Loading...
HomeMy WebLinkAbout04/01/2015 6C . foC AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Approval of Grants for Study Session Date: March 25, 2015 Transportation Projects COUNCIL MEETING Date: April 1, 2015 Department: PW& U Presenter: Tom Knuckey Phone: (360) 473-2376 SUMMARY: The City has been awarded three grants to design and construct transportation improvements citywide. (1) Bremerton Crosswalk Improvements - a $692,000 grant from the Puget Sound Regional Council for non-motorized improvements at several intersections. (2) Austin Drive Pavement Preservation -a $692,000 grant from the Puget Sound Regional Council for a pavement overlay of Austin Drive from Kitsap Way to Erlands Point Road. And (3) Bremerton Highway Safety Improvements Phase 2—a $1,085,100 grant from WSDOT for intersection safety improvements. All three grants will be in WSDOT standard form with their standard terms and conditions. ATTACHMENTS: Site maps for each grant FISCAL IMPACTS (Include Budgeted Amount): The Bremerton Crosswalk Improvement grant requires a 13.5% match ($108,000) identified to come from the Street Fund; the Austin Drive grant requires a 13.5% match ($108,000) identified to come from the TBD; the Bremerton Highway Safety Improvements grant requires a 10% match for design only ($14,900) identified to come from the Street Fund. STUDY SESSION AGENDA: 0 No Presentation ❑ Full Presentation STUDY SESSION ACTION: ❑ Consent Agenda ® General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve Local Agency Agreements with WSDOT for the Austin Drive Pavement Preservation project, the Bremerton Crosswalks Improvement Project, and the Bremerton Highway Safety Improvements Project Phase 2 and authorize the Mayor to finalize and execute the agreements with substantially the same terms and conditions as presented. COUNCIL ACTION: [�Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/07/15