Loading...
HomeMy WebLinkAbout06/25/2014 Special Meeting COUNCIL APPROWD CITY COUNCIL SPECIAL MEETING MINUTES JUL. 1 .1014 Wednesday, June 25, 2014 A Special Meeting of the City Council of the City of Bremerton was called for a Tour of Public Works & Utilities Projects and Facilities. The tour began in the Upper Parking Lot of the NORM DICKS GOVERNMENT CENTER, 345 6' Street, Bremerton, Washington, Wednesday, June 25, from 9:00 AM to 3:30 PM; and members of the public were provided an opportunity to participate. Council Members present were Mike Sullivan, Leslie Daugs, Jerry McDonald, and Dino Davis. The Itinerary was as follows: 9:00 a.m. Met in Norm Dicks Government Center, Upper Parking Lot 9:06 a.m. Sewer Lift Station EB3 (observed beach sewer locations; point out last year's Manette LID project enroute) 9:12 a.m. Enroute to Reservoirs 17 and 20, Ridge Lane. Trenton to 11 to Perry (TBD Overlay). Up Perry to Cascade Trail (TBD Slurry Sea[) back to Trenton (TBD Overlay Cascade Trail to Holman) to Sylvan to Petersville (limits of Water Utility) to Riddell past Pine to Vena and also discuss EB -9 9:30 a.m. Reservoirs 17 and 20, Ridge Lane 9:40 a.m. Enroute to East Side Treatment Plant via Central Valley Road / Tracyton / Lebo (discuss Tracyton sewer issues; vactor need); and stop at Pat Carey Vista to discuss seismic valves 9:55 a.m. East Side Treatment Plant (key facility for CSO program; demonstrate backup power) 10:15 a.m. Enroute to Boardwalk commercial facilities via Manette Bridge (discuss LWW / Washington Avenue projects / Manette Bridge ADA and $80 million investment — roundabout architectural entrance to Manette) 10:23 a.m. Ferry employee entrance: tour Boardwalk commercial facilities (tunnel backup power — demonstrate; tour grease interceptor; dumpsters) 10:43 a.m. Enroute to 11` /Ford via Burwell /Callow /Kitsap Way /Adele. discuss Tunnel at Park; Warren Avenue traffic island; Burwell bulbouts; signals and signal coordination 10:53 a.m. Sewer Manhole at 11 and Summit: discussion of old infrastructure and safety demonstration. Work zone setup; vactor on site. Observe depth /construction of manhole harness use 11:15 a.m. WB -3 (Shipyard pump station) 11:33 a.m. Enroute to Casad Dam (discuss Gorst sewer; water infrastructure) 11:50 a.m. Casad Dam (discuss watershed access and control) 12:05 p.m. Enroute to headworks facility (discuss water infrastructure) 12:10 p.m. Headworks facility (discuss surface water source vs groundwater) 12:20 p.m. Enroute to Advanced Disinfection Facility (lunch) 12:25 p.m. Advanced Disinfection (Ultraviolet) Facility (discuss wells) i City Council Special Meeting Minutes (PW Tour) Wednesday, June 25, 2014 9:00 AM to 3:30 PM Page 2 of 2 1:05 p.m. Enroute to Anderson Creek production wells; drive through biosolids facilities near Golf Course (discuss biosolids application) 1:25 p.m. Anderson Creek production wells 1:40 p.m. Enroute to Reservoir 4 via Anderson Hill Road (swing into Bayside Development; point out water service area; discuss intertie with Port Orchard water system 1:55 p.m. Reservoir 4 and Water System Corrosion Control Facility 2:10 p.m. Enroute to West Side Sewer Treatment Plant 2:15 p.m. West Side Sewer Treatment Plant 2:45 p.m. Enroute to Oyster Bay Facility 2:50 p.m. Oyster Bay main complex (yard space south side; demonstrate backup power; inside tour; plan going forward for Engineering) 3:10 p.m. Depart for Norm Dicks Government Center 3:25 p.m. Arrive at Norm Dicks Government Center, Upper Parking Lot With no further business, the Special Meeting ended at 3:30 PM. Prepared and Submitted by: L RI SMITH Legislative Assistant Attest: SHANNON CORIN, City Clerk GREG EELER, City Council President GW:SC. cg