Loading...
HomeMy WebLinkAbout10/07/2015 7A AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Award the Contract for the Flow Study Session Date: September 23, 2015 Control and Seismic Valve Project to Pape 8� COUNCIL MEETING Date: October 7, 2015 Sons Construction, Inc. . Department: Engineering Presenter: Ned Lever Phone: (360) 473-2398 SUMMARY: The work completed under this contract includes the installation of precast concrete vaults, isolation and flow control/seismic valves and RTU equipment enclosures. Work under this contract will occur at three separate sites in West Bremerton; the Warren Avenue Bridge; Snyder Ave near the 25th Street intersection; and at the Manette Bridge. There were seven bids submitted. NOVA Contracting Inc. was the apparent low bidder; however, their bid has been rejeeted as a result of numerous omissions in their bid documents. Pape& Sons Construction, Inc. is the lowest responsible, responsive bidder, in the amount of$898,949.00 (which includes sales tax). ATTACHMENTS: 1) Council Summary 2) Contract 3) Bid Tabulation 4) Letter& Public Works Department Response FISCAL IMPACTS (Include Budgeted Amount): The project is included in the 2015 budget and is - funded by DWSRF Loan of$1,000,000 previously approved for this project. STUDY SESSION AGENDA: 0 No Presentation ❑ Full Presentation STUDY SESSION ACTION: ❑ Consent Agenda � General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the bid for the Flow Control and Seismic Valve Project from Pape& Sons Construction, Inc. in the amount of$898,949.00 (which includes sales tax) and authorize Mayor to finalize and execute the contract with substantially the same terms and conditions as presented. COUNCIL ACTION: [�Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 07/07115