HomeMy WebLinkAbout018 RESOLUTION NO. 018
A RESOLUTION of the Board of the Bremerton
Transportation Benefit District, authorizing street
maintenance, repair and construction projects for 2016.
WHEREAS, in Ordinance No. 5076, the City Council of the City of Bremerton
established the Bremerton Transportation Benefit District as authorized by RCW 35.21.225 and
subject to the provisions of RCW 36.73; and
WHEREAS, in Resolution No. 005, the Bremerton Transportation Benefit District
established an annual vehicle license fee in the amount of twenty-dollars($20.00),consistent with
RCW 36.73.065, to be collected by the Washington Department of Licensing on qualifying
vehicles as set forth in RCW 82.80.140 and Chapters 36.73 and 46.16 RCW;and
WHEREAS, the funds collected from the vehicle license fee shall be used for
transportation improvements that preserve and maintain and improve the transportation
infrastructure of the City consistent with the requirements of Chapter 36.73 RCW. The funds
shall be used primarily for improvements to preserve and maintain the City's previous
investments in the transportation infrastructure, reduce the risk of transportation facility failure,
improve safety, continue the cost-effectiveness of the City's infrastructure investments, continue
the optimal performance of the transportation system, and make other related improvements as
authorized by Chapter 36.73 RCW; and
WHEREAS,the Board of the Bremerton Transportation Benefit District desires to
formalize a project list for 2016 funding;NOW THEREFORE,
THE BOARD OF THE BREMERTON TRANSPORTATION BENEFIT
DISTRICT DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That the Work Plan as set forth in Exhibit A attached hereto and
incorporated for reference is hereby approved and adopted.
SECTION 2. Severubilitv. If any one or more sections,subsections,or
sentences of this Resolution are held to be unconstitutional or invalid,such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect.
SECTION3. E(�fectii�e Date. This Resolution shall take effect and be in force
immediately upon its passage. �l
�ASSED by the Board of the Bremerton Transportatio istrict this��'
,2015.
Dino Davis,Preside
ST: . APPROVED AS TO FORM:
Shannon Corin,Board Clerk r A. Lubovich, oar rre��
TBD-2016 Street Maintenance,Repair and Construction Projects
Exhibit A
to the
Bremerton Transportation Benefit District 2016 Work Plan Authorizin� Resolution
Proposed 2016 TBD Work Plan:
Activitv/Investment Allocation Method
1. In-House and Contract Maintenance Programs $200,000 (in-house and contract)
2. Austin Drive Overlay $108,000 (contract)
3. Warren Avenue Corridor ADA Ramps $100,000 (contract)
Budget Target $408,000