Loading...
HomeMy WebLinkAbout3253 RESOLUTION NO. 3253 A RESOLUTION of the City Council of the City of Bremerton, Washington, adopting the 2016-2020 Consolidated Plan. WHEREAS, the City of Bremerton receives a Community Development Block Grant (CDBG) entitlement each year from the Department of Housing and Urban Development (HUD), and also receives funding from HUD's Home Investment Partnerships (HOME) fund via an inter-local agreement with Kitsap County; and WHEREAS, the City of Bremerton and Kitsap County's current plan for federal grant allocations will expire December 31, 2015; and WHEREAS, the City of Bremerton is required to establish a Consolidated Plan for the City's management of its HUD entitlement, including a Housing Market Analysis, a Community Needs Assessment, a Strategic Plan, an Annual Action Plan, as well as outlining the citizen participation plan, priority needs, and annual goals; and WHEREAS, statistical data for consolidated planning activities for the City and County is drawn from the same source and has been developed cooperatively with County and City CDBG staff; and WHEREAS, in order to continue receiving HUD federal grants through the HOME and CDBG progams, the City is required to adopt a five-year Consolidated Plan outlining priorities, needs, ways and means of funding priorities; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The recitals and findings of fact set forth in this resolution are hereby incorporated as if fully set forth herein. SECTION 2. The Department of Housing and Urban Development mandated Five-Year Consolidated Plan (Consolidated Plan) outlining priorities, needs, ways and means is hereby adopted by the City of Bremerton. The Consolidated Plan is attached hereto as Exhibit A and incorporated herein by reference. SECTION 3. The Consolidated Plan, which has been developed as a consortium between the City of Bremerton and Kitsap County, is hereby made the basis of funding priorities for the forthcoming period 2016-2020. 1 2016-2020 HUD Consolidated Plan SECTION 4. Pursuant to the existing inter-local ageement, the Consolidated Plan will continue to operate utilizing Kitsap County as the lead agency for HOME funds. CDBG funds given separately to the City and County will be administered by each respective Participating Jurisdiction. SECTION S. The Consolidated Plan does not bind either the City or the County to following the lead of the other in allocations and spending, but does serve as a guide of mutual benefit in providing services and initiatives beneficial to the low-income communities served. SECTION 6. Severabilitv. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 7. Effectiti>e Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this �3� day of , 2015. GREG EELER, Council President APPROVED AS TO FORM: ATTEST: � ' R GER A. LUBOVICH, Ci o SHANNON CORIN, City Clerk Exhibit A: City of Bremerton CDBG Consolidated Plan-The Ciry of�Bremerton's Component of� the Kitsap County/City of Bremerton Consortium Consolidated Plan 2 2016-2020 HUD Consolidated Plan ExhibitA #¨³¸ ®¥ "±¤¬¤±³®­ #®¬¬´­¨³¸ $¤µ¤«®¯¬¤­³ "«®¢ª '± ­³ #®­²®«¨£ ³¤£ Plan  ­£ /­¤-9¤ ± !¢³¨®­ 0« ­ The City of Bremerton’s Component of the Kitsap County/City of Bremerton Consortium Consolidated Plan Consolidated PlanBREMERTON 1 OMB Control No: 2506-0117 (exp. 07/31/2015) Executive Summary ES-05 Executive Summary -91.200(c), 91.220(b) 1. Introduction The City of Bremerton, Washington is an entitlement community participating in the Kitsap County HOME Consortium. Because of this, the City of Bremerton has participated in the preparation of the Regional Consolidated Plan in order to implement our community's federal program funds from the U.S. Department of Housing and Urban Development (HUD). These funds are Community Development Block Grant (CDBG) and HOME Investment Partnership Program (HOME). This plan is for the period of January 1, 2016 to December 31, 2020. The City of Bremerton receives a direct CDBG allocation, and works in partnership with the Kitsap County Consortium to administer HOME funds. The City of Bremerton receives its share of HOME funds based on a percentage allocation determined by HUD. The Consolidated Plan follows requirements of the U.S. Department of Housing and Urban Development (HUD), and uses HUD's format and data tables required for plans adopted after November 15, 2012. The purpose of this plan is to evaluate community needs and set goals for the five year plan period. Through a Community Needs Assessment, Housing Market Analysis and with community input, the City of Bremerton has developed a Strategic Plan. The Strategic Plan outlines the priorities and goals which guide the allocation of funds over the five year period. The City will develop an Action Plan annual which will include projects awarded funds through an annual application process. These projects will address the priorities and goals over the 5-year period. 2. Summary of the objectives and outcomes identified in the Plan Community Development Block Grant (CDBG) and HOME Investment Partnership Program (HOME) funds will be used over the next five years to address the needs outlined in the Strategic Plan. HUD's objectives guiding the proposed activities are: Provide decent affordable housing; Create suitable living environments; and Create economic opportunities The following are the priorities and goals outlined in the Strategic Plan portion of this document. These will guide the investment of CDBG and HOME funds in the City of Bremerton. While ending homelessness is still a priority in the City, projects that address homelessness will be funded from Homeless Housing Grant funds and will not be a high priority for CDBG and HOME funds. Objectives and strategies to reduce and eliminate homelessness are included in the Kitsap County Homeless Housing Plan and referenced in the Consolidated Plan. Homeless sections of this plan were completed with information from the Homeless Housing Plan update in 2015. Consolidated PlanBREMERTON 2 OMB Control No: 2506-0117 (exp. 07/31/2015) 3. Evaluation of past performance The City of Bremerton hascontinued to work collaborativelywith Kitsap County touse CDBG and HOME funds in the most efficient way possible. Funds declined significantly over the past five year period, which resulted in fewer people being served in the community. Production of new housing units has slowed and the allocation of funds has resulted in some difficult choices. Although the previous 5-year Strategic Plan anticipated a small decrease in funding levels, the unforeseen federal entitlement program funding cuts resulted in a challenging five year period. However, the City of Bremerton has implemented the strategies of the 2011-2015 Consolidated Plan. Past accomplishments include: Provided funding for construction of 45 new units of rental housing and 14 new units of homeownership housing; Funded the rehabilitation of 447 units of rental housing; Provided 45 homebuyers with assistance to purchase homes; Weatherized and provided minor home repair to 90 households; Provided funds for rehabilitation of 41 single-family homes; Provided food and services to over 8,000 individuals annually; Provided microenterprise and small business development assistance to 491 individuals; and Funded four public facilities. 4. Summary of citizen participation process and consultation process Development of this plan is the result of evaluation of information and data from a variety of sources, including the preparation of a Community Needs Assessment and Housing Market Analysis, consultations with local municipalities and agencies, an online survey, community meetings and public hearings. Homeless sections of the Consolidated Plan were completed with information developed during the update of the Homeless Housing Plan undertaken in 2015. All of the input received from the outreach conducted in 2015 has been considered and incorporated into the priorities and goals for the plan. All public comments received during public comment periods will be addressed and included in the final Consolidated Plan before submission to HUD. 5. Summary of public comments One citizen comment was received during the 15-day open public comment period in August. The comment is that "we need to encourage more business and industry and reduce the requirements on buildings and development. We should work with the state to create tax free zones for light industry. This will create the jobs we need and lift people out of poverty. If we stimulate our economy there will be more tax dollars to take care of the elderly and disabled." Consolidated PlanBREMERTON 3 OMB Control No: 2506-0117 (exp. 07/31/2015) 6. Summary of comments or views not accepted and the reasons for not accepting them All comments and views were accepted Consolidated PlanBREMERTON 4 OMB Control No: 2506-0117 (exp. 07/31/2015) The Process PR-05 Lead & Responsible Agencies - 91.200(b) 1. Describe agency/entity responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source The following are the agencies/entities responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source. Agency Role Name Department/Agency Lead Agency BREMERTON CDBG Administrator BREMERTON HOME Administrator BREMERTON Table 1– Responsible Agencies Narrative Kitsap County is the lead entity for the Consolidated Plan. The City of Bremerton administers their own CDBG funds and prepares their own Action Plan. The Kitsap County Block Grant Program, as part of the Department of Human Services, is responsible for the administration of County CDBG and HOME funds. The City of Bremerton administers their CDBG funds and share of HOME funds through the City's Department of Community Development. The Bremerton City Council holds public hearings and provides policy direction for CDBG funds and the City's portion of HOME funds. Consolidated Plan Public Contact Information Sarah Achaoui, CDBG Administrator 345 6th Street, Suite 600 Bremerton, WA 98337-1873 Phone: 360-473-5375 Email: sarah.achaoui@ci.bremerton.wa.us Consolidated PlanBREMERTON 5 OMB Control No: 2506-0117 (exp. 07/31/2015) PR-10 Consultation -91.100, 91.200(b), 91.215(l) 1. Introduction Information about CDBG and HOME funds, including information about the annual RFP cycle, CAPER, Action Plan and Consolidated Plan, is posted to the City of Bremerton CDBG program site. All subscribers of the City of Bremerton Electronic Notification System receive notice whenever new information is posted to the City of Bremerton website, including notification of public meetings and hearings. Notices of public hearings are also published in the local paper of record. The City encourages involvement by low and moderate income households, minorities and non-English speaking persons, as well as persons with disabilities. Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(I)). The City of Bremerton has sought to enhance coordination through participation in the Coordinated Grant Application for use of HOME funds and a portion of the Affordable Housing Grant Funds and Homeless Housing Grant funds are given to agencies operating within the Bremerton City limits. In addition, information and goals from the Homeless Housing Plan have been incorporated into the Consolidated Plan. Input from all area housing providers, health, mental health, and service agencies was sought and included in the formation of goals and priorities for this plan. Because the City is changing the direction of the use of CDBG funds to a more targeted approach there was great effort placed in outreach and transparency to encourage public involvement in every step of the way. The City held public hearings where public testimonial was taken. The City of Bremerton continues to work with the Bremerton Housing Authority to prioritize housing needs and services, and maximize the use of federal, state and local funds. Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness Kitsap County Continuum of Care Coalition (CoCC) is an active and engaged coalition of member agencies serving the needs of the homeless in Kitsap County. The mission of the CoCC is to work together to help homeless individuals and families achieve self-sufficiency. The CoCC meets monthly to discuss and share information on housing, prevention of homelessness, restoration of homeless individuals and families to stable living environments, and to promote community awareness of homelessness through education, legislative advocacy, mutual support and the sharing of resources. The CoCC members work closely with staff from Kitsap County Dept. of Human Services to address issues such as unsheltered homeless and veterans homeless. Staff from the Homeless Housing Grant Program Consolidated PlanBREMERTON 6 OMB Control No: 2506-0117 (exp. 07/31/2015) is actively engaged with the CoCC and member agencies are participating in the Homeless Housing Plan update and priorities for these funds. Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in determining how to allocate ESG funds, develop performance standards and evaluate outcomes, and develop funding, policies and procedures for the administration of HMIS Kitsap County does not receive a direct allocation of ESG funds. Kitsap County is part of the Balance of State and receives ESG through the Balance of State process each year. Kitsap County has fully implemented the Homeless Management Information System (HMIS) including full data sharing. Agencies that receive funding through the Coordinated Grant Application process for homeless projects are required to report in HMIS. 2. Describe Agencies, groups, organizations and others who participated in the process and describe the jurisdictions consultations with housing, social service agencies and other entities Consolidated PlanBREMERTON 7 OMB Control No: 2506-0117 (exp. 07/31/2015) Table 2– Agencies, groups, organizations who participated 1 Agency/Group/Organization KITSAP COUNTY CONSOLIDATED HOUSING AUTHORITY Agency/Group/Organization Type Housing PHA What section of the Plan was addressed by Housing Need Assessment Consultation? Lead-based Paint Strategy Public Housing Needs Market Analysis How was the Agency/Group/Organization Agency provided narrative and data for the consulted and what are the anticipated outcomes plan. of the consultation or areas for improved coordination? 2 Agency/Group/Organization Kitsap County Department of Community Development Agency/Group/Organization Type Other government - Local What section of the Plan was addressed by Housing Need Assessment Consultation? Market Analysis How was the Agency/Group/Organization Data and information from the Buildable Lands consulted and what are the anticipated outcomes Analysts and planning staff were used in of the consultation or areas for improved development of the Consolidated Plan coordination? 3 Agency/Group/Organization Bremerton Housing Authority Agency/Group/Organization Type Housing PHA What section of the Plan was addressed by Housing Need Assessment Consultation? Market Analysis How was the Agency/Group/Organization Agency provided narrative and data for the consulted and what are the anticipated outcomes plan. of the consultation or areas for improved coordination? 4 Agency/Group/Organization City of Bremerton Department of Community Development Agency/Group/Organization Type Housing What section of the Plan was addressed by Market Analysis Consultation? Consolidated PlanBREMERTON 8 OMB Control No: 2506-0117 (exp. 07/31/2015) How was the Agency/Group/Organization Data and information from the Comprehensive consulted and what are the anticipated outcomes plan were used in development of the of the consultation or areas for improved Consolidated Plan. coordination? 5 Agency/Group/Organization Kitsap County Department of Human Services Agency/Group/Organization Type Services-Elderly Persons Services-Persons with Disabilities Services-homeless Other government - Local What section of the Plan was addressed by Housing Need Assessment Consultation? Non-Homeless Special Needs How was the Agency/Group/Organization Data from existing plans and information from consulted and what are the anticipated outcomes program staff was used in the Needs of the consultation or areas for improved Assessment. coordination? 6 Agency/Group/Organization Kitsap Continuum of Care Coalition Agency/Group/Organization Type Services-homeless Planning organization What section of the Plan was addressed by Housing Need Assessment Consultation? Homelessness Strategy Homeless Needs - Chronically homeless Homeless Needs - Families with children Homelessness Needs -Veterans Homelessness Needs - Unaccompanied youth Anti-poverty Strategy How was the Agency/Group/Organization Continuum of Care members participated in consulted and what are the anticipated outcomes the update of the Homeless Housing Plan. of the consultation or areas for improved Information from the plan was included in the coordination? Needs Assessment, Market Analysis, and Strategic Plan. 7 Agency/Group/Organization Kitsap Economic Development Alliance (KEDA) Agency/Group/Organization Type Regional organization What section of the Plan was addressed by Economic Development Consultation? Consolidated PlanBREMERTON 9 OMB Control No: 2506-0117 (exp. 07/31/2015) How was the Agency/Group/Organization Agency provided narrative and data for the consulted and what are the anticipated outcomes plan. of the consultation or areas for improved coordination? 8 Agency/Group/Organization KMHS Agency/Group/Organization Type Health Agency What section of the Plan was addressed by Housing Need Assessment Consultation? Homelessness Strategy Homeless Needs - Chronically homeless Non-Homeless Special Needs How was the Agency/Group/Organization Agency provided narrative and data on the consulted and what are the anticipated outcomes housing and service needs of persons with of the consultation or areas for improved mental illness and also participated in the coordination? update of the Homeless Housing Plan. 9 Agency/Group/Organization YWCA Agency/Group/Organization Type Housing Services-Victims of Domestic Violence What section of the Plan was addressed by Housing Need Assessment Consultation? Market Analysis How was the Agency/Group/Organization Agency provided data and narrative on the consulted and what are the anticipated outcomes housing and service needs of victims of of the consultation or areas for improved domestic violence. coordination? Identify any Agency Types not consulted and provide rationale for not consulting Not Applicable Other local/regional/state/federal planning efforts considered when preparing the Plan Name of PlanLead Organization How do the goals of your Strategic Plan overlap with the goals of each plan? Continuum of Care Balance of Washington State Goals are consistent with Balance of State Continuum of Care Continuum of Care goals Kitsap County Kitsap County Dept. of Goals are consistent with Housing Element Comprehensive Plan Community Development of County Comprehensive Plan. Consolidated PlanBREMERTON 10 OMB Control No: 2506-0117 (exp. 07/31/2015) Name of PlanLead Organization How do the goals of your Strategic Plan overlap with the goals of each plan? City of Bremerton City of Bremerton Dept. of Goals are consistent with elements of the Comprehensive Plan Community Development City Comprehensive Plan. Kitsap Homeless Housing Kitsap County, Dept. of Goals are consistent with goals and PlanHuman Servicesstrategies of the Homeless Housing Plan. Kitsap Community Health Kitsap Public Health District Data used in development of the Needs Priorities-2014Assessment/Housing Market Analysis. State of WA Housing Needs WA State Affordable Data used in development of the Needs Assessment Housing Advisory Board Assessment/Housing Market Analysis. Table 3– Other local / regional / federal planning efforts Describe cooperation and coordination with other public entities, including the State and any adjacent units of general local government, in the implementation of the Consolidated Plan (91.215(l)) Early in the process staff from the County Block Grant program met with the mayors of Port Orchard, Poulsbo and Bainbridge Island, as well as individually with each commissioner to discuss the Consolidated Planning process, and the needs and priorities in their jurisdictions. Staff also made presentations at regularly scheduled city council meetings for each of the cities. A range of issues were discussed, including the many positive aspects of living in Kitsap County. Some of the common issues and concerns discussed included: The homeless population in Kitsap County, particularly street homeless and chronically homeless individuals who are more difficult to serve. The need for emergency overnight shelter and 24-hour access to services and shelter for people in crisis. There was also significant concern expressed over Veterans homelessness. The aging population and increasing needs of seniors. The need for a wider range of options to house seniors. Funding and/or regulatory incentives for affordable housing as government funding declines. We need to find ways to promote and support construction of affordable housing that meets the needs even at the lowest income levels. Economic and community development to improve our existing urban areas. Work force development and the need for training targeted at younger workers. The next generation needs more apprenticeship type opportunities. Supportive housing for people overcoming substance abuse. More affordable housing, particularly rental housing in the north end of the County. We need better transportation – improved transit and connections to services. Informational presentations on the Consolidated Plan and Homeless Housing Plan were made by county staff to the city councils of Port Orchard, Poulsbo and Bainbridge Island. Staff from the City of Bremerton Consolidated PlanBREMERTON 11 OMB Control No: 2506-0117 (exp. 07/31/2015) has made several presentations to Bremerton City Council regarding the goals and priorities in the Consolidated Plan and a more targeted use of city funds. Consolidated PlanBREMERTON 12 OMB Control No: 2506-0117 (exp. 07/31/2015) place to live; what There are many needs, and often competing g has declined it commercial housing. When nt, most d asked to investment of ruary 20th, 2015 and was open until March 10th, 2015. There were 242 lenges facing our community; and if you could make one change capable of transforming our community what would it he survey was designed to solicit input on challenges and priorities related to affordable , aging articipants were asked to allocate funds between four categories they allocated 32% of the funding towards economic developme three people attended and participated in several When asked what are the top ty to all astructure and housing were mentioned by more than one person. The one change question elicited many different responses with When asked about challenges our community is facing transportation connectivity, lack of economic diversity/job opportunities focused on things to improve and diversify the economy and improve our community like transit oriented development, improved housing, economic development and community services and facilities. Survey participants were provided a number of options an challenges the top 3 responses were: not enough jobs; existing houses are in poor condition; and not enough affordable rental respondents. The survey was announced on the County web site which triggered electronic notification of the survey availabili Information from outreach to the community was used to establish the goals and priorities of the Consolidated Plan. As fundin When meeting participants were presented with a choice of several strategies and asked to prioritize one in each category for activities designed to solicit input. A group discussion was held and participants discussed what makes our community a great 13 the community was essential in determining the strategic plan priorities. iorities among the choices and explain why they selected their top priorities. Summary of citizen participation process/Efforts made to broaden citizen participation highest priorities in the community. 30% towards affordable housing, 22% towards services and 16% towards public facilities. - meeting was held on April 16th. Twenty setting spaces, urban design standards for downtowns, and creative housing options. BREMERTON - ticipation process and how it impacted goal 91.401, 91.105, 91.200(c) A community survey was launched on Feb even more important to target funds towards the trategies received the most votes: T subscribers which includes citizens and agencies. A community Consolidated Plan priorities for funding, so the input of - 15 Citizen Participation 07/31/2015) Community Meeting Summary: rate, high/med./low, their pr public funds, the following s Survey Results Summary: Summarize citizen par 0117 (exp. Economic Development are the greatest chal - OMB Control No: 2506 has become survey p - infr be? PR 1. 14 BREMERTON Classes and training for existing and prospective business owners Repairs/upgrades to existing community social service buildings ams (i.e. literacy & financial education) Infrastructure improvement/repair in low income areas Modernization of older commercial buildings More affordable homeowner housing Health & Substance Abuse Services Permanent Supportive Housing Consolidated Plan Rental Housing 07/31/2015) sufficiency progr housing 0117 (exp. Affordable Affordable Housing - Rapid Re - Human Services OMB Control No: 2506 Public Facilities Homelessness - Self (If applicable) 15 URL ents not accepted comm reasons of Summary and recei of Summary comments ved BREMERTON response/attenda of Summary nce Outre of ach Consolidated Plan Target 07/31/2015) Citizen Participation Outreach Outre 0117 (exp. ach of Mode - OMB Control No: 2506 Ord er Sort (If applicable) 16 URL ents not accepted comm reasons of Summary and area fearing that targeted area to recei development will be available Also supportive having a target focused on the City's initiative Support of the the City would to focus CDBG opportunities. was explained however, that other parts of not benefit. It of opportunities development - hesitation of housing and available City her funding in a comments Summary affordable comments Wide. economic economic economic of having ved improve wide. Ot BREMERTON - City dd was well attended in the newspaper, through an article approximately 15 t, and a response/attenda City of Bremerton City's electronic an email to the posting on the of public hearing City's website. received. The meeting was testimonials Summary advertised nce mailing lis public with targeted/broad Outre community of ach Consolidated Plan Target - Non 07/31/2015) Outre Public Hearing 0117 (exp. ach of Mode - OMB Control No: 2506 Ord er Sort 1 http://www.kitsapsun.com/news - on - problem_70174437 vote (If applicable)- empty - to - news/council - bremertons 17 URL - building - - /local fixing ents not accepted comm reasons of Summary and recei of Summary comments ved BREMERTON response/attenda Newspaper article conditions in the on City's use of address empty CDBG funds to of buildings and Summary nce blighted city. targeted/broad Outre community of ach Consolidated Plan Target - Non 07/31/2015) Outre Newspaper Ad 0117 (exp. ach of Mode - OMB Control No: 2506 Ord er Sort 2 (If applicable) 18 URL ents not accepted All comments were comm reasons of accepted. Summary and recei narrative above broaden citizen process/Efforts of participation participation. Summary of Summary in y Summary comments ved See Surve under 1. made to Results citizen BREMERTON County and City of announced on the development, and designed to solicit ion of the survey availability 10th, 2015. There respondents. The open until March response/attenda to all subscribers priorities related Bremerton web challenges and February 20th, which includes of 2015 and was abatement of agencies. The A community to affordable bliht diti launched on citizens and Summary sites which survey was survey was survey was electronic nce economic were 242 triggered housing, input on notificat targeted/broad Outre community of ach Consolidated Plan Target - Non 07/31/2015) Outre 0117 (exp. ach of Internet Outreach Mode - OMB Control No: 2506 Ord er Sort 3 (If applicable) 19 URL ents not accepted All comments were comm reasons of accepted. Summary and recei narrative above broaden citizen See summary of process/Efforts of participation participation. Summary of Community Meeting in Summary comments ved under 1. made to tizen BREMERTON ci designed to solicit meeting was held response/attenda people attended and participated the Norm Dicks on April 16th at of three A community activities and Government Bremerton. community Summary discussion nce in several Center in priorities. input on - Twenty targeted/broad Outre community of ach Consolidated Plan Target - Non 07/31/2015) Outre Public Meeting 0117 (exp. ach of Mode - OMB Control No: 2506 Ord er Sort 4 (If applicable) 20 URL ents not accepted All comments were comm reasons of accepted. Summary and requirements on recei light industry in stated we need order to create received which more business and create tax comment was free zones for of people out of development to encourage buildings and and industry, jobs and lift One citizen reduce the Summary comments ved rty. BREMERTON pove availability. Notice to the County and Consolidated Plan City of Bremerton written comment response/attenda Analysis portions August 4th, 2015 period. The draft published on the plan was posted was released on Assessment and Housing Market web sites which of Strategic Plan, notification of home A draft of the day Summary electronic nce triggered was also - for a 15 Needs County of the page. targeted/broad Outre community of ach Consolidated Plan Target - Non 07/31/2015) Outre 0117 (exp. Comment ach of Public Period Mode - OMB Control No: 2506 Ord er Sort 5 (If applicable) 21 URL ents not accepted comm reasons of Summary and recei were received. No comments of Summary comments ved BREMERTON 11, 2015 with the comment period. response/attenda grant application was held on May A public hearing This opened the Commissioners. Availability and Policy Plan was published for a 2016 Notice of of cycle for 2016 Kitsap County day public Summary nce f Funding Board o funds. - 30 targeted/broad Outre community of ach Consolidated Plan Target - Non 07/31/2015) Outre Public Hearing 0117 (exp. ach of Mode - OMB Control No: 2506 Ord er Sort 6 (If applicable) 22 URL ents not accepted comm reasons of Summary and Citizen Participation Outreach recei of Summary comments ved BREMERTON was held to adopt Bremerton Action 2016 use of funds plan was adopted response/attenda was taken on the day comment hearing was held Public testimony period. A public 18th, 2015 with published for a the Bremerton of and the action Public Hearing on November City Council. – 2016 City of CDBG/HOME Summary 4 Policy Plan.Table by council. nce the 2016 Plan was - 30 targeted/broad targeted/broad Outre communitycommunity of ach Consolidated Plan Target -- NonNon 07/31/2015) Outre Public HearingPublic Hearing 0117 (exp. ach of Mode - OMB Control No: 2506 Ord er Sort 78 Needs Assessment NA-05 Overview Needs Assessment Overview The overall purpose of the Needs Assessment and Housing Market Analysis is to evaluate the range of needs in the community and identify high priority needs that will be addressed by the Strategic Plan. The Needs Assessment is comprised of data provided by HUD, primarily 2007-2011 CHAS, Census and American Community Survey data as well as data from a number of Kitsap County agencies and Washington State. This section follows HUD’s template and does not attempt to evaluate all data available, but is instead focused on the areas of housing, homelessness, economic development, facilities and services, as they relate to low-income and special needs populations. Census Data Consolidated PlanBREMERTON 23 OMB Control No: 2506-0117 (exp. 07/31/2015) 24 BREMERTON Consolidated Plan 07/31/2015) 0117 (exp. - OMB Control No: 2506 NA-50 Non-Housing Community Development Needs -91.415, 91.215 (f) Describe the jurisdiction’s need for Public Facilities: In the City of Bremerton the non-housing community development need is centered on the communities need for jobs. The City has an unemployment rate of 6.5% compared to 5.5% in Washington State, and 5.3% in Kitsap County. The City has chosen to focus its efforts on economic development with the goal of creating and sustaining jobs for its residents. The low/mod percentage is comparatively high with 61% city-wide and 69% within the Downtown Regional Center. The City Council determined that targeting funds in this center which includes a designated blighted area will provide a strategy to come up with a strong economic development and housing focus which will abate these blighted conditions, as well as utilizing limited funds in a way that can provide the best opportunity for leverage. Public facilities will be eligible for funding as long as they are within the target area known as the “Downtown Regional Center.” The intention is to focus on capital projects that curb slum and blight, improve public facilities, and invest in economic development. How were these needs determined? Needs were evaluated and determined during the outreach and planning process for the Consolidated Plan. Describe the jurisdiction’s need for Public Improvements: In the City of Bremerton there is an emphasis in utilizing funds in a Downtown Regional Center. Within this center there is a need for public improvement, especially improved streetscapes along 4th avenue between Pacific and Washington. This area is a low-mod area and could greatly benefit from Public Improvements. How were these needs determined? Needs were evaluated during the outreach and planning process for this Consolidated Plan. The City of Bremerton held a series of "Community Conversation" events where staff could hear input from the public on the need of the city and direction of the CDBG/HOME programs. Describe the jurisdiction’s need for Public Services: For this consolidated plan time period the City of Bremerton has decided to not fund public services. While they are still a priority we believe the gap can be filled by the Homeless Housing Grant funds. The Consolidated PlanBREMERTON 25 OMB Control No: 2506-0117 (exp. 07/31/2015) City of Bremerton has a high priority of focusing on economicdevelopment and affordable housing. The City anticipated resuming the 15% allocation for public services in the next consolidated plan time period. How were these needs determined? Needs were evaluated and determined using data, consultations with service providers and public outreach. Consolidated PlanBREMERTON 26 OMB Control No: 2506-0117 (exp. 07/31/2015) Housing Market Analysis MA-05 Overview Housing Market Analysis Overview: Nationally, homeownership rates have fallen back to 1993 levels. The decline can be attributed to several factors including the effects of the recession on household formation and first time homebuyers, decline in household incomes since the start of the recession, and restricted access to financing. At the same time there has been a strong increase in demand for rental units. As the vacancy rate for rentals has declined, rent increases continue to outpace inflation. To meet the surge in demand for rental units, the number of single-family detached homes in the rental market increased and developers also responded to soaring demand by steadily expanding the multifamily housing supply. Despite this expansion of the stock, rental markets nationally continued to tighten in 2014. The national vacancy rate dipped to 7.6 percent, its lowest point in nearly 20 years. As a result rents rose at a 3.2% rate last year – twice the pace of overall inflation. (Source: The State of the Nation’s Housing 2015, Joint Center for Housing Studies of Harvard University). Home sales have increased overall in Washington State but are still recovering from the recession. A typical first-time buyer can’t afford most homes for sale. The median renter household income in 2012 across the Washington State was $36,778. This means that a typical first-time homebuyer, paying no more than 30% of that income on housing, could afford to purchase a $145,201 home. The median priced home in Kitsap County in 2012 was $233,000. (Source: Washington State Housing Needs Assessment 2015) Affordability is an issue for many households across Washington State, particularly those whose incomes are below 50% of the area median income. In Kitsap County a family of 4, would need an annual income of $53,560 to afford a 3 bedroom rental unit with rent of $1,339. A single person household would need an annual income of $30,400 to afford a rental unit with rent of $760. (Source: WA State Housing Needs Assessment). Nationally rents for apartments have risen for 23 straight quarters. As of the third quarter of 2014, rents were 15.2% higher than at the tail end of the Recession in 2009. The tightening rental market has the most significant impact on low income renters. Many higher and middle income renters occupy units that are affordable to lower income groups, reducing the supply of affordable and available decent apartments for the lowest income renters. (Source: National Low Income Housing Coalition(NLIHC), Out of Reach 2015.) The City of Bremerton has a very old housing stock which puts children at risk for many indoor environmental concerns such as asbestos, radon, and lead based paint poisoning. Often time’s families do not have enough money to rehab and mitigate these potential hazards. Consolidated PlanBREMERTON 27 OMB Control No: 2506-0117 (exp. 07/31/2015) The numbers from Kitsap Public Health regarding the reported lead poisoning cases from 2008-2015 are listed below: 2009=1 (probable) 2010=2 (probable, confirmed) 2011=0 2012=0 2013=2 (2 confirmed) 2014=3 (2 confirmed, 1 probable) 2015=8 (4 confirmed, 4 probable) Source: WA Dept. of Health, Public Health Information Management System (PHIMS), extracted 10/22/15. City of Bremerton Housing Occupancy Source: U.S. Census Bureau, 2000 Census; 2010 Census; 2013 Population Estimates. Consolidated PlanBREMERTON 28 OMB Control No: 2506-0117 (exp. 07/31/2015) City of Bremerton Year Structure Built Source: U.S. Census Bureau, 2009-2013 American Community Survey 5-Year Estimates Consolidated PlanBREMERTON 29 OMB Control No: 2506-0117 (exp. 07/31/2015) 8.7%13.7%11.7%9.5%10.3%46.1% Percentage 30 701 1,104 945 763 827 3,711 Year Estimates Number BREMERTON - 2013 American Community Survey 5 Gross Rent as a % of Household Income Consolidated Plan 07/31/2015) % of Income - Source: US Census, 2009 City of Bremerton 0117 (exp. - OMB Control No: 2506 Less than 15% 15% to 19.9%20% to 24.9%25% to 29.9%30% to 34.9% 35% or more 31.4%14.3%14.2%31.1% 9.0% Percentage 31 Monthly Owner Costs as a Percentage of Household Income 1,372623 620 393 1,358 Year Estimates Number BREMERTON - 2013 American Community Survey 5 (Housing units with a mortgage only) Consolidated Plan 07/31/2015) % of Income - US Census, 2009 City of Bremerton 0117 (exp. - OMB Control No: 2506 Less than 20% 20% to 24.9%25% to 29.9%30% to 34.9% 35% or more Source: Jobs less workers 03 220 104 21 03 0 ------- in June 2014, this figure reflects a net loss of approximately 3,200 jobs since June 2007. The main the county. Since 2004, Kitsap County typically experienced average annual total of 28,600 mpared to 7.1 07 to 2014. % unemployment rates under 7 percent. Job numbers are starting to rebound, but have yet to make up for losses occurring from 20 012 345 531 67 013 3 Share of Jobs As of June 2014, the civilian labor force in Kitsap County stood at 115,050 and the county unemployment rate was 5 percent co component of Kitsap County’s employment is government. This sector typically accounts for a third of the nonfarm total with a 32 % Share of Workers 015 525 635 88 016 3 % 241,428 3425,470 595319163 728814 01,655 329 Number of Jobs 91.410, 91.210(f) 251,367 4372,257 541229482 726748 01,377 294 Number of BREMERTON Workers - Development Assets percent in June 2013. Unemployment continues a steady decline in Professional, Scientific, Management Services There were 84,800 nonfarm jobs in the county Economic Development Market Analysis Housing Community Agriculture, Mining, Oil & Gas Extraction Arts, Entertainment, Accommodations Business by Sector Consolidated Plan Education and Health Care Services Finance, Insurance, and Real Estate Transportation and Warehousing 07/31/2015) 0117 (exp. Public Administration Business Activity - Manufacturing - Other Services OMB Control No: 2506 45 Non Construction Introduction Retail Trade Information - jobs. MA Jobs less workers 1 -- 16,94214,624 13.68 38.29 7.25 - % 3 -- Share of Jobs 33 % Share of Workers 4 -- Number of People % 407 12,274 Number of Jobs Occupations by Sector Business Activity Labor Force 370 8,853 Number of BREMERTON Workers Household Dynamics (Jobs) - 6 Table 1,580 - 2,987802 1,8373,295899 5 Table – 7 Table - 2011 ACS (Workers), 2011 Longitudinal Employer Production, transportation and material moving over Construction, extraction, maintenance and Civilian Employed Population 16 years and Farming, fisheries and forestry occupations Total Population in the Civilian Labor Force Business by Sector Management, business and financial Consolidated Plan 2465 -- 07/31/2015) Unemployment Rate for Ages 16Unemployment Rate for Ages 25 2011 ACS2011 ACS 0117 (exp. Occupations by Sector -- Unemployment Rate 20072007 - Wholesale Trade 2007 Sales and office - OMB Control No: 2506 Labor Force Data Source:Data Source: Data Source: Service repair Total 702 1,5332,262 623 1274851,274 1,041 69%21%11% 100% 65+ yrs Not in Labor Force Percentage 2363562,408 2,851 34 65 yrs – 45 143 295829 155 691611,081 1,568 44 yrs Unemployed Age – Educational Attainment by Employment Status 35 10,776 3,237 1,647 15,660 In Labor Force 3345411,552 2,239 34 yrs Travel Time 845 3,0735,340 2,566 – Educational Attainment by Employment Status (Population 16 and Older) 25 Number BREMERTON Civilian Employed - 2498252,306 2,661 8 Table 24 yrs – 18 - 9 Table High school graduate (includes equivalency) High school graduate, GED, or alternative Educational Attainment Consolidated Plan Some college or Associate's degree 07/31/2015) Educational Attainment by Age Less than high school graduate 9th to 12th grade, no diploma 2011 ACS2011 ACS Bachelor's degree or higher Some college, no degree 0117 (exp. -- 20072007 60 or More Minutes Less than 9th grade - 59 Minutes OMB Control No: 2506 < 30 Minutes Travel Time Travel Time Education: Data Source:Data Source: Total - 30 303 481 503 14,859 22,532 31,22343,077 55,497 Business Activity, is the large number of defense related jobs in Kitsap County. Information from Naval Base 65+ yrs Median Earnings in the Past 12 Months 1,209 1,150 602 35 65 yrs the Business Activity table above, what are the major employment sectors within your jurisdiction? – 45 581 452 278 44 yrs Age – 35 Median Earnings in the Past 12 Months Educational Attainment by Age 754 904 296 34 yrs – 25 BREMERTON Median Earnings in the Past 12 Months 215 145 13 24 yrs - – 10 18 Table – Professional, Scientific and Management services 11 Table Educational Attainment Arts, Entertainment, Accommodations (includes equivalency) Kitsap, 2014 numbers for employment were: Education and Health Care Services Consolidated Plan Some college or Associate's degree –07/31/2015) Graduate or professional degree Graduate or professional degree Table 45 Less than high school graduate 2011 ACS2011 ACS – Educational Attainment 0117 (exp. What is not included in High school graduate -- 20072007 Retail Trade Associate's degree Bachelor's degree Bachelor's degree - OMB Control No: 2506 Data Source:Data Source: Based on but not all. Broadband and fiber optic contractors. The civilian work force includes many professional and management workers employed Healthcare managers cite the need for technology skills paired with – Center s shortage impacts all communities with a manufacturing in our region rers and defense contractors. The growth of the healthcare industry will Currently, access to infrastructure is more available on the Port of workforce with strong community skills, strong work ethics and ability to work as a team board, all The largest Greenfield site in the region (Puget Sound Industrial continue to bring healthcare workforce needs. The numbers and types of workers will evolve as the industry evolves across the – 36 Puget Sound Naval Shipyard and Boeing Bremerton (publicly owned) leasable parcels. The privately owned parcels have some of the infrastructure, at Puget Sound Naval Shipyard, Naval Submarine Base Bangor and Naval Undersea Warfare Center. community: medical skills to meet many of the digital healthcare requirements. The skilled trade – The addition of two large (and well paying) magnets for that workforce BREMERTON As with most areas with technology related jobs, tech workers are needed. Bremerton) is 3,400 acres zoned for manufacturing under a master plan. Describe the workforce and infrastructure needs of the business Business Parks currently do not have natural gas or sewer connections. connections are still a challenge for more rural parts of the county. make that shortage even more pronounced at times for manufactu managers and business owners cite a need for a These numbers do not include government Consolidated Plan 8,700 military (active duty) 07/31/2015) 0117 (exp. Infrastructure Needs: 16,000 civilian Workforce Needs: - OMB Control No: 2506 presence. member. the privately ts will create the need for construction worker in all trades; it is possible that during the recession some of those workers ounty. quire establishing new relationships for small businesses as subcontractors. Chugach took over the West It also creates an access ospital. s that have affected or may affect job and business growth opportunities during the planning period. It is anticipated that Two major contracts at Naval Base Kitsap have changed. Multiple Ship Maintenance and Operations changed from Vigor to General Anticipated transportation funding would bring new ferries to the system (for commuters) and some minor road changes in the c etail project at the entrance to Silverdale. This project will contain 200,000 SF of retail space. Describe any major changes that may have an economic impact, such as planned local or regional public or private sector Silverdale will be the healthcare hub for the county, with other healthcare providers moving closer to the new and expanded h Again, this will require small business to establish new The Port of Bremerton continues to seek funding to finish the connector road between Hwy 3 and Lake Flora Road, making A new retail center will create many new retail and service positions in a community already saturated with retail workers. 37 Describe any needs for workforce development, business support or infrastructure these changes may create. tion of their Bremerton campus to their Silverdale Campus. Bremerton more accessible to workers in South Kitsap. additional 700 units. The healthcare industry will continue to grow, requiring additional healthcare workers. nal healthcare offerings. may have retrained for other skilled trades positions in manufacturing. Sound (Kitsap) Base Operating and Service Contract in 2014 from EJB. Several housing projects in Poulsbo are in permit status to create an BREMERTON There will be increased traffic in Silverdale with additio – owned parcels of the Puget Sound Industrial Center CHI Harrison Medical Center has announced reloca point for other infrastructure needs. The Trails at Silverdale is a 30 acre r This will re ips. Consolidated Plan 07/31/2015) subcontracting relationsh investments or initiative Dynamics in 2014. 0117 (exp. Housing projec - OMB Control No: 2506 Needs: edical Receptionist, Nursing Assistant, Pharmacy Technician, Polysomnography Technology, Chemical Dependency and ce, BS; Human Services, BA; Elementary Teacher Education, BAE and Business tain access and clearance on Naval Base Kitsap, which requires US rom WSU thcare training with diplomas in dental assistant, massage therapy, medical administrative Additionally, they offer certificates in Medical Assisting, list are tech related, Project Management Essentials; Information Systems Security; Open Source Systems; Software Application Development; Technical nics; IT ted by Workforce Investment Boards, community lity assurance and quality In collaboration with Western Washington University at Olympic College, the following degrees are available in Kitsap County: Manufacturing Composites, Composites Manufacturing In partnership with Washington State University, Kitsap students can obtain a Bachelor of Science in Mechanical Engineering f ing aerospace workforce How do the skills and education of the current workforce correspond to employment opportunities in the jurisdiction? Olympic College has several certificate programs supporting technology: Applications Server; CIS Basic and CIS Core; Electro 38 colleges and other organizations. Describe how these efforts will support the jurisdiction's Consolidated Plan. Technology; Manufacturing Technology; Welding Technology Proficiency and Welding Technology Specialization. These are often required for large federal defense contracts and are proving difficult to fill. The majority on the Citizenship and no criminal history. More healthcare and technology training is needed to meet the future needs. qua Olympic College is part of Air Washington, a consortium of community and technical colleges provid – In reviewing the top “hard skills” needed by employers, two are based on both experience and training Olympic also has certificate programs supporting professional services, business and retail. Olympic College offers BAS (Bachelor of Applied Science) of Nursing Degree. Describe any current workforce training initiatives, including those suppor Many of those skills cross over into other manufacturing scenarios. Certificate offerings from Olympic College in skilled trades: Advanced BREMERTON services related and healthcare related. Related to skills are the ability to ob Administration, BA; Environmental Policy, BA; Environmental Scien pic College recently added a BAS in Information Systems assistant, medical assistant and pharmacy technician. GIS and Web Client Side Development. Everest College in Bremerton provides heal Consolidated Plan 07/31/2015) Practical Nursing. Medical Billing, M 0117 (exp. Certification. - – Design OMB Control No: 2506 skills. Olym control. t initiatives are you undertaking that may be coordinated with the Consolidated Plan? If not, The Olympic Workforce Development Council is working to provide timely training with input from the WIOA guidelines. kground. 39 Many of the retired and separated military workforce remain in the area with a diverse and skilled training bac the Puget Sound Regional Council. Does your jurisdiction participate in a Comprehensive Economic Development Strategy (CEDS)? describe other local/regional plans or initiatives that impact economic growth. Kitsap is part of the Puget Sound Economic Development District administered by BREMERTON If so, what economic developmen Consolidated Plan 07/31/2015) 0117 (exp. - OMB Control No: 2506 Yes MA-50 Needs and Market Analysis Discussion Are there areas where households with multiple housing problems are concentrated? (include a definition of "concentration") The primary housing problem in Bremerton is housing cost burden. The problems of overcrowding and lack of kitchen or plumbing facilities are small. Geographic analysis shows that the concentration of older housing stock overlaps with a concentration of low to moderate income families. Areas which have a greater than 51% concentration of low and moderate income persons are located in a higher percentage primarily in West Bremerton, and a slightly lower percentage in East Bremerton. Housing units built before 1978, also concentrated primarily in West Bremerton are more likely to contain lead-based paint and are more likely in need of major repair. Yet, these houses are occupied by families least likely to have the financial means to correct either potential lead hazards or make all other needed repairs. The City’s low/mod Census Tracts are all in need of reinvestment through owner and rental housing rehabilitation. The City of Bremerton has a high rental to owner occupant rate (60% renters to 40% buyers). Single- family owner units are available at relatively low prices, but the demand isn’t there because of this need for extensive and expensive renovation in many of the structures, as well as stricter loan standards and higher down payment requirements which limit the number of potential buyers. More affluent buyers will tend to favor newer construction, in other more attractive parts of the City or even the County. The rental market is stronger because of the transient nature of the community which creates an increased demand, especially for more modern or better kept buildings. Rents tend to increase, even for poorer buildings, exacerbating the cost burden issue for low-income households. Landlords are often unable to make costly repairs to their rental units thereby creating unsafe and a lower quality of housing for some low-income households as well. Are there any areas in the jurisdiction where racial or ethnic minorities or low-income families are concentrated? (include a definition of "concentration") HUD has generated a series of standards that can be used to determine if a Census Block Group has a minority concentration or a concentration of low-income households. To determine if a low-income concentration exists, the Area Median Income of a Block Group must be below 50% of the Area Median Income for the Metropolitan Statistical Area (MSA). In 2015 the median income for the Bremerton- Silverdale MSA is $74,600. Therefore, a Block Group with a median income of less than $37,300 would be considered to have a concentration of low-income households. In Kitsap County the majority of census block groups that meet this criteria are located in Bremerton. While the City of Bremerton has block groups with a high concentration of poverty, the City does not have particular block groups with high minority populations. Consolidated PlanBREMERTON 40 OMB Control No: 2506-0117 (exp. 07/31/2015) Under the HUD definition, an area is considered to have a high concentration of minority persons if the percentage of households in a particular racial or ethnic minority group in a Block Group or Groups is at least 20 percentage points higher than the percentage of that minority group for the MSA. Race and ethnicity data was reviewed for each of the census block groups in Bremerton and Kitsap County and no census block group had a minority concentration. What are the characteristics of the market in these areas/neighborhoods? The City of Bremerton has 10 Census Tracts with over 50% of the population low/moderate income. These neighborhoods are centered around the downtown core extending out to West Bremerton, as well as across the water in East Bremerton. The highest percentage of low/moderate income population is census tract 812 which is near the downtown core with 95% LMI. The housing stock in these neighborhoods is older and the rental rates are high. The percentage of cost-burdened households in these areas is also high. Are there any community assets in these areas/neighborhoods? There are many community assets in the downtown/residential core NRSA including well established, older neighborhoods, attractive City Parks, access to the waterfront, investment in revitalization of the downtown core, capable and willing community partners, and a targeted City investment of its CDBG resources. Are there other strategic opportunities in any of these areas? Over the past few years, downtown Bremerton redevelopment has been encouraged and is on the rise due to the creation of new housing units downtown. The City’s focus on directing CDBG funds towards this target area, and with the establishment of an NRSA the City hopes to create mixed income developments by leveraging demand for market rate housing in the area with the demand for affordable housing representing a strategic opportunity for Bremerton. The downtown/residential core NRSA encompasses census tract 805 which has 72% LMI. This area is also where the city plans on investing a large percentage of its CDBG allocation for the next 5 years. Consolidated PlanBREMERTON 41 OMB Control No: 2506-0117 (exp. 07/31/2015) Strategic Plan SP-05 Overview Strategic Plan Overview The City of Bremerton’s Strategic Plan for the Consolidated Plan period from January 1, 2016 through December 31, 2020 sets forth the City’s priorities for expenditure of available Community Development Block Grant Funds (CDBG and HOME) Priorities are based on the needs assessment, and address geographic priorities and priority needs. The strategic plan addresses HUD’s goal to provide decent housing, a suitable living environment, and expand economic opportunity. Bremerton’s Strategic Plan is centered on its most pressing need: providing economic development and opportunity. By addressing concentrated areas of urban blight and deteriorating housing stock, Bremerton will be able to provide a sustainably healthy economic environment where a suitable living environment and decent, affordable housing opportunities are the norm. The City will target its funds in a specific target area which includes its downtown. The City has also renewed its designation of a portion of the downtown core as a slum and blight zone. The City intends to utilize its funding to abate slum and blight conditions, provide economic development and affordable, suitable housing in the target area. The City’s priorities for use of CDBG funds will remain the same throughout the 5 year consolidated plan time period. The City has designated two target areas for prioritization of use of funds. One area is targeted for capital projects, while the other is designated as Slum and Blight. 55% of funds will go towards housing and economic development projects in the City designated target area. Within this target area there are 72% low and moderate income families. 10% of funds will go towards the slum and blight zone, and 15% will be available for Economic Development City-wide. The percentages for dedication of use of funds will be reassessed per year and may change however the target areas and priorities will stay the same. The City of Bremerton will utilize HOME funds for improving and preserving affordable housing. 15% will continue to be set aside for CHDO projects and $75,000 will be set aside for the City of Bremerton Down Payment Assistance Program. City of Bremerton will award its funding through a Request for Proposal process. Through this process the City is able to ensure that the specific needs and objectives detailed in the Consolidated Plan. Consolidated PlanBREMERTON 42 OMB Control No: 2506-0117 (exp. 07/31/2015) City of Bremerton Strategic PlanPriorities Revitalize targeted neighborhoods; Improve and preserve affordable homeownership housing; Expand economic opportunities for very-low and low-income Bremerton residents; Abate Slum and Blight conditions downtown; Increase homeownership opportunities for low to moderate income Bremerton residents. Consolidated PlanBREMERTON 43 OMB Control No: 2506-0117 (exp. 07/31/2015) SP-10 Geographic Priorities - 91.415, 91.215(a)(1) Geographic Area Table 12 - Geographic Priority Areas General Allocation Priorities Describe the basis for allocating investments geographically within the state The City of Bremerton realizes the needs and the impact of a targeted use of funds and because the downtown core is a designated regional growth center with a low/mod population. CDBG target area Consolidated PlanBREMERTON 44 OMB Control No: 2506-0117 (exp. 07/31/2015) Downtown Blight Zone Consolidated PlanBREMERTON 45 OMB Control No: 2506-0117 (exp. 07/31/2015) Downtown/Residential Core Neighborhood Revitalization Strategy Area Consolidated PlanBREMERTON 46 OMB Control No: 2506-0117 (exp. 07/31/2015) SP-25 Priority Needs - 91.415, 91.215(a)(2) Priority Needs Table 13 – Priority Needs Summary 1 Priority Need Economic Development Name Priority Level High Population Extremely Low Low Moderate Non-housing Community Development Geographic Areas Affected Associated Increase economic opportunities Goals Economic Development-City Wide Description Bremerton is a low-income City with few living-wage jobs outside the Navy and military associated industries. Bremerton is also home to a blighted, historic downtown core. CDBG funds will be prioritized to addressing blight in this target area, and furthering economic opportunity through innovative programs aimed at job creation and small business entrepreneur support. Basis for Unemployment rate from the City of Bremerton as of April 2015 is 6.5%, higher Relative than Kitsap County as a whole (5.3%) and the State of Washington (5.5%). The City Priority also has a commercial vacancy rate of 15% in the downtown area. By increasing economic opportunities for low-income residents of the City, through increasing business opportunies, the City hopes to abate slum and blight conditions as well as decrease the commercial vacancy rate. In the 2015 Point in Time count 35% of the respondents listed employment as the cause of homelessness 2 Priority Need Abatement of Blight Conditions Downtown Name Priority Level High Population Extremely Low Low Moderate Non-housing Community Development Consolidated PlanBREMERTON 47 OMB Control No: 2506-0117 (exp. 07/31/2015) Geographic Areas Affected Associated Abate Blight Conditions Goals Description The downtown core has been designated as slum and blight since the 1970’s. 89% of buildings are either vacant, deteriorating, or have depreciated in value. It is critical to target funds and efforts to abating these conditions and creating economic opportunities as well as affordable housing available to benefit all City of Bremerton residents. Basis for For four decades the City of Bremerton's historic downtown core has been Relative designated as a blight zone. Many of these buildings are vacant, in deteriorating Priority condition or have depreciated in value. By focusing its efforts in this target zone, the City hopes to increase economic opportunities and create affordable housing benefitting all Bremerton residents. 3 Priority Need Affordable Housing Name Priority Level High Population Extremely Low Low Moderate Large Families Families with Children Elderly Elderly Frail Elderly Persons with Mental Disabilities Persons with Physical Disabilities Persons with Developmental Disabilities Persons with Alcohol or Other Addictions Persons with HIV/AIDS and their Families Victims of Domestic Violence Geographic Areas Affected Associated Preserve and Increase Affordable Housing Goals Consolidated PlanBREMERTON 48 OMB Control No: 2506-0117 (exp. 07/31/2015) Description Bremerton is an old city, and most of its housing stock is aging and deteriorating. However, these solid, pre-WWII homes are diamonds in the rough, located in walkable neighborhoods, close to schools and amenities, and with careful rehab, very suitable starter homes for lower income residents. However resources for rehab are limited and many homeowners cannot afford these costly repairs. It is becoming too costly for homeowners to purchase and rehab these homes. Basis for 60% of Bremerton residents rent. With the Navy presence, Bremerton will always Relative have a higher-than-average rental rate, but with efforts to improve the housing Priority stock, we can attract new homeownership to our city. The City will primarily use HOME funds for homeownership initiatives. Over three-quarters of the housing units were built before 1980, nearly one-quarter before WWII. These aging unites typically have more issues related to upkeep than buildings built more recently. As home maintenance and improvement projects are necessary with older housing, more residents will be faced with increasing housing costs, which hinder the overall ability of residents to afford housing in these jurisdictions over time. Also, many of these older homes lack energy efficiency. This poses two problems: environmental concerns and higher utility costs for occupants. Older homes may also present health hazards due to their potential to contain lead-based paint and/or asbestos. Many of these holder housing units require some degree to bring them to current, acceptable building standards. Aging housing is also important in regards to renter-occupied units. When renters occupy older housing, housing quality and occupant safety concerns become more of an issue because many of the owners may not have much of an incentive to invest time and money into maintenance and improvements. Thus, over time rental units begin to deteriorate and suffer from deferred maintenance. 4 Priority Need Public Facilities Name Priority Level Low Population Extremely Low Low Moderate Large Families Families with Children Elderly Public Housing Residents Non-housing Community Development Consolidated PlanBREMERTON 49 OMB Control No: 2506-0117 (exp. 07/31/2015) Geographic Areas Affected Associated Public Facilities-City Goals Description The City of Bremerton will look for public facility projects which serve the target area and surrounding residential areas to better the streetscapes, improve public parks, or establish community facilities. Basis for City of Bremerton's street and park maintenance budgets are shrinking while Relative infrastructure maintenance needs are increasing. The City hopes to implement the Priority redevelopment of streetscapes with street furnishing, improved lighting, and increased accessibility as well as improve the city's public parks in the target area. Narrative (Optional) City of Bremerton will utilize funds to address "high" priorities. Consolidated PlanBREMERTON 50 OMB Control No: 2506-0117 (exp. 07/31/2015) s from HUD and is The City of Bremerton will release Request for target area, or for Economic Development in Residential Target area, the Slum and Blight ement of slum and resources including State resources, private the City as a whole. RFP's will also focus on include: economic development, housing, The County is the City's priorities of use of funds which applicants to leverage funds from other Downtown Funding Proposals based on the City's resources, or other public resources. blight. The City strongly encourages Narrative Description for Home Investment Partnership (HOME) funds from HUD. geographic priorities of the the lead agency responsible for administration of HOME funds. The City of Bremerton receives a direct allocation of CDBG fund 51 public facilities, and abat of ConPlan Reminder Available 1,560,000 Amount Expected $ 91.420(b), 91.215(a)(4), 91.220(c)(1,2) Anticipated Resources 390,000 Total: $ Expected Amount Available Year 1 BREMERTON Resources: 0 Prior Year $ - Kitsap County the City of Bremerton together formed a consortium 14 Table Income: 0 Program $ Allocation: 390,000 Annual $ nds. responsible for administration of their fu - 35 Anticipated Resources Public Services Improvements Uses of Funds Consolidated Plan Development Admin and 07/31/2015) Acquisition Economic Planning Housing Public Anticipated Resources 0117 (exp. federal Source - public Funds of - OMB Control No: 2506 Introduction Program CDBG - SP itten agreement is funds will leverage those additional resources (private, state and local funds), including a description of how urces of funding and provide a detailed budget to show how quired before to indicate what other funding is If appropriate, describe publically owned land or property located within the state that may be used to address the needs expected funds will be used. For HOME funded projects, documentation of commitment for all other funding in the project is re expected to be used for the project. All HOME projects must indicate what they will use as match for their project. When a wr 52 At the time of application, all applicants for CDBG or HOME funds must submit a Sources of Funding form executed for projects awarded CDBG or HOME funds, agencies must update the so BREMERTON funds are committed and a written agreement is executed. matching requirements will be satisfied Consolidated Plan 07/31/2015) 0117 (exp. identified in the plan Explain how federal - OMB Control No: 2506 Discussion SP-40 Institutional Delivery Structure -91.415, 91.215(k) Explain the institutional structure through which the jurisdiction will carry out its consolidated plan including private industry, non-profit organizations, and public institutions. Responsible Entity Responsible Entity RoleGeographic Area Served Type BREMERTON GovernmentNon-homeless special Jurisdiction needs Ownership Planning KITSAP COUNTY GovernmentHomelessness Other Non-homeless special needs Ownership Planning Bremerton Housing PHA Ownership Jurisdiction Authority Public Housing KITSAP COUNTY PHA Ownership Jurisdiction CONSOLIDATED Planning HOUSING AUTHORITY Public Housing Rental Table 15 - Institutional Delivery Structure Assess of Strengths and Gaps in the Institutional Delivery System The City of Bremerton has a wide variety of non-profit and government agencies working together to address our community’s most pressing needs. Kitsap Continuum of Care Coalition is actively meeting, planning and working to address homeless. Our county has fully implemented HMIS and conducts an annual Point in Time Count. The Homeless Housing Plan is being updated in 2015 and there are groups working on veterans homelessness and chronic homeless on the streets. Through a coordinated application process each year HOME funds along with Homeless Housing Grant funds and Affordable Housing Grant funds are awarded. This process has improved coordination of funding and allows better targeting of funds. These funding sources are administrated by the County and staff is housed in the Dept. of Human Services. The City of Bremerton’s HOME funds are also allocated through the Coordinated Grant Application process. Beginning in 2015 the City of Bremerton will utilize an RFP process to allocate CDBG funds which will be targeted towards economic development. There is a significant and growing need for affordable housing, and agencies including CHDOs with the ability to successfully develop new units in Kitsap County. However, the lack of funding available to develop new units, and rehabilitate existing aging housing, has resulted in a growing gap. Cuts to federal Consolidated PlanBREMERTON 53 OMB Control No: 2506-0117 (exp. 07/31/2015) and state funds for affordable housing have resulted in almost no new development of subsidized housing units over the last few years. If funds continue to decline, this trend will continue. Availability of services targeted to homeless persons and persons with HIV and mainstream services Homelessness Prevention Available in the Targeted to Targeted to People ServicesCommunityHomelesswith HIV Homelessness Prevention Services Counseling/Advocacy X Legal Assistance X Mortgage Assistance X Rental AssistanceXX Utilities AssistanceX Street Outreach Services Law Enforcement X Mobile Clinics X X Other Street Outreach Services X X Supportive Services Alcohol & Drug Abuse X Child Care X X Education X Employment and Employment Training X HealthcareX X HIV/AIDS X Life Skills X Mental Health Counseling X Transportation X Other X Table 16 - Homeless Prevention Services Summary Describe how the service delivery system including, but not limited to, the services listed above meet the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) The City of Bremerton homeless response system is coordinated through the Kitsap Continuum of Care Coalition, comprised of 40+ organizations providing prevention rental assistance, emergency shelter beds, transitional housing units, rapid rehousing subsidies, and permanent supportive housing units in tandem with a wide range of progressive engagement case management and tailored supports. Kitsap’s Consolidated PlanBREMERTON 54 OMB Control No: 2506-0117 (exp. 07/31/2015) coordinated entry program, the Housing Solutions Center, provides intake, assessment, and referrals for all households experiencing housing instability and homelessness. The Housing Solutions Center refers households to appropriate emergency housing resources and maintains a community-wide waiting list for emergency housing. Chronically homeless individuals are currently under-served in Kitsap, with few programs targeting their needs. Kitsap Community Resources provides a wide range of social services, including housing and supports, for homeless families. Veterans receive prevention funding through the Kitsap Veterans Assistance Fund, and rental assistance and case management through the Veterans Assistance and Supportive Housing (VASH) voucher and the Supportive Services for Veteran Families (SSVF) program. The Coffee Oasis provides a wide array of services for unaccompanied homeless and street-oriented youth, drop-in centers, case management, job training, and a youth shelter. Describe the strengths and gaps of the service delivery system for special needs population and persons experiencing homelessness, including, but not limited to, the services listed above The strength of the Kitsap homeless response system is in the leadership from elected officials and social service providers through the Kitsap Continuum of Care Coalition. Kitsap’s coordinated entry system, the Housing Solutions Center, is recognized as one of the best programs of its kind in the state. Other strengths include accurate data collection through the Kitsap Homeless Management Information System and data sharing between organizations, with periodic analysis and reports being generated. The Kitsap Coordinated Grant Application Process ensures effective investment of public funds and efficient grant administration. Despite great improvements in provision of housing and services to people experiencing homelessness, and a vastly improved capacity over the last 10 years, specific barriers and gaps to our community’s capacity to assist all people who are homelessness have been identified. These barriers and gaps are the underlying causes of Kitsap’s inability to meet the needs of all homeless residents at this time. They include: Insufficient funding Increased demand Limited capacity – both in housing stock and services, and in providers’ ability to expand service provision The following needs and gaps in homeless housing and resources have been identified: Emergency shelter for single men, men with children, couples, and large families Housing and services for homeless individuals entering the community from jails, correctional facilities, foster care, hospitals, and mental institutions, and who are chronically unsheltered. Overnight Shelter Consolidated PlanBREMERTON 55 OMB Control No: 2506-0117 (exp. 07/31/2015) Harm Reduction housing (for chronically unsheltered individuals) Additional units of Permanent Supportive Housing Coordination of case management both between homeless providers and among other systems of care Cross-sector leadership Citizen outreach and communication Integration of planning efforts The 2015 Kitsap Homeless Housing plan includes additional detail about the needs and gaps in the current homeless response system. Provide a summary of the strategy for overcoming gaps in the institutional structure and service delivery system for carrying out a strategy to address priority needs The 2015 Kitsap Homeless Housing Plan includes a strategic plan, comprising five goals with supporting strategies and action steps. Indicators of success are included for each goal. The overall goal of the Plan is to work together as a community to make homelessness a rare, brief, and one time occurrence in Kitsap County through an efficient and effective homeless response system. 1) Make homelessness rare (prevention strategies). 2) Make homelessness brief (crisis response strategies). 3) Make homelessness one-time (ensure long-term housing stability strategies). 4) Continuously improve the homeless response system (increase capacity and efficiency strategies). 5) Expand community engagement (leadership, planning, and communication strategies). Consolidated PlanBREMERTON 56 OMB Control No: 2506-0117 (exp. 07/31/2015) Direct Financial Assistance to Homeowner Housing Added: Goal Outcome Indicator 16 Household Housing Unit12 Household Housing Unit20 Household Housing Unit12 Household Housing Unit Rental units rehabilitated: Rental units constructed: 55 Households Assisted Homeowner Housing Rehabilitated: Homebuyers: 57 Funding Affordable Housing Needs Addressed Geographic Area BREMERTON Category Affordable Housing End Year 2020 91.415, 91.215(a)(4) Start Year 2016 Consolidated Plan 07/31/2015) Goals Summary Information Increase Affordable Goal Name Preserve and 0117 (exp. Housing - - 45 Goals OMB Control No: 2506 Sort Order - SP 1 Low/Moderate Income Housing Low/Moderate Income Housing or Infrastructure ture Goal Outcome Indicator treatment/business Facade treatment/business Public Facility or Infrastruc 220 Businesses Assisted building rehabilitation:building rehabilitation: Jobs created/retained:Jobs created/retained: 20 Businesses Assisted 5620 Persons Assisted Activities other than Activities other than 965 Persons Assisted Businesses assisted:Businesses assisted: Public Facility 10 Business 5 Business Benefit:Benefit: Facade 35 Jobs65 Jobs 58 $1,014,000 $357,500$195,000$292,500 CDBG: CDBG: CDBG: CDBG: Funding Blight Conditions Needs Addressed Public Facilities Abatement of DevelopmentDevelopment Downtown Economic Economic Geographic Area BREMERTON Housing Housing Housing Housing DevelopmentDevelopmentDevelopmentDevelopment Category Community Community Community Community ---- NonNonNonNon End Year 20202020 20202020 Start Year 20162016 20162016 Consolidated Plan 07/31/2015) Increase economic City City - Public Facilities Goal Name - Development opportunities Abate Blight 0117 (exp. Conditions Economic Wide - OMB Control No: 2506 Sort Order 2345 r commercial opportunities. The city also supports business development, education, and sustainabilty. emphasis on economic opportunities focusing on its downtown core by implementing facade improvements, and abatement s. affordable housing is critically important. The City of Bremerton will preserve and expand the supply of affordable housing City of Bremerton will continue to support fair housing strategies and initiatives rehabilitation, public facilities and improvements, job trainings, microenterprise development, and creating or retaining job Support the abatement of blight in the designated downtown blight zone by mitigating code violations, improving safety Facade improvements in designated blight zone, creation of green/walkable streetscapes. Creation of parks/recreation Lack of economic opportunities ranked as the number one issue facing our community. The city plans to place a strong d of funds for projects which create new units of housing through new construction and acqusition; income rehabilitation and weatherization of homeowner units; rehabilitation of rental housing units; and direct homebuyer ake place in the downtown CDBG target area. Projects will include commercial income population of the city, - sufficiency for low 59 activities, fire prevention improvements, street improvements, community/neighborhood centers. - City of Bremerton will fund economic development programs that increase economic self - The City has a high percentage of renters and a low vacancy rate. Because of the low Goals Summary systems and seismic upgrades. BREMERTON designed to affirmatively further fair housing choice. – 17 Table assistance for the purchase of homes. The Preserve and Increase Affordable Housing individuals and create jobs. This will t Increase economic opportunities suppression Conditions of blight conditions fo City issues such as fire through the awarConsolidated Plan - Public Facilities 07/31/2015) Abate Blight 0117 (exp. Goal Descriptions - OMB Control No: 2506 DescriptionDescriptionDescriptionDescription Goal NameGoal NameGoal NameGoal Name Goal Goal Goal Goal 1234 jurisdiction will provide This will focus on business education programs to help create or sustain jobs thereby improving economic stability for 60 income families to whom the - income, and moderate BREMERTON affordable housing as defined by HOME 91.315(b)(2) - income, low City Wide - - Economic Development Estimate the number of extremely low Bremerton residents. Consolidated Plan 07/31/2015) 16 households55 households 0117 (exp. - OMB Control No: 2506 Description -- Goal Name 50% AMI80% AMI Goal -- 31%51% 5 Consolidated PlanBREMERTON 61 OMB Control No: 2506-0117 (exp. 07/31/2015) SP-65 Lead-based Paint Hazards - 91.415, 91.215(i) Actions to address LBP hazards and increase access to housingwithout LBP hazards All housing funded with CDBG constructed before 1978 must comply with lead-based paint regulations at 24 CFR Part 35. The purpose of the regulation is to identify and address lead-based paint hazards before children are exposed to lead. All housing projects are required to complete the Lead Safe Housing Requirements Screening Worksheet. The worksheet is used to determine if the project is Exempt or if additional follow-up is required. The City of Bremerton has specific policies and procedures in place for lead disclosure, lead evaluation and assessment and lead safe work practices. The potential for lead is also evaluated during the environmental review of projects funded with CDBG, including non-housing projects. Projects where lead is suspected are required to have a risk assessment performed and a written report with recommendations for action completed. How are the actions listed above integrated into housing policies and procedures? The City of Bremerton has policies and procedures that follow Lead Safe Housing Rules. All housing funded with CDBG funds must follow these requirements. Consolidated PlanBREMERTON 62 OMB Control No: 2506-0117 (exp. 07/31/2015) SP-70 Anti-Poverty Strategy - 91.415, 91.215(j) Jurisdiction Goals, Programs and Policies for reducing the number of Poverty-Level Families Although the City of Bremerton does not have a stated strategy or plan for reducing the number of poverty-level families, the City works with area service providers, the faith-based community, local business and other governmental entities to address poverty in the community. Most existing programs serve low-income individuals and families and many are targeted to specific populations such as the elderly, disabled, veterans, homeless, etc. They are not necessarily specifically targeted towards those below the federal poverty level. How are the Jurisdiction poverty reducing goals, programs, and policies coordinated with this affordable housing plan The City of Bremerton has many different programs, and public funding sources, directed at low-income individuals and families including those in poverty. The primary goal of this plan is to focus a portion of CDBG funds on housing, particularly housing for households with incomes below 50% of area median income. These households are the most cost burdened and are often forced to make difficult choices about food and medical care in order to maintain housing. While the City of Bremerton will not use funds for services that meet basic needs, the City believes that by creating more economic opportunities citizens will have the chance to help bring themselves out of poverty and promote self-sufficiency such as programs that promote employment and create jobs. Consolidated PlanBREMERTON 63 OMB Control No: 2506-0117 (exp. 07/31/2015) SP-80 Monitoring - 91.230 Describe the standards and procedures that the jurisdiction will use to monitor activities carried out in furtherance of the plan and will use to ensure long-term compliance with requirements of the programs involved, including minority business outreach and the comprehensive planning requirements The City of Bremerton Block Grant staff conduct annual desk and on-site subrecipient monitoring of eligibility, performance, compliance, regulations and accomplishments as well as tracking financial data. The City and County together have established clear policies and procedures for carrying out this responsibility. Kitsap County is responsible for monitoring eligibility, performance, compliance, regulations, and accomplishments as well as tracking financial data for HOME Consortium funds. The City is responsible for City CDBG funds. Each sub-recipient must sign a contract with the City outlining roles and obligations of the City and sub- recipient and laying out the framework for the monitoring requirements. All contracts contain timelines and scope of work to promote timeliness of expenditures and compliance with specific goals and requirements. The project manager is responsible for clearly conveying the requirements described in the agreement to the sub-recipients. Throughout the year, sub-recipients are responsible for submitting quarterly reports, quarterly demographics, budget reconciliation forms, and each voucher is accompanies by a summary of appropriate back-up copies of original receipts and checks. Questions of capacity and expertise are reviewed through this process, and supported where necessary by technical assistance, resource referral, or guidance. Information collected throughout the year is used to provide direction for on-site monitoring at least once a year. Quarterly reports are used to determine funding eligibility and timeliness of expenditures. In addition to monitoring specific projects under contractual agreements, Block Grant staff provides resource material, information, instruction, guidance and referrals proactively to organizations in need of support. Each program year, Block Grant staff conducts an initial desk-monitoring, followed by an on-side sub- recipient review of project and program records related to grant performance and fiscal accountability. The purpose of the review is to assess performance against the agreement, and to verify all federal state and local regulations are satisfied. Where required, monitoring for affordability is also performed on site. Housing Quality Standards (HQS) inspections are performed consistent with HUD requirements by qualified inspectors and reviewed or completed by Block Grant project managers. Each on-site monitoring follows specific procedures and a written checklist that is maintained in the files. Letters of findings with a specific timeline for resolution are written to each contract sub-recipient. Sub-recipients are monitored in a timely manner for compliance with these written requests, and given assistance or guidance where necessary. Consolidated PlanBREMERTON 64 OMB Control No: 2506-0117 (exp. 07/31/2015) 65 BREMERTON Consolidated Plan 07/31/2015) 0117 (exp. - OMB Control No: 2506 allocation of CDBG funds from HUD and is release Request for target area, or for Economic Development in Residential Target area, the Slum and Blight public facilities, and abatement of slum and resources including State resources, private the City as a whole. RFP's will also focus on include: economic development, housing, The County is use of funds which applicants to leverage funds from other geographic priorities of the Downtown Funding Proposals based on the City's ources. blight. The City strongly encourages Narrative Description resources, or other public res Kitsap County the City of Bremerton together formed a consortium for Home Investment Partnership (HOME) funds from HUD. The City of Bremerton will 66 the City's priorities of the lead agency responsible for administration of HOME funds. The City of Bremerton receives a direct of ConPlan Reminder Available 1,560,000 Amount Expected $ Expected Resources 390,000 Total: $ Expected Amount Available Year 1 BREMERTON Resources: 0 Prior Year $ 91.420(b), 91.220(c)(1,2) Income: 0 Program $ Allocation: 390,000 Annual $ r administration of their funds. Public Services Improvements Uses of Funds Consolidated Plan Development - 15 Expected Resources Admin and 07/31/2015) Acquisition Economic Planning Housing Public Anticipated Resources 0117 (exp. federal Source - public Funds of - OMB Control No: 2506 responsible fo Introduction Program CDBG - AP a written agreement is of how o show how funding in the project is required before unding is Explain how federal funds will leverage those additional resources (private, state and local funds), including a description executed for projects awarded CDBG or HOME funds, agencies must update the sources of funding and provide a detailed budget t the time of application, all applicants for CDBG or HOME funds must submit a Sources of Funding form to indicate what other f 67 ct. When expected to be used for the project. All HOME projects must indicate what they will use as match for their proje expected funds will be used. For HOME funded projects, documentation of commitment for all other Priority Table – Expected Resources BREMERTON - funds are committed and a written agreement is executed. 18 Table matching requirements will be satisfied Consolidated Plan 07/31/2015) 0117 (exp. - OMB Control No: 2506 At Income Housing Benefit: 5620 Persons Income Housing Benefit: 965 Persons Activities other than Low/Moderate es other than Low/Moderate Facade treatment/business building Facade treatment/business building Businesses assisted: 220 Businesses Businesses assisted: 20 Businesses Public Facility or Infrastructure Public Facility or Infrastructure Goal Outcome Indicator Jobs created/retained: 35 Jobscreated/retained: 65 Jobs rehabilitation: 10 Business rehabilitation: 5 Business AssistedAssistedAssistedAssisted68 Activiti Jobs $1,014,000$357,500$195,000$292,500 CDBG: CDBG: CDBG: CDBG: Funding DevelopmentDevelopment Addressed Needs Economic Economic Annual Goals and Objectives Goals Summary Geographic 91.420, 91.220(c)(3)&(e) Area BREMERTON – 19 Table Housing Housing Housing Housing DevelopmentDevelopmentDevelopmentDevelopment Category Community Community Community Community Affordable Housing ---- NonNonNonNon - 20 Annual Goals and Objectives End Year 2020 2020 2020 2020 2020 Start Year 2016 2016 2016 2016 2016 Consolidated Plan 07/31/2015) Goals Summary Information Increase Affordable Increase economic City City - Public Facilities Goal Name - Preserve and Development opportunities Abate Blight 0117 (exp. Conditions Economic Housing Wide - OMB Control No: 2506 Sort Order - AP 12345 r commercial opportunities. The city also supports business development, education, and sustainabilty. emphasis on economic opportunities focusing on its downtown core by implementing facade improvements, and abatement s. affordable housing is critically important. The City of Bremerton will preserve and expand the supply of affordable housing City of Bremerton will continue to support fair housing strategies and initiatives rehabilitation, public facilities and improvements, job trainings, microenterprise development, and creating or retaining job Support the abatement of blight in the designated downtown blight zone by mitigating code violations, improving safety Facade improvements in designated blight zone, creation of green/walkable streetscapes. Creation of parks/recreation Lack of economic opportunities ranked as the number one issue facing our community. The city plans to place a strong d of funds for projects which create new units of housing through new construction and acqusition; income rehabilitation and weatherization of homeowner units; rehabilitation of rental housing units; and direct homebuyer ake place in the downtown CDBG target area. Projects will include commercial income population of the city, - sufficiency for low 69 activities, fire prevention improvements, street improvements, community/neighborhood centers. - City of Bremerton will fund economic development programs that increase economic self - The City has a high percentage of renters and a low vacancy rate. Because of the low systems and seismic upgrades. BREMERTON designed to affirmatively further fair housing choice. assistance for the purchase of homes. The Preserve and Increase Affordable Housing individuals and create jobs. This will t Increase economic opportunities suppression Conditions of blight conditions fo City issues such as fire through the awarConsolidated Plan - Public Facilities 07/31/2015) Abate Blight 0117 (exp. Goal Descriptions - OMB Control No: 2506 DescriptionDescriptionDescriptionDescription Goal NameGoal NameGoal NameGoal Name Goal Goal Goal Goal 1234 This will focus on business education programs to help create or sustain jobs thereby improving economic stability for 70 BREMERTON City Wide - Economic Development Bremerton residents. Consolidated Plan 07/31/2015) 0117 (exp. - OMB Control No: 2506 Description Goal Name Goal 5 AP-35 Projects - 91.420, 91.220(d) Introduction # Project Name 1 CDBG Administration 2Facade Improvement 3 Blight Abatement 4 Kitsap Community Resources-Business Education Support and Training 5 Kitsap Community Resources-Weatherization and Minor Home Repair 6 Community Frameworks-Built in Bremerton 3 Table 20 – Project Information Describe the reasons for allocation priorities and any obstacles to addressing underserved needs Consolidated PlanBREMERTON 71 OMB Control No: 2506-0117 (exp. 07/31/2015) CDBG Grant administration is the general management and coordination of the CDBG/HOME programs, other sources of funding for community development. 20% of our CDBG entitlement may be used for and development of 72 including federal regulation compliance, annual monitoring, citizen participation planning and administrative costs to deliver the CDBG program requirements. BREMERTON Increase economic opportunities Economic Development Facade Improvement CDBG Administration CDBG: $78,000 12/31/2016 Consolidated Plan Estimate the number and type 07/31/2015) Project Summary Information from the proposed activities es that will benefit 38 Project Summary 0117 (exp. Location Description Planned Activities Needs AddressedNeeds Addressed Goals SupportedGoals Supported Project NameProject Name - OMB Control No: 2506 Target AreaTarget DateTarget Area Description of famili Funding - AP 12 appeal of the property and increase the likelihood of future redevelopment of the property, and the block. e since 1977. Eventually this redevelopment Funding will go towards mitigating code violations by installing a fire suppression sprinkler systems. This on Fourth Street for three income population in the surrounding area and a This project will provide for the eventual repurposing of the building for a live/work space creating job vacant properties which have sat vacant for 4 decades. This funding will improve the appearance and building has been vacant since 1983 and by installing this sprinkler it would bring the building up to will lead to increased economic opportunities and affordable housing for the downtown area. with over 50% of vacant buildings. 73 façade Funding will pay for the improvement and repurposing of the building struggling downtown which has been a designated blight zon - Facade improvements for a vacant building in a block This project will provide an area wide benefit to a low y. current building codes and allow for occupanc Abatement of Blight Conditions Downtown BREMERTON sing. opportunities and affordable hou Increase economic opportunities 228/230& 252 4th Street Abate Blight Conditions Blight Abatement $235,629 CDBG: $39,000 249 4th Street 016 12/31/2016 12/31/2 CDBG: Consolidated Plan Estimate the number and type Estimate the number and type 07/31/2015) from the proposed activitiesfrom the proposed activities of families that will benefit of families that will benefit 0117 (exp. Location DescriptionLocation Description Planned Activities Needs Addressed Goals Supported Project Name - OMB Control No: 2506 Target DateTarget AreaTarget Date DescriptionDescription FundingFunding 3 aspects of the program, including marketing and enrollment, business training classes, business support In 2016 BE$T plans to guide and support 79 Bremerton and Kitsap County residents as they create small time, dedicated staff member at Kitsap Community Resources to manage all through Washington CASH. This project seeks to provide the tools needed for an individual to reach financial sustainability through 74 Business Education Support and Training icro lending m one technical assistance, workshops, BREMERTON City Wide - Kitsap Community Resources - - Funds will support 1 full Economic DevelopmentEconomic Development paying businesses. entrepreneurship. - on CDBG: $59,000 - groups, one - tax Consolidated Plan Estimate the number and type 07/31/2015) d activities of families that will benefit 0117 (exp. Location Description Planned Activities from the propose Needs Addressed Goals Supported Project Name - OMB Control No: 2506 Target AreaTarget Date Description Funding 4 will provide weatherization and minor home repair services for 6 income eligible homes within the plumbing. Extra emphasis will be placed on increasing accessibility in rental units by installing wheelchair pumps and combustion safety evaluation. It will also include minor home repairs that may include repair d 2020 Consolidated Plan target area. This will include installing measures which erton Residents. or testing to assess heat leakage, ductless heat or replacement of a leaking roof, as well as health and safety improvements such as repairing wiring an 2016 BE$T Annual Showcase to provide opportunity for graduates to display and sell their Training classes for 64 individuals that complete the training class 75 For the activities identified above, approximately half of the participants will be Brem one technical and legal counseling and assistance Eight advanced workshops on business topics for 60 attendees Weatherization and Minor Home Repair Four Get Ready Workshops & Orientations for 79 individuals 20 Business Support Group meetings for 60 individuals improve energy efficiency such as insulation, blower do products and services to the community. Eight volunteers logging 100+ hours Preserve and Increase Affordable Housing BREMERTON shower grab bars. - - on Kitsap Community Resources - 80 sessions of one - City of Bremerton 2016 Four Business Affordable Housing CDBG: $17,871 - ramps, and in 12/31/2016 Funds Consolidated Plan 07/31/2015) 0117 (exp. Planned Activities Needs Addressed Goals Supported Project Name - OMB Control No: 2506 Target AreaTarget Date Description Funding 5 re rehabilitated participating in the Built in Bremerton homeownership program, and to pay administrative costs such as HOME funds will be used to provide Down Payment Assistance (DPA) for approximately 12 homebuyers income homebuyers who fall under the 80% Area Median Income Bremerton is a local homeownership program in which Community Frameworks purchases vacant ting the program and processing homebuyer applications and closings. Built in foreclosed, or otherwise dilapidated homes within the Bremerton City Limits. The homes a 76 Built in Bremerton 3 Preserve and Increase Affordable Housing BREMERTON - and made available for sale to low homebuyers - 6 low income households Community Frameworks affirmatively marke Affordable Housing CDBG: $169,809 12 low income 12/31/2017 limits. Consolidated Plan Estimate the number and type Estimate the number and type 07/31/2015) from the proposed activities activities of families that will benefit of families that will benefit 0117 (exp. Location DescriptionLocation Description from the proposed Planned ActivitiesPlanned Activities Needs Addressed Goals Supported Project Name - OMB Control No: 2506 Target AreaTarget Date Description Funding 6 AP-50 Geographic Distribution - 91.420, 91.220(f) Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed The City of Bremerton is generally characterized by lower income neighborhoods. According to HUD Low-Mod Income Summary Data, it has the highest concentration of low-income households in Kitsap County with approximately 62% of the households in the City at or below 80% of the area median income. The downtown/residential core NRSA where all of the CDBG funding will be directed has a percentage of Low/Mod of 72% with the median household income at $30,931 which is significantly lower than the City's median household income at $43,183 and the County's at $62,413. In addition, the City of Bremerton has one designated blight zone: its Downtown Core. 55% of these funds will be targeted in this area with 10% broken down to help abate blight conditions in the blight zone. The remaining 15% will be available for economic development projects city-wide. All of the City of Bremerton's funding is directed to programs and projects which address the needs of individuals and families with incomes at 80% and below area median income, as established by HUD. Most projects in 2016 are able to qualify under area benefit, particularly public facilities serving the City as a whole. Bremerton does not generally have geographic concentrations of racial/minority groups but racial/minority population counts are on the rise. Geographic Distribution Target Area Percentage of Funds C DBG Target Area 65% Table 21 - Geographic Distribution Rationale for the priorities for allocating investments geographically Based on community outreach and surveys the number one issue facing the City was lack of economic opportunities. The City also has a downtown which has been a designated blight zone since 1977. By investing in downtown the City hopes to create commercial investment and housing units which will greatly impact the economy of the City. Consolidated PlanBREMERTON 77 OMB Control No: 2506-0117 (exp. 07/31/2015) AP-85 Other Actions - 91.420, 91.220(k) Introduction During preparations of the 2016-2020 Consolidated Plan a community survey was used to help identify the obstacles to meeting underserved needs. Survey information along with information provided by agencies and data from the Community Needs Assessment indicated the following barriers faced by persons attempting to obtain services in the community: lack of economic opportunities, lack of affordable housing, and not enough services for low income people. In 2016 the City will be funding facade improvement in the downtown core. This facade improvement will take place in a designated blight zone for a building which will have units of affordable housing, as well as commercial space for the creation of economic opportunities. With this initial investment in the downtown core to rehab buildings which have been vacant since the 1980's there will be a drive for increased economic opportunities in the downtown core. The Bremerton/Kitsap Consolidated Plan identifies goals and strategies for economic development, and have strategically positioned themselves to prioritize projects which can effectively carry out Economic Development projects. This year not only the Council approve funding allocation for facade improvements downtown, but it also adopted a 15% set-aside of available CDBG funds for Economic Development projects. This was awarded to Kitsap Community Resources Business Education Support and Training program which has a track record of success in Kitsap County and will plan on serving 37 Bremerton residents. The objectives and strategies of the 2016-2020 Consolidated Plan are generally focused on improving economic opportunities, and improving Bremerton's affordable housing stock. Actions planned to reduce lead-based paint hazards The City of Bremerton has allocated funds towards Blight abatement and Weatherization and minor home repair. Within the uses of these funds there is an incentive to assess lead-based paint hazard risks and abate as needed. The City of Bremerton HOME funds will be allocated to Community Frameworks for their Built in Bremerton program which conducts lead-based paint abatement on a case-by-base basis. Consolidated PlanBREMERTON 78 OMB Control No: 2506-0117 (exp. 07/31/2015) Program Specific Requirements AP-90 Program Specific Requirements - 91.420, 91.220(l)(1,2,4) Introduction Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out. Community Development Block Grant Program (CDBG) Reference 24 CFR 91.220(l)(1) Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out. 1. The total amount of program income that will have been received before the start of the next program year and that has not yet been reprogrammed 0 2. The amount of proceeds from section 108 loan guarantees that will be used during the year to address the priority needs and specific objectives identified in the grantee's strategic plan. 0 3. The amount of surplus funds from urban renewal settlements0 4. The amount of any grant funds returned to the line of credit for which the planned use has not been included in a prior statement or plan 0 5. The amount of income from float-funded activities 0 Total Program Income:0 Other CDBG Requirements 1. The amount of urgent need activities 0 2. The estimated percentage of CDBG funds that will be used for activities that benefit persons of low and moderate income. OverallBenefit - A consecutive period of one, two or three years may be used to determine that a minimum overall benefit of 70% of CDBG funds is used to benefit persons of low and moderate income. Specify the years covered that include this Annual Action Plan. 100.00% Consolidated PlanBREMERTON 79 OMB Control No: 2506-0117 (exp. 07/31/2015) Discussion The City of Bremerton has not budgeted program income into its 2016 estimate of anticipated, available CDBG funding. However, if CDBG program income is received during 2016, it will be used prior to making additional draws from the City’s HUD line of credit to offset expenditures for projects or Administration included in the Action Plan, as allowable. Any grant funds not expended due to receipt of program income will be carried forward to the next funding year. The City of Bremerton does not have any float funded activities, proceeds from Section 108 loan guarantees, surplus funds from an urban renewal settlement, or funds returned to the line of credit. Every activity funded with CDBG funds must benefit low-income persons in our community, or abate blight conditions. The method for determining benefit depends on the nature of the activity, but overall, the City must ensure that at least 70% of the aggregate CDBG expenditures be for activities benefitting low-income persons. Most of the City's CDBG funded activities will meet this criteria. Consolidated PlanBREMERTON 80 OMB Control No: 2506-0117 (exp. 07/31/2015) Consolidated PlanBREMERTON 81 OMB Control No: 2506-0117 (exp. 07/31/2015)