HomeMy WebLinkAbout5468Contract Number:
Vendor:
Subject:
Department:
File Class:
�
Begin Date:
End Date:
Review Date:
Vault Date:
5468
COATINGS UNLIMITED, INC
Reservoir 10 North - Interior Coating Replacement
Engineering
LEG 12-1
3/18/2015
5/27/2015
5/31/2015
2016
Comments:
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Construction Contract Award to
�Co:afings Inc. for Interior Coating
Replacement of Reservoir 10 North
_
Study Session Date:
COUNCIL MEETING Date:
Department:..
Presenter:
Phone:
March 11, 2015
March 18, 2015
PW&U - - - -- ... .
Chal Martin / Tom
Knuckey
(360) 473-5758
SUMMARY: The work to be completed under this contract includes recoating the interior of a
1,000,000 gallon steel water reservoir located in the Olympic View Industrial Park. The interior of
Reservoir 10 North will be abrasive blasted to remove the existing coal tar epoxy coating, then
coated with a new epoxy coating.
There were 9 bids. Coatings Unlimited was the lowest responsible, responsive bidder in the amount
of $208,108.15 (which includes sales tax).
ATTACHMENTS: 1. Council Summary; 2. Agreement; and 3. Bid Tabulation.
FISCAL IMPACTS (Include Budgeted Amount): The project is included in the 2015 budget at
$400,000 and is funded by rates.
STUDY SESSION AGENDA: 0 No Presentation ❑ Full Presentation
STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to award the construction bid for Reservoir 10 North — Interior
Coating Replacement from Coatings Unlimited in the amount of $208,108.15 (which includes sales
tax) and authorize the Mayor to finalize and execute the agreement with substantially the same terms
and conditions as presented.
COUNCIL ACTION: � Approve
❑ Deny ❑ Table ❑ Continue ❑ No Action
Form Updated 01l07/15
i �� �
.
CITY OF BREMERTON
ADDENDUM NO. 1
TO CONTRACT DOCUMENTS for
�
RESERVOIR 10 NORTH — INTERIOR COATING REPLACEMENT
Issued February 18, 2015
2 pages of text
The following shall modify the Contract Documents and the work shall be accomplished in accordance
with such modifications. It is requested that this addendum be stapled to the Bid Documents.
IMPORTANT: THIS ADDENDUM SHOULD BE ACKNOWLEDGED IN YOUR BID FORMS WHEN
YOUR BID IS SUBMITTED. FAILURE TO ACKNOWLEDGE THE ADDENDUM MAY CONSTITUTE
GROUNDS FOR REJECTION OF THE BID.
'� Contents: This Addendum No. 1 contains revisions to the Specifications and/or the Contract
Drawings. Revisions to the Specifications are made by reissuing entire sections, reissuing specific
�l pages of sections, OR by directing a change in writing, herein. When a paragraph or sentence is
modified, additions are indicated with bold text and deletions are indicated with strikethrough text.
�, Revisions to the Drawings are made by re-issuing a drawing, issuing a revision to a specific detail
from a drawing, OR by directing a change in writing, herein. Bidders are cautioned to check the
'j addendum contents carefully for the presence of all listed revisions.
� l Distribution; This Addendum No. 1 is distributed to all planholders of record.
J
Intepration The following changes, additions, deletions and attachment are hereby made a part of
�J the Contract Documents for Reservoir 10 North — Interior Coatinq Replacement as fully and
completely as if the same were set forth therein.
�J
Acknowledqement of Receipt of Addendum: All prospective bidders are instructed to incorporate
'� this revision into their bids and to complete the acknowledgement of receipt of addenda in the Bid
Proposal. Failure to do so may result in the Bid being rejected as not responsive.
�J City of 8remerton Page 1 of 3 February 2015
Reservoir 10 North — Interior Coating Replacement Addendum #1
�
f�
Item #1 : List of attendees at pre-bid walk through on February 17, 2015
Question #2
Q: Does the site have private vehicle parking? -
A: Yes, inside the fence and there are 3 to 4 spaces immediately outside the fence
Question #3
Q: Can a door sheet be cut?
A: Yes. We believe the steel is 3/8" thick but this should be confirmed. See paragraph 09960 3.1 6
for further discussion of the door sheet. Ramps at least 1 S" high wiil need to be constructed to get
over the concrete ring on the inside of the tank.
City of 8remerton Page 2 of 3 February 2015
Reservoir 10 North - Interior Coating Replacement Addendum #1
Item #2 : Questions asked during the pre-bid walk-through and foilow-up responses:
r
t
�
'
'
�
�
t
1
1
1
'
'
'
1
'
1
'
Question #4
Q: Is there a painting rail?
A: Yes, a painting rail was observed by the engineer who performed the coating inspection.
Question #5
Q: When will the Notice to Proceed be issued.
A: We intend on issuing the Notice to Proceed no later than mid-April so that the work can be
completed prior to the hot weather.
' City of Bremerton Page 3 of 3 February 2015
Reservoir 10 Norfh — lnterior Coating Rep/acement Addendum #1
'
SECTION 00010
CERTIFICATE OF ENG�N�ER
The technical material and data contained in these Specifications for the project Reservoir 10
North -[nterior Coating Replacement were prepared under the supervision and direction of the
undersigned professional engineer(s) licensed to practice as such, whose seals, are affixed below.
/ *
I � l'��,i"
��
William Davis, P.E.
City of Bremerton
�
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT CERTIFICATE OF ENGINEER
FEBRUARY 2015 00010-1
1
1
'
1
'
'
,
'
'
'
�
City of Bremerton
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
Table of Contents
DIVISION 0- BID REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE CONTRACT
00010
00020
00030
00040
00100
00300
00500
00610
00620
00700
00800
Certificate of Engineer
Table of Contents '
Notice Inviting Bids
Bidder Checklist
Instructions to Bidders
Bid Forms
Agreement
Performance Bond
Payment Bond
General Conditions
Supplementary Conditions
(Attachment A: Prevailing Wages Rates for Kitsap County)
DIVISION 1- GENERAL REQUIREMENTS
01010
01020
01025
01030
01300
01311
01500
01600
Summary of Work
Reference Standards and Definitions
Measurement and Payment
Safety, Health and Hazardous Materials Handling
Contractor Submittals
Contractor Schedule
Temporary Site Utilities and Controls
Products, Materials, Equipment, and Substitutions
' DIVISION 9 - FINISHES
09960 Steel Reservoir Coating System
' 09980 Reservoir Cleaning and Disinfection
,
'
'
'
,
APPENDICES
Appendix A - Construction Forms
Appendix B- Reservoir Condition Assessment Report (2014)
Appendix C- Disinfection of Water Storage Facilities (AVWVA C652)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
TABLE OF CONTENTS
0002a�
'
,
'
lJ
'
'
'
SECTION 00030
CITY OF BREMERTON, WASHINGTON
NOTICE INVITING BIDS
RECEIPT OF BIDS: Sealed Bids will be received at the office of the City Clerk of the City of
Bremerton, located at 345 6th Street, Bremerton, Washington 98337 until 2:00 p.m. Pacific Time as
shown on the wall clock inside the City Clerk's office on February 26, 2015 for the project
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT. Bids received after the specified
time and date will not be considered.
OPENING OF BIDS: The bids will be publicly opened and read after 2:00 p.m. on February 26, 2015
in the office of the City Clerk at 345 6t�' Street, Bremerton, Washington 98337.
DESCRIPTION OF WORK: The Work includes all labor, equipment and materials necessary to
, recoat the entire interior of a 1,000,000 gallon welded steel potable water reservoir. The work
includes cleaning out the tank, abrasive blasting to remove the existing coal-tar epoxy coating and
prepare the surface to near white metal (SSPC-SP 10), recoating interior surface in entirety,
' disinfection, site cleanup, site restoration, and disposal of all spent materials and coatings. The site
address is 5785 Imperial Way, Bremerton, WA 98312 and is located at the Olympic View Industrial
Park off of State Route 3, directly across from the Bremerton National Airport.
1
'
�
1
'
'
'
1
COMPLETION OF WORK: The Substantial Completion date is sevent�(70) calendar dqvs following
the Notice to Proceed.
PREV[EWIIVG CONTRACT DOCUMENTS: Contract Documents may be previewed at the ARC
Document Solutions website (www.e-arc.com). Go to htt�//www.e-arc.com/wa/lacoma, then
click on the link'Enter Public Planroom'. Scroll down the page or search to find the project.
PURCHASING CONTRACT DOCUMENTS: The Contract Documents may be purchased from ARC
Document Solutions. Payment is typically cost of reproduction (non-refundable). Contact Bid
Services at ARC in Tacoma, WA: 1(800) 337-8103; FAX (253) 272-4064; E-mail: Tacoma.csC�e-
arc.corn. To receive bid addendum, ensure your company name is on the Planholders list. To
ensure this, purchase bid documents from ARC, or contact them directly and request to have your
company name placed on the Planholders list.
PROPOSALS: All bid proposals must be made on the blank forms furnished in the Contract
Documents. Sealed envelopes containing bids shall be entitled: Bid for RESERVOIR 10 NORTH -
INTERIOR COATING REPLACEMENT.
BID SECURITY: Each bid shall be accompanied by a certified or cashier's check or Bid Bond
payable to the City of Bremerton, in the amount of 5 percent of the Total Bid, including Washington
State sales tax, identified at the time of submittal of the bid as a guarantee that the Bidder, if its Bid
is accepted, will promptly execute the Contract. A bid shall not be considered unless one of the
forms of Bidder's security is enclosed with it.
PERFORMANCE BOND: The successful bidder will also be required to provide a Performance Bond
' for 100 percent of the Contract Price.
BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 60 calendar
days from the date of bid opening.
' RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT NOTICE INVITING BIDS
FEBRUARY 2015 00030-1
,
WAGE RATES: The attention of Bidders is directed to the requirements and conditions of
employment to be observed and the minimum wage rates to be paid under the Contract. Wages
shall be based on the Washington State Prevailing Wage Rates for Public Works Contracts in Kitsap
County current at the time of the bid opening date.
PRE-BID CONFERENCE: Prospective bidders are encouraged to attend the pre-bid conference
conducted by the City, which will include a walk-through of the project site. The reservoir will be
online and interior access through side hatches will not be possible. The objective of the pre-bid
conference is to acquaint bidders with the work and conditions of the site.
The pre-bid conference will begin at 10:00 a.m. on Tuesday, February 17, 2015. Meet at the
Reservoir 10 North site. The site address is 5785 Imperial Way, Bremerton, WA 98312. The site is
located in the Olympic View Industrial Park off of State Route 3, directly across from the Bremerton
National Airport.
CONDITION ASSESSMENT REPORT AND PHOTOGRAPHS: A condition assessment report and
photographs from December 2014 are available for download from the project website at:
tettp:/jwww.ci.brernerton.wa.us/936/Reservoir-lO-North. Alternatively, you may contact
Katie Ketterer at (360) 473-5717 for electronic copies of these documents.
PROJECT COMMUNICATION: All communications related to the project shall be directed to the
City prior to opening of Bids:
Communication b�phone/fax/e-mail:
Bill Davis, P.E.
Telephone: (360) 473-2312; Fax: (360) 473-5398
E-mail: William.davis@ci.bremerton.wa.us
Department of Public Works and Utilities, Engineering Division
3027 Olympus Drive
Bremerton, WA 98310
ATTN: William Davis �
CITY'S RIGHTS RESERVED: The City of Bremerton reserves the right to reject any and all bids on
any or all schedules or alternates or to waive any informalities in the bidding and shall determine
which bid or bidders is the most satisfactory and responsible bidder and shall be the sole judge
thereof.
No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or
as a defense to any action based upon the neglect or refusal to execute a contract.
The City of Bremerton hereby notifies all bidders that it will affirmatively ensure that in any
contract entered into pursuant to this advertisement, disadvantaged business enterprises will be
afforded full opportunity to submit bids in response to this invitation. No bidder will be
discriminated against on the grounds of race, color, religion, sex, national origin, sexual orientation,
age, genetic information, marital or veteran status, or the presence of any disability.
END OF SECTION
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT NOTICE INVITING BIDS
FEBRUARY 2015 00030-2
�
'
'
'
'
'
'
,
1
'
�
'
1
'
'
'
��I
'
SECTION 00040
BIDDER'S CHECKLIST
BIDDER'S CHECKLIST
This section lists the contract forms required for this project. The bidder's attention is especially
directed to the forms that must be executed in full as required and submitted with the bidder's bid.
These are indicated as follows in the section titled "Bid Documents."
BID DOCUMENTS
These documents must be executed and submitted to the City with your bid, not later than the
designated bid closing date and time. Bids that do not include all of the required forms, properly
completed, may be declared unresponsive. The bid forms are in Section 00300.
A. Acicnowledgement of Bid and Addenda
B. Bid Certificate
C. Bid Schedule
D. Bid Bond (This form to be executed by the bidder and the surety company unless bid is
accompanied by a certified check. The amount of this check or bond shall be not less than 5%
�ve percent) of the total amount bid and may be shown in dollars or on a percentage basis.)
E. List of Subcontractors
F. List of Proposed Substitutes (included but not used)
G. Information Required of Bidder .
H. Non-Collusion Affidavit (The form is to be completed and signed by the contractor and
notarized.)
I. Certification by Proposed Contractor Regarding Equal Employment
J. Certification of Non-segregated Facilities
K. Certification of Federal Non-Debarment and Suspension.
DOCUMENTS TO BE EXECUTED BY THE SUCCESSFUL BIDDER
The following forms are to be executed after the contract is awarded. These forms must be filled out
and submitted within fourteen (14) calendar days after the date of Notice of Award of contract.
- Agreement
- Agreement Certificate
- Performance Bond
- Payment Bond
- Insurance Certificates (submit with Agreement)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
BIDDER CHECKLIST
00040-1
1
DOCUMENTS TO BE EXECUTED AFTER AWARD
The following forms are to be executed after Notice of Award but prior to first payment request:
- Statement of Intent to Pay Prevailing Wages. This is a form from Dept. of Labor and
lndustries. Submit prior to first payment request.
DOCUMENTS TO BE EXECUTED PRIOR TO FINAL PAYMENT OR RELEASE OF RETAINAGE
- Acceptance of Compensation and Release of All Claims. This form is located in the Appendix.
Submit prior to final payment.
- Affidavit of Wages Paid. This form is from the Dept. of Labor and lndustries. This form must
be submitted prior to release of retainage.
END OF SECTION
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT BIDDER CHECKLIST
FEBRUARY 2015 00040-2
'
'
'
' 1
�
� 2.
SECTION 00100
INSTRUCTIONS TO BIDDERS
DEFINED TERMS
Terms used in these Instructions to Bidders and the Notice Inviting Bids which are defined
in the General Conditions have the meanings assigned to them in the General Conditions.
The term "Bidder" means one who submits a Bid directly to OWNER, as distinct from a sub-
bidder, who submits a Bid to a Bidder. The term OWNER is defined as the City of
Bremerton, located at 345 6t'� St., 98337.
LOCAL BUSINESS LICENSE
' The successful Bidder shall acquire and/or possess a current City of Bremerton Business
License and any other licenses and permits which may be required to fulfill the obligations
of the Contract as specified. Business and occupancy (B&0) taxes shall be paid when due
' and the CONTRACTOR will agree to assign any payments due to the City Clerk for payment
of such taxes which have been declared delinquent. License shall be obtained prior to first
payment request.
' 3. INTERPRETATIONS AND ADDENDA
'
�
�
'
'
'
,
3.1 All questions about the meaning or intent of the Contract Documents are to be directed to
the ENGINEER, defined in GC-1.01 A, Section 00700. Additions, deletions, or revisions to
the Contract Documents considered necessary by the ENGINEER in response to such
questions will be issued by Addenda mailed or delivered to all parties recorded by the
ENGINEER or OWNER as having received the Contract Documents. Only answers to such
questions issued by formal written Addenda will be binding. Oral and other interpretations
or clarifications will be without legal effect.
Addenda may also be issued to make other additions, deletions, or revisions to the Contract
Documents.
Bidders shall make no special interpretation or inference of intent from differing formats in
the Technical Specifications.
BIDDER'S EXAMINATION OF CONTRACT DOCUMENTS AND SITE
It is the responsibility of each Bidder before submitting the Bid:
3.2
3.3
4.
4.1
I:�
:
To examine thoroughly the Contract Documents and other related data identified in
the Bidding Documents (including "technical" data referred to below);
To visit the site to become familiar with local conditions that may affect cost,
progress, or performance of the WORK;
' C. To consider federal, state, and local Laws and Regulations that may affect cost,
progress, or performance of the WORK;
� RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT INSTRUCTIONS TO BIDDER
FEBRUARY 2015 00100-1
'
�
4.2
To study and carefully correlate the Bidder's observations with the Contract
Documents; and
To notify the ENGINEER of all conFlicts, errors, ambiguities, or discrepancies in or
between the Contract Documents and such other related data.
E
F. When conflicts, errors, ambiguities, or discrepancies are discovered in or between
Contract Documents and/or other related documents, and when said conFlicts, etc.
have not been resolved through the interpretations by ENGINEER as described in
Paragraph 3 above, BIDDER shall include in the Bid the greater quantity of WORK or
compliance with the more stringent requirement resulting in a greater cost. Such
greater cost shall be included in the BID.
Reference is made to the Supplementary Conditions for identification of:
Those drawings of physica! conditions in or relating to existing surface and subsurface
conditions (except Underground Utilities) which are at or contiguous to the site have been
utilized by the ENGINEER in the preparation of the Contract Documents. The Bidder may
rely upon the accuracy of the technical data contained in such drawings, however, the
interpretation of such technical data, including any interpolation or extrapolation thereof,
together with nontechnical data, interpretations, and opinions contained in such drawings
or the completeness thereof is the responsibility of the Bidder.
4.3 Copies of reports and drawings referred to in Paragraph 4.2 will be made available by the
OWNER for review at the office of the OWNER by any Bidder on request, if said reports and
drawings are not bound herein. Those reports and drawings are not part of the Contract
Documents, but the technical data contained therein upon which the Bidder is entitled to
rely, as provided in SC-4.02.0 of the Supplementary Conditions, are incorporated herein by
reference.
4.4 [nformation and data reFlected in the Contract Documents with respect to Underground
Utilities at or contiguous to the site is based upon information and data furnished to the
OWNER and the ENGINEER by the owners of such Underground Utilities or others, and the
OWNER does not assume responsibility for the accuracy or completeness thereof unless it
is expressly provided otherwise in the Supplementary Conditions or Section 01530 -
Protection of Existing Facilities.
4.5 Provisions concerning responsibilities for the adequacy of data furnished to prospective
Bidders on subsurface conditions, Underground Utilities, and other physical conditions, and
possible changes in the Contract Documents due to differing conditions appear in Paragraphs
4.02, 4.03, and 4.04 of the General Conditions, and Supplementary General Conditions.
4.6 Before submitting a Bid, each Bidder will, at Bidder's own expense, make or obtain any
additional examinations, investigations, explorations, tests, and studies and obtain any
additional information and data which pertain to the physical conditions (surface,
subsurface, and Underground Utilities) at or contiguous to the site or otherwise which may
affect cost, progress, or performance of the WORK and which the Bidder deems necessary
to determine its Bid for performing the WORK in accordance with the time, price, and other
terms and conditions of the Contract Documents.
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
INSTRUCTIONS TO BIDDER '
00100-2
'
1
1
�
'
'
'
'
�
1
'
1
�
'
'
4.7 On request a minimum of 2 days in advance, the OWNER will provide each Bidder access to
the site to conduct such examinations, investigations, explorations, tests, and studies as
each Bidder deems necessary for submission of a Bid. WORK conducted on weekends shall
be coordinated during regular business hours of the previous week. Location of any
excavation or boring shall be subject to prior approval of OWNER and applicable agencies.
Bidder shall fill all holes, restore all pavement to match existing structural section, and shall
clean up and restore the site to its former condition upon completion of such explorations.
4.8 The lands upon which the WORK is to be performed, rights-of-way, and easements for
access thereto and other lands designated for use by the CONTRACTOR in performing the
WORK are identified in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities or storage of materials and equipment are to
be provided by the CONTRACTOR. Easements for permanent structures or permanent
changes in existing structures are to be obtained and paid for by the OWNER unless
otherwise provided in the Contract Documents.
►,.
5.
Q
The submission of a Bid will constitute an incontrovertible representation by the Bidder
that the Bidder has complied with every requirement of this Paragraph 4 and the following:
A. That the Bid is premised upon performing the WORK required by the Contract
Documents without exception and such means, methods, techniyues, sequences, or
procedures of construction (if any) as may be required by the Contract Documents;
B. That Bidder has given the ENGINEER written notice of all conflicts, errors,
ambiguities, and discrepancies in the Contract Documents and the written resolution
thereof by the ENGINEER is acceptable to the Bidder; and
C. That the Contract Documents are sufficient in scope and detail to indicate and convey
understanding of all terms and conditions for performance of the WORK.
BID FORMS
The Bid shall be submitted on the Bid Forms in Section 00300 bound herein. All blanks on
the Bid Forms shall be completed in ink. All names must be printed below the signatures.
The Bid shall be submitted in a sealed envelope which shall be plainly marked in the upper
left hand corner with the name and address of the Bidder and shall bear the words "B[D for"
followed by the Project Name, the OWNER name, the address here bids are to be delivered
or mailed to, and the date and hour of opening of Bids.
CERTIFICATES
' 6.1 Bids by corporations must be executed in the corporate name by the president, a vice-
president, or other corporate officer. Such Bid shall be accompanied by the enclosed
Certificate of Authority to sign, attested by the secretary or assistant secretary, and with the
' corporate seal affixed. The corporate address and state of incorporation must appear
below the signature.
' 6.2 Bids by partnerships must be executed in the partnership name and be signed by a
managing partner, accompanied by the enclosed Certificate of Authority to sign, and
' RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT INSTRUCTIONS TO BIDDER
FEBRUARY 2015 00100-3
1
his/her title must appear under the signature and the official address of the partnership
must appear below the signature.
6.3 Bids by joint ventures must be executed in the joint venture name and be signed by a joint
venture managing partner, accompanied by the enclosed Certificate of Authority to sign,
and his/her title must appear under the signature and the official address of the joint
venture must appear below the signature.
6.4 Bids by limited liability companies must be executed in the limited liability company name
and be signed by a member, accompanied by the enclosed Certificate of Authority to sign,
and his/her title must appear under the signature and the official address of the joint
venture must appear below the signature.
DISQUALfFICATION OF BIDDERS
:
�]
10.
11.
More than one Bid from an individual, firm, partnership, corporation, or association under
the same or different names will not be considered. [f the OWNER believes that any Bidder
is interested in more than one Bid for the WORK contemplated, all Bids in which such
Bidder is interested will be rejected. If the OWNER believes that collusion exists among the
Bidders, all Bids will be rejected. A party who has quoted prices to a Bidder is not hereby
disqualified from quoting prices to other Bidders, or from submitting a Bid directly for the
WORK.
QUANTIT[ES OF WORK
Paragraph not used.
SUBSTITUTE OR "OR EQUAL" ITEMS
Whenever materials or equipment are specified or described in the Contract Documents by
using the name of a particular Supplier and the name is followed by the words "or equal",
the Bidder may write the name of a substitute Supplier (which the Bidder considers as an
"or eyual") in the Bid form titled List of Proposed Substitutes. These substitute Suppliers
will only be considered after award of the Contract. The procedure for the submittal of
substitute or "or equal" products is specified in Section 01600 - Products, Materials,
Equipment, and Substitutions. The Bidder shall not be relieved of any obligations of the
Contract Documents or be entitled to an adjustment in the Contract Price in the event any
proposed substitute manufacturer is not subsequently approved.
COMPETENCY OF BIDDERS
In selecting the lowest responsive, responsible Bidder, consideration will also be given to
the general competency of the Bidder for the performance of the WORK covered by the Bid.
To this end, each Bid shall be supported by a statement of the Bidder's experience as of
recent date on the form entitled "INFORMATION REQUIRED OF BIDDER" in the bid Forms.
SUBMISSION OF BIDS
The Bid shall be delivered by the time and to the place stipulated in the Notice Inviting
Bids. It is the Bidder's sole responsibility to see that its Bid is received in proper time and
at the proper place.
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT INSTRUCTIONS TO BIDDER
FEBRUARY 2015 00100-4
,
1
12
'
'
1
1
' 13
,
1
'
' 14
BID SECURITY, BONDS, AND INSURANCE
Each Bid shall be accompanied by a certified or cashier's check or approved Bid Bond in the
amount stated in the Notice Inviting Bids. Said check or bond shall be made payable to the
OWNER and shall be given as a guarantee that the Bidder, if awarded the WORK, will enter
into an Agreement with the OWNER, and will furnish the necessary insurance certificates,
Payment Bond, and Performance Bond; each of said bonds to be in the amount stated in the
Supplementary Conditions. In case of refusal or failure to enter into said Agreement, the
check or Bid Bond, as the case may be, shall be forfeited to the OWNER as liquidated damages.
The parties recognize that actual damages will be very difficult to determine and that the
amount of the bid bond, is a fair and reasonable estimate of damages if the Agreement is not
executed. If the Bidder elects to furnish a Bid Bond as its Bid security, the Bidder shall use the
Bid Bond form bound herein.
DISCREPANCIES IN BIDS
In the event there is more than one Bid item in a Bid Schedule, the Bidder shall furnish a
price for all Bid items in the Schedule, and failure to do so will render the Bid non-
responsive and may cause its rejection. In the event there are unit price Bid items in a
Bidding schedule and the a►nount indicated for a unit price Bid item does not equal the
product of the unit price and quantity, the unit price shall govern and the amount will be
corrected accordingly, and the BIDDER shall be bound by said correction. In the event
there is more than one Bid item in a Bid Schedule and the total indicated for the Schedule
does not agree with the sum of the prices Bid on the individual items, the prices Bid on the
individual items shall govern and the total for the Schedule will be corrected accordingly,
and the BIDDER shall be bound by said correction.
MOD[FICATIONS AND UNAUTHORIZED ALTERNATIVE BIDS
' Unauthorized conditions, limitations, or provisos attached to the Bid shall render it
informal and may cause its rejection as being non-responsive. The completed Bid forms
shall be without interlineations, alterations, or erasures in the printed text. Alternative
' Bids will not be considered unless called for. Oral, telegraphic, or telephonic Bids or
modifications will not be considered.
' 15.
1
�
1
WITHDRAWAL OF BID
The Bid may be withdrawn by the Bidder by means of a written request, signed by the
Bidder or its properly authorized representative. Such written request must be delivered
to the place stipulated in the Notice Inviting Bids for receipt of Bids prior to the scheduled
closing time for receipt of Bids.
Award of the Contract, if awarded, will be made to the lowest responsive, responsible
Bidder based on the TOTAL B[D PRICE whose Bid complies with the requirements of the
Contract Documents. Unless otherwise specified, any such award will be made within the
AWARD OF CONTRACT
16.
, RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
INSTRUCTIONS TO BIDDER
00100-5
'
period stated in the Notice Inviting Bids that the Bids are to remain open. Unless otherwise
indicated, a single award will be made for all the Bid Items in an individual Bid Schedule.
17
:
19
RETURN OF BID SECURITY
Within 14 days after award of the contract, the OWNER will, if requested, return the Bid
securities accompanying such Bids that are not being considered in making the award. All
other Bid securities will be held until the Agreement has been finally executed. They will
then be returned, if requested, to the respective Bidders whose Bids they accompany.
EXECUTION OF AGREEMENT
The Bidder to whom award is made shall execute a written Agreement with the OWNER on
the form of agreement provided reflecting by incorporation the additions, deletions, or
revisions agreed upon, shall secure all insurance, and shall furnish all certificates and bonds
required by the Contract Documents within 14 calendar days after receipt of the agreement
forms from the OWNER. Failure or refusal to enter into an Agreement as herein provided
or to conform to any of the stipulated requirements in connection therewith shall be just
cause for annulment of the award and forfeiture of the Bid Security. If the lowest
responsive, responsible Bidder refuses or fails to execute the Agreement, the OWNER may
award the Contract to the second lowest responsive, responsible Bidder. [f the second
lowest responsive, responsible Bidder refuses or fails to execute the Agreement, the
OWNER may award the contract to the third lowest responsive, responsible Bidder. On the
failure or refusal of such second or third lowest Bidder to execute the Agreement, each such
Bidder's Bid securities shall be likewise forfeited to the OWNER.
LIQUIDATED DAMAGES
The Agreement contains a provision for Liquidated Damages. Please carefully read the
Agreement and all other Contract Documents before submitting a bid.
20. SALES TAX
Washington State Department of Revenue Rule 170 applies to this contract. Contact DOR
for additional information regarding application of Rule 170. ,
All other federal, state, and local sales, use or other taxes as required by federal, state, or
local laws shall be included in the various unit bid item prices or other contract amounts.
END OF INSTRUCTIONS TO BIDDERS
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
INSTRUCTIONS TO BIDDER 1
00100-6
'
,
1
'
'
SECTION 00300
BID FORMS
ACKNOWLEDGEMENT OF BID AND ADDENDA
BID T0: C[TY OF BREMERTON, PUBLIC WORKS AND UTILITIES ENGINEERING DIVISION
' 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an
Agreement with the OWNER in the form included in the Contract Documents to perform the
WORK as specified or indicated in said Contract Documents entitled "RESERVOIR 10
NORTH - INTERIOR COATING REPLACEMENT."
'
'
'
,
'
'
1
l�
'
2. Bidder accepts all of the terms and conditions of the Contract Documents, including without
limitation those in the Notice Inviting Bids and Instruction to Bidders, dealing with the
disposition of Bid Security.
This Bid will remain open for the period stated in the "Notice Inviting Bids" unless
otherwise required by law. Bidder will enter into an Agreement within the time and in the
manner required in the "Notice Inviting Bids" and the "Instructions to Bidders," and will
furnish the insurance certificates, Payment Bond, and Performance Bond required by the
Contract Documents.
4. Bidder has examined copies of all the Contract Documents including the following addenda
(receipt of all of which is hereby acknowledged). Failure to acknowledge addenda shall
render the bid non-responsive and shall be cause for its rejection.
Addenda Number: Date:
5. Bidder has familiarized itself with the nature and extent of the Contract Documents, WORK,
site, locality where the WORK is to be performed, the legal requirements (federal, state and
local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress or
performance of the WORK and has made such independent investigations as Bidder deems
necessary.
To all the foregoing, and including all Bid Forms contained in this Bid, said Bidder further
' agrees to complete the WORK required under the Contract Documents within the Contract
Time stipulated in said Contract Documents, and to accept in full payment therefore the
Contract Price based on the Total Bid Price(s) named in the aforementioned Bid Forms.
'
Dated:
I B
(S�gnature)
1
RESERVOIR 10 NORTH — INTERIOR COATING REPLACEMENT
FEBRUARY 2015
Bidder:
Title:
(Company Name)
BID FORMS
00300-1
'
BID CERTIFICATE
STATE OF
COUNTY OF
)
) SS:
)
jif Corporation�
I HEREBY CERTIFY that a meeting of the Board of Directors of the
a corporation existing under the laws of the State of . held on
. 2015, the folbwing resolution was duly passed and adopted:
"RESOLVED, that . as
President of the Corporadon, be and is hereby authorized to
execute the Bid dated . 2015, to the City of Bremerton by this corporation
and that his execution thereof, attested by the Secretary of the Corporation, and with
the Corporate Seal affixed, shall be the official act and deed of this Corporation" �
I further certify that said resolution is now in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the
corporation this . day of 2015.
Secretary
(SEAL)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT BID FORMS
FEBRUARY 2015 00300-2
,
�
'
'
'
'
'
,
1
�
�
'
'
�
'
1
'
,
'
BID CERTIFICATE
(if Parh�ership�
STAT E 0 F
COUNTY OF
)
) SS:
)
I HEREBY CERTIFY that a meeting of the Pariners of the
a partinership existing under the laws of the State of . held on
. 2015, the following resolution was duly passed and adopted:
"RESOLVED, that
of the Parmership, be and is hereby authorized to execute
the Bid dated . 2015, to the City of Bremerton by this partr�ership and that
his/her execution thereof, attested by the
shall be the official act and deed of this Partr�ership:'
I further certify that said resolution is now in full force and effect.
as
[N WITNESS WHEREOF, I have hereunto set my hand this . day of
2015. �
Partr�er
(SEAL)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
BID FORMS
00300-3
BID CERTIFICATE
�f loint Venture],
STAT E 0 F
COUNTY OF
)
) SS:
)
[ HEREBY CERTIFY that a meeting of the Principals of the
a joint venture existing under the laws of the State of . held on
. 2015, the following resolution was duly passed and adopted:
"RESOLVED, that . as
� of the Joint Venture,
be and is hereby authorized to execute the Bid dated
2015, to the City of Bremerton by this joint venture and that his/her execution
thereof, attested by the � shall be the
official act and deed of this Joint Venture"
1 further certify that said resoludon is now in full force and effect.
IlV WITNESS WHEREOF, I have hereunto set my hand this
2015.
Managing Parh�er
(SEAL)
day of
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT BID FORMS
FEBRUARY 2015 00300-4
1
'
'
'
1
'
'
'
'
'
'
'
'
1
,
'
'
,
'
STATE OF
COUNTY OF
BID CERTIFICATE
(if Limited Liability Company)
)
) SS:
)
I HEREBY CERTIFY that a meeting of the Members of the
a limited liability company existing under the laws of the State of . hekl on
. 2015, the folbwing resolution was duly passed and adopted:
"RESOLVED, that
as members of the Limited Liability Company, be and are hereby authorized to
execute the Agreement dated
2015, to the City of Bremerton by this limited liabiliry company and that their
execution thereof shall be the official act and cleed of this Limited Liability Company."
I further certify that said resoludon is now in full force and effect.
IN W[TNESS WHEREOF, [ have hereunto set my hand this
2015.
day of
A Limited Liability Company
:
:
(SEAL)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
Member
Member
BID FORMS
00300-5
BID SCHEDULE
Following is the Bid Schedule for construction of the RESERVOIR 10 NORTI-I - INTERIOR COATING REPLACEMENT in accordance
with the Contract Document�. The Bid Schedule must be completed by the Bidder by filling in each blank. The cost item shall be in
dollars and cents, using numerals only. Failure to do so will render the bid non-responsive and will cause its rejecdon. NOTE ON
SALES TAX: Washington State Departinent of Revenue Rule 170 applies to this project. Bids will be evaluated on the basis of the
TOTAL BID PRICE.
BID
ITEM ITEM DESCRIPTION COST IN DOLLARS & CENTS
N0.
1
2
3
:!
E
[NTERIOR COATING REPLACEMENT
FORCE ACCOUNT
TOTAL BASE B[D (SUBTOTAL OE BID [TEMS N0. 1 AND 2)
SALES TAX @ 8.7% ON BID ITEM N0. #3
TOTAL BID PR[CE (SUM OF BID ITEMS N0. 3 AND 4)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
BID FORMS
00300-6
$
$30,000.00
$
$
� _ � � � � � � � � � � � � � � � � �
'
1
'
KNOW ALL MEN BY THESE PRESENTS,
BID BOND
That
1
LJ
1
,
'
'
,
held and firmly bound unto City of Bremerton hereinafter callcd "OWNER," in the sum of
(not less than 5 percent of the total amount of the Bid)
as Principal, and
as Surety, are
dollars,
for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors,
administrators, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, said Principal has submitted a Bid to said OWNER to perform the WORK required under the
bidding schedule(s) of the OWNER's Contract Documents entitled RESERVOIR 10 NORTH - IIVTERIOR
COATING REPLACEMENT.
If the Principal is awarded the Bid and, within 14 calendar days after receipt of the Contract Document forms
from the OWNER, fails to provide the OWNER with the duly executed Agreement; the duly executed
Certiticates of Insurance, the duly executed Performance Bond and the duly executed Payment Bond, all as
specified in the Contract Documents, then the Surety shall, without condition and within 5 calendar days from
written demand from the OWNER, pay to the OWNER in U.S. funds, by certified or cashiers check, the full
amount oF this Bid Bond. This Bond shall be irrevocable for 90 days after the bid opening, as defined in the
Contract Documents.
The Surety stipulates and agrees that the obligation of said Surety shall in no way be impaired or affected by
' an extension of the time within which the OWNER may accept such bid and Surety further waives notice of
any such extension. In the event suit is brought upon this bond by said OWNER and OWNER prevails, said
Principal and Surety shall pay all costs incurred by said OWNER in such suit, including reasonable attorney's
fees and costs to be fixed by the court.
'
'
�
,
'
'
,
1
SIGNED AND SEALED, this
By:
(Principal)
(Signature)
(SEAL AND NOTARIAL ACKNOWLEDGMENT OF SURETY)
Address of Surety to which all notices shall be sent
Address for Service of Process (must be a physical address)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
(SEAL)
By:
day of
2015
(SEAL)
(Su rety)
(Signature)
BID FORMS
00300.7
'
LIST OF SUBCONTRACTORS
The Bidder shall provide the following information for each Subcontractor who will perform work or labor or render
service to the CONTRACTOR in or about the construction of the work or improvement, or a Subcontractor who,
under subcontract to the CONTRACTOR, specially fabricates and installs a portion of the work or improvement
according to detailed drawings contained in the plans and specifications, in an amount in excess of 10 percent of the
CONTRACTOR's total bid. The CONTRACTOR shall list only one Subcontractor for each portion of the WORK as is
defined by the CONTRACTOR in its bid. If no Subcontractor is listed the bidder acknowledges that it does not intend
to use any subcontractor whose work on the CONTRACT will exceed 10 percent of the bid price. The Bidder's
attention is directed to the provisions of Article 6.06 of the Standard General Conditions which stipulates the percent
of the WORK to be performed with the Bidder's own forces. Attach additional sheets if required.
SUBCONTRACTOR #1
Company Name:
Subcontractor License #:
Work to be performed
Address/Phone #:
Bid Amount and % of Total Bid: �
SUBCONTRACTOR #2
Company Name:
Subcontractor License #: �
Work to be performed:
Address/Phone #:
Bid Amount and % of Total Bid:
SUBCOIVTRACTOR #3
Company Name:
Subcontractor License #:
Work to be performed:
Address/Phone #:
Bid Amount and % of Total Bid:
SUBCONTRACTOR #4
Company Name:
Subcontractor License #:
Work to be performed:
Address/Phone #: .
Bid Amount and % of Total Bid:
'
'
'
,
'
'
�
O
�
�
�
�
,
'
,
�
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT BID FORMS 1
FEBRUARY 2015 00300-8
,
'
'
'
�
'
'
1
1
LIST OF PROPOSED SUBSTITUTES
INSTRUCTIONS: 1) In the second column, circle the specified product used in the bid; 2) If the Bidder is
proposing to provide a substitute or "or equal" product, identify the manufacturer/model for the product in
the third column.
These proposed substitutes will only be considered after award of the Contract. Substitute or "or equal"
items not proposed in this form by the Bidder will not be considered by the Owner after opening of
bids. The procedure for the submittal of substitute or "or equal" products is specified in Section 01600 -
Products, Materials, Equipment, and Substitutions. The Bid�ier shall not be relieved of any obligations of
the Contract Documents or be entitled to an adjustment in the Contract Price in the event any proposed
substitute manufacturer is not subsequently approved.
Specification Section Name of Specified
Product used in Bid
(Circle product)
Substitute Manufacturer for `Or
equal' products. Include
Make/Model (List only one for
each item)
'
TH IS FORM IS NOT USED
1
1
1
1
1
C�
1
1
' RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
BID FORMS
00300-9
'
IIVFORIWA'I'ION REQ�JIRED OF BIDDER
PAGE 1 of 2
The Bidder shall furnish the following information. Additional sheets shall be attached as required.
Failure to complete these items will cause the Bid to be non-responsive and may cause its
rejection. In any event, no award will be made until all of the Bidder's General Information is
delivered to the OWNER.
Name of Contractor:
Primary Classification:
Address
Telephone: _
Fax number:
E-mail address:
Name and contact information for proposed Project Manager:
Employer's identification number (employer SSN, not personal SSN):
Employment Security Department number
Washington Industrial Insurance number
Washington State Tax Registration (UBI) number
Washington State Contractor's Registration number/expiration date
City of Bremerton Business License number
* if not available. must be obtained prior to mobilization
Name, address, and telephone number of surety company and agent who will provide the required
bonds this contract:
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT BID FORMS
FEBRUARY 2015 00300-10
�
'
'
'
�
1
INFORMATION REQUIRED OF BIDDER
PAGE 2 of 2
To be considered for award, the CONTRACTOR shall have completed at least three projects of
similar type, complexity, and comparable value to that WORK described in Notice Inviting Bids.
ATTACH TO THIS BID a list of 3 projects minimum, completed by the CONTRACTOR, that are
similar to this project in nature, value, and complexity of work. The 3 projects must have been
completed under the bidder's name as the prime (general) contractor within the last 5 years. The
list shall include the following information as a minimum:
• Names,•address, and telephone number of owner.
' • Name of project.
• Location of project.
.•' • Brief description of the work involved.
�
• Contract amount.
�' • Date of completion of contract.
• Name, address, and telephone number of architect or engineer.
' ' • Name of owner's project engineer.
• List of major equipment used.
� • Years in business under current name.
• Contracts now in hand, gross amount, and percent complete.
'
�
'
1
,
'
' RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
BID FORMS
00300-11
'
NON-COLLUSION AFFIDAVIT
STATE OF
COUNTY OF
)
) ss.
)
. being first duly sworn, deposes and says that he or she is
of the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any
undisclosed person, partnership, company, association, organization, or corporation; that the bid is
genuine and not collusive or sham; that the bidder has not directly or indirectly induced or
solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone
shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the bidder or any
other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other
bidder, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and further,
that the bidder has not, directiy or indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid depository,
or to any member or agent thereof to effectuate a collusive or sham bid.
Signed:
Subscribed and sworn to before me
this day of , 2015
Notary Public in and for the
County of
State of
(SEAL)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
BID FORMS '
00300-12
'
,
1
1
1
'
'
�
'
1
'
'
'
�
'
�
'
'
�
1
CERTIFICATION BY PROPOSED CONTRACTOR REGARDING EQUAL EMPLOYMENT
[n accordance with Chapter 56, Laws of 1975 1st Extraordinary Session, Certification
regarding Equal Opportunity is required of bidders or prospective contractors and their
proposed subcontractors prior to the award of contracts or subcontracts.
Name of Prime Contractor
Address
Internal Revenue Service Employer ldentification No.
a. Contractor has participated in a previous contract Yes_ No_
or subcontract subject to the Equal Opportunity Clause.
b. Compliance reports were required to be filed in Yes_ No_
connection with such contract/subcontract.
c. Contractor has filed all compliance reports required by Yes_ No_
Executive Orders 10925,11114,11246 or by regulations
oFthe Equal Opportunity Commission issued pursuant to
Title Vll of the Civil Rights Act of 1964.
d. If answer to item 'c' is "no", please explain in detail in the space below.
CERTIFICATION: I, the undersigned, certify that the information above is true and complete
to the best of my knowledge and belief.
Company Name
Name and Title of Signer (please type or print clearly)
Signature
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
Date
BID FORMS
00300-13
CERTIFICATION OF NON-SEGREGATED FACILITIES
(Applicable to federally assisted construction contracts and related subcontracts exceeding
$10,000 which are not exempt from the Equal Opportunity clause.)
The federally assisted construction contractor certifies that he does not maintain or provide for his
employees any segregated facilities at any of his establishments, and that he does not permit his
employees to perform their services at any location, under his control, where segregated facilities
are maintained. The federally assisted construction contractor certified, further that he will not
maintain or provide for his employees any segregated facilities at any of his establishments, and
that he will not permit his employees to perform their services at any location, under his control,
where segregated facilities are maintained. The federally assisted construction contractor agrees
that a breach of this certification is a violation of the Equal Opportunity clause in this contract.
As used in this certification, the term "segregated facilities" means any waiting rooms, work area,
rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and
other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas,
transportation, and housing facilities provided for employees which are segregated by explicit
directive or area, in fact, segregated on the basis of race, creed, color, or national origin, because of
habit, local custom, or otherwise. The federally assisted construction contractor agrees that
(except where he has obtained identical certifications from proposed contractors for specific time
periods) he will obtain identical certifications from proposed subcontractors prior to the award of
subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal
Opportunity clause, and that he will retain such, certification in this file.
CERTIFICATION: l, the undersigned, certify that the information above is true and complete
to the best of my knowledge and belief.
Company Name
Name and Title of Signer (please type or print clearly)
Signature
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
Date
BID FORMS '
00300-14
1
1
'
,
'
�
'
'
�.
�
1
1
'
,
'
CERTIFICATION OF FEDERAL NON-DEBARMENT AND SUSPENSION
[NSTRUCTIONS TO BIDDERS: THIS FORM SHALL BE EXECUTED BY THE CONTRACTOR AND
SUBMITTED WITH THE BID.
THE CONTRACTOR SHALL MAKE COPIES AND DISTRIBUTE THIS FORM TO ALL SUBCONTRACTORS.
SUBCONTRACTORS MUST SUBMIT THIS FORM TO THE CITY PRIOR TO PERFORMING ANY WORK
ON THIS PROJECT.
As a prospective contractor for working with the City of Bremerton and as a requirement of your
submittal, you are required to provide debarment/suspension certification indicating that you are
in compliance with the below Federal Executive Order.
Debarment:
Federal Executive Order (E.O.) 12549 "Debarment and Suspension" requires that all
contractors receiving individual awards, using federal funds, and all sub-recipients certify
that the organization and its principals are not debarred, suspended, proposed for
debarment, declared ineligible, or voluntarily excluded by any Federal department or
agency from doing business with the Federal Government.
Your signature certifies that neither you nor your principal is presently debarred, suspended, •
proposed for debarment, declared ineligible, or voluntarily excluded from participation in this .
transaction by any federal department or agency. [f, at any time during the term of the contract,
such condition occurs the Contractor will notify the City without delay.
CERTIFICATION: I, the undersigned, certify that the information above is true and complete
to the best of my knowledge and belief.
Company Name
Name and Title of Signer (please type or print clearly)
'
Signature
'
1
'
Date
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT BID FORMS
FEBRUARY 2015 00300-15
'
,
�
�
_�
r�
SECTION 00500
AGREEMENT
THIS AGREEMENT is dated the 18th
day of March in the year 2015 by
�
and between City of Bremerton (hereinafter called OWNER) and
�� Coatings IInlimited, Inc.
1
(hereinafter called CONTRACTOR).
��
�
!� ;
��
r �
�
�
�;
I�
�� I
�
� I
�
�� �
��$
OWNER and CONTRACTOR, in consideration of the mutual covenaiits hereinafter set forth, agree as
follows:
ARTICLE 1. WORK.
CONTRACTOR shall complete the WORK as specified or indicated in the OWNER's Contract
Documents entitled RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
ARTICLE 2. CONTRACT TIMES.
Substantial Completion for the WORK must be achieved not later than 70 calendar davs from the
date of Notice to Proceed. Final Completion and Acceptance of the Work must be achieved not later
than 30 calendar days after Substantial Completion.
ARTICLE 3. LIQUIDATED DAMAGES.
OWNER and the CONTRACTOR recognize that time is of the essence of this Agreement and that the
OWNER will suffer financial loss if the WORK is not completed within the time specified in Article 2
herein, plus any extensions thereof allowed in accordance with I�rticle 12 of the General Conditions
and Supplementary Conditions. They also recognize the delays, expense, and difficulties involved in
proving in a legal proceeding the actual loss suffered by the OWNER if the WORK is not completed on
time. Accordingly, instead of requiring any such proof, the OWNER and the CONTRACTOR agree that
as liquidated damages for delay (but not as a penalty) the CONTRACTOR shall pay the OWNER 620
for each clay that expires after the time specified in 1lrticle 2.
ARTICLE 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for completion of the WORK in accordance with the Contract
Documents in current funds the amount set forth in the Bid Schedule(s).
ARTICLE 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General
Conditions. Applications for Payment will be processed by ENGINEER as provided in the General
�
Conditions.
___ (Contractor Initials)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
AGREEMENT
00500.1
I
�� �
ARTICLE 6. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR
concerning the WORK consist of this Agreeinent (Section 00500) and the following attachments to
this Agreement:
• Notice Inviting Bids (Section 00030).
• Instructions to Bidders (Section 00100). . �
m Bid Forms including the Bid, Bid Schedule(s), Information Required of Bidder, Bid Bond, and all
required certificates and affidavits (Section 00300).
• Pec•formance Bond (Section 00610).
o Paytnent Bond (Section 00620). �
• General Conditions (Section 00700).
o Supplementary General Conditions (Section 00800).
• Technical Specifications as listed in the Table of Contents, including appendices.
• Drawings as listed in the List of Drawings.
• Addenda numbers 1 to 1 , inclusive.
• Change Orders which may be delivei•ed or issued after Effective Date of the Agreement and are
not attached hereto.
There are no Contract Documents other than those listed in this Article 6. The Contract Documents
may only be amended by Change Order as provided in Paragraph 3.04 of the General Conditions.
ARTICLE 7. WAIVER OF IMMUNITY.
Tlie CONTRACTOR and OWNER acknowledge and agree that they have negotiated the following in
accordance with the reyuirements of RCW 4.24.115 and the CONTRACTOR specifically waives his
immunity under industrial insurance under 'I'itle 51 RCW. The CONTRACTOR and OWNER
acknowledge and agree to the reqt►irements for indemnification in paragraphs 00700 6.20 and
00800 SC-6.20. The provisions of this article shall survive the termination or expiration of this
agreement.
ARTICLE 8. SUSPENSION OF WORK AND TERMINATION
The Contractor agrees to the right of the OWNER to suspend work or terminate this agreement as
indicated in Article 15 of Section 00700 (Standard General Conditions) and Section 00800
(Supplementary Conditions).
� (Contractor Initials)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
AGREEMENT �
00500-2
�
�
�
�-�
��
!_�
'�
��
ART[CLE 9. ASSIGNMENT
No assignment by a party hereto of any rights under or interests in the Contract Documents will be
binding on another party hereto without the written consent of the party sought to be bound; and
specifically but without limitation monies that may become due and monies that are due may not be
assigned without such consent (except to the extent that the effect of this restriction may be limited
by law), and unless specifically stated to the contrary in any written consent to an assignment, no
assignment will release or discharge the assignor from any duty or responsibility under the Contract
Documents. The OWNER, in its sole discretion, may refuse to allow the CONTRACTOR to assign any
or all of its duties, rights and/or responsibilities under the Agreement, except with regards to an
assignment of funds for security purposes. In the case of an assignment for security purposes the
OWNER may condition its approval to the extent it deems necessary to assure that there will be
adequate funds to complete the WORK and to pay a subcontractors and suppliers.
OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal
representatives to the other parry hereto, its partners, successors, assigns and legal representatives in
respect oCall covenants, agreements and obligations coi�tained in the Contract Documents.
�
IN W[TNESS WHEREOF, OWNCR and CONTRACTOR llave caused this Agreement to be executed the
day and year first above written.
'_ ' l`; �r�.
i1 I , .d_a VN"- NLI��,/�
�� �
1
'�
1 ' � : • • �
� / /�.��
' ��LV > �
.
' ��`� ��1
CONTRACTO Coatings
BY Greg Snider, P�es
, [CORPORA,�'E S
Att�nc� G�-.I--L-LL
� �
Ad ress fo givin notices
; � �� �� ���� �
'� 3
�
'�
'�'
1� 1
Approved as to Foi
�
( ' nature)
����•� �'�
(Title)
RESERVOIR 10 NORTH — INTERIOR COATING REPLACEMENT
FEBRUARY 2015
Karen L. Parsons, Office
Address for giving notices
18420 68th Ave S., Ste 110, Rent WA 98032
License No. COATIIII097RA
Agent for service of process: Greg Snider
18 6 8 t h Ave S., Ste 110, Kent WA 98032
T ► `:��a ? ? q' t�
? Y.{ :�,, •'� � ;; � s �;7: 4r '' j �.��4,)
�i' ,.;a,�. ! _
�; , %�!
r ,.,.
, ; C-;
° r
.-,�... . . ....':. '� v . �
��
o� � �
. � �' p � � 6S a } �." � .:.f `
�' S: y � y � ` :. �' 4'T4 -
;, p �. '
� �µ'�,
AGREEMENT
a0500-3
,� '
AGREEMENT CERTIFICATE
(if Corporation)
STATE OF WASHINGTON
COUNTY OF RING
)
) SS:
)
I HERF.BY CERTIFY that a meeting of the Board of Directors of the Coatings IInlimitied
Inc. 18420 68th Ave S., Ste 110, Rent, WA 98032
a corporation existing under the laws of the State of Washington . held on
.:•.�:March 18 , 2015, the following resolution was duly passed and adopted:
,/ e � .' •• , 'el..
� - "RESOLVED, that Gre Snider as
-`�c�>'�' tlie President
`� of'the Corporation, be and is hereby authorized to execute the Agreement dated 3� . 2015,
€J.
``•.,� :by�and between this Corporation and City of Bremerton and that his/her execution thereof,
`�� ��� attested by the Secretary of the Corporation, and with the Corporate Seal affixed; shall be the
=:°�;' �. :'..�. . '� ; , , � .. ' ,
... �.' I r ,� . . . .
°•�:.,. ,: ;; i�;�... _ act and deed of this Corporation.' �_
'"YFY...... ,^•'a'z:.��;�.
1 further certify that said resolution is now in full force and effect.
IN WITNESS WHEREOF, I have hereunto :set'my�haricl'and �affxed:the official seal of'the
corporation this 18th , day of March �'" -. , 2015. ,.—� �';
r ;
(SEAL)
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
AGREEMENT '
00500-4
'
Greg Snider, President
' j '
1
ti�
Bond #58720005
SECTION 00610
PERFORMANCB BOND
'� .
�
�
e._I
�
,,�
'� F
�
6.��
,�
'�
��
1� .
'�
'�
'�
��
,.�
�? �
F..�
a
i
KNOW ALI, MEN BYTHESE PRESENI'S,
Tl�at Coatings Unlimited, Inc.
as CONTRACI'OR,
atld Western Surety Company
as Surety,
ai•e held and firmly Uoi��id unto City of Bremerton liereinafter called "OWNER," in tlle su�n of
two hundred eight thousand one hundred eight and 15/100 ($208 108 15)
dollars,
Foi tl�e payme�it of wliicli sum, well and truly to be made, we bi�id ottrselves, ot�i• heirs, exec�ttoi•s,
adu�ij�isn•atoc•s, successai•s, at�d assigns, jointly anct severally, firmly by these pi•esents.
Tf iF CONDITIQNS OF'I'HIS OBLIGATION AR� SUCH, tl�at said CONTRACTOR lias been awarded and is
about to ente►� into tl�e annexed ngi•eernent with said OWNER to pei•foi•izi tl�e WORIt as specified or
indicated in tlie Cocitract Documents entitled "C[TY OP BREMCRI'ON, RESCRVOIR 1,0 NORTH --
INTERIOR COATING REPLACEMBNT"; �iow, tl�ereFore,
Iii tt�e event CONTRACTOR fails to timely oi• propei•ly pez•foi•m any of tlie i•equirements of the Contract
Documents at the ti�iies and in the manner contained therein, the Sw•ety shall be liable under this
bond up to the amoun� of the bond for the fiill amount of the OWNERS's expenses to consh�itct or
repaii• all wortc as we1! as all loss, cost, expei�se or damage suffered by tl�e OWNER in excess of the
Conti•act amount due to the CON7'RACTOR'S failw•e ta com�ly with any coiih�act or permit coiiditions
or otlier appl9cable laws a�id regtilations.
'I'lie Surety agrees that witl�in 30 cale�idar days of receiving ��atice that tl�e OWNER l�as declared a
CONTRACTQR default and formally terminated the COiVTRACTOR'S right to coinplete tlie Contract
pursuant to its teizns and conditions ai�d tl�at tlie CONTRACTOK l�as defaulted oit al! oi• part of tl�e
tei�ins gtiaranteed by this bond, tlte Surety sliall eitlter:
1. Notify tlie OWNCR iii writing of its intent to aire tlie default itself wit}�i�� a reasonable
period of time acceptable to the OWNCR. The OWNEk agrees to pay tiie balance of the
Cont�•act price to the Surety in accordance with the terms of the Contract, or
2. Tendei• to tlie ObVNER the dema�ided sum, up to the amount of Y1ie bond. Howevet; if tl�e
amaunt necessary for the OWNER to cure the default is less than the amount tendered,
the OWNBR wiil return, without ititerest, aiiy overpayment to the Surety.
PROVIDED, that any alterations in the WORI{ Yo be done or the nlaterials to be f�n•nished, ot• chauges
in the time of completion, wliich inay be made pursuant to ti�e terms of said Contt•act Documents,
si�all not i�i a«y way release said CONTRACTOR or said Stn•ety hereundei•, nor sliall any extensions oF
time gt•anted u�tder tlie pi•ovisions of said Contract Documents, release eithei• said CONTRACTOR or
said Surety, aiid notice of sucli alterations oi• extei�sions of tlie Agreente�it is hereby waived by said
Sttrery.
Et�SERVOIR 10 NORTH — INTERIOR COATING REPLACEMENT PERFORMANCE BOND
FEaRU,�zy2ors oosrar
��
��
.�
��
��
'�
'�}
�...1
'�
,�
Erf
'
6'�
'�
�� �
,.�
'
6�
'�
�� e
'�
��
'�
'�
i
E�
PERFURMANCE BOND
(page 2 of 2)
The obligatioi� of tiie Surety shall i�iclude i•eiit�bursing tlie City for all costs and expeiises, (includiiig
6ut not limited to fees and cl�ai•ges of engineers, architects, attorneys, and otiiei�
professionals, and court costs if litigation is com►nenced) incuri•ed by tt�e OWNER in enforcing tlie
provisions of tt�is Bond.
Tlie CONTRl1CTOR hereby agrees tl�at the CONTRACTOR'S obligatioi� to perform the requii•ed work is
not liinited to the amowit af fiuids I�eld by the Siu•ety. This boiid is iri•evocable and camtot be ca�iceled
by the S�u or the CONTRACTOR.
This bo�id shafl re�»aiii in fiill force aiid effect for a period of ane (1) year following fi�ial acceptaTice of
tl�e pi•oject by the City, and until the bond is released in writing by the OWNER at the written request
of tlie Surety or C(}NTRA,CTOR.
IN WITNESS WI-ICREOF, we l�ave here i der set our hands and scals tliis 5th day of March
2015.
.e �� N L rly�
U: �1�17L
i
Coatings Unlimited, Inc. 1
r���rtACTo
Western Surety Company (SEAL)
(Surety)
f �. `�' p .
BY. - J UY.
fi . `(Sign tw•e and
(SEAL ANU NOT�IRIAL ACKNOWL.EDGCMENT OF SURETY)
Addi•ess of Surety to whicli all notices sliatl be sent:
Add��ess of Stirety for seivice of process:
(must Ue a pl�ysical address)
RESERVOIR 10 NORTH — INTERIOR COATING REPLACEMENT
FEBRUAKY 2015
333 5. Wabash Avenue, 41st Floor
Chica o, IL 60604
same
PERFORMANCE BOND
006iU-2
i
I
�
I
1� � � -
1' .
._. f
Western Surety Company
POWER OF ATTORNEY APPOINTING Il\DNIDUAL ATTORI�EY-IN-FACT
Know All Alen B}• These Presents, That WESTER\ SURETI' COMPANY, a South Dakota corporation, is a duly organized and existing corporation
hav�ne its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtuc of the si�nature and seal herein affixed hereby
, � make, constitute and appoint
!j
��
�
'.�
'�
'�
�
1�
'�
1�
''
s�
'�
..
Don Bacic, Maria Moss, Marilyn Larson, Brian Daniels, Brian O'Neil, Regan I�upf,
Individually
of Seattle, R'A, its truc and lawful Attorney(s)-in-Fact with full power and authonty hercby conferred to sign, seal and execute for and on its bchalf bonds,
undertal:mgs and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind it thereby as fully and to the same extent as if such instruments were signed b}• a duly authorized officer of the corporation and all the acts of said
Attomey, pursuant to the authoriq� hereby given, are herebv ratified and confirmed.
This Pow-er of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof, duly adoptcd, as indicatcd, by
the sharcholders ofthe corporation.
In ��'itness Whereof, �VESTERN SURETY CO�ViPANY has caused these presents to be signed by its Vice President and its corporate scal to he
hereto affixed on this 29th day of luly, 2014.
s us�aEr} •,
; WP?�..pOq.:oo;�
-N!VO q l�,;:° y '
_;� i= �
w� SE.A�.j�'�;
�L s+ .�
k�jl1 OPµ�+�
�"
State of Sou[h Dakota l
T SS
County of Mmnehaha J
WESTERN SURETY COMPANY
'aul T. Bruflat, Vice President
On this 29th day of July, 2014, beforc me personally came Paul T. Bruflat, to mc known, who, being by me duly sworn, did depose and say: that he
residcs in thc City of Sioux Falls, State oC Sout6 Dakota, that he is the Vice President of WESTERN SURE"tY CO,�IPANY described m and which executed
the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal, that it was so affixed
pursuant to authority given by the Board of Dircctors of said a�rporation and that hc signed his name thereto pursuant to like authority, and acknowledges
same to be the act and deed of said corporation.
My commission expires *`"""""""�`""'"'�"•'^�""�`�•
f J. b10HR f
' s NOTARY PUBLIC
Junc 23, 2015 � SEAL sen� ;
r SOUTH DAKOTA
F�� i a�,.+.w.Y.w.ti.r,�+...�rr,.r.ti4
�
��
,� r
,�
6..�
, � Form F42R0-7-2012
CERTIFICATE
�
J. Mohr, Notary Public
I, l,. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set furth is still in
force, and (uRher ceR�fy that the By-Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed
my name and affixed thc scal of the said corporation this � day of __V'! lln�rv�n ,��.
�"�RET�`y�.,�
�?�,. _._...... �
� �.r,,. oQ,POqq�, e _
=WE4 1^;a�
. '
�i;Sfpb:'�:
�'�'.. Pa
�'a�lijN �A�,d�
WESTERN SURETY COMPANY
L. Nelson, Assistant 3ecretary
� 1 r, �
'.�
��
'�
Bond #58720005
SECTION OQ610
PAYMENT B011iD
�� KNOW AI.L MEN BY THrS� F'RESENTS,
,�
That Coatings Unlimited, Inc.
as CONTRACTOR,
I�
,�
��
,�
��
�
�
,�
' �
�
atld __ Western Suret Company
8S $liCe�,
are held and 6rmly bound unto City of Bremerton hereinafter called "OWNER," in the sum of
two hundred eight thousand one hundred eight and 15/100 ($208,108.15)
doltacs,
foi• the payment of which stnn, well and tr�ily to be macle, we Uind ourselves, oar heirs, exec�itol•s,
administ►•ators, successors, and assigns, jointly anc� sevei•ally, lii•mly Uy tliese presents.
THF, CONDITIONS OF TI-IIS OBL[GAT10N AItE SUCH, tliat said CONTRACTOR l�as been awarded and is
aUout to enter iuto tl3e annexed Agreemeiit witli said OWNER to perfoi�n the WORK as specified oi•
indicated in the Co��tract Docume�its entitted "CITY OF BREMERTON, RCSF;RVOIR 10 NORTH —
INTERIOIi COATIl1lG REPLACCMENT"; �tow, tl�ei•efore,
If said CONTRACTOR, or subcontrac�ot•, fails to pay For any matei•ials, equip�nent, or other suppiies, or
for rental oF same, used in connection with the perfor►na��ce of work contcacted to be c�one, or for
amounts due imder applicable State law For any worlc or tabor thereo��, said Surety will pay for the
same in an amoiuit not exceeding the sum specified above, and, in the etrent suit is brought ttpon this
bond, �•easonable attoi•�iey`s fees to be fixed by the cotii•t This bond st�all inure to tf�e benefit of a�iy
pei•sons, compaiiies, or corporations entilted lo file claitns u�ider applicable State law so as to give a
�•iglit of action to tl�ent or rlieir assigns in a�iy suit bi�ougl�t upon tl�is bond.
PROVIDED, tl�at aiiy alterations in tlie WORK to be done or tl�e materials to Ue fiii•nished, or changes
in the time of compietion, whicli ►nay be made pursuant to tlie terrns of said Contract Docuinents,
s}�all not itz a�iy way release said CON1'RACTOR or said Sui•ety thereuiider, ►ior sl�all any exte��sions of
time granted under the provisions oF said Contract Documents i•elease eithei• said CONTRACTOR oi•
said Surei.y, aud notice of such alterations or exte�isions of tt�e Agt•eement is hereby waived by said
Surety.
The oUligation of the Si�i•ety sl�all inciude i•eimbursi�ig the City of all costs and expenses, (including,
�� but not limited to fee a�id dia�ges of engineers, ai•cliitects, atto�•neys, a�id othei• pi•ofessio�ials, and
court costs if litigation is com�tienced) incurred by tlie OWNER in enforcing the pravisions of tl�is
Bo�id.
,�
'�
�� RESEf2VOIR 70 NORTH —[NTERIOR COATING REPLACEMENT pAYMENT BOND
FFBRUARY 2015 00620-1
�
�
�
�
'�
,�
��
��
'�
��
��
��
1�
��
��
��
,,�
',�
�
.�
1�
'�
'�
�
PAYMENT BOND
(�age 2 of 2)
IN WITNIsSS WHEREOF, we have l�ereu��der set our 1}at�ds and seals ti�is 5th �
of March .2015.
Coatings Unlimited, Inc.
(CON't'FtACI'OR)
:
Western Surety Com pany
(Surety)
�y: ' .,,�►-� ;
Sigrfa�iire a�id SCA
(SCAL 11ND NOTARIAL ACKNOWL�DGEMEN'I' (?r SURF.TY)
Address of Surety to whicl� all i�otices shall be sent 333 S. Wabash Avenue, 41st Floor
Chicago, IL 60604
Address of Surety foe• service of process:
(rrnist be a ptiysical addr•ess)
sa m e
RESERVOIF210 NORTH — INTERIOR COATING REPiACEMENT
FEBRlIARY 2015
PAYMENTBOND
ooszaa
�� • ..
11 �
��
Western Surety Compan
y
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-Ll\'-FACT
Know All �1en By These Presents, That �VES"CERN SURETY COMPANY, a South Dakota cor}�orahon, is a duly organized and existing corporation
having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein afCxed hercby
make, const�tute and appoint
Don Bacic, Maria Moss, Marilyn Larson, Brian Daniels, Brian O'Neil, Regan Hupf,
Individually
'�
��
,�
��
��
'�
��
'�
1�
�
.�
,�
'�
of Seattle, WA, its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds,
undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind it thereby as fully and to the same extent as if such instruments were sioned by a duly authorized officer of the corporation and all the acts of said
Attomey, pursuant to the authority hcreby given, are hercby ratificd and confirmed.
the sharcholdcrs of thc corporation.
This Power of Attorney is madc and executed pursuant to and by authority of the Ciy-Law printed on thc revcrse hcrcof, duly adopted, as �ndicated, by
In �Vitness �Vhereof, WESTGRN SURETY COMPANY has caused these presents to be signed by �ts Vice President and its corporate seal to be
hereto affixed on this 29th day ofluly, 2014.
State of South Dako�a 1
� ss
County of Minnchaha J
.�rS�AE1yw.
�,.�'P?.•'.__...., .C��ay
e..'"; p PV Cqq t : o'
_W: �F
!__:`
i\. SE A�. i i'�:
J''. P.
`��, �� p ��:
„ w
WESTERN SURETY COMPANY
aul T. Bruflat, V�ce President
On this 29th day of July, 2014, bcfore me personally came Paul T. Bru(lat, to me known, who, being by me duly sworn, did depose and say: that hc
resides in the City of Sioux Falls, State of South Dakota; that hc is thc Vice President of WESTERIV SURETY COMPANY descnbed in and which executed
the above instrument; that he knows the seal of said corporahon; that the seal affixed to the sa�d instrument is such corporate seal; that it was so aflixed
pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like uuthority, and acknowledges
same to be the act and dced of said corporation
My commission expires •�"""w'w'w'�'•�'•'•'-+�+�'w'+ f
i J. MOHR
lune 23, 2015 f sEa� NOTARY PUBLIC SEAL �
j SOUTH DAKOTA i
f f d 0 - '
+ • - - - - - - �,.,.,..�....,�......,....,�.. ♦ �.vc�v
1. Mohr, Notary Public
CERTIFICATE
I, L. Nelson, Assistant Secretary of WESTERN SURETY COIviPANY do hereby certify that the Power of Attomey hereinabove set forth is still in
Force, and further cert�fy that the By-Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed
my name and affixed the seal of the said corporation this �� day of (��� �� ��
� Form F4280-7-2U12
.a
�'��yRE��
r,
_ NP4Q,P ORq)��D=
:z=
_ s��Sfpb,'a�.
m�� �p,,.
�.��,.oA.�
WESTERN SURETY COMPANY
L. I�ielson, Assistant Secretary
�
1
1
'
1
'
'
'
'
i
�
�
'
'
1
�
'
,
,
Version: 2-04-15
C.ITY OF BREMERTON
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
Copyright O 2007 National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882
ww���.nspe.or�
American Council of Engineering Companies
1015 15th StreetN.W., Washington, DC 20005
(202) 347-7474
w���w.acec.or�
American Society ofi Civil Engineers
1801 Atexander l3ell Urive, Reston, VA 20191-4400
(800) 548-2723
w�� w.asce.or�;
Associated General Contractors of America
2300 Wilson Boulevard, Suite 400, Arlin��ton, VA 22201-3308
(703) 548-31 18
www.a ��,c.or�
The copyright for this EJCDC document is owned jointly by the four
EJCDC sponsoring organizations and held in trust for their benefit by NSPE.
�
�
'
C I TY OF B 1ZE M ERTON
STANDARD GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT
TABLE OF CONTENTS
'
Arlicle 1— Dclinitions and Tcrminology .....................................................
' I.OI Dcfined Terms ...................................................: ...................
1 .0? Terminology ...........................................................................
'
,
�
'
'
'
�
�
1
�
'
'
�
Page
.................................................. 1
.................................................. 5
Article 2 — Preli►ninary Matters .............................................................................................
2.01 Delivery ofi Bonds and Evidence of Insurance ...............................................
2 .02 Copies ot' Documents .......................................................................................
2.03 Commencement of Contract Times; Notice to Proceed ..................................
2 .04 Starting the Work ..............................................................................................
2.05 [3efore Starting Construction ............................................................................
2.06 Preconstruction Conference; Designation of Authorized Representatives .....
2.07 Initial Acceptance ofi Schedules .......................................................................
....................... 7
....................... 7
....................... 7
....................... 7
....................... 7
....................... 7
....................... 8
Article 3— Contract Documents: Intent, Amending, Reuse .............:.............................................................. 8
3 .01 Intent ............................................................................................................................................. 8
3 .02 Reference Standards ..................................................................................................................... 9
3.03 Reporting and Resolving Discrcpancies ...................................................................................... 9
3.04 Amendin� and Supple►nenting Contract Documents ................................................................ 10
3 .05 Reuse o1� Documents ................................................................................................................... ] 0
3 .06 Elcctronic Data ........................................................................................................................... 1 1
Article 4— Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental
Conditions; Reference Points .......................................................................................................... 1 1
4 .01 Availability of Lands .................................................................................................................. I 1
4.02 Subsurtacc and Physical Conditions .......................................................................................... 1 1
4.03 Differing Subsurface or Physical Conditions ............................................................................. 12
4 .04 Underground Facilities ............................................................................................................... 13
4 .05 Reference Points ......................................................................................................................... 14
4.06 Hazardous Environmental Condition at Site ............................................................................. 15
Article E3onds and Insurance ..................................................................................................................... 16
5.01 Performance, Payment, and Other Bonds .................................................................................. 16
CI I'Y OP F3RGMIiR'fUN STANDARD (iEN1iKnL C'ONDI'IIONS
'
5.02 Licensed Sureties and Insurers ................................................................................................... I 7
5.03 Cerlificates of Insurance ............................................................................................................. 17
5.04 Contractor's Insurance ................................................................................................................ 17
ARTICLE 6---c;ontractor's Responsibilities ................................................................................................... 21
f.01 Supervision and Superintendence .............................................................................................. 21
6.02 Labor; Working Hours ............................................................................................................... 21
6.03 Services, Materials, and Equipment .............................................................
.............................. 22
6.04 Progress Schedule ....................................................................................................................... 22
6.05 Proposed Substitutions or "Or-Equal" Itein ............................................................................... 22
6.06 Concerning Subcontractors, Suppliers, and Others ................................................................... 25
6.07 Patent Fees and Royalties ........................................................................................................... 26
6.08 Perm its ........................................................................................................................................ 27
6.09 Laws and Regulations ................................................................................................................. 27
6. I 0 Taxes ........................................................................................................................................... 28
6.1 1 Use of Site and Other Areas ....................................................................................................... 28
6.12 Rccord Documents ..................................................................................................................... 29
6.13 Saiety and Protection .................................................................................................................. 29
6.14 Safety Representativc ................................................................................................................. 30
6.15 Hazard Communication Programs ............................................................................................. 30
6.16 Emergencies ................................................................................................................................30
6.17 Submittals ................................................................................................................................... 31
6.18 Continuing the Work .................................................................................................................. 32
6.19 Contractor's General Warranty and Guarantec .......................................................................... 33
6.20 Indemnification ........................................................................................................................... 34
6.2 I [.)elcgation of Professional Design Services .............................................................................. 35
Articic 7- Other Work at the Site .................................................................................................................. 36
7.01 Related Work at Site ................................................................................................................... 36
7.02 Coordination ............................................................................................................................... 36
7.03 Legal Relationships .................................................................................................................... 37
Article 8 - Owner's Responsibilities .................................................
8.01 Communications to Contractor .....................................
8.02 Replacement of Engineer ..............................................
8.03 Furnish Data ...................................................................
8.04 I'ay When Due ...............................................................
8.05 Lands and Easements; Reports and Tesls .....................
Cfl'Y OF BREMERTON
............................................................. 37
............................................................. 37
............................................................. 37
............................................................. 37
............................................................. 37
............................................................. 37
S'I'ANDnRD GIiNIsR�1L CONDI"I'IONS
8.06 Insurance .............................................................................................
8.07 Change Orders ....................................................................................
8.08 Inspections, Tests, and Approvals ......................................................
8.09 Limitalions on Owner's Responsibilities ...........................................
8.10 Undisclosed Hazardous Environmental Condition ............................
8.1 1 Compliance with Safety Program ......................................................
..................................... 38
..................................... 38
..................................... 38
..................................... 38
..................................... 38
..................................... 38
Article 9— Engineer's Status During Construction ........................................................................................ 38
9.01 Owncr's Representative .............................................................................................................. 38
9.02 Visits to Site ................................................................................................................................ 38
9.03 Resident Projcct Representative ......................................
........................................................... 39
9.04 Authorizcd Variations in Work .................................................................................................. 39
9.05 Rejecting Defiective Work .......................................................................................................... 39
9.06 Submittals, Change Orders and Payments ................................................................................. 39
9.07 Determinations for Unit Price Work .......................................................................................... 40
9.08 Decisions on Kequirements of Contract Documents and Acceptability of Work ..................... 40
9.09 Limitations on Engineer's Authority and Responsibilities ........................................................ 40
'
,
'
,
�
1
Article 10—Changes in the Work; Claims ..............................
10.01 Authorized Changes in the Work ........................
10.02 Unauthorized Changes in the Work ....................
10.03 Execution of Change Orders ...............................
10.04 Notification to Surety ..........................................
10.05 Claims ..................................................................
....................................................... 41
....................................................... 41
....................................................... 41
....................................................... 41
....................................................... 42
....................................................... 42
Article 1 I— Cost of the Work; Allowances; Unit Price Work ....................................................................... 43
1 1.01 Cost of the Work ......................................................................................................................... 43
1 1.02 Allowances ................................................................................................................................. 45
1 1.03 Unit Price Work .......................................................................................................................... 46
Article 12 — Change of Contracl Price; Change of Contract Times ............................................................... 47
12.0 I Change of Contract Price ............................................................................................................ 47
12.02 Change of Contract Times .......................................................................................................... 50
12.03 Delays ..........................................................................................................................................50
Article 13 — Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 5 I
13.0I Notice ofi Deiects ........................................................................................................................ 51
13.02 Access to Work ........................................................................................................................... 52
13.03 Tests and Inspections ............................................................................................:..................... 52
CITY OI' 13RF.MER'f ON S'I'ANDARI) GF..NIiRAL CONI�ffIONS
13.04 Uncovering Work ....................................................................................................................... 53
13.05 Owner May Stop the Work ........................................................................................................ 53
13.06 Correction or Removal ofi Defiective Work ................................................................................ 54
13.07 Correction Period ........................................................................................................................ 54
13.08 Acceptance of Defective Work .................................................................................................. 55
13.09 Owner May Correct Defective Work ......................................................................................... 55
Article 14 - Payments to Contractor and Completion .................................................................................... 56
14.01 Schedule of Values ..................................................................................................................... 56
14.02 Progress Paymcnts ...................................................................................................................... 56
14.03 Contractor's Warranty of Title ................................................................................................... 60
14.04 Substantial Completion .............................................................................................................. 60
14.05 Parlial lJtilization ........................................................................................................................61
14.06 Final Inspection ...........................................................................................................................61
14.07 Final Payment ............................................................................................................................. 61
14.08 Final Completion Delayed .......................................................................................................... 64
14.09 Waiver of Claims ........................................................................................................................ 64
Arlicle 15 - Suspension of Work and Termination ....................
15.01 Owner May Suspend Work ....................................
15.02 Owner May Terminate for Cause ...........................
15.03 Owner May Terminate For Convenience ...............
15.04 Contractor May Stop Work or Terminate ..............
...............................
...............................
... 65
... 65
... 65
... 66
... 66
Article 16 - Dispute Resolution.........
16.01 Methods and Procedures
...............................
............................. •-
.......... 67
.......... 67
Article17 - Miscellaneous .............................................................................................................................. 67
17.01 Giving Notice .............................................................................................................................. 67
17.02 Computation of Times ................................................................................................................ 67
17.03 Cumulative Remedies ................................................................................................................. 67
17.04 Survival ofi Obligations ............................................................................................................... 68
17.05 Conlrolling Law .......................................................................................................................... 68
17.06 Headings ..................................................................................................................................... 68
17.07 Administrative Procedures and Forms ........................
17.08 Right to Audit ..............................................................
17.09 Severability ..................................................................
17.10 Waiver ..........................................................................
................................................ 68
................................................ 68
................................................ 69
................................................ 69
CI'I'Y OP RKI?MER'I'ON S'I'I�NDARf) GI.iN1:RAL CONDIIIONS
1
, Article 18— WASHINGTON STATE REQUIREMENTS ........................................................................... 69
18.01 Trench Excavation Safety Systems ............................................................................................ 69
� 18.02 Payment ofi Prevailing Wages .................................................................................................... 69
18.03 Water Pollution Control Requirements ...................................................................................... 71
, 18.04 Prevention of Environmental Pollution & Preservation ofi Public Natural Resources ............. 71
,
,
1
'
'
1
�
'
'
,
,
'
'
�
;
C'ITY OF BIt13M1�,R'1'()N S"I'ANDARD GENI�RAI. C;ONDI"I�IONS
1
'
' ARTICLF 1– DEFINITIONS ANU TERNIINOLOGY
1.01 Defined Terms
'
'
1
'
1
'
�
LJ
�
'
'
'
,
1
,
A. Wherever used in lhe Bidding Requirements or Contract Documents and printed wilh initial
capital Ictters, the terms listed below will have the ►neanings indicated which are applicable to
both the singular and plural thereof. In addition to terms specifically de(incd, terms with initial
capital letters in the Contract Documents include references to identilied articles and
paragraphs, and the titics of othcr documenls or forms.
1. Act of' God – An earthquake, tlood, cyclone, or other cataclysmic phenomenon of nature.
Rain, wind, tlood or other natural phenomenon of intensity less than that rccorded for the
locality of the Work shall not be construcd as an Act ol' God and no reparation shall be
made to Contractor for damage to the Work resulting there from.
2. Ad�lenc�a—Written or graphic instrumcnls issued prior to the opening of Bids which clarify,
correct, or change the Bidding Requirements or the proposed Contract Documents.
3. �lgreement—Thc written instrumcnt which is evidence of the agreement between Owner
and Contractor covcring the Work.
4. �lpplicutiort ,fi�r Payme�zt The form acceptable to Engineer which is to be used by
Contractor during the course of the Work in requesting progress or final payments and
which is to be accompanied by such supporting documentation as is required by thc
Contract Documents.
5. A.shesto.s—Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fiibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
6. Bic� The offer or proposal of a Bidder submitted on the prescribed form setting forth the
prices for the Work to be perli�rmed.
7. Bid Bond – The security to be furnished by the l3idder on the form fiirnished as a guaranty
of good faith to enter into a contract for the Work contemplated if it be awarded to f3idder.
8. Bidder---The individual or entity who submits a Bid directly to Owner.
9. Bidding Doct�mer�t..5—The Bidding Requirements and the proposed Contract Documents
(including all Addenda).
10. 13idding Reyzriremenl.s—The advertisement or invitation to bid, Instructions to Bidders, Bid
sccurity of acceptable form, if any, and the Bid Form with any supplements.
I 1. Chnnge Order– A document recommended by Engineer which is signed by Contractor and
Owner and authorizes an addition, deletion, or revision in the Work or an adjustment in the
Contract Price or the Contract Times, issued on or at�cr the Effective Date of the
Agreement.
' Cf'I'Y OI' E3RI?ti11;RTON
S'I'ANI)AKI) GENIiRAI, C;ONI)I'I'IONS
00700-I
'
12. Clairn—A demand or assertion by Owner or Contractor seeking an adjustment of Contract
Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A
demand for money or services by a third party is not a Claim.
13. C,'larificatior� — A written document issued by the Engineer to the Contractor that interprets
the requirements and/or design intent of the Conlract Documents, which may not represent
an addition, deletion, or revision in the Work or an adjustment of the Contract Price or the
Contract Times. Request For Claritication forms will be provided by the Owner for the
Contractor's usc when seeking Clarification.
14. Confor-med Contruc•t Doci.�rncnt.i — Contract Documents issued for construction that include
the A�neement, Bonds, Insurance and Addenda.
15. G�ntruct— The entire and integrated written agreement between the Owner and C:ontractor
concerning the Work. The Contract supersedes prior negotiations, representations, or
agreements, whether written or oral.
16. Contract Docttment..s—Those items so designated in the Agreement. Only printed or hard
copies of the items listed in the Agreement are Contract Documents. Approved Shop
Drawings, other Contractor submittals, and the reports and drawings of subsurface and
physical conditions are not Contract Documents.
17. Contract Pyice—The moneys payable by Owner to Contractor for completion of the Work
in accordancc with the Contract Documents as stated in the Agreement (subject to the
provisions of Paragraph 1 1.03 in the case ofi Unit Price Work).
18. G�ntruct Time.s—The number of days or the dates stated in the Agreement to: (i) achievc
Milestones, if any; (ii) achieve Substantial Completion; and (iii) complete the Work so that
it is ready fior final payment as evidenced by Engineer's written recommendation ofi iinal
payment.
I 9. Cc�ntractor—The individual or enlity with whom Owner has entcred into the Agreemenl.
20. Cost of �the Wi�rk --See Paragraph 1 1.O1 i��r def nition.
21. De.ti�ign Cngineer — The City's Consulting Engineer, or statf� Engineer who prepared the
drawings and specitications.
22. Drait>rn�,Ts—That parl of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be perfiormed by
Contractor. Shop Drawings and other Contractor submittals are not Drawings as so defined.
23. Ef/�eetive 1)ufe of�the Agr•eement—The date indicated in the Agreement on which it becornes
efi�ective, but if no such date is indicated, it means the date on which the Agreement is
signcd and delivered by the last of the two partics to sign and deliver.
24. En�Tdnecr--The Engineer is defiincd as the City Engineer of the City of Brcmerton,
Washington.
CI'I'Y OI 13RF_MF,R'I�ON
�
Sl'ANUARD GIiNERAL �'ONDI"I'IONS
00700-2
'
�
' 25. Engineer'. PYOjL'C1 Manage�• – The authorized agent or employee of the Engineer,
designated by the Engineer to represent the Engineer in performing the Engineer's duties
related to the Work.
'
,
'
26. Finul Completion and Acceptance – The time when all incomplete WORK has been
completed, all Defective Work has been corrected or accepted by the Engineer and Owner,
and all of the Conlractor's duties and requirements have been satisfactorily discharged, as
evidenced by the Engineer's Notice ofi Final Completion and Acceptance.
27. Cener-ul Reyuirenzents—Sections of Division 1 of the Specifications.
28. Huzardoar.s /s 'nvironmenlul Condr.'tron- -The presence at the Site of Asbestos, PCBs,
' Petroleum, Hazardous Waste, or Radioactive Material in such quantilics or circumstances
that may present a substantial dan�;er to persons or property exposed therceo.
'
'
'
'
�
'
'
29. Hc�.urdi�zr.s Wu.ste—The term Hazardous Waste shall have the meaning provided in Section
1004 ofi the Solid Waste Disposal Act (42 USC Scction 6903) as amended from time to
time.
30. Holr.'day--A non-working day corresponding to a legal holiday adopted by the City of
[ire►nerton City Council, during which City ot�ices are closed.
31. Lcrw.s und Regislatinns; La►us or Rcgzrlation.s—Any and all applicable laws,.:,rules,
regulations, ordinances, codes, and orders of any and all governmental bodies, agencies,
authorities, and courts having jurisdiction. � .
32. Lien.s—Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
33. Mile.stnne—A principal event specilied in the Contract Documents relating to an
intermediate completion date or time prior to Substantial Complction of all the Work.
34. Notice of'Awurd—The written notice by Owner to the Successfill Bidder stating that upon
timely compliance by the Successful [3idder with the conditions precedent listed therein,
Owner will sign and deliver the Agreement.
' 35. Notic•c to Proceed—A wrilten notice given by Owner to Contractor fixing the date on which
the Contract Times will commence to run and on which Contractor shall start to perform the
Work under the Contract Documents.
'
,
'
36. Owner—The Owner is defined as the City of Bremerton, located at 345 6` Street, WA
98337.
37. Payment Bond – The form of security approved by the Owner and furnished by the
Contractor and Contractor's Surety guaranteeing payment for all labor, materials, services
and equipment furnished for use by the Contractor in performance of the Contract.
38. PCBs- Polychlorinated biphenyls.
�
CI'I'Y OF BRkiMER'I�ON
S'I'ANI.)nRl.) GBNI;RAL CONDI I'IONti
0070(1-3
'
39. Performance Bond — The form of security approved by the Owner and furnished by the
Contractor and Contractor's Surety guaranteeing the complete and faithful performance of
all the obligations and conditions placed upon the Contractor by the Contract.
40. Petrolea�m—Petroleum, including crude oil or any fraction thereof which is liquid at
standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per
square inch absolutc), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline,
kerosene, and oil mixed with other non-Hazardous Waste and crude oils.
41. Progress Schedzrle—A schedule, prepared and maintained by Contractor, describing the
sequence and duration of the activities comprising the Contractor's plan to accomplish the
Work within the Contract Times.
42. Pj•oject.—The total construction of which the Work to be perfiormed under the Contract
Documents may be the whole, or a part.
43. Radioactive Materiul—Source, special nuclear, or byproduct material as defined by the
Atomic Energy Act of 1954 (42 USC Section 201 1 et seq.) as amended from time to time.
44. Re.cident Project Representative—The authorized agent or employee of the Engineer
designated by the Engineer to represent the Engineer in on-site Work. The Resident Project
Representative will act as directed by and under the supervision of the Engineer's Project
Manager.
45. Sumples—Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
46. Schedarle of�Sa�hmittals—A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to supporl scheduled performance of related
construction activities.
47. Schedt.rle of Vulues—A schedule, prepared and maintained by Contractor, allocating
portions of the Contract Price to various portions of the Work and used as the basis for
reviewin� Contractor's Applications for Payment.
48. Shop DruwinKs—All drawings, diagrams, illustrations, schedules, and othcr data or
information which are specifically prepared or assembled by or for Contractor and
submitted by Contractor to illustrate some portion of the Work.
49. Sitc--Lands or areas indicated in the Contract Documents as being furnished by Owner
upon which the Work is to be performed, including rights-of-way and easements for access
thereto, and such other lands furnished by Owner which are designated for the use of
Contractor.
50. Spec•ifrcation.s—That part of the Contract Documents consisting of written requirements for
matcrials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
C'I"I'Y OI� I3REMERTON
S"1'ANDnRD (�ENERAI. CONDI'I'IONS 1
00700-4
'
1
'
51. Suhcontractor An individual or entity having a dircct contract with Contractor or with any
other Subcontractor for the perl'ormance ofi a parl ot'the Work at the Site.
� 52. SarhstuntiuJ Complc�tion—The time at which the Work (or a specified parl thereofi) has
reached a level of completion where, in the opinion of Engineer, the Work (or a specitied
part thereot) is sufficiently complete, in accordance with thc Contract Documents, to be
' utilizcd for the purposes fior which it is intended, as evidenced by Enginecr's Notice ofi
Substantial Co►npletion. The terms "subslantially complete" and "substantially completed"
as applied to all or part ofi the Work refier to Substantial Completion thereofi.
'
,
'
1
'
'
53. Succe.s.�•fi�l Bic�der=The Bidder submitting a responsive Bid to whom Owner makes an
award.
54. S2.rpplementcrrl� Conditions- That part of the Contract Uocuments which amends or
supplements thcse General Conditions.
55. Supplier—A manulacturer, fabricator, supplier, distributor, material man, or vendor having
a direct contract with Contractor or with any Subcontractor to lurnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
56. Uncic�r� Ti"01f)1L� Fac:ili�ie.s-- All uilderground pipelines, eonduits, duets, cables, wires,
manholes, vaults, tanks, tunnels, or olhcr such facilities or attachments, and any
encasements containing such facilities, including those that convey electricity, gases, steam,
liquid petroleum products, telephone or other communications, cable tclevision, water,
wastewatcr, storm watcr, other liquids or chemicals, or traftic or other control systems.
57. Unit Pf�ice Woi°k Work to be paid for on the basis of unit prices.
,
1
'
'
�
i
'
58. Wo�-k—The entire construction or the various separately identitiable parts thereof required
to be provided under thc Contract Documents. Work includes and is the result of
performing or providing ali labor, services, and documentation nccessaiy to producc such
construction, and f'urnishing, installing, and incorporating all materials and equipment into
such construction, all as required by the Contract Documents.
59. Work Chunge Dir•ective A written statement to Contractor issued on or a(ter the Et�ective
Date of the Agreement and signed by Owncr and recommcnded by Engineer ordering an
addition, deletion, or revision in the Work, or responding to differing or unforeseen
subsurface or physical conditions under which thc Work is to be perf'ormed or to
emergencies. A Work Change Directive will not change the Contract Price or the Contract
Times but is evidence that the parlies expect that the change ordered or documented by a
Work Change Directive will be incorporated in a subsequcntly issued Change Order
following negotiations by the partics as to its effect, if any, on the Contract Price or Contract
Times.
1.02 TL'l �minolo�ry
A. Thc words and terms discussed in Paragraph 1.02.B through F are not detined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
'
C'I'I'Y OI� 13K1?MI?R'1'ON
S'I'AND1IRD (iFN1iRAl. CON1�17'IONS
00700-5
'
E3. Intent of'Certuin Terms or Adjective.s:
The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as
directed" or terms of like eiT'ect or import to authorize an exercise o['professional judgment
by Engineer. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper,"
"salisfactory," or adjectives of like et�ect or import are used to describe an action or
determination of Enginecr as to the Work. It is intended that such exercise of professional
judgmcnt, action, or determination will be solely to evaluate, in general, the Work for
compliance with the information in the Contract Documents and with the design concept of
the Project as a functioning whoie as shown or indicated in the Contract Documents (unless
there is a specific statement indicating otherwise). The use o1'any such term or adjective is
not intended to and shall not be effective to assign to Engineer any duty or authority to
supervise or direct the perfiormance ot� the Work, or any duty or authority to undertake
responsibility contrary to the provisions o1' Paragraph 9.09 or any other provision oi' the
Contract Uocuments.
C. Du}�'
1. The word "day" means a calendar day of 24 hours measured firom midnight to thc next
midnight.
D. Dc�fectrve:
The word "defective," when moditying the word "Work," refers to Work. that is
unsatisfactory, faulty, or deticicnt in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements ofi any applicable inspcction, ref'erence standard, test, or
approval referred to in thc Contract Documents; or
c. has been damaged prior to Engineer's recom►nendation of' final payment (unless
responsibility for the protection thereofi has been assumed by Owner at Substantial
C:ompletion in accordance with Paragraph 14.04 or 14.05).
E. I 'lfi'19I ,s1�, Ir�s�ull PL'YfOYi77 Pr•ovidc:
l. The word "furnish," when used in connection with services, materials, or equipment, shall
mean to supply and dcliver said scrvices, materials, or equipment to the Site (or some other
specified location) rcady for use or installation and in usable or operable condition.
2. The word "install," when used in connection with services, materials, or equipment, shall
mean to put into use or place in final position said services, ►naterials, or equipment
complete and ready for inlended use.
3. The words "perfiorm" or "provide," when used in connection with services, materials, or
equipment, shall mean to furnish and install said services, materials, or equipment complete
and ready for intended use.
LI"I'Y (>I' 131ZI;MI:K"I'ON S'I'ANI)nRD C;I•:NF.IiAI. CONI)I7'IC)NS
00700-b
'
' 4. When "tiurnish," "install," or "perform," are not uscd in connection with services, materials,
or equipment in a context clearly requiring an obligation of Contractor, "provide" is
implicd.
'
1
F. llnless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recog meaning.
ARTICLE 2 — PItEL1MINARY MATTERS
, 2.01 Dc�liver}� nf Bonds aftd Evidence ��f Insar�-unce
' A. When the Contractor delivers the signed Agreement to the Owner, the Contractor shall a(so
deliver such Bonds, insurance policies and insurance certificates in the number of copies as the
Contractor may be requircd to tumish in accordancc with the Contract Uocuments.
' 2.02
1
' 2.03
'
'
'
'
' 2.04
'
' 2.05
Copies nfDoczrnt�nt.s
A. The Owner shall furnish lo the Contractor live copies of Conformed Contract documents
including Specitications, and reduced size Drawings. Additional copies and up to two full sized
sets ofi Drawings will bc furnished upon Contractor's written request at the cost to the Owner of
reproduction, handling and shipping.
Commencement of'Contract Times; Notice to Proceecl
A. The Contract Times will commcnce to run on the day indicaled in the Notice to Proceed. A
Notice to Proceed may be given at any time within 30 days after the Et�ective Date of the
Agreement.
B. Within sixty (60) calendar days following opening of Bids, the lowest responsivc, responsible
Bidder will be furnished with Notice ofi Award accomplished by three copics each of the
Contract Documents in form for Signatures.
C. Within fil�een (15) business da_ys after receiving from the Owner Notice of' Award and thc
Contract Documents in form for signing, Contractor shall sign and return the Contractor
Documents and furnish to the Owner such Bonds and certifcates of insurance as are required
herein.
Startir�g thc• Wi�r-k
A. Contractor shall start to perform the Work within 10 days of thc Notice to Proceed. No Work
shall be done at the Site prior to the Notice to Proceed.
�C'fOYC' SIGI'/[17��i �.�OiZSI)'1.lC11011
A. Prelimincrrv Schec/zrle.ti•: Within 10 days ai�er the Effective Date of the A� (unless
' otherwise specified in the C;eneral Requirements), Contractor shall submit to Engineer for
timely review:
'
Cfl'Y OF BRF:MF_.R'ION
S'I'ANUi1Rl) GGNF',RnL CONI)I'I'IONS
00700-7
'
1. A preliminary Progress Schedule indicating the times (numbers of'days or dates) for starting
and completing the various stages of the Work, including any Milestones specified in the
Contract Documents;
2.06
2.07
2. A preliminary Schedule of Submittals; and
3. A preliminary Schedule oF Values for all of the Work which includes quantities and prices
of' items which when added together equal the Contract Price and subdividcs the Work into
component parts in sul7icient detail to serve as the basis ('or progress payments during
performance of the Work. Such prices will include an appropriate amount oi'ovenc�ad and
prolit applicable to each item of Work.
4. A schedule of'proposed substitute (or-equal) Submittals.
Precc�nstr 7./Cr1079 C0I1fG'/ DC'S1�17LillOil O f�Authorized Reprc�sentatives
A. Prior to issuance of the Notice to Proceed, a confierence attended by Owner, Contractor,
Engineer, and others as appropriate will be held to establish a working understanding among the
partics as to the Work and to discuss the schedules referred to in Paragraph 2.OS.A, procedures
for handling Shop Drawings and other submittals, processing Applications fior Payment, and
maintaining required records.
Initiul Acceptunce of'Schec�ule.s
A. At Icast 10 days before submission of the tirst Application for Pay►nent a conference attended
by Contractor, Engineer, and others as appropriate will be hcld to review for acceptability to
Enginecr as provided below the schedules submitted in accordance with Paragraph 2.OS.A.
Contractor shall havc an additional 10 days to make corrections and adjustments and to
completc and resubmit the schedules. No progress payment shall be made to Contractor until
acceptable schedules are submitted to and approved by the Engineer.
1. The Progress Schedule will be acceptable to Engineer ii' it provides an orderly progression
of the Work to completion within the Contract Times. Such acceptance will not impose on
Engineer responsibility for the Progress Schedule, for sequencing, scheduling, or pro��ress
of the Work, nor interfere with or relieve Contraclor firom Contractor's full responsibility
therefor.
2. Contractor's Schedule of Submittals will be acceptable to Engineer if it provides a workable
arrangement fior reviewing and processing the required submittals.
3. Contractor's Schedule of Values will be acceptable to Engineer as to form and substance if
it provides a reasonable allocation oi'the Contract Price to component parts of'the Work.
ARTICLE 3— CONTRACT DOCUMENTS: INTF,NT, AMENDING, REUSF
3.01 Intent
A. The C.ontract Documents are complementary; what is required by one is as binding as if
required by all.
CI'1'Y OF BREMEIt'fON S'I'nNl�/�RI� GI:N13Rn1, CONI�I'I'IONS
uo�ou-s
1
'
'
'
E3. It is the intent of'the Contract Documents to describe a functionally complete project (or part
thereo� to be constructed in accordance with the Contract Uocuments. Any labor,
documentation, services, materials, or equipment that reasonably may be inferred from the
Contract [)ocuments or f'rom prevailing custom or trade usage as bcing required to produce the
indicated result will be provided whether or not specifically cal(ed t�>r, at no additional cost to
Owner.
C:. Clarifiications and interpretations of the Contract [)ocuments shall be issued by En�ineer as
provided in Arlicle 9.
' 3.02 Rc�ferencc� .Stcrftdards
'
A. Standards, Specilications, C:odes, Laws, and Regulations
1. Reference to standards, speci(ications, manuals, or codes of any technical society,
' organization, or association, or to Laws or Regulations, whether such reierence be specific
or by implication, shall mean the standard, specification, manual, code, or Laws or
Regulations in cftect at the time of opening of Bids (or on the Effcctive Uate of thc
� Agreement if there were no Bids), except as may be otherwise specifiically stated in the
Contract Documents.
'
'
�
2. No provision ofi any such slandard, specification, manual, or code, or any instruction of� a
Supplier, shall be effective to change the duties or responsibilities of Owner, Contractor, or
Engineer, or any of their subcontractors, consultants, agents, or employees, f'rom those set
fiorth in the Contract Documents. No such provision or instruction shall bc effective to
assign to Owner, Enginecr, or any of their officers, directors, members, partners, employees,'
agcnts, consultants, or subcontractors, any duty or authority to supervise or direct the
performance ofi the Work or any duty or authority to undertake responsibility inconsistent
with the provisions of the Contract Documents.
' 3.03 Reporti��g and Re,s��lvirr�,r Discrepa►�cies
A. Reportin�l Di,screpancies:
�
'
'
'
1
Contructor'.s Review of C�'ontrnct Docrrmer�t.s Before Sturtr.'f�g Work: Betore undertaking
each part of the Work, Contractor shall carefully study and compare the Contract
Documents and check and verify pertinent fiigures therein and all applicable Iicld
measurements. Contractor shall promptly reporl in writing to Engineer any conflict, error,
ambiguity, or discrepancy which Contractor discovcrs, or has actual knowledge of, and shall
obtain a written interpretation or clarification from Enginecr bc1'ore proceeding with any
Work affected thcreby.
2. Contractor's Revieiv nf Contr•act Dncumertt.s Darrin�,J Pef f��-mance of � Work: If, during the
performance of the Work, Contractor discovers any conflict, error, ambiguity, or
discrepancy within the Contract Documents, or between the Contract Documents and (a)
any applicable Law or Regulation ,(b) any standard, specification, manual, or code, or (c)
any instruction of any Supplier, then Contractor shall promptly report it to Engineer in
writing. Contractor shall not proceed with the Work at�ected lhereby (except in an
, C;I'I'Y OI� I;RE'.MI',R'I'ON
S'I'nNDnRI.) C;I?NI�RAI, CONI)I I'IONS
00700-9
,
emcrgency as requircd by Paragraph 6.16.A) until an amendment or supplement to the
Contract Documents has been issued by one ofthe methods indicated in Paragraph 3.04.
3. Contractor shall not be liable to Owner or Engineer for failure to report any conllict, error,
ambiguity, or discrepancy in the Contract Documents unless Contractor had knowledge or
should have known thereof
[3. Resolvin�J Di.screpancies:
1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of
the Contract Documenls shall take precedence in resolvin� any conflict, error, ambiguity, or
discrepancy between the provisions of the Contract Documents and:
a. The provisions ofi any standard, specification, manual, or code, or the instruction of any
Supplier (whcther or not specitically incorporated by reference in the Contracl
Documcnts); or
b. The provisions of any Laws or Regulations applicable to the performance of� the Work
(unless such an interpretation of the provis+ons oI'the Contract Documents would result
in violation of such Law or Regulation).
3.04
3.05
Amending ancl Szrpplemcnting Contr°act Doci�rnertts
A. The Contract Documents may bc amended to provide for additions, deletions, and revisions in
thc Work or to modify the tcrms and conditions thercof by either a Change Order or a Work
Change Directive. However, the requirements of the Contract Documents may be supplemented
and minor variations and deviations in the Work may bc authorized, by one or more of the
following ways:
1. Engineer's approval of a Shop Drawing or Sample (subject to the provisions of Paragraph
6.17.D.3); or
2. Engineer's written interpretation or clarification.
Reiisc� of �Docarrrtents
A. Contractor and any Subcontractor or Supplier shall not:
I. Have or acquire any title to or ownership rights in any of the Drawin�s, Specifications, or
other documents (or copies of any thereo� prepared by or bcaring the seal of Engineer or its
consultants, including electronic media editions; or
2. Reuse any such Drawings, Specifications, other documents, or copies thereofi on extensions
of the Project or any other project without written consent of Owner and Engineer and
specific written veri(ication or adaptation by Engineer.
B. The prohibitions of this Para�naph 3.05 will survive final payment, or tennination of the
Contract. Nothing herein shall preclude Contractor f'rom retaining copies ofi the Contract
Documents fior record purposes.
CTI'Y UI RRI:MIiR'I'ON S'I'ANDnKI� GI•:Nf;RAI, C(:)NI)I'I�IONS
00700-10
1
1
'
'
1
'
1
1
'
'
'
'
1
'
'
'
'
'
1
3.06 Electronic Data
A. Unless otherwise stated in the Supplementary Conditions, the data furnished by Owner or
Engineer to Contractor, or by Contractor to Owner or Engineer, that may be relied upon are
limited to the printed copies (also known as hard copies). Files in clectronic media format of
text, data, graphics, or other types are furnished only for the convenience of the receiving parly.
Any conclusion or infiormation obtained or derived from such electronic tiles will be at the
user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the
hard copies govcrn.
B. Because data stored in electronic media format can deteriorate or be modified inadvertently or
otherwise without authorization of the data's creator, the party receiving electronic files agrees
that it will perform acceptance tests or procedures within 60 days, af�er which the receiving
parly shall be deemed to have accepted the data thus transferred. Any errors detected within the
60-day acceptance period will be corrected by the transferrin� party.
C. When transferring documents in electronic media format, the transfierring parly makes no
representations as to long tenn compatibility, usability, or readability oi' documents resulting
from the use of software application packages, operating systems, or computer hardware
difi�ering from those used by the data's creator.
ARTICLE 4— AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
HAZARDOUS ENVIRONMENTAL COND1T10NS; REFERENCE POINTS
.�
4.02
Availability of ! anc�!ti•
A. Owner shall furnish, as indicated in the Contract Documents, the Site upon which the Work is
to be performed, rights-ofi=way or easements for access thereto, and such other lands which are
designated for the use of the Contractor. Nothing contained in the Contract Documents shall be
interpreted as giving the Contractor exclusive occupancy of the lands or right-of—way provided.
Owner shall notify Contractor ofany encumbrances or restrictions not of general application but
specifically related to use ofi the Site with which Contractor must comply in performing the
Work.
B. Contractor shall provide for all additional lands and access thereto that may be required for
temporary construction facilities or storage of materials and equipment.
Szrhsurface and Physicul Conditions
A. The Supplementary Conditio��s Icleratify:
l. Those reports known to Owner of explorations and tests of subsurfiacc conditions at or
contiguous to the Site.
2. Those drawings known to Owner of physical conditions relating to existing surface or
subsurface structures at the Site (except Underground Facilities). �
B. Limrted ReJiance by Contractor nn Technicul Duta Az�thorized.• Contractor may rely upon the
accuracy of the "technical data" contained in such reports and drawings, but such reporls and
CI'I'Y OI' 13RF.MER'I'ON
S'I'nNl�nRl� C;ENERAI. CONI)I'1'IONS
0070U- I I
drawings are not Contract Documents. Such "technical data" is identitied in the Supplementary
Conditions. Except for such reliance on such "technical data," Contractor may not rely upon or
make any claim against Owner or Engineer, or any of their ot�icers, directors, members,
partners, employees, agents, consultants, or subcontractors with respect to:
4.03
1. The completeness of such reports and drawings for Contractor's purposes, including, but
not limited to, any aspects ofi thc means, methods, techniques, sequences, and procedures of
construction to be employed by Contractor, and safety precautions and programs incidcnt
thereto; or
2. Other data, interpretations, opinions, and information contained in such reports or shown or
indicated in such drawings; or
3. Any Contractor interpretation of or conclusion drawn from any "technical data" or any such
other data, interpretations, opinions, or information.
Dr.'ffcring Szrb.srrrfuce or Physical Conditions
A. Notrce: If Contractor believes that any subsurface or physical condition that is uncovered or
revealed either:
1. Is of such a nature as to establish that any "technical data" on which Contractor is entitled to
rely as provided in Paragraph 4.02 is materially inaccurate; or
2. Is of such a nature as to require a change in the Contract Documents; or
3. Differs materially from that shown or indicated in the Contract Documents;
lhe Contractor shall, promptly after becoming aware thereofi and before further disturbing
the subsurface or physical conditions or performing any Work in connection therewith
(except in an emergency as required by Parag 6.16.A), notify Enginecr in writing about
such condition. Contractor shall not further disturb such condition or perform any Work in
connection therewith (except as aforesaid) until receipt of written order to do so.
B. Engineer :s Review: After receipt of written notice as required by Paragraph 4.03.A, Engineer
will promptly review the pertinent condition, determine the necessity of obtaining additional
exploration or tests with respect thereto, and provide a determination in writing to the
Contractor.
CI"I'Y OF F3REMI:R'I'()N
'
S'I'/�NI.)ARD (;ENIiRAI.. CONI�ITIONS
00700-12
1
'
'
'
1
2. Contractor shall not be entitled to any adjustment in the Contract Price or Contract Times if
1. Possible Price and Times Adjustment — If the Owner concludes that a change in the
Contract Documents is required by the newly discovered condition, the Owner will respond
to the Contractor's notification by issuing a Work Change Directive, Change Order or
Amendment, as required by paragraph 3.04A. If the Owner concludes that a change in the
Contract Documents is NOT required, the Owner will respond to the Contractor's written
notitication by issuing wririen Clarifiication as required by paragraph 3.048.
, a. Contractor knew ofi the existence of such conditions at the lime Contractor made a final
commitment to Owner with respect to Contract Price and Contract Times by the
submission ofi a Bid or becoming bound under a negotiated contract; or
1
'
'
'
'
�
4.04
'
,
'
�
'
'
1
b. The existence of such condition could reasonably have been discovered or revealed as a
result of any examination, investigation, exploration, test, or study of the Site and
contiguous areas required by the Bidding Requirements or Contract Documents to be
conducted by or for Contractor prior to Contractor's making such final commitment; or
c. Contractor failed to give the written notice as required by Paragraph 4.03.A.
3. If Owner and Contractor are unable to agree on entitlemcnt to or on the amount or extent, if
any, of any adjustmcnt in the Contract Price or Contract Times, or both, a Claim may be
made therefor as provided in Paragraph 10.05. However, ncither Owner or Engineer, or any
of their off icers, directors, members, partners, employees, agents, consultants, or
subcontractors shall be liable to Contractor fior any claims, costs, losses, or damages:
(including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or oeher dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project. '
Under-grozrnd Facilities
A. Shotivn or Indicated.• The information and data shown or indicated in the Contract Documents
with respect to existing Underground Facilities at or contiguous to the Site is based on
information and data lurnished to Owner or Engineer by the owners of such Underground
Facilities, including Owner, or by others. Unless it is otherwisc expressly provided in the
Supplementary Conditions:
1. Owner and Engineer shall not be responsible for the accuracy or completeness of any such
information or data provided by others; and
2. The cost of all oFthe following will be included in the Contract Price, and Contractor shall
have fiull responsibility fior:
a. Reviewing and checking all such infiormation and data;
b. Locating all Underground Facilities shown or indicated in the Contract Documents;
c. Coordination of the Work with the owners of such Underground Facilities, including
Owner, during construction; and
CI'I'Y OI' 13NI:MBR"fON
S'I'ANDl�RD GI•:NEItnL CONDI"I'IONS
00700-13
II�
d. The safety and protection of all such Under�nound Facilities and repairing any damage
thereto resulting from the Work.
3. The Contractor shall notify the Washin��ton State One Number Locator Service, Phone No. 1-
800-424-5555, at least 2 business days in advance o('the commencement of Excavation at
any site, and shall strictly comply with the requirements of RCW 19.122, et seq. at all times
during the WORK. The Contractor shall be responsible for making itself aware of utility
company fiacilities not reported by the Washington State One Number Locator Service, and
shall be liable for any and all damages stemming from repair or delay costs or any other
expenses resulting from the unanticipated discovery of underground utilities.
B. Not Shown or Indicatecl.�
I. If an Underground Facility is uncovered or revealed at or contiguous to the Site which was
not shown or indicated, or not shown or indicated wilh reasonable accuracy in the Contract
Documents, Contractor shall, promptly after becoming aware thereof and before fiurther
disturbing conditions affected thereby or performing any Work in connection therewith
(except in an emergency as required by Paragraph 6.16.A), identify the owner of such
Underground Facility and give written notice to that owner and to Owner and Engineer.
Engineer will promptly review the Underground Facility and determine the cxtent, if any, to
which a change is required in the Contract Documents to reflect and document the
consequences of the existence or location of the Underground Facility. During such time,
Contractor shall be responsible for the safiety and protection of such Underground Facility.
4.05
2. If Engineer concludes that a change in the Contract Documents is required, a Work Change
Directive or a Change Order will be issued to reflect and document such consequences. An
equitable adjustment shall be made in the Contract Price or Contract Times, or both, to the
extent that they are attributable to the existence or location of any Underground Facility that
was not shown or indicated or not shown or indicated with reasonable accuracy in the
Contract Documents and that Contractor did not know of and could not reasonably have
been expected to be aware of or to have anticipated. If Owner and Contractor are unable to
agree on entitlement to or on the amount or extent, if any, of any such adjustment in
Contract Price or Contract Times, Owner or Contractor may make a Claim therefor as
provided in Paragraph 10.05. Howevcr, Owner, Engineer, and Uesign Engineer, shall not be
liable to Contractor for any claims, costs, losses or damages incurred or sustained by
Contractor on or in connection with any other project or anticipated project.
Reference Point.s
A. Owner shall provide engineering surveys to establish reference points for construction which in
Engineer's judgment are necessary to enablc Contractor to proceed with the Work. Contractor
shall be responsible for laying out the Work, shall protect and preserve the established reference
points and properly monuments, and shall make no changes or relocations without the prior
written approval of Owner. Contractor shall report to Engineer whenever any reference point or
property monument is lost or dcstroyed or requires relocation because of necessary changes in
grades or locations, and shall be responsible for the accurate replacement or relocation of such
reference points or property monuments by professionally qualified personnel.
CI'I�Y OF BREMERTON
Sl'AND/�ItD CiENERAI, CONDI'I'IONS '
00700-14
'
'
'
'
'
1
'
'
'
�
,
�
�
'
'
C J
'
'
4.06 ffazardntts Environmental Condition ut Site
A. Repor•l,s and Drawings: The Supplementary Conditions identify those reports and drawings
known to Owner relating to Hazardous Environmental Conditions that have been identilied at
the Sitc.
B. Limitcd Reliunce by Cnntractor on Technic•ul Duta Azrthorized.� Contractor may rely upon thc
accuracy of the "tcchnical data" contained in such reports and drawings, but such reporls and
drawings are not Contract Documents. Such "technical data" is identified in the Supplementary
Conditions. Except for such reliance on such "technical data," Contractor may not rely upon or
make any claim against Owner or Engineer, or any of their officers, directors, members,
partners, employees, agents, consultants, or subcontractors with respcct to:
1. The completeness of such reports and drawings for Conlractor's purposes, including, but
not limitcd to, any aspects of the means, methods, techniques, sequences and procedures of
construction to be employed by Contractor and safety precautions and programs incident
thereto; or
2. Other data, interpretations, opinions and information contained in such reports or shown or
indicated in such drawings; or
3. Any Contractor interpretation of or conclusion drawn from any "technical data" or any such
other data, interpretations, opinions or information.
C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or
revealed at the Site which was not shown or indicated in Drawings or Specitications or
identitied in the Contract Documents to be within the scope of the Work. Contractor shall be
responsible tor a Hazardous Environmental Condition created with any materials brought to the
Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is
responsible.
D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for
�vhom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall
immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection
with such condition and in any area at�ected thereby (except in an emergency as required by
Paragraph 6.16.A); and (iii) notify Owner and Engineer (and promptly thereafter confiirm such
notice in writing). Owner shall promptly consult with Engineer concerning the nccessily for
Owner to retain a qualified expert to evaluate such condition or take corrective action, if any.
Promptly after consulting with Engineer, Owner shall take such actions as are necessary to
permit Owner to timely obtain rcquired permits and provide Contractor the written notice
required by Parag 4.06.E.
E. Contractor shall not be required to resume Work in connection with such condition or in any
affected area until after Owner has obtained any required permits related thereto and delivered
written notice to Contractor: (i) specifying that such condition and any affected area is or has
been rendered safe for the resumption of Work; or (ii) specifying any special conditions under
which such Work may be resumed safely. If Owner and Contractor cannot agree as to
entitlement to or on the amount or extent, if any, of any adjustment in Contract Price or
' CI'I'Y OI' BRF_MI:R�'ON
S'I'ANI)ARD GIiN1;RAl, CONDI'1'IONS
00700-IS
,
Contract Times, or both, as a result of such Work stoppage or such special conditions under
which Work is agreed to be resumed by Contractor, either party may make a Claim therefor as
provided in Paragraph 10.05.
F. If after receipt of such written notice Contractor does not agree to resume such Work based on a
reasonable belief it is unsafe, or does not agree to resume such Work under such special
conditions, then Owner may order the portion of the Work that is in the area af'fected by such
condition to be deleted from the Work. If Owner and Contractor cannot agree as to entitlement
to or on the amount or extent, if any, of an adjustment in Contract Price or Contract Times as a
result of deleting such portion of the Work, then either party may make a Claim therefor as
provided in Paragraph 10.05. Owner may havc such deleted portion of the Work perf'ormed by
Owner's own forces or others in accordance with Article 7.
G. To the f'ullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless Owner and Engineer, and the ofticers, directors, members, partners, employees,
agents, consultants, and subcontractors of each and any of them from and against all claims,
costs, losses, and damages (including but not limited to all fees and charges ofi cngineers,
architects, attorneys, and other professionals and all court or arbitration or other dispute
resolution costs) arising out ot' or relating to a Hazardous Environmental Condition created by
Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.H
shall obligate Contractor to indemnify any individual or entity from and against the
consequences of that individual's or entity's own negligence.
H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmcntal
Condition uncovered or revealed at the Sitc.
Alt'I'iCLE 5 — �iONDS AND INSURANCE
5.0 I f'er fo�•mancc, Payntenl, and Other Bvnds
A. Contraclor shall fiurnish performance and payment bonds, each in an amount at least equal to
the Contract Price as security fior the faithful performance and payment of all of Contractor's
obligations under the Contract Documents. These bonds shall remain in cftect until one year
after the date when final payment becomes due or until completion of the correction period
specitied in Paragraph 13.07, whichever is later, except as provided otherwise by Laws or
Regulations or by the Contract Documents. Contractor shall also furnish such other bonds as are
required by the Contract Documents.
[3. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations.
C. If the surety on any bond furnished by Contractor is declarcd bankrupt or becomes insolvent or
its right to do business is terminated in any state where any part of the Project is located or it
ceases �to meet the requirements of Paragraph 5.01.B, Contractor shall promptly notify Owner
and Engineer and shall, within 20 days at�er the event giving rise to such notification, provide
another bond and surety, both of which shall comply with the requirements of Paragraphs
5.01. B and 5.02.
CI'I'Y OF BItEMER�'UN
S"1'nNDnRD GFNI?Rnl. CONDI'I'IONS '
00700-IG
t
1
1
,
'
5.02 I lCL'11 U11L1 �1l surers
A. All bonds and insurance required by the Contract Documents to bc purchased and maintained
by Owner or Contractor shall be obtained from surety or insurance companies that arc duly
licenscd or authori�ed in thc jurisdiction in which the Project is located to issue bonds or
insurance policies for the limits and coverages so required. Such surety and insurancc
companies shall also meet such additional requirements and qualifications as may be provided
in the Supplementary Conditions.
' S.03 CL'Yll f[CUtC'S of Insr.rrunce
A. Contractor shall delivcr to Owner, with copies to each additional insured and loss payee
' identified in the Supplementary Conditions, certiticates of insurance (and other evidence of
insurance requcsted by Owner or any other additional insured) which Contractor is required to
purchase and maintain.
'
'
'
1
'
'
'
,
t
'
�J
�
B. Failure of Owner to demand such certiticates or other evidence of Contractor's full compliance
with these insurance requirements or failure of Owner to identify a deficiency in compliance
from the evidence provided shall not be construed as a waiver of Contractor's obligation to
maintain such insurance.
C. Owner does not represent lhat insurance coverage and limits established in this Contract
necessarily will be adequate to protect Contractor.
D. The insurance and insurance limits required herein shall not be deemed as a limitation on
Contractor's liability under lhe indcmnities granted to Owner in the Contract Documents.
5.04 Cnntr uctor :s /rzsan
A. The Contractor shall purchase and maintain the insurance requircd under this paragraph. Such
insurance shall include the specific coverage's set out herein and be written for not less than the
limits of liability and coverage's provided in paragraph 5.04C, or required by Laws or
Regulations, whichever are greater. All insurance shall be maintained continuously during the
life of the Agreement up lo the date of Final Completion and Acceptance, and at all times
thereafier when the Contractor may be correcting, removing, or replacing Defective Work in
accordance with Paragraph 13.06. The Contractor's liabilities under this Agreemcnt shall not be
dcemed limited in any way to the insurance coverage required.
C3. All insurance required by the Contract Documenls to be purchased and maintained by the
Contractor shall be obtained from insurance companies that are duly licensed or authorized to
issue insurance policies for the limits and coverages so required by the City ot' Bremerton
lnsurancc companies shall havc a current Best's Rating of at least "A" (Excellcnl) general
policy holder's rating and a Class VII financial size category and shall also meet such additional
requirements and qualiiications as may be provided in thcse General Conditions.
C. The Contractor shall f'urnish the Owner, with copies to cach additional insurcd who is indicated
in these General Conditions, with cerliticates and original cndorsements showing the type,
amount, class of operations covcred, cifective dates and dates of cxpiration of policies. All of
the policies of insurance so required to be purchased and maintained (or the certifiicates or other
CI'I'Y ()I� l3RI;MI:R'I'ON
S'I'i1NDnRD GI?NI?Knl. CONDI'I'101�5
00700-17
'
evidence thereof) shall contain a provision or endorsement that the coverage ai't'orded will not
bc canceled, reduced in coverage, or renewal refused until at least 30 days' prior written notice
has been given to the Owner and additional insures by certitied mail. All such insurance
required herein (except for worker's compensation and employer's liability) shall name the
Owner, the Engineer, and their consultants and subconsultants and their officer's, director's
agents, and employees as "additional insured" under the policies. The Contractor shall purchase
and maintain the following insurance:
l. Workers' Compensation and Employcr's Liability: This insurance shall protect lhe
Contractor against all claims under applicable workers' compensation laws or lederal acts,
including claims for injury, disease, or death of employees which, for any reason, may not
fall within the provisions of a workers' compensation law. This insurance shall include an
"all states" endorsement. In the event of a"monopolistic" state, Contractor shall certi(y all
employees arc covered by the state fund or shall provide a separate policy providing "all
states" benefits. Employer's liability "stop gap" coverage for monopolistic states shall be
provided under either a worker's compensation policy or general liability policy. The
Contractor shall require cach subcontractor similarly to provide workcrs' compensation
insurance f��r all oi�the latter's employees to be engaged in such work unless such employees
are covered by the protection at�orded by the Contractor's workers' compensation insurance.
In case any class of employees is not protected under the workers' compensation laws, the
Contractor shall provide and shall cause each Subcontractor to provide adequate employer's
liability insurancc for the protection of such of its employees as are not otherwise protected.
The Contractor and each Subcontractor shall provide a waiver of subrogation in favor of
the Owner and Engineer.
2. Comprehensive or Commercial General Liability: This insurance shall be written in
comprehensive form and shall protecl the C:ontractor against all claims arising trom injuries
to persons other than its employees or damage to property of thc Owner or others arising out
of any act or omission o('the Contractor or its agents, employees, or subcontractors. The
policy shall also include protection against claims insured by personal injury liability
coverage, an "owner's and contractor's protective liability" endorsement and contractual
coverage to insure the contractual liability assumed by the Contraclor under the
indemnification provisions in the General Conditions. To the extent that the Contractor's
work, or work under its direction, rnay require blasting, explosive conditions, or
underground operations, the comprehensive or commercial general liability coveragc shall
specifically include coverage relative to blasting, explosion, collapse, and/or underground
hazards.
3. Co►nmercial Automobile Liability: This insurance shall be written in comprehensive form
and shall protect the Contractor against all clai►ns for injuries to members of the public and
damage to property o[' othcrs arising trom the use of motor vehicles, and shall cover
operation on or off the Sitc of all motor vehicics licenscd for highway use, whether they are
owned, non-owned, or hired.
4. Subcontractor's Public Liability and Property Damage Insurance and Vehicle Liability
Insurance: The Contractor shall either require each of the Subcontractors to procure and to
maintain subcontractor's public liability and property damage insurance and vehicle liability
insurance of the type and in the same amounts specifed in these Supplementary Conditions
CI'I'Y OI' 13RF,MERTON STANL)ARI) GENIiKALCONI)I'I'IONti
00700-IR
�
'
,
'
'
'
'
1
for the Contractor or insure the activities of the Subcontractors under the Contractor's own
policies.
5. Builder's Risk:
a. This insurance shall be written in completed value form, and shall protect the Contractor,
Subcontractors, the Owner, and the Engineer, against risks of damage to buildings,
structures, and materials and equipment (including any stored off=site and while in
transit), Contractors' equip►nent, debris removal and including demolition and
contingent loss occasioned by enforcement of any applicable legal requirements, and
shall cover reasonable compensation for Engineer's services and expenses required as a
resull of such insured loss. The amount of such insurance shall be not less than the
insurable value of the Work at Final Completion plus equipment. Builder's risk
insurance shall provide for losses to be payable to the Contractor and the Owner, as their
interests may appear. This insurance shall contain a provision that in the event of
payment for any loss under the coverage provided, the insurance company shall have no
rights of recovery against the Contraclor, the Owner, and the Engineer. This insurance
shall insure against all risks of loss (including earthquake, flood and collapse) and, at the
option ofi the Owner, shall include comprehensive boiler and machinery coverage
including coverage for installation and testing.
' b. If the Owner finds it necessary to occupy or use a porlion or portions ofi the Project prior
to Substantial Completion thereof, such occupancy shall not commence prior lo the time
mutually agreed to by the Owner and Contractor and to which the insurance company of
' companies providing the [3uilder's Risk Insurance have consented by endorscment to the
policy or policies.
�
�
'
'
�_J
1
'
6. The limits of liability for the insurance required by Article 5 shall provide coverage for not
less than the following amounts or greater, where required by Laws and Regulations. Limits
may be provided by a combination of primary and excess liability policies, and then the
excess or umbrella liability coverage's shall include commercial general, comprehensive
automobile, and employer's liability and shall provide coverage at least as broad as the
underlying policies.
' CI'I'Y OI� 13REME;R"I'ON
a. Worker's Compensation:
1. Statc: Statutory
2. Applicable Federal (e.g., USL&H): Statutory
Note: If the Work cal(ed for in for the Contract Documents involves work in or
orr any navigable waters, , the Contractor shall provide Worker's
Compensation coverage which shall include coverage under the
Longshore and Harbor Workers' Compensation Act, the Jones Act,
Maritime Law, and any other coverage required under Federal or State
laws pertaining to workers in or on navigable waters.
3. Employer's Liability:
b. Comprehensive General Liability:
$2,000,000
S'I'ANI�ARI� GI�:NLRnI, CONDI'I'IONS
00700- I 9
'
l. Combined Single Limit
(a) Products/Completed
(b) Personal Injury
$5,000,000 Each Occurrence
$2,000,000 Each Occurrence
$2,000,000 Each Person
2. POLICIES written on a"claims made basis" are not acceptable.
3. Policies shall includc premises/operations, products, completed operations,
independent contractor's, owners and contractors protective, explosion,
collapse, underg hazard, broad fiorm contractual, personal injury with
employment exclusion deleted, and broad form property damage.
c. Comprehensive Automobile Liability (including owned, hired, and non-owned
Vehicles):
1. E3odily Injury:
2. Property Damage:
$2,000,000 Each Claimant
$2,000,000 Each Occurrence
D. Contractor agrees lo waive all rights of subrogation against the Owner, the Engineer, and
Consultants, employees, ofticers and directors, for WORK performed under Contract.
Endorsements shall be provided with certifiicates of insurance.
E. All policies shall also specifiy that the insurance provided by the Contractor will be considcred
primary and not contributory to any other insurance available to the Owner or the Engineer.
F. All policies except Workers' Compensation and Builders Risk shall name the Owner, Engineer,
their consultants, subconsultants, and their ofticers, directors, agents and employees as
additional insured's. The Builders Risk insurance shall name the Contractor, Owner, and
Engineer as namcd insured's.
G. The Contractor shall provide the Owner and all additional insureds with written notice of any
policy cancellation within (ive days of receipt of such notice. Failure to maintain the insurance
required shall constitute a material breach of contract, upon which Owner may, after giving fiive
business days' notice to the Contractor to correct the breach, immediately tenninate the contract
or, at its discretion, procure or renew such insurance and pay any and all premiums in
connection therewith, with any sums so expended to be repaid to the Owner on demand, or at
the sole discretion of the Owner, ot�'set against funds due the Contractor from the owner.
H. All costs for insurance, including but not limited to premiums, deductible payments or self-
insured retention shall be incidental to and included in the unit or lump sum prices of' the
contract and no additional payment will be made.
CI'I'Y OF 13KEMER'1'ON S"1'ANUARD (iN.N1iKAL C'ONDI'I'IONS
00700-20
1
�
'
'
'
'
ARTICLE G—CONTRACTOR'S IZESPONSIBiLITIES
6.01 Supervision and Superintendence
A. Contractor shall supervise, inspect, and direct the Work competently and ef�iciently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction. Contractor shall not be
responsible for the ncgligence of Owner or Engineer in the dcsign or specification of a specitic
means, method, tcchnique, sequence, or procedurc of construction which is shown or indicated
in and expressly required by the Contract Documents.
B. At all times during lhe progress of the Work, Contractor shall assign a competent resident
' superintendent who shall not be replaced without writlen notice to Owner and Engineer except
under extraordinary circumstances.
'
1
'
�
'
'
1
'
'
'
C. The Contractor's superintendent shall be present at the Site at all times while thc Work is in
progress and shall be available by telephone for emergencies 24 hours per day, 7 days a week.
Failure to observe this requirement may result in a suspension of the Work by the Owner until
such time as the dcsignated superinlendent is again present, full-time, at the Site.
6.02 Lcrbor; Working> Hoarr.s
A. Contractor shall provide competent, suitably qualified personnel to survey and lay oul the
Work and perfiorm construction as required by the Contract Documents. Contractor shall at all
times maintain good discipline and order at the Site.
F3. Except as otherwise required for the safety or protection of persons or the Work or properly at
the Site or adjacent thereto, and except as othcrwise stated in the Contract Documents, all
Work at the Site shall be performed during regular working hours. Contractor will not permit
the performance of Work on a Saturday, Sunday, or any legal holiday without Owner's written
consent (which will not be unreasonably withheld) given after prior written notice to Engineer.
The Contractor shall apply for this consent through the Engineer in writing a minimum of three
(3) working days before the holiday or overtime work is to be scheduled.
C. Except as otherwise provided in this Paragraph, the Contractor shall receive no additional
compensation for overtime work, i.e., work in excess of 8 hours in any one calendar day or 40
hours in any one calendar week. Additional compensation wi I I be paid to the Contractor for
overtime work only in the event extra work is ordered by the Engineer and the Change Order
specitically authorizes the use of overtime work.
D. All increased costs of inspection and testing performed during overtime work by the
Contractor which is allowed solcly for the convenience of the Contractor shall be borne by the
Contractor. The Owner has the authority to deduct the cost of all such inspection and testing
from any partial payments otherwise due to the Contractor.
, CI"I'Y OF 13REMI�R�'ON
S�1'AND�IRD C;ENI',Knl. C'ONDI�I'IONS
00700-21
'
6.03
.1�
6.05
Service.s, Material.s, and Equipmcnt
A. Unless otherwise specified in the Contract Documents, Contractor shall providc and assume
full responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all othcr facilities and incidentals necessary for the
performance, testing, startup, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not
specified, shall be of good quality and new, except as otherwise provided in the Contract
Documents. All special warranties and guarantees required by the Specifications shall
expressly run to the benefit of Owner. If required by Engineer, Contractor shall furnish
satisfactory evidence (including reports of required tests) as to the source, kind, and quality oi'
materials and equipment. No provisions of any such documentation will be et�'ective to assign
to the Owner, Engineer or any ofi their Consultants, agents or employees, any duty or authority
to supervise or direct the furnishing or performance ofthe Work.
C. All materials and equipment shall be stored, applied, installed, connected, erected, protected,
used, cleaned, and conditioned in accordance with instructions of the applicable Supplier,
except as otherwise may be provided in the Contract Documents.
Progres.s Schedirle
A. Contractor shall adhere to the Progress Schedule established in accordance with Paragraph
2.07 as it may be adjusted from time to time as provided below.
l. Contractor shall submit to Engineer for acceptance (to the extent indicated in Paragraph
2.07) proposed adjustments in the Progress Schedule that will not result in changing the
Contract Times. Such adjustments will comply with any provisions of the General
Requirements applicable thereto.
2. Proposed adjustments in the Pro�,�ress Schedule that will change the Contract Times shall be
submitted in accordance with the requirements of Article 12. Adjustments in Contract
Times may only be made by a Change Order.
Propo.sed Suhstitutions or• "Or-Eqzrcr(" Item
A. Whenever materials or equip►nent are identifiied on the "List of Proposed Substitutes" form
located in the Bid Forms by using the name of a proprietary item or the name of a particular
manufacturer, the naming of the item is intended to establish the type, function, and quality
required. The materials or equipment of other manufacturers may bc accepted if sufficient
information is submitted by the Contractor to allow the Owner/Engineer to determine that the
material or equipment proposed is equivalent or equal to that named, subject to the following
requirements:
1. The Contractor shall fill out the bid lonn in Section 00300 titled "List of Proposed
Substitutes", indicating the manufiacturer/model of the proposed substitute. Wherever a
proposed substitution item has not been indicated on this form by the Contractor, the
CI"I'Y OI' 13REMIiR'I'(:)N
1
STANI)ARI� GI?NLiRAI. CONDI'I'IONti
0070� 22
1
'
'
'
'
'
'
'
'
'
lJ
'
Contractor shall provide one oi' the material or equipment products narned in the Contract
Documents and identified on the "List ofi Proposed Substitutes" form.
2. The burden of proof as to the type, function, and quality of any such substitution product,
material or equipment shall be upon the Contractor.
3. The Engineer will be the sole judge as to the type, function, and quality ofi any such
substitution and the Engineer's decision shall be tinal.
4. The Engineer may require the Contractor to furnish additional data about the proposed
substitution.
5. The Owner may require the Contractor co furnish a special perfiormance guarantee or other
surety with respect to any substitution.
6. Acceptance by the Engineer of a substitution item proposed by the Contractor shall not
relieve the Contractor of lhe responsibility for full compliance with the Contract Documents
and for adequacy ol'the substitution.
7. The Contractor shall pay all costs of implementing accepted substitutions, including
redesign and changes to WORK necessary to accommodate the substitution.
B. The procedure for revicw by the Engineer will include the following:
1. Submit materials in accordance with this section and the General Requirements.
2. The Engineer will evaluate each proposed substitution within a reasonable period of time.
3. The Engineer will record the time required by the Engineer in evaluating submittals for
' substitutions proposed by the Contractor and in making changes by the Contractor in the
Contract Documents occasioned thereby.
1
LJ
'
1
�
C. The Contractor's submittal shall address the following factors which will be considered by the
Owner/Engineer in evaluating the proposed substitution:
I. Whether the evaluation and acceptance of the proposed substitution will prejudice the
Contractor's achievement of Substantial Completion on time.
2. Whether acceptance of the substitution for use in the WORK will rcquire a change in any of
the Contract Documents to adapt the design to the proposed substitution.
3. Whether incorporation or use of the substitution in connection with the WORK is subject to
payment of any license fee or royalty.
4. Whether all variations of the proposed substitution from the items originally specified are
identified.
'
CI'I'Y OF BRE;MIiR"1'ON
S'I'i1NDARD GI?NI.iItAl� CONDI"I'IONS
0070� 33
1
5. Whether available maintenance, repair, and replacement service are indicated. The
manufacturer shall have a local service agency (within 50 miles of the site) which maintains
properly trained personnel and adequate spare parts and is able to respond and complete
repairs within 24 hours.
6. Whether an itemi�ed estimate is included of all costs that will result directly or indirectly
firom acceptance of such substitution, including cost of redesi�,m and claims of other
contractors at�ected by the resulting change.
7. Whether the proposed substitute item meets or exceeds the experience and/or equivalency
requirements listed in the appropriate technical specifications.
D. Without any increase in cost to the Owner, the Contractor shall be responsible for and pay all
costs in connection with proposed substitutions and of inspections and testing of equipment or
materials submitted for review prior to the Contractor's purchase thereof for incorporation in the
WOKK, whether or not the Engineer accepts the proposed substitution or proposed equipment
or material.
E. Submittal requirements for proposed substitutions: In addition to the general submittal
requirements indicated in thc General Requircments, submittal requirements for the proposed
substitution include: �
l. All deviations from the specitied requirements necessitated by the proposed substitution.
2. Materials of construction, including material specifications and references.
3. Performance data, including perfiormance curves and guaranteed power consumption,
over the range ofi specif icd operating conditions.
4. Dimensional drawings, showing required access and clearances, including any changes to
the work require to accommodate the proposed substitution.
5. Where controls are a part of the proposed substitution, piping, process and
instrumentation drawings (PIDs), produced in the project format and with project specific
symbols, along with control descriptions.
6. Where controls specified in the project manual require modification to accommodate the
proposed substitution, piping, process and instrumentation drawings (PIDs), produced in
project format and with project-specific symbols, with all required modifications clearly
highlighted.
7. Infonnation and performance characteristics for all system components and ancillary
devices to be f'urnished as a part of the proposed substitution.
8. Reproducible contract drawings, marked up to illustrate the alterations to all structural,
architectural, mechanical, electrical and HVAC systems required to accommodate the
proposed substitution.
Cll'Y OI' 13REMER'1'ON S l'ANDARD (;ENF.RnI� CONDI'I'IONS
007U0-24
'
'
�
�
'
'
'
�
'
9. A list of installations of the proposed substitution indicating application, location, owncr
and datc ofi first use.
F. Cost of Substitution Submittal Revicw: Upon receipt of submittal data for the proposed
substitution, the Engineer will estimate the cost of evaluating lhe request and present the
estimate to the Contractor. The Contractor is advised that the estimate is based upon the best
information available to thc Engineer at the time; however, the actual cost, based on time and
expense, will be documented and applied in the final analysis of the substitution request. If the
C;ontractor wishes to proceed with the request he shall advise the Enginecr in writing and
submit sufficicnt additional information as may be requested by the Enginecr. No evaluation
will take place until such time as thc Contractor has agreed to the estimatc in writing and has
aulhorized the Engineer to deduct thc cost of'the evaluation from monthly progress payments
due the Contractor.
G. Whenevcr materials or equipment are identiiicd in the Contract Documents but are not listed on
the "List of Proposed Substitutcs" form by using the name of a proprictary item or the name ofi
a parlicular manufacturer, the naming of the item is intended to establish the type, function, and
quality required. If thc name is followed by the words "or equal" indicating that a substitution
is permitted, materials or equipment ofi other manufacturers may be accepted if sufficient
information is submitted by the Contractor to allow the Engineer to determine that the matcrial
or equipment proposed is equivalent or equal to that named as part of the standard submittal
process.
' 6.06 Concerning Subcontractors, Suppliers, and Others
A. Contractor shall not employ any Subcontractor, Supplier, or other individual or cntity (including
a those acceptable to Owner as indicated in Parag 6.U6.B), whether initially or as a
replacement, against whom Owner may have reasonable objection. Contractor shall not be
' required to employ any Subcontractor, Supplier, or other individual or entity to furnish or
perform any of the Work against whom Contractor has reasonable objection. The Contractor
shall pertorm not less than 30 percent of the WORK with its own forces (i.e., without
' subcontracting). The 30 percent requirements shall apply to the Contract Price less the values of
Owncr-assigncd contracts and allowance in the Bid for pre-negotiated Work.
1
�
'
'
B. If the Supplementary Conditions rcquire thc identity of certain Subcontractors, Suppliers, or
other individuals or entities to be submitled to Owner in advance for acceptance by Owner by a
specified date prior to thc Effective Date of the Agreement, and if Contractor has sub�nitted a
list thereof in accordance with the Supple►nentary Conditions, Owner's acceptance (either in
writing or by failing to make written objection thereto by the datc indicated fior acceptance or
objection in the E3idding Documents or the Contract Documents) of any such Subcontractor,
Supplier, or other individual or entity so identilied may be revoked on the basis of reasonable
objection af�cr due investigation. Contractor shall submit an acceptable replacement for the
rejected Subcontractor, Supplier, or other individual or entity, and the Contract Price will be
adjusted by the ditfierence in the cost occasioned by such replacement, and an appropriate
Change Order will be issued. No acceptance by Owner of any such Subcontractor, Supplier, or
'
C'I'I�Y OI' BRLMI•:Fi"I'()N
S1'ANI)AKD GENERAI. C:ONI)I'I'IONS
00700-25
1
other individual or entity, whether initially or as a replacement, shall constitute a waiver of any
right of Owner or Engineer to reject defective Work.
C. Contractor shall be fully responsiblc to Owner and Engineer fior all acts and omissions of the
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of'lhc
Work just as Contractor is responsible Ibr Contractor's own acts and omissions. Nothing in the
Contract Documcnis:
1. Shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between Owner or Engineer and any such Subcontractor,
Supplier or other individual or entity; nor
2. Shall create any obligation on the part of Owner or Engineer to pay or to see to the payment
of any moneys duc any such Subcontractor, Supplier, or other individual or entily except as
may otherwise be required by Laws and Regulations.
D. Contractor shall be solely responsible fi�r scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
E. Contractor shall require all Subcontractors, Suppliers, and such other individuals or entities
performing or lurnishing any ofi the Work to communicate with Enginccr through Contractor.
F. The divisions and sections of the Specifications and the identitications of� any Drawings shall
not control Contractor in dividing the Work among Subcontractors or Suppliers or delineating
the Work to be perfor►ned by any specific trade.
G. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to lhe applicable terms and conditions ofi the Contract
Documents for the bcncfit of Owner and Engineer. Whenever any such agreement is with a
Subcontractor or Supplier who.is listed as a loss payee on the property insurance provided in
Paragraph 5.06, the a��reement between the Contractor and the Subcontractor or Supplier will
contain provisions whereby the Subcontractor or Supplier waives all rights against Owner,
Contractor, Engineer, and all other individuals or entities identiiied in the Supplementary
Condilions to be listed as insureds or loss payees (and the officers, directors, members, partners,
employees, agents, consultants, and subcontractors of each and any ofi them) for all losses and
damages caused by, arising out of, relating to, or resulting from any of the perils or causes of
loss covered by such policies and any other property insurance applicable to the Work. If the
insurers on any such policies require separate waiver forms to be signed by any Subcontractor
or Supplier, Contractor will obtain the same.
6.07 Patent Fees uf7d Iloyultie.s
A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the
performance of the Work or the incorporation in the Work of any invention, design, process,
product, or device which is the subject ofi patent rights or copyrights held by others. If a
particular invention, design, process, product, or device is specificd in the Contract Documents
C;I'1'Y OI� 13RI:MI;R'I'C)N
S"I'nNDARD GF.,N�;Ri1L CONDITIONS '
00700-2(i
1
for use in the performance ofi the Work and it; to the actual knowledge of Owner or Engineer,
its use is subject to patent rights or copyrights calling for the payment ofi any license fee or
royalty to others, the existence of such rights shall be disclosed by Owner in the Contract
Documcnts.
B. Contractor shall indemnify and hold harmless Owner and Engineer, and the ofi�icers, dircctors,
members, partners, employees, agents, consultants and subcontractors of each and any of them
fro►n and against all claims, costs, losses, and damages (ini;ludin� but not limited to all fiees and
charges of engineers, architects, attorneys, and other professionals and all court or arbitration or
other dispute resolution costs) arising out of or relating to any infringement ofi patent rights or
copyrights incident to the use in the performance ofi the Work or resulting trom the
incorporation in thc Work o('any invcntion, design, process, product, or device not specified in
lhc Contract Uocuments.
6.08 Per•mit.s
A. The Contractor shall obtain and pay fi��r all construction permits and licenses trom the agencies
having jurisdiction, including the furnishing of insurance and bonds if' required by such
agcncics, EXCEPT those listed in Paragraph 6.08B, below to be paid for by the Owner. The
enforcement of such requirements shall not be the basis for claims for additional compensation
by Contractor. When necessary, the Owner will assist the Contractor in obtaining such permits
and licenses. The Contractor shall pay all governmental charges and inspection fees necessary
for the prosecution of the WORK which are applicable at the time of opening of Bids.
' B. Thc Owner will make application fior and pay all fees for the City of Bremcrton building permit
including structural, mechanical, plumbing, and fiire protection. The Contractor shall be
required to obtain the permit at City oftices.
�
'
1
C. The Contractor shall be responsible for obtaining and paying for any and all remaining permits,
licenses and approvals which are necessary and incidental to his operation in perfiormance of the
WORK, and fior giving notices required by such permits and licenses. A copy of each pennit
and license shall be furnished to the Engineer upon request. The Contractor shall comply with
any and all rcquirements contained in all pern�its, licenses, and approvals which pertain to the
WORK or any portion thcrcol'as if the same were stated herein.
D. The Contractor shall be responsible for complying with lhe requircments of all permits related
' to the WORK, including such permits, licenses and regulatory approvals obtained by the Owner
for the work. Owner-obtained permits and regulatory approvals, if any, are appended to the
Contract [�ocuments.
� 6.09
�
'
Laws and Regulations
A. Contractor shall givc all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, neither Owner nor Engineer shall be responsible lor
monitoring Contractor's compliancc with any Laws or Regulations.
'
(:I'fY OI' 13R1?MI:R'1'ON
S'I'ANDARI) C;ENERAI. CONDI'170NS
OQ700-27
'
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and dama�;es (including but not
limited to all fccs and charges of engineers, architects, attorneys, and other profiessionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to makc ccrlain that the Specifications and
Drawings are in accordancc with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.03.
C. Changes in Laws or Rcgulations not knowable at the time of opening of' Bids (or, on thc
Effective Uate of the Agreemcnt it there were no Bids) having an effect on the cost or time of
performance of the Work shall be the subject of an adjustment in Contract Price or Contract
Times. If Owner and Contractor are unable to agree on entitlement to or on the amount or
extent, if any, of any such adjustment, a Claim may be made thcrefor as provided in Paragraph
10.05.
6.10 Tuxc�s
A. The Contractor shall collect from the Owner and rem it to the state, retail sales tax as required by
the laws, statutes, and regulations of the State oi' Washington and its political subdivisions. The
Owner will claim any exemption from retail salcs tax authorized by law. The Contractor shall
pay all other federal, state, and local sales, use, and other taxcs applicable to the WORK and the
Contractor's activities under the Agreement.
B. The Contractor shall have an active City of Bremerton Business License and shall pay to the
City under said license all applicable City business and occupation (B&O) taxes. B&O taxes
shall be paid when due and Contractor shall agree to assign any payments due to the City Clerk
for payment ofi such taxes which havc been declared delinquent.
C. The Contractor shall withhold and pay any and all sales and use taxes and all withholding taxes,
whether state or federal, and pay all Social Security charges and also all State Unemployment
Compensation charges, and pay or cause to bc withheld, as the casc may be, any and all taxes,
charges, or fees or sums whatsoever, which are now or may hereafter be required to be paid or
withheld under any laws. '
6.1 1 U.se c f�Site crnd Other Arc�u.s
A. Limitation on Use of Site and Other Areas:
l. The Contractor shall confine construction equipment, the storage of materials and
equipment, and the operations of workers to the Site, the land and areas identitied in and
permitted by the Contract Documents, and the other land and areas permitted by Laws and
Regulations, rights-ot=way, permits, and easements. The Contractor shall assume full
liability and responsibility for any damage to any such land or area, or to the owner or
occupant thereof or of any land or areas contiguous thereto, resulting from the performance
of the Work.
CI'I'Y Oh' 13NI;ML'K'I'(.)N S'I'ANI)ARI) C;�?NI:RAL CONI)1'I'I(:)NS
O(1700-28
�
�
�
1
�
'
'
'
,
'
�
'
'
'
'
'
1
2. Should any claim be made against the Owner or the Engineer by any such owner or
occupant because of the performance of the Work, the Contractor shall promptly settle with
such other party by negotiation, agreement or otherwise resolve the claim by arbitration or
at law, at the Contractor's sole liability and expense.
3. The Contractor's indemnification obligations for all claims and liability, arising directly,
indirectly, or consequentially out of any action, legal or equitable, brought by any such
owner or occupant against the Owner, the Engineer, their consultants, subconsultants, and
the ofi�ficers, directors, employees and agents of each and any of them to thc extent caused by
or based upon the Contractor's performance ofi' the WORK shall be in accordance with
Paragraph 6.20 of the Supplementary Conditions.
E3. IZemovcrl Of DL'I71 Dzrring Pefformunce of � thc� Work: During the progress ofi the Work
Contractor shall kecp the Site and other areas free from accumulations ot' waste rnaterials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall coniorm to applicable Laws and Regulations.
C. Cleaning.• Prior to Substantial Completion of the Work Contractor shall clean the Site and the
Work and make it ready tor utilization by Owner. At the complction of the Work Contractor
shal) remove from the Sitc all tools, appliances, construction equipment and machincry, and
surplus matcrials and shall restore to original condition all property not designated for alteration
by thc Contract Documents.
D. Loudin�r .Stf°rrctarre.s: Contractor shall not load nor permit any part ofi any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
6.12 RG'COl'LI DOC °ument,s
A. Contractor shall maintain in a safe place at the Site one record copy of all Urawings,
Specitications, Addenda, Change Orders, Work Change Directives, Field Orders, and written
interpretations and clarifications in good order and annotaled to show changcs made during
construction. These record documents together with all approved Samples and a counterpart of
all approved Shop Drawings will be available to Engineer for reference. l)pon completion of
the Work, these record documents, Samples, and Shop Drawings will be delivered to Engineer
fior Owner. The Contractor's pay requests shall not be considered payable unless the fiield record
drawings are current as required by the contract documents.
6.13 Sufe crnd f'rotectiort
A. Contractor shall be solely responsible ior initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subconlractors oftheir responsibility for the safety ofi persons or property in the perfon»ance of
their work, nor for compliance with applicable saf'ety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. All persons on the Site or who may be at�ected by the Work;
' CI'I'Y OI 13RI;MER'l�()N
S'1'ANI�nRD GENERnI., C()NI)I'I'IONS
00700-29
,
2. All the Work and materials and equipment to be incorporatcd therein, whether in storage on
or offthe Site; and
C.14
6.15
6.16
3. Other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities nol designated for
removal, rclocation, or replacement in the course of construction.
f3. Conlractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to thc protection of persons or property lrom damage, injury, or loss; and
shall erect and maintain all necessary safieguards for such safiety and protection. Contractor shall
notify owners o('adjacent property and oi'Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with thcm in the protection,
removal, relocation, and replacement ofi their property.
C. Contractor shall inform Owner and Engineer ofi the specific requirements ot'Contractor's safety
program with which Owner's and Engincer's employees and representatives must comply while
at the Site.
D. All damage, injury, or loss to any property referred to in Paragraph 6.13.A.2 or 6.13.A.3 caused,
directly or indircctly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any ofi them to perf'orm any of the
Work, or anyone for whosc acts any of them may be liablc, shall bc remedied by Contractor.
The City Reserves the right to replace damaged items at the Contractor's cxpense if the City
determines that time is of the essence.
E. Contractor's duties and responsibilities for safety and for protection oPthe Work shall continue
until such time as all the Work is completed and Engineer has issued a notice to Owner and
Contractor in accordance with Paragraph 14.07.B that the Work is acceptable (except as
otherwise express(y provided in connection with Substantial Completion).
Sufen� Repre.sentutivc
A. Contractor shall designate a qualitied and experienced coinpetent person at the site whose
duties and responsibilities shall include, enfiorcing State of Washington — WISHA regulations
regarding excavations, preventing accidents, and maintaining and supervising construction site
health and safety precautions and programs.
Hazurd Convntsnicution Progf•ums
A. Contractor shall be responsible for coordinating any exchange of material safiety data sheets or
other hazard communication int��rmation required to be made available to or exchanged
between or among employers at the Site in accordancc with Laws or Rcgulations.
Emer�Tc�t�cies
A. [n emergencies afifecting the satcty or prolection of persons or the Work or property at the Site
or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss.
Contractor shall give Engineer prompt written notice if Contractor believes that any significant
changes in the Work or variations from the Contract Documents have been caused thereby or
CI'i'Y OP 13RF;MIiR'I�ON S'1'ANDARD GF.,NERAL CONDI'170NS
QQ700-30
'
' are required as a result thereof. If Engineer determines that a change in the Contract Documents
is required because of the action taken by C:ontractor in response to such an emergency, a Work
Change Directive or Change Order will be issued.
' 6.17 .Szihmiltul.s
' A. Contractor shall submit Shop Drawings and Samples to Engineer ('or review in accordance with
the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be
identified as Enginecr may rcquire.
,
�
'
'
'
1. Sho� Df•aivings:
a. Submit number of copies specified in the Gcneral Conditions.
b. Data shown on the Shop Drawings will bc complete with respect to quantitics,
dimensions, specified performance and dcsign criteria, materials, and similar data to
show Engineer the services, materials, and equipment Contractor proposes to provide
and to enable Engineer to review the information for the limited purposes required by
Paragraph 6.17.D.
2. Sumple,s•:
a. Sub►nit number ofi Samples specified in the Specifications.
b. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog
' numbers, the use for which intended and other data as Engineer may require to enable
Engincer to review the submittal for the limited purposes required by Paragraph 6.17.D.
1
1
'
�
B. Where a Shop Drawing or Sample is required by the Contract Documents or the Schedule of
Submittals, any related Work performed prior to Engineer's review of the pertinent submittal
will be at the solc expense and responsibility of Contractor.
C. Submittnl Procc�drrre.s:
I. E3efore submitting each Shop Drawing or Sample, Contractor shall have:
a. Reviewed and coordinated each Shop Drawing or Sample with other Shop Urawings
and Samples and with the requirements of the Work and the Contract Documents;
b. Determined and verified all field measure►nents, quantities, dimensions, specitied
' performancc and design criteria, installation requirements, materials, catalog numbers,
and similar information with respcct thereto;
' c. Determincd and veritied the suitability of all materials o1'fered with respect to the
indicated application, fabrication, shipping, handling, storage, assembly, and installation
perlaining to thc performance of the Work; and
'
' CI'1'Y UF BRI::MI?.R"I()N
STnNDAItD GF.,NI'Rnl. CONDI"I'I()NS
00700-31
1
d. Dctermined and verilied all information relative to Contractor's responsibilities fior
means, methods, techniques, sequences, and procedures of construction, and safety
precautions and programs incident thereto.
2. Each submittal shall bear a stamp or specitic written cerlification that Contractor has
satislied Contractor's obligations under lhc Contract Documents with respect to
Contractor's review and approval of that submittal.
3. With each submittal, Contractor shall give Engineer specific written notice ofany variations
that the Shop Drawing or Sample may have from the requirements of the Contract
Documents. This notice shall be both a written communication separate from the Shop
Drawings or Sample submittal; and, in addition, by a specitic notation made on each Shop
Drawing or Sample submitted to Engineer for review and approval of each such variation.
[). En�Tinee�° :s Review:
Engineer will provide timely review of Shop Drawings and Samples in accordance with the
Schedule of Submittals acceptable to Engineer. Engineer's review and approval will be only
to determine if the items covered by the submittals will, after installation or incorporation in
the Work, conforn� to the in('ormation given in the Contract Documents and be compatible
with the design concept of the completed Project as a functioning whole as indicated by the
Contract Documents.
?. Enginccr's review will not extend to means, methods, techniques, sequences, or procedures
of construction (except where a particular means, method, technique, sequence, or
procedure of construction is specitically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and approval
of a separate item as such will not indicate approval of the assembly in which the item
fiunctions.
3. Engineer's review shall not relieve Contractor from responsibility for any variation from the
requircments of the Contract Documents unless Contractor has complied with the
requirements of Paragraph 6.17.C.3 and Engincer has given written approval of each such
variation by speciiic written notation thereof incorporated in or accompanying the Shop
Drawing or Sample. Engineer's review and approval shall not relieve Contractor firom
responsibility 1or complying with the requiremcnts of Paragraph 6.17.C.1.
E. Resrrhmittul f'roc;edr�re,s:
l. Contractor shall make corrections required by Enginecr and shall return the required
number of corrected copies of Shop Drawings and submit, as required, new Samples for
review and approval. Contractor shall direct specifiic attention in writing to revisions other
than the corrections called fior by Engineer on previous submittals.
6.18 Contir�uif�g the Work
A. Contractor shall carry on the Work and adhere to the Progress Schedule during all disputes or
disagreements with Owner. No Work shall be delayed or postponcd pending resolution of any
C;1'I'Y OF L31t1_'MFR'I'ON
'
S'I'ANUARD GI:NI�RnI. C:ONDI'I'IONS
00700-32
'
,
�
'
disputes or disagrcemcnts, except as permitted by Paragraph 15.04 or as Owner and Contractor
may otherwise agree in writing.
6.19 Cont��uctor's Ccnerul Wurrarztv und Guuruntee
A. Contractor warranls and guarantees to Owner that all Work will be in accordance with the
' Contract Documents and will not be detcctive. Engineer and its offcers, directors, members,
partners, employees, agents, consultants, and subcontractors shall be entitled to rely on
representation of Contractor's warranty and guarantee.
,
[3. Contractor's warranty and guarantec hercunder excludes defects or damage caused by:
' l. Abuse, modilication, or improper maintenance or operation by persons other than
Contractor, Subcontractors, Suppliers, or any other individual or entity fior whom Contractor
is responsible; or
�
'
�
'
�
'
'
'
'
'
LJ
2. Nonnal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall bc absolute. None of the following will constitute an acccptance of Work that
is not in accordance with the Contract Documents or a release of Contractor's obligation to
perform the Work in accordance wilh the Contract Documents:
I. Observations by Enginccr, or Rcsident Project Representative
2. Recommendation by Engineer or payment by Owner ofi any progress or linal
payment;
3. The issuance of a certiticate of Substantial Completion by Engincer or any payment related
thereto by Owner;
4. Use or occupancy ofthe Work or any part thereoi'by.Owner;
5. Any review and approval of a Shop Drawing or Sample submittal or the issuance oi'a notice
o1'acceptability by Engineer;
6. Any inspection, test, or approval by others; or
7. Any correction of dcfective Work by Owner.
8. Owner's routine operation and maintenance after Substantial Completion is attained.
'
C'I'I'Y OI� 13RI;M1',R'I'ON
S'i'nNDARD GENI�RnL CONDI'1'IONS
007O0-33
'
6.20 Indemnification
A. The Contractor shall indemnity, defend, and hold hannless thc Owner, the Engineer, their
consultants, subconsultants, and the ot�icers, directors, employecs, and agents of each and any
of them, against and firom all claims and liability arising under, by reason of, related, or
incidental to the Contract Documents or any performance of thc Work, but not from the sole
negligence or willful misconduct of the Owner and/or the Engineer. Such indemnification by
the Contractor shall include, but not be limited to, the following:
Liability or claims resulting directly or indirectly from the negligence or carelessness ot'the
Contractor, its employees, or agents in the pertormance of thc Work, or in guarding or
maintaining the same, or from any improper ►naterials, implements, or appliances used in its
construction, or by or on account oPany act or omission of the Contractor, its employecs, or
agents;
2. Liability or claims arising directly or indirectly from bodily injury, occupational sickness or
disease, or death of the Contractor's, Subcontractor's, or Supplier's own employees, or
agents engaged in the Work resulting in actions brought by or on behall'of such employees
against the Owncr and/or the Enginecr;
3. Liability or claims arising directly or indirectly from or based on the violation of any Laws
or Regulations, whether by thc Contractor, its employees, or agents;
4. Liability or claims arising directly or indirectly from the use or manufacture by the
Contractor, its employees, or agents in the performancc of this Agreement of any
copyrighted or uncopyrighted composition, secret process, patented or unpatented
invention, article, or appliance, unless otherwise specifically stipulated in this Agreement;
5. Liability or claims arising directly or indirectly l�om the breach of any warranties, whether
express or implied, made to the Owncr and/or Engineer or any other parties by the
Contractor, its employees, or agents;
6. Liability or claims arising directly or indirectly from the willful misconduct of the
Contractor, its employees, or agents;
7. Liability or claims arising directly or indirectly from any brcach of the obligations assumed
in this Agrecment by the Conlractor;
8. Liability or claims arising directly or indirectly from, relating to, or resulting t�om a
hazardous condition created by the Contractor, Subcontractors, Suppliers, or any ol' their
employees or agents, and;
9. Liability or claims arising directly, or indirectly, or consequentialiy out of any action, lcgal
or equitable, brought against the Owner, the Engineer, their consultants, subconsultants, and
the ofticers, directors, employees and agents ofi each or any of them, to the extent caused by
the Contractor's use of any premises acquired by permits, rights of way, or easements, the
Site, or any land or areas contiguous thereto or its perf'ormance of the Work thereon.
CI'IY OI� BREMGIZ"I'ON Sl'nNDARD GI�NGRnL CONDI'170NS
00700-34
1
1
1
13. The Contractor shall reimburse the Owner and the Engineer for all costs and expenses,
(including but not limited to fees and charges ofi enginecrs, architects, attorneys, and other
professionals and court costs including all costs oP appeals) incurred by said Owner and
Engineer in enf'orcing thc provisions of this Paragraph 6.20.
, C. The indemnification obligation under this Paragraph 6.20 shall not be limited in any way by any
limitation on the amount or type of insurance carried by Contractor or by the amount or type of
damages, compensation, or benefits payable by or for thc Contractor or any Subcontractor or
, other person or organication under workers' compcnsation acts, disability benefit acts, or other
employee benefit acts.
'
�
'
'
'
�
'
�
'
'
'
'
,
D. The Contractor and Owner acknowledge and agree that the Contractor's immunity under
industrial insurance, Title 51 RCW, is expressly waived by this Contract, and that all ofi the
provisions of this I'aragraph 6.20, including said waiver of immunity were mutually negotiated
by them in accordance with thc requirei�ients of RCW 4.24.1 15.
6.21 t�elegution ��fl'rofe.ssinncr! Design Service,s
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a porlion of the Work or unless such
services arc rcquired to carry out Contractor's responsibilities for construction means, methods,
techniques, sequences and procedures. Contractor shall not be required to provide professional
services in violation of'applicablc law.
B. If professional design services or certifiications by a design proicssional related to systems,
materials or equipment are spccitically requircd ol' Contractor by the Contract Documents,
Owner and Engineer will specify all performance and design criteria that such services must
satisfy. Contractor shall cause such services or certifications to be provided by a properly
licensed professional, whose signature and seal shall appear on all drawings; calculations,
specifications, certifications, Shop Drawings and other submittals prepared by such
professional. Shop Drawings and other submittals related to thc Work designed or cerlitied by
such proiessional, il' preparcd by othcrs, shall bear such pro('cssional's writtcn approval when
submittcd to Engineer.
C:. Owner and Engineer shall be entitled to rely upon the adequacy, accuracy and completeness of
the services, certitications or approvals perf'ormed by such design proiessionals, provided
Owner and Engineer have specified to Contractor all performance and design criteria that such
serviccs must satisfy.
D. Pursuant to this Paragraph 6.21, Engineer's review and approval of design calculations and
design drawings will be only for the limited purpose of checking for conforn�ance with
performance and design criteria given and thc design concept expressed in the Contract
Documents. Engineer's rcview of Shop Drawings and othcr submittals (eYCept design
calculations and design drawings) will be only fior the purpose stated in Paragraph 6.17.D.1.
E. Contractor shall not be responsible fior the adequacy of the perfonnance or design criteria
required by the Contract Documents.
CI'I�Y ()I l3KI:M1=.R'I'ON
S'I nNl)nRD GENLRnI. CONDI'I'IONS
00700-35
�
,
ARTICLF, 7— OTHER WORK AT THE SITE
7.01 Related Work at Site
A. Owner may perf'orm other work related to the Project at the Site with Owner's employces, or
through other direct contracts therefor, or have other work performed by utility owners. If such
other work is not noted in the Coniract Documents, then:
1. Written notice thereof will be given to Contractor prior to starting any such other work; and
2. If Owner and Contractor are unable to agrce on entitlement to or on the amount or extent, if
any, of any adjustment in the Contract Price or Contract Times that should be allowed as a
result of such other work, a Claim may be made therefor as provided in Paragraph 10.05.
B. Contractor shall af'('ord each other contractor who is a party to such a direct contract, each utility
owner, and Owner, if Owner is performing other work with Owner's employees, proper and
safie access to the Site, provide a reasonable opporlunity for the introduction and storage of
malerials and equipment and the execution of' such other work, and properly coordinate the
Work with theirs. Contractor shall do all cutting, titting, and patching oi'the Work that may be
required to properly connect or otherwise make its several parls come together and properly
intcgrate with such other work. Contractor shall not endanger any work of others by cutting,
excavating, or otherwise altering such work; provided, however, that Contractor may cut or
alter others' work with the written consent of Engineer and the others whose work will be
afi�ectcd. The duties and responsibilities of Contractor under this Paragraph are for the beneft of
such utility owners and other contractors to the extent that there are comparable provisions for
the benefit of Contractor in said direct contracts between Owner and such utility owners and
other contraclors.
C. If the proper execution or results of any part of Contractor's Work depends upon work
perforn�ed by others under this Article 7, Contractor shall inspect such other work and promptly
report to Engincer in writing any dclays, defects, or deticiencies in such other work that render
it unavailable or unsuitable for the proper execution and results of Contractor's Work.
Contractor's failure to so report will constitute an acceptance of such other work as fit and
proper for integralion with Contractor's Work except fior latent defects and deficiencies in such
othcr work. �
D. Additional requirements for coordination between the Contractor, other contractors and the
Owner's forces are set forth in Division 1— C;eneral Requircments.
7.02 Coordinalion
A. If Owner intends to contract with others for the performance of other work on the Project at the
Site, the following will be set forlh in Supplementary Conditions:
l. The individual or cntity who will have authority and responsibility for coordination ofi the
activities among the various contractors will be identified;
2. The specitic matters to be covered by such authority and responsibility will be itemized; and
CI I Y OF BREMERTON
'
S"I�nNI)ARI) C;I:NERAI, C(:)NI)I I�IONS
00700-36
'
1
'
'
,
�
3. The extcnt of such authority and responsibilities will be provided.
B. Unlcss otherwise providcd in the Supplementary Conditions, Owner shall have sole authority
and responsibility fior such coordination.
C. The Contractor shall coordinate its Work with that of the Owner's forces and others as rcquired
in Division 1— General Requirements.
7.03 Le�rul Relutio».ships
A. Paragraphs 7.O1.A and 7.02 are not applicable for utilities not under the control of Owner.
' E3. Each other direct contract of Owner under Naragraph 7.Ol.A shall provide that lhe other
contractor is liable to Owner and Contractor for the reasonable dircct delay and disruption costs
�ncurred by Contractor as a result of the other contractor's wrongful actions or inact�ons.
'
'
'
'
'
�
�
'
'
C. Contractor shall be liable to Owner and any other contractor under direct contract to Owner t��r
the reasonable direct delay and disruption costs incurred by such other contractor as a result of
Contractor's action or inactions.
Al2'T9CLF. 8 — OWNF.It'S 1tESPONSIBIL[TIES
8.01 Commzrnicution.s to Conh-actor
A. Except as otherwise provided in these General Conditions, Owner shall issue all
communications to Contractor through Engineer. `�
8.02 Replucc:ment nf �Engineer
A. In case of Replacement ofi Engineer, Owner shall appoint an engineer whose status uniier the
Contract Documents shall be that of the f'ormer Engineer.
8.03 Fz�rnish Data
A. Owner shall promptly fiimish the data required o1'Owner undcr the Contract Documents.
8.04 Pav Wlren Dz�e
A. Owncr shall make payments to Contractor when they are due as provided in Naragraphs 14.02.0
and 14.07.C.
8.05 Lundti• ancl L'ascment..ti�; Repor•ts ancl Test.ti�
' A. Owner's duties with respect to providing lands and easements and providing engineering
surveys to establish reference points are set forlh in Paragraphs 4.01 and 4.05. Paragraph 4.02
refers to Owncr's idcntifying and making available to Contractor copies of reports of
' explorations and tests of subsurface conditions and drawings of physical conditions relating to
existing surface or subsurface structures at thc Site.
, (:'I I Y OF BRE:MER�'ON
S'I'ANI)i1RU (if:NERAL C:ONDI��IONS
00700-37
'
8.06 Instryance
8.07
. .;
. 1.
�.'�,
•
A. Owner's responsibilities, ifi any, with respect to purchasing and maintaining insurancc are set
forlh in Article 5.
Change Orders
A. Owner is obligated to execute Change Orders as indicated in Paragraph 10.03.
In,spec:tion.s, Tests, und �l��f•ovul.s
A. Owner's responsibility with respect to certain inspections, lests, and approvals is set forth in
Paragraph 13.03. B.
Limitutions on Otivnc�•'s Rc.s�on,s
A. The Owner shall not supervise, direct, or have control or authority over, nor be responsible fior,
Contractor's means, methods, techniques, or procedures of construction, or the safety
precautions and programs incident thercto, or for any failurc of Contractor to comply with Laws
and Regulations applicable to the perfonnance of the Work. Owner will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
8.10 Undi,sclu.secl Hazcrrdozrs Environmerttul Condition
A. Owner's responsibility in respect to an undisclosed Hazardous Environmental Condition is set
f'orlh in Paragraph 4.06.
8.1 1 Compliunce ivith Sufety Prograrn
A. While at the Site, Owner's cmployees and represcntatives shall comply with the specific
applicablc requirements ol' Contractor's safety programs of which Owner has been informed
pursuant to Paragraph 6.13.C.
ARTiCLE 9— EN(:INEER'S STA'TUS DUR.INC: CONSTRUCTION
9.01 Orvn�r's Reprc�sentulive
A. Engineer will be Owner's representative during the construction period. The duties and
responsibilities and the limitations ofi authority of Engineer as Owner's representative during
construction are set forth in the Contract Documents.
9.02 [�isit.s to Site
A. Engineer will make visits to the Site at intcrvals appropriatc to the various stages of
construction as Engineer decros necessary in order to observe as an experienced and qualified
design prolessional thc progress that has been made and the quality of the various aspects oi'
Contractor's executed Work. Based on information obtained during such visits and
observations, Engineer, for lhe benefiit of Owner, will determine, in general, if� the Work is
proceeding in accordance with the Contract Documents. Engineer will not be required to make
CI'I'Y OF RRf:MI;R'I'(:)N
ti'I'ANI)ARD GP.NfiRnL CONDI'I'IONS '
00700-38
'
�
' exhaustive or continuous inspections on the Site to check the quality or quantity of the Work.
Engineer's et't'orts will be directed toward providing for Owner a greater dcgree of confidence
that the completed Work will conform generally to the Contract Documents. On the basis of
, such visits and observations, Engineer will kcep Owner in['ormed of the progress of the Work
and will endeavor to guard Owncr against defective Work.
'
'
�
'
'
�
'
a
'
'
'
'
'
'
B. Engineer's visits and observations are subject to all the limitations on Engineer's authority and
responsibility set forth in Paragraph 9.09. Particularly, but without limitation, during or as a
result of Enginecr's visits or observations ofi Contractor's Work, Engineer will not supervise,
direct, control, or have authority over or be responsible Ii�r Contractor's means, methods,
techniques, sequences, or procedures of' construction, or the safety precautions and programs
incident lhereto, or for any failure of Contractor to comply with Laws and Regulations
applicable to the performance of the Work.
9.03 Resi�lent Projec! Representutive
A. General: The Resident Project Representative (RPR) wil) act as directed by and under the
supervision of the Engineer's Project Manager and will confer with thc Engineer and Engineer's
Nroject Manager regarding his actions. The Resident Project Representative's dealings in
matters pertaining to the on-site Work shall, in general, be only with the Engineer and the
Contractor, and dealings with Subcontractors shall be exclusively lhrough the Contractor.
Written communication with the Owner will be only through or as directed by the Engincer.
9.04 �lac.rhori�ed Varr.'ation.s in Wos°k
. �,
9.06
A. The Engineer may authorize variations in the Work from the requirements ot' lhc Contract
Documents. These may be accomplished by a Work Change Directive and will require the
Conlractor to perform the Work involved in a manner that minimizes the impact to the Work
and the Contract Times. If the Conlractor believes that a Work Change Directive justities an
increase in the Contract Price or an extension of the Contract Times, the Contractor shall
promptly notify the Enginccr as required in the relevant Sections of Division I— General
Requirements.
Rc� JBChi1f; DC' fective Wi�r•k
A. Engineer will have authorily to reject Work which Engineer believes to be defective, or that
Engineer believes will not produce a completed Project that confonns to the Contract
Uocuments or that will prejudice the integrity of the design concept of the completed I'roject as
a fiunctioning whole as indicated by the Contract Documents. Engineer will also have authority
to require special inspection or testing ol'the Work as provided in Paragraph 13.04, whether or
nol the Work is fabricated, installed, or complcted.
Szrbmittal.s, Churrgc Ordcr.s and Puvments
A. In connection with Engineer's authority, and limitations thereof; as to Submittals, see Paragraph
6.17.
' CI'I'YOI 13KI;M1',RI�()N
S'I'ANI�ARI) (IIiNLRAI., CONDI"f10NS
00700-39
'
B. In connection with Engineer's authority, and limitations thereof; as to design calculations and
design drawings submitted in response to a delegation of professional design services, ifi any,
see Paragraph 6.21.
9.07
• 1:
. �.
C. In connection with Engineer's authority as to Change Orders, see Arlicles 10, 1 1, and 12
D. ln connection with Engineer's authority as to Applications for Nayment, see Article 14.
Determincrtions, for Unit Pf°ice Wof°k
A. Engineer will determine the actual quantities and'classifications oi'lJnit Price Work performed
by Contractor. Engineer will review with Contractor the Engineer's preliminary determinations
on such matters before rendering a writtcn dccision thereon (by recommendation of an
Application for Payment or otherwise). Enginccr's written decision thereon will be tinal and
binding (except as modiiied by Engineer to reflect changed factual conditions or more accurate
data) upon Owner and Contractor, subject to the provisions of Paragraph 10.05.
Decisions on Reytrirement.s of Contrcrct Docr�ment.s und Acceptahility nf Work
A. Engineer will be the initial interpreter oi'the requirements of the Contract Documents and judge
of the acceptability of the Work thereunder. All matters in question and other matters between
Owner and Contractor arising prior to the date final payment is due relating to the acceptability
of the Work, and thc interpretation of the requirements of the Contract Documents pertaining to
the performance of the Work, will bc rcferred initially to Engineer in writing within 14 days of
the cvent giving rise to the question.
B. Engineer will, within 14 days, render a written decision on thc issue referred. 11' Owner or
Contractor believcs that any such decision entitles them to an adjustment in thc Contract Price
or Contract Times or both, a Claim may be made undcr Paragr�ph 10.05. Thc date o1�
Engineer's decision shall be the date of the event giving rise to the issucs rcfcrcnced for the
purposes of Paragraph 1 O.OS.B.
C. Engineer's written dccision on the issue referred will be final and binding on Owner and
Contractor, subject to the provisions oi'Paragraph 10.05.
I,intitutions on I;ngineer :s Az.rthorit}� and Responsibilitres
A. Neither Engineer's authority or responsibility under this Article 9 or under any other provision
01' the Contract Documents nor any decision made by Engineer in good faith cither to exercise
or not exercise such authority or responsibility or the undertaking, exercise, or performance of
any authority or responsibility by Engineer shall create, impose, or give rise to any duty in
contract, tort, or otherwise owed by Engineer to Contractor, any Subcontractor, any Supplier,
any other individual or entity, or to any surety for or employee or agent ofi any ofi them.
B. Engineer will not be responsible for the acts or omissions of Contractor or of any Subcontractor,
any Supplier, or of any other individual or entity performing any of the Work.
C. Engineer's review ofi the tinal Application for Payment and accompanying documentation and
all ►nainlenance and operating instructions, schedules, guarantees, bonds, certificates of
CIIY OP 13RI;MERTON Sl'nNDARD GF.NI:RnL CONDI"I'IONS
00700LL10
1
1
�
i
�
inspection, tests and approvals, and other documcntation required to be delivered by Paragraph
14.07.A will only be to determine generally that their content complies with the requirements
of, and in the case of certificates of inspections, tests, and approvals that thc results certitied
indicate compliance with, the Contract Documents.
D. The limitations upon authority and responsibility set forth in this Paragraph 9.09 shall also
apply to the Resident Project Representative, if any, and assislants, if any.
ARTICLE 10 — CHANGES IN THE WORK; CLAIMS
10.01 Ar.r�h��rized Chu�r�,7e.s ij� thc� W��r°k
' A. Without invalidating the Contract and without notice to any surety, Owner may, at any time or
firom time to time, order additions, deletions, or revisions in the Work by a Change Order, or a
Work Change Directive. Upon receipt of any such document, Contractor shall promptly
, proceed with the Work involved which will be performed under the applicable conditions of the
Contract Documcnts (except as otherwisc specilically provided).
�
'
B. I t� Owner and Contractor are unable to agree on entitlement to, or on the amount or extent, i I�
any, ofi an adjustment in the Contract Price or Contract Times, or both, that should be allowed
as a result of a Work Change Directive, a Claim may be made therefor as provided in Para��
10.05. �
C. If the Owner and Contractor agree as to the extent, if any, of an increase or decrease`° in the
� Contract Price, or an extension or shorlening ol'the Contract Times that should be allowed as a
result of a Work Change Directive, the Contractor shall proceed so as to minimize the impact
on and delays to the Work pending lhc issuance of a Change Order. �
�
'
1
�
�
'
'
'
D. In the event a part ofi thc Work is to be entirely eliminated and no lump sum or unit price is
named in the Contract Documents to cover such eliminated work, the price of the eliminated
work shall be agreed upon by the Owner and the Contractor by Change (.)rder.
10.02 Unat+thorized Changes in thc Wof-k
A. Contractor shall not be entitled to an increase in the Conlract Price or an extension of the
Contract Times with respect to any work performed that is not required by the Contract
Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in
the case of an emergency as provided in Para��raph 6.16 or in the case of uncovering Work as
provided in Paragraph 13.04.D.
10.03 F.xccrrtion of'Char��>c� Orcler.s
A. Owner and Contractor shall execute appropriate Change Orders recommended by Engineer
covering:
l. Changes in the Work which are: (i) ordered by Owner pursuant to Paragraph 10.01.A, (ii)
required because of acceptance ofi defiective Work under Paragraph 13.08.A or Owner's
correction of defiective Work under Paragraph 13.09, or (iii) a�need to by the parties;
CI'I'Y ()F B121;MEk l'ON
S'I'ANI)AKU GI?NI?KAL CONDI'I'IONS
00700-41
'
2. Changes in the Contract Price or Contract Times which are agreed to by the parlies,
including any undisputed sum or amount of time for Work actually performed in
accordance with a Work Change nirective; and
3. Changes in the Contract Price or Contract Times which embody the substance of any
written decision rendered by Engineer pursuant to Paragraph 10.05; provided that, in lieu of
executing any such Change Order, an appcal may be taken from any such decision in
accordance with the provisions of the Contract Documents and applicable Laws and
Regulations, but during any such appeal, Contractor shall carry on the Work and adhere to
the Progress Schedule as provided in Paragraph 6.18.A.
I 0.04 Notific tu Srr�•ery
A. If the provisions of any bond require notice to be given to a surety of any change afl'ecting the
general scope of the Work or the provisions of the Contract Documents (including, but not
limited to, Contract Price or Contract Timcs), the giving of any such notice will be Contractor's
responsibility. The a►nount of'each applicable bond will be adjusted to reflect the eftect of any
such change.
10.05 Cluim.s
A. Es�gineer :s Deci.sr.'ori Reyuirc�d: All Claims, except those waived pursuant to Paragraph 14.09,
shall be referred to the Engincer tor decision. A decision by Engineer shall be required as a
condition precedent to any exercise by Owner or Contractor of any ri�hts or remedies either
may otherwise have under the Contract Documcnts or by Laws and Regulations in respect of
such Clairns.
B. Nuticc.�: Written notice stating the general nature of each Claim, dispute, or other matter shall be
delivered by the Contraclor or Owner to the other promptly (but no later than 14 days) after the
start of the event giving rise thcreto. Notice of the specific arnount or extent of thc Claim,
dispute, or other matter with supporting data shall be delivered to the Engineer within 21 days
after the start of such event (unless Engineer allows additional time fior claimant to submit
additional or more accurate data in support ofi such Claim, dispute, or olher matter). A claim
for an adjustment in Contract Price shall be prepared in accordance with the provisions of
paragraph 12.01. A claim for an adjustment in Contract Time shall be prepared in accordance
with the provisions of paragraph 12.02. Each Claim shall be accompanied by Contractor's or
Owner's written statement that the adjustment claimed is the entire adjz�,stmerit to which the
Contractor believes it is entitled as a result of said event and covers crll amount.i (whether direct,
indirect or consequential). The recipient of the claim shall submit its responsc to thc claimant
within 30 days af'ter receipt of the claimant's last submittal (unless Engineer allows additional
limc).
C. Engineer'.s Action: Engineer will review each Claim and, within 30 days after receipt of the last
submittal of thc claimant or the last submittal ofi the opposing party, ii' any, take one of the
following actions in writing:
1. Deny the Claim in whole or in part;
CI'1'Y OP 13RliMl?R'I'ON S"I'AND/1R1� GENEKAL CONDITIONS
00700-=}2
1
'
2. Approve the Claim; or
3. Notify the parties that the Engineer is unable to resolve the Claim iC, in the Engineer's sole
' discretion, it would be inappropriate for the Engineer to do so. For purposes of fiirther
resolution of the Claim, such notice shall be deemed a denial.
1
D. ln the event that Engineer docs not take action on a Claim within said 30 days, the Claim shall
be deemed denicd.
' E. Engineer's written action under Paragraph 10.O5.0 or denial pursuant to Paragraphs 10.O5.C.3
or 10.O5.D will be final and binding upon Owner and Contractor, unless Owner or Contractor
files suit pursuant to Article 16.
'
1
'
'
�
�
'
'
'
'
F. No Claim for an adjustment in Contract Price or Contract Times will bc valid if not submitted
in accordance with this Paragraph 10.05.
ARTICLE 11 — COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK
I 1.O l Cost uf'the Woi•k
A. Co .ti1.5' �f1L •lzrdec�• The term Cost oi'the Work means the sum of all costs, except those excluded
in Paragraph 1 1.01.B, necessarily incurred and paid by Contractor in the proper perf��rn�ance of
the Work. When the value of any Work covered by a Change Order or when a Claim.fior an
adjustment in Contract I'rice is determined on the basis of Cost oi'the Work, the costs to be
reirnbursed to Contractor will be only those additional or incremental costs required because of�,
the change in the Work or because of the event giving rise to the Claim. Except as otherwise
may be agreed to in writing by Owner, such costs shall be in amounts no higher than those
prevailing in thc locality of the Project, shall not include any of the costs itemized in Paragraph
1 1.01.B, and shall include only the following items:
l. Payroll costs for employees in the direct employ of Contractor in the perf'ormance of the
Work under schedules of job classifications agreed upon by Owner and Contractor. Such
employecs shall include, without limitation, superintendents, forcmen, and other personnel
employed full time on the Work. Payroll costs for employees not employed fiull time on the
Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall
include, but not be limited to, salaries and wages plus the cost of fringe benetits, which shall
include social security contributions, unemployment, excise, and payroll taxes, workers'
compensation, hcalth and retirement benefiits, bonuses, sick leave, vacation and holiday pay
applicable thereto. The expenses of performing Work outside of regular working hours, on
Saturday, Sunday, or legal holidays, shall be included in the above to the extent authorized
by Owner.
' 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs
of' transportation and storage thereof, and Supplicrs' tield services required in connection
therewith. All cash discounts shall accrue to Contractor unless Owner deposits funds with
' Contractor with which to make payments, in which case the cash discounts shall accrue to
Owner. All trade discounts, rebates and refunds and returns from sale of surplus materials
� CI'I'Y OF' BItI:fv11;R'I'ON
S'I'nNl.)I�RI� GI?NI:RAL CONDI"I'IONS
00700-43
r l
�
and equipment shall accrue to Owner, and Contractor shall make provisions so that they
may be oblained.
3. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If
required by Owner, Contractor shall obtain competitive bids lrom subcontractors acceptable
to Owner and Contractor and shall deliver such bids to Owner, who will then determine,
with the advice of Engineer, which bids, if any, will be acceptable. 11' any subcontract
provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the
Subcontractor's Cost of the Work and fee shall be determined in the same manner as
Contractor's Cost ofthe Work and fee as provided in this Paragraph 1 1.01.
4. Costs of special consultants (including but not limited to engineers, architects, testing
laboratories, surveyors, attorneys, and accountants) employed for services specifiically
related to the Work.
5. Supplemental costs including the following:
a. The proportion of necessary transportation, travel, and subsistence expenses o('
Contractor's employees incurred in discharge of duties connected with the Work.
b. Cost, including transportation and maintenance, of all materials, supplies, equipment,
machinery, appliances, office, and temporary tiacilities at the Site, and hand tools not
owned by the workers, which are consumed in the performance of the Work, and cost,
less market value, of such items used but not consumcd which remain thc property of
Contractor.
c. Rentals of all construction equipment and machinery, and the parts thereof whether
rented f'rom Contractor or others in accordance with rental a�neements approved by
Owner with the advice of Engineer, and the costs of transportation, loading, unloading,
assembly, dismantling, and removal thereof. All such costs shall be in accordance with
the terms oI' said rental agreements. The rental of any such equipment, machinery, or
parts shall cease when the use thereofi is no longer necessary f'or the Work.
d. Sales, consumer, use, and other similar taxes related to the Work, and fior which
Contractor is liable, as imposed by Laws and Regulations.
e. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or
anyone directly or indirectly cmployed by any of them or for whose acts any ol� them
may be liable, and royalty payments and fees for permits and licenses.
f. Losses and damages (and related expenses) caused by damage to the Work, not
compensated by insurance or otherwise, sustained by Contractor in connection with the
performance of the Work (except losses and damages within the deductible amounts of
property insurance established in accordance with Paragraph 5.06.D), provided such
losses and damages have resulted t'rom causes other than the negligence of Contractor,
any Subcontractor, or anyone directly or indircctly employed by any o1� them or for
whose acts any ofi them may be liable. Such losses shall include settlements made with
the written consent and approval of Owner. No such losses, damages, and expenses
crrv or i;Ki�.Mi•:K�rorv
�
S'I'ANDARU GIiNIiRAL CONDI'I'IONS
0070Q-�14
'
1�
'
'
shall be included in the Cost of the Work for the purpose of determining C'ontractor's
f ee.
g. The cost of utilities, fuel, and sanitary facilities at the Site.
h. Minor expcnses such as telegrams, long distancc lelephone calls, telephone servicc at
' the Site, express and courier services, and similar petty cash items in connection with
the Work.
, i. The costs of premiums for all bonds and insurance Contractor is required by the
Contract Docu►nents to purchase and maintain.
'
'
'
'
�
�
'
1
�
,
�
�_ J
l3. Cosl.s E.xclzrcled: The term Cost of the Work shall not include any o('the following items:
l. Payroll costs and other compensation of Contractor's ot�icers, executives, principals (of
partncrships and sole proprietorships), gencral managers, safiety managers, engineers,
architects, estimators, attorneys, auditors, accountants, purchasin� and contracting agents,
expediters, timekeepers, clerks, and other personnel cmployed by Contractor, whcther at the
Site or in Contractor's principal or branch ot�ce for general administration of'the Work and
not specifically included in the agreed upon schedule of job classifications referred to in
Paragraph 1 1.01.A.1 or specitically covered by Para�naph 1 1.O1.A.4, all of which are to be
considered administrative costs covered by thc Contractor's fee.
2. Expenses of Contractor's principal and branch ot�ices other than Contractor's ofitice at the
S i te.
3. Any part ofi Contractor's capital expenses, including interest on Contraclor's _capital
employed ior ihe Work and charges against Contractor for delinquent payments.
4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or
indirectly employed by any of them or for whose acts any of them may be liable, including
but not limited to, the correction of' defective Work, disposal of materials or equipment
wrongly supplied, and making good any damage to property.
5. Other overhead or general expense costs of any kind and the costs of any itcm not
specitically and expressly included in Para�naphs 1 1.O1.A.
C. Cont�•aclor's l-ee: When all the Work is performed on the basis of cost-plus, Contractor's fce
shall be determined as set forth in the Agreement. When lhe value of any Work covered by a
Change Order or when a Claim ior an adjustment in C:ontract Price is determined on the basis
of Cost of the Work, Contractor's fee shall bc determined as set forth in Paragraph 12.01.C.
D. Doci�mentatinn: Whenever the Cost of the Work for any purpose is to be determined pursuant
to Paragraphs 1 l.OI.A and 1 I.Ol.l3, Contractor will establish and maintain records thereof in
accordancc with generally accepted accounting practices and submit in a form acceptable to
Engineer an itemized cost breakdown together with supporting data.
11.02 AI.lolvcrnce,s
1 CI'I'Y OP [3RI.'.MF?R"I'ON
S'I'ANI)ARI) GENERnL CC)NDI'IIONS
00700-45
��I
A. lt is understood thal Contractor has included in the Contract Price all allowances so named in
the Contract Documents and shall cause the Work so covered to be performed for such sums
and by such persons or entities as may be acceptable to Owner and Engincer.
B. Cash Allowances:
1. Contractor agrees that:
a. The cash allowances include the cost to Contractor (less any applicable trade discounts)
of materials and equipment required by the allowances to be delivered at the Site, and
all applicable taxes; and
b. Contractor's costs ior unloading and handling on the Site, labor, installation, overhead,
profiit, and othcr cxpcnscs contemplated for the cash allowances have been included in
the Contract Price and not in the allowances, and no demand for additional payment on
account of any of thc forcgoing will be valid.
C. Contingency Allowance:
1. Contractor agrees that a contingency or force account allowance, if any, is for the sole use of
Owner to cover unanticipated costs.
D. Prior to final payment, an appropriate Change Order will be issucd as recommended by
Engineer to retlect actual amounts ,due Contractor on account ofi Work covered by allowances,
and the Contract Price shall be correspondingly adjusted.
1 1.03 Urtit Pricc Work
A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work,
initially the Contract Price will be deemed to include for all Unit Price Work an amount cqual
to the sum oi' the unit price for each separately identitied item ofi Unit Price Work times the
estimated quantity of each item as indicatcd in thc Agreement.
I3. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the
purpose of comparison of Bids and determining an initial Contract Pricc. Determinations oi'the
actual quantities and classifications of Unit Price Work performed by Contractor will be made
by Engineer subject to the provisions of Paragraph 9.07.
C. Each unit price will be dcemed to include an amount considered by Contractor to be adequate to
cover Contractor's overhead and profit fior each separately identified item.
D. Owner or Contractor may make a Claim for an adjustment in the Contract Price in accordance
with Paragraph 10.05 if:
1. The total cost ofi a particular item of Unit Price Work amounts to 5% or more ol' the
Contract I'rice and the variation in the quantity oi'that particular item of Unit Price Work
pert��rmed by Contractor difPers by more than 25% from the estimated quantity of such item
indicatcd in the Agreement; and
C'1"I'Y ()1' 13RI:M�RT()N 5'1'ANI�AKI) GI;NI:NAI, CONI�I'I'IONS
00700-46
1
�
2. There is no corresponding adjustment with respect to any other item of Work; and
3. Contractor believes that Contractor is entitled to an increase in Contract Price as a result ofi
' having incurred additional expense or Owner believes that Owner is entitled to a decrease in
Contract Price and the parties are unable to agree as to the amount of any such increasc or
decrease.
'
�
�
�
'
'
1
�
E. In the event a part of lhe Work is to be entirely climinatcd and no lump sum or unit price is
named in the C�mtract Documenls to cover such eliminated work, the price of the eliminatcd
work shall be agreed upon by the Owner and the Contractor by Change Order.
Al2TiCLE 12 — CHANGE OF CONTFtACT PRICF,; CgiANC:E OF CONTRACT TIMES
12.01 Chunge ��f �Contract Prr.ce
A. The Contract Price constitutes the total compensation payable to the Contractor for performing
the Work. All duties, responsibilities, and obligations assigned to or undertaken by the
Contractor to complete the Work shall be at its expense without change in the Contract Price.
All claims for an incrcase in the Contract Price shall be bascd only upon writlen notice
delivered as required by Paragraph 10.05 herein. The Contractor's notice ofi claim shall include
the nature, justitication for and amount ofi the claim, and such supporting dala as the Engineer
may require to evaluate thc claim. The Contractor and Owner hereby agree that any claim for
adjuslment of the Contract Price shall be evaluated by the Engineer, and that the Enbinecr's
determination shall be tinal and conclusive. No claim for and adjustment in the Contract Price
will be valid if�not submitted in accordancc with this Paragraph.
B. The value o1' any Work covered by a Change Order or of any Claim for an adjustment in the
Contract Price will be determined as follows:
l. Where the Work involved is covered by unit prices contained in the Contract Documents,
' by application of such unit prices to the quantities of the items involved (subject to the
provisions of Paragraph I 1.03); or
' 2. Where the Work involved is not covered by unit priccs contained in the Contract
Documents, by a mutually agreed lump sum (which may include an allowance for overhead
and protit not necessarily in accordance with Paragraph 12.O1.C.2); or
�
'
'
'
'
3. Where the Work involved is not covered by unit prices contained in the Contract
Documents and agreement to a lump sum is not reached under Paragraph 12.01.B.2, on the
basis ofi the Cost o1' thc Work (dctermined as provided in Parag 1 1.01) plus a
Contractor's fec f'or overhead and profit (determined as provided in Paragraph 12.01.C).
C. Cof�t�°uctor•'s• /�ee: The Contractor's fee for overhead and protit 1or the cost of extra work as
defined in Paragraph 12.O1.D shall be determined as follows:
l. A mutually acceptable fixed fee; or
2. Ifi a fixed fec is not agreed upon, then a fee based on the following perccntages of the
various porlions of the Cost of the extra Work:
CI'I'Y OP RREiML':R'I'ON
S�fnNUARD GI?NI'slt/�I, CONDI'I'IONS
00700-47
1
'
a. Extra work ordered on the basis of timc and materials (force account) will be paid for at '
the actual necessary cost as determined by the Enginecr, plus a 20% markup for labor,
materials and equipment.
b. For cxtra work negotiated at a lump sum price the Contractor's fee shall be 20%.
c. No fee shall be payable on the basis of costs itemized under Paragraph 1 l.OI.B;
d. The amount of credit to be allowed by Contractor to Owner ('or any change which
results in a net decrease in cost will be the amount of the actual net decrease in cost plus
a deduction in Contractor's fee by an amount equal to tive percent ofi such net decrease;
and
e. When both additions and credits are involved in any one change, the adjustment in
Contractor's fee shall be computed on the basis of the net change in accordance with
Parag 12.01.C:2.a through 12.01.C.2.d, inclusivc.
D. Co.tit of Extru Wi�rk: The term "cost of cxtra work" shall mean the sum of all costs nccessarily
incurred and paid by the Contractor for labor, materials, equipment and special services in the
proper performance o1� cxtra work as approved by the Engineer. Except as otherwise may be
agreed to in writing by the Owner, such costs shall be in amounts no higher than those
prevailing in the locality of' thc Project, shall include only the following items, and shall not
include any of�the costs itemized in Paragraph 1 1.01.B.
Labor: The costs of labor will be the actual cost for wages prevailing for each crafi or type
of workers pert��rming lhc extra work at the timc the extra work is done, plus employer
payments of payroll taxes, workers compensation insurancc, liability insurancc, health and
wcliare, pension, vacation, apprenticeship funds, and other direct costs resulting from
federal, state or local laws, as well as assessments or benefits required by lawful collective
bargaining agreements. Labor costs for equipment operators and helpers will be paid only
when such costs are not included in the invoice for equipment rental. The labor costs for
foreman shall be proportioned to all of their assigned work and only that applicable to extra
work shall be paid. Indirect labor costs including superintendence shall be considered parl
of the markup set out herein.
2. Materials: The cost of materials reported shall be at invoice or lowest current price at which
materials are locally available and dclivered to the Work in the quantities involved, plus thc
cost of freight, delivery and storage, subject to the following:
a. Atl trade discounts and rebates shall accrue to the Owner, and the Contractor shall makc
provisions so that they may be obtained; and
b. For materials secured by other than a direct purchase and direct billing to the purchaser,
the cost shall be deemed to be the price paid to the actual supplier as determined by the
Engineer. Except fior actual costs incurred in handling of such materials, markup will
not be allowed; and
c. Payment for materials from sources owned wholly or in part by thc purchaser shall not
exceed the price paid by the purchaser t��r similar materials from said sources on extra
C'I'I'Y OF' L3RIiMERT()N S"1'ANUARI� CiENI'.R/1L CONI)I'I'IONS
oo�no-;s
G'
1
'
1
'
1
'
'
'
'
�
�
�
work items or the current wholesale price for such materials delivered to the Site,
whichever price is lower; and
d. If in the opinion of'thc Engineer the cost of material is excessive, or thc Contractor does
not furnish satisfactory evidence of the cost of such material, then the cost shall be
deemed to be thc lowest current wholesale price for the quantity concerned delivered to
the Work, less trade discount. The Owner reserves the right to furnish materials fior the
extra work and no claim will be allowed by the Contractor fior costs and pro(it on such
materials.
3. /;'yz�ipment: The amount of payment for any Contractor-owned equipmcnt that is utili�ed
shall be determined according to the version of thc AGC/WS[)OT Equipment Rcntal
Agreement which is in et�ect at the timc lhe torce account is authorized. The rates listed in
the Rental Rate Blue [3ook (as modified by the current AGC/WSDOT Equipment Rental
Agreement) shall be fiull compcnsation for all fiiel, oil, lubrication, ordinary rcpairs,
maintenance, and all other costs incidental to furnishing and operating the equipment except
labor operation. If it is deemed necessary by the Contractor to use equipment not listed in
the speci(ied Reference Publication, an equitable rental rate for the equipment will be
established by the Engineer. The Contractor may furnish cost data, which might assist the
Engineer in the establishment of the rental rate. Payment for equipmenl shall bc subject to
al I of thc following:
a. All equipment shall, in the opinion of the Engineer, be in good working condition and
suitable for the purpose i��r which the equipment is to bc used;
b. Before construction equipment is used on the extra work, the Contractor shall plainly
stencil or stamp an identifying number thereon at a conspicuous location, and shall
furnish to the Enginecr, in duplicate, a description ofi the equipment and its identifying
number;
c. Unless otherwise specified, manufacturer's ratings and manufacturer-approved
modifications shall be used to classify equipment for the determination ofi applicable
rental rates. Equipment which has no direct power unit shall be powcred by a unit of at
lcast the minimum rating recommended by the manufacturer;
d. Individual pieces of equipment or lools having a replacement value oi' $500 or less,
' whether or not consumed by use, will be considered to be small tools and no payment
will be made theref'or;
'
'
1
1
4. Rental Equipment: The rcntal time to be paid for rental equipment used in the extra Work
will be calculated based on the time the equipment is actually in productive operation on the
extra work being perfiorn�ed and, additionally, shall include the time required to move the
equipment to the location of the extra work and return it to the ori�inal location or to
another location requiring no more time than that required to return it to its original
location; ercept, that moving time will not be paid if the equipment is used on work other
than the extra work, even though it is locatcd at the site of the extra work. Loading and
transporting costs will be allowed in licu of moving time only when the equipment is
moved by means othcr than its own power, except that no payment will be made for loading
CIIY OI' RREMIiR'I'ON
S'I'ANDARI) C.�I?NI:RnI. C;ONI)I'I'IONS
007U0-49
'
and transporting costs when the equipment is used at the site of the extra work on work
other than the extra work. Rental time will not be allowed while equipment is inoperative
due to breakdowns or is otherwise not available for immediate use. The rental time of
equipment on thc site will be computed subject to the fol(owing:
a. When hourly rates are paid, operation for 30 minutes or less will be considered to be
one halt=hour ofi operation, and any part ofi an hour in excess of 30 minutes will be
considered one hour of operation;
b. Whcn daily rates are paid, 4 hours or less of operation will be considered to be one half-
day of operation. When owner-operated equipment is uscd to perform extra work to be
paid for on time and materials basis, the Contractor will be paid f'or the equipment and
operator as set forth herein below.
E. Excluded costs: The term Cost of the Extra Work shall not include any of'the items detined in
Paragraph 1 1.01. B.
12.02 Chun�,Tc ��f Contract Times
A. All Contract Times (or Milestones) stated in the Contract Documents are of the essence of the
Agreement. The Contract Times (or Milestones) may only be changed by Change Order. Any
clai►n for an extension ol'the Contracl Times shall be based only upon written notice delivered
as required in I'aragraph 10.05 herein. The Contractor's written notice ol' such claim shall
include the extent, justification for and nature of the claim, and such supporting data as the
Enginecr may require to evaluate the claim.
B. Any adjustment of the Contract Times covered by a Change Order or any Claim for an
adjustment in the Contract Times will be determined in accordance with the provisions of this
Arlicle 12. With respect to claims fior adjuslment in the Contract Times, the Contraclor and
Owner hereby acknowledge and agree that:
c. Any claim for adjustment of the Contract Times (or Milestones) shall be evaluated by
the Engineer, whose evaluation shall be final and conclusive, and;
d. An approved increase in Contract Times shall not cause an increase in Contract Price
unless the reason for increasing the Contract Timcs is extra work otherwise evaluated by
the Engineer as compensable work. Only compensable work, whether in connection
with an approved increase in the Contract Times or not, shall result in an increase in the
Contract Price.
12.03 Deluus
A. Where Contractor is preventcd fi completing any parl of the Work within the Contract
Times due to delay beyond lhe control of Contractor, the Contract Times will be extended in an
amount equal to the time lost due to such delay ifi a Claim is made theref��r as provided in
Paragraph 12.02.A. Delays beyond the control of Contractor shall include, but not be limited to,
acts or neglect by Owner, acts or neglect of utility owners or other contractors performing other
work as contemplated by Article 7, fires, tloods, epidemics, abnormal weather conditions, or
acts of God.
CI"IY OF 13R1?MERTON S'1'ANDAKD GF,NI;RAL CONDI'I'IONS
00700-50
,
'
'
�
,
1
[3. If Owner, Engineer, or other contractors or utility owners performing other work for Owner as
contemplated by Article 7, or anyone f'or whom Owner is responsible, delays, disrupls, or
interfieres with lhe perfiormancc or progress of the Work, then Contractor shall be entitled to an
equitable adjustment in the Contract Price or the C:ontract Times, or both. Contractor's
entitle►nent to an adjustment of the Contract Times is conditioned on such adjustment being
essential to Conlractor's ability to complete the Work within the Conlract Times.
C. Ifi Contractor is delayed in the performance or progress of the Work by tire, tlood, epidemic,
abnormal weathcr conditions, acts of God, acls or f'ailures to act ot' utility owners not under thc
control of Owncr, or other causes not the fault of and beyond control of'Owner and Contractor,
then Contractor shall be entitled to an equitable adjustment in Contract Times, ifi such
adjustment is essential to Contractor's ability to complctc the Work within the Contract Times.
Such an adjustment shall be Contractor's sole and exclusive remedy for the dclays described in
this Paragraph 12.03.C.
t D. Owner, Engineer, and their ofificers, directors, mcmbers, parincrs, cmployees, agenls,
consultants, or subcontractors shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys,
' and other professionals and all court or arbitration or other dispute resolution costs) sustained
by Contractor on or in connection with any other project or anticipated project.
'
'
�
'
�
'
'
�
1
�
E. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times fior delays
within the control of C.ontractor. Delays attributable to and within the control of'a Subcontractor
or Supplier shall be deemed to be dclays within the control of Contractor.
F. Adjustments of Contract Times Relating to Weather: Contract Times may be extended by the
Enginecr because of dclays in thc completion of the Work due to unusually severe weather,
provided that the Contractor shall, within 2 business days of the beginning of any such delay,
notify the Enginccr in writing of thc causc o1'delay and request an extension of Contract Times.
Thc Enginecr will ascertain the facts and the extent of the delay and extend the Contract Times
when, in its judgment, the tindings of the fact justify such an extension. The Contractor shall
include 10 days of inclement weather delays in the progress schedule submitted to the Engineer
for approval, for purposes of planning and scheduling Only.
G. Adjustments of Contract Price Relating to weather: The Contracior shall havc no claims against
the Owner for damages for any injury to work, materials, or equipment, or for project or
overhead costs of any kind, resulting from the action of the elements. If howevcr, in thc opinion
of the Enginecr, the Conlractor has madc all reasonable eflorls to protcct the materials,
equipmcnt, and work, the Conlractor may be granted a reasonable extension of Contract Times
to make proper repairs, renewals, and replacements of the work, materials, or equipment.
ARTICLC 13 — TESTS AND INSI'F.CT101�1S; CORRECTION, REMOVAL OR ACCCPTANCE
OF DCFECTiVF, WORK
13.01 Nnticc of�Def'ectti
A. Prompt notice of all defiective Work of which Owner or Engineer has actual knowledge will be
given to Contractor.
CI'I'Y OI 13RI:MF:R'I'ON
5'I'ANDnRD (;I�NIiRAI. C'ONI)I'1'IONS
00700-51
'
13.02 Acce.ss to Work
A. Owncr, Engineer, their consultants and other representatives and personnel ofi Owner,
independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable timcs ('or their observation, inspcction, and
testing. Contractor shall providc thcm proper and safe conditions for such access and advise
them of Contractor's safety procedures and programs so that they may comply therewith as
applicable.
13.03 Test.s crnd I�7spectiorrs
A. Contractor shall give Engineer timely notice of' readiness of the Work for all required
inspections, tests, or approvals and shall cooperate with inspection and testing personnel to
facilitate required inspections or tests. Owner and Contractor hereby agree that "timely nolice",
with respect to notification of readiness f'or tests and inspections shall mean not less than 2
business days bcforc lhc time that the test or inspection is desircd.
B. Owner shall employ and pay f'or the services of an independent testing laboratory to perform all
inspections, tests, or approvals required by thc Coniract Documents except:
1. For inspcctions, tcsts, or approvals covered by Paragraphs 13.03.0 and 13.03.D below;
2. That costs incurred in connection with tests or inspections conducted pursuant to Paragraph
13.04.13 shall be paid as providcd in Paragraph 13.04.C; and
3. As otherwise specitically provided in the Contract Documents.
C. If Laws or Regulations of any public body having jurisdiction require any Work (or part
thereoi) spccifcally to be inspected, tested, or approved by an employee or other representative
of such public body, Contractor shall assume full responsibility for arranging and obtaining
such inspections, tests, or approvals, pay all costs in connection therewith, and furnish Engineer
the required cerlificates of inspection or approval.
D. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, or approvals required for Owner's and Engineer's acceptance of
materials or equipment to be incorporated in thc Work; or acceptance of materials, mix designs,
or equipment submitted for approval prior to Contractor's purchase thereofi for incorporation in
the Work. Such inspections, lests, or approvals shall be performed by organi�ations acceptable
to Owner and Engineer.
E. If any Work (or the work ofi others) that is to be inspectcd, testcd, or approved is covered by
Contractor without written concurrence of Engineer, Contractor shall, i1'requested by Engineer,
uncover such Work for observation.
F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense unless
Contractor has given Engineer timely notice of Contractor's intention to cover the same and
Engineer has nol acted with reasonable promptness in response to such notice.
C;I'I'Y OI 13NI;MIiN'I'ON 5�'ANDARD GENLiRAL CONI)1'I'IONti
00700-52
�
'
'
,
1
'
'
'
'
'
�
'
'
'
1
'
�
G. The Engineer will make, or have made, such inspections and tests as the Engineer deems
necessary to see that the Work is being accomplished in accordance with the requirements of
the Contract Documents. Unlcss otherwise specified in Paragraph 13.03.B of the General
Conditions, the cost of such inspection and testing will be borne by the Owner. In the cvcnt
such inspections or tests reveal non-compliance with the requirements of the Contract
Documents, thc Contractor shall bear the cost oi' corrective measures deemed necessary by the
Engineer, shall bear the cost of all subsequent reinspection and retesting of the non-compliant
Work. Neither observations by the Engineer nor inspections, tests, or approvals by others shall
relieve the Contractor i'rom the Contractor's obligation to perfonn the Work in accordance with
the Contract Documents.
13.04 Uncoverin�T Wof•k
A. If any Work is covered contrary to the writlen request ofi Engineer, it must, if requested by
Enginecr, be uncovered f'or Engineer's observation and replaced at Contractor's expense.
B. I(� Engineer considers it necessary or advisable that covered Work be observed by Engineer or
inspected or tested by others, Contractor, at Engineer's request, shall uncover, expose, or
otherw,ise make availablc for observation, inspcction, or testing as Enginccr may require, that
porlion of the Work in question, furnishing all necessary labor, matcrial, and equipment.
C. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses,
and damages (including but not limiled to all fees and charges of engineers, architects,
attorneys, and other professionals and all court or arbitration or other dispute resolution costs)
arising out of'or relating to such uncovering, exposure, observation, inspection, and testing, and
of'satisfactory replacement or reconstruction (including but not limited to all costs oPrepair or
replacement of.work ofi others); and Owner shall be entitled to an appropriate decrease, in the
Contract Price. If the parties are unable to agrce as to the amount thereot; Owner may make a
Claim therefor as provided in Para�naph 10.05.
D. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in
the Contract Price or an extension ofi the Contract Times, or bolh, directly attributable to such
uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. If the
partics are unable to agree as to the amount or extent thereof, Contractor may make a Claim
therefor as provided in Para�naph 10.05.
13.05 Chvner Muy Stop the Work
A. If the Work is defective, or Contractor fiails to supply sufficient sk.illed workers or suitable
materials or equipment, or iails to perform the Work in such a way that the completed Work
will confiorm to the Contract Documents, Owner may order Contractor to stop the Work, or any
portion thereof; until the cause for such order has been eliminated; however, this right of Owner
to stop the Work shall not give rise to any duty on the part of Owncr to exercise this right for
the benetit ot�Contractor, any Subcontractor, any Supplier, any other individual or entity, or any
surety for, or employee or agent of any of thcm.
'
CI'I'Y OI� 13KI:MI�RTUN
S'I'ANDARD GI?NI;RnL CONDITIONS
00700-53
1
13.06 Correctiof� or Removal of Def'ective Work
A. Promptly after receipt of written notice, Contractor shall corrcct all defective Work, whether or
not fabricated, installed, or completed, or, if the Work has becn rejected by Engineer, remove it
from the Project and replace il with Work that is not defective. Contractor shall pay all claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to such correction or removal (including but not
limited to all costs of repair or replaccment of work of others).
B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07,
Contractor shall take no action that would void or otherwise impair Owner's special warranty
and guarantee, ifany, on said Work.
13.07 Correction Periocl
A. If within one year after the date of Final Completion and Acceptancc (or such longer period ofi
time as may be prescribed by the terms of any applicable special guarantee required by the
Contract Documents) or by any specific provision of the Contract Documents, any Work is
found to bc dci'ectivc, or if the rcpair of any damages to the land or areas made available for
Contractor's use by Owner or perniitted by Laws and Regulations as contemplated in Paragraph
6.1 l.A is found to be defective, Contractor shall promptly, without cost to Owner and in
accordance with Owner's written instructions:
1. Repair such defective land or areas; or
2. Correct such defective Work; or
3. If the defective Work has been rejected by Owner, remove it firom the Project and replace it
with Work that is not defective, and
4. Satisfactorily correct or repair or remove and replace any damage to other Work, to the
work of others or other land or areas resulting therefrom.
B. It'Conlractor docs not promptly comply with the terms of Owner's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, Owner may have the
defective Work corrected or repaired or may have the rejected Work removed and replaced. All
clai►ns, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorncys, and other professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to such correction or repair or such removal
and replacement (including but not limited to all costs ot' repair or replacement of work of
othcrs) will be paid by Contractor.
C. In special circumstances where a particular item of equipment is placed in continuous service
before Substantial Completion of all the Work, thc correction period fior that item may start to
run from an earlier date if so provided in the Speci(ications.
D. Where defective Work (and damage to other Work resulting theref'rom) has been corrected or
removed and replaced under this Paragraph 13.07, the correction period hereunder with respect
C'I�I'Y OI' RRI',MI?K'I'ON STANI)ARI) GI?NliKnl_ CONI)1'I'IUNS
00700-54
1
�
to such Work will be extended for an additional period of one year after such correction or
removal and replacement has been satisfactorily completed.
' E. Contractor's obligations under this Paragraph 13.U7 are in addition to any other obligation or
warranty. The provisions of this Paragraph 13.07 shall not be construed as a subslitute lor, or a
waiver of, the provisions of any applicable statute of limitation or repose.
'
'
1
�
�
'
,
�
1
1
'
'
'
'
�
13.08 Acceptu»ce of Defc�ctive Work
A. [f, instead ofi requiring correction or removal and replacement of defective Work, Owner (and,
prior to Engineer's recommendation of final payment, Enginccr) prefiers to accept it, Owner
may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) attributable to Owner's evaluation ol' and
determination to accept such defective Work (such costs to be approved by Engineer as to
reasonableness) and for the diminished value of the Work to the extent not otherwise paid by
Contractor pursuant to this scntence. If any such acccptance occurs prior to Enginecr's
recommendation of tinal payment, a Change Order will be issued incorporating the necessary
revisions in the Contract Documents with respect to the Work, and Owner shall be entitled to an
appropriate decrease in the Contract Price, retlecting the diminished value ofi Work. so accepted.
If the parties are unable to agrcc as to the amount thereofi; Owner may rnake a Claim therefor as
provided in Paragraph 10.05. If the acceptance occurs after such recom►nendation, an
appropriate amount will be paid by Contractor to Owner. In no case shall the acceptance ofi
defective work waive any rights the Owner may have.
13.09 O►vner May Correct Defective Work
A. 11� Contractor fiails within a reasonable timc after written notice from Engineer to correct
defective Work, or to remove and replacc rejected Work as required by Engineer in accordance
with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the
Contract Documents, or if Contractor fails to comply with any other provision of the Contract
Documents, Owner may, after seven days written notice to Contractor, corrcct, or remedy any
such dcficicncy.
B. In exercising the rights and remcdies under this Paragraph 13.09, Owner shall proceed
expeditiously. In connection with such corrective or remedial action, Owner may exclude
Contractor from all or parl of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, take possession ofi Contractor's tools, appliances,
construction equipment and machinery at the Site, and incorporate in the Work all materials and
equipment stored at the Site or fior which Owner has paid Contractor but which are stored
elsewhere. Contractor shall allow Owner, Owner's representatives, agents and employces,
Owner's other contractors, and Engineer and Engineer's consultants access to the Site to enable
Owner to exercise the rights and remedics under this Paragraph.
C. All claims, costs, losses, and damagcs (including but not limited to all fees and charges of
engineers, architects, attorneys, and other profiessionals and all court or arbitration or other
dispute resolution costs) incurred or sustained by Owner in exercising the rights and remedies
under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be
CI'l�Y ()I' 13RI:ME:R"1'ON
S'I'ANI)AI2I) GI?NIiRAL CONDI'IIONS
00700-SS
1
issued incorporating the necessary revisions in the Contract Uocuments with respect to the
Work; and Owner shall be entitled to an appropriate decreasc in the Contract Price. If'the parties
are unable to agree as to the amount of the adjustment, Owner may make a Claim therefor as
provided in Paragraph 10.05. Such claims, costs, losses and damages will include but not be
limited to all costs of repair, or replacement of work ofi others destroyed or damaged by
correction, removal, or replacement of C:ontractor's defective Work.
D. Contractor shall not be allowed an extension of the Contract Times because of any delay in the
performance of the Work atlributable to the exercise by Owner of Owner's rights and remedies
under this Paragraph 13.09.
A1tTICLE 14 — YAYMENTS TO CONTRACTOR AND COMPLETION
14.01 .Scheclule of � [�altres
A. The Schedule ofi Values established as provided in Paragraph 2.07.A will serve as the basis t��r
progress payments and will bc incorporated into a fiorm of Application f'or Payment acceptable
to Engineer. Progress payments on account of Unit Price Work will be based on the number of
units completed.
14.02 Pro�,r��c,ss f'uvment.s
A. Applic•atinr�.s,fi�r Puyment.s:
At least 20 days beforc the date established in the Agreement for each progress payment
(but not more ofi�en than �nce a month), Conlractor shall submit to Engineer for review an
Application for Payment tilled oul and signed by C:ontractor covering the Work completed
as of the date of the Application and accompanied by such supporting documentation as is
required by the Contract Documents. If payment is requested on the basis ofi materials and
equipment not incorporated in the Work but delivered and suitably stored at the Site or at
another location agreed to in writing, the Application for Payment shall also be
accompanied by a bill of sale, invoice, or other documentation warranting that Owner has
received the materials and equipment free and clear of all Liens and evidence that the
materials and equipment are covered by appropriate property insurance or other
arrangements to protect Owner's interest therein, all of which must be satisfactory to
Owner. Paymcnt for Equipment not installed but stored on site with a value greater than
$10,000, will be paid at 50% ol'the invoice value.
2. Beginning with the second Application for f'ayment, each Application shall include an
affiidavit of Contractor stating that all previous progress payments received on account of
the Work have been applied on account to discharge Contractor's legitimate obligations
associated with prior Applications for Payment.
3. The net payment due the Contractor shall be the above-mentioned subtotal from which shall
be deducted the amount of retainage specitied herein and the total amount ofi all previous
payments made to the Contractor.
C:I'I�Y OI' RREMERT()N
. '
S'1'AND/�RI) GENI:iRnl. CONDI'IIONS
OPI'/00-SCi
'
a.' � Pursuant to RCW 60.28.010, the Owner will retain tive percent ofall progress payments
as a trust fund for the protection and payment of any person or persons, mechanic,
subcontractor, or supplier who performs any labor upon the conlract or work hereunder,
' and all persons who shall supply such person or persons or subcontractors with
provisions and supplies for carrying on such work, and the State of Washinglon with
respect to taxes imposed pursuant to Title 82 RCW which may be due from such
Contractor. In the event that during the perfiormance ofi the Contract and prior to the
expiration of the claim period as provided in Chapler 60.28 RCW, the amount retained
is reduced to any amount below fivc percent, then the Owner shall relain additional
sums from monies earned by the Contractor so as to maintain at all times a five percent
retained trust fund, unless othcrwise reduced or excuscd by provisions of Chapter 60.28
RCW.
b. Monies reserved under provisions ofi Chapter 60.28 RCW shall, at the option oi� the
Contractor, bc:
( I) Retained in a fund by the Owner with no intcrest paid thereon to the Contractor
and not subject to withdrawal until aftcr fnal acccplancc of'all Work, or a portion
thcrcof as maybe approved by the Owner: or
' (?) Deposited by the Owner in an interest-bearing account in a bank, mutua( savings
bank, or savings and loan associations, not subject to withdrawal until after final
acceptance ofi all Work, or a portion thereof, as may be approved by the Owner; or
'
�
'
(3) Placed in escrow in a bank or trust company by the Owner until thirty days
('ollowing final acccptance of the work as completed, or a portion thereof.. When
the monies reserved are to be placcd in cscrow, thc Owner will issue a chcck
representing the sum of the monies reserved payable to thc bank or trust company
and thc Contractor jointly. Such check shall be converted into bonds and
securities chosen by the Contractor and approved by the Owner, and the bonds
and securities held in escrow.
'
'
'
1
1
' CI�I Y OF F3RI?ME:R'I'()N
(4) A bond submitted by the Contractor for all or any portion of the retainage in a
fiorm acceptable to the Owner and from a surety meeting standards set by the
Owner. The Owner will accept the bond unless the Owner determines that there
is good causc for rejecting it. The Owner will release the bonded retainage
amount within 30 days of acccpting thc bond. The bond and any proceeds from it
are subjcct to claims in the same manner and priority as retainage set forth in
RCW 60.28.01 l. If thc Owner accepts a retainage bond from the Contractor, the
Contractor shall accept retainage bonds from any subcontractor or supplier I'rom
whom the Contractor retains funds. The Contractor shall relcase retained funds
within 30 days of acccpting the bond from a subcontractor or supplier.
(5) Under option 2 and 3 above, interest will be paid to the Contraclor as the interest
accrues.
STANU/�RD GENGRAI., CONDI'fIONS
007U0-57
�
(6) The Contractor shall designate the option desired in writing to the Owner not later
than with the Contractor's first Application for Payment. The Contractor, in
choosing option 2 or 3, agrecs to assume full responsibility to pay all costs which
may accrue from escrow services, brokcrage charges, or both, and fiirther agrees
to assume all risks in connection with the investment of the retained monies.
B. Review of�Applicutiorz,ti:
The Engineer will, within 8 working days after receipt of each Application for Payment,
cither indicate in writing a recommendation of payment and present the application to the
Owner, or rcturn the application to the Contractor indicating in writing the Engineer's
reasons for refusing to recommend payment. ln the latter case, the Contractor may make the
necessary corrections and resubmit the application. If the Enginecr still disa�nees with a
portion ofi the application, it will submit the application recommending the undisputed
porlion of the application to the Owner for payment and provide reasons (or recommending
non-payment of the disputed amount. Thirly days after presentation of the Application for
Payment with the Engineer's recommendation, the amount recommcnded will (subject to
the provisions of Paragraph 14.02E3.2) become due and when due will be paid by the Owner
to thc Conlractor.
2. Engineer's recommendation of any payment requested in an Application for Payment will
constitute a representation by Engineer to Owner, bascd on Engineer's observations of the
executed Work as an experienced and qualilied design professional, and on Engincer's
review of�the Application for Payment and the accompanying data and schedulcs, that to the
best of Engineer's knowledge, infiormation and belief:
a. The Work has progressed to the point indicated;
b. The quality of the Work is generally in accordance with the Contract Documents
(subject to an evaluation of the Work as a fiunctioning whole prior to or upon
Substantial Completion, thc results of any subsequent tests called for in the Contract
Documents, a tinal dctermination of quantities and classiiications for Unit Price Work
under Paragraph 9.07, and any other qualificalions stated in the recom►nendation); and
c. The conditions prcccdent to Contractor's being entitled to such payment appear to have
becn f'ulfilled in so far as it is Engineer's responsibility to observe the Work.
3. E3y recommending any such payment Engineer will not thereby be deemed to have
represented that:
a. lnspections made to check the quality or the quantity of the Work as it has been
perlormed have been exhaustive, extended to every aspect of the Work in progress, or
involved detailed inspections of the Work beyond thc responsibilities specilically
assigned to Engineer in the Contract Documents; or
CI"I'Y OF BItL•;MI;K"I'ON S I'ANI)AKL) GI:NI?RAI.. CONI�I'I'IONS
00700-SR
�
1 b. There may not be othcr matters or issues between the parties that might entitle
Contractor to be paid additionally by Owner or entitle Owner to withhold payinent to
Contractor.
1
1
'
1
'
1
1
�
'
1
1
'
'
4. Neither Engineer's revicw of� Contractor's Work for the purposes of recoil�mending
payments nor Engineer's recommendation of any payment, including final payment, will
impose responsibility on Engineer:
a. To supervise, direct, or control the Work, or
b. For the means, methods, tcchniques, scquences, or procedures of conslruction, or the
safety precautions and programs incident thereto, or
c. For Contractor's fiailure to comply with Laws and Regulations applicable to
Contractor's perfiormance o!'the Work, or
d. To make any examination to ascertain how or for what purposes Contractor has used the
moneys paid on account ofthe Contract Price, or
e. To determine that title to any o1'the Work, materials, or cquipment has passed to Owner
free and clear of any Liens.
5. Engineer may rcfuse to rccommend the whole or any part of any payment ifi; in Engineer's
opinion, it would be incorrect to ►nake the representations to Owner stated in
Paragraph 14.02.8.2. Enginccr may also refuse to recommend any such pay►nent or,
because ofi subsequently discovered evidence or the results of subsequent inspections or
tests, revise or revoke any such payrnent recommendation previously madc, to such extent
as may be necessary in Engineer's opinion to protect Owner firom loss bccause:
a. Thc Work is defective, or completed Work has been damaged, requiring correction or
replacement;
b. The Contract Price has been reduced by Change Orders;
c. Owner has been required to correct defective Work or complete Work in accordance
with Paragraph 13.09; or
d. Engineer has actual knowledge ofi the occurrence ofi any of the events enumerated in
Paragraph 15.02.A.
C. Pcn�ment Becomes Duc:
l. Thirty days after presentation of the Application for Payment to Owncr with Engineer's
' recommendation, the amount recommended will (subject to the provisions of Paragraph
14.02.D) become due, and when due will bc paid by Owner to Contractor.
1
D. Redr.�ction in Pcry�ment.•
I. Owner may refuse to make paymcnt of the full amount recommended by Engineer because:
' CITY OI' 13RE,MIiR fON
S"I'ANUnitl) GLiNI:RAI, C'ONUI I'IONS
00700-59
'
a. Claims have been made against Owner on account of Contractor's performance or
furnishing of the Work;
b. Liens have been tiled in connection with the Work, except where Contractor has
delivered a specifiic bond satisfactory to Owner to secure the satistaction and discharge
of such Liens;
c. There are other items entitling Owner to a set-ofifi against the amount recommended; or
d. Owner has actual knowledge of the occurrence of any of the events enumerated in
Paragraphs 14.02.B.S.a through 14.02.[3.S.c or Paragraph 15.02.A.
2. If Owner refuses to make payment of the full amount recommended by Engineer, Owner
will give Contractor irnmediate written notice (with a copy to Engineer) stating lhe reasons
for such action and promptly pay Contractor any amount remaining afler deduction of the
amount so withheld. Owner shall promptly pay Contractor the amount so withheld, or any
adjustment thereto agreed to by Owner and Contractor, when Contractor remedies the
reasons for such action.
3. Upon a subsequent determination that Owner's refusal of paymcnt was not justified, the
amount wronglully withheld shall be treated as an amount due as determined by Paragraph
14.02.C.1 and subject to interest as provided in the Agreemcnt.
14.03 Contractor'.s Waf•r�rnt}� ��f �Title
A. Contractor warrants and guarantees that title to all Work, materials, and equipment covered by
any Application ior Payment, whether incorporated in thc Project or not, will pass to Owner no
later than the time of payment tcee and clear of all Licns.
14.04 Suh.starrtial Completion
A. When the Contractor considers the Work ready for its intended use, the Contractor shall notify
the Owner and the Engineer in writing that thc Work is substantially complete. Thc Contractor
shall attach to this request a list of all work items that the Contractor knows are not complele
and a request that the Engineer prepare a Notice of Substantial Completion and a Correction
List of items to be completed before linal payment. At a mutually-agreed timc thereafter, the
Owner, the Contractor, and the Engineer shall inspect the Work to determine the status ofi
completion. If the Engineer does not consider the Work substantially complete, or does not
consider the list of' remaining work items to be comprehensive, the Engineer will notify the
Contractor in writing giving the reasons therefor. If the Enaineer considers the Work
substantially complete, the Engineer will prepare and delivcr to the Owner for its execution and
recordation the Notice of Substantial Completion signed by the Engincer and Contractor, which
shall fix the date of Substantial C'ompletion. The Contractor shall complete all incomplete
work and shal I complcte all items on the Correction List not latcr than 30 calendar days after the
date ofi Substantial Completion
B. Owner shall havc the right to exclude Contraclor from the Site after the date of Substantial
Completion subject to allowing Contractor reasonable access to removc its property and
complete or corrcct items on the tentative list.
C;ITY OF BREMER"I'ON S'I'nNDANI� C)IiNL',Rt�l, C()NI)1'I'IONS
00700-60
'
' 14.05 1'urtial Utilization
A. The Owner shall have the right to utilize or place into servicc any item of cquipment or other
' usable portion of the Work prior to completion ofi the Work. Whencver the Owner plans to
exercise said right, the Contractor will be notified in writing by the Owner, identiiying the
specifiic portion or portions of the Work to be so utilized or otherwise placed into service.
�
'
1
1
1
'
,
B. The Contractor understands and agrees that until and unless such written notifiication is issued,
all responsibility for care and mainlenance of all of the Work shall be borne by the Contractor,
and that Paragraph 14.04 shall apply with respect to certification ol' Substantial Completion of
the Work. Upon issuance of said written notice of Partial Utilization, the Owner will accept
responsibility f'or the protection and maintenance of all such items or portions of the Work
dcscribed in lhe written notice.
C. The Contractor shall retain fiall responsibility for satisfactory completion of the Work,
regardless of whethcr a portion thereofi has been parlially utilizcd by the owner, and the
Contractor's one ycar correction period shall commencc only aflcr the date of Substantial
Completion for the Work.
D. The Owner shall have tfie right to control, operate, repair, or modify the Work, or take any other
suitable action with rcgard to the Work, during emerbencies of any nature whatsocver.
E. No occupancy or separate operation of part of the Work may occur prior to compliance with the
requirements ofi Naragraph 5.10 regarding property insurancc.
14.06 Finnllns�ectiori
' A. i.Jpon written notice trom Contractor that the entire Work or an agreed portion thereofi is
complete, Engineer will promptly make a final inspection with Owner and Contractor and will
notity Contractor in writing of all particulars in which this inspection reveals that the Work is
' incomplete or delective. Contractor shall immediately take such measures as are necessary to
complete such Work or remedy such deficiencies.
' B. When all incomplete Work has been completed, all Defective Work has been corrected or
accepted by the Engineer and Owner, and all ofi the Contractor's dulics and requirements have
been satisfactory discharged, the Engineer will prepare and deliver to the Owner for its
, execution and recordation lhe Notice of Final Completion and Acceptance of the Work, signed
by the Engineer and Contractor, which shall fix the date of Final Coir�pletion and Acccptance.
' 14.07 Finul Yayment
'
,
'
A. Applicutio�t for Pcryment:
After the Contractor has, in the opinion of the Engineer, satisfactorily completed all Work
and corrected all Defective Work, and has delivered, in accordance with the Contract
Documents, all maintenance and operating instructions, schedules, guarantees, [3onds,
certiticates and Record Documents (as provided in Paragraph 6.12), And the Engineer has
delivered the Notice of Final Completion and Acceptancc of the Work, the Contractor may
CI'I'Y OI� BRI,MER'I ON
S'I'ANDARI) GI:NIiRAI� CONI)I'I'IONS
00700-61
�I
make application fior final payment following the procedure established for progress
payments. •
2. The final Application for Payment shall be accompanied (exccpt as previously delivered) by
a. All documentation called for in the Contract Documents, including but not limited to
the evidence oi' insurance required by Paragraph 5.04.
b. Consent ol'the surety, if any, to final payment;
c. A list of all C:laims against Owner that Contractor believes are unsettled; and
d. Complete and legally effective releases or waivers (satisfactory to Owner) ofi all Licn
rights arising out of or Liens filed in conneclion with the Work.
3. In lieu of the releases or waivers bf Liens specified in Paragraph 14.07.A.2 and as approved
by Owner, Contractor may turnish receipts or rcleases in full and an at�idavit of Contractor
that: (i) the releases and receipts include all labor, services, material, and equipment for
which a Lien could be filed; and (ii) all payrolls, material and equipment bills, and othcr
indebtedness connected with the Work for which Owner might in any way be responsible,
or which might in any way result in liens or other burdens on Owner's property, have bcen
paid or otherwisc satistied. If any Subcontractor or Supplier fails to furnish such a release or
receipt in full, Contractor may furnish a bond or other collateral satisfactory to Owner to
indemniiy Owner against any Lien.
B. Ln�Tineer .s Review of Application and Acceptance:
1. If; on the basis of Engineer's observation of the Work during construction and iinal
inspection, and Engineer's review of the fiinal Application for Payment and accompanying
documcntation as required by the Contract Documents, Engineer is satistied that the Work
has been completed and Contractor's other obligations under the Contract Documents have
been fultilled, Enginecr will, within ten days at�er receipt of thc final Application tor
Payment, indicate in writing Engineer's recommendation of payment and present the
Application for Payment to Owncr for payment. At the same time Engineer will also give
written notice to Owner and Contractor that the Work is acceptable subject to the provisions
of I'aragraph 14.09. Otherwise, Engineer will return the Application for Payment to
Contractor, indicating in writing the reasons fior refusing to recommcnd final payment, in
which case Contractor shall make the necessary corrections and resubmit the Application
for Payment.
2. After execution of the Notice of Final Completion and Acceptance of the Work by the
Owner, and execution of the "Acceptance of Compensation and Release of All Claims" by
the Contractor (as provided in Paragraph 14.09.B of thc General Conditions), thc Uwner
will make final payment to the Contractor of thc amount remaining afier deducting all prior
payments and all amounts to be kept or rctained under thc provisions of thc Contract
Documcnts, including the fiollowing items:
a. Liquidated damages, as applicable; and,
CI'I�Y UI� BRI;MI?R'1'C)N
S'I'AND/�RD GfiNF.IZAL CONDI'I'IONS '
0(1700-62
,
1
1
'
1
�
b. Amounts withheld by Owner under Parag 14.02.B.1 which have not been released;
and, Two times the valuc of outstanding items of correction work or Correction List
items yet uncompleted or uncorrected, as applicable. All such work shall be completed
or corrected to the satisiaction of the Owner within the time stated herein and on the
Notice of' Substantial Completion, otherwise the Contractor does hereby waive any and
all claims to all monies withheld by the Owner to cover the value of all such
uncompletcd or uncorrccted itcros.
C. Puvment Becomes Dzre:
l. Thirty days a(�cr the presentation to Owner of the Application for Paymcnt and
' accompanying documentation, the amount recommended by Engineer, less any sum Owner
is entitled to set off against Engineer's recommendation, including but not limited to
liquidated damages, will beco►ne due and will be paid by Owner to Contractor.
'
D. Rclease of Retainage and Other Dcductions
' 1. After cxecuting the Notice of Final Completion and Acceptance (Paragraph 14.06), and not
more than 60 days thereat�er (based on a 45-day claims period and 15-day processing tirnc),
the Owner will releasc to the Contractor thc retained funds withhcld pursuant ,to the
' Agreement, less any deductions to cover pending claims against the Owner pursuant to
Para� �14.02.B, providcd the following conditions are met:
�
'
'
a. Certificatcs approved by the Washin��ton State Department of Labor and Industries,
Washin�rton State Employment Security Department, and all other departmcnts and
agencies having jurisdiction over the activities ot'the Contractor have becn provided to
the Owner.
b. lfi the Contract Price hereunder exceeds $20,000, a release obtained from the Washington
Statc Deparlment of Revenuc has been provided to thc Owner.
' c. Aftidavits of Wages Paid for the Contractor and each subcontractor approved by
Washinglon Statc Department o1' Labor and Industries have bcen provided to the
Owner.
'
�
'
d. No clai►ns, as provided by law, have been (iled against the retainage.
e. The Owner has no claims under this Contract.
f: Affidavit of total monics paid (if any) to each Minority Women F3usiness Enterprise
subcontractor utilized on the project.
g. Acceptance of Compensation and Relcase of All Claims fiorm submiried to the Engineer.
1
, CI"1'YOI� 13RI;M1?R'I'ON
S'I�ANDARD GENI:RAL CONDI'170NS
00700-63
�
2. In the event that claims filed are not resolved at the end of the 45 day claim period, the
Contractor shall be paid such retainage less amount sui�ficient to pay all claims or notices,
together with a sum determined by the Owner to be suffiicient to pay the cost of such action
and to cover attorney's fees, and any sums detennined by the Owner sufficient to pay its
claims against the Contractor.
3. Upon expiration ofi the 60 day period relerred to in Paragraph 14.07.D.1, the amounts
withheld pursuant to the provisions o1' Paragraph 14.02.B and D, for all remaining work
items will be paid to the Contractor; provided that said work has been completed or
correcled to the satisfaction of the Owner within the 30 day period. Otherwise, the
Contractor does hereby waive any and all claims fior all monies withheld by the Owner
under this Agree►nent in an amount two times the value of such remaining uncompletcd or
uncorrected items.
I 4.08 T'inu/ Comp/etiorr Delayed
A. If, through no fault of Contractor, final completion of the Work is signiticantly delayed, and if�
Engineer so confirms, Owner shall, upon receipt of Contractor's final Application for Payment
(for Work fully completed and accepted) and recommendation of Engineer, and without
terminating the Contract, make payment of the balance due for that portion ofi the Work fully
completed and accepted. If the remaining balance to be held by Owner for Work not fully
completed or corrected is less than thc refainage stipulated in the Agreement, and if bonds have
becn furnished as required in Paragraph 5.01, the writlen consent of the surety to the payment of
the balance due for that porlion of the Work fully completed and accepted shall be submitted by
Contractor to Engineer with the Application f'or such payment. Such payment shall be made
under thc terms and conditions governing final payment, except that it shall not constitutc a
waiver of Clairns.
14.09 Waiver of �Claim.s
A. The making and acceptance of final payment will constitute:
A waiver of all Claims by Owner against Contractor, except Claims arising from unscttled
Liens, from defective Work appcaring after iinal inspection pursuanl to Paragraph 14.06,
from failure to comply with the Contract Documents or the terms of any special guarantees
specifiied therein, or from Contractor's continuing obligations under the Contract
Uocuments; and
2. A waiver of' all Claims by Conlractor against Owner other than those previously made in
aci;ordance with the requirements herein and expressly acknowledged by O�vner in writing
as still unsettled.
B. Acceptance of Compensation and Release ofi All Claims.
Bcfore final payment will be made by the Owner, the Contractor will be required to sign the
"Acceptance of Compensation and Release of All Claims" f'orm stating the Conlractor's
acceptance of the tinal payment as the full and tinal amount due i'rom the Owner. An example
form is located in Appendix A.
CI'I'Y OI' F21t1.:MI;R'I'()N S"1'ANI)ARD (;ENI;RAI. C'ONDI'I'IONS
00700-64
'
�
1
'
'
'
l�'
'
ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION
15.01 Owner N1ay Sarspend Work
A. At any time and without cause, Owner may suspend the Work or any portion thereof for a
period of not more than 90 consecutive days by notice in writing to Contractor and Engineer
which will fix the date on which Work will be resumed. Contractor shall resume the Work on
the date so fxed. Contractor shall be granted an adjustment in the C;ontract Price or an
extension of thc Contract Times, or both, directly attributable to any such suspension il'
Contractor makes a Claim therefior as provided in I'aragraph 10.05.
15.02 Owne�� Mcry• Terrninate for Cuusc
A. The occurrence of any one or more ol�the following events will justify termination for cause:
l. Contractor's persistent failure to perf'orm the Work in accordance with the Contract
Documents (including, but not limited to, failure to supply su1'ficient skilled workers or
suitable matcrials or equipment or failure to adhere to the Progress Schedule establishcd
under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04);
2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction;
'
'
�
'
'
'
'
'
'
1
3. C:ontractor's disregard of the authority ot'Engineer; or
4. Contractor's violation in any substantial way of any provisions of lhe Contract Documents. �,
B. Ifi one or more oi'the events identified in paragraph 15.02A occur, Owner may, after giving
Conlractor (and the surety, ifi any) seven days written notice, terminate the services of the
Contractor, exclude the Contractor from the Site, and take possession of the Work and of all of
the Contractor's tools, applianccs, construction cquipment, and machinery ai the Site, and use
the sa►ne to the full extent they could be uscd by Contractor (without liability to Contractor fior
trespass or conversion), incorporate in the Work all materials and equipment stored at the Site
or for which the Owner has paid Contractor but which are stored elsewhere, and tinish the
Work as the Owner may deem expedient.
C. [f Owner procecds as provided in Paragraph 15.02.B, Contractor shall not be entitled to receive
any further payment until the Work is completed. II'the unpaid balance of the Contract Price
excecds all claims, costs, losses, and damages (including but not limited to all fees and charges
of engineers, archilects, attorneys, and other professionals and all court or arbitration or other
dispute resolution costs) sustained by Owncr arising out ofi or relaling to completing the Work,
such cxcess will be paid to Contractor. If such claims, costs, losses, and damages exceed such
unpaid balance, Contractor shall pay the difterence to Owner. Such claims, costs, losses, and
dama�es incurred by Owner will bc reviewed by Engineer as to their reasonableness and, when
so approved by Engineer, incorporated in a Change Order. When exercising any righls or
remedies under this Paragraph, Owner shall not be required to obtain the lowest price for the
Work perlormcd.
D. Notwithstanding Paragraphs 15.02.B and 15.02.C, Contractor's services will not be terminated if
Contractor begins within seven days of reccipt ofi notice of intent to terminate to correct its
C11'Y OF BRF:MER'I'ON
S'I'nNDARI) GI�NI:RnI. CONI.)I'I'IONS
00700-65
,
f'ailure to perform and proceeds diligently to cure such failure within no more than 30 days of
reccipt of said noticc.
E. Where Contractor's services havc been so terminated by Owner, the termination will not atfiect
any rights or remedies of Owner against Contractor then existing or which may thereafler
accrue. Any retention or payment of money due Coniractor by Owner will not release
Contractor from liability.
F. Il' and to the cxtent that Contractor has providcd a performance bond under the provisions of
Parageaph S.OI.A, the tern�ination procedures of that bond shall supersede the provisions of
Paragraphs 15.02.B and 15.02.C.
15.03 Otiv»er• Muy Terminate For Conveniencc�
A. Upon seven days written notice to Contractor and Engineer, Owner may, without cause and
without prejudice to any other right or remedy of Owner, tenninate the Contract. In such case,
Contractor shall be paid for (without duplication ofi any items):
l. Completed and acceptable Work executed in accordance with the Contract Documents prior
to the cf�'ective date of termination, including fair and reasonable sums for overhead and
profit on such Work;
2. Expenses sustained prior to the efi�ective date o1' termination in performing services and
furnishing labor, materials, or equipment as required by the Contract Documents in
connection with uncompleted Work, plus fair and reasonable sums for overhead and profiit
on such expenses;
B. Contractor shall not be paid on account of loss of anticipated profits or revenue or other
economic loss arising out ofi or resulting from such termination.
15.04 Contractor ll�luy StoJ� Wo�-k nr Termii7ate
A. It; through no act or fault of Contractor, (i) the Work is suspended for more than 90 consecutive
days by Owner or under an order ofi court or other public authority, or (ii) Engineer fiails to act
on any Application for Payment within 30 days after it is submitted, or (iii) Owner fails for 60
days to pay Contractor any sum (inally deter►nined to be due, then Contractor may, upon
Fourteen days written notice to Owner and Engineer, and provided Owner or Engineer do not
remedy such suspension or failure within that time, terminate the Contracl and recovcr from
Owner payment on the same terms as provided in Naragraph 15.03.
B. In lieu of terminating the Contract and without prejudice to any other right or remedy, if
Engineer has failed to act on an Application for Payment within 30 days after it is submitted, or
Owner has fiailcd for 60 days to pay Contractor any sum finally determined to be due,
Contractor may, Fourleen days aiier written notice to Owner and Engineer, stop the Work until
payment is made of all such amounts due Contractor, including interest thereon. The provisions
of this Paragraph 15.04 are not intended to preclude Contractor from making a Claim under
Paragraph 10.05 for an adjustment in Contract Price or Contract Timcs or otherwise for
expenses or damage directly attributable to Contractor's stopping the Work as permitted by this
Para�raph.
CI'I'Y OF BRGML•:K"I'ON S'I'ANI�ARD GL;NI',RAL CONDI"I'IONS
00700-66
�
'
'
'
'
ARTICLE 16 — DiSPUTE RCSOLUTION
16.01 Methoc�!s and Procedz�re,s
A. Time Limitation and Jurisdiction. The Owner and Contractor hereby mutually agree that, lor the
convenience o1'both parties, any claims or causes of action which the C:ontractor has against the
Owncr shall be brought within I 80 calendar days a1�er the date oP linal payment by the Owner.
(t is furthcr agreed by Owner and Contractor that all such claims or causes ofi action, if
resolution is sought through litigation, shall be brought only in thc Superior Court of Kitsap
County, Washington.
l3. Conditions Precedent. Bet��re seeking claim resolution through litigation, the C.:ontractor shall
' proceed under lhe administrative procedures required by Paragraphs 9.08 and 10.05. The
provisions of these Paragraphs must be complied with in full as conditions precedent to the
Conlractor's right to seek claim resolution through litigation.
'
�
1
'
�
'
'
'
1
'
'
AItTICLE 17 — MISCELLANEOUS
17.01 Givin�� Notice
A. Whenever any provision ofthe Contract Documents requires the giving oi'written notice, it will
be deemed to havc been validly given if
Delivercd in person to the individual or to a member o(' the fiirm or to an ot�icer of the
corporation Ior whom it is intended; or
2. Delivered at or sent by rcgistered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
17.02 ComJ�z�tution of'Times
A. When any period of time is relerred to in the Contract Documents by days, it will be computed
to exclude the first and include the last day of such period. If the last day of any such period
falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicablc
jurisdiction, such day will be omittcd from the computation.
17.03 CIli711lICllIVC' Remec/ie.s
A. Thc duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hcreto are in addition to, and are not to be construed in any
way as a limitation oi; any rights and remedies available to any or all of them which are
otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by
other provisions of the Contract Documents. The provisions of this Paragraph will be as
effective as ii' repeated specifcally in the Contract Documents in connection with each
particular duty, obligation, right, and remedy to which they apply.
'
crrY oi t3izi:Mf R�rc�N
S'I�nNI)ARI) GENI�RAL C(�NDITIONS
00700-fi7
'
17.04 S2rrvivul of �Obligutions
A. All representations, indemnifications, warranties, and guarantces made in, required by, or givcn
in accordance with the Contract Documents, as well as all continuing obligations indicated in
the Contract Documents, will survive final payment, completion, and acceptance ofthe Work or
termination or completion of the Contract or termination of the services of Contractor.
17.05 Controllin� Lutiv
A. This Contract is to be governed by the laws of the State of Washington.
17.06 Neudirtgs
A. Arlicle and paragraph headings are inserted for convenience only and do not constitute parts oi�
thesc General Conditions.
17.07 Admiizi.stra/ive Pr��cedr�re,s ur�d Form.s
A. Various administrative forms are required to be uscd by the Contractor or will be otherwise
presented to the Contractor during the performance of'the Work including:
1. Requcst for Clarilication (RFC)
?. Shop Drawing Submittal/Transmittal
3. Work Change Directive
4. Change Order
5. Daily Force Account Report
6. Application and Certiticate for Payment (I'ro�ress Payment Form)
These forms will be distributed to the Contractor at the Preconstruction Conference referenced
in Paragraph 2.06 or will be otherwise presented to the Contractor for signature as provided
herein.
17.08 Ri�ht to Azrdit
A. If'the Contractor submits a claim to the Owner for additional compensation, the Owner shall
have lhe right, as a condition to considering the claim, and as a basis for evaluation of the claim,
and until the claim has been sett(ed, to audit the Contractor's books to the extent they are
rclevant. This right shall include the right to examine books, records, documents, and other
evidence and accounting procedures and practices, sufficient to discover and verify all direct
and indirect costs ofi whatever nature claimed to have been incurred or anticipated to be
incurred and for which the claim has been submitted. The right to audit shall include the right
to inspect the Contractor's plant, or such parts thercof, as may be or have bccn engaged in the
performance of'the Work. The Contractor f'urther agrees that the right to audit encompas.ses all
subcontracts and is binding upon Subcontractors. The rights to examine and inspect hcrein
C'1'I'Y UI' 13RF..MF..R"1'ON
�
S'I'ANUARI� (iFNI�RAI, CONDI'flONS
oo�oo-�x
1
'
'
'
C�
provided t��r shall be exercisable through such represeniatives as the Owner deems desirable
during the Contractor's normal business hours at the office ofi the Contractor. The Contractor
shall make available to the Owner fior auditing, all relevanl accounting records and documents,
and other financial data, and upon request, shall sub►nit true copies of requested records to the
Owncr.
17.09 Scveruhilih-
A. If any term or provision of this Agreement is declared invalid or unenforceablc by any court of
, Jawful jurisdiction, thc remaining terms and provisions of the Agrcement shall not be afifected
thereby and shall remain in full force and etfect.
�
,
'
1
'
'
'
1
'
,
'
'
17.10 Wui ver
A. The waiver by the Owner of any breach or violation of any tcrm, covenant or condition of this
Agrecment or of any provision, ordinance, or law shall not be deemed to bc a waivcr of any
other lerm, covenant, condition, ordinance, or law or of� any subsequcnt breach or violation of
the same or of any other term, covenant, condition, ordinance, or law. The subsequent payment
ofi any monies or fee by the Owner which may become due hereunder shall not be deemed to be
a waiver ofi any preceding breach or violation by Coniractor or any lcnn, covenant, condition of
this Agreement or of any applicable law or ordinance.
ARTICLE 18 — WASHINGTON STATE REQUIREMFNTS
18.01 Trerrch F.xc uvatic�n Sufe Sy,stem,s
A. As requircd by RCW 39.04.180, on public works projects in which trench cxcavation will
exceed a depth of four feet, any contract therefor shall require adequate safiety systems for the
trench excavation that meet the requirements of the Washington Division ofi Industrial Salety
and Health Act, Chapter 49.17 RCW. This requirement shall be included in the cost
estimatcs and bidding forms as a separate item. The costs of trench safety systems shall not
be considered as incidental to any other contract item and any attempt to include the trench
safety systems as an incidcntal cost is prohibited.
18.02 PGVI7IL'i1t Of P)'L'VGZIlJ1� WC1�4,
B. In accordance with Revised Code of Washington Chapters 39.12 and 49.28 as amended or
supplcmented, and any regulations adopted pursuant to these statutes, there shall be paid to
all Iaborers, workmen or mechanics employed on this contract at least the prevailing rate of
wage for an hour's work in the same trade or occupation in the area of work regardless of any
contractual relationship which may exist, or be alleged to exist, between the Contractor and
any la6orers, workmen, mechanics or subcontraclors.
C'. The prevailing wage rates to be in force during the duration ofi this contract are included in
Attachment A located at the end of the Supplementary Conditions. However, the Contractor
shall be obligated to confirm that the ratcs are current and conform to the controlling statutes
and regulations. Any wage deticiencies shall be at the Contractor's sole risk and expense.
'
CI'I'Y ()I� HRFMER"I'()N
Sl'ANI)ARI) GF;NIiRAI, CONDI'I'IONS
00700-G9
1
The wage rates shall be included as part of any subcontractors the Contractor may enter into
for work on this project.
D. The "prevailing rate of wage" shail be the rate of hourly wage, usual benefits, and overtime
paid in the locality, as hereinafter detined, to the majority of workmen, laborers, or
mechanics, in the same trade or occupation. In the event that there is not a majority in lhe
same trade or occupation paid at the same ratc, then the average rate of hourly wage and
overti►ne paid to such laborers, workmen or mechanics in the same trade or occupation shall
be the prevailing rate. If the wage paid by any Contractor to laborers, workmen or mechanics
on any public work is based on some period o1'time other than an hour, the hourly wage for
the purposes of this shall be mathematically detcrmined by the number of hours worked in
such period of ti►ne.
E. The "locality" shall be the largest city in the county wherein the physical work is being
performed.
F. The "usual benefits" shall include the amount of:
1. The ratc of contribution irrevocably made by the Contractor to a trustce, or to a trustec or to
a third person pursuant to a fund, plan, or program; and
2. The rate of costs to the Contractor which may be reasonably anticipated in providing
benelits to workmen, laborers, and mechanics pursuant to an enl'orceable commitment to
carry out a linancially responsible plan or program which was communicated in writing to
the workmen, laborcrs, and mechanics affected, for medical or hospital care, pensions on
retirement or death, compensation for injuries or illness resulting from occupational activity,
or insurancc to providc any of thc foregoing, for unemployment benetits, lifie insurancc,
disability and sickness insurance, or accident insurance, fior vacation and holiday pay, l��r
defraying costs of apprenticeship or other similar programs, or for other bona fide fringe
benefits, but only where the Contractor is not required by othcr Federal, statc or local law to
provide any of such benefits.
G. The rulcs and regulations of the Department of Labor and Industries and the schedulc of
prevailing wage rates for the locality or localities where this contract will be perfiormed as
determined by the industrial Statistician of the Department of Labor and Industrics, are by
reference made a part of this contract as though fully set forlh herein. Inasmuch as the
Contractor will be held responsible for paying the prevailing wages, it is imperative that all
Contractors fiamiliarize themselves with the current wage rates before submitting their bids
based on thesc specifications on projects govcrned by wage rates determined by the State of
Washington Department of Labor and Industries and the U.S. Secretary of Labor. If there is a
dififierence between the two in the prevailing rate ofwage for a similar classifiication of labor,
the Contractor shall pay not less than the wage which is the higher ofi the two.
H. The Contractor, on or bcfore the date of commencement of work, shall fiile a statement under
oath with the Owner and with the director of Labor and Industries certifying the rate of hourly
wage paid and to be paid each classifiication of laborers, workmen, or mechanics employed
upon the work by the Contractor or Subcontractor which shall be not less than the prevailing
CITY OF 13RI;MERTON S'I'nNDAKD GI?NEKAL CONDI'I'IONS
00700-70
,
1 rate of wage. Such statement and any supplemental statements which may be necessary shall
be filed in accordance with the practices and procedures required by the Department of Labor
and Industries.
,
1
�
LJ
1
'
1
�
'
�
1
'
L_�
1
�
In case any disputc arises as to what are lhe prevailing rates of wages for work ofi a similar
nature and such dispute cannot be adjusted by the parties in interest, including labor and
management representatives, the matter shall be referred for arbitration to the Dircctor ofi the
Department of Labor and Industries of the State of Washington and his decision therein shall
be final and conclusive and binding on all parties involved in the dispute.
J. Prior to commencing work, each contractor and each and every subcontractor shall fiile a
sworn statement of intent with the Owner and with the Department o1' Labor and Industries as
to the prevailing wage rate, including I'ringe benelits, for each job classilication to be utilized.
K. Each application for payment submitted by a Contractor tor payment on a project estimate
shall state that prevailing wages have been paid in accordance with the pre-filed statement or
statcments of intent on tile with the Department of Labor and Industries as approved by the
Industrial Statistician.
L. At the conclusion of the project, the C:ontractor and its subcontractors shall submit affidaviis
of wagcs paid and request for release to the Department of Labor and Industries for
certification by the Director. Release o1' retainage on the contract shall be withheld until
certification by the Director has been received by the Owner that the prevailing wa�e
requirements of thc law have been satis(ied.
18.03 Wcctej� Pc�Ilrrtion Cnntrol Reqarir•emcj�t.s
A. The Contractor shall conduct thc Work in accordance with all applicable pollution control
laws. The Contractor shall comply with and be liable for all penalties, damages, and
viotations under Chapter 90.48 RCW, in performance ot'thc Work.
18.04 Yreventinn of�L'nvif�onmental Pollution & Preservuzio» off'zihlic Nutz�ral Resorrrces
A. Thc following list represents those federal, state and local statutes, ordinances and regulations
pertinent to the preservation of public natural resources currently known to the Owner that
may aficct or are atfected by the work. l3idders shall rcview such materials and related
regulations prior to submitting bids.
1. Federal. National Environmental Policy Act ol� 1969, 42 USC;C 4321 et. seq; Executive
Order 1 1514; Clean Water Act, 33 USGC 1251 et seq.
2. STATE. Water Pollution Control Act, Chapter 90.48 RCW; State Environmental Policy
Act ofi 1971, Chapter 43.21 C RCW and WAC Chapter 197-1 l; Noise Control Act of 1974,
Chapter 70.107 RCW; Washin�,non Clean Air Act, Chapter 70.94 RCW and WAC Chapter
173-400; Shoreline Management Act of 197i; Chapter 90.58 RCW.
END OF SECTION
� CI'I'Y OI' BRI;ME:K'fON
S'I�ANI)nRl.) GI'.NERAL CONDI'I'IONS
00700-71
1
1
'
,
SECTION 00800
SUPPLEMENTARY CONDITIONS
GENERAL
, These Supplementary Conditions (SC's) amend or supplement the Standard General Conditions
(General Conditions) of the Construction Contract and other provisions of the Contract Documents
' as indicated below. All provisions which are not so amended or supplemented remain in full Force
and effect.
�
'
i
�
'
�
�
ARTICLE 2 - PRELIMINARY MATTERS
SC - 2.05.A.3 Delete Paragraph 2.05.A.3 of the General Conditions and replace with the following
text.
3. The Contractor shall submit a detailed Schedule of Values (SOV) at the pre-
constructiori meeting for review by the Owner. At a minimum, the SOV shall include
the following items: �nobilization (not to exceed 10% of the base bid cost),
subcontractor costs, cutting/restoring door panel, preliminary cleaning, abrasive
blasting, prime coat, stripe coat, intermediate coat, top coat, cleaning and
disinfection, site restoration and force account. Payment requests will not be
approved until the Schedule of Values has been reviewed and accepted by the
Owner.
SC - 2.06.B. Add the Following paragraph:
B. The Pre-construction conference/meeting shall at a minimum cover the following
topics:
• Name, authority, responsibilities, and contact information for parties involved
1
'
'
1
'
• Review of pre-construction submittals.
• Project Procedures:
- Progress Meetings
- Correspondence
- Notification
- Submittals
- Requests for Clarifications
- Change Orders and Work Change Directives
' RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
SUPPLEMENTARY CONDITIONS
00800-1
'
• Confirmation of hours and days of work
• Overall Schedule
• Site Security
• Site Concerns
• Temporary Utilities and Controls
• Hold/Inspection Points
• Quality Control
• Testing During Construction
• Contractor's Coordination
• Data Collection
• Punch Lists and Project Closeout Procedures
• Final Deliverables including Record Drawings, Approved Submittals, Quality
Control Reports, and Special Guarantees.
ARTICLE 3- CONTRACTS DOCUMENTS; INTENT, AMENDING, �tEUSE
SC - 3.03.B. Delete Paragraph 3.03.B.1.a of the General Conditions in its entirety and
insert the following in its place:
A. In resolving conflicts resulting from errors or discrepancies in any of the Contract
Documents, the order of precedence shall be as follows:
1. Permits from other agencies as may be required by law
2. Change Orders
3. Agreement
4. Addenda
5. Contractor's Bid (Bid Form)
6. Supplementary Conditions
7. General Conditions
8. Technical Specifications
9. Referenced Standard Specifications
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
SUPPLEMENTARY CONDITIONS
00800-2
�
�
1
'
�
�
�
'
'
�
�
�
1
'
�
'
10. Drawings
With reference to the Drawings the order of precedence is as follows:
a. Dimensions govern over scaled di►nensions.
b. Detail drawings govern over general drawings.
c. Addenda and Change Order drawings govern over any other drawings.
d. Contract Drawings govern over standard drawings.
ART[CLE 4- AVAILAB➢LITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
SC - 4.02.0 Add the following paragraph after 4.02B of the General Conditions.
C. CONTRACTOR may rely upon the general accuracy of the technical data contained in
reports and drawings listed below, except for such physical dimensions that can be field
verified. The reports are available from the Engineer upon request. Reports and
drawings shall not be understood to be, and are NOT Contract Documents. The
Contractor shall indemnify, defend, and hold harmless the Owner, the Engineer, their
consultants, subconsultants, and the officers, directors, employees, and agents of each
and any of them, against and from all claims and liability arising under, by reason of,
related, or incidental to the Contract Documents or any performance of the Work, but not
from the sole negligence or willful misconduct of the Owner and/or the Engineer. Such
indemnification by the Contractor shall include, but not be limited to, the following
documents:
• Reservoir 10 North Condition Assessment
•Photographs of Reservoir 10 North lnterior
SC - 4.06.A. Add the following at the end of Paragraph 4.06.A of the General Conditions:
!n preparation of the Contract Documents, the ENGINEER has used the following reports
and/or drawings, e�+plorations or tests of any hazardous environmental condition at the
Site:
There are no hazardous environmental condition reports associated with this
rp olect•
ARTICLE 6 - COIVTRACTOR'S RESPOIVSIBILITIES
SC - 6.02 B. Add the following at the end of paragraph 6.02.B
' Regular working hours shall be 8 hours per day, plus lunch break, 5 days per week, Monday
thru Friday. Alternatively, the Contractor may work 10-hour days, 4 days per week. The
Contractor shall worlc no more than 40 work hours per week. Work on weelcends and
, RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
SUPPLEMENTARY CONDITIONS
00800-3
'
holidays is not permitted. The hours of work shall be between 7 a.m. and 5:30 p.m. Work
hours greater than 8 hours per day (or 10 hours per day for 4-day week schedule) or more
than 40 hours per week shall be considered overtime.
The Contractor shall not work outside these parameters, nor work overtime, unless
requested in writing (via e-mail) and approved in writing by the Owner. Any such requests
shall be made at least 48 hours before the actual work. The Owner shall generally not
refuse reasonable schedule modifications.
The Contractor shall notify the Owner at the pre=construction meeting of their intention to
work a 4-day or 5-day week. By default, the Owner will assume the Contractor is working
8-hour days, 5-days per week.
[f the Owner agrees to allow the Contractor to work overtime for the Contractor's
convenience, this does not imply that the Owner agrees to pay for any wages or costs
associated with the overtime work. Costs associated with overtime work shall always be
borne by the Contractor, unless the Owner specifically directs in writing that overtime
work must be used to accomplish a task.
SC - 6.05 Delete this paragraph in entirety.
SC - 6.20.E. Add the following at the end of Paragraph 6.20 of the General Conditions:
E. The provisions of this section shall survive the expiration or termination of this contract.
SC - 6.22 Add the following new paragraph 6.22:
6.22 Weekly Progress Meetings
A. The Contractor must attend mandatory weekly progress meetings to be conducted by the
City. Meetings shall be at City offices, or at another location to be designated by the
City. Attendance is required by the superintendent or other representative acceptable
to and approved by the Owner. The Contractor shall submit and discuss the 3-week
look ahead schedule at the meeting. The agenda shall include discussion and review of
the following items at a minimum:
• Critical items/action list.
• Work progress. Compare actual progress with planned progress shown on
Contractors rolling three-week Schedule. Discuss corrective action required.
Compare actual and projected progress with Contractor's Construction Schedule;
propose methods to correct deficiencies.
• Submittals; review delivery dates and date of need for critical items.
• Coordination problems.
• Schedule needed testing and critical inspections.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT SUPPLEMENTARY CONDITIONS
FEBRUARY 2015 00800-4
,
'
1
'
'
,
�
1
'
�
�
'
1
�
'
,
'
1
'
• Critical requirements for each trade or major piece of equipment prior to beginning
work or installation.
• Contractor Quality Control.
• Open items on Engineers "Items of Concern List."
• Impact of proposed changes on Progress Schedule.
• Other business.
ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLET[ON
SC -14.07 A.4 Add the following at the end of paragraph 14.07 A.
The Contractor shall, prior to requesting final payment, obtain and submit the following
items to the Owner:
• Written guarantees and warranties, where required
• Technical manuals, data sheets, samples
• City-owned keys or locics used for the project
• Project reports; data, and record drawings where required
• Releases from all parties who are entitled to claims
• Executed form: Acceptance of Compensation and Release of All Claims
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
SUPPLEMENTARY CONDITIONS
00800-5
C
1
1
1
1
1
1
�
�
�
�
�
1
,
'
�
�
�
ATTA C H M E N T A
KITSAP COU NTY PREVAI LI NG WAG E
RATES FROM FEBRUARY 4, 2015
�
' ?J3/2015
about blank
' State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
, PO Box 44540, Olympia, WA 98504-4540
' Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of
fringe benefits. On public works projects, worker's wage and benefit rates must add to not
' less than this total. A brief description of overtime calculation requirements are provided on
the Benefit Code Key.
,
1
'
Journey Level Prevailing Wage Rates for the Effective Date: 2/3/2015
�. ..-�- - - �. . . _ . _. _ . . .._._.
�Countv Trade
_
Kitsap CarpentPrs
. .. .
j Kitsap Carpenters
� Kitsap Carpenters
' 4
1 Kitsap Car�enters
{ Kitsap Carpenters
' Kitsap Carpenters
Kitsap Carpenters
. . .. .. ..
Kitsap Ca�enters
' _ .. .. . . .. . ._ ..
� Kitsap `Cement Masons
Kitsap Fla.g�ers
' . . ........
Kitsap :Ironworkers
` Kitsap � Laborers
' ;..... _
Kitsap : Laborers
,. .. .. . .
! Kitsap Laborers
.. . .. , . ... ....... .. . . . .
' Kitsap Laborers
Kitsap Laborers
Kitsap Labarers
' . . .... . .. .. . . .. ... . ..
Kitsap Laborers
, ... ... .
Kitsap Laborers
, .... :..
Kitsap Laborers
..
Kitsap Laborers
..
' Kitsap ; Laborers
Kitsap Laborers
.
Kitsap Laborers
' . . ...
Kitsap Laborers
Kitsap ' Laborers
! Job Classif�catiora Wa e�Holiday Overtir�e! Note
Acoustical Worker $52.32 5D 4C
� ..' . ... .
_ . ...
Brid e Dock And Wharf $52.32 5D 4C
Carpenters
..... . . .. . .. � .. .... —...
Carpenter $52.32 5D 4C
Carpenters on Stationary Tools $52.45 5D 4C
: . ..... . ...... .
Creosoted Material $52.42 5D 4C
..
Floor Finisher $52.32 5D � 4C
. ... .... . .. . . ...... . . . ..... .. . .. .. .. ... ... .. ... .. _ .. . .. . . . .... ; . .. . ... . . . .. . . .. .
Floor Layer ; $52.32: 5D 4C
. . . . .. .. .. . . ....... .. .. . ... . . .... .
Scaffold Erector � $52.32` 5D 4C
. .... y . . .. . .
� Journe Level $52.38 7A 1 M
;.. . y . .. —.. .. .
�Journe Level $36.17 7A 31
..
Journeyman $61.62 7N 10
.. .. . . . .. .. .. . — .. .. . .
�Air, Gas Or Electric Vibrating $42.67 7A 31
�Screed
;.. . . . :.
� Ai rtrac Dri ll Operator �$44.00 7A 31
_ . ,.
Ballast Regular Machine $42.67 7A 31
,. . . .. . : . ..... .. . . . ...
Batch Wei�hman $36.17; 7A 31
. _. . ;... .. .
..
Brick Pavers $42.67 7A 31
,.. ....... . . ; .... ... ..� .... .:: . .. . . . —
Brush Cutter $42.67 7A 31
� , . .. . .:. .:. . . .... ' _
Brush Ho Feeder $42.67 7A 31
. .. : .. ... ... .. . . . .
, . . ..... . ..... ... . .
.. —
� Burner ; $42.67 7A ; 31
, . ,.. . ::. . _ . _ .. ..... . .. ... .. : . . ... .. . .. . . . ..._
;Caisson Worker ; $44.00: 7A 31
;. ,. . :. , ... ... , .,
Carpenter Tender $42.67; 7A 31
. : . .: .:. . . ... .:: .. ... ... .. _ . . .. .: ; , . .... ..
Caulker $42.67' 7A 31
. .. —.:. ..... _
Cement Dumper-paving $43.46 7A 31
. . . .. .. . . . ... . .:.. . . .... . . :. : . . . .. ; . ....:..
Cement Finisher Tender $42.67 7A . 31
. ...: :
Change House Or Dry Shack $42.67 7A 31
. . . .. . . . . .. ... .
. . . .. .... ... . . . : .: .
Chipping Gun (under 30 Lbs.) '$42.67 7A 31
� i t
https://fortress.wa.gov/InUwagelookup/prvWagelookup aspx 1/13
v
3/2015 about:blank
I Kitsap Laborers Chipping Gun(30 Lbs. And Over) '$43.46 7A 31 f
x . .. . .. . ...
`Kitsap Laborers Choker Setter $42.67� 7A 31
Kitsap Laborers Chuck Tender $42.67 7A 31 �
....
Kitsap `Laborers Clary Power Spreader $43.46 7A 31
Kitsap Laborers 'Clean-up Laborer $42.67' 7A 31
...
Kitsap Labarers Concrete Dumper/chute $43.46 7A 31
Operator
Kitsap Laborers �Concrete Form Stripper '$42.67 7A 31
.
Kitsap Laborers Concrete Placement Crew $43.46 7A 31
. . ..
Kitsap Laborers Concrete Saw Operator/core $43.46; 7A 31
,
Driller
Kitsap Laborers Crusher Feeder $36.17 7A 31
......
�
Kitsap Laborers `Curin� Laborer $42.67 7A 31
Kitsap Laborers Demolition: Wrecking �t Moving $42.67; 7A 31
' (incl. Charred Material)
_ . -
Kitsap ' Labarers Ditch Digger $42.67 7A 31
_ .. .
Kitsap Laborers ' Diver $44.00 7A 31
. ..... ... .
Kitsap Laborers DrillOperator $43.46 7A 31
(hydraulic,diamond) :
;. .. ...
Kitsap Laborers � Dry Stack Walls $42.67 7A 31
Kitsap � Laborers Dump Person $42.67 7A 31 '
.. � �
Kitsap Laborers ' Epoxy Technician $42.67 7A 31
Kitsap Laborers Erosion Control Worker $42.67 7A 31
.. .
Kitsap Laborers Faller �t Bucker Chain Saw $43.46 7A 31
, . ...... � .... .
Kitsap Laborers Fine Graders `$42.67� 7A 31
- ,... - .. .
i Kitsap Laborers Firewatch $36.17 7A 31
, .. . ... .. .
� Kitsap Laborers Form Setter $42.67 7A 31
.. .
-
; Kitsap Laborers Gabian Basket Builders $42.67 7A 31
, ;
� Kitsap Laborers General Laborer : $42.67 7A 31
i .. -.
�K�tsap Laborers Grade Checker £� Transit Person $44.00 7A 31
� Kitsap Laborers Grinders $42.67 7A 31
�.... . ... ..
'Kitsap Laborers �Grout Machine Tender $42.67 7A 31
, .. . ....
�Kitsap Labnrers Groutmen (pressure)including ` $43.46 7A 31
� Post Tension Beams
i.. ..
� Kitsap Laborers Guardrail Erector $42.67 7A 31
,.
i Kitsap Laborers Hazardous Waste Worker (level $44.00 7A 31
,
A)
�
; Kitsap Laborers Hazardous Waste Worker (level $43.46 7A 31
� g�
, . , ... ....
�Kitsap Laborers Hazardous Waste Worker (level $42.67 7A 31
!I . . . .. . . � � �.. . . .
Kitsap Laborers High Scaler $44.00 7A 31
. . . .. . . . . .. . ..
Kitsap ` Laborers Jackhammer $43.46 7A 31
� Kitsap Laborers Laserbeam Operator '$43.46 7A 31
�.. ........ ....
; Kitsap Laborers Maintenance Person $42.67 7A 31
, ..
� , https /ffortress.wa.gov/Ini/wagelookup/prvWagelookup aspx 2/13
' 2/3/2015
I Kitsap
'
'
'
'
'
'
'
'
,
'
'
'
1
'
'
'
'
Kitsap
Kitsa_p_
Kitsap
Laborers
,. ..._.�_.... . ... ...__......
Laborers
� Laborers _
Laborers
about:blank
�Manhole Builder-mudman ; $43.46€ 7A � 31
__.. .. .._._.._........__.... .. .. ___.. .___._..... . ----
, .._..._...... _.__ ........... .._.._.,... .._.__. .
.._. ... ..... _.._. .. . . ......_._.._......___. . ..- ---. .. .. . ...
Material Yard Person $42.67; 7A 31
__.. . ._.__ ._... _. ... .... .._.. ... . . . ....... .. ...._._ _ . _.._._ ..... ............. ..__...... .... . .. ... .
..._ .... .... --,._. _. . .. .. _....._ _ .. _. _ . ..... _ _ _._... ... _. _ ..
�Motorman-dinky Locomotive ` $43.46� 7A : 31
__ . . . _..._. ....._ . ... .. .._. ..... . __...... .. .. .---__... ....__... . . .._...... ... _. _._ � ._.__ .. ._ �_. . _ .. .... ... ..._._....... ._ _...... _.__.. . . .....
Noaleman (concrete Pump, $43.46 � 7A 31
�Green Cutter When Using ' �
�Combination Of High Pressure �
jAir �t Water On Concrete �r ;
i Rock, Sandblast, Gunite, ' 3
�Shotcrete, Water Bla ; ;
_.. _..... _.. , _. ......... ........_... . . . ..._._... .._._.__. .......---- -�----.... _- - ------. ..----................_... . . ----- _...._ . . ....... . ___.... _---......---- - -- —� ---
� ;_ a
Kitsap Laborers Pavement Breaker '$43.46; 7A 31
.... . .... . ... ..... .... . .. - -�--. . . ._.._ _.... . . _. _... _ ... . . _..
- - -.. . ...._...... ..... _. ... . _.._ .. . _..__. .....
Kitsap Laborers :Pilot Car $36.17j 7A 31
-- _... . . . . ---.. ...... _ .... ...._.... ._ . ...... .. . ._. . ... . _...... ... ..... _.. . ...._. .......__ . .. .... ........ --- .... .... �_. .. :.. ._....__.. . _. __.._.._ _.._....... ...--
Kitsap Labor Pipe Layer Lead $44.00; 7A ; 31
.............--..... _......__...... ...----. _ .. .. ...._. __..... .. _.__.. . :_... ... _ ..._.._ . . .. _._...... ... .---._.. _. __. .. __..... _..
_...._. ....._ .. . . __._ . .._..
_--- -- ...._.. .
Kitsap Laborers �Pipe Layer/tailor �$43.46� 7A � 31
_. . . ._ ...- - - ..._ . _. .. _. ... . .�._.._. ....—... '
_.. . . ... . . . _ ._. ...
_........ _ _ ..... . . _.._ .. . . _
Kitsap , Laborers ' Pipe Pot Tender �$43.46 7A 31 '
_.._ _ ..__.__.. _____...... ..�_._. . .___. __.._. _.._ ._...1___.. - ------ . _._�__.. . .. ____ _. -
� � _..
_._. _ __ . �._. _ _____.. ...__�. __ �. -=------ .
Kitsap Laborers �Pipe Reliner �$43.46� 7A 31
. . . . .. _. . .._. . . _ ..... ......... . ..... . ..: .. _.. _.. .. .. . ..
_.... ..._............_.... _
- - . _ . ... ......._
Kitsap 'Laborers iPipe Wrapper ;$43.46� 7A 31 ;
_._.. ......__..... .. . .___.. ..... _..._._.. ... ......_.. .. _.._... .. .. ..__....._... __...... ...___�.... .. ..._�... . ...._.__. ....... �._. ... .....�_. ,.. _....�. . .... ___._._. ...._........... ._.__ ... .;.._._...... .....--
Kitsap Laborers Pot Tender $42.67? 7A ; 31
_ .. .._..._. _ .. . _..... ........_..- .... ............. .................. ........._.. . ... _.._._. ....._...._ _....._._ ._. _ _._............ ...._._ ;. . __._ .. _ � _.... . .__ _ _... ... .. ._ _...._ _. _ .. _
_._. . .:
Kitsap Laborers ;Powderman ; $44.00� 7A ' 31
..... . ._. .... . ....._.. . ..._.._........ .---._.. . :...._................._.........._.�.._....... _._.._._.... __ __ ` _
; _ ._.... . ----...._........ _,.__._...._.__..... : ..___ ...... ........_._._ . ............. ... --
Kitsap Laborers 'Powderman's Helper ;$42.67 7A 31 �
_... _.�._......._.—_..........._..... ......�___........----....---......... �_..... ......_..___........_�.......__.._.. .._..__.......__.___n.. ____ ... ..........__. . _... ._._.
.. .__.. .:.---... . __.. . ;. __
Kitsap Laborers � ower Jacks `$43.46I 7A � 31 '
+ . . . ..._._. .
_.... . .. . ----- .. ... . . _. . .. .. ... ... _ ... ... .._. ..... _ .. ... .. ... _ . .. ....._ . ...... ._ ._.. . . . ._ .... .._. _._
_. ..
Kitsap � Laborers f Railroad Spike Pulter - Power ; $43.46 � 7A 31
__ . ......_..._.........;..._.._ .............-----.._..__._...... ....._...... . �
_.__. _.._�_._.__.....__.._........._...__..........._...__.
----. . .....__.__ .. . ...___..... .._--�____._. .....� ...............__.....__....�._.�..... �_. �..._.... _.._
Kitsap ; Laborers Raker - Asphalt `$44.00� 7A ; 31
. . _... .. _. _ _ . ..__ _ .
Kitsap I Laborers ; Re-timberman $44.00 7A � 31 ,
_.. _.. .......... ...__. . �._ - ---- ...---- ...,_._ ..__. .. .__...- -----..... ___..... _..__. ; ---._.._..�_.._ .—__. .;.�---.. .._ _. ___.. ...__
Kitsap Laborers ,Remote Equipment Operator €$43.46; 7A 31 '�
--........_._.__. :.....__�_..... .....___._... ....__._._...,_..._.._..... ....._..._� .. �_...__..... _.._.___._ ..___.__. _. __.. ._ .........._._. .....__._..�. ._.__._.._ ....:_._...........______. . __ __.__. --._... ... ...._
_
Kitsap ' Laborers iRigger/signal Person �$43.46i 7A 31 i
�. . . ...._...._ . .... .._....... . _ . _ ... ...... _ .. . . .... _. .. ... . _.. . ..., .. _... .. ... _ _. .... ...... ... _.._ . ... .. ... _ _..._ . . ... ....... : . .. ._. _ ... ... �. _ .._ .. _. __. ... _:... _..._. � . ... ..----.. . : .. _ .... ... ... _..
Kitsap � Laborers : Ri p Rap Person $42. 67 i 7A � 31
_..._.........�... .,... __.........T_.�......__..._......._.__.... ...---........,._.___.....---_,.._.__ ......_ ...............�_........�.._.... _...__.....;....._^...._...._�____...: __.,__....�.__._........___ __.. i ..___......._�
Kitsap ' Laborers ° Rivet Buster '$43.46 � 7A 31
.. . ............. _... ........ ... ._ .. .._ ................... .... .. .._.. .__ ........_. _.._... . .._............... ....... _....... ..... ...._._.........�
Kitsap ; Laborers : Rodder $43.46� 7A 31
, � �
_._......-----._...----......._._�._...........__._.. ....�.........__.._ .......... ...�_..........._..__..__.....�_......._._�......... _......---.._. ......�_...:........_...._.. .� ._..�._....—_..,_...�.._......____....__._.._.............__
Kitsap Laborers �Scaffold Erector ;$42.67' 7A 31
_........�...._.._...........�...._........_.__._..._..._ .................. .... .. �--._...... ..._..........__._... ......_......_ ...._...................:..._.__._......_---....._._... ........ _._......._..._.
Kitsap ;Laborers �Scale Person ` $42.67� 7A 31 `
_ .. . ....�._.... ...._.._.__.... ..---._... ...._..._ .. . ........... .. _....._...._;.._...... ..._ ..�..... �..._..._.._.......---.._. ........._... .. ..._............ ---_._..._.,._.._. �......._........_.�.......:. ._._............�---_.. .�...--
Kitsap Laborers ; Sloper (over 20") $43.46 i 7A ' 31
_.... .... ._._..... , - ---.._. .._..__ ...... ............. ..... ...---._... ...�......... ..,.._.. .............._..... ._..____...........-�----........._.._..........�.._..............____..._ _.�_..._.. . .__--- -. .:... _.__.. ... ._.__. _ _.
Kitsap Laborers �Sloper Sprayer ?$42.67 7A i 31
_ .. _..__ .. ..... _---..... .. �. �. .... . ._. _ . . .._ .. . ... .� .... ..... .. ... __ _ _. .. . _ ._...... ..... .. .. . ... __ ... .._ _ ... ... .:... ... . .. ._..... . _.._ _. �_ _...... ... ._ . ... _....
Kitsap � Laborers :Spreader (concrete) ` $43. � 7A ; 31
___...... _. __._...._ �. ....____.........T.......__._..._........_..._._........____........ __. ___...... ....� _._._.. ____ ..............
...._........�.__..__...........—_._ ...___..
_...;....__.__...._ .....,... .�
Kitsap � Laborers ;Stake Hopper �$42.67� 7A 31 ;
� ..._ ... ......._ _.. . ... _. .. _. _.. .. _ .......... .. .:......_.. .... . _.. ......
_.._ ......_ .. _ . ...._.. .... _ .. . .. ._ .. .. ... .... �. . _ . _ . .. ... _ . .;...
Kitsap iLaborers �Stock Piler j$42.67� 7A 31 �
.._. . .... ._.. ..... ,. .. __.... ...__..__......... _.. . .. ....... __ _..__._....... .....�__..... ..... __ ____..... ....,_._...... . ._..__.......__ _ __._.._ ___ ....:........_._.�... . .__. ....__. ......_.__.. _ _e......__. .... _. _.._--- -:..___. .. ...- -
Kitsap Laborers Tamper �t Similar Electric, Air `$43.46� 7A � 31 �
; �t Gas Operated Tools ' ! �
_ . _..�.. . .._...._.... .._ _ ...... . ._._.... .. ._. _...... ' _._.. . .. ._ . .. �._. ... ...... _ ... ... ........ _ _._. . �. __ � _ .
, �
,
'
.� .. �. � : ._._....... ....
..... ... . ._...-- - -- -- -�
� Kitsap ; Laborers ;Tamper (multiple �t Self- ; $43.46; 7A 31 ;
` 'propelled) ` ; ; 1
;
._... .. . . . _ ... . ... ._ ....... .._ _. . .. _ ._.. .. .... ..._ . ....�.. ... .. .._ ... . ... . . ----. ... ....... ._ . .. ......... ... _.._... . _. ...._....- --.._... .. � _..__. ......_..._ ... ....... ... .
Kitsap �Laborers ; Timber Person - Sewer (lagger, $43.46� 7A � 31
�Shorer �t Cribber) � �
. _. _ _.. _. _. __ __.. . _ _ . . _� . . _ _ .._.. __ ._... . _
� Kitsap , Laborers Toolroom Person (at Jobsite) $42.67' 7A 31
_...__....._.._.__..L.�..�_ ...............,.,..._._...�._................._.,_ ....._.....___..._.--{�...._._-. ..__................_........_.v...__._ ....�.._........_y_�...._._..e__..__._'....__�_....._._..r._...F.....____..........�_
�.. i ....
Kitsap Laborers sTopper ;$42.67� 7A 31 �
:
_.. . . _._.. . _....___. .. ._..--- .. .. . . ...... _. _. . .` .._..... _...... . _._.�. . _ . ....
_ ... . ................._..... . ....... ...... �...... ...... ;._
-- :
:
Kitsap ;Laborers Track Laborer $42 67� 7A � 31
_._. _.__....:.....___..........�__.... .__ .............___ _...-- -- - . .... ....._.__....._..__......._._..._.... ......._..._..;.._...�.__._'.. _._
_... . . _._._._. .
� Kitsa Laborers =Track Liner � � � � � ~
p , (power $43.46; 7A 31
_____... .. ._ ......__. .. ......---.._. .. . _. �
_......
_.. . ...... .- ---._ _. _ . . _.._.._.. .. -----... - ----.... ......_.... ...... ._ ._ .......... ..._._..._ .. .___ . .. ... _... .. . ._.._... .
.. _._.. .. .....__
' i . .
https:/ffortress.wa.gov/Ini/wagelookup/prvWagelookup aspx 3/13
2/3/2015 aboutblank
Kitsap Laborers !Traffic Control Laborer $38.68� 7A 31 8R
. . . . . ._. . . :... ... ._... .. . _.. .. . .. _ _ . . .... ... . .. _ ... . _.._ . .... .... .. ... . ......�. . . ......._ .. .. ._ .. _.. ... _ . _ _
... _._. ... _... :._ _. ...._ . . . _.. �
Kitsap Laborers sTraffic Control Supervisor $38.68I 7A ; 31 ; 8R
�._......---.... _....__.... _... _.._..._..... 3 _ _ . . _... . . _ . .. ___
_.—...__........_....._�___......____._..._�_.._..�....... _..._�.----..__..._. ,..__.. _....
.___....... , _�..
Kitsap Laborers ;Truck Spotter `$42.67; 7A 31
...... . ... _... ..........._ .. .._ .. . ......._.... ..._. . �... . .._..�.... _._ ... . ............ _...... ...... .__.... ; ....�.
.._ . . ....._._ . _ ._._. _. . .. . _..._..._........ ._._... _
Kitsap Laborers �Tugger Operator $43.46� 7A � 31 t
... ... . _._.._.... , ._.._ . .. .. .. _..__ . ......._. _..... .. .. _. . .. --- .. . _.�._... .. _. __ ... . . ..... . .. . .. _.. .. .... ._. ... ...... . __ . ... _ _.... ... _ _. .: _._ . . ..... . . ..._ . .
�-
Kitsap `Laborers Tunnel Work-Compressed Air �$64.99� 7A ? 31 8�C,
� Worker 0-30 psi �
__ ......;..._._..... .. __._ .. ......._.. --- _.. . ... ..:.. _... ... .� ....... ......._.. . ...... .._... __.... . . , _...
_ . .. . ... .......... ... . ._..... . ..... .. ..;_..._ .... . .--- - --... .
AKitsap Laborers ;Tunnel Work-Compressed Air $70.02� 7A ; 31 ; 8�(
� `Worker 30.01-44.00 psi �
__ ... _.._.. . � _ ___.. ..._....._ . .. .. _._. . ---..._ .. . .. _ .... . v. _. .. ._.__...... ..._._ ..... .-- -- .... ..,....... ... _.... .... . _.__ ..... ... _'._... . . ...... .. .. ..._ .. _._
�..
Kitsap Laborers Tunnel Work-Compressed Air $73.70' 7A ; 31 8�
; Worker 44.01- 54.00 psi ' � ;
.. .. .. _... ... . . ... ..... . . ...._ .... .. .. ._ ... ... .. . .. ..... ... _ ...... ..... .. . -- .. ... ...._.... . - -- -. _ . .. ._. .. ... _.. .. . . . . < .. . . _ . . .. . _. _.. .. .. ... _ . . .. ..
Kitsap Laborers ;Tunnel Work-Compressed Air �$79.40� 7A 31 8�C
� Worker 54.01-60.00 psi
__. . . : - -. . .... . ... ...... _..... .. ... . _....... . . - - ... .. .. .. .. ... . .. . __ .. .. .... _ ... .... ._. . . .... _ ..: ... _ ._ . ..� ... .. . _ - - -
Kitsap Laborers ;Tunnel Work-Compressed Air $81.52; 7A 31 �
� Worker 60.01-64.00 psi ?
_._... . . _,_.. ... .. _.. ... .. . . _ .. � _.. . .. .. _ . • - -- - . _..... _. _ . . ..... . .. . ._
<_...- -- - -. .. .. . ..._. .. ... .._ ... . ...... .... .. .. . �... ;
Kitsap �Laborers 'Tunnel Work-Compressed Air ; $86.62; 7A 31 8�
� ; Worker 64.01-68.00 psi �
_... ;._. _....... �
_.. ... ...: . .._ .... .. .. _. ... ... -- - .. _ .. ... __ .. _. .. _ _.. .. _.. .' . .... . . � . . .. . . . ..€. ..... .. v ..
�Kitsap Laborers Tunnel Work-Compressed Air $88.52; 7A 31 8�
� Worker 68.01-70.00 psi � !
... . .... . .. _ . ... ... .... ... ... . .... .... _ . .. ... ... ._ ... . . .. .. ...... .._ _ _. . _. .._.... .... _ . ... ._ _ .. . .. - - -. . ....... . . ... ... .. . .... .. . _ .
Kitsap :Laborers :Tunnel Work-Compressed Air ;$90.52� 7A 31 �
; Worker 70.01-72.00 psi
__. . _ . . . ... . . _ . ... .. .......... . . ..:_ ... .. .....---. .. . ....... .. . ............ . . .... .. . ... _ .. . � .._ . .. . .. _ _........ .. _. .. . ._. . . _.
Kitsap Laborers 3Tunnel Work-Compressed Air $92.52� 7A 31 8�
f Worker 72.01-74.00 psi �
_ ......._ ... ......�.. ....._... ........... ...._....... ..--- -._.._.... ... _.__. ....--- _ . .. .. ... ..... _.......... _.. ._..... .. .. ....
Kitsap Laborers �Tunnel Work-Guage and Lock ;$44.10; 7A � 31 �
� {Tender � �
. _. .: . _ _.... ... . . __... . . _ _ ... . . : .. ... . :. . ..:.:: ::.. ::.. u .... . , . ..... _ .. .. -- _ . .. ..T.... . _ ... . .. _... .. _ .,. , . .. . _ . . . ... _. . . ...
....
Kitsap Laborers ;Tunnel Work-Miner ;, $44.10i 7A 31 � R _ R ; .R,. � , � y
.__..:.....__ .......::::....�:.::...,...__,..::.._....��..:. ____J_........__.._.......__
____.. :.:.. .... _.. _: ... _ �...._.. . .....�..�.--- -: ._._ .... ___..
Kitsap Laborers � 'Vibrator $43.46� 7A 31
. .. . . . .... ... _ .
_........ ... ....._.._ ... ..... __... . .._ ..... ..........�..._..... ..__ � ,. _._.._.... . .: .....: .=...... . ..._ m.._ ......
... .. . _.....:::, .: . .,.._.
Kitsap ;Laborers iVinyl Seamer ;$42.67, 7A 31
_........_.__... ...___._ ....._.__.........�__ ......._.�._: :...._...:. ._ .. .... ....._ .. .
.,._._ :: ::..._..._.: . .. __.,.. .. ...,._�..... ...._...... ._ _R_. .; ..... ._ ....... . .....�...
Kitsap Laborers �Watchman $32.87; 7A 31
__....._.....__..�... . ..._.._... _.. ._ ........... ...._. _. � ---.. . ...__..� .. ......_.. ....'..._.........._._ .__.... � _.._.._........__ .. �._......._. ._
—. .. ...----... ..�---� - --- -- - ---._.. .. . _—. _ .
... '..._
Kitsap Laborers iWelder `$43.46, 7A ' 31
_. .. .. .._ . .. .. _. _. . _..... .... .. . . _ . .. ... ... ... ... ... _ _ .. ... ... .. .. .. . _ . -- - - - . . __... . .. .__._ .. . . . � . ...... .... ._... .. . ..._. _
Kitsap Laborers `Well Point Laborer ;$43.46{ 7A , 31
_ ._._...^...;_.. —..._..........---..... _._.... .. _. ...._. ......... _._........ _ .._= _._.. ._ . ' __._... .. ._._
.. __.._. _..... .. .__.............._.... ._ ..---.......------._.._.�_.... _._._. :
------...... ...�_....�.
Kitsap Laborers :Window Washer/cleaner ;$32.87` 7A 31
� _... .. . .. ..._... : ..--- -- . .._.... _.... .. . ...._...... ... .--- . ......_.... ..._.._ . . . .-- --..._. _ _.... . ......._ ... : .... .......... ; _.. .. .. .. _. _ _... .. ........... _�.... . .. ..
Kitsap :, Laborers - Underaround Sewer fGeneral Laborer £� Topman ;$42.67; 7A 31 ,
� �t Water
a -.. ... .. . --- -. . ...._. . . ... _. ...... . . ....__...._ ..........__.... _. _._ . - - - -�--- ---... ..-- - ---._.....__..
_._ _. ... .. __...._.........._. . . . . ......... _ _.... __._.. ... ..
Kitsap Laborers - Underground Sewer =Pipe Layer '$43.46� 7A 31
, �t Water
_..... .. _ .... . ..... .. . _.. ... ....... .... ........... ....._.... . ..� ---... ....--- .. . ........ ... . ....... .. . _._........ _..- ---....... ..�_...... ........ ...------.. . ...-- ---... _._
Kitsap �Landscape Construction flrrigation Or Lawn Sprinkler � $9.47i 1
�Installers ; �
__..... ......_._ .. ...._.:� :...::.�_ :._........_.. . __ _ ....... _. , ..::.._.._.:.: .... :_... .. .:. _._........._..._....�.: ::_......, ..._ _..._ _.. _.._.. ......._.._.. .........._.... __.r._.. ........
�Kitsap ;Landscape Construction �Landscape Equipment Operators :$10.054 1
Or Truck Drivers
�.... . �._.........,..._.. .. .. .,::_.. . ...._._......... . __ ... ._._._ . ..._._._.... ._......_.._ ....____... . .....�._.... ....._._.�....:::.._. .; . ....___ ,... _,..... .....__.. ---.... ...._._. �...... . _..__
;.
Kitsap ;Landscape Construction 'Landscaping Or Planting ;$12.92i 1
� Laborers
_ _.... . _.._... ---.._ ..__ . . _ .. .._. : _... . ..._. ___... _....... _�. _ ; _.__. �_..__. .._.--- . ...___ _... ,._._... __
Kitsap �Millwri�ht Journey Level �' $44.89� 1 :
._ ......:......_..---............_...�.. ...__._. _._.. ........_........ :........ _......._..... ..... ..............__.................................._....._._... ..._... �. _
Kitsap �Painters ;Journey Level ; $37.80� 6Z 2B
. -_. _.. .._�__. ,.-----... . ..._..._..... ...__._.... ...._.._._...... ..�._._........:....-----........__ .................._—.........__._......._.._—... ._.__..; ...... ._-- ---...............--
...w.._............- -
�Kitsap :Plumbers &t Pipefitters �Journey Level ' $62.57' 5A 1_G
f ......... . ...._ . . .. ... . __... ... . __ .. . .. .... .. .. .. _.... ....: . � .. . . .. . _. . .._ _
_. _ .. _ .. ... _. _.. .... ._... .. .. . ... .......... . .. _ _ .. . . .. . . . .
;Kitsap Power Equipment OQerators ;Asphalt Plant Operators ;$55.24� 7A 3C 8P
� • ........_..._.__ .......:. ...._..._...............�_. .. ___.... ...._.._...... ..._..._.__.. �.:�.._.... ._..__ ..__......�.. ..._.....��...... .�............_.....----:.......------....�._.........:........_.._..............____._. ........._.._.._. � ...._.... ..._
Kitsap Power Eauipment Operators �Assistant Engineer �$51.97 7A 3C 8P
�.._.. ... ... ., ._;. .. _..._ . . .. .........._.... ... ......_ . .. ....... _...... _.... _..,...... ... ._ .. .... _.._.... .. .._........ ..._ ... ... ._...._... ... ---... . .. _ .._. ...._..... . .......,_. . .......
�Kitsap Power Equipment Operators aBarrier Machine (zipper) ;$54.75� 7A : 3C 8P
� ......... ....__...._.... ....._.._........_... _..._ _. ....._...�. . ..__ .. .._._._._..... ........__.... ----.._.. ..._... . .. ......... _............ _......_..�...... ...._---.. .....�__.. � _..._ _...
https://fortress.wa gov/Inilwagelookup/prvWagelookup.aspx 4J13
' 2/3/2015 about:blank
Kitsap Power Equipment Operat.ors Batch Plant Operator, Concrete $54.75 7A 3C
Kitsap Power Equipment O�erators Bobcat $59.97 7A 3C
' :.
;
Kitsap Power Equiement O�erators Brokk - Remote Demolition $51.97 7A 3C
£ �Equipment
:�
:�
:•
. . ... .. .
Kitsap Power Eauipment O�erators Brooms $51.97 7A 3C 8P
;.. ... .. .
—
Kitsap Power Equi�ment Operatars Bump Cutter $54.75 7A 3C 8P
Kitsap Power Eauipment Operators Cableways $55.24 7A 3C 8P
.. .
— ... ... .. . _
Kitsap Power Equi�mPnt O�erators Chipper $54.75 7A 3C 8P
. . . ...
Kitsap Pawer Equipm�.'nt 0_perators Compressor $51.97 7A 3_C 8P
Kitsap Power Equipment Operators Concrete Pump: Truck Mount $55.24 7A 3C 8P
With Boom Attachment'Over 42 '
M
—. ... .. .
; Kitsap Pawer Eaui�ment Operators Concrete Finish Machine -laser $51.97 7A 3C 8P
I Screed
.. .
�Kitsap Power Equipment C�,perators Concrete Pump - Mounted Or $54.33 7A 3C
{ ;Trailer Hi�h Pressure Line
1 �Pum Pum Hi h Pressure.
� P, P �
.. .. .. . ...;. .
..
�Kitsap Power Equipment Operators 'Concrete Pump: Truck Mount $54.75 7A 3C
i With Boom Attachment Up To
42m
_ .. ..... .
�Kitsap Po�+ver Equipment O�erators Conveyors $54.33; 7A 3C
�Kitsap Power Equipment Op�rators Cranes: 20 Tons Through 44 $54.75; 7A 3C
� Tons With Attachments '
� . .. . . _. . .
,.
j Kitsap Power Equipment O�erators, Cranes: 100 Tons Through 199 $55.79 � 7A 3C
� Tons, Or 150' Of Boom
� (Includin� Jib With
r
Attachments)
Kitsap Power Eguipment Operator� � Cranes: 200 Tons To 300 Tons, $56.36 � 7A 3C
Or 250' Of Boom (including Jib
With Attachments)
, . .. .. .... ..
Kitsap � Power Eauipment Operators Cranes: 45 Tons Through 99 $55.24 7A 3C
Tons, Under 150' Of Boom
(including Jib With
Attachments)
.. ._ . . .. _ ...
Kitsap Power Equipment Operators Cranes: A-frame - 10 Tons And $51.97 7A 3C
U nder
_ ;.... .....
Kitsap Pawer Equipment O�erators �Cranes: Friction 100 Tons $56.36 7A 3C
Through 199 Tons ;
8P
:•
8P
8P
:�
8P
8P
:�
8P
. ... . . .... ... . _ . . .... .
—
Kitsap Power Equipmerit Operators Cranes: Friction Over 200 Tons $56.92' 7A 3C 8P
:. . .. .. . . . . .. .. .. . .
— .. . .... .
Kitsap :Power Equipment Qperators Cranes: Over 300 Tons Or 300' $56.92 7A 3C 8P
Of Boom (including Jib With
Attachments)
. _ . ... ... .. .:.. .. . .. . .
Kitsap Power Equipment Operators Cranes: Through 19 Tons With $54.33 7A 3C 8P
�Attachments A-frame Over 10
Tons
_ .... �..
Kitsap Power Equipment Operators Crusher $54.75 7A 3C
Kitsap Power Equipment 0 erp ators Deck Engineer/deck Winches $54.75 7A 3C
8P .
- 8P
(power)
Kitsap Power Equipment O�erators Derricks, On Building Work $55.24 7A 3C 8P
' https.//fortress wa.gov/Inilwagelookup/prvWagelookup.aspx
5/13
7J3/2015 about.blank
iKitsap Power Equipment Operators Dozers D-9 �t Under $54.33 7A 3C 8P
.
i Kitsap Power Equipment O�erators Drill Oilers: Auger Type, Truck $54.33 7A 3C 8P
' `Or Crane Mount
—
i Kitsap Power Equipment O�erators Drilling Machine $54.75 7A 3C 8P
; . . ..
; Kitsap Power Equi�ment O�erators Elevator And Man-lift: $51.97 7A 3C 8P
` � Permanent And Shaft Type
_.
..
' Kitsap Pawer Equipment Operators Finishing Machine, Bidwell And ; $54.75 7A 3C 8P
� 'Gamaco �t Similar Equipment
i . ..
—
� Kitsap , Power Equipment Operators Forklift: 3000 Lbs And Over $54.33 7A 3C 8P
With Attachments
� Kitsap Power Eauipment Operators `Forklifts: Under 3000 Lbs. With `$51.97 7A 3C 8P
� Attachments
� ' :
Kitsap Power Equipment 0{�erators Grade Engineer: Using Blue $54.75, 7A 3C 8P
Prints, Cut Sheets, Etc
� . .
Kitsap Pow�r Equipment Operators Gradechecker/stakeman $51.97 7A 3C 8P
7 . � .. .. — . . . . .. .. . ... . . _
;Kitsap Power F�ui�ment Operators Guardrail Punch $54.75 7A 3C 8P
.... ... .. . .
iKitsap Power Equipment Operators •Hard Tail End Dump Articulating $55.24 7A 3C 8P
Off- Road Equipment 45 Yards.
�t Over
.. ; . .
—
,.
Kitsap Power Equit�ment O�erators Hard Tail End Dump Articulatin� $54.75 7A 3C 8P
, Off-road Equipment Under 45
� Yards
� � —
� Kitsap ' Power Equipment O�erators Horizontal/directional Drill $54.33 7A 3C SP
Locator
Kitsap 'Power Equipment Operators �Horizontal/directional Drill $54.75' 7A 3C 8P
Operator
. : . . . :: . . .. _ ... ..
Kitsap Power Equipment Operators Hydralifts/boom Trucks Over 10 $54.33 7A 3C 8P
Tons
�. . , . ... . . .. ... . . .
.. —
;Kitsap `Power Equipment Operators Hydralifts/boom Trucks, 10 $51.97 7A 3C 8P
� � ; Tons And U nder
�..
' Kitsap Power Equipment Operators Loader, Overhead 8 Yards. �t $55.79' 7A 3C SP
� Over
.........
Kitsap Power Equi�ment Operators Loader, Overhead, 6 Yards. But $55.24 7A 3C 8P
i Not Including 8 Yards
�. ;
�Kitsap Power E:quipmer�t Operators Loaders, Overhead Under 6 $54.75 7A 3C 8P
,.
Yards
; Kitsap Power Ecruipment Operators Loaders, Plant Feed $54.75 7A 3C 8P
,
Kitsap Power EQUipment Operators Loaders: Elevating Type Belt $54.33 7A 3C 8P
_ —
Kitsap Power EcLuipment Operators Locomotives, All '$54.75 7A 3C 8P
Kitsap Power Ectuipment Operators Material Transfer Device $54.75 7A 3C 8P
Kitsap Power Equipment O�erators Mechanics, All (leadmen -$0.50 $55.79 7A 3C 8P
_..
Per Hour Over Mechanic)
Kitsap Pvwer EcLuipment Operators Motor Patrol Grader - Non- $54.33 7A 3C 8P
finishing
,.
Kitsap Power EcLuipment Onerators Motor Patrol Graders, Finishing $55.24 7A 3C 8P
Kitsap Power Et{uipment Operators Mucking Machine, Mole, Tunnel $55.24 7A 3C 8P
Drill, Boring, Road Header
And/or Shield
, . . .... . ... . ... . _. ...
: ; � � 1
https://fortress wa gov/Ini/wagelookup/prvWagelookup.aspx 6/13
, 2/3/2015
� Kitsap
�
'
'
1
'
'
'
'
�
'
'
'
'
1
'
'
� Kitsap
�
i-....... .
I Kitsap
about:blank
Power Equipment Operators ;Oil Distributors, Blower ;$51.97;
Distribution �t Mulch Seeding
�Operator
_ . . _ _.... - ---. _... . _. � .. .._.._.. _..._. ... .. ..__ .... .... ....... . .. ._.._.... ......_ ... ..._.._ . . , ....._._ ......._. .
Power Equipment Operators Outside Hoists (elevators And ,$54.33
Manlifts), Air Tug�ers,strato
7A i 3C 8P
__... ... ._..._�;... .. _.._. _... .. ----....
7A � 3C 8P
�
�.f
I
�
�
�
._ . _. �. ... .... ... __... ... ...... . . .. . _ . .. ........ .. . _...... . . _._... ......._._ '. ' ..._. ... ................ ............. . . .. _ . :.. ......_..... . .
Power Equipment Operators �Overhead, Brid�e Type Crane: $54.75 7A
� :20 Tons Through 44 Tons ;
. ... __ _ . .. ;__ . . ' --- � ...- ,_ . . --- . _._
_. _
Kitsap : Power Equipment Operators �Overhead Brid e T e: 100 ;$55.79� 7A
; .
;
Tons And Over i
. _ �.. ............---....... ........ _ ..............
-- _ .. .... .. . _ ... . .. .... ...
. . . � _ ... ... .............
Kitsap 'Power Equipment Operators ;Overhead, Bridge Type: 45 Tons� $55.24
� �Through 99 Tons ' �
7A �� f
....«_. . _........ .. ......... ...
3C 8P
._........ ....__ :._..... ...
3C , 8P
3C 8P
. ........... . ...�._.__............ . ._.... .. ...._..... ..__............ . ......_.... . ....._... . ..._............_......._............... ......_ .. ;._. . ...-- -----.. ........ .; .. .._..._........_... . ----......._..._
Kitsap �Power Equipment Operators Pavement Breaker '$51.97� 7A � 3C 8P
. _ _ _.. ... .. ._. ... ... ... .. .. .. _ .. ... ....... .. . _ . _ .. .. ._ .. . . _... ...... _
. ..:. .... _.. ... _._.._....
Kitsap jPower Equipment Operators Pile Driver (other Than Crane ; $54.75; 7A ; 3C ; 8P
; ;Mount) � �
.. .. .. ..._,. .. .. . .... _ . . .... . .... _..... ... ..
. ._.. .. ....... ...._ .... _. � _....
. .. ... ..... _._ . . ... , .. ... .. _. .. ;. . —
Kitsap �Power Equipment Operators ;Plant Oiler - Asphalt, Crusher :$54.33� 7A f 3_C 8P
_.�._. .. . ............_......--- ......__......... ... _........�.__. . ..._.._...... _._.._._.............----- -_.__._............__............ ....._...�..._�.........._.....�..�...... ...__.._....�....._.__
Kitsap �Power Equipment Operators :Posthole Digger, Mechanical '$51.97 7A 3C 8P
---......__.,.........._._........._._._._. � .... . ....----...._._ ........ .....___. _...........__....;.._.__.. ... ......; _.......-- -._..._
_. ... ... -----. ..__._.....
.._. .... . ..._. _....._ _..._...._. ... ._. .
Kitsap ! Power Equipment Operators � Power Plant i$51.97' 7A � 3C 8P
. __... . . . ._..... ..- --. _ _ .. . ._...._.. .. _.._. . .. _.. . . . ...
_.... .. .. .. _.... . . . .. _..... ... ._ _. _. ,... ... .
Kitsap ; Power Equipment Operators Pumps - Water :$51.97 7A : 3C 8P
._....__._,. .....�..__..._....__.........---.. ...._.._........._—.._.....�_. _...:...._.......- ---....---.. ......._._..........___...........____... �__..._..._....__..�.._..__�._._.
... ... . .-- --�...___ .. ... .........
Kitsap � Power Equipment Operators Quad 9, Hd 41, D10 And Over '$55.24 � 7A t 3C 8P
_..�.... . _�_.. .. ._..... . . _...._ . . ....._.._. .. _. ... _... . _........... ..._. . ......._... ... ---- .......... . ........ ... ._._..- � - - •
_. .. ...._ .. ... . _.. ..
Kitsap �Power Equipment OQerators �Quick Tower - No Cab, Under �$51.97� 7A � 3C 8P
;100 Feet In Height Based To ; ;
' - I Boom
---......._... �.... .�..._.... ... ._._.._.. ---_.... i
__..._............�_.. ..._.__...... ......__._.. .... _...._... `
....... ...._._ . ; _T . ....._.. _.: . .. ----- - -- �-. .....�._.... .. .. .._
Kitsap Power Equipment Operators Remote Control Operator On ;$55.24' 7A 3C �
8P
� - :RubberTired Earth Moving . ; � f .
, Equi pment ` � ' :
._..._._... ._.�._r....,_... ..__.._.. ._.__... _.�...__..._._�...,__.. ...___ .�_�__..._.__._....._.._.._._..._._._ _:�__._ .______'s...._a ' ___.. _ ...._...----
? Ri er And Bellman ; � �
........
�Kitsap Power Equipment Operators , gg $51.97� 7A � �3C - 8P
... .. _ . .. . . .. : :....... .... .. .-- - .. _ . . _ . . .;. .� w.. .... .._. .. ....... ..._. .... ... ... � : . __...._ ..... ..... _ . . .; R. _ .::, .:. _... . . --_._. ............:.:. . . . .... . ...._ _.. ... ....,. _.._ : : . ..
� `Kitsap �Power Equipment Operators ;Rollagon � $55.24: 7A : 3C ; 8P
.� ..._..,. _..._�.__. .____� .____..__�_.._ . ____.. _.,�......____ .. ._._.. ..�.., ......�.. ...�_ _.__.� �..__ ...�.._� ____..-._. .._._..� . .._._-_ ....�_.:._.__..._.�._ _
�Kitsap 'Power Equipment Operators Roller, Other Than Plant Mix $51.97; 7A ; 3C 8P
.__ ... .. .,_.._ .. .. ....__ .... T._..::. ..�. x .. .... _.... ... _ �._. . : ...... . ..._.. _.... .... _._ .. : ._ . _ . _ _r... .. .. _ ...;. ....� . . : _ _ ....... _.......... ...... .. ... .... _
Kitsap �Power Equipment Operators ;Roller, Plant Mix Or Multi-lift ;$54.33; 7A � 3C 8P
_ ._....: . .,,. ..�. .
� 'Materials . � �
� �
_..__. . _�. ....__.._ . �.�.. ..._._.. _..__ ___..�. .
.. .A.__ . _ . __.. . . ___ . . .�.._ ...�__ ;�._ . _ . ___� _.. ., ._ .
�Kitsap iPower Equipment Ooerators ;Roto-mill, Roto-grinder ;$54.75� 7A � ' 3C � 8P
.:: . ... . .�... . . ::......_ _ __.. . . _._.:: ::... .�... . ..� _ .. .. .,:: .....:: .: .:. ... . . . _ . _. ._ , _. ::. ::: _... _. . .. _ . .
: _._ .... ... __..::. .:.._.._. . ...._..:.: .. ...._. : .:. : :_ _ . . _.. _ : :. ...
C Kitsap ; Power Equipment Operators �Saws - Concrete ?$54.33� �7A : 3C 8P
..,...�.�. __._._...�....:...�.... .. ___ ,_..�.,_::::.._.._... . . ._.._.....:, . , _--__:...__-__. . ___._. ...___..:._:.,.._.._.._ _�. ____�_:.::.. _�__—. __._._.._: ._.�:_.. ......
�Kitsap �Power Equipment Ooerators ;Scraper, Self Propelled Under 45� $54.75� 7A 3C 8P
' Yards ;
4 �...�......._._�__....... �._.__._�,.. . ._._...... __�....��........_...__._.a_._.�__....._._.�........_._._...__—._i................,.......__
i ....----......_ . _....._.._._........`....,____.....__.�...----...
iKitsap ;Power Equipment Operators �Scrapers - Concrete �t Carry All ;$54.33� 7A 3C 8P
.......,._.. . ...._..._. _._........... . ...__ --- .. ...... ........... . ;.__. __.........._...__.... ......_._ . __.... _..... _..........._._........ ......_...�. . .__ .................; . _._ . ..._.._ .._.. . . ._
�Kitsap IPower Equipment Operators �Scrapers, Self-propelled: 45 �$55.24� 7A ! 3C 8P
_ ..._..._ ._._._ _ _ __ . .; Yards And Over _____ ..-----. .---.. �_. .. ____. �._.. �
� .. . .. ...___.:
_. _...__-___---... �.�_.... ....____... ._..__.
�Kitsap iPower Equipment Operators 'Service Engineers - Equipment =$54.33f 7A j 3C ': 8P
_._.._
�....... ..._._... .._.... .........__. . _. . ..._.. .. ,_._... . �_....... ._.._ .._.... __. _........ . . . _..
.. . .... . . .---. . _ .... . .. ....... . . . . __ _ .. . _.......... . ....._
Kitsap �Power Equipment Operators Shotcrete/gunite �$51.97f 7A � 3C 8P
. _..�- -.,_.. .__..� .------.._..._
Kitsap �Power Equipment O�erators Shovel , Excavator, Backhoe, �$54.33 7A . 3C 8P
; ;Tractors Under 15 Metric Tons. � � �
�........__._...... -.-_--.... . ._.._....... . ........_..._ .. ....._._. __.._ ..�_ ____.........._ .. ........ .. ......... ........._.__.............._._ _____........._...
__. _... ; , _ ;
.._..... .......----.......--._.... ....�......._.__......_..__... ...� .,..
IKitsap ;Power Equipment Operators ;Shovel, Excavator, Backhoe: $55.24: 7A 3C 8P
€ ; �Over 30 Metric Tons To 50 ; ; i
� ` � Metric Tons �
�... . .� �. �
TPower E ui ment 0 erators - � ._.. .. __ __._ ._... _._ � _.__ .. _ , _._._ ._.Y ; . _ _ .. .. . __.;.. ._.. .. _ ._... _.. _
�Kitsap ` q p p 'Shovel, Excavator, Backhoes, ;$54.75; 7A 3C • 8P
, � Tractors: 15 To 30 Metric Tons F � . _..._._ _. ___ __ _ _ .,
L ....__.............._E _. ... ....__._......._'_...._.,..___ ""_"""_'"""'_'._. ....____ .
' _'_'........'_"_'..__.... _..._�. . . ._ . ..'_.
�Kitsap Power Equipment Operators Shovel, Excavator, Backhoes: '$55.79; 7A � 3C 8P
_.... ....._._........ ---._. .. __.. _
: i
� _ ; Over 50 Metric Tons To 90 ;
, https:/ffortress wa gov/Inilwagelookup/prvWagelookup.aspx 7/13
2/3/2015
about:blank
'` � Metric Tons � '
...... .. _�. ... ... _._ . . _ ._ _ ....._.. _ _ . .. .. _ .. . . .
;
._._. . .. _........ .. .._. .... . ......_.. _ _.. ; �. ;
Kitsap 'Power Equipment Operators Shovel, Excavator, Backhoes: $56.36= 7A � 3C j 8P
� Over 90 Metric Tons ' ! �
...._ ... .. ......... .. _ . .. ...... . .. ........ ;.._ .. . .... . ...... _.. . ......... . _...... ...
_ . ... _ .. .. ... .- --. .... .
. .. .
--..
Kitsap �Power Equipment Operators Stipform Pavers �` $5 7A 3C j 8P
. �..
Kitsap Power Equipment Operators 'Spreader, Topsider �t Screedman $55.24' 7A 3C . 8P
_.. ..__. . .. F _ .. __... __...... ....... .._... .. ._..... ..._...._ ...... ........_......._....._..... ... ...�...... ..._..._........ .....__..... ._......._.. ...----�... --_-........_._:.......... ._....... .. __.._........._........... _
Kitsap ;Power Equipment Operators Subgrader Trimmer $54.75: 7A ; 3C 8P
_.._ ...._ _.. . .. _ ... . __ . ..._.. .._. . . _ . :... __... . .. ..
_ . _. .. .. _. . _. . . _
Kitsap =Power Equipment Operators ;Tower Bucket Elevators $54.33; 7A ; 3C 8P
--- -- -...�... ...._._— . .............._...._ ... _ ......_._. .. ....._...._.._........ ..._..... ......._......_ ._. .. .._...__ .. ..__._._.._... .._. _._._._ ......... ..._.__._......... _
, ____.......�.._ .._._.._.. .__..._......._...._._.....
. _.
Kitsap :Power Equipment Operators �Tower Crane Over 175'in �$56.36' 7A 3C i , 8P
; Height, Base To Boom � .
_...... ___.......... ._.�._... .....----....... __..... ...._. .........._. _ ... ..._.�. .. . _. ....._ . . .. .
_.__ ._... ... _ _.. . .._._.... ...._._... . __.__..... ..._._..... . .. __.._.... ;
. ----;..... ..._.._.. . .....� . . .. ..
Kitsap Power Equipment Operators �Tower Crane Up To 175' In $55.79� 7A 3C 8P
� Height Base To Boom ! �
;
_._ . .. ; ... ..._..... ......_.. .. _... ....__._........._...... ....._... . .......... _...._. .---..... _.... ...._._. _....... . _.._. .... _. .. ._... ... .._. .. ._ . ..
: . ;� .
Kitsap :Power Equipment Operators `Transporters, All Track Or $55.24 7A � 3C 8P
� �Truck Type i
_ ... . ...... ..... ... _. _ . . _ ..... . _. _. .. ...... _ .. . .. . . . .... _ .... . . _._ _.. . ._.._. .. ..... ._.. . . ... .. ... ....... ... . ..... _. .. . .. ... .... . _ _. . _. . .... . . ,. . . ..... .. _ .
Kitsap ; Power Equipment Operators Trenching Machines $54.33; 7A ; 3C ; 8P
- -----.. ...;._.._...-----... -----.... _._.._.........---..........___ ....:...................._.. .._... _. ._ __ _.. ...._.. _............ _._.....__.._._-....._._. ...__._....-- -.:.----.. ......
�..
Kitsap ;Power Equipment Operators Truck Crane Oiler/driver - 100 $54.75E 7A 3C 8P
Tons And Over ; ;
.
t
.__ :.._.. _ .__. --- -- ---- _ ._ _. _ .. s - -- . ._._ _ __ _ ._. . .. . _ ; _
_. _; . _ .
Kitsap Power Equi�ment Operators 'Truck Crane Oiler/driver Under $54.33; 7A � 3C 8P
i 100 Tons ; ;
.... _.._ __ ........ .................... .... .. _.._ ___ ... _.....__...... ......_ __....... _ _. ......._.._... ._._ ...----.. ......._.... .. . ... _.... _. .
_
Kitsap Power Equipment Operators ; Truck Mount Portable Conveyor $54.75� 7A � 3C _; 8P
_.. _..__._ ....�........�..........___....... .....__._....._.__..........._..... ......w............_.._._...........___....._...----....--------..._._ ................_..................__._.. .�___. .-� _ €
Kitsap � Power Equipment Operatars � Welder $55.24' 7A 3C 8P
. . . ..._ . . ._.._ . ..- - - . ....._ _ ..._._ _ . _. _ . ...._.. .. .. ._. . . ..._. _.... ... _...__ ._. .. _.. . ..... . . .__ . ..:.. .....:........ _..�... ... . ...... . ... ... ..
�..
Kitsap ;Power Equipment Operators Wheel Tractors, Farmall Type $51.97� 7A � 3C � 8P
- - ----- .... ,..__.. ... ....___ �__.... ..__.._..... . ... ._.......... ............ __ .. . .._._............._ ..... ........_._._........__..... ......_..... . _ .... .....-_-. _._..__ .. . __.. . ..__.. . _ �. .... _........
Kitsap `Power Equipment Operators 'Yo Yo Pay Dozer $54.75; 7A � 3C 8P
_... .._�._..... .;--- -- ---._.: ._._._. ...-- ----. ..___ . : ..__._..... ...__.........____.............—_. . ....___._.... ........�_._.............__...... _.._.;_........:.._....... ...�_..... ._— .............� _ ...._.._........
Kitsap Power Equipment Operators- �Asphalt Plant Operators '$55.241 7A • 3C 8P
;Under�round Sewer �t Water ` f
_ ..............._.. . __,._�.._ . _ ._.__. ..___._...- ----. .._____ .....—_ -....—.........----�---........—_......._...—...._......_.__.......----............_..__;_.....__...__.......... _.......__.... . _ .... _�.—_........
....�.. ....1..
Kitsap ;Power Equipment Operators- Assistant Engineer $51.97� 7A 3C 8P
;Under�round Sewer F� Water ; � �
� r ._...........__...� ... ...........:. .. .....__ .. ..
_... _..�_.__..._. ; �..._ ._ ... ... ............. ..__....._._.__. ....--------�--......._- ..__._.. .._.._.......----.... ....�......^ _.., . _ ._. ..__._
, � .... . .....___._.. .
Kitsap Power Equipment Operators- �Barrier Machine (zipper) $54.75' 7A 3C 8P
;Under�round Sewer �t Water � ; �
._.. . ....__......__...._...._._.....----... ----..._.__.........._._..._......._..._......._..._.........----...... ......._...._.........__.. ...._.._...._......_.,. ......._... .._ _...._ .._ .. . .......... . ........__.....
Kitsap 'Power Equipment Operators- �Batch Plant Operator, Concrete '$54.75' 7A ; 3C � 8P
�Underground Sewer �t Water � ! � �
...: . .._ _._:..... ...;.,._ .:. .:... ..._ ... ..:..::...a_ .. :.._ .. ..,._._ . ... .__. .. ___ ....._. _. .... _.... . _... . .�.._.. ..... ___. : .. _...... . . .. .: . . v:._...... � - --. ._ � . .. _, . ....... . .
Kitsap Power Equipment Operators- Bobcat $51.97� 7A f 3C � � 8P
�Under�round Sewer ft Water ; ? ! �
._ . _.. , ; _ ._. . :. ._ ....... .: _......... ... _ ... . . . ._. _ .. _. ._ , - -... _ .... .. ... _. . .. ... ....... ... . .. _, ... ... _._ . ..._. . .. .. . r.. _. . .... _ .;. _. .. . . .... .: . . .._ . ....._ .. ....
Kitsap Power Equipment Operators- Brokk - Remote Demolition $51.97� 7A f 3C ` 8P
�Under�round Sewer �t Water 'Equipment � �
r. . .....,.:.. .. ,.. .. ..:: ::...:: : . :.: .:_ ..: :..: ..: .:::. :.. _ _. : . ..: _ . ,. ..
. ... _: . .r .. .. . :.:..:.:.. .. _ ; ..._ ...
Kitsap Power Equipment Operators- :Brooms ;$51.97j 7A j 3C E 8P
`Undereround Sewer E� Water • �
....... ..; . .. .. .... _-_.. _ . . ._ .. . _. . .... ..: .. ..... _ .. - - - - - . __ .... ..._._._. . . . ._ .. .._ _. _.. _ f- -�-- - --. .
.. .,.. ....—
Kitsap ; Power EQUi�ment Operators- � Bump Cutter �$54.75 j 7A � 3C � 8P
' U nder�round Sewer £t Water `. I
: �
� _.. .. .__......._�.___._. ......_ ....::: :.::...�_..........W___._ ... _ _._.---. ..�..._;:....:__:...... . _._.. . .____ ..,...�..... __.... . . _�. ;. �_ . .._.. _.:,.._..__... _.._ __.... ._..._ .......r.__�.._.._..__.___- _ .
Kitsap �Power Ec�uipment Operators- ;Cableways '$55.24� 7A � 3C : 8P
:
:Underground Sewer &t Water ' �
.....,. ....._____._.. . ��..........�._._ . ..�_.�......_..___ ............._�....._........___�... ....�....... ...__._.... ____ ....,�__::: ._..::..:.......�....�..._..:_.._._.. .._�-_..........�._._._.._....;.�_..... ._._._.._..._�......... __._..� :
Kitsap Power Equi�ment Operators- �Chipper $54.75� 7A 3C � 8P
; :
Under�round Sewer �t Water ' 1,
.�_.::.: __..�.:._ .;..._.._....::..__.n.... ...___:... _ _....... __--- . ___ . ....._....... .. ._.�. . ..._._._.. _.._, ._.. ....�.__. ...._M..... ;:.. ....:,__: _. . ::..�_... .. .� ... .._!...... .. _._ .... ... _ , ... ..:.:.._._...
_,.... ....
Kitsap Power Egui�ment Operators- Compressor �$51.97� 7A 3C 8P
, ,
•
�Under�round Sewer E� Water ; • � j ;
---. ....._.........�._._._ . . .................._... . ...._.......... ..._..... .... _.._....:.. .._..._ ____ _...___......._.....___... ._....... . _....... __..........__.._...._....... ..._.. .
, ___._.... ..�... ,.._
Kitsap �Power Equi�ment Operators- 'Concrete Pump: Truck Mount ; $55.24' 7A ; 3C 8P
Under�round Sewer �t Water �With Boom Attachment Over 42 ` � � �
_. . ........_.... � ._-- - _ _.. .. _.._._ .... ..... ..�_.... .... . ---- . M--._ .. . . ......__... . ....__._..... ......__...... ......—_....... ---- -_... . ... � . ....__ ...... ......... . ................. ....-- - - ._ ..__ . ..
. '_ �..
https:/ffortress.wa.gov/IniNvagelookup/prvWagelookup.aspx 8/13
' 2/3/2015 about:blank
Kitsap Power E uq ipment Operators- Concrete Finish Machine -laser $51.97 7A 3C
Underaround Sewer � Water Screed
_
, Kitsap Rower Equipment Operators- Concrete Pump - Mounted Or $54.33: 7A 3C
Under�round Sewer £t WatEr Trailer High Pressure Line
Pump, Pump High Pressure.
' ;..
Kitsap Power� Equipment O�erators- Concrete Pump: Truck Mount ;$54.75 7A 3C
Ur�der�round Sewer � Water With Boom Attachment Up To
42m
UnderQround Sewer ft Water Permanent And Shaft Type
. .. . . ... ; .. . . . ..
�
Kitsap Power Equipment Operators- Finishing Machine, Bidwell And $54.75 7A 3C
' '
https://fortress.wa gov/Ini/wagelookup/prvWagelookup.aspx
� .
� .
:�
8P
8P
. .. .... ..... .
8P
8P
8P
. . .. .. ..... — . . . .. . .............. ... ... .
Kitsap Power Equipment Qperators- Elevator And Man-lift: $51.97 7A 3C 8P
Under�round Sewer �r Water
_ . .. .. _ . .. .. ..... .. .. .:. . _
. ... . .:... . ... . . .... .. . . .. . .. ..
Kitsap Pawer EquiRment Operatars- Dozers D-9 �t Under $54.33 7A : 3C
Under;round 5ewer Et Water
.. . ...
Kitsap Power Equipment Operators- Drill Oilers: Auger Type, Truck $54.33 7A 3C
Under�round Sewer �t Water Or Crane Mount
. � — .....
Kitsap Power Equipment OQerators- Drillin� Machine $54.75 7A 3C
�Under�round Sewer £t Water
. .... . .. .... . .. . . ..... ....
. ... . . .
Kitsap Power EaUlqment Operators- Cranes: Friction Over 200 Tons $56.92 7A 3C ' 8P
UndEr�round Sewer �t Water
_. .. . .... ... . .
... . . .. .... .. ... .. . .
Kitsap Pawer Eau�ment Operators- Cranes: Over 300 Tons Or 300' $56.92 7A 3C 8P
�Under�round Sewer Ft Water Of Boom (including Jib With
Attachments)
.... ..; ..... . . .. ... ..... .. .. . .
Kitsap Power Equi�ment O�erators- Cranes: Through 19 Tons With $54.33 7A 3C 8P
Underground Sewer �r Water Attachments A-frame Over 10
Tons
. , .... . . . . .. ., . . ..... ... . ... . . .. . .. :.. ..
Kitsap � Power Equipment Operators- Crusher i$54.75 7A 3C 8P
�Underground S�wer £� Water
.:.
.. .: . . ..... � .. : .:. . ... .:. :
Kitsap Power Equipment Operators- Deck Engineer/deck Winches ;$54.75 7A 3C 8P
Underground Sewer ft Water (power)
.. .. .. ..
.. . . . ...
Kitsap Power Ec�uit�ment Operators- Derricks, On Building Work ;$55.24� 7A 3C 8P
Underground Sewer �t Water� Tons, Under 150' Of Boom
(including Jib With
Attachments)
... . . ...
Kitsap Power Equipment Operators- ;Cranes: A-frame - 10 Tons And $51.97; 7A 3C
Underground Sewer �t Water� ;Under
. ; _ . ... .. ... .... ... .
Kitsap Power Equipment Operators- �Cranes: Friction 100 Tons '$56.36; 7A 3C
Under�round Sewer &t Water Through 199 Tons °
.. .. .. ..
Kitsap Power Eq��i�ment Operators- Conveyors $54.33 7A 3C 8_P
lJnder�round Sewer £� Water
� . .. . . .... .. . .. .
Kitsap Power Equipment O�erators- Cranes: 20 Tons Through 44 $54.75 7A 3C 8P
j Under� Sewer £t Water Tons With Attachments �
�. .
i Kitsap Power Equipment C��erators- Cranes: 100 Tons Through 199 $55.79 7A 3C 8P
� Under�round Sewer �t Water Tons, Or 150' Of Boom
� (Including Jib With
� Attachments)
, .. . . .
Kitsap Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $56.36 7A 3C 8P
Under�round Sewer �t Water Or 250' Of Boom (including Jib
With Attachments)
. . . . . .. ... .
Kitsap Power Equipment Operators- �Cranes: 45 Tons Through 99 $55.24 7A 3C 8P
8P
9/13
2/3/2015 about:blank
I Under�round Sewer �t Water Gamaco �t Similar Equipment
-
—
, Kitsap Power Eguipment Operators- Forklift: 3000 Lbs And Over -. $54.33 7A 3C 8P
} �.
� Under�round Sewer tx Water With Attachments
I Kitsap Power Equipment Operators- Forklifts: Under 3000 Lbs. With $51.97 7A 3C 8P
; Underaround Sewer � Water Attachments
�Kitsap Power Equi@ment Operators- Grade Engineer: Using Blue $54.75 7A
Under�round Sewer �x Water Prints, Cut Sheets, Etc ;
� . . .. .. . ..... .. .. ,
�Kitsap Power Equipment Operators- 'Gradechecker/stakeman $51.97 7A
Under�round Sewer £� Water
3C 8P
3C 8P
Kitsap Power Equi .�ment Operators- Guardrail Punch $54.75' 7A 3C
UnderQround Sewer �. Water
,.
�Kitsap Power E�cuiament Operators- Hard Tail End Dump Articulating $55.24 7A
i 'Under�round Sewer &t Water Off- Road Equipment 45 Yards.
� ft Over
� . .. . . .. . .. . ..
�Kitsap Power Ec�uipment O�erators- Hard Tail End Dump Articulating $54.75' 7A
� Underground Sewer £� Water Off-road Equipment Under 45
� Yards
_. .. . .
� Kitsap Power Equipment Operators- Horizontal/directional Drill $54.33 7A
� Un der round Sewer &t Water Locator
i Kitsap Power Ec�uipment D�erators- `Horizontal/directional Drill $54.75 7A
Under�round Sewer � Water Operator
. . ... . . .. . ;
3C 8P
Kitsap Power Equi�ment Qperators- Hydralifts/boom Trucks Over 10 $54.33 7A 3C
3C
3C
8P
8P
8P
3C 8P
3C 8P
� Under�round Sewer 5� Water Tons
. ... i.
1 Kitsap Power Equipment OQerators- Hydralifts/boom Trucks, 10 $51.97` 7A 3C 8P
Under�round Sewer �t Water Tons And Under
, :. ..
Kitsap , Power Equipment Operators- Loader, Overhead 8 Yards. �t $55.79, 7A
Under�round Sewer £� Water Over
Kitsap Power E ui ment Operators- Loader, Overhead, 6 Yards. But $55.24 7A
Underground Sewer �t Water Not Including 8 Yards
3C 8P
Kitsap Power Egui�ment O�erators- Loaders, Overhead Under 6 $54.75 7A 3C 8P
Under�round Sewer Et Water �Yards
Kitsap Power Eguipment Operators- Loaders, Plant Feed $54.75 7A 3C 8P
Untier�round Sewer �r Water
. ..
Kitsap � Power Equipment Operators- Loaders: Elevating Type Belt $54.33 7A 3C 8P
Underground Sewer � Water
Kitsap Power Equipment O�erators- Locomotives, All $54.75 7A
l�nderQround Sewer �t Water
._. —
Kitsap Power Equipment Operators- Material Transfer Device $54.75 7A
Under�round Sewer & Water ' '
; .... ... . ;
Kitsap Power Equipment Operators- �Mechanics, All (leadmen -$0.50 $55.79 7A
Under�round Sewer £� Water Per Hour Over Mechanic)
.
Kitsap ' Power Equi�ment O�erators- Motor Patrol Grader - Non- ?$54.33 7A
3C 8P
3C 8P
3C 8P
3C
.... .. ... ...
8P
8P
8P
Under�rnund Sewer £� Water finishing
—
Kitsap Power Eau Operators- Motor Patrot Graders, Finishing $55.24 7A 3C
Under�round Sewer ft Water
; .... . ..
Kitsap Power Equipment Operators- Mucking Machine, Mole, Tunnel $55.24 7A
Under�,round Sewer St Water Drill, Boring, Road Header
And/or Shield
Kitsap Power Equipment Operators- Oil Distributors, Blower $51.97 7A
Under�round Sewer �t Water Distribution �t Mulch Seeding
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup aspx
3C 8P
3C 8P
1 ' 10/13
2/3/2015 about:blank
�
; ;Operator � ;
..._.____..._ r ................_.,............_�..............,..........._............_'_ ......-'".. ..._..__..._..._.....____.__"'..._..._L.....__��_._.. .................-..._...._. .... ��__.........1._.._........�
�Kitsap Power Equipment Operators- 'Outside Hoists (elevators And �$54.33 7A 3C � 8P
3 , �
Un erground Sewer �t Water ;Manlifts), Air Tuggers,strato ; ' ; ;
... ... . ......�._._.._. ...____................_........ .. .__._.__._..........._...,.........____................_......_ ._...�..._.. . .---_.._......._............._.._..;. ...._.__._.. ;._._._..............._..__ . ---#—..._......_._..._._.
� Kitsap Power Equipment Operators- ;Overhead, Bridge Type Crane: I$54.75 7A ' 3C � 8P
� Under�round Sewer �t Water 20 Tons Through 44 Tons ' ?
: ; �
_ .. ._._..... . ... .... __... .. ... ..— ... .. ........_.._.. _.... . _..._.._.; .. . . .___.... . ...___ ... . . . _ .._...... .....__ . ... ....___.�. . . . _._._.. .., ...._.._. ... . ... _..._.. ____
_ _...� . -� ;---
Kitsap `Power Equipment Operators- �Overhead, Bridge Type: 100 '$55.79� 7A � 3C � 8P
Underground Sewer �t Water Tons And Over � '
� . ... . ......... .._.. . . ......._. . _ _ _._ ._ . ... ._..._..... ..... _ ....._.. _ . .. ... ..._ . . . '
p,Power Equipment Operators- ;Overhead, Bridge Type: 45 Tons� $55.24� 7A J 3C � 8P
__ ................_............. ....._ ... ....._._...... ......._._._. .. ...._._. � ...�
Kitsa � �.. _...�.
Underground Sewer £t Water Through 99 Tons � �
---. . _ ._ . . ..... _. . .. .. ._ ... .... ... .... ... ..... _... . . . ......._.. _. .... ... . _.__..... . ... _ ........_ . .. _ _.... .. --- . . . .
_. .. .,. . ..... __ . . . _; . . . . .. ..._ .
Kitsap Power Equipment Operators- Pavement Breaker ;$51.97 7A 3C 8P
UnderQround Sewer &t Water '
� €
._ ..... . _.._ .... ..... . . . _._ .. . .. .. ._ ... .. .... .. . _ .. . . .. ............ . .. .. . .. . .....: ... .._ .. . . .._ ._. _ .
_ ..; . . .. .. . .
Kitsap Power Equipment Operators- ;Pile Driver (other Than Crane ;$54.75 7A ` 3C 8P
I
�I
I
ntt�:
Under�round Sewer �t Water Mount) 1 � �
.. _... .. .. : . .._._ . ... .. .. _ . .. .. .. ... ._._ ... . . . .. _ _ _ _ . _
. _.. .. . . . ..... . . . _ _..... .... . ..�_... --
Kitsap �Power Equipment O,perators- ;Plant Oiler - Asphalt, Crusher :$54.33; 7A ; 3C � 8P
�Underground Sewer ft Water � , ' ' �
_ . ....... i . ..._..... . ... ._.. . _ .. ..... .. __ .. ;. ... ..._ _... . .. .. . . . . .... ... .._ . ... .. _ .. ' . --
..... _... ..��.. _. =
Kitsap Power Equipment Operators- ;Posthole Digger, Mechanical '$51.97; 7A : 3C 8P
Undereround Sewer Et Water ` ` ; �
. ... .. ... ..... ....... .. .._.... _
. .. ....... ... . ...- --- ...... ..... _. .. : _ _ . _. _.. _ .._ ... .. .
� � i
_ _._ ..... .� - -
Kitsap Power Equipment Operators- Power Plant $51.97 7A � 3C ` 8P
Underground Sewer �t Water � � � ;
_ . ............... ........... ...----.. . .. . .._._...... .... _..--- ..._. .. ._. .� . .. ... ..._. _._... ......_. ._ ... ...... _.,... ......... __.._.. . __.._. . . ..._._ _. ._..._.__..... . ... _ ...... .. .. .----
_ ;.
Kitsap Power Equipment Operators- Pumps - Water =$51.97 � 7A 3C ' 8P
;Underground Sewer �t Water � E � '
. .....r.... .._�. .___ ......... ....__._..._..... ...__.....�...... ____...... ._____i.. . . .._....._ ..... .. .._.......... . .__.._. .._.._... . .. ____.. � . . �._�_....... .!..._.__........ ...---�-._... ..._
�..._. ...
Kitsap Power Equipment Operators- Quad 9, Hd 41, D10 And Over `$55.24; 7A 3C � 8P
;
Under�round Sewer ft Water ; '
... ....�__. _. .: ....._..... ... . _._—.._. ...._ ___ ...
_ . . ... ....._........ ..—..; ..... .._ .... ... ................._........ ..__.—. ..- ---_.._ . ....._.__. .
�.
_.____�.. ;. _ _ ... _ . ..--.--
__ ................._ _....----
Kitsap Power Equipment Operators- Quick Tower - No Cab, Under ;$51.97' 7A ; 3C � 8P,
Underground Sewer Ft Water 100 Feet In Height Based To � ' .
�
; � Boom � j �
__ . ._ . --__ _ . _ _ --- ... . _ . � ._ -�---. _ _. .. . __ __ .. . . __._ . ------:_. __._ _ _ . ' ..
� . _ __..
_ . . .._� __ ._._ . - -:-_
Kitsap �Power Equipment Operators- `Remote Control Operator On $55.24� 7A � 3C � 8P
'Under�round Sewer �t Water `RubberTired Earth Moving i ' � �
Equipment • '
. . .._.._... _....._......_�..._ _ .. :...._�..... ..._..... _ ........ :.::.._._ .. . .
,� ......_.... ..._.._.. ., _ :...n...:... .. ..._..._. .....__-� . ......__..._ ...... _.._ _ �..:_ :. s _.
�.......
Kitsap jPower Equipment Operators- ;Rigger And Bellman �$51.97; 7A � 3C � 8P
UnderQround Sewer �t Water
_. .:,.:. ;...: _.._.... ._..:..._: . ... . � � .. ...:. ..... .::.....::.. _. ,. ,. w . ...... . : : :.. _ .. . . ..:.__.. ..._ ... . .:. . . . . . . . ... .,..
...._. .._ .. ,......::.:_:..:..... ... ...�.... : ...
Kitsap ; Power Equipment Operators- ; Rollagon �$55.24 � 7A j 3C 8P
'Undereround Sewer &t Water � ' <
__ .... ........ .__......_......... _ �. . __..... . _._ ... __............. ---
......... . � ..._..._. .. ... _: .. ....._ __.. . ......_..
Kitsap Power Equi�ment Operators- �Roller, Other Than Plant Mix $51.97; 7A ' 3C 8P
�Underground Sewer � Water � ; � � �
,
... .. ....._... . _._ .. _.._ ... . .. _ _._. ....._......._ ... _.__..... .. _._ ... . ......... .. __ _._..... _..._..... .. ._......_. _
; ; .
.._ .... . ,. . :
., . _ .. ... . _...�._ . � _...
Kitsap Power Equipment Ooerators- ;Roller, Plant Mix Or Multi-lift ;$54.33; 7A 3C 8P
; Under;round Sewer �t Water ;Materials I �
. ..... ... . .......... . .. . _._... .. _. ... . .. _ - - - - --.... ... ..
_ ._ .. ..... _ .. .. ...._. . . . _.._. . . . �._ .... ...... ... ��. .. .... . ... _.. .... ...
�(itsap Power Equipment Operators- ;Roto-mill, Roto-grinder ; $54.75 7A 3C j 8P
�
;Under�,round Sewer &t Water ' � i `
__ . ... ............- - ------..._.. .. ._..._. .. . ..........._. _.. .----.. .... ---.... . ..__._....... .. .... ..._........---... ......._.__..:... . .�.._._.. . . ---...... ...._._ _.........._.__...._ ...__ ___
(itsap �Power Equipment Operators- Saws - Concrete $54.33' 7A 3C � 8P
� Under�round Sewer �t Water : ' ' j
� ; :
_.__._..........-----.......�_. ........__._... ...._._...... ..__....�......_..._�._.__........._..__..... ..._.__ ............._.__.._....._._._..,.......___.......�..__..._..... ._._._�__...._.�_........ __ __. ..._�__...
titsap Power Equipment Operators- �Scraper, Self Propelled Under 45' $54.75� 7A ; 3C � 8P
�Under�round Sewer �t Water ;Yards = ' 3 �
�. .__....__.. ... �._�._........._..._ _._....._...__._... _. ... ---- ------;- - -�-------- ----.... _.._.......—......-------.._........___�............___..._.... r.__.�_..._ ....._._�---..._�__... ..�_ .... ._
titsap � Power Equipment Operators- Scrapers - Concrete &t Carry All $54.33' 7A ' 3C 8P
,
Under�round Sewer �t Water �
..------._...,._____...._..._---_......._�..... ....____....._� .:.............__..........._.__..........._..�........-�-----..........__._._.,.........�_.......;....._.�...__ .......___�.._.......---._..._.. _ _
<itsap Power Equipment Operators- �Scrapers, Self-propelled: 45 '$55.24' 7A ; 3C � 8P
Under�round Sewer �t Water Yards And Over ' ° �
.:.____,._....._____... _._....__........_�_.._.:..:: __�.�.__.._...._.._._._,........_._� ....:::__._...,.......r...�...�._:..._._._.......... ...__�..._..... ...._.� _... . a�. � . .._.........._. ...._....�.._. ..:,_.._.
Citsap Power Equipment Operators- Service Engineers - Equipment� $54.33 ` 7A j 3C 8P
Underground Sewer �t Water � 3
..... �.._.____ �__...._ _ _._.._.. ...._,_:.. . .,..__._._.
. __..__._._..._.�_______:._:.._____..:....___._.....�._.....___::,.. ..........._.... _ . ; ::...:�._,_:....::..;�,_.�_�..:._._...�.:.::: ....�......... :..:. _. ...._._._.
, � ; �
://fortress wa.gov/Ini/wagelookup/prvWagelookup.aspx 11/13
2/3/2015
about blank
�Kitsap �Power Equipment Operators- [Shotcrete/�unite Equipment j$51.97- 7A E 3C . 8P
�Under�round Sewer bt Water ' ?
_._. .. ......_.. . _---- ........ ......_.... .. ..._..._.... ... _._.__. ........_._:............ .._.__...... _..._.._....... _.._._ .___ - --.........-----._. .....__._ ,.._... � ---..._ __
_� . ... _ ...... .. �
, �- ._�. �._._.__. .
Kitsap Power Equipment Gperators- 15hovel , txcavator, Backhoe, �$54.33; 7A ! 3C ' 8P
Under�round Sewer & Water �Tractors Under 15 Metric Tons.
:
_._.. ....._ ... . ..._ _.... .. ._ _.. ..... . . . ..;.. ... .. .... _.. _ _. _.. ._...._. . ....._._ . .._...._... .. . .�_.._....;... .. _._.._....... _....n... .. . ...�....._._ . .._...
Kitsap ;Power Equipment Operators- jShovel, Excavator, Backhoe: �$55.24' 7A ; 3C ! 8P
`Under�round Sewer � Water �Over 30 Metric Tons To 50 � `
�
; �Metric Tons � � ;
. .... . .... .. . .. _. _ . . ........_.._. ..... ...._.—_...._. .—.. . . _ . _ �__.. . _. .__. _ . . . _ . _ . . _ .. _. _.. _ ... . .... ..-----. . ... � -- - -- -- -.... . _..._
1 . ..._..._.. —�--- ------.:....------ ,�.........
:
Kitsap Power Equigment Operators- !Shovel, Excavator, Backhoes, [$54.75: 7A 3C 8P
;Under�round Sewer �t Water €Tractors: 15 To 30 Metric Tons : i
; :
--. ... .__...... ._ . ..._. _ _.._._...... ----...... ..... ---... .. _._ ..:....... .. .... _.._...... _ .._�......... ......__...._........._..__... ...�__.. ........_._._...._......�...__........;.__.__. .....—_......---. _.
Kitsap �Power Equipment Operators- jShovel, Excavator, Backhoes: �$55.79� 7A 3C 8P
Underground Sewer &t Water `Over 50 Metric Tons To 90 � �
� ;Metric Tons j
r -
. _ ..... �. . ... _..._._._.. .. ......._ ... . .. ..........- ... . ...___. . .. _._,...... . ._. _.... .. .. ... ... ... . ...... __...... . .... __._... . . __.._; .. ..-- --- - ;- -- .. . ....
_... . ' _....... --
'Kitsap Power Equi�ment Operators- iShovel, Excavator, Backhoes: �$56.36, 7A 3C 8P
� Underground Sewer �t Water ;Over 90 Metric Tons ; ;
;---... __.........__.. ;. .._...__ ....................:_.......... ........�_.. ... ........._ ........ ..-- -�--- -......_ _�.........._—...... ..._._..__.._.......__._.........._�_......... . .---. ` . ... ........... ;._.... _ �.... ___......... ..
Kitsap �Power Equipment Operators- �Slipform Pavers $55.24= 7A 3C 8P
, Underground Sewer F� Water ; � ;
�__._... ___._, . ...__._.__ . . _�_..._ _ ._.. . _.__._._ .. . _ _._. _ ...�_�__. __ . _�..._. ... . �.. _�..... . .. �. _ _ _..._.� .___ . _..___. . ___ . : ____._. .
�.. .
Kitsap 'Power Equipment Operators- 'Spreader, Topsider �t Screedman; $55.24� 7A 3C � 8P
; Underground Sewer £� Water � � � i
—_._....T..� _...... --- ... ____ .........._—.........._�_.._... .._.. _..�....._....... .—........ ---.._..........__.
�.........._.__._._.....__—....._.._._—..........._----............_ : 3 ......._._
, .,_.._. ... .._.._.._......,.
'Kitsap �Power Equipment O�erators- �Subgrader Trimmer ;$54.75 7A 3C 8P
` U nder�round Sewer �t Water .._._.n ___...^_. _____._ . _ _,....._ . _? _._.__ ; _ .�_ ..±_..__. ..._� _ .�.., _ � . _ ..
__.... _...._�. �__. . .,�_. . . _...�._.... ._.._._._ .. _... �
Kitsap �Power Equipment Operators- !Tower Bucket Elevators �$54.33; 7A 3C 8P
' Under�round Sewer �t Water � ' �
,
--._... .. ....�..., .... .....��..:...:. ._ _.. ._.. _.___... . ..__.:...:....._ _.:.�._ .. : ...,�.�_.. . ..___._.: .::.__._ ..:. ::,.._s.�._, .. _.._._;. . ... .___......:_._�.... .._.�... m._� :. �.
.�_ ._ .
Kitsap ;Power Equipment Operators- ITower Crane Over 175'in �$56.36� 7A € 3C � 8P
'Under�round Sewer �t Water Height, Base To Boom �
.«..__. .. . _..: ......_...___ . . .�ti........ . ......._a ............. _ . .. ....f ,.,...� ...» . . __...._............_......_.._... .. .._..�. .. —,. .......<.. ..,.,.....« .......... ....... ... ::..««�... . .... a—..._. .. ...
Kitsap ;Power Equipment Operators- `Tower Crane UpTo 175' In `$55.79j 7A 3C 8P
; Under�round Sewer £� Water � Height Base To Boom
_...... . .. .._..:........ ._ ......................_.......... _.._... .........._............ ......;_... ......_................._.._._..................._.. .... ......._._..............�..... . _...._... .. .._.._ .... _..... .._�.. .. ....._.. .... ......
Kitsap ;Power Eauipment Operators- ;Transporters, All Track Or ;$55.24: 7A 3C 8P
�UnderQround Sewer �t Water !Truck Type �
_.. .. .... _.. _.. .. . ....... .. . . .. _ .. .... . ...... _..... . . _ ... . .... __ . . ...._._ _._... ......_._ ... _.... .. ..� _ . .. .. _._.;.. . . .__ ... .... _. _. ......... ....... ... ._.....
Kitsap Power Equipment Operators- jTrenching Machines ;$54.33 � 7A 3C 8P
;UnderQround Sewer �t Water � ` ': '
.. . . . ....._..._.. .. . __..... .. .. ... .._._ .. .. _ .. .. . .. _.... . ....;_ . . .. _.._ .. . ._ ._ .._......_ ... .. .... .. .. _. _ � ._ - - _. .. . .... ..
Kitsap 'Power Equipment Operators- :Truck Crane Oiler/driver - 100 `$54.75; 7A 3C 8P
; , , �
�Under�round Sewer Et Water ;Tons And Over i E ; �
---- .... .........---- .... .._._ _. .. ----.. _ ......._ _._ .. . �._..... _.. _... . . _..._.. . _.._. .._.... .. . .
,
. .. .. _._ ...... .... .__... . .._.... . . .. .. q.. . �
Kitsap Power Equipment Operators- FTruck Crane Oiler/driver Under ;$54.33 7A 3C 8P
�Underground Sewer �t Water j100 Tons ' '
- ----.. ....._..---..._..._....,_ .............._.__......... ............... .... .........._..._._ :�_._ ...----........._.._._.. . .._._.... -- .... ._.._. _.. ....._..__ _..._:. . .. _.._... . .. . ___. ..... .
Kitsap �Power Equipment Operators- Truck Mount Portable Conveyor i$54.75 7A , 3C 8P
�Underground Sewer �t Water ! j ` '
---....._. .. . ._._...: ... .... __. _. . ......._.._. _...... _ .. .. .;_.._ .. _...... _ _ ...... ........._... _..--- --.... . ..._.._....... ... ... ..... ... ._..._._. .. ..
_._._.. .. . ....----..... ...- -�---. _. . .. ,.. ....:.. '
Kitsap ; Power Equipment Operators- � Welder ;$55.24; 7A 3C 8P
;Under�round Sewer £� Water ; ; ! �
"__"....... _�_�........_ ..... ........_...._....."'__...._.........._........_..._�_.._.......__'..... .__._._ .............._._........�_.__... ..€.__... _.. _......E .. . __.. . ..�..__........_..._..___....'....._.._._......' '
Kitsap i Power Equipment Operators- ;Wheel Tractors, Farmall Type =$51.97� 7A 3C 8P
: Undereround Sewer �t Water � � ;
--... .._____.. .. ........—..... ......____._......_..—..........-- --- -�... _..._...... ......_ —....._........_._ _..........—..._. -- ---._...........
;
, , _...__..... ...._.__ .. __.._..----. .. � _.�. ..F___
Kitsap "Power Equi�ment Operators- �Yo Yo Pay Dozer �$54.75; 7A 3C 8P
Under�round Sewer £t Water
, ; �
_.__. . _..._..... ... __..... . ...__;—.........—..... . ......__..........—.._.... .__.__.. ... ,.._.__. ......_.—., .....---�...... :.....___......._�...- : --__ ....... .......
--3 . .... . . .---.- . _. ....._.... .
Kitsap ' Sheet Metal Workers iJourney Level (Field or Shop) $70.37: 7F 1E
_.... -- - - --...... ....._... ....._..... _..._... �--.... . __.._.. ....._... ....... ......_..... ... ._ ......._..... .._...... . _.._.. ..... _._ . .__._. ....
Kitsap 'Truck Drivers Asphalt Mix Over 16 Yards (W. j$48.87{ 5D : 3A 8L
�WA-Joint Council 28) !
_. _ ... �_... .. _...__... . .. ..-- .... ...... .......... .. .. . . - - - - -....._. . ... . ____. . . .---. . .. . __. _..... . ._........ _._�...._. . .. - , - ---..... .. .. ._... _......... ........_..... .. ..._. .... ..
Kitsap Truck Drivers Asphalt Mix To 16 Yards (W. ;$48.03 � 5D 3A 8L
; ;WA-Joint Council 28) , i
.... _�.. .. ....-----..............----. . .----..... ...:.._ ... .... .....; .. ... . ._.__...
---.. ............�. .........�.._._ .....
..__.......__ .__.__.... ---.. ...__.__..... ........_..... . ..._.._... ..
Kitsap Truck Drivers � Dump Truck =$19.60' 1
:
...�._ . ....._.;... ..__. . .. _......... . .._.._... . ..-----.......�.._............_..__......_._._._. .. ._.._..... ..__...�... . _ .... ---- - ........_._.._...... .._.........__...._......... -----......
-
:.
Kitsap �Truck Drivers �Dump Truck And Trailer ;$19.60i 1
__..........----.. _......_._.......��.. ...----......._..----... - - ---. ... _._.._.... .. .._..._. .._._.... . _...._......-----. ....-- �_._... -- ------._ ...... ..�__... .. _
- --...... .. . .
r
https:/ffortress.wa.gov/IniNvagelookup/prvWagelookup.aspx 12/13
2/3/2015 about:blank
� �Kitsap� jTruckDri OtherTrucks
_....__.
r Kitsap Truck Drivers Transit Mixer
' �,a...... , :.:,.. �..::, � ..:.....:_:,,: ,.�.re: . ._.._.�,... .. .: . �.. .... _., � . ., ,_ ..... .. ..,_ .... .............
1
�
'
1
'
'
�
�
�
'
'
'
'
�
�
'
' https:/ffortress wa gov/Ini/wagelookup/prvWagelookup aspx
:
, $18.37� ! ''
_. ......_._m.- ---..........�....._..._ .. ..—,_ .....—....__ .,..__. �_.
-.�_..... ; ..�.__�
,
' $20.79 _
......::..:......� .. .:::: ....:.:......:.. a:.,._.. ..� _...::_:..... . , �..�. .._........ �..... ,. . ...
� �
13/13
,
'
'
,
,
'
1
'
Benefit Code Key — Effective 8-31-2014 thru 3-3-2015
**********************************************************************��************************************
Overtime Codes
Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate
must be not Iess than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided fior
the worker.
AL,I, FIOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER W��;K SHAI.L
BG PAID AT ONE AND ONE-HAL.P TIMF,S 'i'I-IE HOURLY RATE OF WAGE.
L:�
c
All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked
on Sundays and holidays shall be paid at double the hourly rate of wage.
"I'he first two (2) hours after eight (8) regular hours Monday through Friday and the frst ten (10) hours on Saturday
shall be paid at one and one-half times the hourly rate of wagc. All other overtime hours and all hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage.
D. The first two (2) hours before or after a tive-cight (8) hour workweek day or a four-ten (10) hour workweek day and
thc first eight (8) hours worked the ne�t day after either workweek shall be paid at one and one-half times the hourly
ratc of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly
rate of wage.
E. '1'hc first two (2) hours at�er eight (8) regular hours Monday through Friday and the first ei�;ht (8) hours on Saturday
' shall be paid at one and onc-half times the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
' �. 'I'he first two (2) hours aftcr eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be paid al one and onc-half times the hourly rate of wage. All other overtime hours workcd, except l.abor Day,
shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the
hourly rate of wage.
�
'
G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a
four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess
of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage.
H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or
t equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday
through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the
hourly rate of wage.
'
1
1
'
'
'
I. All hours worked on Sundays and holidays shall also bc paid at double the hourly rate of wage.
J. Thc first two (2) hours after eight (8) regular hours Monday through Friday and the tirst ten (10) hours on Saturday
shall bc paid at one and one-halfi times the hourly ratc of wagc. All hours worked over ten (10) hours Monday
through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage.
K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All
hours worked on holidays shall be paid at double the hourly rate of wage.
M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be
paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage.
Benefit Code Key — Effective 8-31-2014 thru 3-3-2015
N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of
wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
O. The tirst ten (10) hours worked_ on Saturday shall bc paid at onc and one-half timcs the hourly rate of wage. All
hours worked on Sundays, holidays and after twclve (12) hours, Monday through Friday and ai�er ten (10) hours on
Saturday shall be paid at double the hourly rate of wage.
P. All hours worked on Saturdays (except makeup days if circumstances warrant) and Sundays shall be paid at one and
one-hal f timcs the hourly rate of wage. All hours worked on holidays shal I be paid at double the hourly rate of wage.
Q. The first two (2) hours aRer eight (8) regular hours Monday through Friday and up to tcn (10) hours worked on
Saturdays shall be paid at one and one-half times the hourly rate of wage. nll hours workcd in excess of ten (10)
hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day) shall
be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half
times the hourly rate of wage.
R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wagc.
S. The first two (2) hours after eight (8) regular hours Monday through Friday and the tirst eight (8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other
overtime hours workcd, except Labor Day, shall be paid at doublc the hourly rate of wage. All hours worked on
Labor Day shall be paid at three times the hourly rate of wage.
U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sundays and holidays (exccpt l,abor Day) shall be paid at two times the hourly ratc of wage. All hours worked on
Labor Day shall be paid at three timcs the hourly rate of wage.
V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and
one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and C'hristmas day shall be paid at
double the hourly rate of wage.
W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the
cmployer)) shall be paid at onc and one-half times thc hourly ratc of wage. nll hours worked on holidays shall be
paid at double the hourly rate of wage.
X. The first four (4) hours aftcr eight (8) regular hours Monday through Friday and the first twclve (12) hours on
Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked ovcr twelvc (12) hours
Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. Whcn holiday falls
on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered thc
holiday and all work performed shall be paid at double the hourly rate of wage.
Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such othcr hours as may be agreed upon by any
employer and the employee) and all hours worked in excess of eight (8) hours per day (10 hours per day for a 4 x 10
workweek) and on Saturdays and holidays (except labor day) shall be paid at one and onc-half times the hourly rate
of wage. (except for employees who are absent from work without prior approval on a scheduled workday during
the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10
workwcek) or 40 hours during that workweck.) All hours worked Monday through Saturday ovcr twelve (12) hours
and all hours worked on Sundays and Labor Day shall be paid at doublc the hourly rate of wage.
'L. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All
hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. '
1
2 ,
1
,
' 2.
'
'
'
'
,
'
'
'
�
Benefit Code Key — Effective 8-31-2014 thru 3-3-2015
ALL HOURS WORKED IN EXCF,SS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PF,R WEGK SHALL
BE PAID AT ONE AND ONE-HALF TIMGS THE HOURLY RATE OF W�1GE.
B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage.
C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wagc. All hours worked on
holidays shall be paid at two times the hourly rate of wage.
F. The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the
holiday pay. All hours worked in excess of eight (8) hours on holidays shall be paid at double the hourly rate of
wage.
G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours workcd on paid holidays
shall be paid at two and one-half times the hourly rate of wagc including holiday pay.
H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall
be paid at one and one-half times the hourly rate of wage.
O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage.
R
U
All hours worked on Sundays and holidays and all hours worked over sixty (60) in one week shall be paid at double
the hourly rate of wabe.
All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours workcd
over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage.
W. The first two (2) hours aRcr eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday
shall be paid at one and one-halftimes the hourly rate of wage. All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day,
ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten?'
shall be paid at double the hourly rate of wage. The first eight (8) hours worked on the fifth day shall be paid at one
and one-half times the hourly rate of wage. All other hours worked on the fiflh, sixth, and seventh days and on
holidays shall be paid at double the hourly rate of wage.
' 3. AI_L HOURS WORKED IN EXCCSS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID
AT ONE AND ONE-HALF TIMES TIIE HOURLY RA'I'E OF WAGE.
'
'
'
'
'
'
A. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours
worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday
and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm
and midnight shall receive an additional one dollar ($ I.00) per hour for all hours worked that shift. The employcr
shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall
be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has
worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate
until such time as the employee has had a break of eight (8) hours or more.
3
'
Benefit Code Key — Effective 8-31-2014 thru 3-3-2015
C. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage.
All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate
of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at
the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more.
D. All hours worked bctween the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium
rate of I S% over the hourly rate of wage. All other hours worked after 6:00 am on Saturdays, shall be paid at one
and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the
hourly ratc of wage.
E.
H
All hours worked Sundays and holidays shall be paid at double the hourly rate of wage. Each week, once 40 hours of
straight time work is achieved, then any hours worked over 10 hours per day Monday through Saturday shall be paid
at double the hourly wage rate.
All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on
Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two
and one-half times the hourly rate of wage including holiday pay.
All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at
two (2) times the regular rate of pay. Work performed on Sundays between October I Sth and March I Sth shall be
compensatcd at one and one halfi ( I-I/2) times the regular rate of pay.
All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. In the event the job is
down due to weather conditions during a five day work week (Monday through Friday,) or a four day-ten hour work
week (Tuesday through Friday,) then Saturday may be worked as a voluntary make-up day at the straight time rate.
However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All hours worked Monday
through Saturday over twelve (12) hours and all hours workcd on Sundays and holidays shall be paid at double the
hourly rate of wage.
4. ALL I-IOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID
nT ONE AND ONE-HAI�F TIMES THE HOURLY RATE OF WAGE.
A.
L:?
All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly
rate of wagc. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage.
All hours worked over twelve (12) hours per day and all hours worked on holidays shall be paid at double the hourly
rate of wage.
C. On Monday through Friday, the first four (4) hours of overtime after eight (8) hours of straight time work shall be
paid at one and one half ( I-1/2) times the straight time rate of pay, unless a four (4) day tcn (10) hour workweek has
been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday
� through Friday, the first two (2) hours of overtime after ten (10) hours of straight time work shall be paid at one and
one half (I-I/2) times the straight time rate of pay. On Saturday, the first twelve (12) hours of work shall be paid at
one and one half ( I-I /2) times the straight time rate of pay, except that if the job is down on Monday through Friday
due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on
Saturday may be worked at the straight time rate of pay. All hours worked over twelvc (12) hours in a day and all
hours worked on Sunday and Holidays shall be paid at two (2) times the straight time rate of pay.
4
�
'
5. A
,
B
' C
' D
' H
' I .
I '
1
'
�
'
'
'
'
'
'
,
'
K.
L.
N.
P.
Q•
R.
S.
T.
Z.
Benefit Code Key — Effective 8-31-2014 thru 3-3-2015
Holidav Codes
Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgivin�; Day, Friday after
Thanksgiving Day, and Christmas Day (7). "
Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, T'hanksgiving Uay, Friday after
Thanksgiving Day, the day before Christmas, and Christmas Day (8).
Holidays: New Ycar's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
the Friday at�er Thanksgiving Day, And Christmas Day (8).
Holidays: New Year's Day, Memorial Day, Independence Day, I,abor Day, Thanksgiving Day, the �riday and
Saturday after Thanhsgiving Day, And Christmas Day (8).
Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Day after Thanhsgiving Day,
And Christmas (6).
Holidays: New Year's Day, Memorial Day, Independence Day, [_abor Day, Thanksgiving Day, and Christmas Day
(6).
Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day,
Christmas Eve Day, And Christmas Day (7).
Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
Friday After Thanksgiving Day, The Day f3cfore Christmas, And Christmas Day (9).
Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, La6or Day,
Thanksgiving Day, Hriday After Thanksgiving Day, And Christmas Day (8). ��
Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (9).
Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday And Saturday
After Thanksgiving Day, "I�he Day Before Christmas, And Christmas Day (9). lf A Holiday Falls On Sunday, The
Following Monday Shall Be Considered As A Holiday.
Paid liolidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas
Day (6).
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After
Thanksgiving Day, One-Half Day Before Christmas Day, And Christmas Day. (7 1/2).
Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving
Day, And Christmas Day (7).
Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, l,abor Day,
Thanksgiving Day, The Friday Afler Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas
(9).
Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the
Friday after'I'hanksgiving Day, And Christmas Day (8).
Holidav Codes Continued
5
Benefit Code Key — Effective 8-31-2014 thru 3-3-2015
A.
Paid Ilolidays: New Year's Day, Presidents' Day, Memorial Day, Indepcndence Day, Labor Day, Thanksgiving
Day, The Friday After Thanksgiving Day, And Christmas Day (8).
E. Paid liolidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day,
Indepcndence Day, Labor Day, Thanksgiving Day, Day After Thanks�iving Day, Christmas Day, And A Half-Day
On Christmas Eve Day. (9 1/2). _
G. Paid I-lolidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day,
Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And Christmas
Eve Day ( I I ).
H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, 'The Day ARer Christmas, And A Floating
Holiday (10).
I. Paid Holidays: New Year's Day; Memorial Day, Independence Day, l,abor Day, Thanksgiving Day, Friday
After Thanksgiving Day, And Christmas Day (7).
�
�
L�
'
'
L�
"1'. Paid Holidays: New Year's Day, Presidents' Day, Memorial Uay, Independence Day, Labor Day, ,
'1'hanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day,
And Christmas Day (9).
Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
"I'hanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be
considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the
holiday.
Holidav Codes Continued
A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And
Saturday After Thanksgiving Day, �\nd Christmas Day (8). Any Iloliday Which Falls On A Sunday Shall 13e
Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday, the preceding
Friday shall be a regular work day.
B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as
a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the
preceding Friday.
C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day,
"I'hanksgiving Uay, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving
Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid
holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which
falls on a Saturday shall be observed as a holiday on the preceding Friday.
E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Priday.
6
�
'
'
'
,
Benefit Code Key — Effective 8-31-2014 thru 3-3-2015
F. Holidays: New Year°s Day, Memorial Day, Independence Day, I,abor Day, Thanksbiving Day, the Friday after
Thanksbiving Day, the last working day before C'hristmas day and Christmas day (8j. Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding hriday.
G. F{olidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6). Any holiday wliich falls on a Sunday shall be observed as a holiday on the following Monday.
H. Holidays: New Year's Day, Martin l,uther King Jr. Day, Independence Day, Memorial Day, l.abor Day,
�l'hanksgiving Day, the Friday after Thanksgiving Day, thc Last Working Day beforc Christmas Day and Christmas
Day (9). Any holiday which falls on a Sunday shall bc observed as a holiday on the following Monday. Any holiday
which falls on a Saturday shall be observed as a holiday on the preceding Friday.
1. Holidays: Ncw Year's Day, President's Day, Independence Day, Memorial Day, Labor Day, 7'hanksgiving Day, The
' Friday After Thanksgiving Day, 'I'he Uay Before C:hristmas Day And Christmas Day (9). Any holiday which falls
on a Sunday shall bc observed as a holiday on the followina Monday. Any holiday which falls on a Saturday shall
be observed as a lioliday on the preceding Friday.
1
'
'
'
J. liolidays: New Year's Day, Independcnce Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day
(6). �1ny holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday
which lalls on a Saturday shall be observed as a holiday on the preceding Friday.
K. Holidays: Ncw Year's Day, Memorial Day, Independence Day, �'hanksgiving Day, the Friday and Saturday after
Thanksgiving Day, nnd Christmas Day (S). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday.
L. Holidays: New Year's Uay, Memorial Day, Labor Day, Independence Day, �'hanksgiving Day, the Last Work Day
before Christmas Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday
on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday.
a M. Paid Holidays: New Year's Day, The Day after or before New Year's Uay, President's Day, Memorial Uay,
Independcncc Uay, Labor Day, Thanksgiving Day, the Friday after "I'hanksgiving Day, Christmas Day, And the Day
at�er or bcforc Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the
following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the precedin� Friday.
'
'
'
N. Ilolidays: New Year's Day, Memorial Day, Independence Day, Labor Day, T'hanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday. When Christmas falls on a Saturday, the preceding Friday shall be observcd as a holiday.
P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, And Christmas Day (7). Any holiday which fialls on a Sunday shall be observed as a holiday on
the following Monday.
Q. Holidays: New Year's Day, Mcmorial Day, Independence Day, Labor Day, Thanksgivinb Uay, the Hriday atler
' Thanksgiving Day, the Last Working Day beFore Christmas Day and Christmas Day (8). Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday,
the preceding Friday shall be a regular work da}.
'
'
�
R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Uay, Memorial Uay,
Independcnce Day, Labor Day, '�hanksgiving Day, the Friday aRer Thanksgiving Day, Chrisimas Day, and the day
after or before Christmas Day (10). If any of the listed holidays fall on Saturday, the preceding Friday shall be
observed as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be
considered a holiday and compensated accordingly.
7
'
Benefit Code Key — Effective 8-31-2014 thru 3-3-2015
Paid Holidays: New Year's Day, Memorial Day, Independence Day, I_abor Day, Thanksgiving Day, Friday After
Thanksgiving Day, Christmas Uay, Thc Day After Christmas, And A Floating Holiday (9). If any ofthe listed
holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated
accordinbly.
T. Paid Flolidays: New Year's Day, The Day After Or I3efore New Year's Day, President's Uay, Memorial Day,
Indcpendence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, and The
Day ARer Or F3eforc Christmas Day. (10). If any of the listed holidays falls on a Sunday, the day observed by the
Nation shall be considered a holiday and compensated accordingly. Any holiday which falls on a Saturday shall bc
observed as a holiday on the preceding Priday.
Note Codes
8. A
C
D.
In addition to the hourly wage and fringe benetits, the following depth premiums apply to depths of fifty feet or
more:
Over 50' To 100' -$3.00 per Foot for Each Foot Over 50 Feet
Over 100' 'I'o 150' -$3.00 per F'oot for Each Foot Over 100 Feet
Over I 50' To 220' -�4.00 per Foot for �.ach Foot Over I50 Feet
Over 220' -$5.00 per Foot for �.ach Foot Over 2�0 F'eet
In addition to the hourly wage and fringe benefits, the following depth premiums apply to depths of fifty feet or
more:
Over 50' To I 00' -$ I.00 per h'oot for Each Foot Over 50 Feet
Over 100' To I50' -$1.50 per Foot for E:ach Foot Over 100 Heet
Over I 50' To 200' -$2.00 per Foot for Gach Foot Over I 50 Feet
Over 200' -Divers Mav Namc 'I'heir Own Price
Workers workinb with supplied air on hazmat projects receive an additional $ I.00 per hour.
L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And
Level C: $0.25.
M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A& B: $ I.00, Levels C& D
$0.50.
N. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $ I.00, Level B: �0.75, l,evel
C: $0.50, And I,evel D: $0.25.
I'. Workers on hazmat projects receive additional hourly premiums as follows -Class A Suit: $2.00, Class 13 Suit:
$ �,50, Class C Suit: $ I.00, And Class D Suit $0.50.
Q. The highest pressure registered on the gauge for an accumulated time of more than fiReen ( I S) minutes during the
shift shall bc used in determining the scale paid.
R. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever ilagging or
spotting or other traffic control labor is being utili�ed. A Traftic Control Laborer performs the setup, maintenance
and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle,
and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on
approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current
tlagging card issued by the State of Washington, Oregon, Montana, or ldaho. "t'hese classifications are only effective
on or after August 31, 2012.
1 Benefit Code Ke — Effective 8-31-2014 thru 3-3-2015
Y
' 8. S. Effective August 3 I, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or
spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on
approved Traffic Control Plans or where directed by the Enginecr. All flaggers and spotters shall possess a current
� flag�;ing card issued by the State of Washington, Oregon, Montana, or ldaho. This classification is only effective on
or after August 31, 2012.
T. Effective August 31, 2012 — A Traffic Control Laborer performs the setup, maintenance and removal of all
, temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian
traffic during construction operations. Flagbers and Spotters shall be posted where shown on approved Traffic
Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagginb card
' issued by the State of Washington, Oregon, Montana, or ldaho. This classification is only effective on or after
August 31, 2012.
'
'
�
'
i
O
�
1
1
1
1
1
1
1
0
1
'
'
�
'
,
'
'
'
'
�
�
�
'
1
'
�
'
1
SUMMARY OF WORK
SECTION 01010
PART 1- GENERAL
1.1 THE REQUIREMENT
1.2
1.3
1.4
A. The WORK to be performed under this Contract shall consist of furnishing tools,
equipment, materials, supplies, and manufactured articles, and furnishing all labor,
transportation, and services, including fuel, power, essential communications, and
performing all work or other operations required for the fulfillment of the Contract in
strict accordance with the Contract Documents. The WORK shall be complete, and all
work, materials, and services not expressly indicated or called for in the Contract
Documents which may be necessary for the complete and proper construction of the
WORK in good faith shall be provided by the CONTRACTOR as though originally so
indicated, at no increase in cost to the OWNER.
WORK COVERED BY CONTRACT DOCUMENTS
A. The WORK is located at the City of Bremerton's Reservoir 10 North. The site address
is 5785 Imperial Way, Breinerton, WA 98312. The site is located in the Olympic
View Industrial Park off of State Route 3, directly across from the Bremerton
National Airport. 99 Lower Shore Drive, Bremerton, Washington 98310.
B. DESCRIPTION OF WORK: The Work consists of recoating of Reservoir 10 North
interior, a 1,000,000 gallon welded steel potable water reservoir. The tank is 66
feet in diameter and 40 feet high with a single center support column. The work
includes site mobilization, cutting a door panel if needed, cleaning out the tank,
removal of existing coal tar based coating and blasting/cleaning the metal
substrate to SSPC-SPS, proper disposal of existing coal tar coating and spent
abrasive blast material, coating the entire interior of the reservoir including the lid,
shell, floor, purlins, column, beams, hatch doors and frames, central vent, ladders,
overflow structure, piping, and all other exposed steel surface inside the reservoir.
The Work also includes applying elastomeric grout to seal an interior joint
(approximately 130 LF), cleaning and disinfection after the coating has cured,
rewelding and coating the door panel, bolting the hatches tight, site
cleanup/restoration, and demobilization.
CONTRACT METHOD
A. The WORK hereunder will be constructed as a lump sum bid item (Bid Item No. 1) in
the Bid Schedule in Section 00300.
CONTRACTOR USE OF SITE
A. The CONTRACTOR's use of the Site shall be limited to its construction operations,
including on-site storage of materials and field offices. Construction activities shall
be contained within the fenced limits.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
SUMMARY OF WORK
01010-1
1
1.5 OWNER USE OF THE SITE
A. The reservoir will be off-line during the project and the Owner will not utilize the
reservoir during the Work except to turn valves. A building located between the site
entrance and the reservoir is utilized for fire flow control and the OWNER wi(1
require occasional access to the building. Access to the building by City personnel is
not expected to impede the Contractor's work. The CONTRACTOR shall cooperate
and coordinate with the OWNER if necessary to allow the OWNER to have access to
the building during construction.
The City will be hiring a contractor to install cathodic protection (CP) on the roof of
the reservoir. The work may occur concurrently with the Contractor's work. The
Contractor shall coordinate with the CP contractor as needed. Special caution shall
be taken by the Contractor to avoid working underneath holes while they are being
drilled in the roof to avoid being struck by falling coupons. The Contractor shall coat
the edges of the lid where the holes were drilled using primer and epoxy.
PART 2 - PRODUCTS (Not Used)
PAR'T 3 - EXECUTION (Not Used)
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
SUMMARY OF WORK '
01010-2
'
'
,
L�,'
t PART 1- GENERAL
� 1.1
1
'
'
1
'
�
�
'
'
'
,
�
1
SECTION 01020
REFERENCE STANDARDS AND DEFINITIONS
REGULATORY REQUIREMENTS
0
A. This project shall comply with the most recent publications of the following:
1.. Uniform Building Code (UBC)
2. Uniform Building Code Standards (UBCS)
3. American Institute of Steel Construction (AISC)
4. American Welding Society (AWS)
5. American Water Works Association (AWWA)
6. Washington State Department of Transportation (WSDOT)/ American Public
Works Association (APWA) Standard Specifications for Road Bridge and
Municipal Construction
7. Puget Sound Clean Air Agency (PSCAA) for Lead-Based Paint covered surfaces
8. Washington State Department of Labor and Industries (L&I).
B. The latest edition of the requirements in effect at the date of submission of bids shall
apply.
C. The Contractor is responsible to comply with laws and codes applicable in performing
the Work.
D. The Contractor is responsible to report code deficiencies in the design to the Engineer
prior to proceeding with the Work.
E. In cases where the Contract Documents are more restrictive than applicable codes, the
Contractor shall comply with the Contract Documents.
1.2 REFERENCE STANDARDS
A. When these Specifications state that Work or tests shall conform to specific provisions
in a referenced standard, specification, code, recommendation, or manua! published by
an association, organization, society, or agency the referenced provision shall be
considered a part of these specifications as fully as if included in total. When these
Specifications or applicable codes contain higher or more restrictive requirements
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT REFERENCE STANDARDS AND DEFINITIONS
FEBRUARY 2015 01020-1
'
than those contained in reference standards these Specifications or applicable codes
shall govern.
B. The latest edition of a referenced standard published at the time of submission of bids
shall apply unless a specific date for the referenced standard is cited in these
Specifications.
1.3 SPECIFICATION LANGUAGE AND STYLE
A. Many parts of the Specification as well as notes on the Drawings are written in the
active voice and are addressed to the Contractor.
1. When words or phrases requiring an action or performance of a task are used, it
means that the Contractor shall provide the action or perform the task. For
example: provide, perform, install, furnish, erect, connect, test, operate, adjust, or
similar words mean that the Contractor shall perform the action or task referred
to.
2. When words or phrases requiring selection, acceptance, approval, review,
direction, designation, or similar actions are referred to, it means that such
actions are the City's or the Engineer's prerogative and that the contractor must
obtain such action before proceeding.
B. Requirements in the Specifications shall apply to all work of similar type, kind or class
even though the word "all" or "typical" may not be stated.
1.4 DEFIN[TIONS
The following terms, when used in the Contract Documents, shall have the following
meanings:
ACCEPTABLE
PERFORM
REQUIRED
SATISFACTORY
SHOWN
SITE
"acceptable to the Engineer°
"perform all operations required to complete the work
referred to in the accordance with the intent of the
Contact Documents"
"required by the Contract Documents or required to
complete the Work and produce the intended results"
"acceptable to the Engineer"
"as indicated on the Drawings"
"geographical location of the Project and land within the
work area shown on the contract drawings and within
which the Work will be installed or built"
SPEC[FIED "as written in the Contract Documents including the
Specifications and the Drawings"
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT � REFERENCE STANDARDS AND DEFINITIONS
FEBRUARY 2015 01020-2
'
'
STANDARD SPECIF[CAT[ONS Refers to the most current edition of the Washington State
, Department of Transportation Standard Specifications
SUBMIT
1.5 ABBREVIATIONS
"submit to the Engineer"
The following acronyms or abbreviations are used in these Specifications for the
organizations listed:
Abbreviations
AASHITO
AAMA
ABMA
ACI
ADC
AGA
AGMA
AI
AISC
AISI
AITC
AMCA
ANSI
APA
AP[
APWA
AREA
ASCE
ASHRAE
ASME
ASTM
AWPA
AWS
AWWA
CAGI
CBM
CBR
CI
CISPI
CMAA
CPSC
CRA
CRSI
CS
Stand For
American Association of State Highway and Transportation Officials
Architectural Aluminum Manufactt�rers Association
American Boiler Manufacturers Association
American Concrete Institute
Air Diffusion Council
American Gas Association
American Gear Manufacturers Association
Asphalt Institute
American Institute of Steel Construction
American Iron and Steel Institute
American Institute of Timber Construction
Air Moving and Conditioning Association
American National Standard Institute
American Plywood Association
American Petroleum Institute
American Public Works Association
American Railway Engineering Association
American Society of Civil Engineers
American Society of Heating, Refrigeration and Air Conditioning
Engineers
American Society of Mechanical Engineers
American Society for Testing and Materials
American Wood Preservers' Association
American Welding Society
A►nerican Water Works Association
Compressed Air and Gas Institute
Certified Ballast Manufacturers
California Bearing Ratio
Chlorine Institute
Cast Iron Soil Pipe Institute
Crane Manufacturers Association of America
Consumer Products Safety Commission
California Redwood Association
Concrete Reinforcing Steel Institute
Commercial Standards for the U,S. Department of Commerce
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT REFERENCE STANDARDS AND DEFINITIONS
FEBRUARY 2015 01020-3
CTI Cooling Tower Institute
DFPA Douglas Fire Plywood Association
DOE Washington State Department of Ecology
DOH Washington State Department of Health
E[A Electronic Industries Association
EPA U.S. Environmental Protection Agency
ETL Electronic Testing Laboratory
FM Factory Mutual Insurance Company
FPS Fluid Power Society
FS Federal Specifications '
HI Hydraulic lnstitute
HMI Hoist Manufacturers Institute
IAPMO International Association of Plumbing and Mechanical Officials
ICPO International Conference of Building Officials
IEEE Institute of Electrical and Electronic Engineers
IES Illuminating Engineering Society
IGCC [nsulating Glass Certification Council
IPCE International Power Cable Engineers Association
[SA Instrument Society of America
L& 1 Washington State Department of Labor and Industries
NAAMM National Association ofArchitectural Metal Manufacturers
NBS National Bureau ofStandards
NCPI National Clay Pipe Institute
NEC National Electrical Code
NEMA National Electrical Manufacturers Association
NEPA National Environmental Policy Act
NETA International Electrical Testing Association
NFPA National Fire Protection Association
NGVD National Geodetic Vertical Datum
NSF National Sanitation Foundation
NWMA National Woodwork Manufacturers Association
OSHA Occupational Safety and Health Act
PCA Portland Cement Association
RCW Revised Code of Washington
REA Rural Electrification Administration
SAMA Scientific Apparatus Makers Association
SMACNA Sheet Metal and Air Conditioning Contractors National Association
SSPC Structural Steel Painting Council
TCA Tile Council of America
UBC Uniform Building Code
UPC Uniform Plumbing Code
UFC Uniform Fire Code
UMC Uniform Mechanical Code
USDC U.S. Department of Commerce
UL Underwriters Laboratories
WAC Washington Administration Code
WCLIB West Coast Lumber Inspection Bureau
WIC Woodwork [nstitute of California
WISHA Washington Industrial Safety and Health Act
WSEC Washington State Energy Code
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT REFERENCE STANDARDS AND DEFINITIONS
FEBRUARY 2015 01020-4
1
'
�
�
�
�
�
�
�
'
�
,
'
�
'
'
'
�
'
WSS Washington State Department of Transportation (WSDOT)/ American
Public Works Association (APWA) Standard Specifications for Road
Bridge and Municipal Constructions
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT REFERENCE STANDARDS AND DEFINITIONS
FEBRUARY 2015 01020-5
1
1
'
' PART 1- GENERAL
1.1 SCOPE
'
'
'
'
1
' 1.2
SECTION 01025
MEASUREMENT AND PAYMEIVT
A. This is a lump sum project.
B. Payment for the various items of the Bid Schedule, as further specified herein, shall
include all compensation to be received by the Contractor for furnishing all tools,
equipment, supplies, and manufactured articles, and for all labor, operations, and
incidentals appurtenant to the items of work being described, as necessary to complete
the WORK all in accordance with the requirements of the Contract Documents, including
all appurtenances thereto, and including all costs of permits and cost of compliance with
the regulations of public agencies having jurisdiction, including Safety and Health
Requirements of the Washington Division of Industrial Safety and Health Act (WISHA),
and the Occupational Safety and Health Administration of the U.S. Department of Labor
(OSHA). No separate payment will be made for any item that is not specifically set forth
in the Bid Schedule, and all costs therefor shall be included in the prices named in the
Bid Schedule for the various appurtenant items of work.
B[D ITEM N0. 1- INTER[OR COATING REPLACEMENT
� A. Measurement for Bid Item No. 1 to coat the interior of Reservoir 10 North is lump sum
and shall be based on percent completion of the work associated with this bid item in
the approved Schedule of Values.
'
'
'
1
�
��
�
B. Total payment for the coating of the interior of Reservoir 10 North will be made at the
price in the Bid Schedule under Bid Item No. 1. Such price shall constitute full
compensation for the Work included in this bid item to prepare and recoat the entire
interior of a 1,000,000 gallon welded steel potable water reservoir. The tank is 66 feet
in diameter and 40 feet high with a single center support column. The work includes
site mobilization, cutting a door pane] if needed, cleaning out the tank, removal of
existing coal tar based coating and blasting/cleaning the metal substrate to white
metal (SSPC-SP 10), proper disposal of existing coal tar coating and spent abrasive
blast material, coating the entire interior of the reservoir including the lid, shell, floor,
purlins, column, beams, hatch doors and frames, central vent, ladders, overflow
structure, piping, and all other exposed steel surface inside the reservoir. The Work
also includes sealing the concrete ring/floor interface, cleaning and disinfection after
the coating has cured, rewelding and coating the door panel, bolting the hatches tight,
site cleanup/restoration, demobilization, and any other work described in the
Contract Documents.
A concrete ring was installed around the interior perimeter of Reservoir 10 North in
May 2005. The ring is 1.5' high and 8' wide. The Work DOES NOT include preparing
and coating the concrete ring.
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT
FEBRUARY 2015
MEASUREMENT AND PAYMENT
01025-1
,
1.3 BID ITEM 2- FORCE ACCOUNT
A. Measurement of the total cost of all items paid under Bid Item No. 2 for Force Account
shall not exceed the amount given in the Bid Schedule. Measurement will be made for
individual items paid under force account.
B. Bid Item No. 2- Force Account is a contingency amount that has been established to pay
for Owner-directed changes (Article 10 of the Standard General Conditions). All changes
paid under this bid item must be authorized by the Owner in writing prior to the actual
work. The cost of the extra work may be paid as lump sum or time and materials and
must be determined by the Owner and Contractor before the actual work.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
RESERVOIR 10 NORTH - INTERIOR COATING REPLACEMENT MEASUREMENT AND PAYMENT
FEBRUARY 2015 01025-2
,
1
'
'
'
1
PART 1- GENERAL
1.1 DESCRIPTION
SAFETY, HEALTH, AND HAZMAT HANDLING
This section specifies safety, health and hazardous materials handling requirements. The
Contractor shall comply with this Specification and provide all necessary tools, equipment
and personnel to ensure compliance with applicable laws, regulations and ordinances.
Safety and health responsibilities for all work at the project site are to be borne by the
Contractor.
, 1.2 GENERAL
'
'
'
�
'
'
�
'
'
A. [n accordance with the generally accepted construction, applicable law and
regulations, the Contractor shall be solely and exclusively responsible for:
SECTION 01030
1. Construction ►neans and methods.
2. Safety of employees engaged in the work while on and off the site.
3. Safety of the City, the paint manufacturer representative, and others who
►nay visit or be affected by the work.
4. Safety of the work itself including material and equipment to be incorporated
therein.
5. Safety of other property at the site or adjacent thereto.
6. Safety programs, equipment, and protective devices required to assure the
safety of persons and property for whom/which the Contractor is
responsible.
B. The duties of the City in conducting review of the Contractor's performance is not
intended to include review of the adequacy of the Contractor's work methods,
equipment, bracing, scaffolding, rigging, or safety measures in, or near the
construction site.
C. The Contractor is hereby informed that work on this project could be hazardous.
The Contractor shall carefully instruct all personnel working in potentially
hazardous work areas as to potential dangers and shall provide such necessary
safety equipment and instructions as required to prevent injury to personnel and
damage to property, and to comply with all applicable laws and regulations including
WISHA, Federal OSHA, and other regulations referenced in these Contract
Documents.
, D. The Contractor shall, at all times, maintain the job in a condition that is safe for the
City, and paint manufacturer representative, to make site visits and to conduct
progress review. The Contractor shall provide the City, the paint manufacturer
' RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
SAFETY, HEALTH, AND HAZMAT HANDLING
01030-1
I I
�
E
representative safe access to every part of the Worlc at all times work is in progress
for observation, inspecting and testing. The Contractor shall give two (2) days notice
of work being ready for required inspection, test or approval or intent to cover work
up to the paint manufacturer representative.
The Contractor shall prepare a Health and Safety Plan (HASP) meeting the
reyuirements of applicable regulations. As a minimum, the Contractor's HASP shall
set forth definite procedures for informing workers about safety, for instructing
workers in safe practices, for assuring that workers are using appropriate safety
equipment and safe work practices, and for reporting accidents.
1.3 QUALITY ASSURANCE
A. Reference Standards:
1.4
Reference
29 USC 651 et seq.
29 CFR 107
29 CFR 1910
29 CFR 1926
RCW 49.17
RCW 70.105
RCW 70.105D
Chapter 296-24 WAC
Chapter 296-36 WAC
Chapter 296-62 WAC
Chapter 296-155 WAC
Chapter 173-303 WAC
Chapter 173-340 WAC
DEFINITIONS
A. Hazardous materials:
Title
Federal Occupational Safety and Health Act
Federal Contract Works Hours and Standards
OSHA General Health and Safety Standards
OSHA Construction Safety and Health Standards
Industrial Safety and Health Act
Hazardous Waste Disposal Act
Hazardous Waste Clean-Up: Model Toxic Control Act
General Safety and Health Standards
Safety Standards - Compressed Air Work
General Occupational Health Standards
Safety Standards for Construction Work
Dangerous Waste Regulations
Model Toxic Control Act
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT SAFETY, HEALTH, AND HAZMAT HANDLING
FEBRUARY 2015 01030-2
'
�
'
'
'
'
' 1.5
�
'
'
1. Any material classified as dangerous waste in accordance with WAC 173-303 or
that in sufficient quantities is classified as dangerous waste.
2. Asbestos material, as defined in Puget Sound Clean Air Agency (PSCAA),
Removal and Encapsulation of Asbestos Materials.
3. Polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs),
explosives, radioactive materials, and others deemed as such by regulatory
agencies having jurisdiction over such matters.
B. Contaminated materials: Materials containing contaminants—such as hydrocarbons,
PCBs, diesel fuels, gasoline, lead paint, heavy metals, solvents, and other types of fuel
oils—in sufficient quantities to necessitate special handling and disposal under
applicable regulations.
SPECIAL CONSIDERATIONS
/1. The Contractor shall be responsible for implementing comprehensive safety, health
and hazardous rnaterials handling programs. In addition to the Contractor's
regulatory responsibilities for its employees, it shall assume full responsibility for all
matters related to health, safety and hazardous materials (including worker and
community Right-to-Know) of all people on or near the site.
13. Confined Space. The nature of work will expose workers to confined spacing having
possible conditions which are explosive, toxic and oxygen fluctuating. A Confined
Space Program that meets the requirements 29 CFR 1910.146 and Part M of Chapter
296-62-141 through 296-62-14529 WAC regulations must be in place
� C. Gases. Contaminant gases that may be encountered at this site include but are not
limited to hydrogen sulfide, methane, carbon monoxide, carbon dioxide, nitrogen, and
gases from hydrocarbon products. Provide a written Hazard Communication Program
' and Emergency Management Plan addressing these and other potential hazardous
substances on site.
1
'
�
'
'
1
D. Infectious Diseases. Sewers have been determined to carry a wide spectrum of
disease-producing organisms. At a minimum, provide a written Hazard
Communication Program and Biological/Bloodborne Pathogen Program detailing the
preventive measures to be taken to provide an appropriate work environmental for all
workers.
E. Fall Protection. The work will require working at heights within a reservoir and on
top of the reservoir lid. The safety plan should address concerns associated with
usage of ladders, scaffolds, elevated platforms, trip hazards, and any other issues
associated with working at heights. Fall protection safety shall be in accordance with
WAC 296-874 for scaffolds, WAC 296-869 for elevated work platforms, and WAC 296-
800 for open-sided walkways and platforms.
Other Construction Site Considerations. Provide a comprehensive written Accident
Prevention Program covering the Contractor's activities on site. Address issues
dealing with precautionary measures to be taken when working near or with
dangerous facilities and installations including but not limited to:
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT SAFETY, HEALTH, AND HAZMAT HANDLING
FEBRUARY 2015 01030-3
1
1.6 SAFETY PROGRAM
A. General
1. Develop, implement and maintain until Contract Acceptance a Safety Program
that includes as a minimum the following:
■ Safety and health risk and/or hazard analysis for each site task and
operation.
■ Safety organizational structure and responsibilities.
■ Hazard Communication Program.
■ Accident Prevention Program.
■ Confined Space Program.
■ Emergency Management Plan.
■ Respiratory Program.
■ Medical Surveillance Program.
■ Biological Bloodborne Pathogen Program.
■ Safety watch (Ground support besides the Safety Officer).
� Lighting/Illumination Plan.
� Ventilation Plan.
■ Access and Egress Plan.
■ Air contaminants including fugitive dusts handling measures.
■ Accident reporting and recordkeeping.
■ Carcinogens and other hazardous materials.
■ Site control measures.
■ Hearing Conservation Program.
■ Personal protective equipment.
■ Employee Informational and Communication Program.
■ Required trainings and certifications.
■ [ntegration of subcontractor's activities.
■ Excavation support.
■ Equipment and machinery. �
2. Locate copies of the Safety Program on the Contractor's worksite and at each of
the subcontractor's worksites.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT SAFETY, HEALTH, AND HAZMAT HANDLING
FEBRUARY 2015 01030-4
'
1
'
'
1
'
'
,
�
�
�
'
�
'
1
1
'
1
'
3. Update each copy of the Safety Program within seven (7) days if any changes are
made at the worksite or to the Safety Program.
1.7 SUBMITTALS
A. Procedures: See Section 01300.
B. Contaminant gases that may be encountered at this site include but are not limited to
hydrogen sulfide, methane, carbon monoxide, carbon dioxide, nitrogen, and gases from
hydrocarbon products. Provide a written Hazard Communication Program and
Emergency Management Plan addressing these and other potential hazardous
substances on site.
C. Test reports of all waste characterizations, if applicable.
D. Material safety data sheets (MSDS) per WAC 296-62-05413 for all hazardous chemicals
used or stored on-site.
PART 2 - PRODUCTS (Not Used)
PAItT 3 - EXECUTION
3.1 RESPONSIB[LITY FOR EXECUTION
A. The Contractor shall have full responsibility for execution of safety, health and
hazardous materials handling programs.
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT SAFETY, HEALTH, AND HAZMAT HANDLING
FEBRUARY 2015 01030-5
1
1
'
' PART 1- GENE�2AL
1.1 GENERAL
'
�
1
'
'
1.2
1
,
'
'
�
1
'
,
SECTION 01300
CONTRACTOR SiJBMITTALS
A. Submittals covered by these requirements include:
1. Shop Drawings/Plans
2. Product Data
3. Samples
4. Reports
5. Materials Submittals
6. Administrative Submittals
7. Schedules
B. Unless noted otherwise, submittals shall be submitted at the pre-construction
conference/meeting and tlien electronically via e-mail after the Notice to Proceed is
issued.
SUBMITTAL TRANSMITTAL PROCEDURE
A. Unless noted otherwise, the Contractor shall submit the specified information to the
designated City representative via e-mail in Adobe PDF format.
B. A transmittal cover sheet shall accompany each submittal. This cover sheet is
included in the Appendix titled 'Construction Forms.' The City can provide an
electronic version of this cover sheet upon request.
C. A separate form shal( be used for each specific item, class of material, equipment, and
items specified in separate, discrete sections, for which the submittal is required. The
form shall be signed by the Contractor's review or authorized representative.
Submittal documents common to more than one piece of equipment shall be identified
with all the appropriate equipinent numbers. Submittals for various items shall be
made with a single form when the items taken together constitute a manufacturer's
package or are so functionally related that expediency indicates checking or review of
the group or package as a whole.
D. A unique number, sequentially assigned, shall be noted on the transmittal form
accompanying each item submitted. Original submittal numbers shall have the
following format: "XXX"; where "XXX" is the sequential number assigned by the
Contractor. Resubmittals shall have the following format: "XXX-Y"; where "XXX" is the
originally assigned submittal number and "Y" is a sequential letter assigned for
resubmittals, i.e., A, B, or C being the 1st, 2nd, and 3rd resubmittals, respectively.
Submitta1025-B, for example, is the second resubmittal of submittal 025.
' RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
CONTRACTOR SUBMITTALS
01300-1
�
�
'
1.3
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
A. For most submittals, the OWNER will return prints of each submittal to the
CONTRACTOR with its comments noted thereon, within 14 calendar days following
receipt by the OWNER. It is considered reasonable that the CONTRACTOR shall make a
complete and acceptable subinittal to the OWNER by the second submission of a
submittal item. The OWNER reserves the right to withhold monies due to the
CONTRACTOR to cover additional costs of the OWNER's review beyond the second
submittal.
E. Submittals which are incomplete and/or do not have all the information required to
be submitted, including but not limited to a signed and dated submittal transmittal
form, and copy of marked-up specifications and/or drawings when specified , are not
acceptable and will be returned without review. All submittal information provided
by subcontractors shall be transmitted through the Contractor and shall bear the
Contractor's signature.
SUBMITTAL REVIEW PROCESS
B. If a submittal is returned to the CONTRACTOR marked "NO EXCEPTIONS TAKEN," �
formal revision and resubmission of said submittal will not be required.
C. [f a submittal is returned marked "MAKE CORRECTIONS NOTED," CONTRACTOR shall
make the corrections on the submittal, but formal revision and resubmission of said
submittal will not be required.
D. If a submittal is returned marked "AMEND-RESUBMIT," the CONTRACTOR shall revise
said submittal and shall resubmit the reyuired number of copies of said revised
submittal to the OWNER for review.
E. If a submittal is returned marked "REJECTED-RESUBMIT," it shall mean that the
submitted material or product does not satisfy the specification. The CONTRACTOR
shall prepare a new submittal and shall resubmit the required number of copies of said
revised submittal to the OWNER for review.
F. Fabrication of an item shall be commenced only after tlie OWNER has reviewed the
pertinent submittals and returned copies to the CONTRACTOR marked either "NO
EXCEPT[ONS TAKEN" or MAKE CORRECTIONS NOTED." Corrections indicated on
submittals shall be considered as changes necessary to meet the requirements of the
Contract Documents and shall not be taken as changes to the contract requirements.
G. All submittals shall be carefully reviewed by an authorized representative of the
CONTRACTOR, prior to submission to the OWNER. Each submittal shall be dated,
signed, and certified by the CONTRACTOR, as being correct and in strict conformance
with the Contract Documents. In the case of Shop Drawings, each sheet shall be so
dated, signed, and certified. The OWNER will only review submittals which have been so
certified by the CONTRACTOR. All non-certified submittals will be returned to the
CONTRACTOR without action taken by the OWNER, and any delays caused thereby shall
be the total responsibility of the CONTRACTOR.
CONTRACTOR SUBMITTALS '
01300-2
1
�
'
�
�
�
1
�
'
,
' 1.4
1
'
'
1
1
a
�
'
�
�
1
1
'
H. The OWNER's review of submittals shall not relieve the CONTRACTOR of the entire
responsibility for the correctness of details and dimensions. The CONTRACTOR shall
assume all responsibility and rislc for any misfits due to any errors in submittals. The
CONTRACTOR shall be responsible for the dimensions and the design of adequate
connections and details.
PRE-CONSTRUCTION CONFERENCE SUBMITTALS
A. At tlie Pre-construction Conference, the CONTRACTOR shall submit the following
items to the OWNER for review in addition to the items to be submitted as noted in
Paragraph 1.1 above. After the Pre-construction Conference, the OWNER shall review
the items submitted at the conference and may request further information for any of
those items which are determined to be incomplete or insufficient. If such a request is
made, the CONTRACTOR shall be required to submit additional information as
requested within three (3) calendar days after receipt of such request.
B. Submit three (3) printed copies of each item in this section. Submit one (1) electronic
copy on a CD-ROM disk in MS Word, MS Excel, or MS Project format where
appropriate for items 1- 5.
1. Contractor's and Subcontractor's Contact Information: Names and 24-hour
contact telephone numbers of contractor's and each subcontractor's key
personnel.
2. Contractor's Labor Classifications and Rates: Classification of all workers to
be employed by the Contractor and its subcontractors in the work, excluding
the Contractor's Superintendent and General Foremen (if any), and; straight-
time and overtime Weighted Wage Rates for each submitted labor
classification. Update and resubmit the entire labor classification file
whenever worker classifications are changed, added or deleted:
3. Contractor's Equipment Classifications and Rates: Make and model of each
item of equipment and small tools to be employed by the Contractor and its
subcontractors in the work, and; working and standby (idle) hourly rates for
each submitted item of equipment. Equipment Rental Rate Agreement
referenced therein. Update and resubmit this entire equipment classification
file whenever equipment or small tools classifications are changed, added or
deleted.
4. Contractor's Overall CPM Progress Schedule
5. Detailed Schedule of Values
6. List of all Subcontractors, including:
■ Percentage value of work assigned.
■ Principal contact(s).
■ Address.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
CONTRACTOR SUBMITTALS
01300-3
'
■ Telephone and fax numbers.
7. List of all requested exceptions to the Contract Documents.
8. Retainage account information (if applicable)
9. Intent to Pay Prevailing Wage Rates for prime contractor and subcontractors.
10. All required permits, as applicable.
11. Spill Prevention Control Plan
1.4
SHOP DRAWINGS (TECHNICAL SUBMITTALS)
A. Wherever called for in the Contract Documents, or when requested by the OWNER, the
CONTRACTOR shall furnish Shop Drawing submittals to the Owner. The term "Shop
Drawings" as used herein shall be understood to include detail design calculations,
shop-prepared drawings, fabrication, and installation drawings, process drawings,
descriptions of work, erection drawings, lists, graphs, catalog sheets, data sheets, and
similar items. Whenever the CONTRACTOR is required to submit design calculations as
part of a submittal, such calculations, shall bear the signature and seal of an engineer
registered in the appropriate branch and in the state wherein the project is to be built,
unless otherwise indicated.
B. Shop Drawing submittals shall be accompanied by the OWNER's standard submittal
transmittal form, a reproducible copy of which is available from the OWNER. Any
submittal not accompanied by such a form, or where all applicable items on the form are
not completed, will be returned for resubmittal.
C. A single submittal transmittal form shall be used for each technical specification section
or item or class of material or equipment for which a submittal is required. A single
submittal covering multiple sections will not be acceptable, unless the primary
specification references other sections for components. Transmittal of a submittal of
various items using a single transmittal form will be permitted only when the items
taken together constitute a manufacturer's "package" or are so functionally related that
expediency indicates review of the group or package as a whole. A multiple-page
submittal shall be collated into sets, and each set shall be stapled or bound, as
appropriate, prior to transmittal to the OWNER.
D. The following items are also considered Shop Drawings and may be requested to be '
submitted to the Owner:
■ Construction photographs.
■ Daily records and inspection logs, including list of active equipment and employees on
the site, including hourly utilization.
■ Equipment data logs
■ Equipment maintenance records and invoices
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
1
'
�
CONTRACTOR SUBMITTALS '
01300-4
'
'
'
,
�
�
■ Work plans for different activities on the project (narrative description of proposed
method for performing work, including equipment, materials and labor to be used,
along with activity dates and milestones)
■ Survey notes and data
1.5 ADMINISTRATIVE SUBMITTALS
�
'
�
'
1
�
1.6
'
1
'
1
'
'
A. Submittals that are not Shop Drawings or Samples, or that do not reflect quality of
product or method of construction may include, but not be [imited to:
■ Applications for payment.
■ Progress reports.
■ Progress schedules.
■ Schedule of values.
■ Schedule of estimated progress payments.
■ Training materials
■ Training schedules
■ Certified payroll (submitted throughout project). All certified payrolls must be
submitted prior to release of retainage or retainage bond.
■ Submittals required by laws, regulations, and governing agencies.
QUALITY CONTROL SUBMITTALS
A. Quality Control submittals may include, but not be limited to the following.
■ Manufacturer's instructions.
■ Certificates/Certifications:
o Manufacturer's.
o Inspection.
o Governing Agency's.
■ Manufacturer's field service reports.
■ Manufacturer's test reports.
■ Operation and maintenance data.
■ Operation and maintenance manuals.
■ Quality control plan.
' RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
CONTRACTOR SUBMITfALS
01300-5
'
■ Reports (inspection and test).
■ Statements of qualifications.
■ Test specimens.
■ Equipment and material invoices, including invoices for repair.
■ Employee time sheets
■ Contractor field notes and photographs
■ Data logs and reports
1.7 SAMPLES
A. Whenever in the Specifications samples are required, the CONTRACTOR shall submit
not less than 3 samples of each item or material to the OWNER for acceptance.
B. Unless otherwise indicated, samples, shall be submitted a minimum of 21 days prior to
ordering such material.
C. Samples shall be individually and indelibly labeled or tagged, indicating thereon all
specified physical characteristics and Manufacturer's name. Upon receiving acceptance
of the OWNER, one set of the samples will be stamped and dated by the OWNER and
returned to the CONTRACTOR, and one set of samples will be retained by the OWNER,
and one set of samples shall remain at the Site until completion of the WORK.
D. Unless indicated otherwise, all colors and textures of items presented in sample
submittals shall be fro�n the manufacturer's standard colors and standard materials,
products, or equipment lines. If the samples represent non-standard colors, materials,
products, or eyuipment lines and their selection will require an increase in Contract
Times or Price, the CONTRACTOR shall clearly indicate same on the transmittal page of
the submittal.
1.8 REQUESTS FOR SUBSTITUT[ON
A. Requests for substitution shall be submitted with a transmittal cover sheet. Requests
for substitution shall be prepared and reviewed in accordance with Section 01600 1.7.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
CONTRACTOR SUBMITTALS '
01300-6
'
'
�
'
, PART 1 - GENERAL
1.1 GENERAL
'
'
'
'
' 1.2
'
�
1
1
1
1
'
1.3
'
'
SECTION 01311
CONTRACTOR SCI-IEDULE
A. Scheduling of the WORK shall be performed�by the CONTRACTOR in accordance with
the requirements of this Section.
E3. Development of the schedule, the cost loading of the schedule, monthly payment
requisitions and project status reporting requirements of the Contract shall employ
computerized Critical Path Method (CPM) scheduling. The CPM schedule and all reports
should be prepared with Microsoft Project or similar software. Hand-written schedules
will not be accepted. Where submittals are required hereunder, the CONTRACTOR shall
submit three copies of each submittal item.
C. The schedule shall include 5 days of delay in the schedule for severe weather conditions
DETAILED CPM AND PROGRESS SCHEDULE
A. The Contractor shall submit a detailed overall project schedule at the Pre-Construction
Meeting. The schedule shall show the completion of the entire project from Notice to
Proceed through Substantial Completion. The schedule shall be based upon the Critical
Path Method (CPM) and show activities, start dates, end dates, duration, critical
milestones, and float.
B. The Owner will review this schedule and return it to the Contractor within 5-days. The
Contractor shall resubmit the revised schedule within 15 days of the Notice to Proceed
date.
C. An updated progress schedule shall be submitted with each monthly payment request.
Payment will be withheld until the updated schedule is submitted.
D. Float Ownership_ Neither the OWNER nor the CONTRACTOR owns the float time. The
project owns the float time. As such, liability for delay of the project completion date
rests with the party actually causing delay to the project completion date. For example,
if Party A uses some, but not all of the Float time and Party B later uses the remainder of
the float time as well as additional time beyond the Float time, Party B shall be liable for
the costs associated with the time that represents a delay to the project's completion
date. Party A would not be responsible for any costs since it did not consume all of the
float time and additional float time remained, therefore, the project's completion date
was unaffected.
THREE-WEEK LOOK AHEAD SCHEDULE
A. The CONTRACTOR shall furnish a 3-week look ahead schedule at each weekly
construction meeting. The 3-week look ahead schedule shall indicate the work
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT CONTRACTOR SCHEDULE
1 FEBRUARY 2015 01311-1
accomplished during the previous week, and work to be accomplished in the next two
weeks. When a weekly construction meeting is cancelled, the schedule shall be
submitted directly to the Owner via e-mail.
PART 2 - PRODUCTS (Not Used)
PA92T 3 - EXECUTION (Not Used)
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT CONTRACTOR SCHEDULE
FEBRUARY 2015 01311-2
'
�
'
LJ
�
1
�
,
LI
SEC"I"ION 01500
TEMPORARY SI'd'E UTILITIES AND CONTROLS
PART 1- GEIVERAL
1.1 TEMPORARY UTILITIES
A. Sanitary Facilities: Contractor to provide and maintain self-contained portable
sanitary facilities for the Contractor's, subcontractor's, Engineer, and City use. The
facilities shall comply with applicable regulations and shall be serviced, cleaned, and
disinfected weekly.
B. Temporary Water and Electrical: City provided water and electrical service (20 amp,
120V) will be available on-site for Contractor's use.
C. The Contractor is permitted to use water supplied from City hydrants during the
work. There is no guarantee that all fire hydrants will be available for use for
cleaning, lining, or any other construction activities associated with this project. Prior
to construction activities, it shall be the Contractor's responsibility to verify which
hydrants will be available by contacting the City. The Contractor shall use only those
hydrants permitted by the City.
' A hydrant meter and bacicflow preventer assembly must be installed at the hydrant
prior to usage. The meter and assembly will be supplied and installed by City staff at a
hydrant to be designated by the Contractor. No charge for water will be rnade unless
� there is obvious waste. The Contractor i1�ay relocate the meter and assembly as
needed to other hydrants during the work. The Contractor is solely responsible for
security and protection of the meter and assembly at all times during the work.
' To obtain a meter and assembly, contact the Department of Community Development
(DCD) at (360) 473-5343. DCD is located on the 6�" floor of the Norm Dicks
Government Center at 345 Sixth Street, Bremerton, WA 98310. A deposit of $2000 is
' required prior to obtaining the ►neter and assembly. Upon completion of the project,
contact DCD for retu► of the items and a refund of the deposit for undamaged
hydrant meters.
'
1.2 TEMPORARY CONSTRUCTION AND SUPPORT SYSTEMS
�
,
'
A. The Contractor is solely and exclusively responsible for the design, construction, and
maintenance of all temporary construction including forms, false work, shoring,
rigging, scaffolding, stairs, ladders, and all other similar items, including ensuring that
such mentioned items are designed and stamped by appropriate design professionals
in accordance with applicable regulations and codes.
B. Construct adequate and safe forms and false work, to rigidly support partially
complete structures. Provide temporary bridges and decking to maintain vehicular
' RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
TEMPORARY SITE UTILITIES AND CONTROLS
01500-1
,
and pedestrian access. Design and construct temporary forms, false work, bridges, and
decking in accordance with applicable regulations and codes.
1.3
1.4
1.5
C. The Contractor shall provide temporary guard rails, ladders, stairs, guards, plastic
sheeting, and barricades to protect persons in accordance with applicable regulations
within and around the work.
PROTECTION OF INSTALLED WORK
A. Provide temporary and removable protection for installed products. Control activity in
immediate work area to minimize damage.
B. Provide heavy planking to protect valve boxes, vaults, curbs, gutters, paving, and
similar surfaces from damage by heavy equipment or vehicles.
S[TE SECURITY
A. The reservoir is located within a fenced site. Materials and equipment left exposed at
the site overnight and during off-hours are at risk for theft and the Contractor is solely
responsible for securing equipment and materials against theft and vandalism.
B. The Contractor is responsible for security to protect the Work, on-site stored materials,
existing facilities, and City's operations fi om unauthorized entry, vandalism, or theft.
C. The site gate shall be locked at the end of each work day. The Contractor shall provide a
temporary padlock and use the "daisy-chain" method for locking the gate. Alternatively,
the Contractor may obtain a City-issued key for the existing gate padlock.
D. The Contractor shall confine the use of the site for work and storage to within the
fenced limits.
E. The Contractor shall be responsible for maintaining a safe working environment for the
City, and Contractor's personnel in all areas affected by the Contractor's work.
TEMPORARY SITE CONTROLS:
A. EROSION AND SEDIMENT CONTROL: Employ measures to prevent erosion and trap
any sediment created by construction operations before it leaves the site. Prevent
sediment from entering the public right-of-way and/or water bodies. Grade any areas
damaged by construction or by erosion and hydroseed with grass.
B. PETS AND RODENT CONTROL: Avoid creating conditions conducive to pests and
rodents. Comply with regulations governing the use of chemicals to control pests and
rodents.
C. WASTE D[SPOSAL AND RUBBISH CONTROL: The Contractor shall keep the work site
clean and free from rubbish and debris. Materials and equipment shall be removed
from the site when they are no longer necessary. Upon completion of coating, the
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT TEMPORARY SITE UTILITIES AND CONTROLS
FEBRUARY 2015 01500-2
'
'
�
'
'
'
1
'
' 1.6
'
Contractor shall remove any surplus material protective coverings, and accumulated
rubbish, and thoroughly clean surfaces and repair overspray or other coating-related
damage. The Contractor shall be responsible for disposal of all waste materials and for
obtaining any required permits or approvals. All expenses for disposal shall be solely
borne by the Contractor. The Contractor shall provide temporary sanitary facilities and
trash disposal at the site. These facilities shall be maintained regularly in compliance
with applicable laws.
D. NOISE CONTROL: The project site is zoned industrial and is subject to the requirement
of Bremerton Municipal Code 6.32. There are no noise limits from 7:00 a.m. to 10:00
p.m. From 10 p.m. to 7 a.m., the decibel limit is 60 dB(A). Provide sound-attenuating
enclosures for equipment as needed to meet the limits.
E. SPILL CONTROL: Measures including containment booms, oil absorbent pads, and spill
control kits shall be used to contain debris and materials within work areas. Spill
control kits shall be available on-site at all times. The Contractor shall prepare a Spill
Prevention Countermeasures and Control (SPCC) Plan to be used for the duration of the
project. The Plan shall be submitted to the Construction Manager prior to the
commencement of any construction activities. A copy of the Plan with any updates shall
be maintained at the work site by the Co►ltractor.
TRAFFIC REGULATIONS - applicable to the specific site location
A. Conduct operations so as to offer least possible obstructions and inconvenience to the
public in general. Do not overload or damage paved improved or gravel maintained
roadway surfaces, sidewalks, curbs, or gutters.
� B. Provide temporary barricades, lights, flag persons, and
pedestrians and vehicular traffic entering and leaving
project site.
�
other means to safely control
the project site and on the
C. Develop and follow a traffic control plan in accordance with the Manual on Uniform
Traffic Control Devices (MUTCD).
I 1.7 PROTECTION OF EXISTING FACILIT[ES
' A. The Contractor shall protect and maintain all underground or aboveground utilities and
structures affected by the worlc and all lawns, shrubs, trees, fences, rockeries,
mailboxes, monuments, signs, etc., and parking strips or private property crossed by or
' adjacent to his operation. Any damage shall be repaired and restored by the Contractor
to the satisfaction of the City.
'
'
'
B. The Contractor will be responsible for all damage to roads, highways, ditches,
bulkheads, walls, bridges, culverts, utilities, barricades, lights or other property, caused
by the work, whether such damage be at the site of the work or caused by transporting
of hauling to or from the work. The Contractor shall repair or replace, or arrange for the
repair or replacement of all such damage to the satisfaction of the City. Any material
damaged by the Contractor's operations shall be replaced with new material at no
additional cost to the City.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT TEMPORARY SITE UTILITIES AND CONTROLS
FEBRUARY 2015 01500-3
'
C. Whenever construction work under this Contract is undertaken on easement, right-of-
way, or franchise, all work shall be confined to the limits of each easement, right-of-way,
or franchise, and accomplished so as to cause the least amount of disturbance and a
minimum amount of damage. The Contractor is responsible to restore the disturbed
area(s) to its original condition and satisfaction of the City.
PART 2- PRODUCTS - Not Used.
PAI2T 3- EXECUTION - Not Used.
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT TEMPORARY SITE UTILITIES AND CONTROLS
FEBRUARY 2015 01500-4
'
'
�
,
'
'
'
'
,
SECTION 01600
PRODUCTS, MATERIALS, EQUIPMENT AIVD SUBSTITUTIONS
PART1-GENERAL
1.1 DEFINITIONS
' 1.2
�
1
'
A. The word "Products," as used in the Contract Documents, is defined to include purchased
items for incorporation into the WORK, regardless of whether specifically purchased for
the project or taken from CONTRACTOR's stock of previously purchased products. The
word "Materials," is defined as products which must be substantially cut, shaped, worked,
mixed, finished, refined, or otherwise fabricated, processed, installed, or applied to form
WORK. The word "Equipment" is defined as products with operational parts, regardless
of whether motorized or manually operated, and particularly including products with
service connections (wiring, piping, and other like items). Definitions in this paragraph
are not intended to negate the meaning of other terms used in the Contract Documents,
including "specialties," "systems," "structure," "finishes," "accessories," "furnishings,"
special construction," and similar terms, which are self-explanatory and have recognized
meanings in the construction industry.
B. Neither "Products" nor "Materials" nor "Equipment" includes machinery and equipment
used for preparation, fabrication, conveying, and erection of the WORK.
QUALITY ASSURANCE
A. Source Limitations: To the greatest extent possible for each unit of WORK, the
CONTRACTOR shall provide products, materials, and eyuipment of a singular generic kind
from a single source.
B. Compatibility of Options: Where more than one choice is available as options for
CONTRACTOR's selection of a product, material, or equipment, the CONTRACTOR shall
select an option which is compatible with other products, materials, or equipment.
Compatibility is a basic general requirement of product, material and equipment
selections.
C. All equipment and products supplied for this project shall be new and not previously
' used. Refurbished equipment and products will be rejected. As requested by the City, the
Contractor shall provide acceptable documentation from the supplier or manufacturer
indicating that equipment or products are new, not previously used, and not refurbished.
, 1.3 PRODUCT DELIVERY AND STORAGE
' A. The CONTRACTOR shall deliver and store the WORK in accordance with manufacturer's
written recommendations and by methods and means which will prevent damage,
deterioration, and loss including theft. Delivery schedules shall be controlled to minimize
' long-term storage of products at the Site and overcrowding of construction spaces. In
particular, the CONTRACTOR shall ensure coordination to ensure minimum holding or
' RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
PRODUCTS, MATERIALS, EQUIPMENT & SUBSTITUTIONS
01600-1
'
storage times for flammable, hazardous, easily damaged, or sensitive materials to
deterioration, theft, and other sources of loss.
1.4 TRANSPORTATION AND HANDLING
A. Products shall be ti by methods to avoid damage and shall be delivered in
undamaged condition in manufacturer's unopened containers and packaging.
B. The CONTRACTOR shall provide equipment and personnel to handle products, materials,
and equipment including those furnished by OWNER, by methods to prevent soiling and
damage.
C. The CONTRACTOR shall provide additional protection during handling to prevent
marring and otherwise damaging products, packaging, and surrounding surfaces.
1.5 STORAGE AND PROTECT[ON
A. Products shall be stored in accordance with manufacturer's written instructions and with
seals and labels intact and legible, Sensitive products shall be stored in weather-tight
climate controlled enclosures and temperature and humidity ranges shali be maintained
within tolerances required by manufacturer's recommendations.
B. For exterior storage of fabricated products, products shall be placed on sloped supports
above ground. Products subject to deterioration shall be covered with impervious sheet
covering and ventilation shall be provided to avoid condensation.
C. Loose granular materials shall be stored on solid flat surfaces in a well-drained area and
shall be prevented from mixing with foreign matter.
D. Storage shall be arranged to provide access for inspection. The CONTRACTOR shall
periodically inspect to assure products are undamaged and are maintained under
required conditions.
E. Storage shall be arranged in a manner to provide access for maintenance of stored items
and for inspection.
1.6 MAINTENANCE OF PRODUCTS [N STORAGE
A. Stored products shall be periodically inspected on a scheduled basis. The CONTRACTOR
shall maintain a log of inspections and shall make the log available on request.
B. The CONTRACTOR shall comply with manufacturer's product storage requirements and
recommendations.
C. The CONTRACTOR shall maintain manufacturer-required environmental conditions
continuously.
D. The CONTRACTOR shall ensure that surfaces of products exposed to the elements are not
adversely affected and that weathering of finishes does not occur.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
PRODUCTS, MATERIALS, EQUIPMENT $ SUBSTITUTIONS '
01600-2
1
�
'
1
'
1 1.7
'
'
'
�
'
�
'
'
�
�
,
'
E. For mechanical and electrical equipment, the CONTRACTOR shall provide a copy of the
manufacturer's service instructions with each item and the exterior of the package shall
contain notice that instructions are included.
F. Products shall be serviced on a regularly scheduled basis, and a log of services shall be
maintained and submitted as a record document prior to final acceptance by the OWNER
in accordance with the Contract Documents.
PROPOSED SUBSTITUTIONS OR "OR-EQUAL" ITEM
A. Whenever materials or equipment are indicated in the Contract Documents by using the
name of a proprietary item or the name of a particular manufacturer, the naming of the
item is intended to establish the type, function, and quality required. When the name is
followed by the words "or equal", materials or equipment of other manufacturers may be
substituted for the named products. When the Contractor wants to use substitute
products, they shall submit sufficient information to allow the OWNER/ENGINEER to
determine that the material or equipment proposed is equivalent or equal to that named,
subject to the following requirements:
1. The burden of proof as to the type, function, and quality of any such substitution
product, material or equipment shall be upon the CONTRACTOR.
2. The OWNER/ENGINEER will be the sole judge as to the type, function, and quality
of any such substitution. Whether the product is an acceptable substitute is at the
sole discretion of the OWNER/ENGINEER and the decision, once-made, shall be
final.
3. The OWNER/ENGINEER may require the CONTRACTOR to furnish additional data
about the proposed substitution.
4. The OWNER may require the CONTRACTOR to furnish a special performance
guarantee or other surety with respect to any substitution.
5. Acceptance by the OWNER/ENGINEER of a substitution item proposed by the
CONTRACTOR shall not relieve the CONTRACTOR of the responsibility for full
compliance with the Contract Documents and for adequacy of the substitution.
6. The CONTRACTOR shall pay all costs of i�nplementing accepted substitutions,
including redesign and changes to WORK necessary to accommodate the
substitution.
B. The procedure for review by the OWNER/ENGINEER will include the following:
IF the CONTRACTOR wishes to provide a substitution item, the CONTRACTOR
shall indicate on the Submittal Transmittal cover sheet that the item is a
substitution by writing, "PROPOSED OR-EQUAL ITEM" or "SUBSTITUTION ITEM"
in the provided blanks.
The CONTRACTOR shall include a copy of the relevant specification section with
the submittal. The section shall be marked up to explain where the substituted
product differs from the named product.
' RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
PRODUCTS, MATERIALS, EQUIPMENT & SUBSTITUTIONS
01600-3
'
'
C. The CONTRACTOR's submittal shall - address the following factors which will be '
considered by the OWNER/ENG[NEER in evaluating the proposed substitution:
1.
2.
4
Whether the evaluation and acceptance of the proposed substitution will
prejudice the CONTRACTOR's achievement of Substantial Completion on time.
Whether acceptance of the substitution for use in the WORK will require a change
in any of the Contract Documents to adapt the design to the proposed substitution.
Whether incorporation or use of the substitution in connection with the WORK is
subject to payment of any license fee or royalty.
Whether all variations of the proposed substitution from the items originally
specified are identified.
5. Whether available maintenance, repair, and replacement service are indicated.
The manufacturer shall have a local service agency (within 50 miles of the site)
which maintains properly trained personnel and adequate spare parts and is able
to respond and complete repairs within 24 hours.
6. Whether an itemized estimate is included of all costs that will result directly or
indirectly from acceptance of such substitution, including cost of redesign and
claims of other contractors affected by the resulting change.
,
,
�
'
,
�
7. Whether the proposed substitute item meets or exceeds the experience and/or
equivalency requirements listed in the appropriate technical specifications. '
D. Without any increase in cost to the OWNER, the CONTRACTOR shall be responsible for
and pay all costs in connection witli proposed substitutions and of inspections and testing
of equipment or materials submitted for review prior to the CONTRACTOR's purchase
thereof for incorporation in the WORK, whether or not the OWNER/ENG[NEER accepts
the proposed substitution or proposed equipment or material. The CONTRACTOR shall
reimburse the OWNER for the charges of the OWNER/ENGINEER for evaluating each
proposed substitution.
PART 2 - PRODUCTS (Not Used]
PART 3 - EXECUTION (Not Used)
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
PRODUCTS, MATERIALS, EQUIPMENT & SUBSTITUTIONS '
01600�
'
�
,
'
'
,
�
'
'
�
'
�
�
1
'
'
'
'
SECTION 09960
STEEL RESERVOIR COATING SYSTEM
PART 1-GENERAL
1.1
1.2
SCOPE
The Work includes removing the existing coating and installing a new coating for the
entire interior of City of Bremerton Reservoir 10 North, located at the Olympic View
Industrial Park off of State Route 3, directly across from the Bremerton National Airport.
The site address is 5785 Imperial Way, Bremerton, WA 98312. Specifically, the work of
the project includes:
• Abrasive blasting to remove the existing coating and prepare the surface in
accordance with SSPC-SP 10.
• Maintaining the internal environment as described in these specifications to
provide optimal air and surface conditions for coating application/curing.
• Application of new coating system to the reservoir interior as described in this
section, including roof, shell, floor, ladders, purlins, beams, overflow structure, ��
inlet/outlet piping, center column, hatches and any other exposed surfaces inside
the reservoir. Do NOT coat the interior ladder safety climb equipment and level
sensing equipment/devices.
• Holiday testing of all coated surfaces to ensure proper application. ,
The welded-steel reservoir is 66' diameter by 40 feet high. The site is surrounded by a
chain link fence and there is adequate space for equipment and material
maneuverability/storage. An external ladder allows access to the top of the reservoir from
the outside. There is an 18" high x 6' wide concrete ring around the interior perimeter.
DEF[NITIONS
Specific coating terminology used in this Section is in accordance with definitions
contained in ASTM D16, ASTM D3960, and the following definitions:
A.
B.
C.
D
Abrasive: Material used for blast cleaning, such as sand, grit or shot.
Abrasive Blast Cleaning: Cleaning/surface preparation by abrasive propelled at high
speed.
Anchor Pattern: Profile or texture of prepared surface(s).
ANS[: American National Standards [nstitute.
Bug Holes: Small cavities, usually not exceeding 15 mm in diameter, resulting from
entrapment of air bubbles in the surface of formed concrete during placement and
compaction.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
' FEBRUARY 2015
STEEL RESERVOIR COATING SYSTEM
09960-1
1
F
G
�:�
K.
L.
M
N.
0.
P.
Q•
R.
S.
T.
U.
V.
W
X.
Y.
Z.
AA.
::
CK1�
11
Coating/Paint/Lining Thickness: The total thickness of primer, intermediate and/or
finish coats.
Coating System Applicator (CSA): A generic reference to the contractor or
subcontractor installing the coating systems specified in this Section.
Coating System Manufacturer (CSM): Refers to the acceptable coating system
manufacturer, abbreviated as the CSM. Also referred to as Manufacturer.
Coating System Manufacturer's Technical Representative(s) (CTR): Refers to the
technical representative(s) of the acceptable Coating System Manufacturer and is
abbreviated as CTR.
Dew point: Temperature of a given air/water vapor mixture at which condensation
starts.
Dry Film Thickness (DFT): Depth of cured film, usually expressed in mils (0.001 inch).
Drying Time: Time interval between application and curing of material.
Dry to Recoat: Time interval between application of material and ability to receive
next coat.
Dry to Touch: Time interval between application of material and ability to touch
lightly without damage.
Feather Edging: Reducing the thickness of the edge of paint.
Feathering: Operation of tapering off the edge of a point with a comparatively dry
brush.
Field Coat: The application or the completion of application of the coating system after
installation of the surface at the site of the work.
Hold Point: A defined point, specified in this Section, at which work shall be halted for
inspection. Work shall not proceed past the Hold Point until accepted by the Owner
and the OCI.
Holiday: A discontinuity, skip, or void in coating or coating system film that exposes
the substrate.
Honeycomb: Segregated condition of hardened concrete due to non-consolidation.
ICRI: International Concrete Repair [nstitute.
Incompatibility: Inability of a coating to perform well over another coating because of
bleeding, poor bonding, or lifting of old coating; inability of a coating to perform well
on a substrate.
Laitance: A layer of wealc, non-durable concrete containing cement fines that is
brought to the surface through bleed water because of concrete finishing and/or over-
finishing.
Mil: 0.001 inch.
NACE: National Association of Corrosion Engineers.
Overspray: Dry spray, particularly such paint that failed to strike the intended surface.
Owner's Coating Inspector (OCI): A NACE Level 3 Certified Coating Inspector to be
contracted by the Owner to inspect the coating application at Hold Points and other
times as requested by the Owner.
Pinhole: A small diameter discontinuity in a coating or coating system film that is
typically created by outgassing of air from a void in a concrete substrate resulting in
exposure of the substrate or a void between coats. Also see Holiday.
Pot Life: Time interval after mixing of components during which the coating can be
satisfactorily applied.
Resurfacer/Resurfacing Material: A layer of cementitious and/or resin- based material
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-2
'
1
,
'
,
,
t
'
�
�
�
�
�
,
1
�
1
1.3
D4285, "Standard Test Method for Indicating Oil or Water in Compressed Air"
E337, "Standard Test Method for Measuring Humidity with a Psychrometer (The
Measurement of Wet- and Dry-Bulb Temperatures)"
D16, "Standard Terminology for Paint, Related Coatings, Materials and
Applications
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
' FEBRUARY 2015
EE.
FF.
GG.
HH
II.
lI�
KK.
used to fill or otherwise restore surface continuity to worn or damaged surfaces.
Shelf Life: Maximum storage time for which a material may be stored without losing
its usefulness.
Shop Coat: One or more coats applied in a shop or plant prioi• to shipment to the site
of the work, where the field or finishing coat is applied.
Spreading Rate: Area covered by a unit volume of paint at a specific thickness.
SSPC: The Society for Protective Coatings.
Stripe Coat: A separate coat of paint applied to all weld seems, pits,
nuts/bolts/washers and edges by brush. This coat shall not be applied until any
previous coat(s) have cured and, once applied, shall be allowed to cure prior to the
application of the subsequent coat(s).
Surface Saturated Dry (SSD): Refers to concrete surface condition where the surface is
saturated (damp) without the presence of standing water.
Tie Coat: An intermediate coat used to bond different types of paint coats. Coatings
used to improve the adhesion of a succeeding coat.
LL. Touch-Up Painting: The application of paint on areas of painted surfaces to repair
marks, scratches, and areas where the coating has deteriorated to restore the coating
film to an unbroken condition.
MM.TPC: Technical Practice Committee.
NN. Volatile Organic Compound (VOC) Content: The portion of the coating that is a
compound of carbon, is photochemically reactive, and evaporates during drying or
curing, expressed in grams per liter (g/1) or pounds per gallon (Ib/gal).
00. Immersion: Refers to a service condition in which the substrate is below the waterline
or submerged in water or wastewater at least intermittently if not constantly.
PP. Weld Splatter: Beads of inetal scattered near seam during welding. �
QQ. Wet Film Thickness (WFT): The primer or coating film's thickness immediately
following application. Wet film thickness is measured in mils or thousandths of an
inch (0.001 inch) and is abbreviated WFT.
REFERENCES
This section contains references to the following documents. They are a part of this
section as specified and modified. Where a referenced document contains references to
other standards, those documents are included as references under this section as if
referenced directly. In the event of conflict between the requirements of this section
and those of the listed documents, the requirements of this section shall prevail.
Ainerican Society for Testing and Materials (ASTM�.
STEEL RESERVOIR COATING SYSTEM
09960-3
1
National Association of Corrosion Engineers (NACE International�
RP0287-02, "Field Application of Surface Profile of Abrasive Blast Cleaned Steel
Surfaces Using A Replica Tape"
SP0188-2006, "Discontinuity Testing of New Protective Coatings on Conductive
Substrates"
National [nstitute of Standards and Technoloev
"Certified Coating Thickness Standards for Nonmagnetic Coating on Steel"
The Society for Protective Coatings (SSPC�.
PA 1, "Shop, Field and Maintenance Painting"
PA 2, "Measurement of Dry Paint Thickness with Magnetic Gages"
SP 1, "Solvent Cleaning"
SP 10, "Joint Surface Preparation Standard Near White Metal Blast Cleaning"
VIS 1, "Visual Standard for Dry Abrasive Blast Cleaning"
1.3
QUALITY CONTROL REQUIREMENTS
A. The Contractor is responsible for the workmanship and quality of the coating system
installation. [nspections by the Owner, OCI or the CTR will not relieve or limit the
Contractor's responsibilities.
B. Coating products shall be from a single manufacturer.
C. The Contractor's methods shall conform to requirements of this specification and the
standards referenced in this Section. Changes in the coating system installation
requirements will be allowed only with the written acceptance of the Owner before
work commences. �
D. The Contractor shall have minimum 5 years of experience in performing the work
described in this specification and shall have been in existence under the current
company name for minimum 3 years. The Owner may request supporting
documentation for this requirement.
E. Contaminated, outdated, diluted materials, and/or materials from previously
opened containers shall not be used.
F. For repairs, the Contractor shall provide the same product, or products
recommended by the CSM, as used for the original coating.
G. The Contractor shall identify the points of access for inspection by the Owner or
OC[. Tlte Contractor shall provide ventilation, ingress and egress, and other means
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-4
�
'
necessary for the Owner, CTR, and OCI to safely access the work areas.
, H. The CTR shall attend the pre-construction meeting with the Owner, Contractor and
sub-contractor. Additionally, the CTR shall attend up to three (3) site meetings as
requested by the Owner or OCI in order to inspect ambient conditions, surface
' preparation, coating application and curing, or for any other reason as requested by
the Owner.
, I. Hold Poants: Prior to moving past each Hold Point and continuing onto the
next activity, the work must be inspected and approved by the OCI, which
includes executing the Hold Point Completion forrn upon approval. The form
, requires signing off by both the Contractor and the OCI (or other City-
authorized representative). The form is included at the end of this section and
must be executed for each Hold Point.
L
,
'
�
The Contractor shall demonstrate the functionality and suitability of all equipment
on the site to be used for the control of environmental conditions, ventilation,
abrasive blasting, coating application, and any other eyuipment requested by the
Owner. It shall be demonstrated to the Owner that all equipment is functioning and
correctly sized for its intended application.
K. Upon request from the Owner, the Contractor shall provide written daily reports
that include test data, status of equipment used, invoices for repair or maintenance
of equipment, progress of work and any problems that were encountered, surfaces
covered using visual display, ambient conditions, quality control inspection test
findings, names and hours for employees worked and other information pertinent to
the coating system installation.
0 1.4 DELIVERY AND STORAGE
' A. Materials shall be delivered to the job site in their original, unopened containers. Each
container shall be properly labeled. Materials shall be handled and stored to prevent
damage to or loss of label.
1
,
B. Labels on the container shall include manufacturer's name, type of paint, brand name,
brand code, coverage, surface preparation, drying time, cleanup, color designation, and
instructions for mixing and reducing. Paint containers not displaying product
identification will not be acceptable.
' C. Materials shall be stored in enclosed structures and shall be protected from weather
and excessive heat or cold in accordance with the CSM's recommendations.
Flammable materials shall be stored in accordance with state and local requirements.
'
'
D. The Contractor shall store and dispose of hazardous waste according to federal,
state and local requirements. This requirement specifically addresses waste
solvents and coatings.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
' FEBRUARY 2015
STEEL RESERVOIR COATING SYSTEM
09960-5
�
,
1.5 SUBMITTALS
Provide in accordance with Section 01300:
A. Product data sheets for coating system products. The data sheets should
include the following information at a minimum:
1. Volatile organic compound (VOC) data
2. Surface preparation recommendations.
3. Primer type, where required.
4. Maximum dry and wet-mil thickness per coat.
5. Minimum and maximum curing time between coats, including
atmospheric conditions for each.
6. Curing time before submergence in liquid.
7. Acceptable cleaning and thinner solutions to be used with each
coating.
8. Ventilation requirements.
9. Minimum atmospheric conditions during which the paint shall be
applied, including but not limited to air and surface temperatures,
relative humidity, wind velocity, and precipitation.
10. Allowable application methods.
11. Maximum allowable moisture content.
12. Storage requirements and maximum shelf life.
13. Exterior color samples as requested by Owner
B. Material Safety Data Sheets (MSDS) for materials to be delivered to the job
site, including coating system materials, solvents, and abrasive blast media.
C. Contractor shall provide an outline of the intended equipment to be used to
ensure that required environmental conditions are maintained. The Owner
may request additional documentation, such as equipment maintenance
records or calculations, to ensure equipment has been adequately maintained
and is properly sized for the application.
D. Data sheets for equipment being used for environmental control, ventilation,
and dust collection.
E. The Contractor shall provide a minimum of three project references each
including contact name, address, and telephone number where similar coating
work has been performed by their company in the past five years.
1.6 RESPONS[BILITIES OF OWNER'S COATING INSPECTOR (OCI)
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-6
�
1
C �
'
'
�
'
'
'
'
�
�
�
, 1.7
�
'
,
The Owner is contracting with a NACE Level 3 Certified Coating Inspector (the OCI) for
quality assurance inspection during the work and to conduct inspections and approval at
Hold Points during the work. Responsibilities of the OCI will include:
A. Attend pre-construction meeting and additional meetings as requested by the
Owner.
B. Conduct Hold Point inspections and approvals.
C. Inspect materials upon receipt to ensure that they are supplied by the CSM.
D. Inspect to verify that specified storage conditions for the coating system
materials, solvents and abrasives are provided.
E. Inspect and record findings for the degree of cleanliness oFsubstrates.
F. Inspect and record substrate profile (anchor pattern).
G. Measure and record dry bulb, wet bulb and substrate temperature.
H. Measure and record dew point and relative humidity.
I. Inspect to verify that correct mixing of coating system materials is
performed in accordance with CSM's instructions.
J. Inspect, confirm, and record that the "pot life" of coating system materials is
not exceeded during installation. Inspect to verify that recoat li�nitations for
coating ►naterials are not exceeded.
K. Measure and record the thickness of the coating system.
L. Inspect to verify proper curing of the coating system in accordance with the
CSM's instructions.
M. Witness holiday testing of all coated surfaces.
HOLD POINT INSPECTIONS
The OCI shall complete inspection at the following hold points. The Contractor shall not
proceed beyond the hold point inspection until verification that the requirements
pertaining to that hold point have been met. Approval of a Hold Point is given when the OCI
(or other authorized City representative) and Contractor execute the form at the end of this
Section for the Hold Point. The Contractor shall provide the Owner with a minimum of
twelve (12) hours of notice prior to the time when the hold point inspection is to be
completed.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
' FEBRUARY 2015
STEEL RESERVOIR COATING SYSTEM
09960-7
'
The Hold Point #'s and description of each are as follows. Hold point inspection
forms are included at the end of this section. Instructions are included on the form.
A form must be executed for each Hold Point prior to moving on to the next activity.
HOLD POINT INSPECTION TABLE
Activity Description
/ Hold �
Point #
1 Envi�onmental condition control and ventilation. Prior to commencing surface
preparation via abrasive blasting, the Contractor shall measure, record, and confirm
acceptability of ambient air temperature and humidity as well as other conditions
such as proper protective measures for surfaces not to be coated and safety
requirements for personncl. Additionally, the Contractor shall demonstrate the
functionality and suitability of all equipment on the site to be used for control
of the environmental conditions, ventilation, abrasive blasting, and coating
application, and any other equipment as requested by the OCI, including but
not limited to the dehumidifier, air dryer, generator, abrasive blasting
equipment, compressors, paint pots, and manlifts. It shall be demonstrated to
the OCI that all equipment is functioning and correctly sized for the application.
2 Surface Preparation: Upon completion of the surface preparation and prior to
application of the prime coat, the OCI shall measure and inspect for proper degree of
cleanliness and surface profile as specified in this Section. This shall also include
removal of all weld slag. The OCI may also direct application of surface filler prior to
application of the prime coat.
3,4,5,6 Inspection of Prime. Stripe. Intermediate. and Final Coat AQplication. Upon
completion of the each coat of prime, stripe, intermediate, and final coat (4 hold
points), the OCI shall inspect, measure, and record the dry or wet film thickness and
general film yuality (visual inspection) for lack of ►•uns, sags, pinholes, holidays, etc.
The Contractor shall not apply the next coat until all deticiencies have been corrected,
the current coat has been approved, and is adequately cured for recoat. The Owner
may request the OCI to be present as the application proceeds to inspect the
application method and confirm environmental conditions.
7 Post-cure testin� The OCI shall measure and inspect the overall dry film thickness, as
well as holiday detection, or cure testing as required per the specific requirements in
this Section and/or per the CSM's recommendations. The Contractor shall correct all
deficiencies identified by the OC[ and allow for re-inspection of corrective action
performed to repair any defects. The Contractor shall not proceed with cleaning and
disinfection until all deficiencies have been corrected and the final coating application
has been accepted by the OCI. If a door panel has been removed and replaced, the
restored coating shall also be inspected at this time.
1.8 WARRANTY INSPECT[ON
A one-year warranty inspection will be conducted during the 12�h month after the coating
work has been completed. The Contractor and a representative of the coating material
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-8
1
'
'
'
,
�
'
'
'
'
'
�
'
�
'
'
'
,
1
manufacturer shall attend this inspection. All defective work shall be repaired in
accordance with these specifications and to the satisfaction of Owner. Owner may, by
written notice to Contractor, reschedule the warranty inspection to another date within the
one year warranty period.
PART 2--PRODUCTS
2.1 APPROVED COATING MANUFACTURERS AND PRODUCTS
Acceptable coating manufacturers include Tnemec, Sherwin Williams, and
International Paint. No other manufacturers will be considered. The following
tables list acceptable products and coating thicknesses.
TNEMEC NORTHWEST
Coating Color Coating Dry Film Thickness (DFT)
Minimum Maximum
Primer Green 2.5 3.5
Hydro-Zinc Series 91 H20
Stripe White 4 8
Pota-Pox Series N 140
Intermediate White 4 8
Pota-Pox Series N140
Finish Beige 4 8
Pota-Pox Series N140
Total (excluding stripe) --- 10.5 19.5
Surface filler: Tnemec Series 215 Surfacing Epoxy
SHERWIN WILLIAMS
Coating Color Coating Dry Film Thickness (DFT)
Minimum Maximum
Primer Grey 3 4
Corothane 1 Galvapac
Stripe White 5 8
Macropoxy 646PW
Intermediate W hite 5 8
Macropox 646PW
Finish Buff 5 8
Macro ox 646PW
Total (excluding stripe) --- 13 20
Surface filler: Sherwin Williams Steel-Seam VSE
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-9
INTERNATIONAL PAINT
Coating Color Coating Dry Film Thickness (DFT)
Minimum Maximum
Primer Light Green • 2.5 3.5
Cathacoat 316
Stripe White 4 6
Bar-Rust 233H
Intermediate White 4 6
Bar-Rust 233H
Finish Buff 4 6
Bar-Rust 233H
Total (excluding stripe) --- 10.5 15.5
Surface filler: Devmat 142HB
PART 3--EXECU'I'ION
3.1 GENERAL
1. The coating system shall consist of a prime coat, intermediate coat, stripe coat,
and top coat with thicicnesses as described in Paragraph 2.1.
2. Where purlins, beams, rafters, and columns attach to the reservoir interior, use a
combination of brush and sprayer to coat within small gaps to the greatest
extent possible.
3. Coat surfaces within eight (8) hours of blast cleaning and within the time
recommended by the coating manufacturers literature. This requirement can be
waived if dehumidification is continuously operated and all environmental
conditions are met. Do not coat over visible rust bloom or contaminated
surfaces. If, for any reason, rust bloom appears on the interior surface to be
coated, restore that surface to a white metal blast (SSPC-SP 10). Ensure that the
surfaces are clean, dry, and free oFcontamination prior to all coating
applications. Protect all coated surfaces from damage during the curing process.
4. Fill in noticeable voids and gaps on the metal floor of the reservoir using the
epoxy surface filler and where directed by the OCI. The filler shall be applied
before the prime coat. Allow 1-day in the bid for a 3-person crew to grind off
weld slag and apply surface filler where directed by the Owner. Additional
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-10
�
'
'
,
'
'
1
'
work beyond one-day will be paid vaa force account.
5. While coating, inspect the condition of all hardware and notify the City of any
deficiencies or possible failures.
6. The Contractor is permitted to cut a door-sheet and construct ra►nps in and out
of the reservoir. An approximately 18" high concrete ring has been poured
against the interior of the reservoir wall which the Contractor should consider
when cutting the door-sheet. The door-sheet shall be welded and coated at the
seams as part of restoration. The cutting/welding Contractor shall have
minimum 5-years of experience in cutting and welding steel plates. The exterior
coating material shall Ue consistent with the interior coating and match the color
of the existing exterior coating.
7. Elastomeric grout placement at concrete ring and floor interface: After the floor
has been coated and cured, place SikaFlex lA along the interface between the
concrete ring and the Floor of the reservoir to seal the joint (approximately 130
feet of joint length).
8. After the final coating has sufficiently cured for immersion, disinfection and
' cleaning have been approved by the OCI, bolt and tighten hatches. The
Contractor shall supply new bolts and gaskets for sealing the hatches. The City
will pay for new hardware and gaskets using force account.
'
3.2 CON'I'ROLLING ATMOSPHERIC CONDITIONS
a
1
'
'
'
'
�
The Contractor must control tlle ambient environment during surface preparation and
coating such that "flash rust" does not occur at any time during the wo► Ambient
environmental conditions and equipment associated with controlling the enclosed
environment shall be constantly monitored and maintained to ensure the surface
preparation is held to the required degree of cleanliness prior to coating material
application. The Contractor shall have an electronic data monitor that measures air and
surface temperature, dew point, and relative humidity mounted at all times within the
reservoir. The monitoring data must be made available to the Owner or OCI at any time
upon request.
Coatings systems shall not be applied during rainy, misty weather, or to surfaces upon
which there is frost or moisture condensation. During damp weather, when the
temperature of the surface to be coated is within 10 degrees F of the dew point, forced
dehumidification equipment may be used to inaintain a temperature of minimum 40
degrees F and 10 degrees F above the dew point for the surfaces to be coated, the
coated surface, and the atmosphere in contact with the surface.
During abrasive blasting and prior to application of the prime coat, the
maximum relative humidity shall not exceed 50%. After application of the farst
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
, FEBRUARY 2015
STEEL RESERVOIR COATING SYSTEM
09960-11
'
coat , the maximum relative humidity shall not exceed 80%. Waiver of these
values by the OCI must be in writing. Where conditions causing condensation are
severe, dehumidification equipment, fans, and/or heaters shall be used inside enclosed
areas to maintain the required atmospheric and surface temperature requirements for
proper coating application and cure.
3.3
PREPARATIOIV
The steel surfaces scheduled for coating shall be prepared to the SSPC-SP 10 standard
("near white metal blast cleaning"). Oil and grease shall be removed before mechanical
cleaning is started. The abrasive used shall be washed, graded and free from
contaminants that might interfere with the adhesion of the coatings. The air used for
blast cleaning shall be sufficiently free of oil and moisture so as not to cause
detrimental conta�nination of the surfaces to be coated.
Weld splatter that is identified during the course of the work by the Contractor or OCI
shall be grinded down and removed and may be considered a deficiency if not removed
to the satisfaction of the OCI.
A. REMOVAL AND DISPOSAL OF LEAD-CONTAINING PAINT
It is unknown if the tank coating contains lead. The assessment only revealed
coal tar epoxy. The Contractor shall perform a lead-check using a swab to
confirm whether lead is present in the coating. If lead is present and requires
special handling and/or disposal, this will be paid as force account.
B. ABRASIVE BLAST CLEANING
1. Preparation of inetallic surfaces shall be based upon comparison with SSPC-
VIS1-89 (ASTM D2200).
2. Used or spent blast abrasive shall not be reused on this project.
3. The compressed air used for blast cleaning shall be filtered and shall contain no
condensed water and no oil. Moisture traps shall be cleaned at least once every
four hours or ►nore frequently as required to prevent moisture from entering the
supply air to the abrasive blasting equipment.
4. Oil separators shall be installed just downstream of compressor discharge valves
and at the discharge of the blast pot discharges. These shall be checked on the
same freyuency as the moisture traps as defined in item 2 above.
5. Regulators, gauges, filters, and separators shall be in use on co�npressor air lines
to blasting nozzles times during this work.
6. An air dryer or desiccant filter drying unit shall be installed which dries the
compressed air prior to blast pot connections. This dryer shall be used and
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-12
�
'
maintained for the duration of surface preparation work.
' 7. The abrasive blast nozzles used shall be of the venturi or other high velocity type
supplied with a minimum of 100 psig air pressure and sufficient volume to
obtain the blast cleaning production rates and cleanliness/specified.
' 8. The Contractor shall provide ventilation for airborne particulate evacuation
(meeting pertinent safety standards) to optimize visibility for both blast
cleaning and inspection of the substrate during surface preparation work.
' 9. If, between final surface preparation work and coating system application,
contamination of prepared and cleaned metallic substrates occurs, or if the
prepared substrates' appearance darkens or changes color, recleaning by water
' blasting, reblasting and abrasive blast cleaning shall be required until the
specified degree of cleanliness is reclaimed.
10. In manv locations. a gan of up to 2.0-inches exists between the roof plates and
' roof su�port beams. The gapned areas shall also be abrasively blasted to the
best of the Contractors abilitv. which includes the use of angled nozzles in order
to access hard to reach sites.
1
'
C �
a
'
'
�
'
'
'
11. The Contractor is responsible for dust control and for protection of inechanical,
electrical, and other equipment adjacent to and surrounding the work area.
12. Particular care shall be given to the cleaning of all crevices, corners, and edges of
all structural shapes, piping conduits, ladder, and all other appurtenances. All
paint, mill scale, rust, corrosion products, and any other deleterious foreign
attachments on the steel shall be completely removed from the surface of the
metal.
13. The Contractor is responsible for removing all encountered mill scale. Removal
techniques may include: abrasive blasting, hand scraping, and rotary grinders.
Once removed, the surface under the mill scale must be prepared in accordance
with the anchor profile and surface cleanliness reyuirements of this
specification.
3.4 APPLICATION
A. WORKMANSHIP:
1. Coated surfaces shall be free from runs, drips, ridges, waves, laps, and
brush marks. Coats shall be applied to produce an even film of uniform
thickness completely coating corners and crevices.
2. The Contractor's equipment shall be designed for application of the
materials specified. Compressors shall have suitable traps and filters to
remove water and oils from the air. A paper blotter test shall be performed
by the Contractor when requested by the Owner to determine if the air is
sufficiently free of oil and moisture so as not to produce deteriorating
effects on the coating system. Spray equipment shall be equipped with
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
' FEBRUARY 2015
STEEL RESERVOIR COATING SYSTEM
09960-13
'
mechanical agitators, pressure gages, and pressure regulators, and spray
nozzles of the proper sizes.
3. Each coat shall be applied evenly and sharply cut to line. Care shall be
exercised to avoid overspraying or spattering paint on surfaces not to be
coated.
4. Coating applications method shall be conventional or airless spray, brush
or roller, or trowel as recommended by CSM. Coatings shall not be applied
to a surface until it has been prepared as specified. Coats for blast-cleaned
ferrous surfaces and subsequent coats for nonblast-cleaned ferrous
surfaces may be either brush or spray applied.
5. Allow each coat to cure or dry thoroughly, according to CSM's printed
instructions, prior to recoating. Items that have been coated shall not be
handled, worked on, or otherwise disturbed, until the coating is completely
dry and hard.
6. Where two or more coats are required, alternate coats shall contain
sufficient compatible color additive to act as indicator of coverage, or the
alternate coats shall be of contrasting colors. Color additives shall not
contain lead, or lead compounds, which may be destroyed or affected by
hydrogen sulfide or other corrosive gas, and/or chromium.
7. When coating complex steel shapes, apply a stripe coat after the prime coat
for welds, edges of structural steel shapes, bolts, joints, metal cut-outs, pits
in steel surfaces, or rough surfaces with the primer coat. This involves
applying a separate coat using brushes or rollers to ensure proper
coverage. Stripe coat via spray application is not permitted.
8. Dewpoint shall be determined by use of sling psychrometer in conjunction
with the U.S. Department of Commerce, Weather Bureau Psychrometric
Tables. Other methods of dewpoint determination must be pre-approved
by the Engineer.
9. Painters shall routinely measure the wet film thickness of the coating
during application using a comb type WFT gauge. This is to ensure that
proper dry film thickness requirements are met. Repair areas of
measurement after readings are taken.
10. Contractor shall NOT apply coatings under the following conditions:
Temperature exceeding the manufacturer's recommended maximum and
minimum allowable.
Dust or smoke laden atmosphere.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-14
,
'
�
'
,
,
�
'
�
'
'
'
'
'
'
'
�
:
C.
• Damp or humid weather.
• When the air temperature is expected to drop below 40° F or less than 5° F
above the dewpoint.
• Relative Humidity greater than 50% during abrasive blasting and prior to
application of fii•st coat.
• Relative Humidity greater than 80% after prime coat has been applied.
• When wind conditions are not calm.
COATING PROPERTIES, MIXING AND THINNING:
Coatings, when applied, shall provide a satisfactory film and smooth even surface.
Coating materials shall be thoroughly stirred, strained, and kept at a uniform
consistency during application. Coatings consisting of two or more components
shall be mixed in accordance with the CSM's instructions. Where necessary to suit
the conditions of the surface, temperature, weather and method of application, the
coating may be thinned as reco►nmended by the CSM immediately prior to use. The
volatile organic content (VOC) of the coating as applied shall comply with prevailing
air pollution control regulations. Unless otherwise specified, coatings shall not be
reduced more than necessary to obtain the proper application characteristics.
Thinner shall be as recommended by the CSM. Glossy undercoats shall be liglitly
sanded to provide a surface suitable for the proper application and adhesion of
subsequent coats.
FILM THICKNESS AND CONTINUITY:
1. The WFT of each coat shall be verified by the Contractor. The DFT of each coat
shall be verified by the Contractor and OCI.
2. The co►npleted coating system shall produce a minimum dry film thickness in
accordance with these speci�cations. Verification of proper DFT will be per
SSPC-PA 2. In areas where required thickness is not obtained, sufficient coats
shall be applied to produce the required coating thickness. In areas where
excess thickness is noted, removed excess thickness to the required surface
preparation and reapply.
3. [n testing for continuity of coating about welds, projections (such as bolts and
nuts), and crevices, the Contractor shall determine the minimum conductivity
for smooth areas of like coating where the dry-mil thickness has been
accepted. This conductivity shall be the minimum required for these rough or
irregular areas. Pinholes and holidays shall be recoated to the required
coverage.
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
' FEBRUARY 2015
STEEL RESERVOIR COATING SYSTEM
09960-15
1
4. The ability to obtain specified film thickness is generally compromised when
brush or roller application methods are used and, therefore, more coats may
need to be applied to achieve the specified dry film thickness.
5. For concrete substrates, the Contractor shall apply a complete skim coat of the
specified filler/surfacer material over the entire substrate prior to application
of the coating system. This material shall be applied such that all open air
voids and bugholes in the concrete substrate are completely filled prior to
coating application. �
6. The completed coating on the interior metal surfaces of reservoir shall be
inspected by the Contractor in the presence of the OCI and/or Owner for
pinholes and holidays with a Tinker and Rasor Model M1 non-destructive type
holiday detector, K-D Bird Dog, or equal. The unit shall operate at less than 75
volts. A non-sudsing type wetting agent such as Kodak Photo-Flo or equal shall
be added to the water prior to wetting the detector sponge. Areas found to
contain pinholes or holidays shall be repaired and recoated in accordance with
manufacturer's recommendations and these specifications.
END OF SECTION
RESERVOIR 10 NORTH INTERIOR COATtNG REPIACEMENT STEEL RESERVOIR COATING SYSTEM
FEBRUARY 2015 09960-16
1
�
1
�
�
�
�
'
,
�
1
'
1
�
�
'
'
'
�
CITY OF BREMERTON
RESERVOIR COATING - HOLD POINT INSPECTION FORM
INSTRUCTIONS: THIS FORM MUST BE COMPLETED AND EXECUTED AT EACH HOLD POINT INSPECTION. THE
CONTRACTOR MUST PASS THE CURRENT HOLD POINT INSPECTION IN ORDER TO CONTINUE ONTO THE NEXT PHASE OF
THE WORK. THE FORM WILL BE ADMINISTERED BY THE CITY'S NACE LEVEL 3 INSPECTOR (OR STAFF INSPECTOR) AND
MUST BE SUBMITTED TO THE CITY.
DATE OF INSPECTION: � RESERVOIR #: INTERIOR / EXTERIOR
HOLD POINT #:
DESCRIPTION OF CURRENT HOLD POINT INSPECTION:
NAME OF NACE LEVEL 3 INSPECTOR:
NAME OF CITY INSPECTOR:
NAME OF CONTRACTOR:
NAME OF CONTRACTOR REPRESENTATIVE:
IS THIS A RE-INSPECTION OF A HOLD POINT? Y/ N (CIRCLE ONE)
RESULTS OF INSPECTION: PASS / FAIL (CIRCLE ONE)
INDICATE THE REASON FOR FAILURE, OR ADD ADDITIONAL NOTES HERE:
SIGNATURE (NACE LEVEL 3 INSPECTOR)
SIGNATURE (CITY INSPECTOR, IF PRESENT DURING INSPECTION)
SIGNATURE (CONTRACTOR REPRESENTATIVE PRESENT DURING THE INSPECTION)
SECT[ON 09980
RESERVOIR CLEANING AND DISINFECTION
PAdtT 1- GENERAL
1.1 SCOPE
A. After the top coat has cured and prior to filling the reservoir, the Contractor shall
clean and disinfect the reservoir interior in accordance with AWWA C652.
B. The Owner shall be responsiblc for tilling the tank, performing bacteriological and VOC
testing, and placing the reservoir back on-line.
C. Water lor cleaning, disinfection, and tilling will be supplicd by the Owner unless noted
otherwise.
1.2 RELATED SECTIONS
A. Section 09960 - Steel Reservoir Coating Systems
B. Appendix C- AWWA C652 - Disinfection of Water-Storage Facilities
C. NSF/ANSI Standards 60 and 61
1.3 SUBMITTALS
A. Submit a disinfection plan which includes the following information:
- Name and contact information of responsible person for reservoir disinfection.
- The type and amount of disinfecting agent to be used with a specific volume of wa-
ter, the tools and methods of application, the intended amount of residual chlorine.
- Proposed method and agent for dechlorinating disinfectant rinse water from the
reservoir.
�
'
�
1
PART 2 - PRODUCTS
A. Disinfecting agent: Sodium hypochlorite or calcium hypochlorite per AWWA C652.
B. Pumps, pressure washer, sprayer, hose, nozzles, extensions, brushes and other equipment
lor spraying and washing the interiors of the tank.
C. Uechlorination agent
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
RESERVOIR CLEANING AND DISINFECTION
09980 - 1
D. Materials and equipment used in the work shall be NS� Standard 60.
PART 3 - EXECUTION
3.1 CLEANING AND DIS[NFECT[ON
I:�
K�a
:
�
All cleaning and disinfection shall be done in accordance with the ►nost current
edition of A1NWA C652, which is included in Appendix C.
The disinfection method shall be Method 2 per AWWA C652.
Do not begin final cleaning and disinfection until the finish coat has cured for
minimum fourteen (14) calendar days, or earlier if accepted by the OCI.
D. Cleaning: Sweep and clean the reservoir interior to remove all dust, dirt and any
other materials that may have accumulated in the reservoir. Ensure that dust and dirt
is cleaned from all exposed interior surfaces, including the interior lid, purlins, ladder,
columns, beam, floors, center vent and overflow structure. Use a high-pressure water
source for accumulated material. Special attention shall be paid to areas that are
difficult to access, such as laps, crevices, corners, tops of purlins or the center vent,
where dust and solid material can accumulate without notice. All cleaning shall be in
accordance with AW1NA C652-02 Section 2 or latest version. All cleaning is subject to
inspection and approval of the City. The City may request additional cleaning until
the condition is considered satisfactory.
E. Disinfection: The reservoir shall be thoroughly disinfected using Method 2 per AWWA
Standard C652. The Contractor is responsible for informing the City of progress
during all steps of the disinfection process. All disinfection work is subject to
inspection and approval of the City.
F. The Contractor shall be responsible for disposal of disinfection solution so not to
contaminate surrounding lands or water and to the satisfaction of the State and local
authorities. Do not discharge any chlorinated rinse water from the tank prior
to coordinating and confirming dechlorination method with the Owner.
SECURING THE RESERVOIR PRIOR TO F[LLING
A. Removal all tape and all temporary covers from fill, drain, and sensing lines prior to
securing the hatches. Replace and secure any screens or standpipes.
B. Hardware: Supply and install new gaskets and hardware if directed by the Owner.
Payment for supply of these items shall be via force account and shall be actual
invoice cost plus force account markup for material.
C. After the reservoir has been thoroughly cleaned and disinfected, notify the City in
order to perform a final visual inspection. After acceptance of the cleaning and
disinfection, the Contractor shall tighten the side hatches. All bolts shall be coated
RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT RESERVOIR CLEANING AND DISINFECTION
FEBRUARY 2015 09980 - 2
'
�
'
,
'
' 3.3
'
'
�
'
�
1 _J
'
'
�
'
'
with anti-seize cornpound. Provide touch up paint for recoat where the hatch bolt
holes have been darnaged.
D. After the hatches have been tightened, the City will fill the reservoir. The City is solely
responsible for controlling valves on site in order to drain or fill the reservoir. No
leakage is permitted from the hatches and the City will direct additional tightening if
leakage is observed.
E. The Contractor is responsible for both unbolting and tightening the hatches. When
unbolting the hatches at the beginning of the project, coordinate with the Owner to
ensure the tank has been drained.
TESTING
A. Coliform Bactea The City will perform bacteriological tests after
the reservoir has been filled but prior to placing the reservoir into service. If the
results are not satisfactory, the City will perform additional tests until passing results
are obtained. Costs and work associated with the first test shall be paid for by the
City. Costs for additional testing and work to obtain passing results shall be borne by
the Contractor.
B. Volatile Organic Compounds fVOCsI: After the tank has been filled for 7 days, the
City will test for volatile organic compounds (VOCs). The City may also test for
phthalates if there is concern that the product may not be phthalate-compliant. If any
VOCs are found above State or EPA maximum contaminant levels or applicable health
advisory levels, the tank will be drained to waste and the Contractor will be
responsible to take appropriate actions, subject to approval of the City, to assure that
the interior tank coating is entirely cured and will not leach VOC's. Costs for
additional testing and work to obtain passing results shall be borne by the Contractor.
END OF SECT[ON
' RESERVOIR 10 NORTH INTERIOR COATING REPLACEMENT
FEBRUARY 2015
RESERVOIR CLEANING AND DISINFECTION
09980 - 3
'
'
'
1
'
l_ J
1
1
1
APPENDIX A
1
CONSTRTTCTION FORMS
1
�
1
1
1
1
1
1
1
1
�
�
,
'
'
'
�
'
1
'
�
�
�
'
1
�
'
'
'
ACCEPTANCE OF COMPENSATION & RELEASE OF ALL CLAIMS
<Project Title>
<City Project Number> -<City Construction Contract Numbcr>
<CONTRACTOR>, hcreby indicatcs agreement with, and acceptance of, the final Contract Payment of
<$000,000>, the total Contract Price of <$000,000,000>, including Washington State sales and/or use
taxes, and the tinal Contract Time of <NNN Days>, as full and fiinal compensation fior all Work
perforn�ed in connection with Contract Number <City Construction Contract Number>, and does
hereby release the City of Bremerton from all claims, liability, demands, damages and actions ol' any
kind whatsoever, arising firom perfonnance of that Contract.
<CONTRACTOIt>
By:
Title:
Certificatc of Notarv
Subscribed and sworn to before me this
Date:
day o(' ,
� � � � � � � � 0 � � � � � � � � � �
Rev 01 Printed . 2/21/2012 Page 1 of 1
City of Bremerton
Engineering Division
Daily Force Account Report Contractor:
CITI( OF BREMERTON
REQUEST FOR INFORMATION
Log No.
Project Title:
Contractor:
Project No.:
Contract Date:
Unique, Chronological)
(For Contractor's Use)
Date: Subject:
I Information Description:
Contractor's Authorized Signature:
I Date:
I Information Description:
(For Owner's Use)
Subject:
Owner's Authorized Signature:
� � � s■ � � � ■� o ■■� s � �■ � � � � � �
CITY OF BREMERTON
Project:
Contractor:
Project No.
SHOP DRAWING SUBMITTAL
Submittal No.:
Date.
Resubmittal (Y/N).
Previous Submittal No --
To Be Completed by the Contractor To Be Completed by the City
Specification No Make Amend
Item P/C Para / Dwg Copies Exceptions Corrections and Rejected
No (*) Reference Description of Item Sub'm Taken Noted Resubmit Resubmit
� � � - � a„�a� .,,.,,����«a�, ., - ����� �������«a�
Contractor, initial by either (a) or (b), to certify the following•
(a) We have verified that the material or eqwpment contained in this submittal meets all requirements specified or shown
(no exceptions)
(b) We have verified that the material or eqwpment contained in this submittal meets all requirements specified or shown,
except for the following deviations (list deviations).
-
-
Contractors Authorized Representative
Review Remarks:
Corrections or comments made relative to submittals during this review do not relieve the contractor from Very truly you�s,
compliance with the reqwrements of the drawings and specifications This check is only for review of City of B�emerton
general conformance with the design concept of the project and general compliance with the information Dept of PubliC Works and Utilities
given in the contract documents The contractor is responsible for confirming and correlating all quantities
and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with
that of other trades, and performing his work in a safe and satisfactory manner. P�oject Engineer
�
1 CITY OF BREMERTON
WORK CHANGE DIRECTIVE (WCD)
' WCD #:
Date:
Project Name
Project #:
Contractor:
Notice to Proceed Date:
I YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
1
'
�
�
'
'
ATTACHMENT(S):
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
� ❑ Unit Price
❑ Lump Sum
' ❑ Time & Materials
❑ Other:
' Estimated increase (decrease) in Contract Price:
' �
If the change involves an increase, the estimated
amount is not to be exceeded without further
' authorization.
RECOMMENDED:
1
�
By:
,
1 PAGE 1 0F 1
CONTRACTOR
Method of determining change in Contract Times:
❑ Contractor's Records
❑ Engineer's Records
❑ Other:
Estimated increase (decrease) in Contract Times:
Substantial Completion: 0 days;
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization.
AUTHORIZED:
By:
CITY OF BREMERTON
'
L
,
'
'
1
1
i
1
APPENDIX B
i RESERVOIR CONDITION
0 ASSESSMENT REPORT (2014)
1
1
A color version of this report as a PDF and additional photos are
' available for download at the City of Bremerton project website at:
' htt ://www.ci.brernerton.wa.us/936/Reservoir-lO-North
P
'
'
'
'
'
1
'
'
1
1
'
'
,
'
u
January 27, 2015
Mr. William Davis, I'.E.
City ofi Eiremerton
3027 Olympus Drive
Bremerlon, WA 98310
��_�_..._
` ; ��
� �<� � ; orthwest Corrosion Engineering
" 9
�___..._.._____ � ��'��,�
10995 Warfiield Road, Sedro-Woolley, WA 98284
Phone: (360) 826-4570 Fax: (360) 826-6321
SUB.IECT: City of Bremerton Rcscrvoir 10 North Interior Coating Assessment
Mr. Davis,
Northwest Corrosion Engineering completed an internal coatings evaluation for the City of
Bremerton's Reservoir 10 North. Spcci(ic tasks conducted during this investigation included:
1. Evaluation of the general condition of the reservoirs interior coating
2. Coating thickness measurements at representative locations
3
n
Measuring the depth of any accessible noted pitting
Preparation of a report summarizing thc results ol'our (ield inspection
As the reservoir was lilled during this evaluation, it was not possible to conduct an inspeclion
of the submerged sidewal I surfiaces or tloor.
TEST RESULTS AND ANALYSIS
Interior [�isual Inspection
The interior roof and visible sidewall surfaces were inspected using a raf't inserted into the
' reservoir. The watcr Icvcl was approximately 6-feet below the surface of the roofi: The roof
has a slight slope towards the center and is supported using a series of I-bcams and angle iron
members that follow the contour of the roofi. There are approximalely 36 I-beam supports
' lransitioning from the sidewall to the center ol'thc reservoir. Thc beams are bolted to steel tabs
welded to thc reservoir sidewall; the 1-bea►ns are not welded to the roof plates. Angle iron
members are connected to the beams and are positioned throughout the reservoir roof. A
' painter's rail transitions around the perimeter of the reservoir and is welded to thc sidewalls. A
single center column and `crows nest' assembly are used as a means to support the roof:
'
'
'
�
A steel pipe inlet and half-circic overflow are welded to thc sides of thc rescrvoir. Thcre is an
interior ladder that extends to the bottom of the reservoir with a galvanized steel safety-climb
rail connected to it. There is no visible means of' corrosion control in the form of cathodic
protection.
Pa�e I of G
,
�
January 2015
City of Bremerton — Reservoir l ON
Interior Coating Assessment '
\ °� 1 `�' "� �. ,`\ .��"' �� ' .. D �
\�, � , �`
��� � \\,�� � � - �-,.�.,{`1 . _ : \� � _- ..
ti _ ',�, '� � � - . _ _� .
\ ` � ,
• ,. \ �; .
. �� ,��
. ;!
- -- -�'--_.�.`' ._ . _ �;' -�.
� =.
,; .
�%"� \i-::.; ,...__.,
_ -�� - - Roof lap sheets
---"'
/,/ ' -- -- -- ..�-. �--
, / . .�---- y _ _.
,� `I , / _ ��.._: '�-..._._.-_ - t-beam
,,'� - -
Angle iron � ` `
,_ . �----�--�----�..�.—�-�----- - � - �.� _, - �
� -_�'� , � r_ ���.,.� .
c- r
_ � • \-. ( ��� C �i � �
. . ` , .,� �, '1 II � , ,
; ', !�1
� �� � Painters rail
., , . �j
�__._.__W__ ----
--- --- ._. ---.. _ __ .. s.�-
Reservoir Interior
Interior Inspection
The interior coating appears to consist of one or two layers of coal tar epoxy. Dry tilm
thickness measurements recorded on the sidewalls ranged from 9— 18 mils while coating
thickness measurements on the beams were slightly highcr at 18 — 25 mils. The coating
material can be easily scraped off using a razor knife.
An estimatcd 15 - 20% ofi the visible interior coating is missing, exposing the underlying steel
to the atmosphere. The roof surfaces are experiencing tuberculation, particularly at the non-
seal welded lap joints. Typical tuberculation is the si�e of a quarter and exists on
approximately I% of the surface roof with a larger accumulation on the I-beams.
The coating on the center stanc�pipe is in generally good condition with no visible
tuberculation. The painter's rail is experiencing coating losses on the upper and lower edges of
the steel, but there was no visible metal deterioration. Thc fiasteners used to support the beams
appear to be in good condition with surface corrosion product accumulation.
Pa�e 2 of 6
l._ l
'
,
'
'
���
'
.lanuary 2015
C.:ity of Bremerton - Reservoir I ON
Interior Coaling Assessment
Interior Corrosion Assessment
� The visible weld beads on the sidewall sheets are in good condition, there was no noted
inslances of signi(icant deterioration. In addition, there was no observed pitting greater than
, 1/16-inches deep on any of'the exposed surfaced.
General surtace corrosion was noted at all coating defect locations. These areas include;.the
edges of� beams and angle iron, along the edgcs of the painter's rail, on the wcb and flange
' surfiaccs of the beams near the center of the reservoir, and at the roof overlap joints. [3ecause
the rool' plates are not seal welded, crevices are created whereby the non-oxygenated locations
within the crevice become anodic to the oxygen-saturated areas adjacent to the crevice. This
� results in corrosion within the crevice and subsequent build-up of iron oxide. Many of t}iese
overlap areas are greater than 0.5-inches which will make it difficult when conducting surface
preparation operations.
�
'
'
�
'
'
'
'
Gaps between roof
platcs and corrosion
product build-up
Page 3 of 6
Sidewall and beams
Sidcwall and beams
January 2015 City of Brcmerton — Reservoir I ON
Interior Coating Asscssment
The surfaces of lhe 1-beam supports near the center of the reservoir are displaying significantly
more coating loss than at other sites. Near complete coating loss on the beams was observed
starting from the center of the reservoir and extcnding out a distance of' 10 — 15 feet. This has
resultcd in general surface corrosion at these locations; however there did not appcar to be any
significant loss of inetal as is normally observcd in the form of sharp beam edges and pilting
damage.
There are also large gaps between the top of the supporting equipment (beams and angle iron)
and the roof plates. Gaps up to 1.5-inches were noted in many locations with larger gaps likely
in unobserved sites. This condition will mak-c surfiace preparation diiticult in areas where the
gaps between the beams and roof' plates narrows.
During our investigation, there was no observed mill scalc accumulation on any of the exposed
surfiaces. However, it is likcly that mill scalc is present in areas that could not be inspected.
As part o(' any surface preparation prior to the application of a new coating, all mill scale must
be removed.
Condition of beams near center of reservoir, signifiicant coating loss and general surface corrosion
Pa�e 4 of 6
1
'
>
,
'
'
'
1
1
1
a
�
'
'
1
1
'
'
'
January 2015 C:ity of Firemerton -- Reservoir I ON
Interior Coating Asscssmcnt
Typical condition of reservoir roof and beams
Overtlow and inlet, minor coating loss and rust staining on edges
Page 5 of 6
. . � _'.�;;
. 't :'
. �
, i:
'
January �Ol 5
C ONCLUSIONS
City of Bremerton — Rescrvoir I ON
Interior Coating Assessment '
The following conclusions are based upon a visual inspection of the rescrvoir.
I. The coating on the interior of the 10 North reservoir appears to consist of one or two coats
of coal tar epoxy ranging in thickness from 9— 25 mils.
2. Approximately I 5— 20% of the visible surfaces havc cxperienced coating loss.
3. At locations of coating loss, general surfacc corrosion and rust staining is present.
4. There was no noted deep pitting on thc exposed metal. The welds appeared to be in good
condition.
5. Larger than normal gaps exist. between the roof beams and roof plates. As part of any
abrasive blasting operations, angle noz�les are reco►nmcndcd to be used in order to remove
as ►nuch corrosion product as possible.
6. The condition of the coating below the water surfacc Icvcl is unknown.
RECOMMENDATIONS
1. The existing coal tar coating is ncaring thc cnd ol' its usel'ul life. Acccicraled coating loss
with associated surface corrosion and rust staining can be expected. An additional 3— 5
ycars of�uscful life can be expected from the existing coating system.
2. When the reservoir is drawn down for coating replacement or for routine maintenance, an
inspection of the filoor and wall surfiaces should be made.
3. A new coating system should include surface preparation to whitc metal blasl standards and
the application of a three-coat system consisting of a zinc rich primer followed by an
inter►nediate and topcoat of epoxy. Alternatively, if the use a cathodic protection system is
desired, the submerged surfiaces could be coated with two layers ofi epoxy without the
application of a �inc primer. All non-submerged surfaces are still recommended to
incorporate a zinc primer and two coats of epoxy.
We appreciate the opportunity to assist you with this project. Ifi you have any queslions or
would like any additional information, please do not hesitate to contact our otfice.
Sincercly,
Northwest Corrosion Engineering
�'�..�:;i..�. 1�.���,.�- _
f - '. �_� �
��
Jeremy Hailey, P.E.
NACE Corrosion Specialist #5401
NACE Level 3 Coating Inspcctor # 5672
Page 6 of 6
�
'
1
'
'
i
1
APPENDIX C
1 AWWA C652 - DISINFECTION OF
� WATER STORAGE FACILITIES
1
1
1
1
1
1
1
1
1
1
1
'
�J
1
'
'
�
1
1
1
�
'
'
'
��
'
/ �
Arnerican Water VVorks
/�ssociatson
AiVSI/AWWA Cfi52-11
iRevision of ANSI/AVVWA C652-02)
Tl�e Aiifhoritetive Resource on Sa+� 4Yaterr
.� 1 � s tt�'Yl l�y°�
1S1Y1 eCt1Q O
. ' � ,' � �
•
Facil�ties
,\\. sTn����a
Amalifan
Assoc�la�n Si�rce 1881
� �y1Wn f
4 �"v
l
Effective date: Oct. 1. 2011.
First edit+on approved t�y AWWA Board ol Directors June .15, 1J80.
This edition appraved June 12, 2011.
A�provecl by American National Standards Institute Jufy 12, 2011.
' 6666 West Qumcy Avenue
Denver, CO 80235-309�
T 800.926.7337
�vww.awwa.or�
'
Advocacy
Communications
Cor�ferences
Education and Trainirig
Science c�nd recr��,orogy
Section>
Copyiigtit � 2Q1'I American Water Works /lssociation. All Rights Reserved.
'
� �' " ;� �� ��1 . l.:..
TViis documer�t is ari Americ2n 4Yater Works Association (A4N4Vd1) stand�rd. It is not a spec�ficakion. A4VWA standards describe
mir�imiam reyuirernents and cio not contain all of the engineering ancf administrative informatio�� ilorinally co�itained �n speclfi-
cations. T1ie AWWA stantlards usuaily contain oplions that must be evaluated by the user oC the stantlard. Ltntit each optionai
feature is sper,ified by the user tf1P. �COCIUCI O! S@I'VIC° is not fully defined. A1VWA publ�cation of a standard does not constitute
endorsemenL of any produc� or produr,f. type, nor does AWWA tesl, certify. or approve any pracluet. Tlie use oF A1�1WA standards
is enlirety voluntary. This standartl tloes not superseUe or take precetlence over or dispiace any applicable law, regulation, or
codes of any governmental authority. A'NWA st.andards are iniendeU to represent a consensus oT the water supply induslry that
the product described will provide satis#actary service. Wlien A4VWA revises or withctrawrs tl�is standard. an offlcial nutice af
act+on will be placed in the officiaf notice section of Journal /�bVWA. Ttie action l,ecomes effec;tive on the first day of tfie montn
tollowing the month oi lournal AWWA publication of the official not+ce.
American Natto�tal Standard
An American Nalional StandarJ impiies a consensus oC those substantiatly concerned wilh its scope and provisions. An American
Nationa! Standard is intended as a guide to aid li�e manu(acturer the consumer arid u�e peneral public. �rtie existence a� an
American Nalional Slandard dues not in any respect nreclia�e anyone, wheiher that person tias approved the si.andard or not.
Irom manufacturing. markeling, purchasing. or using proclucts, �rocesses, or procediires not conform�rg ia th2 standa�cl. Ameri-
can National 5landards are subjecl lo periodic review, ��nd users are c�utianed to obtai�i I.he la[est edilions. Producers oi goods
made in conformily �vith an American National Standarcl are encouraged to state o�i kneir own responsibility in aciverlising ar:d
promc�llonal materials or un lags or labels 4t�at lfie goods are produced in conCormif.y �ill� narticular F�meric��n National 5tand2rtis.
CnutioN NottcE: 7he American National 5tandards Instiiule (AN51j approva! vate an tiie tront cover of this star�clartl indicates
completion of ttie ANSI approval process. 7his American National Standard may be revised or withdr�wn af. any lime. AlV51
procedures require �hat action be takeii to reafflrm, revise. or withdraw ?his standard no later than five years from the date of
pub{ication. Purci�asers of American Nafional Standards may receive currenl informat�on on alf stantlarcls by calling or wriking
the Americ:ari Nal�on21 Standarcls Insiitule. 25 NJest 43rd Streel, taurth �loor. Ne�a- Y�rk, NY 14036: (?_1L) 642-490U. or
e•rnailing inFoC�ansi.org.
� '`° ._
T7iisAWV'JA content is ih� prodi�c�t of fliousands oP
hours of cvorlc by your fc:(1c�w w�tc� p1•ofc.ssionriis
Revenuc trom thc safes vf fhis /tWWll matcrial supports
its ongotng developmenl. Unauthorized distribution,
either electronic or pFotocopiect, is �[le_qaI and hinders
AtN WA's ntissian to suppvrt the warer coriirni�nity.
All rights ressrved. No part o! this p��blicalion may be reproduced or transmitted in any (orm or by arry means, elecLronic or
mechanic2l. including photocopy. recording, or any information or retriava! syslem, except in the form oC briet excerpts or
quotations Cor review purposes, v�ittioul Lhe writleii permissian of the publi:�her.
Copyright tJ 2�11 by American Waler Works Associat�on
Printed in USA
C<.;pyright :� 201 I Ame��ican Water Works Assaciation. All Riglits Reserve��.
�
�
�
'
1
'
i �
�I7ze r�1.jUt��A S�andards Contn�irree on Disinfecti��n oFFac.ilities, �vhich. re� �ie�vec { and ��ppro�•ec� rhis
s�andar.d, h.3d cl�c Eollo�c �Ci'SOltIIC� 3[ CI1C ttlll(' OE 3�7�COVal:
I3crs�� ltcillcv, Chrarr
�PJICI"llIIJ'1tF1'CSL I�1�'79't�7ii��
K.C. Cl�oquct�c, lo«�a I)cpar�niciu ot 1'c�blic .Hcalch, Dcs i1•loincs, 1oc�a
1..)_�. � Srandards C ;ottncil Liaisoi3 C.�i•e Gincinnati `�:/arc►•,
Ciiaci�i.nati, C)Iiin
' C:.I3. Hatrar, C arollo E�,;inccrs, !'ltoc��ix, �1.riz.
J.�1. He�zdersop�, Vi��csr. I_.i►in, C?rc.
' S. Vidika, 1)iton �:nginccrin� lnc., i�lcdi�ia, Ohio
�.5. �Uailcs, i3iack Ha�vk, Cc:�lo.
�I".VC�. ��/a(l:cc Ne�v R'orf� Sta�e l�epar�ment of Hr�l�h, Victor, N.1'.
' :L-1.1.. Wcnrinl:, Nebraska DHHS Ul'H, North 1'laccc, Ncb.
K.L,. .Mcrccr;' Statidards En�inccr Lia�so�l, A�k�WA, [�eiivcr, C;c�lo.
'
1
1'rodrrrrr 1Llemlie�:s
lt.). G OC11113I11CC, Mcasuresnent �lcehnolo�irs Inc., Rcdmond, Vi/ash.
User 1'�lenrGc r�
'
'
'
�
�
'
'
'
�I'.['. Clarlc, ?�tonroc Couii�ti• ��.�aCer Au�hoci�t', Rochcster, N.Y.
L.A. Hcnsley�, Vcc�lia Watcr Indiana��olis LLC, lndia�lapolis, lnd.
R.C. Lorcnz, VG�cstcrvillc ��accr 1'lant, �X/cstcrv �hio
'I:V'v':ll. �4acl.7c�nald, Cainl�rid�c \Y/acer Dcparr.�i�cnt Camb�•idgc, iVlass.
1'.�4. Marci�ai�d, 1'rovidc�ue tiVatcr Suppl� Iioard, 1'ro�Tidc�.ncc , R.i.
B_ lZcillc�•, 1vlassachusct�s Vi�atcr Rcsourccs 1\uthorir}-, Sourhborougli, ��t;.�ss
E.i�. Sch��arrz, Nc�v Jcrsey !\incrican Vi/a«r 1� N..E.
_j.l.. Stapf, He.r« COUIIC� Utilicies, 13roc�ltsvillc, C�la.
13.L. VUhircck�crri�, C�rcater Cincinnaci `�!acer ��G�orks, Cincinna�i, Ohio
* I.iaison, n<�n��oten�;
�
Copyri�ht O 201 �I Arnerican Water Works /lssociation AN Rights Reserved.
(r1�k/ �X�11}
(A��' 1��/A)
{n�w ti����
(n�.�i/�.�i�)
(J1ti�' ��t�A)
(�1�X� V{%�)
(Ati�� 1ti'11)
(AtW ��Vi1 j
(11��� �K�tA)
(t'1�tiJ �'V,�l)
(nv��w�)
(AW ��/A)
(A�Y��Yitl;
(A��'��Cit1)
(N L��/ ��/r'�)
(f1V(� Wf1)
(AV(!��t/f1)
(11�X� �Y�r1)
(AW ��;/A)
�
� }
fl/lfltk%4��1 sr�r,�d�rrd� fo/%u� tl �e �erlcrnl f 07'Ill(1l 117G�tCl7tPLI �rrGsc� (�'11C121I)�. SO/�1P U(Il"!lll1011S fi•onr t/>i�
f flr•t�trtt �y�r�y Ge f�t1i'1�711 f! pl71'lIC1l�lf1'.i![lilCltlY�
SEC. PAGE
Fo�•� �vor•�
1 �LILCOCillCil0I1 .................................... �'ll
l.A 13ac�:grou��d ..................................... vii
1.13 His�orti� ............................................ ti�ii
1.C; 11ccc�prancc ...................................... �-ii
I1 p . � . ...
S ccia 1 �st��s .................................. v�ii
li.t� lntor���atioi� on �lpplicacioi�
. ...
ot ".Cllis Sra�z��:�.rd..........
............. �°ii�
111 Use ot This Sr:���darci ......................... x
l�l.A I'urcl�ascr C)�tioiis a�id!\l�criia�ivcs. �;:i
11I.13 1�lodikication iu Scandard ................ xii
1 V iylaj��r )Zcvisions ............................... xii
V �.OI13[I1CIlt5 ...................................... Ylf
S�C. PAG�
4.�f I7isin'rccrien 1'rocedtu•cs \X/hcn
COl1dUCC111� U11C�Cf4S':iLCl'
�YIti�CCil017 and/or Clcanin� oF
1.'o�ablc-�`i�a.CCr-SCOraye �� acil icics .., 8
5 Ver.ification
�.1 Watcr Qualitti• Sa�����li,�g and
"C � st.i ��� `'
n ...................................... 1 �
6 �elivery ......................................... 13
Appc��r.lixes
A E�hlai•inc Rcsidual 'lcsting ............... 15
13 Chlol�ir►e D osagcs ............................ 1%
C llisposaloF.F�i�hlti
`UxTtf �
........................................ � �
SIYL 3t l.�l11'!�
1 General
1.1 Scopc ................................................ 1
1.2 i'ur}�osc ............................................. 1
�.3 n���i►��C;4n ..............
.......................... �
2 Rcferences ........................................ 2
3 llefinitions .................................. ..... 3
4 Requiremetits
4.1 Materials and C�lcanin� ..................... 4
4.? 1� OI717S O� CI7�01'l[7C EOf I�IS111fCCC1011 ... `t
4.3 iti'lcdzads of Chlorinatio�� ................... �
T�LI�s
13.1 !\it�oi�n�s of C;hcmical Requircd �o
t�ivc Varic�us Clilorine
C:oi�ccn�ratic�ns i�� 100,000 gal
��; $.� �n- oE VC�accr ................... 17
13.2 Amoun�s of Chcinical Requircd ro
C�ivc a C ;hlorine Concenrra�ic�n
of 200 mg/L in V�irious
Voluir�cs oE Watcr ...................... 18
C:.1 An,ounrs of Chr �mical I�.cquircd
�c� Neut��alizc Various itcsidual
C �'ttOl'lilC CO11CC1lLC�t10115 lfl
zoo,0t)U g31 (3,s.7 ,�, i) �r
�,�Ua�er ....................................... 19
u
Copyrigl;t �?-J 2Q1 I American Water Works AsSOCiation Ail Rights Resetieci.
�
�
�'�
'
'
1
'
'
1
'
�
'
1
'
1
'
,
'
1
�> ' �'` i 1;
T/'zs i� fos• i� f0/'711t7.17l1i1 O/lI) rrud is �rot ra �,rrt vf f11��SI /fx �k�`!.F":9 t::Y��?.
�. �aitroduction.
l.A. 13�1c•Izo�•ot[�1CI. �T�I�is s�auci:ird desiriUes metkioc{s of disinfe;�.tin� �:�ater
scora�e C ;tilICS. ^ I�IE' i�1SiRECCC111} dist.ttsseci. i�t rl�is standard are chkiri��e solutions,
.�nd sever�l cc��nhi��ations oFf�rec chlorinr� resid.ual at�td con�act tii�te (�;'1') are }�ro�•idcd.
"I��e �1�lorine s��lurions t�, ny lie cierivee� frc�jn liquid cl�lc�ri�ie (( :IZ), calciuin hS�ptzcl�lorire
(C:,a{C)Cl):�), o�� s�diun� li}'pacl�.loritc (NaOCI.'1.
1.13. Histor�,. rliis scanciar�. �vas firsr a�pro��ed oal Ju»e l.j, 1`)$U E�m�er tlie
cicsign���ion A�ISI/A��� WA 1�105, S�andard for DisinEcc�ii>n c�f ��4�atcr Storage� Facilitics.
1��e 1980 ec{itio.n �v;is de��elopcd fro�xa lllf0!'ITl ori�;inally� containec ii� A'�X�'V�rA
D102--64, niodified to include disinfection nf �����rcr-stoea�e Facilicies constructed of
str.e.l or ather iixateri:��s. T��r. s[ anclard �i�:rs redesi�;»a.red ANSI/AtV`Y!� C�C52 �vitli tl�e
l�$G ec�ition. It �vas l arer revised irt 199:? a►zd a�iin in 2002. 71�is edirion �vas approveci
by cl�c A�W W� L�o �lfd Of L�IfCCi()I'ti Odl June 12, 2()11.
1.C Accr��l�rnre. En R4ay 198j, thc US �,m�irorinicn�al 1'roCCCCian /1�cncy
(US�.I'f'�) cntcrcd inro a cooE�eracivc a�rccmcnc z�vieh a consor[iu►�1 Icd bv NS1=
lnccrnarional (NSfi) �o dcvcloE� volun�ary third eonscnsus standards and a
ce��tification pro gram for direct and i»c�.ireir. dri��k ���.trer addiCi� t�tliec atlembers
oF the original cor,sortium includcd thc A►izeric �'atcr ��G�orks Association 1Zcscarch
l�oiuidation (A«-«�alt.�, ��oti�,� �Y�ater Rcscarch I�oune�aeiot�"} �uicL ehe Cos�Frrcncc of
St�ire Health and Environinencal 11�1an:��ers �C(�SHE,I��1). The ��meric,a�� ��arer u!orks
Associazion (IlV(!V�l{1) a� cllc .Iissociation ot Sracc DriEtkin�* ���a�cr f1d�r►inis�rators
(ASD�//�) joi�icd laccr.
En nc�� Unitcd 5tares, ai.i�hority ro rc�ulatc produc�s for usc in, or in contacC �vi�h,
drinking �vatcr rescs �vith individual scaces.T Local a��ncics may ehoosc uz imposc
1'CC�llll'CIl1C'IlLS mon strin�ent �haii rliosc rcq�zircd by� �.hc sr.ace. " ��11��arc tl,e hca�ch
eFEec[s of prac�trcts and driiilciti�; «�acer addiri�•es From sucli ��ru�uc:ts, s�ate aizd loccil
a;cncics ma}' use various refercnces, inc,ludin� '
l. An ad�•isory� pra�ram Fornierly� adii�inistered L�}' L!SEI'r�, Of�ice of Drinkiny
�Vatcr, discontinucd on t�pr. 7, 1990.
' Aruerican Narional Scanda�ds Institute, �7 �•'rsc •'�3rd Scc�ec. 1'ourch riuoi, Ne�+� Yi�rk, i�lY 10()'aG.
; l��atCr R�,rairc:h ruun�lstion. (i6(i6 �k' (�uinc�' r�veaue. [.)cnvCr, Cl) R02_'�5.
- Persuns c�utside tiie Uniced States shouid cc�ntact the appropriar.e audioriry havin}; jurisdictiun.
vii
Copynght (� 201 1 Amencari Nlaler V�Jorks Association Ali Rigiits Reserved.
2. :5pecilic. policies aE�rlie state c>r local i1�Ci1CV.
3. �l�vo sr;�ndards develoF�ed und�r �he dire:crion of NSF, NSI�*/�1NSI fi0,
Drinl�iia� �!zcer Trearmenc C:he3nic .�IS—HC:lICIl ��'�CCS, <�ncl i�TSF/A�S.I G1 , Lhinkin�
�G!iter S�,�srem C:o�i�ponenrs—Healt(i Ef�ects.
4. QC�1CC fCfi'fCI1CC5, 111CIUC�l11�,* /�W ���11 SE�Il(�:iCC�S, 1�'OOL� {,�7('7�llCll�S � OL�fJ�,
l�'�ter Che�ur.'cnls Codex,' and c�rl�er standards considered a��j7ropriaCC bj- thc srare or
local a�e��cr.•.
V;3rious ce�rtific OC�:illll e��ay be inr�o[��ed i�ti ter.tit}'i�i�; proc�uc�s iez;zccar-
c�ance �vi�h NSFIt1.NS1 Gl. Individu staees or local ageneics ha� 3LlC�lOi'iCV to aeccpt
ar accreclit c.erritication o�•t,a illL:lll01]S �VtCIll11 Cf1e1C )UC15L�lCCl�?!1. ACCCeCjlt:lCl011 U cerri-
�1C.:�CIUII Ufy:iI111:1Cii7E1S II1�T}' �':lC}' f'I'(3TI1 JliCt$��Cf.i011 CO )UflSC�ICCIC>ll.
Anncx t�, ` I`crico�• and �valiiatiot� I'rc�cedures," co NS�I11NS1 61 c{ocs
IiOC SC1�)L113[L'. 1 ITl;l\111�U171 ���0«'a �C�' (i�iAL) OF a conEa►�tinant tor su6sc ��f1CCS [lOL
regul;ued Liy a LJSE.PA .(i�� ii� .ISlllllltll contami►r.int level (?��fCL}. 1he t�1t�Ls aE an
unspec.ified list of " tuZre ` ulatecl r.oncaminants" are I�asrd on ro�icic�� tes�i��a �uic.�zliiaes
(noncarcino�cns) a��d. risk d�araccc.rizarion tncch�doiogy tC:1fC1170�CI1S�. USC Of I,Ilf?CX �
pracee{ures .�t� nor ahvays be ic�.entical, depene{in� «n �he certifier.
ANSI/A��`C�A CG>2 does nac address ac�iditi� reqtii� �TlZUS, users of chis
s�andarci sl�oulc� consulc rhe a����rop��iazc stau or local 3�Cl1C� }iaving jurisdic�ioi� in
order to
1. DCCCiIlllllC addirivcs rcyttirer�ncnrs, i�icludin� applic.ablc s�andards.
�. I7CLet'itlitl� C�ZC SC arus of certific:irions by parties af�eri�i� co ce���if�� ��rodi�c�s
for contacc �vich, or u�ca�mcn� oF, drinkin� w;ircr.
3. 13etermii�e r.�srrc.nt inform atitm on produc;t certifica[ioa�.
Il. SpecialIssues.
II../�. �11t03'?99lLf101'l orr A���ilic�ttinfa of 7��u .tit�trz�ar�� Utilities are increasin�ly
Focusi«� o�z �vacer stora�c reservoir it�ana�e�nent and maii�ce��ance as part c�f p�•eservit�g
discriburio,� s� �sre�n �vater qualit�'. 17isinfcc�ion of �r,�a.tcr storagc tanlcs }�rescnts spccizil
C�13IIC11�C5 C�LLC' CO C�1C' qll:iYlCli� of «,�a�cr d�at �llusc bc dcal< <vizh, chc condi�ions of thc
«�a�cr supplied ro chc cank, and d�c abi}i«y co collcc� rc�rescn�a�ive sainplcs of tl�c «atcr
in thc ranl:.
Disinfccrion oF t .il7�S c'tild 0C�1Ci' I"1CtI1ClCti uscd For clrinkin� water cclies on his�h
levds of fi�c� chloriiic cc� ensurc bactcria2 acic� o�iler po�cn�ial pathogens are iiiac�ivaced.
' NSI� lntern .ill(7il"1I , 7�3�) N. llixhnro Rc�ad, Anii Arltor, �\4 4RIU7.
y Sc>rli pui>licaciuz�s a�silable Froni Natiuna! Acadeinti• of Seienccs. 70Q l�ifth Street, N�Y�, �Y';tshin�ti��E,
nr: zaooi.
����
CapyrighY � 201 �I American Water Works Assoc�ation. A!i Rights Reserved.
'
L�I
1
'
'
'
,
Ic shou[d be noreii rhat pH and [emper:iture are tw iztiporrant tacrors af�ectin� tl;E:
l{tStilfC;CCi011 process. H}=pochlorous acid ai�d h�rpochlorir.e are the «vo forms ot chlo-
rii�e presenc in wacer ac }�H �;rea�er ch 3. Hvpochlorous acici has bcen sho�vn to be
significantly cY►ote effeui�•e th..i►i h}'pochlorice fc�r disinfeccioi�. ttbove pH 9 che��e i�
essenti nu hy pochlorous .tcid only hy pochloi�ite. �lemper also aH r}�e et�ec.-
�i�reness of c�isinfection; loti� t� m��er atur�s .11'C 110C .is e�fectivr. as I�ig tem��er for
c.4�l Oi'lllt; C�ISlI1�CGC10[l. T}.1C Illa cli(earii�r. dosages rec�iiired iii tliis stancLarc�. a��e nzcessar}•
to pro��ide eRectl�>e CjIS111tzCIBO[1 isncler �•ai•yin;7 COIIC�lC6011S ��� pH, C�mpe.rarure, :zne�
o�hcr faceors.
l;'ol[a�i C�151IlECCC1011 3f1CI 47I'!Of' LO �iCCIV3L1i1 C�1C i<Z1ZI{ f0I' 11SC� rv� itfl' lIl tI]C storagc
ra�ik slic�uld bc tesced tc� dcccrmine �hat it incets cx��ecced para�neters rv �ICZI Itl L�1C S} •s-
rcm. (:,onsidcr espceiall�� �lic ��c�rk dc�nc in thc ca:�k anel a}�pi•opi•iaTc E�a►•a�ncrers �o mca
sure. Tesr. resulrs sh.ould coc�firm tliat the �v.iter yualiry is appro�.�ri:ice for z�isrribi�cion.
' Alchou� C�llti 3SSCSti111Cf1C tS i1111Cj11C. fOC C1CI1 S1. •stctn, suggesteci ce 5i �)31"a incluc�e
EzH, alkali»ie}', rurbidiry, odor, and s��eci6c. cond�ictance. lf rhe tanl: was paintcc� or
if epox� �v�s applicd 111C3SLlC1[]� iCV(:IS QFVOI acilc ar�anic cciinpounds (VOC:.) or othcr
' COIIl�UI1CIiCS O� L�1C CA3Llil�o., II1�CC1'l�il �Sl1CI] 7S ZlS1C� may� bc ncccssar�; natiilg �liac cl�c.
crihalorncrhancs ("1'HMs) chloroEorm, hromcadichIoro�iicc�zanc, dibro�l�ochloran�cch-
'
,
'
�
'
1
'
1
'
'
anc, and bro�notorm, �vhich arc par� of �he VOC� tcsr, arc a result oFdisinfcction, I10L
coati�ig marerials, and ��ould be expecCed to be presenr. Satisfactory chlorine residual
and caliform s�csul�s arc also i•cquircd.
When collcctin�, saniples for anal}'sos of c�litorm or otl�cr parametcrs, it is impor-
cant �ha� the sample represenc �11c �ratcr quali�}� in th� eank. Sarnplc taps need to be
cl�a�z and sanirary. ln some cascs, 53111�ICS [1'l�4 i1CCC� CO L�C CdIICCC(:L� �COIlT tI1C CO�) OFtI]C
tank or I�a�ch. Whcn sampli��� Fram thc to� of �he rank or haCCh, usc o�a dcpth sam-
pler may be beize(icial to besc represe.►Zt the cluality of �varer rli :�t will enter. [lie sys�eitz.
Nor bactcri�logical Ccsrs, �hc results of �cs�ing musr show iao colitorm. Givcn the
different test procedures a�•.iilaL�lc: far coliform analysis, results sliould be expressed as
"confirinec. cc�liforiti" a�id sl�otild l�c� <1 cfu/100mL, < 1 l�'II'N/100 inL, or "tlbsenc:'
���l�il� bac�eriolo�,ical cesrin� ii1 accordance �vitl� Section 5 is tised ra v erif� ti�e
absence af c�lilarm oc�;: u�isms a�i�� is �;etier acceprecl as verifcarioii diat acce�.�ctble
disinfec�ion has bee�� accon�plishcd, tollati�rin sani�ary procedures durin� cl�e course ot
all �rork is necessar} CU CI15Ui'C tllC. C{iSlilfCCCL tai�I: �vill be readti Eor ac�ivation.
Disinfrcranr.s o�h�r chan chlorinc niay be appro��riatc �o use. ��/hik diis standard
describcs onl�� thc usc of liquid chlarinc, sodium l�vpochlc�ritc solutioazs, and calcium
hypochlorirc, thc applicabilicy of otlier disinfcctants sllouid bc cvaluatcd. Ozonc and
ix
Copyright J 2U1'I Arnerican Water Works Association. Ali Ftiglits Reserved.
cl�c�nical cicancrs lia<<c bccn uscd, and nc�se �varrant furthcr in��cszigatiot�. VC�hich-
ever disinfectant or mezltod is sclected, approv S1'n[7.1 �he local regi�latory� agenc�� is
rcquircd.
t\s morc Freq�tent inspections and cicaning oE rLServoi��s a� rcquircd, uciliCies are
zur►iin�, Co incthods thaz ininimize do�i-il�ime and «•astcd «•a�ec�. Ucili�ies ma�� use
mcthods cm��lo� div Of [Ct110C� operaicd ��chicics (1ZOVs) tor bo�(�� inspcccio�i
and sedi���ent remova Sec. 4.4 of rhis sc andard dcscribcs ehe disinfeccion procedures
and opera�ional considcraCio��s for CC)[1C�LICtt11�; 1P1S}JlCC10Il and cleanin� in �otablc-
�vacer-sto►•a�c f. aC1I[I(CS. IC SI1011II� �7C narcd that an} LIilCICCti4 rctricval of rcmo�cl}�
c�peraceci vehicles iz�ith divr��s 1�iusr bc: perfcsrn�cd iit accc�rdancc tivith all.as�crts o3� tliis
sca�i�{ard. V'v `l�cn sciccrinr a contractor to �.�cr! �}�is ty��e ot� rvork, ir is csscntial co
evaluace thcir experiei�ce 53FCCV procedures, and merhods. �:ach bidder should hc �viil-
in� tc� �ncc� tl�r illllllfllt1111 CCC�l1ICCRIE'IIIS tiCi hti this s�ar7dard Eor saf'c ��c.rformance ot
tlie �vt�rl;. 11iis sra��d iiic���c�es retereilces ro perri�ieizr QSHA re¢ulaEic�iis. �Ilzere :ire
spec.ific tec.hnical skills a ucilir�- shoul�i l r_�s - >k For whe�� co��sidering a firil.� f �_>r rhis �:y pe.
ot �vorlc, such as �hc follo«J�,�g:
• Qualifica�ions tor co�u�iuctin� in-service oper: IC1011S 111 CO[i1�Il �viclt C.>SNr'�.
•( �or isispecrin� ai�d evaluauiny s[eel/c.oncrete/4� or merz�luaue-
crn•crcd reservoirs.
° Rt.SIllrieS fc�r {.lie specifir persurinc:l w �10 1V1�1 })el'f01'fTl U.l1l�CCiY: i.nspecrion andi
or cic:anin�;.
Sec. 4.4 d«es ,�ot address rhe fnllot�•ing items, each ot �vliic.l� rnust i�e s��eciFied bv
thc purchascr:
I. Tk�e tyE�e ot inspectic�n co be perfi�rined (seruc�ural, coa�in�,, bot�om sedi-
��zcnt, c lillOd �c pro�ec�ion, bac�eriolo�,ical, and so Fordi).
2. "�Il�e �echnical requiremesl�s of C! inspec�ion and/or cleanin�.
�nr additional buid��iicc, t to A�K�WA �V1ai�i.ra_l M42, Steel l� '�tler - S1o���e 7�nks.
Sec. 4.4 does no� .tCC(;I11�C �o rc�vrite cxis�ing saf<.E}' standards a��cl rclies on cl�c
cxiscin� :�pplicablc C)SHt� Standards, includin� bur nor liini�cd to
OSHA, 29 CFR, Su�par� I; Com�ncrcial llivin ; O��crarions, i910.401 cl�rou ;li
19i0.441.
OSHA, �9 CFR, I'ermit Required Cot�.tii�ed Spacrs, 191U.446.
III. Use oF This Seandard. This standard describes metliods of clisinfecrin�;
wa�er facilitics chat are ne�vly conscrucced, have been entered for cc�nstruction
or inspeccion purposes, or rhac contii�ue ro sho�v nc� pr.esence of coliform bacreria
duri��� norm operarion. In aclditiou, the s�ondarci dehnes dis.intection prvicedures 1�or
x
Copynght J 201 �I Ame:rican Water Works Association. All Rights Reserved.
�
�
'
t
�
'
'
,
'
'
'
'
1
'
'
'
�
�
,
liC1�t:F'1�'ACtC ll7S�CCC10I15 bccausc �varcr utilitics increasingly are c�n��lo��in� clivers and
rci��ocely operaCCd vchicics co conduct undcr�varcr inspccriolis a�1d/or cicaninn af in-
sercrice �x�ta.l�le facilicics to n�iiiiinize t��a loss and do�{�nuinc nc�rmallv
.1SSC�CI�C�C� �� �itl� iiec.essar}' n�aintenance. Tl�.e srazac does not descril�e rhe ty��e �uid
CCCIIIlIC�7I I'Ct�i11C�I11C[7t5 OI" Ui7(�CClL'1ICC 1[15��CCClOII '3R(�IOf' CIC:LI1111 UC [�1C S'CC�ll1CC.(i SIi1�I
Icvel oEchc divi�lg iris��cccor.
/1 srorage f.�rilir�- is defin�c� :is :t reser4�oir froin �i•lzicl� �vc �cer. �vit}�c>iit fa�rrlier treat
n�e�u orl�cr �han E?(70S[Cf lilSlllfC:Ct1011� is siEE plicc{ direc�l}• co rlic dis�ribu�ion ��ipin�
systcm toi• damcsr�c us�. �ron� a pr actica! stancipoinc, this s�andard ap�.�lies Go chc dis-
infcctio�� of co�°crcd src�r.�gc tacilitics C011SCfLLCCCCi f3f St�l�� COIICCCI('� c��• rna�erials that
�4'C111�(i �)I'()VfdC .1 51R11I3i" SCPi1CCL1�C_ fFOf1l � i'V7CCi' C�l13I1[}' SC211C�F�Oltli. �CC.1L15C `�'tl0(� d71a1'
s�ppor� d�e � ro«�h of coli�oc��� b ac�eri<;, ir is recotntnenc�ec� tliat an} suhrnerged �c�ood
surt:YCe (cc�lu�nns, batHes, and �o forth) Ue coated 4virh epo�y or ot�her durzble, ef�ec-
tivcly im��crincable pain� or coa�in� approvcd For doR�c:stic K�ater usc.
�'arrs ot cliis st:uidard i�1ay l�e applic.a ro che disi��fecrioai of lar�e, fitzished-�vatc:r,
open s�orage rescrvoirs suclz as rescn�oirs formed by co�icre�e c>r cartl� da�ns, �ur clzese
a.E���ticatic�ns arc incidciital �I1C{ CI'11S SC3ilC� is n��t intcndcd ro co��cr �Iiose kia�ds of
storagc facilicics.
Tl�ree �tie�hods oFchlorinatiny sroraze f�cilities are described in this srancla.rd. Each
utiliCy should dccide �� hich mcrhod is inosc suirahlc for a ai��cn situarion. lil sclrc�ing
[�1C IIICt}?()C.� IO L)C iISCC{ u�i(it}r personncl should coi�sidcr chc :�vailabilir�t- oF iiiaccrials
a��d rquip�l�cnt foi° disinCc�ctian, thc rrainin� of persotZncl «�ho �vill perforin rl�c disin-
fec�ion, clilorinaced �vater disposal options, a�1d safec�-. Ne�r ex an�ple, gas chlorina�ion
sl�ould tae usca onl}� ��hcii properly designed and cai�sr� eqc�ipmenr is av��ilablc;
makcsl�ifr cqui�n�cnt is iiot accepr.able ��vhen liqi�id-chlori�le eylinders arc used. Spra�•
Cqli1�J(I1C11L S}lOUIt� I�C usr.d inside �he s�oragc E:iCl�liT' Oilly �i� h�►� thoro�fgh ti•c„rila�io�1
15 C[lSItCC(� Of �VIlCC] 3p�fO��iIACC �JfUCCCtlOi7 IS t>1'OVICjCC{ LL51I1� CalIISC�C-Cti �. i5 IT1aS�5 OI'
self-coi�taincd brcathin� unirs. lf a chlorinatiori nicrhod is sciccted chat re.yuires thc
scoragr Faciliry to bc drained i► ordcr ro disposc of hi�hly chlorinatcd ��•arer, thorou�h
consic�Ier shoulci Ize �;iven to t�ie ef�err c�n t}ie rec:ei��ina e�zvironme��r. I� chere is
nnti� quesriota as to �vherl�er .t chlorinzred-«�aste discharge ►nay cause dc��na�;e ta iish
lifc, E�lanc life, phy�sical ins�allarions or ochcr downsrrcam warer uses �f ai�}• c��pc, an
adcquate a�noun� of a rcd.ucing a�cnr sllo�tld be applicd to tlie dischar�,cd �va�cr in
ordcr to rhorou�hly neurralizc thc. chlorinc residiial.
xi
Copyri�hl � 201'I Arrierican Water Works Associauon. All Riglits Reserved.
!� is thc responsibilityr oF cl�c uscr of an �\1X,�Wi1 stanciard to (jCCCS111111C Eha< <l7c
praducts anci pr��cedures dcscribed in tllat standai�d are stti�able for use in �hr par�icu-
lar application bei��� coizsidcri�d.
111.11. 1'aerc%�uer O�tionsandAl[eruatives. 77iis stancjard istivrircen as thouyh die
�vork dvill l�c dc3nc by thc purchascr's ��crsonncl. If chc �urchascr is coiurac�ing for �he
�iOC� t0 L)C CiOd1C, �l(��CO}�!'I:iLC ��Cnl•'lS1q175 SI10lllt� k?C IRCIUC�C(� kll C}'1'L' CUlltf<tCC ��!'CC111CI1C
to ensure the con�r acrc�c is spc:ci(ica.11v iristrucred as to his ar her resE�o�zsibiliries. �r a
R111111i111111, cl�c ��urcli l�SCd' 5110l1IC� S�)CCI�I` CI]C FOLIOG4'lIl� :
1. Szar►dard uscd—cliat is, �NSl/A�k���'A C652 Disinfr•crion aF`�Va�cr-S�ora�c�
i acilitics, of la�cst rcvisioz�.
2. Whcchcr cnmpliancc ividn NS�/ttNSl CO Drinking Waccr T'rcarmcnr
(_ I�einic:tls—He EfE�(=CS, is requirec�.
3. i'�1c�hoz ol'disinfcc�ion t� be uscd.
4. ��ny rcquired disposa) and. �recau�ions to be cakrn in disposi«g oF chlori-
na�ed ti��atcr in tlie stora;c facilic��.
>. 13ac�eriological �cs�in; and .n�e�hod ro be used.
�. l:cdisiiiFcccion proccdurc if rcy«ircd.
?. lleCails of othcr tcdcral, s�a.cc or provincial, and local i•cyuirenicnrs (Scction 4).
11I.13. 1Llndr.'fii:rrtic�r� ta St�r.r�d,�rd. Ani� modific..ition oE die �.�ro�•isioe2s, dehnitions,
or rer�ninolc��,tir in chis srandar� ;nus� be providrd by thc purchaser.
1V. Major Revisions. �'44aj�r c.l�an,cs madc in chis rcvision of ANSl/�1�Y���C��1
�(i72 are as 1
l. Scveral deh.nitions liati•e been addec� or upd,t�ecl.
2. Addi�ion oi Scc. 5.1.1.7, Op�ional Sam�lin�, and 'lcsting.
3. t3road revision of Scc. 4.4.7, I'os�-inspcetion chlorinc residual CUCh1t�1Ly a�id
hac�teriological �csrin�.
V. Com,nents. lf yrou havc anv commcatts or questions about chis standard,
plcasc call AVG�VC/,' f�ngii�ecring a�1d "1'rchnical Scrvic�s at: 3C)3.794.7?I1, �t�X. at
303.?9>.?603, �vri�e to c�ie dep arcment a� C�C� V►�est Quinc}• 1\venue, Uenver, CO
80235-3098, or c-mail a� scandardsC�a�vti��a.or�.
xii
Copyright :� 203 I American Water Nlorks Association. AI! Rights Reserved.
'
'
'
'
'
u
�
�
1
�
�
'
'
�
'
/ Y;
3 � .�.��... � P
i ...... � r '.. � . .,:�.
l�NSI/AWWA C652-11
(P,evision of ANSI/AWWA CG52-02)
/ I JI /
I� - � � , • i ,,..
.
Fa.cilities
sECT�oN �: GENE�AL .
s��. �.1
Scc. 1.2
Facilitv preparation, appliration oFdisinEeecanr ro ii�terior su�•ftces aEfaciliries, and
S�11T1�)Ilt]p�. 3I1C� TCSIlt7� for tl�c presci�ce of ct>li�orm bacccria, CIIIQI'lI7C I'CSFdLt and
czcc:eE�t:ible aesrlieric. �v,tter c�ualinf. `Ilie srandard .�iso ;,�c.l��des disi��Eac.t�iaii pr��ce-
ditres for unden�•a�er iiis��cc�ic7n .111�I01' C�C211147� UF ��ClC able-�vater-scora�e Facilities
hlli C�OCS Rt3C C{GSCfIhC C�1� CCCI"i111C3I 25�7CCCS O� llllC{CPW.iCCI' I[IS�CCC1011 aliCl/0I' GiC�iil-
in�. t111 ncw src�ragc facili�irs sli bc dis��,Fccrcd bctorc nc�} arc placcd in sei
All sc�ra f�cil�cies caken our of sc�-�i�� for �nspcction, rcpair, paincin�;, cicanin�,
ar c�d�er accivi�� dtat might Ic �2C� TO \�.'��CCC COLlLr1I171I1�C10(1 5�13II hC d.1S111FCCCCU LJC�OCC
�hc�� are re�urned to scrvice.
Scopc
Il�is srai�dard for disiiiFectic�n uf �vater-stor:ige f:icili�ies dr.;cril�es m,�ceri:ils,
Purpose
11ie purpose of this srandar� is tu deiine che n�ini�nun� require�nen�s I nc�
' disinEeccion of warer stora�;c facilitii;s, includin�, r.l�e prepara�ian oF �vater storage:
facilities, ap��lica�ic�n oF chlorine, procedures �or disinfeccin� underwater i��s��ec-
' tic�n and (:�C�11111f; C:C�lil�rilE11C, a��d sa,npl;ng and testing for the presence of coli-
forin bacteria, clllorinc residual, and accep�ablc aesthc�ic �varer quali�y.
�
'
1
Copyright J 201'I American Weter Works As�ociation All Rights Reserved.
2 AW W�1 C652-11
Scc.1.3 Appiication
Tkiis stai�dai•d can be �•etere�lced iii specific.irions tor r}�e disinfecrio�t of �vater
storagc facilitics and can bc uscd as a�uic�c in prcparii�g tva�cr srorage facilicics
tor disinfec�i.c» i}�ruceclures follo�riny i�xspeceion or mainCeii TE]L'Se �)L'OCLC�Ut'tS
includc the applicatio�i of cl�lorine C�1SII1fCCC1017 procc.dures to be used during
�utder�vater inspections and/or cleanin`, and cestina fc3r tlL-r ��resrnce oF colifortn
lr.tcteria, chlorine residual, and accepta�le �tesc�iecic ���arer qai.tlity. 17�e s�.ipt.ilarions
OE` Clliti SC�l1C�31'L� 3E��)�y «.nc�n tlzis documenc l�as l7e�n rcEercnced :.1t1C{ CI1C'll 017�} �o
�lic disinfcccion of �varcr scora�c faciliri�s.
SECTION 2: REFERENCES
�I�Zis st�u reEer��ices tltr follot��in� documents. Ii� cheir lacest editio�is,
rhey form a p:zrt of.�ihis standard to the ex�rnt s��ccifieci �vithin the srandard. I�z any
case of c:o.nflicr, che .re�1uirei���iits of rhis star�dard shall prevail.
ANS1*/A�V Wil 13�()Q----�-i�•pochlorites.
ANSI/AtiX!'�Vf11330I—Liquid Chlorinc.
ANSI/AW�,�i1 Ct.57—l���ld Dc�hiz�r►��acion.
.Standa�� ��IetL�a�s for 11�c° �x�ri��irrratinrl of l�/��ter nrr�l L�lasterc�nte Al'HA
J1��%Vi 311C� `���.�'. ���ashin��on, 1).C. (la�csr cdition).
Additional matcrials ���la�ing to ac�i�ritti• accordi►zg co this srandard includc
tllc follo�ving:
Cl� IlIlYi1P II'Ill71Y!!lI—C.. liisririu� lnc.g
LY/rrte IJ'f'G71•711P111. ���SO SCClCS, Vc:�l. 2. A4WWt1 Dcnvcr.
�Vlarcrial saFcr� ciaea shccts tor forms of chlorinc used (providc�i by supplicrs).
i�T�F/A1\T.SI 6U—Uriiikiiig W:iter �Trcat�i�eiit Cheinicals—Hc:tltli EH
i`SF/ANS.1 C1 l�r�ter S}'srem Cotripoiients—Heal�l� F.F�eces.
S�x 1'ractrces fir �Y/�r��� �.Itilieaes. t1�w�1�w Manual t'V13. r'1��G��`C�tl LJCiI�'CC.
l�irzter Chlor•iraatio»/Clilnr•�rrni�t�tr.'oil 1'r�ctic•es �rnr,l 1'ri�tciples. AVU�X�A R9anu.�l
i�1.20. .�1V�/�W't1, llc�ivcr.
lY/itt:°rQunlic}�r��1d lr�nt.ure�u..r111�%IUA, llcnvc.�•.
y f N:3CIClfl S�and:udi Institutr, ?7 \�'rst •-'13r�1 Streec, r��t«Cf� r-i�,�>�, Nc«� York, N1' 10()3C.
i:�mrrican Public [ Associatiun, �i00 1 Street N\�'. \Y%ashiia�;ton. D(: ZU001.
; ��C�atCr Gm�irtinmrnt C�ederatic�s�, GUl �'G�vthe Sts .11rx:tndria, �:� lZ:i14.
6Chlorir►e Institute Tnc., 2U01 L Si. N��; Suite 5p(, t��ashiris;tan, DC.'�03C.
C'opyright J 201 �I American Water N.�orks Associotian. AI! Riglits Re�erved.
1
L
'
�
�
'
1
'
1
'
�
'
1
'
�
'
'
�
'
DlSINFECTI�N OF WAT[R-STORAGE FACILITIES 3
SECTI4N 3: DEFINI'I'IONS
llze tolla«<iit� de.finirioils sh <�ll apply icl cliis sr.�ndar�i:
1. �r�ril�rGl�� c{�lorr�aP: f1 mcasurc of nc� amounr c�E cl�lorine in chlori-
narcd lin�c, h}-poch(c�ri�c conipounds, c}ilor< IIIlIIlLS, and othcr ai�arr_rials tha.� arc
uscd For disic�l�rcrioti as com��arcd zo r.lZC at�zount i►i cic��it�n�al (liquid or �as-
cousj �,hlor's��.c.
2. CI. 7I0T'Li7P, COIIlEJll]t'Ll: �Ille :illl()llllC OI' CI3�i)flt!C C011l�lili �vich ammonia
(N1-i3) or otlier compcsu�ids ira ���atc.�r.
:3. t:l.�l�riue°, fi•e Also ea�lec� #rec a��ailable c1�l�ri�ie, �he �.inoui�� of chlo-
,�i��� a��ailablc as dissohre �;as (Cl�), ht'��:�chlc�rous acid (HOC�I), at�d hypocl�loriic
(OCCI ) Cl�at is nc3z con�bincc� �vith aiatmc�rxia (NH,;} �r t�d�►er eot��� in warcr
rha� is availablc fc'r disi�iFcction.
4. Ch lvriu�� resrclrr�tl.• C onccn�ra�ian of chlorinc spccies prescnz IIl �vaecr
.�frer tlie oxid:itlt de�Y�an�l li:is beec� s;trisfiecl.
�. �IJIO1'Zllt', t.otnl.• Tlie si�mi�� czF fi chlori.nc, coinbincd chlorine,
3[ld nI�3ROC�1lOi'iRC S�JCCiCS.
6. Coturr�ctnJ: 7he p;u rhat providcs �hc �vorl� anci maccrials for placc-
mcnt or installarion.
?. 11�1�r.,rrrfitctrire•�° Tlie part} LIlaC mar�uf�c�ures, Eahriea�es, or produces
tnaterials or produc.rs.
8. t���nrrochlm•ine: 11n}' or;anic compound concainin� chlorinc as a cc�n-
SClCtIL'IlC. C�l"�1flOCj1I01'(!iC CO�II}�vuiltiS C�Il FOI�Rl �V�1C11 C11IOf131C 1'CaCCS �V or�anic
ti�i�)SC?llCCS.
9. 1'urclj�ser: Ilie yerse�n, compan}', or ory.in.izacion tha� purch;ases any
n�aterials or �vork to bc pa�foril�cd.
10. 1'ntal�le w�rter: Watcr tl�at is 51fC anc{ sacisfac�ory for drinkin�; and
cooking.
11. IlOV RC11lOLC1� operaccd vehictc
12. ,titsfi�ilr.e�° Tf��e parrti< <ha� supplics mare:rial oa• serv iccs. A su���alicr niay or
�71ay not bc �he ma nuEac�urcr.
Copyric�hl J 2�7'I Arnencan Water Works Assoc+�tion. AI! Rights Reserveci.
4 AWWA CG52-11
SECTION 4: REQUIREMENTS
Scc. 4.1 Ibtatcrials and Clcaning
4.1.1 11�Irzcerin/s. Maccriais sl�all comply « 'iCll tI3� CC�UICCl71CllCS OI iI1C S�tEC
1)rinkizz�, �K/atcr .F1cr and ocl�icr Eederal regulatiotis fo►• potable tiva�er, rvasce�varer,
ai�d reclainicd waccr s�-strms as applicablc.
/.1.2 l�lnr.erirzl enterffr, t��f�k. Scaffaldin;;, planks, tools, raRs. :z�ici o�lier
�i noC parc oF thc structural or operatin�; facilirics OE LI3l tank sllall L�c
removed. Zlie►� rhe si�rkaces of� tl�e �+�alls, flc7or, and operacing tacilitir.s o1-` rhe stor-
agc facilit�- shall bc cicancd nc��rou�l�ly using a high-�ressitrc t�vacc�r jct, s��-cc}�ii�g,
scrul�l�in�, ur ec�ua(ly ef�ec�i�•r nte:ins. �X!�ter, c{irc. : iYU� 1'orei n material accrr�nu-
la�ct�. in this CIC3[llll 0�3C;1'3CIOI1 sl�all bc dischargcd Froin che storabc Eacilin� or
c►�hec���ise removc:d. �w'ar.er used 1 dea�iin�, ��reparacion of solutio�is, �nd tank
tilling sha11 i�e potabl.e Gvater.
4.1.3 O�I�e� rr�r�te3 �^c�llo�vin� chc cicattin� o��cration, CI1C VCI1C SCi'CCII
�»�erHo��• screen, :i�.�d aii,v odi sc�-ee��ed i�penin;s sh :t.Il l�e c�lec� 717C� �1UC [il S at-
isFac�or}' condition �o prcvrnt birds, insects, a��d orizer pe�ssible con�aminants from
enterii�� �he Eaciliry. 11nti� inate� required to be iii �he operarin�, scora�c facilir}�
afrcr chc cicaning procedtzrc has bccn cor��}�Ictcd shall bc cican and sanica.r�• ���l�cn
placed in the Facilin-. i�i these ins�anees, care shall be taken to minimize zhe intro-
duc�ion of dirt or othcr forcign matcrial.
Scc. 4.2 F1Dfi11S O�CIlIOTiIIC fOt �lSlll�CCtIOCd
The fariY�s of� chlorine thar rna}� be us�d in the �1511.tI"CCC171a opeeat.io.ns are
liyui�i chlori�ie, SOi�IWIl Il} SOIUCIUI 3C7C� C3ICIli111 �1} 'pochlori�� grc�n�zics
ar cablc�s. Appi•opriatc persoiial pro�cc�ivc cyui��mcn� sliould l�c �vorn ��hc�z usin'
tliese produc�s.
4.2.1 Ligui� cl.�lorine. l�iquid chlorinc cc�nformin� to /INSI/t1V;/�i(/A 133U1
conrains lU0 percene a�railable chlorine anci is p ackagc� i�� steel containers usually oF
1{)Q-16, 150-1b, or 1-rac� (4>.4-kg, 68.0-kg, or )0?.2-i:g) nc� chto�-;nc �ti�ci�,lu. Liquid
thlorine shall be used only (1) in comUinarion «�irh appropriate �;as-How chlarinators
and ejecrc�rs to pro�-ide a contre�lled high-co�tccn�ration SOIllLl011 Fced to cl�c «�ater
to l�c chlorinaECd; (2) undcr Clzc dircc� supervision oE a person who is familiar �virl�
chlo,�„1c phy�srolo�ical, chcinical, aa�d ph}'sical properties, and �vho is �raincd a�id
equippcd to h andlc any cmcr�,c�ic,v that may arisc; and (3) t�`hen appropria�c safet��
praccices ta pro�ec� worl:ing personnel and che }�ublic are. observ�d.
Copyright O 201 I fliriencan Water Works Assor,iation. All Ric�hYs Reseived.
1
D1SfNFECTIOfV OF WATER-STORAGE FACIL1ilES 5
'
'
'
'
'
'
,
'
'
�
�.2.2 Soc%rur�a hlpachlor•rti�. Sodium }�irpocliloritr conFormin� to .F�NSI/
r1\���U�1 I330Q is a�•ailablc. in liquid fos�m i�1 ;lass, rubb�r-lincd, or pIastic co�zcaincrs
rtirpicallv ran�ing i!� sizc From 1 qr (0.95 L} to 5�al (18.92 i_). Conraincrs of �() gal
(1.13.0 L) or lac�er �nay be a��ailable ie� saine arcas. Sodiurn h�rpochloritc cor�taii�s
approximatcl}- 5�ercc�lt ro 15 perccnc ati�aila�lc. chlorinc bt- vol�tinc, and c�rc musr.
he taken Eo con�rol scorage conciirions and icn�rh af s�orage �o �ninimize iCS dcEe-
rioration.
4.?.3 Crrlcilran 1�3f�oc/�lnr•ite. Calci��m l�y��.�nc conCora�iing tc3 l�NSl/
ti�.�l��'r1 B3t)0 is avail �l�IC l[l �I':ifli.11.tC �'OI'!t7 Ol' tll SI71aII Ta�ICC5 :�I1C� C(3I7C31S15 �i���}f0�-
imatel}' Cj pc.rcecit <c�•ailable chlorine by r��eiylit. ' T_I12 117 :.iteri.ii shouic[ Ue sroreci in a
c<�ol, dry, darl� envirc�nir►cn� co miiiinuzc i�s c�ctcriorarion..
Scc. 4.3 Mcthods of Chlorination
Tl�rr=� m.echcads of cltlarinatioca are etE�l <1111�Ci li7 C�115 SC andard. Typica.11y. nnly
onc mcthod �vil1 bc tsscd for a gi��cn sto�•a�c-fariliry disinfec�ion, bLtC COSTl�tllZClOtlti
oF t1��: anecl�ods ma}' be useet. �Ille �firee mechs,cis :�re (1} chl����ii�ation of rlie fiill
scora�c faciliry such tli��t, ar thc cnd of �lie ap�ro�ria�e re�ciitioil }�eriod, chc �vaccr
�i�ill have a free cl�lorinc residual oF no� less than 10 tng/L; (2) sp�•a��in� or �ai�l�ing
of all srora�r facili��• watc:r-con�acr surfaces �virh ;� solution of 200-�n�/I., availablc
chlo� and (3) a c�vo-sccp procrss of chlorinatin� thc boctom por[ion o� chc scor-
age f:iciliry �vitli 50-m�/L. :rvailal�le chlorii�e follo�vec� l.iy- filling ro overHo�v and
mainrainin� a trcc dilorinc� residu ��fa� Ie�sc 2 mg/T., fc�r 24 hr.
43.1 C/11orz�T�tiort arirc%nd .1. Tl�e «�atcr l��cility sll:ill be fiE.led �o
' tlie ��•erl�o�v led•el ��•itli po� .1��It iV:l[ef CO \�'�11CI1 C110Uf;�1 G}]IOflile S�11II lie :lt�C�2C� �o
providc a f►•cc chlorine residual in the t;.ill facilit�- of not lcss than 10 m�1L at �hc
' end ol�the apprapriate 6-hr or 24-hr }�eriad, ; is cjescrilied in Sec. 4.�i.:1.4. "Il�e c:hlo-
rinc, cithcr as calcium ii}°pochloricc, sodiiim h}rpochlorirc, or liquid chlorinc, shall
hC IIICCOC{UCCL{ li1CU CI1C W atcr as dcscribed iii thc Eollo«�in�, su�scctions.
' 4.3.1.1 Liquid usc. L'syuid C}IIC3C131� shall be incroc��iccd inco
the «•arer hllin� rhe stara�e Fc 1CILICV �11 SUC11 a�v:iy as to �;ive a unifor�n clilc�rii�e
' cuncenrr during die enrire lilling c�per aciun. Portal�le clalorinatian �:��uip-
mcnr shall l�c careFully op�rarcd and sliall iitclude a liquid-chlarinc cylincicr, �as-
' fto«• chlorinacar, c��Ior.ine ejectar safetv equi�.�meut, ai�d ��n ap��ropri:�te solution
rube ro iniecr che hi�; c.hlorine sol���ion inru rh� hllin� wa [er. �l�ie
solu�ion �ubc shall bc iizscr�cd through an appropria�c ��ah-e locared on chc inict
' pipe atld near the s�c�rage facilit�• such tha� che chlori��e solucio,� �v ill n�i.r readily
�vi�h [he intluent �vater.
'
' Copynght c� 201 I Amencan W�ter Works Association. AIf Rights Reserved.
6 AW WR C652-'11
4.3.1.2 s�d�u,l� hy �JUC�iIUf1CC LLSC. SO�illill I"l� �podiloritc shall be addc�i co
nc� �varcr cntcrin� chc sco�-agc Facifi�i� t�� mcans of a nc�mical-fccd pump c�r shali
lye a}�j L�}� ha��d-potrrin� into the storage t,.lcilit}' a�1�1 cillo��•in� the inF�uenr �vaeer
to prc�vidc the cicsireci «iixina.
4.�.1.2.1 �X�hen a chc,nical-ki:cd pump is uscd, �hc concc,�«�accd cl,lori�,c
SCDillCl0i1 5�'1:3�� �]C �)Lllll�C'C� C�7C�llf;�1 :ill �F?�7I0})IIaCC SO�l1ClOi3 ECIhC SO 3S LO IRJCC:i C�1C
Ild��l-CO1lCCt1[PfiiL1011 chlorine SO�tlCl�ll 3C 3 T'�iTC [l�a[ �vill �FVe a t.iniEortn chioru�e
concenrr�uion in nc�� fillir.i�; ��•a Tlte solurion tulie sli all 6e insertecl rhrou�h an
ap�.�ro�riacc val��c locatcd on cl�c inlc� pi�c and ncar thc stora�;e facility, or rlirough
an a��E�r�priatc valvc locatcd on Chc stora�e faci.lity suc11 rhat tlic chlo��in� s�lu�ion
will mix reacLii} �vitli tlie hllin; �t�a
4. �.1.2.2 �`Uhrn sodi�un h}'poclllorice is poured in�o tlie scora�e tacilit�;
Clie fillin� ot� the scura�e f:u:ilit}' shall bi.yin imsneciia�eltir CI1E'CE'<lE or as soon as
an�r rcriiavf;d manl�ole covcrs can bc closcd. Sodium hy�pc�chli�ritc inay bc pou��cd
throutih �Izc cicanc�u� t�P• inspcctio�Y ina.nholc in chc �O�YCf CQLIfSC or lcvcl of rlic
st�ra€;c facili�y�, in �he riscr pipc of an cic��accd �ank, or �hrou�l� �hc roof rnanl�olc.
Sodium h}r�ochlc>ri�c shall bc pourcd inro chc �vatcr in nc� storagc facilit}' `��hcn chc
�vaccr is not morc dian 3 f� (t).9 .m) in dc}��h, SlOf ICtiti CI7311 1 f� (0.� m} in dcpdi or
1S CIOSC CIICTCCO 35 IY7311I1O�C �QC�1Clt7E]S ��CftillC.
4.3,1.3 Ca lci��n - ► hti ���ochlorirc usc. Calcium h}'}�oclzlorire � ranulcs or rab
lets brokc:n or criishcd t� sizcs no� largcr than �i�s (G.4 matimum dimril
siot�► ma�� t�c poiired or carried inro tl�e storage faci[it.}� chrou�h the cleanouc or
ins��ccrion ma� in thc Io�Ercr coursc or le��cl ot chc srora�c facility, ll1tQ �hc
riser pi�e �7f�an elevated r.ink, c,r th���7unh r1.ie roof inanl.iale. 11�e �;ra nules or t �tlilet
par-ticl�.s sliall be placed iaz �l�e stor.�ye fic:iliry bel Ho�Vin�; «�arer in�o i�. "Ilie
�ranule; or tablers shall be locateci so chac r1 inHireuc ti��arer s circ.ulace tlirt�uyh
the calciuna hypachl�rite, disst�h�iri�; ic ci�irin� tlie Filling operation. Tlie calciurr�
l�} '�OCIlIOI'tCC 5�13.LI I)C �]IaCCC� ORlY OI1 drtir surfaccs unlcss adeyuatc E�recaucions arc
ta�c�i �o providc ��cn�ilation or prorccrivc hrcathin� cyui}�men�.
4.3.1.4 IZc�cnrioti pet•iad. 11Fcr.r �lie srora�e Eaciliry li�ls 6een fillyd ���irh
the disinfectin�, tivarer, it shall sCand full as f�llo«rs: (1) For a}3criod of no� less
chan C hr �vhcn che �vatcr cntcring chc storagc Faciliry� has becn chlori��a�cd uni-
forml}' b�r gas-feeei equip�ncn� or cliemical p�r.unp, or (2) Fc�� a��eriod oI' iloc less
dl .��� 24 hr ��• lieu the s�ocage faciliry i���s been filled ��•irh .��a ter thac has been rni�eet
with sodium hypochloriCC or calciun� trypoclllori�e cvichin thc storagc facility as
described in Sec. 4.3.1.2 anc� 4.3.1.3.
Copync�ht � 2D1 �{ Aofierican VJater Works Assoc;ation AII Rights Reserved.
DISfNFECTION OF WATER-STORAGE FACILITIES 7
4.3.1.5 Handling oFdisinfcerio�i wa�cr. tlfter the retencioii period statcd
in Scc. 4.3.1.4 thc Frec chlorinc residu Ill CI1C SCO�a facilit� shal( bc rcduccd co a
conccn�ration appro��riacc for distriburion by complcccly draining the stora� c Facil-
�_it}' and refillin� ��•idi potable �varer, or by a combinarion of addi�ional holding ri�ne
and blcnciinb �vi�h potablc �vaccr lia��iii� a lo« 'Cl' CIlIOCIf]C COIICE'11Cf3ClOIl. �'UIIO«rllla
this procedure and subjec� co sa�ist actory bac�eriolo�ical ces�in�, appropria�e chlo
rinc residual, and acccptablc acsthe�ic �va�er qualicl�, �he ��� a�er ma� b� dclivered �o
C�IC C{ISCflhllt1011 5�'SCGlI. •
4.3.1.j.1 111e em-ironmcnt in�o «rhich ihc chlorinatcd waccr is to bc dis-
chargcd shall bc inspccrcd, and it chcrc is any likclihood rha[ �hc chlorinaCed
discl�ar;c �vill causc datnagc, a rcducing a�,cnc shall bc a}�plicd co chc �vatcr to
be discharged to neucr �he chlorine residual in �he «�arer. Federal stace or
provincial, and local cnv iranmcn[ ai rcgula�ions may rcquire spccial provisions or
perrnits E�rior co disposal of liiglil}' chlorina�cd �i�atcr. 1'i auchoricics sliould
bc contac�cd prior ta disposal of highly- chlorina�ed watcr.
4.3."? Cl�lor•i�ratinu irtetl�o�! ?. A solu�ioii oF a� leasc 200-mg/L available
�hlori«c shall bc appl►cd dix�cccly �� nc� surfaccs oF��arts of thc storagc Facilicy that
wauld be in cuntact «ri�h �vater tivhen the star.�ge f:icilit}' is full co che o��erHo�v
elcvation.
4.3.?.1 Mcchod of applicarioii. Tlle chlari�tc solucion ma}' bc applicd
' ��•ith suitable bn�shes or spr:�y equipment. Tl�e solurion sh .i.11 chorou�hly coac sur
taccs to br trcatcd, includin� chr inlcr and ou�lct pipin�, and shall bc applicd ro
' any separace drain pi��in�, such tha� it �vill havc a��ailable chlorine of i�ot lcss than
10 my/L when filled �vidi ���a�er. U�•erHo�v pipin� need not be disinfec�ed.
4.3.2.? Recention. The disinFecced surfaces shall remain in conCacc widi
1
'
1
'
thc s�ron� chlorine solu�ion for at lcast 30 min, af�er �vhich po�ablc �vatcr shall bc
admit�cd, dic drain piping purgcd of che 10-mg/L chlorina�cd �va�cr, and thc s�or-
age 1 chen filled to its o�•erHo«� level. Fallo�vin� rhis procedure and subjecr
to satisfactory� bactcriological tcsting, appropria�c chlorine residual, atid acccpta6lc
acschr�ic �vater quality�, C�1C �Y atcr ma} bc dclivcrcd m the distribution sr-srem.
4.�.3 Chlori�zatdon n�ecl�nd 3. �X�atcr and chlorinc shall br added �o �hc scor-
age Facilityr in amounrs such diaC �hc solu�ion �vill initially cai�ain a� lcas� 50 ing/L
a��nilable chlorine and �vill fill approximarely j percenr o f che ro�al srorage volum�.
This solu�ion shall be held in the sr.ora�;e fiicility for a period oF not less �h�ita G hr.
' The stora�;e F;icility sh:ill then be filled to tlie averflo�v ievel b}� Howi,tg pacable
�vaccr inco �hc highly chlorinaccd �vaccr. 1C shall bc held Eull for a period of noc lcss
1
'
Copyright O 201 �t American Water Works Association. AI! Rights Reserved.
8 AW WA C652-11
tl�z►, 24 h��. H,ghly chlorinated «�a�cr shall nc�n bc purged from che drain piping.
Fol(a�vin� chis procec�ure a►id subjec� co satisfactory bactei•iolo�ical tesrin�, appro-
priare chlorine residual, and accep�able aesrheric �vacer quali�ti; t4�e remaining �va�er
may bc. delivcrcd to chc distribuLion sy �stc�n.
4.3.3.1 /ldding clllorine. Clilorine shall bc addcd to the stora�,c tacilit}' bv
die method de.�scriUeci in Sec. 4.,3.1.1, 4.3.1.2, or 4.3.1.3. 1�ie aaual � rolume ot ttie
j0-ina/L chlorine so.lurion shall be such thar, aF�er �he soluCion is mixed �vith fill-
iiig �va�cr and thc storagc facili��r is hcld tull for 24 hr, �hcrc �vill bc a frcc-chlo.rinc
residual of noc lcss than 2 mg/L.
Sec. 4.4 Disinfection 1'rocedures When Conducting linderwater Inspection and/
or Cleaning of Potable Water Facilitics
4.4.1 1'r•e jofi �neeting. f1 prc-job mcering involving nc� conn•accor and
�va�cr uCilit}• re}�rescnra�ives sh .�ll bc held to ensurc �he Fo1lo�ving: �I�at tlle person-
nel understand the conhauracin�� oF rhe reser�•oir :�nd �he disinFec�ioi� procedures
�hac under�va appurten :iee ideucitied; chat rime tes�ricti�ns are d'►scusscd
tha< <hc divin� condi�ions arc c�nsidcred; that satety� proccdures arc in placc; and
thar inspcction andJor cleaning rcquircrnenrs are unders�ood. Anti• pi•oblctns asso-
ciared �vith logis�ics should be resolved at chis rime. Clear con�munication bcn�een
urility O��CC�iCIUf75 �JCCSU[111CI al1CI C�1C CO1lCCaC[Uf 15 ESSCIlt13I.
4.4.2 Stnraae : f rrcilr't�� i;al�rtinji. lr is srrongl}• rcco�n�ncndcd chac nc�
�vater s�oragc facility be rcmo� fcom scr�•ice and isolaccd from thc systrm ��rior
ro inspcc�ion and/or cicaning by closing inlet and outic� valvcs. Flo�vmetcrs and
dic rank levcl should bc monitored �o vcrif}� diar thc facility has bccn isolarcd.
77ie under�va�er inspec[ion ane�/or cleaning should be m ac�e �vith �he resec�•oir as
fu(I as possible, �vhilc s�ill lcavin�, room for access �o thc roof area. lf �hc reservoir
must bc inspcc�cd wi�h the inlct/ou�lc� vah�cs in thc opcn posi�ion, s� 'SCCIlI �3IVCS
further upsrre or do�vnstream sho�ild be closed. (.Uf�-liiie inspec�ion and/or
cicaning of scoragc Facilitics ma} IlOC �C PptiSIhIC Of CO(1VG7lCIlC �'OC CCfC31i1 C312ICS
or cicar�vclls. In-servicc diving �vork may bc complctcd 53f�1y bur scrict a«ci�-
cion to saEet�- is rcquired. lFspccial opera�io►Zal conditioi7s ncccssicarc. undcr�vatcr
inspcctioii and/or cicaning �vithout isolation, di��ing �vork should bc done dur-
ing periods �vlien posi�ive Ho�v into the reservoir is maintained and rates i►lta ur
out of clic �vatcr-storage fa.cilit}' arc minimal. For undcnvatcr inspcction and/or
cleaiiiit� of noltisolated Facilities liaviitg a common inle�/outler pipe, it is su•ongly
recummen� rhar a positive Hc►�v into che. sCOrci�e f:icility be mainrained during
che divc.
Copyright � 201 �I American Water Works Association. Ali Rights fteserved.
1
1
'
l�
DISINFECTION OF WATER-STORAGE �ACILITIES 9
4.4.3 Storrr�{re faci/r��� n�ce±s. Speciai care s�iould be taken co keep equi}�-
�nent and �e��so�lnel clean pric>r to en�crin�, tl�e zank. Dirt ai�d concaminants t�n rhe
resen�oir raof/adjace�it co rlie harcli ca�1 contaminar.r equipnle�nt. .�icforc the facili�y
access iaaech is ope►ied �hc hacch ai�d ir�imedia�e are �l SI12.�I I l'�C�.i1C:C{ C)FIi7USL dir�
a�id debris.
/f.�.4 I�rr.'eirrl rc�rreer r��rnlit.y. 'I�ie �icilir}� shall es�ablisll clic chloriiZC resitival
' ctiic� turbic�ity in che reseru �vater L�ef ��re enrerie�y i[. The utili�y shi�Eild cal :e repre
scnrar.i��e «-arcr s am}�lcs fronz �c:�,reral dcprhs ancl locaticros, iFpossiblr, anri ana:yzc
(or c�i�orine �•esi��� and curl�idity �1C r.esulcs sl�all be rec.ordeci. Cl�lorine residual
'
1
ccstin� is no� ncc�ssar�- if th c s}'�te�n d�is no� operar.c �v icl� a chlo��ine residua(. lF
nc� wa�cr seor�ge f S�CillCi� Ptl11.�1175 I11 SCf'1. durin� thc cleanin� operaeion, sa.inplcs
shall be collecred daily fi �he �ailk atid cestcd Fur coliform bacteria, chlorine
��csidual (if'applicaUlc), and turbidirr.
1 4.4.5 Lrjrripfrrerac �rr�cl.�er��»zriel rerj�rir-err��rrts.
4.4.j.1 Equiprncia� and clotliinn. �qui}�metit usc for ii�spccrioil and/c3r
cleanin� of po�able-�va�er-sCOr�a�e facilicies shall be dedicared Far eha� Exirpase only.
� Equip►��cnc shall be conscructcd and «�a.inraincd in sucla a i SO C�73C lv atcr
c��ialiry �<<ill sioc be .iffecced. Ec�uipment shall be availczb}e Foc iiis�.�ec�iori.
1 4.4.>.l.l According �o this s�ai�dard, bt�th SCU13A (sclf coi��aincd under-
�vatcr brcaCl�ing apparatus 1Eld CXCC:CLI:�LLV supplied air �ncchods arc acccptabl� air
�
'
S(3LI1'CCS.
4.4.7.1.2 Lt�lll��l'l1Cl�C CX(�OSCCi CO CI1C W3CL:f 5}13II L�C SLEitdfllC I'OC C{35111fCCt1011.
17ivirs s��all be com��lrtelp• enca�sulatc.d �vith nc> bare skit� c�poscd. Di��in� cloth-
in� shall bc of the dry-suit �}'pe and shall bc i�i �ood condi�ioii, #rct frc�m tcars,
scrapcs, unrepaiird arcas, or o�hcr imperfccrions cha� ma�� impais thc intct;rit�� of
' thc suic. Eq�cipsncne and dr�- suits dcdiearcd Eor potablc-�var.cr undcr«�atcr inspcc-
rioii anci/or deaning �vurk shall be s�ored in a ma►uier �hac preve►ics bonc �licanical
1
'
�
'
1
'
and bac�criological co�lramiria�ion.
4!.5.1.3 Tl�ei-c s1�a11 t�c nc� contact �f thc mc�uth on c�ad tivit}i �lic �4�ater
during �llly ��ne. c,peraeions. I1ie head sl�r�ll be fully encapsula�ed l�}' o�ae or a
combination of che fi�llowin': hclmet or dry suir hooci �vuh Eutl-face mask.
4.4.7.1.4 Divcrs shall have COl11IIlUlllC3Cl0[3 in accorciai�ce with fcdcral,
sratc or �rovincial and Iocal re�,ulacions.
4.4.5.1.5 Under�va�er operaeions ma�• be video�a�cd or documeiucd wid�
s�ill pt�o�ogra}}hs ac nc� iF�ilicy's rcquesc.
C�pyright J 201 �I American Wate: Works Assoc�ation Ail Riglits Res�rved.
10 �W WA C652-11
4.4.S.1.G L7isrurbing zanl� bottom scdiincnt inav im},air �vatcr quaiit�=.
SE'C.�![I7f;llC Illay contai�� bactrria, �vhich if resuspcndcd can causc conracninarioii.
Disriar�cd stdiment ivill crcate Iocalized Eurbidicy. ��1 soine: cascs, i� may� bc dcsir-
ablc �o disrurl� a s�nall arca af rhin scdiincn� i�z order tt� inspccr thc undcrl�ring
c:o��ri.ny or f1o�:�r coi�di�ion Diti•ers or re�7�orel} operaree� vel�icles s1�:�lI nor disrurl�
chc seciimen� in an�• way unlcss cxplicitl�i approved br• �he utility to do so; �his
111GILIC�ES "��=a lrilll, ` �.'� i�l] CIIC. I1CfU1'
�f.F�.�.� 1'c°rsonricl r�quircrncttts. f3ecausc of thc liazardous na�urc of chis
�vork, �vliicld ca�t�bi�zes ele�•ated ���ork, cUaxfined-space entr}r, al�d di��i��;;, rhe �.c�i�-
Cl':iCCUf �3c'1'�Oft]11f2� CI1C �VOI'1C Slla�� C:Ol11�Jti �v �rh all fcd�r SC�CC Of �fOVIIlCl2� and
�OC� i'c'bU�aCl(3115.
4.4.5.2.1 Cer� :�117 C�[Vil7a c:ontracrors n�l�� har�e b�cn providin� these ser-
�=ices for nian}r years may nor ha�•e the Ft�rma[ certific lisre� I.�elo«•. U[iliti.es
shnL►id careFuily revic«< the documc�i�aeion ot crainin� ai�d c�c�e� fc�r CIICSC
tirrtis and req�iire a c�etailed persc�naf diver's log for dte personnel ��� �Vll� CO[1t�.UC[
the �n rv l�ie pr�senrZriott <���a sporc cli�•er cerrific�rion c ar��l for SGU$A b}
itsdF is not acceptablc prr�of �F pro}�cr traitlin�.
'�The Iollo«rin�; is a liinited list oF e�:unples of c{i�•er c�ualitic tli.�e are
accc�Cablc—but not zvizhc�ur d.cz a�icd. docun�cnr�cio„ of cra inin� and dircct taj�k
ii:spcctic�n andlor cl���;►in� �v c�rk es}�cricncc:
ZRt{ C��SS US N3Vj' D1i'CI' .I C3111111,�'
AItiSI/A(1L)E, U1 (latest ��ersion) Cornmercial L)i�er C:ercific
AD(� Cc,nutlercial (= ertilication
�f.4.S.2.2 Pcrson��el on the di��e reatn ►tiust be US�Ik Ccutfined Space Cer-
rified, These certi�cares shoulci i�e provide.c{ on the job sire Far :all pers<7n.ne1.
4.4.S.Z.3 Ali }�crsonnc! on chc di�•e tcan� s;1al( bc frcc of co►nmunicablc dis-
casc ar�d slial! liot I�a��c heen ui�dcr a physicia��'s carc �.�virhai� nc� scven-dat- �3criod
prior to �I�e �ntcrin� of �he facilirti�. 1Vo person who i�nowin�l<< has an abnorinal
�cmperatui c�r syinp�oms of illncss shall tvork in :� �va�cr facili��•.
4.4.5.2.4 �Ilie American Rccl (:�ross or an equivalcnr. agency� shall certiEy all
dive ccarn Encmbers in the. use ofC,I'!t and l�irst Aid.
4.4.5-� Safe«-. Tl�.e dive team shall compiy� tvich all applicable lc�cal, state.
or provinci.il, and fcderal safcty� a•cyuirenYCnts and shall providc all s�cccssary safct�-
ec�uipmenc suitable for tl�e spe�cific �tccess opeeaiia�;, deprl� to «�ater, and otl�er aspecCs
of Lhe �va�er-srora;e faciiic�• to be inspected.
Copyrigiii ;� 201 �I Amer�can Watcr Wo� ks Association. Afl Ric�his Reserved.
�
DISiNFECTION OF WATER-STORAGE FACILITlE5 11
'
4.4.5,3.1 The conEractor sl����ll have a comprchcnsi�•c safc�y manua! on-sitc,
�i�lzich adc�.resses all of tlie potential hazards. �he safery rtial�ua) shall ii3uiuc�e cer-
' � rifcarions lor .ill s.zfet}' :3���� �n�erpenc}' rESponse rr.quire��iznts at zhe sice. Tl�e ce
L1':iCCOI S17�II I7�i4'C 1 111CT�7Q� and che equipi��enc reaciil�r availahle tor the excraction
'
'
'
'
�
'
'
�
'
'
'
1
'
�
'
of an ini��rcd di�>cr a a mc�hc�d for lo« �cring a��crson to cl�e ground ��ho is inca-
paci�ared I�11S ill a�r ii�clude tli.e use of a properly tr.iii�ed al�d equi�.�ped Lc,c<�! tie•e
dep a��rmenr �r rescue sq �Ilie use oE an nur.side res}�anse ce ji7.�ist 1�e codered
ii3 rl�c }�rc�-j<�k� inec�in�, and clac}• r7iust be abie co CLti4)Ofld C'�UIC�.II' c�n c� on
tjL1Flll� CIl(° �Y Ork.
4.4.0 �CJIl1�171P11C t7Y1LI �P�S071l1eI L�XSdi f'Cl1071. t�ll CL�Ul�IT1CllC 3IlL� ��CI'SfDT117CI
r.ha� ��ill rntcr thc �va�cr-sti�ra�c facili«� ��it►sc bc disicafccecd inui ��rior ro
ciizrl• into thc potal�lc rescrvoir. An}l cquipnien� makin� con�act �vith t}�c
c. lilai. 1C�OE musc be disi�iteccecl a�ain pr.i.ur to entry .i.nto �he �v�zcr.r. 71�.e merhod of
CC�L1l�7f11L'J1L Ci15111fC:GC1()il can �c submersic3n in, sprayi��g witli, or spon�ing ��rirl�.
c�iisi��Fec:t:iaic solurion as dehned in Sec. 4.3.2. The. dive.r a�ld t1.ie clorhiaig shcill l�e
C�I51l7tCCCCCi 3�'CCC CI1C C�IL'Cf IS Sll1CCC{ U�] 3S7CI C311 COt) OF CIIC �ank as �.�er Sec. 4.3.2. Ca�•c
must bc r�ken �vlzen a��plyin� disiiifecc3nc solutioz� ta �!►e diver, � c�perated
�rehicie, a .nc{ ocher cl2 :uiin` equipine��c so chat c�ny excess, r�ii�ol�, or spilla;e is coii-
trollcd so ir docs ilor cntcr chc rescr��oir. Harldle C17I01'IIZC SOIUT1031S Rrl[�1 C31'C SO ?S
1'lOi CQ CORC�CC ��Cl sonnel clochii�� or skin. Appropriate personal proCeaive cquip-
117E11C S�lOUICI �C �'VOI'Il R =lzcn using �hesc produccs.
4.4.7 1'nst-iusj�ec•tivr� c%lorijze r�esidarr.tl., [r�rhiditj�, rrrrd G�zctt3 �e+c-
r.'r��f C«I.lecr sa9i�ples and resr :as descril�ed in Sec:rion j , Verihcatic�i�. 1F t}te srora�e
L3[lI �i 'aS fCi710�'CC�I �l'Otll SCfV1C� sa�isfac�ory bacccriological and chlorinc residual
(if applicablc) results acc rcyuircd bcfc�rc Cl�c facili�t� can bc placcd back in scrvicc.
If it is nccessar}• to rcbuild clllori��c residuals in chc storagc Facili�}; bactc�•iological
S3II1�IC5 SIIOUl(1 liC COLICCCCC� 3FCC1' CI'llOC1I](: residuals arc brought ta an acccptablc.
IE:\�C I.
4.4.� flffidrrvr.'c o co�npl�aj�ce. The purcl�. :tsi�ig utiliey may require thar che
c�tltraccc�r E�erfarini.ilg rhe iiispectian aild/or cIe .111111Q se.r��ices prov an athdavit
ot coml.�liance ��•itlz �hc r�:quirc�i�en�s oE this sr.andard.
' Copyright c� 7_01 �t Arnerican \Nater Works Association. All f2ic�hls Re�erved.
12 �WWA C652-11
SECTION 5: VERIFICATION
Sec. .�.� Warcr Qu.ality Sampling anc� Tcsti�ag
:i.l.i SI!lIIC.I/LP'l� C011dl[1011s. /LFCCf chc chlorina�ioit procedurc is complcccd
and before d�e scora�e. taciliry is placed in service, 1V a�e� - froizi r.he full facilitt� shall
bc samplc� and uscec� fc:�r coiiforni bac�eria and chlarinc residual in accordancc wiCh
zl�c la.tcs� c:di�ion of Scar��l�rr�lvl�iL the �:rrr�rrr.'ruitin�r of' I� r lIIP)'lfllf� L��tSlPtU
5.1.1.1 'l'csc Eor odor. "Il1e ��•a�cr in tltc fu11 Facilir� SIlOE1�C� 3IS0 �]C CCSICi� CO
ensure di ae� na ��f�eiisiv o� exists.
5.1.i.2 [�esulcs of cesting. lf �hc r.csr for coliform Ot'�3l11S1115 is i�cgativc
3I11i CIlIOCilI(; I'CSldLl3I5 31"C �+C �CCC.()CaL��C diSLCIL�UtIOtl S} rsrcm 1e�rcls, r.hc sturagc facil-
ity may bc plc�cec� in scrvice. 1{�d�e ccst sho��-s tlzc ��rescnce af�coliforrn bacceria, thc
situati��n shall be e�•alu:�red by c��ia(ified person.nel. In t12is case, re��eat s� 1[11�.1IC•S S]l all
bc cal:cn un�il t�vcr consccti�ivc S:iI'17()�L'S arc. nc�atir�e, or thc srora�c facili«• shall
again bc: si.�bjecrcd ro disinfect.ion.
5.1.1.3 Carc in sarnplin�,. `llie sainplcs shall bc taken Froir► a sainpic
tap or� tl�e oudec pipi��� from chc s�csrage Facilitt- c�r frot�ri a sample �a.}? c«nnecred
dircctl3 co rl,c s�oragc facilir� or s� �lI1�Jllil� F1'011l CIlC [O� OF LIlC Ca[lI: t)C I]3CCI1 t21��
bc rcquircd. !n anyr casc, the operarion shall l�c such so as �o cnsurc tliaC the sai�aplc
co.11ecced is a��n.�ally from �vater rhat has been ia� the stora�e facili�z: Sample eyizip-
C11CllC 3RC1 i71CtIlO�S SI1:iII fOl�O�i� �iSC�CIC CCC}1t11C�UCS FOI' h acteria sam�lin�.
5.1.1.4 ltccon� mcizdcd addicioiial sacnples. 1C ina}� bc ac�vis.�blc �o collcc�
sa���ples ot tvater flo��riny ii�r.o the sror:��;e f:ic.ility to derermine if roiifori�zs ar pres-
cn� in C�1C t�� pieal �oca��c watcr sourcc �nreicularly ,f Coi;form hactcria arc tound
i�z thc tank.
5.1.1.� Oprional samp6in� and res�ing. Fo1lo�vit�g disinfecric�n and prior
to aetivating the tank for usc, �4�atcr in C�1C StOC tank should be t�stcd �o dcccr-
mine chat i� tneecs expec�ed �?ar ame�crs tS l}�ica1 in the s}'stem. 'lcs� rc:�ulrs should
co��firin diat rlir « �ater qi.i alir�* is approp.riare kor � �1SCCIL�UC10[l . A.lrhou�h this assess-
mciiC is uniqi�c For cach syseem, sug�es�ed ccst ��ara�r►c�crs include pH., a(l;alinir��,
turl,idity, ado� arid specih.c co�iducr.�nce. If tl�e r.ir.�k �vas painced or if epa,r•}' ���as
applicd, measurin� J.e�•cls of volatilc organic co���pounds or onc�r componcnr.s of
the coatin� �na�crial (such as zinc) �ma�° be iiecessar� (nocing Chat 'I'I �vhich
are par� of �he VOC: tesc are a re�ulc of disiz�f�ccio,, iiot coaCiri� marerials, and
�vould bc cxpcc�ed ro bc �!'�SCI11"}. I�CE7('l1C�!!7� 011 �he size of the storagc faciliry,
Copyrigfit :�� 2�1'I American Water Works Associatum All Rights F2eserved.
DIS�NFECTIQN OF WA1�ER-STORAGE FACiLiTIES 13
niore samplcs nlay bc ap�ropriatc. Whilc the ���.iml�ci abovc thc reyuircd
rnimbcr is u� za clic discrc:cian of rhe �varcr svs�cm operator, su��,csred niiix�bcrs
include onc sainpl f���� �a►��:� �f �a ���e or [css and a�i addicional samplc For cacli
,lc�c�lLlU11 1� I��I(:; r�ol���z�e, usi��� anarher t.ip OC �1�1CCI1 il 71�e spFCific.
i�um�er of sam}�les i�cccssarti� sliould bc dcceri7�inf:d h�:forchand and �vill de��end
Utl C3I]�i VOILl11lC <111C� 5�1174�IC t ar h :.�CC}1 3Vh1I�1L�lIlC�
� ' � � ,
lhis s�ai�c:larc� h ::1S ll0 appiic,ahle inti�rtxi �ar [I�is section.
Copyr+glit O 201 i Arnericat� Wate� Works Association All Rights Reserved.
: a ► �� . :
Chlorine Resi�ival 'I"esting
7T�is rr.��err�ix is f 03' 11'1 forf�trtriou c»�1.p ra�lrl i.,• unt f�,zrt o t:�l.�lrSl/�1 it���� G°G.52.
SECTION A..1A DI'D llROP DILUTIOl�1 M�T�-IOI)
(FOR FIELD TESZ')
I1ie N, 1`r-dierh}'I-p-pl�enedi,in�ine (DI'D) drop dilu�i��n inethoc{ u} approxi-
nlati�i� j•esidual CIlIOfl11C is s�iirahlc Eor conccnEracions a�ovc 10 m�/L, stich as
chosc applicd in chc disinfcctio�a af ���a�e�• mains or tanks.
Sec. A.�.1 Appaa�acus
1. A graduatcci. cyf ii�dcr for mcasurin� discillcd u�a�er.
2. An aucontatic or satcn� pipc«c.
3. 'I�vo droppin� pi}�ecc�:s rl�at ciclivcr a l-mL sam�lc in 20 dre�ps. Onc
�1�9CCCC i5 �'0!' C{I5�)CllSlll� CI1C \v atcr sam��le, and dic ochcf• is for dispci�sin�, thc lll'I�
c�nd �iufEer soh�tions. 7 pipetces should nor Lie inrerc}.ianged.
4. A coE���.�araror kir containi�ig a suicablc ran;c of sranuards.
Sec. A.1.2 Reagcnts
1. DI'L) indicarc�r so(u�ioil. 1'rc�arc as prescribcd in St�r,r�lrrrc! 1�1rtl.�o�1� for
Lj7E' �Y7lllllil!/LT071 Of 1X�(7�f7'l7llf� U��jIS1E'1LJl1lP)' �I3LCSt CC�lL"tOl7}� SCCTII�R 4�nQ-Cl, }7• 1'•2�•
2. 1'hosph:ire l.�uf�er solu�ioi�. I'repare as presiribed in St�rr�ar�lMcrtl�nr.l.+ fo�•
�l_�e �;.�ar�riu�[zo�l of lkj�tler n���I 1� '%rs��w�rcer (I�ecs� cdt�ion) Sec�i�n 4500-CI, �. l�.2a.
Scc. A.l.:i Procedure
1. Add 10 dro}�s of�DPD so lurioli:ind 10 drops of�l�ufler soliitic»i (or 20 drops
of con�bine�� L)I'D-buf�er s< co a cumpar�iror c.ell.
2. �'ill rhe com��aratc�r cell �o nc� 1Q marl: �virl� di�rille �va�er.
3. t�7i�h a droppinn pi��crte, add thc �varer sam}.�lc onc drop ar a cimc, mix
until a rcd color is fornicd �hat mardzcs c�nc of �hc colc3r srandards.
4. ltccor�i t.he roral number of d r��ps used aud th� hnal chlorine readin�
obraincd (�hac is, Cl�c chlorine rcading of thc marched standard).
15
C�«pyright ::i 201 �l Amencan Water Works Assoc�ation. All Riglils Reserved
16 AW WA C652-11
�. Calculatc thc milli�ranls per [itcr of chlorii�� residi�al as foIlo�t•s:
rcading X 2.00
m;/L chlori�lc =
drops of sarai��lc
SECTI011�11 A.2: HIGH-RANG�: C�-IL�RINE 'I'�ST'
KI'�'S
Sc�•cral l7l�Ri1�'1CCtIfCl prc�cii.icc l�i�l�-rangc. chlorinc �csc kir.s tliar are i��cx-
pcnsivc, casy to usc, :�nd satisfacsarS• for thc prccisio�� rcqiiircd.
Co��yrit�lit t� 201 I Americren Water V1�orks Association. AI! Riglits Reserved.
. �
C}�loric�e Dosages
T/irs a�i�FUdi.r,� is for i�tfor�irrct.loit orrl�� rtrt�l i: uot .7 �irrrt nf'A!\'1I/� �t%Zt�� C
Table l3.1 Amonnts �f cheanica� required to give varioias chlorine concen€ratiot�s in
100,000 gal (378.5 m of water'�
C:alciu.n�
I-I vpoch luri rc
Sodium ! Iy}�orhlorite Rrc�uirrd Reyuireci
ll�sired
C;hlorine 5 1'erccnt li) 1'ercenc 15 ]'ertent C�5 1'ercrnc
C:oncrntration Chlorine r'ivailable clvailablc Availabl� Availa�lc
in \k'arcr 1tecluirecl (;hlo.rin� C;hlo� C;.I�iorinc t.;hlorinc
�,�g/L. 1!� (k�) ��r! { L) e rr/ (L) g�rl (1,) !6 (kK)
2 1.7 (0.8) 3.9 {l4.?) 2.0 (7.G) 1.:� (4 �)) ?.G (1.1)
f 0 8.3 (3.8) 1{).4 (?3.4) 9.�) (37.�) C,.7 ('�.4) 12.8 (5.�)
>0 �2.() (19.]) 97.ff (3C7.2) 49.0 (i87.8) 33.4 (12G.4) G4.0 (?9.ci)
� CfI' SO(�iUlll hype�cl�Ic�ri�e are l�a sed e�n cemcentr uf FlV�1lI1IlIC CflI01'lI1C �)}� VU�UII7C. PUf CII�1Cf SU�IU111
hy pochlorite or calc;ium hypochlurice, exteiideel or i�uprcjper stora�;e ufchrmicals ma}• �ausr a Ic>ss <�f availabie
�hlurine. t11so, arnounts dc� noc takr into accuunr chlorinr demarid or ciilorine resi�fiial thst mi�;ht bz 4�resent in
the �i�atrr.
17
Copynyl�i v 201'1 Americ�n VVater WorkS Assoi:iahon. AI1 Riyl�ts Rese�rved.
' 18 AW WA C652-11
� 'I'able �3.2 Acnounts of chemical required ta give a chlorine concentration of 200 nag/L in
Vaf40uS YOIu►�neS oFwa1'er'"
, (�alcium
[
Sodiun� i [ 1Zcy�iircd Rcc�uircd
' 7 1'crccnt I.0 1'erccnc i.5 I'c:rcc�ir Gi !'c:�
�•��hirne of Chlorinc� ;l1•.�ilablr Availahle Available Avaiiable.
' i�'ater I�rc�uir��cl C }3�(lEltlt C:hlorin� C:lilori�ir CIIIC)I7I]E
�rri (L) lb (kg) g��l (f ,;<rl (LI �nl (L Ir`� ("k�)
' 10 (37.9) 0.{)2 (9.l) O.t}� (0.15} ().02 (0.1.?ti) U.Q? (0.(ft31 f.f.03 (l3.(s)
>o (ifi�1.31 o.ln (47.4) o.?Q (u.7(>} O.tt) (0.38) c).o7 {U.2G) U.I7 ((�s.o)
l00 (378.i) 0.2U {90.7} 0.4U (1.51) t).20 ({}.7C;) l).!7 (O..S?) ().30 (14C.I)
� 2()0 (?�7.1j 0.40 (181.4) O.fiO (3.(.),) 0.40 (1.51) 0.3!) {1.14) O.Ciif (7.72."�}
° Atilt)URCti i)��(1t�ILLll1 i3y pc�chlorire are 6 1tiC(� Ofl COIICCtlCf.4CIC113ti OF 1Y8II:lf53C Cl7I(?CI1SC �ly �`C)IUIIIC. FiJi E'ICI7Ct tiO�1U111
' hypochl�rcit� vr �.iicium Iay pe�cliloritr, exten�Iecl or irnE�resE�er storat�e of�cfiei�ticals ��i ca��se a li�ss ot .z�•;iilah!e
chlurine.. Alsu, amaunts �lo not takz intc� acraunt chlori��z clrm or ch�oriiiz re�iilual th at i�ii�fic be prrsr.nt in
the w-ater.
,
'
a
�
t
t
�
�
�
'
' Copyri�hi �u 2�1 �I American Water Works Association. Ali F2i�hts Reserved.
� _ _�� lf .
D'asposal of'�Iighly �hlorinatecl Water
71iis �z�pf�itr.�it• r.� for• iu f01711llti011 071I) rxr�d is uor �t p��•tofA!\TSI/�. CG5?.
Refer �a f1N.Sl/AW l�1%'1� Cti��.
l. Ch�ck �4•ith chc local sctver dc��aru�icnt for thc conclitions of disposal co
�lie sa��irar�r seivcr.
2. C:hlorinc: residual of �va�er bein; dis��oscd of d�rill bc �ZCUtl�alizcd b;�� �rcat-
I1lClli VVlC�1 O11C n� II1C C%1C111kCdL5 IISC�C� lIl "lablc C.1.
lable C.1 Amounts of che�nica! requlred to neutralize various residua! chlor�ne concen-
trations in 100,Om0 gal (378 m of wacer
�,�iC[111C:31 RCCllfll'i'(1
iZCSICiLt3 �
C:hlorinc Su(Eur Dio�idc Soclium Bisulhte Sodium Sulfic� Sodium l�iiosultare
Concrntration (St)�l (�lal-iSt)3) (\fazSC);l (ti'a�S�U;•S�IzC)j
nrg/L IG (k;; ) 1G (Irg) IL (kg) lb (k� j
1 U.8 (0.36) 1.2 (0.54) 3.4 (().(,4) !.� (0.54)
2 1.;� {c�.7!) 2...� ii.i3) 2.9 {i.��2) ?.4 (t.(?9}
1(� 8.3 (3.7G) ]2.; (5.G7) 14.G (G.G2) 12.0 (j.44)
5U 4t.? (I8.y1) C'Z.G (��3.39} 7�.0 {3:i.11) Gt.}.0 ('?7.22)
1.�
C�pyright cc� 203 i Amencan Waier JVorks Association All �ic�lits R�served