AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: SR303-Manette Bridge Sewer
Relocation Settlement Agreement with
WSDOT�
Study Session Date: 6/10/15
COUNCIL MEETING Date: 6/17/15
Department: PW�U
Presenter: Ned Lever
Phone: 473-5758
SUMAIIARY: A legacy issue associated with the construction of the Manette bridge has been the
improperly-constructed sewer line adjacent to a pier on the Manette side of the bridge. This sewer
line resulted in a backup in 2012 which released sewage into Port Washington Narrows. Public
Works and WSDOT staff have worked over the past three years to come to an agreement and move
forward. We believe it is reasonable and best for the City to make the repair, as sewer repair work is
not a WSDOT area of expertise. At issue has been the monetary value to assign to the repair risk.
Mayor Lent stepped in with a best and final offer, which WSDOT accepted. The attached agreement
formalizes the settlement.
ATTACHNIENTS: Settlement Agreement
FISCAL IIVIPACTS (Include Budgeted Amount): Neutral or positive. We believe we can make the
sewer line repairs within the $250,000 settlement amount.
STUDY SESSION AGENDA: � No Presentation ❑ Full Presentation
STUDY SESSION ACTION: � Consent Agenda O General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to approve the Manette Bridge Sewer Settlement Agreement with
WSDOT and authorize the Mayor to finalize and execute the agreement with substantially the same
terms and conditions as presented.
COUNClL ACTION: [�Approve
❑ Deny ❑ Table ❑ Continue ❑ No Action
Fortn Updated 01/07/15
R '
GCB 2102
SR 303/Manette Bridge Sewer Relocation
Settlement Agreement
This Settlement Agreement is made and entered into between the WASHINGTON STATE, Department
of Transportation, hereinafter the "State," and the City of Bremerton, 345 6th Street, Suite 600
Bremerton, WA 98337 , hereinafter the "City."
WHEREAS, the legislature deleted portions of SR 303 from the state highway system pursuant to RCW
47.17.555 in 1992; however, the legislature made the State responsible for the structural maintenance,
repair, and replacement of the Manette Bridge's substructure, superstructure, and roadway deck pursuant
to RCW 47.17.960, and.
WHEREAS, the State had a construction project to replace the Manette Bridge within the City corporate
limits, entitled "SR 303/Manette Bridge Bremerton Viciriity — Bridge Replacement," hereinafter the
"Project," and
WHEREAS, it was discovered that a City-owned sewer line conflicted with the construction of the
Project, requiring relocation of the sewer line, and
WHEREAS, the State relocated the sewer line as part of the Project at State expense by constructing a
new sewer line (Sewer Line) in a different location, and
WHEREAS, after construction, the Sewer Line profle had multiple sags which has the potential to
reduce capacity, increase the incidence of blockages, and require higher than normal maintenance, and
WHEREAS, the City has agreed to accept the Sewer Line in its present condition as constructed by the
State and to release and indemnify the State from all future responsibility for the operation,
maintenance, repair, and replacement of the Sewer Line, if the State will pay the City Two Hundred
Fifty Thousand ($250,000.00) dollars, and
WHEREAS, the cost to correct the Sewer Line profile would exceed Two Hundred Fifty Thousand
($250,000.00) dollars, and ,
WHEREAS, the State agrees to pay the City the agreed amount in exchange for the City accepting the
Sewer Line in its present condition, including accepting the sole responsibility for the operation,
maintenance, repair and replacement of the Sewer Line and in full settlement of any and all present and
future costs or damages caused by the State's construction and relocation of the Sewer Line,
NOW, THEItEFORE, pursuant to Title 47 RCW, the above recitals that are incorporated herein as if
fully set forth below, and in consideration of the terms, conditions, covenants, and performances
contained herein, and Exhibit A, attached hereto and made a part hereof,
IT IS MUTUALLY AGREED AS FOLLOWS:
GCB 2102
Page 1 of 3
ti
� . 1. GENERAL
1.1 The State agrees to settle all Project impacts to the Sewer Line, including its construction and
relocation, by making a one-time Settlement Payment of Two Hundred Fifty Thousand Dollars
($250,000.00), as shown in Exhibit A, to the City.
1.2 The City agrees to accept Two Hundred Fifty Thousand Dollars ($250,000.00) from the State as
full and complete settlement and compensation for all present and future Project impacts to the Sewer
Line, including its construction and relocation, and to assume at the City's sole cost and expense all
responsibility for maintenance, operation, repair, and replacement of the Sewer Line in its current
condition.
2. SETTLEMENT PAYMENT
2.1 Within thirty (30) calendar days from the date of execution of this Settlement Agreement, the
State will make a one-time lump sum Settlement Payment of Two Hundred Fifty Thousand Dollars
($250,000.00) to the City in full and complete settlement and compensation for all present and future
Project impacts to the Sewer Line, including its construction and relocation.
2.2 Upon the City's receipt of the State's Settlement Payment of Two Hundred Fifty Thousand
Dollars ($250,000.00), the City releases the State from any and all costs or claims, present and future,
for compensation due to the construction and relocation of the Sewer Line as part of the Project.
Further, the City agrees to and shall accept the Sewer Line in its present condition upon receipt of the
Settlement Payment and shall also accept, at its sole cost and expense, all responsibility for the
operation, maintenance, repair, and replacement of the Sewer Line.
3. TERM OF AGREEMENT
3.1 The term of this Agreement shall commence on the day and year this Agreement is fully
executed and shall continue until the City receives the State's Settlement Payment.
4. MODIFICATION
4.1 No modification of this Agreement is valid unless evidenced in writing by amendment to this
Agreement and signed by both Parties. No verbal agreement may supersede, replace or amend this
Agreement.
5. VENUE
5.1 In the event that either Party deems it necessary to institute legal action or proceedings to enforce
any right or obligation under this Agreement, the Parties hereto agree that any such action or
proceedings shall be brought in Thurston County Superior Court. Further, the Parties agree that each
will be solely responsible for payment of its own attorney fees, witness fees, and costs.
6. INDEMNIFICATION
6.1 The City shall protect, defend, indemnify, and hold harmless the State and its employees and
authorized agents, while acting within the scope of their employment as such, from any and all costs,
claims, judgments, and/or awards of damages (both to persons and/or property), arising out of, or in any
GCB 2102
Page 2 of 3
..
.:•
�
way resulting from, the City's obligations to perform the operation, maintenance, repair or replacement
of the Sewer Line pursuant to the provisions of this Agreement.
6.2 The City further agrees to release, defend, indemnify and hold harmless the State from and
against any and all claims, causes of action, demands and liability including, but not limited to, any
costs, liabilities, damages, expenses, assessments, penalties, fines, losses, judgments and attorneys' fees
associated with the removal or remediation of any hazardous substances that have been released, or
otherwise come to be associated with the relocated Sewer Line.
6.3 Section 6 shall survive the termination or expiration of this Settlement Agreement.
7. AUTHORIZING SIGNATURES
7.1 The persons signing this Settlement Agreement warrant that they have the respective power and
authority to execute and bind their respective Party to the terms and conditions of this Settlement
Agreement.
IN WITNESS WHEREOF, the Parties hereto have executed this Settlement Agreement as of the Party's
date signed last below.
CITY OF BREMERTON
By: � l�
Patty Le , ayor
Date: D G �Z �
APPROVED AS TO FORM
STATE OF WASHINGTON
DEPARTMENT OF TRANSPORTATION
B � -
K in J. ayton, Region Administrator
Date: _ �� NL� �i�7 , Z��,�
APPROVED AS TO FORM
4 ,
By: By: c.
City Attorney Ann E. Salay, Senior Counsel
6 � �5 - 2c� is— `-�
Date: �7 Date:
GCB 2102
Page 3 of 3
r�
1
.• ' .
�
i
i
, , � .
..F
�. '
Mayor Patty Lenfi
�]Y: .. .. _�:r.:' . .. .
December 18, 2014
7+.`. !"' � ,, i '3 ' '
3 '�!`9"'v .: � :.. r �
��
&° `
i
Mr. Nea! Campbeii
Local Programs Engineer
Washington State Department of Transportation
Olympic Region
F'O Box 47440
Olympia, WA 98504
RE: Manette Bridge Beach Sewer Replacement — Revised Settlement Offer
Dear Mr. Campbeli,
I want to thank you and the WSDOT Qlympic Region staff for yaur continuing efforts to work
with the City to resolve this important issue. Most recently, yaur meeting with our staff on
Tuesday, Oecember 16` at }�our Port Orchard offices was muct� appreciated. As you know,
our staff continues to be very concerned about the sewer line: the coRtinuing risk of feaving
it unrepaired, and also the significant rislc invofved in repairing it. We recognize that both
parties would like to sett{e this issue so that it can be put behind us. Therefore, in a final
effort to resalve this issue, we propose the following:
• Bremerton will immediately process an amendment to GCA-6458, and process for
payrnent the outstanding balance of $4,679.00.
• Bremerton wili submit for payment any remaining charges against GCA-6463 so that
this agreement can be clased out.
• WSDOT will pay the City �250,OD0.
• Bremerton will accept the sewer line and release WSDOT from future tiability
associated with the improperly constructed iine, subject to a written agreement
outlining the elements above.
Thank you in advance for your consideration of this settlement offer.
Respectfully,
..� T�-
Pa L t
Maya