Loading...
HomeMy WebLinkAbout5413Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: 5413 GREENSHIELD SYSTEMS, LLC Pendergast Field #1 Sports Field Drainage Improvements Parks LEG 12-1 9/15/2014 9/30/2014 2015 Comments : AGENDA BILL CITY OF BREMERTON CITY COUNCIL ���-�� �`� SUBJECT: Study Session Date: Public Work Agreement with King County COUNCIL MEETING Date: Directors Association (KCDA) for Department: Pendergast Field No. 1 Drainage Presenter: Improvements Phone: July 23 2014 Aug 6 2014 Parks and Recreation Wyn Birkenthal 473-5752 SUMMARY In 2013 the City installed sub-surface drainage improvements at Pendergast Regional Park's Field No. 3. The improvements greatly reduced ponding in the outfield, increased safety for softball players and decreased the amount of staff time needed to prepare Field No. 3 for league and tournament games following rainy weather. The attached contract with King County Directors Association (KCDA) will facilitate the construction of a similar sub-surface drain system at Pendergast Field No. 1. KCDA is a non-profit purchasing co-op used by municipalities and school districts to obtain volume pricing for goods and services. Bremerton is a member of KCDA. Greenshield Systems LLC will perform the work under the contract. The tasks include installation of perforated pipe in sand filled trenches, tie in to a drain that carries water away from the ball field playing surface and restoration work for the disturbed area. ATTACHMENTS: 1) Public Work Agreement with KCDA; 2) Attachment A— Greenshield Systems LLC Quote; and 3) Attachment B— KCDA Contract with Greenshield Systems LLC. FISCAL IMPACTS (Include Budgeted Amount): $40,000 for the Pendergast Drainage Improvements is included in the 2014 Parks Capital Budget. STUDY SESSION AGENDA: ❑x No Presentation ❑ Full Presentation STUDY SESSION ACTION: 0 Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to approve a Public Work Agreement with KCDA for the Pendergast Park Ball Field No. 1 drainage improvements and authorize the Mayor to finalize and execute the agreement with substantially the same terms as presented. COUNCIL ACTION: [`�Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/25/13 ������� �E'I'WEEI�1 �� A 1 �� ��ElY'���i �1`r r 1 � 7 � � Al�{ HJ ��1� 1 ����ll '�his AG1tEElVIE1�1T is made as of the 12�' day of August, 2014, between the public entity C�TX OF ��tEMEI�'�'ON ("C1ienC"), 345 — 6'� Stree4, Sui�e 600, �re�erton, dVA 98337 (address), and the Contractor: Greetnshie�d Syste�as, LI.C. This Agreement supplements the King County Directors' Association ("KCDA") Purchase Order Number 4084860 ("Purchase Order") for the Client. A general descriptivn of the Project is: Pendergas# Taeld #1 Spoa�ts �eld Drainage Iinprovenaents The Architect/Engineer ("A/E"), if any, is: The Client, KCDA, and Contractor agree as set forth below. �TICLE 1 T� W�1� 1.1 This Agreement provides supplementa.l terms and conditions to the Purchase Order and is incozporated by reference into the Purchase Order as if set forth in full thereia This Agreement shall be campleted and executeti for all KCDA projects that include any on-site construetion aetivities. The Contractor shall fully execute and complete the entire V�ork described in the Contract Documents. AR'I'ICI,E 2 1)A'�ES OF COli�EI�TCEIi��T'Y' AI�iID S��'�'A1�1'�"IAL, ANI� I`Il��. COIV�PI.ET��PI 2.1 The date of commencement of the Work (the date from wkuch the Contract Time is measwed) shail be the date established in a notice to proceed issued by the Client, unless a different date is sta.ted below: 2.2 The Contractor sha11 achieve Substantial Complerion of the entire Work no later than September I 5, 2014 and Final Completion no later than September 30, 2014, subject to adjustments of the Contract Time as provided in the Contract Documents. 2.3 Liquidated damages, if any, shall be $ 10 0. 0 0 per day for eaeh calendar day after the Contract Time that Substantial Completion is not aitained, and shall he paid to the Client. AR'�`ICLE 3 CC91�i'I'id�C'I' Si3IV� 3.1 KCDA shall pay the Contractor for the Contractor's performarice of the Contract the Contract Sum of Thirtv £our thousand seven hundred azid thirty three Dollars Agreement between Client and Contractor - Washington REV 04292013 20122115_1.DOC Page 1 �{$34 , 733 . 00 '_), subject to additions and deductions as provided in the Contract Documents. Sales tax is not inciuded in the Cantract Sum and shall be added to the invoice between the Contractor and KCDA and to the invoice between KCDA and the Client. The contract swn has been derived from the contractor's bid to KCDA directly, or to KCDA through the Association of Educational Purchasing Agencies (AEPA) dated � , and is made up of the following components: 3.2 The Contract Sum is based upon and includes the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Client: 3.3 Unit prices beyond those listed in the Contractor's Bid to KCDA or AEPA, if any, are as follows: 3.4 Allowances, if any, are as follows: 3.5 If this Agreement is for a Project for the Contract Sum of one million dollaxs or more, complete below the names of the following subcontractors with whom the Contra.ctor will subcontract for perfarmance of the work: HVAC (heating, ventilation, and air canditioning) Plumbing as described in chapter 18.I06 RCW Electrical as described in chapter 19.28 RCW. A�t'T�CLE 4 PAYI�I�'I' 4.1 Whenever this Agreement sta.tes that KCDA will rnake payments, the parties agree that payment from the Client to KCDA is a condition precedent to payment from KCDA to the Contractor and that KCDA will use such payments from the Client to pay Contractor. KCDA will make payments to the Contractor as provided below and elsewhere in the Contra.ct Dacuments based upon Application(s} for Payment submitted by the Contractor and per Article l 5. KCDA will schedule fwal payment, constituting the entire unpaid balance of the Contract Sum except statutory retainage, to the Contractor when the Work has achieved Final Campletion, the Agreement has been fully performed, the Client's Board of Directors has accepted the Work, and the Client has agreed to receive billing from KCDA. The retaina.ge shall be �aid pursuant to RCW 60.28 and the Contract Documents. 4.2 Payments due and unQaid u.nder the Agreement shall bear interest as specified by RCW 39.76, not to exceed the Bank of America prime rate plus 2%. Agreement between Client and Contractor - Washington REV 04292013 zo�z2� is_i.00c Page Z Alt'TYCL,E 5 PE�VIII'�'S A1011ID I+'EES 5.1 The Client will secure and pay for the cost of any required building permit. The Client shall secure and pay for necessaay approvals, easemen.ts, assessments and charges required for the use or occupancy of permanent structures or permanent changes in existing facilities. 5.2 The Contractor shall secure and pay, as a part of the Contra.ct Sum, for a11 other permits and governmental fees, licenses and inspections necessary for proper execution and completian of the construction of the Work. Alt'�'ICLE 6 PitOPER'1'IT INSIJ�IVCE 6.1 The Client shall insure the property in the amount of its insurabte replacement cost, including additions and alterations, against "all risks" of physical loss. The policies may inure to the benefit of the Client only. The Contractor is at risk for alI material and equipment not a permanent part of the structure. If the Client requires in writing that the Contractor procure property insurance it shall be paid for by a Change Order. The Contractor's insurance requirements are described in Article 17. 6.2 Upon the occurrence of an insured loss, the Client shall have the power to ad}usfi and settle any loss with the insurers. AIt'I'ICLE 7 EI+dIJN��tA"I'IOi�i ��' CONT'12ACT I90CU1V�1l1'I'S The Contract Documents are enumerated as fotlows, except far modifications issued after execution of this Agreement: 7.1 KCDA Invitation to Bid Nwnber 12-415 or AEPA Invita.tion to Bid Number AEPA and all of the terms a.nd conditions incorporated therein. 7.2 For �,EPA bids, Washington, King County Direciors' Association (KCDA) Additional Agency Terms and Conditians as listed in the AEPA Invita.tion to Bid. 7.3 7.4 Conditions. 7.5 KCDA Purchase Order Number 4084860 This executed Agreement between the Client and Contractor, including the attached General Any Supplementa.ry and other Conditions of the Agreement. 7.6 The Specifications as follows: Sec�imn 'Tit�e 7.7 The Drawings as follows: Agreement between Client and Contractor - Washington Page 3 P�es REV 04292013 zo�zatts_i.poc lvumiber Title 7.8 The Addenda (if any) as follows: IrTu�enber Date 7.9 Department of Laboy and Tnduslxies Prevailing Wage Rates; Couaty: _____ Effective Date: / •- - i Date Pa�es 7.14 Any other dacuments forming part of the Contract Documents ar►d iisted below 7'hrs Agreement entered into as of the day and year frrst writter� above. KING COUNTY Dll2ECTORS' ASSOCIATION By � � (5ignorure} �I.� / � S . /`e.4[.�,�t.-L�i� (Printed rttime rnrd title) � •. �• � , � � , _ � � : � � .ir�f�-.,�a%..� f� �— ., l� i - , s •�I� �/ 3 .�..,_.. •. , ,��, CLIENT B Y (Sigrrature) Qg�a�'�ZO�'¢ . Pa Len a or (Printed title) Agreement between Clieatt artd Contractor - Washington Page 4 REV Q4292013 zo�z2>>s_t.noc ' GEI�I�� �OI�i1�II'I'I01�1S �►R�cL� g Tl�IE CONTRAC'Y' DOC6JR9�1V"d'S AR'I'ICLE 9 A.lD1i�IiNYS'1'RA'Y'ION ��' TI3E AGIiEEMENT 8.1 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Document�s are complementary, and what is required by one is as hircding as if required by all. Performance by the Contractor is required to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the intended results. 8.2 The Contract Documents shall not be wnstrued to create a contractual relationship of any kind between either the Client or KCDA and a Subcontractor of arry tier, or between. any persons or entities ather than tha Client, KCDA, and Contractor. 8.3 The term "R7ork" means the construction and services required by the Contract Docuinents, whether completed or partia(ly completed, and includes all other labar, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may consHtute the whole or a part of the Project. 8.4 The term "A/E" means the entity listed as such on the first page of this Agreement, if any. The A/E may be an azchitect, engineering or similar company, or consultant, and is not necessarity a licensed architect or engineer. If "None" or "N/A" is listed for the A/E, then the Client or ifis designated representative will perform all of the functions of the A/E described herein. The A/E xs not an agent of the Ctient or KCDA, and is no# suthorized to speak on behalf of or bind the Client or KCDA. 8.5 The Contractor's execution of the Agreement is a representatiqn and acknowledgement that the Contractor has visited the site and become familiar with the local cond.itions under which the Work is to be performed, that the Contract Sum. is reasonahle compensation for all the Work, and that the Contract Time is adequate for the performance of the Work. The Contxactor's execution of the Agreement is a further representatian and acimowledgement ti�at the Contractor has carefully checked and verified all pertinent flgures and examined the Contract Documents and the Project site, including any existing structures, and that it has satisfied itself as to the nature, location, character, quality and quantity of the Work, the labor, roaterials, equipment, goods, supplies, work, services and other items to be furnished, and all other requirements of the Contract Documents, as well as the surface conditians and other matters thax may be encountered at the Project site or affect performance of the Work or the cost or difficulty thereof. 8.6 KCDA is an intended third-party beneficiary of this Agreement and may enforce all of its terms directly against the Contractor. Contractor hereby assigns to the Client all manufacturers' warranli.es. 9.1. 7fie Client, wit.� assistance from the A/E, will provide administration of the Agreemen� The Client must approve in writing alI changes in the Contract Surn or Time and all Change Orders, Construction Change Directives, and payments to the Contractor. 9.2 No representative of KCDA, the Client, ar the A/E is authorized to revoke, aiter, enlarge, relax or release any requirements of lhe Contract Documents, nor to approve or accept any portion of the Work whether or not executed in accordance with, nor to issue instrttctions contraYy to the Conhact Documents. Atl warranties, guarantees, and certificates shall inure to the benefit of the Cfient. 9.3 The Client or the A/E may disapprove, condemn or reject work when, in its opinion, the Work does not confortn W the Contract Documents. 'The Client or the A/E may require special inspection or testing of any Work in accordance with the provisions of the Contract Doct►ments whether or not such Work is then. fabricated, installed or completed. 9.4 The Client ar the A/E may ca11, schedule and canduct job meetings, which the Contractor and representatives of its Subcontractors shall attend, to discuss such raatters as procedures, progress, problems and scheduling. 9.5 The Client, KCD.A, and the A/E may visit the site at intervals each. considers appropriate to the stage of ttie Work to becflme generally Familiar with the progress and quality of the completed Work. However, none of them will be required to make exhausiive or continuotts on-site inspections to ch.eek the quality or quantity of the Work. ARTICL� 1 Q 'i7� C�N'TItACTOR 10.1 The Contractor shatl perform, supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have conteol over construction means, methods, techniques, sequ,ences, personnet and procedures, for safety, and for coordinating all portions of the Work under the Agreement. The Contractor shall be an independent contractor in the performance of the Work and sha[L have compiete cantrol over and responsibility for alI personnel performing the Work. 'Fhe Con�actor is not authorized to enter into any agreements or underta.kings for or on behalf of KCDA or the Client or to act as or 6e an agent or emptoyee of KCDA or the Client. 10.2 The Contractor shall provide and pay for all labor, materials, equipment, tools, consirucrion equipment and machinery, water, heat, utiiities, tra.nsportation, and other facilities and services necessary for the proper execution and Agreement between Ctient and Contractor - Washington 2oizzi �s_t.noC Page 5 completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. ]0.3 Workers. T6e Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons canrying out the Work. The Contxactor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. The Contractor shall be responsible to KCDA and the Client for the acts and omissions of t�e Contraetor's employees, Subconfiactors of any teer and their agents and employees, and other persons performing portions of the Work under a contract with the Contractor. At no change to the Con�aact Sum or Coniract Tirne, the Client may provide written notice requir.ing the Contractor to remove from the Work any employee or other person car�ying oui the Work that the Ctient considers objectionable. If the Work is being perFormed at a site in active school use or where there is a likelihood of contact with children, a person shall be unfit and removed from the site if he ar she has pled guilty to or has been convicted of any felony crime involving tkie physical injury or death of a child (RCW 9A.32 or RCW 9A.36 but not RCW 46.b1—motor vehicle violation), the physical neglect of a child (RCW 9A.42), sexual offenses against a minor (RCW 9A.44), sexual exploitat�ion. of a child (RC W 9.b8A), the sale or purchase of a minor child (RCW 9A.64.030), promoting prostitution of a child (RCW 9A.88), or violati.on of similar laws of another jurisdiction. Failure to comply with this section shall be groun.ds for the immediate termination of this �eement. 10.4 Warranty. The Contractor warrants that materials and equipment fumished under the Agreement will be of. gaod quality and new, that the Work will be performed in a workmanlike manner, free from defects not inherent in the qua,lity requieed or permitted, and that the Work will conform to the requirements of the Contract Documents. Work not confornning to these requirements, inclt�ding substitutioas not properly approved and authorized, is defective. 1'he Contractor's warranry excludes remedy for daraage or defect caused by abuse, modificarions oot executed by the Contractor, 'vnproper or insufficient maintenance, improper operation, or normal wear and tear under normal usage. 10.5 Taxes and Fees. In accordance with Aiti.cle 3, KCDA shail invoice the Client and pay all sales tax. 1fie Con�actor shall pay all other consumer, use, B& O, and other similar taxes that are legally enacted when bids are received, whether or not yet effective or merely scheduled to go into effect. 10.6 H,egal Gompliance. The Contractor shall compiy with and give notices required by laws, ordinances, ruies, regulations, and lawful orders of public authorities bearing on pecforroance of the Work. The Contractor shall promptly norify KCDA, the Client, and A/E in writing if the Contractor observes the Drawings and Specifications to be at variance with them. 10.7 Submittals. 1fie Contractor shall review, approve and submit to the Client or A/E with reasonahle promptness Shop Drawings, Product Data, Samples and Agreement between Cl.ient and. Contractor - Washington similar submittals required by the Contract Documents. The Work shall be in accosdance with approved submittals. 10.8 Pragress Schedulc. Within seven days of execution of this Agreement, the Contractor shall submit a preliminary schedule of the Work to the Client Failure to do so shall constitute a material breach of the Contract and a material breach of the conditions of the bid bond. Withen thirty days after execution of the Agreement, and before any progress payment need be made, the Contractor, after consultations with its Subcontractors, shall submit a Progress Schedule to the Clien� Neither the Client nor the A/E will, however, be required to review ar approve the substance or sequence of the Progress Schedul.e, which are the Contractor's sole responsibility. Tb.e Contractor will be responsible for planning, scheduling, managing, and reporting the progress of the Work in accordance with all of the specific methods and submittals described in the Contract Documents. Tbe Contractor shall use the Contract Schedul.e to plan, coordinate, and prosecute the Work in an orderty and expeditious manner. 10.9 �lean-Up. The Contractor shall keep the premises and surrounding area free from accumulation of waste materia.ls or rubbish caused by operations under the Agreement. Upan completion of Work or at the Client's request, the Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials. If the Contractor fails to do so, the Client may do sa and charge to the Contractor alt costs incurred. 10.10 Access. The Contractor shall provide KCDA, the Client, and the A/E access to the Work wherever located. 10.11 Royalties and Patents. The Contractor shall pay all royalties and license fees, shall defend suits or claims for infringement of patent rights and shall hold KCDA, the Client, and the A/E harmless from loss on account thereof, unless the Contract Documents require the particular design, process or product of a particular manufactarer or manufacturers. 10.12 Indemnif'ication. Subject to the following conditions and to the fullest extent permitted by law, the Contzactor shal! defend, indemnify, and hold harmless KCDA, the Client, and the A!E and their respective agents, employees, consultants, suceessors and assigns ("Indemnified Parties") from and against all claims, damages, losses and expenses, direct and indirect, or consequential, including but not limited to costs and attomeys' fees incurred on such claims and in proving the right to indemnification, arisi.ng out of or resulting Gom performance of the Work, any act or omission of the Contractor, its agents, any of its Subcontractors of any tier, and anyone directly or indirectly employed by the Contractor or Subcontractors of any tier ("Indemnitor"). The Contractor will fuliy indemnify the Indemnified Parties for the sole negligence of the Indemnitor. The Contzactor will indemnify the indemnified Parties for the cancurrent negligence of the Indemnitor to the extent of the Indemnitor's negligence. The Cantractor agrees to being added by KCDA or the Client as a 201221 I S_l .DOC Page 6 party �o any mediation, arbitration, or litigation with third parties in which KCDA or the Client alleges indemnification or contribution from an Indemnitor. The Contractor agrees that ali of its Subcontractors vf any tier will, in the subcontxacts, similarly stipulate; in tbe event any does not, the Contractor sha11 be tiable in place of such S�bcontractor(s). Ta the exient a court or arbitrator stn7ces any portion of this indemnification provision for any reason, all remaining pravisions sha11 retain their vitality and effect. 10.13 Prevailing V�ages. 10.13.1 Pursuant to RCW 39.12, no worker, labarer, or inechanic employed in the performance of any part of this Agreement shall be paid less than the "prevailing rate of wage" (in effect as of the date that bids are due) as determined by the Industrial Statistician of the Department of Labor and Industries, ESAC Division, PO Box 44540, Otympia, WA 98504-4540, Telephone (360) 902-5335. 'The schedule of the prevailing wage rates for the locality or localities where this Work will be perfomned are determined as of the Bid Date for the county in which the Project is located and are available at htt�://www.Ini.wa.gov/TradesLicensing/PrevWage/W age Ra.tes/default.asp and are made a part of Ifiis Ageement by reference as diough fully set forth herein. A copy is available for viewing at tfie Client's office, and a hard copy wilt be mailed upon request. To the extent that there is any discrepancy between the refereaced schedule of prevailing wage rates and the published rates as are applicable under WAC 296-127-011, the published rates shall apply at no increase to the Contract Sum. The Contractor shall pravide the respective Subcontractors with a schedule of the applicable prevailing wage rates. The Industrial Statistician wilt answer quesrions relating to prevai�ing wage data upon request. 10.13 2 Pursuant to RC W 39.12.060, in case any dispute arises as to what are the prevailing rates of wages for work of a similar nature, ared such dispute cannot be adjusted by the parties in interest, including labor and management representatives, the matter shall be referred for arbitration to the director of the Department of Labor and Industries, whose decision therein shall be final and conclusive and binding on all parties involved in the dispute. 10.13.3 The Contractor shalt defend, inderanify, and hotd KCDA and the Client harmless, including attorneys' fees, from any violation or aUeged violation of RCW 39.t2 ("Prevailing Wages on Public Works") or RCW 51 ("Indust�ial insurance"), i.ncluding without limitation RCW 51.12.050, by the Contractor or any Subcontractor of any tier. 10.14 The Contractor shall comply with all applicable provisions af RCW 49.28. 10.15 Pursuant to RCW 49.70 and WAC 29b-62- 454 et seq., the Contractor shall provide KCDA and the Client copies of and have available at the Project Site a workplace survey or material safety data sheets for all "hazardous" chemicals under the control or use of Contractor or any Subcontractor at ihe 1'roject Site. Agreement between Ctient and Contractor - Washington 10.16 Contractor shall. maintain and preserve for at Ieast tbree years from the date of finai payment books, ledgers, records, documents, estimates, correspondence, logs, schedules, electronic data and other evidence pertaining to the costs incurred by the Contractor in connecrian with or related to the Agreement {"recards") to s�ch extent and in such detail as will properly reflect and fully support all costs, charges and other amounts of whatever nature for which reimbursement or payment is or may be claimed under the Contract. Contractor agrees to make available at all reasonable times at the office of the ContracEor all such records for inspecti.on, audit and reproduction (including electronic reproduction) by KCDA and the Ctient and their representatives. These requirements shall. be applicable to each Subcontractor of any tier and inciuded in each Subcontract and purchase arder issued with respect to the Work. The Contractor agrees, on behaif of itself, its representatives, and Subcontractors of any tier and tt►eir representativas, that any rights under RCW 42.56.070 will commence at Fina! Acceptance, and that the invacation of such tights at any time by the Contractor or a Subcon�actor af any tier or their representa.rives shall iniriate an equivalent right to disclosures from the Contractor and Subcontractors of any tier f.or the benefit af KCDA and the Client. ARTYCLE 11 SUBCOI�ITRACTOItS 11.1 A"Subcontractor" is a person or entity that has a direct contract with the Contractor to perform a portion of the Work at the site or to supply maierials or equipmen� A "Subcontractor of any tier" includes Subcontractors as well as all direct and lower level sub-subconiractors and suppliers. 11.2 As soon as practicable after award of the Agreement, the Contractor shall confirm in writing to KCDA and the Client the names of t�e Subcontractors for each parti�n of the Woek. The Contractor shall not contraet with any Subcontractor to whom the Client has made reasonable and timely objection or different from the one listed in conjunction with the bid. Contracts between the Contractor and Subcontractors shall (i) require each Subcontractor to be bound to the Contractor by the terms of the Contract Documents to the extent of the Work to be performed by the Subcontractor and to assume toward the Contractor aIl the obligations and responsibilities which the Contractor, by the Contract Documents, assumes towazd KCDA and the Client, and (2) aliow to the Sui�contractar the beuefit of all righrs, remedies and redress afforded to the Contractor by these Contrrct Documents. 11.3 The Contractor shall pmmptly pay (and secure the discharge of any liens asserted by) all persons properly fumishing labor, eyuipment, materials or other items in connection with ttte perfomiance of the Work (including, but not limited to, any Subcontractors). The Contractor shall furnish ta KCDA and the Client such releases of liens and claims and other documenes as KCDA or the Client may request from time to time to evidence such payment (and discharge). KCDA may, at its opHon, withhold payment, in whole or in part, to the Contractor unti3 such documents are so furnished. Th.e Contractor shall defend, ind.emnify, and hold zoi2zi ts_t.DOC Page 7 . harmless �CCDA �nd the Clieat from any liens, including all expenses and attorneys' fees. Nothing in the Contract Documents shall create any obligation on the part of KCDA, the Client, or A/E to pay or to see to the payment of any moneys due any Subcontractor of any tier or other person or entity, except as may otherwise be required by laws and regulations. ARTICLE lZ CONSTRUC"I'ION BY �LIEN'[' OR BY SEPAItATE CONTItAC'9'ORS 12.1 The Client reserves the right to perform construction or operations related to the Pmject with the Client's own forces and to award separa.te contracts in connection with other portions of the Project or other construction or operations on the site under condirions of the contract identical or substantially similar to those of the Conlract Documents. 12.2 The Contractor shall afford the Client and separate contractors reasonable opportunity for the introduction ar►d storage of their materials and equipmenr and performance of their activ�ties, and shall connect and coordinate the Contractor's constcuction and operations as required by tlie Cantract Documents. AIt'I'ICLE 13 CHANGES IN 'i'I�E WOItK 13.1 The Client, without invalidating the Agreemen�, may order changes in the Work consisting flf additions, deletions or modifications ("Changes"), aad the Contxact Sum and Contract Time wilf be adjusted accordingly. Changes in the Work, the Contract Sum andlor the Contract Time shall be authorized only by written Change Order signed by KCDA, the Client, the A/E and the Contractor or by written Construction Change Directive signed by the Client and the A/E. 13.1.1 Chank:e Orders. A Chan�e Ordcr is a written instrument signed by KCDA, the Client, and the Contractor stating their ageement upon a change in the Work; the amount of the adjustment in the Contract Sum, if any; and the extent of the adji�stment in the Contract Time, if any. 13.1.2 Construction Change Directives. A Construction Change Directive is a written order prepazed and sign.ed by the Client and the A/E that directs a change in the 'Work and states a proposed basis for adjusiment, if any, in the Contract Sum or Contract Time, or both. It shall be used in the absence of total agreement on the terms of a Change Order. The Contractor shall promptly proceed witli the change in the VJork described in the Construction Change Directive. As soon. as possible, and within seven days of receipt, ihe Contractor shall advise KCDA and the Client in writing of the Contractor's agreement or disagreement with the cost or the method, if any, provided in the CanstrucNon �hange Directive for determining the proposed adjustment in ti�►e Contract Sum or Contract Time. 13.2 Changes in the Work shall be priced using the Contractor's unit prices and/or R.S. Means pricing as suhmitted in its Bid to KCDA or AEPA. If no such unit prices are listed for the Changes in the VJork, and if the parties cannot agree on the cost or credit to KCDA and the Client from a Change in the Work, the Contractor shall keep and present, in such form as KCDA or the Client may prescribe, an itemized accounting together with supporting data. T'he total cost of any Change or Claim shall be limited to the reasonable value of the folIowing: 13.2.1 Direct labor costs: The e#�ective W.D.O.L.&I. prevailing haurly wage for the laborers, journeymen, and foremen performing and/or directly supervising the Changed Work on the siie. The premium portion of overtime wages may not be included unless pre- approved in writing by the Clien� The hourly cost shall be based upon basic wages and mandatory fringe benefits and workers' insurances. 13.2.2 Direct material costs: M itemization af the quantity of materials necessary to perform the Change in the Work and the net cost therefar. 13.2.3 Construction �qui�ment usage costs: An itemization of the actual length of time consiruction equipment appropriate for the Work will. be used solely on the Change in the Work at the Site times the lower of the actual rental receipt or applicable current state, NECA, Data Qttest, or MCA renta►I cost. Actusi, reasoaable mobilization costs are petmitied if the equi�ment is brought to the Site solely for the Change in the Work. The rate for equipment necessarily standing by for future use on the Work sha11 be Sd% of the rate established above. 13.2.4 Cost of anv change in insurance or bond remium. Upon req�est, the Contractor shall provide KCDA and the Client with supporting doci.mrentation. 13.2.5 Subcontractor costs: Payments the Contractor makes to SUbcontractors for C;hanged Work performed by Subcontractors of any Her. The cost of Work for Subconttactors of any tier shall be determined in the same manner as prescribed in this Section 13.2. 13.2.6 Fee: Th.e allowance for all com.bined overbead, profit, and ott�er costs, includ"uag all office, home office, extended and site overhead (including project manager, project engineer, superintendent and general foreman time}, and all delay and including impact costs of any kind, added to the total cost to the Client of any Change Order or any Claim for additionai work or extra payment of any kind on this Project shall be caleulated consistent with the provisions of the KCDA contract. The change order must be signad by both the Client and Conh•actor. 13.3 D�spate Resolution. All claims, disputes and other matters in yuesdon of the Contractor, direct or indirect, arising out of, or relating ta, the Contract Documents or the breach thereof ("Claims"), except Claims which have been waived under the terms of the Contract Documents, shall Agreement between Client and Contractor - Washington 2oi2zi �s_t:�oc Page 8 . be decided exclusively by the following dispute resalation procedure; claims that have been waived under the terms of the Contract Documents are not permitted to be brought in any forum. The Cantractar shall diligently cany on the Work and maintain the progress schedule during the dispute resolution procedure, including any lirigation proceedings, unless the parties mutually agree in. writing otherwise. 133.1 Natice of C.laim The Conh�actor shall submit notice of all Claims to both KCDA and the Client in wriring within seven dcrys of the event giving rise to them and shall include a clear descriptian of the event and its probable effect. 133.2 Claim Submission. Within 21 days of the Notice of Claim, the Contractor shall provide both KCDA and the Client in writing with a Claim, which shall �nciude a clear description of khe Claim, a(1 changes in cost and in time (direct, indirect, impact, and otherwise) to which the Contractor and Subcontractors of any tier aze enritled, and data snpporting the Claim. The claim of a Swbcontractor may be brought oniy tfirough �he Conti�actor and only after the Contractor notifies KCDA and the Client in writing that the Contractor has reviewed and agrees with the Claim. 13.3.3 lnformal Resolution KCDA and the Client will make a determination of the Claim. If the Contractor disagrees with KCDA and the Client's determinafion and wishes to pursue the Claim further, the Contractor must, within fourteen days of receipt of the determination, provide KCDA and the Client with a written request that a representative of the Contractor, KCDA, and the Client meet, confer, and attempt to resolve the Ctaim. Tbis meeting wiil then take place at a mutually convenient rirae within thirty days of the request, unless the Client elects to proceed d'vrectly to mediation. 13.3.4 Mecfi$tion. The Contractor may bring no litigation against the CGent or KCDA unless the Claim is first subject to non-binding medistion under the Construcrion Mediation Ruies of the American Arbitrati.on Association ("AAA"). The Contractor is responsible for initiating the mediation process. This requirement cannot be waived except by an explicit written waiver signed by KCDA, the Clieut, and the Contractor. To initiate the mediation process, the Conlractor shall su6mit a written mediation request to KCDA and the Ciient within thirty days of the meeting undertaken in Subparagraph 13.3.3. lf the parties are unable to agee to a tnediator wit�in thirry dcrys ai�er KCDA and tt�e Client's receipt of the written request for mediation, any party may subm.it a request for mediation to the AAA. An officer of the Contractor and of KCDA and the Superintendent or designee of the Glient, al.l having fuli authority to settle the Claim, must aitend the mediation session. To the extent there are other parties in interest, such as Subcontractors, their representatives, with fuli authority to settIe the Claim, shail also atxend the mediation session. Unless KCDA, the Client, and Cantractor mutualty agree in writing otherwise, ali unresolved Clarms in the Pro�ect sha11 be considered at a single mediation session which shall occur prior to Final Acceptance by the Ciietrt. Agreement between Client and Contractor - Washington 13.3.5 Litigation. The Contractor may bring no litigation on Ciaims unless snch Claims have been properly raised and considered in the dispute resolution procedures of Subparagcaphs 13.3.1 through 13.3.4 ahove. All unresolved Claims of the Contractor shall be waived and released imless the Contractor has strictly complied with the tirne limits of the Coutract Documents, and litigation is served and �i(ed within tt�e earlier of (a)120 drrys after the Date of Substantial Completian as designated in wricing by the Client or (b) 60 days after Final Acceptance. Ttxis requirem.ent cannot be waived except by an explicit written waiver signed by KCDA, the Client, and t1�e Confiractor. The pendency of a mediation (calculated as the period from the written request for mediation through the day following the mediation proceeding) shall toll these filing requirements. 13.4 Notices and Claims. All notices and Claims shall be made in writing as required by the Agreement. 13.4.1 Any norice of a Claim of the Contractor against KCDA or the Client and any Ciaim of the Contractor, whether under the Agreement or otherwise, must be made pursuant to and in strict accordance with the applicable provisions of the Contract Documents. Failure to comply wit#� these requirements shall consttt.ute waiver of. the Claim. No act, omission, or knowledge, achial or constructive, of KCDA, the Client, or the A/E sl�all in any way be deemed to be a waiver of the requirement for timeiy written natice and a timely written Claim. unless KCDA, the Client, and the Contractor sign an explicit, unequivocal written waiver approved by KCDA and the Client's Boarci of Directors. 13.4.2 The fact that KCDA, the Client, and the Contractor may continue to discuss or negotia#e a Claim ti�at has or may have been defective or tmtimely under the Contract shall not constitate waiver of the provisions of the Contract Documents unless KCDA, the Clierrt, and Contractor sigrt an explicit, unequivocal written waiver approved by the Client's board of directors. 13.4.3 The Contractor expressly acknowledges and agrees that the Cantracto�'s failure to timely submit required notices or timely submit Claims has a subscantial impact upon and pre,judices KCDA and the Client, including but not limited to the inability to futly investigate or veri.fy the Claim, mitigate damages, choose alternative options, adjust the budget, delete or modify the impacted Work, and/or manitor fime, cost and quantities. For these and other reasons, the parties stipulate that KCDA and the Client are prejudiced by the Contractor's fail.ure to timely submit notices or Claims as requaed by the Contract Documents. 13.5 Ciatms far Concealed or Unknown Conditions. If conditions unknown to the Contractor are encountered at the site which. are (1) coneealed physical conditions ti�at differ materially fram those indicated in the Contract Docuznents or (2) unknown physical conditions of an unusual nature, which differ materiaI3y from those ordinarily found and generally recognized as inherent in activities of the character provided for in the Contract DocumenLs, then the Zoi���s_i.DOC Page 9 Contra+ctor shall give written notice to KCDA and the Clien.t promptly before conditions are disturbed and in no event later than seven days after the first observance oa the conditions. The Contractor shall make any Claim arising from such condition in accordance with the dispute resalution procedure in Sabparagraph 13.3. 13.6 Claims for Consequen4ial Damages. The Coniractor, the Client, and KCDA waive Claims against each other for consequentia! damages arising out of or relating to this Contract This mut�al waiver includes without limitation: .1 damages incurred by KCDA or the Client for rental. expenses, for losses of use, income, profit, financing, business and reputa.tion, and for loss of management or employee productiviry or of the services of such persons; and .Z damages incurred by the Contractor for principal and home office overhead and expenses inctuding without limitation the compensatian of personnel stationed there, for Losses of finencing, business and reputation, for losses on other projects, for loss of profit, and for interest or financing costs. This mutual waiver is appIicable to all consequential damages af any cause, including without limitation dae to either patty's bermination in accordance with Article 2�. Nothing co.ntained in this Section 13.6 shall be deemed to precl.ucie an award of liquidated damages, when applicable, in accordance with the requirements of the Contract Documents. 13.7 The Contrac[or (inciuding Subcontractors} shall not in any event be entitied to damages arising out of actual or alleged loss of efficiency; morale, fatigue, attitude, or labor rhythm; constructive acceleraiion; home office overhead; expectant undemm; trade stacking; reassignment of workers; concurrent operations; dilution of supervision; learning curve; beneficial or joint occupancy; logistics; ripple; season change; extended overhead; profit upon damages for delay; impact damages; or similar damages. ARTICLE 14 '�'l1VIE 14.1 Within seven days of executing the Agreement, the Contractor shall deliver any required bond to the Client with a cnpy to KCDA; no Progress Payments shall be due until the bond is deiivered. 14.2 if the Contractor is delayed at any time in progress of the Work by changes ordered "m the Work, by unanticipated general labor disputes, fire, imusual delay in deliveries, abnormal adverse weather conditions not reasonably anticipatable, unavoidable casualties, delays caused by the Client or its separate contractars, or any causes beyond the Contractor's control, or by otiter causes which may ,{ustify deiay, then the Contract Time shall be extended by Change Order to the extent the critical path is affected. The Contractor (including Subcontractars) shall be entitled to damages for delay, the total limited to the liquidated rate of Agreement between Client an.d Contractor - Washington Subparagraph 2.3, only where KCDA or the Client's own actions or inactions were the actual, substantial cause of the delay and where the Contractor could not have reasonably avoided the delay by the exercise of due diligence. IF a delay was caused by the Contractor, a Sabconiractor of any tier, or anyone aeting on behalf of any of them, the Contractor is not entitled to an increase in the Contract Time or in the Contract Swn. 14.3 THE TIl�LY COMPLETION OF THIS PR03ECT IS ESSENTIAL TO KCDA AND THE CLIENT. KCDA and the Client will incur serious and substantial damages if Substantial Completion of the Work does not occur within the Contract Time; however, it may be difficult if not impossible to determine the amount of such damages. Consequently, this Agreement may inctude provisions for liquidated damages. KCDA and the Client's right to liquidated damages is not affected by partiai completion, occupancy, or beneficial occupancy. if this Agreement does not contain an agreed amount for liquidated damages, KCDA and the Client ma.y prove their actual damages. ART7CY.E 15 PAYIVJLENTS AND C4MP1,�7'60N 15.1 Progress �'ayments. Payments shall be made as provided in Articles 3 and 4 of ti�is Ageement. If Pmgress payments are specified, they will be made monthty for Work duly approved and performed during the ca.lendar raonth preceding the application according to the foltowing procecture. 15.1.1 Draft Application. Within the first five days of each month, the Contractor shaU submit to KCDA and the Client, for the Client's approval, a report on the current status of the Work as compared to the Progress Schedule and a draft itemized AIA Application for Payment for Work performed during the prior calendat month. This shall not constitule a payment request. KCDA or the Client may request the Coniractor to provide data substanriating the Contractor's right to payment, such as copies of requisitions or invoices from Subcontractars. 15.1.2 Pavment Request. The Client shall review and approve the draft Application for Payment, or state its reasons for disapproval. Upan the ClienYs approvai, and after the Contractor has fucnished all data. requested, the Contractor may submit to KCDA a payment request in the �greed-upon amount, in the form of a notarized, itemized AIA Applicati.on for Payment for Work performe�i during the prior calendar month. KCDA shall ee-verify the amounEs with the Client and, once verifed and approved by the Client, will invoice the Client, and KCDA shall make payment to Contractor from funds received from the Client. Payment from the Client to KCDA is a condition precedent to payment from KCDA to the Coniractor. Among other things, the Appli.cation shall state that prevailing wages have been paid in accordance with the prefiled statement{s) of intent to pay prevaiiing wages on file with KCDA and the Client and that all payments due Subcontractors Gotn KCDA's prior payments have been made. The submission of this Application constitutes a zoizzits_t.noc Page 10 certi�cation that the Work is current on the progress schedule, unless otherwise nated on the Application.. If the Contractor believes it is entitled to payment for Work performed during the prior calendar month in addition to the agreed-upon amount, the Contractor may submit to KCDA a separate written payment request specifying the exact additianal amount due, the category in the Schedule of Values in which the payment is due, t1�e specific Work for which the addirional amount is due, and why the add.itional payment is due. 15.13 Pavments to Subcontractors. No payment request shalt inclade amovnts the Contractor does not intend to pay to a Subcontractor, If, after making a requ�st for payment but before paying a Subcontractor for its performance covered by the payment request, the Con.tractor discovers that part or ail of the payment otherwise due to the Subcontra.ctar is subject to withholding fi the Subcontractor for unsatisfactory perFormance, the Contractor may withhotd the amount as allowed under the subconira.ct, but it shail give the Sabcontractor and KCDA and the Client written notice of the remedial actions that must be taken as saon as practicahte after determining the cause for the withholding but before the due date for the Subcontractor payment, and pay the Subcontractor within eight working drrys after the Subcontractor saxisfactorily eompletes the remedial action identi€ied in the notice. 15.2 �'revailing Wmges. Pursuant to RCW 34.12, the Contractor wil1 not receive any payment until the Contractor and a11 Subcontractors have subm.itted a"Statement of Intent to Pay Prevailing Wage" to KCDA and the Client. The statement must have the approval of the Industrial Staristician of th.e Depamnent of Labor and Industries before it is submitted. to KCDA and the Clien.t. The Contractor and the respective Subcontractors shalt pay ali fees required by the Department of Labor and Indusixies, including fees for the approval of the "Statement of Intent to Pay Prevailin� Wages:' Approved copies of the "Statement of Intent to Pay Prevailing �Vages" must be posted where worfcers can easily read ti�em. 1S3 Progress payments. Unless the Client informs the Contractor that a payment wili be withheld as provided in Section 15.4, KCDA shall make progress payments witlun 30 days of approval of the payment request by the Client. 15.4 O�Vithheld Payments. Payments may be withheid on account of (1) defecrive Work not remedied, (2) ciaims filed by third parties, (3) failure of the Contractor to make payments properly to Subcontractors or for labor, materials or equipment or provide releases under Section 113.1, (4) reasonable evidence that the Work cannot be comp(eted for the unpaid balance of the Contract Sam, (5) damage to KCDA, the Client, or another contractor, (6) reasonable evidence that the Work will not be completed within the Contract Time and that the unpaid balance would not be adequate to cover actual or Iiquidated damages for the ar�ticipated delay, or (7) failure to carry out the Work in accordance with the Contract Documents. When KCDA mtends to withlnold atl or part of a payment for any of the foregoing reasoas, KCDA will provide the Contractor, rwwithin eight working days after KCDA's receipt of the Application for Payment, written notification of the reasons thai ali or part of the payment is being withheld and what remedial actions the Contractor must take to receive the withheld amount. I5.5 Substantial Compietion. 15.5.1 When the Contractor believes that ti�e Work is Substantially Complete, it shall notify KCDA and the Client in writing. When the Client agrees, the Client will issue a Certificate of Substantial Completion. Substantial Completion is the stage in. the Qrogress of the Work when the construcdon is sufficiently complete, in accordance witlt the Contract Documents, so the Client can fully utilize the Work (or the designated pottion thereofl for the use for which it is intended. All Work other than incidental corrective or punchlist work and final. cleaning shall have been completed. The Wotk is not Substantially Complete if all systems and parts affected by the Worlc are not usable or if utilities affected by the Work are not connected and operating c�ormally. The fact that the Client may use or occupy the Work or designated portion thereof does not indicate that the Work is Substantially Complete, nor does such occupation toll or change any iiquidated damages due KCDA. 15.5.2 Immediately before partial or complete occupancy, the Client will schedule an inspection to�u of the area to be occupied. A representative of KCDA and/or the Client, A/E and Contractor will jointly tour the area and record items stitl remaining to be Finished andlor corrected. The Contractor shall supply and install any items missed by the inspection but required or necessary foz Final Completian as a part of the Contract Sum, notwithstanding their not being recorded dvring the inspection tour. �5.6 Ftival Psy�een� Pursuant to RCW 60.28, completion of the Contract Work shall occur after the Contractor has notified KCDA and the Client in writing ffiat the 9�ork }ias been concluded and submits the items listed below to KCDA and the Client, any required occupancy permit has been issued, and. the Client's Board formally accepts the Project ("Finai Acceptance"). Final Payment shall not become due until after Final Acceptance. .1 An affidavit that all payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Client or its property might in any way be responsible or encumbered, have been paid or otherwise satisfied, .2 consent of surety to final payment, .3 a certificate evidencing ti�at insurance required by the Contract Documents to reraain in force after final payment is cwxently in effect and will not be canceled or allowed to expire until at least 30 days' prior written noticc has been given to KCDA and the Client, Agreement between Ctient and Contractor - Washington 2o�22t is_i.DOC Page 11 .4 a written statement that the Contractar knows of no substantial reason why the insurance will nat be renewable to cover the period required by the Contract Documents, .5 other data establishing payment or satisfaction of or protection (satisfactory to KCDA and the Client) agau�st a11 obligations, such as receipts, releases and waivers of liens arising out of the Agreement, satisfactorily demonstrating to KCDA and the Client that the clairns of Subcontractors and laborers who have filed claims have been paid, .6 pursuant to RCW 39.12.(}4U, an "Affidavit of Wages Paid" from the Contractor and from each Subcontractor certified by the Industrial Statistician of the Deparlment of Labor and Industries, with fees paid by the Contractor or Subcontractor, .7 a certi�ied statement that the Contractor has closed all necessary permits or otherwise met the requirements of all governing jurisdictions retated to this Project (including, without limitation, city/county building departments, healt6 districts and utility districts; attach a copy of each of these closed or signed-off permits), .8 all warranties, guarantees, certificates, spare parts, specified excess material, and other documents or items required by the Contract Docurnents, and .9 a hard copy of the "record" drawings and specifications, delivered in a clear, ciean and legible condition. If any Subcontractor of any tier refuses to furnish a release or waiver required by KCDA of the Client, KCDA may retain in the fund, account, or escrow funds such amount as to defray the cost of foreclosing the liens of such claitns and to pay attomeys' fees, the total of which shatl be no less than 150% of the claimed amount. If any such lien remains unsatisfied after ali payments are made, the Contractor shall refund to KCDA alt moneys that the latter or the Client may be compelled to pay in d'sscharging sach lien, including all costs aaid reasonable atxorneys' fees. Final payment shall be made pursuant to RCW b0.28 after the Contractor has pmperly submitted certificates fram the Department of Revenue, the Department of Labor and (n.dustries and, puc�suant to RCW SQ24, a certificate from ihe Department of Employment Security. 15.7 llVaive�s. V 15.7.1 Final Payment bv KCDA. The making of final payment shall constitute a waiver of claims by KGDA and the Client except those arising from (1) liens, claims, security interests, oe encumbrances arising out of the Agreement and unsett(ed; (2} failure of the Work to comply with the requirements of the Contract Documents; or (3) terms of warranties required by the Contract Documents ar law. Agreement between Client and Contractor - Washington 15.7.2 Final Payment to Coniractor. Acceptance of final payment by tt�e Contractor shall consritute a waiver of Claims except those previausly made in writing and identified in writing as unsettled on the final Applicatiou for Paymenf. 15.7.3 Change Orders. The execution of a Change Order shall constitute a waiver of Claims by the Contractor arising out of the Wo�c to b� performed or deteted pursuant to the Change 4rder, except as specifically described in the Change Qrder. If the Contractor adds to a Change Order or any other document a reservation of rights that has not been initialed by KCDA and the Client, ail the amounts previously agreed shall be considered disputed and not yet payable unless the costs are re-negotiated ar the reservation is withdrawn or changed in a manner satisfactory to and initialed by KCDA and the Client. If KCDA makes payment for a Change Order or an Application for Payment that contains a reservation of rights not initialed by KCDA and the Client to indicate agreement with the reservation, and if the Contractor negotiates the check for such payment, then the reservatian of rights shall be deemed waived, withdrawn, and of no effect. 15.8 Retainage. 15.8,1 Progress Pa,yments: .1 Pursuant to RCW 60.28, KCDA wil! reserve 5% from. t�e moneys the Contractor earns on estimates during the progress of the BJork, to be retained as a trust fimd for the protection and payment of the claims of any person arising under the Agreemern and the state with respect to taxes imposed pursuant to Title 82 RC�V which may be due from the Contractor. .2 The moneys reserved may, at the option of the Contractor, be (1) retained in a fund by KCDA until 4S days following Final Acceptance; or (2) depasited by KCDA in an interest-bearing account in a bank, mutual savings bank, or savings and loan associarion, not subject to withdrawal until 45 days following Final Acceptance, with interest to the Contractor; or (3) placed in escrow wi#h a bank or trust company unril 45 days folIowing the Final Acceptance, by KCDA's joint check to the bank or tivst company and the Contractor, to be converted into bonds and securities chosen by the Contractor, approved by KCDA, and held in escrow, with interest on the bonds and securities paid to the Contractor as it acerues. .3 If moneys are retained frozn the Contractor, it may eetain payment of not more than 5% from the moneys eamed by any Subcontractor, pmvided that the Contractor pays interest to the Subcontractor at the same interest rate it receives from its reserved funds. 15.9 Warranty of Ti4le. The Contractor warrants and guarantees that ritle to Work, materiats and equipmen co v e r e ci by sn Applicati for Payment, whether 2oia2iis_i.DOC Page 12 . incorgorated in tHe Project or not, wil{ pass to the Client no later than the time of payment, free and cleaz of liens. A�tTICH.E lb PltO'I'ECT�ON OF PERSOIVS ANiD PROPER'Y'�' lb.l The Conlractor shall be solely responsible for, and neither KCDA, the Cl.ient, nor the A/E shall have responsibility for, atl aspects of safeiy, including initiating, maintaining, and supervising all safety precautions and programs in connection with Ihe performance of the Agreement. The Contractor shall take reasonable precautions for safety o� and shall provide reasonable protection to prevent damage, injury or loss to (I) employees on the Work and other persoas who may be affected thereby; (2} the Work and materials and equipment to be incorgorated. therein; and (3) other property at the site or adjacent thereto. 16.2 The Contractor shail give notices and comply with applicable laws, ordinances, rules, regul.ations and lawful orders of public authorities bearing on safety of persons and property and their protecrion from dam.age, injury, or loss. The Contxactor shall promptly remedy damage and loss to property at the site caused in whole or in part by the Contractor, a Subcontractor of any tier, or anyone directty or indirectly employed by any of them, or by anyone far whose acts they may be liable and for which the Contractor is responsible, except for damage or luss aUributabte to acts or omissions of KCDA, ihe Client, or A/E or by anyone for whose acts any of them may be liable, and not attributabie to the fault or negligence of the Contractor. The foregoing obligations of the ContracWr are in addition to the Contractor's obligations uncier Paragraph 10.12. 16.3 The Contractor shall not be required to perform without consent any QVork relating to asbestos or polychlorinated biphenyl ("PCB") unless specifically required by the Contract Documents. 16.4 The Contractar shatl bear the risk of any loss, damage or destruction vf its own property, including without tirnitation its tools, trailers and equipmeflt, whether rented or ow�eed, to the extent that they wilI not be incorporateci in the Work Any insurance provided by the Client wiil not cover any such loss, damage or destructi.on. AItTICLE 17 INSUIZANCE Al�ii) BO1�tIDS 17.1 Cootractor's Liabit�ty lnsurance. 17.1.1 T'he Contractor shalt purchase fiom and maintain during the life of th.is Agreement, at its own cost in a company or companies admitted to do business in the State of Washington, possessing a Best's policy halder's rating of A- or better and a financial rating of no Iess than VII, and reasonably acceptable to KCDA and the Client, an occurrence- based Commercial General Liability Insurance Policy which shall provide bodily injury and property damage liability on the Contractor's operations, including its Subcoutractors of any tier; owned, non-owned and. hired vehicles; and on work Agreement between Client and Contractor - Washington t1�e Contractor may subcontract or sublet to others; and on the indemnity provisians of this Agreement. This insurance wiil name KCDA and the Ciient and their employees as additional insareds per Additional Insured 4wner's (Form B) for Work performed under this Ageement The Contractor's policy shail be designated primary coverage for bath defense and indemnity, and any KCDA or Client po�icies excess. Such limits of liability insurance shall have per project general aggregate provisions and shall not be less than ihe followiag: .l $1,000,000 Combined Singie Limit protection for both bodily injury and property damage liability per occurrence and $2,000,000 general aggregate; .2 $1,000,000 per accideat for bodily injury liability including sickness, disease or death an.d property damage liability because of damage to or deswction of property of others, including loss of use thereof arising out of the operation of automobiles. 3$],OOd,tt00 for personal injury liability coverage included and definec� in the Commercial Generai Liability insurance policy for damages which are sustained by (1) a person as a result of an offense directly or indffectly related to empioyment of such person by the Contractor, or (2) by another person. .4 $1,000,000 for claims involving blanket contractual liability insurance {inclnded and defined in the Commercial General Liability Insurance Policy) applicable to ihe Contractor's obligations un.der Paragaph 1.0.12. .5 In addition, ihe Contra.ctar shall maintain a true umbrella policy that provides excess timits over the primary layer, in an amount not less than $2,000,000. 17.12 The insurance described above shal} include coverage for underground, collapse and explosion exposures. 17.1.3 In addition, the Contcactor shall purchase and maintain insurance for claims under wortters' compensation (industrial insw�ance), disa6ility benefit and other similar e�nployee benefit acts in the State statutory amount and Employer's Liabitity with coverage of at least $250,000/�500,000. 17.1.4 Before commencing the Work or exposure to .loss can occtv, and, in any event, within ten days after KCDA has issued its notice of intent to award contract, the Contractor shall fumish KCDA and the Client with Certificates of Insurance, in duplicate, as evidence of all insurance eequired by the Contract Documents. 17.1.5 Coverage shall be maintained without interruption from the daie of commencement of the Work until the date of Final Acceptance, except for any coverage rec�uired to be main.tained after Final Acceptance. Completed operations coverage shall remain in force for tivee yeazs after Final Acceptance. Zo�2a�is_�.00c Page 13 • 2 7.1.6 �f KGDA or the Client is damaged by the faiture of the Con�actor to maintain any of the above insurance or ta so notify KCDA and tbe Client, than the Contractor shall bear all costs property attributable thereto. KCDA MAY WITHHOLD PAYMENT PENDING RECEIPT OF ALL CBRTIFICATES OF INSURANCE. Failure to withhold payment shalt not constitute a waiver. 17.1.7 KCDA's spec�cation or approval of the insurance in this Agreement or of its amaunt shall not relieve or decrease the liability af the Contractor under the Contract Documents or otherwise. Coverages are the minimum to be provided and are not limitations af liability under the Contract, indemnification, or applicable law provisions. The Contractor �nay, at its expense, parchase larger coverage amounts or additional insurance. 17.2 Property Insurancc. 17.2. [ The requirements for praperiy insurance are addressed in Article 6 above. 1.7.3 Waivers of Subrogation. 17.3.1 KCDA, the Client, and the Contractor waive all rights against each other and any of their subconira.ctors of any tier, the A/E, their consultants, separate con.tractors described in Article 12 (if any), and any of their respective agents and employees, for damages caused by fire or oiher causes of loss to the extent covered by property "visurance obtained pursuant to Artic[es 6 and 17.2 or other property insurance appiicable ta t�e Work, except such rights as they bave to proceeds of such insurance held by the Client as fiduciary. KCDA and the Client do not waive theu subrogation rights to the extent of the Client's property insurance on structures or portions of structures that do not comprise the Worlc. A waiver of subrogation shall be effective as to a person or entity even though that person or entity wou.ld ot�►erwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in fhe property damaged. 17.4 PaymenY and Performance Bond. 17.4.1 The Contraetor is required to submit a bond secured from a surety company licensed to do business in the State of Washington. 1'he Contractor shall pay for a surety bond in the full amount of the Contract Svm plus sales tax, pursuant to RCW 39.08. Within seven days of enter�ng into the Agreement, th.e Cantractor shall deliver two copies of the bond to KCDA and one copy each ta the Client and the A/�. The price of the bond will be added to the total con�act amount to be paid by the Client. KCDA MAY DECLIAIE TO ENTER INTO THE C4NTRACT IF EVIDENCE OF BONDABILITY IS NOT REGEIVED, AND THE CLIENT MAY WITHH�LD ITS NOTICE TO PROCEED AND/OR WITHHOLD PAYA�ENT TO THE COAiTRACTOR UNTiL SUCH SURETY BOND IS RECEIVED. ARTICY.,E 18 CORI[�ECTION O� WORK ��.1 The Contaactor shall promptly and wi.thin at least fourteen (14) days of notice from the Client or KCDA correct Wortc rejected or failing to conform to t�e requirements of the Contract .Documents at any time through a period of one year from s�e date of Substantial Completion of the Agreement or by terms of a longer manufacturer's warranty or an applicable special warranty required by the Contract Documents. The provisions of this Artide apply to Vi/ork done by Subcontractors of any tiee as well as to Work done by direct employees of the Contractor. 18.2 If the Contractor fails to correct Work that is not in accordance with the requirements of the Contract Documents or fails to cany out the Work in accordance with the Contra�ct Documents, KCDA and/or the Client, by a written order, may order the Con�actor to stop the Worlc, or any gortion thereof, until the cause for such order has been eliminated. 18.3 Nothing contained in this Article shall be construed to estabtish a period of limitation with respect to other obligations which the Contractor might have under �e Contract Documents. Establishment of the time period of one yeaz as described above relates only to the specific obligation of the Contractor to correct the Work and has no reiationship to the time within which the abligarion to comply with the Contract Documents may be sought to be enf'orced, nor to die time within which proceedings may be commenced to establish the Contractor's IiabiIity with respect to the Contractor's obligations other than specifically to correct the Work. AD3TICLE 19 Ng6SCEL�,ANEOgTS PI20VISIONS 19.T Appl)cabte Law. The Agreement shall be governed by the laws of the State of Washington, without regard to its choice of law provisions. 19.2 Statutes. The Contractor sh.all abide by the provisions of ai1. applicable Washington statutes. The statutes referenced in the Contract Documents are not meant to be a complete list and should not be relied upan as such. 19.3 Cootractor Registration and Related itequireme�ts. Pursuant to RCW 39.06, the Contractor shali be registered or licensed as required by ti�e laws of the State of Washington, including but not limited to RCW 18.27. The Conlractor shall: have a current staie unified business identifier number; ha.ve industrial insuiance coverage for the Contractor's empioyees working in Washington as required in Title 51 RCW; have an employment security department number as requiced in Title 50 RCW; have a state excise tax registration number as required in Title 82 RCW, and; not he disqe�atified fram bidding on any public works contraet under RCW 39.06.010 (unregistered or unlicensed contractors} or RCW 39.12.065(3) (prevailing wage viola.tions). Agreement between Client and Contractor - Washington zo�2zs �s_i.DOC Page 14 , , 14.4 l.aw Agaanst Discrimination. Coniractor shall comply wit�► pertinent statutory provisions retating to public works of RCW 49.60. 19.5 Provisions for Aged and Handicapped Persons. Contractor sha.11 comply with pertinent statutory provisions relating to public works of RCW 70.92. 19.6 Safety Standards. Coniractor shall comply with pertinent provisions af Chapter 296-155 WAC, "Safety Standards for Canstrucrion Work." 19.7 Unemployment Compensation. Pursuant to RCW 50.24 in gen.eral and RCW 50.24.t3� in particular, the Contractor shall pay contnbutions for wages for personat services performed ander this Agreement or anar►ge far a bond aceeptable tp the commissioner. 19.8 IDrug-Frec Workplace. The Contractor and all Subcontractors shall fully comply with all applicable federal, state, and local laws and regulations regarding d�ug- free work�lace, incl.uding the Drug-Free Warkpiace Act of 198�. Any person nat fit far duty for any reason, including the use of alcohol, controlled suhstances, or drugs, shall itnmediatety be removed from the Work. 19.9 TobaccaFrce E�avironment. Smoking ar use of any kind of lighted pipe, cigar, cigarette or any other lighted smoking equipment, material or smokeless tobacco products is prohihited on all Client property. I9.10 Asbestos Removal. To the extent this Project involves asbestos removal, the Contractor shall comply with RCW 49.26 and any provisions of the Washington Administrative Code promulgated thereunder. 19. fl 1 �issign.�ent. The Contractor shall not let, delegate duties under, assign or transfer this Agreement, or any interest in it or part of it, without the prior written consent of KCDA and the Client. ARTICLE 20 TEItIdIIPiA7'ION OF'9'IE�E COiV"CRAC1' 2d.1. Termination !or Cause by Contractor. If KCDA fails to make payment for a period of 60 days through. n.o fault of the Contractor and has been given a{�proval by the Client, the Contractor may, upon seven additional days' written notice to KCDA, terminate the Agreement and recover from KCDA payment for all Work pmperl.y executed and for proven loss with respect to materials, equ'rpment, tools, and consttvction equipment and machinery, including Fees appiicable thereto. 20.2 Termin�Hon for Cause by Clien� The Client may, upon seven days' weitten notice to the Contractor, terminat,e (without prejudice to any right or remedy of KCDA or the Ciient) the whole or any portion of the Work for cause, including but not limited to the following circumstances: .1 the Contractor fails to prosecute the Work or any portion thereof with sufficient diligence to ensure the Completion ofthe Work within the Contract'Time; .2 the Gontractor is in material default of or materially breaches any provisions of this Agreement; .3 the Contracwr is adjudged bankrupt, makes a general assignment for the benefit of its creditors, or if a receiver is appointed on account of its insaivency; .4 the Contractor fails to supply a sufficient number of properiy skilled warkers or proper materials; .5 the Contractor fails to make prompt payment to Subcontracto.rs or for materials or labor; .6 the Contractor materially disregards laws, ordinances, rules, regulations or orders of any public authority having jurisdiction; or .7 the Contractor Eails to comply with the provisians of RCW 28A.400.330 by permitting a worker on the Project having contact with children wha has been convicted of or pled guilty to a felony crime involving children as described in Parag'aph 103. 2�.3 Termination for Convenience by Ctien� The Client may, at any time upon seven days' writxen notice to the Contractor, terminate (without prejud.ice to any right or remedy of the Client or KCDA) the whole or any portion of the Work for the convenience of KCDA and the Client. The Client shall be liable to Contractor only for diose costs reimbursable to Coniractor in accordance witl� the following: .1 'The amotmt due under Arti.cles 4 of this Ageement for the perfarmance of the Wark terntinated; .2 Other pre-approved costs, consistent with Paragraph 13.2, necessary and reasonably incurred in connection with the terminatian of Work. The total swn to be paid ta the Contractor under this Paragraph 203 shall not exceed the Contract Sum as reduced by the amount of payments otherwise made. 20.4 Effects of Terroination. 20.4.1 Unless the Client direets otherwise, after receipt of a Not�ce of Termination from the Client pursuant to Paragraph 20.2 or 20.3, the Goniractor shall promptly: .1 stop Work under the Agreement on the date and as specified in the Notice of Termination; .2 place no further orders or subcontracts for rnaterials, equipment, services or facilities, except as Ageement between Client and Contractor - Washington zo122iis_�.�oc Page l5 . may be hecessary for completiop of any portion of the Work that is not termir►ated; 3 pracure cancellation of all orders and subcontracts, upon terms acceptabte to t�e Client, to the extent that they rela.te to the performance of Work ternninated; .4 assi� to the Client al3 of. the right, title and interest of the Contractor under all orders and subcontracts, in which case the Client shall have the right, in its discretion, to settle oc pay any ot all claims arising out of the termination of such orders and subcontracts; .5 with the Client's approval, settle al.l outstanding liabilities and ai.l claims arising out of such termination of orders and subcontracts not assigned to the Client; .6 transfer title and deliver to t.�e entity or entities designated by die Client the fabricated or unfabricated parts, Work in process, partially completed supplies and equipment, materials, parts, tools, dies, jigs and other fixtt�res, completed Work, supplies and other material produced as part of, or acquired in connection with the performance of, the Work terminateci, and the compteted or partiatly completed plans, dxawings, information and other property related to the Rrork; .7 use its best efforts to sell any property of the types referred to in Subpatagtaph 20.4.1.6. The Contractor may acyuire any such property under the conditions prescn'bed by and at a price or prices appraved by the Ctient, and the proceeds of any such transfer or disposition may be applied in reduction of any payments to be made by the Clierit to the Contractor; .8 take such action as may be necessary or as directed by the Client to peeserve and protect the Work and property relatsd w this Project in the possession of ttie Contractor in which the Client has an interest; and .9 continue performance only to the extent not term'snated.. 20.4.2 In arrivin.g at any amoiu►t due the Contractor atter termination, the following deductions shall be made: .1 all unliquidated advance or other prior payments on account made to the Contractor appiicable to the terminated portian of the Agreement; .2 any claim which KCDA or the Client may have against the Contractor; .3 an amount necessary to protect KCDA and the Client against outstanding or potential liens or ctaims; and Agreement between Client and Contractor - Washington .4 the agreed price for or the proceeds of sale of any materials, supplies or other things acquired by the Contractor or sold, pnrsuant to the provisions of Subparagraph 20.4.1.7, and not otherwise recovered by or credited W KCDA. 20.4.3 If {and only ifl the termination pursuant to Paragraph 20.3 is partial, the Contractor may file a Claim for an eyuitable adjustment af the price or prices specified in the Agreement relating to the continued portion of the Ageement. The Contractor must assert any Claim for an equitable adjustment under tfiis subparagraph within twenty-one days from the effective date of the Termination. 20.4.4 'The Contractor shall refimd to KCDA any amounts KCDA paid to die Contracto.r in excess of costs reimbursable under Paragraph 20.3. 20.4.5 The damages and relief &om termination by the Client specifically provided in Article 20 shall t� the Contxactar's sole entitlement in the event of termination. 20.4.6 When this Agreement refers to a termination, it is understood that the termination is of this Agreement, the Purchase Order, and all relaf�ed contract documents. End of Section zoizz��s_t.�oc Page 16