SUBJECT: Professional Services Study Session Date: October 28, 2015
Agreement with HDR, Inc. for Design of COUNCIL MEETING Date: November 4, 2015
Reservoir 4 Cover Replacement Department: Engineering
Presenter: Bill Davis
Phone: (360) 473-2312
SUMMARY: Based on an evaluation of qualified consultants, the City has selected HDR Inc. to
design a hard cover for Reservoir 4, an 11 million gallon in-ground reservoir located in West
Bremerton. The previous two membrane covers failed within approximately 10 to 15 years of
installation. The new hard cover is expected to have a 50-year life span.
Four consultants were sent a Request for Proposals (RFPs). All four consultants submitted proposals to
the City. HDR, Inc. was selected for the work based on their experience, qualifications and project
approach. A scope of work was submitted and negotiated in the amount of$288,694. The requested
action before the City Council is authorization for the Mayor to finalize and execute the consultant
agreement.
ATTACHMENTS: 1) Council Summary
2) Professional Services Agreement— including Exhibits A, B & C
3) Site Plan
FISCAL IMPACTS (Include Budgeted Amount): The design and construction of this project is
included in the 2015 and 2016 budgets. The work is funded by DWSRF Loan # DM15-952-026 for
$2,300,000 previously approved for this project.
STUDY SESSION AGENDA: ❑x No Presentation ❑ Full Presentation
STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to authorize the Mayor to finalize and execute the Professional
Services Agreement with HDR, Inc. for design of the Reservoir 4 Cover Replacement with
substantially the same terms and conditions as presented.
COUNCIL ACTION: 0 Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action