Loading...
HomeMy WebLinkAbout4482 Vendor Subject Department Status Code Amount Begin Date End Date Review Date Insurance Comments Contract Number 4482 URS CORPORATION Pump Station 4 Redesign/Remodel - Project #416 Engineering PRO File Class LEG 12-1 $81963.00 03/03/2005 06/24/2005 02/15/2008 GL $ AL $ E&O $ Insurance Total $ Insurance Review Date Vault 01/01/2008 PROFESSIONAL SERVICES AGREEMENT Pump Station 4 Redesign/Remodel, Project No. 416 The City of Bremerton ("City") and URS Corporation ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated February 8, 2005, including any attachments thereto, attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.H. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto as Exhibit B; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $81,963.00. Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. BremertonlURS Pump Station 4 RedesignlRemodel Page 1 of6 IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement, except for that portion of the injuries and damages caused by the City's sole negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. BremertonlURS Pump Station 4 Redesign/Remodel Page 2 of6 I I I VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $2,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liabilitv insurance written on an occurrence basis with limits no less than $2,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and employer's liability; ami 3. Excess Liabilitv insurance with limits not less than $2,000,000 limit per occurrence and aggregate. 4. Professional Liability insurance with limits no less than $2,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a "claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject . any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. BremertonlURS Pump Station 4 Redesign/Remodel Page 3 of6 ----------- - VII. General Conditions: A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Seattle, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such . information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. D. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Seattle, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. BremertonlURS Pump Station 4 Redesign/Remodel Page 4 of6 F. Severability: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. G. Modification: This Agreement may only be modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Consultant Address City of Bremerton URS Corporation City Clerk Century Square 345 Sixth Street, Suite 600 1501 4th Avenue, Suite 1400 Bremerton, WA 98337-1873 Seattle, W A 98101-1616 I. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. 1. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. K. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attornevs' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. N. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, or disability, except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement shall remain in force until contract completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City BremertonlURS Pump Station 4 Redesign/Remodel Page 5 of6 of Bremerton for convenience. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non-performing Party does not commence correction ofthe failure of performance within thirty (30) days of the terminating Party's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. c~7#f CONSULTANT , ~y:C()y~ fJoz e w,nh ItS: J1ttyor Date: 'dwd.-/-05 A C R:\LEGAL\Contracts\FORMS\Professional Services Agreement Form (2003).doc BremertonlURS Pump Station 4 Redesign/Remodel Page60f6 EXHIBIT A .' CITY OF BREMERTON Design and Construction Services Pump Station 4 Redesign/Remodel Scope of Services, February 8, 2005 1.0 INTRODUCTION The purpose of this contract is to provide project: management services, design and construction documents, and limited construction phase services for the planned water Pump Station No.4 for the City of Bremerton. The contract includes performing the following projects: . Task 100: Project Management . Task 200: Water Pump Station NO.4 - Design, Bidding and Construction Services . Task 300: Additional Services 2.0 SCOPE OF SERVICES URS proposes to provide the scope of services detailed herein to perform the required geotechnical, structural, electrical, architectural, and instrumentation and control design professional services. We propose to include the following tasks as discussed with the City on January 18, 2005. Assumptions used in the preparation of this scope of services are presented in Section 3.0. TASK 100: PROJECT MANAGEMENT A. URS Responsibilities: 1. URS proposes to include an overall project management task to include preliminary review and project coordination, management of the subtasks, coordination of consultants, and contract management. 2. Invoicing Requirements a. Provide invoices for professional services to City at least monthly, with charges under this authorization itemized separately and organized by project task. b. Provide a brief, narrative status report that addresses each project task to the City with each invoice. Each invoice will show the dollar amount previously billed, amount being billed for that period, and total billed to date. c. Correspond on a regular basis with the City's project manager by telephone, e- mail, or in person until all work is completed and accepted by the City. . 3. Completion Schedule a. The City and URS will agree upon a milestone completion schedule for all work herein authorized. City of Bremerton Page 2 Pump Station 4 Redesign/Remodel - Scope of Services February 8, 2005 b. See Exhibit B for proposed project deliverable schedule B. Deliverable Products: 1. Monthly invoices for professional services. 2. Monthly reports. 3. Milestone Completion Schedule, when authorized. TASK 200: WATER PUMP STATION No.4 - DESIGN, BIDDING, and CONSTRUCTION SERVICES Task 201 : Design Services A. URS Responsibilities: 1. Prepare technical structural, electrical, architectural, and instrumentation and control specifications for Pump Station NO.4 in CSI format. 2. Prepare structural, electrical, architectural, and instrumentation and control drawings for a new Pump Station NO.4. 3. Conduct a geotechnical investigation of site subsurface soils. Investigation will include the digging of one test pit, collecting and analyzing soil samples from the test pit for characterization and structural design purposes, and preparation of a soils summary report. Soil samples will be analyzed in the URS soils laboratory. 4. Coordinate new electrical supply to the pump station with Puget Sound Energy and meet current IBC's. 5. Attend a design meeting prior to each submittal and a review meeting at the completion of the City's review of each submittal. Meetings to be conducted in Bremerton. B. City of Bremerton Responsibilities: 1. Provide backhoe and operator for the digging of the soil test pit. 2. Provide electronic drawings (in AutoCAD version 2002 or later) of preliminary pump station layout, including a surveyed site plan. 3. Provide survey and utility location information as needed for design and drawing completion. C. Deliverable Products: 1. 35% submittal of conceptual design and drawings for City review. URS will provide four half size drawing sets for City's review. 2. 65% submittal of design drawings and technical specifications for City review. URS will provide four half size drawing sets and specifications for City's review. 3. 90% submittal of design drawing sets and technical specifications. URS will provide four half size drawings sets and specifications for City's review. 4. Final submittal will include one full size and one half size reproducible set of drawings and one unbound copy of the technical specifications. At the final submittal URS will also provide an electronic (Auto CAD 2004) copy on CD of the final drawings and an electronic (Microsoft Word) copy on CD of the technical specifications. 5. Design calculations and supporting materials as may be necessary, or requested by the City for issuance of permits and approvals for construction. 6. Engineers construction cost estimate will be provided with the 90% and final submittals. ------------ City of Bremerton Page 3 Pump Station 4 Redesign/Remodel - Scope of Services February 8, 2005 Task 202: BIDDING AND CONSTRUCTION SERVICES A. URS Responsibilities: 1. Provide assistance to the City during the bid period for addenda issues regarding electrical, architectural, structural and instrumentation and control clarifications. 2. One URS representative attend the pre-construction conference with the Contractor and City of Bremerton representatives. 3. Conduct up to 2 site visits, when requested by the City. Provide copies of field reports to the City. 4. Review selected Contractor submittals and shop drawings as requested by the City for quality and compliance with design intent. The City will track all submittals that are reviewed, and will maintain a log of submittals to include dates received. 5. Review and respond in writing to Contractor's Requests for Information (RFI), as requested by the City. To the extent feasible, RFI responses will be electronically provided within 48 hours of receipt, followed with a hard copy response. 6. Assist with commissioning activities during project acceptance. Conduct final inspection with City staff to establish final punch .Iist. Verify submittal of specified warranties and coordinate warranty issues with the Contractor until transfer of this task to operations staff. B. Deliverable Products: 1. Field Reports - 1 copy for each site visit conducted. 2. RFI Reponses - 1 copy. 3. Addendum preparation, as needed. Task 300: ADDITIONAL SERVICES A. Additional project management, design, or construction support services as authorized in writing by the City of Bremerton. The total cost of additional services shall not exceed $10,000. 3.0 PROJECT ASSUMPTIONS The following assumptions are incorporated into the scope of services as presented by the City of Bremerton in our discussion with the City on January 18, 2005 and in follow-up phone and e-mail correspondence. 1. The term "final state of completion", used in relation to completion of designs and final bidding and construction documents, shall mean: A state of completion acceptable to the City, sealed and signed by a professional engineer registered in the State of Washington, and suitable for bidding and construction as a public work. 2. The City shall provide all available existing engineering drawings to URS in both digital and plotted formats; all other available documentation and calculations shall be provided to URS in the form currently available. 3. Surveying, utility locate information, and electronic site base map will be provided by the City. I City of Bremerton Page 4 Pump Station 4 Redesign/Remodel - Scope of Services February 8, 2005 4. URS will provide structural, architectural, electrical, and instrumentation and control drawings based on the City's preliminary layout. The City will develop all general, civil, plumbing, and mechanical drawings and specifications (including modeling and pump sizing and specification) and include URS'drawings to the design drawing package. 5. URS will provide the technical specifications necessary for the structural, electrical, architectural, and instrumentation and control work. The City will be responsible for all other specification sections, including cover and the overall compilation of the specifications. 6. The specification and drawing format will follow the format used for Pump Station 2A. 7. The City will be responsible for providing information and securing all necessary permits. 8. The City will be responsible for securing Department of Health project approval. 9. Record (as-built) drawings are not included. 10. The budget for the scope of services is based on URS providing a maximum of . 5 architectural drawings . 8 structural drawings . 5 electrical drawings . 2 instrumentation and control drawings r----- EXHIBIT B CITY OF BREMERTON Design and Construction Services Pump Station 4 Redesign/Remodel Project Schedule The design schedule for Pump Station NO.4 is presented below. The schedule is dependent on the coordination of design information between the City and URS. The dates are based on having a notice to proceed date of March 3, 2005. The dates shown are delivery dates to the City by close of business. . 35% Submittal: March 25, 2005 . 65% Submittal: April 29, 2005 (based on 35% submittal review meeting conducted no later than April 8, 2005) . 95% Submittal: June 1, 2005 (based on 65% submittal review meeting conducted no later than May 13, 2005) . Final Submittal: June 24, 2005 (based on 95% submittal review meeting conducted no later than June 10, 2005. Bidding support will be required during the month of August, 2005, and construction support will occur between September 2005 and March 2006. The terms of this agreement shall expire on December 31,2006. EXHIBIT C of Bremerton TASKS 1 AND 300 COST SUMMARY Pump Station No.4 Upgrades Design and Construction Assistance Services Total Direct Labor Total Other Total Task Description Hours Labor Multiplier Labor Direct Cost Cost Project Management 60 2280 2.8 $ 6,384 $ 40 $ 6,424 TOTAL TASK 100 60 $ 2,280 $ 6,384 $ 40 $ 6,424 .~_1II_ m~ . " 210 Design Completion 544 $ 16,626 2.8 46,553 $ 420 210 Instrumentation & Control Sub 220 Bidding Assistance 12 $ 399 2.8 $ 1,117 $ - 230 Construction Support 49 $ 1,975 2.8 $ 5,529 $ 40 TOTAL TASK 200 605 $ 19,000 $ 53,199 $ 460 ._.'''d''~__'\''''..l ,~~, \4< ~,iII iF ",\;,il%*"I]r~ " E"~'*:i_ ~'\~!i $ 10,000 TOTAL DESIGN AND CONSTRUCTION ASSISTANCE SERVICES $ 81,963 2/15/2005 URS CORPORATION ! ----------- - -- -- ---- ------- ---- - ----------------------- of Bremerton TASKS 100 AND 200 Pump Station No.4 Upgrades Design and Construction Assistance Services for Pump Station No.4 ...: ...: ...: ...: OJ '- OJ OJ C OJ Q) C C W c OJ W W w ro ro ~ ro c ..c ..c '- ro u u ::l ::l '- ::l :;E Q) Q) 1:5 1:5 1:5 ro 0 0 ::l ::l U ro 1:5 '- 2 Q) Q) U5 '- .C 0 U Q) (9 (9 U5 :.c 1:5 0 .~ "e' ...: ...: ...: ...: ~ Q) <( CL (f) """') (f) """') <( w <.) (3 Subtotals Task No. Description 38.00 42.00 25.00 38.50 27.00 38.00 45.00 25.00 20.00 Direct Rate . -.;" Project Management 44 44 Meetings at City (2 total) 16 16 Hours 60 60 Direct Labor Cost 2280 $ 2,280 O:D.C.'s (travel) 40 $ 40 ~\'i..~"'~'''''>m m~t' l< . . .", ".' ~ m ' 210 Design Completion Field Investigation & Analysis 4 28 Drawing completion to 100% 60 40 60 240 400 Specifications 8 8 8 16 40 Cost Estimate 2 2 2 6 QA/QC Review 4 4 4 4 16 Design Meeting (3ea @ 5hrs per) 10 5 5 5 25 Submittal Review Mtg. (3ea @ 5hrs per) 10 5 5 5 25 Hours 24 4 28 4 80 64 84 240 16 544 Direct Labor Cost 912 168 700 154 2160 2432 3780 6000 320 $ 16,626 O.D.C.'s (reproduction) $ 300 (travel) $ 120 220 Bidding Assistance Respond to Bidder Questions 2 2 2 2 4 12 Hours 2 2 2 2 4 12 Direct Labor Cost 76 77 76 90 80 $ 399 230 Construction Support Pre-Construction Conference 8 8 Site Visits (2 ea) 4 4 8 Respond to RFls (9 ea) 3 3 3 9 Submittal/Shop Dwg.Review 4 8 4 8 24 Hours 12 15 0 7 15 0 0 49 Direct Labor Cost 456 578 0 266 675 0 o $ 1,975 O.D.C.'s (travel) $ 40 SUMMARY Task 100 $ 2,280 Task 200 $ 19,000 Sub-Task 210 $ 16,626 Sub-Task 220 $ 399 Sub-Task 230 $ 1,975 TOTAL - PUMP STATION NO.4 - DIRECT LABOR $ 21,280 TOTAL -INSTRUMENTATION AND CONTROL SUBCONTRACTOR (TSI) $ 11,880 TOTAL O.D.C.'S $ 500 2/15/2005 URS CORPORATION CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 03/2112020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer riqhts to the certificate holder in lieu of such endorsement(s). PRODUCER Marsh Risk & Insurance Services CA License #0437153 633 W. Fifth Street, Suite 1200 Los Angeles, CA 90071 Attn: LosAngeles.CertRequest@Marsh.Com C N 101348564-ST N D-GA U E-20-21 INSURED AECOM URS Corporation dba URS Corporation Americas 600 Montgomery Street San Francisco, CA 94111 COVERAGES 12 oM%MMIVE® APR 0 6 202U City of Bremerton CERTIFICATE NUMBER: INsuRER A :ACE American Insurance ER B : N/A INSUR INsuRER c :Illinois Union Insurance Co INSURER E LOS-002151642-21 REVISION NUMBER: NAIC # 22667 N/A 27sso THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR POLICY NUMBER MM/DD/YYYY MM/DD/YYYY A X COMMERCIAL GENERAL LIABILITY HDO G7123311A 04/01/2020 04/01/2021 EACH OCCURRENCE $ 22000,000 DAMAGE TO TED CLAIMS -MADE � OCCUR -PREMISES (Ea occurrence) $ 11000,000 MED EXP (Any one person) $ 51000 PERSONAL & ADV INJURY $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 X POLICY ❑ PRO JECT ❑ LOC PRODUCTS - COMP/OP AGG $ 2,000,000 OTHER: $ A AUTOMOBILE LIABILITY ISA H25301730 04/01/2020 04/01/2021 COMBINED SINGLE LIMIT $ 2,000,000 Ea accident X ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON -OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS -MADE AGGREGATE $ DED I I RETENTION $ $ D WORKERS COMPENSATION SEE ACORD 101 04/01/2021 X PER OTH- AND EMPLOYERS' LIABILITY STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE YIN N/A E.L. EACH ACCIDENT $ 2,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L. DISEASE - EA EMPLOYEE $ 2,000,000 If yes, describe under 2,0001000 DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ C ARCHITECTS & ENG. EON G21654693 005 04/01/2020 nPef Claim/Agg 1,0002000 PROFESSIONAL LIAB. "CLAIMS MADE" Defense Included DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Re: City of Bremerton Pump Station 4 Redesign/Remodel, URS Project Number: 33757677. The City of Bremerton, its officers, officials, employees & agents are additional insureds for all coverage other than professional liability. Such insurance as is afforded for the additional insureds shall apply as primary insurance. Any other insurance maintained by the additional insureds or its officers and employees shall be excess only and not contributing on part of the additional insureds. CERTIFICATE HOLDER CANCELLATION The City of Bremerton CERTIFICATE HOLDER CANCELLATION The City of Bremerton SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Financial Services THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Attn: Cherie Henry ACCORDANCE WITH THE POLICY PROVISIONS. 345 Sixth Street, Suite 100 Bremerton, WA 98337-1873 AUTHORIZED REPRESENTATIVE of Marsh Risk & Insurance Services James L. Vogel <= ©1988-2016 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: CN101348564 LOC #: Los Angeles ACID ® ADDITIONAL REMARKS SCHEDULE Page 2 of 2 AGENCY NAMEDINSURED Marsh Risk & Insurance Services AECOM URS Corporation dba URS Corporation Americas POLICY NUMBER 600 Montgomery Street San Francisco, CA 94111 CARRIER NAIC CODE EFFECTIVE DATE: ACORD 101 (2008101) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD V �0 W Z w0 W ce III] 4 L In W0 low DWN Inl xZ W U) wJw Z0 FM 0 �U 3 m N n cL fir_ Sa�c°i al 3rn T] or��c oy°Ngm _n NN nCm 3.O OONa and nr c v:._a m m T rn Y Oy LCNO'L"d Om�Ona r �.am ��dp�S �ENcn m N N m O In G d � No ¢v�08.0� �:==ova - Gt mod_] O n c a m m ma �rn pi 10p mE c N—}'� �v � II L a L N G V� O O a .dG j C R M N d*' � N N� C N n 0 o 7' d 00 a 0 o u U a y Os,.T.G= N m ON N� a('N"ndm mL=_act c t6 a�n`L _ 1 N'nO L y y �Gm �° OIL Ctaflg = Fj O = N a= c m {UIl N'a r C N N ypN d M C u � NJJ` yrna � dt aNC � d3y <) o'ti=ad 4 v rn=NN C of POLICY INUMUMM MLIFU G7[ZOO I IA This endarserrreni modifres insurance prn�rided under the fr�ltowing. 915 �ndarsement Number 5 CC}it�MERCIAL GEi�ERAL LIABILITY GQVERACiE DART PRODUCTS/COMPLETED OPERATIONS LIA131LITY COVERAGE PART SCHEDULE . ........... w_.w ......_ s ...,_ t w_ w...._v..... _ . u _. vu� ....... . Name Of Additional Insured Persons} Or Qrnanization(s) Location And Description Of Completed Operationse� Any person or arganixation whom you have agreed to All locations when: you p€:rforni work for such additional include as an additional insured under a written insured pursuant to any such written contract. contract, provided such contract was executed prier to the date of lass. r f i i i ............_...__.._...... _ .._ .... _ _ _ _ _.. ...... ............. Information required to complete this Schedule, if not shown above, will be shown in the Declarations: A. Seotion it —1+�ho Is An Insured as amended to include as an additional insured the peraon(s} or organization(s) shown in the Schedule, but only with respect to liability for '"bodily injury" or „property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "productsecompleted operations hazard' However. 9. The insurance afforded to such additional A nsured only applies to the extent permitted by law; and 2 . If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured wilt not be broader than that which you are required by the contract or agreement to prrrvide for such additional insured. B. With respect ko the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: Ef coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement: or 2. Available under the applicabte Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20370413 1 Insurance Services Uiiice, Inc,, 2�'12 Page 1 of 1