Loading...
HomeMy WebLinkAbout5493 Contract Number: 5493 Vendor: YAMAMOTO LANDSCAPING Subject: PWA - Walker Park Construction Department: Parks File Class: GS55-05A-06 Rev. 1 Capital Assets (Real Property) Begin Date: 6/15/2015 End Date: 8/4/2015 Review Date: 9/1/2015 Vault Date: 2016 Comments: CO #1 8/6/15; CO #2 9/22/15 CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Walker Park Construction PROJECT NO: 8236 CONTRACTOR: Yamamoto Landscaping ORIGINAL CONTRACT AMOUNT: $20,245.38 DAYS: 30 PREVIOUSLY APPROVED CHANGES: $4,331.70 DAYS: 20 THIS CHANGE: $422.84 DAYS: 0 REVISED CONTRACT AMOUNT: $24,999.92 DAYS: 50 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. DESCRIPTION OF CHANGES INCREASE (DECREASE) IN CONTRACT o � IN CONTRACT TIME � � CONTRACT AMOUNT EXTENSION � � AMOUNT ($) (DAYS) � � ' ($) X 1 Work Change Directive#4 $389.00 0 0 5/8"gravel top course for leveling steps Subtotal of Change Order: $389.00 8.7% Sales Tax $33.84 Total of Change Order $422.84 NET CHANGE IN CONTRACT AMOUNT $422.84 INCREASE OR DECREASE Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: Walker Park Construction RECOMMENDED: G - ' � ' �� l� PROJECT MANAGER , Date . RECOMMENDED: � 3� � PAR DIR OR Date ACCEPTED: g�L2��� CO Date APPROVED: � �` �� MAYDR Date APPROVED AS TO FORM: AT � BPe erton City Atto City Clerk Page 2 of 2 . Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: 5493 YAMAMOTO LANDSCAPING PWA - Walker Park Construction Parks GS55-05A-06 Rev. 1 Capital Assets (Real Property) 6/15/2015 8/4/2015 9/1/2015 2016 Comments: CO #1 8/6/15 PUBLIC WORKS AGREEMENT THIS AGREEMENT, is entered into between the City of Bremerton, a Washington Municipal Corporation ("City"), and Yamamoto Landscapin� ("Contractor"), whose mailing address is 5765 Sidnev Rd. SW, Port Orchard, WA. 98367-9392. - �.,�_. The parties agree as follows: � 1. CONTRACTOR SERVICES. The Contractor shall perform the following services for the City: Removal of invasive plants on shoreline and installation of mortared steps to beach as detailed in attached scope of work. 2. TIME OF COMPLETION. Contractor shall complete the work (1) within 30 calendar days from the date of issuance of the City's Notice to Proceed. 3. COMPENSATION. The City shall pay the Contractor the total amount of $18,625, plus any applicable Washington State Sales Tax, for the work and services contemplated in this agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this agreement. A. No Performance Bond. Because this contract, including applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Retaina�e N/A C. Dcfective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to PUBLIC WORKS AGREEMENT—Page 1 of 10 Rev. 6/14 (behveen Ciry of'Bremerton and Yamamoto Landscaping Inc.) deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Pa�ment: Waiver of Claims. THE ACCEPTANCE OF FINAL PAYIVIENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERI,Y MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR F1NAL PAYMENT IS MADE. 4. INDEPENDEN'�' CONTRACTOR. Contractor is and shall be at all times acting as an independent contractor and not as an employee of the City. The Contractor shall secure at its expense, and shall be responsible for all payments of income tax, social security, state industrial insurance compensation, unemployment compensation, and all other payroll deductions for the Contractor, officer, agents, employees and, sub-contractors. The Contractor sha11 also secure all applicable business licenses, if required, in connection with the contract services, including all required licenses for Contractor's officers, agents, employees and sub- contractors. 5. '�'ERMINATION. The City may terminate this agreement without notice for good cause. "Good cause�' shall include, without limitation, any one or more of the following events: A. The Contractor's failure to supply sufficient skilled workers or suitable materials or equipment. B. The Contractor's failure to prosecute the work with such diligence as will ensure its physical completion within the original physical completion time specified in this Agreement and any extensions of time which may have been granted to the Contractor by change order or otherwise. C, D E. F. G The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. The Contractor's disregard of federal, state or local laws, rules or regulations. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. The Contractor disregards the authority of the City. Tlie .Contractor performs work which deviates from the Contract, and neglects or refuses to correct rejected work. H. The Contractor's failure to provide continuous competent supervision. PUBLIC WORKS AGREEMEN'I' — Page 2 of 10 Rev. 6/14 (behveen City of Bremerlon artd Y'mnantoto Landscaping htc.) I. The Contractor otherwise violates in any material way any provisions or requirements of the contract. If the City terminates this agreement for good cause, the Contractor shall not receive any monies due under this agreement, if any, until the Contract work is completed. 6. PREVAILING WAGES. Contractor shall file a"Statement of Intent to Pay Prevailing Wages," with the State of Washington Departinent of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. 7. CHANGES. The City may issue a written or oral work change directive for any change in the Contract work during the performance of this agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the City's project manager within two (2) business days of the date the Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written or oral work change directive from the City or a change order from the City. If the Contractor fails to require a change order within the time allowed, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided below: A. Procedure and Protest bv the Contractor. If the Contractor disagrees with anything required by a written work change directive, oral work change directive or change order, including any direction, instruction, interpretation, or determination by the City, the Contractor shall: 1. Give a signed written notice of protest to the City within one business day; 2. Supplement the written protest within five (5) calendar days with a written statement that provides the following infonnation: a. The date of the Contract's protest. b. The nature and circumstances that caused the protest. c. The provisions in this agreement that support the protest. d. The estimated dollar cost, if any, of the protested work and how that estimate was determined. PUBLIC WORKS AGREEMENT — Page 3 of 10 Rev. 6/14 (behveen City of Bre»�erton and Yamamoto Landscapirzg Inc.) e. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. The Contractor shall keep complete records of extra costs and time incurred as a result of the protested work. The City shall have access to any of the Contractor's records needed for evaluating the protest. 3. The City will evaluate all protests, provided the procedures in this section are followed. If the City determines that a protest is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. B. Contractor's Dutv to Complete Protested Work. In spite of any protest, the Contractor shall proceed promptly with the work as the City has ordered. C. Contractor's Acceptance . of Chan�es. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts form the City any written or oral order (including directions, instructions, interpretations, and determination). 8. CLAIMS. The Contractor shall give written notice to the City of all claims other than change orders within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is inade in strict accordance with the applicable provisions of this agreement; or, if (and only i� no such provision is applicable, unless that claim is set forth in detail in writing and received by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claiin. At a minimum, a Contractor's written claim must include the information set forth regarding protests in Section 7.A.2.a.-e. PUBLIC WORKS AGREEMENT — Page 4 of 10 Rev. 6/14 (between City ofBremerton and Yamamoto Lar�dscapirrg /nc.) FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING 1N ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. Contractor must, in any event, file any claim or bring any suit arising from or connected with this agreement within 120 calendar days from the date the contract work is complete. 9. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the Contractor's acceptance of the City's final payment under this contract. When defects are corrected, the warranty for that portion of the work shall extend for one year form the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including all legal costs and attorney fees, arising out of or in connection with the performance of this agreement, except for injuries and damages solely caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS 1NDEMNIFICATION CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL 1NSUR.ANCE, TITLE 51 RCW, SOLELY FOR TI-IE PURPOSF OF THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this agreement. � 11. INSURANCE. The Contractor shall procure and maintain for the duration of this agreement, insurance against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the Contract work by the Contractor, its agents, representatives, employees or subcontractors. PUBLIC WORKS AGREEMENT — Page 5 of 10 Rev. 6/14 (between Ciry of Bremerton and Yamamoto Landscaping Inc.) Before beginning the work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: A. Automobile Liabilitv insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and B. Coirunercial General Liabilitv insurance written on an occurrence basis with limits no less than $2,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form properly damage; explosion, collapse and underground (XCU) if applicable; and employer's liability. Any payment of deductible or self-insured retention shall be the sole responsibility of the Contractor. The City reserves the right to receive a certified copy of all the required insurance policies. , The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor's insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Contractor's insurance shall be primary insurance as respects the City, and the City shall be given thirty (30) calendar days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. If this contract requires work to be performed in or on navigable waters, the Contractor shall provide insurance written on an occurrence basis with limits no less than $2,000,000 combined single limit per occurrence and $2,000,000 aggregate for claims made under the Longshoreman and Harbor Workers Act and the Jones Act. 12. 1VgISCELLANEOUS. A. Nondiscrimination. In the hiring of employees for the performance of work under this Agreement or any sub-contract hereunder, the Contractor, its sub-contractors, or any person acting on behalf of such Contractor or sub-contractor shall not, by reason of race, religion, color, sex, national PUBLIC WORKS AGREEMENT — Page 6 of 10 Rev. 6/14 (between City of Bre�rrerton and Yamamolo Landscaping Inc.) origin, or the presence of any sensory, mental, physical disability, or sexual orientation discriminate against any person who is qualified and available to perform the work to which the employment relates. B. Compliance with Laws. Contractor shall comply with all federal, state and local laws, rules and regulations throughout every aspect in the performance of this agreement. C. Work Performed at Contractor's Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Use of Photographs and Images. Consultant shall not use or distribute photographs or images depicting City officials, personnel, property, or equipment whether prepared by Consultant or provided by City without prior written consent of the City. The City will not unreasonably withhold its consent. E. Nonwaiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be constructed to be a wa.iver or relinquishment of those terms and rights and they shall remain in full force and effect F. Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be ava.ilable only through the jurisdiction, venue and rules of the Kitsap County .Superior Court, Kitsap County, Washington. G. Attorney's Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties' performance of this agreement, each pariy shall be responsible for payment of its own legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City's right to indemnification under Section 10 of this agreement. H. Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail, and shall be deemed PUBLIC WO.RKS AGREEMENT — Page 7 of 10 Rev. 6/14 (between Ciry ofBremerton and Yammnoto Lundscapinglnc.) sufficiently given if sent to the addressee at the address stated on this agreement. I. Assi nment. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. J. Modification. No waiver, alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. K. Severabilitv. If any one or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. L. Entire Agreement. The written provisions and terms of this agreement, together with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement, the terms of this agreement shall prevail. . IN WITNESS WHEREOF, the parties below have executed this agreement. CONTRACTOR P Name: f Y H 0 Title: � � � DATE � `Z "I� Notices to be sent to: CONTRACTOR: Teny Yamamoto, President 5765 Sidney Rd. SW Port Orchard, WA. 98467-9392 (360) 876-1889 PUBLIC WOIZKS AGREEMENT—.Page 8 of 10 (behveen City of Bremerton and Yamamoto Landscaping Inc.) THE CITY OF BREMERTO � Print Name: yn ��� r K� n•I r� I Title:�rK.S G,.� 12tcru,-ttah bl���� DATE IS �6( S� Notices to be sent to: CITY OF BREMERTON: Colette Berna, Project Manager 680 Lebo Blvd. Bremerton, WA. 98310 (360) 550-3088 Rev. 6/14 R:�I,EGAL\Contracts�FORMS\ShortForm.P W.Agr.doc APPROVED AS TO FORM: PUBLIC WORKS AGREEMENT — Page 9 of 10 Rev. 6/14 (between City of L3rernerton and Ya�rinmoto Landscaping Inc.) Bremerton City Clerk PREVAILING WAGES State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of frin�e benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 5/6/2015 Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Trade Asbestos Abatement Workers Boilermakers Brick Mason Brick Mason Brick Mason Building Service Employees Kitsap �Building Service Kitsap Cabinet Makers (I Kitsap ,Carpenters � Kitsap Car,�enters �. e � f Kitsap Caraenters ' �--- — - --� -- .; Kitsap Carpenters �Kitsap Carpenters �Kitsa CarQenters �----P — --------�--�- � K itsap Carpenters �Kitsap ,Car,�enters 4 .,L-_'_ _' € Ki tsap ' C� ement Masons �- ---� -- ---�— � Kitsap j Divers £t Tenders I Kitsap : Kitsap � Kitsap � Kitsap Divers £� Tenders Divers £t Tenders Divers �t Tend Divers �t Tenders Kitsap f DredQe Workers Kitsap � Dred�e Workers Job Classification Journey Level Journey Level Brick And Block Finisher Journey Level Pointer-Caulker-Cleaner Janitor �loyees Shampooer _ �t oyees ' Waxe �loyees Window Cleaner ho�i Journey Level Acoustical Worker Bridge, Dock And Wharf Carpenters _' �---- Carpenter - .-- -- — �Carpenters on Stationary Tools --------�---- --- _jCreosoted Material --.-,--- Floor_Finisher ^-T---`_..--- __ Floor Layer Scaffold Erector - -�-_-"'-- -- � --- ------ ------� �Journey Level _.---- �— ----�--- ��--------..... i Diver --- —� ---------- — -- Diver On Standby �--------- ---�-- - --------------- �Diver Tender '_ � Surface Rcv &t Rov Operator_ � Surface Rcv �t Rov Operator Tender iAssistant Engineer � ^ �Assistant Mate (Deckhand) Wa�e $42.67 $30.34 $44.46 $51.32 $51.32 $9.47 $9.47 $9.47 $13 .22 $23.72 $52.32 $52.32 $52.32 $52.45 $52.42 $52�32 $52.32 $52.3 _$52.38 $105.37 $59.50 $54.82 . $54.82 $51.07 5D 5A 5A 5A 5D 5D 5D 5D 5D _ 5D 5D _5D _ 7A __5D 5D 5D 5D 5A $54.75 5D $54.33 5D 1H 1 1M 1M 1M 1 1 1 1 1 4C 4C 4C 4C 4C 4C 4C 4C 1M 4C 4C 4C 4C 4C 3F 3F Note --- --: _.._ 8 A —.3 —� _e f _.' _� `Kitsap DredQe Workers Boatmen Kitsap Dred�e Workers � Engineer Welder Kitsap DredQe Workers � � � �Leverman, Hydraulic Kitsap Dred�e Workers Mates Kitsap Dred�e Workers T �Oiler Kitsap� Drvwall Anplicator Journey Level Kitsap Drywall Tapers �Journey Level Kitsap Electrical Fixture Maintenance I Journey Level Workers � Kitsap Electricians - Inside Jou�evel Kitsap Electricians - Motor Shoo Craftsman Kitsap Electricians - Motor Shop � Journey Level � Kitsap Electricians - Powerline Cable Splicer Construction _ ' __ _ Kitsap Electricians - Powerline Certified Line Welder � Construction ^ ___ ___` _ �Kitsap Electricians - Powerline Groundperson Construction v �__ __ _ _ �---- —��-- - ._ Kitsap Electricians - Powerline Heavy Line Equipment I Construction Operator �Kitsap Electricians - Powerline Journey Level Lineperson Construction _� � _ �Kitsap Electricians - Powerline ILine Equipment Operator j Construction � Kitsap Electricians - Powerline �Pole Sprayer f Construction � I Kitsap Electricians - Powerline ` iPowderperson Construction -�-�---�----------- -.__�.__- Kitsap Electronic Technicians _ Journey Level , �Kitsap Elevator Constructors �Mechanic ---- - -- -- �Kitsap Elevator Constructors IMechanic In Charge �Kitsap IFabricated Precast Concrete �Journey Level - in-Factory ' Products IWork Only �- - �------- -�---- _.__. -------- --_.._._:_. _... -------.___- - . ____.-------- �Kitsap Fence Erectors �Fence Erector -�---- -------_...__, : Kitsap Fence Erectors �Fence Laborer g Kitsap � Flag�ers � �Journey Level �-_------ ° ___._._.___..�-----.----_...---_�__..._ EKitsap Glaziers Journey Level - i -----------`..- �Kitsap �Heat �t Frost Insulators And IJourneyman Asbestos Workers --- ------ -----�--.... .- -�------- �- ------- EKitsap Heatin� Equipment Mechanics f Journey Level � �Kitsap Hod Carriers £� Mason Tenders �Journey Level ----�---�- -- --�--------�-�---�------ -...__. 'Kitsap Industrial Power Vacuum �Journey Level ` Cleaner � � � --- ---------- �Kitsap � l Boatmen �Boat Operator :- .--...�__..�_.---... _ �___..�L.___.-_-----•-- ..__------�-- �Kitsap jlnland Boatmen �Cook � ��-------- - - �Kitsap f Inland Boatmen iDeckhand � I ---- - --� — - ------ $54.75 $55.79 $56.92 $54.75 $54.33 $52.32 $52.37 $31.74 $51.26� $15.37� -- --.___.._.��_._ � $14.69 � $69.95� 5A �. �--�--�---- I $63.97� 5A ----I--�----�----�- $43.62� 5A �_,� � $63.97� 5A �-- $63.97� 5A $53.81 5A -�--- $63.97; 5A � $47.55 5A $44.26 $82.67 $89_40 $13.50 7E 7D 7D 3F 3F 3F 3F 3F 1 Fi 1E 1 5D 5D 5D 5D 5D 5D 5P 1 -�-�- 1 4D 4D 4D 4D 4D 4D 4D 4D 1 4A 4A _ 1 $13.80 --�--------___ 1 ___.. $11.6� � 1 —�--- ' -- -_- -., $36�17� 7A ? _31 $54 _91� 7L � 1 Y $61.18; 5J � 1S � i -----�..._------- -- � $70.37 7F . T .__,.. 1E --- � -- -- $44_00 i 7A _ � _� 31 _ $9.4� I� 1 $54�57 $50.95 $51.19 56 5B 5B 1K 1K 1K � __-E -'- � —_�; --- k Kitsap Inland Boatmen Deck En�ineer Kitsap Inland Boatmen Launch Operator Kitsap Inland Boatmen Mate Kitsap Inspection/Cleaning/Sealin� Of Cleaner Operator, Foamer Sewer �t Water Svstems By Operator Remote Control Kitsap Inspection/Cleanin�/SealinQ Of Grout Truck Operator Kitsap �Inspection/Cleanin�/Sealin� Of �Head Operator Kitsap �Inspection/Cleanin�/Sealin� Of Tv Truck Operator I Sewer �t Water Systems By Remote Control �Kitsap Insulation A Kitsap Ironworkers Kitsap Laborers � Kitsap Laborers Kitsap Laborers �Kitsap Laborers �Kitsap Laborers � Kitsap Laborers Kitsap Laborers Kitsap �Laborers Ki� 'tsap Laborers �Kitsap Laborers F - ;Kitsap Laborers 4 ; Kitsap Laborers _ s Kitsap �Laborers ( Kitsap Laborers EKitsap �Laborers --- ,-- � Kitsap � Laborers f ------ i - - :Kitsap Laborers_ 7 Kitsap � Laborers �._.�__ . _ � Kitsap �Laborers � Kitsap � Laborers t Kitsap Laborers �Kitsap Laborers �..---�– � �Kitsap �Laborers itsap Laborers �Kitsap jLaborers Journey Level Journeyman Air, Gas Or Electric Vibrating Screed Airtrac Drill Operator Ballast Re�ular Machine Batch Weighman Brick Pavers Brush Cutter Brush Hog Feeder Burner Caisson Worker C arpenter Te nder Caulker i Cement Dumper-paving Cement Finishe Ten der Change Hous Or Dry Shac Chipping Gun (under 30 Lbs.) Chipping Gun(30 Lbs. And Over) Choker Setter Chuck Tender Clary Power Spreader ~ ` Clean-up Laborer Concrete Dumper/chute Operator Concrete Form Stripper __ Conc rete Placement Crew _ Concrete Saw Operator/core Drill CrusherFeeder $52.18' 5B 1 K $53.40 56 1 K $53.40 5B 1 K $9.73 1 $11.48 ` 1 $12.78 $24.17 1 1 i $52.32 5D $61.62 7N � $42.67 7A � $44.00 7A � $42.67 7A j $36.17 7A i $42.67� 7A � $42.67 7A � $42.67! 7A � $42. 7A i $44.00 7A � $42.67 7A � $42.67 7A � $43 .46 7A i $42.67j 7A _� $42.67� 7A � $42.67� 7A � $43.46 7A i � I $42.67� 7A J � $42.67 7A �-�---� _� $43.4 7A i $42.67! 7A --------j------- ; $43.46� 7A I � � $42.67 -- 7A I $43.46 7A � $43.46 7A � $36.17� 7A _ y �— � e i ----ti Kitsap�Laborers Kitsap Laborers Kitsap ' Laborers Kitsap Laborers Kitsap Laborers Kitsap �Laborers Kitsap Laborers Kitsap Laborers Kitsap Laborers Kitsap Laborers Kitsap Laborers Kitsap ' Laborers Kitsap Laborers Kitsap Laborers Kitsap Laborers Kitsap Laborers Kitsap � Laborers I-----. EKitsap I Laborers � I �Kits Laborers r. _�...� ___ �-----� �-- �--- � Kitsap � Laborers k Kitsap � Laborers � � _L_ �: Kitsap � Laborers � Kitsap � Laborers � Kitsap i Laborers �---- Kitsap � Laborers ?Kitsap JLaborers [---- � �: Kitsap j Laborers '---� � Kitsap � Laborers �------, �Kitsap �Laborers �Kitsap � Laborers F-� - � Kitsap I Laborers � I ' i t ; �� i ---- � ------ : Kitsap � Laborers � Kitsap �Laborers Curing Laborer ! $42.67 ------- ---- -- j- --- Demolition: Wrecking 8 $42.67 Moving (inc Charr Material) Ditch Di��er $42.67 Diver $44.00 Drill Operator $43.46 (hydraulic,diamond) � Dry Stack Walls � $42.67 Dump Person � $42.67 Epoxy Technician � $42.67 Erosion Control Worker $42.67 Faller £� Bucker Chain Saw - I $43.46 Fine Graders _____ _ $42.67 Firewatch � $36.17 Form Setter $42.67 Gabian Basket Builders � $42.67 General Laborer � $42.67 Grade Checker £� Transit $44.00 Person Grinde ' $42.67 Grout Machine Tender $42.67 Groutmen (pressure)including I $43.46 Post Tension Beams � ------- --�-�-- ----��--- -- - -�------�-- - Guardrail Erector ` $42.67 _ -_-�------� Hazardous Waste Worker (level � $44.00 A) f Hazardous Waste Worker (level i $43.46 g� � ---- --�- - Hazardous Waste Worker (level � $42.67 C) High Scaler $44.00 Jackhammer __`____ 6 Laserbeam O perator � $43.46 Maintenance Person � $42.67 �-r ----�- Manhole Builder-mudman � $43�46 Material Y ard Pe rson �I $42.67 ----�---- Motorman-dinky Locomotive $43.46 -- --- ----�--..�-- Nozzleman (concrete Pump, � $43.46 Green Cutter When Using Combination Of Hi�h Pressure I Air �t Water On Concrete �t � Rock, Sandblast, Gunite, Shotcrete, Water Bla ; --�--- Pavement Breaker $43.46 -- _..-------�------ Pilot Car ; $36.17 7A 31 7A -� - -- 31 7A 31 7A 31 =--- 7A � 31 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A � 31 7A � 31 i 7A -����.- 31 7A � 31 7A 31 7A I 31 7A � 31 7A 7A 7A 7A 7A 7A 7A 7A 7A 31 7A --- � --,�31 6Kitsap j Laborers �Kitsap lLaborers Kitsa �Lp aborers Kitsap �Laborers Kitsap La ob rers _ .._.._i_.___ Kitsap jLaborers ' Kitsap �i Laborers � --�---�---F- ---- Kitsap �Laborers ._�._.. �Ki �Lab , Kitsap �Laborers � Kitsap Laborers __._.�____�__ Kitsap Laborers Kitsap . Laborers �__ ��Kitsap �Laborers T EKitsap ILaborers i-.V._.-__.- Kitsap iLaborers Kitsap i Laborers � `Kitsap {Laborers� ---�- ---- - � Kitsap� Laborers -�-- ---._�� Kitsa �Laborers ��K �Laborers � � Kitsap ! Laborers �._._.-...._--_{- --- �Kitsap Laborers � --� -- -- �Kitsap ;Laborers � Kitsap Laborers L_ � ___ � Kitsap Laborers � iKitsap ^ �Laborers ` i , Kitsap Laborers � Kitsap _ I Laborers : Kitsap j Laborers �Kitsap Laborers a _.,.__ __.�-�� = Kitsap Laborers �Kitsap ,'Laborers �Kitsap tLaborers : Kitsap � ;Laborers I ---__.. -----_�.____.--�-- �; Kitsap � Laborers � Kitsap � Laborers � t -�------i--�----�--..._�_.. , `s $44.00 $43.4 $43.46 $43.46 $43.46 $42.67 $44.00 $42.67 $43. 46 $43.46 $44.00 $44.00 $43.46 $43.46 $42.67 $43.46 $43 46 $42.67 $42.67 $43.46 $42.67 $43.46 $42.67 $42.67 $43.46 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A $43.46� 7A $43.46 7A $42_67 $42.67 $42 $43.46 $38.68 $38.68 $42.67 $43.46 $64.99 7A 7A 7A 7A 7A 7A 7A �7A 7A $70.02� 7A i 31 --i --- -- _. . � _ � __ . --�- --- � � - �__.__. � _1_ ; 8R '� '----- - ---� I � S � , Tunnel Work-Compressed Air Worker 30.01-44 psi _--_-.__- .-----_.__.____i__.r...�_�' .. lTunnel Work-Compressed Air �$73.70' 7A � 31 � Worker 44.01-54.00 psi � � ` ._ ..__s_.__-_._± i _._ -'---- -�----- - i --� Pipe Layer Lead _ _+_ Pipe Layer/tailor Pipe Pot Tender � Pipe Reliner " Pipe Wrapper � __ Pot Tender Powderman __~ __ Powderman's Helper Power Jacks Railroad Spike Puller - Power Raker_; Asphalt ��__ Re-timberman Remote Equipment Operator� Rigger/signal Person Rip Rap Person _ Rivet Buster Rodder������ Scaffold Erector _ Scale Person Sloper (over 20") __� � Sloper Sprayer Spreader(concrete) ~�! _ Stake Hopper Stock Piler Tamper �t Similar Electric, Air �t Gas Operated Tools Tamper (multiple £� Self- propel led ) ---......._---------- - ---- Timber Person - Sewer (lagger, Shorer � t Cribber) Toolroom Person (at Jobsite) _� Topper � ^- - Track Laborer ____ _ Track Liner (power) _ _ _ Traffic Control Laborer Traffic Control Supervisor Truck Spotter _ _!. ___ � Tu�ger Operator Tunnel Work-Compressed Air Worker 0-30 psi i m �--- ' 31 ; 31 ---�-i----._ - :• :• Kitsap ILaborers I Kitsap � i Laborers f --,-------�- Kitsap �Laborers _ i Kitsap �Laborers j Kitsap�i Laborers __.�.:.___.._ Kitsap 4Laborers i ___ ._ I_. - -�� - --- Kitsap �Laborers --- -- � -- Kitsap �Laborers Kitsa � Laborers � _.y���.�...�., Kitsap � Laborers Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap �Tunnel Work-Compressed Air i $79.40 i Worker 54.01-60.00 psi : ----_.�._ ._ ; __._._.__—..___------._._____.._�._...._;.-_.__.......__ ;Tunnel Work-Compressed Air ; $81.52 ; Worker 60.01-64. 00 psi ': ;Tunnel Work-Compressed Air � $86.62 Worker 64.01-68. 00 psi � ..-�-------._.�._--�---------------- � -6--- � - � - � --- �Tunnel Work-Compressed Air i $88.52 � Worker 68. 01-70.00 psi � �� �Tunnel Work-Compressed Air � $90.52 _.._._.�_.LWorker 70.01�72.00 psi . _ . � . _�1 -- -..-- ;Tunnel Work-Compressed Air � $92.52 � Worker 72.01-74.00 psi i ----------7-- ------------------°--------,-------.. iTunnel Work-Guage and Lock ! $44.10 �Ten � , 7A i 7A� ---- I i _ 7A _.__; --�----1 7A i i 7A j _. _._ i 7A ; -�-�-------� 7A � I �------- � --�---- --�--,-- --�--------------- -- ------.._.�.----- �Tunnel Work-Miner ; $44.10i 7A --�------�--.._.__ ._.._. �___.--�----------- ...------�----.._. _, --�---�� -- ---- �� __ � Vibrator ! $43.46� 7A ,V' inyl Seamer � 4 ��$42.67� 7A _.�. ---..__�_.-�_....-------�- ----- �- ---- ,�---- �Watchman � $32.87E 7A ---�-�- ----.....------.._. __--_.__:--------_..� ,--- --�--- -- Laborers ; Welder ; $43.46 � 7A -�------�--------�---------�-------�-------�---------�----�----� - �•---- i . j ._ ....__..__; Laborers �Well Point Laborer � $43_46� __7A �---�-------------_.. . .......---�--------� --�-�----�-----�----�---�----�---- -- i I Laborers _ _ ; indow Washer/cleaner �$32.87i 7A --r-- �-�------------ Laborers - Underaround Sewer ;General Laborer �t Topman ;$42.67; 7A �t Water � ► � --------�-�--------._._.------.._..-----------' --�---...... _..----�---------��—�- -----�--�.�._..--�--------.'--._.......___._. Laborers - Under�round Sewer �Pipe Layer �$43.46i 7A � Water ; , _ ��_. ..___._.__'_� _____.�....Y__ __�_�_�.__.__.�__'_�.....�.___._�:_�._ _ �..._____^.... �____- Landscape Construction llrri�ation Or Lawn Sprinkler � $9.47f 31 ; 84 � - �-----i- _ _� ; 31 --- i -�- I "' 31 ; 8�C 31 j 84 . $_.. _ , � i ---�--- - ' --•-- 31 � 84 ----- 3 �� �� 31 31 .._ ._.... 31 31 __ _31 _ 31 :� 31 � � I _._.__._... .._____..._. _..... ----.-. 31 i --- �-=� --� 1 i t i ;Installers � i � �.__.__......__� _._..�.__...__..__..___.___...�_.�___.._.. ._._Y_______.._�..---.....�______,_;__---�__...�_,_.___.__...I.__....__..._.__---. ;_.._____. � �Kitsap � Landscape Construction �Landscape Equipment ;$10.05� I 1 ; s � � 0 erators Or Truck Drivers � i ; " � _ i P , ------- ` • --- ----'------�----------�--._' J------!---------l--��----� rKitsap � Landscape Construction �Landscaping Or Planting ;$12.92 � 1 ; , � g__�f � Laborers i ' . _ _._.�-..---._.__.___�_.___.__._.___—.._�..--.----.._...-.---....._�.-. -----. _� __.__.___!_.__...._..: �._._..._..._.__._. _._.----- -- ._�._ . , : RKitsap ; Lathers kJOURNEY LEVEL ': $21.00 ( 1 i , -- ---[.�--_—._...------------- , � ----� �-- - �----------- � --,•------�-----�----� �Kitsap Marble Setters �Journey Level �$51.32; 5A ; 1M ; �Kits -----��._._.._._.__. _.__.._...._�___.........__ __._. _�..—____._..___..___._.__.._.._�___�_._.__.__.__. _._� ............... _._� a IMetal Fabrication (In Shop) 'Fitter � �---- -�-_.___i .......�__.�.__„ p � $26.96� i 1 . - , — ----�-- �-- � � ---------- ---- - --�-- � , 'Kitsa 'Metal Fabrication In Sho �Laborer ' ' � 1 ' � P � ( P1 � � $9.47� � ; k �----------!- �---- -- �- - � ' ' ` - ..----------- --�------- ....: ._...----- --� ---------- - -----�-- �- . , i --- ---�---�---�-- -- - -- -------- ---------------- ;Kitsap �Metal Fabricat�on (In Shop� iMachine Operator �$13.83� j 1 � �-- --....__.._.___.:._..--_..�.----�---------�--_—___....-----._......_.-_; __...------�--�:--�---._.._....__....._;___..._�.___ - —.__ ._�_�� �Kitsap _iMetal Fabrication (In ShoP1 �Welder � $13.83; � 1 � -----� --- �—�--��--�------- -�---- --�--..___ ___ --;---------'-- �- ------._�... ..-- ---_ ---- --; -�- ------ -- 'K itsap ; MillwriQht !Journey Level ; $44.89i � 1 ; --- ----�-, —._..._....--- �------.....- --_ _-�; �- --------------- � - -�----...------ �--s-�---�—� ----- ---; ------ ---- - �-?-------�--._...- -:� �Kitsap � Modular BuildinQS iCabinet Assembly ;$11.56i � 1 ; . ----�---�-------�� --------- -�-----�-'-- ------•�------...---------�-----�------�---.;_....---- � � ` .,. � I ' ' T __"'_"_ _ "� "' "___"' :Kitsap _f Modular BuildinQS � M �Electrician ; $11.56' : 1 ' �. .. _ l. ..-.---__.._: � � � .��..._.-�---��----- -�-�-�-----.._.___.-----_��_ ... .... :. ... . ......_...� .._._ ..-- --- � - �: �Kitsap _� Modular Buildines �Eq uipmen t Maintenance ;$11.56! ; 1 I � - - - -------------- --- --- �-----�-----�-�-:-------�-----� :----_-�----- _-� _Kitsap IModular Buildin�s ;Plumber � $11.56i j 1 �' ` _ - __ , , �. __'�.___.._..�___'___'___.________........_._'. _.'_._'__�'_____."'_'"' "'_ . ' _. . � � . � • ' �_.___ ""' '_ ��'�.__.. �Kitsap �Modular BuildinQS iProduction Worker ! $9.47� ; 1 I -� Y .----.---._..... i .___._._._.._._.__�__�..._.___.__.._._.�..�___..._._��...------.--.------_____._... ; _--.-.--._..---.�__._._._. .___:�..____-._.__._v._Y_,__:. .,Kitsap ! Modular Buildines ;Tool Maintenance � $11.56� ; 1 ; : �---------�------------�--------------- -�-------....-----�—�—�-----------....:---------�------------�-----_-------- ,: , i � , � .._..----.. -._; ;Kitsap ! Modular Buildines �Utilit Person $11.561 ' ,:------' -- ---------...___.__..___..._.__.._.�.._...__._.y � � ... i---�---�---�- ----�...--------�, 'Kitsap TModular BuildinQS _�jWelderY �---�_.___.----._.._._..+ $11.56� .Y---..--. � - --' 1 � __.�� ---�--�-- -�----- ------__......___----------r---_.._�_..—a.---=-----�--- -�: !.;Kitsap LPainters _'_` ___, _IJourney Level j!Kitsap f Pile Driver IJourney Levet � Ki tsap Plasterers Jo urne y Level ��Kitsap Play�round £t Park Equiqment Journey Level � ,Installers ; Kitsap Plumbers �t Pipefitters �Journey Level �- --- -- — !�Kitsap Power Eauipment Operators IAsphalt Plant Operators '�Kitsap �Power Equipment Operators� Assistant Engineer �Kitsap Power E ui ment 0 erators �Barrier Machine zi er i q P P , � PP ) � Kitsap Power Equipment Operators Batch Plant Operator, '` � Concrete � �Kitsap Power Equipment Operators Bobcat �; ; Kitsap Power Eauipment Operators Brokk - Remote Demolition '� � Equi pment ;� Kitsap Power Equipment Operators J Brooms �� Kitsa ► Power E ui ment 0 erators , p q p p Bump Cutter i�Kitsap Power Equipment Operators Cableways ��Kitsap � Power Equipment Operators � Chipper � �' !;Kitsap �Power Equipment Operators Compressor � Kitsap Power Equipment Operators � Concrete Pump: Truck Mount ' I With Boom Attachment Over I 42 M ----- - , ;;Kitsap Power Equipment Operators �Concrete Finish Machine -laser ,,_ _ _� _ � Sc reed _ __ ��.Kitsap Power Equipment Operators `Concrete Pump - Mounted Or I ITrailer Hi� h Pressure Line _�_ _.__! �Pump, Pump High Pressure_ Kitsap �Power Equipment Operators Concrete Pump: Truck Mount � With Boom Attachment Up To --�--------- 42 m ': Kitsap � Power Equi pment Operators _ i Conveyors ___ �__ _ ,Kitsap iPower Equipment Operators �Cranes: 20 Tons Throu�h 44 � � _ f Tons With Attachments _ ---'----- Kitsap �Power E uipment Operators (Cranes: 100 Tons Through 199 ' j �Tons, Or 150' Of Boom (Including Jib With � � Attachments) Kitsap �Power Equipment Operators 'Cranes: 200 Tons To 300 Tons, � �Or 250' Of Boom (including Jib ; _iWith Attachments) _ Kitsap �Power Equipment Operators iCranes: 45 Tons Through 99 ( jTons, Under 150' Of Boom f (including Jib With � IAttachments) , 'Kitsap �Power EQUipment Operators iCranes: A-frame - 10 Tons And � � U nder ' Kitsap Equipment Operators iCranes: Friction 100 Tons � � �Throu�h 199 Tons �---� �- - ------------------ ----_____..___.—___.}__. _—_---�--�-- � I 4 ------ -- - --�-- $37.80 6Z — -�-- � 2B - ( �— $52.57 5D 4C ' $ 50.42 7� 1 R � �' $9.47 � 1 �— �'I $63.57 $55.24 $51.97 $54.75 $54.75 $51.97 $51.97 $51.97 $54.75 $55.24 $54.75 $51.97 $55.24 5A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 1G �_^ 3C 8P 3C 8P 3C ' 8P 3C ,8P 3C 8P 3C 8P 3C 3C 3C 3C 3C 3C $51.97I 7A � 3C _. _ � __. $54.33� 7A 1 3C � � - $54.75 7A� 3C $54_33j 7A j _3C $54.75 7A i 3C � � --;--- $55.79� 7A { 3C $56.36i 7A i 3C I , ---�— � $55.24� 7A j 3C $51.97� 7A � 3C � $56.36 7A i 3C ---- ----; - -�- :� :� :• :� :• :� � — 8P i �; ± $p i, I I gp I ._ P ,� --I 8P -�; � 8P I , � �--- �.._ . i gp � � �: � --�---- I 8P � I � ,: ----� 8P _�_ _ � 8P i --;--- i ; � Kitsap Power Equipment O�erators Cranes: Friction Over 200 Tons i$56.92 Kitsap Power Eauioment Onerators � Cranes: Over 300 Tons Or 300' f $56.92 i Of Boom (including Jib With , Attachments) Kitsap iPower E�uiqment Operators Cranes: Through 19 Tons With $54.33 i . Attachments A-frame Over 10 j � Tons f Kitsap Power Equipment Operators Crusher $54.75 �Kitsap Power Equipment Operators Deck Engineer/deck Winches $54.75 � (power) � Kitsap �Power Equiqment Operators Derricks, On Building Work $55.24 Kitsap Power Equipment Operators Dozers D-9 £t Under $54.33 Kitsap iPower Epuiament Operators Drill Oilers: Auger Type, Truck $54.33 ! Or Crane Mount I_ �Kitsap Power EcLuipment Operators Drilling Machine $54.75 Kitsap Power Equipment Operators Elevator And Man-lift: ` $51.97 Permanent And Shaft Type Kitsap Power Equipment Operators Finishing Machine, Bidwell And $54.75 Gamaco �t Similar Equipment �Kitsap Power E�uipment Operators �Forklift: 3000 Lbs And Over $54.33 �__ � __ __ �With Attachments _ _ �Kitsap I o er Equipment Operators Fo�rklifts: Under 3000 Lbs. With� $51.97 �_�_ _ Attachments __�_ _ I �Kitsap �Power Epuioment Operators ` Grade Engineer: Using Blue t $54.75 � _ Prints, Cut Shee Etc '� _ Kitsap i P' ower Equipment _Gradechecker/stakeman ` $51.97 �Kitsap Power Eauioment Operators �Guardrail Punch $�54.75 ---�- --�-- �Kitsap Power Equipment Operators Hard Tail End Dump $55.24 ; � Articulating Off- Road . � � Equipmen 45 Yards. �t Over �Kitsap IPower Equipment Operators iHard Tail End Dump �$54.75 � IArticulating Off-road � Equipment Under 45 Yards � j ------� -�----------��- --._. _..____.... ------ i -- ;Kitsap iPower Equi�ment Operators Horizontal/directional Drill i$54.33 - � Locator �- --- -r----� --- --- --- ------- - --.. �Kitsap ;Power Equipment Operators , Horizontal/directional Drill $54.75 6 j �0 perator '� -- -----�------- �.�.. --------+- ---�-----�--------�-'-----_-_ ' Kitsap �Power Equipment Operators Hydralifts/boom Trucks Over $54.33 ; i I 10 T ons s .�____.....;...____.--------�-----�---_____ ------.. _...--� ------�-------�.._------------- Kitsap IPower Equipment Ooerators Hydralifts/boom Trucks, 10 I$51.97 � � Tons And Under � ' ---j-�---- �Kitsap {Power Equipment Operators + 'Loader, Overhead 8 Yards. �t �$55.79 ` � fOver � ;� Kitsap V � Power Equipment Operators � iLoader, Overhead, 6 Yards ��$55.24 �� � IBut Not Inclu ding 8 Yards � ---!----- -- --- --J --- - ;: Kitsap i Power Equipment Onerators I Loaders, Overhead Under 6 �$54.75 ,: � i � , ards _ J�_ ; Kitsap ^; Power Equipment Operators �� Loaders, Plant Feed . �$54.75 �; Ki tsap Loaders: Elevating Type Belt $54.33 7A � 3C 7A 3C �� ---�- _ � 3C 7A ' 3C 7A � 3C 7A 3C 7A 3C 7A � 3C - � - 7A 3C 7A I 3C 7A 3C 7A - j 3C 7A � 3C � 7A 3C �a � --- 3c �A_-J---- 3� 7A I 3C i 7A 3C 7A I 3C 7A � 7A � Y � ----- 3C 7A - 3C 7A 3C 7A I 3C 7A I 3C L ------ 7 f 3C _._ �__._., 7A � 3C 8 P� 8P � ! 8P � 8� 8P � � --F SP ' 8P 8P ---� 8 � i � 8P ---G gp r --� 8P ` 8P � 8P !' ---; gp_ t 8P :: � 8P : �: 8P 8P ; .8P 8P ^. 8P _8P ; 8P : 8P , 8P �— , _...- �- - � - --- -- .. . - - : -,... . Kitsap Power Equiqment Operators iLocomo All �i $54. 7A ; 3C ��.____.� , Kitsap �Power Equipment Operators �Material Transfer Device � �$54.75� 7A � 3C --- -�-- --L--=---_ .�._._� - Kitsap jPower Equipment Operators �Mechanics, All (leadmen - �$55.79! 7A j 3C Kitsap iPower Eauipment Operators Kitsap ��Power Equioment Operators Kitsap �Power Equi�ment Operators Kitsap IPower Equipment Operators Kitsap iPower Equipment Operators Kitsap i Power Equioment O�erators Kitsap ;Power Equipment Operators Kitsap ; Power Equipment Operators Kitsap �Power Equipment Operators --�-�.� Kitsap ;Power Equipment O�erators Kitsap Power Eauipment Operators Kitsap Power Equipment Operators Kitsap �Power Equipment Operators -_.�.-.—____-- Kitsap Power Epuipment Operators Kitsap �Power Equipment Operators Kitsap �Power Ec�uipment Operators � _ .. �___. fi.__._..___.�_.�_�._.__.. . _.____. _ f Kitsap � Power Equipment Operators � ; ,, ; . �, _...._____,__�. --- 'Kitsap {Power Eauinment Ooerators x ----__...-j�--- -� �Kitsap Power Equipment Operators �Kitsap Power Equipment Operators �..__,_ � : Kitsap ; Power Eauipment Operators ' -----.......__?.—__.._--------------------- f Ki tsap _� Power Equi pment Operators _ 'Kitsap tPower Eguipment Operators ►------ — -- �Kitsap Power Equipment Operators � A ._.....�___.��.._�...�.__�_�'�'___'� ._.___._.���....�.'_�._�_........-.� �Kitsap �Power Eauipment Operators ;Kitsap �Power Equipment Operators � �---......._...----,.._----� -�---__ ._.......-----�- �-- �50.50 Per Hour Over Mechanic)i __.,1_ �._.� � Patrol Grader - Non- �$54.33 ±finishing � �. -..—. _ �Moto Patrol G raders, Finishing $55.24 ----�------ �Mucking Machine, Mole, � $55.24 Tunnel Drill, Boring, Road � Header And/or Shield � 8P -- _g � 8P 7A ; 3C SP i 7A �--� 3C 8P 7A j 3C ��� 8P Oil Distributors, Blower ^ ~ � $51.97 7A 'Distribution �t Mulch Seedin� i Operator � Outside Hoists (elevators And i $54.33 iManlifts), Air Tuggers,strato � � Overhead, Bridge Type Crane: i$54.75 20 Tons Throu�h 44 Tons i ----�. �.�__-_ __ Overhead, Bridge Type: 100 �$55.79 Tons A Ov er ; �Overhead, Bridge Type: 45 r $55.24 �Tons Through 99 Tons ; � _._.�.__._� �Pavement Breaker __`_ � { _$51_97 �Pile Driver (other Than Crane i $54.75 kMount) +---_-- --- � Plant Oiler - Asphalt, Crusher ` $54.33 ----- --- -�----�-- _—_.-- ' Posthole Digger, Mechanical � $51.97 { P L ower Plant_ � _ ��� � $51_97 � ' Pumps Water 51.97 ---- ---+----- ;Quad 9, Hd 41, D10 And Over i$55.24 �---� ;Quick Tower - No Cab, Under $51.97 � 100 Feet In Hei�ht Based To i � Boom j �_____.. _.___.-----___ _._--..--- :��__.__._ I Remote Control Operator On � $55.24 � Rubber Tired Earth Moving ( Equi pment ----- -- ------t----- �Rigger And Bellman I $51.97 �------ -- - �----- - _.. - -- - -- � Rollagon j $55.24 Roller, Other Than Plant Mix ±$51.97 ;Roller, Plant Mix Or Multi-lift � $54.33 Materials ; ;Roto-mill, Roto-grinder ; $54.75 ,----�._-�.__-----�--�- ------------�-_....-- --._ ?Saws - Concrete � $54.33 � _.... . � - --- --..._- ---�-- --�-- - --- !Scraper, Self Propelled Under � $54.75 i45 Yards � r ---- .__._.__...---- �Scrapers - Concrete F� Carry All; $54.33 ��Scrapers, Self-propelled: 45 � $55.24 �Yards And Over : �_.... ---------.......-----�---..._.._._._.__....._..... � -- ---.._._.._._ 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 7A 3C � 8P � ---�----- 3C I 8P 3C� 8P . ._�I..� 3C � 8P ; 3C � 8P --_______. � 3C i 8P 3C 8P i 3C � 8P ---}--- 3C ; 8P -� _��_. , i � 3C �� 8P � �- � .__ 3C_ � _ 8P ----� r 3C i 8P �: � 3C i ^ 8P ` ; � I ` ; � . --�- 3C �.+.._._. ......� I - • - � --------- � � � 3C 8P � 3C � 8P ` � - - -- -��----= 3C � 8P � -------�---�--_--... ...- : + 3C I 8P � I � _.__: --Y----- I ` __� ..__ 3C �8P _ ; j 3C j 8P � --,---,-- _-- - � : � 3C ; 8P �- � ----�-•-----�---�----� A. ' 3C ' 8P ; i - f - 3C ---- �" - 8P -� I i ' __._.. .....---- -�------: Kitsap ;Power Epuipment Operators Kitsa � P wo er Eauipment Operators Kitsap �Power Equioment Operators Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Power Eauipment Operators Power Equipment Operators Power Equiqment Operators Power Equipment Operators Kitsap !Power Equipment Operators ------._..._...._,-------._--�---..,.-�--�--�-----..._._ .__._. Kitsap �Power Equiqment Operators Kitsap �Power Equioment Operators Kitsap iService En�ineers - Equipment --.+ .-...------...---------..... !Shotcrete/gunite Equipment � Shovel , Excavator, Backhoe, ;Tractors Under 15 Metric Tons. �Shovel, Excavator, Backhoe: �Over 30 Metric Tons To 50 �Metric Tons �.__ �------�---.�_.._...----_.__.._.--�-----� `Shovel, Excavator, Backhoes, ;Tractors: 15 To 30 Metric Tons Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons Shovel, Excavator, Backhoes: Over 90 Metric Tons Slipform Pavers ..._ _._.....---�._..---�._._._ Spreader, Topsider �t Screedman Subgrader Trimmer Tower Bucket Elevators Tower Crane Over 175'in Height, Base To Boom Tower Crane Up To 175' In Height Base To Boom $54.33I 7A � 3C ! 8P _--;---__ --- -----�---- - - � -- $51.97' 7A , 3C ; 8P i .�...----� -- $54.33 ---- � 3C i 8P ---.�__.._...____�...------+--- $55.24� 7A ! 3C ! 8P $54.75�� 7A � ---�----J---�--� -- � ---._�. $55.79� 7A � 3C -'- _ .. ..._ $56.36f 7A i --- --�---- $55.24� 7A $55.241 7A : $54.75i--�--�A� ----� $54.33 � 7A �..�_�__. j $56.36� 7A i , 1 � _...__. �j $55.79i 7A �Kitsap lPower Equipment Operators �Transporters, All Track Or 4 � �Truck Type � ; s ; --------.._..--�---�- ---�---._----�--...--�----.._..._. ---._;_-- ----.....--- -�--�----.___....-- -._----� 'Kitsap iPower Equipment Operators �Trenching Machines �_.___._..;.�__�_._......_..._..__..._____. _._.._.._._�.__;.._.____._.._.___.__.�__._._.____._____..�----.---. tKitsap ;Power Equipment Operators !Truck Crane Oiler/driver - 100 ! � iTons And Over t -----.-�__....----�-------�----�---------� ;------�--------�-----...----�--�----��- $55.24� 7A 3C 3C 3C 3C 3C 3C 3C 3C �._.�-� i L —..--- i 8P � i i.__. _ � 8P i i 8P 4 --._8P _. : i� -- 8P - i .._..- 8P ; 8P � �-----._.._. j 8P i i i 8P � _ _....._..____.__'.__...----� -------.... $54.33; 7A i 3C � 8P 3 --_..___;_..._ ___._ .. _--.-�-- ___ ....___._._�.�..___.__� $54.75i 7A � 3C j 8P ' . ; , � � � .. � ' �-�-'---�-------� ---�--' ;Kitsap i Power Equioment Operators jTruck Crane Oiler/driver ;$54.33�� 7A i 3C T ^ ` i � U nder 100 Tons F ' ; � � ;_—._....�---.____.---�--�----- -- --�-- ----�----...._.-�---......_.�__._._..�._....._----.;.._—_----t----.._.__._.._.�_...------,. �Kitsap ` Power Equipment Operators �Truck Mount Portable ;$54.75i 7A j 3C i 8P , i : � �Conveyor ; I j �: ;---- -- - --- ----�--- --�..--- --.., -�-- - - - � �_.___ _.._ _._ . ; -----�----._; �.-------- ,----�-�----�--�----�--; ;Kitsap ! Power Equiqment Operators � :$55.24� 7A �! 3C � gp ;r-__-..�._..--------._...___—_-------- _--�---�------� -----�---�--------�------- -- .-. —_.._ �_.__. —._._._- ;---_—...�, �Kitsap �Power Equipment Operators �Wheel Tractors, Farmall Type f$51.97� 7A ; 3C j 8P ---�---------- -.`.----�--�------�.__.�.--__,_._..__'---�------ � �-- -�----�I---- ----- . �_.._..._.- ------:--___.- ....._..__ - � kKitsap _;Power Equipment O�erators iYo Yo Pay Dozer ;$54.75� 7A :' 3C � 8P � .. �----�-------.�...--------�—---�------ �--�—_---�---... � — .—'----_---� �_...--�-------�--—�---._.._..----...—._._._..-; -----._ .,._..__,....------- ; �Kitsap ;Power Equipment Operators- ;Asphalt Plant Operators �$55.24� 7A ; 3C � 8P `: � � � � �Under�round Sewer �t Water i ; " ! ` - >-�______....._.._--�--�-- ------�------- �--------.._..---------r ------��—�----�---�--._;.._.—------- �.�.._4.� i -�--�-�-- --�----- � '�Kitsap iPower Equipment Operators- �Assistant En�ineer i$51.97� 7A � 3C ; 8P 5 � � U nderQround Sewer £t Water ; � i i ! � � , .. ,. ...._._._.._._...___:,___..._._._,__�._.________._____._..._.._..�.;_.--.-----..__._.__..._�_. _-.-.----___....._,_�._.__.....__�...�.__._.�.._..__;.._._.....__-.-----...__�...__._......_. 'Kitsap I Power Epuipment Operators- �Barrier Machine (zipper) ;$54.75j 7A 1 3C � 8P i s � U ndereround Sewer ft Water � � � � � , , ;---- ---�-- ---- ---�---�--- -- -----�-�---------.._.._..—,.-!- --- -____ ;. --�--�----�-- -----�--- : :`Kitsap jPower Equipment Operators- 'Batch Plant Operator, :$54.75� 7A 3C i 8P � iUnderQround Sewer �t Water ;Concrete :.....__ . �__ _._ .'_—___.._.._...�.—.�.---�-----�-- .__.-- �- � --..._... _... _--�--------�--�— --�--.-- ----- --- ------._.. . _.------�--�--� : Kitsap � power Equi�ment Operators- 'Bobcat �$51.97' 7A I 3C i 8P a : i ; , � iUnder�round Sewer �t Water ; i � ' '': _-------;----..._._----- --------��---�-------.-.... -----._._.._.._..---. __ �___._._...._. ;..._.. ........----!-------...----�-- �---� ,Kitsap 'Power Epuipment Ooerators- iBrokk - Remote Demolition •$51.971 7A j 3C 8P � ; iUnderQround Sewer �t Water !E ui ment � ! � � � 4 P ' ' � . --�-�---..--.-.._..____._...—_.._.-------..........---_......---;----.---._._...�__.__ ..............;_�_�.--- -----------�. ��.--�---��.-------.._._ ...._ � � I i � � lKitsap Power EQUipment Operators- IBrooms �$51.97 7A � Under�round Sewer £t Water j pKitsap Power Equipment Operators- Bump Cutter $54.75 7A Un der�ro und Sewer ft Water Kitsap Power Equipment Operators- Cableways � $55.24 7A Under�round Sewer �t Water Kitsap� Power Eauipment Operators- Chipper I$54.75 7A Under�round Sewer Ft Water � Kitsap Power Equipment Ooerators- Compressor $51.97 7A Under�round Sewer �t Water Kitsap Power Equipment Operators- Concrete Pump: Truck Mount $55.24 7A � Under�round Sewer �t Water With Boom Attachment Over � _ 42 M _ Kitsap Power Equipment Operators- Concrete Finish Machine -laser �$51.97 7A Underground Sewer £t Water Screed Kitsap Power Equipment Operators- Concrete Pump - Mounted Or $54.33 7A UnderQround Sewer �t Water Trailer High Pressure Line Pump, Pump High Pressure. Kitsap Power Equioment Operators- Concrete Pump: Truck Mount �$54.75 7A ; Under�round Sewer �t Water With Boom Attachment Up To I � 42m Kitsap Power Equipment Operators- Conveyors �$54.33 7A � Under�round Sewer � Water — � - Kitsap Power Equipment Ooerators- Cranes: 20 Tons Through 44 i$54.75I 7A �__'Under�round Sewer &t Water Tons With Attachments � �Kitsap Power Eauipment Operators- Cranes: 100 Tons Throu�h 199 $55.79 7A R Under�round Sewer £� Water Tons, Or 150' Of Boom � (Including Jib With � � Attachments) �_ yKitsap . Power Eauipment Operators- Cranes: 200 Tons To 300 Tons, j$56.36 7A � Under�round Sewer &t Water Or 250' Of Boom (including Jib I ! � � !With Attachments) � - - ;Kitsap �Power Equipment Operators- Cranes: 45 Tons Throu�h 99 i$55.24 7A r �Under�round Sewer £t Water Tons, Under 150' Of Boom ; —� � I(including Jib With + ------�-----•--.__i ----- � ---- I - xKitsap Power Equipment Operators- ,Cranes: A-frame - 10 Tons And j$51.97 7A � Underground Sewer 8 Water �Under � t --- —�------- ----- --- !---l-- �Kitsap Power Equipment Operators- �Cranes: Friction 100 Tons �$56.36I 7A ; I Under�round Sewer �t Water Through 199 Tons j � - --I-----� - ��Kitsap Power Epuiqment Operators- Cranes: Friction Over 200 Tons; $56.92� 7A _ _ �UnderQround Sewer �t Water �� _� _____ ; FKitsap�Power Equipment O�erators- Cranes: Over 300 Tons Or 300' T$56.92j 7A ' �Under�round Sewer �t Water Of Boom (includin� Jib With ! I j i Attachments) � —�- � - -- -- -- --- ---- -- ---- --� �Kitsap �er Eauipment Operators- ,Cranes: Through 19 Tons With �$54.33� 7A � Pow � Under�round Sewer � Water fAttachments A-frame Over 10 ' � ,; � , ''--- � _ ITons -----._�..---- ��R._ ; Kitsap Power Equipment Operators- �Crusher� �$54.75� 7A Under�round Sewer � Water �_ _� 1 i _.�.._ J�__..__"_'__ _. � : I l -------__ __� __._ � __. 3C 3C 3C 3C 3C 3C 8P 8P 8P 8P 8P 8P 3� 3C I 8P i �—_ 3C j 8P 3C 3C 3C :� :• :� 3C 3C 3C 3C 3C 3C 3C 3C � 8P : � :. _ �. f a 8P 8P —, � 8P --: 8P . _ 8P � _� _ _. � e Kitsap Power Equipment Operators- �Deck Engineer/deck Winches I$54.75� 7A Under�round Sewer £t Water �(power) I --t----- Kitsap Power Equipment Operators- Derricks, On Building Work i$55.24� 7A Under�round Sewer 8 Water I _-t__._.__ Kitsap Power Equipment Operators- `Dozers D-9 �t Under �� �$54.33� 7A Underground Sewer £r Water ; � Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap Kitsap �� Drill Oilers: Auger Type, Truck $54.33 7A - Or Crane Mount � �� = Drilling Machine ���i $54.75 7A ' I _ Elevator And Man-lift: $51.97 7A � Permanent And Shaft Type _ ,Finishin� Machine, Bidwell And $54.75 7A - �Gamaco �t Similar Equip � :�orklift: 3000 Lbs And Over $54.33 7A � With Attachment � _ �Forklifts: Under 3000 Lbs. With� $51.97 7A � - Attachments I -- --+---�-- _ Grade Engineer: Using Blue $54.75 7A - Prints, Cut Sheets, Etc I_ _ �—��.�_�_ —�_Y. ._._._. : fGradechecker/stakeman i $51.97 7A -----�---- _..----_.-------__ ! _..__�.__�.. _ I Guardrail Punch �, 54.75 7A ' � I Hard Tail End Dump � 7A Articulating Off- Road Equipment 45 Yards. � Over Hard Tail End Dump Articulating Off-road Equipment Under 45 Yards Horizontal/directional Drill Loc Horizontal/directional Dritl 0 perator `•Kitsap Power EquiQment Operators- iHydralifts/boom Trucks Over i __I U nder�round Sewer £� Water ^ i 10_ Tons _` _ �� :�Kitsap �Power Epuipment Operators- �Hydralifts/boom Trucks, 10 Under�round Sewer £� Water _�Tons And Under ;:Kitsa Power E uipment Operators- � Overhead 8 Yards. �t ` P �Under�round Sewer �t Water ►Over ; ___.�__ ________� __._______ __ _ _._____ _ �,Kitsap IPower Equipment Operators- �Loader, Overhead, 6 Yards. F Underground Sewer 8 Water �But Not Including 8 Yards � �- ---------�--�._._�_.�- --------��—�-- � Ki tsap I Power Equi oment Operators- � Loaders, Overhead U nder 6 �_ jUnder�round Sewer �t Water Yards — �----------�--�-------.____ 'Kitsap 1Power Equi�ment Operators- jLoaders, Plant Feed 4 Kitsap " -- P Kitsap _ �Loaders: Elevating Type Belt �Locomotives, All $54.75+ 7A � i ; $54.33( 7A � $54.75 7A $54.33� 7A $51.97 7A i $55.79� 7A __.___�____ $55.24� 7A $54.75' 7A ---i---- $54.75� 7A $54.33� 7A —.-- !---- $54.75? 7A 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 8P � 8� 8P -- 8P� 8P � 8P R , ,� 8P � 8� — � —� 8P � _ � 8P � ;� � P. 8P � — � 8P ---� 8P � F �: i: . __. 8P gp � 8P 8P i ; 8P , SP � 8P . 8P� - f 8P F ----; 8P �� : Under�round Sewer £t Water Kitsap Power Equioment Operators- Material Transfer Device i$54.75 7A Under�round Sewer � Water � Kitsap Power Equipment Ooerators- Mechanics, All (leadmen - !$55.79 7A UnderQround Sewer �t Water $0.50 Per Hour Over Mechanic)I Kitsap Power Equinment Operators- Motor Patrol Grader - Non- $54.33 7A Under�round Sewer �t Water fini Kitsap Power Eauipment Ooerators- Motor Patrol Graders, Finishing $55.24 7A Underground Sewer �t Water Kitsap Power Equipment Operators- Mucking Machine, Mole, $55.24 7A � Underaround Sewer �t Water Tunnel Drill, Boring, Road _ Header And/or Shield I Kitsap Power Equipment Operators- Oil Distributors, Blower �$51.97 7A ,� Under�round Sewer �t Water Distribution �t Mulch Seeding Operator �_ � Kitsap Power Equipment Operators- Outside Hoists (elevators And $54.33 7A _ Under�round Sewer Ft Water Manlifts), Air Tu�gers,strato � a Kitsap Power Equipment Operators- Overhead, Bridge Type Crane: i$54.75 7A UnderQround Sewer �t Water 20 Tons Through 44 Tons �Kitsap Power Equioment Operators- Overhead, Bridge Type: 100 $55.79 7A ' Under�round Sewer �t Water Tons And Over Kitsap Power Equipment Operators- Overhead, Bridge Type: 45 �$55.24 7A UnderQround Sewer �t Water Tons Through 99 Tons � p Kitsap ,Power Equipment Operators- Pavement Breaker •$51.97 7A �; Under�round Sewer �t Water �Kitsap Power Equipment O�erators- Pile Driver (other Than Crane $54.75 7A � 1 Underground Sewer £t Water Mount) ; � Kit as p lPower Equipment Operators- Plant Oiler - Asphalt, Crusher 54 33 7A , Under�round Sewer �t Water � Kitsap Power Equiqment Operators- Posthole Digger, Mechanical i$51.97 7A ` �Under�round Sewer Ft Water � ' I �Kitsap �Power Equipment Operators- Power Plant + ^ �$51.97 7A Under�round Sewer �t Water ;Kitsap�Power Eauipment Operators- Pumps - Water --; $51.97 7A � ;Under�round Sewer �t Water • i �_—_ --...a--------- ---- — — - --;--- tKitsap �Power Equiqment Operators- Quad 9, Hd 41, D10 And Over �$55.24 7A � � ;Undereround Sewer �t Water Kitsap �Power Equioment Operators- ' Quick Tower - No Cab, Under $51.97� 7A � i Under�round Sewer £� Water 100 Feet In Height Based To � � -- ---�-- ----- Boom - ----- � � 'Kitsap IPower Equipment Operators- l Remote Control Operator On �$55.24� 7A � lUndereround Sewer �t Water Rubber Tired Earth Moving � � I Equi pment -- �Kitsap �Power Equipment Operators- Rigger And Bellman �$51.97� � 7A ' IUnder�round Sewer £t Water t - —�--fi---- fiKitsap �Power Eauipment Operators- Rollagon �$55.24 7A _ �Under�round Sewer �t Water i �Kitsap ,Pow Ere auipment Operators- Roller, Other Than Plant Mix �$51.97 7A ; � Under�round Sewer £t Water � � A � � - -- ----- -�-- -��._-- 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C 3C :� :� :� :� :� :� 8P 8P _ _ 3 8 — � — 4 8P �� S 8P � � 8P i 8P — � Y . � 8P ; � 8P --.� 8P 8P ` 8P ': � 8P � 8P ' ; 8P �. ; _ � Kitsap Power Epuipment OQerators- (Roller, Plant Mix Or Multi-lift �$54.33I 7A I 3C Under�round Sewer �t Water Materials � ' Kitsap Power Eauipment O�erators- Roto-mill, Roto-grinder f$54.75 7A 3C �Undereround Sewer �t Water � ' - - �------- -- - -�-------�----�- -- Kitsap Power Equipment Operators- Saws - Concrete I$54.33 7A 3C Under�round Sewer �t Water � Kitsap Power Equipment Operators- Scraper, Self Propelled Under j$54.75 7A 3C UnderQround Sewer �t Water 45 Yards � Kitsap Power Eauipment Operators- �Scrapers - Concrete £� Carry All Y $54.33 ^ 7A �3C Undereround Sewer &t Water Kitsap IPower Equipment Operators- �Scrapers, Self-propelled: 45 $55.24 7A 3C Under�round Sewer £� Water Ya rds And Over --�-�----- ----�� ...--- Kitsap �Power Equipment Operators- Service Engineers - Equipment i$54.33 7A 3C Under�round Sewer £r Water I Kitsap , Power Equipment Ogerators- Shotcrete/gunite Equipment "• $51.97r 7A �3C Under�round Sewer 8 Water i � Kitsap Power Eauipment Operators- Shovel , Excavator, Backhoe, �$54.3� 7A�_ 3C UnderQround Sewer £t Water Tractors Under 15 Metric T ons. � __ Kitsap �Power Equipment Operators- Shovel, Excavator, Backhoe: �$55.24 7A i 3C � Under�round Sewer tt Water Over 30 Metric Tons To 50 j ; � _ __ Metri Tons � � _ _ � . __ Kitsap fPower Equiqment Operators- �Shovel, Excavator, Backhoes, i $54.75� 7A 3C f Under�round Sewer £t Water Tractors: 15 To 30 Metric Tons ( � __ � Kitsa Power E ui ment 0 erators- �Shovel Excavator Backhoes: � 55.79 7A 3C ,. P q p P > > $ , - I - � � UnderQround Sewer �t Water +Over 50 Metric Tons To 90 I I � t ` �Metri Tons i .----- ---------�_...�..y_-'--�-- ----�-----��- -' -----�--�-� �Kitsap Power Equioment Operators- �Shovel, Excavator, Backhoes: i$56.36I 7A I 3C Underaround Sewer £t Water � Over 90 Metric Tons � i I �_ ._..__._— __ --.- ----..__._.__....._-.----.-----.� , F Kitsap IPower Equipment Operators- �Slipform Pavers �$55.241 7A� i 3C ! �Under�round Sewer £t Water � � � �-- �-.L �-- --- -� - - 1 �..-------.. �Kitsap Power Equioment Operators- Spreader, Topsider &t I$55.24� 7A � 3C � Undereround Sewer � Water Screedman I - ---� - -------- - I-�-�----- - � .. _ ...� �Kitsap �Power Equipment Operators- Subgrader Trimmer �$54.75 7A i 3C � IUnder�round Sewer tt Water � � , I - iKitsap �Power Equi�ment Operators- Tower Bucket Elevators �$54.33i 7A � 3C � Under�round Sewer �t Water _ �_ � � � � ----f-----� ---.^_�T �,Kitsap Power Equioment Operators- ; Tower Crane Over 175'in �$56.36, 7A I 3C - iUnder�round Sewer �t Water Height, Base To Boom � � ---r------ -, �Kitsap��Power Equipment Ooerators- Tower Crane Up To 175' In �$55.79f 7A � �3C ; � Under�round Sewer �t Water ; Height Base To Boom _� �`_��_ �Kitsap Power Eauipment Operators- ^ �Transporters, All Track Or �$55.24� 7A � 3C 4 "Under�round Sewer £t Water iTruck Type____ �____� � ; �- -�-� ------_..____ ;Kitsap Power Equipment Operators- 'Trenching Machines I$54.33� 7A � 3C # I U nder�round Sewer £� Water ' ---- �- - ! ----- ;-- �- -- ; Kitsap �Power Equipment Operators- �Truck Crane Oiler/driver - 100 �$54.751 7A 3C � �Undereround Sewer �t Water jTons And Over � ; :Kitsap Power Equipment Operators- 'Truck Crane Oiler/driver �$54.33 7A � 3C � UnderQround Sewer �t Water �Under 100 Tons ! � ' � -�---- ------ ':Kitsap Power Equipment Ooerators ^ �Truck Mount Portable j$54.75� 7A I 3C , Under�round Sewer � Water �Conveyor ; � :� :� :� :� :� :� :� :� :� :� l 8P � �__! ; 8P 4 8P ! _�. � 8P t � ---- E a "�'.' � 8P y ; �_._ � 8P � 8P ^ 5 ; _i 8P � 8P � 8P �. ; 8P � - - i 8P g f I� 8P ; i ;, ?Kitsap Power Equipment Operators- �Welder $55.24" 7A k Undereround Sewer �t Water 9 �Kitsap Power Equiqment Operators- Wheel Tractors, Farmatl Type ,$51.97 7A � UnderQround Sewer £� Water �Kitsap Power Epuipment Operators- Yo Yo Pay Dozer $54.75 7A Under�round Sewer �t Water �Kitsap Power Line Clearance Tree Journey Level In Charge $45.75 5A � Trimmers e — yKitsap Power Line Clearance Tree Spray Person •$43.38 5A r T rimmers �Kitsap Power Line Clearance Tree Tree Equipment Operator � $45.75 5A Trimmers 4Kitsap Power Line Clearance Tree Tree Trimmer $40.84 5A ` Trimmers �....__-----.._ .._.--- ----_-- - --�--�- - - - -- �Kitsap Power Line Clearance Tree Tree Trimmer Groundperson $30.74 5A k� Trimmers �Kitsap Refri�eration £r Air Mechanic Conditionine Mechanics ; Kitsap � Residential Brick Mason � Journey Level � � Kitsap Residential Carpenters Journey Level �Kitsap Residential Cement Masons Journey Level �Kitsap Residential Drvwall A�plicators Journey Level �Kitsap Residential Drvwall Taoers Journey Level � Residential Electricians Journey Level �{ Kitsap Residential Glaziers Journey Level #Kitsap Residential Insulation Journey Level ; Aqqlicators � �Kitsap_ Residential Laborers _ Journey Level �Kitsap � Residential Marble Setters Journey Level �Kitsap Residential Painters Journey Level fKitsap �Residential Plumbers £� Journey Level , �Pipefitters I ° Kitsap � Kitsap :-- � Kitsap ; Kitsap �tion �t Air iJourney Level ics i _ tal Workers Journey Level (Field or Shop) r Lavers Journey Level _ _ _ Fitters Journey Level $63.57 $17.04 $40.1 $30.87 $40.14 $20.00 $27.00 $54.91 $13.96 $16.89 $17.04 $19.52 $21.11 5A 5D 5D 7L 3C � 8P � - � 3C i 8P i 3C 8P 4A � 4A I 4A � 4A � — I L 4 � --- 1G � — , 1 4C 1 4C 1 1 1Y 1 n � 1 � 1 ? 1 ----� ._._ 1 ---. � _...--- I $17.64) i 1 F ! ; ; $28.95��I 1 ------ ----;--�--- � ---:. $19. 38 � t----- .. --- � , $27.74� — - - ---f---; ' � ----- -- Kitsap ' Residential Stone Masons Journey Level '$51.32� 5A ! 1M ' :_ ... ---- -- - . �.----�--�------ -.._.._ _-----�----._ -�---._...-----; -� - --------�- - �- �---�---�---�-- -� -- �------_. i Kitsap_ � Residential Terraao Workers Journey Level i $9.47 ; 1 �__; -- �- � -------- � Kitsap Residential Terraao/Tile �Journey Level i �$30.26j � 1 � � Finishers : � -----�---� �— ------- -- ----- �_ ... _— _ _ ___.._._ - ---�--!-- ___ _� _._-- ------ ------ �--_— ;Kitsap i Residential Tile Setters Jou Level $31.14 1 , ----f _.--� -- - --- -- -� -._ __ __-f-------� ' K itsap i Roofers Journey Level � j$45.71 5A � 3Fi ';Kitsap Roofers Using Irritable Bituminous i$48.71 � 5A � 3H � _ ' � Materials i ` � � ` ,: _ __ _�-_-- _--_-- ----� ---- ---- ------- ' -- .J � _J .. . I ! ' I — I --- ---- I _ Kitsap Kitsap Kitsap Kitsap K itsap Kitsap Kitsap Kitsap Kitsap Sheet Metal Workers Shi �bui ldi nQ �t Shi o Re�ai r Shi pbui ldi n� £� Shi p Repai r Shipbuilding �t Ship Repair Shipbuildine �t Shio Reoair Shipbuildin� £t Ship Repair Shipbui ldi ng �t Shi p Repai r Journey Level (Field or Shop) CARPENTER � ELECTRICIAN Heat �t Frost Insulator ' Laborer MACHINIST OPERATOR Painter � � PIPEFITTER Kitsap �Shipbuilding �t Ship Repair RIGGER Kitsap Shipbuildin� £� Ship Repair Sheet Metal Kitsap Shipbuildin� &t Ship Repair SHIPFITTER _ Kitsa iShipbuilding £t Ship Repair WELD ER/BURNER Kitsap Sien Makers �t Installers Journey Level � (Etectrical) _-1—_— Kitsap i Si�Qn Makers �t Installers (Non- IJourney Level ! Kitsap Kitsa Kitsap Kitsap E Kitsap E Kitsap h t i'- "_ t Kitsap : Kitsap t Kitsap � Kitsap `Kitsap ; � Kitsap J _.—.. ;' Kitsap � Kitsap Kitsap � Kitsap �; = Kitsap Journey Level Journey Level Journey Level Journey Level Journey Level Journey Level Technicians Assistant Construction Site Surveyor Ch ainman Construction Site Surveyor Journey Level $70. 37 $19.29 $25.53 $61.18 $19.64 $19.29 $19.44 $37.80 $19.29 $19.29� $�--� $19.29 $19.29 $20. 58� 7F 5J 6Z $9.47� s $42.41 5A $10.31� $69.74� 5C i $13.23� ._.___� $51.32 $16.00 5A � ----fi-- i � ; � i L 7A ; 8P '� �, '----__�_. � � �. 7A _._1� 3�_,L8P� , � _ 7A 3C � 8P ; 7E � 1 E �-- --1 $54.33! $53.81 $55.24 $42.07 _ �Cable Splicer � $36.96 Telephone Line Construction - Hole Digger/Ground Person �$20.49 Outside ! ------�-�----------------- -� --------�--------- ----�--�-------� --!--- -----�-- Telephone Line Construction - ilnstaller (Repairer) �$35.40 Outside ----�-----_ _------ ----------�------- � ------ Telephone Line Construction - �Special Aparatus Installer I '$36.96 Outside � - � ---- � Y ' ��----- _.____.__.� ___.r___ __,�_ Telephone Line Construction - Special Apparatus Installer II �$36.19 Outside — — L - ---------- � --- Telephone Line Construction -�Telephone Equipment Operator 36.96 Outside _ _ (Heavy) __ _ �__ Telephone Line Construction - Telephone Equipment Operator $34.34 Outside � (Li�ht) � I i 5A i --�-- 26 ----�-------; � �; � ---...----! __—.----- '• �---- 5A I 26 ! ` i � i �-----�-- � --- �-- ' ----- 5A � 2B � - --� --. � � ._----�--� ------------;._-----:. 5A ' 2B � � i _ �------.: 5A � 2B ; , __J _ � _I 5A ( 2B � < ------! --- 5A 26 � p ---�__ � : 1E 1 1 1S 1 1 1 2B 1 1 1 1 1 1 1 3D 1 1X 1 �1 M 1 3C � Kitsap � TeleQhone Line Construction - �Telephone Lineperson I$34.34� 5A Outside -J___'___� �Kitsap Telephone Line Construction -�Television Groundperson i$19.45� 5A �Outside w �_ __: _.._� .�_.___ r __...---- �Kitsap �Teleohone Line Construction -;Television Lineperson/Installer i$25.89{ 5A " Outside j I --�---- —�-- Kitsap �Telephone Line Construction -!Television System Technician �$30.97� 5A Outside " � ------ ------ --- �— ----- -- ! , ----j Kitsap Telephone Line Construction - iTelevision Technician � i$27.77! 5A Outside � � i Kitsap Telephone Line Construction' �Tree Trimmer �~�� $34.34 A Outside � � � _____.___._._.. ____. ._.._____._ � , _._J_____. Kitsap� ,Terrazzo Workers ����_ i Journey Level ���? $46.96� 5A —.__�_._�.� Kitsap � Tile Setters Journey Level '$46.96; 5A ------- --..--1—.�..�� Kitsap jTile. Marble &t Terrazzo Journey Level � �$12.00i � Fi nishers �__�__ Kitsap Traffic Control Stripers �Journey Level ;$43.11 7A —�---...--� ---- � Kitsap �Truck Drivers � �� Asphalt Mix Over 16 Yards (W. �$49.85 5D � ,_ _ _ iWA-Joint Council 28) � �-- �—.__. = �Kitsap �Truck Drivers �Asphalt Mix To 16 Yards (W. ;$49.01 5D � _ !WA-Joint Council 28) v_�_ __._._.._.._---.______.._._..___. _ _____�..�_._______�� �Kitsap �Truck Dri Dump Truck I $19.60 Kitsap ;Truck Driver Dump Truck And Trailer ; $19.60 ..�_ _.�._—._._ �—._�.—._,_._------- -- Kitsap� Drivers jOtherTruck ; $ 18.37� ---� � .�-------�------- — ---- Kitsap CTruck Drivers ,Transit Mixer ; $20.79 t �.------�- ;---- -�—�---..`_._.__._,._—._..._ _._.._..__._..__.�.-------....---�----�--� --. __--------- -�--..._.__ �Kitsap + Well Drillers �t irri�ation Pum� �Irrigation Pump Installer �$13.17� � � installers _ � �_ _ _ _ � ^ � Kitsap ; Well Drillers �t IrriQation Pump lOiler �$14.08�� � I nstallers � _ _____�_.__r._._.__..._ _._----.._. _�._.__..—._._..._+._____�_...__ Kitsap � Well Drillers &t IrriQation Pum� �Well Driller !$14.40I � �Installers j � � � f � � ; , , �. ,..v.....; ._..� . ....�_�.:.�, : �.-.�...� .,... .. . �: �... ..�_..:...:....-.: _ � ., .._..... _ .�.�.. . ... ., � .. .x ,.. � ... ...........�..,. . � . .... 2g i — � 2B 2B 2B 2B 2B 1M 1M 1 1K 3A � 8L 8L General Decision Number: WA150001 04/03/2015 WA1 Superseded General Decision Number: WA20140001 State: Washington Construction Type: Highway Counties: Washington Statewide. HIGHWAY (Excludes D.O.E. Hanford Site in Benton and Franklin Counties) Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to a.11 contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the E0, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number 0 1 2 3 4 5 CARP0001-008 06/O1/2013 Publication Date O1/02/2015 O1/09/2_015 O1/23/2015 02/27/2015 03/20/2015 04/03/2015 Rates Fringes Page � 1 CARPENTER COLUMBIA RIVER AREA = ADAMS, BENTON, COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GRANT, OKANOGAN (EAST OI' THE 120 MERIDIAN) AND WALLA WALTA COUNTIES GROUP 1 :...................$ 30.66 GROUP 2 :...................$ 31.56 GROUP 3 :...................$ 31.64 GROUP 4 :...................$ 31.64 GROUP 5 :...................$ 62.58 GROUP 6 ....................$ 30.29 GROUP 7 ....................$ 31.29 GROUP 8 ....................$ 28.54 GROUP 9 ....................$ 30.29 12.87 12.87 12.87 12.87 12.87 12.87 12.87 12.87 12.87 WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �2 SPOKANE AREA: ASOTIN, GARFIELD, LINCOLN, PEND OREILLE, SPOKANE, STEVENS AND WHITMAN COUNTIES GROUP 1 :...................$ 30.66 GROUP 2 :...................$ 31.56 GROUP 3 :...................$ 31.64 GROUP 4 :...................$ 31.64 GROUP 5 :...................$ 70.78 GROUP 6 :...................$ 32.64 GROUP 7 ....................$ 35.39 GROUP 8 ....................$ 34.39 GROUP 9 ....................$ 34.39 CARPENTER & DIVER CLASSIFICATIONS: 12.87 12.87 12.87 12.87 12.87 12.87 12.8? 12.87 12.87 GROUP 1: Carpenter GROUP 2: Millwright, machine erector GROUP 3: Piledriver - includes driving, pulling, cutting, placing collars, setting, welding, or creosote treated material, on all piling GROUP 4: Bridge carpenters GROUP 5: Diver Wet GROUP 6: Diver Tender, Manifold Operator, ROV Operator GROUP 7: Diver Standby, Bell/Vehicle or Submersible operator Not Under Pressure GROUP 8: Assistant Tender, ROV Tender/Technician GROUP 9: Manifold Operator-Mixed Gas ZONE PAY: ZONE 1 0-40 MILES ZONE 2 41-65 MILES ZONE 3 66-100 MILES ZONE 4 OVER 100 MILES FREE $2.25/PER HOUR $3.25/PER HOUR $4.75/PER HOUR DISPATCH POINTS: CARPENTERS/MILLWRIGHTS: PASCO (515 N Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the works�te). CARPENTERS/PILEDRIVER: SPOKANF (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: WENATCHEE (?..7 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: COEUR D' ALEiVE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite). WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �3 DEPTH PAY FOR DIVERS BELOW WATER SURFACE: 50-100 feet $2.00 per foot 101-150 feet $3.00 per foot 151-220 feet $4.00 per foot 221 feet and deeper $5.00 per foot PREMIUM PAY FOR DIVING IN ENCLOSURES WITH NO VERTICAL ASCENT; 0-25 feet Free 26-300 feet $1.00 per Foot SATURATION DIVING: The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decomnression are complete. tne diver rate shall be paid for all saturation hours. WORK IN COMBINATION OF CLASSIFICATIONS: Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift. HAZMAT PROJECTS: Anyone working on a HAZMAT job (task), where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows: LEVEL D+$.25 per hour - This is the lowest level of protection. No respirator is used and skin protection is minimal. LEVEL C+$.50 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B+$.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit". LEVEL A+$1.00 per.�hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line. ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction CARP0003-006 10/O1/2011 SOUTHWEST WASHINGTON: CLARK, COWLITZ, KLICKITAT, LEWIS(Piledriver only), PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to Willapa Bay to the Pacific Ocean), SKAMANIA AND WAHKIAiCUM COUNTIES and INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA BAY SEE ZONE DESCRIPTION FOR CITIES BASE POINTS ZONE 1: Rates Carpenters: CARPENTERS ..................$ 32.04 DIVERS TENDERS ..............$ 36.34 DIVERS ......................$ 77.08 DRYWALL .....................$ 27.56 MILLWRIGHTS .................$ 32.19 PILEDRIVERS .................$ 33.04 DEPTH PAY: 50 TO 100 FEET $1.00 PER FOOT OVER 50 rEET 101 TO 150 FEET $1.50 PER FOOT OVER 101 FEET 151 TO 200 FEET $2.00 PER FOOT OVER 151 FEET Zone Differential (Add up Zone 1 rates): Zone 2 - $0.85 Zone 3 - 1.25 Zone 4 - 1.70 Zone 5 - 2.00 Zone 6 - 3.00 Fringes 14.18 14.18 14.18 14.18 14,. 18 14.18 BASEPOINTS: ASTORIA, LONGVIEW, PORTLAND, THE DALLES, AND VANCOUVER, (NOTE: Al1 dispatches for Washington State Counties: Cowlitz, Wahkiakum and Pacific shall be from Longview Local #1707 and mileage shall be computed from that point.) ZONE 1: Projects located within 30 miles of the respective city hall of the above mentioned cities ZONE 2: Projects located more than 30 miles and less than 40 miles of the respective city of the above mentioned cities ZONE 3: Projects located more than 40 miles and less than 50 miles of the respective city of the above mentioned cities ZONE 4: Projects located more than 50 miles and less than 60 miles of the respective city of the above mentioned cities. ZONE 5: Projects located more than 60 miles and less than 70 miles of the respective city of the above mentioned cities 70NE 6: Projects located more than 70 miles of the respected ciLy of the above mentioned cities ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �4 Page �5 CARP0770-003 07/O1/2014 Rates CARPENT�R CENTRAL WASHINGTON: CHELAN, DOUGLAS (WEST OF THE 120TH MERIDIAN), KITTITAS, OKANOGAN (WEST OF THE 120TH MERIDIAN) AND YAKIMA COUNTIES CARPENTERS ON CREOSOTE MATERIAL ...................$ 38.78 CARPENTERS .................$ 38.68 DIVERS TENDER ..............$ 39.15 DIVERS .....................$ 87.20 MILLWRIGHT AND MACHINE ERECTORS ...................$ 39.78 PILEDRIVER, DRIVING, FULLING, CUTTING, PLACING COLLARS, SETTING, WELUING OR CRESOTE TREATED MATERIAL, ALL PILING.......$ 38.93 Fringes 13.64 13.64 13.64 13.64 13.64 13.64 (HOURLY 'LONF. PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Auburn Renton Aberdeen-Hoquiam Ellensburg Centralia Chelan Olympia Bellingham Bremerton Anacortes Shelton Yakima Tacoma Wenatchee Everett Port Angeles Mount Vernon Sunnyside Pt. Townsend Zone Pay: 0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/nour Over 55 radius miles $1.55/hour (HOURLY ZONE PAY: WESTERN AND CFNTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVFR ONLY) Hourly Zone Pay shall be computed from Seattle linion Ha].1, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles 26-45 radius m.iles Over 45 radius miles Free $ .70/hour $1.50/hour WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �6 ---------------------------------------------------------------- CARP0770-006 06/O1/2014 Rates Fringes CARPENTER WESTERN WASHINGTOPd: CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS (excludes piledrivers only), MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COUNTIES BRIDGE CARPENTERS..........$ 38.68 CARPENTERS ON CREOSOTE MATERIAL ...................$ 38.78 CARPENTERS .................$ 38.68 DIVERS TENDER ..............$ 39.15 DIVERS .....................$ 87.20 MILLWRIGHT AND MACHINE ERECTORS ...................$ 39.78 PILEDRIVER, DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING OR CRESOTE TREATED MATERIAL, ALL PILING.......$ 38.93 13.64 13.64 13.64 13.64 13.64 13.64 13.64 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Auburn Renton Aberdeen-Hoquiam Ellensburg Centralia Chelan Olympia Bellingham Bremerton Anacortes Shelton Yakima Tacoma Wenatchee �verett Port �ingeles Mount Vernon Sunnyside Pt. Townsend Zone Pay: 0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zorie Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �7 ---------------------------------------------------------------- ELEC0046-001 02/04/2013 CALLAM, JEFFERSON, KING AND KITSAP COUNTIES Rates Fringes CABLE SPLICER ....................$ 46.87 3%+15.96 ELECTRICIAN ......................$ 42.61 3%+15.96 ---------------------------------------------------------------- ELEC0048-003 O1/Ol/2015 CLARK, KLICKITAT AND SKAMANIA COUNTIES Rates Fringes CABL� SPLICER ....................$ 44.22 21.50 ELECTRICIAN ......................$ 40.20 21.50 HOURLY ZONE PAY: Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Portland, The Dalles, Hood River, Tillamook, Seaside and Astoria Zone Pay: Zone 1: 31-50 miles $1.50/hour Zone 2: 51-70 miles $3.50/hour Zone 3: 71-90 miles $5.50/hour Zone 4: Beyond 90 miles $9.00/hour *These are not miles driven. Zones are based on Delorrne Street Atlas USA 2006 plus. ---------------------------------------------------------------- ELEC0048-029 O1/O1/2015 COWLITZ AND WAHKIAKUi�I COUNTY Rates Fringes CABLE SPLIC�R ....................$ 44.22 21.50 ELECTRICIAN ......................$ 40.2.0 21.50 ---------------------------------------------------------------- ELEC0073-001 08/02/2014 ADAMS, FERRY, LINCOLN, PEND OREILLE, SPOKAPdE, STEVENS, WHITMAN COUNTIES Rates CABLE SPLICER ....................$ 33.00 ELECTRICIAN ......................$ 30.00 WA150001 Modification 5 Federal Wage Determinations for Highway Construction Fringes 16.25 16.25 Page �8 ---------------------------------------------------------------- ELEC0076-002 09/Ol/2014 GRAYS HARBOR, LEWIS, MASON, PACIFIC, PIERCE, AND THURSTON COUNTIES Rates Fringes CABLE SPLICER ....................$ 37.94 23.36 ELECTRICIAN ......................$ 34.49 23.36 ---------------------------------------------------------------- ELEC0112 06/O1/2014 ASOTIN, BENTON, COLUMBIA, FRANKLIN, GARFIELD, KITTITAS, WALLA WALLA, YAKIMA COUNTIES Rates Fringes CABLE SPLICER ....................$ 39.95 17.88 ELECTRICIAN .......................$ 38.05 17.82 ---------------------------------------------------------------- ELEC0191-003 06/O1/2014 ISLP.ND, SAN JUAN, STdOHOMISH, SKAGIT AND WHATCOM COUNTIES Rates Fringes CABLE SPLICER ....................$ 44.23 17.73 ELECTRICIAN ......................$ 40.21 17.73 ---------------------------------------------------------------- ELEC0191-004 06/Ol/2014 CHEL•AN, DOUGLAS, GRANT AND OKANOGAN COUNTIES Rates Fringes CABLE SPLICER ....................$ 40.82 17.63 ELECTRICIAN ......................$ 37.11 17.63 ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �9 ENGI0302-003 06/O1/2014 CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLANU, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOi�IISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES PROJECTS: CATEGORY A PROJECTS (EXCLUDES CATEGORY B PROJECTS, AS SHOWN BELOW) Zone 1 (0-25 radius miles): Rates Fringes Power equipment operators: Group lA ...................$ 38.39 17.39 Group lAA ..................$ 38.96 17.39 Group lAAA .................$ 39.52 17.39 Group 1 .....................$ 37.89 17.39 Group 2 .....................$ 37.35 17.39 Group 3 .....................$ 36.93 17.39 Group 4 .....................$ 34.57 17.39 Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) - $1.00 Zone 3(Over 45 radius miles) -$1.30 BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Snelton, Wenatchee, Yakima POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP lAAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments) GROUP lAA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom GP,OUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to ].75 ft in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments GROUP 1- Cableway; Cranes 45 tons thru 99 tons, under 150 f.t of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end du�*�p articulating off-road equipment 45 yards and over; Loaaer- overhead 6 yards to, but not including 8 yards; Mucking machine, mo.le, tunnel, drill and/or shield; Quad 9, HU 41, D-10; Remote control operator on rubber tired �arth moving equipment; Rollagon; Scrapers-self propelled 45 yards and over; Slipform pavers; Transporters, all truck or track type WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �10 GROUP 2- Barrier machine (zipper); Batch Plant Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons througn 49 tons; Chipper; Concrete Pump-truck mount wi.th boom attachment; Crusher; Deck Engineer/Deck Winches (power); Drilling machine; Excavator, shovel, backhoe-3yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail nunch; Horizontal/directional drill operator; Loaders-overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics-all; Mixers-asphalt plant; Motor patrol graders-finishing; Piledriver (other than crane mount); Roto-mill,roto-grinder; Screedman, spreader, topside operator-Blaw Kno�, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper-self propelled, hard tail end dump, articulating off-road equipment-under 45 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine-shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer GROUP 3- Conveyors; Cranes-thru 19 tons with attacnments; A-frame crane over 10 tons; Drill oilers-auger type, truck or crane mount; Dozers-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pumps-concrete; Roller, plant mix or multi-lift materials; Saws-concrete; Scrpers-concrete and carry-all; Service engineer-equipment; Trenching machines; Truck Crane Oi1er/Driver under 100 tons; Tractors, backhoe 75 hp and under GROUP 4- Assistant Engineer; Bobcat; Brooms; Compressor; Concrete finish mahine-laser screed; Cranes-A frame-10 tons and under; Elevator and Manlift-permanent or shaft type; Gradechecker, Stakehop; Forklifts under 3000 lbs. witn attachments; Hydralifts/boom trucks, 10 tons and unde*-; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger, mechanical; Power plant; Pumps, water; Rigger and Bellman; Roller-other than plant mix; Wheel Tractors, farmall type; Snotcrete/gunite equipment operator WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page � 11 Category B Projects: 950 of the basic hourly reate for each group plus full fringe benefits applicable to category A projects shall apply to the following projects. A Reduced rates may be paid on the following: 1. Projects involving work on structures such as buildings and bridges whose total va].ue is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded. 3. Marine projects (docks, wharfs, etc.) less than $150,000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter. snall be elgible for compensation in accordance with the following group schedule relative to tne level of hazardous waste as outlined in the specific hazardous waste project site safety plan. � H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing H-2 Class "C" Suit - Base wage rate plus $.25 per hour. H-3 Class "B" Suit - Base wage rate olus $.50 per hour. H-4 Class "A" Suit - Base wage rate plus $.75 per hour. Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) - $ .70 Zone 3(Over 45 radius miles) -$1.00 BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page � 12 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP lAAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments) GROUP lAA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments GROUP 1- Cableway; Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9, HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers-self propelled 45 yards and over; Slipform pavers; Transporters, all truck or track type GROUP 2- Barrier machine (zipper); Batch Plant Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons through 44 tons; Chipper; Concrete Pump-truck mount with boom attachment; Crusher; Deck Engineer/Deck Winches (power); Drilling machine; Excavator, shovel, backhoe-3 yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directional drill operator; Loaders-overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics-all; Mixers-asphalt plant; Motor patrol graders-firishing; Piledriver (other than crane mount); Roto-mill,roto-gr.inder; Screedman, spreader, topside oper.ator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper-self propelled, hard tail end dump, articulating off-road equipment-under 45 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine-shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page � 13 GROUP 3- Conveyors; Cranes-thru 19 tons with attachments; A-frame crane over 10 tons; Drill oilers-auger type, truck or crane mount; Dozers-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pumps-concrete; Roller, plant mix or multi-lift materials; Saws-concrete; Scrpers-concrete and carry-all; Service engineer-equipment; Trenching machines; Truck Crane Oiler/Driver under 100 tons; Tractors, backhoe '15 hp and under GROUP 4- Assistant Engineer; Bobcat; Brooms; Compressor; Concrete finish mahine-laser screed; Cranes-A frame-10 tons and under; Elevator and Manlift-permanent or shaft type; Gradechecker, Stakehop; Forklifts under 3000 lbs. with attachments; Hydralifts/bcor.i trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger, mechanical; Power plant; pumps, water; Rigger and Bellman; Roller-other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator CATEGORY B PROJECTS: 95% OF THE BASIC HOURLY RATE FOR EACH GROUP PLUS FULL FRINGE BENEFITS APPLICABLE TO CATEGORY A PROJECTS SHALL P.PPLY TO THE FOLLOWING PROJECTS. REDUCED RATES MAY BE PAID ON THE FOLLOWING: 1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less than $1 million where no building is involved. Surfacing and paving including, but utilities excluded. 3. Marine projects (docks, wharfs, ect.) less than $150,000. HANDLING OF I3AZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designed hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing. H-2 C1ass "C" Suit - Base wage rate plus $.25 per hour. H-3 Class "B" Suit - Base wage rate plus $.50 per. hour. H-4 Class "A" Suit - Base wage rate plus $.'75 per hour. WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page � 14 ENGI0370-002 06/O1/2014 ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES ZUNE 1: Rates POWER EQUIPMENT OPERATOR GROUP 1 .....................$ 25.86 GROUP 2 .....................$ 26.18 GROUP 3 .....................$ 26.79 GROUP 4 .....................$ 26.95 GROUP 5 .....................$ 27.11 GROUP 6 .....................$ 27.39 GROUP 7 .....................$ 27.66 GROUP 8 .....................$ 28.`76 Fringes 13.15 13.15 13.15 13.15 13.15 13.15 13.15 13.15 ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2-$2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel, or electric power); Deck Hand; Fireman & Heater Tender; Hydro-seeder, Mulcher, Nozzleman; Oiler Driver, & Cable Tender, Mucking Machine; Pumpman; Rollers, all types on subgrade, including seal and chip coatings (farm type, Case, John Deere & similar, or Compacting Vibrator), except wnen pulled by Dozer with operable blade; Welding Machine; Crane Oiler-Driver (CLD required) & Cable Tender, Mucking Machine WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page � 15 GROUP 2: A-frame Truck (single drum); Assistant Refrigeration Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt Finishing Machine; Blower Operator (cement); Cement Hog; Compressor (2000 CFM or over, 2 or more, gas diesel or electric power); Concrete Saw (multiple cut); Distributor Leverman; Ditch Witch or similar; Elevator Hoisting Materials; Dope Pots (power agitated); Fork Lift or Lumber Stacker, hydra-lift & similar; Gin Trucks (pipeline); Hoist, single drum; Loaders (bucket elevators and conveyors); Longitudinal Float; Mixer (portable-concrete); Pavement Breaker, Hycira-Hammer & similar; Power Broom; Railroad Ballast Regulation Operator (self-propelled); Railroad Power Tamper Operator (self-propelled); Railroad Tamper Jack Operator (self-propelled; Spray Curing Machine (concrete); Spreader Box (self-propelled); Straddle Buggy (Ross & similar on construction job only); Tractor (Farm type R/T with attachment, except Backhoe); Tugger Operator GROUP 3: A-frame Truck (2 or more drums); Assistant Refrigeration Plant & Chiller Operator (over 1000 ton); Backfillers (Cleveland & similar); Batch Plant & Wet Mix Operator, single unit (concrete); Belt-Crete Conveyors with oower pack or similar; Belt Loader (Kocal or similar); Bending Machine; Bob Cat (Skid Steer); Boring Machine (earth); Boring Machine (rock under B inch bit) (Quarry Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete); Chipper (without crane); Cleaning & Doping Machine (pipeline); Deck Engineer; Elevating Belt-type Loader (Euclid, Barber Green & similar); Elevating Grader-type Loader (Dumor, Adams or similar); Generator Plant Engineers (diesel or electric); Gunnite Combination Mixer & Compressor; Locomotive Engineer; Mixermobile; Mucking Machine; Posthole Auger or Punch; Pump (grout or jet); Soil Stabilizer (P & H or similar); Spreader Machine; Dozer/Tractor (up to D-6 or equivalent) and Traxcavator; Traverse Finish Machine; Turnhead Operator GROUP 4: Concrete Pumps (squeeze-crete, flow-crete, pump- crete, WhiLman & similar); Curb Extruder (asphalt or concrete); Drills (churn, core, calyx or diamond); �quipment Serviceman; Greaser & Oiler; Hoist (7_ or mor.e drums or Tower Hoist); Loaders (overhead & front-end, under 4 yds. R/T); Refrigeration Plant Engineer (under 1000 ton); Rubber-tired Skidders (R/T with or without attachments); Surface Heater & Plant Machine; Trenching Machines (under 7 ft. depth capacity); Turnhead (with re-screening); Vacuum Drill (reverse circulation drill under 8 inch bit) WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �16 GROUP 5: Backhoe (under 45,000 gw); Backhoe & Hoe Ram (under 3/4 yd.); Carrydeck & Boom Truck (under 25 tons); Cranes (25 tons & under), all attachments including clamshell, dragline; Derricks & Stifflegs (�nder 65 tons); Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar); Hoe Ram; Piledriving Engineers; Paving (dual drum); Railroad Track Liner Operaotr (self-propelled); Refr.igeration Plant Engineer (1000 tons & over); Signalman (Whirleys, Highline Hammerheads or similar); Grade Checker GROUP 6: Asphalt Plant Operator; Automatic Subgrader (Ditches & Trimmers)(Autograde, ABC, R.A. Hansen & similar on grade wire); Backhoe (45,000 gw and over to 110,000 gw); Backhoes & Hoe Ram (3/4 yd. to 3 yd.); Batch Plant (over 4 units); Batch & Wet Mix Opera�or (multiple units, 2& incl. 4); B1ade Operator (motor patrol & attachments); Cable Controller (dispatcher); Compactor (self-propelled with blade); Concrete Pump Boom Truck; Concrete Slip Form Paver; Cranes (over 25 tons, to and including 45 tons), all attachments including clamshell, dragline; Crusher, Grizzle & Screening Plant Operator; Dozer, 834 R/T & similar; Drill Doctor; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Multiple Dozer Units with single blade; Paving Machine (asphalt and concrete); Quad-Track or similar equipment; Rollerman (finishing asphalt pavement); Roto Mill (pavement grinder); Scrapers, all, rubber-tired; Screed Operator; Shovel(under 3 yds.); Trenching Machines (7 ft. depth & over); Tug Boat Operator Vactor guzzler, super sucker; Lime Batch Tank Gperator (REcycle Train); Lime Brain Operator (Recycle Train); Mobile Crusher Operator (Recycle Train) GROUP 7: Backhoe (over 110,000 gw); Backhoes & Hoe Ram (3 yds & over); Blade (finish & bluetop) Automatic, CMI, ABC, Finish Athey & Huber & similar when used as automatic; Cableway Operators; Concrete Cleaning/Decontamination machine operator; Cranes (over 45 tons to but not including 85 tons), all attachments including clamstiell and dragine; Derricks & Stiffleys (65 tons & over); Elevating Belt (Holland type); Heavy equipment robotics operator; Loader (360 degrees revolving Koehring Scooper or similar); Loaders (overhead & fr.ont-end, over. 8 yds. to 10 yds.); Rubber-tired Scrapers (multiple engine with three or more scrapers); Shovels (3 yds. & over); Whirleys & Hammerheads, ALL; H.D. Mechanic; F�.D. Welder; Hydraulic Platform Trailers (Goldhofer, Shaurerl.y andSimilar); Ultra High Pressure Wateriet Cutting Tool System Operator (30,000 psi); Vacuum Blasting Machine Operator WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �17 GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower), all attachments including clamshell, dragline; Loaders (overhead and front-end, 10 yards and over); Helicopter Pilot BOOM PAY: (Al1 Cranes, Including Tower) 180 ft to 250 ft $.50 over scale Over 250 ft $.80 over scale NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom. HAZMAT: Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification. ---------------------------------------------------------------- ENGI0612-012 06/O1/2019 LEWIS,PIERCE, PACIFIC (portion lying north of a parallel line extending west from the northern boundary of Wahkaikum County to the sea) AND THURSTON COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS. ON ALL OTHER WORK, THE FOLLOWING RATES APPLY. Zone 1 (0-25 radius miles): Rates Fringes POWER EQUIPMENT OPERATOR GROUP lA ...................$ 38.39 17.40 GROUP lAA ..................$ 38.96 17.40 GROUP lAAA .................$ 39.52 17.40 GROUP 1 .....................$ 37.89 17.40 GROUP 2 .....................$ 37.35 17.40 GROUP 3 .....................$ 36.93 17.40 GROUP 4 .....................$ 34.57 17.40 Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) _ $1.00 'Lone 3 (Over 45 radius miles) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page � 18 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1 AAA - Cranes-over 300 tons or 300 ft of boom (including jib with attachments) GROUP lAA - Cranes- 200 tonsto 300 tons, or 250 ft of boom (including jib with attachments; Tower crane over 175 ft in height, bas to boom GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft,in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments GROUP 1- Cableway; Cranes 45 tons thru 99 tons under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead, 6 yards to, but not including, 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9 HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers- self-propelled 45 yards and over; Slipform pavers; Transporters, all track or truck type GROUP 2- Barrier machine (zipper); Batch Plant Operator- concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-Overhead, bridge type, 20 tons through 44 tons; Chipper; Concrete pump-truck mount with boom attachment; Crusher; Deck engineer/deck winches (power); Drilling machine; Excavator, shovel, backhoe-3 yards and under; Finishing machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Loaders, overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics- all; Mixers, asphalt plant; Motor patrol graders, finishing; Piledriver (other than crane mount); Roto-mill, roto- grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper-self- propelled, hard tail end dump, articulating off-road equipment- under 45 yards; Subgrader trimmer; Tractors, backhoe over 75 hp; Transfer material service machine-shuttle buggy, Blaw Knox- Roadtec; Truck Crane oiler/driver-100 tons and over; Truck Mount Portable Conveyor; Yo Yo pay WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page � 19 GROUP 3- Conveyors; Cranes through 19 tons with attachments; Cr.ane-A-frame over 10 tons; Drill oilers-auger type, truck or crane mount; Dozer-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/di.rectional drill locator; Outside Hoists-(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loaders-elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pump-Concrete; Roller, plant raix or multi-lfit materials; Saws-concrete; Scrapers, concrete and carry all; Service engineers-equipment; Trenching machines; Truck crane oiler/driver under 100 tons; Tractors, backhoe under 75 hp GROUP 4- Assistant Engineer; Bobcat; Brooms; Compressor; Concrete Finish Machine-laser screed; Cranes A-frame 10 tons and under; Elevator and manlift (permanent and shaft type); Forklifts-under 3000 lbs. with attachments; Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger-mechanical; Power plant; Pumps-water; Rigger and Bellman; Roller-other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator FOOTNOTE A- Reduced rates may be paid on the following: 1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 m.illion excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded. 3. Marine projects (docks, wharfs, etc.) less than $150,000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing, Class "D" Suit - Base wage rate plus $.50 per hour. H-2 Class "C" Suit - Base wage rate plus $1.00 per hour. H-3 Class "B" Suit - Base wage rate plus $1.50 per hour. H-4 Class "A" Suit - Base wage rate plus $2.00 per hour. ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �20 _ . ... . . . - - - .. . ENGI0701-002 O1/O1/i014 CLARK, COWLITZ, KLICKKITAT, PACIFIC (SOUTH), SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1 Rates Power equipment operators: (See Footnote A) GROUP 1 .....................$ 38.25 GROUP lA ....................$ 40.16 GROUP 1B ....................$ 42.08 GROUP 2 .....................$ 36.56 GROUP 3 .....................$ 35.54 GROUP 4 .....................$ 34.56 GROUP 5 .....................$ 33.43 GROUP 6 .....................$ 30.34 Zone Differential (add to Zone 1 rates): Zone 2 - $3.00 Zone 3 - $6.00 Fringes 13.70 13.70 13.70 13.70 13.70 13.70 13.70 13.70 WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �21 For the following metropolitan counties: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: Al1 jobs or projects located in Multnomah, Clackamas and Marion Counties, W�st of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt. St. Helens "Blast Zone" shall receive Zone I pay for all classifications. All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications. All jobs or projects located mor.e than 50 miles from the Portland City Hall, but outside the identified border above, sha11 receive Zone III pay for all classifications. For tne following cities: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDF`ORD; ROSEBURG All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications. All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications. WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �22 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: CONCRETE: Batch Plant and/or Wet Mix Operator, three units or more; CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments; FLOATING EQUIPMENT: Floating Crane, 150 ton but less than 250 ton GROUP lA: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom; FLOATING EQUIPMENT: Floating Crane 250 ton and over GROUP 1B: L•ATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over; FLOATING EQUIPMENT: Floating Crane 350 ton and over GROUP 2: ASPHALT: Asphalt Plant Operator (any type); Roto Mill, pavement profiler, operator, 6 foot lateral cut and over; BLADE: Auto Grader or "Trimmer" (Grade Checker required); Blade Operator, Robotic; BULLDOZERS: Bulldozer operator over 120,000 lbs and above; Bulldozer operator, twin engine; Bulldozer Operator,tandem, quadnine, D10, D11, and similar type; Bulldozere Robotic Equipment (any type; CONCRETE: Batch Plant and/or Wet Mix Operator, one and two drum; Automatic Concrete Slip Form Paver Operator; Conrrete Canal Line Operator; Concrete Profiler, Diamond Head; CRANE: Cableway Operator, 25 tons and over; HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment); TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; CRUSHER: Crusher Plant Operator; FLOATING EQUIPi�1ENT: Floating Clamshell, etc.operator, 3 cu. yds. and over; Floating Crane (derrick barge) Ope.rator, 30 tons but less than 150 tons; LOADERS: Loader operator, 120,000 lbs. and above; REMOTE CONTROL: Remote controlled earth-moving equipment; RUBBER-TIRED SCRAPERS: Rubber- tired scraper operator, with tandem scrapers, multi-engine; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Shovel, Dragline, Clamshell, operator 5 cu. yds and over; TRENCHING MACHINE: Wheel Excavator, under 750 cu. yds. per hour (Grade Oiler required); Canal Trimmer (Grade Oiler required); Wheel Excavator, over 750 cu. yds. per hour; Band Wagon (in conjunction with wheel excavator); UNDERWATER EQUIPMENT: Underwater Equipment Operator, remote or otherwise; HYDRAULIC HOES Excavator over ].30,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (with �uffing or tower attachment); WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �23 GROUP 3: BULLDOZERS: Bulldozer operator, cver 70,000 lbs. up to and including 120,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment); LATTICE BOOM CRANES: Lattice Boom Crane-50 tnrough 89 tons (and less than 150 feet boom); FORKLIFT: Rock Hound Operator; HYDRAULIC HOES-EXCAVATOR: excavator over 80,000 lbs. through 130,000 lbs.; LOADERS: Loader operator 60,000 and less than 120,000; RUBBER-TIRED SCRAPERS: Sc.r.aper Operator, with tandem scrapers; Self-loading, paddle wheel, auger type, finish and/or 2 or more units; SHOVEL, DRAGLINE, CLAMSHELL,SKOOPER OFERATOR: Shovel, Dragline, Clamshell operators 3 cu. yds. but less than 5 cu yds. GROUP 4: ASPHALT: Screed Operator; Asphalt Paver operator (screeman required); BLADE: Blade operator; Blade operator, finisn; Blade operator, externally controlled by electronic, mechanical hydraulic means; Blade operator, multi-engine; BULLDOZERS: Bulldozer Operator over 2Q,000 lbs and more than 100 horse up to 70,000 lbs; Drill Cat Operator; Side-boom Operator; Cable-Plow Operator (any type); CLEARING: Log Skidders; Chippers; Incinerator; Stump Splitter (loader mounted or similar type); Stump Grinder (loader mounted or similar type; Tub Grinder; Land Clearing Machine (Track mounted forestry mowing & grinding machine); Hydro Axe (l.oader mounted or similar type); COMPACTORS SELF-PROPELLED: Compactor Operator, with blade; Compactor Operator, multi-engine; Compactor Operator, robotic; CONCRETE: Mixer Mobile Operator; Screed Operator; Concrete Cooiing Machine Operator; Concrete Paving Road Mixer; Concrete Breaker; Reinforced Tank Banding Machine (K-17 or similar types); Laser Screed; CRANE: Chicago boom and similar types; Lift Slab Machine Operator; Boom type lifting device, 5 ton capacity or less; fioist Operator, two (2) drum; Hoist Operator, three (3) or more drums; Derrick Operator, under 100 ton; Hoist Operator, stiff leg, guy derrick or similar type, 50 ton and over; Cableway Operator up to twenty (25) ton; Bridge Crane Operator, Locomotive, Gantry, Overhead; Cherry Picker or similar type crane; Carry Deck Operator; Hydraul.ic Crane Operator, under 50 tons; LATTICE BOOM CRI�NE OPERATOR: Lattice Boom Crane Operator, under 50 tons; CRUSfIER: Generator Operator; Diesel-Electric Engineer; Grizzley Operator; Drill Doctor; Boring Machine Operator; Driller-Percussion, Diamond, Core, Cable, Rotary and similar type; Cat Drill (John Henry); Directional Drill Operator over 20,000 lbs pullback; FLOATING EQUIPMENT: Diesel-electric Engineer; Jack Oper.ator, elevating barges, Barge Operator, self- unloading; Piledriver Operator (not crane type) (lleckhand required); Floating Clamshelll, etc. Operator, under 3 cu. yds. (Fireman or Diesel-Electric Engineer required); Floating Crane (derrick barge) Operator, less than 30 tons; GENERATORS: Generator Operator; Diesel-electric Engineer; GUARDRAIL EQUIPMEN'P: Guardrail Punch Ope.r.ator (all types); Guar.drail Auger Operator (all types); Combination Guardrail machines, i.e., punch auger, etc.; HEA'1'lIVG PLANT: Surface WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �24 Heater and Planer Operator; HYDRAULIC Y.OES EXCAVATOR: Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments; Excavator Operator over 20,000 lbs through 80,000 lbs.; LOADERS: Belt Loaders, Kolman and Ko Cal types; Loaders Operator, front end and overhead, 25,000 lbs and less than 60,000 lbs; Elevating Grader Operator by Tractor operator, Sierra, Euclid or similar types; PILEDRIVERS: Hammer Operator; Piledriver Operator (not crane type); PIPELINE, SEWER WATER: Pipe Cleaning Machine Operator; Pipe Doping Machine Operator; Pipe Bending Machine Operator; Pipe Wrapping Machine Operator; Boring Machine Operator; Back Filling Machine Operator; REMOTE CONTROL: Concrete Cleaning Decontamination Machine Operator; Ultra High Pressure Water Jet Cutting Tool System Operator/Mechanic; Vacuum Blasting Machine Operator/mechanic; REPAIRMEN, HEAVY DUTY: Diesel Electric Engineer (Plant or Floating; Bolt Threading Machine operator; Drill Doctor (Bit Grinder); H.D. Mechanic; Macnine Tool Operator; RUBBER-TIRED SCRAPERS: Rubber-tired Scraper Operator,single engine, single scraper; Self-loading, paddle wheel, auger type under 15 cu, yds.; Rubber-tired Scraper Operator, twin engine; Rubber-tired Scraper Operator, with push- ull attachments; Self Loading, paddle wheel, auger type 15 cu. yds. and over, single engine; Water pulls, water wagons; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Diesel Electric Engineer; Stationay Drag Scraper Operator; Shovel, Dragline, Clamshell, Operator under 3 cy yds.; Grade-all Operator; SURFACE (BASE) MATERIAL: Blade mounted spreaders, Ulrich and similar types; TRACTOR-RUBBERED TIRED: Tractor operator, rubber-tired, over 50 hp flywheel; Tractor operator, with boom attachment; Rubber-tired dozers and pushers (Michigan, Cat, Hough type); Skip Loader, Drag Box; TRENCHING MACHINE: Trenching Machine operator, digging capacity over 3 ft depth; Back filling machine operator; TUNNEL: Mucking machine operator WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �25 GROUP 5: ASPHALT: Extrusion Machine Operator; Roller Operator (any asphalt mix); Asphalt Burner and Reconditioner Operator (any type); Roto-Mill, pavement profiler, ground man; BULLDOZERS: Bulldozer operator, 20,000 lbs. or less or 100 horse or less; COMPRESSORS: Compressor Operator (any power), over 1,250 cu. ft. total capacity; COMPACTORS: Compactor Operator, including vibratory; Wagner Pactor Operator or similar type (without blade); CONCRETE: Combination mixer and Compressor Operator, gunite work; Concrete Batch Plant Quality Control Operator; Beltcrete Operator; Pumperete Operator (any type); Pavement Grinder and/or Grooving Machine Operator (riding type); Cement Pump Operator, Fuller-Kenyon and similar; Concrete Pump Operator; Grouting Machine Operator; Concrete mixer operator, single drum, under (5) bag capacity; Cast in place pipe laying machine; maginnis Internal Full slab vibrator operator; Concrete finishing mahine operator, Clary, Jchnson, Bidwell, Burgess Bridge deck or similar type; Curb Machine Operator, mechanical Berm, Curb and/or Curb and Gutter; Concrete Joint Machine Operator; Concrete Planer Operator; Tower Mobile Operator; Power Jum.bo Operator setting slip forms in tunnels; Slip Form Pumps, power driven hydraulic lifting device for concrete forms; Concrete Paving Machine Operator; Concrete Finishing Machine Operator; Concrete Spreader Operator; C!�ANE: Helicopter Hoist Operator; Hoist Operator, single drum; Elevator Operator; A-frame Truck Operator, Double drum; Boom Truck Operator; HYDRAULIC CRANE OPERATOR: Hydraulic Boom Truck, Pittman; DRILLING: Churm Drill and Earth Boring Machine Operator; Vacuum Truck; Directional Drill Operator over 20,000 lbs pullback; FLOATING EQUIPMENT: Fireman; FORKLIF'P: Fork Lift, over 10 ton and/or robotic; HYDRAULIC HOES EXCAVATORS: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type); Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; LOAllERS: Loaders, rubber- tired type, less than 25,000 lbs; Elevating Grader Operator, Tractor Towed requiring Operator or Grader; Elevating loader operator, Athey and similar types; OILERS: Service oiler (Greaser); PIPELINE-SEWER WATER: Hydra hammer or simialr types; Pavement Breaker Operator; PUMPS: Pump Operator, more than 5(any size); Pot Rammer Operator; RAILROAD EQUIYMENT: Locomotive Operator, under 40 tons; Ballast Regulator Operator; Ballast Tamper Multi-Purpose Operator; Track Liner Operator; Tie Spacer Operator; Shuttle Car Operator; Locomotive Operator, 40 tons and over; MATFRIAL HAULRS: Cat wagon DJBs Volvo similar. types; Conveyored material hauler; SURFACING (BASE) MATERIAI,: Rock Spreaders, self-propelled; Pulva-mixer or s.imilar types; Chi.ip Spreading machine operator; Lime spreading operator, construction job siter; SWEEPERS: Sweeper operator (Wayne type) self-propelled construction job site; TRACTOR-RUBBER TIRED: Tractor operator, rubber-tired, 50 hp flywheel and under; Trenching machine operator, maximum digging capacity 3 ft depth; TUNNEL: Dinkey WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �26 GROUP 6: ASPHALT: Plant Oiler; Plant Fireman; Pugmill Operator (any type); Truck mounted asphalt spreader, with screed; COMPRESSORS: Compressor Operator (any power), under 1,250 cu. ft. total capacity; CONCRETE: Plant Oiler, Assistant Conveyor Operator; Conveyor Operator; Mixer Box Operator (C.T.B., dry batch, etc.); Cement Hog Operator; Concrete Saw Operator; Concrete Curing Machine Operator (riding type); Wire Mat or Brooming Machine Operator; CRANE: Oiler; Fireman, all equipment; Truck Crane Oiler Driver; A-frame Truck Operator, single drum; Tugger or Coffin Type Hoist Operator; CRUSHER: Crusher Oiler; Crusher Feederman; CRUSHER: Crusher oiler; Crusher feederman; DRILLING: Drill Tender; Auger Oiler; FLOATING EQUIPMENT: Deckhand; Boatman; FORKLIFT: Self-propelled Scaffolding Operator, construction job site (exclduing working platform); Fork Lift or Lumber Stacker Operator, construction job site; Ross Carrier Operator, construction job site; Lull Hi-Lift Operator or Similar Type; GUARDRAIL EQUIPMENT: Oiler; Auger Oiler; Oiler, combination guardrail machines; Guardrail Punch Oiler; HEATING PLANT: Temporary Heating Plant Operator; LOADERS: Bobcat, skid steer (less than 1 cu yd.); Bucket Elevator Loader Operator, BarberGreene and similar types; OILERS: Oiler; Guardrail Punch Oiler; Truck Crane Oiler-Driver; Auger Oiler; Grade Oiler, required to check grade; Grade Checker; Rigger; PIPELINE-SEWER WATER: Tar Pot Fireman; Tar Pot Fireman (power agitated); PUMPS: Pump Operator (any power); Hydrostatic Pump Operator; RAILROAD EQUIPMENT: Brakeman; Oiler; Switchman; Motorman; Ballast Jack Tamper Operator; SHOVEL, DRAGLINr�, CLAMSHELL, SKOOPER, ETC. OPERATOR: Oiler, Grade Oiler (required i;o check grade); Grade Checker; Fireman; SWEEPER: Broom operator, self propelled, construction job site; SURFACING (BASE) MATERIAL: Roller Operator, grading of base rock (not asphalt); Tamping Machine operartor, mechanical, self-propelled; Hydrographic Seeder Machine Operator; TRENCHING �IACHINE: Oiler; Grade Oil.er; TUNNEL: Conveyor operator; Air filtration equipment operator - ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction - Page � 27 IRON0014-005 07/O1/2013 ADAMS, ASOTIN, BENTON, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND ORIELLE, SPOKANE, STEV�NS, WALLA WALL•A AND WHITMAN COUNTIES Rates Fringes IRONWORKER .......................$ 31.60 21.35 ---------------------------------------------------------------- IRON0029-002 07/O1/2013 CLARK, COWLIT7, KLICKITAT, PACIFIC, SKAMANIA, AND WAHKAIKUM COUNTIES Rates Fringes IRONWORKER .......................$ 34.12 21.35 ---------------------------------------------------------------- IRON0086-002 07/O1/2013 YAKIMA, KITTITAS AND CHELAN COUNTIES Rates Fringes IRONWORKER .......................$ 31.60 21.35 ---------------------------------------------------------------- IRON0086-004 07/O1/2013 CLALLAM, GRAYS HARBOR, ISL•AND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PIERCE, SKAGII', S�IOHOMISH, THURSTON, AND WHATCOM COUNTIES Rates Fringes IRONWORKER .......................$ 38.14 21.35 ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �28 LAB00001-002 06/O1/2014 ZONE 1: Rates Fringes Laborers: CALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC (NORTH OF STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN), PIERCE, SAN JUAN,SKAGIT, SNOHOMISH,THURSTON AND WHATCOM COUNTIES GROUP 1 ....................$ 22.49 10.30 GROUP 2 ....................$ 25.79 10.30 GROUP 3 ....................$ 32.29 10.30 GROLIP 4 ....................$ 33.08 10.30 GROUP 5 ....................$ 33.62 10.30 CHELAN, DOUGLAS (WEST OF THE 120TH MERIDIAN), KITTITAS AND YAKIMA COUNTIES GROUP 1 ....................$ 18.95 10.30 GROUP 2 ....................$ 21.76 10.30 GROUP 3 ....................$ 23.85 10.30 GROUP 4 ....................$ 24.43 10.30 GROUP 5 ....................$ 24.85 10.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1- Projects within 25 radius miles of the respective city hall ZONE 2- More than 25 but less than 45 radius miles from the respective city hall ZONE 3- More than 45 radius miles from the respective city hall ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: CHELAN, SUNNYSIDE, WENATCHEF, AND YAKIMA ZONE 1- Projects within 25 radius mi_les of the respective city hall ZONE 2- More than 25 radius miles from the respective city ha].l ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $'�.25 WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �29 LABORERS CLASSIFICATIONS GROUP 1: Landscaping and Planting; Watchman; Window Washer/Clear.er (detail clean-up, such as but not limited to cleaning floors, ceilings, walls, windows, etc., prior to final acceptance by the owner) GROUP 2: Batch Weighman; Crusher Feeder; Fence Laborer; Flagman; Pilot Car GROUP 3: General Laborer; Air, Gas, or Electric Vibrating Screed; Asbestos Abatement Laborer; Ballast Regulator Machine; Brush Cutter; Brush Hog Feeder; Burner; Carpenter Tender; Cement Finisher Tender; Change House or Dry Shack; Chipping Gun (under 30 lbs.); Choker Setter; Chuck Tender; Clean-up Laborer; Concrete Form Stripper; Curing Laborer; Demolition (wrecking and moving including charred material); Ditch Digger; Dump Person; Fine Graders; Firewatch; Form Setter; Gabian Basket Builders; Grout Machine Tender; Grinders; Guardrail Erector; Hazardous Waste Worker (Level C: uses a chemical "splash suit" and air pur_ifying respirator); Maintenance Person; Material Yard Person; Pot Tender; Rip Rap Person; Riggers; Scale Person; Sloper Sprayer; Signal Person; Stock Piler; Stake Hopper; Toolroom Man (at job site); Topper-Tailer; Track Laborer; Truck Spotter; Vinyl Seamer GROUP 4: Cement Dumper-Paving; Chipping Gun (over 30 lbs.); Clary Power Spreader; Concrete Dumper/Chute Operator; Concrete Saw Ooerator; Drill Operator (hydraulic, diamond, aiartrac); Faller and Bucker Chain Saw; Grade Checker and Transit Person; Groutmen (pressure) including post tension beams; Hazardous Waste Worker (Level B: uses same respirator protection as Level A. A supplied air line is provided in conjunction with a chemical "splash suit"); High Sca].er; Jackhammer; Laserbeam Operator; Manhole Builder-Mudman; Nozzleman (concrete pump, green cutter when using combination of high pressure air and water on concrete and rock, sandblast, gunite, shotcrete, water blaster, vacuum blaster); Pavement Breaker; Pipe Layer and Caulker; Pipe Pot Tender; Pipe Reliner (not insert type); Pipe Wrapper; Power Jacks; Railroad Spike Puller-Power; Raker-Asphalt; Rivet Buster; Rodder; Sloper (over 20 ft); Spreader (concrete); Tamper and Similar electric, air and glas operated tool; Timber Person-sewer (lagger shorer and cribber); Track Liner Power; Tugger Operator; Vibrator; Well Point Laborer GROUP 5: Caisson Worker; Miner; Mortarman and Hodcarrier; Powderman; Re-Timberman; Hazardous Waste Worker (Level A: utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line). ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �30 LAB00238-004 06/O1/2014 PASCO AREA: ADAMS, BENTON, COLUMBIA,DOUGLAS (East of 120th Meridian), FERRY, FP.ANKLIN, GRANT, OKANOGAN, WALLA WALLA SPOKANE AREA: ASOTIN, GARFIELD, LINCOLN, PEND OREILLE, SPOKANE, STEVENS & WHITMAN COUNTIES Rates Fringes LABORER (PASCO) GROUP 1 .....................$ 22.25 10.95 GROUP 2 .....................$ 24.35 10.95 GROUP 3 .....................$ 24.62 10.95 GROUP 4 .....................$ 24.89 10.95 GROUP 5 .....................$ 25.17 10.95 LABORER (SPOKANE) GROUP 1 .....................$ 2.1.95 , 10.95 GROUP 2 .....................$ 24.05 10.95 GROUP 3 .....................$ 24.32 10.95 GROUP 4 .....................$ 24.59 1.0.95 GROUP 5 .....................$ 24.87 10.95 Zone Differential (Add to Zone 1 rate): $2.00 BASE POINTS: Spokane, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: 45 radius miles and over from the main post office. WA150001 Modification 5 . Federal Wage Determinations for Highway Construction Page �31 LABORERS CLASSIFICATIONS GROUP 1: Flagman; Landscape Laborer; Scaleman; Traffic Control Maintenance Laborer (to include erection and maintenance of barricades, signs and relief of flagperson); Window Washer/Cleaner (detail cleanup, such as, but not limited to cleaning floors, ceilings, wa11s, windows, etc. prior to final acceptance by the owner) GROUP 2: Asbestos Abatement Worker; Brush Hog Feeder; Carpenter Tender; Cement Handler; Clean-up Laborer; Concrete Crewman (to ir.clude stripping of forms, hand operating jacks on slip form construction, application of concrete curing compounds, pumperete machine, signaling, handling the nozzle of squeezcrete or similar machine,6 inches and smaller); Confined Space Attendant; Concrete Signalman; Crusher Feeder; Demolition (to include clean-up, burning, loading, wrecking and salvage of all material); Dumpman; Fence Erector; Firewatch; Form Cleaning Machine Feeder, Stac!�er; General Laborer; Grout Machine Header Tender; Guard Rail (to include guard rails, guide and reference posts, sign posts, and right-of-way markers); Hazardous Waste Worker, Level D(no respirator is used and skin protection is minimal); Miner, Class "A" (to include all bull gang, concrete crew dumpman and pumperete crewman, including distributing pipe, assembly & dismantle, and nipper); Nipoer; Riprap Man; Sandblast Tailhoseman; Scaffold Erector (wood or steel); Stake Jumper; Structural Mover (to inclune separating foundation, preparation, cribbing, shoring, jacking and unloading of structures); Tailhoseman (water nozzle); Timber Bucker and Faller (by hand); Track Laborer (RR); Truck Loader; Well-Point Man; All Other Work Classifications Not Specially Listed Shall Be Classified As General Laborer GROUP 3: Asphalt Roller, walking; Cement E'inisher Tender; Concrete Saw, walking; Demolition Torch; Dope Pot Firemen, non-mechanical; Driller Tender (when required to move and position r.iachine); Form Setter, Paving; Grade Checker using level; Hazardous Waste Worker, Level C(uses a chemical "splash suit" and air purifying respiralor); Jackhammer Operator; Miner, Class "B" (to include brakeman, finisher, vibrator, form setter); No�zleman (to include squeeze and flo-crete nozzle); Nozzleman, water, air or steam; Pavement Breaker (under 90 lbs.); Pipelayer, corrugated metal culvert; Pipelayer, multi- plate; Pot Tender; Power Buggy Operator; Power Tool Operator, gas, electric, pneumatic; Railroad Equipment, power driven, except dual mobile power spiker or puller; Railroad Power Spiker or Pul.ler, dual mobile; Rodder and Spreader; Tamper (to include operation of Barco, Essex and similar tampers); Trencher, Shawnee; Tugger Operator; Wagon Drills; Water Pipe Liner; Wheelbarrow (power driven) WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �32 . ... ... .... GROUP 4: Air and Hydraulic Track Drill; Aspahlt Raker;Brush Machine (to include horizontal construction joint cleanup brush machine, power propelled); Caisson Worker, free air; Chain Saw Operator and Faller; Concrete Stack (to include laborers when laborers working on free standing concrete stacks ior smoke or fume control above 40 feet high); Gunite (to include operation of machine and noz�le); Hazardous Waste Worker, Level B(uses same respirator protection as Level A. A supplied air line is provided in conjunction with a chemical "splash suit"); High Scaler; Laser Beam Operator (to include grade checker and elevation control); Miner, Class.0 (to include miner, nozzleman for concrete, laser beam operator and rigger on tunnels); Monitor Operator (air track or similar mounting); Mortar Mixer; Dlozzleman (to include jet blasting nozzleman, over 1,200 lbs., jet blast machine power propelled, sandblast nozzle); Pavement Breaker (90 lbs. and over); Pipelayer (to include working topman, caulker, collarman, jointer, mortarman, rigger, jacker, shorer, valve or meter installer); Pipewrapper; Plasterer Tender; Vibrators (all) GROUP 5- Drills with Dual Masts; Hazardous Waste Worker, Level A(utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line); Miner Class "D", (to include raise and shaft miner, laser beam operator on riases and shafts) ---------------------------------------------------------------- LAB00238-006 U6/O1/2014 COUNTIES EAST OF THE 120TH MERIDIAN: ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FEF.RY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND OREILLE, STEVENS, SPOKANE, WALLA WALLA, WHITMAN Rates Fringes Hod Carrier ......................$ 24.32 10.95 ---------------------------------------------------------------- LAB00335-001 06/O1/2013 CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN), SKAMANIA AND WAHKIAKUM COUNTIES P.ates L•aborers : ZONE 1: GROUP 1 ....................$ GROUP ? .....................$ GROUP 3 ....................$ GROUP 4 ....................$ GROUP 5 ....................$ GROUP 6 ....................$ GROUP 7 ....................$ 28.65 29.25 29.69 30.07 26.15 23.73 20.53 Fringes 10.05 10.05 10.05 10.05 10.05 10.05 10.05 WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �33 Zone Differential (Add to Zone 1 rates): Zone 2 $ 0.65 Zone 3 - ]..15 Zone 4 - 1.70 Zone 5 - 2.75 BASE POINTS: GOLDENDALE, LONGVIEW, AND VANCOUVER ZONE 1: Projects within 30 miles of the respective city all. ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respective city hall. ZONE 4: More than 50 miles but less than 80 miles from the respective city hall. ZONE 5: More than 80 miles from the respective city hall. LABORERS CLASSIFICATIONS GROUP 1: Asphalt Plant Laborers; Asphalt Spreaders; Batch Weighman; Broomers; Brush Burners and Cutters; Car and Truck Loaders; Carpenter Tender; Change-House Man or Dry Shack Man; Choker Setter; Clean-up Laborers; Curing, Concrete; Demolition, Wrecking and Moving Laborers; Dumpers, road oili.ng crew; Dumpmen (for grading crew); Elevator Feeders; Median Rail Reference Post, Guide Post, Right of Way Marker; Fine Graders; Fire Watch; rorm Strippers (not swinging stages); General Laborers; Hazardous Waste Worker; Leverman or Aggregate Spreader (Flaherty and similar types); Loading Spotters; Material Yard Man (including electrical); Pittsburgh Chipper Operator or Similar Types; Railroad Track Laborers; Ribbon Setters (including steel forms); Rip Rap Man (hard placed); Road Pump Tender; Sewer Labor; Signalman; Skipman; Slopers; Spraymen; Stake Chaser; Stockpiler; Tie Back Shoring; Timber Faller and Bucker (hand labor); Toolroom Man (at job site); Tunnel Bullgang (above ground); Weight-Man- Crusher (aggregate when used) GROUP 2: Applicator (including pot power tender for same), applying protective materi.al by hand or nozzle on utility lines or storage tanks on oroject; Brush Cui:ters (power saw); Burners; Choker Splicer; Clary Power Spreader and similar types; Clean- up Nozzleman-Green Cutter (concrete, rock, etc.); Concrete Power Buggyman; Concrete Laborer; Crusher Feeder; Demolition and Wrecking Charred Materials; Gunite Nozzleman Tender; Gunite or. Sand Blasting Pot Tender; Handlers or Mixers of all Materials of an irritating nature (including cement and lime); Tool Operators (includes but not limited to: Dry Pack Machine; Jackhammer; Chipping Guns; Paving Breakers); Pipe Doping and Wrapping; Post Hole Digger, air, gas or electric; Vibrating Screed; Tampers; Sand Blasting (Wet); Stake-Setter; Tunnel-Muckers, Brakemen, Concrete Crew, Bullgang (under.ground) WA150001 Modification 5 Federal Wage Determinations for Highway Construction. Page � 34 GROUP 3: Asbestos Removal; Bit Grinder; Drill Doctor; Drill Operators, air tracks, cat drills, wagon drills, rubber-mounted drills, and other similar types including at ' crusher plants; Gunite Nozzleman; High Scalers, Strippers and Drillers (covers work in swinging stages, chairs or belts, under extreme conditions unusual to normal drilling, blasting, barring-down, or sloping and stripping); Manhole Builder; Powdermen; Concrete Saw Operator; Pwdermen; Power Saw Operators (Bucking and Fal.ling); Pumperete Nozzlemen; Sand Blasting (Dry); Sewer Timberman; Track Liners, Anchor Machines, Ballast Regulators, Multiple Tampers, Power Jacks, Tugger Operator; Tunnel-Chuck_ Tenders, Nippers and Timbermen; Vibrator; Water Blaster GROUP 4: Asphalt Raker; Concrete Saw Operator (walls); Concrete Nozzelman; Grade Checker; Pipelayer; Laser Beam (pipelaying)-applicable when employee assigned to move, set up, align; Laser Beam; Tunnel Miners; Motorman-Dinky Locomotive-Tunnel; Powderman-Tunnel; Shield Operator-Tunnel GROUP 5: Traffic Flaggers GROUP 6: Fence Builders GROUP 7: Landscaping or Planting Laborers ---------------------------------------------------------------- LAB00335-019 09/O1/2013 Rates Fringes Hod Carrier ......................$ 30.47 10.05 ---------------------------------------------------------------- PAIN0005-002 07/O1/2014 STATEWIDE EYCEPT CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH), SKAMANIA, AND WAIIKIAKUM COUNTIES Rates Fringes Painters: STRIPERS ....................$ 28.50 14.61 ---------------------------------------------------------------- PAIN0005-004 03/O1/2009 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, i{ING, KITSAP, LEWIS, MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COUNTIES Rates Fringes PAINTER ..........................$ 20.8?.. 7.44 ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �35 PAIN0005-006 07/O1/2014 ADAMS, ASOTIN; BENTON AND FRANKLIN (EXCEPT HANrORD SITE); CHELAN, COLUMBIA, DOUGLAS, FERRY, rARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLl1 WALLA, WHITMAN AND YAKIMA rOUNTIES Rates PAINTER Application of Cold Tar Products, Epoxies, Polyure thanes, Acids, Radiat�.on Resistant Material, Water and Sandblasting............$ 26.65 Over 30'/Swing Stage Work..$ 22.20 Brush, Roller, Striping, Steam-cleaning and Spray....$ 21.55 Lead Abatement, Asbestos Abatement ...................$ 21.50 10.48 7.98 10.48 7.98 *$.70 shall be paid over and above the basic wage rates listed for work on swing stages and high work of over 30 feet. ---------------------------------------------------------- * PAIN0055-003 04/O1/2015 CLARK, COWLITZ, KLICKITAT, PACIFIC, SK,AMANIA, AND WAHKIAKUM COUNTIES Rates Fringes PAINTER Brush & Roller ..............$ 22.47 High work - All work 60 ft. or higher...... .......$ 23.22 Spray and Sandblasting......$ 23.07 --------------------------------------------------- PAIN0055-006 11/O1/7_014 9.60 9.60 9.60 CLARK, COWLIT7.,, KLICKITAT, SKAMANIA and WAHKIAKUM COUN'PIES Rates Fringes Painters: HIGHWAY PARKING LOT STRIPER .....................$ 33.43 11.08 ---------------------------------------------------------------- Fringes WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �36 PLAS0072-004 06/O1/2014 ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN, AND YAKIMA COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER ZONE 1 ......................$ 26.41 12.44 Zone Differential (Add to Zone 1 rate): Zone 2-$2.00 BASE POINTS: Spokane, Pasco, Lewiston; Wenatchee Zone 1: 0- 45 radius miles from the main post office Zone 2: Gver 45 radius miles from the main post office --------------------------------------------------------------- PLAS0528-001 06/O1/2014 CLALLAM, COWLITZ, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON, WAHKIAKUM AND WHATCOM COUNTIES Rates Fringes Cement Masons: CEMENT MASON ................$ 37.43 14.95 COi�POSITION, TROWEL MACHINE, GRINDER, POWER TOOLS, GUNNITE NOZZLE.......$ 37.43 14.95 TROWLING MACHINE OPERATOR ON COMPOSITION ..............$ 37.93 14.95 ---------------------------------------------------------------- PLAS0555-002 06/O1/2014 CLARK, KLICKITAT AND SKANiANIA COUNTIES ZONE 1: Rates Fringes Cement Masons: CEMENT MASONS DOING BOTH COMPOSITION/POWER MACHINERY AND SUSPENDED/HANGING SCAFFOLD..$ 30.58 17.76 CEMENT MASONS ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD............$ 30.58 17.76 CEMENT MASONS ...............$ 29.98 17.76 COMPOSITION WORKERS ANU POWER MACHINERY OPEI2ATORS...$ 31.18 17.76 WA150001 Modification 5 Federal Wage Determinations for Highway Construction Zone Differential (Add To Zone 1 Rates): Zone 2 - $0.65 Zcne 3 - 1.15 Zone 4 - 1.70 Zone 5 - 3.00 BASE POINTS: BEND, CORVALLIS, EUGENE, MEDFORD, PORTLAND, SALEM, THE DALLES, VANCOUVER Page �37 ZONE 1: Projects within 30 miles of the respective city hall ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respective city hall. ZONE 4: More than 50 miles but less than 80 miles from the respective city hall. ZONE 5: More than 80 miles from the respective city hall ------------------------ TEAM0037-002 06/Ol/2014 CLARK, COWLITZ, KLICKITAT, PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to tYie Pacific Ocean), SKAMANIA, AND WAHKIAKUM COUNTIES Rates Truck drivers: ZONE 1 GROUP 1 ....................$ 26.90 GROUP 2 ....................$ 27.02 GROUP 3 ....................$ 27.15 GROUP 4 ....................$ 27.41 GROUP 5 ....................$ 27.63 GROUP 6 ....................$.27.79 GROUP 7 ....................$ 27.99 Zone Differential Zone 2 - $0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 2.75 (Add to Zone 1 Rates): Fringes 14.37 14.37 14.37 14.37 14.37 14.37 14.37 BASE POINTS: ASTORIA, THE DALLES, LOi�IGVIEW AND VANCOUVER ZONE 1: Projects within 30 miles of the respective city hall. ZONE 2: �Iore than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respective city hall. 'LONE 4: More than 50 miles but less than 80 miles from the respecti.ve city hall. ZONE 5: More than f30 miles from the respective city hall. WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �38 TRUCK DRIVERS CLASSIFICATIONS GROUP 1: A Frame or Hydra lifr.t truck w/load bearing surface; Articulated Dump Truck; Battery Rebuilders; Bus or Manhaul Driver; Concrete Buggies (power operated); Concrete Pump Truck; Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations there of: up to and including 10 cu. yds.; Lift Jitneys, Fork Lifts (all sizes in loading, unloading and transporting material on job site); Loader and/or Leverman on Concrete Dry Batch Plant (manually operated); Pilot Car; Pickup Truck; Solo Flat Bed and misc. Body Trucks, 0-10 tons; Truck Tender; Truck Mechanic Tender; Water Wagons (rated capacity) up to 3,000 gallons; 'Pransit Mix and Wet or Dry Mix - 5 cu. yds. and under; Lubrication Man, Fuel Truck Driver, Tireman, Wash Rack, Steam Cleaner or combinations; Team Driver; Slurry Truck Driver or Leverman; Tireman GROUP 2: Boom Truck/Hydra-lift or Retracting Crane; Challenger; Dumpsters or similar equipment all sizes; Dump Trucks/Articulated Dumps 6 cu to 10 cu.; Flaherty Spreader Driver or Leverman; Lowbed Equipment, Flat Bed Semi-trailer or doubles transporting equipment or wet or dry materials; Lumber Carrier, Driver-Straddle Carrier (used in loading, unloading and transporting of materials on job site); Oil Distributor Driver or Leverman; Transit mix and wet or dry mix trcuks: over 5 cu. yds. and including 7 cu. yds.; Vacuum Trucks; Water truck/Wagons (rated capacity) over 3,000 to 5,000 gallons GROUF 3: Ammonia Nitrate Distributor Driver; Dump trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations thereof: over 10 cu. yds. and including 30 cu. yds. includes Articulated Dump Trucks; Self-Propelled Street Sweeper; Transit miY and wet or dry mix truck: over 7 cu yds. and including 11 cu yds.; Truck Mechanic-Welder-Body Repairman; Utility and Clean-up Truck; Water Wagons (rated capacity) over 5,000 to 10,000 gallons GROUP 4: Asphalt Burner; Dump Trucks, side, end and bottom cumps, including Semi-Trucks and Trains or combinations thereof: over 30 cu. yds. and inc.luding 50 cu. yds. includes Articulated Dump Trucks; Fire Guard; Transit MiY and Wet or Dry Mix Trucks, over 11 cu. yds. and including 15 cu. yds.; Water Wagon (rated capacity) over 10,000 gallons to 15,000 gallons GROUP 5: Composite Crewman; Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations thereof: over 50 cu. yds. and including 60 cu. yds. includes Articulated Dump Trucks GROUP 6: Bulk Cement Spreader w/o Auger; Dry Pre-Batch concrete Mix Trucks; Dump trucks, side, end and bottom dumps, including Semi Trucks and Trains of combinations thereof: over 60 cu. yds. and including 80 cu. yds., and includes Articulated Dump Trucks; Skid Truck WA150001 Modification 5 � Federal Wage Determinations for Highway Construction Page �39 GROUP 7: Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations thereof: over 80 cu. yds. and including 100 cu. yds., includes Articulated Dump Trucks; Industrial Lift Truck (mechanical tailgate) ---------------------------------------------------------------- TEAM0174-001 O1/O1/2014 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COr,7NTIES Rates Truck drivers: ZONE A: GROUP 1 :...................$ 32.18 GROUP 2 :...................$ 31.34 GROUP 3 :...................$ 28.53 GROUP 4 :...................$ 23.56 GROUP 5 :...................$ 31.73 16.69 16.69 16.69 16.69 16.69 ZONE B(25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates. ZONE C(over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates. *Zone pay will be calculated from the city center of the following listed cities: BELLINGHAM CENTRALIA EVERETT SHELTON SEATTLE PORT ANGELES TACOMA PORT TOYdNSEND P.AYMOND OLYMPIA ANACORTES BELLEVUE MT. VERNON KENT ABERDEEN BRE��'IERTON TRUCK DRIVERS CLASSIFICATIONS GROUP 1-"A-frame or Hydralift" trucks and Boom trucks or similar equipment when "A" frame or "Hydralift" and Boom truck or similar equipment is used; Buggymobile; Bulk Cement Tank_er; Dumpsters and similar equipment, Tournorockers, Tournowagon, Tournotrailer, Cat DW series, Terra Cobra, Le Tourneau, Westinghouse, Athye Wagon, Euclid Two and Four-Wheeled power tractor with trailer and similar top-loaded equipment transporting material: Dump Trucks, side, end and bottom dump, including semi-trucks and trains or combinations ther.eof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional for each 10 yard increment; Explosive Truck (field mix) and similar equipment; Hyster Operators (handling bulk loose aggregates); Lowbed and Heavy Duty Trailer; Road Oil Distributor Driver; Spreader, Flaherty Transit mix used exclusively in heavy construction; Water Wagon and Tank Truck-3,000 gallons and over capacity Fringes WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �40 GROUP 2- Bulllifts, or similar equipment used in loading or unloading trucks, transporting materials on job site; Dumpsters, and similar equipment, Tournorockers, Tournowagon, Turnotrailer, Cat. D.W. Series, Terra Cobra, Le Tourneau, Westinghouse, Athye wagon, Euclid two and four-wheeled power tractor with trailer and similar top-loaded equipment transporting material: Dump trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with less than 16 yards capacity; Flatbed (Dual Rear Axle); Grease Truck, Fuel Truck, Greaser, Battery Service Man and/or Tire Service Man; Leverman and loader at bunkers and batch plants; Oil tank transport; Scissor truck; Slurry Truck; Sno-Go and similar equipment; Swampers; Straddler Carrier (Ross, Hyster) and similar equipment; Team Driver; Tractor (small, rubber-tired)(when used within Teamster jurisdiction); Vacuum truck; Water Wagon and Tank trucks-less than 3,000 gallons capacity; Winch Truck; Wrecker, Tow truck and similar equipment GROUP 3- Flatbed (single rear axle); Pickup Sweeper; Pickup Truck. (Adjust Group 3 upward by $2.00 per hour for onsite work only) GROUP 4- Escort or Pilot Car GROUP 5 - Mechanic HAZMAT PROJECTS Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows: LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supp.lied air line is provided in conjunction with a chemical "splash suit." LEVEL A: +$.75 per hour - This level utilizes a fully- encapsulated suit with a self-contained breathing apparatus or a supplied air line. WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �41 TEAM0690-004 O1/O1/2014 ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHTTA4AN AND YAKIMA COUNTIES Rates Fringes Truck drivers: (AREA 1: SPOKANE ZONE CENTER: Adams,Chelan, Douglas, Ferry, Grant, Kittitas, Lincoln, Okanogan, Pen Oreille, Spokane, Stevens, and Whitman Counties AREA 1: LEWISTON ZONE CENTER: Asotin, Columbia, and Garfield Counties AREA 2: PASCO ZONE CENTER: Benton, Franklin, Walla Walla and Yakima Counties) AREA 1: GROUP 1 ....................$ 20.17 GROUP 2 ....................$ 22.44 GROUP 3 ....................$ 22.94 GROUP 4 ....................$ 23.27 GROUP 5 ....................$ 23.38 GROUP 6 ....................$ 23.55 GROUP 7 ....................$ 24.08 GROUP 8 ....................$ 24.44 AREA 2 GROUP 1 ....................$ 21.77 GROUP 2 ....................$ 24.31 GROUP 3 ....................$ 24.42 GROUP 4 ....................$ 24.75 GROUP 5 ....................$ 24.86 GROUP 6 ....................$ 25.02 GROUP 7 ....................$ 25.56 GROUP 8 ....................$ 25.88 Zone Differential (Add to 'Lone 1 rate 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 15.19 Zone 1 + $2.00) BASE POINTS: Spokane, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: Outside 45 radius miles from the main post office TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Escort Driver or Pilot Car; Employee Haul; Power Boat Hauling Employees or Material GROUP 2: Fish Truck; Flat Bed Truck; Fork Lift (3000 lbs. and under); Leverperson (loading trucks at bunkers); Trailer Mounted Hydro Seeder and Mulcher; Seeder & Mulcher; Stationary Fuel Operator; Tractor (small, rubber-tired, pulling trailer or similar equipment) WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �42 GROUP 3: Auto Crane (2000 1bs. capacity); Bugqy Mobile & Similar; Bulk Cement Tanks & Spreader; Dumptor (6 yds. & under); Flat Bed Truck with Hydraullic System; Fork Lift (3001-16,000 lbs.); Fuel Truck Driver, Steamcleaner & Washer; Power Operated Sweeper; Rubber-tired Tunnel Jumbo; Scissors Truck; Slurry Truck Driver; Straddle Carrier (Ross, Hyster, & similar); Tireperson; Transit Mixers & Truck Hauling Concrete (3 yd. to & including 6 yds.); Trucks, side, end, bottom & articulated end dump (3 yards to and including 6 yds.); Warehouseperson (to include shipping & receiving); Wrecker & Tow Truck GROUP 4: A-Frame; Burner, Cutter, & Welder; Service Greaser; Trucks, side, end, bottom & articulated end dump (over 6 yards to and including 12 yds.�; Truck Mounted Hydro Seeder; Warehouseperson; Water Tank truck (0-8,000 gallons) GROUP 5: Dumptor (over 6 yds.); Lowboy (50 tons & under); Self- loading Roll Off; Semi-Truck & Trailer; Tractor with Steer Trailer; Transit Mixers and Trucks Hauling Concrete (over 6 yds. to and including 10 yds.); Trucks, side, end, bottom and end dump (over 12 yds. to & including 20 yds.); Truck-Mounted Crane (with load bearing surface either mounted or pulled, up to 14 ton); Vacuum Truck (super sucker, guzzler, etc.) GROUP 6: Flaherty Spreader Box Driver; Flowboys; Fork Lift (over 16,000 lbs.); Dumps (Semi-end); Mechanic (Field); Semi- end Dumps; Transfer Truck & Trailer; Transit Mixers & Trucks Hauling Concrete (over 10 yds. to & including 20 yds.); Trucks, side, end, bottom and articulated end dump (over 20 yds. to & including 40 yds.); Truck and Pup; Tournarocker, DWs & similar with 2 or more 4 wheel-power tractor with trailer, gallonage or yardage scale, whichever is greater Water Tank Truck (8,001- 14,000 gallons); Lowboy(over 50 tons) GROUP 7: Oil Distributor Driver; Stringer Truck (cable oeprated trailer); Transit Mixers & Trucks Hauling Concrete (over 20 yds.); Truck, side, end, bottom end dump (over 40 yds. to & including 100 yds.); Truck Mounted Crane (wi�h load bearing surface either mounted or pulled (16 through 25 tons); GROUP 8: Prime Movers and Stinger Truck; Trucks, side, end, bottem and articulated end dump (over 100 yds.); Helicopter Pilot Hauling Employees or Materials Footnote A- Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a pr.emium, in additon to the classification working in as follows: LEVEL C-D: -$.50 PER HOUR (This is the lowest level of protection. This level may use an air purifying respirator or additional protective clothing. WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �43 LEVEL A-B: -$1.00 PER HOUR (Uses supplied air is conjunction with a chemical spash suit or fully encapsulated suit with a self-contained breathing apparatus. Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours. NOTE: Trucks Pulling Equipment Trailers: shall receive $.15/hour over applicable truck rate WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of. each wage determination lists the classification and wage rates that have been found to be prevailing for_ the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUMO7.98-005 07/O1/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, wrich in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/O1/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �44 Survey Ratc Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the e:�ample, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WA150001 Modification 5 Federal Wage Determinations for Highway Construction Page �45 WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be. * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determinata.on matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional. Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, tnen the process described in 2.) and 3.) should be £ollowed. With regard to any other matter not yet ripe for the formal orocess described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 WA150001 Modification 5 Federal Wage Determinations for Highway Construction � Page �46 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practi.ce material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION WA150001 Modification 5 Federal Wage Determinations for Highway Construction Yamamoto La►ndscaping lnc. May 20, 2015 City of Bremerton Parks & Recreation 680 Lebo Blvd Bremerton, WA 98310 Reference Walker Park Subject Labyrinth Pavers and Walkway to beach Revised prices per conversation on 5-19-15 with Colette Berna Attention Colette Berna Colette I have the prices you requested for Walker Park based on the drawings dated 4-28-15 Install the city provided Labyrinth Paver Kit. NIC Cutting back and removing Blackberries along the bank, and cutting the English Ivy growing on tree trunks and removing their roots, all on the East side of the proposed new stairs, $3030.00 plus tax. Building stairs to the beach using Mutual Materials Quarry or Slate Stone, gravel sub base, compacted, an ecology block at the bottom stair. We will install city provided rocks East and West of the proposed stairs. These steps will be installed without any type of staking/pegging to the ground. This will cost $14,005.00 plus tax. Optional. Add Thin Set Motar to motar steps together, $510.00 plus tax. We will be paying Davis Bacon wages on this project. I have attached a drawing showing our areas of work. Thank you Terry Yamamoto President 5765 Sidney Rd. S.W. Port Orchard Washington 98367-9392 Tel: (360) 876-1889 Fax: (360) 895-0315 Cont. License No. YA-MA-MLI"-98010Z I I � � »>CAUTION«< � � FXIST� GTRE�S (I 5-79-15 This area has CALLBEFOREYOUDIG! �xw xmc..ou�x.xro. nsu� o.n rmu � ToR �MAIN � ,: been cleared by City. " ' 58954'12'E � \ �xE,oix�ra��t.+.o�.�waTM..-,... � � ow..�.��. � I`,;s``; .. , 162 59" I .����,F,��,�� i• •�+. I [ • /.... .� .' r:'� i �%� � . l . - - - ____ ' �1-B00-424-5555 I � {�'".= nM1�OCO�'Ed� . ;:':'�".` % / . ' �' '� . 4 � . � I 1! ight of �o � y •`� `I' J` 1, � � I � � I V;'� �� 466 .� r� `,;"'`` i ' ' : f:. r j , 5r`�°'�o � �( . .�� f �" � f ; � f , � . o �+ ,� I r � I f � • � ' � � � • f � ' � ' / , � , � ` ',,, , : :'� � .� : . ' � a � � � ' I '� ., �� ' � d '. j ; � / .`• �' � � : '� .-� '� � � t Blackberries d . , � PARKS AND RECREATION I [' � �r e.; ; i. 680 LEBO BLVD I �: " r, �� i '���C.Ut �IS�'1 Ofl I S H 25'D� E HPAVERS � �, i � � � ' '. / � �trunks r remove i �i ` I i: ; I� F.` ; j� ... �� Q .��: i� �. � � \ BRFMERTON, WA 98310 . �1 � �F�-� � � � � : S � �I � CONTACT:COLETTEBERNA I ; � . I ' ` ��.: � J � . �J I � � �� � PARNDEVELOPMENTMANAGER � ,��. � F; ,� i� ' , , REMOVE ENGlISH NY (INCLUDING ROOTS) 8 CUT BLACKBERRIES TO GRQUND, � �I ' .:/ ���! i ' � r � ��;� J �f��� ��.�,'�� : � � . . , EXISTINGTREESlTOREMAIN PH.360.473.5429 :.� . f I� / ` � EMAIL: COLERE BERNAa�I. � I � = 1 ' .i�. � � � . ( . � � :' ` . � BREMERTON.WA US I� i 'p����� +�J / �� � .. �`- I � N ( ! ,� ' � \ . • PRUJECf TiTIE I � � I � �,: �x ; ' t , f . - , l / ��r ' � WALKER PARK �; `� / ' o ;". '; I '� 5 city will provide �� v � � ;i. �` ,� .'.;�._ � :�. ' _ � rocks IMPROVEMENTS �� ' �: � `�, we will install - / I ' ' .� ;! : '� �' / � ; � 2310 79TH ST. i {' r;...: . ;:� F ' : �, � � - � -_ . REES"� BREMERTON,WA98337 - I I �� ;,` `' , 5-19-15 NIC � t � � � — v-- �° SfAMP I} 3 � I :� �' ,k �� � I : } +� � . i --�'+-� i- � i �;, S:� � , , �' �. I ` C t�r1/jjL�ly I� , � 1H� � i c } t � �' \ u t � � C ��� �� � � ; t �.. : ,. � �. • � � �{i GH � �„� _� W SZANE S?�PS. .. I � • 1 ith ;� ' � r � . " BY O HED M!'\. c t� I I � : I . � �,`}�i i. : C � ` � �{ �: , , .; � : � \ -......:.�� �..�.�.� ; � :� /� : � � � �/ , ;; �ti,�.a.,. [. .. I i ' �� , \ � , f ` � `.1 �� � : sK« r� m�„� o,., ��; ;t � ` ' ° i I ,: �.. �; ::�`• t' `Pathways-NIC Cut Blackberries down. LAYOUT AND ' ' �' i� �.�,„ : ` ` +: ' 1; 'k � MATERIALS V - - , }:. }. �' � ,;, 4 , • ` a� Cut English Ivy on I a'., (;'� � �� ��.�� trunks of trees, remove �' PLAN �/I ..; �. '`� ti ' Rocks NIC roots / I , . .''� \ ��1 . 1 �:� F 't 1 , �� i . I...: :• �. .. , ; ' �; � � �� :: � � : �' .:.a.. .. ,.' � l \ :'.:q�_ i ,... / I � . ..:.: �� . •. . .'� ..� ��� �'• \ �n issueo sn / n[nsioNS o�rz � ' � � -� � ,' � ' +,, ,, _ \.1.. .I���... � eioonnvnncs a.ze.�s _ � � T , .. . . . . : , . � i .: ' � � � � �':', , � ' .1.. --I ,. _. . . \ ;.' , `� „ --.sr =•SY - _ � +�. � , � i . �.: . . ,. , , � < � >: . , . � . 54�1 . E �... _. . . - . , � . 5 � 0,3. -- „ ... ;; ,;, ���R���� I . � � < < 1 5 ' ;•r ';;� SDM �' � \ � 1 - - - 151. � � , . _ - < - _ • LJ LJ I DMH �� ' � �����' S ? �s N___ � o z s's' ia' zo 7 cmp �� 8 ��=151. 40 5 � n c j �J L--� _ \_ s--� \I I/ s�� r-:o _o- ����mi� � /� ,� �E=151 4� S� , L(� STR� ! - --•-- � S -_ _ _ _ SXEET NIIM � , ! /iE=�s�.a so"�m ' -.'', _. _ --- }':-- / Rrm. T33.48 � - --�-- - -�— � � -- r- - - - -- •e- -- - - � -�w- - - - - - „__ 8..- - - -- �" - - -�----�� - --�- ,ti -�-�--------.,- � -- - 1.0 Mnrk 1 / � . ' - � " -.- -_- � Yamamoto Landscaping inc. June 6, 2015 City of Bremerton Parks & Recreation 680 Lebo Blvd Bremerton, WA 98310 Reference Walker Park Subject Add 3 steps for stairs to beach. Steps include custom color Attention Colette Berna Colette I have a price you requested for adding 3 more steps to Walker Park based Mutual Materials stone steps. This will cost $1080.00 plus tax. This includes the color change you requested. Thank you Terry Yamamoto President 5765 Sidney Rd. S.W. Port Orchard Washington 98367-9392 Tel: (360) 876-1889 Fax: (360) 895-0315 Cont. License No. YA-MA-MLI*-98010Z �: _ CITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 1 PROJECT NAME: , Walker Park Construction . PROJECT NO: 8236 CONTRACTOR: Yamamoto Landscapin� ORIGINAL CONTRACT AMOUNT: $20,245.38 DAYS: PREVIOUSLY APPROVED CHANGES: $0.00 DAYS: 30 ��.�3�.� THIS CHANGE: °'" "��7 DAYS: 20 _ ,---�-- ��4'. 577. os REVISED CONTRACT AMOUNT: $�� DAYS: 50 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and ..perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. o � � � a� a� � � � � DESCRIPTION OF CHANGES INCREASE (DECREASE)IN CONTRACT IN CONTRACT TIME CONTRACT AMOUNT EXTENSION AMOUNT ($) (DAYS) ��) X 1 Work Change Directive #1 $490.00 0 2 lnstall ecology blocks at bioswale X 2 Work Change Directive #2 Install coconut matting on hillside below silt fence "'$�;�9�:QD" 0 3 �3 y9s, 07 X 2 Work Change Directivc #3 Reorder steps due to error made by fabricator 0 0 15 Subtotal of Changc Order: 8.7% Sales Tax � 3 � e � �r'.,�6r2� Total of Changc Order Y3�6.90 �4���� � NET CHANGE IN CONTRACT AMOUNT -�4,�H�fr . 20 INCREASE OR DECREASE �4331. �° � Z� ��'S Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. \� �\� � CONTRACT CHANGE ORDER NO: � PROJECT NAME: Walker Park Construction RECOMMENDED: � �� /�� GS' PROJECT MA GER Date RECOMMENDED: G � `'� PARKS DIR TOR Dat ACCEPTED: —�� 7 - �i� �l��;� �l � .. CONTF3� l APPROVED: � V.G+i MAYOR Date � �� � � ��� Date ATTEST: Ci y Clerk •.:. s:: . • �•.,� Page 2 of 2 �: . APPROVED AS TO FORM: