Loading...
HomeMy WebLinkAbout4486 Contract Number: 4486 Vendor: CH2M HILL � Subject: Consultant - Wastewater Treatment Plant Upgrade Department: Engineering File Class: LEG 12-1 Begin Date: 04/O1/2005 End Date: 10/31/2009 Review Date: 02/15/2011 Vault Date: O1/Ol/2011 � Comments: Amendment #1-12/06 #2-12/08 f CONTRACT MODIFICATION AGREEMENT NO.2 BETWEEN THE CITY OF BREMERTON AND CH2M HILL WASTEWATER TREATMENT PLANT UPGRADE, PROJECT NO. 5020 PROJECT Wastewater Treatment Plant Upgrade, Proiect NO. 5020 CONSULTANT CH2M Hill DATE November 7, 2008 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE PROFESSIONAL SERVICES AGREEMENT (the "Contract") entered into between the City of Bremerton and CH2M Hill on April 1, 2005. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section Exhibit A. I. Scone , is modified as follows: See Amended Scope of Work attached as Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by October 31, 2009. Section III. Comnensation , is modified as follows: The original contract amount was Five Hundred Four Thousand Thirteen Dollars and 23 cents ($ 504.013.23). Contract Modification Number 1 increased the budget by Eighty Six Thousand Two Hundred Thirty Dollars and 91 cents ($ 86.230.91) for a total current contract amount of Five Hundred Ninety Thousand Two Hundred Forty Four Dollars and 14 cents ($ 590.244.14). The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed Fifty One Thousand Six Hundred Ten Dollars and 14 cents ($ 51.610.14) for a total amended contract amount of Six Hundred Forty One Thousand Eight Hundred Fifty Four Dollars and 28 cents ($ 641.854.28), including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant's claims for contract time and for all costs of any kind, including without limitation, costs of delays. related to any work either covered or affected by this CONTRACT MODIFICATION No.2 Project Number: 5020 Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process Initials and Date By Its TANT. t~ By Its DATE: DATE: /~/,^/of ATTEST: 1:rd~ City Cler NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Ned Lever Project Manager City of Bremerton Engineering Department 3027 Olympus Drive Bremerton, W A 98310 Phone (360) 473-2398 I Fax (360) 473-5398 Brady Fuller Proiect Manager CH2M Hill 1100 112th Avenue NE, Suite 400 Bellevue, W A 98009-2050 CONTRACT MODIFICA nON No.2 Project Number: 5020 2 Contract Modification No.2 Exhibit A - Scope of Work October 8, 2008 Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project I ntrod uction This contract amendment addresses the revised project scope and level of effort required for the services during construction, and project management activities for the WWTP Upgrade Project (Project). This amendment identifies tasks that supersede the applicable tasks in the original scope of work. The engineering services fees associated with this amendment supplements the original contract amount and other amendments and address the increased level of effort required. Task 6.0 Construction Services Task 6.01 Construction Support Activities The City Project Manager has requested that construction management documentation be organized using Microsoft Sharepoint software. Consultant has proceeded with preparing the Sharepoint interface and it is being used on the project, but will require additional scope . and level of effort to fully-fund and complete this work for the duration of the construction period. Consultant will do the following: 1) Designate Sharepoint Administrator (Cara Lockrem) as point of contact'for all Sharepoint related issues for Contractor and City. 2) Purchase software and required licenses for City, Contractor and Consultant to access the Sharepoint Site. 3) Customize site (based on existing template from another similar project) for Bremerton WWTP project. 4) Post materials (including requests for information with attachments, photos, contract documents, project correspondence, notice of intent, prevailing wage rates, and other documents as requested). 5) At conclusion of project, provide City with all project materials on Sharepoint site on a DVD disc for archiving purposes. 6) Maintain site during duration of construction contract. 7) Answer questions from Contractor and City regarding Sharepoint site use. 8) Troubleshoot Sharepoint site operational issues with City and Contractor as needed. 9) Provide Project Management services for the activities listed above. EXHIBIT A SDC 20081008 CONTRACT MOD 2 CONTRACT MODIFICATION #1: EXHIBIT A-SCOPE OF WORK ENGINEERING SERVICES FOR BREMERTON WWTP UPGRADE PROJECT Assumptions: All project correspondence to be posted to Sharepoint site shall be sent from City to Consultant Sharepoint Administrator with instructions for posting. As needed, RFI's will be posted to the site. City Responsibilities: Provide materials through normal course of construction contract to designated Consultant Sharepoint Administrator. Work Product: Maintain Sharepoint site and provide archive DVD within 30 days of Final Completion of project. Task 6.01 Construction Support Activities The office engineering services required of the project have been more than forecast. This amendment adds an allowance to fund additional project engineer time to provide the level of service requested and required by the City. The Consultant will continue to perform office engineering services including RFI review and response, submittal and resubmittal review, coordination with City Project Manager. Time of Performance No changes to existing Scope of Work. EXHIBIT _A_SDC_20081008 CONTRACT MOD 2 2 Contract Modification #2 Exhibit B - Compensation September 10, 2008 Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project Compensation for professional engineering services for the Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project was estimated in the Original Contract based on anticipated level of effort for engineering activities. Based on the description in Amendment #2 Exhibit A, the estimated level of effort was increased as shown in the following table. WORK TASK COST BREAKDOWN Task NO./Task Original Contract Contract Contract Total Description Amendment #1 Amendment #2 Compensation Task 1 - Facility Planning $105,634.19 ($5,427.54) $0 $100,206.65 Task 2 - Permitting I $16,155.32 ($16,155.32) $0 $0.00 Environ. Documentation Task 3 - STAG Grant $7,311.37 $967.09 $0 $8,278.46 Preparation Task 4 - Design Services $221,329.60 $92,635.00 $0 $313,964.60 Task 5 - Bidding Support $10,583.67 $0 $0 $10,583.67 Services Task 6 - Construction $74,308.29 $0 $ 51,610.14 $125,918.43 Services Task 7 - Project $55,255.99 $22,646.48 $0 $77,902.47 Management Task 8 - General $13,434.80 ($8,434.80) $0 $5,000.00 Contingency Total $504,013.23 $86,230.91 $51,610.14 $641,854.28 Contract/Amendment A. For the additional services described in Exhibit A of this Amendment #2, City will pay the Consultant compensation amounting to the labor billing rate for the employee multiplied by the time charged to this project, plus direct expenses. The labor billing rate is calculated by the employee's raw labor rate multiplied by a factor of 3.20, which is designated as the labor multiplier. The fee so determined shall be payable based on monthly statements submitted in a form acceptable to the City. The estimated not-to- exceed fees for the Project are set forth above. B. The following direct cost expenses are reimbursable. 1. Travel, subsistence, and incidental costs, at cost. EXHIBIT _B_SDC_20081008 CONTRACT MOD 2 CONTRACT MODIFICATION #1: EXHIBIT B - COMPENSATION ENGINEERING SERVICES FOR BREMERTON WWfP UPGRADE PROJECT 2. Use of motor vehicles on a mileage basis (Consultant's current standard rate) or rental cost basis, except as otherwise set forth herein. 3. Reproduction of reports, drawings, specifications, and other Project-related documents, at cost. 4. Postage and shipping charges for Project-related materials, at cost. 5. Charges of special consultants requested or authorized by the City. 6. Local taxes or fees applicable to the engineering work or payments thereof. 7. Charges for review of drawings and specifications by government agencies, if any. 8. Cost of acquiring any other materials or services specifically for and applicable to this Project, if approved by the City. 9. Rental charges for use of equipment, if approved by the City. C. Payments shall be made to the Consultant by the City based on the Consultant's invoice. Invoices shall be prepared no more frequently than once a month and shall be itemized to indicate the amount of work performed and the associated reimbursable expenses. Each statement shall indicate the name of the person for whose services compensation is being sought, the number of man-hours charged and the cost, in dollars, per man-hour. D. The entire amount of each statement shall be due and payable upon receipt by the City. E. It is understood and agreed that a delay, for any reason or cause, in the start of services by the Consultant shall not entitle the Consultant to additional compensation. F. It is understood and agreed: 1. That the Consultant shall start the performance of Services within 10 days of receipt of Notice to Proceed. 2. That the Consultant shall keep records on the basis of generally accepted accounting practice of costs and expenses which records shall be available for inspection at all reasonable times. G. The budget and rates for Tasks 1-4 were original based on calendar year 2005. Billing rates for activities that extend beyond the end of 2005 will be subject to an annual increase by 4 % to account for 2006 through 2008 salary increases. H. The Consultant understands that the City shall hold the Consultant to the "not-to- exceed" project budget versus holding the Consultant to each individual task and subtask level budget. The Consultant shall be allowed to move budget from one task to another if it is deemed (with concurrence from the City) that the budget allocated to a task may be in excess of that required to complete the task. The excess budget from one task shall only be moved to another task that is projected to require more funding than originally estimated. The Consultant will provide monthly updates of the budget status of all tasks to the City. EXHIBIT_B_SDC_20081008 CONTRACT MOD 2 2 Vendor Subject Department Status Code Amount Begin Date End Date Review Date Insurance Comments Contract Number 4486 CH2M HILL Consultant - Wastewater Treatment Plant Upgrade Engineering PRO File Class LEG 12-1 $590244.14 04/01/2005 12/31/2008 11/01/2008 GL AL E&O $5000000.00 $2000000.00 $1000000.00 Insurance Total Insurance Review Date $8000000.00 05/01/2007 Amendment #1-12/06 CONTRACT MODIFICATION AGREEMENT NO.1 BETWEEN THE CITY OF BREMERTON AND CH2M HILL WASTEWATER TREATMENT PLANT UPGRADE, PROJECT NO. 5020 PROJECT Wastewater Treatment Plant Upgrade, Proiect NO. 5020 CONSULTANT CH2M Hill DATE December 7, 2006 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE PROFESSIONAL SERVICES AGREEMENT (the "Contract") entered into between the City of Bremerton and CH2M Hill on April 1, 2005. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section Exhibit A. I. Scope , is modified as follows: See Amended Scope of Work attached as Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by December 31, 2008. Section III. Compensation , is modified as follows: The original contract amount was Five Hundred Four Thousand Thirteen Dollars and 23 cents ($ 504.013.23). The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed Eighty Six Thousand Two Hundred Thirty Dollars and 91 cents ($ 86.230.91) for a total amended contract amount of Five Hundred Ninety Thousand Two Hundred Forty Four Dollars and 14 cents ($ 590.244.14), including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. This Contract Modification does not limit the City's right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. CONTRACT MODIFICATION Project Number: 1 This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director 'pv<Ovod to pro"G# /2-/ i5/ob Initials and Date CONSU~TAN~~ _ ~. / ~~ Vi~"'''';:J' n'tY ERTON ~ DATE: ~~ \Sl~ DATE: $-;;(0--0 {;; TO FOl ATTEST: NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Ron Brown Vice President CH2M Hill 1100 llih Avenue NE, Suite 400 Bellevue, W A 98009-2050 Ned Lever Project Manager City of Bremerton Engineering Department 3027 01ympus Drive Bremerton, W A 98310 Phone (360) 473-2398 / Fax (360) 473-5398 CONTRACT MODIFICA nON Project Number: 1 2 Contract Modification No. 1 Exhibit A - Scope of Work December 7,2006 Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project Introduction This contract amendment addresses the revised project scope and level of effort required for the final design and project management activities for the WWTP Upgrade Project (Project). The scope of the Project was revised based on the outcomes from the facility planning activities of the original contract. This revised scope of this amendment is reflected in the following scope of work description. This amendment identifies tasks that supersede the applicable tasks in the original scope of work. The engineering services fees associated with this amendment supplements the original contract amount and address the increased level of effort required. Task 4.0 Design Services The Consultant will provide final design services for the proposed Bremerton WWTP Upgrade, as defined under Basic Services of this Agreement. Final design activities include engineering services required to develop contract documents suitable for bidding purposes. Contract documents will include construction plans and specifications, and the engineer's construction.cost estimate. Task 4.02 - Preparation of Contract Documents Consultant will prepare final design drawings and specifications for the contract bid documents for the construction of the Bremerton WWTP upgrade. Final design activities include the development of design drawings and specifications for the following design discipline areas (number of revised drawings included): · General, (9) · Process Mechanical, HV AC, and Plumbing (15) · Civil Site, (5) · Architectural and Structural, (8) · Electrical, and Instrumentation and Control (13) · Process and Instrumentation Diagrams (4). Assumptions: A revised estimate of 54 construction drawings was estimated for the Project to complete design of improvements to fully expend the City's revised construction budget. The Project was defined in detail at the conclusion of Task 1.0- Facility Planning. The level of effort for the Instrumentation and Controls (I&C) work still assumes that the City will conduct the system integration for software development, and startup services. CONTRACT MODIFICATION #1: EXHIBIT A - SCOPE OF WORK ENGINEERING SERVICES FOR BREMERTON WWTP UPGRADE PROJECT City Responsibilities: The City will provide to the Consultant, applicable design requirements, standards, equipment preferences, and applicable general condition documents including bidding documents prior to preparation of final design drawings. Work Products: Eight (8) copies of the 50-percent and 90-percent design drawings, technical specifications, and construction cost estimate for the contract package. One (1) full size (22" x 34") set and one (1) half size (11" x 17") set of the lOa-percent design drawings on bond paper, plus technical specifications and applicable City of Bremerton legal documents including Division a, and final construction cost estimate for the contract package. An electronic copy of all lOa-percent deliverables will also be provided on a Compact Disc (CD). Final deliverable of the bid drawings will be converted to AutoCAD format and delivered to the City. Task 4.02.01 - Construction Drawings and Specifications The Consultant will prepare 50- and 90-percent design drawings using Computer Aided Designand Drafting Software (CADD) for submission to and review by the City. Fifty- percent design review drawings will adequately define the location, layout, and dimensions of the applicable process and support structures, and equipment. A preliminary draft of the major equipment and building materials specifications and the front end bidding documents will be provided with the 50-percent design review package. The Consultant's standard technical specifications will be used for the Project. City review of submittal package is anticipated to occur during a two-week period after receipt of the 50-percent design drawings and specifications. The Consultant will continue preparation of the design drawings after receipt of the 50-percent design review comments from the City. Ninety-percent design review drawings will include complete design of all design disciplines defining site and building layout, pipe routing and equipment location, process and building structure construction features and details. A draft version of the Consultant's standard technical specification, modified as needed for this project, and a draft of City of Bremerton legal documents will be provided with the 90-percent design review package. City review of submittal package is anticipated to occur during a two-week period after receipt of the 90-percent design drawings and specifications. The Consultant will continue preparation of the design drawings after receipt of the 90-percent design review comments from the City. The Consultant will deliver two (2) half size sets of the 90-percent drawings and specifications to the DOE for final review. The Consultant will respond to comments from the City review of the 50- and 90-percent design submittal and modify the design drawings as appropriate. Comments from the City will be solicited during the interim design review workshops. The Consultant will respond to written comments from the DOE review of the 90-percent design submittal and modify the design drawings as appropriate. The Consultant will conduct a technical and constructibility review of the construction drawings at the 50- and 90-percent completion stage of the final design activities. Assumptions: For budget purposes it is assumed that the Consultant will discontinue major design work activities until after receiving review comments from the City. Task 4.02.04 - Biosolids Hauling Truck Procurement (Scope Deleted from Project) EXHIBIT _A_FINALDESIGN_120706.DOC 2 1 '1~ CONTRACT MODIFICATION #1: EXHIBIT A - SCOPE OF WORK ENGINEERING SERVICES FOR BREMERTON ~P UPGRADE PROJECT Task 7.0 Project Management The Consultant will provide project planning, management, work and budget status evaluation and reporting, and quality and cost control activities for the duration of all phases of the Project as defined in the following sections. Task 7.02 Project Management, Status and Reporting Meetings The Consultant will, in addition to the technical portion of the project, provide general project management and administrative activities to facilitate the successful completion and delivery of the Project to the City. The Consultant will perform project monitoring and control functions such as coordination of project activities, facilitating quality assurance reviews, monitoring project budget and schedule, preparation of miscellaneous project correspondence, project status reporting, conducting periodic progress meetings, preparation of invoices, and overall management of project activities. General project management and technical quality control and assurance activities are included as an ongoing part of the individual technical tasks. The Consultant will provide the City with project progress, budget and schedule status monthly with submission of each invoice. Status report will include percent complete and percent spent by task. The Consultant will attend periodic status report meetings with the City throughout the duration of the Project. Assumptions: Facility planning activities will be conducted through November 30, 2006 or for a period of 19 months. Final design activities will commence beginning October 2006 and proceed for a period of 9 months. Bidding and Construction Services will commence in July 2007 and proceed for a period of 1~ months. Projec~ management activities will be required for a period of 43 months. City Responsibilities: None. Work Product: The Consultant will prepare project status reports to accompany each invoice submitted to the City Time of Performance The duration for each task as assumed in the Original Contract and the revised task durations based on the revised Project scope is shown in the following table. The Project was placed on hold due to lack of available funding shortly after the original notice to proceed. The Project duration is now estimated to extend through November 2008. PROJECT TASK DURATIONS Task Activities Task Duration Original Contract 6 months 6 months 12 months 23 months Task Duration Amendment #1 19 months 9 months 15 months 43 months Tasks 1 through 3 - Planning, Permitting, and Funding Activities Task 4 - Final Design Activities Task 5 through 6 - Bidding and Construction Support Activities Task 7 - Project Management Activities The Consultant will continue to make every effort to complete the work in a timely manner. However, it is agreed that the Consultant cannot be responsible for delays occasioned by EXHIBIT _AJINALDESIGN_120706.DOC 3 CONTRACT MODIFICATION #1: EXHIBIT A - SCOPE OF WORK ENGINEERING SERVICES FOR BREMERTON ~P UPGRADE PROJECT factors beyond his control, nor by factors that could not reasonably have been foreseen at the time the Original Agreement or supplemental Amendment were executed. EXHIBIT _A_FINALDESIGN_120706.DOC 4 ,t 1;:' :~. Contract Modification #1 Exhibit B - Compensation December 7,2006 Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project Compensation for professional engineering services for the Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project was estimated in the Original Contract based on anticipated level of effort for engineering activities. Based on the revised Project as defined in the outcomes from Tasks 1 through 3, the estimated level of effort was increased as shown in the following table. WORK TASK COST BREAKDOWN Task NO./Task Description Original Contract Contract Total Amendment #1 Compensation Task 1 - Facility Planning $105,634.19 ($5,427.54) $100,206.65 Task 2 - Permitting I Environ. Documentation $16,155.32 ($16,155.32) $0.00 Task 3 - STAG Grant Preparation $7,311.37 $967.09 $8,278.46 Task 4 - Design Services $221,329.60 $92,635.00 $313,964.60 Task 5 - Bidding Support Services $10,583.67 $0 $10,583.67 Task 6 - Construction Services $74,308.29 $0 $74,308.29 Task 7 - Project Management $55,255.99 $22,646.48 $77,902.47 Task 8 - General Contingency $13,434.80 ($8,434.80) $5,000.00 Total Contract/Amendment $504,013.23 $86,230.91 $590,244.14 A. For the additional services described in Exhibit A of this Amendment #1, City will pay the Consultant compensation amounting to the labor billing rate for the employee multiplied by the time charged to this project, plus direct expenses. The labor billing rate is calculated by the employee's raw labor rate multiplied by a factor of 3.20, which is designated as the labor multiplier. The fee so determined shall be payable based on monthly statements submitted in a form acceptable to the City. The estimated not-to- exceed fees for the Project are set forth above. B. The following direct cost expenses are reimbursable. 1. Travel, subsistence, and incidental costs, at cost. 2. Use of motor vehicles on a mileage basis (Consultant's current standard rate) or rental cost basis, except as otherwise set forth herein. 3. Reproduction of reports, drawings, specifications, and other Project-related documents, at cost. 4. Postage and shipping charges for Project-related materials, at cost. EXHIBIT _B_FINALDESIGN_120706 (3).DOC CONTRACT MODIFICATION #1: EXHIBIT B - COMPENSATION ENGINEERING SERVICES FOR BREMERTON WWTP UPGRADE PROJECT 5. Charges of special consultants requested or authorized by.the City. 6. Local taxes or fees applicable to the engineering work or payments thereof. 7. Charges for review of drawings and specifications by government agencies, if any. 8. Cost of acquiring any other materials or services specifically for and applicable to this Project, if approved by the City. 9. Rental charges for use of equipment, if approved by the City. C. Payments shall be made to the Consultant by the City based on the Consultant's invoice. Invoices shall be prepared no more frequently than once a month and shall be itemized to indicate the amount of work performed and the associated reimbursable expenses. Each statement shall indicate the name of the person for whose services compensation is being sought, the number of man-hours charged and the cost, in dollars, per man-hour. D. The entire amount of each statement shall be due and payable upon receipt by the City. E. It is understood and agreed that a delay, for any reason or cause, in the start of services by the Consultant shall not entitle the Consultant to additional compensation. F. It is understood and agreed: 1. That the Consultant shall start the performance of Services within 10 days of receipt of Notice to Proceed. 2. That the Consultant shall keep records on the basis of generally accepted accounting practice of costs and expenses which records shall be available for inspection at all reasonable times. G. The budget and rates for Tasks 1-4 were original based on calendar year 2005. Billing rates for activities that extend beyond the end of 2005 will be subject to an annual increase by 4% to account for 2006 through 2008 salary increases. H. The Consultant understands that the City shall hold the Consultant to the "not-to- exceed" project budget versus holding the Consultant to each individual task and subtask level budget. The Consultant shall be allowed to move budget from one task to another if it is deemed (with concurrence from the City) that the budget allocated to a task may be in excess of that required to complete the task. The excess budget from one task shall only be moved to another task that is projected to require more funding than originally estimated. The Consultant will provide monthly updates of the budget status of all tasks to the City. EXHIBIT _B_FINALDESIGN_120706 (3).DOC 2 +--------------------------------------------------------------------------+ ::Press Esc Key to Insert new record, Ctrl-Z to Clear form =1= ::Press Del Key to Terminate Insert Mode INSERT Contract Number T +Vendor Name +Subject =l=Department =l=Status Code + 9= y Press F1 for + valid insurance 9= type codes =1= + Comments Contract Maintenance 4486 CH2M HILL CONSULTANT - WASTEWATER TREATMENT PLANT UPGRADE ENGINEERING PRO Insurance Type Amount y =1= Amount Begin Date End Date Review Date $504013.23 -- 05/03/2005 06/30/2007 =i= 05/01/2007 =1= + Insurance Total Insurance Review Date $0.00 =i= 06/01/2005 + =1= =1= NEED CERTIFICATE OF INSURANCE =i= =1= +--------------------------------------------------------------------------+ PROFESSIONAL SERVICES AGREEMENT Wastewater Treatment Plant Upgrade, Project No. 570 The City of Bremerton ("City") and CH2M Hill ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated A.p~' t ,200.5, including any attachments thereto, attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VILG. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) ofthis agreement. III. Compensation: In consideration ofthe services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed Five Hundred Four Thousand Thirteen Dollars and 23 Cents, ($504,013.23.) Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit B and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit B. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit B. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. Bremerton/CH2M Hill Wastewater Treatment Plant Upgrade, Project 570 Page 1 of6 IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of th,e benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing: If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. Bremerton/CH2M Hill Wastewater Treatment Plant Upgrade, Project 570 Page 2 of6 VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: 1. Automobile Liabilitv insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liabilitv insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCV) if applicable; and employer's liability; and 3. Excess Liabilitv insurance with limits not less than 1,000,000 limit per occurrence and aggregate. 4. Professional Liabilitv insurance with limits no less than $1,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a "claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements upon the tender of any claim to the insured based on this contract. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. Bremerton/CH2M Hill Wastewater Treatment Plant Upgrade, Project 570 Page 3 of6 VII. General Conditions: A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Bellevue, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. c. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Bellevue, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. Bremerton/CH2M Hill Wastewater Treatment Plant Upgrade, Project 570 Page 4 of6 F. Severability: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. G. Modification: This Agreement may only be modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Consultant Address City of Bremerton 345 6th Street Suite 600 Bremerton, W A 98337 CH2M Hill 1100 11ih Avenue NE Suite 400 Bellevue, W A 98009-2050 I. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. J. Non-Waiver of Breach: The failure ofthe City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. K. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. N. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, or disability, except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City of Bremerton Bremerton/CH2M Hill Wastewater Treatment Plant Upgrade, Project 570 Page 5 of6 for convenience. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non- performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Party's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. A. Excusable Delavs: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. c~ By: b1h11d- ;>().f~\'\0oV\ its: Vlt(! Y{isidQl!\t Date: 4-}lD. oS" By: its: Date: ...1"- (~ w 05 C:\Docurnents and Settings\chalvers\Local Settings\Ternporary Internet Files\OLK4\Brernerton FINAL PSA _ 033005.doc Bremerton/CH2M Hill Wastewater Treatment Plant Upgrade, Project 570 Page 6 of6 Exhibit A - Scope of Work Date: April 1, 2005 Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project Introduction The purpose of this scope of services is for CH2M HILL, Inc. ("Consultant") to provide facility planning, design, permitting, bidding assistance, and construction services for the Bremerton WWTP (BWWTP) Upgrade Project (Project) for the City of Bremerton, Washington ("City") as described herein. The Project includes: . Facility planning to prioritize and establish the scope of the proposed improvements . Permitting services related to NEP A and SEP A . Preparation of funding application for a STAG grant. . Final design services for the scope of improvements identified in the Facility Plan Amendment . Bidding and construction services for the Project It is understood that proposed improvements to the WWTP include: . Two Gravity Belt Thickeners (GBTs) to replace function of existing Dissolved Air Flotation Thickener (DAFT) . One Dewatering centrifuge, and biosolids cake pumping system . Single bay truck loading facility . Procurement of biosolids hauling vehicle(s) . Odor control system improvements associated with project elements . Replace existing engine generators with new backup electrical power generation equipment and associated electrical improvements. . One new boiler . Replacement of existing slide or sluice gates with new gates . Addition of a headworks screen . Sitework and yard piping associated with proposed improvements The anticipated work products are listed following each task description. Work products include deliverab1es such as draft reports, Technical Memoranda (TMs), data evaluations, calculations, and mapping developed for review by City staff. All reports and TMs will initially be submitted in draft form (5 copies) for review by the City. Deliverables will be finalized based on incorporation of City comments. Only one review submittal will be provided. Multiple reviews of draft deliverables have not been assumed nor budgeted in each task budget. Review drawing sets will be submitted in half-size format (11" x 17") unless requested otherwise. Comments on draft deliverables (provided in a single comment EXHIBIT A - SCOPE OF WORK BREMERTON WWTP UPGRADE PROJECT set prepared and organized by the City) will be provided to the Consultant by the City within fifteen working days after receipt of the draft deliverable. Comments will be incorporated into the final deliverables. All final deliverables will be submitted in electronic format using Microsqft(M'S) Office products and in hard copy. The City will make its facilities accessible to Consultant staff as required for Consultant's performance of its services and upon request by Consultant. The City will provide labor and safety equipment as required by Consultant for such access. City will perform, at no cost to Consultant, such tests of equipment, machinery, pipelines, and other components of City's facilities as may be required in connection with Consultant's services. Basic Services The Consultant will perform the technical analysis and evaluation, facility planning, permitting, grant application, and design services for Project. The Consultant will evaluate alternatives and make recommendations regarding the project elements, facilities design criteria and locations, and opinions of costs for construction of facilities under the facility planning tasks. The Consultant will also develop construction drawings and specifications suitable for bidding and construction under the design tasks. Bidding services will be provided including preparation of addenda, administering pre-bid meeting, and answering bidder questions as directed by City. Construction services will include submittal review, answering Request for Clarifications, preparing change orders for City approval, performing periodic site visits, and technical assistance provided via telephone and correspondence as directed by City. Work will proceed on a task by task basis only with authorization from the City to the Consultant. Additional tasks not specifically addressed in the following Scope of Work will not proceed without prior written authorization from the City. Engineering design will be in accordance with applicable requirements of the following resources and codes: . The latest version of "Criteria for Sewage Works Design" (the Orange Book) published by Washington State Department of Ecology (DOE) . "Standard for Fire Protection in Wastewater Treatment and Collection Facilities - NFP A 820" published by the National Fire Protection Association. . 2003 International Building Code (IBC) as adopted by City of Bremerton This scope of work assumes that City will obtain an exemption to compliance with Washington State Energy Code (WSEC) for Project. Substantial calculations would be required if compliance with the WSEC is required, and compliance would be difficult and expensive to achieve due to work in existing structures. The Scope of Work of the Consultant is described in more detail under the following tasks: . Task 1 - Facility Planning . Task 2 - Permitting and Environmental Documentation . Task 3 - STAG Grant Application . Task 4 - Design Services . Task 5 - Bidding Services . Task 6 - Construction Services 2 EXHIBIT A . SCOPE OF WORK BREMERTON WWfP UPGRADE PROJECT . Task 7 - Project Management . Task 8 - Contingency A fee estimate summary for payment to the Consultant for each work task is provided as Exhibit B to this Agreement. Task 1.0 Facility Planning The Facility Planning task will evaluate and select alternatives and present preliminary layouts of the project elements under consideration. A Facility Plan Amendment will be prepared to satisfy DOE requirements. The preliminary drawings presented in the Facility Plan Amendment will serve as the basis of design development, which will follow immediately after the Facility Planning Task. No alternative analyses will occur after Facility Planning. The Consultant will develop preliminary design and sizing requirements for each of the upgrade elements and appurtenances under evaluation. For each upgrade element, a one- page 11lx17"summary will be prepared depicting a plan or process schematic, design criteria and proposed equipment information, capital cost, operating costs, and life cycle cost analysis. Advantages and disadvantages will be identified for each element. Special system requirements such as materials of construction, process controls, or support systems will be identified and documented. o Preliminary layouts of each project element will be prepared. This task will include development and evaluation of alternatives (for example, at least two GBT location alternatives will be developed and evaluated). Field visits accompanied by City staff to develop understanding of required improvements will be performed under this task. Capital cost estimates used on the one-page summaries will be performed based on the preliminary drawings developed in this task. Cost estimates will include allowances for design costs, and construction management. Specific activities and task descriptions are presented in the following sections. Task 1.01 - Project Kickoff and Partnering This task includes the project kickoff and partnering activities for the WWTP upgrade project. Partnering defines the project team's purpose, scope, goals, behaviors, roles, and responsibilities, and other elements that give the team clarity of purpose essential for high quality performance. Also included in this task is the data and drawing request to the City, and refinement and City confirmation of the design criteria. The Consultant will conduct a project kickoff meeting with DOE to discuss their requirements for a Facility Plan amendment, review requirements and schedule, and to discuss any additional needs that will be required to facilitate project approval, environment documentation needs, and grant funding application. The Consultant will prepare and distribute meeting minutes documenting all meetings to the participants. Task 1.01.01 Kickoff Meeting One workshop will be conducted to discuss City preferences and establish background information sufficient to start the project. The workshop will be used to gain endorsement of 3 EXHIBIT A - SCOPE OF WORK BREMERTON wwrp UPGRADE PROJECT City and Consultant staff regarding project contents and frame the decisions that are necessary to guide the development of the Project. The workshop will focus on: . Defining the essential decisions that are critical to project success, and information desired to support making such decisions . Establishing the initial criteria, and the initial weighting of the each criterion, that will be used in prioritizing project elements for inclusion in the project . City's preference for level of process automation and summary of SCADA requirements . Confirm City's preferred order of implementation (i.e. centrifuge system goes first, then GBT's, etc) . Discussion of each unit process or piece of equipment to be evaluated in facility planning . Description of Consultant's proposed prioritization process . Understanding of process shutdown constraints . Details of current biosolids truck hauling practice and any preferences related to hauling equipment . Discussion of backup power needs and critical! essential electrical loads . Request for City-provided information . City equipment numbering conventions and direction for additional numbering During the kickoff meeting, City's input will be sought to clearly establish aspects of the project that are of overarching importance, City's perceptions on quality, and particular risks faced by the project team. Specific quality metrics will then be established. Assumptions: Workshop will be offended by Consulfmtt stnjf: Ron Brown/ Brmly Fuller, IlItd Pot Burke. City Responsibilities: Stnjf will porticipote in kickoff meeting IlItd provide relfuested in/onnmion witltin 14 colendor dtl!fs qfreceiptqfrelfuest Work Products: Meeting ogendo/ Meeting minutes from workshop/ (electronic ftnnot prepnred by Consulfmtt, hnrdcopy printouts qf results). Task 1.01.02 Data Gathering and Information Requests The Consultant will identify and request from the City information that will be used to develop the design criteria for the facility plan amendment for the proposed treatment facilities upgrades. Additional or more recent data will be compiled as needed for the development of the Facility Plan Amendment. Anticipated plant information includes the following: . Past two years of plant operating data, furnished in Microsoft Excel@ electronic format . Current and proposed (if appropriate) NPDES discharge permit including biosolids disposal requirements. . Appropriate as-built construction drawings for treatment and conveyance facilities including odor control system, and existing dewatering centrifuge facility drawings. Electronic CAD files for these facilities will be provided, if available. . Previous facility plans, engineering reports, and studies relating to the BWWTP. 4 EXHIBIT A - SCOPE OF WORK BREMERTON WWTP UPGRADE PROJECT Assumptions: All previously received daln will be used as appropriate. Additional daln rel/uests will be made to lite City in writing willtin two weeks of receiving Notice to Proceed. Consultontwill reasonably rely upon lite accuracy, timeliness, and completeness of lite information provided by City. Consullnntwill rely on as-built dimensions and uhlity locations as shown on existing drawings as basis of altemahve evaluations, layout and design of new ftcilities. Gty Responsibilities: l7te City will provide all daln rel/uested willtin two weeks of receiving lite written rel/uest Daln rel/uested will be submitted to lite Consullnntin electronic format to 'ke greatest extentpossible. Work Product: Memorandum presenting daln and information rel/uests. Task 1.01.03 Refine Design Criteria The Consultant will review and evaluate the current plant operating data. Historical flow, loading and plant operating conditions from the last 2 years will be evaluated to characterize the plant operating conditions and compare to original design parameters for the WWTP. The Consultant will use the mass balance information as provided by the City, as the basis of the design criteria for the proposed improvements to the solids handling facilities. No additional analysis or process modeling will be conducted. The Consultant will also review the existing primary power supply to the BWWTP site. The Consultant will develop preliminary design and sizing requirements for the treatment facilities and determine the power requirements for the proposed project elements. The adequacy of the existing power supply and distribution system will be compared to the requirements for the proposed facilities. The City will direct the Consultant in the backup power capacity required for the Project. Assumptions: No process modeling will be conducted. Analysis of lite power needs will be based on lite electrical power rel/uired by existing plantfactlities plus projectelements defined in litis scope of work. Gty Responsibilities: Work willt Consultontstaff to identffy and prion"tize electrical loads eligible for backup power. .Review Consultonfs recommendahons for design criteria for proposed improvements. Work Product: Technical memorandum summarizing lite design criteria for each project element For CRT and centriftge litis will include rated unitprocess capacity based on WAS; Primary Sludg~ and Digested Sludge production (as appropriate) as calculated in litis task. Task 1.01.04 Meeting with DOE Following the kickoff meeting Consultant and City staff will meet with DOE's regional engineer Mike Dawda and the designated STAG funding manager to gain agreement on facility planning and funding application approach to project. A Facility Plan Amendment will be the proposed planning document, in lieu of a more extensive Facility Plan, which will allow more rapid completion of project definition and prioritization. Assumptions: Two meetings are assumed. One initial meeting followed by anollter to present and review lite dr'!fi Facility Plan. A tolnl of IItree Consultont staff wtll attend each meeting. 5 EXHIBIT A - SCOPE OF WORK BREMERTON wwrp UPGRADE PROJECT City Responsibilities: A ttend each 0/ two meetings. Work Products: Fncilily PIIU/ Amendment Outline IU/d Drn/f Funding Application Task 1.02 - Schematic Design Development Schematic design development services provided by the Consultant will include, in general, the initial data collection, the development of planning and design criteria, the development and evaluation of alternatives, the sizing and preliminary layout of the recommended improvements, and development of a Facility Plan amendment. The Facility Plan amendment will meet the DOE requirements and will form the basis of final design activities. Specific schematic design development activities and task descriptions are presented in the following sections. Task 1.02.01 Define and Evaluate Facility Upgrade Components The Consultant will define and evaluate each upgrade component, as listed below, for the facility upgrades to be prioritized and identified for further development. The requirements of NFP A 820 and other related building codes will be identified, as appropriate. Headworks Improvements . Headworks screen Treatment Plant Redundancy Improvements . Engine generators . Boiler Solids Thickening Improvements . Gravity Belt Thickeners (GBTs) Solids Dewatering Improvements . Dewatering centrifuge Biosolids Loading Improvements . Biosolids cake pumping system . Truck loading facility . Biosolids hauling vehicle(s) . Odor control system improvements Misc. Treatment Plant Improvements . Slide gates . Sitework and yard piping The following activities will be performed for each project component, as appropriate. A one page summary deliverable will be prepared for each component, which will facilitate the prioritization of components to be implemented as part of this project. . Develop Process Flow Diagrams . Develop narratives for each unit process, including key elements, performance and expected reliability, and related facility assumptions. . Develop preliminary design criteria . Select and determine size requirements for major equipment . Define control system configuration . Develop sketches of facility with process equipment footprints, and building structure concepts. Alternatives for each option will be developed during this activity. . Prepare site layout 6 EXHIBIT A - SCOPE OF WORK BREMERTON 'NWTP UPGRADE PROJECT . Develop preliminary costs, including capital, annual, and life-cycle costs Assumptions: Only budgetory costs will be developed. Detniled engineering cost estimates will be developed as part qf the Design Services to be described under Task 4.tJ. Oty Responsibilities: None. Work Product: One page summaries nccompanied by brief technical memorandum summarizing presented alternatives. Task 1.02.02 Prioritization of Facility Upgrade Components After the one page project element summaries are submitted to City for review and comment, the Consultant will facilitate a workshop with City staff to review each facility upgrade component and discuss the upgrade features, advantages and disadvantages. During the workshop, the City and Consultant will review and respond to City comments and questions, assist the City in prioritizing the list of facility upgrades to be implemented, and document the process for incorporation into the Facility Plan Amendment. Assumptions: l7te listed project elements will include preparation qf one-page summmies, and tabular statements qf advantages and disadvantages. A total qf three Consultant sltf/f will attend ench workshop. Oty Responsibilities: Attend workshop. Work Product: Brie/TechnicalMemorandum summarizing prioritized listqfproject elements Task 1.02.03 Prepare Draft Facility Plan Amendment The Consultant will prepare a draft Facility Plan Amendment document summarizing the analysis, preliminary design, analysis results, and recommendations completed under the facility planning activities. The Consultant will submit a detailed outline of the report for review by City staff prior to development of the report text. The Facility Plan Amendment will be contained in a single volume document, including the one page summaries (including cost estimates), preliminary drawings, and cost estimates. The Consultant will also prepare a draft Executive Summary chapter (approximately 5 pages in length, including tables and figures) targeted for non-technical audience. The Executive Summary may be published as a separate document for distribution at the City's discretion. The draft Facility Plan Amendment will be distributed to the City for review. City review comments will be incorporated and the draft will then be submitted to DOE. Calculations supporting process and equipment sizing will be prepared and included in Facility Plan Amendment as required by DOE. Assumptions: l7tis scope excludes developmentqfplantin.fluentwastewat.er .flows and load projections. Preparation qf Fncility Plan Amendment will base design values on existing data fitrnished by City. l7te preparation and organization qf supporting calculations for processes and elfufpmentis assumed to be relfuired by DOE based on other recent Fncility Plan experience. Supporting calculations WIll be presented at the minimum level qf detail to salis/!! DOE relfuirements. 7 EXHIBIT A - SCOPE OF WORK BREMERTON WWfP UPGRADE PROJECT Oty ResponsibDities: None. Work Product: Drtfi nnd final Fncility Plnn Amendment outline/ drtfi Fncility Plnn Amendment(5 copies with Executive Summnry). Facility Plnn Amendment will be published in one volume including IlJ'pendices nnd supporting technical memornndn. All documents will be provided electronically to the City in MS Word format for review. Task 1.02.04 Facility Planning Workshop The Consultant will attend and conduct design review workshop with the City at the end of the Facility Planning effort and prior to preparation of the 50-percent design drawings. Design issues, comments, and decisions will be presented and discussed during the Facility Planning Workshop. The intent of the workshop is to reach consensus on design issues that are developed during the schematic design phase and clearly define the recommendations for the proposed project components to be detailed in design development phase. The Consultant will document the meeting discussions and results. Assumptions: Workshop to be held in the Consulfmtts Bellevue office. A tolnl of three Consulfmttstnjfwill nttend the workshop. Oty ResponsibDities: City will attend workshop in the Consulfmtts Bellevue office. Wor~ Product: Workshop agenda nnd workshop minutes. Task 1.02.05 Prepare Final Facility Plan Amendment The Consultant will review and incorporate City and DOE comments on the draft Facility Plan Amendment and executive summary. The final report will be submitted within 30 days after receipt of written comments from the City and DOE. The Consultant will also provide electronic files of text, tables, and figures in MS Word, MS Excel, Microstation (translation to AutoCAD will be provided), or ArcView format as appropriate. Assumptions: None Oty ResponsibDities: None Work Product: Finn! Fncility Plnn Amendment(5 copies of the final version of the technical memornnda in Volum~'PllJ'er mtlSter nnd electronic file of Fncility Plnn Amendment nnd executive summary in MS Word nnd PDF format). Task 2.0 Permitting and Environmental Documentation Permitting and environmental documentation provided by the Consultant will include, in general, the preparation of the SEP A Checklist, the development of technical memorandum that describes the lack of environmental impacts resulting from the proposed work, and meetings with the associated permitting agencies, as described in detailed in the following sections. Tasks 2.01 and 2.02 are also described below, but budgeted under a letter agreement dated March 22, 2005. The scope of work for Tasks 2.03, 2.04, and 2.05 and the associated budgets are contracted under this agreement and not under the letter agreement. 8 EXHIBIT A - SCOPE OF WORK BREMERTON wwrp UPGRADE PROJECT Task 2.01 SEPA Checklist/NEPA Categorical Exclusion Documentation Consultant will prepare a project specific site plan and SEP A checklist in advance of meeting with EP A and DOE staff. Consultant will also prepare a brief memorandum documenting the project's lack of environmental impacts in support of a NEP A Categorical Exclusion. Consultant will communicate and meet with City of Bremerton Planning Department staff to verify local permitting requirements. Assumptions: l7tis level qf tflbrtis btlSed on lite tlSsumption lItot lite proposed project will sotisfY lite criteriofor 0 Cotegoricol Exclusion under NEPA. Itis tlSsumed lItotneillter IlIt Environmentol Assessmentnor IlIt EIS will be re'luired IlItd lItot EPA will be lite lend ogency for NEPA complimtce. Itis olso tlSsumed lItot lite City qf Bremerton WIll be lite SEPA leod ogencyllltd lItotsubmittnl qfo SEPA checklistwillresultin oDeterminotion qfNon- Significllltce (DNS) by lite City. Oty ResponsibDities: Attend meeting. Work Product: Project specflic site pllllt, SEPA checklist; IlItd memorllltdum. Task 2.02 Meeting with EPA and DOE Consultant will meet jointly with City, EP A and DOE permitting staff and present supporting evidence for designation of Categorical Exclusion under NEP A. Assumptions: One meeting willt EPA stnjf IlItd one meeting willt DOE sfo/}: A totol qf two Consultont stnjf will ottend eoch meeting. Oty ResponsibDities: Attend one meeting. Work Product: Meeting notes. Task 2.03 Environmental Information Document This task is a contingency to supplement the Task 2 activities completed under a separate contract, with work performed only after receipt of written direction from City. Should additional environmental documentation be required, an Environmental Information Document (EID) will be prepared to describe the environmental effects of the Bremerton WWTP Upgrade. The EID will serve to satisfy both NEP A and SEP A requirements as required by EP A, DOE, and the City of Bremerton. Assumptions: !f re'luired, on ElD would be limited in scope to no more IItIllt jive environmentnl elements IlItd no more IItIllt 20 poges in lengllt. An ollowllltce qf 96 hours qf Consultontstnjfis ollocoted to litis task. City ResponsibDities: Provision qfbockground informotion on existing site IlItd focililies. Work Product: Dr'!ft IlItd finol ElD (10 copies qf eoch plus one electronic copy). Task 2.04 . Develop List of Required Permits and Timelines The Consultant will prepare a listing of anticipated permits and approvals that will be required to implement the BWWTP improvements. For each permit and approval, a timeline with milestones will be developed. Preparation of permit applications and supporting documentation will be done during the Final Design (Task 6) phase of the project and is not included in this task. 9 EXHIBIT A - SCOPE OF WORK BREMERTON WWTP UPGRADE PROJECT Assumptions.' In mldition to environmentnl documentntion/ lite Project will relfuire a bUIlding permit IlItd possibly a grading permit Gty ResponsibDities: None. Work Product: Technical memorll11dum summarizing lite IlItticipated permi4 information need~ Il11d time/ines. Task 3.0 STAG Grant Application The City plans to finance the Project from an already-appropriated STAG grant and from funds collected through rates. This task will include completion of STAG grant application and coordination with DOE. Task 3.01 Grant Application Preparation The Consultant will assist the City in preparing one STAG grant application for submission to DOE. This assistance will include telephone and correspondence contact with DOE and EP A, one meeting with DOE and EP A, and preparation of application forms for the STAG grant. It is assumed that all other supporting documentation for the application will come from current City sources or from work to be completed under other tasks in this contract. Assumptions: One meeting will be attended by Consultant st# Ron Brown Il11d ftnnfftr Barnes. Gty ResponsibDities: Provide historical information Il11d ezistingfiles on STA G grll11t t1J1plication. Work Products: One completed grllltt t1J1plication pllCkage. Task 4.0 Design Services The Consultant will provide final design services for the proposed Bremerton WWTP Upgrade, as defined under Basic Services of this Agreement. Final design activities include engineering services required to develop contract documents suitable for bidding purposes. Contract documents will include construction plans and specifications, and the engineer's construction cost estimate. Task 4.01 - Additional Field Investigation The following activities include the additional field services required to complete the final design activities of the Bremerton WWTP upgrade. Task 4.01.01 . Topographical Surveys The City will perform topographical and boundary surveys as necessary for use in the preparation of the construction documents for the proposed Bremerton WWTP upgrade. The City will provide surveying services confirming location and elevation of the existing treatment facilities, yard piping, va1ving, and associated structures. The survey information 10 EXHIBIT A - SCOPE OF WORK BREMERTON wwrp UPGRADE PROJECT will be used to develop base maps for the site and facilities improvements recommended. Elevations will be based on the USGS datum. Assumptions: City will provide surueJ/ing. Oty Responsibilities: City wl71 provide surueJ/ing. Work Product: City will deliver topogrnphic surueJ/ bllSe mnps in electronic ftrmnt to lite Consultont Task 4.01.02 - Geotechnical Investigation The Consultant will review all available geotechnical information and assess the adequacy of the subsurface conditions of the project site for the proposed work under the WWTP upgrade project. The adequacy of the available information, and/ or necessity to supplement the available information will be determined in this task. Assumptions: !f mldifionnl subsuifnce explorntion is relfuired, n sepnrnte contrnct nmendmentwill be executed to mldress lite scope IlItd budget ftr lite work Oty Responsibilities: Provide 1lItJ/ previous geotechnicnl inftrmntion ftr lite existing ~ Work Product: None. Task 4.02 - Preparation of Contract Documents Consultant will prepare final design drawings and specifications for the contract bid documents for the construction of the Bremerton WWTP upgrade. Final design activities include the development of design drawings and specifications for the following design discipline areas: . Process Mechanical, . Civil Site, . Architectural and Structural, . Heating, Ventilating, and Air Conditioning (HV AC), and Plumbing, . Electrical, and Instrumentation and Control (I&C). Assumptions: A preliminnry estimnte of 36 construction drnwings were esfimnted ftr lite Projectto complete design ofimprovemenfs to fitlly expend lite Citys nnficipnted construction budget 17te esfimnted drnwings include lite ftllowing: . Cenernl- 6 Drnwings . P&lDs - 4 Drnwings . Site/ Civl7 - 2 Drnwings . Architecturnl/ Structurnl- 6 Drnwings . Process Mechlllticnl- S Drnwings . Electricnl/ I&C - 6 Drnwings . HVA C/ Plumbing - 4 Drnwings 17te Project will be difined in detnil nt lite conclusion ofT1lS1c 1'(J IlItd lite drnwing list will be revised nccordingly IlItd lite Consultonts scope IlItd budgetwI71 be revisited nt IItnt trine. 11 EXHIBIT A - SCOPE OF WORK BREMERTON WWTP UPGRADE PROJECT Ilte level 0/ effortfor lite Instrumentntion nnd Controls (I&e) work IlSsumes lItat lite City will conduct lite system integration for softwnre development, nnd startup seruices. Oty Responsibilities: Ilte City will provide to lite Consulfont, npplicable design relJuiremenls, sfondard~ nnd elJuipmentpriferences prior to prepnration 0/ final design drawings. Ilte City will also provide to lite Consulfont, npplicable general condition documents including bidding documents pnor to preparatron 0/9(J-percent design drawings. Work Products: Eight(9) copies 0/ lite 5(J-percent nnd 9(J-percent design drawing~ technical specfftcation~ and construction cost estimate for lite contrnctpnckage. One (1) full size (22 "x 34/ setnnd one (1) hal/size (11 "x 17/ seto/llte 1(J(J-percentdesign drawings on bond pnpe1; plus technical specflicatrons nnd npplicab/e City 0/ Bremerton legal documents . including Division ~ nnd final construction cost estrmate for lite contrnctpnckage. An electronic copy 0/ all 1(J(J-percentdeliverables will also be provided on a CompnctDisc (CD). Final deliverable 0/ lite bid drawings will be converted to AutoCAD fonnnt nnd delivered to lite City. Task 4.02.01 - Construction Drawings and Specifications The Consultant will prepare 50- and 90-percent design drawings using Computer Aided Design and Drafting Software (CADD) in Microstntion for submission to and review by the City. Fifty-percent design review drawings will adequately define the location, layout, and dimensions of the applicable process and support structures, and equipment. A preliminary draft of the major equipment specifications and the front end bidding documents will be provided with the 50-percent design review package. The Consultant's standard technical specifications Division 1 through 16 will be used for the Project. City review of submittal package is anticipated to occur during a two-week period after receipt of the 50-percent design drawings and specifications. The Consultant will continue preparation of the design drawings after receipt of the 50-percent design review comments from the City. Ninety-percent design review drawings will include complete design of all design disciplines defining site and building layout, pipe routing and equipment location, process and building structure construction features and details. A draft version of the Consultant's standard technical specification Division 1 though 16, modified as needed for this project, and a draft of City of Bremerton legal documents will be provided with the 90-percent design review package. City review of submittal package is anticipated to occur during a two-week period after receipt of the 90-percent design drawings and specifications. The Consultant will continue preparation of the design drawings after receipt of the 90-percent design review comments from the City. The Consultant will deliver two (2) half size sets of the 90-percent drawings and specifications to the DOE for final review. The Consultant will respond to comments from the City review of the 50- and 90-percent design submittal and modify the design drawings as appropriate. Comments from the City will be solicited during the interim design review workshops. The Consultant will respond to written comments from the DOE review of the 90-percent design submittal and modify the design drawings as appropriate. The Consultant will conduct a technical and 12 EXHIBIT A - SCOPE OF WORK BREMERTON WWTP UPGRADE PROJECT constructibility review of the construction drawings at the 50- and 90-percent completion stage of the final design activities. Assumptions: For budgetpu1poses itis IlSsumed IItnt lite Consu/lnntwrl/ discontinue mn;or design work nctivities unftl nfter receiving review comments .from lite City. Task 4.02.02 - Preparation of Construction Cost Estimate The Consultant will prepare construction cost estimate based on the 50- and 90-percent design drawing submittal for budgetary review by the City. The estimate will provide a detailed breakdown showing unit prices and quantities for each item as appropriate. The cost estimate will include allowance for contractor fees, markup, and profit. City review comments of the 50-percent design submittal will be incorporated in the 90-percent design review submittal. The Consultant will prepare a final construction cost estimate based on the 100-percent design drawings and submit to City and DOE. City review comments of the 9o-percent design submittal will be incorporated in the 100-percent design submittal. In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the Project, the Consultant has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate Project cost or schedule. Therefore, the Consultant makes no warranty that City's actual Project costs, financial aspects, economic feasibility, or schedules will not vary from Consultant's opinions, analyses, pr?jections, or estimates. Task 4.02.03 - Design Workshops The Consultant will attend and conduct design review workshops with the City for the final design review at the 50-percent and 90-percent design submittal for each contract package. Design issues, comments, and decisions will be presented and discussed during the interim design meetings. The Consultant will document meeting discussions and results in meeting minutes and distribute them to all attendees. The Consultant will conduct an internal senior technical review at the 50-percent and 90- percent design submittal to the City for the contract package. The internal review will include an evaluation of the technical design and the constructibility of the proposed improvements. Assumptions: Two 1-dny workshops/or design reviews willt Consu/lnntnnd City sttrlfwill be conducted. l7te design review workshops will be conducted in lite Consu/lnnts Bellevue, WA office. Ongoing design guidnnce by senior consu/lnnts will be conducted IItroughout lite finn/ design Insk. Comments genernted .from lite 50-percent design workshop will be inco1pornted into lite gO-percent design. Comments genernted .from lite gO-percent design workshop willbe inco1pornted into lite 100-percentdesign. City Responsibilities: A ttend workshop in Consu/lnnts office. 13 EXHIBIT A . SCOPE OF WORK BREMERTON WWfP UPGRADE PROJECT Work Products.' Comments generated during the workshop will be summarized along with the proposed resolution in workshop meeting notes tlItd submitted to the City. Task 4.02.04 - Biosolids Hauling Truck Procurement The Consultant will develop procurement documents for biosolids hauling vehicles. Biosolids vehicle type will be selected during Task 1 and the procurement documents will be based on procuring vehicles to meet the requirements established during the Facility Planning effort. Consultant will prepare draft and final procurement documents for City review. It is assumed that City preferences and design requirements will be developed in one truck procurement workshop. The Consultant will document workshop discussions and results in meeting minutes and distribute them to all attendees. Assumptions.' City will ndminister procurementprocess using documents developed by Consulfmtt. Oty Responsibilities: Provide inputon vehicle pn!ferences. Review drnftprocurement documents. A ttend truck procurement workshop. Work Products.. Meeting agenda tlItd minutes. Drnft tlItd finn/vehicle procurement documents. Task 5.0 Bidding Support Services Based upon the acceptance by the City of the contract documents, including construction plans and specifications developed during the final design activities in Task 4, the Consultant will proceed with the bidding support services for the proposed improvements to the BWWTP, as defined under Basic Services of this Agreement. Bidding activities include engineering services required to respond to bidder questions, provide clarification, prepare addenda, and other activities as needed and described in the following. Task 5.01 - Bid Advertisement Support The Consultant will provide full size (22" x 34") and hall-size (11" x 17") reproducible drawings and camera-ready copies of the technical specifications to the City for the purpose of providing bid documents to prospective bidders for the contract package. The Consultant will attend a prebid conference with the City and prospective bidders and explain the scope of the project for the contract package. The City will serve as primary contact for questions and will issue addenda, if needed, to provide clarification or correction to the bid documents. In response to bidder inquiries to the City, the Consultant will interpret contract drawings and specifications during the bid advertisement period. As necessary and agreed to by the City, the Consultant will prepare addenda and submit to the City for distribution to the prospective bidders. Assumptions.' I7te City wl71 print tlItd bind the contract documents for distribution to the plan center~ tlItd bidders. I7te specifications will be bound in a single S!Z,I,I x 11,1,1volume with the 11,1,1 x 17,1 drawings comb bound separately. I7te City will tlCceptrelfuests for 14 EXHIBIT A - SCOPE OF WORK BREMERTON wwrp UPGRADE PROJECT contrnct documents from bidders, shtjJ documents., maintnin a bidders lis~ tlItd coordinate otlter IlSpects q/ tlte contrnct document distribution. City Responsibilities: City will provide bid documents to nil bidders tlItd shall maintnin tlte bidders list Work Products: One (1) copy q/ tlte 100-percentdesign drawing in full size (22//x 34/ tlItd ha!f-size (11//x 17/ /onna~ technical specifications tlItd applicable City q/Bremerton legal documents including Division ~ tlItd final construction cost estimate for ench contrnct pnckage. Written m1denda items tlItd responses to bidder Ifuestions for tlte contrnctpnckage. Task 5.02 - Bid Evaluation Support The City will receive, tabulate, and analyze bids with assistance from the Consultant. The Consultant will review the apparent low bid and report recommendations on contractor qualifications to the City. The City will award the contract and prepare contract documents for execution by the City and successful contractor. Assumptions: Bidding nctivities will be conducted for a period not to exceed tltree (3) montlts. City ResponsibDities: None. Work Product. .Recommendation letter regarding contrnct award for ench contrnct Task 6.0 Construction Services The Consultant will provide services during construction for the proposed BWWTP project, as defined under Basic Services of this Agreement, to assist the City in construction ad:rIlinistration for the project. Construction services include office engineering services required to respond to contractor questions, provide clarification, prepare change orders, and other activities as needed and described in the following sections. The scope of work will be limited to the budget allowance for this item. The budget was estimated for a construction period of not more than 18 months. Deviations from the anticipated schedule or duration will materially affect the scope of these construction services and/ or the budgets estimated. Task 6.01 Construction Support Activities The Consultant will attend the pre-construction conference and monthly progress meetings with the City and the Contractor. The Consultant will also make periodic site visits and pre- startup inspections to monitor progress of the construction and completion of the work. The presence or duties of Consultant's personnel at a construction site, whether as onsite reprE(sentatives or otherwise, do not make Consultant or Consultant's personnel in any way responsible for those duties that belong to City and/or the construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the construction 15 EXHIBIT A - SCOPE OF WORK BREMERTON wwrp UPGRADE PROJECT Contract Documents and any health or safety precautions required by such construction work. Consultant and Consultant's personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions and have no duty for inspecting, noting, observing, correcting, or reporting on health or safety deficiencies of the construction contractor(s) or other entity or any other persons at the site except Consultant's own personnel. The presence of Consultant's personnel at a construction site is for the purpose of providing to City a greater degree of confidence that the completed construction work will conform generally to the construction documents and that the integrity of the design concept as reflected in the construction documents has been implemented and preserved by the construction contractor(s). Consultant neither guarantees the performance of the construction contractor(s) nor assumes responsibility for construction contractor's failure to perform work in accordance with the construction documents. The Consultant will review the technical shop drawings and respond to City and/ or Contractor requests for information (RFIs), clarification, and proposed substitutions, and assist in the preparation of change orders, as requested. The Consultant will provide startup services, O&M manual preparation, consultation and troubleshooting, as requested by the City. The Consultant will also provide Project closeout activities and documentation. '- Assumptions: . Construction conlrnct mlminislrotion IlI1d resident inspection will be peifonned by tlte City or 0 tltird pnrty construction mlll10ger (CM). . The City or CM wl71 conlrnct directly witlt IlI1 independent testing loborotory to peifonn '1uolity IlSsurlll1ce testing IlI1d tlte CM will coordinote witlt tlte testing lob personnel regording scheduling qf tlte field testing. . The City or CM will moinlnin record drowing inftnnotion ftr tlte project Record drowings will be bllSed on tlte llS-builtinftnnotion provided by tlte conlrnctor IlI1d inftnnnlion from field obserllotion by tlte CM residentinspector. The City will peifonn record drowing updntes to tlte drnwing files provided by tlte Consullnnt Qty ResponsibDities: See nbove IlSsumptions. Work Product. None Task 6.02 O&M Manual The Consultant will prepare an Operation and Maintenance (O&M) manual to supplement existing manuals currently used by the City. The level of effort includes compiling process narratives and manufacturer-provided equipment O&M maIlUals into single bound document (may be more than one volume depending on submitted quantities). This approach is assumed to meet the minimum requirements of DOE and EP A requirements tied to the STAG funding. Draft and final manual submittals will be prepared. Assumptions: Level qf &ortis bllSed on tlte compiled ftnnot slnted obove. 16 EXHIBIT A - SCOPE OF WORK BREMERTON wwrp UPGRADE PROJECT City ResponsibDities: Review draft IU/d final versions 0/ O&M mlU/uaL Submitmanual to DOE and communicate DOEs review comments to consultont Work Products: Draft IU/d Final O&M mlU/un,L Task 7.0 Project Management The Consultant will provide project planning, management, work and budget status evaluation and reporting, and quality and cost control activities for the duration of all phases of the Project. These services also include partnering the project team, coordinating the project design, conducting technical reviews and workshops, and other activities as defined in the following sections. Task 7.01 Work Plan Preparation The Consultant will prepare and submit to the City a detailed Work Plan for review. A final Work Plan will be prepared incorporating City review comments. The Work Plan will document the roles of the project team (including City staff), communications protocol, project schedule and deliverables, and the general purpose and goals for the project. The Work Plan will serve as a reference guide for team members throughout the project. The Consultant will conduct meetings, as described in Task 1.0, with the City and DOE to discuss the project requirements, schedule, agency approval and funding requirements. The Consultant will conduct a kickoff meeting with the design team, including all design disciplines, to discuss the project requirements and schedule at the Consultant's design center in Bellevue, Washington. This separate meeting from the Project kickoff meeting will be held prior to design work with only Consultant staff to kickoff the design portion of the work. Assumptions: None Oty ResponsibDities: None. Work Product. A totolo//ive (5) copies 0/ lite Work PllU/ IU/d schedule 0/ delivernbles will be submitted to lite City nits will be updated for subsequent tnsks. Task 7.02 Project Management, Status and Reporting Meetings The Consultant will, in addition to the technical portion of the project, provide general project management and administrative activities to facilitate the successful completion and delivery of the Project to the City. The Consultant will perform project monitoring and control functions such as coordination of project activities, facilitating quality assurance reviews, monitoring project budget and schedule, preparation of miscellaneous project correspondence, project status reporting, conducting periodic progress meetings, preparation of invoices, and overall management of project activities. General project management and technical quality control and assurance activities are included as an ongoing part of the individual technical tasks. The Consultant will provide the City with project progress, budget and schedule status monthly with submission of each invoice. Status report will include percent complete and 17 EXHIBIT A - SCOPE OF WORK BREMERTON WWfP UPGRADE PROJECT percent spent by task. The Consultant will attend periodic status report meetings with the City throughout the duration of the Project. Assumptions: Fnetlity plllllning netivities will be conducted IItrouglt October 2005 or for II period o.f 6 monllts. Finlll design netivities will commence beginning November 2005. Gty ResponsibDities: None. Work Product.17te Consulfllnlwill prepllre project sflltus reports to necompllllyenelt invoice submitted to lite City Task 7.03 Quality Review Program Implementing a quality review program at the outset of the project is a foundation for establishing and meeting quality objectives for the duration of the project. The Consultant will perform detailed internal quality reviews for all work products submitted to the City as identified in the Scope of Work, with particular emphasis on major submittals. The Consultant will also create and implement a detailed process for City review and comment on all work product submittals. This process will include features to capture, address, reach . resolution, and document all significant City review comments. Assumptions: DIlII Reynolds/ CH2M Hill will provide constructibility review o.f lite drnft documents IlIId Pili Burke/ CH2M Hill will provide overllll process IlIId /neility design review o.f lite drnft documents. GtyResponsibDities: City will pnrticipllte in conducting II detm7ed review o.f 1111 submitfllls IlIId providing written comments in Ill/ulllity review fonn to be provided by lite Consulfllnt Work Product. Qulllity review fonns for enelt deliverllble. Task 7.04 Project Schedule and Cost Control The Consultant will provide the City with a detailed project schedule of the Facility Plan, design work, bidding and construction services, and related environment document and funding application activities, including deliverable dates, review periods and meetings, and other key milestones. The required permits and timelines developed in Task 2.04 will be incorporated into the schedule. The Consultant will use the schedule as a measure of project performance and cost control for the duration of the project activities. Assumptions: Scltedule wtll be developed using MicrosoftProject Consulfllnlwill provide .pt(( files o.f lite scltedule updlltes if desired by City. Gty ResponsibDities: None. Work Product. Deflliled project scltedule in MS Project fonnllt Task 8.0 General Contingency A contingency fund has been established to cover activities that may be required that are outside of the work defined in this Scope of Work. These activities may include extra requirements requested by regulatory agencies relating to the environmental documentation and/ or funding applications, which are outside of the Consultant's control. In addition, a 18 EXHIBIT A - SCOPE OF WORK BREMERTON WWTP UPGRADE PROJECT general contingency fund is established to cover other activities as requested by the City. Use of this contingency allowance is at the sole discretion of the City. Task 8.01 Miscellaneous Regulatory and Funding Support The Consultant will provide support to the City in meetings with DOE, and other agencies or jurisdictions as requested. This task covers miscellaneous environmental document review and funding-related tasks as requested. Assumptions: An allowlHtce ftr consu/Inn! stnjf q/ 4(J hours is allocated to litis task. Gty Responsibilities: None. Work Product: None. Task 8.02 General Contingency The Consultant will conduct additional scope of work tasks as directed by the City. Assumptions: An allowlHtce ftr consu/Inn! stnjf q/ 6(J hours is allocated to litis task. Gty Responsibilities: None. Work Product: None. Time of Performance The duration of Tasks 1 through 3 is assumed to be approximately 6 months from the signing of this Agreement. The duration of Task 4 is assumed to be approximately 6 months immediately following completion of Tasks 1 through 3, and as authorized by the City. The duration of Tasks 5 though 6 is assumed to be approximately 12 months immediately following completion of Task 4, and as authorized by the City. The duration of Task 7 is simultaneous with Tasks 1 through 6 and is assumed to be 23 months. The Consultant will make every effort to complete the work in a timely manner. However, it is agreed that the Consultant cannot be responsible for delays occasioned by factors beyond his control, nor by factors that could not reasonably have been foreseen at the time this Agreement was executed. 19 Exhibit B - Compensation Date: April}, 2005 Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project Compensation for professional engineering services for the Facility Planning, Design, Permitting, Bidding Assistance, and Construction Services for Bremerton WWTP Upgrade Project have been estimated based on anticipated level of effort for engineering activities. For . the services covered by this Agreement, the City agrees to pay the Consultant as follows: TASK BREAKDOWN WITH TOTAL COSTS Task No. 1.0 1.01.01 1.01.02 1.01.03 1.01.04 1.02.01 1.02.02 1.02.03 1.02.04 1.02.05 2.0 2.01 2.02 2.03 2.04 3.0 3.01 4.0 4.01.01 4.01.02 4.02.01 4.02.02 4.02.03 4.02.04 5.0 5.01 5.02 6.0 6.01 6.02 Task Description Estimated Costs Facility Planning Kickoff Meeting Data Gathering Refine Design Criteria Meeting with DOE Define and Evaluate Facility Upgrade Components Prioritization of Facility Upgrade Components Prepare Draft Facility Plan Amendment Facility Planning Workshop Prepare Final Facility Plan Amendment Permitting and Environmental Documentation SEPA ChecklistlNEPA Categorical Exclusion Documentation Meeting with EPA and DOE Environmental Information Document Develop List of Required Permits and Timelines STAG Grant Application Grant Application Preparation Design Services Topographical Surveys Geotechnical Investigation Construction Drawings and Specifications Preparation of Construction Cost Estimate Design Workshops Biosolids Hauling Truck Procurement Bidding Support Services Bid Advertisement Support Bid Evaluation Support Construction Services Construction Support Activities O&M Manual $5,422.31 $1,839.81 $4,007.19 $3,706.39 $43,681.65 $3,515.22 $26,494.68 $4,103.72 $12,863.22 $0 $0 $12,839.62 $3,315.70 7,311.37 $686.83 1,232.21 $194,899.50 $7,046.11 2,750.26 14,714.69 $7,749.94 $2,833.73 $69,463.41 $4,844.88 EXHIBIT _B_FACPLAN_040105.DOC EXHIBIT B - COMPENSATION BREMERTON WWTP UPGRADE PROJECT TASK BREAKDOWN WITH TOTAL COSTS Task No. Task Description Estimated Costs 8.01 8.02 Project Management Work Plan Preparation Project Management, Status and Reporting Meetings Quality Review Program Project Schedule and Cost Control General Contingency Miscellaneous Regulatory and Funding Support General Contingency $3,360.10 $44,406.45 $2,850.56 $4,638.88 7.0 7.01 7.02 7.03 7.04 8.0 Total $5,373.92 $8,060.88 $504,013.23 A. For the Basic Services described in Exhibit A of this Agreement, City will pay the Consultant compensation amounting to the labor billing rate for the employee multiplied by the time charged to this project, plus direct expenses. The labor billing rate is calculated by the employee's raw labor rate multiplied by a factor of 3.20, which is designated as the labor multiplier. The fee so determined shall be payable based on monthly statements submitted in a form acceptable to the City. The estimated not-to-exceed fees for the Project are set forth above. B. The following direct cost expenses are reimbursable. 1. Travel, subsistence, and incidental costs, at cost. 2. Use of motor vehicles on a mileage basis (Consultant's current standard rate) or rental cost basis, except as otherwise set forth herein. 3. Reproduction of reports, drawings, specifications, and other Project-related documents, at cost. 4. Postage and shipping charges for Project-related materials, at cost. 5. Charges of special consultants requested or authorized by the City. 6. Local taxes or fees applicable to the engineering work or payments thereof. 7. Charges for review of drawings and specifications by government agencies, if any. 8. Cost of acquiring any other materials or services specifically for and applicable to this Project, if approved by the City. 9. Rental charges for use of equipment, if approved by the City. C. Payments shall be made to the Consultant by the City based on the Consultant's invoice. Invoices shall be prepared no more frequently than once a month and shall be itemized to indicate the amount of work performed and the associated reimbursable expenses. Each statement shall indicate the name of the person for whose services compensation is being sought, the number of man-hours charged and the cost, in dollars, per man-hour. D. The entire amount of each statement shall be due and payable upon receipt by the City. E. It is understood and agreed that a delay, for any reason or cause, in the start of services by the Consultant shall not entitle the Consultant to additional compensation. EXHIBIT _B_FACPLAN_040105.DOC 2 EXHIBIT B - COMPENSATION BREMERTON wwrp UPGRADE PROJECT F. It is understood and agreed: 1. That the Consultant shall start the performance of Services within 10 days of receipt of Notice to Proceed. 2. That the Consultant shall keep records on the basis of generally accepted accounting practice of costs and expenses which records shall be available for inspection at all reasonable times. G. The budget and rates for Tasks 1-4 were based on calendar year 2005. Billing rates for activities that extend beyond the end of 2005 will be subject to an increase by 4% to account for 2006 salary increases, and an additional 4% for 2007 salary increases. H. The Consultant understands that the City shall hold the Consultant to the "not-to-exceed" project budget versus holding the Consultant to each individual task and sub task level budget. The Consultant shall be allowed to move budget from one task to another if it is deemed (with concurrence from the City) that the budget allocated to a task may be in excess of that required to complete the task. The excess budget from one task shall only be moved to another task that is projected to require more funding than originally estimated. The Consultant will provide monthly updates of the budget status of all tasks to the City. EXHIBIT _B_FACPLAN_040105.DOC 3