Loading...
HomeMy WebLinkAbout08/19/2015 7F AGENDA BILL � . CITY OF BREMERTON CITY COUNCIL SUBJECT: Purchase of a new large pump Study Session Date: August 12, 2015 for the Biofilter Process at the WWTP COUNCIL MEETING Date: August 19, 2015 Department: PW&U/WWTP Presenter: Pat Coxon Phone: 473-5448 SUMMARY: The existing large Biofilter pump has been removed and scrapped, as it was completely corroded due to it not being used for over 20 years. Subsequently, we have completely rehabilitated the Biofilter process and it is now operational, and we need to replace the large pump (13,200 gpm) to assist in the operational flushing of the Biofilter and for high flow periods. We have received finro quotes for the replacement pump, one from Triangle Pump 8� Equipment, Inc. for 98 563.73 (includes tax), and one from Granich Engineered Products, Inc. for$137.070.70 (includes tax). ATTACHMENTS: 1)Triangle Pump & Equipment quote; and 2) Granich Engineered Products quote FISCAL IMPACTS (Include Budgeted Amount): STUDY SESSION AGENDA: � No Presentation ❑ Full Presentation STUDY SESSION ACTION: � Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the purchase of the Cascade Mixed flow pump from Triangle Pump 8� Equipment, Inc. for 98 563.73 , and authorize the Mayor to finalize and execute this purchase with substantially the same terms and conditions as presented. COUNCIL ACTION: [�Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/07/15