Loading...
HomeMy WebLinkAbout018 RESOLUTION NO. 018 A RESOLUTION of the Board of the Bremerton Transportation Benefit District, authorizing street maintenance, repair and construction projects for 2016. WHEREAS, in Ordinance No. 5076, the City Council of the City of Bremerton established the Bremerton Transportation Benefit District as authorized by RCW 35.21.225 and subject to the provisions of RCW 36.73; and WHEREAS, in Resolution No. 005, the Bremerton Transportation Benefit District established an annual vehicle license fee in the amount of twenty-dollars($20.00),consistent with RCW 36.73.065, to be collected by the Washington Department of Licensing on qualifying vehicles as set forth in RCW 82.80.140 and Chapters 36.73 and 46.16 RCW;and WHEREAS, the funds collected from the vehicle license fee shall be used for transportation improvements that preserve and maintain and improve the transportation infrastructure of the City consistent with the requirements of Chapter 36.73 RCW. The funds shall be used primarily for improvements to preserve and maintain the City's previous investments in the transportation infrastructure, reduce the risk of transportation facility failure, improve safety, continue the cost-effectiveness of the City's infrastructure investments, continue the optimal performance of the transportation system, and make other related improvements as authorized by Chapter 36.73 RCW; and WHEREAS,the Board of the Bremerton Transportation Benefit District desires to formalize a project list for 2016 funding;NOW THEREFORE, THE BOARD OF THE BREMERTON TRANSPORTATION BENEFIT DISTRICT DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That the Work Plan as set forth in Exhibit A attached hereto and incorporated for reference is hereby approved and adopted. SECTION 2. Severubilitv. If any one or more sections,subsections,or sentences of this Resolution are held to be unconstitutional or invalid,such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION3. E(�fectii�e Date. This Resolution shall take effect and be in force immediately upon its passage. �l �ASSED by the Board of the Bremerton Transportatio istrict this��' ,2015. Dino Davis,Preside ST: . APPROVED AS TO FORM: Shannon Corin,Board Clerk r A. Lubovich, oar rre�� TBD-2016 Street Maintenance,Repair and Construction Projects Exhibit A to the Bremerton Transportation Benefit District 2016 Work Plan Authorizin� Resolution Proposed 2016 TBD Work Plan: Activitv/Investment Allocation Method 1. In-House and Contract Maintenance Programs $200,000 (in-house and contract) 2. Austin Drive Overlay $108,000 (contract) 3. Warren Avenue Corridor ADA Ramps $100,000 (contract) Budget Target $408,000