeking partners for potential contract in region;
10/6/2015 Defense xx anticipate much growth next 10 years.With award,would open office and hire employees;
would also subcontract up to 30%of work;would also be open to mentor proteg�program
! Q2 2014: lead from KEDA board member;contact made re possible expansion site;meeting
6/19/2014 Project GH set for mid luly Q3 2014:follow up with potential office space in SK q4 2015:site tour and
follow up for future expansion
OTHER RECRUITMENT ACTIVITY—Q3
• Continued discussion/planning regarding NUWC Keyport Industry Day 2016
• Continued contact with Defense XX; Kitsap visit delayed due to merger activities
• Hosted and/or presented at PTAC(Procurement and Technical Assistance Center)workshops which draw attendees
from outside the county
■ Contracting Coffee Hour(2 total)
■ Marketing to the Government: Reaching Buyers and Primes(including social media)
■ Small Business Participation Plans
o KEDA PTAC counselors presented at WA DOC.workshops in Seattle
• Provided data based on inquiries including the following:
■ County growth
■ Multi-family housing activity
■ Defense economy/climate
■ Foreign Trade Zone boundaries
• Actively involved with Washington Military Alliance and other activities being coordinated by Kristine' Reeves
• KEDA's PTAC(Procurement Technical Assistance Center)works with clients outside Kitsap and is always listening for
potential expansion or relocation opportunities for follow up
• Continued Kitsap promotion via news releases,twitter and Facebook
Page � 2
E C O N O M I C 4`n Quarter 2015 Economic Development Report
/ City of Bremerton
� D E V E L O P M E N T October 1, 2015—December 31, 2015
� ALLIAIVCE
�
BUSINESS RETENTION AND EXPANSION ACTIVITY—SELECTED CASES
SITE VISITS/COUNSELING SESSIONS:
NOTE:In the following posts,PTAC stands for Procurement Technical Assistance Center
�. • ..- . -
1/12/10 Professional Servites PTAC client 2012:Attended Kiewit Outreach event for EH W2;sent email re upcoming Walsh
1�2010) construction bid seeking subs Attended Keyport Industry Day;counseled re business succession
planning Q12013:attended"selling to the Navy"workshop;met with Mary Jo for general
session;referred client to regional transportation center for small business cert Q3:Met for
follow up on status;reviewed talent needs;Q4:follow up on business plan and future growth
Q12014:Sent client info on new WA State Small Business certification in response to prior inquiry
Q2 2014:new staff member attended Govt 101 and line card class;follow up with client re
BidMatch and marketing/research;made arrangements for intro to Whidbey Island small
business folks;Introduced to prime contractor Q3 2014:attended being a subcontractor parts 2
and 3 q4:worked with client on RFP and helped determine areas to address Q12015:attended
contracting coffee hour;forwarded info on SBIR website"down"time;worked with client on SAM
challenges and review of capability statement.Attended Korte Outreach;Small MACC workshop;
attended Feb contracting coffee hour Q2 2015:attended April contracting totfee hour;attended
July contracting coffee hour Q3 2015:attended July Contracting coffee hour a and b;attended
rv�eet the Buyers;attended NAVFAC NW Outreach Q4 2015:attended Small Business
Participation Plan class
1/7/14 Tethnology 5 412014:New business seeking assistance with government contracting.Provided SAM guide and
capability statement template.Attended January"selling to the Navy workshop";Ql:Site visit
with details on company goals and plans;seeking investment capital Q12015:attended 1an Feb
and March contracting coffee hour;reviewed capability statement q2 2015:attended Being a
Subcontractor class,part 1;attended May contracting coffee hour Q3 2015:attended contracting
coffee hour;attended Reviewing a Technical Proposal;site visit and follow up for new regional
briefing outreach q4:etroductions to potential partners;info on state cooperative
purchasing agreements
7/3/12 PTAC 21 Assisted with keywords for PTAC bid match search;Solved client's challenge with not receiving
BidMatch email notices q3 2013:Client came to office for SAM assistance Q4:following up on
query for name of sole contract award for PSNS ship preservation;attended Govt Contracting
101;provided input on research and marketing to expand client base;q12014:fallowed up with
staff regarding NOVA lead for sub-contractors;client seeking opportunities outside government
contracting.brainstormed options and referred to WorkSource for business development staff
person;attended 1an"selling to the Navy"workshop 43 2014:follow up re BidMatch emails Ql
2015:provided info on Korte Construction subcontracting Q2 2015:attended Being a
Subcontractor class part 1;assisted client with updating DSBS listing Q4 2015:client seeking
assistance on 8a and HUB zone certification;follow up planned in Jan;attended small
business participation plan class
11/18/15 Tech Services 2 44 2015 attended Small Business Participation Pian class
12/21/15 R&D 44 2015:client requested assistance with GSA schedule;also review federal
procurement certifications
2/18/il Construction 14 2011:counseling re graduation from 8a program;referrals on potential opportunities.
Q2 2012:Attended"synopsis or solicitation?"workshop Attended EHW2 Outreach
Event Q1:sent info re subcontracting opportunity with prime Q3:Provided information
on updating SAM registration 412015:attended Jan contracting coffee hour q4 2015:
client attend PTAC classes;worked with client on potential partnerships
2/12/15 Defense 38 Q12015:attended Korte Construction outreach;educated on resources to find work
including websites and outreach events Q4 2015:worked with client on staff transition
effort
Page � 3
f E C O N O M I C 4tn Quarter 2015 Economic Development Report
City of Bremerton
D E V E L O P M E N T October 1, 2015—December 31, 2015
ALLIANCE
11/5/14 Electrical Contractor Q4 2014:attended contracting coffee hour in Nov and Dec Q12015:attended Korte Construction
1 event;attended Jan contracting coffee hour and small MACC workshop;attended Overhead
pricing workshop;attended change order pricing workshop;Q4 2015:attended NOV
contracting coffee hour
2/27/15 Real Estate 10 Q12015:meeting re current opportunities and growth plans Q4 2015 worked with
client regarding project funding options
6/22/15 Clean Teth 5 QZ 2015:meeting with startup regarding plans and needs;Q3 2015:follow up regarding needs in
initlal meeting Q3 2015:site vlsit with new company with goal of creating manufactur(ng facility;
currently working on R&D component Q4 2015:met with client regarding opportunity for
energy project;made intros to potential partner;provided research on PSIC incentives
and permitted uses as well as FundLocal program
2/29/08 Professional Services PTAC client.2012:June-sent email re upcoming Walsh construction bid seeking bids
25 Q3 2013:sent client reminder re SAM expiration with renewal guide Q4 2015:attended
Small Business Participation Plan class
OTHER BRE ARIVITIES—Q4
• KEDA Tech committee continued setting mission and goals
• Supported and promoted Global Entrepreneurship Week activities
■ Note: Kitsap was first in state with most number of events
• Attended Green Drinks networking event for connections and follow up
� Actively involved with Washington Military Alliance and other activities being coordinated by Kristine' Reeves
■ Reviewed multiple proposals in response to RFPs that will identify and create programs for defense firms
wishing to expand to other sectors
■ Forwarded names of Kitsap firms for inclusion in DoD services companies pilot project
� Continued discussion/planning regarding Nl1WC Keyport Industry Day 2016
• Hosted and/or presented at PTAC(Procurement and Technical Assistance Center)workshops
■ Contracting Coffee Hour(2 total)
■ Marketing to the Government: Reaching Buyers and Primes(including social media)
■ Small Business Participation Plans
■ Boots to Business(at NBK Bangor)
• Presentations to groups aimed at business owners and managers
■ WSDOT workshop
■ Decision Makers II
� Leadership Kitsap
• Provided demographics and referrals for startups
■ WA State online licensing guide �
■ Workforce
• Provided data based on inquiries including the following:
■ Top employers
■ County growth
■ Multi-family housing activity
■ Incentives �
■ Kitsap small business data
■ Defense economy/climate
■ Contacts for partners
■ HUB Zone information
■ Business licensing
• Helped coordinate three(3) Kitsap Business Forums
• Began working with volunteer to update Top Employers list
Page � 4
E C O ru o ivl�C 4th Quarter 2015 Economic Development Report
City of Bremerton
D E V E L O P M E fV T October 1, 2015—December 31, 2015
ALLIANCE
• Continued Kitsap promotion via news releases,twitter and Facebook
• Continued updates of KEDA website, KEDA Facebook page, Pinterest boards and KEDA Twitter account
MARKETING AND Ot1TREACH—Q4
• Submitted ad copy and graphic for PNAA 2016 conference program advertisement
• Kitsap economic indicators updated
• Began phase 2 of KitsapConnected video series
• Monthly columns on Kitsap economic development in Kitsap Peninsula Business Journal with links from KEDA blog
(website),twitter and Facebook
• Produced e-newsletters;sent to Kitsap businesses with timely business information and contracting opportunities
• Continued posts on KEDA Facebook,Twitter, Linkedln and Pinterest accounts with new followers weekly
�------�-----. .......- -----._.._._...._........._...-------�--- �-- - ---------........-� -- ------._. ._�......_�.__..._,,..�.__.....------------------- --.
. ,
� All Kitsap Connected Videos � I kitsapeda.org Unique Visits
; i � Q4 2015
� ; I I
� I : � �
i ;
� 201a
i � I
. f I zois ' �
; � I
� � I
�
� ' � : : i
; j - 1,000 2,000 3,000 4,000 �
■41 zoi5 •Qz zo15 ■Q3 2015 ■Ra zois � 1 ■December �November ■October j
�-------- _._...----�..__. . .__._..__---__ __._�_._....---�--�------..__� L. -- ----- ------..__.. �
-.-----_-..._____.___________.______ ._..__..____._._..._
�- �- -�---------�- -- -�
' KEDA Social Media Activity - Q4 2015
I
,
� I
�
, j
i I
� .. .. ...._ _....... .. ._..........----- �- - --- -- ----- - --_.. _ .. . . ;
' I
i _ .._ _ . ... _.... ._ . _._. .._.... ... . . _ i
. .
( .._ . ..... ............ ...... .---�----...... ..___._. _ _......-----.. _.._. . .... i
; I
� ---------..._..---____......._._..------... _.._......._._.
---------�-- , --------._._..--
�� I
I FACEBOOK LINKEDIN TWITTER
I �
� ■New Likes/Followers ■Retweets or Shares �RePins i
� ■Comments or Mentions ■Clicks to Web �
�..-- ---_...--- ...-- --._ _...-----.__. �
_...------- _.._ .__....,..
Page � 5
4ih Quarter 2015 Economic Deveiopment Report
� E C O N O M I C City of Bremerton
D E V E L O P M E N T October 1, 2015— December 31, 2015
ALLIANCE
' ' i
KITSAPEDA.ORG TOP PAGES
� Licenses and Permits ! •-•^�--W---�---�-� 407 Q4 2015 i
� Kitsap Business Licenses and Permits t ---��W--�,.-�-.�-.�-�- 407
Contracting Coffee Hour ; -�-�--�---- 414 ,
: Laborforce and employment � �-�--�•��- --• - 450 •
, s �
Education,K-12 and Higher Ed ': — 468 i
� Events Calendar � •-�-�•-- - -------------- 546
i What is a Sources Sought7 ; --^•• 611 �
� Contact Us i ------- -�- - - -•- __-- 623 �
Board of Directors ; •-------�-T-----<--M�µ••- -- ••-• 796 i
; Life+Work r •---�---^----•�• - •-� 1838
� 0 200 400 600 800 1000 1200 1400 1600 1800 2000 �
.
�..,..._-----•---..,.- --.—_ --- -----------..........._�_...._..•----...._---......_..._._.-•-- -........__�..._...._.._.___._..._._..._..........- ----...-----�-.._._�._.._ '
: .... . . .... ... ... ..... .. .. ... .... .... � --.. ...._._.. .._._.. ..... .. _ ,__... __... _ .. ...._... ._. �
� �
2014 Keyport Industry Day !�• 147 � Q3 TOP DOW N LOADS ;
Seaport-elnfo �---�-� 167 � KITSAPEDA.�RG ; �
! ' � � � � ;
� PTAC Calendar �-� 170 � ' ' i '
; i i �
NUWC Keyport Industry Day Command Overview �-�»a•�••--� 344 � � ± � �
� � � � •
': WA state rail map �*�•• 349 ; ' ; i
' 2013 Top Employers-Private �•-�-d�= 37g ; ; I � '
, NAVFAC NW Prime Contractors List(all editions) �•�••.•W+... 3 i 7 I I I i
I � !
� Navy Contracting Opps � �� 416 � � �
� j � i ; � ;
� Economic Indicators(all editions) i •�� 492 i ; � � i
� capability statement + � � � I 2018 i
� 0 500 1000 1500 2000 2500 ;
'--�--....- -•--- - ---.... . ._.......---- ---......-------�--..._.._. ._-�------__.._._..._. . .----._�___.._._..____._.�._..._._......_..----...- -- --.. .------..._.�__ _.-----.�
Page � 6
Business Retention, Expansion and Attraction (BRER) — Q4
Retain, Expand and Assist Primary Businesses in Kitsap County
: � • � - • . �� ' • . . . . �, • . ..
• • • ' - - . � ' - - • 63 58 55 98 274 137% 200
-. - � - -
• • . - � . • - - 51 ;; --- 32 �! 29 " -- 37 � 149 :. 99% �: 150 -
- - - --- ._. :: _ _ ,. __..._ _ _ ._
. • • - - . • ---25 . _33,. _ _ 26 26 110 110% 100
_
--._ .-- - -- - ---.. _ .. -
• � 7 : 5 �. 4 I! 3 �' 19 ': 63% 30 ;
• • • . - . ! 2 �� 1 0 4 4� 10
. . .
. .
�� —
_ ., __ . _ _ _ .. . .
. .
. . . , � . . . . 2 �� 1 ;� 1 �; 0 � 4 " 80% � 5 ;
. .
.__._....__'_'.._._.._....�._.._____'_" ___'...�. _"'___... __' . .�:_.._. __ ....._"_'_'.._:L__'__'. .._._.._._ . I.._ ____' ._. _.... .....' _ __' " _ '
�g�'g-���� Early Stage Technology Firms �ar{y Stage Technology Q4 2015 ASSISTANCE
�`���4}�'��_��—.____ Contacted 1% � Assisted
�;;, --�� / g% ■BRE/PTAC ■Re t �PTAC classes/events(attendees by location) �,Inquiries&Reports
Visits and z3
Presentation 16
Z0� 9 11 �3�
�Information 4 3
�� 9
Research& I ' I � '
o ,
Referrals - ---...�.__ .. . ..----..... -----..... .. �_.
BAINBRIDGE ISLAND REMERTO KITSAP COUNTY PORT ORCHARD POULSBO
Companies 49��
Assisted 2015 BRER ASSISTANCE
26%
MARKETING AND OUTREACH — Q4
All Kitsap Connected Videos ICItSapedB.org Unique Visits Qa ZoiS
Zoia
i
.�
zois
� � . , � , I
- S00 1,000 1,500 2,000 2,500 3,000 3,500 4,000
■December !November ■October
•Ql 2015 •Q2 2015 •Q3 2015 Q4 2015 �--
KEDA Social Media Activity - Q4 2015
._------ ---- --�----�------------------ -_--_--
��
FACEBOOK LINKEDIN TWITTER
■New Likes/Followers ■Retweeu or Shares ■RePins Commenu or Mentions ■Clicks to Web
Licenses and Permits � • 407
Kitsap Business Licenses and Permits e.�-- 407 IC9TSAPEDA.ORG TOP PAG ES
Contracting Coffee Hour -.. - ql4 Q4 2015
Labor force and employment � � a50
Education,K-12 and Higher Ed �_� 468
EventsCalendar - 546
What is a Sources Sought? � ��� 611
Contact Us 623
Board of Di�ectors --- .� 796
Life+Work f - - _-��• 1838 .
0 200 400 600 800 1000 1200 1400 1600 1800 2000 -
2014 Keyport Industry Day ��� 147 + i � �
; Q3 TOP DOWNLOADS �
Seaport-e Info �� �6� i KITSAPEDA.ORG �
PTAC Calendar :� 170 + � ' I �
NUWC Keyport Industry Day Command Overview 344i ' I � I
� I
WA state rail map =� 349� ' I I
2013 Top Employers-Private - 378 i i �
NAVfAC NW Prime Contractors List(all editions) _�� 397 i : �
; ' �
Navy Contracting Opps � 416 j I
Economic Indicators(all editions) , 492 � � I-
capability statement ; :...:: � i ; I 2018
o soo i000 isoo z000 zsoo
°" w : � � ��. �I � � ��C, i1_���f. ,-�`
� _
'� :i• � °
�.:_
�....,.. �.: }
,. � -
� 1 � � , .
� � 1
, 1� �Y �` �
_ � �;, --� - "'
_� ,'� _
,��� ��
,
v `- � • ..
_, .,r,s -- . - .�
r � . ��_�....; �• �• =�F
. �'�' „ •- � - � 'd., -- _ ,.
��'"�:� ^� _+i.' . - ' �`'. .t�.�'-„ � =r
.�-�
a, �
. aw�,�-'��� __ �� `'` ' `
.,..�� -�..:- , , _ ; ,
_
__ ,
. . ; _ �, ' � ;�_
. ,
:_,.,.�. } �,,.. - T _ ,.- �: ,�:.-.�
:,:-'�i`•I - �,.,-. ,� _ _� �.� >�. �,. � �.
� „�.:v.--��,." y'�.�r�GM�'* -V- -:1'� _ .•� .. .`..f' � .
�V . . � t.
-��'��M� •�'.• r �ih.y„W, .
`�- `�;� ��'� ,`_, '`
� ►� , �, `'"�. ,.�� �-� Economic
.
. , ; ,.,�,�
�..- ��� �� ,�--
�� � � � Development
COM PREH ENSIVE PLAN U PDATE Element
BREMERTON2035
Planning Commission
� Workshop
_ , f
� - � �" =�� ;. ,,�� March 2 , 2016
���� s}�,,��:�. ;:;
��� � ,
.. ..1'.j —�.�������:�- _ " �_
• ���� �� _,� �
� ��„'.s.���wr
' �.F��_—_ .._ � . . ...... ...- ..
• • � • � 1 I � 1 �
.------------ ____ ---.-----.---- - ----- ---.---- ---_.--------------._.-----.--------- - --------- --�--- ------.-----------�----__.-------- ------- _ --- ----. __.
� �
;
■ 2000-2004 was a period of considerable growth �
� worldwide . �
; ,
; _r- � i r � �
;
; ;
�
� �
' ■ Unprecedented growth Nationwide �
The Globa! Econamy !
� � 2004 had the lowest interest rates picks Up Ste�m I
� since 1954 in 20D4 ` �'�'�� �
,
'� �
� Record inflow of money from - :� � � --'
� � �� i
i abroad $600 billion . -, : �
; � � ;
� ,
; � !� '
, . . . _ � ,� I
� ■ Bremerton see s rev�talization ! �-� - ;
. .... . ;
�
� �- ;
; __ _ _ _ __ _ _. �
; �
� ;
i �
�
CHANGES IN LANDSCAPE
2003 - 2015
. - . . . . -
. . . . � . . - �
• � • � . � ' • . �
• ' � � • � • • � • � � . • • � � � �
• � •
. �
• ■ �
_ - �� ":, - :^--..
yt��':s -.,�„ �er„� � ti - �. �
. � . - ;�•rr.TF � � ..*�1 �� r� �� v.W�l�4 t, ..v_�'+ t y ;M �,;'-F'Y - .. .
.�.Y' °�i' _;.ti'l+i. �`.. �� `�, ..5.'i. �!`,�. ?s f ��4 � ..�^11._ ' - '��.
� _ .. �_, �?r _ ~.f h?� +• • . � �c-� .�:: 'Yi. I�s-4.r Y{ ,� �F-" �r t .; � ;, y 1•! ~ • '
. .. ...- , _ '
.- -. . . � . - "
_ - . �-'-i . _. .. , ��: ti': �"a---� �..:� .,� '�^�.. Y t. .
' �`• • r . .�r �.`.'
�- �' . ' l. ,.� t; - —,c a+' �-.�d7 �r �..s : � .
' ��
`>w r. `�'�r -:: `""`. ti_ a .`_�,,�: '�i .�r :d' �-l.;t - h V �� �;Cc .�.� v+.^'..,t+,:•:V-+��r- ..9 - =7!'�„�'
�. .
,...
- -..-. � Y � . .'�- .- .a
'^.
. ����� ..,.� *, � ��
_.i.� ..� �-..�a:�
:��cfr+_ �L`�l"�'.T'�.��!t �,��'^�.. �.••'' ,...� '' �.• ' �l~ - ' '�� ��w+=_' -�r r��!'i rt;,..� \,�'.
� � �_
,� -Fa tc����.+�+�}-�.e� 'i'''�i�'.•• "'L- � 1 .� -. ',� y _ 11�" �.�� .
�r5�f. �,M. -. '7� ��.,a"�.'�yhwF. _ ,: '`t y r y. � �ss. � '
�..�',� .'y�s� �� �,.. �., ` �.�,-, '�:, _, — — = -
' k�. �
K�' i"�_!. y. �F!` S-rwv .� t ?1,1t + � �1 ':'�`�-r„_'� T.'�L� j s,�,+�' � f
�� .i�:l.<.�`$:�i.'� � �"�.,". _ - ��� � �w�� y.tec�• _ �,r.!
.
y '
�ti � . .� 'S;.:t.-�yi�,��,� ,1k,,U - " �. •.--
.
^ . , `-
.�;.�-`y-. „ . � _ _ .
. . _ �
_ , � .�� - _ ..
.
, , �.. sh� ��_ � � � '�- _� -. +�� �
,
.� , ��,, -• .
' .1 . .,� .i1f I F _— � K�S�-� "'S..v
- 'F„ �• .� � •,.'��.� �( _.. , t,..'- �: �� ��J�� I r� �<..
F�,. T\� �� , e4_ �—' �".�,� � � .``
- ` ` ,.;r� �¢e�3 '�.`'►
7 Y 4f�
,�-� ``� �
�:,,,+� . � �'�
'�;., .I�-, �= �� � i�...: i �'
� 1• W.
-_,��...--- '
. 5 .
� �
;�---:--:.-------:.-:_-----.-_:--<--:----.---:-:-:-----_-:.:--.:-._-----_-:_.-:..-::. .-...--::_----:-.:--:-------_:--------- - - ------------ ------�------------------- ----------..._...._._.-..-----------------,
� � • Bremerton is the Metropolitan
� � . . � .
� �
� � ; City in Kitsap County ;
, .
� ; �
; ;i------ ;;----------------,;
�
� �; Bremerton ;i 28,359 � �
� ��-------:---�---�------------��----:--...:--__-_ ---------_------_-.---,; • The number of businesses in �
, ; - _ __ _ ---- ,
� �� Bainbridge Island �� 6,260 Bremerton is steadily climbing �
. ,. ,
, , -- - . . � - - -- - - =- - - - _. - - -- �
_�. ,
; ;r--- ----�;
� ;�_ Port Orchard �--� �j _ -6,810 � ;
, �. - - --__--:--------;_----�_—_=---��-,-__---:_�-----:---_-:.---_----:---�; • Annual increases in B&0 tax ;
� ;, � ,
� �! Poulsbo :� 5,630 !.� �
� � :� exemptions ,
, �� _. _ __ . _ :.�_-,--. _ _ _._
;�
_ . .__ _ - -:-- _. _ _.
___. . _.
ii � i �i �
; ; Unincorporated I 32,368 ,; ;__ _ • 2016 = 140k er ear.___ _
- _ _ _ _ __ p Y - -
i � '
� � Kitsap �� � ; : . : �
; , ,
, ,
� � -- --- - �� �; i �
� -- ---...__-----�----------- --�--�--- -------------- ----------�---- - ' �
i � �i--- - ---�-�-- -i�
-------�---.___._.__ �-------�-------------------. _ Number of Licenses
; � � Yea r ;� �� ;
; .
� � � - - -- - - - _ . _- __ . . _ . .
; � I_._--=----��---- ------------
, _.. .._..., _ --- -.._..- - --
` ' ' '� 2006 4,356
: � �. �; � ;
, , ; � � , :
, ; . �w, ; ;�.�. _ . ._. .. .::. . . . ............ ._ - -- - -- -- - - - '
, , -- . - ---- -----
, � � '' 2008 I; 4,536 l; '
.
� i ' 'i
�
: , �
� � - — ----- -------
, ��-_20 __ �
; ,_ - , . � - � ; - --- ----- -- _ - --- . ___ _ _ _ 96 __.. _ . _ _ . ._; �
; -, I� 10 5,2 ; i
; . ,,. ;: �
;
, , ,�-2� - - - -� . - - -_ -- ---�; �
; �... ; i
� � �� 201 '� 5,390 '�
� ;!. _.�i_ li
; . �
� � � ,------�-- ---�-------�-..- _ _ _ --------- ---- ---------
; ; , - .... . . . .. . . .. . ... . . . . - - - - _ _ ---...._ . ... .._ _. . . .. _.. _
,
_ �
' � I: 6,253
------- -- ___ . . - - ___ _ _. ___ _
2014 ''
�.
, ,
_ _. ,
,
,: , �
--------------------------------- ----------------- -----_---- �: ,
� � � • � � , • � � •
�
•-----� --------- -------
, ------------- ------- ----------
; �------...-�--�-----�----�------------..__...------._._.------.....__: i
� � Seattle - the fastest growing big city ` RANK:2013 2012 ONf-YfARGROWTH I �
� ; ' I
;
in the USA It1 2013 �ce�sus� � � ��uryl.zoiz-�Uryi,zoi3� � ,
, ,
� �. _._._ . _
' � r seaicte �_ .__..._.._....__.: �
� ■ 18,000 new residents � l�-�--z:sx = = . � �
� ;, :, '� ` i ;
.�� O � �
; ■ 15,000 new jobs i � , � � ` ��� � � ;
�{ -1, o Washington;D.C. ; �
� I �� Deriver♦ ; 2.06°6 ..�I'' � ;
�.ti 2.36�_�� r-`'�v I ;
� -- Charlotte -.�,-
� ■ Amazon expects to have the capacity ; i 1 ��_� i ;
; to house 70,000 employees b 2019 ' l'���`- -,. � � ,0 2.3$% `�0 � '
i y � --�-� -��Austin �,. �. . � " j I
, . , ,
� � 2.43% �' I` ` I �
; �ti -' i ;
� ■ 2 015 - S e a t t I e r a n k e d t o p 10 �------_. -------------------------��---------� ;
;---------.-----_...__ .---------.___.....--------.---------------�-------..-------, �
; m o s t e x p e n s i v e C i t i e s t o I I V e � Seattle rent soaring O 7op 10 citles by rising rent ! i
_.. ._.... __.. _._._ .
i Between 2010 and 2013,Seattle experienced p ' � '
for renters census I - ; �
i � ) the steepest rise in median rent among the SO ,
� � most-populous cities,according to new - �m v ; I
t h Census Bureau data. E�-0 rQ 3.;; I i
� "
' ■ 7 worst traffic in USA po„a, +5113 "''� ° i :
� �nr.reose
I `� I �
! *$75 ^ � - ' � i 1
� i +562 �
� I ;
� ■ Bremerton - just a +551 +SS° +5� , ;
j +538 � 35 +535 +531 i ;
ferry ride away! , � �
; ■ 11 miles from Seattle... Rnnk ` ' ' �
o e o 0 0 0 0 0 o m ; i
� [r'ry Seattle Coloredo:Portland San Oakland Austin ElPaso Denver Washing- New � '
; Springs � �ose tan,D.C.� York i I
i increa e +10.7% +9.1% I r6.9% r3.5%� +47% +4.G% +5.4% +4.I% +2.8% � +2.6% I. i
� ' SOWte:U.S.Cer75u5,I013 I(BLLY SH�A/THF.SHATTLB TIMQS � �
— l—.____
i_..--'...-------------'---...------------'�-----'------'—'--"---'.— —.—.—'—'_'__-_:.::-_. .—:'_�-- __—`-:_---_:__--_::'.::�—c.:_`—.:�:.________-_
• / , / � /
�
�
i
i '
; As the onl Metro olitan Cit within �
: -
Y p y
� K� tsa Count Bremerton ex ects to �
� p Y� p
�
; .
; substantiall ex and em lo ment and �
� y � ;
� . . �
� ob var� et over the next 20 ears to .
� Y �
� . �
: support a row� n econom and �
�
,
� . . . . . .
� l� fest le d� vers� t w► th �n the re � on . �
� - y y g
�
�
,
;
�
� ,
�
; �
� .
�__________________________________________. _______._______ _______________._.________.__.__
• • � • ' • �
.-------.__.__..._.____.--------------- ------------ ------------.------- ------�----__.__---------.------------.---------.---------------.---.----.----.---- ___.___ .-;
1. Support expansion of commerce !
�
i ■ Incentives for redevelopment, growth in Centers, training opportunities ;
; �
I
�
i 2. Upgrade street frontages ;
�
� ■ Encourage rehabilitation of existing streets and building facades; ensure j
� new development promotes street level activation. ;
� i
�
j 3. Facilitate improvements through incentives/partnerships ;
� �
; ■ Pursue regional and state investments (MFTE) !
�
;
� ;
; ;
� 4. Improve multi-modal transportation �
�
i �
� ■ Working with other agencies: WSDOT, Kitsap Transit, County, NB-K, Port
I
�
�
5. Establish a regional presence as business friendly i
�
■ No-nonsense permit process, helpful staff, encourage tourism efforts, I
:
and community activities. i
� �
� i
• � � � � / �
r._'__'.__"_____.'.'__'___.._..-..._.".___."_.._.._..._'___"__._.......__'...__..._-.....-.__......'__..""-_'_._.__'_'_.___'.._.._...""__'.'_.'-_.___.....'._.'_._'_"_._.. ' "-.
� . . _ . .,.-""'-'_'_-"'_-"'_-'..__�."-...'__'__._..._....._,�
I I
� www. Bremerton2035 . com '
� ;
� ,
�
' March 16 2016 @ Cit Council ►
i � y , �
� �
' 345 6t" Street, Bremerton Com rehensive Plan �
p i
: Update : Trans�ortation Element �
� ,
I '
�
, I
1
� Become an interested part �
y ;
� .:
, Send in a comments or questions ;
� �
j Com Plan@ci . bremerton . wa . us or i
� �
i Allison Satter Senior Planner �
i ' �
�
� 360-473-5845 or !
a . . �
Allison .Satter@c � . Bremerton . wa . us ;
-,--�'�� _- _ f '#�_D�i � . , _ -.�,
. ,- - _ - � . . tJ , '1''i
. -' � . ��� . ��� � ' I
-- , ,. - i--�--'.,. . � , li -
� ' � y
_ . .., __ , .,�� . ,� � �i , ,.-
�' , � �: _ ,
_ . - ,
r ' � _ ' - � � - �� � , , '
-_ s • _ , ;� J� , �� �
,
r
� - - � : v L.' . � ,r,
- z _ � � ,,:
. � – � �
�iF _;_ _ _-.' ' _- . . � o.e.n- r, . I
,.4 T�d�,? � � � � . I �
- 'i=r�. �? ' �I I .f� 1i . ,
;. ' .�� ' _ __- ':.� �, ,
_ 1�- . � , , � . ,�,r,.
�� .��� �..r�q . _ . . , � „ '
.. � t.. � ' . ..
_ .� ���� ' , __ . , �� , � . .
i�: � ,���u- � . . — ., , ,
—,,'�T�' � u � _ T= __ , �,
�;� w L( _ _ � -�• i, . �� . . i
M- �oP �L�P ',� .
�r. . � �' � '
y� '� ��- �, � _ 'rt �i
�',i ��� �.c�, . . � , . — . ,I��� � � t .
A � : � - ,
" w r�" G _ - � 1 I _ ,
��'��r� g ��.�E� �_S� ! • q
I
_'���_ �' �`�, � � , , _
� �� _
�'� J�� :,�.
i'� � � _ C�� �j � . �
�- . ,�� �� � .� `1 �J ��' .
�'.i ' __ �'�_� � a ,
r'�'� �� _ ,�` r, � �.
� • `, �`'� : -,
r' f I I �
I
' ' .- , i'i( .
a� , _
� �
_� �� �' r �I ii,:
, '� �•� ,
����`:�i� � • i� '�, . _ � '�� - '�
i�� � �i
� �
_ .� ' �. I' 1�,I
_ �', .
' �, _ � _ _ �� -- � .. . � �)� - ry����
�t - -
4�F�\� �` �:r�� .1 � ,i,
' .'�.'"� ..t . .
� !
-� _ . ' � ���:�
..5 ' ��, � . . _ '' . -_ .. , � _ , "
•{ l'
_� �.���.� ., . �'� . � �
.4'. �.t-�a � �.
�4�1 �
,�1��--1,�� � f M
�:��� ' � � ` ` l _ a_I , .f
" ' �. �" . - • � ' .:
� ! �� .'
6 - --
.��. F •I -.�� 5 _ . _..� " .
i � t _ • �
��;' �, �;� � _. _ ,- - �
�� 1 �:
_ .�. • -
�
��- �3 :E� -_ -. ` ` �;�. �-- ' . _
-_,o = -� � �'� �
� - �.
�i. „_,- - -; _ . - �:
_ '��� _�� ,-'� ,
=- _,�j�:�.�_ y�
�A '�1 rt��•��• �
'��' �r,2 f. .`J1^�1.�.+ - '_s , I
� ��i V
:ii� t'`.<<,1�i .�=y ' tT�,l,I.1•: i ' �� �
'h ,_� � , �� ' ' �
Y ��,� y
_ 1'� �
,. � � �
_j � _ � � ��� _
_. , � — '. �t_��� _ ,
'� ���-}� lr:� ��f����f,C�� ,��..- � ,. _ .
•� � �� ' '1 l T i _ ��+—x�� ' -�-- �
. �p�Yi'_ -��J'G } � �
�` _ 1 �+ =r�.t ' • " �
-Y ' - ' ` - - �•- �- � .
U �'�y,— , � - r
t r '. �
. , `� � ' � '. ' ' .
~ .4��� � . .. _ ^ y.
2' � ' . 7-.' -
� `�ti���� -' . , . . � " � � �. ..
��� i i�-+� : i
,,^ _���,y�*�r _ _ ��
44�� _ '.i _ - .
�"' =_wr�,-._ -� , ' - "
w .1. � - .�� - . . . , jl .
• � ti �A N.f�'�� . �'�� .
.,�,��;.,.�; _ F _ ... ' ' .
_ ,_,��� __ __�,_��, _ .i 1
,r-- _ � ��
�=� ,�__ , . �li'��� - ._ E� . :
�`,�� ;''#'?j;� � ,`, �q �' , �J .
,.� - I y'- 1
�i� ' � �� �: . . _' .
_ - - -��'' - ����
�.;, ;.i,�� i
. ,��, e�.
i�J�y
��� •.:A
I� r,� _
� « t�
,� �. `�4�
�� _�,
�—r�".'��al�—"i"'�.i._-'��i(��— _ 1�1. �i � _ _ 4iR"��—0-9if1 -'_- _ __ F- r<__ �-•� � � � -+.,._-�--.�i --�.� ,r_..-y�-�'�—: ��y_..� -.;, - . -�- _ ._...
_--...,—
.� �_— .. I - 1 _ ' . •Y.�—� - . . _ '. . . . . � .�.� . , 1 � , �- � '
. . .'� p� �1 � a � •II
� � -
1 � 1. p�
r�_ �ll ' 1 � -1�1 d� 1'1.� . .. � �i 1, a` 7
',I+tl�L'��, � d' � p _ -__ �. y. � � �1
� . . ......:�I .a�tn�6�a�.� '"F, t i -� -�—� � Il ' . o . { '" .. � _p C • � _,.-. __'__
_ + V
' i ...ci�w.+ i,hi� ' , • I II ���-i] � 1'r — �_�.,�tiR '�'�-J� . . � � — — -'r`+'_� -- `
�-�. � -'-' . � - - Il
� � - � �.� - •7' _ .I,, � � , r �•-�-..�_, f .� � � ��. f ti,�,�J� r _- ,r- � . .,4-
II
—_ .. � .. —� -'._ �, � , � ,I _^'l-'_4, -� s'— _ _ � , ' ^ _ l�-_���t
1' � i"�. � .� ��"a'� �
�-'- ' �i� - ��- -I .___ �_._,��I�._ _ __ � - � ��.-r .' _ . � ` .v �� � ����'S , �'.'� - �'-' :���� .;. —_I� � ,� . ' L•�
�� � - II .� � rt: ���� . r I ��� Fl �I�'� �I� _(� . � ' � (� ��� � �� � � �,�-� �) � -i '
� � � � I I �,- i F� l.� . 'r �.- 'dl u�_.l- ,L __� ,.�, 7 � �� �.,� �1�� _i.
�I r • �
�b �,� , ,�, �- , � ����� �� ,�.�.� �11 ����� " , ,� ����, -_ .-1_� � ,
i t �,;. _h . �r L .� �, --i . ■
I i 4�(.
i I � _� �I �t d� �� .,�� _i, F•�r. � n� y 1��y d'��.{�. I {F - _—
P ��� �4�
). IN , - _ ��— , J».. �' - - _ -ita y_ ' S��L� �L:.__l�I..{; , `_ . . .. '� .
� - IL ( � I �Jr- �� ��' r� �'�t � �` �rri —r_
___ ` '__- _ _ _ . � " .� �
t_ t, ��f � �I' _ _-� �_ _—_--'._ � 2 ' . ' � �_tl � �, "
l. L ' . �I L _L� • �y, �
9T
I���, j�..
� `' ���I } �, � � � I,yi ��hh r�'�"• .,�
�I_-� `� .. +a- 1 ' � _ h �.� i. ,. ����' � � ` � i�if�� . L�� ,C�Ft.,=�.
i z�.�7� . . 'a,Fa�,. . . ti.� ���"7; L-.,z� 7a
. � , ... . �.4 _ .:�' f`� '' � '� � � tr ti �y:,;_ al �.t ��: � . ' �..
' r - _x � -;iy, � . yi� h�r i . '�
� .�;� o, �r - . . . ' . � ' _4_
�,. � ,�- r.'
�� � � � -�- x
� ,r�°�. r'"+ lk:. � � 'y . e`!b, `�� �' Fly. ° '.A_ '�'��-� :.t�['i �� F�' _� :"4'-
'..� � � ' y4_°+. �° "' �� y • _ _1�_ . ,1\ � ! . '
�.n_ .
'f,y. � �e�''� : �. I��.; � � , ' �_-, - . `
.�,'F �� u �c�_5-' .c4 � �ry ���� y�uk� � �.t�� f� -_ `y�-.n 1 ° � T�n
d"_ a��W '�'-- I:' ,1-�• :� � � � � ��� .
_ } �r.. u�os�. rt� ' � � �� t�:t`�. � c�J k . '�.4 . � � 15.
•u _ . 7 . _ - =�:
T' �� i� - ;��" •'K�� F��,'�Irl. -`�, 5' _ . �.
� � ��_
^i: -.3r, 4 �T
..L� �,� .
�
I
Y'�t- ry1 . .r�cf:,'�
i _
\- .•�
.•
/� ' � -��
. •
� � � � �� �
� � .
�•� i � • ' -� \
�� -� .
• . , .� � � �
• � �
. � � ' • . • ' • . . . • ` ' � , . �\ ,• • • . '
. . . . . . . • • • • ' � �' • • . � � � � . . � ��:
. .
. . �
� � ' " . . . . . . . • • • • •
� �� �—
�
� ��L�!/n!E�L�(1I2 �L2�
� .����N J!J ��JJJR��CK°�-�-� D�Y
i ii i1�i—i�idjJ
.
.:;�� � .
-�� Satu rda Ma rch 19
=Y �,
� ' � � •� � • • � •
�'' �
' /
bth street Get your Irish on and celebrate
� this fun community tradition�
,
4th Street � ����-fL�
...............•
d ; � � Parade steps off at llam on Pacific
� Q � a � Avenue at 6th. Children can search for
� . V �
`} • GOLD COINS hidden along the route.
a � � � Spectators are welcome to follow the
'�•••••••••••••�� parade through the tunnel�
•
� Burwell � �
.
Tunnel ����� �
• � ��- �
•
: • '.-. � ) ,?,,,�
• �V� � �' _.�`�I%
Ferry Dock :• �^=� -- �
E
downtownbremerton.org �'�l __
�
= Join the;:
� � + � '� � ,�".St: Paddy s �
� � ,� Day Crawll"
�
ET//N R�/W ;'
� Ir - � ;
• • • '.BR�MERT.ON. ,I+' �� {�I �I 1���° ��:
L:_" �
- - _ _ ��� "u7_ .'. ��.,
-�'- — � — �� � f
,{`��i,� � � ! � '`. ' I � '
3 � PF . : ; f,.
��� ; �`'.� I �1 q� �
a �--
� � � � � � � � � � � � � � � � � � � � � � �
� �
� Cl COL1I1C1117�1a.11 �
� �
GRE G �'�HE E
LER
� �
� invites you to a �
� j -
_ ;� �
� � �
�
� o - - in
�, �
� � ,,:. -_ �
� Monday, M�arch 7th
�
� • _ • �
6.00 7.30
� �
� �
e orces a �ra e
� �
� *route and sta in cl�an e
g g g �
� �
� Milenka Hawkins-Bates Public Works Department Manager �
� t.t. Pete Fis�er' Bremerton Police Department �
� Ge11a yVa�es Bremerton Chamber of Commerce Exec. Director �
� C�11'ls FuT1�ce Kiwanis Club of Bremerton �
� T�I�IlI ' �
aaaswe��our q�uestdon,� and c�o��e�,�.
� � New route rvlll sta �
( rt on 6� Street.)
� �
� Corner of Veneta 8c 10�
�
� In the basement of �
Community of�hrist
� Memorial Lutheran Church �
@
� (ADA accessible site ) �
� Please contact (360) 473-5280 for further information �
� � � � � � � � � � � � � � � � � � � � � � �
, �,.'.`�y.S,�l�;�`(�tr��....
p� � '�" d�{�y�'F�/1 • ��i�!��... ,- �
.:/ k . � .4 1'. �
:� L
r l�:
i•
-1
•,� -'�:_ �:y
::''s ■ '
`� �fi•' •` � .�j�,., � -���,,,
�; ,�. , ..c.
�� �4 Y I.
�, �� �
- '`��� ji°` A� f �
'i. '1� �, .
'�. , r
�i.• 'r�' 'T,'��..��j'. r_ .
}.
:���'�•��y y ry�� ' i�j '\�"�'�-,�
f t 4
•c' ,�.;'* ��i� �1—.
. ..':' y �r�pJ"wh,.,��i,. 1 '
��.�'}r,.i � ��� �'.� � r'^�.�.C.,�
.�.t� ,�#�F, � \�� ,. _
�� ,ti ��,�!�i �� R`1� �k�,�� `' ,f�;
� �r�rG iti �r y -� �� r ,....
rS' � ���� •.t�,,,' ����` ` i
� �� �� �}+��4�, ���'.� �--i.� ,� ��� ..�.
- yl1`!, 4,;^ �,.fi��fi 'l_ ��� �'`/'•--5 ,..
:r.�} ",�`,u=„" ` � �, t"' ° ';'
ey _ r. ' -.w�{ ,� ��#`��6.!, i
�,y,. .�1: . ',, s.V , y `F �.
'��?� '� ; � Y-_��, , � ' ' � _' �
r � ' '� .i- � Y ',
_� ��' ,�'... �r y,r • �• i ti ,�.
�T�-�; :;
� �, , r. �' �.� � �
�!�°;a� tc .:�- � ti � +
1* -•�+t_;, -� �, ^�' �
'� * *.,-..''�"" ,.:_.l'�. . . ".'C . �� •' ��
�L'�� C.ti�a3�. �'� � '7 �� � �, t; � � st
' ,.���`.��=- :,,'�. V;;� ,,., ' -- `�`� � �; �` � �f_� _ '.j�.,�'_ .�.
,�-� ,,�' '�, , �,"` �
��. '. �-. ,�e - r ��. �� :.� T•,S � �...
�'K��`'�'� �`� ,;• � ;ai1�'`f'�?� 3 . �•.` r,I � .
.3 � �/�''� � i
• Y31,. ••�, ,►'M ��! L ' \.� _'.��I� ��:1`4�.G. , �, .�5� �1 Y�
._� ' Fyl�t'�t�..,l . �-/,�. �'AE,. •���� ��:, :� �'
~` `� �A'f�"r r� � }` ,� 1" 3�F
y��{"j'L, ��.. � �'rr� � � „��� ,�''�� � ,
,: �r}, .n � tr
�f . „ . . . J ��U�` '�� '�_ ��1 � R,� A�
�'�.!4I � �'�. .�` yy �.
k � ..' �l - � r� ' '�; _J• ^� 4`�:'�:
'-1. 1/��.' . � ,�.y �[� -' '��` ����� � � � `,
�■r
a
' -'��: . � I`'_ " .�
`� r:,.�" : r • ' � ,�j�,.�ti)l. .,
_ r , +�N{,Tc_ .. . . i_�}�,]� �.�=�l�l � _ /��1�•.��i.�.
�rC � J
* ���,rY'� . �.:.-sy-• 'fAi/��:� . � �.
�,�,, + 1� � .rl� �,� _I �
,.�G,Y ; . - . �' - �;�:-P. JI .;.'
���, � � a� � _ ''
.�5��5 ��;..,�r!i yi « � '�r_#, �'
'� 1 �� }� � •�� -� ., `1' ly, .
-.''�'c�'�b���'` �:� � 'i,� '� •� � - � ;
,��,�r S .� �� � t�ta` e j y �;.
�,�,.. � •
'r.�a- ,,,����1'�sr � l. .i�E.I , ' '���it ,
.,r� ��` �� ,i
y����tt f . , i�}/•,� '/''. I� � � � , • ��I �'�3
7 � �.«+�, 'M��� �. ? � ;. � � !
�7�i'�':. :� ! �r * �• �--� t � i_ ;:
1 a �� f •�- ���� fi.�/�.1��^ � �/� /�� . � I �, .e
,SN Yr �.. . ._ �.+ 1�,_` —- ��� %J G�:_cr '�
�� t,� , �� ,: W�., `^x � r 4.Y * � / f.,�,�/`f 3 •11 ` `
r
n� �� _�� 1 r '�h. K�� �:�����t`��� � " � i-�`�-
'`f4(�;:� '-��!. 7 • . '9�: � L� ♦ �� `��
, ir!�. , ���.� � ��\�4y.
11 . ��� �-'"+�"• V'. `�y �
•���'� \��R• -1, �����r�; y'11l'l��
n�� � (..1i � .:�� _����!� � . .' 1� '�11� i� _^.:�
�. .� . ,I , ��� �1�� ( F4
` i:.- ' �`f .•�, .> / .`� ,�'4�� /
..,l;,ty I � K , 1 �` �F� ��:�,i�I R!� .` �� .j �,'.
' �M' /,A� +iS;+ ' i � �'l��Q -`! . ;f���
1��. � ��.- -
���� 1 ��/%�� j �{ I.
. � ` ;'U
:� �
r � -
, � �� � 1`� �
„ \ � _..
_ til �-
/1.:�-�. ,�_:� �r�� �I � r.
�e , ,,�c' 1 ���, �,t � ' •°,
� �^�
��% .k._ ..,�. � � V
�� � �, ; w f�.�.� 'Y- � ��.
b� + r.� � :+_+> r . � ,r, .t
��� � ��! - .�;::��;:��r,,,�'� - -,`�,fi,�}�r' ,
•`� � r_Jt.��'q++I✓.�; _ � \�/{ Y� _
�`�L�1.�"��.,,, � {� �d ^'�,�,y-��
�.r �y �11
- �� .�::�a�
;N
i''
�
'r�Y:
. � _ i:,�r �.
'? � :.
����, �i ' � : ;�.�'�`.�.
,� L�� �,. .. . A
k . *. �� �j y... p
.1T��'� � ?�•., - -�" q
�'ti'. � A ` „� .�`'..`.yj:p4�����{/
�.. . $:� '���'� ' � � �'f �}P
a �� -k! �,�.s.. :.f��(1 Q�;
�
'�''*•',�.1, j{; �ti9 a r �,.�-4;.�-, .i�
,��A 1`«A`,�.:� y,,, .1� i r-s-��. _. . ... �
,3�v1�w " ' n f /r a�{' t ,,,,�.
� 4 � i�� r ,1'`�J`�.,.�-.hr'".� � � � �:;�F
I. �� �� � �� �, .
'� , � . :°�-.:+ ,�-_! � .�;; � `', , �
r,_ '. - � ` � �,�- ,.1. ? .�^t .�,.�-,.'.i ; ,�,N�L��� '
.,,.,.� '.. ..�.�:`�, �� �.-�y.%ti�.�.:;� � .' '•`•^h, , ��,: ,} �. (,� _��
��r�"Lr�,s`� '.��M ,� ,:r ., �..,r:4� .�i"�'" - +�
n � , >A 1"� "fJ�'L' !V"y+�. _� � �g�, . � 'c' . � r''_r� . ` Q
� -1��_,� - �: .�i ,,y�• 's�r'-l-H i��. � .t '�
,-��p- ';L� t`<��cy-� . ,4. _ - _
'.' •F, ',r C "l"�pt� ��`. 'YS ' :s���-- .>�. � •
�..'-'�,F. - .'_' �+,` T' '1 ` A ' Y �' � �'I. �1Se�.�. . _
" "'� "' /y/�T— \,s '. C�i ' p L__� � .���,�. 't`�"� "'a. ' �
✓� � ;� � .`'
� ' " � �j � 1 ,j1 ' �`
� t�t• •� `•
;��—�. --- �� � '�=� _ - _ -�.
i - - - _ -- _ ��. -
- -- — - _ _. .. tI J !� - --- .
-- �� r _.
- ,� �e ry� -
. _" '�
1
_ • i.., e
�.w � it_ �i•.
�_ ` �' 4
..-_ "_- ' � ' .� . • '.S't�• 6,- !:;r..�S�.` � .
� , -'%`e ��. • . -iv;. -'- .
_ 4 �{•" '-7 � *f•`
: .''+i'��f''t'. . ;����
.yt t-I ,...
,-r+y�q✓��.+. ♦' '�- -
,�_-'�;p". ` . ..• , _ _
..;��-Y r, �. •. -.
. :��'�• ' � R' •
. • �•�f r♦ ' • ` • - n� ` �~��•
'" ' . �� . ,t�.t�'(�{�7.
" . . � ' � ' �V�)
. . . � . - y...-4�'.
- . • �. . .. M��1. '
. ' L , " . +,:.
1� • � { ' " � a �
. l . � � . .. �. . '
.. � k •�.� . _ '.r.'
-� � �N c �
. � � ti . � c: .
�� �i.r l. ' _
� i �
• �� � ��• '1 T �
- .rt `" . ` r , 1 ' Y ' -0 i��
-. R � � , � .' � .
lr
. . y * , j , • ��•� ,s
� . : ` . � , - .. . . _ .� ��
. . � . �,�, � � i
. , �
� . ,d'�, .� e.� -� • � � _ �
' ' ' ' �. � 7' , � � '��' �
' _ . -;.w .�,
, � i . . • . - •� i
. r �
� ��r� - � �1 . � . ' .� ,.�. _ ! ,.
.. a . ' �� . d ' . . . _ � � �
•
' • � . � � � ` � - - `� �� � � - _
1 ' ,. � � r � ` "' ` ] .. -� '
���
- I, � w . - l4� '.��
��. ✓
i,. -,4 '' + ,§ .! � . � 1 �
� I`
�� � J.
. - Fi � . o. � � � Th� G��}..
.. � . . � r y . • ��*�t '
. '� . �' � ` �.�� � -. ��� ��.�.
" , �4 �9 '7�z,��, � � .,a/4•� t
, _ � � `. •f � ��'r' � — -
. .� �' � . � �; . '�4, - .�"�, _
� li i .. � .' �r� ����� . t
� : � '� � � 'N'� � � .. `� � �
i . " r ��1 i.J . 4��a. , . ..
.. � •� � � , .� 1' ' � V . .� ..
' . . ' � v.., . '. _, �. i
a N :41 . . - . , .
i. e.. �i I-.
,a . - _ .. .. r. ,�r.� . � � . ���r '�
� k' � T
. � " _ ,,! '�,
.� ` _� . ., � . -�i�.� � � . ~� . . . � . '�}� � . . __ • - '
' ,�� � � ' ��� s� r � 5 ��,.- `�_ �
n � k - ' ti'i ' '� i � •,��', � ��� ��y��
'r. . �. '+', � . � .� - —�
� , " � _ ry �.� 1�,,,�.
� . r ' c.
. ' • � ' t ' � � . '
� �� � r
' Y
' ' , y .��h � r !�. ',�
` ,.
3
. �` f ���.�� ��� �
�� �� � �• '
�, ' ! �.1
C- 1 _
I
_ � :� N' _
i' ` � •i{k`��, ' _� � • �
.�`' ��� �''�'•�� � � k
. �� ���li,� . . `
, �h:��
Fr i:�. '�y .��. 1 'k '.. ' .�y� �.
5 .
#'-. � . �•� ' .��f..� }-� .
� }
� ��+ �.r. ,�'e,. �i���� .` � "� f .� �A`f
. . ..� - ,. ��� .
����� � � ��� . � _ � �� ��,� �.
�,��� �.-' , � i - _ -
.�.1 !�,1
, .r`. -� . � -.'
� � I .'d r� A... � � � ..
� � � •�
.1 f�. . '� �_+' �� � �1 �.
r ,�r�1.'. .��'• .1 :I � ,? -�.-
. n , .t,'J �n�`�i�i'I _ �'' �"�� ,• ,._
' ' ;� .� . r_ +� � , "Q�� q�-
- � .�� � . . ����� F:� . ��� �;�.�
' t�.i� .7t.f� � �'.''
_. ,_ , • °,� o�. v,. . . I ;,G,�� ..�
� / �� \_ � (�,.,� '��rj ,`
i � j.��) �{��� �
`�y
_ � l ' �\ � �� ' -.
�
:+'
. � �'�� r �1�� i':�.�,
� � l
_� / . "4 ` �� '
Ga ;.-- � — �/— __. _ � . , r '_ r i, �� _"�
� �� _ - }- � ` � b 4�i -
i ,��'_ � ar. _--.-
, n ' , � , � � ._
;i� -
:," , _ F �, ,�
�ti
�, l . �
���-� . - ; , _� Wr
°� ',', . � � �� �, �°-�_�-=� ' � � ;
'�� J � r' ��� - � ��� �-' - y '� '�'� 1
- �-' , � �'- � , ` ����� `
i" ,� ���L.� ; ' � .��- I
�� �, J-ti � ,' i� �`.. j
� r� � � ;�� ,,. — � (� �' �_ �
�,l�y'j ,� - %:� j�t�Y'
_�_� _a
�� r '�' � �� ;�`
.„ � "-� I:cl�r-,-�.
�,�' . �� r' 7�6 ' :'r.�,':'f�i
� %:_ _ -�_ �� , . ,,�,
._--�� , - �-~� �.. � ��'� ' I
, , � t � �� �_
I i� �-'�,� � - � �
' .-� �,, �� ; ! �' .� r.
J � �f. '' :i .' . � � .
1 ;- ��.l� , �j' /- .
. - �-- �! .'" - �; �� '�
� - ��, . � � �
; . :
, �� � ��� � .r,- �. �._
��� �' ,� � ` p � - � ',��
� '�._�; �' J `?'� ,� , � E i
� �" `
_ � J ! ,,I �k-:
�� '�� �<. �-A
' �,. �, -�. �
_ �", �' -� �'��� �'( a� �, J
� ; �. —_ d d �1, l:' ��,� �� ��� ��� : �i�. ,s
�
( � � j � � .� -�;,� :�' �,`-
' 1
;(�' 'i ��1, �� /'-'`;
"� , --, �, —
�� � �,�,� � —�� .� � �, �r
� ��"�� � �
,� f J`1� ' � �•� . �I'� �
�-:. ^\ _� I � ��' i,�' ��� fi
l �J �
�d' ., �� � - �` ,l"' �` ���1� �
Q�:�bM �4 \�� �] �)� I
� ' � • '
r .
� t `' 1!
a • ` � L _.�-. �
. �_ ` �
� �,I _/ �- - -� _--�
'- :� �' . �' ►
�1 / ��
� 1
. . �`, / v�1�� ..i� '� _ ., r ,� -- .
�• t � •� �`�
� � L ��� , ,.
_ �`.��� ' ��i�
- /•. � � '� , � ` '-i
�:.
-,�_ � ��, <.
, ,. � ,.�
/ r. , .!�\ P �,�
. �%/ � , f ��' ,�,
r _ _,�. r �,
` - ��
!
l�
r
��.
t�
iy
r� �
` `
��. �: � ,
1{I�/� . A � 1.
�'�'���: � �� = � `��� � .��
! • . ,,,,. . :'� �� .fj;__ �:` -r�� � ��....
t .�� '� �i � �,!�y 4� �f F� F; .� 1 t_ �rh,' �� _ , ..� , . '1`i !,�- .�'t ��
,� � ' ' .. : }- ���� ` ��. ti ,'S f
. ; ��.:�, � . > t__,_,i • �` `�1!�t���,`''' �'111���'•'S!�� -. . "s I . .`'�+� �, `
�- � ��~ f� �I i ,r► � �� � �: �� . -�'.
- t.' --, - - - - -.. ` - .-��__ -> > � ----,y. . „ ��:�:,.;_ .�..=�:-� _ - .� .�,.
'� :; '��- - -.S; -�� � ..� 4 c-%�`;"� �- ��.����- . � � �, �� �"�' � :+��
_ ' '�'R. ' �, '' �*/'.s, n r �+�* �� �x
�� � ������ . � �'' � �= '�� . -' , _ � '��� ' _ �h _ _� - _ � "
fs.sv¢ ' ' �, , . . � -.,c �'1 � ` '� ,-.�
� �� � � � �'�'o� ! ` � ' ' �� � .� �
f � :��- _ '• -�'• _ • . r
� " i�° � a".s'�" -.'a�:��.� ' ' • �� ,� : • �j� -�;i
''1-- =�_ .r � i ! ".� . �' \� � �! . ;, � �� "�-_ ..��c „
.. . ,-�
,,. . __ . . - -
d r � � f� � �{ � �,� � - ' - - �� � �rx., � .c �;i•.� -�
1{��+�..•�' 1 r �� I '" __ -_' •. 1 - -�"*'� _- . . . -. .,.�« . . _
, �' ` ti,, - t --+ _ - � , ' ' �^� `_.
- ` - — -- ' - ' . � . —r. .
_ _ ' � �' _. � - c�y� '_ . _. � /_ . , ._ . . . ' � + ...- , _'
' � � C � T`` a_�. �� l • '. . . � . ' ' . , . -- ,' . _
,Y f
� � � � _ � .. , 'i • 'I _
/�n^ 14 \ , �,�'���. .- � ` ' .. - � , �,.t� C -1�. \ .. r '�' ' - '
� � •����� . . . . �, . y .
� � . �i'-•r � _ � l � ��r . _ � _ � '� ,
- - 1 � - , ���' �� . . � ' ,
�+�-.-:Y - # � . -. � ' � .. � . _, " _ - � . � .- ' � ` ,' � . i � � . �� ,�� �� ' . ._I ' . . .� i�� � . �.
' � _ - - . � . � , . ,t . . � � � '/ ' , - . 11 1 , . ��it�.. � ��_ _
� ��t � �� . � . . ' . • }/ �. • ,. " ' . • ' � i • . , - . , ' t . ._ , .-� !. �,
_:� t4.r�' - � - - ' ' .. ~, • �� ,�. — � .:� .i .
F :_ .- . _ ' � - . , ' . ' ' 1 ' 1�. \ 1 . �i � .
ti �, � _ � . . I : , _r � _ .. �
- � ' ' _ .� - � � , . � , �j . � � . , � r. ' - ^ •�` ��- /� � -
���r .. ' . - - , �� �,, .. . ' , , . ' - , i � + ._ i - / � , , , ' � .`
_ , . . , , _ � , , i , , . �
rx >�,,.:i�. .!' 'i�r v-+. �l r/ �./"., �—� ��, `Y , 11 , . i� ` .`�\ •- , 1, �1 •.l - ., "� ` _ • .
,����� ��y��.w.-"�� -- I,'I�. � � �, � ` � . . . . _ " . '
��:��571�.�L'a � - � �� � � , / . .. , t
l�-`��a. � , ..:�t ��T' �V..''tt �\ •� �I• ._�� �� 1 . `�'y.� � � I -l" .\_� { '�L, _ ... • ' ,. - . � .,,. ` _ . .
�l��ry � + 3 / � !� i
�; �. ,4. a `,�,\ �,-� �L'� ',s /
� ' .�` .'I- � - . . .��i � . J � - � 1� -� r , � . , _ .�'...` _ lr ,
.`� . 'i�-• ,t.��.. . "� ���� ',. � " ,� ��_f r � .y��•1�
,` � ( 1 �^ 't ' / / Y i ' � �c 'n-�,-� ' . .� •� • " 1 � � - ` -''s � r "T+ �
l 4 �� (�
r.J .{t`V' . rC � "�-K � j�..y .`+,f�� � • �l '11 � l . _ � -C 'l 1 ' . � *\ _:��,_ � t��/�l���(i+'�.���f��
�r. #' c. . fy _ti , � . - . . , . l
,��*f. T::Z '` . .. �` �' y .,' "` :i� '.r `� _ .'�� � i'�►/ ':'�� :-s� �� � �ti
'� �� r � _ � r �y 1� ��.L�ti.A� {'N� � ! ' I . ` ' . . !�y\ �l '� 1'x ���.,�� ' � '��.
' - ' � :l J� _ ..�" �S . `� �y:1 � T"'� � , ' y i . �`�` l_'j+r�y���� ` �4.
+� '�.ro s � i� ' ,� ._ �� t' "��i�.-�T��'tn �p_ .�„ f. �a�,,,_ f,�. 1'1. �,` ^ ^^ .;�::�J -I,i ..'� ' . ,�- '� '
� - ��• ,}.'Nt-� . _ _ �i.. 1:.� � ;_�.'�i[%i7�.:�,1lf`y.i��''+t�`-uh �`'. i.� l��'.: .`•� �� '�v \1 - `i..,..�'. �.
�. , . . .. , �. . , .
I �9C. � / � � � .:� ^�'a.
i. _ , 't �� i — .
r' . .
l � �
_ ,y_ L:
.s _ . ...-.'�C' - . � �,.
. . ��. , �t'
�, _ ,
r.,_ -.-- _ � .
- . �1�- i
z. � _ �. .. ; -- �-- _, C r �' _�:f,;. , � �
• ,,, �' . � � � , , t �, ,� �� ;:.� � . - , � - ;
.�. �1 . . . -• . . r ` 4�� �`Y=j,Qt�``�- � ,-* 1 � + 'y�- �` ti� � - . -
�, �� - �F . ., r r .aA.
o ?� ,.,� ` _ `} � .,,;..}��, _ ; P —� '�,r„ �� ���� ��: �,�'.
_ 1' �C� • � ' , 1 f--•.!I � ~� .�'} �` ���', �nr .'�1.�. 'y), .A.- 'C_f_• . �'� _�
� ' ' � - '. _ . _ ' . . � t �`,` ��'. )' ��) ��'r `� I,'�
� L ' � - .�'� / 1� �.. . , � _ � ���� �� '�/ ��L,~��r .��1
f� } � ` . ,•_ ` ��� - � 4 t� \ 11,%��/_ ��
� _Lt. ��.la� . , . .. � ���` `,^ �.�.�' 1' ''.�
�h .k4:1+ - . \. •' �� �� �I _ '� �'MM�';���f
1 , r- '� '
M � � � ' l. ' ' 1 T'j S^`� _ '� ' ' � � }�a 1�♦`1 ` /`i4'�,,
,.,(I' .�,+y'�I P'� � � �.Z��,. ��"-�:
J.� /. . �i � . �` , . ' - - i � f .rT -'_ 1 . �.�������'1
, ( �i , � . �i ' 4 ' � . `' . �'``J � _ -_ .�`M ��
a � , •\ ��`
"r '� , ,' y.,.. F '`'��, t �,,. , � _ - � , • -
. � �' =�t . , �,-,; _..
�. _ _ . �y � � !`? ,� � � ��� � , �. ` . �r . .-.s^ �.. i , .
. � . , w _ .'" ,, •��A �� 1 �} �`�. '
-' ' 1�� � , ti T . . . t— r�: �_' � . .� .. /. .
y, ������ . . '�-. 1 _ I `��% �'` i�c �l -� w i � ? a.� . � �
�`-+�.�- � � f ,- ; .� � -l":` .� Sk;4:'� � • .
�, �.. . 1 i �,1 n ♦ � _ _t .� \.. ...� �n 1 `.
� � � "J ref..�� � ' '�+.',c. �l_-?i•- ' � ./
� ���'1� `II�' t� j�i,� � E` . .. � '.r w�'�� - � � �,'�
�" . `-��1—.� 'r� ��. r r i �� .. \ �\ �.��'� , -, .�.
� - \ � �'`
� �� - � '� !� ', - ,.�.�.�>
> :�..V
, � � . �� - '� -�a
' �} •,� r�T'a�:�• :+ , .��... ` M• i /��r' .� � _ � '
�� 'V�� ���� �. SI -, �_ ' � , ..`7�i �.� .r'i, � 1_
} ' ,-�' •• -��/� '� ��� ������iri!!f/��ii�
�' ., ��'�.� � �.S�.-y/�i� .,ai+� I�
•.`�, '.�� . -ti ' � �
✓�' :,y'"�
t �,�
'¢ �
� ,
,
,
� � I
� � �
�- R� c ar Hu — D � str� ct
�- y
CI?Y 6F
BREM�i2TON
Lions Pa rk
Shoreline Weedin Work Part
g v
Frida Ma rch 4 2016
v> >
9 : 00 A M to 3 : 00 P M
Hosted by the Washington State Youth Academy
Gardeners are invited to help guide the cadets...
• - • • • �,c�, �
�
! � . Creste Pege� i
� � :" �,. Dremertonwagov -. ..
i ..r y .�P.�++�'�`••S�•. �s on Face600t. 'R�: I
.''=`�~ - ��� n�'- _ To c�arecl wv�e hrem�itonwa.�v.s��ioP Fa�eboak tnday. roie i
i _• •J '� '; 1_, ��D � o �
i .�� •� , �• �
� .•. _ y '`" :
_ ,"r`. 7 _ ^ - �' .
'• _A'- i
__—_._-'..--1 �r. I
i' � �
i �!� � 'c�: �F. I
1 �
: .r �..... . •� .
; e . . � . � � o ' � ;
t.....--- '
>n��: rl, •■ • � ■
� ... �s4.zF+.si��*,;� -
�
i �' I rneFuc � Abwt Ptmms � RevR+ns : M�e• �
� '
� �
; ; veoatF > i �1 6rerne�mnm.gov I
i j
znr.-W i
� �-------------------�.I ' ' ;
i � i
� �$'���1'� �
; ; ;; P1�:�c V�le Gbrnm i�e hS tn 7�y AAN 5,2016 at 4:9D PM�
; , 167 iBaes 6ie�uwl Oonferer¢e Raorn�.ated�6ie 6fi FEo�of Vie Ptmm D�6s ! I
i �.- --.- j (�aivnsitCkr[�.r,ht�:lP+�n�manEifurwagov,ta�ar.��E�778 I
� ----------- ---- - --------. ._._..._._.. _, i �
� ------------ I
' ABOUT ) � •
I
` , , �-----� Bremerton,WA-Offit3al G1'ebsite ' I i
i ,.. . .. _.___.... - -:: -• a r- i ; i
. ,�, I ;I Crea�an Aceount-mcrease S��P���N. 1 I
. � � ; I i asmmis ymv e�erienee.ano enqa�ye m i I ;
� '� - :0-- � i ' 6 mtonnation yau care anout !
� .
, ,
.,.
. ... . :.-. . _ �
' � s `-=-=-
. .. ... ._.... . .. ..._ , I
-. . -.-... . . -_ � ;,;e.�. � �� na�.�Rrcomcr.,ov I I
. ... . , .. . ,.._ i ' �_=-----J , I I
� sas�srteetsu�aaw ; i .._ _-_._.__.-.--__..._._�..�__,_ � i
� .
' ' ere;ner3n.w.�asn�.gmn I ' _... _ .
, , _._
.
. . � -----'--._........__...._.-'-----......_.._.._...-`-----'-- -�-'---. " __._. I
' <�5nere
"
�
' ' C ��i 4� ' . .
� . I �_. ..-- ��- ----`-- ----.'-_ '
Ij :i----------�---------....----"--------. ....____.._...----------'__..._..__ i
i � i.!t Qipan i� �
i ; �acayenmu�n-s�wo�� � ; �6, ,n� brenertornue.qov ; i
i j ; r •' 2�'N ;
� � rl �t�:LiWmx.BrerneflCnW0.govi �; �
Traffic Alert-�sb s�m d�naee,traflic s�at fie fo0nwvig
-�-----------------------— ; o�ers�tms are rmt y�g�,e sho�aa ne aea�c�irna�way st�s: '
PxoTos > �. K�i �V�y&Plaimnal Avave.K��W�y�Mare�e Oaive agl iG��Wigy i
: �..._._-._.....---.----...._._..-.--..----....__....._.._..---..--.�j &�s+B�fi Bay.(?e»s are arr-si�ard vnl��restrnc pmvEs tn O�e:se � �
;
I .�, � : traSi�s��ls;At�lnvwxhrener�remagm��C]vicR]eris�sp�f?aID=195 ; !
�-- ; i
i .' ' �•.- • -"_.'_'.'.""_......____._ ....-.'_.._..."'_____'_.__-___'.'._._'.__.__
� I
I � I' BP2TIIE1'[OII�W�► � i �
i
T IE'
� i�;- _ j` ' maEfx aen-K��way ' �
.•` �: ' I i
� .
: .... �- - :
i ; � ; ` EF£h!'cF7�NiVAGCV �
; � .
� .�..._._,..,-...-�.-.._..�......-...-............._�.,.-.....�...._.:.___..... . ,
� �� _....-�..---.___._-..-r.-......
1 �
� • . � '� ! 1; _-._._.....'___"-_._...""__'____..._.....____-.._..._._.."_'__"_.-...___-_____ � :
' . '
- �e .
� , . � � AS°Oe-�-_-__ �___- ___- __-.--faceboo�k.com/BremertonWA.qov
_ .
, i , ,��
, .
, ..___.._..----�---�— - -- .._..-- . .._....---- �
�. � --- ._._._ _------- --— -. ---�=�--------- - -----... .....--- - �
i �-=-- � , � ;
I�� � �� 62rneAO[wua.govSharEdBrenterAonKAsapAccess � I
� �i � Te�vs�'s past j I
'• i I I s^'L a�
� ' � • � � --- ------. ... .... .. ...... . ..... ...._.__ . i
, • ,:.: �--.... ............ -, : ;
--.-.-.--..-' _ . . i.i i Pr.� I BrenertonfGLsanAceessTelev�ion � � .-.--.._...__..__._..... __..:
AGENDA BILL ��
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Claims & Check Register Study Session Date:
COUNCIL MEETING Date: March 2, 2016
Department: Financial Services
Presenter: Shannon Corin
Phone: 473-5323
SUMMARY:
Approval of the following checks and electronic fund transfers:
1) Check#'s 367378 through 367515 and EFT's 15813 through 15845 in the amount of
$1,534.436.08.
2) Regular Payroll forthe pay period ending February 15, 2016 in the amount of$721,134.74.
3) Regular Payroll for the pay period ending February 15, 2016 in the amount of$18,769.89.
4) Retiree Payroll for the pay period ending February 29, 2016 in the amount of$53,148.96.
ATTACHMENTS:
FISCAL IMPACTS (Include Budgeted Amount):
STUDY SESSION AGENDA: � No Presentation ❑ Full Presentation
STUDY SESSIOIV ACTION: 0 Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION:
Move to approve the consent agenda as presented.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Form Updated 01/07/15
AGENDA BILL � B
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Minutes of Meeting - Study Session Date: N/A
February 17, 2016 COUNCIL MEETING Date: March 2, 2016
Department: City Council
Presenter: Council President
Phone: (360) 473-5280
SUMMARY: Attached is a summary of the City Council Meeting on February 17, 2016.
ATTACHMENTS: Meeting Minutes
FISCAL IMPACTS (Include Budgeted Amount): N/A
STUDY SESSION AGENDA: 0 No Presentation ❑ Full Presentation
STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION:
Move to approve the Consent Agenda as presented.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Form Updated 01/07/15
DIGITAL RECORDING
CITY COUNCIL MEETING MINUTES
Wednesday, February 17, 2016
The weekly meeting of the City Council of the City of Bremerton was called to order Wednesday,
February 17, 2016, at 5:00 PM in Council Conference Room 603 of the NoRM DiCKs GovERtvME►vT
CENTER, 345 6th Street, Bremerton, Washington, with Council President Eric Younger presiding.
Council Members present were Richard Huddy, Dino Davis, Greg Wheeler, Jerry McDonald, Leslie
Daugs, and Pat Sullivan. Also present were City Attorney Roger Lubovich; City Clerk Shannon Corin;
Legislative Assistant Lori Smith; and Kevin Matthew, Information Services Manager.
A CouNc�� BR�EF�tvG was held to discuss General Council Business at 5:00 PM in the Council
Conference Room. At 5:30 PM the meeting moved to the Meeting Chambers.
The Pledge of Allegiance was led by Council Member Pat Sullivan followed by the invocation
provided by Pastor Eric Roberts of Discavery Fellowship.
MAYOR'S REPORT—Mayor Patty Lent...
• Mentioned that she'll attend the Grand Re-Opening of Susanna's Antiques this weekend;
• Presented a Mayor's Recognition Award to thank Gordon Andrews for his larger than life silk
floral arrangements that he's so generously donated for everyone's enjoyment in the Norm
Dicks Government Center Lobby over the past several years;
• Encouraged local high school students who would like to spend a week in Kure, Japan to
provide an application by April 14; and also asked for any Bremerton residents who would like
to host a Japanese Exchange Student.;for 4-weeks this summer to please contact Elaine
Valencia at (360) 473-5266 for more�information;
• Provided a reminder that tomorrow was Job Shadow Day; and
' • Announced the Bremerton Housing Authority would be accepting applications for Section 8
Housing from March 14 to 25.
POLICE DEPARTMENT BRIEFING
Chief Strachan used a Power Point presentation to highlight trends and statistics for the Month of
January and part of February.
COMPREHENSIVE PLAN UPDATE
Allison Satter, City Planner, provided an overview of Element 3 on "Housing" Questions were asked
by Mr. Huddy, with responses provided by Ms. Satter...
PUBLIC RECOGNITION
Bernie Waldbilliq, owner of Susanna's Antiques, presented a drawing of the USS Kitty Hawk to
Mayor Lent for her to display at City Hall; and invited everyone to the Grand Opening of their new
location at 312 North Callow over the weekend of February 20 & 21 from 10:00 AM to 6:00, with the
Ribbon Cutting at 10:00 AM.
Bill Schnarr expressed several concerns with issues in and around his neighborhood, and asked if
the City could help repair/repave the alley paralleling Gregory Way; repair cracked concrete caused
by tree roots pushing up through the road at Gregory Way and Naval Avenue; slow down vehicles
that ignore the speed limit for the most part on Kitsap Way and down through Burwell; repair sidewalk
cracks that are over water lines running up to homes; suggested a parking garage near Kitsap Transit
to prevent commuters from speeding through the community; and adding blinking lights in the two
crosswalks by the Police Department, as well as the one at the top of the hill on Burwell due to safety
concerns. Tom Knuckev, City Engineer approached Mr. Schnarr to address several of his issues.
City Council Reg. Mtg. Minutes
Wednesday, February 17, 2016
Page 2 of 3
CONSENT AGENDA
7A— Claims & Check Register: Check Numbers 367163 through 367377, and EFT-15767 through
EFT-16812 in the amount of$1,635,694.66; and Regular Payroll for the pay period ending
January 31, 2016 in the amount of$669,546.92
7B— Minutes of Joint Planning Session —January 30, 2016
7C — Minutes of Meeting — February 3, 2016
7D— Minutes of Study Session — February 10, 2016
7E — Confirm Re-appointment of Holly James to the Civil Service Commission
7F— 2016 Excess Loss Insurance with Companion Life Insurance Company for the City's Partially
Self-Funded Medical Insurance Program
7G — Elevator Equipment Systems Services & Maintenance Contract with Otis Elevator Company
7H — Contract Award to SGC General Contractors for the Anderson Creek Hypochlorite Building
Project
7I— Purchase two (2) '/z-Ton Utility Trucks from Bud Clary Chevrolet of Longview, WA for the
Water Utility Maintenance Division; and a Budget Adjustment from the 2016 Water Capital
Budget
7J — Change Orders No. 4 and 5 with RV Associates, Inc. for the Washington Avenue Community
Boulevard Project
7K— Resolution No. 3263 to set March 16, 2016 as a Public Hearing date to consider an ordinance
authorizing the City of Bremerton to assume the rights, powers, functions, and obligations of
the Bremerton Transportation Benefit District (TBD)
7L— Public Works Agreement with Utter Associates for the Purchase and Installation of Broadcast
Equipment for Upgrades in the Meeting Chambers of the Norm Dicks Government Center;
and a Budget Adjustment to increase the 2016 BKAT Capital Budget
There were no comments from the public...
06:09:22 M/S/C/U (Wheeler/Davis) Move to approve the CoNSENT A�Etv�A as presented.
GENERAL BUSINESS— There are no Genera/Business Items tonight...
�
COUNCIL MEMBER REPORTS
Richard Huddv summarized the future of passenger only ferry service discussion that took place at
the Kitsap Transit Board of Commissioners Meeting; announced that 50 cadets from the Washington
Youth Academy, 10 Bremerton High School students, and 10 gardeners will be working together on a
Shoreline Weed Pulling Party on Friday, February 19 from 9:00 AM to 3:30 PM at Lions Park.
Dino Davis reiterated information about the Grand Opening & Ribbon Cutting taking place at the new
location for Susanna's Antiques on Callow Avenue this weekend.
Greq Wheeler announced that volunteers are welcome at the next Kiwanis Field Work Party on
Saturday, February 27 from 9:00 to 11:00 AM; enjoyed attending the Grand Opening last week for
Fuji Buffet located at 3583 Wheaton Way; and was pleased to accept an invitation from Senator Patty
Murray to meet with the Chief of Staff for the H.E.L.P. Committee (Health, Education, Labor, and
Pensions) and discuss how the Committee can assist with any challenges within the community.
Jerrv McDonald encouraged business owners to attend the Westsound Business Expo on February
18 from 2:00 to 7:00 PM in the Kitsap Sun Pavilion at the Kitsap County Fairgrounds; announced that
�
City Council Reg. Mtg. Minutes �
Wednesday, February 17, 2016
Page 3 of 3
volunteers are needed for a Community Clean-Up at Evergreen Rotary Park on Saturday, February
20 from 9:00 AM to Noon; provided an update on the expansion of the Hot Java Cafe located on the
corner of 4th and Pacific; and welcomed the Saboteur Bakery which recently opened on 4�h Street.
Leslie Daugs announced the 9th Annual Semancik Crab Feed fundraiser to be held on Saturday,
March 5, 2016 at 5:00 PM at the Arc Building; and expressed condolences to the family and friends of
Lucas Weaver, a Klahowya High School senior who drowned in a tragic accident while hiking and
fishing at Big Beef Creek on Monday.
Pat Sullivan encouraged District 1 residents to provide feedback during a Public Works Community
Meeting to be held on Monday, February 22 from 5:00 to 6:30 PM in the Lounge at Sheridan Park
Community Center where City Engineers will be discussing the Lebo Boulevard Improvements
Project.
With no further business, President Younger adjourned the Council Meeting at 6:23 PM.
Prep red and Submitted by:
r �
LORI SMITH
Legislative Assistant
Attest:
SHANNON CORIN, City Clerk
ERIC YOUNGER, City Council President
EY:SC:Is:cg
AGENDA BILL �C
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Minutes of Study Session - Study Session Date: NIA
February 24, 2016 COUNCIL MEETING Date: March 2, 2016
Department: City Council
Presenter: Council President
Phone: (360) 473-5280
SUMMARY: Attached is a summary of the City Council Study Session on February 24, 2016.
ATTACHMENTS: Meeting Minutes
FISCAL IMPACTS (Include Budgeted Amount): N/A
STUDY SESSION AGENDA: � No Presentation ❑ Full Presentation
STUDY SESSION ACTION: � Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION:
Move to approve the Consent Agenda as presented.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Form Updated 01/07/15
DIGITAL RECORDING
CITY COUNCIL STUDY SESSION MINUTES
Wednesday, February 24, 2016
A Study Session of the City Council of the City of Bremerton was called to order in the Council
COnfe�ence Room of the NORM DICKS GOVERNMENT CENTER, 345 6th Street, Bremerton,
Washington, Wednesday, February 24, 2016, at 5:00 PM, with Council President Eric Younger
presiding. Council Members present were Richard Huddy, Dino Davis, Greg Wheeler, Jerry
McDonald, Leslie Daugs, and Pat Sullivan. Christine Grenier, Council Assistant, was present to
provide staff support.
President Younqer emphasized that the Study Session was open to the public but there would be
no opportunities for input or participation; and announced that approved items by Council will be
placed on the March 2, 2016 Council Meeting Agenda; or as indicated.
A. NO PRESENTATION PLANNED — The following items are budgeted items or subjects that
have been raised with the appropriate Council Committee Members...
1. Resolution authorizing the Mayor to submit a formal Grant Funding Assistance Application
to the Salmon Recovery Funding Board for Evergreen Rotary Park Nearshore Restoration
Design Consent Agenda
2. Sole Source Purchase of a 2009 John Deere 135-D Tracked Excavator from United
Rentals of Bremerton, WA Consent Agenda
3. Contract Supplemental Agreement No. 2 with KPG for Sidewalk Improvements funded
from the Department of Commerce Grant received for the Burwell Pedestrian Tunnel
Consent Agenda
B. INORMATION BRIEFINGS
4. Follow-up on the Warren Avenue Bridge Pedestrian Improvements Project Community
Meeting held February 4, 2016 — Chal Martin, Public Works & Utilities Director
5. Operation L.I.F.T. Neighborhood Program —Greg Wheeler, Council Member
6. Update on Kitsap Transit Passenger-Only Ferry Service— Richard Huddy, Council Member
and Member of the Kitsap Transit Board of Commissioners
C. GENERAL COUNCIL BUSINESS
0
o Audit Committee Briefing (2/18/16 Meeting) — Chair Leslie Daugs o
o Finance & Investment Committee Briefing (2/23/16 Meeting)— Chair Richard Huddy
o Other General Council Business was briefly discussed.
President Younger announced that following adjournment of the Study Session, Council would
hold an Exempt Closed Session under RCW 42.30.140 (4)(b) to discuss "Labor Negotiations; and
that due to the late hour, the webinar"How to Successfully Sell Tourism" has been postponed.
With no further business, President Younqer adjourned the Council Study Session at 8:00 PM.
Prepared and Submitted by:
�
CHRISTINE GRENIER
Council Assistant
City Council Study Session Minutes
Wednesday, February 24, 2016
Page 2 of 2
Attest:
SHANNON CORIN, City Clerk
ERIC YOUNGER, City Council President
EY:SC:Is:cg
AGENDA BILL
CITY OF BREMERTON � D
CITY COUNCIL
SUBJECT: Resolution No. 3265 Study Session Date: February 24, 2016 _
authorizing the Mayor to Make Formal COUNCIL MEETING Date: March 2, 2016
Application to the Salmon Recovery Department: Public Works and Utilities
Funding Board for Grant Assistance PI'eS211te�: Kathleen Cahall,
Water Resources Manager
Phone: (360) 473-2315
SUMMARY: The City of Bremerton has been offered grant funding for Evergreen Park Beach
Restoration Design by the Washington State Salmon Recovery Funding Board (SRFB) in the amount
of$127,000. The Recreation and Conservation Office that oversees the SRFB requires a resolution
to authorize the City of Bremerton Mayor to make formal application to the SRFB.
Some text of the Resolution was provided by the Washington State Recreation and Conservation
Office; per that Office, only limited alterations to the text of the Resolution were allowable.
ATTACHMENTS: 1) Resolution No. 3265; 2) Exhibit A—Grant program Project Agreement
FISCAL IMPACTS (Include Budgeted Amount): This action allows the City to makeformal
application for a $127,000 SRFB grant.
STUDY SESSION AGENDA: o No Presentation ❑ FuIlPresentation
STUDY SESSION ACTION: o ConsentAgenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to adopt Resolution No. 3265 authorizing the Mayor to make
formal application to the Salmon Recovery Funding Board.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Form Updated 01/07/15
RESOLUTION NO. 2 5
A RESOLUTION of the City Council of the City of
Bremerton, Washington authorizing submission of an application
for grant funding assistance for Evergreen Park Nearshore
Restoration Design, a salmon recovery project, to the Salmon
Recovery Funding Board.
WHEREAS, authorization is needed for submitting an application for grant
funding assistance for Evergreen Park Nearshore Restoration Design, a salmon recoveryproject,
to the Salmon Recovery Funding Board, as provided in RCW 77.85, WAC 420 and subsequent
Legislative action;and
WHEREAS, under the provisions of the Salmon Recovery Act, state grant
assistance is requested to aid in financing the cost of restoration design; and
WHEREAS, our organization considers it in the best public interest to complete
the project described in the application; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON,WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The Mayor is authorized to make formal application to the Salmon
Recovery Funding Board for grant assistance.
SECTION2. Our organization has reviewed the sample project agreement on
the Recreation and Conservation Office's web site at: http://www.rco.wa.gov/documents/
manuals&forms/Sam�leProjAgreement.pdf(Exhibit A) and authorize the Mayor to enter into
such a project agreement, if funding is awarded. We understand and acknowledge that the project
agreement will contain the indemnification (applicable to any sponsor) and waiver of sovereign
immunity(applicable to Tribes) and other terms and conditions that are contained in the sample
project agreement.
SECTION3. Any grant assistance received will be used for direct costs
associated with implementation of the project referenced above, the Evergreen ParkNearshore
Restoration Design project.
SECTION4. Our organization expects our matching share of projectfunding
will be derived from N/A and meets the requirements of WAC 420-12-040. In
addition, our organization understands it is responsible for supporting all non cash commitments
to this project should they not materialize.
SECTIONS. We acknowledge that if the Salmon Recovery FundingBoard
approves grant assistance for the project, the Recreation and Conservation Office will pay uson
only a reimbursement basis, except for a specially approved advance payment. We understand
Evergreen Park Nearshore
� Restoration Design
reimbursement basis means that we will only request payment from the Recreation and
Conservation Office after we incur eligible and allowable costs and pay them. The Recreation
and Conservation Office may also determine an amount of retainage and hold that amount until
the project is complete. The Recreation and Conservation Office may approve advance payments
in limited circumstances, pursuant to WAC 420-12-060 and the policy outlined in Manual8,
Reimbursements, located online at
http://www.rco.wa.gov/documents/manuals&forms/manual 8-reimbursement.pdf.
SECTION 6. We acknowledge that any property restored be maintained for a
period of ten years after the project is complete unless otherwise provided and agreed to byour
organization and the Salmon Recovery Funding Board.
SECTION 7. This application authorization becomes part of a formal application
to the Salmon Recovery Funding Board for grant assistance.
SECTION 8. We provided appropriate opportunity for public comment on this
application.
SECTION 9 We certify that this Resolution was properly and lawfullyadopted
following the requirements of our organization and applicable laws and policies and that the
person signing as authorized representative is duly authorized to do so.
SECTION 10. Severability. If any one or more sections, subsections, or sentences
of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the
validity of the remaining portion of this Resolution and the same shall remain in full force and
effect.
SECTION ll.Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
PASSED by the City Council of the City of Bremerton, Washington this
day of , 2016.
ERIC YOiJNGER, Council President
APPROVED AS TO FORM: ATTEST:
ROGER A. LUBOVICH, City Attorney SHANNON L. CORIN, City Clerk
Evergreen Park Nearshore
Restoration Design
ti,�,R WASHINGTOfd STATE (Grant Program) Project Agreement
_�-_�� Recreation and
Conservation Office (Grant Program Account or Category)
Project Sponsor: Project Number:
Project Title: Approval Date:
A. PARTIES OF THE AGREEMENT
This project grant Agreement(Agreement) is entered into between the State of Washington by and through
the Recreation and Conservation Funding Board (RCFB or board)] or the [Salmon Recovery Funding Board
(SRFB or board) and the Recreation and Conservation Office, P.O. Box 40917, Olympia, Washington 98504-
0917 and [parent organization name if it exists] [by and through the] [child organization name] Address, City,
State, Zip Code(sponsor)and shall be binding on the agents and all persons acting by or through the parties.
B. PURPOSE OF AGREEMENT
This Agreement sets out the terms and conditions by which a grant is made from the [Account Name] of the
State of Washington. The grant is administered by the Recreation and Conservation Office (RCO)to the
sponsor for the project named above.
C. DESCRIPTION OF PROJECT
The project will........
D. PERIOD OF PERFORMANCE
The project reimbursement period shall begin on [Project Start Date]and end on [Project End
Date]. No expenditure made before or after this period is eligible for reimbursement unless incorporated by
written amendment into this Agreement or specifically provided for by RCFB and/or SRFB policy or WAC.
Requests for time extensions are to be made at least 60 days before the Agreement end date. If the request
is made after the Agreement end date, the time extension may be denied.
The sponsor has obligations beyond this period of performance as described in Section E.
E. ON-GOING OBLIGATION
For[acquisition, developmenf, renovation and restoration projects]the project sponsor's on-going obligations
shall be in perpetuity and shall survive the completion/termination of this project Agreement unless otherwise
identified in the Agreement or as approved by the funding board. It is the intent of the funding board's
conversion policy(see section 23)that all lands acquired and or facilities and areas [developed, renovated, or
restoredj with funding assistance remain in the public domain in perpetuity.
F. PROJECT FUNDING
The total grant award provided by the funding board for this project shall not exceed fRCO totall. The funding
board shall not pay any amount beyond that approved for grant funding of the project and within the funding
board's percentage as identified below. The sponsor shall be responsible for all total project costs that
exceed this amount. The contribution by the sponsor toward work on this project at a minimum shall be as
indicated below:
Percentage Dollar Amount
[Grant Program-account- category]
Project Sponsor
Total Project Cost 100
G. RIGHTS AND OBLIGATIONS
All rights and obligations of the parties to this Agreement are subject to this Agreement and its attachments,
as now existing or hereafter amended, including the sponsor's application, project summary, eligible
reimbursement activities report, project milestones, and the Standard Terms and Conditions of the project
Agreement, all of which are incorporated herein.
Except as provided herein, no amendment/deletions of any of the terms or conditions of this Agreement will
be effective unless provided in writing. All such amendmenUdeletions must be signed by both parties except
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 1 of 23
PROJAGR.RPT
the RCO director may unilaterally make amendments to extend the period of performance. Period of
pertormance extensions need only be signed by RCO's director or designee.
H. COMPLIANCE WITH APPLICABLE STATUTES,RULES,AND RCFB-SRFB POLICIES
This Agreement is governed by, and the sponsor shall comply with, all applicable state and federal laws and
regulations, 111CIUdlf19 ChBptef[REVISED CODE OF WASHINGTON SECTION(S)] RCW, [Chapter 286 WAC or
Chapter 420 WAC], and published agency policies, which are incorporated herein by this reference as if fully
set forth.
I. SPECIAL CONDITIONS
J. FEDERAL FUND INFORMATION
A portion or all of the funds for this project are provided through the following federal funding source.
Federal Agency:
Catalog of Federal Domestic Assistance:
Federal Award Number: Federal Fiscal Year:
If the sponsor's total federal expendifures are $500,000 or more during the sponsor's fisca!-year, the sponsor
is required to have a federal single audit conducted for that year in compliance with Office of Management
and Budget Circular A-133. A copy of the final audit report must be provided to RCO within nine months of
the end of the sponsor's fiscal year, unless a longer period is agreed to in advance by the cognizant or
oversight agency.
Failure to provide required A-133 audits will lead to a suspension of payments and may lead to a suspension
of RCO Agreements.
K. PROJECT GRANT AGREEMENT REPRESENTATIVE
All written communications and notices under this Agreement will be addressed and sent to at least the mail
address or the email address listed below if not both:
Proiect Contact RCFB-SRFB
Name: Recreation and Conservation Office
Title: Natural Resources Building
Address: PO Box 40917
E-mail Address Olympia,Washington 98504-0917
These addresses shall be effective until receipt by one party from the other of a written notice of any change.
L, ENTIRE AGREEMENT
This Agreement, with all amendments and attachments, constitutes the entire Agreement of the parties. No
other understandings, oral or otherwise, regarding this Agreement shall exist or bind any of the parties.
M. EFFECTIVE DATE
This Agreement, for project(Number], shall be subject to the written approval of the RCO's authorized
representative and shall not be effective and binding until executed by both the Sponsor and the RCO.
Reimbursements for eligible and allowable costs incurred within the period of performance identified in
Section D above are allowed only when this Agreement is fully executed and an original is received by RCO.
The sponsor/s has read, fully understands, and agrees to be bound by all terms and conditions as set forth in
this Agreement. The signators listed below represent and warrant their authority to bind the parties to this
Agreement.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 2 of 23
PROJAGR.RPT
Project Sponsor
By: Date:
Name: (printed)
Title:
State of Washington
On behatf of the [Recreation and Conservation Funding Board or Salmon Recovery Funding Board]
By: Date:
[RCO DIRECTOR NAME]
Director, Recreation and Conservation Office
Pre-approved as to form:
sv: /s/ Date: _�_June 7, 2013
Assistant Attorney General
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 3 of 23
PROJAGR.RPT
y INASHINGIONSTATE Standard Terms and Conditions
��� Recreation and
Conservation Office of the Project Agreement
Project Sponsor: Project Number:
Project Title: Approval Date:
SECTION 1. CITATIONS, HEADINGS AND DEFINITIONS
A. Any citations referencing specific documents refer to the current version at the date of project
Agreement and/or any revisions in the future.
B. Headings used in this Agreement are for reference purposes only and shall not be considered a
substantive part of this Agreement.
C. Definitions. As used throughout this Agreement, the following terms shall have the meaning set forth
below:
acquisition—The purchase of fee or less than fee interests in real property. These interests include,
but are not limited to, conservation easements, access/trail easements, covenants,water rights,
leases, and mineral rights.
Agreement—The accord accepted by all parties to the present transaction;this Agreement, any
supplemental Agreements, any amendments to this Agreement and any intergovernmental
Agreements.
applicant—Any agency or organization that meets the qualifying standards, including deadlines,for
submission of an application soliciting a grant of funds from the funding Board.
application—The documents and other materials that an applicant submits to the RCO to support
the applicant's request for grant funds; this includes materials required for the"Application" in the
RCO's automated project information system, and other documents as noted on the application
checklist including but not limited to legal opinions, maps, plans, evaluation presentations and scripts.
asset—Equipment purchased by the sponsor or acquired or transferred to the sponsor for the
purpose of this Agreement. This definition is restricted to non-fixed assets, including but not limited to
vehicles, computers or machinery.
cognizant or oversight agency— Federal agency responsible for ensuring compliance with federal
audit requirements.
contractor—Shall mean one not in the employment of the sponsor who is performing all or part of
the eligible activities for this project under a separate Agreement with the sponsor. The term
"contractor"and "contractors" means contractor(s) in any tier.
development—The construction of or work resulting in new elements, including but not limited to
structures,facilities, and/or materials to enhance outdoor recreation, salmon recovery or habitat
i n resources.
conseroat o
director—The chief executive officer of the Recreation and Conservation Office or that person's
designee.
elements, items and work types—Components of the funded project as provided in the project
description.
funding board—The board that authorized the funds in this Agreement, either the Recreation and
Conservation Funding Board (RCFB)created under chapter 79A.25.110 RCW, or the Salmon
Recovery Funding Board (SRFB)created under chapter 77.85.110 RCW.
grantee The organizational entity or individual to which a grant(or cooperative agreement)is
awarded and signatory to the Agreement which is responsible and accountable both for the use of the
funds provided and for the performance of the grant-supported project or activities.
landowner agreement—A landowner agreement is required between a SRFB and/or RTP project
sponsor and landowner for projects located on land not owned, or otherwise controlled, by the
sponsor.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 4 of 23
PROJAGR.RPT
lower tier participant—refers to any sponsor receiving a federal grant through RCO. Lower tier
participants also refer to any grantee, subgrantee, or contractor of any grantee or subgrantee from
the original sponsor funded by RCO.
milestone—An important event with a defined deadline for an activity related to implementation of a
funded project.
period of pertormance—The time period specified in the Agreement, under Section D, period of
performance.
post evaluation summary—One of the documents used to summarize and describe the actions
undertaken in the Agreement.
project—The undertaking that is the subject of this Agreement and that is, or may be, funded in
whole or in part with funds administered by RCO on behalf of the funding board.
RCO—Recreation and Conservation Office -The state office that provides administrative support
to the Recreation and Conservation Funding Board and Salmon Recovery Funding Board. RCO
includes the director and staff, created by Chapters 79A.25.110 and 79A.25.150 RCW and charged
with administering this Agreement by Chapters 77.85.110 and 79A.25.240 RCW.
reimbursement—Payment of eligible and allowable costs that have already been paid by the
sponsor per the terms of the Agreement.
renovation - The activities intended to improve an existing site or structure in order to increase its
service life or functions. This does not include maintenance activities.
restoration—Bringing a site back to its original function as part of a natural ecosystem or improving
the ecological functionality of a site.
RTP - Recreational Trails Program—A federal grant program administered by RCO that allows for
the development and maintenance of backcountry trails.
secondary sponsor-one of two or more eligible organizations that sponsors a grant-funded project.
Of these two sponsors, only one—the primary sponsor—may be the fiscal agent.
sponsor—The eligible applicant who has been awarded a grant of funds and is bound by this
executed Agreement; includes its officers, employees, agents and successors.
subgrantee—the government or other legal entity to which a subgrant is awarded and which is
accountable to the grantee for the use of the funds provided.
SECTION 2. PERFORMANCE BY THE SPONSOR
The sponsor and secondary sponsor where applicable, shall undertake the project as described in this
Agreement, post evaluation summary, the sponsor's application, and in accordance with the sponsor's
proposed goals and objectives described in the application or documents submitted with the application,
all as finally approved by the funding board. All submitted documents are incorporated by this reference
as if fully set forth herein. The Order of Precedence is covered in Section 31.
Timely completion of the project and submission of required documents, including progress and final
reports, is important. Failure to meet critical milestones or complete the project, as set out in this
Agreement, is a material breach of the Agreement.
SECTION 3. ASSIGNMENT
Neither this Agreement, nor any claim arising under this Agreement, shall be transferred or assigned by
the sponsor without prior written consent of the Recreation and Conservation Office.
SECTION 4. RESPONSIBILITY FOR PROJECT
While the funding board undertakes to assist the sponsor with the project by providing a grant pursuant to
this Agreement, the project itself remains the sole responsibility of the sponsor. The funding board
undertakes no responsibilities to the sponsor, a secondary sponsor, or to any third party, other than as is
expressly set out in this Agreement. The responsibility for the implementation of the project is solely that
of the sponsor, as is the responsibility for any claim or suit of any nature by any third party related in any
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 5 of 23
PROJAGR.RPT
way to the project. When a project is sponsored by more than one entity, any and all sponsors are
equally responsible for the project and all post-completion stewardship responsibilities.
SECTION 5. INDEMNIFICATION
The sponsor shall defend, indemnify, and hold the State and its officers and employees harmless from all
claims, demands, or suits at law or equity arising in whole or in part from the actual or alleged acts, errors,
omissions or negligence of, or the breach of any obligation under this Agreement by, the sponsor or the
sponsor's agents, employees, subcontractors or vendors, of any tier, or any other persons for whom the
sponsor may be legally liable.
Provided that nothing herein shall require a sponsor to defend or indemnify the State against and hold
harmless the State from claims, demands or suits based solely upon the negligence of, or breach of any
obligation under this Agreement by the State, its agents, officers, employees, subcontractors or vendors,
of any tier, or any other persons for whom the State may be legally liable.
Provided further that if the claims or suits are caused by or result from the concurrent negligence of(a)
the sponsor or the sponsor's agents, employees, subcontractors or vendors, of any tier, or any other
persons for whom the Sponsor is legally liable, and (b)the State its agents, officers, employees ,
subcontractors and or vendors, of any tier, or any other persons for whom the State may be legally liable,
the indemnity obligation shall be valid and enforceable only to the extent of the sponsor's negligence or
the negligence of the sponsor's agents, employees, subcontractors or vendors, of any tier, or any other
persons for whom the sponsor may be legally liable.
This provision shall be included in any Agreement between sponsor and any subcontractor and vendor, of
any tier.
The sponsor shall also defend, indemnify, and hold the State and its officers and employees harmless
from all claims, demands, or suits at law or equity arising in whole or in part from the alleged patent or
copyright infringement or other allegedly improper appropriation or use of trade secrets, patents,
proprietary information, know-how, copyright rights or inventions by the sponsor or the sponsor's agents,
employees, subcontractors or vendors, of any tier, or any other persons for whom the sponsor may be
legally liable, in performance of the Work under this Agreement or arising out of any use in connection
with the Agreement of inethods, processes, designs, information or other items fumished or
communicated to State, its agents, officers and employees pursuant to the Agreement; provided that this
indemnity shall not apply to any alleged patent or copyright infringement or other allegedly improper
appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or
inventions resulting from State's, its agents', officers'and employees'failure to comply with specific
written instructions regarding use provided to State, its agents, officers and employees by the sponsor, its
agents, employees, subcontractors or vendors, of any tier, or any other persons for whom the sponsor
may be legally liable.
The sponsor specifically assumes potential liability for actions brought by the sponsor's own employees
or its agents against the State and, solely for the purpose of this indemnification and defense, the sponsor
specifically waives any immunity under the state industrial insurance law, Title 51 RCW.
The RCO is included within the term State, as are all other agencies, departments, boards, or other
entities of state government.
SECTION 6. INDEPENDENT CAPACITY OF THE SPONSOR
The sponsor and its employees or agents performing under this Agreement are not officers, employees or
agents of the funding board or RCO. The sponsor will not hold itself out as nor claim to be an officer,
employee or agent of RCO, a funding board or of the state of Washington, nor will the sponsor make any
claim of right, privilege or benefit which would accrue to an employee under Chapters 41.06 or 28B RCW.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 6 of 23
PROJAGR.RPT
The sponsor is responsible for withholding and/or paying employment taxes, insurance, or deductions of
any kind required by federal, state, and/or local laws.
SECTION 7. CONFLICT OF INTEREST
Notwithstanding any determination by the Executive Ethics Board or other tribunal, RCO may, in its sole
discretion, by written notice to the sponsor terminate this Agreement if it is found after due notice and
examination by RCO that there is a violation of the Ethics in Public Service Act, Chapter 42.52 RCW; or
any similar statute involving the sponsor in the procurement of, or performance under,this Agreement.
In the event this Agreement is terminated as provided above, RCO shall be entitled to pursue the same
remedies against the sponsor as it could pursue in the event of a breach of the Agreement by the
sponsor.The rights and remedies of RCO provided for in this clause shall not be exclusive and are in
addition to any other rights and remedies provided by law.
SECTION 8. ACKNOWLEDGMENT AND SIGNS
A. Publications. The sponsor shall include language which acknowledges the funding contribution of the
applicable grant program to this project in any release or other publication developed or modified for,
or referring to, the project during the project period and in the future.
B. Signs. The sponsor also shall post signs or other appropriate media during the project period and in
the future at project entrances and other locations on the project which acknowledge the applicable
grant program's funding contribution, unless exempted in funding board policy or waived by the
director.
C. Ceremonies. The sponsor shall notify RCO no later than two weeks before a dedication ceremony for
this project.The sponsor shall verbally acknowledge the applicable grant program's funding
contribution at all dedication ceremonies.
D. Federally Funded Projects. When issuing statements, press releases, requests for proposals, bid
solicitations, and other documents describing a project funded in whole or in part with federal money
provided for in this grant, sponsors shall clearly state:
1. The percentage of the total costs of the project that is financed with federal money;
2. The dollar amount of federal funds for the project; and
3. The percentage and dollar amount of the total costs of the project that is financed by
nongovernmental sources.
SECTION 9. COMPLIANCE WITH APPLICABLE LAW
The sponsor will implement the Agreement in accordance with applicable federal, state, and local laws,
regulations and RCO and funding board policies regardless of whether the sponsor is a public or non-
public organization.
The sponsor shall comply with, and RCO is not responsible for determining compliance with, any and all
applicable federal, state, and local laws, regulations, and/or policies, including, but not limited to: State
Environmental Policy Act; Industrial Insurance Coverage; Architectural Barriers Act; permits (shoreline,
Hydraulics Project Approval, demolition); land use regulations (critical areas ordinances, Growth
Management Act);federal and state safety and health regulations (Occupational Safety and Health
Administration/Washington Industrial Safety and Health Act); and Buy American Act.
Endangered Species
For habitat restoration projects funded in part or whole with federal funds administered by the SRFB the
sponsor shall not commence with clearing of riparian trees or in-water work unless either the sponsor has
complied with 50 CFR 223.203 (b)(8), limit 8 or until an Endangered Species Act consultation is finalized
in writing by the National Oceanic and Atmospheric Administration. Violation of this requirement may be
grounds for terminating this project Agreement. This section shall not be the basis for any enforcement
responsibility by RCO.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 7 of 23
PROJAGR.RPT
Nondiscrimination Laws
The sponsor shall comply with all applicable federal, state, and local nondiscrimination laws and/or
policies, including but not limited to: the Americans with Disabilities Act; Civil Rights Act; and the Age
Discrimination Act. In the event of the sponsor's noncompliance or refusal to comply with any
nondiscrimination law or policy, the Agreement may be rescinded, cancelled, or terminated in whole or in
part, and the sponsor may be declared ineligible for further grant awards from the funding board. The
sponsor is responsible for any and all costs or liability arising from the sponsor's failure to so comply with
applicable law.
Wages and Job Safety
The sponsor agrees to comply with all applicable laws, regulations, and policies of the United States and
the State of Washington which affect wages and job safety. The sponsor agrees when state prevailing
wage laws (RCW 39.12)are applicable, to comply with such laws, to pay the prevailing rate of wage to all
workers, laborers, or mechanics employed in the performance of any part of this contract, and to file a
statement of intent to pay prevailing wage with the Washington State Department of Labor and Industries
as required by RCW 39.12.040. The sponsor also agrees to comply with the provisions of the Davis-
Bacon Act, and other federal laws, and the rules and regulations of the Washington State Department of
Labor and Industries.
Archaeological and Cultural Resources
The RCO reviews all applicable projects for potential impacts to archaeological sites and state cultural
resources. The sponsor must comply with Executive Order 05-05 or the National Historic Preservation
Act before initiating ground disturbing activity. The funding board requires documented compliance with
Executive Order 05-05 or Section 106 of the National Historic Preservation Act, whichever is applicable to
the project. If a federal agency declines to consult,the sponsor shall comply with the requirements of
Executive Order 05-05. In the event that archaeological or historic materials are discovered during
project activities, work in the location of discovery and immediate vicinity must stop instantly, the area
must be secured, and notification must be provided to the following: concerned Tribes' cultural staff and
cultural committees, RCO, and the State Department of Archaeology and Historic Preservation. If human
remains are discovered during project activity, work in the location of discovery and immediate vicinity
must stop instantly, the area must be secured, and notification provided to the concerned Tribe's cultural
staff and cultural committee, RCO, State Department of Archaeology,the coroner and local law
enforcement in the most expeditious manner possible according to RCW 68.50.
Restrictions on Grant Use
•No part of any funds provided under this grant shall be used, other than for normal and recognized
executive-legislative relationships,for publicity or propaganda purposes, or for the preparation,
distribution, or use of any kit, pamphlet, booklet, publication, radio, television, or video presentation
designed to support or defeat legislation pending before the U.S. Congress or any state legislature.
No part of any funds provided under this grant shall be used to pay the salary or expenses of any
sponsor, or agent acting for such sponsor, related to any activity designed to influence tegislation or
appropriations pending before the U.S. Congress or any state legislature.
SECTION 10. HAZARDOUS SUBSTANCES
A. Certification. The sponsor shall inspect, investigate, and conduct an environmental audit of the
proposed acquisition site for the presence of hazardous substances, as defined in Chapter
70.105D.020 (10) RCW, and certify:
1. No hazardous substances were found on the site, or
2. Any hazardous substances found have been treated and/or disposed of in compliance with
applicable state and federal laws, and the site deemed "clean."
B. Responsibility. Nothing in this provision alters the sponsor's duties and liabilities regarding hazardous
substances as set forth in Chapter 70.105D RCW.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 8 of 23
PROJAGR.RPT
C. Hold Harmless. The sponsor will defend, protect and hold harmless RCO and any and all of its
employees and/or agents,from and against any and all liability, cost(including but not limited to all
costs of defense and attorneys'fees)and any and all loss of any nature from any and all claims or
suits resulting from the presence of, or the release or threatened release of, hazardous substances
on the property the sponsor is acquiring.
SECTION 11. RECORDS
A. Maintenance. The sponsor shall maintain books, records, documents, data and other evidence
relating to this Agreement and performance of the services described herein, including but not limited
to accounting procedures and practices which sufficiently and properly reflect all direct and indirect
costs of any nature expended in the performance of this Agreement. Sponsor shall retain such
records for a period of six years from the date RCO deems the project complete , as defined in
Section 17(C) below. If any litigation, claim or audit is started before the expiration of the six (6)
year period,the records shall be retained until all litigation, claims, or audit findings involving the
records have been resolved.
B. Access to records and data.At no additional cost,the records relating to the Agreement, including
materials generated under the Agreement, shall be subject at all reasonable times to inspection,
review or audit by RCO, personnel duly authorized by RCO,the Office of the State Auditor, and
federal and state officials so authorized by law, regulation or Agreement. This includes access to all
information that supports the costs submitted for payment under the grant and all findings,
conclusions, and recommendations of the sponsor's reports, including computer models and
methodology for those models.
C. Public Records. Sponsor acknowledges that the funding board is subject to chapter 42.56 RCW and
that this Agreement and any records sponsor submits or has submitted to the State shall be a public
record as defined in chapter 42.56 RCW. Additionally, in compliance with RCW 77.85.130(8),
sponsor agrees to disclose any information in regards to expenditure of any funding received from the
SRFB. By submitting any record to the state sponsor understands that the State may be requested to
disclose or copy that record under the state public records law, currently codified at RCW 42.56. The
sponsor warrants that it possesses such legal rights as are necessary to permit the State to disclose
and copy such document to respond to a request under state public records laws. The Sponsor
hereby agrees to release the State from any claims arising out of allowing such review or copying
pursuant to a public records act request, and to indemnify against any claims arising from allowing
such review or copying and pay the reasonable cost of state's defense of such claims.
SECTION 12. TREATMENT OF ASSETS
A. Assets shall remain in the possession of the sponsor for the duration of the project or applicable grant
program.When the sponsor discontinues use of the asset(s)for the purpose for which it was funded,
RCO will require the sponsor to deliver the asset(s)to RCO, dispose of the asset according to RCO
policies, or return the fair market value of the asset(s)to RCO. Assets shall be used only for the
purpose of this Agreement, unless otherwise provided herein or approved by RCO in writing.
B. The sponsor shall be responsible for any loss or damage to assets which results from the negligence
of the sponsor or which results from the failure on the part of the sponsor to maintain and administer
that asset in accordance with sound management practices.
SECTION 73. RIGHT OF INSPECTION
The sponsor shall provide right of access to the project to RCO, or any of its officers, or to any other
authorized agent or official of the state of Washington or the federal government, at all reasonable times,
in order to monitor and evaluate performance, compliance, and/or quality assurance under this
Agreement.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 9 of 23
PROJAGR.RPT
If a landowner agreement or other form of control and tenure has been executed, it will further stipulate
and define the funding board and RCO's right to inspect and access lands acquired or developed with
funding board assistance.
SECTION 14. STEWARDSHIP AND MONITORING
Sponsor agrees to perform monitoring and stewardship functions as stated in policy documents approved
by the funding boards or RCO. Sponsor further agrees to utilize, where applicable and financially feasible,
any monitoring protocols recommended by the funding board.
SECTION 15. DEBARMENT CERTIFICATION
A. For Federally Funded Projects
By signing the Agreement with RCO, the sponsor certifies that neither it nor its principals nor any
other lower tier participant are presently debarred, suspended, proposed for debarment, declared
ineligible or voluntarily excluded from participation in this transaction by any Federal department or
agency. Further, the sponsor agrees not to enter into any arrangements or contracts related to this
Agreement with any party that is on the Office of Inspector General Suspension and Debarment List
at http://www.gsaig.gov/index.cfm?LinkServID=C4C89080-D2BE-D29A-96355D44A13E4356
The sponsor(prospective lower tier participant) shall provide immediate written notice to RCO if at
any time the prospective lower tier participant learns that the above certification was not correct when
submitted or has become erroneous by reason of changed circumstances.
B. For State Funded Projects
By signing the Agreement with RCO, the sponsor certifies that neither it nor its principals nor any
other lower tier participant are presently debarred, suspended, proposed for debarment, declared
ineligible or voluntarily excluded from participation in this transaction by Washington State Labor and
Industries. Further, the sponsor agrees not to enter into any arrangements or contracts related to this
Agreement with any party that is on the"Contractors not Allowed to Bid on Public Works Projects"list
at www.lni.wa.qov/TradesLicensing/PrevWaqe/AwardinpAQencies/DebarredContractors/
SECTION 16. PROJECT FUNDING
A. Additional Amounts. The funding board shall not be obligated to pay any amount beyond the dollar
amount as identified in this Agreement, unless an additional amount has been approved in advance
by the funding board or director and incorporated by written amendment into this Agreement.
B. Before the Agreement. No expenditure made, or obligation incurred, by the sponsor before the project
start date shall be eligible for grant funds, in whole or in part, unless specifically provided for by
funding board policy, such as a waiver of retroactivity or program specific eligible pre-Agreement
costs. For reimbursements of such costs,this Agreement must be fully executed and an original
received by RCO. The dollar amounts identified in this Agreement may be reduced as necessary to
exclude any such expenditure from reimbursement.
C. After the period of performance. No expenditure made, or obligation incurred, following the period of
performance shall be eligible, in whole or in part, for grant funds hereunder. In addition to any remedy
the funding board may have under this Agreement,the grant amounts identified in this Agreement
shall be reduced to exclude any such expenditure from participation.
SECTION 17. PROJECT REIMBURSEMENTS
A. This contract is administered on a reimbursement basis. The sponsors may only request
reimbursement after eligible and allowable costs have already been paid by the sponsor and remitted
to their vendors. RCO will then reimburse the sponsor for those costs based upon RCO's percentage
as defined in Section F of the Project Agreement of the amount billed to RCO. RCO does not
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 10 of 23
PROJAGR.RPT
reimburse for donations which the sponsor may use as part of its percentage. All reimbursement
requests must include proper documentation of expenditures as required by RCO.
B. Compliance and Payment. The obligation of RCO to pay any amount(s) under this Agreement is
expressly conditioned on strict compliance with the terms of this Agreement by the sponsor.
C. Compliance and Retainage. RCO reserves the right to withhold disbursement of up to the final ten
percent(10%)of the total amount of the grant to the sponsor until the project has been completed. A
project is considered "complete"when:
1. All approved or required activities outlined in the Agreement are done;
2. On-site signs are in place (if applicable);
3. A final project report is submitted to and accepted by RCO;
4. Any other required documents are complete and submitted to RCO;
5. A final reimbursement request is submitted to RCO;
6. The completed project has been accepted by RCO;
7. Final amendments have been processed; and
8. Fiscal transactions are complete.
9. RCO has accepted a final boundary map, if required for the project, for which the Agreement
terms will apply in the future.
D. Reimbursement Request Frequency. Sponsors are encouraged to send RCO a reimbursement
request at least quarterly. Sponsors are required to submit a reimbursement request to RCO, at a
minimum for each project at least once a year for reimbursable activities occurring between July 1
and June 30. Sponsors must refer to the most recently published/adopted RCO policies and
procedures regarding reimbursement requirements.
SECTION 18. ADVANCE PAYMENTS
Advance payments of or in anticipation of goods or services to be provided under this Agreement are
limited to grants approved by the SRFB and must comply with SRFB policy. See WAC 420-12-060 (5).
SECTION 19. RECOVERY OF PAYMENTS
In the event that the sponsor fails to expend funds under this Agreement in accordance with state and
federal laws, and/or the provisions of the Agreement, or meet its percentage of the project total, RCO
reserves the right to recover grant award funds in the amount equivalent to the extent of noncompliance
in addition to any other remedies available at law or in equity.
The sponsor shall reimburse RCO for any overpayment or erroneous payments made under the
Agreement. Repayment by the sponsor of such funds under this recovery provision shall occur within 30
days of demand by RCO. Interest shall accrue at the rate of twelve percent(12%)per annum from the
time that payment becomes due and owing.
SECTION 20. COVENANT AGAINST CONTINGENT FEES
The sponsor warrants that no person or selling agent has been employed or retained to solicit or secure
this Agreement on an Agreement or understanding for a commission, percentage, brokerage or
contingent fee, excepting bona fide employees or bona fide established agents maintained by the
sponsor for the purpose of securing business. RCO shall have the right, in the event of breach of this
clause by the sponsor, to terminate this Agreement without liability or, in its discretion, to deduct from the
Agreement grant amount or consideration or recover by other means the full amount of such commission,
percentage, brokerage or contingent fee.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 11 of 23
PROJAGR.RPT
SECTION 21. PROVISIONS APPLYING TO DEVELOPMENT, RENOVATION, AND RESTORATION
PROJECTS
The following provisions shall be in force only if the project described in this Agreement is for
development, renovation, and restoration of land or facilities for outdoor recreation, habitat conservation,
or salmon recovery:
A. Document Review and Approval. The sponsor agrees to submit one copy of all development,
renovation, restoration or construction plans and specifications to RCO for review prior to
implementation. Review and approval by RCO will be for compliance with the terms of this
Agreement.
B. Contracts for Development, Renovation, or Restoration. Sponsors must have a procurement process
that follows applicable state and/or required federal procurement principles. If no such process exists
the sponsor must follow these minimum procedures: (1) publish a notice to the public requesting
bids/proposals for the project(2)specify in the notice the date for submittal of bids/proposals (3)
specify in the notice the general procedure and criteria for selection; and (4)comply with the same
legal standards regarding unlawful discrimination based upon race, ethnicity, sex, or sex-orientation
that are applicable to state agencies in selecting a bidder or proposer. This procedure creates no
rights for the benefit of third parties, including any proposers, and may not be enforced or subject to
review of any kind or manner by any other entity other than the RCO. Sponsors may be required to
certify to the RCO that they have followed any applicable state and/or federal procedures or the
above minimum procedure where state or federal procedures do not apply.
C. Contract Change Order. Only change orders that impact the amount of funding or changes to the
scope of the project as described to and approved by the funding board or RCO must receive prior
written approval.
D. Control and Tenure. The sponsor must provide documentation that shows appropriate tenure
(landowner agreement, long term lease, easement, or fee simple ownership)for the land proposed for
development, renovation, or restoration. The documentation must meet current RCO requirements.
E. Nondiscrimination. Except where a nondiscrimination clause required by a federal funding agency is
used,the sponsor shall insert the following nondiscrimination clause in each contract for construction
of this project:
"During the performance of this contract, the contractor agrees to comply
with all federal and state nondiscrimination laws, regulations and policies."
F. Use of Best Management Practices. Project sponsors are encouraged to use best management
practices developed as part of the Washington State Aquatic Habitat Guidelines (AHG) Program. The
best management practices are described in three documents: "Stream Habitat Restoration
Guidelines: Final Draft", 2004; "Design of Road Culverts for Fish Passage", 2003; and "Integrated
Streambank Protection Guidelines", 2002. These documents and other information can be found on
the AHG website.
SECTION 22. PROVISIONS APPLYING TO ACQUISITION PROJECTS
The following provisions shall be in force only if the project described in this Agreement is for the
acquisition of interest in real property(including easements)for outdoor recreation, habitat conservation,
or salmon recovery purposes:
A. Evidence of Land Value. Before disbursement of funds by RCO as provided under this Agreement,
the sponsor agrees to supply documentation acceptable to RCO that the cost of the property rights
acquired has been established according to funding board policy.
B. Evidence of Title. The sponsor agrees to provide documentation that shows the type of ownership
interest for the property that has been acquired. This shall be done before any payment of financial
assistance.
C. Legal Description of Real Property Rights Acquired.The legal description of the real property rights
purchased with funding assistance provided through this project Agreement(and protected by a
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 12 of 23
PROJAGR.RPT
recorded conveyance of rights to the State of Washington)shall be incorporated into the Agreement
before final payment. _
D. Conveyance of Rights to the State of Washington. Document securing long-term rights for the State
of Washington. When real property rights (both fee simple and lesser interests)are acquired, the
sponsor agrees to execute an appropriate document conveying certain rights and responsibilities to
RCO, on behalf of the State of Washington. These documents include a Deed of Right, Assignment
of Rights, Easements and/or Leases. The sponsor agrees to use document language provided by
RCO, to record the executed document in the County where the real property lies, and to provide a
copy of the recorded document to RCO. The document required will vary depending on the project
type, the real property rights being acquired and whether or not those rights are being acquired in
perpetuity
1. Deed of Right. The Deed of Right conveys to the people of the state of Washington the right to
preserve, protect, and/or use the property for public purposes consistent with the fund source.
Sponsors shall use this document when acquiring real property rights that include the underlying
land. This document may also be appticable for those easements where the sponsor has
acquired a perpetual easement for public purposes.
2. Assignment of Rights. The Assignment of Rights document transfers certain rights such as
access and enforcement to RCO. Sponsors shall use this document when an easement or lease
is being acquired for habitat conservation or salmon recovery purposes. The Assignment of
Rights requires the signature of the underlying landowner and must be incorporated by reference
in the easement document.
3. Easements and Leases. The sponsor may incorporate required language from the Deed of Right
or Assignment of Rights directly into the easement or lease document, thereby eliminating the
requirement for a separate document. Language will depend on the situation; sponsor must
obtain RCO approval on the draft language prior to executing the easement or lease.
E. Real Property Acquisition and Relocation Assistance
1. When federal funds are part of this Agreement,the Sponsor agrees to comply with the terms and
conditions of the Uniform Relocation Assistance and Reat Property Acquisition Policies Act of
1970, 84 Stat. 1894 (1970)--Public Law 91-646, as amended by the Surface Transportation and
Uniform Relocation Assistance Act, PL 100-17-1987, and applicable regulations and procedures
of the federal agency implementing that Act.
2. When state funds are part of this Agreement,the sponsor agrees to comply with the terms and
conditions of the Uniform Relocation Assistance and Real Property Acquisition Policy of the State
of Washington, Chapter 8.26 RCW, and Chapter 468-100 WAC.
3. Housing and Relocation. In the event that housing and relocation costs, as required by federal
law set out in subsection (1)above and/or state law set out in subsection (2)above, are involved
in the execution of this project, the sponsor agrees to provide any housing and relocation
assistance required.
F. Buildings and Structures. In general, grant funds are to be used for outdoor recreation, habitat
conservation, or salmon recovery. Sponsors agree to remove or demolish ineligible structures.
Sponsors must consult RCO regarding compliance with section 9—Archaeological and Cultural
Resources before structures are removed or demolished.
SECTION 23. RESTRICTION ON CONVERSION OF REAL PROPERTY AND/OR FACILITIES TO
OTHER USES
The sponsor shall not at any time convert any real property or facility acquired, developed, renovated,
and/or restored pursuant to this Agreement to uses other than those purposes for which funds were
approved without prior approval of the funding board in compliance with applicable statutes, rules, and
funding board policies. It is the intent of the funding board's conversion policy, current or as amended in
the future, that all real property or facilities acquired, developed, renovated, and/or restored with funding
assistance remain in the public domain in perpetuity unless otherwise identified in the Agreement or as
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 13 of 23
PROJAGR.RPT
approved by the funding board. Determination of whether a conversion has occurred shall be based
upon applicable law and RCFB/SRFB policies.
For acquisition projects that are term limited, such as one involving a lease or a term-limited restoration,
renovation or development project or easement, this restriction on conversion shall apply only for the
length of the term, unless otherwise provided in written documents or required by applicable state or
federal law. In such case,the restriction applies to such projects for the length of the term specified by
the lease, easement, deed, or landowner agreement.
When a conversion has been determined to have occurred,the sponsor is required to remedy the
conversion per established funding board policies.
SECTION 24. CONSTRUCTION, OPERATION, USE AND MAINTENANCE OF ASSISTED
PROJECTS
For acquisition, development, renovation, and restoration projects, sponsors must ensure that properties
or facilities assisted with funding board funds, including undeveloped sites, are built, operated, used, and
maintained:
A. According to applicable federal, state, and local laws and regulations, including public health
standards and building codes.
B. In a reasonably safe condition for the project's intended use.
C. Throughout its estimated life so as to prevent undue deterioration.
D. In compliance with all federal and state nondiscrimination laws, regulations and policies.
For acquisition, development, renovation and restoration projects, facilities open and accessible to the
general public must:
A. Be constructed and maintained to meet or exceed the minimum requirements of the most current
local or state codes, Uniform Federal Accessibility Standards, guidelines, or rules, including but not
limited to:the International Building Code, the Americans with Disabilities Act, and the Architectural
Barriers Act, as updated.
B. Appear attractive and inviting to the public except for brief installation, construction, or maintenance
periods.
C. Be available for use by the general public without reservation at reasonable hours and times of the
year, according to the type of area or facility.
SECTION 25. INCOME AND INCOME USE
A. Income.
1. Compatible source. The source of any income generated in a funded project or project area must
be compatible with the funding source and the Agreement.
2. Fees. User and/or other fees may be charged in connection with land acquired or facilities
developed with funding board grants if the fees are consistent with the:
(a) Value of any service(s)furnished;
(b) Value of any opportunities furnished; and
(c) Prevailing range of public fees in the state for the activity involved.
Excepted are Firearms and Archery Range Recreation Program safety classes (firearm and/or
hunter)for which a facility/range fee must not be charged (Chapter 79A.25.210 RCW).
B. Income use. Regardless of whether income or fees in a project work site (including entrance, utility
corridor permit, cattle grazing,timber harvesting, farming, etc.)are gained during or after the
reimbursement period cited in the Agreement, unless precluded by state or federal law, the revenue
may only be used to offset:
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW, Chapter 286 WAC Page 14 of 23
PROJAGR.RPT
1. The sponsor's matching funds;
2. The project's total cost;
3. The expense of operation, maintenance, stewardship, monitoring, and/or repair of the facility or
program assisted by the funding board grant;
4. The expense of operation, maintenance, stewardship, monitoring, and/or repair of other similar
units in the sponsor's system; and/or
5. Capital expenses for similar acquisition and/or development and renovation.
SECTION 26. PREFERENCES FOR RESIDENTS
Sponsors shall not express a preference for users of grant assisted projects on the basis of residence
(including preferential reservation, membership, and/or permit systems)except that reasonable
differences in admission and other fees may be maintained on the basis of residence. Even so, the
funding board discourages the imposition of differential fees. Fees for nonresidents must not exceed
twice the fee imposed on residents. Where there is no fee for residents but a fee is charged to
nonresidents,the nonresident fee shall not exceed the amount that would be imposed on residents at
comparable state or local public facilities.
SECTION 27. PROVISIONS RELATED TO CORPORATE (INCLUDING NONPROFIT)SPONSORS
A corporate sponsor, including any nonprofit sponsor, shall:
A. Maintain corporate status with the state, including registering with the Washington Secretary of
State's office,throughout the sponsor's obligation to the project as identified in the Agreement.
B. Notify RCO prior to corporate dissolution. Within 30 days of dissolution the sponsor shall name a
qualified successor that will agree in writing to assume any on-going project responsibilities. A
qualified successor is any party eligible to apply for funds in the subject grant program and capable of
complying with the terms and conditions of this Agreement. RCO will process an amendment
transferring the sponsor's obligation to the qualified successor if requirements are met.
C. Sites or facilities open to the public may not require exclusive use, (e.g., members only).
SECTION 28. LIABILITY INSURANCE REQUIREMENTS FOR FIREARMS AND ARCHERY RANGE
SPONSORS
A. The sponsor of a firearms or archery range recreation project shall procure an endorsement, or other
addition,to liability insurance it may currently carry, or shall procure a new policy of liability insurance,
in a total coverage amount the sponsor deems adequate to ensure it will have resources to pay
successful claims of persons who may be killed or injured, or suffer damage to property, while
present at the range facility to which this grant is related, or by reason of being in the vicinity of that
facility; provided that the coverage shall be at least one million dollars ($1,000,000)for the death of,
or injury to, each person.
B. The liability insurance policy, including any endorsement or addition, shall name Washington State,
the funding board, and RCO as additional insured and shall be in a form approved by the funding
board or director.
C. The policy, endorsement or other addition, or a similar liability insurance policy meeting the
requirements of this section, shall be kept in force throughout the sponsor's obligation to the project
as identified in this Agreement.
D. The policy, as modified by any endorsement or other addition, shall provide that the issuing company
shall give written notice to RCO not less than thirty(30)calendar days in advance of any cancellation
of the policy by the insurer, and within ten (10)calendar days following any termination of the policy
by the sponsor.
E. The requirement of Subsection A through D above shall not apply if the sponsor is a federal, state, or
municipal government which has established a program of self-insurance or a policy of self-insurance
with respect to claims arising from its facilities or activities generally, including such facilities as
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 15 of 23
PROJAGR.RPT
firearms or archery ranges, when the applicant declares and describes that program or policy as a
part of its application to the funding board.
F. By this requirement,the funding board and RCO does not assume any duty to any individual person
with respect to death, injury, or damage to property which that person may suffer while present at, or
in the vicinity of,the facility to which this grant relates. Any such person, or any other person making
claims based on such death, injury, or damage, must took to the sponsor, or others, for any and all
remedies that may be available by law.
SECTION 29. REQUIREMENTS OF THE NATIONAL PARK SERVICE
If the project has been approved by the National Park Service, US Department of the Interior,for funding
assistance from the federal Land and Water Conservation Fund (LWCF), the"Project Agreement General
Provisions" in the LWCF State Assistance Program Federal Financial Assistance Manual are also made
part of this Agreement. The sponsor shall abide by these LWCF General Provisions, in addition to this
Agreement, as they now exist or are hereafter amended. Further, the sponsor agrees to provide RCO
with reports or documents needed to meet the requirements of the LWCF General Provisions.
SECTION 30. FARMLAND PRESERVATION ACCOUNT
For projects funded through the Washington Wildlife and Recreation Program Farmland Preservation
Account, the following sections will not apply if covered separately in a recorded RCO approved
Agricultural Conservation Easement.
• Section 8 -Acknowledgement and Signs
• Section 10- Hazardous Substances
• Section 14-Stewardship and Monitoring
• Section 22—Provisions applying to Acquisition Projects, Sub-sections F and G
• Section 23— Restriction on Conversion of Real Property and/or Facilities to Other Uses,
• Section 24—Construction, Operation and Maintenance of Assisted Projects Sub-sections E, F, G
and
• Section 25- Income and Income Use.
SECTION 31. ORDER OF PRECEDENCE
This Agreement is entered into, pursuant to, and under the authority granted by applicable federal and
state laws. The provisions of the Agreement shall be construed to conform to those laws. In the event of
an inconsistency in the terms of this Agreement, or between its terms and any applicable statute, rule, or
policy or procedure, the inconsistency shall be resolved by giving precedence in the following order:
A. Applicable federal and/or state statutes, regulations, policies and procedures including RCO/funding
board policies and procedures, applicable federal Office of Management and Budget(OMB)circulars
and federal and state executive orders;
B. Project Agreement including attachments;
C. Special Conditions;
D. Standard Terms and Conditions of the Project Agreement.
SECTION 32. AMENDMENTS
Amendments to this Agreement shall be binding only if in writing and signed by personnel authorized to
bind each of the parties except period of performance extensions and minor scope adjustments need only
be signed by RCO's director or designee.
SECTION 33. LIMITATION OF AUTHORITY
Only RCO or RCO's delegate by writing (delegation to be made prior to action)shall have the express,
implied, or apparent authority to alter, amend, modify, or waive any clause or condition of this Agreement.
Furthermore, any alteration, amendment, modification, or waiver of any clause or condition of this
Agreement is not effective or binding unless made in writing and signed by RCO.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 16 of 23
PROJAGR.RPT
SECTION 34. WAIVER OF DEFAULT
Waiver of any default shall not be deemed to be a waiver of any subsequent default.Waiver or breach of
any provision of the Agreement shall not be deemed to be a waiver of any other or subsequent breach
and shall not be construed to be a modification of the terms of the Agreement unless stated to be such in
writing, signed by the director, or the director's designee, and attached to the original Agreement.
SECTION 35. APPLICATION REPRESENTATIONS—MISREPRESENTATIONS OR INACCURACY
OR BREACH
The funding board and RCO rely on the sponsor's application in making its determinations as to eligibility
for, selection for, and scope of,funding grants.Any misrepresentation, error or inaccuracy in any part of
the application may be deemed a breach of this Agreement.
SECTION 36. SPECIFIC PERFORMANCE.
The funding board and RCO may enforce this Agreement by the remedy of specific pertormance, which
usually will mean completion of the project as described in this Agreement. However,the remedy of
specific performance shall not be the sole or exclusive remedy available to RCO. No remedy available to
the funding board or RCO shall be deemed exclusive. The funding board or RCO may elect to exercise
any, a combination of, or all of the remedies available to it under this Agreement, or under any provision
of law, common law, or equity.
SECTION 37. TERMINATION
The funding board and RCO will require strict compliance by the sponsor with all the terms of this
Agreement including, but not limited to, the requirements of the applicable statutes, rules and all funding
board and RCO policies, and with the representations of the sponsor in its application for a grant as finally
approved by the funding board
A. For Cause. The funding board or the director may suspend or terminate the obligation to provide
funding to the sponsor under this Agreement:
i. In the event of any breach by the sponsor of any of the sponsor's obligations under this
Agreement; or
ii. If the sponsor fails to make progress satisfactory to the funding board or director toward
completion of the project by the completion date set out in this Agreement. Included in
progress is adherence to milestones and other defined deadlines
In the event this Agreement is terminated by the funding board or director, under this section or any
other section after any portion of the grant amount has been paid to the sponsor under this
Agreement, the funding board or director may require that any amount paid be repaid to RCO for
redeposit into the account from which the funds were derived.
B. Non Availability of Funds. The obligation of the RCO to make payments is contingent on the
availability of state and federal funds through legislative appropriation and state allotment. If amounts
sufficient to fund the grant made under this Agreement are not appropriated to RCO for expenditure
for this Agreement in any biennial fiscal period, RCO shall not be obligated to pay any remaining
unpaid portion of this grant unless and until the necessary action by the Legislature or the Office of
Financial Management occurs. If RCO participation is suspended under this section for a continuous
period of one year, RCO's obligation to provide any future funding under this Agreement shall
terminate. Termination of the Agreement under this section is not subject to appeal by the sponsor.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 17 of 23
PROJAGR.RPT
C. For Convenience. Except as otherwise provided in this Agreement, RCO may, by ten (10)days
written notice, beginning on the second day after the mailing, terminate this Agreement, in whole or in
part. If this Agreement is so terminated, RCO shall be liable only for payment required under the
terms of this Agreement for services rendered or goods delivered prior to the effective date of
termination.
SECTION 38. DISPUTE HEARING
Except as may otherwise be provided in this Agreement, when a dispute arises between the sponsor and
the funding board, which cannot be resolved, either party may request a dispute hearing according to the
process set out in this section. Either party's request for a dispute hearing must be in writing and clearly
state:
A. The disputed issues;
B. The relative positions of the parties;
C. The sponsor's name, address, project title, and the assigned project number.
In order for this section to apply to the resolution of any specific dispute or disputes, the other party must
agree in writing that the procedure under this section shall be used to resolve those specific issues. The
dispute shall be heard by a panel of three persons consisting of one person chosen by the sponsor, one
person chosen by the director, and a third person chosen by the two persons initially appointed. If a third
person cannot be agreed on,the third person shall be chosen by the funding board's chair.
Any hearing under this section shall be informal, with the specific processes to be determined by the
disputes panel according to the nature and complexity of the issues involved. The process may be solely
based on written material if the parties so agree. The disputes panel shall be governed by the provisions
of this Agreement in deciding the disputes.
The parties shall be bound by the decision of the disputes panel, unless the remedy directed by that
panel shall be without the authority of either or both parties to perform, as necessary, or is otherwise
unlawful.
Request for a disputes hearing under this section by either party shall be delivered or mailed to the other
party. The request shall be delivered or mailed within thirty(30)days of the date the requesting party has
received notice of the action or position of the other party which it wishes to dispute. The written
Agreement to use the process under this section for resolution of those issues shall be delivered or
mailed by the receiving party to the requesting party within thirty(30)days of receipt by the receiving
party of the request.
All costs associated with the implementation of this process shall be shared equally by the parties.
SECTION 39. ATTORNEYS' FEES
In the event of litigation or other action brought to enforce contract terms, each party agrees to bear its
own attorney fees and costs.
SECTION 40. GOVERNING LAW/VENUE
This Agreement shall be construed and interpreted in accordance with the laws of the State of
Washington. In the event of a lawsuit involving this Agreement, venue shall be in Thurston County
Superior Court if legally proper; otherwise venue shall be in a county where the project is situated. The
sponsor, by execution of this Agreement acknowledges the jurisdiction of the courts of the State of
Washington.
In the cases where this Agreement is between the funding board and a federally recognized Indian Tribe,
the following governing law/venue applies:
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW, Chapter 286 WAC Page 18 of 23
PROJAGR.RPT
A. Notwithstanding the above venue provision, if the State of Washington intends to initiate a lawsuit
against a federally recognized Indian tribe relating to the performance, breach or enforcement of this
Agreement, it shall so notify the Tribe. If the Tribe believes that a good faith basis exists for subject
matter jurisdiction of such a lawsuit in federal court, the Tribe shall so notify the State within five days
of receipt of such notice and state the basis for such jurisdiction. If the Tribe so notifies the State,the
State shall bring such lawsuit in federa�court; otherwise the State may sue the Tribe in the Thurston
County Superior Court. Interpretation of the Agreement shall be according to applicable State law,
except to the extent preempted by federal or tribal law. In the event suit is brought in federal court
and the federal court determines that it lacks subject matter jurisdiction to resolve the dispute
between the State and Tribal Party, then the parties agree to venue in Thurston County Superior
Court.
B. Any judicial award, determination, order, decree or other relief, whether in law or equity or otherwise,
resulting from such a lawsuit shall be binding and enforceable on the parties. Any money judgment
or award against a Tribe, tribal officers and members, or the State of Washington and its officers and
employees may exceed the amount provided for in Section F- Project Funding of the Agreement in
order to satisfy the judgment.
C. The Tribe hereby waives its sovereign immunity for suit in state court for the limited purpose of
allowing the State to bring such actions as it determines necessary to give effect to this section and to
the enforcement of any judgment relating to the pertormance, or breach of this Agreement. This
waiver is not for the benefit of any third party and shall not be enforceable by any third party or by any
assignee of the parties. In any enforcement action, the parties shall bear their own enforcement
costs, including attorneys'fees.
For purposes of this provision, the State includes the RCO and any other state agencies that may be
assigned or otherwise obtain the right of the RCO to enforce this Agreement.
SECTION 41. SEVERABILITY
The provisions of this Agreement are intended to be severable. If any term or provision is illegal or invalid
for any reason whatsoever, such illegality or invalidity shall not affect the validity of the remainder of the
Agreement.
WWRP Project Agreement-RCO#XX-XXXX (Grant Program Account or Category)
Chapter 79A.15 RCW,Chapter 286 WAC Page 19 of 23
PROJAGR.RPT
Eligible Scope Activities
Project Sponsor: Project Number:
Project Title: Project Type:
Program Approval
Project Metrics
Project Acquisition
Project acres by purpose type:
Habitat Conservation 18.00
Public Access 32.00
Miles of shoreline protected: 1.00
Sites Improved
Project areas developed: 2.00
Project areas renovated: 0.00
Acquisition Metrics
Property: Worksite #1
Real Property
Land
Acres by Acreage Type (fee simple):
Uplands 17.00
Tidelands 33.00
Existing structures on site: No structures on site
Clean up of hazardous substances required (yes/no): Unknown
Incidentals
Signs(Acq)
Number of permanent signs that identify site and funding partners 1
Development Metrics
Property: Worksite #1
Buildings and Structures
Construct/install restroom
Number of restrooms: 1 new, 0 renovated
Select the restroom type: Vault toilets
General Site Improvements
Develop paths/walkways
Select the surface of the path/walkway: Compacted gravel
Linear feet of path/walkway: 1200
Walkway lighting provided (yes/no): No
Number of walkway bridges: 0 new,0 renovated
Develop viewpoint
Number of designated viewpoints: 1 new, 0 renovated
Select the viewpoint structures: Benches/seating
Install signslkiosk
Number of kiosks: 0 new, 0 renovated
Number of interpretive signs/displays: 5 new, 0 renovated
Number of permanent entrance signs: 1 new,0 renovated
Project involves installation of informational signs (yes/no):
ELIGREIM.RPT Date Page
Parking and Roads
Parking development
Number of vehicle parking stalls: 8 new, 0 renovated
Number of vehicle with trailer parking stalls: 0 new, 0 renovated
Number of accessible parking stalls:
Vehicle with trailers 0
Vehicle 1
Select the parking surfaces: Gravel
Select the parking enhancements: Entry gate,Wheel stops
ELIGREIM.RPT Date Page
Legal Description
Project Sponsor: Project Number:
Project Title: RCO Approval:
Worksite Name
Property Name
Legal Description
Worksite#1
The legal description of the property purchased with funding assistance provided through this Project
Agreement(and protected by a recorded Deed-of-Right)shall be amended into the Project Agreement prior to
reimbursement of the final payment.
LEGALDSC.RPT Date Page
Milestone Report by Project
Project Number:
Project Name:
Sponsor:
Project Manager:
. . -
. � . . � - . .
X Project Start 08/01/2014
Please provide the
X Baseline Documentation to RCO 10/01/2014 prelimary title report for the
property prior to closing
X Survey Complete 10/31/2014
X Order Appraisal(s) 11/01/2014
X ! Progress Report Submitted 01/15/2015
X � Order Appraisal Review(s) 03/15/2015
X � Purchase Agreement Signed 03/31/2015
X � Acquisition Closing 06/30/2015
X Funding Acknowl Sign Posted 06/30/2015
X ! Progress Report Submitted 06/30/2015
X Recorded Acq Documents to RCO 07/30/2015
X � Annual Project Billing 07/31/2015
X � Cultural Resources Complete 12/31/2015
X � Progress Report Submitted 01/15/2016
RCO Final Inspection 02/01/2016
! Agreement End Date 06/30/2016
Final Billing to RCO 07/31/2016
Final Report in PRISM 07/31l2016
X=Milestone Complete
!=Critical Milestone
1 MILESTO.RPT Date Page
AGENDA BILL 7 E
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Sole Source Purchase of a used Study Session Date: February 24, 2016
John Deere 135D Tracked Excavator from COUNCIL MEETING Date: March 2, 2016
United Rentals of Bremerton, WA Department: PW&U/ERR
� Presenter: Jim Orton
Phone: (360) 473-5359
SUMMARY: The approved 2016 budget includes purchase of an excavator and various
attachments for the Forestry Division. After researching many brands and models available with low
hours, staff chose a 2009 John Deere 135D tracked excavator from United Rentals of Bremerton
WA. The total cost of this machine and one extra "muck" bucket at $83,807.70 including Washington
State sales tax. It is our intent to purchase a machine locally so that the portion of sales tax remains
within the City of Bremerton. Additional attachments will be bought separately.
ATTACHMENTS: 1) Memorandum 2) Copy of quote from 134205782 from United Rentals
FISCAL IMPACTS (Include Budgeted Amount): This is an addition to the fleet and funding will come
from Water Utility Capital then will be transferred to fund 510 (ERR). The budget amount is $240,000.
STUDY SESSION AGENDA: � No Presentation ❑ Full Presentation
STUDY SESSION ACTION: 0 Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to approve the purchase one 2009 John Deere 135D tracked
excavator from United Rentals, Bremerton WA, in the amount of$83,807.70 including Washington
State sales tax.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Form Updated 01/07/15
i_ ____�_�_��__i
� I
I
I I
I �
�
! � Public Works and Utilities Department
; I� 100 Oyster Bay Ave. N. • Bremerton,WA 98312 • (360)473-5315 • FAX(360)473-5360
, �
' : • • I
I�"_._.—�
- MEMORANDUM
DATE: February 18, 2016
TO: City Council
FROM: Jim Orton, Public Works Operations Manager
SUBJECT: Request for Sole Source Purchase
The approved 20'i6 budget shows a purchase of a used excavator for Forestry. Our
specifications for this purchase were for a tracked excavator with low hours within
a size range comparable to a John Deere 135 with extra bucket and the capability to
handle a boom mower device.
We looked at various dealers and only found one excavator that meets all of our
specifications. I am requesting that Council approve a sole source purchase of this
excavator from United Rentals.
Pursuant to BMC 2.76.090, the sole source purchase is justified by special market
conditions in that the City could not find another used excavator with low hours and
the desired size range, and the price quoted is believed to be a very competitive
price. In addition, the City has an interest in buying local (see BMC 2.76.040);
United Rentals is a local business. Buying the same equipment from a non-local
business would produce additional costs.
A new comparable excavator would cost approximately $180,000 -$220,000.
Working for and with our citizens to establish Bremerton as Puget Sound's most beautiju!and livable waterfront city
• Page 2 February 18, 2016
2.76.090 SOLE SOURCE PURCHASES.
The requirements set forth in BMC 2.76.040 for requests for bids may be waived by a written
determination by the Director that either the materials, supplies, equipment or services are clearly
and legitimately limited to a single source of supply, or that the materials, supplies, equipment or
services are subject to special market conditions, involve special facilities or services, or that a
bid would otherwise not be practicable or in the City's best interests under the circumstances, in
which instances the purchase price may be best established by direct negotiation.The written
determination shall also recite why this situation exists.
2.76.040 REQUESTS FOR BIDS AND BID LISTS.
(e) Local Preference Purchase for Goods.When reviewing bids for purchase, all things being
equal when considering factors such as product quality,delivery,warranty or service provided,
there is a preference to purchase from a local supplier. A local supplier is a supplier having an
office or facility located in Kitsap County and licensed to do and doing business in the County.
OUnited Rentals° ������I�����������������������I��������������������� EQUI QUOTESALE
BRANCH 054
5950 STATE HWY 303 NORTHEAST # 1 342 0 57 82
BREMERTON WA 98311
360-373-1234
360-373-1696 FAX Customer # : 20302
Quote Date : O1/05/16
� BREMERTON CITY
�
''i Z O O OYSTER BAY AVE N UR Job LoC : 10 0 OYSTER BAY AVE S
� BREMERTON WA 9 8 312-3 4 5 5 Customer Job ID: 2
OP.O. # : JIM
�7 OffiCe: 360-473-5356 Cell: 360-473-5556 Ordered sy : JIM
Written By : DOUGLAS YORK
Salesperaon : DOUGLAS YORK
BREMERTON CITY OF EQUIPMENT
SERVICES DIVISION
100 OYSTER BAY AVENUE NORTH ThIS IS 110tat1 111VOICe
BREMERTON WA 9 8 312 Please do not pay from this document
Qty Equipment # Price Amount
1 1127021 CC: 905-1035 74500.00 74500.00
EXCAVATOR 30000-34999#REDUCED TAIL SWING
Make: JOHN DEERE Model: 135D Serial #: FF135DX302045
Model Year: 09 HR OUT: 3890.400
*******************************�********
12 months of full United Guard warranty
***************************�*********�**
COB elected to not take the warranty
above
1 9055035 CC: 905-5035 N/C .00
EXCAVATOR BUCKET 36"
Included in purchase
1 10195684 CC: 905-5362 2600.00 2600.00
EXCAVATOR BUCKET CLEAN OUT 43000-47999#
Make: TAG Model: 60100XD Serial #: 96678-1
Model Year: 13 HR OUT:
Sub-total: 77100.00
Tax: 6707.70
Estimated Total: 83807.70
OSC KEN DONLEYCOTT 360-204-6078.
Customer is hereby notified that United Rentals has assigned its
rights (but not its obligations) in the agreement to sell all or
any of the used equipment described herein to United Rentals
Exchange, LLC. , a qualified intermediary, as part of a Section
1031 like-kind exchange program.
Note: This proposal may be withdrawn if not accepted within 30 days.
THIS IS NOT AN EQUIPMENT SALE AGREEMENT/INVOICE.THE SALE OF EQUIPMENT AND ANY OTHER ITEMS LISTED ABOVE IS SUBJECT TO AVAILABILITY AND ACCEPTANCE OP THE
TERMS AND CONDITIONS OF UNITED'S E�UIPMENT SALE AGREEMENTIINVOICE,WHICH MUST BE SIGNED PRIOR TO OR UPON DELIVERY OF TNE EQUIPMENT AND OTHER ITEMS.
Page: 1
AGENDA BILL � �
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Contract Supplement No. 2 with Study Session Date: February 24, 2016
KPG for Sidewalks funded from the COUNCIL MEETING Date: March 2, 2016
Department of Commerce Grant received for Department: PW8�U
the Burwell Pedestrian Tunnel Presenter: Tom Knuckey
Phone: (360) 473-2376
SUMMARY: In November, 2015, the City executed a contract with KPG Inc., to design the Highway
Safety Improvement project. Contract Supplement No. 1 was executed in January, 2016 and was
essentially a no cost change to revise the scope of work as described in the Council Summary. This
Contract Supplement No. 2 modifies the scope of work for KPG to design an advanced pedestrian
signal on Burwell Street at Chester Avenue, and sidewalks on Chester and State Avenues. These
improvements will be included in the Highway Safety Improvement Project bid documents as a
separate schedule, with funding for both design and construction coming from the grant from the
Department of Commerce for the Burwell Pedestrian Tunnel.
ATTACHMENTS: 1) Council Summary; 2) Contract Supplement No. 2 with attachments
FISCAL IMPACTS (Include Budgeted Amount): None. The supplement provides $74,473.69 for
design; all costs for the design and construction will be from the Department of Commerce Grant for
the Burwell Pedestrian Tunnel.
STUDY SESSION AGENDA: ❑x No Presentation ❑ Full Presentation
STUDY SESSION ACTION: � Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to approve Contract Supplement No. 2 with KPG; and authorize
the Mayor to finalize and execute the agreement with substantially the same terms and conditions as
presented; and to amend the 2016 Annual Budget to reflect the change in use of the Commerce
grant funds.
COUNCIL ACTION: ❑ Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Form Updated 01/07/15
CONTRACT SUPPLEMENT NO.2 WITH KPG INC.,
FOR COMMERCE GRANT FUNDED SIDEWALKS
COUNCIL SUMMARY
BACKGROUND
Commerce Grant for Burwell Pedestrian Tunnel: In July, 2013,the State of Washington awarded a
$1.3M grant to the City to reconstruct the Burwell Pedestrian Tunnel. Since that time,the City has
contracted with the Navy's designer of record and bid the project twice,first in March, 2015 and again
in June, 2015; however, both times the City did not receive an awardable bid. Consequently,the City
and Navy have agreed to modify the project approach where the City will complete all design services,
and purchase materials and equipment for the Navy to incorporate into the improvements under a
separate Navy led construction contract. In addition,depending on the bids the Navy receives for the
construction,the City may also contract for traffic control.
With this new project approach,funds will remain from the Commerce Grant,and so the City
coordinated with the Department of Commerce to expend the funds constructing pedestrian safety
improvements adjacent to the Navy's State Street pedestrian gate, since that work meets the intent of
the grant award.
KPG Contract: On 11/18/2015,the City executed a contract with KPG Inc.,to design the Highway Safety
Improvement(HSIP) project. The HSIP project scope was developed concurrently with the WSDOT ADA
ramp replacement project,and as a result there was redundant scope to design and replace the ADA
ramps at the intersection of Wheaton Way and Sheridan Road. Staff coordinated with WSDOT for
approval to revise the HSIP scope of work to eliminate work at this location and replace it with similar
' work at the intersection of SR304 (Burwell Street)and Chester Avenue. This revision resulted in a net
cost decrease to the KPG contract of$7.02 which was executed in Contract Supplement No. 1 on
February 2, 2016.
Upon determination that grant funds from the Burwell Pedestrian Tunnel project could fund pedestrian
improvements in the vicinity of the Navy's State Street pedestrian gate,the City identified sidewalk
construction along Chester Avenue and State Avenue, and installation of an advanced pedestrian signal
(HAWK,or standard traffic signal) at the intersection of Burwell Street and Chester Avenue as the
greatest need. Since KPG was already scoped to design ADA ramp improvements at the intersection of
Chester and Burwell,the City decided to include the new work scope into their existing contract to
design and construct the work concurrently. The cost of the work will be paid for in separate work
schedules to track the project costs separately for accounting purposes.
FISCAL SUMMARY
Highway Safety Improvements Project—Phase II
The grant amount is$1,085,100 and requires a match of 10%for the design only. A match is also
typically required for construction; however,the match is waived if construction authorization is
1
obtained by September 30, 2017. Staff are scheduled to deliver this project in 2016;therefore there will
be no construction match. �
KPG work scope funded by the HSIP Grant=$138,986.45 �
Construction Funds Available=$946,113.55 �
Burwell Pedestrian Tunnel—Commerce Grant �
The grant amount is$1,300,000; however, 3%($39,000) is with-held by Commerce for:administration,
therefore total funds available are$1,261,000. The grant reimburses project costs at 100%; no matching
funds are required. As the City will not own the improvements for the Burwell Tunnel itself,that work
will not be capitalized;therefore both the project costs and grant revenue will be incurred in the
Engineering General Fund budget. Since the work associated with the Commerce Grant funded
sidewalks will be capitalized,those costs will require a budget adjustment in the Street;Fund which will
occur in the mid-year budget adjustment.
Project costs reimbursable under the grant are as follows: ,
Fraser+ Equipment Street Lights Traffic KPG Design Commerce : Total
Fogle Design and Material on Warren Control Grant Funded Projected
Procurement at 4`"&5`h (Placeholder) Sidewalks ; Expense
2014 $9,815 - - $9.815
(Attual)
2015& $286,025 $200,000 $50,000 $100,000 $74,474 $540,686 $711,844
2016
Total $295,840(1) $200,000 $50,000 $300,000(2) $74,474 $540,686(2) $1,261,000
Notes:
1 Fraser+Fogle(Burwell Tunnel Designer of Record)expenses:$79,256(first design for City bid),
$52,470(second design for City bid),$164,114(material procurement design for City bid,and
development of final design for Navy bid). �
2 This amount has been reserved for Traffic Control. The sidewalk construction scope will be scalable
so that any funds not expended for Traffic Control will be used for additional sidewalk construction.
3 The gift letter to the Navy identifies the gift value at$700,000 to ensure the gift provided does not
exceed the gift identified in the MOA. The current value of the gift is approximately$465,000 and is
comprised of the final design,equipment and material procurement,and traffic control.
i
2
I
�
� Washington State
Department of 7�ansportation
Supplemental Agreement OrganizationandAddress
Number 2 KPG,P.s.
2502 Jefferson Ave
Original Agreement Number Tawma,wa 9sao2
N/A Phone: 253-627-0720
Project Number Execution Date Completion Date
HSIP-OOOS(433) 12/31/2016
Project Title New Maximum Amount Payable
Highway Safety Improvements,Yhasc 2 $ 2�3,460.14
Description of Wo�k
This supplement includes work associated with construction of sidewalk on State Street, Gregory Way and
Chester St and a new HAWK signal at the intersection of Burwell Street and Chester Street.
The Local Agency of �itX of Bremerton
desires to supplement the agreement entered in to with I���p �
and executed on l l/l$/�915 and identified as Agreement No. �1�A
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
See Exhibit A, attached
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read: nP''P"'�er 3l, 2016
III
Section V, PAYMENT, shall be amended as follows:
See Exhibit D,attached
$138,993.47(Original Amount)+(-$7.02)(Supplement#1)+$74,473.69(Supplement#2)_$213,460.14(New Maximum Amount Payable)
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
gy: i n �e• KP(' By:
.
Cons Itan ignature Approving Authority Signature
Date
DOT Form 140-063
Revised 09/2005
i
:
Exhibit "A" ,
Summary of Payments
Basic Agreement Supplement#2 Total ;
+ Sup. #1 '
Direct Salary Cost 53274.57 26898.59 80173.16 +
Overhead 70050.74 35368.95 105419.69
(Including Payroll Additives)
Direct Non-Salary Costs 2342.5 5481.50 7824
Fixed Fee 13318.64 6724.65 20043.29
Total 138986.45 74473.69 213460.14
DOT Form 140-063
Revised 09/2005
City of Bremerton
Puget Sound Naval Safety Project
KPG
Scope of Work
Purpose
The purpose of the Puget Sound Naval Safety Project is to improve pedestrian accessibility within
the vicinity of the Puget Sound Naval Shipyard.
Proposed Improvements
Proposed Improvements for the State St & Chester Ave Sidewalks project includes the following:
♦ Approximately 160 LF of concrete sidewalk(both sides of the roadway), HMA parking
strip, curb, gutter, ADA compliant driveway/alley approaches, and pedestrian scale
sidewalk lighting on State Street from the Puget Sound Naval Shipyard gate to
Gregory Way. See attached cross sections prepared by the CITY.
♦ ADA compliant curb ramps at the intersection of State Street & Gregory Way
♦ Approximately 25 SY of spot repair of existing concrete sidewalk along Gregory Way
from State Street to Chester Avenue.
♦ Approximately 245 LF of 6 ft. wide concrete sidewalk, curb, gutter, and ADA
compliant driveway/alley approaches on the west side of Chester Street from
Gregory Way to Burwell Street.
♦ ADA compliant curb ramps at the intersection of Gregory Way & Chester Street
(west side only).
♦ New Pedestrian Hybrid Beacon (HAWK Signal) at the intersection of Chester
Street & Burwell Street.
Assumptions
The following assumptions were identified to provide direction with design:
♦ The project will be combined with the City's Federally Funded HSIP Phase 2 and
Crownhill Elementary Sidewalks projects for advertisement using a "tied bid". The
tied bid set will utilize one set of contract plans and specifications. Separate bid
schedules will be prepared for each project.
♦ AutoCAD drafting and base mapping shall utilize City of Bremerton and American
Public Works Association (APWA) drafting standards.
♦ Conceptual typical sections (including pavement sections) and horizontal layout will
be provided by the CITY. A formal pavement section design will not be developed.
The CONSULTANT shall utilize the conceptual horizontal layout to proceed directly
to 60% design.
♦ All deliverables will be provided as electronic (PDF, Word, Excel, and AutoCAD
2015). The CONSULTANT will provide the final Bid Documents to ARC Document
Solutions for advertisement. Hard Copies of the Final Bid Documents will be ordered
and paid by the CITY directly from ARC.
♦ The CITY will provide legal descriptions for determining right of way and provide to
the CONSULTANT. Legal descriptions will be provided prior to the CONSULTANT
completing field survey.
City of Bremerton Page 1 of 10 KPG
Puget Sound Naval Safety Projecf 1/29/2016
♦ Right of way and/or easement acquisition will not be required. Temporary
Construction Permits, if required, will be drafted by the CONSULTANT and executed
by the CITY.
♦ A formal public involvement process/program is not included in�the scope of work.
Public involvement and coordination with business owners/residents will be handled
by the CITY.
♦ Traffic signal modifications at the intersection of State Street & Burwell Street does
not include relocation of existing traffic signal controller cabinets or mast-arm traffic
signal poles.
♦ Traffic Analysis and/or traffic counts are not included in the scope of work. See the
Additional Services section of this Scope of Work.
♦ Structural engineering is not included in the scope of work. See the Additional
Services section of this Scope of Work.
♦ As-Buitt drawings are not included in the scope of work. See the,Additional Services
section of this Scope of Work.
Information Provided by the City �
The following information will be provided by the CITY: �
♦ Conceptual typical sections (including pavement sections) and horizontal layout
♦ Best available aerial photographs and CAD-compatible utility maps.
♦ Complete front end iegal documents and Division 1.
♦ Boilerplate Division 2-9 special provision language.
Work Element 1 Project Management
The estimated project duration is 6 months. No design work will proceed without written
authorization from the CITY.
1.1 Provide project management administrative services including:
♦ Project set-up and execute agreement
♦ Execution of subconsultant agreements
♦ Preparation of monthly progress reports and invoices
♦ Record keeping and project closeout
1.2 Provide project management services including:
♦ Project staff management and coordination
♦ Subconsultant management and coordination '
♦ Prepare and update project schedule �
♦ Schedule and budget monitoring '
1.3 Coordinate with City staff, including preparation and attendance of u�p to 6 coordination
meetings throughout the duration of the project. Level of effort for this task is based on
an average of 2 Consultant staff at each of the following meetings: `
♦ Project Milestone (concept workshop, design review) meetings at the City throughout
the project duration. Milestone meetings will be combined with milestone meetings
for the HSIP Phase 2 and Crownhill Elementary Sidewalks projects. (Assume six (6)
meetings).
City of Bremerton Page 2 of 10 � KPG
Puget Sound Naval Safety Projecf ; 1/29/2016
Work Element 1 Deliverables:
♦ Monthly progress reports (6 months). �
♦ Project schedule and updates
♦ Meeting notes
Work Element 2 Utility Marking, Survey and Base Mapping
This Work Element includes survey and base mapping on State Street from the Puget Sound
Naval Shipyard gate to approximately 20 feet north of Burwell Street and Chester Avenue from
Gregory Way to 20 feet south of Burwell Street. No survey will be completed on Gregory Way
between State Street and Chester Avenue. Exact survey limits will be marked in the field and
verified by the CITY prior to mapping.
2.1 The CONSULTANT will make a one-call utility locate request and request utility
companies record drawings. Utility as-builts will be used to verify the location and type
of utilities within the limits of this project (i.e. adding the size and type of water main, and
type, location and symbol of water valves). Utility depths will not be shown with the
exception of those described herein.
2.2 Establish horizontal and vertical control points along the corridor and within the project
limits. Basis of control will be Washington State Plane North Zone, NAVD 88 vertical
datum. Control points will be established and will be made available for the Contractor's
use during construction. The CONSULTANT will locate, field survey, and calculate
positions for all monuments and control points throughout the project limits, using the
Washington State plane coordinate system. Conventional or GPS surveying methods will
be used on this project. Monuments or corners to be located and field surveyed include
side street monuments and property corners.
Field Survey and Note Reduction. Field mapping will include signs, mailboxes, fences,
trees, curbs, sidewalks, utility poles, and other surface features within the mapping area.
Perform note reduction of the field survey data.
Field survey to locate paint marks in Work Element 2.1 at approximate 50-ft intervals and
surface features (valves, manholes, catch basins, junction boxes, vaults). Irrigation
systems will not be included. The CONSULTANT will prepare a utility base map from this
information.
Perform observation and measure-downs of existing storm drain catch basins and
manholes. Document the approximate size, type, material (brick, concrete), and general
condition of the structures to confirm suitability for continued use, and approximate size,
material and location of storm drainage pipes will be documented. These observations
will be made from the surface.
Mapping work to prepare 1"=20' topographic base map and digital terrain model (DTM)
in AutoCAD 2015 format of the curbs, sidewalks and crosswalks within the within the
limits described above. Mapping will terminate approximately 20 feet beyond the ends of
the returns. The base map will include features within the mapping area as described
above. One-foot contours will be generated from the DTM. See assumptions for mapping
of features outside the areas described above.
City of Bremerton Page 3 of 10 KPG
Puget Sound Naval Safety Project 1/29/2016
Work Element 2 Assumptions: �
♦ No survey will be completed on Gregory Way between State Street and Chester
Avenue. If required, basemapping along Gregory Way will be prepared by using
aerial images.
♦ The CITY will obtain right-of-entry permits necessary for survey. ;
♦ The CONSULTANT will provide traffic control for the CONSULTANT's survey crew
when performing work within the roadway.
♦ Property corners will not be located as part of this scope of work.
♦ Any required pipe video inspection, potholing or smoke testing needed to verify the
condition or connectivity of drainage features will be performed by the CITY and the
information will be made available to the CONSULTANT.
Work Element 2 Deliverables:
♦ Electronic (AutoCAD 2015 and PDF) files of the topographic base map will be
provided to the CITY.
Work Element 3 Right of Way Calculations
This Work Element includes establishing the existing ROW along State Street and Chester
Avenue within the project vicinity.
3.1 Calculate existing right of way (per City provided legal descriptions) and show on project
base map.
Work Element 3 Assumptions:
♦ The CITY will provide legal descriptions for determining right of way and provide to
the CONSULTANT. Legal descriptions will be provided prior to the CONSULTANT
completing field survey.
♦ Right of way and lot lines will be defined using existing street monuments and their
relationship to public records and GIS data.
♦ No additional right of way or easements are anticipated.
♦ Preparation of legal descriptions is not included in this scope of work.
Work Element 3 Deliverables:
♦ Copies of the obtained legal descriptions for each parcel (15 parcels).
♦ ROW lines will be included in the basemap per Work Element 2.
Work Element 4 Geotechnical Engineering
This Work Element includes geotechnical investigation and recommendations necessary for
signal pole foundation design. See the attached Proposal from GeoResources for additional
information.
4.1 KPG's effort under this task includes review of reports and providing i�nformation such as
plans, figures, and details to the Geotechnical sub consultant as required to complete the
geotechnical investigation and report.
City of Bremerton Page 4 of 10 KPG
Puget Sound Naval Safety Project 1/29/2016
Work Element 4 Deliverables:
♦ Draft Geotechnical Report, One (1) electronic PDF copy of the report
♦ Final Geotechnical Report, One (1) electronic PDF copy of the report
Work Element 5 Environmental Documentation
This Work Element includes preparation of a City of Bremerton Environmental Checklist. The
CONSULTANT will compile and review environmental information from readily available public
domain and CITY provided resources to gain a general understanding of environmental
considerations along the project corridor.
5.1 Environmental Checklist. The CONSULTANT will prepare a City of Bremerton
Environmental Checklist. The Environmental Checklist will briefly describe the project and
address the project's effects on elements of the environment as outlined in the checklist.
The Checklist will include a list of permit requirements for the proposed project. To
prepare the Checklist, we will use project design information and other available studies
prepared for the project, such as drainage report, traffic report, and cultural resources
report, as necessary.
Work Element 5 Assumptions:
♦ The project will receive SEPA Determination of Non-Significance (DNS).
♦ CITY staff will prepare and publish the DNS.
♦ Public meetings or public hearings will not require CONSULTANT attendance.
♦ The CITY will complete Historical and Cultural Artifacts documentation meeting the
requirements of Governor's Executive Order 05-05 and all associated
documentation.
♦ NEPA documentation, Environmental Impact Statement and/or an Environmental
Assessment will not be required.
♦ Right of Way acquisition and/or permanent easements will not be required.
♦ Air Quality and/or Hot Spot analysis will not be required.
Work Element 5 Deliverables:
♦ An electronic copy (PDF and Word) of the draft Environmental Checklist.
♦ An electronic copy (PDF and Word) of the final Environmental Checklist.
Work Element 6 Stormwater pocumentation
This Work Element includes analyzing and documenting the stormwater design of the project in
accordance with the 2012 edition of the Stormwater Management Manual for Western
Washington (SWMMWW), which has been adopted by the City of Bremerton.
6.1 Review the existing storm water facilities within the limits of the project and perform an
off-site analysis. Prepare a map to delineate and quantify areas of new and replaced
impervious surfaces, both pollution-generating and non-pollution generating. Delineate
City of Bremerton Page 5 of 10 KPG
Puget Sound Naval Safety Project 1/29/2016
threshold discharge areas (TDAs). Determine the applicability of each of the 10 Minimum
Requirements to each TDA.
6.2 Prepare a Stormwater Site Plan (SSP) memorandum. The SSP will address the
applicable Minimum Requirements of the Surface Water Management Manual. A draft
SSP memorandum will be completed with the 60%design submittal and finalized with the
Draft Bid submittal.
Work E/ement 6 Assumptions:
♦ It appears that flow control requirements may not be triggered by this project. If
flow control requirements are triggered, Low Impact Development techniques such
as permeable pavement will be employed to satisfy the requirement.
♦ It appears that runoff treatment requirements may not be triggered by this project.
Runoff treatment, if required, will be addressed with the use of proprietary BMPs
such as Filterra or Modular Wetlands.
♦ Because the stormwater requirements applicable to this project are expected to be
minimal, the Stormwater Site Plan requirements will be documented in an
abbreviated, memorandum format.
♦ Stormwater improvements will be limited to stormwater catchment/conveyance
along the new curb line. The new stormwater main will be connected to an existing
system. There is sufficient depth to invert at the existing catch basin(s) to allow
connection of the new stormwater pipe without modification. There are no
deficiencies downstream of the connection point that will require improvements
outside of the project area.
Work Element 6 Deliverables:
♦ (1) electronic copy of the Draft Stormwater Site Plan Memorandum in PDF format
♦ (1) electronic copy of the Final Stormwater Site Plan Memorandum in PDF format
Work Element 7 Stakeholder & Utility Coordination
This Work Element includes the anticipated work necessary to coordinate with stakeholders and
franchise utilities to coordinate adjustment and/or relocation of existing franchise utilities.
7.1 The CONSULTANT will prepare draft temporary construction permits for the CITY to
issue on City letterhead. The CITY wilt coordinate signature of the permits with the
property owners. (Assume 2 permits)
7.2 The CONSULTANT will prepare a draft and final utility potholing plan during the 60%
design task. The potholing plan will be provided to the franchise utilities.and the CITY so
they may provide potholing of their facilities. Following the receipt of potholing data, the
basemap will be updated with correct horizontal/vertical location, size and material.
Work Element 7 Assumptions:
♦ 60% Design plans will be utilized for franchise utility coordination.
♦ All potholing of CITY utilities will be completed by the CITY.
♦ All potholing of franchise utilities will be completed by the respective franchise utility.
♦ The CITY will provide a complete utility contact list to the CONSULTANT.
City of Bremerton Page 6 of 10 KPG
Puget Sound Naval Safety Project 1/29/2016
♦ Utility undergrounding is not included in this scope of work.
Work Element 7 Deliverables:
♦ Draft Temporary Construction Permits in electronic (Word) format.
♦ Electronic PDF and/or AutoCAD drawings of preliminary design provided to franchise
utilities.
♦ (1) electronic copy of the draft utility pothole plan in PDF format
♦ (1) electronic copy of the final utility pothole plan in PDF format
Work Element 8 60% Design
This Work Element includes preparation of 60% Design Plans, Specifications and Estimates for
review and approval by the CITY. Plans shall be formatted to provide sufficient detail for
convenient field layout of all proposed facilities. City standard details and WSDOT standard
plans will be supplemented with project specific details as necessary. The 60% plans and
specifications shall be stamped by a licensed professional Engineer in the State of Washington.
8.1 The CONSULTANT shall prepare 60% plan sheets for review and approval by the CITY.
The 60% submittal will be based on the conceptual layouts provided by the CITY and will
include horizontal location of improvements with the following level of detail:
♦ Construction Limits
♦ Curb and radii
♦ Sidewalks, parking lanes, and planter strips
♦ Location and types of curb ramps
♦ Location and type of driveway and alley approaches
♦ Location of traffic signal/HAWK signal equipment
♦ Location of pedestrian illumination
♦ Channelization and signing
♦ Storm drainage improvements (if applicable)
♦ Utility impacts, required relocations and pothole locations
♦ Impact to private improvements both inside and outside of public right of way
In general, vertical location of improvements will not be specified on the Plans unless
there are conflicts with existing utilities and/or surface improvements. Vertical information
will be provided at locations where proposed improvements are confined by existing
grades. The CONSULTANT will provide Senior level QA/QC prior to submitting to the
CITY.
8.2 The CONSULTANT shall prepare 60% quantities and opinion of probable cost for review
and approval by the CITY.
8.3 The CONSULTANT shall prepare 60% specification documents, Divisions 1-9. The
CONSULTANT will include additional special provision language as needed. Legal
documents and appendices will not be included in this submittal.
8.4 The CONSULTANT will prepare an Illumination Design Report and AGi32 computer-
aided modeling of the illumination system. The illumination design report will include a
summary of City of Bremerton lighting design standards, proposed lighting levels and all
City of Bremerton Page 7 of 10 KPG
Puget Sound Naval Safety Project 1/29/2016
supporting calculations and documentation
8.5 The CONSULTANT shall attend a 60% design review meeting.
Work Element 8 Deliverables:
♦ Electronic (PDF) half size and full size 60%design plans
♦ Electronic (PDF & Word) 60% design specifications
♦ Electronic (PDF & Excel) 60%design opinion of cost
♦ Illumination Design Report
♦ Meeting notes from 60% submittal design review meeting
Work Element 9 Final Design
This Work Element includes preparation of Draft Bid and Bid Document Plans, Specifications
and Estimates for review and approval by the CITY. Plans shall be formatted to provide sufficient
detail for convenient field layout of all proposed facilities. City standard details and WSDOT
standard plans will be supplemented with project specific details as required. Draft Bid and Final
Bid Documents will be stamped, signed and dated by a licensed professional engineer in the
State of Washington.
9.1 The CONSULTANT shall prepare Draft Bid plans for review and approval by the CITY.
The Draft Bid submittal will include all comments received from the 60% review. The
CONSULTANT will provide Senior level QA/QC and constructability review by KPG
construction management staff prior to submitting to the CITY. The plans are estimated
to have the following sheets:
Sheet List
Title/index sheet (1 sheet)
Legend, Abbreviations, General Notes and Survey Control (1 sheet)
Typical Sections and Details (1 sheets)
Channelization and Signing Details (1 sheet)
Restoration Details (1 sheet)
Site Preparation and Erosion Control Plan/Plan (2 sheets)
Roadway, Restoration and Storm Alignment Plan and Profile (2 sheets)
Intersection Grading and ADA Ramps Plan (2 sheets)
ADA Ramp Details (2 sheets)
Channelization and Signing Plan/Plan (2 sheets)
Illumination Plans & Details (1 sheets)
Pedestrian Hybrid Beacon Plan and Notes— Burwell & Chester (2 sheets)
Pedestrian Hybrid Beacon Wiring Diagram — Burwell & Chester (1 sheet)
Signal Pole Specifications and Schedule (1 sheet)
Traffic and Pedestrian Control Plans (2 sheets)
TOTAL = 22 sheets
City of Bremerton Page 8 of 10 KPG
Puget Sound Naval Safefy Projeci 1/29/2016
Traffic and Pedestrian Control plans will utilize WSDOT TC Plans and City standard plans
and be for the Contractor's reference only. The CONSULTANT will not develop site specific
Traffic and Pedestrian Control plans. The Contractor will still be required to develop site
specific traffic control plan for all construction activities.
9.2 The CONSULTANT shall prepare Draft Bid quantities and opinion of probable cost for
review by the CITY.
9.3 The CONSULTANT shall prepare Draft Bid specification documents including CITY
provided legal documents, division 1 and City GSPs. The CONSULTANT will include
additional special provision language as needed. The Draft Bid submittal witl include all
comments received from the 60% review.
9.4 The CONSULTANT will attend a Draft Bid design review meeting.
9.5 The CONSULTANT shall prepare Final Bid Documents for advertisement by the CITY.
The CONSULTANT will provide Senior level QA/QC prior to submitting to the CITY. The
final bid documents will include all comments received from the Draft Bid review and will
be complete set of contract drawings.
9.6 The CONSULTANT will prepare Maximum Extend Feasible, Public Interest Finding and
"Tied Bid" documentation and provide to the CITY.
Work Element 9 Assumptions:
♦ Specifications will be based on 2016 WSDOT Standard Specifications.
♦ Design Plans and Specifications will be packaged with the HSIP Phase 2 and
Crownhill Elementary Sidewalks plan set and advertised as a "tied bid". A separate
bid schedule will be prepared for each project.
♦ WSDOT concurrence review will not be required.
♦ The CONSULTANT will provide the final Bid Documents to ARC Document Solutions
for advertisement. Hard Copies of the Final Bid Documents will be ordered and paid
by the CITY directly from ARC.
Work Element 9 Deliverables:
♦ Draft Bid Design Submittal
o Electronic (PDF) half size and full size design plans
o Electronic (PDF & Word) specifications
o Electronic (PDF & Excel) opinion of cost
o Meeting notes from Draft Bid submittal design review meeting
City of Bremerton Page 9 of 10 KPG
Puget Sound Naval Safefy Projecf 1/29/2016
♦ Bid Document Submittal
o Electronic (PDF) half size and full size design plans
o Electronic (PDF & Word) specifications
o Electronic (PDF & Excel) opinion of cost
o AutoCAD 2013 drawing files of the Final Bid Documents Plans.
♦ Maximum Extend Feasible, Public Interest Finding and `Tied Bid"documentation
Work Element 10 Assistance During Bidding
10.1 Prepare addenda and respond to bidders questions relayed through the CITY. It is
assumed that the CONSULTANT will prepare two (2) addenda.
Additional Services
The CITY may require additional services of the CONSULTANT. The scope of these services
will be determined based on the unanticipated project needs or other considerations at the sole
discretion of the CITY. This work may include items identified in the current task authorizations
as well other items, which may include, but are not necessarily limited to the following:
♦ Structural Engineering
♦ Right of Way plans, acquisition, appraisals, or assistance with condemnation
proceedings
♦ Temporary Construction Easements
♦ Arborist Investigations
♦ Construction Management & Inspection Services
♦ As-Built Drawings
♦ Hazardous Materials Testing
♦ Traffic Analysis
♦ Traffic Counting
These services will be authorized under a future contract supplement if necessary. At the time
these services are required, the CONSULTANT shall provide a detailed scope of work and an
estimate of costs. The CONSULTANT shall not proceed with the work until the CITY has
authorized the work and issued a notice to proceed.
City of Bremerton Page 10 of 10 KPG
Pugef Sound Naval Safety Project 1/29/2016
HOUR AND FEE ESTIMATE
ProJect: City o1 Bremerton K��'
Puget Sound Naval Setety Pro�eet Inrcrdisclplinary Design
February 12,2016
Labor Hour Estlmate
� OA,'OC Pro�ect Sr.Pro�ect Pro�ecl Dealgn CAD Senlor Survey Party Survey Survey ConsUucllon
En Ineer Mena er En Ineer En Inear En Ineer 7ec�nlclan Surva or Chlel Chelnmen Technlclen Mene er Clerlcel Hours To�el Fee
f 181.26 S 83.72 f 141•81 f 108.42 S 70.00 f 98.03 S 117.14 f 107.29 S 78.82 f 102.34 S 110.88 S 72.77
Task Descri tlon DIrec�Sala Cost DSC S 70.67 f 36.54 S 55.29 S 42.27 S 28.85 S 9822 f 45.67 S 41.83 f 30.77 S 39.90 f 43.27 f 28.37
Work Elament 1•Pro eet AAana ement/Coordinatlon/AdminLstratbn
1 1 Administralion Services(6 Monlhs) _ � ._ I 6 I .. � 6 12!$ 998.93
_ .. _. ..._..._ _. ... .___..__.
� 1 2 Managomeni Serwces ! 8 � _ _ _ 8'$ 749 77
13 Coordina6onMeelings(6Meetingsi_ __ 4 I 16 .8 , __.,___ _.. _ 28�$ 3,091.94
Reimbursablc e enses-see breakdown for tictails '$ ��2'S�
TaskTotels 4 30 0 8 0 0 0 0 0 0 0 6 A8:f 5013.13
Work Element 2-Surve and Base Me In
21 UlilityLocatos . _ 4 _. 4 $ _ 468_56
22 FioldSurvoy86asemapping _,_ _ . _ 4 32 _12 24 __ I 721$ 7,305.04
Roimbursable e enses-soo breakdown lor details $ 172 50
TaskTotel 0 0 0 0 0 0 8 32 12 20 0 0 76 S 7946.10
Work Ekment 3-R ht oi Wa Cakulatbns
3 1 Calculale ROW 8 Add to Basomap . . I - � 8 � ....I_ 8 _.. '. _.,_ 16I 5 1,755 83
� Reimbursablo e�onses see breakdown�or dotails i � I I � � � ' �$ -
Task Total I 0 0 � 0 � 0 0 � 0 I 8 0 � 0 8 0 ! 0 16 S 1,755.87
Work Ekment 4-Geoleehnkal En Ineerin
4.1 Develop SuePon Documonis . 2 I 4 i 6 $ 621 12
Reimbursablo omonses see bieakdoxm for dotails I $ 4,96d 00
raskrocai I o z I o I a i o I o I o o I o 0 o i o i s i s s,sas.�z
Work Element 5-Envlronmental Doeumentetbn
51 Env�ronmentalCheckl�sl I � 2 �6 � ._._ .. ' 4 _ 2315 2,394.46
Reimbursable o�onses see breakdown lor dotails � I � i g -
Taek Tolal � 1 2 � 0 � 16 I 0 � 0 � 0 0 I 0 0 0 4 I 23�S 2,394.46
Work Element 6-Slormweter poeumentatbn
6.1 Stormwater Requiremenis Analysis,Ofis�e Analysis 8 Map I ' 4 i 6 ._ 6 _ . � 161 5 1.661.75
62 Slormwatcr Sito Plan Memorandum I I Z 6 4 _ I �ZI.S _1,23D.73_
Roimbursable e ensos-soo breakdown lor delails ' � g
TeskTotal 0 0 6 12 10 � 0 0 0 0 0 0 0 28 f 2891.87
Work Element 7•Stakeholder 6 Utll Coordinatlon
7 1 Temporary Construction Permils(Assume 10) _ 2 _ 8 _ i .. _ 6 161 5 1,491.39
72 Utiliry Potholing Plan 1 2 8 ; I 11 I S 902.54
Reimbursable e enses-soo breakdown lor details �g
Tesk Totel 0 3 0 10 8 0 0 0 0 0 0 6 27!S 2 393.82
Ciry of Bremeeon
Pugel Sound Naval Salery Pro7oct 1 of 4 KPG
Hour and Fee Eslimate February 2016
HOUR AND FEE ESTIMATE
Pro�ect: Clty uf 8remerton K p G
Puget Sound Navel Safety ProJeet Inrcrdlsclpilnary Design
February 12,2016
Lebor Mour Eslimete
ONOC ProJecl Sr.Pro�ect Pro�ect Deslgn CAU Senlor Survey Perry Survey Survay Conehuctlon �
En Ineer Mena e En Ineer En Ineer En Ineer Technlclen Surve or Chlel Chelnmun Technlclen Mane er Clerical Houre Total Fee
S 181.26 S 93.72 S 141.81 S 108.42 f 74.00 S 88.03 f 117.14 S 107.29 f 78-82 S 102.34 S 110.88 S 72.77
Task Deseri tlon Dlractsela Cost DSC f 70.67 S 36.54 f 55.29 S 42-27 S 28.85 f 38.22 E 45.67 f 41.83 S 30.77 S 39.90 S 43.27 t 28.37
Work Element 8•60%Desl n
81 60%DesignPlans 2 8 12 50 82 � 54 0 D I 0 � 0 0 0 __ 208 $ 19.59640
C��vc• . . __ . I I 2 .. . I I _� __
� Le9entl . - ._ - ._ j 2 I I _
Gcla Is 13 shccic� I I P _ I _ I � . _ _ _
_ , _ _. �-
Sile Prep�Tf.S(:(2�hcclsl ._ . I _ I 12 i 8 . ' _ _ � I ._._.._._.__. __
- _.. _'
Ra�dway!Slo�m!:shr.r.lsl ._. � 2 12 12 � 8 : __�� _...
Ir.lcrsncl:o�GraUi�q(?s�cot) I _2 I 12 6 � 8_ ' _ ' I, I
ADA Ramps(2 shcr,is) 2 I 16 fi I B I � I _�
.. c;h1n 6 s�qnina l2 sh�Hs; � i �2 _ 4 t? I •1 __ I _ I .__.
Illumi��lion(lshcel� I I z ' » 2 � � .,
HAWK Signel-Bunvoll 8 Checir.•12 shoels� I 8 Z a 2A 4 _,. � _.
82 60%Design OuanLUos 8 Eslimale I 2 8 I 4�____ . _ ._. _._ _ _ _ �4 S 1,350 78
83 60%Dosign ecilicalions . _� � d 2 i _. 8 ..!--� �- .. _ . . ._. .. ._ 24�$
I 8 2,470 51
8.4 Illuminahon Design Roport _ __. _ 2 .. I .. _ 4 _. . . .. _ i 6�$ 48343
B.5 60�Desgn Ro�ew Meeung 4 I .4 _ _ _ I _._ __ Bi$ 808.56
Roimbursa6le e ensos-see Creakdown for detals I I ,$ 172 50
Tesk Total 4 20 I 14 70 BO 54 0 0 0 0 0 8 260 I S 24,882.18
Work Ekment 9-Flnel Des n
9 1 Drall Bid Plans 2 ' 4 10 40 62 36 0 ' 0 D 0 8 � 0 _ 1621$ 15,497.07
Covcr 2 � � 8 -�
Lr.gentl _ _. _ .-. . ._ � . . � _ . ._ _ . _ . . __-
Dela�ls;3 shr.clsl .._ . . _ 6 � .. . .--. � '
Silr f'rep/TESC(2 shcclsj _ � F i 4 - �
I103EW2Y`SIO'T(Z SF.CCISi _. I z ' c e I a _ ____
I�Icrsaclw�Graoing(2 shr.^11 2 _� 12 G n i _ � _..
ADA Ramps 12 shcr.isi 2 : 8 � 6 a � �__ I
Cha�3 ciqninq(2 snr.cls) �" 2 � B _ 4 _' _ _' . ! - ..
Illuminali�n(lshccll I �Z h 2 _ � - -
HAW K S�qn;�l-Burvv�ll 8 r,hetl^r(3 shoelsl ! 2 � 2 B 24_ 2 . _
7ntf:c l:onlrol ! 2 4 I 4 _. 1 �
92 Drall Bd Ouantities&Estimale I Z � 4 ._I . 6.3 621 12
i
93 Dre11BidSpecdications _ 2 � __. 4 _ _ 2 . ._. � . . . ' . . __ � _._ S 1,53638
B 16
9 4 Final Bid Plans,SpecilKalions 8 Estimale 2 B 4 4 2 � _._ I � d___ 24!S 2.329 08
9.5 MEF,PIF&Tied Bid Documenlalion 2 2 � i _ I .. 4�S 335 44
Rcimbursable e onsos-see breakdown for delails � �$ -
TeskTotal ' 6 20 10 50 68 38 0 0 I 0 0 I 8 12 212 S 20318.09
Work Ekment 10-Avsletanee Durin Biddin
10.1 Bidder Oueslions/Atltlenda(Assumo 2 Adtlend) 6 4 4 - --. - �4 $ �'Z9�99
Reimbursablo e enses-soo breakdown lor dotails � ' � $ -
Tesk Total I 0 6 0 4 4 0 0 0 0 0 0 ! 0 14 S 1 291.89
TOTAL HOURS AND TOTAL ES7IMATED FEE 15 83 30 I 17C 180 I 92 16 i 32 12 32 8 36 I 710 I S 74,473.69
r 1
Orrect Sala Cosfs $ 70 67 $ 36.54 $ 55 29 $ 42 27 $ 28 B5 $ 38 22 $ 45.E7 $ 41 83 $ 30 77 $ 39 90 $ 43 27 $ 28 37
Overhead 131.49k $ 9292 $ 4805 $ 7270 $ 5558 $ 3793 $ 5026 $ 6005 $ 5500 $ 4046 $ 5246 $ 5690 S 3730 13149%
FixedFee@30h $ f767 $ 914 $ 1382 $ f057 $ 721 $ 9.56 $ 1142 $ f046 $ 7.69 3 998 $ 1082 $ 709 2500%
TotalLa6oiRale $ f8126 $ 9372 $ 14181 $ 10842 $ 74.00 $ 9803 $ 117-14 $ 10729 $ 7892 $ 10234 $ 11098 5 7277
Ciry of Bremerton
Pugot Sound Naval Safety Pro�ecl 2 of 4 KPG
Hour and Fco Estimale February 2D76
HOUR AND FEE ESTIMATE
Project: Clty of Bremerton ���
Puget Sound Neval Sefety Pro�ect Imerdlsciplinary Design
February 12,2016
Reimbursable Breakdown
Work Element 1-Project Management/Coordinetion/Adminislration
Mileage(est 300 miles x 0.575 cents/mile) __ _ _ _._ _.. $ 172 50
Task 1-TOWI S 172.50
Work Element 2-Survey and Base Mapping _. _
Mileage(est.300 miles x 0 575 cents/mile) _ _ _ _ $ __ 172.50
Task 2-Total $ 172.50
Work Element 3-Ri ng t of Way Calculations _ _ _ _._ ___ _.
Task 3-Total S
Work Element 4-Geotechnical Engineering _ _ _ _ _ _ _. _
GeoResources $ 4,964 00
Task 4-Total $ 4,964.00
Work Element 5-Environmental Documentation
Task 5-Total S
Work Element 6-Slormwater pocumentation
Task 6-Total S
Work Element 7-Stakeholder&Utili Coordination _ _. _ _. .
— -- $ -
Task 7-TaWI $
Work Element 8-60%Design _
_ Mileage est.300 miles x 0 575 cents/mile) _ __ _ $ ._ 172.50
Task 8-Total $ 172.50
Work Element 9-Final Design __ _ _ _ __
-- - - $ -
Task 9-Total S
Work Element 10-Assistance Durin9 Bidding
— - -- _ —
$
Task 10-Totel S
TOTALREIMBURSABLES: $ 5481.50
City of Bremerton
Puget Sound Naval Safety Project 3 of 4 KPG
Hour and Fee Estimate February 2016
FEE SUMMARY K P G
Interdisciplinary Design
Project: City of Bremerton
Puget Sound Naval Safety Project
February 12, 2016
' Description " Estimated Fee
Work Element 1 - Project Management/Coordination/Administration $5,013.13
Work Element 2-Survey and Base Mapping $7,946.10
Work Element 3 - Right of Way Calculations $1,755.83
Work Element 4-Geotechnical Engineering $5,585.12
Work Element 5- Environmental Documentation $2,394.46
Work Element 6- Stormwater pocumentation $2,89�•87
Work Element 7-Stakeholder& Utility Coordination $2,393.92
Work Element 8-60% Design $24,882•1$
Work Element 9 - Final Design $20,319.09
Work Element 10-Assistance During Bidding $1,291•99
;Total Estimated Fee $74,473.69
City of Bremerton
Puget Sound Naval Safety Project 4 of 4 KPG
Hour and Fee Estimate February 2016
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
KPG
City of Bremerton
Puget Sound Naval Safety Project
Direct Salary Direct Salary
Classification Cost Total Hours Total Cost
QA/QC Engineer $70.67 15 $1,060.05
Project Manager $36.54 83 $3,032.82
Senior Project Engineer $55.29 30 $1,658.70
Project Engineer $42.27 174 $7,354.98
Design Engineer $28.85 180 $5,193.00
CAD Technician $38.22 92 $3,516.24
Senior Surveyor $45.67 16 $730.72
Survey Party Chief $41.83 32 $1 ,338.56
Survey Chainman $30.77 12 $369.24
Survey Technician $39.90 32 $1,276.80
Construction Manager $43.27 8 $346.16
Clerical $28.37 36 $1,021.32
DSC Subtotal 710 $26,898.59
Overhead (OH) Cost (Include Salary Additives)
OH Rate x DSC 131.49% x $26,898.59 = $35,368.95
Fixed Fee (FF)
FF Rate x DSC 25.00% x $26,898.59 = $6,724.65
DSC Total $68,992.19
Direct Reirnbursables
Mileage $517.50
GeoResources $4,964.00
Reimbursable Total $5,481.50
Total Agreement Amount $74,473.69
City of Bremerton 2/12/2016
GeoResources, LI,C
Ph.253-896-1011 5007 Pacific Hwy. E,Suite 16
Fx.253-896-2633 Fife,Washington 98424-2649
January 26, 2016
City of Bremerton
c/o KPG
2502 Jefferson Avenue
Tacoma, Washington 98402
(253) 627-0720
Attention: Mr. Aaron Knight, PE
aaron @ kpg.com
Proposal for Geotechnical
Engineering Services
Puget Sound Naval Shipyard— Safety
Project
Signal Pole Foundations
Bremerton, Washington
DocID: KPG.Bremerton.PSNSY.P
INTRODUCTION AND SCOPE
We are pleased to submit this proposal for geotechnical engineering services for -
the proposed Puget Sound Naval Shipyard — Safety Project in Bremerton, Washington.
According to information provided by you, the proposed improvements will include a new
single pole.
Our understanding of the project is based on our January 14, 2016 meeting with
you. We were not able to visit the site prior to preparing this proposal and no conceptual
plans or drawings were provided.
We understand that the project is part of the Puget Sound Naval Shipyard—
Safety Project; you are requesting a single geotechnical borings at a corner SW Burwell
Street and Chester Avenue. The purpose of our services is to evaluate the surface and
m nts as a basis for evaluatin the
subsurface conditions along the proposed improve e 9
geotechnical feasibility of the project as well as providing geotechnical recommendations
and design criteria. Specifically, the scope of services for this project will include the
following:
1. Conducting a geologic reconnaissance of the site area;
2. Exploring the subsurface conditions along the alignment by drilling one
boring at each of the proposed intersections;
3. Performing a grain size analyses on a representative sample collected from
our boring;
4. Addressing the appropriate City of Bremerton public works standards;
Providing recommendations and design criteria for signal pole foundation in
accordance with current WSDOT or City of Bremerton requirements;
5. Providing geotechnical recommendations for site grading including site
preparation, subgrade preparation, fill placement criteria, suitability of on-
KPG.Bremerton.PSNSYSafetyProject.Pr.doc
January 26,2016
Page 2
site soils for use as structural fill, and drainage and erosion control
measures;
6. Providing conclusions regarding suitable types of retaining walls, and
include geotechnical design criteria for the proposed wall, including both
internal and global stability;
7. Review of the standard City's flexible pavement design standards
SUBSURFACE EXPLORATIONS
As stated, we propose to explore surface and subsurface conditions by drilling a
one single boring in the SW corner of each of the above referenced intersection. The
boring location will be determined in conjunction with GeoResources, KPG, and the City
of Bremerton based on the proposed improvements, traffic impact and underground
utility constraints.
Our borings will be drilled with either a small rubber track-mounted drill rig or
trailer-mounted drill rig using hollow-stem auger. The drill will be operated by a licensed
drilling contractor working for GeoResources, LLC. Throughout the drilling operation,
soil samples will be obtained at 2'h- or 5-foot depth intervals by driving split-spoon
samplers in accordance with the Standard Penetration Test procedure (ASTM:D-1586).
A geologist or engineer from our office will continuously observe the borings, log the
subsurface conditions, collect representative soil samples, and transport all samples to
our laboratory for further visual examination and testing. After drilling, each borehole will
be backfilled with bentonite chips, as required by the Washington State Department of
Ecology.
Before drilling, GeoResources, LLC will mark the proposed boring focations and
request the local utility locating service to mark any underground utilities at each
exploration location. Additional assistance from the City may be needed for any private
utilities or services. On the day of drilling, we assume that our equipment and crew will
be given ready access to the work locations and that any necessary rights-of-entry
issues will have been obtained in advance by KPG or the City.
Because our borings will be drilled in the existing roadway right-of-way,
temporary traffic control and flagging services may be required. We expect that there will
be sufficient room to perform our boring on the sidewalk but still within the right-of-way.
As such, traffic control should only be limited to signage for shoulder work/sidewalk
closure. We do not expect that a traffic lane closure will be necessary. Because we will
be working for the City, we do not anticipate that an actual right-of-way permit will be
required, however, we will have the City review the temporary traffic control plan prior to
beginning our field work.
GEOTECHNICAL LABORATORY TESTING
We propose to conduct a series of geotechnical laboratory tests on selected soil
samples obtained from our explorations in order to evaluate the engineering and index
properties of the site soils. These tests typically will include moisture content
determinations and grain size analyses. We propose to perform one sieve analysis on
representative sample from each boring. We will store all samples for 30 days after
testing has been completed and then discard them, unless prior arrangernents are made
for long term storage.
KPG.Bremerton.PSNSYSafetyProject.Pr.doc
January 26, 2016
Page 3
SCHEDULE AND BUDGET
We estimate that we can begin our subsurface explorations within two weeks of
receiving our notice to proceed, contingent upon subcontractor availability. We
anticipate that field work will require less than one full day, with subsequent laboratory
testing will require an additional 5 days. A draft report will be available within two weeks
of completion of our laboratory testing. Our final report will be completed within 5 days of
receipt of any comments from the City or design team.
The professional services listed above will be provided in accordance with our
current Fee Schedule and General Conditions, copies of which are attached and parts of
this proposal. Copies of these schedules are attached. Using these rates, we estimate
that we can complete the aforementioned scope of work within the budget shown below.
Geotechnical Enqineerinq Report Cost
Drilling Contractor(1 @ 30 feet) .........................................$1,734
TrafficControl Signage...........................................................$157
Field engineering and transportation ...................................$1,033
Laboratory testing...................................................................$115
Geotechnical research, analysis, and report preparation .....$1,925
Total Geotechnical Costs �4
Optional Items Cost
Traffic Control Flagging for Lane Closure (full day)...............$1,299
tf adverse conditions arise during our evaluation, we will inform you as soon as
possible and will perform no work beyond the authorized scope without your written
approval.
POST REPORT SERVICES
After completion of our final report, we will be available for consultation regarding
the geotechnical and hydro-geological aspects of the project. This typically involves
written correspondence, telephone conversations, and meetings with the owner and
design team; supplemental analyses due to design changes; and preliminary or informal
reviews of design details, plans, and specifications. If needed, these services will be
performed on a time and material basis in addition to the above budget.
GeoResources
Hour and Fee Estimate
Project: City of Bremerton
Puget Sound Naval Safety Project
February 12,2016
Labor Hour Estimate
Field Geotechnical Project Total
Geolo ist En ineer Mana er Clerical Hours Total Fee
$ 94.66 $ 102.02 $ 137.92 $ 56.58
Task Descri tion Direct Sala Cost DSC $ 33.46 $ 36.06 $ 48.75 $ 20.00
Work Element 1 -Geotechnical En ineerin �
1.1 Field Engineering and Transportation 8 1 1 10 $ 997.23
1.2 Laboratory testing 2 2 4 $ 393.36
- - - - -- -. � .- - - --
1.3 Geotechnical Research&Analysis � 1 1 1 _ 3 $ 334.60
1.4 Report Preparation 4 2 1 ! 7 $ 720.60
1.5 Internal Report Review __ 2 2 _ 1 _ 5 $ 531.28
_ 1.6 _ Report Production&Printing _ _ _ _ _� � _ _ 3 _ 3� $ _ 169.75_
Reimbursable ex enses-Drillin Fees and business milea e � � $ 1,817.19
Task Total � 17 8 ! 4 3 32 $ 4,964.00
Hourl rates are based on the followin :
Direct Sala Costs $ 33.46 $ 36.06 $ 48.75 $ 20.00
WSDOT A roved Indirect Cost Rate @ 152.91% $ 51.16 $ 55.14 $ 74.54 $ 30.58 152.91%
Fixed Fee @ 30% $ 10.04 $ f 0.82 $ 14.63 $ 6.00 30.00�/
Total Labor Rate $ 94.66 $ f02.02 $ 137.92 $ 56.58
City of Bremerton
Puget Sound Naval Safety Project 1 of 1 GeoResources
Hour and Fee Estimate February 2016
�
� Washington State Transportation Building
�e�?aP$147�'t'�t Of �1'a1�5tl�P��t[01! P.O.Box�4 300 Avenue S.E.
' Olympia,WA 98504-7300
Lynn Peterson 360-705-7000
Secretary of Transportation TTY:1-so0-s33-s38s
wtivf;J.wsdot.wa.gov
November 16, 2015 .
GeoResources, L.L.C. '
5007 Pacific Hwy. E, Suite 16
Fife, WA 98424
Subject: Acceptance FYE 20141CR—Risk Assessment Review
Dear Mr. Keith Schembs: ' �
Based on Washington State Department of Transportation's (WSDOT) Risk
Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed
FYE 2014 ICR of 152.9�%. This ICR acceptance is in accordance with 23 CFR 172.7 ,
and must be updated on an annual basis. This rate may be subject to additional review
if considered necessary by WSDOT and will be applicable for:
❑ WSDOT Agreements
� Local Agency Contracts in Washington State only
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with the finn is
responsible for detennining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7104 or via
email consultantrates(c�wsdot.wa.�.
� Regards;
� I K. JONSO
Manager, Consultant Services Office
EKJ:rck
Acceptance ICR Risk Ass�ssment Review
XYZ Corp. •
Overhead Schedule
Fiscul Year Ended December 31,2006
• GeoResources,LLC
•ludireet Cost Rate Schedule
For the Year Ended December 31,2014
' Flnaodal
Slatement Acceptcd
DeserlpHon Amount CeoremurcaAdJ. WS1HY1'Adl• Ref. Amount %
Direq Lebor 389,666 PR e 1 �i',
Dlrect Lebor 5389,666 � 100.00%
�6f�ICd C09b:
Fringe Benenb
� Varation Pry 57,098 PR e S7,098 1.82%
Slrk Pny 52.971 PR a 52,971 0.76%
Holldey Pay E4.968 PR a 54.968 1.27%
PayrollTaxa Y40,546 a $40,546 10.41%
Halth Imvrence $74,396 2 34,]% 8.83%
Profit Sturu�g(401-k) 598,757 1 98,753 25.74%
heluing f2,109 e 2,109 D.54% ,
Totel FtiMge Bmellta 3190,64 L SO SO S 190,641 48.98%
Cenerel Overdead '
PRe,AI.
[odiroetLabor SZI7,790 ($4,054) A(0 5213,7]6 54.65%
Bid&Proposell�b� SL0,422 PRe 10,422 2.67%
Advatlsing Lebor 3999 (999) PR e 0 D.00%
Rmt 26,426 . a 26,426 6.78Yo
T�avel 41,444 (].070) e,AQj A 36,374 9.85Yo
�1Q1 A.
71avd-Mmla 0 3,070 0 Adj l l 3,070 0 79% �
Inturena 76,955 b 76,955 94896
Tdeplione 10,610 ' a 10,6I0� 2,72%
UriGtla 1.988 e 1.986 0.5196
Texe @ LimLvns 17,288 (295) e,Adj6 16,997 43696
Deprecinrimi&Amort'vation 31,007 (30,954)'a,A7,A9 53 0.41%
Dua;&Subscriptions 0 3.092 At�j 8 3.092 0.79%
Bntataimeat 3,569 (3,569) a,A2 0 0.00°/.
Pro[essimet Aea 9,879 (1.39� c,N 6,4B4 1,66% �
Intcot 504 (504) e,Ad�3 (0) 0.00%
Comyutc 0 1 I.D77 , Adj C I 1,077 2.64%
;A4f4. �
Supplia&Miuzllanmua 43,497 (14.169) (1,6I8) AqjB 25,710 6.60°/.
Yoml Cenerel Over6ead $450,�79 SO (545,788) 5404.991 107.93%
Totel l�dlreet Corts&OvuAead S(v11,220 SO (545,368) 5595,872 15291Ye �
• IndlrectCoetRete(LaarFCC) 164.56h 16456% 157.91X
Fudllfi�Cmt of Capital SO 0.0096
$641220 EO (545,788) 5595,67t
Totel Ftneadal Statemeat 6ryense EI,OJ0,886 d
lndlrect Cost Rate Qncludu FCC� 152.91 SL
Georrraurces,IlC-►n Aoces+
"l�idired Coef Rafe aJ1l1 tabJedlo WSDOTAudll"
Referencn
Ceoresourem,LLC AdJuehnenU:
Ta�rdum,eavh basu,pmpazed by Armwr VicJevmeq PLLC Certibed Publlc A000uacants.
CPA p�wid�e�juetmrnt+upan mx rrtum mmplaion et whleJ�Nne the a�jmN�mts e�e posted into Qwd�oola,Preartod timrcial sletanmm reflau Past
Ceermewcea,LLG lnAirx�Curf Raa-No�Audltcd
aw..wmr�A:
a xowaineeymwenorawwremw
n awoMw�,�o.,wewd►.purmweoorem�a.avarm.e
Bum Yro1W14W F�y Nm dlnatlyb W9�OT B10MvG Fa��1
0 9umTeWE�pma�
BumeuppW�Nhe�IMp E4�elly In W9WT BIOMW Fomrl
AdJ A MUm Tm'�I W W
/�0 MWe�Owl&bmpbir
�C WelmCempW��
1 Bum�01NIP�Mbn,IMndnolybWB00febnd�NFo�mM
z BumiNanhWYnne.,MenNactlybW8DCT8WWrAFam�1
PR lumPrylal'VR",iMnM1omp�ra�Eeeum�nbaplttYYoIeWBDO75�oWNFam�18p�el0eliuWm�
W�D7Al�:
AI�crosaeaNveampmelloanpaNCM,48CFR71.205fi(p1
A2 Bn1a�aluencap,f7569,uonlloweblcpa714D5-14
A7 Bnldebtcallxtioncwta,EU95,wnlbwoblepa31.205-3(aaowuradvablowrlamaflBroton9um¢lal�etmua��uraea36be+iw)
A4 Cash mwib�uimv,S 1250,wnlbwnble per 71.205-8
AS INaffii,f304.unn1lowablepQJ1-205-20
AG Pawml PrqiBytmced,S295,unnllown6le na 21-205J11(E)(5)
A7 OandwN.f I 1,119,unallowoble pa l 1-203�49
AB IRS Seelion 461(p),2767.95,wellowahlepa 31.205-27 atd-17 OS umamwna6ludoamiatlerta�unallowublape 71.201•1(J)Iar bml 2367 95
� A9 INS Sm 179,719835,unelloweblo pa 71 205-I 1,Cw�Dlacbs�vaOucUonalre sDea�illrstete 179�nd ellarrnble
AIO[aborariateinmmt(hmch1,f2640,unnllowablopa71.2Q5-14
A�i 2014 Tnx Rdum disallows SI535 T8c8 bu131.205-46 doa not epedfimtly mrntian if the IRS diselloxs ihrn the Sdoller b PAR disallov�ed