Loading...
HomeMy WebLinkAbout07/01/2015 5E � AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Professional Services Study Session Date: June 24, 2015 Agreement with Murray, Smith &Associates, COUNCIL MEETING Date: July 1, 2015 Inc. for 2015 Water Resources System Department: PW & U Improvements Presenter: Bill Davis Phone: (360)473-5758 SUMMARY: Based on an evaluation of qualified consultants, the City has selected Murray, Smith, and Associates(MSA)to provide consulting engineering services for the contract 2015 Water Resources System Improvements. The contract includes the design of three projects: 1)The McKenna Falls Intake Improvements, which includes modifications to the concrete channel, replacement of the traveling screen equipment, installation of the main stem bypass system, and evaluation of the West Branch Intake; 2) Geotechnical evaluation of the Casad Dam Overflow Rock Face; 3) Anderson Creek Pump Station 2 Sodium Hypochlorite Building. For projects 1 and 3, MSA will perForm pre-design, detailed design, and construction management support. Project 2 is an evaluation with the majority of the work to be done by subconsultant Shannon &Wilson. Four consultants were sent Request for Proposals(RFPs). Two of the consultants submitted proposals and MSA was selected for the work. A scope of work was submitted and negotiated in the amount of $419,904. ATTACHMENTS: 1) Council Summary 2) Professional Services Agreement(w/attached exhibits) FISCAL IMPACTS (Include Budgeted Amount): This contract is fully funded and is included in the 2015 Water fund budget. The McKenna Falls Intake Improvements is budgeted for$200,000; Casad Dam Overflow Rock Face Improvements is budgeted for$200,000 for design and construction; Anderson Creek Pump Station 2 Sodium Hypochlorite Building is budgeted for$100,000, for a total of$500,000 for the three projects. During the scoping process, it was determined that only$475,000 would be required for the design in 2015 and the remaining $25,000 can be reallocated for construction in 2016. STUDY SESSION AGENDA: � No Presentation ❑ Full Presentation STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve the Professional Services Agreement with Murray, Smith &Associates, Inc. in the amount of$419,904 and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: [�Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/07/15