HomeMy WebLinkAbout3249 RESOLUTION NO. 3249
A RESOLUTION of the City Council of the City of
Bremerton, Washington, adopting the 2016 — 2021 Six Year
TranspoRation Improvement Plan.
WHEREAS, after proper notice, the City Council of the City of Bremerton held a
public hearing at the regular meeting of the City Council at 5:30 p.m. on July 15, 2015 to
consider public testimony on the City's proposed 2016 -2021 Six Year Transportation
Improvement Plan and, having considered public testimony to the Plan and in accordance with
the provisions of RCW 47.80; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The 2016 through 2021 Six Year Transportation Improvement
Plan, set forth in Exhibit"A" attached hereto and herewith filed with the City Clerk, is hereby
adopted.
SECTION 2. Se>>erabilrtv. If any one or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect.
SECTION 3. �fectii�e Date. This Resolution shall take effect and be in force
immediately upon its passage.
�
r PASSED by the City Council of the City of Bremerton, Washington this ��
day of �l , 2015.
W
Greg W ler, Council President
APPROVED AS TO FORM: ATTEST:
�
ROGER A. LUBOVICH, Ci ey SHANNON CORIN, City Clerk
R:\I.egal�Legal\Resolutux�s\Public Wo . 008 Resolution for TIP.doc
1 Six Year Transportation Plan �
CITY OF BREMERTON PROPOSED TRANSPORTATION IMPROVEMENT PROGRAM 2016 - 2021
Project
Project Title 2076 2017 2018 2019 2020 2027 Total
SR3 Corridor Planning/Environmental-KRCC-Carryover from 2015 15,000 0 0 0 0 0 �s,000
Highway Safety Improvements Pro�ect-Phase 2 ssi,000 0 0 0 0 o ss�,000
Crosswalk Project Bundle e�o,000 0 0 0 0 o s�o,000
ADA Transition Plan 200,000 0 0 0 0 0 200,000
Non-motorized Transportation Plan Update so,000 0 0 0 0 o so,000
Traffic Calming io,000 so,000 so,000 3o,00o so,000 so,000 iso,000
Sidewalk Improvements(For BMC 11.08.090, Sidewalk Abatement Fund) so.000 zso,000 soo,000 zso,000 soo,000 zso,000 i,�so,000
City Safety Improvement-Annual Program z5,000 zs,000 2s,000 zs,000 2s,000 2s,000 �so,000
Signal System Upgrades zs.aoo 200,00o zoo,000 2oo,o0o zoo,000 200,00o i,ozs,000
Lebo Blvd,Wheaton Way to City Limits sso.000 s,000,000 0 0 o s,sso,000
Pavement Preservation including Transportation Benefit District 200,00o aoo,000 aoo,000 aoo,000 aoo,000 aoo,000 z,zoo,000
Arterial Streets Ma�or Maintenance and Reconstruction o 2,zoo,000 z,zoo,000 2,200,00o z,2oo,00o z,2oo.000 ��,000,000
Local Street Major Mamtenance and Reconstruction aoo,000 s,soo,000 s,soo,000 s,soo,000 s,soo,000 s,soo.000 i�,soo,000
Crownhill Elementary Safe Routes to Schools ass,000 0 0 0 0 o ass,000
Kitsap Lake Elementary-Safe Routes to Schools izo,000 i,zoo,000 0 0 0 o i,s2o,000
View Ridge Safe Routes to Schools o ioo,000 aoo,000 0 0 o soo,000
Naval Avenue Safe Routes to Schools o o so,000 soo,000 0 o sso,000
Crownhill Elementary Safe Routes to Schools o 0 0 �o,000 �oo,000 o no,000
Armin Jahr Elementary Safe Routes to Schools o 0 0 o so,000 eoo,000 sso,000
Anderson Cove Sidewalks; 19th&Naval to 15th-(Not a Safe Routes Pro�ect) o 0 o o ao,000 aoo,000 aao,000
Matan&Lillian&James Walker Park Sidewalk Connector; Bloommgton&Olympic o 0 0 o ao,000 aoo,000 aao,000
Street Lights Warren Avenue at 4th and 5th Street Crosswalks o so,000 0 0 0 o so,000
Install yellow-flashing lights on left turns city-wide o �s,000 0 0 0 0 �s,000
Manette E. 11 th Sidewalk/Storm Low Impact Development Retrofit o so,000 soo,000 0 0 o sso,000
Washington Avenue,Warren to Manette Bridge o 250,00o z,soo,000 0 0 o z,�so,000
East Bremerton Shared Use Path(WSCC Initiative, connects to County) o eo,000 soo,000 0 0 o sao,000
Streets Electrical Cabinet Replacement Program o ss,000 ss,000 ss,000 ss,000 ss,000 i�s,000
Belfair Valley Road Shoulder Widening for Multimodal o o aso,000 0 0 o aso,000
4th Street Landscaping Replacement/Sidewalk Repair o o aoo,000 0 0 o aoo,000
Ped Connector Under Warren Avenue Bndge South Approach o o so,000 aso,000 0 o soo,000
Sidewalk&Guardrail,Warren Avenue/SR303 north of bridge to Sheridan � o 0 2so,000 2,2so,000 0 0 2,soo,000
SR303 Corridor Improvements-Burwell to Riddell o 0 2so,00a z,000,000 a,000,000 a,000,000 io,zso,000
Wheaton Way-extend left turn pocket from 16th south to 13th o 0 0 �oo,000 soo,000 �oo,000
Oyster Bay Avenue Improvements o 0 0 �oo,000 600,000 �oo,000
Marine Drive NMT Improvements o 0 o iso,000 soo,000 sso,000
2016-2021 TIP;Page 1 of 2
Project
Project Title 2016 2017 2018 2079 2020 2027 Total
Construct Werner Road widening and signal improvements o 0 0 0 o s,000,000 s,000,000
Construct street lighting on Pine Road at Brandywine Development o 0 0 0 o aoo.000 aoo,000
Arsenal Way/Patton Ave Safety Improvements o 0 0 0 o ioo,000 ioo,000
Gorst Sinclair Trail(Planning) o 0 0 0 o zoo,aoo zoo,000
Access ways in Dockside(Planning) o 0 0 0 o so,000 so,000
Naval Ave Road Diet o 0 0 0 0 �oo,000 ioo,000
Construct street lighting on Ricky Road per 2008 developer agreement o 0 0 0 o zoo,000 2oo,o00
Shore Drive Shared Use path(Planning) o 0 0 0 o so,000 so,000
West Belfair Valley Road Guardrails-Evaluat�on and Implementation o 0 0 0 0 60,00o so,000
City Street Lighting-evaluation and upgrade for compliance with standards o 0 0 0 o so,000 so,000
Hospital District Street Improvements; Callahan, Cherry, Wheaton o 0 0 0 o so,000 so,000
3,511,000 11,425,000 12,750,000 12,360,000 13,730,000 16,110,000 70,086,000�
2016-2021 TI P;Page 2 of 2